WO2017069313A1 - 프리캐스트 바닥판과 충전강관 트러스 거더의 조립을 이용한 교량의 런칭시공방법 - Google Patents

프리캐스트 바닥판과 충전강관 트러스 거더의 조립을 이용한 교량의 런칭시공방법 Download PDF

Info

Publication number
WO2017069313A1
WO2017069313A1 PCT/KR2015/011324 KR2015011324W WO2017069313A1 WO 2017069313 A1 WO2017069313 A1 WO 2017069313A1 KR 2015011324 W KR2015011324 W KR 2015011324W WO 2017069313 A1 WO2017069313 A1 WO 2017069313A1
Authority
WO
WIPO (PCT)
Prior art keywords
cft
truss girder
precast
segment
launching
Prior art date
Application number
PCT/KR2015/011324
Other languages
English (en)
French (fr)
Inventor
이경찬
여인호
김성일
장승엽
김현민
김기현
마향욱
곽영학
신윤봉
김인규
김영진
Original Assignee
한국철도기술연구원
(주)대우건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국철도기술연구원, (주)대우건설 filed Critical 한국철도기술연구원
Priority to US15/570,726 priority Critical patent/US10161090B2/en
Priority to CN201580079630.5A priority patent/CN107849831B/zh
Publication of WO2017069313A1 publication Critical patent/WO2017069313A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D6/00Truss-type bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
    • E01D21/065Incremental launching
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal

