WO2016147614A1 - 蓄電池装置、及び、容量補正方法 - Google Patents

蓄電池装置、及び、容量補正方法 Download PDF

Info

Publication number
WO2016147614A1
WO2016147614A1 PCT/JP2016/001298 JP2016001298W WO2016147614A1 WO 2016147614 A1 WO2016147614 A1 WO 2016147614A1 JP 2016001298 W JP2016001298 W JP 2016001298W WO 2016147614 A1 WO2016147614 A1 WO 2016147614A1
Authority
WO
WIPO (PCT)
Prior art keywords
capacity
battery pack
capacity correction
limit switch
turned
Prior art date
Application number
PCT/JP2016/001298
Other languages
English (en)
French (fr)
Inventor
涼 志尾崎
Original Assignee
日本電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社 filed Critical 日本電気株式会社
Priority to JP2017506074A priority Critical patent/JPWO2016147614A1/ja
Publication of WO2016147614A1 publication Critical patent/WO2016147614A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the present invention relates to a storage battery device and a capacity correction method.
  • Battery packs may have different storage capacities that are managed based on the amount of charge / discharge.
  • it is necessary to charge and discharge according to the actual storage capacity.
  • an intermediate capacity meaning the storage capacity between the fully charged state and the no capacity state
  • Japanese Patent Application Laid-Open No. 2014-132243 discloses a technique for measuring an open circuit voltage from the time when charging / discharging of the battery pack is stopped and estimating an actual storage capacity from the open circuit voltage.
  • Japanese Patent Application Laid-Open No. 2007-250521 and Japanese Patent No. 5615995 are known.
  • a main object of the present invention is to provide a storage battery device and a capacity correction method capable of performing capacity correction processing even during charging and discharging.
  • an invention relating to a storage battery device that charges and discharges a plurality of battery packs is provided for each battery pack, and a connection switch that controls connection between the battery pack and a load, and at least the opening of the battery pack Apply the measurement unit that measures the terminal voltage and the voltage capacity conversion information that stores the open terminal voltage in advance, calculate the measured capacity of the battery pack, and correct the already stored management capacity based on the measured capacity
  • a capacity management unit including a capacity management unit to be updated, a control unit for outputting a control signal including a charge / discharge command and a capacity correction command for charging / discharging the battery pack in response to an external power supply / reception request, and a control signal
  • a relay drive unit that turns on and off the connection switch based on the control unit, and when the control unit performs capacity correction on one of the plurality of battery packs, the plurality of capacity management units.
  • the relay switch When the capacity correction command for outputting the capacity correction is output to one of the battery packs, and the relay drive unit receives the capacity correction command, the relay switch turns off the connection switch connected to the battery pack whose capacity is to be corrected.
  • the open terminal voltage from the measurement unit is applied to the voltage capacity conversion information to calculate the actual capacity, and the management capacity is corrected and updated by the actual capacity.
  • the invention concerning the capacity correction method in the storage battery device that charges and discharges a plurality of battery packs controls the connection between the battery pack and the load by controlling the connection switch included in the capacity management unit provided for each battery pack.
  • the measurement unit measures at least the open terminal voltage of the battery pack, and the capacity management unit applies the open terminal voltage to the voltage capacity conversion information stored in advance to calculate the actual capacity of the battery pack.
  • the control unit outputs a capacity correction command that causes one of the plurality of capacity management units to perform capacity correction, and the relay drive unit receives the capacity correction command and is connected to the battery pack that performs capacity correction.
  • the switch is turned off, and the capacity management unit calculates the actual capacity by applying the open terminal voltage from the measurement unit to the voltage-capacitance conversion information, and corrects and updates the management capacity with the actual capacity.
  • the capacity correction process is an interrupt process, the capacity correction process can be performed even during charging and discharging.
  • FIG. 1 is a block diagram of a storage battery device 2A according to the present embodiment.
  • the storage battery device 2A includes a battery pack 11 (11a, 11b), a measurement unit 12 (12a, 12b), a capacity management unit 13 (13a, 13b), a connection switch 14 (14a, 14b), a relay drive unit 15, and a voltage conversion.
  • the term “external” refers to a power plant or the like to which the storage battery device 2A receives and supplies power, but is not limited thereto.
  • other DC power sources including storage batteries
  • the voltage conversion unit 16 that performs AC / DC conversion is not necessary.
  • the measuring unit 12, the capacity management unit 13, and the connection switch 14 constitute a capacity management unit, and each unit is provided corresponding to the battery pack 11. That is, one capacity management unit is provided in one battery pack 11.
  • the voltage of the battery pack 11 may differ depending on whether the load (here, the voltage conversion unit 16) is connected or not. Therefore, the voltage when the load is connected is described as a connection terminal voltage, the voltage when the load is not connected is described as an open terminal voltage, and these are collectively referred to as a terminal voltage.
  • the battery pack 11 is formed by modularizing a plurality of storage batteries.
  • the plurality of battery packs 11 are connected in parallel, and this is connected in parallel with the voltage conversion unit 16.
  • FIG. 1 two battery packs 11a and 11b are illustrated, but the purpose is not limited to two, and it is sufficient if there are two or more.
  • the measurement unit 12 (12a, 12b) measures the terminal voltage and the charge / discharge current of the battery pack 11, and outputs the measurement result to the capacity management unit 13 as measurement information.
  • the capacity management unit 13 (13a, 13b) stores the management capacity of the subordinate battery pack 11, accumulates the charged / discharged current value based on the measurement information from the measurement unit 12, and stores the storage capacity of the battery pack 11. Update.
  • the capacity management unit 13 performs capacity correction processing according to an instruction from the control unit 17.
  • the open terminal voltage of the battery pack 11 is obtained from the measurement information, and the actual storage capacity is calculated as the actually measured capacity by applying the open terminal voltage to the voltage capacity conversion information stored in advance.
  • the management capacity is corrected based on the actually measured capacity, and the corrected management capacity is sent to the control unit 17.
  • the voltage capacity conversion information is information in which the correspondence between the open terminal voltage and the actual storage capacity is summarized in the form of a table or the like.
  • the capacity obtained by integrating the charged / discharged current values based on the measurement information is the management capacity
  • the capacity calculated based on the open terminal voltage of the battery pack 11 is the actual capacity
  • these management capacity and actual capacity are collectively referred to. Defined as storage capacity.
  • connection switch 14 (14a, 14b) has one end connected to the terminal of the battery pack 11 and the other end connected to the terminal of the voltage conversion unit 16, and is turned on and off based on the drive signal from the relay drive unit 15. Thus, the connection state between the battery pack 11 and the voltage conversion unit 16 is controlled.
  • a connection switch 14 a semiconductor switch such as a transistor or a relay can be used.
  • the relay drive unit 15 receives a control signal including a charge / discharge command and a capacity correction command from the control unit 17, and controls and drives the ON / OFF operation of the connection switch 14 based on the control signal, and from the capacity management unit 13. Is relayed and output to the control unit 17.
  • the voltage conversion unit 16 includes a power conditioner system having such a function.
  • the control unit 17 outputs a control signal to the relay drive unit 15 and the voltage conversion unit 16 in response to an external power supply / reception request, and receives capacity information from the capacity management unit 13 via the relay drive unit 15. Store in a storage area (not shown).
  • control unit 17 When such a control unit 17 receives the power supply / reception request, it plans the charge / discharge amount for each battery pack 11 based on the stored capacity information, and uses this as a control signal for the relay drive unit 15 and the voltage conversion unit 16. Output.
  • control unit 17 may be a control unit of the storage battery system.
  • the storage battery system may control a plurality of storage battery devices 2A.
  • FIG. 2A Next, the operation of the storage battery device 2A will be described with reference to FIGS. 2A, 2B, 3A, 3B, 4A, 4B, 5A, 5B, 6, and 7.
  • the storage battery device 2A uses charge / discharge processing (charge processing and discharge processing) and capacity correction processing that is interrupt processing for the charge / discharge processing as a large processing procedure.
  • the execution of the capacity correction process does not mean that the charge / discharge process is stopped, but is performed in parallel with the charge / discharge process.
  • the charging process is a process for charging the battery pack 11, and the discharging process is a process for supplying power from the battery pack 11.
