WO2016125267A1 - 駆動装置、クレーン、及び駆動装置の制御方法 - Google Patents
駆動装置、クレーン、及び駆動装置の制御方法 Download PDFInfo
- Publication number
- WO2016125267A1 WO2016125267A1 PCT/JP2015/053099 JP2015053099W WO2016125267A1 WO 2016125267 A1 WO2016125267 A1 WO 2016125267A1 JP 2015053099 W JP2015053099 W JP 2015053099W WO 2016125267 A1 WO2016125267 A1 WO 2016125267A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- main
- inverter
- motors
- main winding
- motor
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/18—Control systems or devices
- B66C13/22—Control systems or devices for electric drives
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02P—CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- H02P5/00—Arrangements specially adapted for regulating or controlling the speed or torque of two or more electric motors
- H02P5/74—Arrangements specially adapted for regulating or controlling the speed or torque of two or more electric motors controlling two or more ac dynamo-electric motors
Definitions
- the present invention relates to a drive device, a crane, and a drive device control method.
- a ladle crane is used as a crane for moving molten steel, molten iron, etc. in a pan.
- a ladle crane includes a main winding device for hanging a pan and an auxiliary winding device for tilting the pan.
- Thyristor control and reactor control are used for drive control of the main winding device and auxiliary winding device in the ladle crane.
- inverter control which is highly versatile and inexpensive, is being used for drive control.
- Patent Document 1 discloses a technique for replacing a failed inverter with a spare inverter.
- the capacity per inverter and motor is selected by a value that allows normal operation even when one of the plurality fails, and is prepared for when a failure occurs. A method is conceivable.
- An object of the present invention is to provide a drive device, a crane, and a drive device control method capable of reducing the capacity, cost, and installation space of equipment.
- the drive device is configured such that the total rated capacity is set to a capacity corresponding to the load, and the plurality of main motors for performing main operation in cooperation with each other, One or a plurality of main inverters connected to the main motor set to a capacity corresponding to the rated capacity of the main motor, and a control device for controlling the main inverter, the control device comprising the plurality of When driving all of the main motors, the main inverter connected to each of the main motors is controlled so that each main motor is driven at a rated rotational speed, and some of the plurality of main motors are out of order. In this case, the rotation speed of each of the remaining main motors is reduced to reduce the load, and the output of each of the remaining main motors is set to the same value as before the rotation speed is reduced. To control.
- the control device acquires a value indicating the magnitude of the load, and according to the magnitude of the load.
- the rotational speed of each of the remaining main motors may be calculated.
- the control device when a part of the main inverters connected to the plurality of main motors fails, the control device outputs the respective main inverters to the main inverters.
- the rated capacity of the inverter is multiplied by the ratio of the outputs of all the main inverters including the failed part to the outputs of all of the remaining main inverters.
- the remaining main inverters may be operated.
- each of the main inverters outputs the output by all the main inverters before being reduced with respect to the output by all the main inverters when the main inverter is reduced by a predetermined number.
- a value obtained by multiplying the ratio by a capacity corresponding to the rated capacity of the main motor may be provided as the rated capacity.
- the main inverter may be connected in parallel to at least two main motors.
- the drive device includes an auxiliary motor for performing an auxiliary operation, and an auxiliary motor connected to the auxiliary motor having a capacity corresponding to the rated capacity of the auxiliary motor as a rated capacity.
- An inverter, and a first main inverter that is one of the main inverters is connected via a switching unit that can be switched to the auxiliary motor in addition to the main motor connected to the main motor.
- the control device causes the switching unit to connect the first main inverter to the auxiliary motor through the switching unit, and to connect the first main inverter through the first main inverter. You may make it drive a motor.
- a crane includes any one of the first to sixth driving devices, a main winding device driven by the driving device, and an auxiliary winding device driven by the driving device. .
- the control method of the drive device is configured such that the total rated capacity is set to a capacity corresponding to the load, and a plurality of main motors for performing main operation in cooperation with the rated capacity.
- Control of a drive device comprising one or a plurality of main inverters connected to the main motor, the total of which is set to a capacity corresponding to the rated capacity of the main motor, and a control device for controlling the main inverter
- the control device controls the main inverter connected to each of the main motors such that each main motor is driven at a rated rotational speed.
- the rotation speed of each of the remaining main motors is reduced to reduce the load, and the output of each of the remaining main motors reduces the rotation speed. To be the same value as before, to control the main inverter.
- FIG. 1A is a plan view schematically showing the structure of a ladle crane in the first embodiment of the present invention.
- FIG. 1B is a side view schematically showing the structure of the ladle crane in the first embodiment of the present invention.
- the ladle crane 100 includes a garter 111, a main trolley 121, and an auxiliary trolley 131.
- the garter 111 can travel on a pair of traveling rails 110 provided in parallel to each other extending in the horizontal direction.
- the garter 111 includes a main transverse rail 120 and an auxiliary transverse rail 130.
- the main transverse rail 120 and the auxiliary transverse rail 130 are each in pairs and extend in the horizontal direction perpendicular to the traveling rail 110.
- the main trolley 121 is provided so as to be able to travel on the main traverse rail 120 provided in the garter 111.
- the main trolley 121 includes a main winding device 122 for hanging the pan 140.
- the main winding device 122 includes a main winding motor (main motor) 123, a speed reducer 124, a wire drum 125, and a support frame 128.
- the main winding motor 123 is driven by a driving device 200A described later.
- the speed reducer 124 is connected to the output shaft of the main winding motor 123.
- the reducer 124 decelerates the rotation of the main winding motor 123 at a predetermined reduction ratio and outputs it.
- the wire drum 125 is rotationally driven by the main winding motor 123 via the speed reducer 124.
- a wire 126 is wound around the wire drum 125.
- the wire 126 is paid out or taken up.
