WO2016137017A1 - 評価装置及び評価方法 - Google Patents

評価装置及び評価方法 Download PDF

Info

Publication number
WO2016137017A1
WO2016137017A1 PCT/JP2016/059979 JP2016059979W WO2016137017A1 WO 2016137017 A1 WO2016137017 A1 WO 2016137017A1 JP 2016059979 W JP2016059979 W JP 2016059979W WO 2016137017 A1 WO2016137017 A1 WO 2016137017A1
Authority
WO
WIPO (PCT)
Prior art keywords
bucket
data
display screen
excavation
evaluation
Prior art date
Application number
PCT/JP2016/059979
Other languages
English (en)
French (fr)
Inventor
進 幸積
英美 ▲高▼橋
亜紀 田畑
Original Assignee
株式会社小松製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社小松製作所 filed Critical 株式会社小松製作所
Priority to CN201680001448.2A priority Critical patent/CN106414860B/zh
Priority to US15/309,835 priority patent/US10147339B2/en
Priority to AU2016224354A priority patent/AU2016224354B2/en
Priority to DE112016000037.5T priority patent/DE112016000037B4/de
Priority to JP2016529494A priority patent/JP6002873B1/ja
Priority to PCT/JP2016/059979 priority patent/WO2016137017A1/ja
Priority to KR1020167031108A priority patent/KR20170113001A/ko
Publication of WO2016137017A1 publication Critical patent/WO2016137017A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/261Surveying the work-site to be treated
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B19/00Teaching not covered by other main groups of this subclass
    • G09B19/24Use of tools
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/30Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom
    • E02F3/32Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom working downwardly and towards the machine, e.g. with backhoes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2004Control mechanisms, e.g. control levers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/264Sensors and their calibration for indicating the position of the work tool
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C5/00Registering or indicating the working of vehicles
    • G07C5/008Registering or indicating the working of vehicles communicating information to a remotely located station
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B19/00Teaching not covered by other main groups of this subclass
    • G09B19/16Control of vehicles or other craft
    • G09B19/167Control of land vehicles
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B5/00Electrically-operated educational appliances
    • G09B5/02Electrically-operated educational appliances with visual presentation of the material to be studied, e.g. using film strip
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N23/00Cameras or camera modules comprising electronic image sensors; Control thereof
    • H04N23/60Control of cameras or camera modules
    • H04N23/63Control of cameras or camera modules by using electronic viewfinders
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N5/00Details of television systems
    • H04N5/44Receiver circuitry for the reception of television signals according to analogue transmission standards
    • H04N5/445Receiver circuitry for the reception of television signals according to analogue transmission standards for displaying additional information
    • H04N5/44504Circuit details of the additional information generator, e.g. details of the character or graphics signal generator, overlay mixing circuits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2264Arrangements or adaptations of elements for hydraulic drives
    • E02F9/2271Actuators and supports therefor and protection therefor
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/048Interaction techniques based on graphical user interfaces [GUI]
    • G06F3/0484Interaction techniques based on graphical user interfaces [GUI] for the control of specific functions or operations, e.g. selecting or manipulating an object, an image or a displayed text element, setting a parameter value or selecting a range
    • G06F3/04845Interaction techniques based on graphical user interfaces [GUI] for the control of specific functions or operations, e.g. selecting or manipulating an object, an image or a displayed text element, setting a parameter value or selecting a range for image manipulation, e.g. dragging, rotation, expansion or change of colour
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/048Interaction techniques based on graphical user interfaces [GUI]
    • G06F3/0487Interaction techniques based on graphical user interfaces [GUI] using specific features provided by the input device, e.g. functions controlled by the rotation of a mouse with dual sensing arrangements, or of the nature of the input device, e.g. tap gestures based on pressure sensed by a digitiser
    • G06F3/0488Interaction techniques based on graphical user interfaces [GUI] using specific features provided by the input device, e.g. functions controlled by the rotation of a mouse with dual sensing arrangements, or of the nature of the input device, e.g. tap gestures based on pressure sensed by a digitiser using a touch-screen or digitiser, e.g. input of commands through traced gestures

