WO2017026097A1 - 蓄電制御システム、指示制御装置、蓄電制御装置、蓄電制御方法、及びプログラム - Google Patents
蓄電制御システム、指示制御装置、蓄電制御装置、蓄電制御方法、及びプログラム Download PDFInfo
- Publication number
- WO2017026097A1 WO2017026097A1 PCT/JP2016/003465 JP2016003465W WO2017026097A1 WO 2017026097 A1 WO2017026097 A1 WO 2017026097A1 JP 2016003465 W JP2016003465 W JP 2016003465W WO 2017026097 A1 WO2017026097 A1 WO 2017026097A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power storage
- control unit
- control
- instruction
- power
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/466—Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/34—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
- H02J7/35—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/62—The condition being non-electrical, e.g. temperature
- H02J2310/64—The condition being economic, e.g. tariff based load management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
Definitions
- the communication unit 413 is a communication interface and is connected to a communication line 9 (for example, an Internet line).
- the plan control unit 411 and the interrupt control unit 412 each output a plan control instruction and an interrupt control instruction to the power storage control device 3 via the communication unit 413.
- the power storage control method of the present embodiment is a method for controlling the power storage device 2 having the storage battery 21 and provided in the detached house 6 (customer facility).
- the power storage control method controls the operation of the power storage device 2 based on a planned control instruction (first control instruction) indicating the operation instruction content of the power storage device 2 in the target period.
- the power storage control method controls the operation of the power storage device 2 based on the interrupt control instruction when there is an interrupt control instruction (second control instruction) indicating the operation instruction content of the power storage device 2 during the target period. .
- the determination unit 414 is used to determine whether the content of the DR request is reflected in the plan control instruction or the interrupt control instruction.
- the instruction control device 41 transmits the content of the DR request to the power storage control device 3 regardless of the content of the DR request, and the power storage control device 3 can control the power storage device 2 based on the content of the DR request. If there is, charge / discharge control of the storage battery 21 is performed.
- the plan control unit 411 of the instruction control device 41 creates a plan control instruction reflecting the content of the DR request at the next plan control instruction creation timing, and outputs the plan control instruction to the power storage control device 3.
- the power storage control unit 31 Charge / discharge control can be continued.
- the interruption control part 34 instruct indicates the discharge of the storage battery 21 in order to adjust the balance of the electric power supply-demand in the detached house 6.