  • the capacity correction process is a process for correcting and updating the management capacity of the battery pack 11 as described later.
  • FIG. 2A is a diagram showing a time change of the terminal voltage or the open terminal voltage of the battery pack 11a
  • FIG. 2B is a diagram showing the terminal voltage of the battery pack 11b.
  • FIG. 3A is a diagram showing the change over time of the charge / discharge current of the battery pack 11a
  • FIG. 3B is a diagram showing the charge / discharge current of the battery pack 11b.
  • the charge / discharge current based on the power supply / reception request is also shown.
  • FIG. 4A is a diagram showing the operation state of the connection switch 14a with respect to time
  • FIG. 4B is a diagram showing the operation state of the connection switch 14b.
  • FIG. 5A shows the storage capacity of the battery pack 11a with respect to time, and shows the storage capacity of the battery pack 11b in FIG. 5B.
  • FIG. 6 is a flowchart showing the procedure of the charge / discharge process.
  • Step SA1 When control is started, the control unit 17 sets a capacity correction flag indicating whether to execute capacity correction processing to “0”. When the capacity correction flag is “1”, execution of capacity correction processing is indicated, and when the capacity correction flag is “0”, capacity correction processing is not executed.
  • control part 17 produces
  • the generated control signal is output to the relay drive unit 15 and the voltage conversion unit 16.
  • the control signal includes switch operation information for controlling the connection switch 14, AC / DC conversion method in the voltage converter 16, power conversion information for designating a voltage value and a current value, and charging or discharging. A charge / discharge command is included.
  • the control unit 17 performs the battery packs 11a and 11b. It is determined that charging is necessary.
  • This specified capacity is a preset value indicating whether or not charging is necessary.
  • the switch operation information at this time is such that both the connection switches 14a and 14b are turned ON, and the power conversion information is the content to convert the AC power from the power supply line 18 into DC power and supply it to the battery packs 11a and 11b.
  • the switch operation information turns on the connection switch 14a and the connection switch 14b turns off, and the power conversion information includes the contents to be supplied to the battery pack 11a by converting AC power from the power supply line 18 into DC power. Become.
  • the discharge mode for example, when the management capacity of the battery pack 11a is greater than the specified capacity and the management capacity of the battery pack 11b is less than the specified capacity, it is determined that the battery pack 11b cannot be discharged.
  • the switch operation information turns on the connection switch 14a, and the connection switch 14b turns off, and the power conversion information is the content that converts the DC power from the battery pack 11a into AC power and supplies it to the power supply line 18. .
  • Step SA2 The relay drive unit 15 acquires the switch operation information included in the control signal, and operates the connection switch 14 corresponding to the switch operation information. For example, when charging the battery packs 11a and 11b, both the connection switches 14a and 14b are turned on. At time t0 in FIGS. 4A and 4B, both the connection switches 14a and 14b are in the ON state.
  • Steps SA3 and SA4 On the other hand, when the voltage conversion unit 16 obtains the power conversion information from the control signal, the voltage conversion unit 16 self-sets to convert DC power into AC power in the discharge mode and AC power in the charge mode. Self-configure to convert to DC power.
  • the voltage converter 16 adjusts the charge / discharge current. That is, when a change occurs in the number of battery packs 11 to be charged / discharged (for example, when capacity correction processing is performed), the charge / discharge amount from each battery pack 11 is adjusted to satisfy the power supply / reception request ( Power adjustment). At time t0 in FIGS. 3A and 3B, the charging currents of the battery pack 11a and the battery pack 11b are adjusted to the same value.
  • Step SA5 After that, the control unit 17 determines whether or not to end the charge / discharge, and returns to Step SA1 if it ends.
  • Steps SA6 and SA7 On the other hand, if charging / discharging has not been completed, the control unit 17 determines whether or not the capacity correction flag is “1”. As described above, when the capacity correction flag is “1”, it indicates that the capacity correction process is requested to be interrupted. Therefore, if the capacity correction flag is “1”, an interrupt process (capacity correction process) is executed, and the process returns to step SA2.
  • step SA2 the reason for returning to step SA2 is to control the connection switch 14 in order to disconnect the battery pack 11 that performs capacity correction processing from the voltage converter 16.
  • connection switch 14b is turned off, and the battery pack 11b is disconnected from the load (voltage conversion unit 16). Accordingly, at time t1 in FIGS. 3A and 3B, the amount of charge of the battery pack 11a is doubled and power adjustment is performed.
  • FIG. 7 is a flowchart showing the procedure of capacity correction processing.
  • the capacity of the battery pack 11b is corrected while the battery packs 11a and 11b are being charged.
  • Step SB1 The control unit 17 always monitors whether a preset capacity check determination criterion is satisfied. When the capacity check determination criterion is satisfied, the control unit 17 sets the capacity correction flag to “1”, and proceeds to Step SB2.
  • Examples of the capacity check determination criteria include a case where a preset time has elapsed since the start of charging / discharging, a case where a regular time has passed, and a case where the operation time has reached a predetermined time. Moreover, you may judge from the change condition of the connection terminal voltage during charge. Furthermore, the occurrence of an event may be used as an execution condition for the capacity check execution determination.
  • the capacity check is executed when a preset time has elapsed since the start of charge / discharge.
  • the capacity check determination criterion is when the time t1 from the start of charge / discharge has elapsed. ing.
  • control unit 17 outputs a control signal including a capacity correction command for the battery pack 11b.
  • Step SB2 Upon receiving this control signal, the relay drive unit 15 turns off the connection switch 14b connected to the battery pack that is the capacity correction target and disconnects it from the voltage conversion unit 16 for capacity correction processing.
  • the connection switch 14b is in the OFF state at time t1 in FIGS. 4A and 4B.
  • Step SB3 On the other hand, the voltage conversion unit 16 adjusts the power as the number of battery packs 11 to be charged changes.
  • the charging current of the battery pack 11a is adjusted (power adjustment) at time t1 in FIGS. 3A and 3B.
  • Step SB4 The capacity management unit 13 constantly monitors the current input to and output from the battery pack 11. And the product (charging / discharging electric energy) of charging / discharging time and charging / discharging electric current is calculated, and the memorize
  • the capacity management unit 13 when the capacity management unit 13 receives a control signal including a capacity correction command from the relay drive unit 15, the capacity management unit 13 waits for a predetermined time to elapse and then measures the open terminal voltage of the battery pack 11. Get from.
  • the terminal voltage of the battery pack 11 may fluctuate for some time even if the terminal is opened.
  • the capacity management unit 13 applies the measured open terminal voltage to the voltage capacity conversion information stored in advance, and the capacity corresponding to the open terminal voltage ( Measure actual capacity).
  • Step SB5 The capacity management unit 13 determines consistency between the terminal capacity and the management capacity. If the management capacity is within an allowable range set in advance with respect to the actual measurement capacity, it is determined that the actual measurement capacity and the management capacity match. On the other hand, if it is outside the allowable range, it is determined that the management capacity has shifted.
  • Such an allowable range is appropriately set according to the structure and type of the storage battery constituting the battery pack 11, and is, for example, a range in which the absolute value of (actually measured capacity ⁇ managed capacity) / managed capacity is 10%. Can be within the allowable range.
  • Step SB6 When the management capacity is outside the allowable range with respect to the actually measured capacity, the capacity management unit 13 corrects the management capacity with the actually measured capacity and sends the corrected management capacity to the control unit 17.
  • the control unit 17 stores the received management capacity.
  • management capacity may be uniformly corrected and updated when the measured capacity is obtained without determining the coincidence between the terminal capacity and the management capacity in step SB5.
  • Step SB7 When the capacity correction is completed, the control unit 17 sets the capacity correction flag to “0” and ends the interrupt process.
  • the relay drive unit 15 turns on the connection switch 14b to return the battery pack 11b to the charging / discharging process. However, if it is unconditionally returned, the terminal voltage between the battery pack 11a and the battery pack 11b is different. In some cases, an inrush current larger than the rating may flow between the battery packs 11.
  • control unit 17 acquires the terminal voltage from the measurement unit 12, waits until the terminal voltages of the battery pack 11a and the battery pack 11b match (hereinafter, this waiting time is referred to as a return waiting time), and relay drive.