Definitions

  • the present invention relates to a method of constructing a bridge by launching the superstructure of the bridge. According to the present invention, after pre-assembled a concrete filled steel tube truss girder (hereinafter, abbreviated as "CFT truss girder") and a precast bottom plate to form a "segment", a plurality of segments are sequentially formed.
  • CFT truss girder concrete filled steel tube truss girder
  • the present invention relates to a method of launching a bridge using an assembly of a precast deck and a packed steel truss girder, which is to be constructed by launching a bridge.
  • CFT truss girder is a girder made by arranging a filled steel pipe filled with concrete inside the steel pipe in a truss structure.
  • an Incremental Launching Method (hereinafter, abbreviated as "ILM") is known.
  • ILM Incremental Launching Method
  • a plurality of units forming the upper structure of the bridge are manufactured at a prefabricated site at the rear of the shift, and then the bridge is sequentially constructed by pushing the segments in the direction of the bridge using extrusion equipment such as a jack device.
  • the conventional ILM has the following problems, it is necessary to solve these problems.
  • the steel girder can be launched first while applying the conventional ILM.
  • the concrete deck is made of cast-in-place concrete, which does not solve the disadvantage of increased air.
  • the work after launching the steel girder, when the concrete floor plate is made of cast-in-place concrete, the work must be carried out at a high place, which also has a problem in that construction efficiency and construction safety are deteriorated. Therefore, in order to construct the upper structure of the bridge using the CFT truss girder and concrete deck plate to construct the ILM, it is necessary to solve the problems of the conventional ILM as described above.
  • the present invention has been developed to overcome the above limitations of the prior art.
  • the present invention forms the upper structure of the bridge by using the CFT truss girder and concrete slab to be constructed by ILM, while minimizing the work in the field to shorten the air (construction period), improve the construction efficiency and in the construction process It aims at improving stability.
  • an object of the present invention is to effectively suppress the lateral torsional buckling phenomenon caused by the girder to ensure stability for the lateral torsional buckling.
  • an object of the present invention is to prevent excessive tensile force from acting on the precast sole plate during the launching process to prevent the sole plate from being damaged by the tensile force.
  • a method of constructing a bridge to have a superstructure consisting of a CFT truss girder and a precast bottom plate a CFT truss girder by mounting a precast bottom plate on a CFT truss girder in the manufacturing workshop And the precast sole plate fabricate the segments in a preassembled state, continuously arrange the segments to connect the CFT truss girder 1 integrally with each other, and sequentially launch the segments forward to form a bridge superstructure; After the launching of the segment is completed, the CFT truss girder and the precast deck are integrally combined and synthesized, and the precast deck is longitudinally tensioned to synthesize the precast decks integrally with each other.
  • a method of launching a bridge is provided.
  • the CFT truss girder is configured to include an upper beam and a lower beam, and an abdominal beam connecting the upper and lower beams;
  • a support member is provided on the upper surface of the upper beam to support the precast sole plate, and the precast sole plate is formed with a shear pocket formed of a through hole at a position on the upper beam of the CFT truss girder, and the upper beam is provided within the shear pocket.
  • a stud to be inserted is provided; Mounting the precast bottom plate on the CFT truss girder to preassemble the CFT truss girder and the precast bottom plate, placing the precast bottom plate on the support member so that the stud is inserted into the shear pocket and placed on the top of the stud.
  • Combining the extension rod and the mounting member on the upper surface of the precast bottom plate may include the step of coupling the upper portion of the extension rod and the mounting member.
  • the process of integrally synthesizing the CFT truss girder and the precast bottom plate includes the steps of removing the extension rod and the mounting member, and pouring the grouting material into the shear pocket in which the stud is located, so that the upper space and the shear of the upper beam are sheared. It may include the step of allowing the grouting material is filled in the pocket to cure.
  • the mounting member is formed with a through hole through which the extension rod;
  • the step of coupling the upper part of the extension rod with the mounting member while the extension rod is coupled to the stud, the mounting member is placed on the shear pocket while the upper end of the extension rod is inserted into the through hole, and the mounting member is precast through the mounting member.
  • Placed on the upper surface of the may include a process of applying a pressing force to press the fastening member to the upper surface of the precast bottom plate by coupling the fastening member to the extension rod protruding to the upper surface of the mounting member.
  • the grouting material when synthesizing the CFT truss girder and the precast bottom plate integrally, after removing the extension rod and the mounting member, after coupling the head to the top of the stud, the grouting material may be poured into the shear pocket.
  • the process of forming the bridge superstructure by sequential launching the segments forward in the present invention, the step of mounting the precast bottom plate on the CFT truss girder and pre-assembled to produce a first segment; Manufacturing a second segment by pre-assembly of the CFT truss girder and the precast bottom plate, and arranging the second segment behind the first segment to connect the CFT truss girder of the first and second segments; Pushing forward the first and second segments; And make additional segments by pre-assembly of CFT truss girder and precast deck, place newly created additional segments behind the rearmost segment, connect the CFT truss girder between segments, and push the segments to launch forward It may also comprise the step.
  • the winch is provided on the shift; In the step of pushing the segment forward and launching it forward, at the rear end of the segment located at the rear end, a cross beam with a pulley is installed, the wire is wound around the pulley, and the winch winds the wire to pull the wire so that the segment is moved forward. It may also be configured to move.
  • the main member constituting the upper structure of the bridge is manufactured in the factory, it is possible to minimize the work in the field, thereby greatly shortening the air required for the bridge construction, mechanical construction It has the advantages of improving construction efficiency and improving stability in the construction process.
  • the present invention has the advantage that the precast deck can suppress the lateral torsional buckling caused by the CFT truss girder during the launch of the bridge superstructure, thereby ensuring an excellent stability for the lateral torsional buckling.
  • 1 to 3 are schematic side views each showing a process of the bridge launching construction method according to an embodiment of the present invention sequentially.
  • FIGS. 4 and 5 are schematic exploded perspective views showing the direction in which the precast bottom plate is placed on the CFT truss girder, respectively, in the present invention.
  • FIG. 6 is a schematic enlarged view of a portion A of FIG. 4.
  • FIG. 7 is a schematic perspective view showing a state in which a precast bottom plate is placed on a CFT truss girder in the present invention.
  • FIG. 8 is a schematic perspective view of the precast bottom plate taken along line E-E of FIG. 7.
  • 9 to 13 are schematic cross-sectional views in the longitudinal direction of the circle D of FIG. 8 as viewed in the direction of an arrow B in the present invention, respectively.
  • FIG. 14 is a schematic cross-sectional view corresponding to FIG. 10 showing a state in which the upper beam is rotated due to lateral torsional buckling.
  • FIG. 15 is a schematic cross-sectional view corresponding to FIG. 10 showing a state in which a head unit is assembled to a stud in the present invention.
  • FIG. 16 is a schematic cross-sectional view corresponding to FIG. 10 showing a state in which a stud is embedded in a grouting material in a shear pocket in the present invention.
  • FIG. 17 is a schematic side view corresponding to FIG. 2B showing the launch of the segment forward using a wire.
  • FIG. 18 is a schematic enlarged view of a portion E of FIG. 17.
  • FIG. 19 is a schematic enlarged view of a portion F of FIG. 17.
  • FIG. 20 is a schematic enlarged view of a portion G of FIG. 17.
  • FIG. 1 to 3 are schematic side views showing sequentially the process of the bridge launching construction method according to an embodiment of the present invention, respectively.
  • a CFT truss girder 1 is manufactured to a predetermined length and precast floor prefabricated at the factory in a precast manner.
  • the plate 2 is mounted on the CFT truss girder 1 and "temporarily assembled" to produce a ⁇ first segment> S1 (step 1).
  • the precast bottom plate 2 and the CFT truss girder 1 corresponding to the main members constituting the bridge are pre-fabricated at the factory. Compared with the prior art for construction, there is an advantage in that the quality of construction can be improved and the quality of a uniform member can be maintained.
  • the CFT truss girder 1 and the precast bottom plate 2 are preassembled to the rear end of the first segment S1 to form a second segment S2.
  • the second segment S2 mounts a precast base plate 2 prefabricated at the factory on the CFT truss girder 1 on the factory manufactured CFT truss girder 1 with a predetermined length.
  • Additional segments installed behind the second segment S2 are also manufactured in the same manner as the first and second segments S1 and S2 described above.
  • the integral connection work between the CFT truss girders can be performed using various methods such as welding.
  • a launching nose 9 is connected to the front of the first segment S1. Since the launch nose 9 is a member generally used in the ILM, description thereof will be omitted.
  • the segment is extruded forward in a state in which the plurality of segments are continuously arranged in the axial direction at the manufacturing site (step 3).
  • Fig. 2 (a) by operating the extrusion jack 39 in the rear of the segment located at the rear end, as shown in Fig. 2 (b), a plurality of continuously arranged
  • the segments (in the example illustrated in the figure, the first segment and the second segment) are pushed forward to launch to a predetermined position.
  • the third segment S3 is disposed by continuously arranging the third segment S3 behind the second segment S2, which is still located at the manufacturing site. It connects with two segments S2 (step 4).
  • the third segment S3 is also manufactured by preliminary assembly of the CFT truss girder 1 and the precast bottom plate 2.
  • the extrusion jack 39 is installed at the rear of the third segment S3 to operate the plurality of segments arranged in series (in the case of the embodiment illustrated in FIG. The first segment, the second segment and the third segment) are moved forward to launch to a predetermined position (step 5).
  • the CFT truss girder 1 and the precast deck 2 are still prefabricated in each segment during the process of being placed over the entire span of the designed bridge and supported by the bridge 32. Is in a state. That is, the CFT truss girder 1 and the precast bottom plate 2 are not completely integrated with each other. Also, the precast bottom plates 2 of the segments in the axial direction are not integrated with each other.
  • step 7 After a plurality of segments are arranged over the entire span of the bridge designed in a continuous state, the integral composite work between the CFT truss girder 1 and the precast deck 2 in each segment is performed, and the axial direction As a result, an integral synthesis operation between the precast bottom plates 2 of the segment is performed (step 7).
  • the CFT truss girder 1 is launched in a state where the precast bottom plate 2 is "assembled", and the launching of the segment is completed over the entire span of the bridge. Afterwards an integral synthesis between the CFT truss girder 1 and the precast deck 2 is made. Next, the prefabricated structure and method of the CFT truss girder 1 and the precast deck 2 will be described. The integrated composite structure and method of the CFT truss girder 1 and the precast deck 2 are also described.
  • FIGS. 4 and 5 are schematic exploded perspective views showing the direction in which the precast bottom plate 2 is placed on the CFT truss girder 1 in a different direction
  • FIG. A schematic enlarged view of the top surface of the upper beam 11 in the CFT truss girder 1 is shown.
  • the CFT truss girder 1 extends in the axial direction and is arranged in parallel with each other with a vertical gap therebetween, and the upper and lower beams 12, and the upper and lower beams 11, respectively. 12, the abdominal (web) beam 13 to connect between.
  • the upper beam 11, the lower beam 12 and the abdominal beam 13 has a configuration in which the concrete 101 is filled in the steel pipe.
  • the CFT truss girder 1 is installed so that the upper beam 11 and the lower beam 12 are positioned at the upper and lower portions in the vertical direction, respectively.
  • a plurality of CFT truss girders 1 are arranged side by side at intervals in the orthogonal direction.