- four sets of main winding motors 123 and two sets of wire drums 125 are provided. Each of the main winding motors 123 rotates the corresponding wire drum 125 via the speed reducer 124 and drives the feeding and winding of the wires 126 one by one. As a result, the pan 140 suspended from the support frame 128 is moved up and down.
- each wire 126 is connected to the support frame 128.
- the support frame 128 suspends the pan 140 via a pair of hooks 127.
- the pan 140 has a pair of support portions 141 on its outer peripheral surface.
- the support part 141 is supported by the hook 127. Thereby, the pan 140 is supported so as to be able to swing around the support portion 141 supported by the hook 127.
- the auxiliary trolley 131 is provided so as to be able to travel on the auxiliary transverse rail 130 provided in the garter 111.
- the auxiliary trolley 131 includes an auxiliary winding device 132 for tilting the pan 140.
- the auxiliary winding device 132 includes an auxiliary winding motor (auxiliary motor) 133 provided on the auxiliary trolley 131 and a wire drum 135.
- the auxiliary winding motor 133 is driven by a driving device 200A described later.
- the wire drum 135 is rotationally driven by the auxiliary winding motor 133.
- a wire 136 is wound around the wire drum 135. By rotating the wire drum 135, the wire 136 is fed out or wound up.
- the wire 136 includes a hook 137 at the tip. By locking the hook 137 to the pan 140 and winding the wire drum 135 with the auxiliary winding motor 133, the pan 140 can be tilted.
- FIG. 2 is a diagram illustrating a configuration of the drive device according to the first embodiment.
- the driving device 200 ⁇ / b> A of this embodiment includes four sets of main winding motors 123. In order to distinguish these main winding motors 123, they are referred to as main winding motors (main motors) 123A, 123B, 123C, 123D.
- the driving device 200A includes main winding motors 123A, 123B, 123C, 123D, auxiliary winding motor 133, main winding converters 211A, 211B, 212A, 212B, 213A, 213B, 214A, 214B, Auxiliary winding converter 215, main winding inverter (main inverter) 221A, 221B, 222A, 222B, 223A, 223B, 224A, 224B, auxiliary winding inverter (auxiliary inverter) 225, and control device (control unit) 230 I have.
- a main winding inverter 221A is connected to the main winding converter 211A.
- Main winding inverter 221B is connected to main winding converter 211B.
- Main winding inverter 222A is connected to main winding converter 212A.
- Main winding inverter 222B is connected to main winding converter 212B.
- Main winding inverter 223A is connected to main winding converter 213A.
- Main winding inverter 223B is connected to main winding converter 213B.
- Main winding inverter 224A is connected to main winding converter 214A.
- Main winding inverter 224B is connected to main winding converter 214B.
- Two main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, 224A, and 224B are connected in parallel to each of the main winding motors 123A, 123B, 123C, and 123D. That is, two pairs of main winding inverters 221A and 221B are connected in parallel to the main winding motor 123A. Two pairs of main winding inverters 222A and 222B are connected in parallel to the main winding motor 123B. Two pairs of main winding inverters 223A and 223B are connected in parallel to the main winding motor 123C. Two pairs of main winding inverters 224A and 224B are connected in parallel to the main winding motor 123D.
- auxiliary winding inverter 225 is connected to the auxiliary winding motor 133.
- the auxiliary winding inverter 225 is connected to the auxiliary winding converter 215. Thereby, auxiliary winding inverter 225 receives supply of direct current from auxiliary winding converter 215 and drives auxiliary winding motor 133.
- a switch is provided between the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, 224A, 224B, the auxiliary winding inverter 225, and the main winding motors 123A, 123B, 123C, 123D, and the auxiliary winding motor 133.
- Switchching unit 291A, 291B, 292A, 292B, 293A, 293B, 294A, 294B, 295, 296 are provided.
- switches 291A, 291B, 292A, 292B, 293A, 293B, 294A, 294B, 295 the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, 224A, 224B, the auxiliary winding inverter 225, and the main winding motor 123A, 123B, 123C, 123D and auxiliary winding motor 133 can be intermittently connected. Further, the main winding inverter 224B and the auxiliary winding motor 133 can be intermittently connected by the switch 296.
- the switches 291A, 291B, 292A, 292B, 293A, 293B, 294A, 294B, 295, 296 may be any connection switching means, and may be, for example, an electromagnetic contactor.
- main winding motors 123A, 123B, 123C, and 123D are provided.
- the driving device 200A when the rated load set based on the power to be output by the main winding motors 123A, 123B, 123C, 123D is 1, each of the main winding motors 123A, 123B, 123C, 123D is 1 / 4 rated capacity.
- These main winding motors 123A, 123B, 123C, and 123D cooperate with each other to move the support frame 128 up and down as a main operation.
- the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, 224A, and 224B have capacities corresponding to the main winding motors 123A, 123B, 123C, and 123D.
- each of the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, 224A, and 224B is connected in parallel to each of the main winding motors 123A, 123B, 123C, and 123D. Yes.
- each of the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, 224A, and 224B is half of the quarter of the capacity of each main winding motor 123A, 123B, 123C, and 123D. 1/8 capacity.
- the main winding converters 211A, 211B, 212A, 212B, 213A, 213B, 214A, 214B have capacities corresponding to the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, 224A, 224B. That is, each of the main winding converters 211A, 211B, 212A, 212B, 213A, 213B, 214A, 214B has a capacity per one of the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, 224A, 224B. Similarly, it has a capacity of 1/8 of the rated load.
- the auxiliary winding converter 215, the auxiliary winding inverter 225, and the auxiliary winding motor 133 have a capacity of 1/8 or less of the rated load.
- the auxiliary winding motor 133 tilts the pan 140 as an auxiliary operation.
- the control device 230 controls the operation of the driving device 200A.
- a method for controlling the driving device 200A by the control device 230 will be described.
- the control device 230 performs main winding motors 123A, 123B, 123C, 123D corresponding to the main winding converters 211A, 211B, 212A, 212B, 213A, 213B, 214A, 214B. Is driven at the rated speed to perform the main operation.