  • a control signal for turning on the connection switch 14b is output to the unit 15.
  • the capacity correction can be performed without stopping the storage battery device 2A, and the appropriate storage capacity can be managed efficiently. And the reliability with respect to power supply / reception improves.
  • the correction waiting time has elapsed.
  • a correction standby time is a time during which the battery pack that is the target of capacity correction does not contribute to the charge / discharge process (hereinafter referred to as capacity correction time), and it is not possible to lengthen the capacity correction time.
  • the reliability Capability reliability, lifetime reliability, etc.
  • the correction waiting time is shortened.
  • the correction standby time is equal to the time required for the open terminal voltage to settle (hereinafter referred to as the terminal voltage convergence time).
  • the terminal voltage convergence time is required. Must be set to a longer time.
  • the terminal voltage convergence time depends on the current value flowing when the connection switch 14 connected to the battery pack 11 is turned off. If this current value is small, the terminal voltage convergence time is also shortened. If the terminal voltage convergence time is shortened, the correction standby time can be shortened, and the capacity correction time can be shortened.
  • FIG. 8 is a block diagram of the storage battery device 2B according to the present embodiment configured from such a viewpoint.
  • the storage battery device 2B has a current limiter 19 (19a, 19b) and a limit switch 20 (20a, 20b) connected in series to the current limiter 19 in addition to the storage battery device 2A shown in FIG. Has been.
  • the current limiter 19 and the limit switch 20 constitute a current limiter.
  • the current limiter 19 can be exemplified by a fixed resistor, and the limit switch 20 can be exemplified by a semiconductor switch such as a transistor or a relay.
  • the current limiter 19 and the limit switch 20 are connected in series, and this connection body is connected in parallel with the connection switch 14.
  • FIG. 9 is a flowchart showing this operation procedure.
  • 10A is a diagram showing the operating state of the connection switch 14a
  • FIG. 10B is a diagram showing the operating state of the connection switch 14b on the capacity correction target side
  • FIG. 10C is a diagram showing the operating state of the limit switch 20a
  • FIG. It is a figure which shows the operation state of the restriction
  • FIG. 11 is a diagram showing the charging current of the battery pack 11b. In FIG. 11, the solid line indicates the charging current requested to be charged / discharged, and the dotted line indicates the charging current of the battery pack 11b.
  • Step SC1 The control unit 17 outputs a control signal including a charge / discharge command instructing charging of the battery packs 11a and 11b in accordance with the power supply / reception request.
  • the relay drive unit 15 turns on the connection switches 14a and 14b and turns off the limit switches 20a and 20b to start charging the battery packs 11a and 11b (FIGS. 10A to 10D and FIG. 11). Time t0). At this time, it is assumed that charging currents Ia and Ib flow through the battery packs 11a and 11b.
  • Steps SC2 to SC4 When the capacity check determination criteria are satisfied during such charging, the control unit 17 outputs a control signal including a capacity correction command in order to perform capacity correction processing of the battery pack 11b.
  • the relay drive unit 15 When receiving the control signal, the relay drive unit 15 turns on the limit switch 20b on the battery pack 11b side to be corrected, and turns off the connection switch 14b. In FIG. 10A to FIG. 10D and FIG. 11, this state switching is performed at time ta.
  • the charging current Ibm (Ibm ⁇ Ib) flows through the battery pack 11b via the current limiter 19. That is, the charging current of the battery pack 11b decreases.
  • a charging current Iam (Iam> Ia) flows through the battery pack 11a.
  • Ib ⁇ Ibm Iam ⁇ Ia. That is, the entire charging current does not change.
  • Steps SC5 and SC6 Then, the relay drive unit 15 waits for a predetermined time (hereinafter referred to as current limit time) to elapse. When the current limit time elapses, the relay drive unit 15 turns off the limit switch 20b and completely disconnects the battery pack 11b from the voltage conversion unit 16.
  • current limit time a predetermined time (hereinafter referred to as current limit time)
  • Steps SC7 and SC8 When the battery pack 11b is completely disconnected, the capacity management unit waits for the correction standby time to elapse. When the correction standby time is reached, the capacity management unit obtains the measured capacity based on the open terminal voltage, and thereby corrects the managed capacity.
  • the charging current Ibm flowing through the battery pack 11b when the battery pack 11b is disconnected is smaller than the initial charging current Ib (time t0). Accordingly, the terminal voltage convergence time at this time is shorter than the terminal voltage convergence time when the charging current Ib flows.
  • Step SC9 The relay drive unit 15 turns on the limit switch 20b. Thereby, charging of the battery pack 11b is resumed via the current limiter 19b.
  • Steps SC10 to SC12 Then, it is determined whether or not the charging via the current limiter 19b is performed for the current limiting time.
  • the relay driving unit 15 sets the connection switch 14b to the ON state.
  • the limit switch 20b is turned off. As a result, the battery pack 11b is charged without going through the current limiter. 10A to 10D and 11, the limit switch 20b is in the OFF state at time t3.
  • Steps SC13 and SC14 Thereafter, the completion of charging / discharging is determined, and when completed, all of the connection switch 14 and the limit switch 20 are turned off.
  • Such a series of operations makes it possible to correct and update the storage capacities of a plurality of battery packs while satisfying the power supply / reception request and reducing the capacity correction time.
  • the correction waiting time is shortened.
  • FIG. 12 is a block diagram of the storage battery device 2C according to the present embodiment.
  • the current limiter of the storage battery device 2B shown in FIG. 8 was a fixed resistor.
  • the current limiter of the storage battery device 2C according to the present embodiment is configured by a constant current circuit. That is, the current limiting unit in the present embodiment includes the limit switch 20 (20a, 20b) and the constant current circuit 21 (21a, 21b).
  • the constant current circuit 21 (21a, 21b) functions to flow a set current for a current less than a predetermined current value (maximum allowable current), but for a current greater than the maximum allowable current, And has a function of limiting to the maximum allowable current.
  • FIG. 13 is a flowchart showing this operation procedure.
  • 14A is a diagram showing the operating state of the connection switch 14a
  • FIG. 14B is a diagram showing the operating state of the connection switch 14b on the capacity correction target side
  • FIG. 14C is a diagram showing the operating state of the limit switch 20a
  • FIG. It is a figure which shows the operation state of the restriction
  • the limit switch 20 is driven by the relay drive unit 15.
  • FIG. 15 is a diagram showing the charging current of the battery pack 11b.
  • the solid line indicates the charging current requested to be charged / discharged
  • the dotted line indicates the charging current of the battery pack 11b.
  • Step SD1 The control unit 17 outputs a control signal instructing charging of the battery packs 11a and 11b in accordance with the power supply / reception request.
  • the relay drive unit 15 turns on the connection switches 14a and 14b and turns off the limit switches 20a and 20b based on the charge / discharge command included in the control signal. Thereby, charging of the battery packs 11a and 11b is started (time t0 in FIGS. 14A to 14D and FIG. 15). At this time, it is assumed that charging currents Ia and Ib flow through the battery packs 11a and 11b.
  • Steps SD2 and SD3 When the capacity check determination criteria are satisfied during such charging, the control unit 17 outputs a control signal including a capacity correction command in order to perform capacity correction processing of the battery pack 11b.
  • the relay drive unit 15 When receiving the capacity correction command, the relay drive unit 15 turns off the connection switch 14b on the battery pack 11b side to be corrected. In FIG. 15, this state switching is performed at time t1.
  • Steps SD4 and SD5 Thereby, the battery pack 11b is completely disconnected from the voltage converter 16, and the terminal voltage of the battery pack 11b converges to the open terminal voltage. A charging current of Ia + Ib flows through the battery pack 11a. In this state, the capacity management unit waits for the correction standby time to elapse, and performs capacity correction after the time.
  • Step SD6 Next, the relay drive unit 15 turns on the limit switch 20b. Thereby, the constant current circuit 21b sets the charging current of the battery pack 11b as the maximum allowable current. The maximum allowable current at this time can be set to the same current value as the current value flowing through the battery pack 11a.
  • connection point K (see FIG. 12) viewed from the voltage conversion unit 16 can be regarded as the same potential. Therefore, even if the terminal voltages of the battery packs 11a and 11b are different, the inrush current can be prevented from flowing between the battery packs 11a and 11b.
  • the return waiting time can be shortened.
  • Steps SD7 to SD9 Then, the relay drive unit 15 waits until the terminal voltage of the battery pack 11b matches the terminal voltage of the battery pack 11a, and when these terminal voltages match, the connection switch 14a is turned on and the limit switch 20b is turned off. Put it in a state.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Power Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)
  • Tests Of Electric Status Of Batteries (AREA)