  • two CFT truss girders 1 are provided.
  • the precast bottom plate 2 is a concrete square plate member having a predetermined thickness.
  • the precast deck 2 is installed on the CFT truss girder 1 to form a segment.
  • the length in the axial direction of the precast bottom plate 2 may be equal to the length in the axial direction of the CFT truss girder 1.
  • the length in the axial direction of the precast bottom plate 2 in one segment may be smaller than the length in the axial direction of the CFT truss girder 1.
  • a plurality of precast bottom plates 2 are provided on the CFT truss girder 1 while being continuously positioned in the axial direction in one segment.
  • a plurality of precast bottom plates 2 may be continuously arranged in the longitudinal direction. In one segment, a plurality of precast bottom plates 2 may be arranged continuously in the longitudinal direction over the top beam 11 of the longitudinally continuous CFT truss girder 1.
  • the precast bottom plate 2 is placed on the top beam 11 of the CFT truss girder 1.
  • the front pocket 20 is formed in the precast bottom plate 2.
  • the front end pocket 20 is a through hole penetrating the precast bottom plate 2 in its thickness direction.
  • a plurality of front end pockets 20 are formed at intervals in the axial direction.
  • a vertical stud 14 is provided at the point where the front pocket 20 is positioned when the precast bottom plate 2 is placed. That is, the stud 14 made of a rod member is erected vertically and is fixed to the upper surface of the upper beam 11. The upper end of the stud 14 is formed with a thread.
  • the support member 15 may be provided on the upper surface of the upper beam 11 so that the precast bottom plate 2 may be stably placed on the upper surface of the upper beam 11.
  • the support member 15 is composed of a bent beam extending in the axial direction when the bent section of the letter A to have a horizontal portion and a vertical portion.
  • the lower end of the vertical part of the supporting member 15 is fixedly coupled to the upper surface of the upper beam 11.
  • Two support members 15 are provided in pairs on both sides of the upper and lower beams 11 from the center of the upper beam 11. It is preferable that a sealing material 150 such as a rubber plate is disposed on the upper surface of the horizontal portion of the supporting member 15.
  • the support member 15 may extend in the axial direction over the entire length of the upper beam 11.
  • a CFT truss girder (1) having an upper beam (11) and having a stud (14) and a support member (15) installed on an upper surface of the upper beam (11) is manufactured in a factory and installed in a fabrication site (31).
  • the precast bottom plate 2 is also prefabricated in the factory in a precast manner, and then installed on the CFT truss girder 1 in the fabrication site 31.
  • FIG. 7 is a schematic perspective view showing a state where the precast bottom plate 2 is placed on the CFT truss girder 1, and FIG. 8 shows the cutting of the precast bottom plate 2 according to the line EE in FIG. 7.
  • a schematic perspective view is shown showing the engagement portion of the precast deck 2 and the CFT truss girder 1 in one section.
  • FIG. 9 to 13 sequentially illustrate the process of pre-combining the precast bottom plate 2 and the upper beam 11 of the CFT truss girder 1 with each other at the position where the front pocket 20 is formed.
  • a schematic cross sectional view of the longitudinal direction of the portion D in the direction of arrow B is shown.
  • the precast bottom plate 2 is lifted using lifting equipment such as a crane and installed above the upper beam 11 of the CFT truss girder 1 located in the manufacturing site 31.
  • lifting equipment such as a crane
  • the precast bottom plate 2 is lowered on the CFT truss girder 1 as shown in FIG. 9, the precast bottom plate 2 is placed on the support member 15 as shown in FIG. 10, and the upper beam ( The stud 14 of 11 is inserted into and positioned in the front pocket 20 of the precast bottom plate 2.
  • the sealing member 150 is provided on the support member 15, when the precast bottom plate 2 is placed on the support member 15, a space between the lower surface of the precast bottom plate 2 and the support member 15 is provided. Sealing material 150 will be made in a watertight state.
  • the extension rod 16 is coupled to the top of the stud 14, and the mounting member 17 is installed on the upper surface of the precast bottom plate 2 to couple the upper portion of the extension rod 16 to the mounting member 17.
  • an extension rod 16 consisting of a rod member extending in a vertical direction is screwed to the top of the stud 14.
  • the extension rods 16 may be assembled to the studs 14 in advance, but as described above, the extension rods 16 may be precast. After installing the bottom plate 2 on the top of the CFT truss girder 1, it is preferable to assemble the studs 14 in order to prevent damage.
  • the mounting member 17 is installed to couple with the extension rod 16.
  • the mounting member 17 is a member placed on the upper surface of the precast bottom plate 2 while crossing the front pocket 20.
  • the through member 170 is formed in the mounting member 17. As shown in FIG. 12, when the extension rod 16 is coupled to the stud 14 and the mounting member 17 is placed on the shear pocket 20, the upper portion of the extension rod 16 is formed through a through hole ( It is fitted to 170 and penetrates the mounting member 17, the mounting member 17 is placed on the upper surface of the precast bottom plate (2).
  • the fastening member 18 is coupled to the extension rod 16 penetrating the mounting member 17 and protruding to the upper surface of the mounting member 17, as shown in FIG.
  • the fastening member 18 is composed of a member for causing the pressing force to act to press the mounting member 17 to the upper surface of the precast bottom plate 2 in the state in which the extension rod 16 penetrates the mounting member 17.
  • the fastening member 18 may be composed of a nut member.
  • the precast bottom plate 2 is installed on the CFT truss girder 1 on which the stud 14 and the support member 15 are installed on the upper surface of the upper beam 11, the precast bottom plate ( 2) is supported by the support member 15 and the stud 14 is placed in the front pocket 20.
  • the extension rod 16 is coupled to the stud 14 in this state, and the mounting member 17 and the fastening member 18 are installed, the CFT truss girder 1 and the precast bottom plate 2 are preassembled. It becomes a state. In other words, the CFT truss girder 1 and the precast bottom plate 2 are temporarily assembled to form a segment.
  • the CFT truss girder 1 and the precast sole plate 2 are not perfectly integrated with each other, but when the segment is launched forward.
  • the CFT truss girder 1 and the precast deck 2 move together.
  • the CFT truss girder 1 is a structure in which the upper beam 11 and the lower beam 12 are positioned at the upper and lower portions in the vertical direction, respectively, and the abdominal beam 13 is connected between the upper and lower beams 11 and 12.
  • FIG. 14 is a schematic cross-sectional view corresponding to FIG. 10 showing a state in which the lateral torsional buckling occurs in the CFT truss girder 1 while the stud 14 is inserted into the shear pocket 20 and the upper beam 11 is rotated. Is shown.
  • the stud 14 may move freely within the shear pocket 20. Therefore, when the segment is launched, a change in position of the upper beam 11 occurs as shown in FIG. 14 by the force in the vertical direction, and thus a lateral torsional buckling may occur in the CFT truss girder 1.
  • the stud 14 is fixed by the extension rod 16, the mounting member 17 and the fastening member 18, as shown in Figure 13, so that the stud 14 can move within the shear pocket 20. Therefore, even if a force is applied to the CFT truss girder 1 in the vertical direction, the CFT truss girder 1 is not twisted by installing a precast bottom plate 2 on the CFT truss girder 1. It is possible to effectively prevent the occurrence of lateral torsional buckling in the CFT truss girder 1 in the process of launching the segment forward.
  • the stud 14 is fixed by the extension rod 16, the mounting member 17, and the fastening member 18 so that the CFT truss girder 1 and the precast bottom plate 2 are secured. Segments of prefabricated form are sequentially launched forward.
  • FIG. 15 is a schematic cross-sectional view corresponding to FIG. 10 showing a state in which the head unit 140 is assembled to the stud 14.
  • Tension is introduced axially against the precast deck 2 over the entire span of the bridge to integrate the precast deck 2 in all segments.
  • a sheath tube or the like in which the tension member can be placed in advance when the precast bottom plate 2 is manufactured can be embedded in the precast bottom plate 2.
  • FIG. 16 is a schematic cross-sectional view corresponding to FIG. 10 showing a state where the stud 14 is embedded in the grouting material by filling the grouting material 27 in the front pocket 20.
  • a space (upper space of the upper beam) surrounded by the upper surface of the upper beam 11 and the support member 15 is formed below the front pocket 20, and the front pocket 20 has a through hole with the upper and lower portions opened.
  • the upper space of the upper beam is made of a ball is in communication with the inside of the front pocket (20).
  • the grouting material 27 is also filled in the upper space of the upper beam.
  • the upper space of the upper beam is also formed in the longitudinal direction, and in this case, the grouting material, which is called the front pocket 20, is long in the longitudinal direction. It will be filled in the upper space.
  • the grouting material 27 is filled and cured in the upper space of the upper beam 11 and the front end pocket 20, and the studs 14 are embedded in the grouting material 27, thereby precasting the CFT truss girder 1 and the precast.
  • the bottom plate 2 is combined and synthesized integrally.
  • a segment is manufactured using the CFT truss girder 1 and the precast deck 2, and the segments are continuously arranged to connect the CFT truss girder 1 in the axial direction, and connected to each other.
  • the bridge is constructed by sequentially launching segments forward.
  • the CFT truss girder 1 and the precast bottom plate 2 are completely assembled and not in a synthesized state.
  • the tensile force acting on the CFT truss girder 1 in the process of launching the segment is not transmitted to the precast bottom plate 2. Therefore, when launching the segment, it is possible to prevent excessive tensile force from acting on the precast sole plate, thereby effectively preventing the precast sole plate from being damaged by the tensile force.
  • the precast deck 2 serves as a kind of bracing member to prevent lateral torsional buckling of the CFT truss girder 1 . If only the CFT truss girder (1) is launched first and then the bottom plate is installed in the field, the risk of lateral torsional buckling on the CFT truss girder (1) is very high during the launch of the CFT truss girder (1).
  • the segment is launched, so that the CFT truss girder 1 is launched while the CFT truss girder 1 is launched. Lateral torsional behavior of the truss girder 1 is suppressed. Therefore, in the present invention, it is possible to effectively prevent the occurrence of lateral torsional buckling in the CFT truss girder 1 during the launching process, thereby increasing the lateral torsional buckling stability.
  • the extrusion jack 39 was used as the extrusion device in the sequential launch of the segment.
  • a wire may be used as the extrusion device. Since the segment is manufactured using the lightweight CFT truss girder 1, the weight of the segment to be launched is smaller than the concrete bridge constructed by the conventional ILM.
  • FIG. 17 is a schematic side view corresponding to FIG. 2 (b) showing the launching of the first segment S1 and the second segment S2 forward by wires.
  • FIG. 18 shows a schematic enlarged view of the circle E portion of FIG. 17,
  • FIG. 19 shows a schematic enlarged view of the circle F portion of FIG. 17,
  • FIG. 20 shows the circle G portion of FIG. 17. A schematic enlarged view is shown.
  • a winch 55 is provided in the alternating 30 and / or the pier 32.
  • a cross beam 56 is provided at the rear end of the segment located in the rearmost portion (the second segment in FIGS. 17 to 20).
  • the crossbeam 56 is simultaneously attached to a plurality of CFT truss girders 1 existing in the lateral direction.
  • the crossbeam 56 is provided with a pulley 57.
  • the wire 50 is wound around the pulley 57. Therefore, when the winch 55 is wound around the wire 50, the wire 50 wound around the pulley 57 is pulled and the segment is launched forward. In this way, it is possible to easily launch the segment forward using the wire 50, in this case it can be carried out more easily than when using the extrusion jack.
  • the bridges are continuously launched by forwarding the bridges. Will be constructed.
  • the main members forming the upper structure of the bridge is manufactured in the factory, it is possible to minimize the work in the field, thereby greatly shortening the air required for the bridge construction, and construction through mechanized construction It has the advantage of improving the efficiency and stability in the construction process.
  • the segment is launched in a state where the CFT truss girder and the precast deck are "preassembled". Therefore, the precast deck prevents the lateral torsional buckling phenomenon caused by the CFT truss girder during the launching process, and thus has the advantage of ensuring excellent stability against the torsional buckling.
  • the bridge between the long span can be constructed, it can be very usefully applied to roads and railroad bridges crossing obstacles such as rivers and valleys.