- the main winding converters 211A, 211B, 212A, 212B, 213A, 213B, 214A, 214B and the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, 224A, 224B are controlled.
- the control device 230 controls the auxiliary winding inverter 225 corresponding to the auxiliary winding converter 215 connected to the auxiliary winding motor 133 to drive the auxiliary winding motor 133 to perform the auxiliary operation.
- FIG. 3 is a first diagram illustrating a configuration when the drive device according to the first embodiment has a failure.
- FIG. 3 is a diagram for explaining the operation when one main winding motor 123 fails.
- the control device 230 controls the main winding inverters 221A, 221B, 222A, 222B, 223A, and 223B, and drives the main winding motors 123A, 123B, and 123C in the backup mode.
- the control device 230 is preset with a normal mode during normal operation and a backup mode when one of the main winding motors fails.
- control device 230 backs up the operation modes of the main winding inverters 221A, 221B, 222A, 222B, 223A, and 223B other than the main winding inverters 224A and 224B corresponding to the main winding motor. Switch to mode. Further, control device 230 stops the operation of main winding inverters 224A and 224B corresponding to the failed main winding motor 123D.
- the backup mode refers to an operation mode in which a larger output torque is obtained by suppressing the rotation speed of the main winding motor 123 to be lower than the rated rotation speed at the normal time.
- a motor control method a control method is known in which the magnitude of the back electromotive force is changed by controlling the strength of the magnetic field, and the motor rotation speed is increased or decreased while keeping the motor output constant. It has been.
- the rotation speed is suppressed while maintaining the output of the main winding motor 123 by this field control.
- the rotational speed of the main winding motor 123 decreases by switching to the backup mode, the winding up / down speed by the main winding motors 123A, 123B, 123C becomes slow.
- the output P required for winding up and down can be expressed by the following equation (1).
- P (load W ⁇ winding speed V) ⁇ (constant 6.12 ⁇ mechanical efficiency ⁇ ) ... (1)
- equation (1) it can be seen that the output P required for the main winding motors 123A, 123B, 123C can be reduced when the load W is wound up and down speed V is reduced.
- V be the hoisting and lowering speed when the four main winding motors 123A, 123B, 123C, and 123D are driven at the rated output (driven at the rated rotational speed) in the normal mode.
- the winding up / down speed V is proportional to the rotational speed of the main winding motors 123A, 123B, 123C, 123D.
- the main winding motor 123D breaks down, and the control device 230 switches the operation mode to the backup mode.
- the control device 230 controls the rotation speeds of the main winding motors 123A, 123B, and 123C to 3/4 ⁇ rated rotation speed via the main winding inverters 221A, 221B, 222A, 222B, 223A, and 223B. To do. Thereby, the speed V is also controlled to 3/4. According to the equation (1), if the speed V at which the load W is wound up and down is 3/4, the required output is also 3/4. On the other hand, since the number of main winding motors 123 for winding up and down the load W has decreased from four to three, the total output by the three main winding motors 123A, 123B, 123C is also 3/4.
- the control device 230 sets the remaining main winding motors 123A, 123B, and 123C to 3/4 while maintaining the rated output. If the field control is performed, the three main winding motors 123A, 123B, and 123C can raise and lower the load W while being driven at the rated output.
- the main winding motors 123A, 123B, 123C, and 123D each have a rated capacity that can correspond to the rated load with four units, and the rated capacity is It has the property of reducing the rotation speed while maintaining it. Therefore, for example, even if one of the main winding motors 123 fails, the remaining three units are driven at a reduced rotational speed, thereby reducing the necessary output P and increasing the load W due to the rated load. Can be lowered.
- the drive device 200A is provided with backup means.
- the capacity, cost, and installation space of the equipment of the ladle crane 100 can be reduced.
- the load W is detected using the following method, and the control device 230 obtains the value of the load W, and the predetermined main equation (1) is obtained. Based on the characteristic of the relationship between the rotational speed of the winding motor 123 and the torque, the rotational speed corresponding to the magnitude of the load may be calculated.
- a method for detecting the load W for example, a load meter is provided in the main winding device 122 to detect the load amount, measure the internal torque current value of the main winding inverter 221A, etc., and calculate the load amount from the torque current value.
- a method of measuring a motor current value of an internal or external instrument such as the main winding inverter 221A and calculating a load W from the motor current value may be used.
- FIG. 4 is a second diagram illustrating the configuration when the drive device according to the first embodiment is in a state where a failure has occurred.
- FIG. 4 is a diagram illustrating an operation when one main winding inverter 224B (first main inverter) fails.
- the control device 230 controls the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, and 224A to operate with the overload tolerance.
- the main winding motors 123A, 123B, 123C, and 123D are also driven in an overload state.
- each of the main winding motors 123A, 123B, 123C, and 123D bears an output of P / 4. If the main winding inverter 224B fails, the main winding motor 123D is driven only by the main winding inverter 324A, and the capacity of the inverter corresponding to the main winding motor 123D is halved, so the output of the main winding motor 123D is also halved.
- the control device 230 operates the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, and 224A in an overload state of 8/7.
- the outputs of the main winding motors 123A, 123B, 123C, and 123D also become 8/7 times. More specifically, each of the main winding motors 123A, 123B, and 123C bears 1 ⁇ 4 ⁇ 8/7 of the output P required for winding up and down the load W, and the main winding motor 123D Pay 1/8 x 8/7 minutes of P. Accordingly, the driving device 200A can obtain a necessary output P.
- the control device 230 has an operation time in an overload state, Temperature, current, and the like are monitored, and when each value reaches a predetermined threshold value, the operation in the overload state may be terminated to prevent damage to the device.
- the drive device 200A and the ladle crane 100 of the above-described embodiment even if one main winding inverter 224B breaks down, the remaining seven main winding inverters and four main winding motors 123 are overloaded. By operating, it is possible to obtain the output P necessary for winding up and down the load W. As a result, a spare main winding inverter 224 is provided in preparation for a failure of the main winding inverter 224B, or the capacities of the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, 224A, 224B are increased in capacity in preparation for the failure.