Abstract

充放電中であっても容量補正処理が行えるようにする。このため、電池パック毎に設けられ、かつ、電池パックと負荷との接続を制御する接続スイッチと、少なくとも電池パックの開放端子電圧を計測する計測部と、開放端子電圧を予め記憶している電圧容量変換情報に適用して、電池パックの実測容量を算出し、該実測容量に基づき既に記憶している管理容量を補正して更新する容量管理部とを含む容量管理ユニットと、外部からの受給電要求に応じて電池パックを充放電させる充放電指令及び容量補正指令を含む制御信号を出力する制御部と、制御信号に基づき接続スイッチをON・OFF状態にする中継駆動部と、を備え、制御部が、複数の電池パックの1つに対して容量補正を行う際に、複数の容量管理ユニットの1つに対して容量補正を行わせる容量補正指令を出力し、中継駆動部は、容量補正指令を受信すると、容量補正する電池パックに接続された接続スイッチをOFF状態にし、容量管理部は、計測部からの開放端子電圧を電圧容量変換情報に適用して実測容量を算出し、該実測容量により管理容量を補正更新する。

Description

蓄電池装置、及び、容量補正方法
 本発明は、蓄電池装置、及び、容量補正方法に関する。
 電池パックは、充放電量に基づき管理している蓄積容量が、実際の蓄積容量と異なる場合がある。このような電池パックを備えた蓄電池装置では、実際の蓄積容量に従って充放電を行う必要がある。特に、電池パックが常に中間容量(フル充電状態と、容量無し状態との間の蓄積容量の意味)で充放電される場合には、管理している蓄積容量と実際の蓄積容量とのズレが問題となる。
 そこで、特開2014-132243号公報においては、電池パックの充放電が停止した時点から開放回路電圧を測定して、この開放回路電圧により実際の蓄積容量を推定する技術が開示されている。なお、他の先行技術文献として特開2007-250521号公報や特許第5615995号公報が知られている。
特開2014-132243号公報 特開2007-250521号公報 特許第5615995号公報
 しかしながら、特開2014-132243号公報にかかる構成では、実際の蓄積容量により管理している蓄積容量を補正するためには、充放電中では行えない問題があった。
 そこで、本発明の主目的は、充放電中であっても容量補正処理が行えるようにした蓄電池装置、及び、容量補正方法を提供することである。
 上記課題を解決するため、複数の電池パックを充放電する蓄電池装置にかかる発明は、電池パック毎に設けられ、かつ、電池パックと負荷との接続を制御する接続スイッチと、少なくとも電池パックの開放端子電圧を計測する計測部と、開放端子電圧を予め記憶している電圧容量変換情報に適用して、電池パックの実測容量を算出し、該実測容量に基づき既に記憶している管理容量を補正して更新する容量管理部とを含む容量管理ユニットと、外部からの受給電要求に応じて電池パックを充放電させる充放電指令及び容量補正指令を含む制御信号を出力する制御部と、制御信号に基づき接続スイッチをON・OFF状態にする中継駆動部と、を備え、制御部が、複数の電池パックの1つに対して容量補正を行う際に、複数の容量管理ユニットの1つに対して容量補正を行わせる容量補正指令を出力し、中継駆動部は、容量補正指令を受信すると、容量補正する電池パックに接続された接続スイッチをOFF状態にし、容量管理部は、計測部からの開放端子電圧を電圧容量変換情報に適用して実測容量を算出し、該実測容量により管理容量を補正更新することを特徴とする。
 また、複数の電池パックを充放電する蓄電池装置における容量補正方法にかかる発明は、電池パック毎に設けられた容量管理ユニットに含まれる接続スイッチを制御して電池パックと負荷との接続を制御し、計測部により少なくとも電池パックの開放端子電圧を計測し、容量管理部により開放端子電圧を予め記憶している電圧容量変換情報に適用して、電池パックの実測容量を算出し、該実測容量に基づき既に記憶している管理容量を補正して更新する手順と、制御部により外部からの受給電要求に応じて電池パックを充放電させる充放電指令及び容量補正指令を含む制御信号を出力する手順と、中継駆動部により制御信号に基づき接続スイッチをON・OFF状態にする手順とを含み、複数の電池パックの1つに対して容量補正を行う際に、制御部は、複数の容量管理ユニットの1つに対して容量補正を行わせる容量補正指令を出力し、中継駆動部は、容量補正指令を受信すると、容量補正する電池パックに接続された接続スイッチをOFF状態にし、容量管理部は、計測部からの開放端子電圧を電圧容量変換情報に適用して実測容量を算出して、該実測容量により管理容量を補正更新することを特徴とする。
 本発明によれば、容量補正処理を割り込み処理としたので、充放電中であっても容量補正処理が行えるようになる。
第1実施形態にかかる蓄電池装置のブロック図である。 2つの電池パックの一方の電池パックの端子電圧又は開放端子電圧の時間変化を示した図である。 2つの電池パックの他方の容量補正対象とした電池パックの端子電圧又は開放端子電圧の時間変化を示した図である。 一方の電池パックの充放電電流の時間変化を示した図である。 他方の容量補正対象とした電池パックの充放電電流の時間変化を示した図である。
一方の接続スイッチの動作状態を時間について示した図である。 他方の容量補正対象側の接続スイッチの動作状態を時間について示した図である。
一方の電池パックの蓄積容量を時間について示した図である。 他方の容量補正対象とした電池パックの蓄積容量を時間について示した図である。 充放電処理の手順を示すフローチャートである。 容量補正処理の手順を示すフローチャートである。 第2実施形態にかかる蓄電池装置のブロック図である。 動作手順を示すフローチャートである。 接続スイッチの動作状態を示した図である。 容量補正対象側の接続スイッチの動作状態を示す図である。 制限スイッチの動作状態を示す図である。 接容量補正対象側の制限スイッチの動作状態を示す図である。 容量補正対象とした電池パックの充電電流を示した図である。 第3実施形態にかかる蓄電池装置のブロック図である。 動作手順を示すフローチャートである。 接続スイッチの動作状態を示した図である。 容量補正対象側の接続スイッチの動作状態を示す図である。 制限スイッチの動作状態を示す図である。 容量補正対象側の制限スイッチの動作状態を示す図である。 容量補正対象の電池パックの充電電流を示した図である。
 <第1実施形態>
 本発明の第1実施形態を説明する。図1は、本実施形態にかかる蓄電池装置2Aのブロック図である。この蓄電池装置2Aは、電池パック11(11a,11b)、計測部12(12a,12b)、容量管理部13(13a,13b)、接続スイッチ14(14a,14b)、中継駆動部15、電圧変換部16、制御部17を備える。そして、蓄電池装置2Aは、外部に対して電池パック11から電力供給し、また外部から電力を受けて電池パック11を充電する。
 ここで、外部とは、当該蓄電池装置2Aが電力を受給電する発電所等を言うが、これに限定するものではない。例えば、他の直流電源(蓄電池を含む)であっても良い。外部として直流電源を用いる場合には、交流/直流変換を行う電圧変換部16は不要になる。
 なお、計測部12、容量管理部13、接続スイッチ14は容量管理ユニットを構成し、各ユニットは電池パック11に対応して設けられている。即ち、1つの電池パック11には1つの容量管理ユニットが設けられている。
 なお、電池パック11の電圧は、負荷(ここでは電圧変換部16)が接続されている場合と、接続されていない場合とで異なることがある。そこで、負荷が接続されている場合の電圧を接続端子電圧、負荷が接続されていない場合の電圧を開放端子電圧、これらを総称して端子電圧と記載する。
 電池パック11は、複数の蓄電池がモジュール化して形成されている。そして、複数の電池パック11は並列接続され、これが電圧変換部16と並列接続されている。
 図1においては、2つの電池パック11a,11bを例示しているが、2つに限定する趣旨ではなく、2つ以上であればよい。
 計測部12(12a,12b)は、電池パック11の端子電圧や充放電電流を計測して、計測結果を計測情報として容量管理部13に出力する。
 容量管理部13(13a,13b)は、配下の電池パック11の管理容量を記憶しており、計測部12からの計測情報に基づき充放電した電流値を積算して、電池パック11の蓄積容量を更新する。
 また、容量管理部13は、制御部17からの指示により容量補正処理を行う。容量補正処理は、電池パック11の開放端子電圧を計測情報から取得し、予め記憶している電圧容量換算情報に開放端子電圧を適用することで、実際の蓄積容量を実測容量として算出する。そして、実測容量に基づき管理容量が補正されると共に、補正後の管理容量が制御部17に送られる。なお、電圧容量換算情報とは、開放端子電圧と実際の蓄積容量との対応関係がテーブル等の形で纏められた情報である。
 ここで、計測情報に基づき充放電した電流値を積算して得られる容量を管理容量、電池パック11の開放端子電圧に基づき算出された容量を実測容量、これら管理容量と実測容量とを総称して蓄積容量と定義する。
 接続スイッチ14(14a,14b)は、一端が電池パック11の端子に接続され、他端が電圧変換部16の端子に接続されて、中継駆動部15からの駆動信号に基づきON・OFF動作することで、電池パック11と電圧変換部16との接続状態を制御する。このような接続スイッチ14として、トランジスタ等の半導体スイッチやリレー等の利用が可能である。
 中継駆動部15は、制御部17から充放電指令や容量補正指令を含む制御信号を受信し、該制御信号に基づき、接続スイッチ14のON,OFF動作を制御駆動すると共に、容量管理部13からの容量情報を中継して制御部17に出力する。
 電池パック11からの直流電力を外部に供給するような場合(電池パック11を放電させる場合)には、交流電力に変換して供給する必要がある。また、電池パック11を充電する場合には、供給された交流電力を直流電力に変換する必要がある。そして、いずれの場合も電圧値や電流値を制御する必要がある。
 そこで、電圧変換部16は、かかる機能を備えるパワーコンディショナーシステム等から構成されている。
 制御部17は、外部からの受給電要求に応じて中継駆動部15及び電圧変換部16に制御信号を出力すると共に、当該中継駆動部15を介して容量管理部13から容量情報を受信して図示しない記憶領域に記憶する。
 このような制御部17は、受給電要求を受信すると、記憶している容量情報に基づき各電池パック11に対する充放電量を計画し、これを制御信号として中継駆動部15及び電圧変換部16に出力する。