Definitions

  • the present invention relates to an evaluation apparatus and an evaluation method.
  • Patent Document 1 In excavation work at a construction site, a work vehicle having a bucket as disclosed in Patent Document 1 is used.
  • an operator operates a work vehicle for construction, it is desired that the excavated material is efficiently scooped up by one excavation operation with a bucket from the viewpoint of improving construction efficiency.
  • the skill of the operator is required.
  • An object of an aspect of the present invention is to provide an evaluation device and an evaluation method that can easily evaluate the skill of an operator of a work vehicle.
  • the detection data acquisition unit that acquires the shooting data of the bucket of the work machine, the first display control unit that displays the shooting data on the display screen of the display device, and the bucket on the side
  • a second display control unit for displaying on the display screen a graphic showing at least a part of the outline of the bucket when viewed from the side, and moving the graphic on the display screen by operating an input device;
  • An evaluation device is provided that includes an identification unit that distinguishes between the bucket on the display screen and the excavated matter that has come out of the opening end of the bucket based on the figure that has been aligned.
  • the second aspect of the present invention when acquiring the shooting data of the bucket of the work machine, displaying the shooting data on the display screen of the display device, and when viewing the bucket from the side, Displaying a graphic showing at least a part of the outline of the bucket on the display screen, moving the graphic on the display screen based on input data generated by an operation of an input device, and positioning the bucket
  • An evaluation method includes discriminating between the bucket on the display screen and the excavated matter coming out of the open end of the bucket based on the combined figure.
  • an evaluation device and an evaluation method that can easily evaluate the skill of an operator of a work vehicle are provided.
  • FIG. 1 is a diagram schematically illustrating an example of an evaluation system according to the present embodiment.
  • FIG. 2 is a side view showing an example of a hydraulic excavator according to the present embodiment.
  • FIG. 3 is a plan view illustrating an example of the hydraulic excavator according to the first embodiment.
  • FIG. 4 is a diagram schematically illustrating an example of the operation device according to the present embodiment.
  • FIG. 5 is a diagram schematically illustrating an example of a hardware configuration of the evaluation system according to the present embodiment.
  • FIG. 6 is a functional block diagram illustrating an example of a portable device according to the present embodiment.
  • FIG. 7 is a flowchart illustrating an example of the evaluation method according to the present embodiment.
  • FIG. 1 is a diagram schematically illustrating an example of an evaluation system according to the present embodiment.
  • FIG. 2 is a side view showing an example of a hydraulic excavator according to the present embodiment.
  • FIG. 3 is a plan view illustrating an example of the hydraulic exca
  • FIG. 8 is a flowchart illustrating an example of a shooting preparation method according to the present embodiment.
  • FIG. 9 is a diagram for explaining an example of a shooting position determination method according to the present embodiment.
  • FIG. 10 is a diagram for explaining a method for specifying the position of the upper-part turning body according to the present embodiment.
  • FIG. 11 is a diagram for explaining the work machine position specifying method according to the present embodiment.
  • FIG. 12 is a flowchart illustrating an example of the evaluation method according to the present embodiment.
  • FIG. 13 is a diagram for explaining an example of the excavation amount calculation method according to the present embodiment.
  • FIG. 14 is a diagram schematically illustrating an example of a method for specifying an opening end according to the present embodiment.
  • FIG. 15 is a diagram schematically illustrating an example of a method for specifying an opening end according to the present embodiment.
  • FIG. 16 is a diagram schematically illustrating an example of a graphic according to the present embodiment.
  • FIG. 17 is a diagram schematically illustrating an example of a graphic according to the present embodiment.
  • FIG. 1 is a diagram schematically illustrating an example of an evaluation system 1 according to the present embodiment.
  • the work vehicle 3 operates at the construction site 2.
  • the work vehicle 3 is operated by an operator Ma who has boarded the work vehicle 3.
  • the evaluation system 1 performs one or both of the evaluation of the operation of the work vehicle 3 and the evaluation of the skill of the operator Ma who operates the work vehicle 3.
  • the operator Ma operates the work vehicle 3 to construct a construction site.
  • a worker Mb different from the operator Ma performs the work.
  • the worker Mb performs auxiliary work at the construction site 2.
  • the evaluation system 1 includes a management device 4 including a computer system and a portable device 6 including a computer system.
  • the management device 4 functions as a server.
  • the management device 4 provides services to clients including users of the work vehicle 3 or users of the mobile device 6.
  • the client includes at least one of an operator Ma, a worker Mb, a holder of the work vehicle 3, and a contractor from whom the work vehicle 3 is rented.
  • the portable device 6 is possessed by at least one of the operator Ma and the worker Mb.
  • the portable device 6 includes a portable computer such as a smartphone or a tablet personal computer.
  • the management device 4 is capable of data communication with a plurality of portable devices 6.
  • FIG. 2 is a side view showing an example of the hydraulic excavator 3 according to the present embodiment.
  • FIG. 3 is a plan view showing an example of the hydraulic excavator 3 according to the present embodiment. 3 shows a plan view of the excavator 3 viewed from above in the posture of the working machine 10 as shown in FIG.
  • the excavator 3 includes a work machine 10 that is operated by hydraulic pressure, and a vehicle body 20 that supports the work machine 10.
  • the vehicle main body 20 includes an upper swing body 21 and a lower traveling body 22 that supports the upper swing body 21.
  • the upper swing body 21 includes a cab 23, a machine room 24, and a counterweight 24C.
  • the cab 23 includes a cab.
  • a driver's seat 7 on which the operator Ma sits and an operating device 8 that is operated by the operator Ma are arranged in the driver's cab.
  • the operating device 8 includes a work lever for operating the work implement 10 and the upper swing body 21 and a travel lever for operating the lower travel body 22.
  • the work machine 10 is operated by the operator Ma via the operation device 8.
  • the upper swing body 21 and the lower traveling body 22 are operated by the operator Ma via the operation device 8.
  • the operator Ma can operate the operation device 8 while sitting on the driver's seat 7.
  • the lower traveling body 21 has drive wheels 25 called sprockets, idle wheels 26 called idlers, and crawler belts 27 supported by the drive wheels 25 and idle wheels 26.
  • the drive wheel 25 is operated by power generated by a drive source such as a hydraulic motor.
  • the drive wheel 25 rotates by operating the travel lever of the operating device 8.
  • the drive wheel 25 rotates about the rotation axis DX1 as a rotation center.
  • the idler wheel 26 rotates about the rotation axis DX2.
  • the rotation axis DX1 and the rotation axis DX2 are parallel. As the driving wheel 25 rotates and the crawler belt 27 rotates, the excavator 3 travels or turns back and forth.
  • the upper turning body 21 can turn around the turning axis RX while being supported by the lower traveling body 22.
  • the work machine 10 is supported by the upper turning body 21 of the vehicle body 20.
  • the work machine 10 includes a boom 11 connected to the upper swing body 21, an arm 12 connected to the boom 11, and a bucket 13 connected to the arm 12.
  • the bucket 13 has a plurality of convex blades.
  • a plurality of cutting edges 13B, which are the tips of the blades, are provided.
  • the blade edge 13B of the bucket 13 may be, for example, the tip of a straight blade provided on the bucket 13.
  • the upper swing body 21 and the boom 11 are connected via a boom pin 11P.
  • the boom 11 is supported by the upper swing body 21 so as to be operable with the rotation axis AX1 as a fulcrum.
  • the boom 11 and the arm 12 are connected via an arm pin 12P.
  • the arm 12 is supported by the boom 11 so as to be operable with the rotation axis AX2 as a fulcrum.
  • the arm 12 and the bucket 13 are connected via a bucket pin 13P.
  • the bucket 13 is supported by the arm 12 so as to be operable with the rotation axis AX3 as a fulcrum.
  • the rotation axis AX1, the rotation axis AX2, and the rotation axis AX3 are parallel to the front-rear direction. The definition of the front-rear direction will be described later.
  • the direction in which the axes of the rotation axes AX1, AX2, and AX3 extend is referred to as the vehicle width direction of the upper swing body 21 as appropriate, and the direction in which the axis of the swing axis RX extends is appropriately
  • the direction orthogonal to both the rotation axes AX1, AX2, AX3 and the turning axis RX is appropriately referred to as the front-rear direction of the upper turning body 21.
  • the direction in which the work machine 10 including the bucket 13 is present is the front, and the reverse direction of the front is the rear.
  • One side in the vehicle width direction is on the right side, and the opposite direction on the right side, that is, the side with the cab 23 is on the left side.
  • the bucket 13 is disposed in front of the upper swing body 21.
  • the plurality of cutting edges 13B of the bucket 13 are arranged in the vehicle width direction.
  • the upper swing body 21 is disposed above the lower traveling body 22.
  • Work machine 10 is operated by a hydraulic cylinder.
  • the hydraulic excavator 3 has a boom cylinder 14 for operating the boom 11, an arm cylinder 15 for operating the arm 12, and a bucket cylinder 16 for operating the bucket 13.
  • the boom cylinder 14 expands and contracts, the boom 11 operates with the rotation axis AX1 as a fulcrum, and the tip of the boom 11 moves in the vertical direction.
  • the arm cylinder 15 expands and contracts, the arm 12 operates with the rotation axis AX2 as a fulcrum, and the tip of the arm 12 moves in the vertical direction or the front-rear direction.
  • the bucket 13 When the bucket cylinder 16 expands and contracts, the bucket 13 operates with the rotation axis AX3 as a fulcrum, and the blade edge 13B of the bucket 13 moves in the vertical direction or the front-rear direction.
  • the hydraulic cylinder of the work machine 10 including the boom cylinder 14, the arm cylinder 15, and the bucket cylinder 16 is operated by a work lever of the operation device 8.
  • the posture of the work implement 10 changes as the hydraulic cylinder of the work implement 10 expands and contracts.
  • FIG. 4 is a diagram schematically illustrating an example of the operation device 8 according to the present embodiment.
  • the operation lever of the operating device 8 includes a right operation lever 8WR disposed to the right of the center of the driver seat 7 in the vehicle width direction and a left operation disposed to the left of the center of the driver seat 7 in the vehicle width direction.
  • Lever 8WL The travel lever of the operating device 8 includes a right travel lever 8MR disposed to the right of the center of the driver seat 7 in the vehicle width direction and a left travel disposed to the left of the center of the driver seat 7 in the vehicle width direction.
  • Lever 8ML Lever 8ML.
  • the operation pattern regarding the operation relationship between the tilting direction of the right working lever 8WR and the left working lever 8WL and the turning direction of the work implement 10 or the upper turning pair 21 may not be the above-described relationship.
  • FIG. 5 is a diagram schematically illustrating an example of a hardware configuration of the evaluation system 1 according to the present embodiment.
  • the portable device 6 includes a computer system.
  • the portable device 6 includes an arithmetic processing device 60, a storage device 61, a position detection device 62 that detects the position of the portable device 6, a photographing device 63, a display device 64, an input device 65, and an input / output interface device 66. And a communication device 67.
  • the arithmetic processing unit 60 includes a microprocessor such as a CPU (Central Processing Unit).
  • the storage device 61 includes memory and storage such as ROM (Read Only Memory) or RAM (Random Access Memory).
  • the arithmetic processing device 60 performs arithmetic processing according to a computer program stored in the storage device 61.
  • the position detection device 62 detects an absolute position indicating the position of the mobile device 6 in the global coordinate system by a global navigation system (GNSS).
  • GNSS global navigation system
  • the photographing device 63 has a video camera function capable of acquiring moving image data of a subject and a still camera function capable of acquiring still image data of the subject.
  • the photographing device 63 includes an optical system and an image sensor that acquires photographing data of a subject via the optical system.
  • the image sensor includes a CCD (Charge Coupled Device) image sensor or a CMOS (Complementary Metal Oxide Semiconductor) image sensor.
  • the photographing device 63 can photograph the excavator 3.
  • the imaging device 63 functions as a detection device that detects operation data of the work machine 10 of the excavator 3.
  • the imaging device 63 can acquire the shooting data of the work machine 10 and acquire the movement data of the work machine 10 including at least one of the movement trajectory, the movement speed, and the movement time of the work machine 10.
  • the shooting data of the work machine 10 includes one or both of moving image data and still image data of the work machine 10.
  • the display device 64 includes a flat panel display such as a liquid crystal display (LCD) or an organic EL display (OELD).
  • the input device 65 generates input data when operated.
  • the input device 65 includes a touch sensor provided on the display screen of the display device 64.
  • Display device 64 includes a touch panel.
  • the input / output interface device 66 performs data communication among the arithmetic processing device 60, the storage device 61, the position detection device 62, the photographing device 63, the display device 64, the input device 65, and the communication device 67.
  • the communication device 67 performs data communication with the management device 4 wirelessly.
  • the communication device 67 performs data communication with the management device 4 using a mobile phone communication network or an Internet line.
  • Management device 4 includes a computer system.
  • the management device 4 includes an arithmetic processing device 40, a storage device 41, an output device 42, an input device 43, an input / output interface device 44, and a communication device 45.
  • the arithmetic processing unit 40 includes a microprocessor such as a CPU.
  • the storage device 41 includes a memory such as a ROM or a RAM and a storage.
  • the output device 42 includes a display device such as a flat panel display.
  • the output device 42 may include a printing device that outputs print data.
  • the input device 43 generates input data when operated.
  • the input device 43 includes at least one of a keyboard and a mouse. Note that the input device 43 may include a touch sensor provided on the display screen of the display device.
  • the input / output interface device 44 performs data communication among the arithmetic processing device 40, the storage device 41, the output device 42, the input device 43, and the communication device 45.
  • the communication device 45 performs data communication with the mobile device 6 wirelessly.
  • the communication device 45 performs data communication with the mobile device 6 using a mobile phone communication network or an Internet line.
  • FIG. 6 is a functional block diagram illustrating an example of the mobile device 6 according to the present embodiment.
  • the portable device 6 functions as an evaluation device 600 that performs one or both of the evaluation of the operation of the excavator 3 and the evaluation of the skill of the operator Ma who operates the excavator 3.
  • the functions of the evaluation device 600 are exhibited by the arithmetic processing device 60 and the storage device 61.
  • the evaluation device 600 includes a detection data acquisition unit 601 that acquires imaging data captured by the imaging device 63, and a position data calculation unit 602 that calculates position data of the work implement 10 based on the imaging data captured by the imaging device 63.
  • a target data acquisition unit 611 that acquires target data indicating the target excavation amount of the work implement 10
  • an input data acquisition unit 612 that acquires input data generated by operating the input device 65
  • a bucket based on the imaging data
  • the excavation time calculation unit 613 for calculating the excavation time of one excavation operation by the No.
  • the evaluation data generation unit 604 for generating the image data and the first display control unit 605A for displaying the photographing data on the display screen of the display device 64.
  • the second display control unit 605B displays a graphic showing at least a part of the outline of the bucket 13 on the display screen of the display device 64, and the second display control unit 605B displays a guide line whose size and position are fixed on the display screen of the display device 64.
  • the evaluation device 600 performs data communication via the input / output unit 610.
  • the photographing device 63 photographs the photographing data of the work machine 10 operated by the operator Ma via the operation device 8.
  • the detection data acquisition unit 601 acquires the shooting data of the bucket 13 of the work machine 10 shot by the shooting device 63.
  • the position data acquisition unit 602 calculates the position data of the work machine 10 from the shooting data of the work machine 10 shot by the shooting device 63.
  • the position data acquisition unit 602 calculates the position data of the work machine 10 from the shooting data of the work machine 10 using, for example, a pattern matching method.
  • the target data acquisition unit 611 acquires target data indicating the target excavation amount of the bucket 13.
  • the input data acquisition unit 612 acquires input data generated by operating the input device 65.
  • the input data includes designation data that designates the open end of the bucket 13.