Abstract

본 발명은 CFT 트러스 거더와 프리캐스트 바닥판을 가조립하여 세그먼트를 형성한 후, 복수개의 세그먼트를 순차적으로 런칭시켜서 교량을 시공하게 되는 프리캐스트 바닥판과 충전강관 트러스 거더의 조립을 이용한 교량의 런칭시공방법에 관한 것이다.

Description

프리캐스트 바닥판과 충전강관 트러스 거더의 조립을 이용한 교량의 런칭시공방법
본 발명은 교량의 상부구조를 런칭(launching)하여 교량을 시공하는 방법에 대한 것이다. 본 발명은 충전강관(Concrete Filled steel Tube) 트러스 거더(이하, "CFT 트러스 거더"라고 약칭함)와 프리캐스트 바닥판을 가조립하여 "세그먼트(segment)"를 형성한 후, 복수개의 세그먼트를 순차적으로 런칭시켜서 교량을 시공하게 되는 "프리캐스트 바닥판과 충전강관 트러스 거더의 조립을 이용한 교량의 런칭시공방법"에 관한 것이다.
CFT 트러스 거더는, 강관 내부에 콘크리트를 채운 충전강관을 트러스(Truss) 구조로 배열하여 만든 거더이다. 교량을 시공하는 종래의 방법으로 연속압출공법(Incremental Launching Method)(이하, "ILM"이라고 약칭함)이 알려져 있다. ILM에서는 교대의 후방에 미리 조성한 제작장에서 교량의 상부구조를 이루게 되는 복수개의 유닛을 제작한 후, 잭장치 등의 압출장비를 이용하여 세그먼트를 순차적으로 교축방향으로 밀어내어 교량을 시공하게 된다.
CFT 트러스 거더와 콘크리트 바닥판을 이용하여 교량을 시공함에 있어서, ILM을 이용하는 것이 바람직하다. 그런데 종래의 ILM은 다음과 같은 문제점을 가지고 있으며, 이러한 문제점의 해결이 반드시 필요하다.
강재 거더와 콘크리트 바닥판으로 이루어진 교량 상부구조를 종래의 ILM으로 시공할 경우, 강재 거더 위에서 콘크리트를 현장 타설하여 콘크리트 바닥판을 강재 거더에 일체로 합성된 상태로 상부구조의 유닛을 제작한 후에야 런칭이 가능하다. 따라서 종래 기술은 공기가 증가되는 단점이 있다. 또한 종래 기술에서는 상부구조의 유닛을 순차적으로 런칭하는 과정에서 콘크리트 바닥판에 작용하는 인장응력을 상쇄시키기 위하여, 런칭 과정 중에 연속적으로 콘크리트 바닥판에 긴장력을 도입해야 한다. 따라서 공사비가 증가되는 단점이 있다.
종래의 ILM을 적용하면서 강재 거더를 우선 런칭할 수 있는데, 이 경우에도 콘크리트 바닥판은 현장 타설 콘크리트로 제작하게 되어 공기가 증가되는 단점이 해결되지 않는다. 또한 강재 거더를 런칭한 후, 콘크리트 바닥판을 현장 타설 콘크리트로 제작할 때에는 고소에서의 작업이 이루어져야 하므로 시공 효율성과 시공 안전성이 저하되는 문제점도 가지고 있다. 따라서 CFT 트러스 거더와 콘크리트 바닥판을 이용하여 교량의 상부구조를 형성하여 ILM으로 시공하기 위해서는 위와 같은 종래의 ILM이 가지는 문제점을 해결할 필요가 있다.
본 발명은 위와 같은 종래 기술의 한계를 극복하기 위하여 개발된 것이다. 본 발명은 CFT 트러스 거더와 콘크리트 바닥판을 이용하여 교량의 상부구조를 형성하여 ILM으로 시공하되, 현장에서의 작업을 최소화시켜서 공기(공사기간)를 단축시키고, 시공 효율성을 향상시키며 시공과정에서의 안정성 향상시키는 것을 목적으로 한다.
또한 본 발명은 거더에 대해 유발되는 횡비틀림 좌굴 현상을 효과적으로 억제하여 횡비틀림 좌굴에 대한 안정성을 확보하는 것을 목적으로 한다. 또한 본 발명은 런칭과정에서 프리캐스트 바닥판에 과도한 인장력이 작용하는 것을 방지하여 바닥판이 인장력에 의해 파손되는 것을 방지하는 것을 목적으로 한다.
위와 같은 과제를 달성하기 위하여 본 발명에서는, CFT 트러스 거더와 프리캐스트 바닥판으로 이루어진 상부구조를 가지도록 교량을 시공하는 방법으로서, 제작장에서 프리캐스트 바닥판을 CFT 트러스 거더 위에 거치하여 CFT 트러스 거더와 프리캐스트 바닥판은 가조립된 상태로 세그먼트를 제작하고, 세그먼트들을 연속 배치하여 CFT 트러스 거더(1)를 서로 일체로 연결하고, 순차적으로 세그먼트들을 전방으로 런칭하여 교량 상부구조를 형성하며; 세그먼트의 런칭이 완료된 후에, CFT 트러스 거더와 프리캐스트 바닥판을 일체로 결합하여 합성하며, 프리캐스트 바닥판에는 종방향으로 긴장력을 부여하여 프리캐스트 바닥판들로 서로 일체로 합성하는 것을 특징으로 하는 교량의 런칭시공방법이 제공된다.
위와 같은 본 발명에 따른 교량의 런칭시공방법에서, CFT 트러스 거더는 상부빔과 하부빔, 그리고 상,하부빔 사이를 연결하는 복부빔을 포함하여 구성되며; 상부빔의 상면에는 프리캐스트 바닥판을 지지하도록 지지부재가 구비되어 있고, 프리캐스트 바닥판에는 CFT 트러스 거더의 상부빔 위에 놓이는 위치에, 관통공으로 이루어진 전단포켓이 형성되어 있고 상부빔에는 전단포켓 내에 삽입되는 스터드가 구비되어 있으며; 프리캐스트 바닥판을 CFT 트러스 거더 위에 거치하여 CFT 트러스 거더와 프리캐스트 바닥판을 가조립하는 과정은, 스터드가 전단포켓 내에 삽입되어 위치하도록 프리캐스트 바닥판을 지지부재 위에 올려놓는 단계, 및 스터드 상부에 연장봉을 결합하고 프리캐스트 바닥판 상면에 거치부재을 설치하여 연장봉의 상부를 거치부재와 결합하는 단계를 포함할 수 있다.
특히, 이 경우, CFT 트러스 거더와 프리캐스트 바닥판을 일체로 합성하는 과정은, 연장봉과 거치부재를 제거하는 단계, 및 스터드가 위치하고 있는 전단포켓 내에 그라우팅재를 부어서, 상부빔의 상부공간과 전단포켓 내에 그라우팅재가 채워져 경화되도록 하는 단계를 포함할 수 있다.
또한 본 발명에서, 거치부재에는 연장봉이 관통하게 되는 관통공이 형성되어 있고; 연장봉의 상부를 거치부재와 결합하는 단계에서는, 연장봉이 스터드에 결합된 상태에서 거치부재를 전단포켓 위에 놓으면서 연장봉의 상부가 관통공에 끼워져서 거치부재를 관통한 상태로 거치부재를 프리캐스트 바닥판의 상면에 놓고, 거치부재의 상면으로 돌출된 연장봉에 체결부재를 결합하여 거치부재를 프리캐스트 바닥판의 상면으로 가압하도록 가압력이 작용하게 하는 과정을 포함할 수도 있다.
이러한 본 발명에서, CFT 트러스 거더와 프리캐스트 바닥판을 일체로 합성할 때, 연장봉과 거치부재의 제거 후, 스터드의 상단에 헤드부를 결합한 이후에, 그라우팅재를 전단포켓 내에 타설하게 될 수도 있다.
또한 본 발명에서 세그먼트들을 제작하여 순차적으로 세그먼트들을 전방으로 런칭하여 교량 상부구조를 형성하는 과정은, 프리캐스트 바닥판을 CFT 트러스 거더 위에 거치하고 가조립하여 제1세그먼트를 제작하는 단계; CFT 트러스 거더와 프리캐스트 바닥판의 가조립에 의해 제2세그먼트를 제작하여 제1세그먼트의 후방에 배치하여 제1,2세그먼트의 CFT 트러스 거더를 연결하는 단계; 제1,2세그먼트를 밀어서 전방으로 런칭하는 단계; 및 CFT 트러스 거더와 프리캐스트 바닥판의 가조립에 의해 추가적인 세그먼트를 제작하여 최후방에 위치한 세그먼트의 후방에 새로 제작한 추가적인 세그먼트를 배치하고 세그먼트간의 CFT 트러스 거더를 연결한 후, 세그먼트를 밀어서 전방으로 런칭하는 단계를 포함할 수도 있다.
또한 본 발명에서, 교대에는 윈치가 설치되어 있고; 세그먼트를 밀어서 전방으로 런칭하는 단계에서는, 최후방에 위치한 세그먼트의 후단에, 풀리가 구비된 크로스빔을 설치하고, 와이어를 풀리에 감아서, 윈치가 와이어를 와인딩하여 와이어가 당겨지도록 함으로써 세그먼트가 전방으로 움직이도록 구성될 수도 있다.
본 발명에 의하면, CFT 트러스 거더와 프리캐스트 바닥판으로 이루어진 경량의 상부구조를 가지는 장경간의 교량을 시공할 수 있게 된다.
특히, 본 발명에서는 교량의 상부구조를 이루는 주요부재를 공장에서 제작하게 되므로, 현장에서의 작업을 최소화시킬 수 있게 되고, 그에 따라 교량 시공에 소요되는 공기를 크게 단축시킬 수 있을 뿐만 아니라, 기계화 시공을 통한 시공 효율성 향상 및 시공과정에서의 안정성 향상의 장점을 가지게 된다.
또한 본 발명에서는 교량 상부구조의 런칭과정에서 CFT 트러스 거더에 대해 유발되는 횡비틀림 좌굴 현상을 프리캐스트 바닥판이 억제하게 되며, 그에 따라 횡비틀림 좌굴에 대한 우수한 안정성을 확보할 수 있게 되는 장점이 있다.
또한 본 발명에서는 교량 상부구조의 런칭과정에서 프리캐스트 바닥판에 과도한 인장력이 작용하는 것을 방지할 수 있게 되고, 그에 따라 프리캐스트 바닥판이 인장력에 의해 파손되는 것을 효과적으로 예방할 수 있게 되는 장점이 있다.
도 1 내지 도 3은 각각 본 발명의 일 실시예에 따른 교량 런칭시공방법의 과정을 순차적으로 보여주는 개략적인 측면도이다.
도 4 및 도 5는 각각 본 발명에서 CFT 트러스 거더에 프리캐스트 바닥판이 놓이는 상태를 바라보는 방향을 달리하여 보여주는 개략적인 분해 사시도이다.
도 6은 도 4의 원 A부분에 대한 개략적인 확대도이다.
도 7은 본 발명에서 CFT 트러스 거더에 프리캐스트 바닥판이 놓여있는 상태를 보여주는 개략적인 사시도이다.
도 8은 도 7에서 선 E-E에 따라 프리캐스트 바닥판을 절단한 단면으로 보여주는 개략적인 사시도이다.
도 9 내지 도 13은 각각 본 발명에서 도 8의 원 D부분을 화살표 B 방향으로 바라본 종방향의 개략적인 단면도이다.
도 14는 횡비틀림 좌굴로 인하여 상부빔이 회전한 상태를 보여주는 도 10에 대응되는 개략적인 단면도이다.
도 15는 본 발명에서 스터드에 헤드부를 조립하는 상태를 보여주는 도 10에 대응되는 개략적인 단면도이다.
도 16은 본 발명에서 전단포켓 내에서 스터드가 그라우팅재에 매립되어 있는 상태를 보여주는 도 10에 대응되는 개략적인 단면도이다.
도 17은 와이어를 이용하여 세그먼트를 전방으로 런칭시키는 것을 보여주는 도 2의 (b)에 대응되는 개략적인 측면도이다.
도 18은 도 17의 원 E 부분에 대한 개략적인 확대도이다.
도 19는 도 17의 원 F 부분에 대한 개략적인 확대도이다.
도 20은 도 17의 원 G 부분에 대한 개략적인 확대도이다.
이하, 본 발명의 바람직한 실시예를 첨부한 도면을 참조하여 설명한다. 본 발명은 도면에 도시된 실시예를 참고로 설명되었으나 이는 하나의 실시예로서 설명되는 것이며, 이것에 의해 본 발명의 기술적 사상과 그 핵심 구성 및 작용이 제한되지 않는다. 참고로 본 명세서에서는 교축방향으로 교대에서 교각을 향하여 세그먼트를 밀어주는 방향을 "전방"이라고 기재하고 이와 반대되는 방향을 "후방"이라고 기재한다. 그리고 교축방향은 "종방향"으로도 기재하고, 교축직각방향은 "횡방향"으로도 기재한다.
도 1 내지 도 3에는 각각 본 발명의 일 실시예에 따른 교량 런칭시공방법의 과정을 순차적으로 보여주는 개략적인 측면도가 도시되어 있다. 도 1의 (a)에 도시된 것처럼, 교대(30)의 후방에 형성된 제작장(31)에서, CFT 트러스 거더(1)를 소정 길이로 제작하고 프리캐스트 방식으로 공장에서 사전 제작된 프리캐스트 바닥판(2)을 CFT 트러스 거더(1) 위에 거치하고 "가(假)조립(임시조립)"하여 <제1세그먼트>(S1)을 제작한다(단계 1). 이와 같이 본 발명의 교량 런칭시공방법에서는 교량을 이루는 주요부재에 해당하는 프리캐스트 바닥판(2)과 CFT 트러스 거더(1)를 모두 공장에서 사전 제작하게 되므로, 현장에서 콘크리트를 타설하여 바닥판을 시공하는 종래 기술에 비하여, 시공의 품질을 향상시킬 수 있게 되고, 균일한 부재의 품질을 유지할 수 있게 되는 장점이 있다.
