WO2017110007A1 - 金型および金型の製造方法 - Google Patents

金型および金型の製造方法 Download PDF

Info

Publication number
WO2017110007A1
WO2017110007A1 PCT/JP2015/086590 JP2015086590W WO2017110007A1 WO 2017110007 A1 WO2017110007 A1 WO 2017110007A1 JP 2015086590 W JP2015086590 W JP 2015086590W WO 2017110007 A1 WO2017110007 A1 WO 2017110007A1
Authority
WO
WIPO (PCT)
Prior art keywords
mold
space area
stationary
sprue bush
cooling pipe
Prior art date
Application number
PCT/JP2015/086590
Other languages
English (en)
French (fr)
Inventor
阿部 諭
田中 健一
内野々 良幸
武 松本
武南 正孝
Original Assignee
パナソニックIpマネジメント株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニックIpマネジメント株式会社 filed Critical パナソニックIpマネジメント株式会社
Priority to US16/065,565 priority Critical patent/US11173641B2/en
Priority to CN201580085518.2A priority patent/CN108430730B/zh
Priority to PCT/JP2015/086590 priority patent/WO2017110007A1/ja
Priority to KR1020187017685A priority patent/KR102102586B1/ko
Priority to EP15911439.6A priority patent/EP3395536B1/en
Priority to JP2017536915A priority patent/JP6229868B1/ja
Publication of WO2017110007A1 publication Critical patent/WO2017110007A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/26Moulds
    • B29C45/27Sprue channels ; Runner channels or runner nozzles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/72Heating or cooling
    • B29C45/73Heating or cooling of the mould
    • B29C45/7312Construction of heating or cooling fluid flow channels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/26Moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/26Moulds
    • B29C45/27Sprue channels ; Runner channels or runner nozzles
    • B29C45/2737Heating or cooling means therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/26Moulds
    • B29C45/27Sprue channels ; Runner channels or runner nozzles
    • B29C45/2737Heating or cooling means therefor
    • B29C2045/2753Heating means and cooling means, e.g. heating the runner nozzle and cooling the nozzle tip