  • the excavation time calculation unit 613 performs image processing on the imaging data of the bucket 13 imaged by the imaging device 63 and calculates the excavation time for one excavation operation by the bucket 13.
  • the excavation amount calculation unit 614 performs image processing on the shooting data of the bucket 13 shot by the shooting device 63.
  • the excavation amount calculation unit 614 calculates excavation efficiency in the excavation operation of the bucket 13, and the excavation amount or fullness of the bucket 13 is calculated from the area of the excavated matter that has come out from the opening end of the bucket 13. Calculate drilling efficiency such as rate.
  • the excavation amount calculation unit 614 includes an identification unit 614 ⁇ / b> A that performs image processing on the imaging data of the bucket 13 captured by the imaging device 63 and distinguishes the bucket 13 and the excavated matter from the opening end of the bucket 13.
  • the evaluation data generation unit 604 is based on the first detection data indicating the excavation amount of the bucket 13 calculated by the excavation amount calculation unit 614 and the second detection data indicating the excavation time of the bucket 13 calculated by the excavation time calculation unit 613. Thus, evaluation data of the operator Ma is generated.
  • the first detection data may indicate the fullness rate described later instead of the excavation amount or together with the excavation amount.
  • the evaluation data generation unit 604 generates evaluation data of the operator Ma based on the difference between the first detection data calculated by the excavation amount calculation unit 614 and the target data acquired by the target data acquisition unit 611. .
  • the first display control unit 605A generates display data from the photographing data of the excavator 3 photographed by the photographing device 63 and displays the display data on the display screen of the display device 64. In addition, the first display control unit 605A generates display data from the evaluation data and causes the display device 64 to display the display data.
  • the second display control unit 605B displays on the display screen of the display device 64 a graphic showing at least a part of the outline of the bucket 13 when the bucket 13 is viewed from the side, and displays the graphic by operating the input device 65. Move on the display screen of the device 64. The size of the figure displayed on the display screen of the display device 64 by the second display control unit 605B is fixed.
  • the third display control unit 605C displays a guide line whose dimensions and position are fixed on the display screen of the display device 64 on the display screen of the display device 64.
  • the third display control unit 605C displays a guide line on the display screen of the display device 64 based on the work vehicle data including the dimensions of the excavator 3 and the movable range of the work implement 10.
  • the storage unit 608 stores various data.
  • the storage unit 608 holds work vehicle data including the dimensions of the excavator 3 and the movable range of the work implement 10.
  • the storage unit 608 stores a computer program for executing the evaluation method according to the present embodiment.
  • FIG. 7 is a flowchart illustrating an example of the evaluation method according to the present embodiment.
  • the evaluation method includes a step of preparing the photographing of the excavator 3 by the photographing device 63 (S200), and a step of photographing the hydraulic excavator 3 using the photographing device 63 and evaluating the operator Ma (S300). Including.
  • FIG. 8 is a flowchart illustrating an example of a shooting preparation method according to the present embodiment.
  • the shooting preparation method includes a step of determining the shooting position of the shooting device 63 with respect to the excavator 3 (S210), a step of specifying the position of the upper swing body 21 (S220), and specifying the position of the boom 11.
  • step S210 a process of determining a relative position between the hydraulic excavator 3 and the imaging device 63 that images the hydraulic excavator 3 is performed (step S210).
  • FIG. 9 is a diagram for explaining an example of a shooting position determination method according to the present embodiment.
  • the computer program stored in the storage unit 608 is activated.
  • the portable device 6 transitions to the shooting preparation mode.
  • the shooting preparation mode as shown in FIG. 9, the third display control unit 605C displays the guide line 70 whose size and position are fixed on the display screen of the display device 64 based on the work vehicle data. Display on the screen.
  • the zoom function of the optical system of the shooting device 63 is limited.
  • the excavator 3 is photographed by a photographing device 63 having a fixed prescribed photographing magnification.
  • the position of the imaging device 63 where the contour of the vehicle body 20 and the guide line 70 coincide is determined as the imaging position.
  • step S220 a process for specifying the position of the upper swing body 21 is performed (step S220).
  • the position data calculation unit 602 specifies the position of the upper swing body 21 using the pattern matching method.
  • FIG. 10 is a diagram for explaining a method for specifying the position of the upper-part turning body 21 according to the present embodiment.
  • the photographing device 63 acquires photographing data of the search area 73 including the hydraulic excavator 3.
  • the position data calculation unit 602 calculates the position data of the work machine 10 based on the shooting data of the search area 73 shot by the shooting device 63.
  • the position data calculation unit 602 scans and moves the upper swing body template 21T, which is the template of the upper swing body 21, with respect to the search area 73, and calculates the position data of the vehicle main body 20.
  • the position data calculation unit 602 calculates the position data of the vehicle main body 20 based on the correlation value between the imaging data of the vehicle main body 20 and the upper swing body template 21T.
  • the position data of the vehicle body 20 is calculated, whereby the position of the upper swing body 21 is specified.
  • the position of the boom pin 11P is specified.
  • the position data calculation unit 602 calculates dimension data indicating the dimensions of the vehicle main body 20 based on the shooting data of the search area 73.
  • the position data calculation unit 602 calculates a dimension L of the upper swing body 21 in the front-rear direction on the display screen of the display device 64 when the upper swing body 21 is viewed from the left side.
  • a process for specifying the position of the boom 11 is performed (step S230).
  • the position data calculation unit 602 calculates the position data of the boom 11 by moving the boom template 11T, which is the template of the boom 11, with respect to the search area 73 on the display screen of the display device 64.
  • the position data calculation unit 602 calculates the position data of the boom 11 based on the correlation value between the shooting data of the boom 11 and the boom template 11T.
  • FIG. 11 is a diagram for explaining a method for specifying the position of the boom 11 according to the present embodiment.
  • the boom 11 is rotatable about the rotation axis AX1 with respect to the upper swing body 21. Therefore, depending on the angle of the boom 11 in the rotation direction around the rotation axis AX1, the image data of the boom 11 and the boom template 11T may not match even if the boom template 11T is scanned and moved with respect to the search area 73. There is sex.
  • the position of the boom pin 11P is specified by specifying the position of the upper swing body 21.
  • the position data calculation unit 602 displays the position of the boom pin 11P of the boom 11 and the position of the boom pin of the boom template 11T specified in step S220 on the display screen of the display device 64. Match. After matching the position of the boom pin 11P of the boom 11 and the position of the boom pin of the boom template 11T, the position data calculation unit 602 causes the boom 11 and the boom template 11T to match on the display screen of the display device 64. The position data of the boom 11 is calculated by rotating the template 11T. The position data calculation unit 602 calculates the position data of the boom 11 based on the correlation value between the shooting data of the boom 11 and the boom template 11T.
  • the position of the boom 11 is specified by calculating the position data of the boom 11. By specifying the position of the boom 11, the position of the arm pin 12P is specified.
  • a process for specifying the position of the arm 12 is performed (step S240).
  • the position data calculation unit 602 calculates the position data of the arm 12 by moving an arm template that is a template of the arm 12 with respect to the search area 73 on the display screen of the display device 64.
  • the position data calculation unit 602 calculates the position data of the arm 12 based on the correlation value between the imaging data of the arm 12 and the arm template.
  • the arm 12 can rotate with respect to the boom 11 about the rotation axis AX2. Therefore, depending on the angle of the arm 12 in the rotation direction about the rotation axis AX2, there is a possibility that the shooting data of the arm 12 and the arm template do not match only by scanning the arm template with respect to the search area 73. is there.
  • the position of the arm 11 is specified by specifying the position of the boom 11.
  • the position data calculation unit 602 specifies the position of the arm 12 in the same procedure as the procedure for specifying the position of the boom 11.
  • the position data calculation unit 602 matches the position of the arm pin 12P of the arm 12 identified in step S230 with the position of the arm pin of the arm template on the display screen of the display device 64.
  • the position data calculation unit 602 sets the arm template so that the arm 12 and the arm template match on the display screen of the display device 64. By rotating, the position data of the arm 12 is calculated.
  • the position data calculation unit 602 calculates the position data of the arm 12 based on the correlation value between the imaging data of the arm 12 and the arm template.
  • the position of the arm 12 is specified by calculating the position data of the arm 12. By specifying the position of the arm 12, the position of the bucket pin 13P is specified.
  • a process for specifying the position of the bucket 13 is performed (step S250).
  • the position data calculation unit 602 calculates the position data of the bucket 13 by moving the bucket template that is the template of the bucket 13 to the search area 73 on the display screen of the display device 64.
  • the position data calculation unit 602 calculates the position data of the bucket 13 based on the correlation value between the shooting data of the bucket 13 and the bucket template.
  • the bucket 13 is rotatable with respect to the arm 12 about the rotation axis AX3. For this reason, depending on the angle of the bucket 13 in the rotation direction about the rotation axis AX3, there is a possibility that the image data of the bucket 13 and the bucket template do not match only by scanning the bucket template with respect to the search area 73. is there.
  • the position data calculation unit 602 specifies the position of the bucket 13 in the same procedure as the procedure for specifying the position of the boom 11 and the procedure for specifying the position of the arm 12.
  • the position data calculation unit 602 matches the bucket pin 13P of the bucket 13 identified in step S240 with the position of the bucket pin of the bucket template on the display screen of the display device 64.
  • the position data calculation unit 602 causes the bucket 13 and the bucket template to match on the display screen of the display device 64.
  • the position data of the bucket 13 is calculated by rotating the template.
  • the position data calculation unit 602 calculates the position data of the bucket 13 based on the correlation value between the shooting data of the bucket 13 and the bucket template.
  • the position of the bucket 13 is specified by calculating the position data of the bucket 13. By specifying the position of the bucket 13, the position of the blade edge 13 ⁇ / b> B of the bucket 13 is specified.
  • FIG. 12 is a flowchart showing an example of the photographing and evaluation method according to this embodiment.
  • the imaging and evaluation method according to the present embodiment includes a step of acquiring target data indicating a target excavation amount of the work machine 10 (S305B), a step of specifying a movement start position of the work machine 10 (S310B), and a moving work.
  • a step (S320B) of obtaining the photographing data of the machine 10 a step (S330B) of specifying the movement end position of the work machine 10, a step of calculating the excavation time of the bucket 13 (S332B), and the photographing device 63.
  • step S305B The process which acquires the target data which show the target excavation amount of the working machine 10 is implemented (step S305B).
  • the operator Ma declares a target excavation amount to be excavated, and inputs the target excavation amount to the evaluation device 600 via the input device 65.
  • the target data acquisition unit 611 acquires target data indicating the target excavation amount of the bucket 13.
  • the target excavation amount may be designated as the excavation amount by the amount of soil of the excavated matter, or may be designated by the full rate based on the state in which the excavated matter having the specified volume has come out from the opening end of the bucket 13. That is, the operator Ma declares the excavation efficiency of the excavation work performed by the operator Ma.
  • the target excavation amount is designated by the full rate.
  • the fullness rate is a kind of pile capacity. In this embodiment, when the excavated object is raised with a 1: 1 gradient from the opening end (upper edge) of the bucket 13, the full capacity is 0.8 [m 3 ].
  • the state in which the excavated material is being crushed by the bucket 13 is assumed to be 1.0.
  • step S310B a process of specifying the movement start position and the movement start time of the bucket 13 of the work machine 10 is performed.
  • the movement start position of the bucket 13 is arbitrarily determined by the operator Ma.
  • the time at which the blade edge 13B of the bucket 13 is stationary is equal to or longer than the specified time, and the position where the stationary bucket 13 starts moving is determined as the movement start position. Further, the time when the stationary bucket 13 starts to move is determined as the movement start time. In other words, the position at which the stationary bucket 13 starts moving is the movement start position, and the time when the bucket 13 starts moving is the movement start time.
  • the position data calculation unit 602 determines that the time during which the bucket 13 is stationary is equal to or longer than the specified time based on the shooting data of the shooting device 63, the position of the bucket 13 is determined as the movement start position of the bucket 13. To do.
  • the position data calculation unit 602 detects that the movement of the bucket 13 is started based on the shooting data.
  • the position data calculation unit 602 determines a time point when the stationary bucket 13 starts to move as a time point when the bucket 13 starts moving.
  • step S320B a process of acquiring operation data of the bucket 13 is performed.
  • the operation data of the bucket 10 is the shooting data of the bucket 13 until the stationary work machine 10 starts moving at the movement start position and performs excavation operation, and the excavation operation ends and the movement ends at the movement end position. Including.
  • step S330B a process for specifying the movement end position and the movement end point of the bucket 13 of the work machine 10 is performed.
  • the movement end position of the bucket 13 is arbitrarily determined by the operator Ma.
  • the position of the bucket 13 in which the cutting edge 13B of the bucket 13 in the moving state stops moving and is determined to be stopped for a specified time or longer is determined as the movement end position.
  • the time when the movement is finished is determined as the movement end time.
  • the position where the bucket 13 in the moving state is stopped is the movement end position, and the time when it is stopped is the movement end time.
  • the position data calculation unit 602 detects that the movement of the bucket 13 is stopped based on the shooting data.
  • the position data calculation unit 602 determines the position at which the bucket 13 in the moving state has stopped moving as the movement end position of the bucket 13. Further, the position data calculation unit 602 determines the time point when the bucket 13 in the moving state stops moving as the time point when the movement of the bucket 13 ends.
  • the position data calculation unit 602 determines that the moving bucket 13 stops moving and the time during which the bucket 13 is stationary is equal to or longer than the specified time, the position of the bucket 13 is changed to the movement end position of the bucket 13. To decide.
  • the excavation time calculation unit 613 calculates excavation time based on the imaging data (step S332B).
  • the excavation time is the time from the start of movement of the bucket 13 to the end of movement.
  • the excavation amount calculation unit 614 determines whether or not the opening end portion 13K of the bucket 13 can be specified based on the shooting data of the bucket 13 shot by the shooting device 63 (S335B).
  • FIG. 13 is a diagram for explaining an example of the excavation amount calculation method according to the present embodiment.
  • FIG. 13 shows a state in which the bucket 13 is viewed from the left side when the excavation operation is finished.
  • the excavated material is stored in the bucket 13 when the excavation operation is completed. If more excavated material is scooped up by excavation operation, when the bucket 13 is viewed from the side, the excavated material emerges upward from the open end 13K of the bucket 13 as shown in FIG. If the excavation operation results in excavation that does not fill the inner volume of the bucket 13, the excavated material does not come upward from the open end 13 ⁇ / b> K of the bucket 13 even when the bucket 13 is viewed from the side.
  • the excavation amount calculation unit 614 performs image processing on the imaging data of the bucket 13 imaged from the left side by the imaging device 63, and specifies the opening end portion 13K of the bucket 13 that is the boundary between the bucket 13 and the excavated material.
  • the excavation amount calculation unit 614 can specify the open end 13K of the bucket 13 based on contrast data including at least one of a luminance difference, a brightness difference, and a chromaticity difference between the bucket 13 and the excavated object. .