- the instruction from the instruction control unit (plan control instruction and interrupt control instruction) is an instruction to frequently charge and discharge the storage battery 21, the interrupt control unit 34, unlike these instructions, the storage battery 21 An instruction not to repeatedly charge and discharge is generated and output to the power storage control unit 31. Thereby, it is suppressed that the storage battery 21 repeats charging / discharging frequently, and it becomes possible to suppress the fall of the lifetime of the storage battery 21.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
図1に、本実施形態の蓄電制御システム1のブロック図を示す。まず、本実施形態の蓄電制御システム1の概要について説明する。
2 蓄電装置
21 蓄電池
3 蓄電制御装置
31 蓄電制御部
34 割込制御部(第2制御部)
41 指示制御装置
411 計画制御部(第1制御部)
412 割込制御部(第2制御部)
6 戸建住宅(需要家施設)
Claims (13)
- 蓄電池を有し需要家施設に設けられる蓄電装置、を制御する蓄電制御システムであって、
前記蓄電装置の動作を制御する蓄電制御部と、
対象期間における前記蓄電装置の動作指示内容を示す第1制御指示を、前記蓄電制御部に出力する第1制御部と、
前記蓄電装置の動作指示内容を示す第2制御指示を、前記蓄電制御部に出力する第2制御部とを備え、
前記蓄電制御部は、前記対象期間において前記第1制御部から受け取った前記第1制御指示に基づいて前記蓄電装置の動作を制御し、前記対象期間中に前記第2制御部から前記第2制御指示を受け取った場合、前記第2制御指示に基づいて前記蓄電装置の動作を制御する
ことを特徴とする蓄電制御システム。 - 前記第1制御部は、前記対象期間より短い所定の間隔で前記第1制御指示を前記蓄電制御部に出力し、
前記蓄電制御部は、最新の前記第1制御指示に基づいて前記蓄電装置の動作を制御する
ことを特徴とする請求項1記載の蓄電制御システム。 - 前記蓄電制御部は、前記第1制御指示を受け取れなかった場合、過去に受け取った前記第1制御指示に基づいて前記蓄電装置の動作を制御する
ことを特徴とする請求項2記載の蓄電制御システム。 - 前記第2制御部は、前記第1制御指示が示す前記蓄電装置の動作指示内容に修正が必要な事象が発生した場合、前記事象に基づいた前記第2制御指示を前記蓄電制御部に出力する
ことを特徴とする請求項1~3のいずれか1項に記載の蓄電制御システム。 - 前記第2制御部は、買電価格が閾値を超えた場合、前記第2制御指示を前記蓄電制御部に出力する
ことを特徴とする請求項1~4のうちいずれか1項に記載の蓄電制御システム。 - 前記第2制御部は、前記蓄電制御部が受け取った前記第1制御指示の前記対象期間が終了した場合、前記第2制御指示を前記蓄電制御部に出力し、
前記蓄電制御部は、前記第2制御指示に基づいて前記蓄電装置の動作を制御する
ことを特徴とする請求項1~5のいずれか1項に記載の蓄電制御システム。 - 請求項1~6のいずれか1項に記載の蓄電制御システムに用いられ、前記第1制御部を備える
ことを特徴とする指示制御装置。 - 請求項1~5のいずれか1項に記載の蓄電制御システムに用いられ、前記第1制御部と前記第2制御部とを備える
ことを特徴とする指示制御装置。 - 請求項1~6のいずれか1項に記載の蓄電制御システムに用いられ、前記蓄電制御部を備える
ことを特徴とする蓄電制御装置。 - 前記第2制御部をさらに備える
ことを特徴とする請求項9記載の蓄電制御装置。 - 前記蓄電池の充電、及び放電を行う電力変換部をさらに備え、
前記蓄電制御部は、前記電力変換部を制御することにより前記蓄電装置の動作を制御する
ことを特徴とする請求項9または10記載の蓄電制御装置。 - 蓄電池を有し需要家施設に設けられる蓄電装置、を制御する蓄電制御方法であって、
対象期間における前記蓄電装置の動作指示内容を示す第1制御指示に基づいて前記蓄電装置の動作を制御し、前記対象期間中に前記蓄電装置の動作指示内容を示す第2制御指示があった場合、前記第2制御指示に基づいて前記蓄電装置の動作を制御する
ことを特徴とする蓄電制御方法。 - 蓄電池を有し需要家施設に設けられる蓄電装置、を制御するプログラムであって、
コンピュータを、
対象期間における前記蓄電装置の動作指示内容を示す第1制御指示に基づいて前記蓄電装置の動作を制御し、前記対象期間中に前記蓄電装置の動作指示内容を示す第2制御指示があった場合、前記第2制御指示に基づいて前記蓄電装置の動作を制御する蓄電制御部として機能させる
ことを特徴とするプログラム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2016306224A AU2016306224A1 (en) | 2015-08-07 | 2016-07-27 | Electricity storage control system, instruction control system, electricity storage control device, electricity storage control method, and program |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015-157756 | 2015-08-07 | ||
JP2015157756A JP6519924B2 (ja) | 2015-08-07 | 2015-08-07 | 蓄電制御システム、指示制御装置、蓄電制御装置、蓄電制御方法、及びプログラム |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017026097A1 true WO2017026097A1 (ja) | 2017-02-16 |
Family
ID=57983525
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2016/003465 WO2017026097A1 (ja) | 2015-08-07 | 2016-07-27 | 蓄電制御システム、指示制御装置、蓄電制御装置、蓄電制御方法、及びプログラム |
Country Status (3)
Country | Link |