- FIG. 5 is a third diagram showing the configuration when the drive device according to the first embodiment is in a state where a failure has occurred.
- FIG. 5 is a diagram for explaining the operation when one auxiliary winding inverter 225 fails.
- the control device 230 switches the switches 294B and 296 to connect the main winding inverter 224B and the auxiliary winding motor 133.
- Control device 230 controls main winding inverter 224 ⁇ / b> B and drives auxiliary winding motor 133.
- control device 230 operates the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, and 224A in an overload state of 8/7 times as described in FIG.
- the outputs of the main winding motors 123A, 123B, 123C, and 123D are also 8/7 times, and the output P necessary for raising and lowering the load W can be obtained as a whole.
- the control device 230 is arranged so that the operation of the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, 224A and the main winding motors 123A, 123B, 123C, 123D is not prolonged.
- the overload state may be monitored, and the operation in the overload state may be terminated when the operation time in the overload state exceeds a predetermined threshold.
- the output in the overload state is 8/7 times the rated output, and the amount exceeding the rated capacity is relatively small. .
- the time during which an overload state can be continued with an inverter or the like is proportional to the square of the current. If the amount exceeding the rated capacity is small, the operation time in the overload state can be extended. According to the present embodiment, for example, even when the main winding inverter 224B fails, there is a high possibility that the operation in the overload state can be continued for a time that does not cause a problem in operation.
- the main winding inverter 224B is used both for driving the main winding motor 123D and for driving the auxiliary winding motor 133.
- control device 230 outputs parameters for main winding motor 123D to main winding inverter 224B.
- control device 230 outputs parameters for auxiliary winding motor 133 to main winding inverter 224B.
- the main winding inverter 224B operates the main winding motor 123D and the auxiliary winding motor 133 so as to be in an operation state corresponding to the received parameter.
- the control device 230 controls the main winding inverter 224B and drives the auxiliary winding motor 133.
- the control device 230 operates the remaining main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, and 224A in an 8/7 times overload state, and outputs the output P necessary for raising and lowering the load W. obtain.
- auxiliary winding inverter 225 in preparation for failure of the auxiliary winding inverter 225, it is not necessary to provide a spare auxiliary winding inverter, and the cost, the capacity of the device, and the installation space of the driving device 200A and the ladle crane 100 are reduced while providing backup means. It becomes possible.
- auxiliary winding inverter 225 fails, the following measures can be taken. For example, simultaneous driving of the main winding motor 123 and the auxiliary winding motor 133 is prohibited, and only the side operated first can be operated.
- control device 230 switches switches 294B and 296 to connect main winding inverter 224B to main winding motor 123D.
- the control device 230 switches the switches 294B and 296 and connects the main winding inverter 224B to the auxiliary winding motor 133.
- main winding inverter 224B is connected to the auxiliary winding motor 133 side, it is not limited to this.
- Other main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, and 224A may be connected to the auxiliary winding motor 133 side.
- any of the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, 224A, and 224B may be selectively connected to the auxiliary winding motor 133 side.
- a second embodiment of the drive device according to the present invention a crane using the drive device, and a control method of the drive device will be described.
- the drive device shown in the second embodiment, the crane using the drive device, and the drive device control method are different from the drive device 200A of the first embodiment in the main winding converter, main winding inverter, auxiliary winding converter, auxiliary winding. Only the capacity of the inverter is different. Therefore, in the description of the second embodiment, the same portions as those in the first embodiment are denoted by the same reference numerals and redundant description is omitted. That is, the description of the entire configuration of the ladle crane 100 common to the configuration described in the first embodiment is omitted.
- FIG. 6 is a diagram illustrating a configuration of the drive device according to the second embodiment.
- the driving device 200B includes a main winding motor 123A, 123B, 123C, 123D, an auxiliary winding motor 133, main winding converters 311A, 311B, 312A, 312B, 313A, 313B, 314A, 314B, A winding converter 315, main winding inverters 321A, 321B, 322A, 322B, 323A, 323B, 324A, 324B, an auxiliary winding inverter 325, and a control device 230 are provided.
- a main winding inverter 321A is connected to the main winding converter 311A.
- Main winding inverter 321B is connected to main winding converter 311B.
- Main winding inverter 322A is connected to main winding converter 312A.
- Main winding inverter 322B is connected to main winding converter 312B.
- Main winding inverter 323A is connected to main winding converter 313A.
- Main winding inverter 323B is connected to main winding converter 313B.
- Main winding inverter 324A is connected to main winding converter 314A.
- Main winding inverter 324B is connected to main winding converter 314B.
- a pair of main winding inverters 321A and 321B are connected in parallel to the main winding motor 123A.
- Two pairs of main winding inverters 322A and 322B are connected in parallel to the main winding motor 123B.
- Two pairs of main winding inverters 323A and 323B are connected in parallel to the main winding motor 123C.
- Two pairs of main winding inverters 324A and 324B are connected in parallel to the main winding motor 123D.
- One auxiliary winding inverter 325 is connected to the auxiliary winding motor 133.
- the auxiliary winding inverter 325 is connected to the auxiliary winding converter 315.
- each of the main winding motors 123A, 123B, 123C, 123D has a rated capacity of 1/4.
- These main winding motors 123A, 123B, 123C, and 123D cooperate with each other to move the support frame 128 up and down as a main operation.
- each of the main winding inverters 321A, 321B, 322A, 322B, 323A, 323B, 324A, and 324B is equivalent to the main winding inverters 221A, 221B, 222A, 222B, 223A, 223B, 224A, and 224B in the first embodiment. 7 times the capacity.
- the auxiliary winding inverter 325 has a capacity 8/7 times that of the auxiliary winding inverter 225 in the first embodiment.