Definitions

  • the present disclosure relates to a mold and a method of manufacturing the mold.
  • the present disclosure relates to injection molds and methods of making injection molds.
  • the injection molding method is mainly a method in which a heat-melted resin is injected, injected into a mold, cooled, and solidified to obtain a molded product, and a large number of complex-shaped molded products are produced. Suitable for production.
  • the process of this injection molding method is roughly divided into a mold clamping process, an injection process, a cooling process, and a mold opening process. By repeating these steps, it becomes possible to continuously produce molded articles.
  • the injection mold comprises a movable mold, a stationary mold, and a sprue bush formed in the stationary mold.
  • the sprue bush has a sprue portion for injecting the molten resin into the cavity.
  • the volume per unit area of the sprue may be larger than the cavity. Therefore, the time required for the molten resin in the sprue to solidify is longer than the time required for the molten resin in the cavity to solidify. Therefore, even if the molten resin in the cavity solidifies, the mold can not be opened until the molten resin in the sprue solidifies.
  • the timing of opening the mold is early, problems occur in the drawing of the molten resin and the removal of the molded product. Therefore, it is necessary to delay the timing of opening the mold until the molten resin in the sprue part has completely solidified. Therefore, the molding time will be long.
  • a sprue bush having a coolant flow path for passing a coolant Patent Documents 1 and 2.
  • the inlet and the outlet of the coolant flow path of the sprue bush and the water pipe path for passing the coolant formed on the side of the stationary mold using a gun drill etc. are connected via (see Figure 7).
  • a gun drill or the like on the side of the stationary mold of the mold.
  • the O-ring is easily damaged.
  • a water pipe path is formed using a special tool such as a gun drill, maintenance in the water pipe path is difficult.
  • the cooling pipe is not directly connected to the inlet and the outlet of the coolant flow path, it is not easy to properly control the temperature.
  • the present invention shortens the molding cycle by efficiently cooling the molten resin passing through the sprue, and also facilitates the formation and maintenance of the water pipe route.
  • the purpose is to provide a method of manufacturing a mold.
  • a mold comprising a movable side mold, a fixed side mold, and a sprue bush provided with a coolant flow path provided in the fixed side mold,
  • Each of the inlet and outlet of the coolant channel is directly connected to a cooling pipe disposed along a space area formed in the fixed mold, and the space area is formed by the fixed mold
  • a mold is provided, characterized in that at least one of the surfaces has an open form.
  • a manufacturing method of a mold comprising a movable side mold, a fixed side mold, and a sprue bush provided with a coolant flow path provided in the fixed side mold, Opening at least one surface of the stationary mold, thereby forming a space area in the stationary mold; and disposing a cooling pipe along the space area formed in the stationary mold;
  • a method of manufacture is provided, comprising the step of direct connection with the inlet and outlet of the flow path.
  • the stationary mold since at least one surface of the stationary mold is open, it is possible to directly connect the inlet and the outlet of the coolant channel with the cooling pipe. it can. Therefore, since the temperature control of the coolant can be properly performed, the molten resin passing through the inside of the sprue can be cooled efficiently. Therefore, there is an advantage that the molding cycle can be shortened. Further, in the embodiment of the present invention, since at least one surface of the stationary mold is opened, the surface of the stationary mold can be easily cut, and the degree of freedom of cutting can be increased. Therefore, it has the advantage of facilitating maintenance in the space area.
  • FIG. 1A is a partial schematic cross-sectional view of an injection mold according to an embodiment of the present invention.
  • FIG. 1B is a photographic view of a sprue bush of a component of an injection mold according to an embodiment of the present invention.
  • FIG. 1C is a schematic perspective view of a sprue bush provided with a coolant flow passage inside.
  • FIG. 2A is a partial schematic perspective view of an injection mold according to an embodiment of the present invention.
  • FIG. 2B is a partial schematic perspective view of the stationary-side mounting plate of the component of the injection molding mold according to the embodiment of the present invention and the stationary-side template outline being separated.
  • FIG. 1A is a partial schematic cross-sectional view of an injection mold according to an embodiment of the present invention.
  • FIG. 1B is a photographic view of a sprue bush of a component of an injection mold according to an embodiment of the present invention.
  • FIG. 1C is a schematic perspective view of a sprue bush provided with a
  • FIG. 3A is a partial schematic cross-sectional view of the injection mold of the present invention when the space area is formed in the lower side of the fixed mounting plate.
  • FIG. 3B is a partial schematic cross-sectional view of a mold for injection molding according to an embodiment of the present invention when the space area is formed in the upper side portion of the stationary mold plate.
  • FIG. 3C is a partial schematic cross-sectional view of an injection mold according to an embodiment of the present invention where the space area is formed in the lower side of the stationary template.
  • FIG. 3D is a partial schematic cross-sectional view in the case where the space area is formed between a part of the lower side of the fixed side mounting plate and a part of the upper side of the fixed side template.
  • FIG. 3E shows the case where the space area for providing the suction side cooling pipe is formed in the upper side of the fixed side mounting plate, and the space area for providing the discharge side cooling pipe is formed in the lower side of the fixed side mold board.
  • FIG. 1 is a partial schematic cross-sectional view of an injection mold according to an embodiment of the present invention.
  • FIG. 4A shows a portion of an injection mold according to an embodiment of the present invention when the cooling pipe is directly connected to the inlet and the outlet of the coolant flow passage exposed on the main surface of the flange portion. It is a schematic sectional view.
  • FIG. 4B is for injection molding according to an embodiment of the present invention when the cooling pipe is directly connected to the inlet and the outlet of the coolant flow passage exposed on the surface facing the main surface of the flange.
  • FIG. 4C It is a partial schematic sectional view of a mold.
  • the cooling pipe on the suction side is directly connected to the inlet of the cooling fluid flow path exposed on the main surface of the flange portion, and the cooling flow path on the discharge side is exposed on the side surface of the sprue bush base
  • FIG. 6 is a partial schematic cross-sectional view of an injection mold according to an embodiment of the present invention when it is directly connected to the outlet portion of the present invention.
  • FIG. 4D the cooling pipe on the suction side is directly connected to the inlet of the coolant flow passage exposed on the main surface of the flange, and the cooling pipe on the discharge side is exposed on the surface facing the main surface of the flange FIG.
  • FIG. 10 is a partial schematic cross-sectional view of an injection mold according to an embodiment of the present invention when it is directly connected to the outlet portion of the coolant flow channel.
  • the cooling pipe on the suction side is directly connected to the inlet of the coolant channel exposed on the side surface of the flange, and the cooling pipe on the discharge side is exposed on the surface facing the main surface of the flange
  • FIG. 6 is a partial schematic cross-sectional view of an injection mold according to an embodiment of the present invention when it is directly connected to the outlet of the liquid flow path.
  • FIG. 5A is a schematic plan view of an injection mold according to an embodiment of the present invention when the inlet and the outlet of the coolant flow channel are provided on both sides of the sprue bush so as to face each other.
  • FIG. 5B is a schematic plan view of an injection mold according to an embodiment of the present invention in which both the inlet and the outlet of the coolant channel are provided on one side of the sprue bush.
  • FIG. 5C is a schematic plan view of an injection mold according to an embodiment of the present invention in the case where a flexible hose is used for a suction pipe provided on the space area and a cooling pipe provided on the discharge side.
  • FIG. 6A is a schematic perspective view showing a form in which a part of the surface of the stationary mold is opened.
  • FIG. 6B is a schematic perspective view showing a form in which one surface of the stationary mold is continuously opened from the other surface.
  • FIG. 6C is a schematic perspective view when the space area has the form of a gap formed between two sub-molds constituting the stationary-side mold.
  • FIG. 6D is a schematic perspective view when the space area has a form of a gap formed between three sub-molds constituting the stationary mold.
  • FIG. 7 is a partial schematic cross-sectional view of a conventional injection mold.
  • FIG. 8A is a molding cycle diagram for obtaining a molded product using an injection mold according to an embodiment of the present invention.
  • FIG. 8B is a molding cycle diagram for obtaining a molded article using a conventional injection mold.
  • FIG. 8C is a photographic view of a sprue runner obtained by an injection mold according to an embodiment of the present invention.
  • FIG. 8D is a photographic view of a sprue runner obtained by a conventional injection mold.
  • FIG. 9A is a molding cycle diagram for obtaining a molded product using an injection mold according to an embodiment of the present invention.
  • FIG. 9B is a molding cycle diagram for obtaining a molded article using a conventional injection mold.
  • FIG. 9C is a schematic perspective view showing a temperature distribution area of the sprue bush.
  • FIG. 10 is an exploded perspective view of an injection mold according to an embodiment of the present invention.
  • FIG. 1A is a partial schematic cross-sectional view of an injection mold 1 according to an embodiment of the present invention.
  • the injection mold 1 according to an embodiment of the present invention includes a stationary mold 2 and a sprue bush 3 formed in the stationary mold 2.
  • the sprue bush 3 is composed of a sprue bush base 4 and a flange portion 5 integrated with the sprue bush base 4 as shown in FIG. 1B. Further, the sprue bush 3 has a sprue portion 6 for injecting a molten resin into a cavity formed by the movable side mold and the stationary side mold 2 and a coolant flow path.
  • FIG. 1A is a partial schematic cross-sectional view of an injection mold 1 according to an embodiment of the present invention.
  • the injection mold 1 according to an embodiment of the present invention includes a stationary mold 2 and a sprue bush 3 formed in the stationary mold 2.
  • the sprue bush 3 is composed of a sprue bush base 4 and a f
  • the cooling fluid flow path 7 is provided so that the periphery of the sprue part 6 may be surrounded.
  • the stationary mold 2 has a stationary mounting plate 8 and a stationary mold plate 9.
  • the cooling pipe 10 for passing the cooling water through the side surface of the flange portion 5 of the sprue bush 3 In fact, it is directly connected via a female screw.
  • the joining member 15 is not limited to the female screw, and may be a male screw or a cooling joint 16.
  • the cooling pipe 10 is directly connected to the inlet 11 and the outlet 12 of the coolant flow passage exposed on both side surfaces of the flange 5.
  • the inlet portion 11 and the outlet portion 12 of the coolant flow channel are provided on both sides of the sprue bush 3 so as to face each other.
  • the space area 14 is preferably perpendicular to the extending direction of the sprue portion 6 which is a component of the sprue bush 3.