---|---|
JP (2) | JP6519924B2 (ja) |
AU (1) | AU2016306224A1 (ja) |
WO (1) | WO2017026097A1 (ja) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11984750B2 (en) | 2019-06-18 | 2024-05-14 | Lg Energy Solution, Ltd. | Battery management system and battery management method |
JP7501418B2 (ja) | 2021-03-22 | 2024-06-18 | トヨタ自動車株式会社 | Vppにおける通信異常対応装置及び方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012060775A (ja) * | 2010-09-09 | 2012-03-22 | Tokyo Electric Power Co Inc:The | 蓄電池運用装置 |
JP2014096946A (ja) * | 2012-11-09 | 2014-05-22 | Toshiba Corp | 電力抑制型蓄電蓄熱最適化装置、最適化方法及び最適化プログラム |
-
2015
- 2015-08-07 JP JP2015157756A patent/JP6519924B2/ja active Active
-
2016
- 2016-07-27 WO PCT/JP2016/003465 patent/WO2017026097A1/ja active Application Filing
- 2016-07-27 AU AU2016306224A patent/AU2016306224A1/en not_active Abandoned
-
2019
- 2019-02-25 JP JP2019031368A patent/JP6827220B2/ja active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012060775A (ja) * | 2010-09-09 | 2012-03-22 | Tokyo Electric Power Co Inc:The | 蓄電池運用装置 |
JP2014096946A (ja) * | 2012-11-09 | 2014-05-22 | Toshiba Corp | 電力抑制型蓄電蓄熱最適化装置、最適化方法及び最適化プログラム |
Also Published As
Publication number | Publication date |
---|---|
JP6519924B2 (ja) | 2019-05-29 |
JP2017038466A (ja) | 2017-02-16 |
AU2016306224A1 (en) | 2018-03-08 |
JP6827220B2 (ja) | 2021-02-10 |
JP2019075990A (ja) | 2019-05-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US12021385B2 (en) | Methods and systems for adjusting power consumption based on a fixed-duration power option agreement | |
US9692233B2 (en) | Method for controlling an energy storage system | |
WO2014208059A1 (ja) | 電力調整装置、電力調整方法、電力調整システム、蓄電装置、サーバ、プログラム | |
JP6373476B2 (ja) | 電力管理装置、電力管理システム、および電力管理方法 | |
WO2015122196A1 (ja) | 在宅状況判定装置、配送システム、在宅状況判定方法、在宅状況判定プログラム、および配送端末 | |
WO2016017424A1 (ja) | 制御装置、機器制御装置、通知方法および記録媒体 | |
JP6827220B2 (ja) | 蓄電制御システム、指示制御装置、蓄電制御装置、蓄電制御方法、及びプログラム | |
JP7103925B2 (ja) | 電力管理方法および電力管理システム | |
WO2013179809A1 (ja) | 電力管理装置、電力管理システム、及び電力管理方法 | |
JP2017135945A (ja) | 蓄電池制御装置 | |
JP2018085825A (ja) | 電力供給制御装置、電力供給制御プログラム、電力料金設定システム | |
JP7354394B2 (ja) | 電力管理装置及び電力管理方法 | |
JP2019050714A (ja) | 電力管理装置及びプログラム | |
JP6995825B2 (ja) | 電力管理システム及び電力管理方法 | |
US20230384852A1 (en) | Dynamic updating of a power available level for a datacenter | |
JP7257107B2 (ja) | 二次電池制御装置および二次電池制御方法 | |
JP7003509B2 (ja) | 処理装置、制御装置、pcs、処理方法、制御方法及びプログラム | |
JP2022121495A (ja) | 電力制御システム、電力制御装置およびプログラム | |
JP2023003860A (ja) | 電力管理装置及び電力管理方法 | |
JP2023104761A (ja) | 電源装置及び電源管理システム | |
JP2023095550A (ja) | 電力制御システム及び電力制御機器 | |
JP2021118632A (ja) | 電力供給源管理システム | |
JP2021027644A (ja) | 電力管理システム、電力管理方法、電力管理装置、及びプログラム | |
JP2020089231A (ja) | 電力管理システム及び電力管理方法 | |
EP2869421A1 (en) | Electrical power management of excess power |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 16834800 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2016306224 Country of ref document: AU Date of ref document: 20160727 Kind code of ref document: A |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 16834800 Country of ref document: EP Kind code of ref document: A1 |