- Each of the main winding converters 311A, 311B, 312A, 312B, 313A, 313B, 314A, 314B is 8/7 times the main winding converter 211A, 211B, 212A, 212B, 213A, 213B, 214A, 214B in the first embodiment.
- Have a capacity of The auxiliary winding converter 315 has a capacity that is 8/7 times that of the auxiliary winding converter 215 in the first embodiment.
- the main winding inverter 321A and the like and the main winding converter 311A having a capacity 8/7 times that of the first embodiment are selected from among the four main winding motors 123 in the first embodiment. This is because when one unit fails, the main winding inverter 221A, the main winding converter 211A, etc. are operated in an overload state of 8/7 times the rated capacity.
- the control device 230 causes the main winding inverters 321A, 321B, 322A, 322B, 323A, 323B, 324A, 324B and the main winding converters 311A, 311B, 312A.
- 312B, 313A, 313B, 314A, 314B are operated at their rated capacities, and the main winding motors 123A, 123B, 123C are driven in an overload state. Thereby, the rated load W can be wound up and down without placing a burden on the main winding inverter and the main winding converter.
- FIG. 7 is a first diagram illustrating a configuration when a failure has occurred in the drive device according to the second embodiment.
- FIG. 7 is a diagram for explaining the operation when one main inverter 324B fails.
- the control device 230 controls the main winding inverters 321A, 321B, 322A, 322B, 323A, 323B, and 324A to operate at the maximum rated output.
- each of the main winding motors 123A, 123B, 123C, and 123D is driven in an overload state corresponding to 8/7 times the rated output.
- each of the main winding motors 123A, 123B, and 123C outputs 1 ⁇ 4 ⁇ 8/7 of the output P necessary for winding up and down the load W, and the main winding motor 123D outputs the necessary output. Outputs 1/8 ⁇ 8/7 minutes of P. Therefore, even when one main winding inverter 324B fails, the necessary output P can be obtained by the four main winding motors 123A, 123B, 123C, and 123D.
- control device 230 monitors the overload state so that the operation of the main winding motors 123A, 123B, 123C, 123D is not prolonged, and the operation time in the overload state is predetermined. If the threshold value is exceeded, the operation in the overload state may be terminated.
- the main winding inverter 321A having a large capacity exceeding the necessary capacity at the normal time (for example, 8/7 times), etc.
- the main winding converter 311A, etc. By selecting the main winding converter 311A, etc., even if one main winding inverter 224B breaks down, the remaining seven units are operated at the rated output, so that the four main winding motors 123 are operated in an overloaded state. It is possible to obtain the output P necessary for raising and lowering the load W. Thereby, it is not necessary to provide a spare main winding inverter in preparation for failure of the main winding inverter 224B.
- the main winding inverter 321A and the like which are relatively easily damaged electronic devices, and the main winding inverter 321A and the like and the main winding converter 311A and the like are suppressed to the minimum necessary.
- the output of the winding converter 311A or the like can be suppressed within the rated capacity even in the operation at the time of backup.
- FIG. 8 is a third diagram illustrating the configuration when the drive device according to the second embodiment is in a state where a failure has occurred.
- FIG. 8 is a diagram for explaining the operation when one auxiliary winding inverter 325 fails.
- the control device 230 switches the switches 294B and 296 to connect the main winding inverter 324B and the auxiliary winding motor 133.
- Control device 230 controls main winding inverter 324B using parameters for auxiliary winding motor 133, and drives auxiliary winding motor 133.
- control device 230 operates the main winding inverters 321A, 321B, 322A, 322B, 323A, 323B, 324A at the maximum rated output.
- each of the main winding motors 123A, 123B, 123C, and 123D is driven in an overload state corresponding to 8/7 times the rated output.
- Each of the main winding motors 123A, 123B, and 123C bears 1 ⁇ 4 ⁇ 8/7 of the output P necessary for raising and lowering the load W, and the main winding motor 123D is 1 / ⁇ of the necessary output P. Pay 8/7.
- the output P required for winding up and down of the load W can be obtained as a whole.
- the control device 230 controls the main winding inverter 324B and drives the auxiliary winding motor 133. Further, the control device 230 operates the remaining main winding inverters 321A, 321B, 322A, 322B, 323A, 323B, and 324A at the maximum rated output, and obtains an output P necessary for raising and lowering the load W.
- auxiliary winding inverter 325 in preparation for failure of the auxiliary winding inverter 325, it is not necessary to provide a spare auxiliary winding inverter, and the backup device is provided, while the cost of the driving device 200B and the ladle crane 100, the capacity of the equipment, and the installation space are reduced. It becomes possible.
- the main winding inverter 321A and the like having a capacity 8/7 times the required capacity, the main winding converter 311A, and the like are selected.
- the main winding motor 123 also has a required capacity of 8/7. It is good also as a structure which selects the motor with a double capacity
- the present invention is not limited to the above-described embodiment, and the design can be changed without departing from the spirit of the present invention.
- four systems of drive devices are targeted, but the present invention is naturally applicable to a drive device having any number of systems of two or more.
- this invention is the case where one or more inverters fail, one or more motors fail, or one or more The inverter can be expanded so that it can cope with any failure of one or more motors.
- the driving devices 200A to 200B are used for the ladle crane 100, the present invention is not limited to this.
- the drive device 200 can also be used for an overhead crane installed in a factory or a portal crane installed in a harbor or the like, for example.