 なお、蓄電池装置2Aの上位に蓄電池システムが設けられている場合には、制御部17は、当該蓄電池システムの制御手段であってもよい。このとき、蓄電池システムは複数の蓄電池装置2Aを配下にしてもよい。
 次に、このような蓄電池装置2Aの動作を図2A、図2B、図3A、図3B、図4A、図4B、図5A、図5B、図6,図7を参照して説明する。
 蓄電池装置2Aは、充放電処理(充電処理及び放電処理)と、この充放電処理に対して割り込み処理となる容量補正処理とを大きな処理手順とする。但し、容量補正処理の実行は、充放電処理の停止を意味せず、充放電処理と並列に行われる。
 なお、充電処理は電池パック11を充電する処理であり、放電処理は電池パック11から電力供給する処理である。これに対し、容量補正処理は後述するように、電池パック11の管理容量を補正更新する処理である。
 図2Aは、電池パック11aの端子電圧又は開放端子電圧の時間変化を示した図で、図2Bは電池パック11bの端子電圧を示す図である。
 図3Aは、電池パック11aの充放電電流の時間変化を示した図で、図3Bは電池パック11bの充放電電流を示す図である。なお、同図においては、受給電要求に基づく充放電電流も示されている。
 図4Aは、接続スイッチ14aの動作状態を時間について示した図で、図4Bは接続スイッチ14bの動作状態を示す図である。
 また、図5Aは、電池パック11aの蓄積容量を時間について示した図で、図5B電池パック11bの蓄積容量を示す図である。
 <充放電処理>
 充放電処理について説明する。図6は充放電処理の手順を示すフローチャートである。
 ステップSA1: 制御が開始されると、制御部17は、容量補正処理を実行するか否かを示す容量補正フラグを「0」に設定する。容量補正フラグが「1」の場合には、容量補正処理の実行を示し、容量補正フラグが「0」の場合には、容量補正処理を行わないことを示している。
 そして、制御部17は、外部から受信した受給電要求の内容に応じて充電モード又は放電モードを判断して、その判断結果を充放電指令とする制御信号を作成する。作成された制御信号は、中継駆動部15及び電圧変換部16に出力される。なお、制御信号には、接続スイッチ14を制御するためのスイッチ動作情報、電圧変換部16での交流/直流変換方法及び電圧値や電流値を指定する電力変換情報、及び、充電するか放電するかを指示する充放電指令が含まれる。
 例えば、受給電要求が、充電モードを指示している場合に、電池パック11a,11bの管理容量が予め設定された規定容量より少なくなっているときは、制御部17は当該電池パック11a,11bの充電が必要と判断する。この規定容量は、充電が必要か否かを示す予め設定された値である。
 このときのスイッチ動作情報は接続スイッチ14a,14bを共にON動作させ、電力変換情報は給電ライン18からの交流電力を直流電力に変換して、電池パック11a,11bに供給させる内容となる。
 また、電池パック11aの管理容量のみが規定容量より少なくなっている場合には、当該電池パック11aのみの充電が必要と判断する。このときのスイッチ動作情報は接続スイッチ14aをON動作、接続スイッチ14bをOFF動作させ、電力変換情報は、給電ライン18からの交流電力を直流電力に変換して、電池パック11aに供給する内容となる。
 一方、放電モードの場合には、例えば電池パック11aの管理容量が規定容量より多く、電池パック11bの管理容量が規定容量より少ない場合には、当該電池パック11bから放電は不可能と判断する。
 このときのスイッチ動作情報は接続スイッチ14aをON動作、接続スイッチ14bをOFF動作させ、電力変換情報は、電池パック11aからの直流電力を交流電力に変換して給電ライン18に供給する内容となる。
 ステップSA2: 中継駆動部15は、制御信号に含まれるスイッチ動作情報を取得して、このスイッチ動作情報に該当する接続スイッチ14を動作させる。例えば、電池パック11a,11bの充電を行う場合、接続スイッチ14a,14bを共にON動作させる。図4A,図4Bの時刻t0で、接続スイッチ14a,14bは、共にON状態となっている。
 ステップSA3,SA4: 一方、電圧変換部16は、制御信号から電力変換情報を取得すると、放電モードの場合は直流電力を交流電力に変換するように自己設定し、充電モードの場合は交流電力を直流電力に変換するように自己設定する。
 このとき、電圧変換部16は、充放電電流を調整する。即ち、充放電する電池パック11の数に変更が生じた場合(例えば、容量補正処理が実行されるような場合)、受給電要求を満たすように各電池パック11からの充放電量を調整(電力調整)する。図3A,図3Bでの時刻t0では、電池パック11aと電池パック11bとの充電電流が同じ値に調整されている。
 ステップSA5: その後、制御部17は、充放電を終了するか否かを判断し、終了する場合はステップSA1に戻る。
 ステップSA6,SA7: 一方、充放電が未了の場合には、制御部17は容量補正フラグが「1」か否かを判断する。先に説明したように容量補正フラグが「1」の場合は、容量補正処理が割り込み要求されていることを示している。そこで、容量補正フラグが「1」の場合は、割り込み処理(容量補正処理)を実行させた後、ステップSA2に戻る。
 なお、ステップSA2に戻るのは、容量補正処理を行う電池パック11を電圧変換部16から切り離すために、接続スイッチ14を制御するためである。
 図4A,図4Bの時刻t1で、接続スイッチ14bがOFFして、電池パック11bは負荷(電圧変換部16)から切り離されている。これに伴い、図3A,図3Bの時刻t1では、電池パック11aの充電量が倍増して、電力調整が行われている。
 <容量補正処理>
 次に、容量補正処理について説明する。図7は容量補正処理の手順を示すフローチャートである。ここでは、電池パック11a,11bの充電中に、電池パック11bの容量補正を行う場合を例とする。
 ステップSB1: 制御部17は、予め設定された容量チェック判断基準が満たされたかを常に監視している。この容量チェック判断基準が満たされると、制御部17は容量補正フラグを「1」に設定して、ステップSB2に進む。
 この容量チェック判断基準として充放電開始から予め設定された時間が経過した場合、定期的な時間が経過した場合、稼働時間が所定の時間に達した場合等が例示できる。また、充電中の接続端子電圧の変化状況から判断しても良い。さらに、何かイベントが発生したことを容量チェック実行判断の実行条件としても良い。
 以下の説明では、充放電開始から予め設定された時間に達したときに容量チェック実行を行うとする。図2A、図2B、図3A、図3B、図4A、図4B、図5A、図5Bにおいては、容量チェック判断基準を、充放電開始してからの時間t1が経過したときとした場合を示している。
 先の仮定では、電池パック11a,11bの充電中に、電池パック11bの容量補正を行うので、制御部17は、電池パック11bの容量補正指令を含む制御信号を出力する。
 ステップSB2: 中継駆動部15は、この制御信号を受信すると容量補正処理のために容量補正対象である電池パックに接続されている接続スイッチ14bをOFF状態にして電圧変換部16から切り離す。図4A,図4Bの時刻t1で接続スイッチ14bがOFF状態となっている。
 ステップSB3: 一方、電圧変換部16は、充電対象の電池パック11の数が変動したのに伴い電力調整する。図3A,図3Bの時刻t1で電池パック11aの充電電流が調整(電力調整)されている。
 ステップSB4: 容量管理部13は、常時電池パック11に入出力する電流をモニタしている。そして、充放電時間と充放電電流との積(充放電電力量)を算出して、記憶している管理容量を更新している。
 このような状況にあって、容量管理部13は容量補正指令を含む制御信号を中継駆動部15から受信すると、所定時間の経過するのを待って、電池パック11の開放端子電圧を計測部12から取得する。電池パック11の端子電圧は、端子が開放されても多少の時間変動することがある。
 そこで、かかる端子電圧の変動が収まって開放端子電圧となるまでの時間だけ待つ(この時間を補正待機時間と記載する)。図2Bにおいては、時刻t1で接続スイッチ14bがOFFされ、その後、電池パック11bの端子電圧は徐々に落ち着いている。
 そして、電池パック11bの開放端子電圧が取得されると、容量管理部13は計測された開放端子電圧を予め記憶している電圧容量換算情報に適用して、当該開放端子電圧に対応した容量(実測容量)を算出する。
 ステップSB5: 容量管理部13は、端子容量と管理容量との一致性を判断する。管理容量が実測容量に対して予め設定された許容範囲内ならば実測容量と管理容量とは一致していると判断する。一方、許容範囲外ならば管理容量にズレが生じていると判断する。
 このような許容範囲は、電池パック11を構成する蓄電池の構造や種類等に応じて適宜設定されるものであり、例えば、(実測容量-管理容量)/管理容量の絶対値が1割の範囲を許容範囲とすることが可能である。
 ステップSB6: 管理容量が実測容量に対して許容範囲外の場合には、容量管理部13は管理容量を実測容量により補正し、補正後の管理容量を制御部17に送る。制御部17は受信した管理容量を記憶する。
 なお、ステップSB5における端子容量と管理容量との一致性を判断せず、実測容量が得られると、一律に管理容量を補正更新しても良い。
 ステップSB7:容量補正が終了すると、制御部17は容量補正フラグを「0」に設定して、割り込み処理を終了する。
 このとき中継駆動部15は、接続スイッチ14bをON動作させて、電池パック11bを充放電処理に復帰させるが、無条件に復帰させると、電池パック11aと電池パック11bとの端子電圧に違いがある場合には、これらの電池パック11間に定格より大きな突入電流が流れる恐れがある。
 そこで、制御部17は計測部12から端子電圧を取得し、電池パック11aと電池パック11bとの端子電圧が一致するまで待って(以下、この待ち時間を復帰待機時間と記載する)、中継駆動部15に接続スイッチ14bをON動作させる制御信号を出力する。
 このように、蓄電池装置2Aを停止させることなく容量補正が行えるようになり、効率的に適切な蓄電容量の管理が可能になる。そして、受給電に対する信頼性が向上する。
 <第2実施形態>
 次に、本発明の第2実施形態を説明する。なお、第1実施形態と同一構成に関しては、同一符号を用いて説明を適宜省略する。
 第1実施形態においては、容量補正処理を実行する際に、補正待機時間の経過を待った。しかしこのような、補正待機時間は、容量補正の対象である電池パックが充放電処理に寄与していない時間(以下、容量補正時間と記載する)であり、かかる容量補正時間を長くすることは、蓄電池装置の信頼性(能力的な信頼性、寿命的な信頼性等)の低下を招く一因になる恐れがある。そこで、本実施形態では、補正待機時間の短縮を図る。