  • the cooling pipe 10 is provided along the groove portion 13 formed in the upper side portion of the fixed side mounting plate 8.
  • the sprue bush injection port side is the fixed side mounting plate 8, that is, the "lower side" of the fixed side mold 2
  • the side facing the sprue bush injection port is the fixed side mounting plate 8, that is, the fixed side metal.
  • the cooling pipe 10 is provided along the space area 14 having a form in which a part of the surface of the upper side portion of the fixed side mounting plate 8 is opened.
  • FIG. 2B after the cooling pipe 10 is provided along the groove 13 formed in the upper side portion of the fixed side mounting plate 8, the fixed side mounting plate 8 and the fixed side mold plate 9 are joined. .
  • FIG. 10 first, cooling pipes 10 connected to both side surfaces of the sprue bush 3 and the flange portion 5 of the sprue bush 3 are provided along the groove 13 formed in the upper side of the fixed side mounting plate 8. .
  • the cooling pipe 10 Since the cooling pipe 10 is directly connected to the inlet portion 11 and the outlet portion 12 of the coolant flow channel, temperature control of the coolant can be more accurately performed. Therefore, the molten resin passing through the inside of the sprue portion 6 can be efficiently cooled, and the molding cycle can be shortened. Thereby, the production efficiency of the obtained molded article can be improved. Further, since the cooling pipe 10 is provided along the space area 14 formed in the upper side portion of the fixed side mounting plate 8, the cooling pipe 10 can be visually confirmed from the outside. Therefore, it is easy to cut the surface of the fixed side mounting plate 8, that is, the fixed side mold 2, and the degree of freedom of cutting can be increased. That is, it is easy to access the cooling pipe 10. This has the advantage of facilitating maintenance within the space area 14.
  • the cooling pipe 10 described above is (1) directly connected to the inlet 11 and the outlet 12 of the coolant channel, (2) the space formed in the upper side of the fixed side mounting plate 8 It is characterized in that it is provided along the region 14.
  • the injection molding die 1 of the present invention is not limited to the above embodiment, and as shown by the broken line in FIG. 1A, the cooling pipe 10 includes the upper side portion and lower side portion of the fixed side mounting plate 8 and the fixed side mold. It may be configured on the upper side or lower side of the plate 9.
  • the space area 14 may be formed in the lower side of the fixed side mounting plate 8 as shown in FIG. 3A.
  • the space area 14 may be formed in the upper side portion of the fixed side mold plate 9 as shown in FIG. 3B.
  • the space area 14 may be formed in the lower side of the stationary mold plate 9 as shown in FIG. 3C.
  • the space area 14 may be formed between a part of the lower side of the fixed side mounting plate 8 and a part of the upper side of the fixed side mold plate 9 as shown in FIG. 3D. That is, the space area 14 does not necessarily have to be formed in a part of one member, but may be formed in at least two members.
  • the space area 14 for providing the cooling pipe 10 on the suction side and the space area 14 for providing the cooling pipe 10 on the discharge side do not have to be flush with each other.
  • the space area 14 for providing the suction side cooling pipe 10 is formed in the upper side portion of the fixed side mounting plate 8 and the space area 14 for providing the discharge side cooling pipe 10 is the fixed side mold plate 9. May be formed in the lower side of the Moreover, this may be reversed.
  • the space area 14 can be freely defined by milling, the space area 14 can be extended in a non-linear manner. Therefore, a flexible member, such as a flexible hose, can be used as the cooling pipe 10 provided along the space area 14. Thereby, the interference part of a mold base can be avoided. Further, since it is possible to use a flexible member as the cooling pipe 10, the degree of freedom of the arrangement form can be increased.
  • the cooling pipe 10 may be directly connected to the inlet portion and the outlet portion of the coolant flow passage exposed on the main surface of the flange portion 5 as shown in FIG. 4A. That is, the cooling pipe 10 has a non-linear form instead of a linear form.
  • the cooling pipe 10 may be directly connected to the inlet and the outlet of the coolant flow passage exposed on the surface facing the main surface of the flange 5 as shown in FIG. 4B. Further, as shown in FIG.
  • the cooling pipe 10 on the suction side is directly connected to the inlet 11 of the coolant flow passage exposed on the main surface of the flange 5, and the cooling pipe 10 on the discharge side is a sprue bush It may be directly connected to the outlet 12 of the coolant channel exposed on the side of the base 4. Also, the reverse is possible. Further, the cooling pipe 10 on the suction side is directly connected to the inlet 11 of the coolant flow passage exposed to the main surface of the flange 5 as shown in FIG. 4D, and the cooling pipe 10 on the discharge side is a flange It may be directly connected to the outlet portion 12 of the coolant flow channel exposed to the surface facing the main surface 5. Also, the reverse is possible.
  • cooling pipe 10 on the suction side is directly connected to the inlet 11 of the coolant flow passage exposed on the side surface of the flange 5 as shown in FIG. 4E, and the cooling pipe 10 on the discharge side is flange 5 It may be directly connected with the outlet part 12 of the coolant channel exposed on the surface opposite to the main surface of the. Also, the reverse is possible.
  • the space area 14 is formed to reach the vicinity of the injection port of the sprue bush 3.
  • the molten resin in the vicinity of the injection port of the sprue bush 3 can be solidified quickly, so that the timing for opening the mold can be made earlier. Therefore, the molding time can be further shortened, and the production efficiency of the obtained molded product can be further improved.
  • the inlet portion 11 and the outlet portion 12 of the coolant flow passage do not necessarily have to be provided on both side surfaces of the sprue bush 3 so as to be opposed to each other. That is, the inlet portion 11 and the outlet portion 12 of the coolant channel may be provided at any position on the side surface of the sprue bush 3.
  • both the inlet 11 and the outlet 12 of the coolant channel may be provided on one side of the sprue bush 3.
  • a flexible hose 17 can be used for the suction or discharge side cooling pipe 10 provided along the space area 14. Thereby, the interference part 18 of mold bases, such as a pin, can be avoided.
  • a flexible hose 17 may be used for any of the suction side and discharge side cooling pipes 10 provided along the space area 14.
  • each space region 14 described above has a form in which a part of the surface of the fixed side mounting plate 8 or the fixed side mold plate 9, ie, the fixed side mold 2 is opened.
  • the space area 14 is not limited to this, and may have a form which is continuously opened from one surface of the fixed mold 2 to the other surface as shown in FIG. 6B, for example.
  • the space area 14 may have a form of a gap formed between two sub-molds 21 constituting the stationary-side mold 2.
  • the space area 14 may have the form of a gap formed between the three sub-molds 21 constituting the stationary-side mold 2.
  • the space area 14 may have a form of a gap formed between four or more sub-molds 21 constituting the stationary-side mold 2.
  • Example 1 Molded articles were obtained under the following conditions. Resin material: PPWW567w3952 Mold: (dimensions) 300mm x 500mm x 345mm / (mass) 403kg Molding machine: Nissei ES 2000
  • the cooling time of the molten resin can be shortened from 13 s to 8 s, as compared with the conventional mass-produced mold, As a result, the molding cycle could be shortened to 25.7% (35 s to 26 s) as a whole.
  • the cooling temperature of the molten resin is appropriately controlled to sufficiently cool the molten resin as shown in the photograph of FIG. 8C.
  • the sprue runner was in good condition as it was done.
  • the cooling temperature of the molten resin can not be properly controlled, and the cooling of the molten resin is insufficient. It could not be molded continuously.
  • Example 2 As shown in FIGS. 9A and 9B, in the injection mold 1 according to an embodiment of the present invention, the cooling time of the molten resin can be shortened from 39 s to 25 s, as compared with the conventional mass-produced mold, As a result, the molding cycle could be shortened to 30.8% (65 s to 45 s) as a whole.
  • the molten resin can be sufficiently cooled by appropriately controlling the cooling temperature of the molten resin, so that the phenomenon of sprue elongation occurs. It was not.
  • temperature analysis of the sprue bush 3 was performed during the cooling process, as shown in FIG. 9C, the temperature in the vicinity of the sprue bush injection port was cooled sufficiently more than other parts of the sprue bush. I understand.
  • the cooling temperature of the molten resin can not be properly controlled, and the cooling of the molten resin is insufficient. Therefore, it could not be continuously molded because it was caught at the time of mold opening.
  • First aspect A mold comprising: a movable side mold; a fixed side mold; and a sprue bush provided with a coolant flow path provided in the fixed side mold, Each of the inlet and the outlet of the coolant channel is directly connected to a cooling pipe disposed along a space area formed in the stationary mold; A mold, wherein the space area has a form in which at least one surface of the stationary mold is open.
  • Second aspect The mold according to the first aspect, wherein the space area has a form of a groove provided on a surface of the stationary mold.
  • Third aspect In the first aspect, the space region has a form in which the one surface of the stationary mold is continuously opened from the other surface.
  • the mold comprises at least two sub-molds, A mold, characterized in that the space area has the form of a gap formed between the at least two sub-molds.
  • the stationary mold is composed of a stationary mounting plate and a stationary template. The space area is characterized by being formed on at least one of the upper surface and the lower surface of the fixed side mounting plate and / or at least one of the upper surface and the lower surface of the fixed side template. ,Mold.
  • the inlet and the outlet of the coolant channel are provided at an arbitrary position on the side surface of the sprue bush. Type.
  • the mold is characterized in that the inlet portion and the outlet portion of the coolant flow channel are provided to be opposed to each other on both side surfaces of the sprue bush.
  • the mold is characterized in that both the inlet portion and the outlet portion of the coolant flow channel are provided on one side surface of the sprue bush.
  • Ninth aspect The mold according to any one of the first to eighth aspects, wherein the cooling pipe has flexibility.
  • the cooling pipe has a form of a flexible hose.
  • the space area has a form extending in a non-linear manner.
  • the sprue bush includes a sprue portion, and the space region extends in a direction orthogonal to the extension direction of the sprue portion.
  • the space region extends in a direction orthogonal to the extension direction of the sprue portion.
  • the space area is provided to reach the vicinity of the sprue bush injection port.
  • the inlet and the outlet of the coolant channel are connected via at least one joining member selected from the group including an external thread, an internal thread, and a cooling joint. The mold is characterized by being directly connected to the cooling pipe.
  • a method of manufacturing a mold comprising a movable side mold, a fixed side mold, and a sprue bush provided with a coolant flow path provided in the fixed side mold, Opening at least one surface of the stationary mold, thereby forming a space area in the stationary mold; and arranging a cooling pipe along the space area formed in the stationary mold.
  • a manufacturing method characterized in that it comprises the step of direct connection with the inlet and the outlet of the coolant channel.
  • the mold according to an embodiment of the present invention can be used as a mold for injection molding.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