- a crane using the drive device, and a drive device control method it is possible to reduce the capacity, cost, and installation space of the device.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Automation & Control Theory (AREA)
- Mechanical Engineering (AREA)
- Control And Safety Of Cranes (AREA)
- Control Of Ac Motors In General (AREA)
Abstract
駆動装置は、定格容量の合計が負荷に対応した容量に設定され、連携して主動作を行うための複数の主モータと、格容量の合計が前記主モータの定格容量に対応した容量を定格容量として有する、前記主モータと接続された1つ又は複数の主インバータと、記主インバータを制御する制御装置と、を備え、前記制御装置は、前記複数の主モータの全てを駆動する場合、それぞれの主モータが定格回転速度で駆動するように前記主モータのそれぞれに接続された前記主インバータを制御し、前記複数の主モータのうち一部が故障した場合、残りの主モータそれぞれの回転速度を低減して、前記負荷を低減するとともに、前記残りの主モータそれぞれの出力が回転速度を低減する前と同じ容量となるよう、前記主インバータを制御する。
Description
この発明は、駆動装置、クレーン、及び駆動装置の制御方法に関する。
製鉄所では、溶鋼、溶鉄等を鍋に入れて移動させるためのクレーンとして、レードルクレーンを用いる。このようなレードルクレーンは、鍋を吊り込む主巻装置と、鍋を傾動させる補巻装置とを備えている。レードルクレーンにおける主巻装置や補巻装置の駆動制御には、サイリスタ制御やリアクトル制御を用いている。近年では、機器手配の困難性や価格高騰を理由として、駆動制御に、汎用性が高く、より安価なインバータ制御の採用が進んでいる。
インバータ制御により駆動されるレードルクレーンが駆動装置のインバータやモータの故障によって停止した場合、製鉄所のラインを停止させる必要がある。さらに、クレーン本体への熱の影響により他の機器が破損する可能性がある。
そこで、故障発生時でもレードルクレーンを継続して運転可能とするバックアップ手段が必要である。
そこで、故障発生時でもレードルクレーンを継続して運転可能とするバックアップ手段が必要である。
例えば、特許文献1には、故障したインバータを予備のインバータで代替する技術が開示されている。また、例えば、複数台のインバータやモータを備えた駆動装置において、インバータ及びモータ1台あたりの容量を、複数のうちの1台が故障した場合でも通常運転できる値で選定し故障発生時に備えるという方法が考えられる。
しかしながら、特許文献1のような技術では、予備のインバータを設ける必要がある。したがって、機器台数が増加し、コスト、設置スペースの増大等を招く。また、1台が故障しても他のインバータやモータで容量を賄えるように、容量の大きなインバータを選定する方法では、機器の容量、コスト、設置スペースの増大を招く。
この発明は、機器の容量、コスト、設置スペースの低減を図ることのできる駆動装置、クレーン、及び駆動装置の制御方法を提供することを目的とする。
この発明は、機器の容量、コスト、設置スペースの低減を図ることのできる駆動装置、クレーン、及び駆動装置の制御方法を提供することを目的とする。
本発明の第一の態様によれば、駆動装置は、定格容量の合計が負荷に対応した容量に設定され、連携して主動作を行うための複数の主モータと、定格容量の合計が前記主モータの定格容量に対応した容量に設定された、前記主モータと接続された1つ又は複数の主インバータと、前記主インバータを制御する制御装置と、を備え、前記制御装置は、前記複数の主モータの全てを駆動する場合、それぞれの主モータが定格回転速度で駆動するように前記主モータのそれぞれに接続された前記主インバータを制御し、前記複数の主モータのうち一部が故障した場合、残りの主モータそれぞれの回転速度を低減して、前記負荷を低減するとともに、当該残りの主モータそれぞれの出力が回転速度を低減する前と同じ値となるよう、前記主インバータを制御する。
本発明の第二の態様によれば、前記制御装置は、前記複数の主モータのうち一部が故障した場合、前記負荷の大きさを示す値を取得し、当該負荷の大きさに応じて、前記残りの主モータそれぞれの回転速度を算出するようにしてもよい。
本発明の第三の態様によれば、前記制御装置は、前記複数の主モータに接続された主インバータのうちの一部が故障した場合、残りの主インバータそれぞれの出力が、当該各主インバータの定格容量に、前記故障前と同じ出力を行った場合における、前記残りの主インバータの全てによる出力に対する、故障した分を含む全ての前記主インバータによる出力の割合、を乗じた値となるよう、前記残りの各主インバータを稼働するようにしてもよい。
本発明の第四の態様によれば、前記主インバータのそれぞれは、前記主インバータを所定の数だけ減じた場合の全ての前記主インバータによる出力に対する、減じる前の全ての前記主インバータによる出力の割合、を前記主モータの定格容量に対応した容量、に乗じた値を定格容量として有するようにしてもよい。
本発明の第五の態様によれば、前記主インバータは、前記主モータ1つに対して少なくとも2つ並列に接続されているようにしてもよい。
本発明の第六の態様によれば、前記駆動装置は、補動作を行うための補モータと、前記補モータの定格容量に対応した容量を定格容量として有する、前記補モータと接続された補インバータと、をさらに備え、前記主インバータのうちの一つである第一主インバータは、当該主モータに接続された前記主モータの他に、前記補モータと切り替え可能な切替部を介して接続され、前記制御装置は、前記補インバータが故障した場合、前記切替部により、前記第一主インバータを、前記切替部を介して前記補モータと接続させ、前記第一主インバータを介して前記補モータを駆動するようにしてもよい。
本発明の第七の態様によれば、クレーンは、第一から第六態様の何れか一つの駆動装置と、前記駆動装置により駆動する主巻装置と、前記駆動装置により駆動する補巻装置と、を備える。
本発明の第八の態様によれば、駆動装置の制御方法は、定格容量の合計が負荷に対応した容量に設定され、連携して主動作を行うための複数の主モータと、定格容量の合計が前記主モータの定格容量に対応した容量に設定された、前記主モータと接続された1つ又は複数の主インバータと、前記主インバータを制御する制御装置と、を備えた駆動装置の制御方法であって、前記制御装置は、前記複数の主モータの全てを駆動する場合、それぞれの主モータが定格回転速度で駆動するように前記主モータのそれぞれに接続された前記主インバータを制御し、前記複数の主モータのうち一部が故障した場合、残りの主モータそれぞれの回転速度を低減して、前記負荷を低減するとともに、当該残りの主モータそれぞれの出力が回転速度を低減する前と同じ値となるよう、前記主インバータを制御する。