 補正待機時間は、開放端子電圧が落ち着くまでに要する時間(以下、端子電圧収束時間と記載する)と等しいことが理想的であるが、容量補正処理が適正に行うためには、端子電圧収束時間より長い時間に設定しなければならない。
 端子電圧収束時間は、電池パック11に接続されている接続スイッチ14をOFF状態にした時に流れていた電流値に依存し、この電流値が小さいと、端子電圧収束時間も短くなる。端子電圧収束時間が短くなれば、補正待機時間を短くすることができ、容量補正時間を短縮することが可能になる。
 図8は、このような観点から構成された本実施形態にかかる蓄電池装置2Bのブロック図である。この蓄電池装置2Bには、図1に示す蓄電池装置2Aに対して、電流制限器19(19a,19b)、及び、電流制限器19に直列に接続された制限スイッチ20(20a,20b)が追加されている。なお、電流制限器19及び制限スイッチ20は、電流制限部を構成している。
 電流制限器19としては固定抵抗等が例示でき、制限スイッチ20としてはトランジスタ等の半導体スイッチやリレー等が例示できる。
 電流制限器19と制限スイッチ20とは直列に接続され、この接続体が接続スイッチ14と並列に接続されている。
 次に、このような構成の蓄電池装置2Bの動作を説明する。以下の説明では、充放電は同じように制御されるので、充電を例に説明する。
 図9は、この動作手順を示すフローチャートである。図10Aは接続スイッチ14aの動作状態を示した図、図10Bは容量補正対象側の接続スイッチ14bの動作状態を示す図、図10Cは制限スイッチ20aの動作状態を示す図、図10Dは容量補正対象側の制限スイッチ20bの動作状態を示す図である。また、図11は電池パック11bの充電電流を示した図である。なお、図11において、実線は充放電要求された充電電流であり、点線は電池パック11bの充電電流を示している。
 ステップSC1: 制御部17は受給電要求に従い電池パック11a、11bの充電を指示する充放電指令を含む制御信号を出力する。これにより中継駆動部15は、接続スイッチ14a,14bをON動作させ、制限スイッチ20a,20bをOFF動作させて、電池パック11a、11bの充電が開始される(図10A~図10D及び図11の時刻t0)。このとき各電池パック11a,11bには、充電電流Ia、Ibが流れていたとする。
 ステップSC2~SC4: このような充電を行っている時に、容量チェック判断基準が満たされると、制御部17は電池パック11bの容量補正処理を行うために容量補正指令を含む制御信号を出力する。中継駆動部15は、制御信号を受けると、補正対象である電池パック11b側の制限スイッチ20bをON状態とし、接続スイッチ14bをOFF状態にする。図10A~図10D及び図11ではこの状態切換を時刻taで行っている。
 これにより、電池パック11bには電流制限器19を介して充電電流Ibm(Ibm<Ib)が流れるようになる。即ち、電池パック11bの充電電流は減少する。そして、電池パック11aには充電電流Iam(Iam>Ia)が流れる。このとき、Ib-Ibm=Iam-Iaである。即ち、全体の充電電流は変化しない。
 ステップSC5,SC6: そして、中継駆動部15は、所定時間(以下、電流制限時間と記載する)の経過を待つ。この電流制限時間が経過すると、中継駆動部15は制限スイッチ20bをOFF状態にして、電池パック11bを電圧変換部16から完全に切り離す。
 ステップSC7,SC8: 電池パック11bが完全に切り離されると、容量管理部は、補正待機時間の経過を待ちとなる。そして、当該補正待機時間に達すると、容量管理部は、開放端子電圧に基づき実測容量を求め、これにより管理容量を補正する。電池パック11bを切り離す際の電池パック11bに流れていた充電電流Ibmは、初期(時刻t0)の充電電流Ibより小さい。従って、このときの端子電圧収束時間は、充電電流Ibが流れていたときの端子電圧収束時間より短い。
 図10A~図10D及び図11では、時刻tbで端子電圧が収束して容量補正が行われたので、中継駆動部15は制限スイッチ20bをON状態に駆動している。これにより、電池パック11bには電流制限器19bを介して充電電流が流れ、充電が再開される。このときの充電電流Ibmとすると、電池パック11aには充電電流Iam(=Ia+Ib-Ibm)が流れて、全体の充電電流が変化しないようになっている。
 ステップSC9: 中継駆動部15は、制限スイッチ20bをON状態にする。これにより電池パック11bは、電流制限器19bを介して充電が再開される。
 ステップSC10~SC12: そして、電流制限器19bを介した充電を電流制限時間だけ行った否かの判断が行われ、当該時間だけ充電すると、中継駆動部15は、接続スイッチ14bをON状態に、制限スイッチ20bをOFF状態にする。これにより、電池パック11bは電流制限器を介することなく充電されるようになる。図10A~図10D及び図11において時刻t3で制限スイッチ20bがOFF状態となっている。
 ステップSC13,SC14: その後、充放電の完了が判断されて、完了した場合には接続スイッチ14、制限スイッチ20の全てのスイッチがOFF状態となる。
 このような一連の動作によって、受給電要求を満たしながら、かつ、容量補正時間を短縮しながら、複数の電池パックの蓄積容量を補正更新することができるようになる。
 <第3実施形態>
 次に、本発明の第3実施形態を説明する。なお、第1,2実施形態と同一構成に関しては、同一符号を用いて説明を適宜省略する。
 第1実施形態においては、容量補正処理を実行する際に、補正待機時間の経過を待って、複数の電池パックの端子電圧が一致するのを待った(復帰待機時間の経過を待った)。これは端子電圧の異なる電池パック11間で定格より大きな突入電流が流れるのを防止するためであった。本実施形態では、この補正待機時間の短縮を図る。
 図12は、本実施形態にかかる蓄電池装置2Cのブロック図である。図8に示す蓄電池装置2Bの電流制限器は固定抵抗であった。これに対し、本実施形態にかかるこの蓄電池装置2Cの電流制限器は、定電流回路で構成されている。即ち、本実施形態における電流制限部は、制限スイッチ20(20a,20b)と定電流回路21(21a,21b)とにより構成されている。
 定電流回路21(21a,21b)は、所定の電流値(最大許容電流)未満の電流に対しては設定された電流を流すように機能するが、この最大許容電流以上の電流に対しては、当該最大許容電流に制限する機能を持つ。
 このような構成の蓄電池装置2Cの動作を説明する。なお、以下の説明では、充放電は同じように制御されるので、充電を例に説明する。
 図13は、この動作手順を示すフローチャートである。図14Aは接続スイッチ14aの動作状態を示した図、図14Bは容量補正対象側の接続スイッチ14bの動作状態を示す図、図14Cは制限スイッチ20aの動作状態を示す図、図14Dは容量補正対象側の制限スイッチ20bの動作状態を示す図である。
なお、制限スイッチ20は、中継駆動部15により駆動される。
 また、図15は電池パック11bの充電電流を示した図である。図15において、実線は充放電要求された充電電流であり、点線は電池パック11bの充電電流を示している。
 ステップSD1: 制御部17は受給電要求に従い電池パック11a、11bの充電を指示する制御信号を出力する。中継駆動部15は制御信号に含まれる充放電指令に基づき、接続スイッチ14a,14bをON動作させ、制限スイッチ20a,20bをOFF動作させる。これにより、電池パック11a、11bの充電が開始される(図14A~図14D及び図15の時刻t0)。このとき各電池パック11a,11bには、充電電流Ia、Ibが流れていたとする。
 ステップSD2,SD3: このような充電を行っている時に、容量チェック判断基準が満たされると、制御部17は電池パック11bの容量補正処理を行うために容量補正指令を含む制御信号を出力する。中継駆動部15は、容量補正指令を受けると、補正対象である電池パック11b側の接続スイッチ14bをOFF状態にする。図15ではこの状態切換を時刻t1で行っている。
 ステップSD4,SD5: これにより、電池パック11bは、電圧変換部16から完全に切り離されて、当該電池パック11bの端子電圧は開放端子電圧に収束する。なお、電池パック11aにはIa+Ibの充電電流が流れる。このような状態で、容量管理部は補正待機時間の経過を待ち、当該時間後に容量補正を行う。
 ステップSD6: 次に中継駆動部15は、制限スイッチ20bをON状態にする。これにより定電流回路21bが電池パック11bの充電電流を最大許容電流とする。なお、このときの最大許容電流は、電池パック11aに流れている電流値と同じ電流値とすることができる。
 このことは、電圧変換部16から見た接続点K(図12参照)の電位が同じ電位と見なせることを意味する。従って、電池パック11a,11bの端子電圧が例え違っていても、電池パック11a,11b間に突入電流が流れるのを防止できる。
 従って、補正対象の電池パック11bは、制限スイッチ20bを介して容量補正処理後に直ちに復帰するので、復帰待機時間を短縮することが可能になる。
 ステップSD7~SD9: そして、中継駆動部15は電池パック11bの端子電圧が電池パック11aの端子電圧と一致するまで待ち、これらの端子電圧が一致すると接続スイッチ14aをON状態、制限スイッチ20bをOFF状態にする。
 このような一連の動作によって、受給電要求を満たしながら、かつ、容量補正後に直ちに最大許容電流で充放電を行うことが可能となり、復帰待機時間を短くすることができる。
以上、実施形態(及び実施例)を参照して本願発明を説明したが、本願発明は上記実施形態(及び実施例)に限定されるものではない。本願発明の構成や詳細には、本願発明のスコープ内で当業者が理解し得る様々な変更をすることができる。
この出願は、2015年3月16日に出願された日本出願特願2015-051809を基礎とする優先権を主張し、その開示の全てをここに取り込む。
 2A~2C  蓄電池装置
 11(11a,11b)  電池パック
 12(12a,12b)  計測部
 13(13a,13b)  容量管理部
 14(14a,14b)  接続スイッチ
 15  中継駆動部
 16  電圧変換部
 17  制御部
 18  給電ライン
 19(19a,19b)  電流制限器(固定抵抗)
 20(20a,20b)  制限スイッチ
 21(21a,21b)  電流制限器(定電流回路)