  • the excavation amount calculation unit 614 may have difficulty in identifying the opening end portion 13K of the bucket 13 from the imaging data of the imaging device 63. .
  • the excavation amount calculation unit 614 determines whether or not the opening end portion 13K of the bucket 13 can be specified based on the shooting data of the bucket 13 shot by the shooting device 63 (step S335B).
  • step S335B when it is determined that the opening end portion 13K of the bucket 13 can be specified (step S335: Yes), the excavation amount calculation unit 614 specifies the position of the opening end portion 13K of the bucket 13, and the photographing device 63 The photographed data of the photographed bucket 13 is subjected to image processing to calculate the area of the excavated matter that has exited from the open end 13K of the bucket 13.
  • the excavation amount calculation unit 614 calculates the excavation amount in the excavation operation of the bucket 13 from the area of the excavated matter that has come out from the open end 13K.
  • the approximate amount of excavation by the bucket 13 is estimated from the area of the excavated matter that has exited from the open end 13K (step S348B).
  • a specific method for calculating the excavation amount based on the area of the excavated material will be described later. If the area of the excavated material is obtained, the excavation amount can be estimated as follows. For example, the width of the bucket 13 (perpendicular to the paper surface of the bucket 13 shown in FIG. 13) is stored in the storage unit 608 or the width of the bucket 13 is input from the input device 65.
  • Step S335B when it is determined that the opening end portion 13K of the bucket 13 cannot be specified (Step S335: No), the portable device 6 transitions to the opening end portion designation mode.
  • FIG. 14 and 15 are diagrams schematically illustrating an example of a method for specifying the opening end 13K according to the present embodiment.
  • the first display control unit 605A displays the photographing data of the excavator 3 including the bucket 13 on the display screen of the display device 64.
  • the second display control unit 605 ⁇ / b> B displays a graphic showing at least a part of the outline of the bucket 13 on the display screen of the display device 64.
  • the graphic indicating at least part of the outline of the bucket 13 is an icon CB that imitates the bucket 13.
  • the icon CB includes a line CBK indicating the open end 13K of the bucket 13.
  • the icon CB shows the outline of the bucket 13 viewed from the left side. The shape and size of the icon CB are fixed.
  • the icon CB is displayed in the peripheral area of the display screen of the display device 64.
  • the worker Mb designates the position of the open end 13K of the bucket 13 using the icon CB (step S345B). Specifically, as illustrated in FIG. 15, the worker Mb operates the display screen of the display device 64 on which the input device 65 including the touch sensor is arranged to move the icon CB on the display screen. The worker Mb slides his / her finger to the left / right / up / down while pressing the icon CB with the finger, and the opening end 13K of the bucket 13 displayed on the display screen of the display device 64 by the first display control unit 605A. The second display control unit 605B slides the icon CB so that the line CBK of the icon CB displayed on the display screen of the display device 64 is aligned on the display screen.
  • the second display control unit 605B moves the icon CB, which is a graphic, on the display screen of the display device 64 based on the operation of the input device 65.
  • the position of the opening end 13K of the bucket 13 is designated by aligning the opening end 13K of the bucket 13 and the line CBK of the icon CB on the display screen of the display device 64.
  • the display screen of the display device 64 includes a plurality of pixels, and an address is assigned to each of the plurality of pixels.
  • the position data calculation unit 602 can specify the position of the bucket 13 based on the position of the icon CB and the address of the pixel.
  • the identification unit 614A performs image processing on the shooting data of the bucket 13 and, based on the line CBK of the icon CB aligned with the opening end 13K of the bucket 13, the bucket 13 and the bucket 13 on the display screen of the display device 64. It distinguishes from the excavation thing which has come out from the opening edge part 13K.
  • the identification unit 614A included in the excavation amount calculation unit 614 distinguishes between the bucket 13 and the excavated matter exiting from the open end portion 13K of the bucket 13 and calculates the area of the excavated matter exiting from the open end portion 13K ( Step S348B). For example, based on the number of pixels that display the excavated object, the area of the excavated object that exits from the open end 13K is calculated. Thereby, the excavation amount calculation part 614 can calculate the excavation amount of the bucket 13 (step S348B).
  • the position of the upper swing body 21, the position of the boom 11, and the position of the arm 12 are sequentially specified by the pattern matching method.
  • the position data calculation unit 602 displays the position of the bucket 13 and the position on the display screen of the display device 64. Based on the combined icon CB, the position of the bucket 13 relative to the upper swing body 21 can be calculated.
  • the shooting position is determined using the guide line 70 so that the shooting device 63 is separated from the excavator 3 by a specified distance.
  • the excavation amount calculation unit 614 calculates the excavation amount of the bucket 13 based on the icon CB aligned with the bucket 13 photographed by the photographing device 63 that is separated from the excavator 3 by a specified distance.
  • the evaluation data generation unit 604 Ma evaluation data is generated.
  • the evaluation data generation unit 604 obtains the evaluation data of the operator Ma based on the difference between the first detection data indicating the excavation amount of the bucket 13 and the target data indicating the target excavation amount of the bucket 13 acquired in step S305B. Generate. The smaller the difference between the first detection data and the target data, the better the skill of the operator Ma. On the other hand, it is evaluated that the skill of the operator Ma is inferior as the difference between the first detection data and the target data is large. Further, it is determined that the skill of the operator Ma is higher as the excavation time is shorter, and it is determined that the skill of the operator Ma is lower as the excavation time is longer.
  • a process for displaying the evaluation data on the display device 64 is performed (step S360B).
  • the first display control unit 605A generates display data from the evaluation data and causes the display device 64 to display the display data.
  • the evaluation data may be transmitted by wireless or wired transmission to other display devices or printing devices instead of the display device 64 provided in the portable device 6.
  • the first display control unit 605A causes the display device 64 to display the name of the operator Ma, which is personal data.
  • the first display control unit 605A as evaluation data, “excavation time” indicating the movement time of the bucket 13 from the movement start position to the movement end position, and the difference between the target excavation amount and the actual excavation amount “ Each item of “digging amount difference” is displayed on the display device 64. Further, the first display control unit 605A causes the display device 64 to display numerical data of each item of “digging time” and “digging amount difference” as evaluation data. The first display control unit 605A causes the display device 64 to display the skill score of the operator Ma as evaluation data.
  • the storage unit 608 stores reference data regarding skills. The reference data is, for example, evaluation data for an operator having a standard skill, and is obtained statistically or empirically. The skill score of the operator Ma is calculated based on the reference data.
  • the first detection data indicating the excavation amount of the work implement 10 and the excavation time of the work implement 10 are obtained by causing the operator Ma to actually perform the excavation operation in the evaluation of the operator Ma.
  • the second detection data indicating that the operator Ma is acquired, and the evaluation data of the operator Ma is generated based on the first detection data and the second detection data, so the skill of the operator Ma regarding the actual excavation operation is evaluated. can do.
  • the skill of the operator Ma of the excavator 3 is objectively and quantitatively evaluated, and the evaluation data is provided, whereby the operator Ma's motivation for improving the skill is improved. Further, the operator Ma can improve his / her operation based on the evaluation data.
  • the evaluation device 600 includes the input data acquisition unit 612 that acquires input data generated by operating the input device 65.
  • the surface of the bucket 13 is highly likely to be soiled with excavated material, and the clear end data is not obtained, and the opening end portion 13K is specified from the photographing data of the bucket 13 photographed by the photographing device 63. It may not be possible.
  • clear contrast data may not be obtained.
  • the background of the bucket 13 to be photographed is a sandy mountain, clear contrast data may not be obtained.
  • the designation data for specifying the opening end portion 13K of the bucket 13 is input as input data, and the data is output from the bucket 13 and the opening end portion 13K of the bucket 13. It can be distinguished from the excavated material. Since it is possible to distinguish between the bucket 13 and the excavated matter coming out from the open end portion 13K of the bucket 13, the excavation amount calculation unit 614 including the identifying unit 614A comes out from the open end portion 13K based on the designated data. The excavation amount of the bucket 13 can be calculated by calculating the area of the excavated object.
  • the evaluation device 600 displays the first display control unit 605A that displays the shooting data of the bucket 13 on the display screen of the display device 64, and the icon CB that indicates the outline of the bucket 13 of the display device 64.
  • the second display control unit 605 ⁇ / b> B moves the icon CB on the display screen of the display device 64 based on the operation of the input device 65.
  • the excavation amount calculation unit 614 can specify the position of the opening end 13K by aligning the shooting data of the opening end 13K of the bucket 13 and the line CBK of the icon CB on the display screen of the display device 64. it can.
  • the identification unit 614A of the excavation amount calculation unit 614 distinguishes between the bucket 13 and the excavated matter coming out from the opening end 13K based on the icon CB aligned with the imaging data of the opening end 13K of the bucket 13, and opens the opening. It is possible to calculate the area of the excavated matter that has come out from the end portion 13K.
  • the excavation amount calculation unit 614 can calculate the excavation amount of the bucket 13 by calculating the area of the excavation item coming out from the opening end 13K. .
  • the display device 64 includes a touch panel
  • the input device 65 includes a touch sensor provided on the display screen of the display device 64. Therefore, the worker Mb or the operator Ma operates the display screen of the display device 64 to slide and move the icon CB, and the opening end portion 13K of the bucket 13 and the icon displayed on the display screen of the display device 64 are displayed.
  • the opening end portion 13K of the bucket 13 can be designated simply by aligning with the CB line CBK.
  • the position data calculation unit 604 scans and moves the upper swing body template 21T with respect to the search area 73 to obtain a correlation value between the imaging data of the upper swing body 21 and the upper swing body template 21T. After calculating the position data of the upper-part turning body 21 based on this, the boom template 11T is moved with respect to the search area 73, and the position data of the boom 11 is calculated based on the correlation value between the imaging data of the boom 11 and the boom template 11T. To do. Thereby, also in the hydraulic excavator 3 having a characteristic structure in which the working machine 10 moving with respect to the vehicle main body 20 exists, the position of the working machine 10 can be specified.
  • the position of the boom 11 is specified with reference to the boom pin 11P, so that the position of the boom 11 is accurately specified. Is done.
  • the position of the boom 11 is specified, the position of the arm 12 is specified with reference to the arm pin 12P.
  • the position of the bucket 13 is specified with reference to the bucket pin 13P. Even in the hydraulic excavator 3 having a characteristic structure, the position of the blade edge 13B of the bucket 13 can be accurately specified.
  • the third display control unit 605C causes the imaging device 63 to move away from the excavator 3 by a specified distance when the vehicle body 20 and the guide line 70 are positioned on the display screen of the display device 64.
  • the guide line 70 is displayed, and the excavation amount calculation unit 614 excavates the bucket 13 based on the icon CB aligned with the bucket 13 photographed by the photographing device 63 that is separated from the excavator 3 by a specified distance. Calculate the amount.
  • the excavation amount of the bucket 13 is always calculated under the same evaluation condition.
  • the shooting position is set so that the excavator 3 and the imaging device 63 are separated from each other by a specified distance, the safety of the operator Mb who is the photographer is ensured.
  • the evaluation device 600 includes the target data acquisition unit 611 that acquires target data indicating the target excavation amount of the bucket 13, and the evaluation data generation unit 604 includes the first detection data, the target data, Evaluation data is generated based on the difference.
  • the target excavation amount can be designated, and the skill of the operator Ma can be evaluated for the excavation amount in the actual excavation operation. For example, when performing excavation and loading work such as loading excavated material on the loading platform of the dump truck using the hydraulic excavator 3, the operator Ma finely adjusts the excavation amount by the bucket 13 so as to obtain an appropriate loading amount. There is a need.
  • the target excavation amount is specified, and the operator Ma's skill is quantitatively evaluated with respect to whether or not the operator Ma has a skill capable of executing an excavation operation close to the target excavation amount.
  • the skill of the operator Ma's actual excavation and loading work can be evaluated.
  • the excavation amount of the bucket 13 is obtained by performing image processing on the shooting data of the bucket 13 shot by the shooting device 63 and opening the bucket 13. It is calculated from the area of the excavated matter that has come out from the end portion 13K. Thereby, the excavation amount of the bucket 13 can be easily obtained without performing complicated processing.
  • the link processing unit 606 that generates link data that associates the evaluation data with the position data of the photographing device 63 that indicates the photographing position of the excavator 3, and the link data output that outputs the link data Part 607 is provided.
  • the management device 4 can effectively take advantage of the link data and take measures for improving the skill of the operator Ma in various parts of the country.
  • FIGS. 16 and 17 are diagrams for explaining an example of the icon CB according to the present embodiment.
  • FIGS. 16 and 17 are icons CB showing a part of the outline showing the outer shape of the bucket 13 when the bucket 13 is viewed from the left side.
  • the icon CB is a figure simulating the shape when the bucket 13 is viewed from the side, and includes the outline of the entire bucket 13.
  • the icon CB may be a graphic showing only the outline of the lower part (back part) of the bucket 13.
  • the icon CB may be a graphic showing only the outline of the upper portion (open end portion) of the bucket 13.
  • the icon CB is a graphic showing a part of the outline indicating the outer shape of the bucket 13, the position of the bucket 13 is specified by positioning the icon CB and the bucket 13 on the display screen of the display device 64, The bucket 13 and the excavated material can be distinguished.
  • the icon CB representing the outline of the bucket 13 as shown in FIGS. 14, 16, and 17 has, for example, a plurality of types of icons CB in the storage unit 608 according to the shape and size of the bucket 13. Data is prepared, and the operator Mb selects one of the icons CB by operating the input device 65 in accordance with the bucket 13 attached to the work machine 10 of the excavator 3 operated by the operator Ma. You may make it do.
  • the portable device 6 transitions to the opening end designation mode according to the processing of the computer program.
  • the operator Mb may move to the opening end designation mode by operating the input device 65.
  • contour data representing the contour of the bucket 13 is transmitted from the excavator 3 to the portable device 6 using the wireless device, and the portable device 6 receives the contour data to shift to the open end designation mode. May be.
  • the management device 4 may have some or all of the functions of the evaluation device 600.
  • the management device 4 determines the skill of the operator Ma based on the operation data of the excavator 3. Can be evaluated. Since the management device 4 includes the arithmetic processing device 40 and the storage device 41 that can store the computer program for performing the evaluation method according to the present embodiment, the management device 4 can exhibit the functions of the evaluation device 600.
  • the skill of the operator Ma is evaluated based on the operation data of the work machine 10.
  • the operating state of the work machine 10 may be evaluated. For example, an inspection process for determining whether or not the operating state of the work implement 10 is normal based on operation data of the work implement 10 may be performed.
  • the work vehicle 3 is the hydraulic excavator 3.
  • the work vehicle 3 may be a work vehicle having a work machine or an attachment capable of scooping excavated material, such as a backhoe loader and a wheel loader.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Educational Administration (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Technology (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Signal Processing (AREA)
  • Multimedia (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Mechanical Engineering (AREA)
  • Computer Graphics (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Component Parts Of Construction Machinery (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