本発明は、可動側金型と、固定側金型と、固定側金型内に設けられた冷却液流路を備えたスプルブッシュと、を有して成る金型であって、冷却液流路の入口部および出口部のそれぞれが、固定側金型に形成された空間領域に沿って配置された冷却管と直接的に接続されており、および、空間領域は、固定側金型の少なくとも一方の表面が開口した形態を有していることを特徴とする。

Description

金型および金型の製造方法
 本開示は金型および金型の製造方法に関する。具体的には、本開示は射出成形用金型および射出成形用金型の製造方法に関する。
 日本の「ものづくり」産業を支えてきた技術の一つに、金型を用いた成形技術がある。この成形技術として、加圧成形法、射出成形法、押出成形法、注形法等が挙げられる。これら成形法のうち、射出成形法は、主として、加熱溶融させた樹脂を金型内に射出注入し、冷却し、固化させる事によって成形品を得る方法であり、複雑な形状の成形品を大量に生産するのに適している。この射出成形法の工程は、大きく分けて型締め工程、射出工程、冷却工程、および型開き工程から構成される。これら工程を繰り返すことで、成形品を連続的に生産することが可能となる。
WO2008/038694号公報 WO2010/082331号公報
 射出成形用金型は、可動側金型、固定側金型、および固定側金型内に形成されたスプルブッシュを有して成る。スプルブッシュは、溶融樹脂をキャビティ内に注入するためのスプル部を有して成る。スプル部の単位面積当たりの容積はキャビティよりも大きい場合がある。それ故、スプル部内の溶融樹脂が固化するまでに要する時間は、キャビティ内の溶融樹脂が固化するまでに要する時間よりも長い。それ故、キャビティ内の溶融樹脂が固化しても、スプル部内の溶融樹脂が固化するまで金型を開くことができない。又、金型を開くタイミングが早いと、溶融樹脂の糸引きや成形品の取り出しに問題が生じる。それ故、スプル部内の溶融樹脂が完全に固化するまで金型を開くタイミングを遅くする必要がある。従って、成形時間が長くなってしまう。
 そこで、スプル部内の溶融樹脂を固化させる時間を短くするため、冷却液を通すための冷却液流路を有したスプルブッシュが開示されている(特許文献1、2)。このスプルブッシュを含む金型では、スプルブッシュの冷却液流路の入口部および出口部と、固定側金型の側面にガンドリル等を用いて形成した冷却液を通すための水管経路とをOリングを介して接続させている(図7参照)。しかしながら、金型の固定側金型の側面にガンドリル等の特殊工具を用いて水管経路を形成することは容易ではない。又、モールドベースに孔加工されている場合にも水管経路を形成することは容易ではない。又、冷却液として高温冷媒を用いると、Oリングが傷みやすい。又、ガンドリル等の特殊工具を用いて水管経路を形成した場合、水管経路内のメンテナンスが困難である。又、冷却液流路の入口部および出口部と冷却管とを直接的に接続しないため、温度コントロールを的確に行うことが容易ではない。
 従って、本発明は、上記課題を解消するために、スプル部内を通る溶融樹脂を効率的に
冷却することにより成形サイクルを短縮させ、又、水管経路の形成およびメンテナンスを容易にする金型および金型の製造方法を提供することを目的とする。
 上記の目的を達成するために、本発明では、
 可動側金型と、固定側金型と、固定側金型内に設けられた冷却液流路を備えたスプルブッシュと、を有して成る金型であって、
 冷却液流路の入口部および出口部のそれぞれが、固定側金型に形成された空間領域に沿って配置された冷却管と直接的に接続されており、および
 空間領域は、固定側金型の少なくとも一方の表面が開口した形態を有していることを特徴とする、金型が供される。
 又、上記の目的を達成するために、本発明の一実施形態では、
可動側金型と、固定側金型と、固定側金型内に設けられた冷却液流路を備えたスプルブッシュと、を有して成る金型の製造方法であって、
 固定側金型の少なくとも一方の表面を開口させ、それによって、固定側金型に空間領域を形成する工程、および
 固定側金型に形成した空間領域に沿って冷却管を配置して、冷却液流路の入口部および出口部と直接的に接続させる工程を含んで成ることを特徴とする、製造方法が供される。
 本発明の一実施形態では、固定側金型の少なくとも一方の表面が開口した形態を有しているため、冷却液流路の入口部および出口部と冷却管とを直接的に接続させることができる。それ故、冷却液の温度コントロールを的確に行うことができるため、スプル部内を通る溶融樹脂を効率的に冷却することができる。従って、成形サイクルを短縮させることができる利点を有する。又、本発明の一実施形態では、固定側金型の少なくとも一方の表面が開口した形態を有しているため、固定側金型の表面を切削し易く、切削自由度を上げることができる。それ故、空間領域内のメンテナンスが容易となる利点を有する。
図1Aは、本発明の一実施形態に係る射出成形用金型の部分概略断面図である。 図1Bは、本発明の一実施形態に係る射出成形用金型の構成要素のスプルブッシュの写真図である。 図1Cは、内部に冷却液流路を備えたスプルブッシュの概略斜視図である。 図2Aは、本発明の一実施形態に係る射出成形用金型の部分概略斜視図である。 図2Bは、本発明の一実施形態に係る射出成形用金型の構成要素の固定側取付板と固定側型板概略とが離れている際の部分概略斜視図である。 図3Aは、空間領域が固定側取付板の下側部内に形成されている場合の本発明の射出成形用金型の部分概略断面図である。 図3Bは、空間領域が固定側型板の上側部内に形成されている場合の本発明の一実施形態に係る射出成形用金型の部分概略断面図である。 図3Cは、空間領域が固定側型板の下側部内に形成されている場合の本発明の一実施形態に係る射出成形用金型の部分概略断面図である。 図3Dは、空間領域が固定側取付板の下側部の一部と固定側型板の上側部の一部との間に形成されている場合の部分概略断面図である。 図3Eは、吸入側の冷却管を設ける空間領域が固定側取付板の上側部内に形成され、排出側の冷却管を設ける空間領域が固定側型板の下側部内に形成されている場合の本発明の一実施形態に係る射出成形用金型の部分概略断面図である。 図4Aは、冷却管がフランジ部の主面に露出した冷却液流路の入口部および出口部と直接的に接続されている場合の本発明の一実施形態に係る射出成形用金型の部分概略断面図である。 図4Bは、冷却管がフランジ部の主面に対向する面に露出した冷却液流路の入口部および出口部と直接的に接続されている場合の本発明の一実施形態に係る射出成形用金型の部分概略断面図である。 図4Cは、吸入側の冷却管がフランジ部の主面に露出した冷却液流路の入口部と直接的に接続され、排出側の冷却管がスプルブッシュ基部の側面に露出した冷却液流路の出口部と直接的に接続されている場合の本発明の一実施形態に係る射出成形用金型の部分概略断面図である。 図4Dは、吸入側の冷却管がフランジ部の主面に露出した冷却液流路の入口部と直接的に接続され、排出側の冷却管が、フランジ部の主面に対向する面に露出した冷却液流路の出口部と直接的に接続されている場合の本発明の一実施形態に係る射出成形用金型の部分概略断面図である。 図4Eは、吸入側の冷却管がフランジ部の側面に露出した冷却液流路の入口部と直接的に接続され、排出側の冷却管がフランジ部の主面に対向する面に露出した冷却液流路の出口部と直接的に接続されている場合の本発明の一実施形態に係る射出成形用金型の部分概略断面図である。 図5Aは、冷却液流路の入口部および出口部がスプルブッシュの両側側面に相互に対向するように設けられている場合の本発明の一実施形態に係る射出成形用金型の概略平面図である。 図5Bは、冷却液流路の入口部および出口部の双方がスプルブッシュの片側側面に設けられている場合の本発明の一実施形態に係る射出成形用金型の概略平面図である。 図5Cは、空間領域に沿って設ける吸入側又は排出側の冷却管にフレキシブル・ホースを用いた場合の本発明の一実施形態に係る射出成形用金型の概略平面図である。 図6Aは、固定側金型の表面の一部が開口した形態を示す概略斜視図である。 図6Bは、固定側金型の一方の表面から他方の表面まで連続的に開口した形態を示す概略斜視図である。 図6Cは、空間領域が固定側金型を構成する2つのサブ金型の間に形成された間隙部の形態を有している際の概略斜視図である。 図6Dは、空間領域が固定側金型を構成する3つのサブ金型の間に形成された間隙部の形態を有している際の概略斜視図である。 図7は、従来の射出成形用金型の部分概略断面図である。 図8Aは、本発明の一実施形態に係る射出成形用金型を用いて成形品を得るための成形サイクル図である。 図8Bは、従来の射出成形用金型を用いて成形品を得るための成形サイクル図である。 図8Cは、本発明の一実施形態に係る射出成形用金型により得られたスプル・ランナーの写真図である。 図8Dは、従来の射出成形用金型により得られたスプル・ランナーの写真図である。 図9Aは、本発明の一実施形態に係る射出成形用金型を用いて成形品を得るための成形サイクル図である。 図9Bは、従来の射出成形用金型を用いて成形品を得るための成形サイクル図である。 図9Cは、スプルブッシュの温度分布域を示した概略斜視図である。 図10は、本発明の一実施形態に係る射出成形用金型の分解斜視図である。