Claims (9)

  1.  複数の電池パックを充放電する蓄電池装置であって、
     前記電池パック毎に設けられ、かつ、前記電池パックと負荷との接続を制御する接続スイッチと、少なくとも前記電池パックの開放端子電圧を計測する計測部と、前記開放端子電圧を予め記憶している電圧容量変換情報に適用して、前記電池パックの実測容量を算出し、該実測容量に基づき既に記憶している管理容量を補正して更新する容量管理部とを含む容量管理ユニットと、
     外部からの受給電要求に応じて前記電池パックを充放電させる充放電指令及び容量補正指令を含む制御信号を出力する制御部と、
     前記制御信号に基づき前記接続スイッチをON・OFF状態にする中継駆動部と、を備え、
     前記制御部が、複数の前記電池パックの1つに対して容量補正を行う際に、複数の前記容量管理ユニットの少なくとも1つに対して容量補正を行わせる前記容量補正指令を出力し、前記中継駆動部は、前記容量補正指令を受信すると、容量補正する前記電池パックに接続された前記接続スイッチをOFF状態にし、前記容量管理部は、前記計測部からの前記開放端子電圧を前記電圧容量変換情報に適用して前記実測容量を算出し、該実測容量により前記管理容量を補正更新することを特徴とする蓄電池装置。
  2.  請求項1に記載の蓄電池装置であって、
     前記接続スイッチと並列接続された、制限スイッチ及び該制限スイッチと直列に接続された固定抵抗又は定電流回路の電流制限器からなる電流制限部を備えることを特徴とする蓄電池装置。
  3.  請求項2に記載の蓄電池装置であって、
     前記電流制限器が固定抵抗の場合に前記容量補正処理を行う際には、前記中継駆動部は、容量補正する前記電池パックに接続された前記接続スイッチをOFF状態、前記制限スイッチをON状態に設定して所定の電流制限時間の経過を待ち、該電流制限時間の経過後に前記制限スイッチをOFF状態にして容量補正処理が行えるようにし、該容量補正処理が終了すると直ちに前記制限スイッチをON状態にして所定の復帰待機時間の経過を待ち、該復帰待機時間が経過すると、前記接続スイッチをON状態、前記制限スイッチをOFF状態にすることを特徴とする蓄電池装置。
  4.  請求項2に記載の蓄電池装置であって、
    前記電流制限器が定電流回路の場合に前記容量補正処理を行う際には、前記中継駆動部は、前記容量補正処理が行われる際に、前記中継駆動部は、所定の電流制限時間の経過を待ち、該電流制限時間の経過後に前記制限スイッチをON状態にして容量補正処理が行えるようにし、該容量補正処理が終了すると直ちに前記制限スイッチをON状態にして所定の復帰待機時間の経過を待ち、該復帰待機時間が経過すると、前記接続スイッチをON状態、前記制限スイッチをOFF状態にすることを特徴とする蓄電池装置。
  5.  請求項1乃至4のいずれか1項に記載の蓄電池装置であって、
     前記負荷が前記電池パックから外部に電力供給する際に直流電力から交流電力に変換し、外部から前記電池パックに電力供給する際に交流電力を直流電力に変換する電圧変換部を備え、
     該電圧変換部は、容量補正処理が行われる際に、該容量補正処理の対象である前記電池パックが当該容量補正処理前に受給電していた電力を他の前記電池パックに割り当てることを特徴とする蓄電池装置。
  6.  複数の電池パックを充放電する蓄電池装置における容量補正方法であって、
     前記電池パック毎に設けられた容量管理ユニットに含まれる接続スイッチを制御して前記電池パックと負荷との接続を制御し、
     計測部により少なくとも前記電池パックの開放端子電圧を計測し、
     容量管理部により前記開放端子電圧を予め記憶している電圧容量変換情報に適用して、前記電池パックの実測容量を算出し、該実測容量に基づき既に記憶している管理容量を補正して更新する手順と、
     制御部により外部からの受給電要求に応じて前記電池パックを充放電させる充放電指令及び容量補正指令を含む制御信号を出力する手順と、
     中継駆動部により前記制御信号に基づき前記接続スイッチをON・OFF状態にする手順と、を含み、
     複数の前記電池パックの少なくとも1つに対して容量補正を行う際に、
     前記制御部は、複数の前記容量管理ユニットの1つに対して容量補正を行わせる前記容量補正指令を出力し、
     前記中継駆動部は、前記容量補正指令を受信すると、容量補正する前記電池パックに接続された前記接続スイッチをOFF状態にし、
     前記容量管理部は、前記計測部からの前記開放端子電圧を前記電圧容量変換情報に適用して前記実測容量を算出して、該実測容量により前記管理容量を補正更新することを特徴とする容量補正方法。
  7.  請求項6に記載の容量補正方法であって、
     前記接続スイッチと並列接続された、制限スイッチ及び該制限スイッチと直列に接続された電流制限器が固定抵抗の場合に前記容量補正処理を行うときは、
     前記中継駆動部は、容量補正する前記電池パックに接続された前記接続スイッチをOFF状態、前記制限スイッチをON状態に設定して所定の電流制限時間の経過を待ち、
     該電流制限時間の経過後に前記制限スイッチをOFF状態にして容量補正処理が行えるようにし、
     該容量補正処理が終了すると直ちに前記制限スイッチをON状態にして所定の復帰待機時間の経過を待ち、
     該復帰待機時間が経過すると、前記接続スイッチをON状態、前記制限スイッチをOFF状態にすることを特徴とする容量補正方法。
  8.  請求項6に記載の容量補正方法であって、
     前記接続スイッチと並列接続された、制限スイッチ及び該制限スイッチと直列に接続された電流制限器が定電流回路の場合に前記容量補正処理を行うときは、
     前記中継駆動部は、所定の電流制限時間の経過を待ち、
     該電流制限時間の経過後に前記制限スイッチをON状態にして容量補正処理が行えるようにし、
     該容量補正処理が終了すると直ちに前記制限スイッチをON状態にして所定の復帰待機時間の経過を待ち、
     該復帰待機時間が経過すると、前記接続スイッチをON状態、前記制限スイッチをOFF状態にすることを特徴とする容量補正方法。
  9.  請求項6乃至8のいずれか1項に記載の容量補正方法であって、
     前記負荷が前記電池パックから外部に電力供給する際に直流電力から交流電力に変換し、外部から前記電池パックに電力供給する際に交流電力を直流電力に変換する電圧変換部が、容量補正処理が行われる際に、該容量補正処理の対象である前記電池パックが、当該容量補正処理前に受給電していた電力を他の前記電池パックに割り当てることを特徴とする容量補正方法。
PCT/JP2016/001298 2015-03-16 2016-03-09 蓄電池装置、及び、容量補正方法 WO2016147614A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017506074A JPWO2016147614A1 (ja) 2015-03-16 2016-03-09 蓄電池装置、及び、容量補正方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015-051809 2015-03-16
JP2015051809 2015-03-16