후속하여 도 1의 (b)에 도시된 것처럼, 제1세그먼트(S1)의 후방 단부에, CFT 트러스 거더(1)와 프리캐스트 바닥판(2)이 가조립되어 형성되는 <제2세그먼트>(S2)를 연속되게 배치하여 제1세그먼트(S1)와 연결한다(단계 2). 제2세그먼트(S2)는 제1세그먼트(S1)와 마찬가지로, 소정 길이로 공장 제작된 CFT 트러스 거더(1) 위에 공장에서 사전 제작된 프리캐스트 바닥판(2)을 CFT 트러스 거더(1) 위에 거치하고 "가(假)조립"하여 제작된다. 제2세그먼트(S2)의 후방에 설치되는 추가적인 세그먼트들 역시 위에서 설명한 제1,2세그먼트(S1, S2)와 동일한 방식으로 각각 제작된다.
압출에 의한 런칭이 진행되지 않은 상태에서 세그먼트들을 서로 연결한다는 것은 CFT 트러스 거더(1)만을 서로 일체로 연결하는 것이다. 즉, 제1세그먼트(S1)의 후방에 제2세그먼트(S2)를 연속하여 배치하고 제1,2세그먼트(S1, S2)를 연결할 때에는, 아직 프리캐스트 바닥판(2)은 일체로 연결하지 않고 단지 제1세그먼트(S1)의 CFT 트러스 거더와 제2세그먼트(S2)의 CFT 트러스 거더만을 서로 일체로 연결하는 것이다. CFT 트러스 거더 간의 일체 연결 작업은 용접 등의 다양한 방법을 이용하여 수행할 수 있다. 제1세그먼트(S1)의 후방에 제2세그먼트(S2)를 배치하고 연결하는 작업과 병행하여, 제1세그먼트(S1)의 전방에는 런칭 노즈(launching nose)(9)를 연결 설치한다. 런칭 노즈(9)는 ILM에서 일반적으로 사용되는 부재이므로 이에 대한 설명은 생략한다.
제작장에 복수개의 세그먼트들이 교축방향으로 연속배치된 상태에서 세그먼트를 전방으로 압출한다(단계 3). 이를 위하여 도 2의 (a)에 도시된 것처럼, 최후방에 위치하는 세그먼트의 후방에 압출잭(39)을 설치하여 작동함으로써, 도 2의 (b)에 도시된 것처럼, 연속배치되어 있던 복수개의 세그먼트들(도면에 예시된 실시예의 경우에는 제1세그먼트와 제2세그먼트)을 전방으로 밀어내어 사전에 정해진 위치까지 런칭시킨다.
후속하여 도 3의 (a)에 도시된 것처럼, 아직 제작장에 위치하고 있는 <제2세그먼트(S2)>의 후방에 <제3세그먼트(S3)>를 연속배치하여 제3세그먼트(S3)를 제2세그먼트(S2)와 연결한다(단계 4). 제3세그먼트(S3) 역시 CFT 트러스 거더(1)와 프리캐스트 바닥판(2)의 가조립으로 제작된다. 후속하여 도 3의 (b)에 도시된 것처럼, 제3세그먼트(S3)의 후방에 압출잭(39)을 설치하여 작동시켜 연속배치되어 있던 복수개의 세그먼트들(도면에 예시된 실시예의 경우에는 제1세그먼트, 제2세그먼트 및 제3세그먼트)을 전방으로 움직여서 사전에 정해진 위치까지 런칭시킨다(단계 5).
전방으로 런칭된 세그먼트들의 최후방 세그먼트의 후방에 새로운 세그먼트를 연속배치하여 연결한 후, 압출잭(39)을 설치하고 작동시켜 세그먼트들을 전방으로 런칭시키는 일련의 과정을 반복하여, 복수개의 세그먼트가 연속된 상태로 설계된 교량의 전체 경간에 걸쳐 배치되도록 한다(단계 6).
복수개의 세그먼트가 연속된 상태로, 설계된 교량의 전체 경간에 걸쳐 배치되고 교각(32)에 의해 지지되는 과정 동안, 각각의 세그먼트에서 CFT 트러스 거더(1)와 프리캐스트 바닥판(2)는 아직 가조립 상태에 있다. 즉, CFT 트러스 거더(1)와 프리캐스트 바닥판(2)는 서로 완전하게 일체로 합성되어 있지 않은 것이다. 또한 교축방향으로 세그먼트의 프리캐스트 바닥판(2)들도 서로 일체로 합성되어 있지 않다. 따라서 복수개의 세그먼트가 연속된 상태로 설계된 교량의 전체 경간에 걸쳐 배치된 후에는, 각각의 세그먼트에서의 CFT 트러스 거더(1)와 프리캐스트 바닥판(2)간의 일체 합성 작업을 수행하고, 교축방향으로는 세그먼트의 프리캐스트 바닥판(2)들간의 일체 합성 작업을 수행한다(단계 7).
본 발명의 교량 런칭시공방법에서는, CFT 트러스 거더(1)에 프리캐스트 바닥판(2)이 "가(假)조립"된 상태에서 런칭이 이루어지고, 교량의 전체 경간에 걸쳐서 세그먼트의 런칭이 완료된 후에 CFT 트러스 거더(1)와 프리캐스트 바닥판(2)간의 일체 합성이 이루어진다. 다음에서는 CFT 트러스 거더(1)와 프리캐스트 바닥판(2)의 가조립 구조 및 방법에 대해 설명한다. 그리고 CFT 트러스 거더(1)와 프리캐스트 바닥판(2)의 일체 합성 구조 및 방법에 대해서도 설명한다.
도 4 및 도 5에는 CFT 트러스 거더(1)에 프리캐스트 바닥판(2)이 놓이는 상태를 바라보는 방향을 달리하여 보여주는 개략적인 분해 사시도가 도시되어 있으며, 도 6에는 도 4의 원 A부분 즉, CFT 트러스 거더(1)에서 상부빔(11)의 상면부에 대한 개략적인 확대도가 도시되어 있다. 도면에 예시된 것처럼, CFT 트러스 거더(1)는 연직방향의 간격을 가진 채 각각 교축방향으로 연장되고 서로 평행하게 배치되는 상부빔(11)과 하부빔(12), 그리고 상,하부빔(11, 12) 사이를 연결하는 복부(web)빔(13)을 포함하여 구성된다. 상부빔(11), 하부빔(12) 및 복부빔(13)은 강관 내부에 콘크리트(101)가 채워져 있는 구성을 가진다. CFT 트러스 거더(1)는 상부빔(11)과 하부빔(12)이 각각 연직방향으로 상부와 하부에 위치하도록 세워져 설치된다. 본 발명에서 CFT 트러스 거더(1)는 복수개가 교축직각방향으로 간격을 두고 나란하게 배치된다. 도면에 예시된 실시예의 경우, 2개의 CFT 트러스 거더(1)가 구비되어 있다.
프리캐스트 바닥판(2)은 소정 두께를 가지는 콘크리트 사각판 부재이다. 프리캐스트 바닥판(2)은 CFT 트러스 거더(1) 위에 설치되어 세그먼트를 이루게 된다. 하나의 세그먼트에서, 프리캐스트 바닥판(2)의 교축방향의 길이가 CFT 트러스 거더(1)의 교축방향의 길이와 동일할 수도 있다. 그러나 하나의 세그먼트에서 프리캐스트 바닥판(2)의 교축방향의 길이가 CFT 트러스 거더(1)의 교축방향의 길이보다 작을 수도 있다. 이 경우, 하나의 세그먼트에서 복수개의 프리캐스트 바닥판(2)이 교축방향으로 연속하여 위치하면서 CFT 트러스 거더(1) 위에 설치된다. 그리고 하나의 세그먼트를 형성함에 있어서, 복수개의 프리캐스트 바닥판(2)이 종방향으로 연속배치될 수도 있다. 하나의 세그먼트에서, 종방향으로 길게 연속된 CFT 트러스 거더(1)의 상부빔(11) 위에 복수개의 프리캐스트 바닥판(2)이 종방향으로 연속배치될 수도 있는 것이다.
프리캐스트 바닥판(2)은 CFT 트러스 거더(1)의 상부빔(11) 위에 놓이게 된다. 프리케스트 바닥판(2)이 상부빔(11)에 놓이게 되는 위치에서, 프리캐스트 바닥판(2)에는 전단포켓(20)이 형성되어 있다. 전단포켓(20)은 프리캐스트 바닥판(2)을 그 두께 방향으로 관통하는 관통공이다. 전단포켓(20)은 복수개가 교축방향으로 간격을 두고 형성되어 있다.
상부빔(11)의 상면에서, 프리캐스트 바닥판(2)이 놓였을 때 전단포켓(20)이 위치하게 되는 지점에는 연직한 스터드(14)가 구비되어 있다. 즉, 막대부재로 이루어진 스터드(14)가 연직하게 세워져서 상부빔(11)의 상면에 고정 설치되어 있는 것이다. 스터드(14)의 상단에는 나사부가 형성되어 있다.
상부빔(11)의 상면에 프리캐스트 바닥판(2)이 안정적으로 놓일 수 있도록, 상부빔(11)의 상면에는 지지부재(15)가 구비될 수 있다. 도면에 도시된 실시예의 경우, 지지부재(15)는 수평부와 수직부를 가지도록 ㄱ자의 절곡된 단면을 가지면 교축방향으로 연장되어 있는 절곡빔으로 이루어져 있다. 지지부재(15)의 수직부 하단은 상부빔(11)의 상면에 결합 고정된다. 지지부재(15)는 2개가 한 쌍을 이루어서 상부빔(11)의 중앙으로부터 교축직각방향 양측에 각각 구비된다. 지지부재(15)의 수평부 상면에는 고무판 등의 밀봉재(150)가 배치되는 것이 바람직하다. 지지부재(15)는 상부빔(11)의 전체 길이에 걸쳐 교축방향으로 길게 연장될 수 있다.
상부빔(11)을 가지고 있고 상부빔(11)의 상면에 스터드(14)와 지지부재(15)가 설치되어 있는 CFT 트러스 거더(1)를 공장에서 제작하여 제작장(31)에 설치한다. 프리캐스트 바닥판(2)도 공장에서 프리캐스트 방식으로 사전 제작한 후, 제작장(31)에서 CFT 트러스 거더(1) 위에 설치된다. 도 7에는 CFT 트러스 거더(1)에 프리캐스트 바닥판(2)이 놓여있는 상태를 보여주는 개략적인 사시도가 도시되어 있고, 도 8에는 도 7에서 선 E-E에 따라 프리캐스트 바닥판(2)을 절단한 단면으로 보여주는 프리캐스트 바닥판(2)과 CFT 트러스 거더(1)의 결합 부분을 보여주는 개략적인 사시도가 도시되어 있다. 도 9 내지 도 13에는 각각 전단포켓(20)이 형성된 위치에서 프리캐스트 바닥판(2)과 CFT 트러스 거더(1)의 상부빔(11)을 서로 가결합하는 과정을 순차적으로 보여주기 위하여 도 8의 원 D부분을 화살표 B 방향으로 바라본 종방향의 개략적인 단면도가 도시되어 있다.
프리캐스트 바닥판(2)을 크레인 등의 인양장비를 이용하여 인양하여, 제작장(31)에 위치한 CFT 트러스 거더(1)의 상부빔(11) 위쪽에 설치한다. 도 9에 도시된 것처럼 프리캐스트 바닥판(2)을 CFT 트러스 거더(1) 위에서 하강시키면, 도 10에 도시된 것처럼 프리캐스트 바닥판(2)이 지지부재(15) 위에 놓이게 되고, 상부빔(11)의 스터드(14)는 프리캐스트 바닥판(2)의 전단포켓(20) 내에 삽입되어 위치하게 된다. 지지부재(15) 위에 밀봉재(150)가 구비되어 있는 경우, 프리캐스트 바닥판(2)이 지지부재(15) 위에 놓일 때, 프리캐스트 바닥판(2)의 하면과 지지부재(15) 사이를 밀봉재(150)가 수밀한 상태로 만들게 된다.
후속하여 스터드(14) 상부에 연장봉(16)을 결합하고 프리캐스트 바닥판(2) 상면에 거치부재(17)을 설치하여 연장봉(16)의 상부를 거치부재(17)와 결합한다. 도 11에 도시된 것처럼, 연직방향으로 연장된 봉부재로 구성된 연장봉(16)을 스터드(14)의 상단에 나사결합한다. 프리캐스트 바닥판(2)을 CFT 트러스 거더(1)의 상부에 설치하기 전에, 미리 스터드(14)에 연장봉(16)을 조립 결합해둘 수도 있지만, 위에서 설명한 것처럼 연장봉(16)은 프리캐스트 바닥판(2)을 CFT 트러스 거더(1)의 상부에 설치한 후에, 스터드(14)에 조립결합하는 것이 손상방지를 위하여 바람직하다.