上述した駆動装置、クレーン、及び駆動装置の制御方法によれば、機器の容量、コスト、設置スペースの低減を図ることが可能となる。
(第1実施形態)
図1Aは、この発明の第1実施形態におけるレードルクレーンの構造を概略的に示す平面図である。図1Bは、この発明の第1実施形態におけるレードルクレーンの構造を概略的に示す側面図である。
図1Aに示すように、レードルクレーン100は、ガータ111と、主トロリ121と、補トロリ131と、を備えている。
ガータ111は、水平方向に延びる互いに平行に設けられた二本一対の走行レール110上を走行移動可能である。ガータ111は、主横行レール120と、補横行レール130と、を備えている。主横行レール120、補横行レール130は、それぞれ二本一対で、走行レール110と直交する水平方向に延びている。
図1Aは、この発明の第1実施形態におけるレードルクレーンの構造を概略的に示す平面図である。図1Bは、この発明の第1実施形態におけるレードルクレーンの構造を概略的に示す側面図である。
図1Aに示すように、レードルクレーン100は、ガータ111と、主トロリ121と、補トロリ131と、を備えている。
ガータ111は、水平方向に延びる互いに平行に設けられた二本一対の走行レール110上を走行移動可能である。ガータ111は、主横行レール120と、補横行レール130と、を備えている。主横行レール120、補横行レール130は、それぞれ二本一対で、走行レール110と直交する水平方向に延びている。
主トロリ121は、ガータ111に設けられた主横行レール120上で走行移動可能に設けられている。
主トロリ121は、鍋140を吊り込むための主巻装置122を備える。
主トロリ121は、鍋140を吊り込むための主巻装置122を備える。
主巻装置122は、主巻モータ(主モータ)123と、減速機124と、ワイヤドラム125と、支持フレーム128と、を備える。主巻モータ123は、後述する駆動装置200Aにより駆動される。減速機124は、主巻モータ123の出力軸に連結されている。減速機124は、主巻モータ123の回転を所定の減速比で減速して出力する。
ワイヤドラム125は、減速機124を介して主巻モータ123により回転駆動される。ワイヤドラム125には、ワイヤ126が巻き回されている。ワイヤドラム125を回転させることにより、ワイヤ126が繰出し、または巻き取られる。この実施形態では、主巻モータ123が4組、ワイヤドラム125が2組設けられている。それぞれの主巻モータ123は、減速機124を介してそれぞれ対応したワイヤドラム125を回転させ、1本ずつのワイヤ126の繰出し・巻取りを駆動する。これにより、支持フレーム128に吊下された鍋140が上下動される。
それぞれのワイヤ126の先端は、支持フレーム128に連結されている。支持フレーム128は、一対のフック127を介して鍋140を吊り下げている。鍋140は、その外周面に一対の支持部141を有している。支持部141は、フック127に支持されている。これにより、鍋140は、フック127に支持された支持部141を中心として揺動可能に支持されている。
補トロリ131は、ガータ111に設けられた補横行レール130上で走行移動可能に設けられている。補トロリ131は、鍋140を傾動させるための補巻装置132を備える。
補巻装置132は、補トロリ131上に設けられた補巻モータ(補モータ)133と、ワイヤドラム135と、を備える。
補巻装置132は、補トロリ131上に設けられた補巻モータ(補モータ)133と、ワイヤドラム135と、を備える。
補巻モータ133は、後述する駆動装置200Aにより駆動される。ワイヤドラム135は、補巻モータ133により回転駆動される。ワイヤドラム135には、ワイヤ136が巻き回されている。ワイヤドラム135を回転させることにより、ワイヤ136が繰出し、または巻き取られる。ワイヤ136は、先端にフック137を備えている。このフック137を鍋140に係止し、補巻モータ133でワイヤドラム135を巻き取ることによって、鍋140を傾動させることができる。
図2は、第1実施形態における駆動装置の構成を示す図である。
ここで、図2に示すように、この実施形態の駆動装置200Aは、主巻モータ123を4組備えている。これら主巻モータ123を区別するため、主巻モータ(主モータ)123A,123B,123C,123Dと称する。
ここで、図2に示すように、この実施形態の駆動装置200Aは、主巻モータ123を4組備えている。これら主巻モータ123を区別するため、主巻モータ(主モータ)123A,123B,123C,123Dと称する。
図2に示すように、駆動装置200Aは、主巻モータ123A,123B,123C,123Dと、補巻モータ133と、主巻コンバータ211A,211B,212A,212B,213A,213B,214A、214Bと、補巻コンバータ215と、主巻インバータ(主インバータ)221A,221B,222A,222B,223A,223B,224A,224Bと、補巻インバータ(補インバータ)225と、制御装置(制御部)230と、を備えている。
主巻コンバータ211Aには、主巻インバータ221Aが接続されている。主巻コンバータ211Bには、主巻インバータ221Bが接続されている。主巻コンバータ212Aには、主巻インバータ222Aが接続されている。主巻コンバータ212Bには、主巻インバータ222Bが接続されている。主巻コンバータ213Aには、主巻インバータ223Aが接続されている。主巻コンバータ213Bには、主巻インバータ223Bが接続されている。主巻コンバータ214Aには、主巻インバータ224Aが接続されている。主巻コンバータ214Bには、主巻インバータ224Bが接続されている。
主巻モータ123A,123B,123C,123Dのそれぞれには、主巻インバータ221A,221B,222A,222B,223A,223B,224A,224Bが二個一対で並列に接続されている。すなわち、主巻モータ123Aには、二個一対の主巻インバータ221A,221Bが並列接続されている。主巻モータ123Bには、二個一対の主巻インバータ222A,222Bが並列接続されている。主巻モータ123Cには、二個一対の主巻インバータ223A,223Bが並列接続されている。主巻モータ123Dには、二個一対の主巻インバータ224A,224Bが並列接続されている。