 評価装置は、作業機のバケットの撮影データを取得する検出データ取得部と、撮影データを表示装置の表示画面に表示させる第1表示制御部と、バケットを側方から見たときの、バケットの輪郭の少なくとも一部を示す図形を表示画面に表示させ、入力装置の操作により図形を表示画面において移動させる第2表示制御部と、バケットに位置合わせされた図形に基づいて、表示画面におけるバケットとバケットの開口端部から出ている掘削物とを区別する識別部と、を備える。

Description

評価装置及び評価方法
 本発明は、評価装置及び評価方法に関する。
 施工現場における掘削作業において、特許文献1に開示されているようなバケットを有する作業車両が使用される。操作者が作業車両を操作して施工する場合、施工効率の向上の観点からバケットによる1回の掘削動作で掘削物を効率的にすくえることが要望される。効率的な掘削動作を行うためには、操作者の技量が求められる。
特開2008-241300号公報
 操作者の技量が客観的に評価されれば、操作の改善点が明確となり、操作者にとって、さらに技量を向上しようとする意欲が動機づけられる。そのため、バケットの掘削量を検出して操作者の技量を簡便に評価できる技術が要望される。
 本発明の態様は、作業車両の操作者の技量を簡便に評価できる評価装置及び評価方法を提供することを目的とする。
 本発明の第1の態様に従えば、作業機のバケットの撮影データを取得する検出データ取得部と、前記撮影データを表示装置の表示画面に表示させる第1表示制御部と、前記バケットを側方から見たときの、前記バケットの輪郭の少なくとも一部を示す図形を前記表示画面に表示させ、入力装置の操作により前記図形を前記表示画面において移動させる第2表示制御部と、前記バケットに位置合わせされた前記図形に基づいて、前記表示画面における前記バケットと前記バケットの前記開口端部から出ている掘削物とを区別する識別部と、を備える評価装置が提供される。
 本発明の第2の態様に従えば、作業機のバケットの撮影データを取得することと、前記撮影データを表示装置の表示画面に表示させることと、前記バケットを側方から見たときの、前記バケットの輪郭の少なくとも一部を示す図形を前記表示画面に表示させることと、入力装置の操作により生成された入力データに基づいて前記図形を前記表示画面において移動させることと、前記バケットに位置合わせされた前記図形に基づいて、前記表示画面における前記バケットと前記バケットの前記開口端部から出ている掘削物とを区別することと、を含む評価方法が提供される。
 本発明の態様によれば、作業車両の操作者の技量を簡便に評価できる評価装置及び評価方法が提供される。
図1は、本実施形態に係る評価システムの一例を模式的に示す図である。 図2は、本実施形態に係る油圧ショベルの一例を示す側面図である。 図3は、第1実施形態に係る油圧ショベルの一例を示す平面図である。 図4は、本実施形態に係る操作装置の一例を模式的に示す図である。 図5は、本実施形態に係る評価システムのハードウエア構成の一例を模式的に示す図である。 図6は、本実施形態に係る携帯機器の一例を示す機能ブロック図である。 図7は、本実施形態に係る評価方法の一例を示すフローチャートである。 図8は、本実施形態に係る撮影準備方法の一例を示すフローチャートである。 図9は、本実施形態に係る撮影位置決定方法の一例を説明するための図である。 図10は、本実施形態に係る上部旋回体の位置特定方法を説明するための図である。 図11は、本実施形態に係る作業機の位置特定方法を説明するための図である。 図12は、本実施形態に係る評価方法の一例を示すフローチャートである。 図13は、本実施形態に係る掘削量の算出方法の一例を説明するための図である。 図14は、本実施形態に係る開口端部の指定方法の一例を模式的に示す図である。 図15は、本実施形態に係る開口端部の指定方法の一例を模式的に示す図である。 図16は、本実施形態に係る図形の一例を模式的に示す図である。 図17は、本実施形態に係る図形の一例を模式的に示す図である。
 以下、本発明に係る実施形態について図面を参照しながら説明するが、本発明はこれに限定されない。以下で説明する各実施形態の構成要素は適宜組み合わせることができる。また、一部の構成要素を用いない場合もある。
<評価システム>
 図1は、本実施形態に係る評価システム1の一例を模式的に示す図である。施工現場2において作業車両3が稼働する。作業車両3は、その作業車両3に搭乗した操作者Maに操作される。評価システム1は、作業車両3の動作の評価、及び作業車両3を操作する操作者Maの技量の評価の一方又は両方を実施する。操作者Maは、作業車両3を操作して施工現場を施工する。施工現場2においては操作者Maとは別の作業者Mbが作業を実施する。作業者Mbは、例えば施工現場2で補助作業を実施する。
 評価システム1は、コンピュータシステムを含む管理装置4と、コンピュータシステムを含む携帯機器6とを備える。管理装置4は、サーバとして機能する。管理装置4は、作業車両3の使用者又は携帯機器6の使用者を含むクライアントにサービスを提供する。クライアントは、操作者Ma、作業者Mb、作業車両3の保有者、及び作業車両3がレンタルされる契約者の少なくとも一つを含む。
 携帯機器6は、操作者Ma及び作業者Mbの少なくとも一方に所持される。携帯機器6は、スマートフォン又はタブレット型パーソナルコンピュータのような携帯型コンピュータを含む。
 管理装置4は、複数の携帯機器6とデータ通信可能である。
<作業車両>
 次に、本実施形態に係る作業車両3について説明する。本実施形態においては、作業車両3が油圧ショベルである例について説明する。図2は、本実施形態に係る油圧ショベル3の一例を示す側面図である。図3は、本実施形態に係る油圧ショベル3の一例を示す平面図である。なお、図3は、図2のような作業機10の姿勢において、油圧ショベル3を上方から見たときの平面図を示している。
 図2及び図3に示すように、油圧ショベル3は、油圧により作動する作業機10と、作業機10を支持する車両本体20とを備える。車両本体20は、上部旋回体21と、上部旋回体21を支持する下部走行体22とを含む。
 上部旋回体21は、キャブ23と、機械室24と、カウンタウエイト24Cとを有する。キャブ23は、運転室を含む。運転室には、操作者Maが着座する運転席7と、操作者Maに操作される操作装置8とが配置される。操作装置8は、作業機10及び上部旋回体21を操作するための作業レバー、及び下部走行体22を操作するための走行レバーを含む。作業機10は、操作装置8を介して操作者Maに操作される。上部旋回体21及び下部走行体22は、操作装置8を介して操作者Maに操作される。操作者Maは、運転席7に着座した状態で操作装置8を操作可能である。
 下部走行体21は、スプロケットと呼ばれる駆動輪25と、アイドラと呼ばれる遊動輪26と、駆動輪25及び遊動輪26に支持される履帯27とを有する。駆動輪25は、例えば油圧モータのような駆動源が発生する動力により作動する。駆動輪25は、操作装置8の走行レバーを操作することで回転する。駆動輪25は、回転軸DX1を回転中心として回転する。遊動輪26は、回転軸DX2を回転中心として回転する。回転軸DX1と回転軸DX2とは平行である。駆動輪25が回転して履帯27が回転することにより油圧ショベル3が前後に走行あるいは旋回する。
 上部旋回体21は、下部走行体22に支持された状態で旋回軸RXを中心に旋回可能である。
 作業機10は、車両本体20の上部旋回体21に支持される。作業機10は、上部旋回体21に連結されるブーム11と、ブーム11に連結されるアーム12と、アーム12に連結されるバケット13とを有する。バケット13は、凸形状の複数の刃を有する。刃の先端部である刃先13Bは複数設けられる。なお、バケット13の刃先13Bは、例えばバケット13に設けられたストレート形状の刃の先端部でもよい。
 上部旋回体21とブーム11とはブームピン11Pを介して連結される。ブーム11は、回転軸AX1を支点として動作可能に上部旋回体21に支持される。ブーム11とアーム12とはアームピン12Pを介して連結される。アーム12は、回転軸AX2を支点として動作可能にブーム11に支持される。アーム12とバケット13とはバケットピン13Pを介して連結される。バケット13は、回転軸AX3を支点として動作可能にアーム12に支持される。回転軸AX1と回転軸AX2と回転軸AX3とは前後方向に平行である。前後方向の定義については後述する。
 以下の説明においては、回転軸AX1,AX2,AX3の軸が延びる方向を適宜、上部旋回体21の車幅方向、と称し、旋回軸RXの軸が延びる方向を適宜、上部旋回体21の上下方向、と称し、回転軸AX1,AX2,AX3及び旋回軸RXの両方と直交する方向を適宜、上部旋回体21の前後方向、と称する。
 本実施形態においては、運転席7に着座した操作者Maを基準として、バケット13を含む作業機10が存在する方向が前方であり前方の逆方向が後方である。車幅方向の一方が右方であり右方の逆方向、すなわちキャブ23があるほうが左方である。バケット13は、上部旋回体21よりも前方に配置される。バケット13の複数の刃先13Bは、車幅方向に配置される。上部旋回体21は、下部走行体22の上方に配置される。
 作業機10は、油圧シリンダによって作動する。油圧ショベル3は、ブーム11を動作させるためのブームシリンダ14と、アーム12を動作させるためのアームシリンダ15と、バケット13を動作させるためのバケットシリンダ16とを有する。ブームシリンダ14が伸縮動作すると、ブーム11が回転軸AX1を支点に動作して、ブーム11の先端部が上下方向に移動する。アームシリンダ15が伸縮動作すると、アーム12が回転軸AX2を支点に動作して、アーム12の先端部が上下方向あるいは前後方向に移動する。バケットシリンダ16が伸縮動作すると、バケット13が回転軸AX3を支点に動作して、バケット13の刃先13Bが上下方向あるいは前後方向に移動する。ブームシリンダ14、アームシリンダ15、及びバケットシリンダ16を含む作業機10の油圧シリンダは、操作装置8の作業レバーによって操作される。作業機10の油圧シリンダが伸縮動作することにより、作業機10の姿勢が変化する。
<操作装置>
 次に、本実施形態に係る操作装置8について説明する。図4は、本実施形態に係る操作装置8の一例を模式的に示す図である。操作装置8の作業レバーは、車幅方向において運転席7の中心よりも右方に配置される右作業レバー8WRと、車幅方向において運転席7の中心よりも左方に配置される左作業レバー8WLとを含む。操作装置8の走行レバーは、車幅方向において運転席7の中心よりも右方に配置される右走行レバー8MRと、車幅方向において運転席7の中心よりも左方に配置される左走行レバー8MLとを含む。
 中立位置にある右作業レバー8WRを前方に傾倒するとブーム11が下げ動作し後方に傾倒するとブーム11が上げ動作する。中立位置にある右作業レバー8WRを右方に傾倒するとバケット13がダンプ動作し左方に傾倒するとバケット13が掻き込み動作する。
 中立位置にある左作業レバー8WLを右方に傾倒すると上部旋回体21が右旋回し左方に傾倒すると上部旋回体21が左旋回する。中立位置にある左作業レバー8WLを後方に傾倒するとアーム12が掻き込み動作し前方に傾倒するとアーム12が伸ばし動作する。
 中立位置にある右走行レバー8MRを前方に傾倒すると右方のクローラ27が前進動作し後方に傾倒すると右方のクローラ27が後進動作する。中立位置にある左走行レバー8MLを前方に傾倒すると左方のクローラ27が前進動作し後方に傾倒すると左方のクローラ27が後進動作する。
 なお、右作業レバー8WR及び左作業レバー8WLの傾倒方向と作業機10あるいは上部旋回対21の旋回方向との動作関係についての操作パターンは、上述の関係でなくてもよい。
<ハードウエア構成>
 次に、本実施形態に係る評価システム1のハードウエア構成について説明する。図5は、本実施形態に係る評価システム1のハードウエア構成の一例を模式的に示す図である。
 携帯機器6は、コンピュータシステムを含む。携帯機器6は、演算処理装置60と、記憶装置61と、携帯機器6の位置を検出する位置検出装置62と、撮影装置63と、表示装置64と、入力装置65と、入出力インターフェース装置66と、通信装置67とを有する。
 演算処理装置60は、CPU(Central Processing Unit)のようなマイクロプロセッサを含む。記憶装置61は、ROM(Read Only Memory)又はRAM(Random Access Memory)のようなメモリ及びストレージを含む。演算処理装置60は、記憶装置61に記憶されているコンピュータプログラムに従って演算処理を実施する。
 位置検出装置62は、全地球測位システム(Global Navigation Satellite System:GNSS)により、グローバル座標系における携帯機器6の位置を示す絶対位置を検出する。
 撮影装置63は、被写体の動画データを取得可能なビデオカメラ機能、及び被写体の静止画データを取得可能なスチルカメラ機能を有する。撮影装置63は、光学系と、光学系を介して被写体の撮影データを取得する撮像素子とを有する。撮像素子は、CCD(Charge Coupled Device)イメージセンサ又はCMOS(Complementary Metal Oxide Semiconductor)イメージセンサを含む。
 撮影装置63は、油圧ショベル3を撮影可能である。撮影装置63は、油圧ショベル3の作業機10の動作データを検出する検出装置として機能する。撮影装置63は、作業機10の撮影データを取得して、作業機10の移動軌跡、移動速度、及び移動時間の少なくとも一つを含む作業機10の移動データを取得可能である。作業機10の撮影データは、作業機10の動画データ及び静止画データの一方又は両方を含む。
 表示装置64は、液晶ディスプレイ(Liquid Crystal Display:LCD)又は有機ELディスプレイ(Organic Electroluminescence Display:OELD)のようなフラットパネルディスプレイを含む。入力装置65は、操作されることにより入力データを生成する。本実施形態において、入力装置65は、表示装置64の表示画面に設けられたタッチセンサを含む。表示装置64は、タッチパネルを含む。
 入出力インターフェース装置66は、演算処理装置60と記憶装置61と位置検出装置62と撮影装置63と表示装置64と入力装置65と通信装置67との間でデータ通信する。
 通信装置67は、管理装置4と無線でデータ通信する。通信装置67は、携帯電話通信網又はインターネット回線を使って管理装置4とデータ通信する。
 管理装置4は、コンピュータシステムを含む。管理装置4は、演算処理装置40と、記憶装置41と、出力装置42と、入力装置43と、入出力インターフェース装置44と、通信装置45とを有する。
 演算処理装置40は、CPUのようなマイクロプロセッサを含む。記憶装置41は、ROM又はRAMのようなメモリ及びストレージを含む。
 出力装置42は、フラットパネルディスプレイのような表示装置を含む。なお、出力装置42は、プリントデータを出力する印刷装置を含んでもよい。入力装置43は、操作されることにより入力データを生成する。入力装置43は、キーボード及びマウスの少なくとも一方を含む。なお、入力装置43が表示装置の表示画面に設けられたタッチセンサを含んでもよい。
 入出力インターフェース装置44は、演算処理装置40と記憶装置41と出力装置42と入力装置43と通信装置45との間でデータ通信する。
 通信装置45は、携帯機器6と無線でデータ通信する。通信装置45は、携帯電話通信網又はインターネット回線を使って携帯機器6とデータ通信する。
<携帯機器>
 次に、本実施形態に係る携帯機器6について説明する。図6は、本実施形態に係る携帯機器6の一例を示す機能ブロック図である。携帯機器6は、油圧ショベル3の動作の評価、及び油圧ショベル3を操作する操作者Maの技量の評価の一方又は両方を実施する評価装置600として機能する。評価装置600の機能は、演算処理装置60及び記憶装置61によって発揮される。
 評価装置600は、撮影装置63によって撮影された撮影データを取得する検出データ取得部601と、撮影装置63によって撮影された撮影データに基づいて作業機10の位置データを算出する位置データ算出部602と、作業機10の目標掘削量を示す目標データを取得する目標データ取得部611と、入力装置65の操作により生成された入力データを取得する入力データ取得部612と、撮影データに基づいてバケット13による1回の掘削動作の掘削時間を算出する掘削時間算出部613と、撮影データに基づいてバケット13の掘削量などの掘削効率を算出する掘削量算出部614と、操作者Maの評価データを生成する評価データ生成部604と、撮影データを表示装置64の表示画面に表示させる第1表示制御部605Aと、バケット13の輪郭の少なくとも一部を示す図形を表示装置64の表示画面に表示させる第2表示制御部605Bと、寸法及び位置が固定されたガイド線を表示装置64の表示画面に表示させる第3表示制御部605Cと、記憶部608とを有する。評価装置600は、入出力部610を介してデータ通信する。
 撮影装置63は、操作者Maによって操作装置8を介して操作された作業機10の撮影データを撮影する。
 検出データ取得部601は、撮影装置63によって撮影された作業機10のバケット13の撮影データを取得する。
 位置データ取得部602は、撮影装置63によって撮影された作業機10の撮影データから作業機10の位置データを算出する。位置データ取得部602は、例えばパターンマッチング法を使って、作業機10の撮影データから作業機10の位置データを算出する。
 目標データ取得部611は、バケット13の目標掘削量を示す目標データを取得する。
 入力データ取得部612は、入力装置65の操作により生成された入力データを取得する。入力データは、バケット13の開口端部を指定する指定データを含む。
 掘削時間算出部613は、撮影装置63によって撮影されたバケット13の撮影データを画像処理して、バケット13による1回の掘削動作の掘削時間を算出する。
 掘削量算出部614は、撮影装置63によって撮影されたバケット13の撮影データを画像処理する。本実施形態において、掘削量算出部614は、バケット13の掘削動作における掘削効率を算出するものであって、バケット13の開口端部から出ている掘削物の面積からバケット13の掘削量や満杯率といった掘削効率を算出する。
 掘削量算出部614は、撮影装置63によって撮影されたバケット13の撮影データを画像処理して、バケット13とバケット13の開口端部から出ている掘削物とを区別する識別部614Aを含む。