후속하여 거치부재(17)를 설치하여 연장봉(16)과 결합한다. 거치부재(17)는 전단포켓(20)을 가로지른 상태로 프리캐스트 바닥판(2)의 상면에 놓이는 부재이다. 거치부재(17)에는 관통공(170)이 형성되어 있다. 도 12에 도시된 것처럼 연장봉(16)이 스터드(14)에 결합된 상태에서, 거치부재(17)를 전단포켓(20) 위에 놓아서 설치하게 되면, 연장봉(16)의 상부는 관통공(170)에 끼워져서 거치부재(17)를 관통하게 되고, 거치부재(17)는 프리캐스트 바닥판(2)의 상면에 놓이게 된다.
거치부재(17)를 관통하여 거치부재(17)의 상면으로 돌출된 연장봉(16)에는, 도 13에 도시된 것처럼 체결부재(18)를 결합한다. 체결부재(18)는 연장봉(16)이 거치부재(17)를 관통한 상태에서 거치부재(17)를 프리캐스트 바닥판(2)의 상면으로 가압하도록 가압력이 작용하게 만드는 부재로 구성되는 것이 바람직하다. 예를 들어 체결부재(18)는 너트부재로 구성될 수 있다.
위에서 설명한 것처럼 상부빔(11)의 상면에 스터드(14)와 지지부재(15)가 설치되어 있는 CFT 트러스 거더(1) 위에, 프리캐스트 바닥판(2)을 설치하게 되면, 프리캐스트 바닥판(2)이 지지부재(15)에 의해 지지되고 스터드(14)가 전단포켓(20) 내에 위치한 상태가 된다. 이러한 상태에서 스터드(14)에 연장봉(16)을 결합하고, 거치부재(17) 및 체결부재(18)를 설치하게 되면, CFT 트러스 거더(1)와 프리캐스트 바닥판(2)는 가조립된 상태가 된다. 즉, CFT 트러스 거더(1)와 프리캐스트 바닥판(2)이 가조립됨으로써 세그먼트가 만들어지는 것이다.
이러한 CFT 트러스 거더(1)와 프리캐스트 바닥판(2)의 가조립 상태에서는, CFT 트러스 거더(1)와 프리캐스트 바닥판(2)가 서로 완벽하게 일체화되어 있지 않지만, 세그먼트가 전방으로 런칭될 때 CFT 트러스 거더(1)와 프리캐스트 바닥판(2)는 함께 움직이게 된다. 특히, CFT 트러스 거더(1)와 프리캐스트 바닥판(2)의 가조립 상태에 의해, 세그먼트 런칭 과정에서 CFT 트러스 거더(1)에 횡비틀림 좌굴이 발생하는 것을 효과적으로 방지할 수 있게 된다.
CFT 트러스 거더(1)는 상부빔(11)과 하부빔(12)이 각각 연직방향으로 상부와 하부에 위치하고, 상,하부빔(11, 12) 사이를 복부빔(13)이 연결하고 있는 구성을 가진다. 따라서 연직방향으로 CFT 트러스 거더(1)에 힘이 가해지면 CFT 트러스 거더(1)가 비틀리게 되는 횡비틀림 좌굴이 발생하기 쉽다. 도 14에는 스터드(14)가 전단포켓(20) 내에 삽입된 상태에서 CFT 트러스 거더(1)에 횡비틀림 좌굴이 발생하여 상부빔(11)이 회전한 상태를 보여주는 도 10에 대응되는 개략적인 단면도가 도시되어 있다. 만일 CFT 트러스 거더(1) 위에 프리캐스트 바닥판(2)이 놓이되, 단순히 스터드(14)가 전단포켓(20) 내에 위치한 상태로만 있다면 스터드(14)가 전단포켓(20) 내에서 자유롭게 움직일 수 있으므로, 세그먼트의 런칭이 진행될 때, 연직방향의 힘에 의해 도 14에 도시된 것처럼 상부빔(11)의 위치 변화가 발생하고 그에 따라 CFT 트러스 거더(1)에 횡비틀림 좌굴이 발생할 수 있다.
그러나 본 발명에서는 도 13에 도시된 것처럼 스터드(14)가 연장봉(16, 거치부재(17) 및 체결부재(18)에 의해 고정되어 있으므로, 스터드(14)가 전단포켓(20) 내에서 움직일 수 없게 되다. 따라서 연직방향으로 CFT 트러스 거더(1)에 힘이 가해지더라도 CFT 트러스 거더(1)는 비틀리지 않게 된다. CFT 트러스 거더(1)에 프리캐스트 바닥판(2)을 설치하여 세그먼트를 만들어서, 세그먼트를 전방으로 런칭하는 과정에서 CFT 트러스 거더(1)에 횡비틀림 좌굴이 발생하는 것을 효과적으로 방지할 수 있게 된다.
다음에서는 앞서 단계 7로 설명하였던 각각의 세그먼트에서 CFT 트러스 거더(1)와 프리캐스트 바닥판(2)을 일체로 합성하는 작업 및 종방향으로 세그먼트의 프리캐스트 바닥판(2)들을 일체로 합성하는 작업에 대해 구체적으로 설명한다.
본 발명에서는 도 13에 도시된 것처럼 스터드(14)가 연장봉(16), 거치부재(17) 및 체결부재(18)에 의해 고정되어 CFT 트러스 거더(1)와 프리캐스트 바닥판(2)가 가조립된 형태의 세그먼트들을 순차적으로 전방을 향하여 런칭하게 된다.
런칭이 완료되어 복수개의 세그먼트가 연속된 상태로 설계된 교량의 전체 경간에 걸쳐 배치된 후에는, 체결부재(18)와 거치부재(17), 그리고 연장봉(16)을 해체하여 제거한다. 필요에 따라서는 스터드(14)의 전단연결재 역할을 더욱 강화시키기 위하여, 연장봉(16)이 제거된 상태에서 스터드(14)의 상단에는 스터드(14)의 직경보다 더 큰 헤드부(140)를 조립 설치할 수도 있다. 도 15에는 스터드(14)에 헤드부(140)를 조립하는 상태를 보여주는 도 10에 대응되는 개략적인 단면도가 도시되어 있다.
교량의 전체 경간에 걸쳐 프리캐스트 바닥판(2)에 대해 교축방향으로 긴장력을 도입하여 전체 세그먼트들에서 프리캐스트 바닥판(2)을 일체화시킨다. 이를 위해서 프리캐스트 바닥판(2)을 제작할 때 미리 긴장재를 배치할 수 있는 쉬스관 등을 프리캐스트 바닥판(2)에 매립해둘 수 있다.
교축방향의 긴장력 도입을 통해서 프리캐스트 바닥판(2)을 일체화시킨 후에는, 내부에 스터드(14)가 위치하고 있는 전단포켓(20) 내에 그라우팅재를 채운다. 도 16에는 전단포켓(20) 내에 그라우팅재(27)를 채워서 스터드(14)가 그라우팅재에 매립되어 있는 상태를 보여주는 도 10에 대응되는 개략적인 단면도가 도시되어 있다. 전단포켓(20)의 아래쪽에는 상부빔(11)의 상면과 지지부재(15)에 의해 둘러싸인 공간(상부빔의 상부공간)이 형성되어 있고, 전단포켓(20)은 상,하부가 개방된 관통공으로 이루어져 있어서 상부빔의 상부공간은 전단포켓(20)의 내부와 연통되어 있다. 따라서 전단포켓(20) 내에 그라우팅재를 부으면, 그라우팅재(27)는 상부빔의 상부공간에도 채워지게 된다. 특히, 지지부재(15)가 종방향으로 길게 연장되어 있는 경우는 상부빔의 상부공간도 종방향으로 길게 형성되므로, 이 경우 전단포켓(20)으로 부어진 그라우팅재는 종방향으로도 길게 상부빔의 상부공간에 채워지게 된다. 이와 같이 상부빔(11)의 상부공간과 전단포켓(20) 내에 그라우팅재(27)가 채워져 경화되고, 스터드(14)가 그라우팅재(27)에 매립됨으로써, CFT 트러스 거더(1)와 프리캐스트 바닥판(2)이 결합되어 일체로 합성된다.
위에서 살펴본 것처럼, 본 발명에서는 CFT 트러스 거더(1)와 프리캐스트 바닥판(2)을 이용하여 세그먼트를 제작하고, 이러한 세그먼트를 연속 배치하여 CFT 트러스 거더(1)들을 교축방향으로 연결하면서, 서로 연결된 세그먼트를 순차적으로 전방으로 런칭시켜서 교량을 구축하게 된다. 그런데 본 발명의 경우, 세그먼트를 런칭할 때에는 CFT 트러스 거더(1)와 프리캐스트 바닥판(2)가 완전히 결합되어 합성된 상태가 아니라 가조립된 상태에 있게 된다. 이러한 가조립 상태에서는 세그먼트를 런칭하는 과정에서 CFT 트러스 거더(1)에 작용하는 인장력이, 프리캐스트 바닥판(2)에 전달되지 않는다. 따라서 세그먼트를 런칭할 때, 프리캐스트 바닥판에 과도한 인장력이 작용하는 것을 방지할 수 있게 되고, 그에 따라 프리캐스트 바닥판이 인장력에 의해 파손되는 것을 효과적으로 예방할 수 있게 된다.
CFT 트러스 거더(1)와 프리캐스트 바닥판(2)의 가조립 상태에서는, 프리캐스트 바닥판(2)이 CFT 트러스 거더(1)의 횡비틀림 좌굴을 방지하기 위한 일종의 브레이싱 부재로서의 역할을 수행하게 된다. 만일 CFT 트러스 거더(1)만을 먼저 런칭한 후 현장에서 바닥판을 시공한다면, CFT 트러스 거더(1)를 런칭하는 과정에서 CFT 트러스 거더(1)에 횡비틀림 좌굴이 발생할 위험이 매우 높다.
그러나 본 발명에서는 CFT 트러스 거더(1)와 프리캐스트 바닥판(2)가 가조립되어 있는 상태의 세그먼트를 런칭하게 되므로, CFT 트러스 거더(1)가 런칭되는 과정에서 프리캐스트 바닥판(2)이 CFT 트러스 거더(1)의 횡비틀림 거동을 억제하게 된다. 따라서 본 발명에서는 런칭 과정에서 CFT 트러스 거더(1)에 횡비틀림 좌굴이 발생하는 것을 매우 효과적으로 방지할 수 있게 되어, 횡비틀림 좌굴 안정성을 높일 수 있게 된다.
도 1 내지 도 3에 도시된 본 발명의 실시예에서는 세그먼트를 순차적으로 런칭함에 있어서 압출장치로서, 압출잭(39)을 이용하였다. 그러나 세그먼트를 런칭함에 있어서 압출장치로서 와이어를 이용할 수도 있다. 경량의 CFT 트러스 거더(1)를 이용하여 세그먼트가 제작되므로, 런칭해야 할 세그먼트의 자중이 종래의 ILM에 의해 시공되는 콘크리트 교량보다 작기 때문이다.
도 17에는 연속배치되어 있는 제1세그먼트(S1)와 제2세그먼트(S2)를 와이어에 의해 전방으로 런칭시키는 것을 보여주는 도 2의 (b)에 대응되는 개략적인 측면도가 도시되어 있다. 도 18에는 도 17의 원 E 부분에 대한 개략적인 확대도가 도시되어 있으며, 도 19에는 도 17의 원 F 부분에 대한 개략적인 확대도가 도시되어 있고, 도 20에는 도 17의 원 G 부분에 대한 개략적인 확대도가 도시되어 있다.
도 17 내지 도 20에 도시된 것처럼, 와이어를 이용하여 세그먼트를 런칭하기 위해서는, 교대(30) 및/또는 교각(32)에 윈치(55)를 설치한다. 최후방에 위치한 세그먼트(도 17 내지 도 20에서는 제2세그먼트)의 후단에 크로스빔(cross beam)(56)을 설치한다. 크로스빔(56)은, 횡방향으로 존재하는 복수개의 CFT 트러스 거더(1)에 동시에 결합설치된다. 크로스빔(56)에는 풀리(57)가 구비된다. 와이어(50)는 풀리(57)를 감게 된다. 따라서 윈치(55)가 와이어(50)를 감게 되면 풀리(57)에 감겨진 와이어(50)가 당겨지면서 세그먼트가 전방으로 런칭된다. 이와 같이 와이어(50)를 이용해서도 용이하게 세그먼트를 전방으로 런칭시킬 수 있으며, 이 경우 압출잭을 이용할 때보다 용이하게 런칭작업을 수행할 수 있게 된다.
이상에서 살펴본 바와 같이, 본 발명에 따른 교량 런칭시공방법에서는 공장 제작된 프리캐스트 바닥판과 CFT 트러스 거더를 제작장에서 조립하여 각각의 세그먼트를 제작한 후, 연속배치된 세그먼트를 전방으로 런칭하여 교량을 시공하게 된다. 이와 같이 교량의 상부구조를 이루는 주요부재를 공장에서 제작하게 되므로, 현장에서의 작업을 최소화시킬 수 있게 되고, 그에 따라 교량 시공에 소요되는 공기를 크게 단축시킬 수 있을 뿐만 아니라, 기계화 시공을 통한 시공 효율성 향상 및 시공과정에서의 안정성 향상의 장점을 가지게 된다.
또한 본 발명에서는 CFT 트러스 거더와 프리캐스트 바닥판이 "가조립"된 상태에서 세그먼트가 런칭된다. 따라서 런칭과정에서 CFT 트러스 거더에 대해 유발되는 횡비틀림 좌굴 현상을 프리캐스트 바닥판이 억제하게 되며, 그에 따라 횡비틀림 좌굴에 대한 우수한 안정성을 확보할 수 있게 되는 장점이 있다.
특히, 본 발명에 따른 교량 런칭시공방법에 의하면 장경간의 교량을 시공할 수 있으므로, 하천, 계곡 등 장애물을 횡단하는 도로 및 철도교에 매우 유용하게 적용할 수 있다.