 以下、本発明の一実施形態に係る射出成形用金型1の実施形態について説明する。
 図1Aは、本発明の一実施形態に係る射出成形用金型1の部分概略断面図である。本発明の一実施形態に係る射出成形用金型1は、固定側金型2と固定側金型2内に形成されたスプルブッシュ3とを有して成る。スプルブッシュ3は、図1Bに示すように、スプルブッシュ基部4および該スプルブッシュ基部4と一体化したフランジ部5から構成されている。又、スプルブッシュ3は、その内部に可動側金型および固定側金型2により形成されるキャビティ内に溶融樹脂を注入するためのスプル部6および冷却液流路を有して成る。なお、図1Cに示すように、冷却液流路7は、スプル部6の周縁を取り囲むように設けられている。又、固定側金型2は、固定側取付板8および固定側型板9を有して成る。又、本発明の一実施形態に係る射出成形用金型1では、更に、図1Aに示すようにスプルブッシュ3のフランジ部5の側面に冷却水を通す冷却管10が、接合部材15、具体的には雌ねじを介して直接的に接続されている。なお、接合部材15は雌ねじに限定されず、雄ねじや冷却ジョイント16であってよい。具体的には、冷却管10が、フランジ部5の両側側面に露出した冷却液流路の入口部11および出口部12と直接的に接続されている。すなわち、冷却液流路の入口部11および出口部12が、スプルブッシュ3の両側側面に相互に対向するように設けられている。又、図1Aに示すように、空間領域14は、スプルブッシュ3の構成要素であるスプル部6の延在方向に対して垂直であることが好ましい。又、図2Aに示すように、冷却管10は、固定側取付板8の上側部内に形成された溝部13に沿って設けられている。なお、本明細書では、スプルブッシュ射出口側を固定側取付板8、すなわち固定側金型2の「下側」、スプルブッシュ射出口に対向する側を固定側取付板8、すなわち固定側金型2の「上側」と規定する。すなわち、冷却管10は、固定側取付板8の上側部の表面の一部が開口した形態を有する空間領域14に沿って設けられている。なお、図2Bに示すように、固定側取付板8の上側部内に形成された溝部13に沿って冷却管10を設けた後、固定側取付板8と固定側型板9とが接合される。又、図10に示すように、まず、スプルブッシュ3およびスプルブッシュ3のフランジ部5の両側側面に接続した冷却管10を固定側取付板8の上側部内に形成された溝部13に沿って設ける。次いで、この溝部13に沿って設けたスプルブッシュ3およびスプルブッシュ3のフランジ部5の両側側面に接続した冷却管10を、ロケーティング・リング22により固定する。これにより、本発明の一実施形態に係る射出成形用金型1が得られる。
 冷却管10が冷却液流路の入口部11および出口部12と直接的に接続されていることで、冷却液の温度コントロールをより的確に行うことができる。それ故、スプル部6内を通る溶融樹脂を効率的に冷却することができ、成形サイクルを短縮させることができる。これにより、得られる成形品の生産効率を向上させることができる。又、冷却管10が固定側取付板8の上側部内に形成された空間領域14に沿って設けられているため、外部から冷却管10を視覚的に確認できる状態となっている。それ故、固定側取付板8、すなわち、固定側金型2の表面を切削し易く、切削自由度を上げることができる。すなわち、冷却管10にアクセスし易いのである。これにより、空間領域14内のメンテナンスが容易となる利点を有する。
 上記で記載する冷却管10は、(1)冷却液流路の入口部11および出口部12と直接的に接続されていること、(2)固定側取付板8の上側部内に形成された空間領域14に沿って設けられていることを特徴とする。しかしながら、本発明の射出成形用金型1は上記実施形態に限定されず、図1Aの波線に示すように、冷却管10が、固定側取付板8の上側部や下側部、固定側型板9の上側部や下側部に構成されてよい。
 従って、以下、本発明の射出成形用金型1の別の実施形態について説明する。
 まず、空間領域14は、図3Aに示すように固定側取付板8の下側部内に形成されてよい。又、空間領域14は、図3Bに示すように固定側型板9の上側部内に形成されてよい。又、空間領域14は、図3Cに示すように固定側型板9の下側部内に形成されてよい。又、空間領域14は、図3Dに示すように固定側取付板8の下側部の一部と固定側型板9の上側部の一部との間に形成されてよい。すなわち、空間領域14は、必ずしも1つの部材内の一部に形成される必要はなく、少なくとも2つの部材内に形成されてよいのである。又、吸入側の冷却管10を設ける空間領域14と排出側の冷却管10を設ける空間領域14とは面一状である必要はない。例えば、図3Eに示すように、吸入側の冷却管10を設ける空間領域14は固定側取付板8の上側部内に形成され、排出側の冷却管10を設ける空間領域14は固定側型板9の下側部内に形成されてよい。又、この逆であってもよい。
 又、フライス加工により空間領域14を自在に規定可能であるため、空間領域14を非直線状に延在した形態にすることができる。それ故、空間領域14に沿って設ける冷却管10として、可撓性部材、例えばフレキシブル・ホースを用いることができる。これにより、モールドベースの干渉部を回避することができる。又、冷却管10として可撓性部材を用いることが可能であるため、配置形態の自由度を上げることができる。
 従って、以下、本発明の射出成形用金型1の更なる別の実施形態について説明する。
 まず、冷却管10は、図4Aに示すようにフランジ部5の主面に露出した冷却液流路の入口部および出口部と直接的に接続されてよい。すなわち、冷却管10は直線状ではなく非直線状の形態を有している。又、冷却管10は、図4Bに示すようにフランジ部5の主面に対向する面に露出した冷却液流路の入口部および出口部と直接的に接続されてよい。又、吸入側の冷却管10は、図4Cに示すようにフランジ部5の主面に露出した冷却液流路の入口部11と直接的に接続され、排出側の冷却管10は、スプルブッシュ基部4の側面に露出した冷却液流路の出口部12と直接的に接続されてよい。又、この逆であってよい。又、吸入側の冷却管10は、図4Dに示すようにフランジ部5の主面に露出した冷却液流路の入口部11と直接的に接続され、排出側の冷却管10は、フランジ部5の主面に対向する面に露出した冷却液流路の出口部12と直接的に接続されてよい。又、この逆であってよい。又、吸入側の冷却管10は、図4Eに示すようにフランジ部5の側面に露出した冷却液流路の入口部11と直接的に接続され、排出側の冷却管10は、フランジ部5の主面に対向する面に露出した冷却液流路の出口部12と直接的に接続されてよい。又、この逆であってよい。
 又、好ましくは、空間領域14は、スプルブッシュ3の射出口付近に至るように形成されていることが望ましい。これにより、スプルブッシュ3の射出口付近の溶融樹脂を素早く固化させることができるので、金型を開くタイミングをより早くすることができる。従って、成形時間をより短くすることができ、得られる成形品の生産効率をより向上させることができる。