 評価データ生成部604は、掘削量算出部614で算出されたバケット13の掘削量を示す第1検出データ及び掘削時間算出部613で算出されたバケット13の掘削時間を示す第2検出データに基づいて、操作者Maの評価データを生成する。第1検出データは、掘削量に代えて、あるいは掘削量とともに後述する満杯率を示すものでもよい。また、評価データ生成部604は、掘削量算出部614で算出された第1検出データと目標データ取得部611で取得された目標データとの差分に基づいて、操作者Maの評価データを生成する。
 第1表示制御部605Aは、撮影装置63によって撮影された油圧ショベル3の撮影データから表示データを生成して、表示装置64の表示画面に表示させる。また、第1表示制御部605Aは、評価データから表示データを生成して表示装置64に表示させる。
 第2表示制御部605Bは、バケット13を側方から見たときの、バケット13の輪郭の少なくとも一部を示す図形を表示装置64の表示画面に表示させ、入力装置65の操作により図形を表示装置64の表示画面において移動させる。第2表示制御部605Bによって表示装置64の表示画面に表示される図形の寸法は固定されている。
 第3表示制御部605Cは、表示装置64の表示画面において寸法及び位置が固定されたガイド線を表示装置64の表示画面に表示させる。第3表示制御部605Cは、油圧ショベル3の寸法及び作業機10の可動範囲を含む作業車両データに基づいて表示装置64の表示画面にガイド線を表示させる。
 記憶部608は、各種のデータを記憶する。本実施形態において、記憶部608は、油圧ショベル3の寸法及び作業機10の可動範囲を含む作業車両データを保持する。また、記憶部608は、本実施形態に係る評価方法を実施するためのコンピュータプログラムを記憶する。
<評価方法>
 次に、本実施形態に係る操作者Maの評価方法について説明する。図7は、本実施形態に係る評価方法の一例を示すフローチャートである。
 本実施形態において、評価方法は、撮影装置63による油圧ショベル3の撮影準備を実施するステップ(S200)と、撮影装置63を使って油圧ショベル3を撮影し操作者Maを評価するステップ(S300)とを含む。
(撮影準備)
 操作者Maの個人データが登録された後、撮影装置63による油圧ショベル3の撮影準備が実施される(ステップS200)。図8は、本実施形態に係る撮影準備方法の一例を示すフローチャートである。
 本実施形態において、撮影準備方法は、油圧ショベル3に対する撮影装置63の撮影位置を決定するステップ(S210)と、上部旋回体21の位置を特定するステップ(S220)と、ブーム11の位置を特定するステップ(S230)と、アーム12の位置を特定するステップ(S240)と、バケット13の位置を特定するステップ(S250)とを含む。
 油圧ショベル3の撮影条件を一定にするために、油圧ショベル3とその油圧ショベル3を撮影する撮影装置63との相対位置を決定する処理が実施される(ステップS210)。
 図9は、本実施形態に係る撮影位置決定方法の一例を説明するための図である。操作者Ma又は作業者Mbによって携帯機器6の入力装置65が操作されることにより、記憶部608に記憶されているコンピュータプログラムが起動する。コンピュータプログラムの起動により、携帯機器6は、撮影準備モードに遷移する。撮影準備モードにおいては、図9に示すように、第3表示制御部605Cは、表示装置64の表示画面において寸法及び位置が固定されたガイド線70を作業車両データに基づいて表示装置64の表示画面に表示させる。
 また、撮影準備モードにおいては、撮影装置63の光学系のズーム機能が制限される。油圧ショベル3は、固定された規定撮影倍率の撮影装置63によって撮影される。表示装置64の表示画面において車両本体20の輪郭とガイド線70とが一致する撮影装置63の位置が撮影位置に決定される。
 撮影位置が決定された後、上部旋回体21の位置を特定する処理が実施される(ステップS220)。位置データ算出部602は、パターンマッチング法を使って、上部旋回体21の位置を特定する。
 図10は、本実施形態に係る上部旋回体21の位置特定方法を説明するための図である。図10に示すように、撮影装置63は、油圧ショベル3を含むサーチ領域73の撮影データを取得する。位置データ算出部602は、撮影装置63で撮影されたサーチ領域73の撮影データに基づいて、作業機10の位置データを算出する。位置データ算出部602は、表示装置62の表示画面において、サーチ領域73に対して、上部旋回体21のテンプレートである上部旋回体テンプレート21Tをスキャン移動して、車両本体20の位置データを算出する。位置データ算出部602は、車両本体20の撮影データと上部旋回体テンプレート21Tとの相関値に基づいて、車両本体20の位置データを算出する。
 車両本体20の位置データが算出されることにより、上部旋回体21の位置が特定される。上部旋回体21の位置が特定されることにより、ブームピン11Pの位置が特定される。
 また、位置データ算出部602は、サーチ領域73の撮影データに基づいて、車両本体20の寸法を示す寸法データを算出する。本実施形態において、位置データ算出部602は、上部旋回体21を左側方から見たときの、表示装置64の表示画面における前後方向の上部旋回体21の寸法Lを算出する。
 上部旋回体21の位置データが算出された後、ブーム11の位置を特定する処理が実施される(ステップS230)。位置データ算出部602は、表示装置64の表示画面において、サーチ領域73に対して、ブーム11のテンプレートであるブームテンプレート11Tを移動して、ブーム11の位置データを算出する。位置データ算出部602は、ブーム11の撮影データとブームテンプレート11Tとの相関値に基づいて、ブーム11の位置データを算出する。
 図11は、本実施形態に係るブーム11の位置特定方法を説明するための図である。ブーム11は上部旋回体21に対して回転軸AX1を中心に回転可能である。そのため、回転軸AX1を中心とする回転方向におけるブーム11の角度によっては、サーチ領域73に対してブームテンプレート11Tをスキャン移動させただけでは、ブーム11の撮影データとブームテンプレート11Tとが一致しない可能性がある。
 上述のように、上部旋回体21の位置が特定されることにより、ブームピン11Pの位置が特定される。本実施形態においては、図13に示すように、位置データ算出部602は、表示装置64の表示画面において、ステップS220で特定されたブーム11のブームピン11Pの位置とブームテンプレート11Tのブームピンの位置とを一致させる。ブーム11のブームピン11Pの位置とブームテンプレート11Tのブームピンの位置とを一致させた後、位置データ算出部602は、表示装置64の表示画面においてブーム11とブームテンプレート11Tとが一致するように、ブームテンプレート11Tを回転移動して、ブーム11の位置データを算出する。位置データ算出部602は、ブーム11の撮影データとブームテンプレート11Tとの相関値に基づいて、ブーム11の位置データを算出する。
 ブーム11の位置データが算出されることにより、ブーム11の位置が特定される。ブーム11の位置が特定されることにより、アームピン12Pの位置が特定される。
 ブーム11の位置が算出された後、アーム12の位置を特定する処理が実施される(ステップS240)。位置データ算出部602は、表示装置64の表示画面において、サーチ領域73に対して、アーム12のテンプレートであるアームテンプレートを移動して、アーム12の位置データを算出する。位置データ算出部602は、アーム12の撮影データとアームテンプレートとの相関値に基づいて、アーム12の位置データを算出する。
 アーム12はブーム11に対して回転軸AX2を中心に回転可能である。そのため、回転軸AX2を中心とする回転方向におけるアーム12の角度によっては、サーチ領域73に対してアームテンプレートをスキャン移動させただけでは、アーム12の撮影データとアームテンプレートとが一致しない可能性がある。
 上述のように、ブーム11の位置が特定されることにより、アームピン12Pの位置が特定される。本実施形態においては、位置データ算出部602は、ブーム11の位置を特定した手順と同様の手順で、アーム12の位置を特定する。位置データ算出部602は、表示装置64の表示画面において、ステップS230で特定されたアーム12のアームピン12Pとアームテンプレートのアームピンの位置とを一致させる。アーム12のアームピン12Pの位置とアームテンプレートのアームピンの位置とを一致させた後、位置データ算出部602は、表示装置64の表示画面においてアーム12とアームテンプレートとが一致するように、アームテンプレートを回転移動して、アーム12の位置データを算出する。位置データ算出部602は、アーム12の撮影データとアームテンプレートとの相関値に基づいて、アーム12の位置データを算出する。
 アーム12の位置データが算出されることにより、アーム12の位置が特定される。アーム12の位置が特定されることにより、バケットピン13Pの位置が特定される。
 アーム12の位置が算出された後、バケット13の位置を特定する処理が実施される(ステップS250)。位置データ算出部602は、表示装置64の表示画面において、サーチ領域73に対して、バケット13のテンプレートであるバケットテンプレートを移動して、バケット13の位置データを算出する。位置データ算出部602は、バケット13の撮影データとバケットテンプレートとの相関値に基づいて、バケット13の位置データを算出する。
 バケット13はアーム12に対して回転軸AX3を中心に回転可能である。そのため、回転軸AX3を中心とする回転方向におけるバケット13の角度によっては、サーチ領域73に対してバケットテンプレートをスキャン移動させただけでは、バケット13の撮影データとバケットテンプレートとが一致しない可能性がある。
 上述のように、アーム12の位置が特定されることにより、バケットピン13Pの位置が特定される。本実施形態においては、位置データ算出部602は、ブーム11の位置を特定した手順及びアーム12の位置を特定した手順と同様の手順で、バケット13の位置を特定する。位置データ算出部602は、表示装置64の表示画面において、ステップS240で特定されたバケット13のバケットピン13Pとバケットテンプレートのバケットピンの位置とを一致させる。バケット13のバケットピン13Pの位置とバケットテンプレートのバケットピンの位置とを一致させた後、位置データ算出部602は、表示装置64の表示画面においてバケット13とバケットテンプレートとが一致するように、バケットテンプレートを回転移動して、バケット13の位置データを算出する。位置データ算出部602は、バケット13の撮影データとバケットテンプレートとの相関値に基づいて、バケット13の位置データを算出する。
 バケット13の位置データが算出されることにより、バケット13の位置が特定される。バケット13の位置が特定されることにより、バケット13の刃先13Bの位置が特定される。
(撮影及び評価)
 作業機10の位置が特定されると、携帯機器6は、撮影及び評価モードに遷移する。撮影及び評価モードにおいても、撮影装置63の光学系のズーム機能が制限される。油圧ショベル3は、固定された規定撮影倍率の撮影装置63によって撮影される。撮影準備モードにおける規定撮影倍率と、撮影及び評価モードにおける規定撮影倍率とは同一である。
 図12は、本実施形態に係る撮影及び評価方法の一例を示すフローチャートである。本実施形態に係る撮影及び評価方法は、作業機10の目標掘削量を示す目標データを取得するステップ(S305B)と、作業機10の移動開始位置を特定するステップ(S310B)と、移動する作業機10の撮影データを取得するステップ(S320B)と、作業機10の移動終了位置を特定するステップ(S330B)と、バケット13の掘削時間を算出するステップ(S332B)と、撮影装置63によって撮影されたバケット13の撮影データに基づいてバケット13の開口端部が特定可能か否かを判定するステップ(S335B)と、撮影データに基づいてバケット13の開口端部を特定できない場合にバケット13の開口端部の位置を指定するステップ(S345B)と、バケット13の掘削量を算出するステップ(S348B)と、操作者Maの評価データを生成するステップ(S350B)と、表示装置64に評価データを表示するステップ(S360B)とを含む。
 作業機10の目標掘削量を示す目標データを取得する処理が実施される(ステップS305B)。操作者Maは、自身が掘削しようとする目標掘削量を宣言し、入力装置65を介して目標掘削量を評価装置600に入力する。目標データ取得部611は、バケット13の目標掘削量を示す目標データを取得する。
 目標掘削量は、掘削量として掘削物の土量で指定されてもよいし、バケット13の開口端部から規定容積の掘削物が出た状態を基準とした満杯率で指定されてもよい。つまり、操作者Maは、自身が行う掘削作業の掘削効率を宣言する。本実施形態においては、目標掘削量が満杯率で指定されることとする。満杯率とは、山積容量の一種であり、本実施形態においては、バケット13の開口端部(上縁)から1:1の勾配で掘削物を盛り上げたとき、0.8[m]の掘削物がバケット13に掬われている状態を満杯率1.0とする。
 次に、作業機10のバケット13の移動開始位置及び移動開始時点を特定する処理が実施される(ステップS310B)。
 本実施形態において、バケット13の移動開始位置は、操作者Maによって任意に決定される。本実施形態においては、バケット13の刃先13Bが静止している時間が規定時間以上でありその静止状態のバケット13が移動を開始した位置が移動開始位置に決定される。また、静止状態のバケット13が移動を開始した時点が移動開始時点に決定される。換言すれば、静止状態のバケット13が動き出した位置が移動開始位置であり、動き出した時点が移動開始時点である。
 位置データ算出部602は、撮影装置63の撮影データに基づいて、バケット13が静止している時間が規定時間以上であると判定した場合、そのバケット13の位置をバケット13の移動開始位置に決定する。
 静止状態のバケット13が操作者Maの操作により移動を開始した場合、位置データ算出部602は、撮影データに基づいて、バケット13の移動が開始されたことを検出する。位置データ算出部602は、静止状態のバケット13が移動を開始した時点をバケット13の移動開始時点に決定する。
 バケット13の移動が開始されると、バケット13の動作データを取得する処理が実施される(ステップS320B)。バケット10の動作データは、移動開始位置において静止状態の作業機10が移動を開始して掘削動作を行い、掘削動作が終了して移動終了位置において移動を終了するまでのバケット13の撮影データを含む。
 移動状態のバケット13が操作者Maの操作により移動を停止した場合、作業機10のバケット13の移動終了位置及び移動終了時点を特定する処理が実施される(ステップS330B)。
 本実施形態において、バケット13の移動終了位置は、操作者Maによって任意に決定される。本実施形態においては、移動状態のバケット13の刃先13Bが移動を停止しその停止している時間が規定時間以上であると判定されたバケット13の位置が移動終了位置に決定される。また、移動を終了した時点が移動終了時点に決定される。換言すれば、移動状態のバケット13が停止した位置が移動終了位置であり、停止した時点が移動終了時点である。
 移動状態のバケット13が操作者Maの操作により移動を停止した場合、位置データ算出部602は、撮影データに基づいて、バケット13の移動が停止されたことを検出する。位置データ算出部602は、移動状態のバケット13が移動を停止した位置をバケット13の移動終了位置に決定する。また、位置データ算出部602は、移動状態のバケット13が移動を停止した時点をバケット13の移動終了時点に決定する。位置データ算出部602は、移動状態のバケット13が移動を停止し、そのバケット13が静止している時間が規定時間以上であると判定した場合、そのバケット13の位置をバケット13の移動終了位置に決定する。
 掘削時間算出部613は、撮影データに基づいて、掘削時間を算出する(ステップS332B)。掘削時間は、バケット13の移動開始時点から移動終了時点までの時間である。
 次に、掘削量算出部614は、撮影装置63によって撮影されたバケット13の撮影データに基づいてバケット13の開口端部13Kが特定可能か否かを判定する(S335B)。
 図13は、本実施形態に係る掘削量の算出方法の一例を説明するための図である。なお、図13は、掘削動作が終了した時にバケット13を左側方から見た状態を示している。図13に示すように、掘削動作が終了することにより、バケット13に掘削物が収容される。掘削動作により、より多くの掘削物をすくいあげたならば、バケット13を側方から見ると、図13に示すように掘削物がバケット13の開口端部13Kから上方に出る。掘削動作により、バケット13の内容積を満たさないような掘削であったならば、バケット13を側方から見ても、掘削物がバケット13の開口端部13Kから上方には出ない。掘削量算出部614は、撮影装置63によって左側方から撮影されたバケット13の撮影データを画像処理して、バケット13と掘削物との境界であるバケット13の開口端部13Kを特定する。バケット13と掘削物との輝度の差、明度の差、及び色度の差の少なくとも一つを含むコントラストデータにより、掘削量算出部614は、バケット13の開口端部13Kを特定することができる。
 一方、バケット13の表面は掘削物との接触により汚れたり、バケット13の表面に塗られた塗装がはがれたりする可能性があるため、バケット13と掘削物との明確なコントラストデータが得られない可能性がある。その結果、バケット13と掘削物との境界が不明確になり、掘削量算出部614は、撮影装置63の撮影データからバケット13の開口端部13Kを特定することが困難となる可能性がある。
 そのため、掘削量算出部614は、撮影装置63によって撮影されたバケット13の撮影データに基づいてバケット13の開口端部13Kを特定することができるか否かを判定する(ステップS335B)。
 ステップS335Bにおいて、バケット13の開口端部13Kを特定できると判定された場合(ステップS335:Yes)、掘削量算出部614は、バケット13の開口端部13Kの位置を特定し、撮影装置63によって撮影されたバケット13の撮影データを画像処理してバケット13の開口端部13Kから出ている掘削物の面積を算出する。