Claims (8)

  1. CFT 트러스 거더와 프리캐스트 바닥판으로 이루어진 상부구조를 가지도록 교량을 시공하는 방법으로서,
    제작장에서 프리캐스트 바닥판을 CFT 트러스 거더 위에 거치하여 CFT 트러스 거더와 프리캐스트 바닥판은 가조립된 상태로 세그먼트를 제작하고, 세그먼트들을 연속 배치하여 CFT 트러스 거더(1)를 서로 일체로 연결하고, 순차적으로 세그먼트들을 전방으로 런칭하여 교량 상부구조를 형성하며;
    세그먼트의 런칭이 완료된 후에, CFT 트러스 거더와 프리캐스트 바닥판을 일체로 합성하는 것을 특징으로 하는 교량의 런칭시공방법.
  2. 제1항에 있어서,
    하나의 세그먼트에는 복수개의 프리캐스트 바닥판이 종방향으로 연속배치되며;
    세그먼트의 런칭 완료 후 CFT 트러스 거더와 프리캐스트 바닥판을 일체 합성하는 것과 병행하여, 복수개의 프리캐스트 바닥판들에 대해 종방향으로 긴장력을 부여하여 프리캐스트 바닥판들을 서로 일체화시키는 작업을 수행하는 것을 특징으로 하는 교량의 런칭시공방법.
  3. 제1항에 있어서,
    CFT 트러스 거더는 상부빔과 하부빔, 그리고 상,하부빔 사이를 연결하는 복부빔을 포함하여 구성되며;
    상부빔의 상면에는 프리캐스트 바닥판을 지지하도록 지지부재가 구비되어 있고, 프리캐스트 바닥판에는 CFT 트러스 거더의 상부빔 위에 놓이는 위치에, 관통공으로 이루어진 전단포켓이 형성되어 있고 상부빔에는 전단포켓 내에 삽입되는 스터드가 구비되어 있으며;
    프리캐스트 바닥판을 CFT 트러스 거더 위에 거치하여 CFT 트러스 거더와 프리캐스트 바닥판을 가조립하는 과정은, 스터드가 전단포켓 내에 삽입되어 위치하도록 프리캐스트 바닥판을 지지부재 위에 올려놓는 단계, 및 스터드 상부에 연장봉을 결합하고 프리캐스트 바닥판 상면에 거치부재를 설치하여 연장봉의 상부를 거치부재와 결합하는 단계를 포함하는 것을 특징으로 하는 교량의 런칭시공방법.
  4. 제3항에 있어서,
    CFT 트러스 거더와 프리캐스트 바닥판을 일체로 합성하는 과정은, 연장봉과 거치부재를 제거하는 단계, 및 스터드가 위치하고 있는 전단포켓 내에 그라우팅재를 타설하여, 상부빔의 상부공간과 전단포켓 내에 그라우팅재가 채워져 경화되도록 하는 단계를 포함하는 것을 특징으로 하는 교량의 런칭시공방법.
  5. 제4항에 있어서,
    거치부재에는 연장봉이 관통하게 되는 관통공이 형성되어 있고;
    연장봉의 상부를 거치부재와 결합하는 단계에서는, 연장봉이 스터드에 결합된 상태에서 거치부재를 전단포켓 위에 놓으면서 연장봉의 상부가 관통공에 끼워져서 거치부재를 관통한 상태로 거치부재를 프리캐스트 바닥판의 상면에 놓고, 거치부재의 상면으로 돌출된 연장봉에 체결부재를 결합하여 거치부재를 프리캐스트 바닥판의 상면으로 가압하도록 가압력이 작용하게 하는 과정을 포함하는 것을 특징으로 하는 교량의 런칭시공방법.
  6. 제5항에 있어서,
    CFT 트러스 거더와 프리캐스트 바닥판을 일체로 합성할 때, 연장봉과 거치부재의 제거 후, 스터드의 상단에 헤드부를 결합한 이후에, 그라우팅재를 전단포켓 내에 타설하게 되는 것을 특징으로 하는 교량의 런칭시공방법.
  7. 제1항에 있어서
    세그먼트들을 제작하여 순차적으로 세그먼트들을 전방으로 런칭하여 교량 상부구조를 형성하는 과정은,
    프리캐스트 바닥판을 CFT 트러스 거더 위에 거치하고 가조립하여 제1세그먼트를 제작하는 단계;
    CFT 트러스 거더와 프리캐스트 바닥판의 가조립에 의해 제2세그먼트를 제작하여 제1세그먼트의 후방에 배치하여 제1,2세그먼트의 CFT 트러스 거더를 연결하는 단계;
    제1,2세그먼트를 밀어서 전방으로 런칭하는 단계; 및
    CFT 트러스 거더와 프리캐스트 바닥판의 가조립에 의해 추가적인 세그먼트를 제작하여, 최후방에 위치한 세그먼트의 후방에 새로 제작한 추가적인 세그먼트를 배치하고 세그먼트간의 CFT 트러스 거더를 연결한 후, 세그먼트를 밀어서 전방으로 런칭하는 단계를 포함하는 것을 특징으로 하는 교량의 런칭시공방법.
  8. 제7항에 있어서,
    교대에는 윈치가 설치되어 있고;
    세그먼트를 밀어서 전방으로 런칭하는 단계에서는, 최후방에 위치한 세그먼트의 후단에, 풀리가 구비된 크로스빔을 설치하고, 와이어를 풀리에 감아서, 윈치가 와이어를 와인딩하여 와이어가 당겨지도록 함으로써 세그먼트가 전방으로 움직이도록 하는 것을 특징으로 하는 교량의 런칭시공방법.
PCT/KR2015/011324 2015-10-21 2015-10-26 프리캐스트 바닥판과 충전강관 트러스 거더의 조립을 이용한 교량의 런칭시공방법 WO2017069313A1 (ko)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US15/570,726 US10161090B2 (en) 2015-10-21 2015-10-26 Method for launching/constructing bridge using assembly of precast bottom plate and concrete-filled steel tube truss girder
CN201580079630.5A CN107849831B (zh) 2015-10-21 2015-10-26 用于使用预制底板和钢管混凝土桁架梁来顶推/建造桥梁的方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2015-0146405 2015-10-21
KR1020150146405A KR101794683B1 (ko) 2015-10-21 2015-10-21 프리캐스트 바닥판과 충전강관 트러스 거더의 조립을 이용한 교량의 런칭시공방법