 又、図5Aに示すように、必ずしも冷却液流路の入口部11および出口部12は、スプルブッシュ3の両側側面に相互に対向するように設けられている必要はない。つまり、冷却液流路の入口部11および出口部12は、スプルブッシュ3の側面の任意の箇所に設けられてよい。例えば図5Bに示すように、冷却液流路の入口部11および出口部12の双方が、スプルブッシュ3の片側側面に設けられていてよい。これにより、本発明の射出成形用金型1の小型化を実現することができる。又、前述のとおり、フライス加工により空間領域14を自在に規定可能であるため、空間領域14を非直線状に延在した形態にすることができる。それ故、図5Cに示すように、空間領域14に沿って設ける吸入側又は排出側の冷却管10にフレキシブル・ホース17を用いることができる。これにより、ピン等のモールドベースの干渉部18を回避することができる。なお、空間領域14に沿って設ける吸入側、排出側の冷却管10のいずれにもフレキシブル・ホース17を用いてもよい。
 又、上記で説明する空間領域14は、図6Aに示すように、いずれも固定側取付板8又は固定側型板9、すなわち固定側金型2の表面の一部が開口した形態を有している。しかしながら、空間領域14はこれに限定されず、例えば図6Bに示すように固定側金型2の一方の表面から他方の表面まで連続的に開口した形態を有していてよい。又、図6Cに示すように、空間領域14は、固定側金型2を構成する2つのサブ金型21の間に形成された間隙部の形態を有していてよい。更に、図6Dに示すように、空間領域14は、固定側金型2を構成する3つのサブ金型21の間に形成された間隙部の形態を有していてよい。当然のことながら、空間領域14は、固定側金型2を構成する4つ以上のサブ金型21の間に形成された間隙部の形態を有していてよい。
<実施例1>
 以下の条件の下、成形品を得た。
樹脂材料:PPWW567w3952
金型:(寸法)300mm×500mm×345mm/(質量)403kg
成形機:日精ES2000
 図8Aおよび図8Bに示すように、本発明の一実施形態に係る射出成形用金型1では、従来の量産金型と比べて溶融樹脂の冷却時間を13sから8sに短縮することができ、その結果、成形サイクルを全体として25.7%(35s→26s)に短縮することができた。
 本発明の一実施形態に係る射出成形用金型1を用いた場合、図8Cの写真図に示すように、溶融樹脂の冷却温度を適切に制御して溶融樹脂の冷却を十分に行うことができたので、スプル・ランナー部は良好な状態であった。これに対し、従来の量産金型を用いた場合、図8Dに示すように、溶融樹脂の冷却温度を適切に制御できず、溶融樹脂の冷却が不十分であったので、スプル・ランナーが折れてしまい連続成形できなかった。
<実施例2>
 図9Aおよび図9Bに示すように、本発明の一実施形態に係る射出成形用金型1では、従来の量産金型と比べて溶融樹脂の冷却時間を39sから25sに短縮することができ、その結果、成形サイクルを全体として30.8%(65s→45s)に短縮することができた。
 本発明の一実施形態に係る射出成形用金型1を用いた場合、溶融樹脂の冷却温度を適切に制御して溶融樹脂の冷却を十分に行うことができたので、スプルが伸びる現象は生じなかった。なお、冷却工程の間のスプルブッシュ3の温度解析を行ったところ、図9Cに示すように、スプルブッシュの射出口付近の温度が、スプルブッシュの他の部分よりも十分に冷却されていることが分かった。これに対し、従来の量産金型を用いた場合、溶融樹脂の冷却温度を適切に制御できず、溶融樹脂の冷却が不十分であったので、スプルが伸びる現象が発生した。それ故、型開きの際に引っかかるため連続成形できなかった。
 尚、上述のような本発明は、次の好適な態様を包含している。
第1態様
 可動側金型と、固定側金型と、該固定側金型内に設けられた冷却液流路を備えたスプルブッシュと、を有して成る金型であって、
 前記冷却液流路の入口部および出口部のそれぞれが、前記固定側金型に形成された空間領域に沿って配置された冷却管と直接的に接続されており、および、
 前記空間領域は、前記固定側金型の少なくとも一方の表面が開口した形態を有していることを特徴とする、金型。
第2態様
 上記第1態様において、前記空間領域が、前記固定側金型の表面に設けられた溝部の形態を有していることを特徴とする、金型。
第3態様
 上記第1態様において、前記空間領域が、前記固定側金型の前記一方の表面から他方の表面まで連続的に開口した形態を有していることを特徴とする、金型。
第4態様
 上記第3態様において、前記金型が少なくとも2つのサブ金型から構成されており、
 前記空間領域が、前記少なくとも2つの前記サブ金型の間に形成された間隙部の形態を有していることを特徴とする、金型。
第5態様
 上記第1態様~第4態様のいずれかにおいて、前記固定側金型が固定側取付板および固定側型板から構成されており、
 前記空間領域が、前記固定側取付板の上側表面および下側表面の少なくとも一方、並びに/又は、前記固定側型板の上側表面および下側表面の少なくとも一方に構成されていることを特徴とする、金型。
第6態様
 上記第1態様~第5態様のいずれかにおいて、前記冷却液流路の前記入口部と前記出口部とが、前記スプルブッシュの側面の任意の箇所に設けられていることを特徴とする、金型。
第7態様
 上記第6態様において、前記冷却液流路の前記入口部と前記出口部とが、前記スプルブッシュの両側側面に相互に対向するように設けられていることを特徴とする、金型。
第8態様
 上記第6態様において、前記冷却液流路の前記入口部および前記出口部の双方が、前記スプルブッシュの片側側面に設けられていることを特徴とする、金型。
第9態様
 上記第1態様~第8態様のいずれかにおいて、前記冷却管が可撓性を有していることを特徴とする、金型。
第10態様
 上記第9態様において、前記冷却管がフレキシブル・ホースの形態を有していることを特徴とする、金型。
第11態様
 上記第1態様~第10態様のいずれかにおいて、前記空間領域が、非直線状に延在した形態を有していることを特徴とする、金型。
第12態様
 上記第1態様~第11態様のいずれかにおいて、前記スプルブッシュがスプル部を備えており、前記空間領域が、前記スプル部の延在方向に対して直交する方向に延在していることを特徴とする、金型。
第13態様
 上記第1態様~第12態様のいずれかにおいて、前記空間領域が前記スプルブッシュ射出口付近に至るように設けられていることを特徴とする、金型。
第14態様
 上記第1態様~第13態様のいずれかにおいて、前記冷却液流路の前記入口部および前記出口部が、雄ねじ、雌ねじおよび冷却ジョイントを含む群から少なくとも1つ選択される接合部材を介して、前記冷却管と直接的に接続されていることを特徴とする、金型。
第15態様
 可動側金型と、固定側金型と、該固定側金型内に設けられた冷却液流路を備えたスプルブッシュと、を有して成る金型の製造方法であって、
 前記固定側金型の少なくとも一方の表面を開口させ、それによって、前記固定側金型に空間領域を形成する工程、および
 前記固定側金型に形成した前記空間領域に沿って冷却管を配置して、前記冷却液流路の入口部および出口部と直接的に接続させる工程を含んで成ることを特徴とする、製造方法。
第16態様
 上記第15態様において、非直線状に延在する形態に前記空間領域を形成することを特徴とする、製造方法。
第17態様
 上記第15態様又は第16態様において、前記冷却管として、フレキシブル・ホースを用いることを特徴とする、製造方法。
第18態様
 上記第15態様~第17態様のいずれかにおいて、溝形態を有するように前記空間領域を形成することを特徴とする、製造方法。
 本発明の一実施形態に係る金型は、射出成形用金型として用いることができる。
1 射出成形用金型
2 固定側金型
3 スプルブッシュ
4 スプルブッシュ基部
5 フランジ部
6 スプル部
7 冷却液流路
8 固定側取付板
9 固定側型板
10 冷却管
11 冷却液流路の入口部
12 冷却液流路の出口部
13 溝部
14 空間領域
15 接合部材
16 冷却ジョイント
17 フレキシブル・ホース
18 モールドベースの干渉部
19 Oリング
20 水管経路
21 サブ金型
22 ロケーティング・リング