Publications (1)

Publication Number Publication Date
WO2016147614A1 true WO2016147614A1 (ja) 2016-09-22

Family

ID=56918574

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/001298 WO2016147614A1 (ja) 2015-03-16 2016-03-09 蓄電池装置、及び、容量補正方法

Country Status (2)

Country Link
JP (1) JPWO2016147614A1 (ja)
WO (1) WO2016147614A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019188890A1 (ja) * 2018-03-28 2019-10-03 古河電気工業株式会社 蓄電システムおよび計測方法
JP2020072516A (ja) * 2018-10-30 2020-05-07 三菱電機株式会社 電力変換装置
JP2020134438A (ja) * 2019-02-25 2020-08-31 ニチコン株式会社 パワーコンディショナおよび蓄電システム

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011155014A1 (ja) * 2010-06-07 2011-12-15 トヨタ自動車株式会社 車両の電力制御装置および車両の電力制御方法
JP2012034529A (ja) * 2010-08-02 2012-02-16 Nec Energy Devices Ltd 二次電池パック接続制御方法、蓄電システム、および二次電池パック
JP2012108046A (ja) * 2010-11-18 2012-06-07 Honda Motor Co Ltd 電池容量推定装置および電池容量推定方法
JP2014056811A (ja) * 2012-08-13 2014-03-27 Sumitomo Electric Ind Ltd 溶融塩電池システム及びその充放電方法
JP2014073051A (ja) * 2012-10-01 2014-04-21 Toyota Industries Corp 電源装置および電池モジュール切り替え方法
JP2016015246A (ja) * 2014-07-02 2016-01-28 日産自動車株式会社 電源装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011155014A1 (ja) * 2010-06-07 2011-12-15 トヨタ自動車株式会社 車両の電力制御装置および車両の電力制御方法
JP2012034529A (ja) * 2010-08-02 2012-02-16 Nec Energy Devices Ltd 二次電池パック接続制御方法、蓄電システム、および二次電池パック
JP2012108046A (ja) * 2010-11-18 2012-06-07 Honda Motor Co Ltd 電池容量推定装置および電池容量推定方法
JP2014056811A (ja) * 2012-08-13 2014-03-27 Sumitomo Electric Ind Ltd 溶融塩電池システム及びその充放電方法
JP2014073051A (ja) * 2012-10-01 2014-04-21 Toyota Industries Corp 電源装置および電池モジュール切り替え方法
JP2016015246A (ja) * 2014-07-02 2016-01-28 日産自動車株式会社 電源装置

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019188890A1 (ja) * 2018-03-28 2019-10-03 古河電気工業株式会社 蓄電システムおよび計測方法
CN111919355A (zh) * 2018-03-28 2020-11-10 古河电气工业株式会社 蓄电系统及测量方法
CN111919355B (zh) * 2018-03-28 2024-02-20 古河电气工业株式会社 蓄电系统及测量方法
JP2020072516A (ja) * 2018-10-30 2020-05-07 三菱電機株式会社 電力変換装置
JP2020134438A (ja) * 2019-02-25 2020-08-31 ニチコン株式会社 パワーコンディショナおよび蓄電システム
JP7166956B2 (ja) 2019-02-25 2022-11-08 ニチコン株式会社 パワーコンディショナおよび蓄電システム

Also Published As

Publication number Publication date
JPWO2016147614A1 (ja) 2017-12-28

Similar Documents

Publication Publication Date Title
US9331523B2 (en) Power control device and power control method
US9106092B2 (en) Apparatus for discharging DC-link capacitor for electric vehicle charger
US10763754B2 (en) Power supply device
AU2017336736B2 (en) Active filter device, air conditioning device, and air conditioning system
WO2016147614A1 (ja) 蓄電池装置、及び、容量補正方法
US8484491B2 (en) Power supply apparatus and power supply control method
JP6877640B2 (ja) 電力変換装置および電力変換システム
CN110382282B (zh) 车辆电源装置
JP6854177B2 (ja) 電力制御システム
US11159031B2 (en) Electrical machinery and apparatus
KR100902508B1 (ko) 전력 조절장치 및 그 운영방법
CN112840549A (zh) 逆变器装置的测试装置
US10081254B2 (en) Method for coupling at least one secondary energy source to an energy supply network, in particular an on-board vehicle power supply
EP3551943B1 (en) Hvac actuator
CN103856040B (zh) 用于控制升压变换器的方法和系统
JP2018121379A (ja) 周波数変換システムの制御装置
US10326274B2 (en) Arrangement comprising an energy storage device for receiving electrical energy from an electrical network and discharing electrical energy to the electrical network
JP6707309B2 (ja) 電力供給システム
CN111788755A (zh) 连接子电网与交流电压网的设备及调节电功率的方法
JP3933537B2 (ja) 交流電源装置
JP5876748B2 (ja) コンバータ装置
WO2013121899A1 (ja) 電気機器
JP7276103B2 (ja) 電力システム及び電力供給装置
JP6658482B2 (ja) 充電装置
JP6819640B2 (ja) 電力バッファ装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16764447

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017506074

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16764447

Country of ref document: EP

Kind code of ref document: A1