 掘削量算出部614は、開口端部13Kから出ている掘削物の面積から、バケット13の掘削動作における掘削量を算出する。開口端部13Kから出ている掘削物の面積から、バケット13によるおおよその掘削量が推定される(ステップS348B)。掘削物の面積に基づく掘削量の算出の具体的な方法は後述するが、掘削物の面積が求まれば、以下のようにして掘削量を推定できる。例えば、バケット13の幅(図13に示すバケット13の紙面に垂直方向)を記憶部608に記憶させておくか、バケット13の幅を入力装置65から入力する。そして、開口端部13Kから出ている掘削物の面積とバケット13の幅とを掛け算することで、開口端部13Kから出ている掘削物の土量を求めることができる。なお、単に、開口端部13Kから出ている掘削物の面積の大きさを掘削量の大小として用いてもよい。
 ステップS335Bにおいて、バケット13の開口端部13Kを特定できないと判定された場合(ステップS335:No)、携帯機器6は、開口端部指定モードに遷移する。
 図14及び図15は、本実施形態に係る開口端部13Kの指定方法の一例を模式的に示す図である。開口端部指定モードに遷移すると、図14に示すように、第1表示制御部605Aは、バケット13を含む油圧ショベル3の撮影データを表示装置64の表示画面に表示させる。また、第2表示制御部605Bは、バケット13の輪郭の少なくとも一部を示す図形を表示装置64の表示画面に表示させる。
 図14に示すように、本実施形態において、バケット13の輪郭の少なくとも一部を示す図形は、バケット13を模したアイコンCBである。アイコンCBは、バケット13の開口端部13Kを示すラインCBKを含む。アイコンCBは、左側方から見たバケット13の輪郭を示す。アイコンCBの形状及び寸法は固定されている。アイコンCBは、表示装置64の表示画面の周縁領域に表示される。
 作業者Mbは、アイコンCBを使って、バケット13の開口端部13Kの位置を指定する(ステップS345B)。具体的には、図15に示すように、作業者Mbは、タッチセンサを含む入力装置65が配置された表示装置64の表示画面を操作して、アイコンCBを表示画面において移動させる。作業者Mbは、アイコンCBを指で押さえながら指を左右上下のいずれかにスライド移動させ、第1表示制御部605Aによって表示装置64の表示画面に表示されているバケット13の開口端部13Kと第2表示制御部605Bによって表示装置64の表示画面に表示されているアイコンCBのラインCBKとが表示画面において位置合わせされるように、アイコンCBをスライド移動する。
 第2表示制御部605Bは、入力装置65の操作に基づいて、図形であるアイコンCBを表示装置64の表示画面において移動させる。表示装置64の表示画面においてバケット13の開口端部13KとアイコンCBのラインCBKとが位置合わせされることによって、バケット13の開口端部13Kの位置が指定される。
 表示装置64の表示画面は、複数の画素を含み、それら複数の画素のそれぞれにはアドレスが付されている。その表示装置64の表示画面においてアイコンCBが指定されることにより、位置データ算出部602は、アイコンCBの位置と画素のアドレスとに基づいて、バケット13の位置を特定することができる。
 識別部614Aは、バケット13の撮影データを画像処理して、バケット13の開口端部13Kに位置合わせされたアイコンCBのラインCBKに基づいて、表示装置64の表示画面におけるバケット13とバケット13の開口端部13Kから出ている掘削物とを区別する。掘削量算出部614に含まれる識別部614Aは、バケット13とバケット13の開口端部13Kから出ている掘削物とを区別して、開口端部13Kから出ている掘削物の面積を算出する(ステップS348B)。例えば、掘削物を表示する画素の数に基づいて、開口端部13Kから出ている掘削物の面積が算出される。これにより、掘削量算出部614は、バケット13の掘削量を算出することができる(ステップS348B)。
 このように、本実施形態においては、図8のフローチャートを参照して説明したように、パターンマッチング法によって上部旋回体21の位置、ブーム11の位置、及びアーム12の位置が順次特定される。アーム12の位置が特定された後、パターンマッチング法を含む撮影データの画像処理に基づいてバケット13の位置を特定できない場合、位置データ算出部602は、表示装置64の表示画面においてバケット13と位置合わせされたアイコンCBに基づいて、上部旋回体21に対するバケット13の位置を算出することができる。
 また、本実施形態においては、図9を参照して説明したように、ガイド線70を使って撮影装置63が油圧ショベル3から規定距離だけ離れるように撮影位置が定められる。掘削量算出部614は、油圧ショベル3から規定距離だけ離れた撮影装置63によって撮影されたバケット13と位置合わせされたアイコンCBに基づいて、バケット13の掘削量を算出する。
 評価データ生成部604は、ステップS348Bで算出されたバケット13の掘削量を示す第1検出データと、ステップS332Bで算出されたバケット13の掘削時間を示す第2検出データとに基づいて、操作者Maの評価データを生成する。
 評価データ生成部604は、バケット13の掘削量を示す第1検出データと、ステップS305Bにおいて取得されたバケット13の目標掘削量を示す目標データとの差分に基づいて、操作者Maの評価データを生成する。第1検出データと目標データとの差分が小さいほど、操作者Maの技量は優れていると評価される。一方、第1検出データと目標データとの差分が大きいほど、操作者Maの技量は劣っていると評価される。また、掘削時間が短いほど操作者Maの技量が高いと判定され、掘削時間が長いほど操作者Maの技量が低いと判定される。
 評価データが生成された後、その評価データを表示装置64に表示させる処理が実施される(ステップS360B)。第1表示制御部605Aは、評価データから表示データを生成して表示装置64に表示させる。なお、評価データは、携帯機器6に備えられた表示装置64ではなく、他の表示装置や印刷装置などに評価データを無線或いは有線によって送信し出力するようにしてもよい。第1表示制御部605Aは、例えば、個人データである操作者Maの氏名を表示装置64に表示させる。また、第1表示制御部605Aは、評価データとして、移動開始位置から移動終了位置までのバケット13の移動時間を示す「掘削時間」、及び目標掘削量と実際の掘削量との差分を示す「掘削量差」の各項目を表示装置64に表示させる。また、第1表示制御部605Aは、「掘削時間」及び「掘削量差」の各項目の数値データを評価データとして表示装置64に表示させる。また、第1表示制御部605Aは、操作者Maの技量の得点を評価データとして表示装置64に表示させる。記憶部608には、技量についてのリファレンスデータが記憶されている。リファレンスデータは、例えば、標準的な技量を有する操作者についての評価データであり、統計的又は経験的に求められる。操作者Maの技量の得点は、そのリファレンスデータを基準に算出される。
<作用及び効果>
 以上説明したように、本実施形態によれば、操作者Maの評価において操作者Maに実際に掘削動作を実施させ、作業機10の掘削量を示す第1検出データと作業機10の掘削時間を示す第2検出データとを取得し、その第1検出データ及び第2検出データに基づいて操作者Maの評価データを生成するようにしたので、実際の掘削動作に関する操作者Maの技量を評価することができる。また、油圧ショベル3の操作者Maの技量が客観的及び定量的に評価され、その評価データが提供されることにより、技量向上のための操作者Maの意欲は向上する。また、操作者Maは、評価データに基づいて、自身の操作を改善することができる。
 また、本実施形態によれば、評価装置600は、入力装置65の操作により生成された入力データを取得する入力データ取得部612を備える。上述のように、バケット13の表面は、掘削物で汚れる可能性が高く、明確なコントラストデータが得られずに、撮影装置63によって撮影されたバケット13の撮影データからでは開口端部13Kを特定できない可能性がある。また、バケット13の表面の塗装が剥がれた場合においても、明確なコントラストデータが得られない可能性がある。また、撮影されるバケット13の背景が土砂山である場合においても、明確なコントラストデータが得られない可能性がある。撮影データからでは開口端部13Kを特定できない場合、入力データとして、バケット13の開口端部13Kを指定する指定データが入力されることにより、バケット13とバケット13の開口端部13Kから出ている掘削物とを区別することができる。バケット13とバケット13の開口端部13Kから出ている掘削物とを区別することができるため、識別部614Aを含む掘削量算出部614は、指定データに基づいて開口端部13Kから出ている掘削物の面積を算出して、バケット13の掘削量を算出することができる。
 また、本実施形態によれば、評価装置600は、バケット13の撮影データを表示装置64の表示画面に表示させる第1表示制御部605Aと、バケット13の輪郭を示すアイコンCBを表示装置64の表示画面に表示させる第2表示制御部605Bとを備える。そのため、作業者Mb又は操作者Maは、入力装置65を操作して、アイコンCBを移動して、表示装置64の表示画面に表示されているバケット13の開口端部13KとアイコンCBのラインCBKとを位置合わせするだけで、バケット13の開口端部13Kを指定することができる。第2表示制御部605Bは、入力装置65の操作に基づいてアイコンCBを表示装置64の表示画面において移動させる。掘削量算出部614は、表示装置64の表示画面においてバケット13の開口端部13Kの撮影データとアイコンCBのラインCBKとが位置合わせされることにより、開口端部13Kの位置を特定することができる。掘削量算出部614の識別部614Aは、バケット13の開口端部13Kの撮影データと位置合わせされたアイコンCBに基づいてバケット13と開口端部13Kから出ている掘削物とを区別して、開口端部13Kから出ている掘削物の面積を算出することができる。これにより、バケット13の表面が汚れていたり、バケット13の表面の塗装が剥がれていたりしていて撮影データからでは開口端部13Kを特定できない場合でも、バケット13の開口端部13Kが簡単に指定され、掘削物とバケット13との境界とが区別され、掘削量算出部614は、開口端部13Kから出ている掘削物の面積を算出して、バケット13の掘削量を算出することができる。
 また、本実施形態においては、表示装置64はタッチパネルを含み、入力装置65は表示装置64の表示画面に設けられたタッチセンサを含む。そのため、作業者Mb又は操作者Maは、表示装置64の表示画面を操作して、アイコンCBをスライド移動して、表示装置64の表示画面に表示されているバケット13の開口端部13KとアイコンCBのラインCBKとを位置合わせするだけで、バケット13の開口端部13Kを指定することができる。
 また、本実施形態によれば、位置データ算出部604は、サーチ領域73に対して上部旋回体テンプレート21Tをスキャン移動して上部旋回体21の撮影データと上部旋回体テンプレート21Tとの相関値に基づいて上部旋回体21の位置データを算出した後、サーチ領域73に対してブームテンプレート11Tを移動してブーム11の撮影データとブームテンプレート11Tとの相関値に基づいてブーム11の位置データを算出する。これにより、車両本体20に対して移動する作業機10が存在する特徴的な構造を有する油圧ショベル3においても、作業機10の位置を特定することができる。本実施形態においては、パターンマッチング法でブームピン11Pを含む上部旋回体21の位置が特定された後、ブームピン11Pを基準としてブーム11の位置が特定されることにより、ブーム11の位置が正確に特定される。ブーム11の位置が特定された後、アームピン12Pを基準としてアーム12の位置が特定され、アーム12の位置が特定された後、バケットピン13Pを基準としてバケット13の位置が特定されることにより、特徴的な構造を有する油圧ショベル3においても、バケット13の刃先13Bの位置を正確に特定することができる。
 また、本実施形態によれば、第3表示制御部605Cは、表示装置64の表示画面において車両本体20とガイド線70とが位置決めされたとき、撮影装置63が油圧ショベル3から規定距離だけ離れるように、ガイド線70を表示させ、掘削量算出部614は、油圧ショベル3から規定距離だけ離れた撮影装置63によって撮影されたバケット13と位置合わせされたアイコンCBに基づいて、バケット13の掘削量を算出する。これにより、常に同一の評価条件でバケット13の掘削量が算出される。また、油圧ショベル3と撮影装置63とが規定距離だけ離れるように撮影位置が設定されるので、撮影者である作業者Mbの安全性が確保される。
 また、本実施形態によれば、評価装置600は、バケット13の目標掘削量を示す目標データを取得する目標データ取得部611を備え、評価データ生成部604は、第1検出データと目標データとの差分に基づいて評価データを生成する。これにより、任意の目標掘削量を指定して、実際の掘削動作における掘削量について、操作者Maの技量を評価することができる。例えば、油圧ショベル3を使ってダンプトラックの荷台に掘削物を積むような掘削積込作業を実行する場合、操作者Maは、適正な積載量になるようにバケット13による掘削量を微調整する必要がある。本実施形態によれば、目標掘削量が指定され、その目標掘削量に近い掘削動作を操作者Maが実行できる技量を有するかどうかという点について操作者Maの技量が定量的に評価されることにより、操作者Maの実際の掘削積込作業の技量を評価することができる。
 また、本実施形態によれば、バケット13の開口端部13Kが特定された場合、バケット13の掘削量は、撮影装置63によって撮影されたバケット13の撮影データを画像処理してバケット13の開口端部13Kから出ている掘削物の面積から算出される。これにより、煩雑な処理を実施することなく、バケット13の掘削量を簡単に求めることができる。
 また、本実施形態によれば、評価データと油圧ショベル3の撮影位置を示す撮影装置63の位置データとを関連させたリンクデータを生成するリンク処理部606と、リンクデータを出力するリンクデータ出力部607とが設けられる。リンクデータが出力されることにより、管理装置4は、そのリンクデータを有効活用して、全国各地の操作者Maの技量向上のための措置を講ずることができる。
 図16及び図17は、本実施形態に係るアイコンCBの一例を説明するための図である。図16及び図17は、バケット13を左側方から見たときのバケット13の外形を示す輪郭の一部を示したアイコンCBである。上述の実施形態においては、図14に示したように、アイコンCBはバケット13を側方から見たときの形状を模した図形であり、バケット13全体の輪郭を含むこととした。図16に示すように、アイコンCBは、バケット13の下部(背面部)の輪郭のみを示す図形でもよい。図17に示すように、アイコンCBは、バケット13の上部(開口端部)の輪郭のみを示す図形でもよい。アイコンCBがバケット13の外形を示す輪郭の一部を示す図形であっても、そのアイコンCBとバケット13とが表示装置64の表示画面において位置決めされることにより、バケット13の位置を特定し、バケット13と掘削物とを区別することができる。なお、図14、図16、図17に示したようなバケット13の外形を示す輪郭を表すアイコンCBは、バケット13の形状や大きさに応じて、例えば記憶部608に複数種類のアイコンCBのデータを用意しておき、操作者Maが操作する油圧ショベル3の作業機10に装着されたバケット13に応じて、作業者Mbが入力装置65を操作することで、いずれかのアイコンCBを選択するようにしてもよい。
<その他の実施形態>
 なお、上述の実施形態においては、撮影データからではバケット13の開口端部13Kを特定できないと判定された場合、コンピュータプログラムの処理に従って、携帯機器6が開口端部指定モードに遷移する。作業者Mbが入力装置65を操作することによって開口端部指定モードへ遷移してもよい。また、無線機器を使って油圧ショベル3から携帯機器6にバケット13の外形を示す輪郭を表した輪郭データが送信され、携帯機器6がその輪郭データを受信することによって開口端部指定モードへ遷移してもよい。
 なお、上述の実施形態において、評価装置600の機能の一部又は全部を管理装置4が有してもよい。検出装置63によって検出された油圧ショベル3の動作データが通信装置67を介して管理装置4に送信されることにより、管理装置4は、油圧ショベル3の動作データに基づいて操作者Maの技量を評価することができる。管理装置4は、演算処理装置40及び本実施形態に係る評価方法を実施するコンピュータプログラムを記憶可能な記憶装置41を有するため、評価装置600の機能を発揮することができる。
 なお、上述の実施形態においては、作業機10の動作データに基づいて、操作者Maの技量が評価されることとした。作業機10の動作データに基づいて、作業機10の作動状態が評価されてもよい。例えば、作業機10の動作データに基づいて、作業機10の作動状態が正常か否かを判定する点検処理が実施されてもよい。
 なお、上述の実施形態においては、作業車両3が油圧ショベル3であることとした。作業車両3は、バックホウローダ及びホイールローダなど、掘削物をすくうことができる作業機やアタッチメントを有する作業車両であればよい。
 1 評価システム、2 施工現場、3 油圧ショベル(作業車両)、3C 油圧ショベル(作業車両)、4 管理装置(サーバ)、6 携帯機器、7 運転席、8 操作装置、8WR 右作業レバー、8WL 左作業レバー、8MR 右走行レバー、8ML 左走行レバー、10 作業機、11 ブーム、11P ブームピン、12 アーム、12P アームピン、13 バケット、13B 刃先、13K 開口端部、13P バケットピン、14 ブームシリンダ、15 アームシリンダ、16 バケットシリンダ、20車両本体、21 上部旋回体、22 下部走行体、23 キャブ、24 カウンタウエイト、25 駆動輪、26 遊動輪、27 クローラ、40 演算処理装置、41 記憶装置、42 出力装置、43 入力装置、44 入出力インターフェース装置、45 通信装置、60 演算処理装置(評価装置)、61 記憶装置、62 位置検出装置、63 撮影装置、63C 検出装置、64 表示装置、65 入力装置、66 入出力インターフェース装置、67 通信装置、70 ガイド線、73 サーチ領域、600 評価装置、601 検出データ取得部、602 位置データ算出部、603 目標データ生成部、604 評価データ生成部、605 表示制御部、605A 第1表示制御部、605B 第2表示制御部、606 リンク処理部、607 リンクデータ出力部、608 記憶部、611 目標データ取得部、612 入力データ取得部、613 掘削時間算出部、614 掘削量算出部、614A 識別部、AX1 回転軸、AX2 回転軸、AX3 回転軸、CA アイコン、CB アイコン、DX1 回転軸、DX2 回転軸、Ma 操作者、Mb 作業者、RX 旋回軸。