Claims (18)

  1.  可動側金型と、固定側金型と、該固定側金型内に設けられた冷却液流路を備えたスプルブッシュと、を有して成る金型であって、
     前記冷却液流路の入口部および出口部のそれぞれが、前記固定側金型に形成された空間領域に沿って配置された冷却管と直接的に接続されており、および、
     前記空間領域は、前記固定側金型の少なくとも一方の表面が開口した形態を有していることを特徴とする、金型。
  2.  前記空間領域が、前記固定側金型の表面に設けられた溝部の形態を有していることを特徴とする、請求項1に記載の金型。
  3.  前記空間領域が、前記固定側金型の前記一方の表面から他方の表面まで連続的に開口した形態を有していることを特徴とする、請求項1に記載の金型。
  4.  前記金型が少なくとも2つのサブ金型から構成されており、
     前記空間領域が、前記少なくとも2つの前記サブ金型の間に形成された間隙部の形態を有していることを特徴とする、請求項3に記載の金型。
  5.  前記固定側金型が固定側取付板および固定側型板から構成されており、
     前記空間領域が、前記固定側取付板の上側表面および下側表面の少なくとも一方、並びに/又は、前記固定側型板の上側表面および下側表面の少なくとも一方に構成されていることを特徴とする、請求項1に記載の金型。
  6.  前記冷却液流路の前記入口部と前記出口部とが、前記スプルブッシュの側面に設けられていることを特徴とする、請求項1に記載の金型。
  7.  前記冷却液流路の前記入口部と前記出口部とが、前記スプルブッシュの両側側面に相互に対向するように設けられていることを特徴とする、請求項6に記載の金型。
  8.  前記冷却液流路の前記入口部および前記出口部の双方が、前記スプルブッシュの片側側面に設けられていることを特徴とする、請求項6に記載の金型。
  9.  前記冷却管が可撓性を有していることを特徴とする、請求項1に記載の金型。
  10.  前記冷却管がフレキシブル・ホースの形態を有していることを特徴とする、請求項9に記載の金型。
  11.  前記空間領域が、非直線状に延在した形態を有していることを特徴とする、請求項1に記載の金型。
  12.  前記スプルブッシュがスプル部を備えており、
     前記空間領域が、前記スプル部の延在方向に対して直交する方向に延在していることを特徴とする、請求項1に記載の金型。
  13.  前記空間領域が前記スプルブッシュ射出口付近に至るように設けられていることを特徴とする、請求項1に記載の金型。
  14.  前記冷却液流路の前記入口部および前記出口部が、雄ねじ、雌ねじおよび冷却ジョイントを含む群から少なくとも1つ選択される接合部材を介して、前記冷却管と直接的に接続されていることを特徴とする、請求項1に記載の金型。
  15.  可動側金型と、固定側金型と、該固定側金型内に設けられた冷却液流路を備えたスプルブッシュと、を有して成る金型の製造方法であって、
     前記固定側金型の少なくとも一方の表面を開口させ、それによって、前記固定側金型に空間領域を形成する工程、および
     前記固定側金型に形成した前記空間領域に沿って冷却管を配置して、前記冷却液流路の入口部および出口部と直接的に接続させる工程を含んで成ることを特徴とする、製造方法。
  16.  非直線状に延在する形態に前記空間領域を形成することを特徴とする、請求項15に記載の製造方法。
  17.  前記冷却管として、フレキシブル・ホースを用いることを特徴とする、請求項15に記載の製造方法。
  18.  溝形態を有するように前記空間領域を形成することを特徴とする、請求項15に記載の製造方法。
PCT/JP2015/086590 2015-12-25 2015-12-25 金型および金型の製造方法 WO2017110007A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
US16/065,565 US11173641B2 (en) 2015-12-25 2015-12-25 Mold and method for manufacturing mold
CN201580085518.2A CN108430730B (zh) 2015-12-25 2015-12-25 模具及模具的制造方法
PCT/JP2015/086590 WO2017110007A1 (ja) 2015-12-25 2015-12-25 金型および金型の製造方法
KR1020187017685A KR102102586B1 (ko) 2015-12-25 2015-12-25 금형 및 금형의 제조 방법
EP15911439.6A EP3395536B1 (en) 2015-12-25 2015-12-25 Mold and method for manufacturing mold
JP2017536915A JP6229868B1 (ja) 2015-12-25 2015-12-25 金型および金型の製造方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/086590 WO2017110007A1 (ja) 2015-12-25 2015-12-25 金型および金型の製造方法