Publications (1)

Publication Number Publication Date
WO2017069313A1 true WO2017069313A1 (ko) 2017-04-27

Family

ID=58557606

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2015/011324 WO2017069313A1 (ko) 2015-10-21 2015-10-26 프리캐스트 바닥판과 충전강관 트러스 거더의 조립을 이용한 교량의 런칭시공방법

Country Status (4)

Country Link
US (1) US10161090B2 (ko)
KR (1) KR101794683B1 (ko)
CN (1) CN107849831B (ko)
WO (1) WO2017069313A1 (ko)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108060636A (zh) * 2017-12-11 2018-05-22 重庆交通大学 整体装配式组合梁桥的施工方法
CN114808751A (zh) * 2022-04-25 2022-07-29 中铁山桥(南通)有限公司 一种主航道桥钢桁梁整节段拼装工艺

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2546093B (en) * 2016-01-08 2019-01-23 Bright Structures Ltd A bridging system
US10895047B2 (en) * 2016-11-16 2021-01-19 Valmont Industries, Inc. Prefabricated, prestressed bridge module
US11926977B2 (en) * 2017-11-21 2024-03-12 Allied Steel Bridge truss system
CN109056493A (zh) * 2018-09-25 2018-12-21 中铁二院工程集团有限责任公司 一种水平桁架与正交异性钢桥面组合的铁路桥面系
CN109752903B (zh) * 2018-12-29 2020-10-27 中国科学院长春光学精密机械与物理研究所 用于遥感相机的桁架结构及其组装方法
US10718094B1 (en) 2019-02-12 2020-07-21 Valmont Industries, Inc. Tub girders and related manufacturing methods
CN110487827A (zh) * 2019-09-06 2019-11-22 广西大学 一种大跨度钢管混凝土拱桥脱粘脱空的检测装置及检测方法
KR102257540B1 (ko) * 2019-09-17 2021-05-31 한밭대학교 산학협력단 트러스 합성 구조의 프리캐스트 데크플레이트와 이를 이용한 슬래브 시공방법
US11041278B2 (en) * 2019-10-30 2021-06-22 Dutchland, Inc. Connection assembly
US11214932B2 (en) * 2020-04-28 2022-01-04 United States Of America As Represented By The Secretay Of The Army Over decking systems and methods
US11718964B2 (en) 2021-09-13 2023-08-08 Summit Precast Concrete, Lp Bridge apparatus, systems and methods of construction
CN114808739A (zh) * 2022-05-24 2022-07-29 山东省路桥集团有限公司 一种节段梁的施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193430A (ja) * 2001-12-28 2003-07-09 Kajima Corp 複合トラス橋の施工方法
KR20110023334A (ko) * 2009-08-31 2011-03-08 연세대학교 산학협력단 거더 일체형 복공판 및 이를 이용한 가설교량
KR20110126866A (ko) * 2010-05-18 2011-11-24 (주)대우건설 강관 매립형 콘크리트 블록 일체식 지점부 시공방법
KR101245620B1 (ko) * 2010-12-15 2013-03-20 진승영 임시 결합재를 이용한 ilm 압출공법
KR20130141275A (ko) * 2012-06-15 2013-12-26 주식회사 서영엔지니어링 강합성 교량의 전단포켓형 상부슬래브 시공을 위한 압출가설 장치

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2612963B1 (fr) * 1987-03-27 1991-07-26 Muller Jean Pont constitue d'un tablier et de moyens pour le supporter, notamment pont haubane de grande portee et son procede de construction
US5802652A (en) * 1995-05-19 1998-09-08 Fomico International Bridge deck panel installation system and method
US5617599A (en) * 1995-05-19 1997-04-08 Fomico International Bridge deck panel installation system and method
US5978997A (en) * 1997-07-22 1999-11-09 Grossman; Stanley J. Composite structural member with thin deck portion and method of fabricating the same
JP3026184B2 (ja) * 1997-09-05 2000-03-27 住建機工株式会社 橋梁架設装置
KR200294571Y1 (ko) 2002-08-01 2002-11-13 비비엠코리아(주) 고분자 복합재료를 이용한 충전 복합관 거더
US7546656B2 (en) * 2005-08-16 2009-06-16 Daewoo Engineering & Construction Co., Ltd Method of installing prefabricated, segment concrete filled tube members
US7669272B2 (en) * 2008-01-28 2010-03-02 Powers James M Method of launching bridge spans in bridge construction
CN101603288B (zh) * 2009-07-03 2012-05-30 中铁大桥局股份有限公司 一种公铁两用斜拉桥的三桁式主梁结构及其安装方法
KR101096170B1 (ko) 2009-10-15 2011-12-22 (주)대우건설 충전강관 트러스거더교의 연속화 시공방법
CN101831874B (zh) * 2010-05-27 2011-08-03 中铁大桥局集团第一工程有限公司 多孔大跨度连续钢桁梁多点同步顶推施工方法
CN203768810U (zh) * 2014-03-07 2014-08-13 天津城建大学 预制桥面板空间钢管混凝土桁架组合梁
CN103924528B (zh) * 2014-04-14 2016-03-09 上海市机械施工集团有限公司 大跨度桥箱梁结构整体长距离顶推滑移施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193430A (ja) * 2001-12-28 2003-07-09 Kajima Corp 複合トラス橋の施工方法
KR20110023334A (ko) * 2009-08-31 2011-03-08 연세대학교 산학협력단 거더 일체형 복공판 및 이를 이용한 가설교량
KR20110126866A (ko) * 2010-05-18 2011-11-24 (주)대우건설 강관 매립형 콘크리트 블록 일체식 지점부 시공방법
KR101245620B1 (ko) * 2010-12-15 2013-03-20 진승영 임시 결합재를 이용한 ilm 압출공법
KR20130141275A (ko) * 2012-06-15 2013-12-26 주식회사 서영엔지니어링 강합성 교량의 전단포켓형 상부슬래브 시공을 위한 압출가설 장치

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108060636A (zh) * 2017-12-11 2018-05-22 重庆交通大学 整体装配式组合梁桥的施工方法
CN108060636B (zh) * 2017-12-11 2019-09-17 重庆交通大学 整体装配式组合梁桥的施工方法
CN114808751A (zh) * 2022-04-25 2022-07-29 中铁山桥(南通)有限公司 一种主航道桥钢桁梁整节段拼装工艺

Also Published As

Publication number Publication date
KR101794683B1 (ko) 2017-11-07
CN107849831B (zh) 2019-05-31
US10161090B2 (en) 2018-12-25
KR20170046286A (ko) 2017-05-02
US20180291570A1 (en) 2018-10-11
CN107849831A (zh) 2018-03-27

Similar Documents

Publication Publication Date Title
WO2017069313A1 (ko) 프리캐스트 바닥판과 충전강관 트러스 거더의 조립을 이용한 교량의 런칭시공방법
WO2016129826A1 (ko) 안전성이 강화된 피씨 트러스 벽체 구조물 및 이를 이용한 지하구조물 시공방법
CN107964948B (zh) 一种超大直径拼装式空心桩及其拼接方法
WO2009136762A9 (ko) 가로보를 정착부로 이용한 피에스씨 합성거더의 연속화 시공방법 및 그 구조
WO2010114288A2 (ko) 상하 각각 이중 앵커리지 기능을 갖는 트러스형 전단보강재
WO2012053730A1 (ko) 지점부의 이차 모멘트에 대응하는 트러스구조물과 이의 제작방법 및 지점부의 이차 모멘트에 대응하는 트러스구조물을 이용한 트러스교와 이의 시공방법
WO2019093540A1 (ko) V형 띠철근을 이용한 기둥 보강 구조
WO2016021811A1 (ko) 선조립 벽체 유니트 및 프레임
KR101693256B1 (ko) 조립식 psc 교량의 시공방법
WO2013172598A1 (ko) 복합트러스 거더교의 격점부 연결구조를 향상시키기 위한 복부재
CN113718949B (zh) 梁柱混合框架节点构造及其施工方法
WO2012044013A2 (ko) 개단면 상현재를 갖는 트러스구조물과 이의 제작방법 및 개단면 상현재를 갖는 트러스구조물을 이용한 트러스교와 이의 시공방법
WO2018074814A1 (ko) 프리캐스트 보와 기둥의 연결구조 및 이를 이용한 보와 기둥을 연결하는 공법
JP3635004B2 (ja) 橋梁の片持式架設工法
KR100981982B1 (ko) 프리캐스트 코핑용 인양 시스템
WO2013081408A1 (ko) 블록들의 연결부 접합면의 간극차이를 이용하여 거더에 프리스트레스를 도입할 수 있는 조립식 하이브리드 거더, 조립식 하이브리드 거더에 프리스트레스를 도입하는 방법, 조립식 하이브리드 거더의 연속화 방법 및, 그 제작 및 조립방법
CN110565550A (zh) 一种装配式自排水管涵及其装配方法
CN110184916B (zh) 斜拉桥主塔
WO2017204393A1 (ko) 데크 단부에서 긴장 정착시킨 장스팬 내화 데크의 긴장재 정착시스템 및 그 시공방법
KR100580819B1 (ko) 가접합을 이용한 불연속 교량의 연속압출공법
KR20140139703A (ko) 프리캐스트 세그먼트 간 접합용 강재 연결재 및 그 연결방법
WO2013125778A1 (ko) 강연선 위치 고정수단을 가진 pc슬래브 및 이를 이용한 1방향 장선 슬래브의 연속화 시공방법
KR20170069680A (ko) 개구 u형 복부 파형강판 psc거더, 개구 u형 복부 파형강판 psc거더를 이용한 교량의 상부 구조체 및 개구 u형 복부 파형강판 psc거더를 이용한 교량의 시공방법
KR101562805B1 (ko) 현수바닥판교의 연속 압출식 시공방법 및 이에 의해 시공된 슬라이드 거더 일체형 현수바닥판교
CN113668688B (zh) 一种搭建快且节约土地的三层悬挑钢结构及其施工方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15906764

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 15570726

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15906764

Country of ref document: EP

Kind code of ref document: A1