Claims (7)

  1.  作業機のバケットの撮影データを取得する検出データ取得部と、
     前記撮影データを表示装置の表示画面に表示させる第1表示制御部と、
     前記バケットを側方から見たときの、前記バケットの輪郭の少なくとも一部を示す図形を前記表示画面に表示させ、入力装置の操作により前記図形を前記表示画面において移動させる第2表示制御部と、
     前記バケットに位置合わせされた前記図形に基づいて、前記表示画面における前記バケットと前記バケットの前記開口端部から出ている掘削物とを区別する識別部と、
    を備える評価装置。
  2.  前記バケットの開口端部から出ている前記掘削物の面積から、前記バケットの掘削動作における掘削効率を算出する掘削量算出部を備える、
    請求項1に記載の評価装置。
  3.  前記図形は、前記バケットの前記開口端部を示すラインを含む、
    請求項1又は請求項2に記載の評価装置。
  4.  前記入力装置は、前記表示画面に設けられた入力装置を含む、
    請求項1から請求項3のいずれか一項に記載の評価装置。
  5.  前記作業機は、操作装置を介して操作者に操作されることで掘削動作し、
     前記掘削量算出部で算出された前記掘削量を示す第1検出データ及び掘削時間を示す第2検出データに基づいて、掘削動作に関する前記操作者の評価データを生成する評価データ生成部を備える、
    請求項2から請求項4のいずれか一項に記載の評価装置。
  6.  前記バケットの目標掘削量を示す目標データを取得する目標データ取得部を備え、
     前記評価データ生成部は、前記第1検出データと前記目標データとの差分に基づいて前記評価データを生成する、
    請求項5に記載の評価装置。
  7.  作業機のバケットの撮影データを取得することと、
     前記撮影データを表示装置の表示画面に表示させることと、
     前記バケットを側方から見たときの、前記バケットの輪郭の少なくとも一部を示す図形を前記表示画面に表示させることと、
     入力装置の操作により生成された入力データに基づいて前記図形を前記表示画面において移動させることと、
     前記バケットに位置合わせされた前記図形に基づいて、前記表示画面における前記バケットと前記バケットの前記開口端部から出ている掘削物とを区別することと、
    を含む評価方法。
PCT/JP2016/059979 2016-03-28 2016-03-28 評価装置及び評価方法 WO2016137017A1 (ja)

Priority Applications (7)

Application Number Priority Date Filing Date Title
CN201680001448.2A CN106414860B (zh) 2016-03-28 2016-03-28 评价装置以及评价方法
US15/309,835 US10147339B2 (en) 2016-03-28 2016-03-28 Evaluation apparatus and evaluation method
AU2016224354A AU2016224354B2 (en) 2016-03-28 2016-03-28 Evaluation apparatus and evaluation method
DE112016000037.5T DE112016000037B4 (de) 2016-03-28 2016-03-28 Bewertungsvorrichtung und Bewertungsverfahren
JP2016529494A JP6002873B1 (ja) 2016-03-28 2016-03-28 評価装置及び評価方法
PCT/JP2016/059979 WO2016137017A1 (ja) 2016-03-28 2016-03-28 評価装置及び評価方法
KR1020167031108A KR20170113001A (ko) 2016-03-28 2016-03-28 평가 장치 및 평가 방법

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/059979 WO2016137017A1 (ja) 2016-03-28 2016-03-28 評価装置及び評価方法

Publications (1)

Publication Number Publication Date
WO2016137017A1 true WO2016137017A1 (ja) 2016-09-01

Family

ID=56788799

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/059979 WO2016137017A1 (ja) 2016-03-28 2016-03-28 評価装置及び評価方法

Country Status (7)

Country Link
US (1) US10147339B2 (ja)
JP (1) JP6002873B1 (ja)
KR (1) KR20170113001A (ja)
CN (1) CN106414860B (ja)
AU (1) AU2016224354B2 (ja)
DE (1) DE112016000037B4 (ja)
WO (1) WO2016137017A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018044415A (ja) * 2016-09-16 2018-03-22 日立建機株式会社 建設機械の施工時間予測システム

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6662762B2 (ja) * 2016-12-19 2020-03-11 株式会社クボタ 作業車
US10407879B2 (en) * 2017-02-08 2019-09-10 Deere & Company System and method for remote work implement angular position display
KR102615982B1 (ko) 2017-12-11 2023-12-19 스미토모 겐키 가부시키가이샤 쇼벨 및 쇼벨의 관리시스템
US10801180B2 (en) * 2018-06-11 2020-10-13 Deere & Company Work machine self protection system
CN108538136B (zh) * 2018-06-19 2023-04-07 江苏省交通技师学院 挖掘机精准刷坡实训装置及其方法
JP7266371B2 (ja) * 2018-06-29 2023-04-28 株式会社小松製作所 作業機械、および作業機械を含むシステム
CN109903337B (zh) * 2019-02-28 2022-06-14 北京百度网讯科技有限公司 用于确定挖掘机的铲斗的位姿的方法和装置
EP3951076B1 (en) * 2019-03-26 2024-05-08 Hitachi Construction Machinery Co., Ltd. Work machine
CN111582135B (zh) * 2020-04-30 2023-05-16 中南大学 基于工作阶段识别的挖掘机手操作熟练度评价方法及装置
CN115188241A (zh) * 2022-09-13 2022-10-14 徐州硕博电子科技有限公司 一种基于数据采集的装载机驾驶模拟评估系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001323517A (ja) * 2000-05-18 2001-11-22 Carnegie Mellon Univ 掘削機械のバケット内に取り込まれた材料の容積を推測するためのシステムならびに方法
JP2009235833A (ja) * 2008-03-28 2009-10-15 Komatsu Ltd 建設機械の運転評価システム及び運転評価方法
JP2015040422A (ja) * 2013-08-22 2015-03-02 日立建機株式会社 建設機械の表示装置

Family Cites Families (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3854608A (en) * 1971-04-13 1974-12-17 Wain Co Roy Materials handling
EP0406435B1 (en) * 1988-11-22 1996-07-31 Kabushiki Kaisha Komatsu Seisakusho Work automation method and apparatus for electronic control type hydraulic driving machine
US5438771A (en) * 1994-05-10 1995-08-08 Caterpillar Inc. Method and apparatus for determining the location and orientation of a work machine
US5404661A (en) * 1994-05-10 1995-04-11 Caterpillar Inc. Method and apparatus for determining the location of a work implement
US6047227A (en) * 1996-11-19 2000-04-04 Caterpillar Inc. Method and apparatus for operating geography altering machinery relative to a work site
US6131061A (en) * 1997-07-07 2000-10-10 Caterpillar Inc. Apparatus and method for preventing underdigging of a work machine
US6114993A (en) * 1998-03-05 2000-09-05 Caterpillar Inc. Method for determining and displaying the position of a truck during material removal
US6148254A (en) * 1998-03-26 2000-11-14 Caterpillar Inc. Method and apparatus for controlling a bucket and thumb of a work machine
US6236924B1 (en) * 1999-06-21 2001-05-22 Caterpillar Inc. System and method for planning the operations of an agricultural machine in a field
WO2001025549A1 (fr) * 1999-10-01 2001-04-12 Hitachi Construction Machinery Co., Ltd. Dispositif de delimitation de la surface d'excavation cible pour engin excavateur, support d'enregistrement prevu a cet effet et unite d'affichage
US6282477B1 (en) * 2000-03-09 2001-08-28 Caterpillar Inc. Method and apparatus for displaying an object at an earthworking site
JP4689134B2 (ja) * 2000-03-31 2011-05-25 日立建機株式会社 建設機械の管理方法及びシステム並びに演算処理装置
US6728619B2 (en) * 2000-03-31 2004-04-27 Hitachi Construction Machinery Co., Ltd. Failure measure outputting method, output system, and output device
US6437726B1 (en) * 2000-11-30 2002-08-20 Caterpillar Inc. Method and apparatus for determining the location of underground objects during a digging operation
US6782644B2 (en) * 2001-06-20 2004-08-31 Hitachi Construction Machinery Co., Ltd. Remote control system and remote setting system for construction machinery
US6769836B2 (en) * 2002-04-11 2004-08-03 Enviro-Pave, Inc. Hot-in-place asphalt recycling machine and process
US6711838B2 (en) * 2002-07-29 2004-03-30 Caterpillar Inc Method and apparatus for determining machine location
US6643577B1 (en) * 2002-08-22 2003-11-04 Caterpillar Inc Operator control station and method for a work machine having more than one function
US7532967B2 (en) * 2002-09-17 2009-05-12 Hitachi Construction Machinery Co., Ltd. Excavation teaching apparatus for construction machine
JP4233932B2 (ja) * 2003-06-19 2009-03-04 日立建機株式会社 作業機械の作業支援・管理システム
JP4332028B2 (ja) * 2003-12-25 2009-09-16 キャタピラージャパン株式会社 表示器制御システム
US10036249B2 (en) * 2005-05-31 2018-07-31 Caterpillar Inc. Machine having boundary tracking system
US8485822B2 (en) * 2006-05-31 2013-07-16 Caterpillar Inc. Simulation system implementing historical machine data
US7516563B2 (en) * 2006-11-30 2009-04-14 Caterpillar Inc. Excavation control system providing machine placement recommendation
JP5108350B2 (ja) * 2007-03-26 2012-12-26 株式会社小松製作所 油圧ショベルの作業量計測方法および作業量計測装置
US8091256B2 (en) * 2008-01-15 2012-01-10 Trimble Navigation Limited Loader elevation control system
JP2011001269A (ja) * 2009-06-16 2011-01-06 Chikako Nishigori 紫外線誘発皮膚炎又は一次刺激性皮膚炎の予防又は治療用外用剤
KR20120014389A (ko) * 2010-08-09 2012-02-17 박성열 스마트폰 어플리케이션 제작 솔루션
WO2012157379A1 (ja) * 2011-05-13 2012-11-22 日立建機株式会社 作業機械の周囲監視装置
WO2013032041A1 (ko) * 2011-08-26 2013-03-07 Ryoo Min-Kyu 이동통신 단말기를 이용한 거리, 높이, 길이 측정 방법
JP5941663B2 (ja) * 2011-11-30 2016-06-29 住友建機株式会社 建設機械用モニタシステム
JP5624101B2 (ja) * 2012-10-05 2014-11-12 株式会社小松製作所 掘削機械の表示システム、掘削機械及び掘削機械の表示用コンピュータプログラム
JP5937499B2 (ja) * 2012-12-05 2016-06-22 鹿島建設株式会社 作業内容分類システム及び作業内容分類方法
JP2015016847A (ja) * 2013-07-11 2015-01-29 藤田 八十仁 航空機タイヤホイールの空気流速による回転駆動の達成効果が及ぼす操縦安定性向上と、タイヤ損傷保安等による有益効果。
CN103559016B (zh) * 2013-10-23 2016-09-07 江西理工大学 一种基于图形处理器并行计算的频繁子图挖掘方法
CN103900669B (zh) 2014-03-20 2016-07-20 华侨大学 一种挖掘机铲斗物料动态称重装置及其方法
JP5781668B2 (ja) * 2014-05-30 2015-09-24 株式会社小松製作所 油圧ショベルの表示システム
JP5944573B2 (ja) * 2014-10-30 2016-07-05 株式会社小松製作所 鉱山機械の管理システム及び鉱山機械の管理方法
CN107343381A (zh) * 2016-03-01 2017-11-10 株式会社小松制作所 评价装置以及评价方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001323517A (ja) * 2000-05-18 2001-11-22 Carnegie Mellon Univ 掘削機械のバケット内に取り込まれた材料の容積を推測するためのシステムならびに方法
JP2009235833A (ja) * 2008-03-28 2009-10-15 Komatsu Ltd 建設機械の運転評価システム及び運転評価方法
JP2015040422A (ja) * 2013-08-22 2015-03-02 日立建機株式会社 建設機械の表示装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018044415A (ja) * 2016-09-16 2018-03-22 日立建機株式会社 建設機械の施工時間予測システム
WO2018051536A1 (ja) * 2016-09-16 2018-03-22 日立建機株式会社 建設機械
KR20180104700A (ko) * 2016-09-16 2018-09-21 히다찌 겐끼 가부시키가이샤 건설 기계
KR102094770B1 (ko) 2016-09-16 2020-03-30 히다찌 겐끼 가부시키가이샤 건설 기계
US10975551B2 (en) 2016-09-16 2021-04-13 Hitachi Construction Machinery Co., Ltd. Construction machine

Also Published As

Publication number Publication date
KR20170113001A (ko) 2017-10-12
CN106414860A (zh) 2017-02-15
DE112016000037T5 (de) 2017-04-06
US10147339B2 (en) 2018-12-04
AU2016224354B2 (en) 2019-02-14
CN106414860B (zh) 2019-04-26
DE112016000037B4 (de) 2020-04-02
AU2016224354A1 (en) 2018-02-08
JPWO2016137017A1 (ja) 2017-04-27
JP6002873B1 (ja) 2016-10-05
US20170278425A1 (en) 2017-09-28

Similar Documents

Publication Publication Date Title
JP6002873B1 (ja) 評価装置及び評価方法
JP6259515B2 (ja) 評価装置及び評価方法
JP6337126B2 (ja) 評価装置及びコンピュータプログラム
KR102102133B1 (ko) 쇼벨의 화상표시장치
JP6909641B2 (ja) 表示システム
WO2017150298A1 (ja) 評価装置、管理装置、評価システム、及び評価方法
JP6568228B2 (ja) 作業機械の表示装置及び表示システム
JP7151392B2 (ja) 建設機械の遠隔操作装置
JP2008240362A (ja) 建設機械および建設機械の後進移動ガイダンス方法
JP7092714B2 (ja) 作業機械の制御装置及び作業機械の制御方法
JP7197314B2 (ja) 作業機械の表示システムおよびその制御方法
JP2020045635A (ja) ホイールローダの表示システムおよびその制御方法

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2016529494

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16755760

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20167031108

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 15309835

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 112016000037

Country of ref document: DE

ENP Entry into the national phase

Ref document number: 2016224354

Country of ref document: AU

Date of ref document: 20160328

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 16755760

Country of ref document: EP

Kind code of ref document: A1