Publications (1)

Publication Number Publication Date
WO2017110007A1 true WO2017110007A1 (ja) 2017-06-29

Family

ID=59089841

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/086590 WO2017110007A1 (ja) 2015-12-25 2015-12-25 金型および金型の製造方法

Country Status (6)

Country Link
US (1) US11173641B2 (ja)
EP (1) EP3395536B1 (ja)
JP (1) JP6229868B1 (ja)
KR (1) KR102102586B1 (ja)
CN (1) CN108430730B (ja)
WO (1) WO2017110007A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109366878A (zh) * 2018-10-29 2019-02-22 孙美玲 一种双冷冷却的快速成型的模具

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0570922U (ja) * 1992-03-02 1993-09-24 積水化学工業株式会社 スプルーブッシュ
JP2003245961A (ja) * 2002-02-26 2003-09-02 Mitsubishi Materials Corp 成形用金型装置
WO2008038694A1 (fr) * 2006-09-27 2008-04-03 Ngk Insulators, Ltd. Buse de carotte et son procédé de production
JP2010194719A (ja) * 2009-02-23 2010-09-09 Sekisou Kanagata Co Ltd スプルーブッシュ及びスプルーブッシュの製造方法
JP2014223733A (ja) * 2013-05-15 2014-12-04 株式会社クリモト 多点ゲート用射出成形金型
JP2015074185A (ja) * 2013-10-10 2015-04-20 株式会社メイク スプル−ブッシュ温度調節用金型部品

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5331065U (ja) * 1976-08-25 1978-03-17
CA1273463A (en) * 1989-02-01 1990-09-04 Jobst Ulrich Gellert Profiled plate heaters for injection molding nozzles
US4955804A (en) * 1989-06-19 1990-09-11 General Motors Corporation Tool for molding plastic articles
JPH0570922A (ja) 1991-08-09 1993-03-23 Koichi Moriya 複合材の無機化合物による封孔処理法
KR200170475Y1 (ko) 1999-09-22 2000-02-15 이홍규 신발의 중창제조용 금형장치
DE60332971D1 (de) * 2003-03-06 2010-07-22 Husky Injection Molding Angiessvorrrichtung
CN201040416Y (zh) * 2007-05-29 2008-03-26 郭学文 模具的改进结构
KR101564784B1 (ko) * 2008-07-30 2015-11-06 세키스이가세이힝코교가부시키가이샤 금형 냉각배관을 갖춘 발포 성형 장치 및 이것을 이용한 발포 성형 방법
WO2010082331A1 (ja) 2009-01-15 2010-07-22 株式会社Opmラボラトリー スプルーブッシュ及びスプルーブッシュの製造方法
CN102848521A (zh) * 2011-06-29 2013-01-02 深圳富泰宏精密工业有限公司 用于注塑成型模具的灌嘴及该注塑成型模具
JP6445007B2 (ja) * 2013-08-01 2018-12-26 ハスキー インジェクション モールディング システムズ リミテッドHusky Injection Molding Systems Limited 操作性を向上するための非メルト内部チャンネルを有するホットランナマニホルドを備えた射出成形システム

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0570922U (ja) * 1992-03-02 1993-09-24 積水化学工業株式会社 スプルーブッシュ
JP2003245961A (ja) * 2002-02-26 2003-09-02 Mitsubishi Materials Corp 成形用金型装置
WO2008038694A1 (fr) * 2006-09-27 2008-04-03 Ngk Insulators, Ltd. Buse de carotte et son procédé de production
JP2010194719A (ja) * 2009-02-23 2010-09-09 Sekisou Kanagata Co Ltd スプルーブッシュ及びスプルーブッシュの製造方法
JP2014223733A (ja) * 2013-05-15 2014-12-04 株式会社クリモト 多点ゲート用射出成形金型
JP2015074185A (ja) * 2013-10-10 2015-04-20 株式会社メイク スプル−ブッシュ温度調節用金型部品

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109366878A (zh) * 2018-10-29 2019-02-22 孙美玲 一种双冷冷却的快速成型的模具

Also Published As

Publication number Publication date
EP3395536B1 (en) 2020-08-05
JP6229868B1 (ja) 2017-11-15
JPWO2017110007A1 (ja) 2018-01-11
US11173641B2 (en) 2021-11-16
US20210138708A1 (en) 2021-05-13
KR20180086467A (ko) 2018-07-31
CN108430730A (zh) 2018-08-21
EP3395536A1 (en) 2018-10-31
EP3395536A4 (en) 2018-12-12
CN108430730B (zh) 2020-07-14
KR102102586B1 (ko) 2020-04-21

Similar Documents

Publication Publication Date Title
US10442125B2 (en) Injection mold, molding tool comprising the mold and methods of use thereof
CA2147177C (en) Process for the production of temperature-controlled tools or temperature- controlled moulds for the production of plastics mould parts and tools or moulds produced by said process
CN105813820A (zh) 塑料材料的成形方法
US8845321B2 (en) Split thread insert
CN211389927U (zh) 一种模具冷却水路
WO2017110007A1 (ja) 金型および金型の製造方法
JP2010094937A (ja) サイドバルブゲート式ホットランナーシステム
SE517483C2 (sv) Förfarande samt anordning vid framtällning av en formsprutad detalj
JP6624574B2 (ja) 金型および金型の製造方法
CN102275268A (zh) 灌嘴及采用该灌嘴的射出成型模具
WO2012172669A1 (ja) 射出成形用型装置および射出成形機
JP2007283533A (ja) 射出成形用金型
KR101554491B1 (ko) 라디에이터 그릴 성형용 사출 성형 금형 및 그 제조 방법
KR101533080B1 (ko) 곡선 유체 유로를 구비한 사출 성형 금형
JP6756958B1 (ja) 射出成型装置及び方法
JP2010089390A (ja) 成形金型
CN211221763U (zh) 一种无针板无方铁的模架
KR101173064B1 (ko) 사출 성형용 금형 장치
JP5703084B2 (ja) 射出成形用金型
CN211334382U (zh) 一种热固材料模具的流道板水路系统
CN205735891U (zh) 一种计算器外壳成型注塑模具
CN110815733A (zh) 一种热固材料模具的流道板水路系统
KR20080107877A (ko) 사출 성형용 금형
JPH0768556A (ja) 成形用金型
TWM452051U (zh) 具有功能模組的塑膠成型模具

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2017536915

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15911439

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20187017685

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 1020187017685

Country of ref document: KR

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2015911439

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2015911439

Country of ref document: EP

Effective date: 20180725