補巻モータ133には、1個の補巻インバータ225が接続されている。この補巻インバータ225は、補巻コンバータ215に接続されている。これにより、補巻インバータ225は、補巻コンバータ215から直流電流の供給を受け、補巻モータ133を駆動する。
主巻インバータ221A,221B,222A,222B,223A,223B,224A,224B、補巻インバータ225のそれぞれと、主巻モータ123A,123B,123C,123D、補巻モータ133との間には、切替器(切替部)291A,291B,292A,292B,293A,293B,294A,294B、295、296が設けられている。これら切替器291A,291B,292A,292B,293A,293B,294A,294B、295により、主巻インバータ221A,221B,222A,222B,223A,223B,224A,224B、補巻インバータ225と、主巻モータ123A,123B,123C,123D、補巻モータ133とを断続できる。また、切替器296により、主巻インバータ224Bと補巻モータ133とを断続できる。
切替器291A,291B,292A,292B,293A,293B,294A,294B、295、296は、任意の接続切り替え手段であってよく、例えば、電磁接触器であってもよい。
切替器291A,291B,292A,292B,293A,293B,294A,294B、295、296は、任意の接続切り替え手段であってよく、例えば、電磁接触器であってもよい。
この実施形態において、4台の主巻モータ123A,123B,123C,123Dが設けられている。駆動装置200Aにおいて、主巻モータ123A,123B,123C,123Dによって出力すべき動力に基づいて設定された定格負荷を1とした場合、主巻モータ123A,123B,123C,123Dのそれぞれは、1/4の定格容量を有している。これらの主巻モータ123A,123B,123C,123Dは、4台で連携して、主動作として、支持フレーム128を昇降動作させる。
また、主巻インバータ221A,221B,222A,222B,223A,223B,224A,224Bは、各主巻モータ123A,123B,123C,123Dと対応した容量を有する。この実施形態では、主巻インバータ221A,221B,222A,222B,223A,223B,224A,224Bのそれぞれは、主巻モータ123A,123B,123C,123Dのそれぞれに対し、2個一対で並列接続されている。したがって、主巻インバータ221A,221B,222A,222B,223A,223B,224A,224Bのそれぞれは、各主巻モータ123A,123B,123C,123Dの1台当たりの容量である1/4に対して半分の1/8の容量を有している。
主巻コンバータ211A,211B,212A,212B,213A,213B,214A,214Bは、各主巻インバータ221A,221B,222A,222B,223A,223B,224A,224Bと対応した容量を有している。つまり、主巻コンバータ211A,211B,212A,212B,213A,213B,214A,214Bのそれぞれは、各主巻インバータ221A,221B,222A,222B,223A,223B,224A,224Bの一つ当たりの容量と同じく定格負荷の1/8の容量を有している。
補巻コンバータ215、補巻インバータ225、補巻モータ133は、定格負荷の1/8以下の容量を有している。補巻モータ133は、補動作として鍋140を傾動させる。
制御装置230は、駆動装置200Aの動作を制御する。
以下、制御装置230による駆動装置200Aの制御方法について説明する。
まず、図2に示すように、通常運転状態において、制御装置230は、主巻コンバータ211A,211B,212A,212B,213A,213B,214A,214Bと対応する主巻モータ123A,123B,123C,123Dを定格回転速度で駆動させ、主動作を行う。これには、主巻コンバータ211A,211B,212A,212B,213A,213B,214A,214Bと対応する主巻インバータ221A,221B,222A,222B,223A,223B,224A,224Bを制御する。
また、制御装置230は、補巻モータ133と接続された補巻コンバータ215に対応する補巻インバータ225を制御し、補巻モータ133を駆動させ、補動作を行う。
以下、制御装置230による駆動装置200Aの制御方法について説明する。
まず、図2に示すように、通常運転状態において、制御装置230は、主巻コンバータ211A,211B,212A,212B,213A,213B,214A,214Bと対応する主巻モータ123A,123B,123C,123Dを定格回転速度で駆動させ、主動作を行う。これには、主巻コンバータ211A,211B,212A,212B,213A,213B,214A,214Bと対応する主巻インバータ221A,221B,222A,222B,223A,223B,224A,224Bを制御する。
また、制御装置230は、補巻モータ133と接続された補巻コンバータ215に対応する補巻インバータ225を制御し、補巻モータ133を駆動させ、補動作を行う。
図3は、第1実施形態における駆動装置に故障が生じた状態にあるときの構成を示す第一の図である。
図3は、主巻モータ123が1台故障した場合の動作について説明する図である。例えば、主巻モータ123Dが故障した場合、制御装置230は、主巻インバータ221A,221B,222A,222B,223A,223Bを制御し,主巻モータ123A,123B,123Cをバックアップモードで駆動させる。制御装置230には、予め通常運転時の通常モードと主巻モータの1台が故障したときのバックアップモードとが設定されている。制御装置230は、例えば主巻モータ123Dが故障した場合、その主巻モータに対応する主巻インバータ224A、224Bの以外の主巻インバータ221A、221B、222A、222B、223A、223Bの動作モードをバックアップモードに切り替える。また、制御装置230は、故障した主巻モータ123Dに対応する主巻インバータ224A,224Bの動作を停止する。
図3は、主巻モータ123が1台故障した場合の動作について説明する図である。例えば、主巻モータ123Dが故障した場合、制御装置230は、主巻インバータ221A,221B,222A,222B,223A,223Bを制御し,主巻モータ123A,123B,123Cをバックアップモードで駆動させる。制御装置230には、予め通常運転時の通常モードと主巻モータの1台が故障したときのバックアップモードとが設定されている。制御装置230は、例えば主巻モータ123Dが故障した場合、その主巻モータに対応する主巻インバータ224A、224Bの以外の主巻インバータ221A、221B、222A、222B、223A、223Bの動作モードをバックアップモードに切り替える。また、制御装置230は、故障した主巻モータ123Dに対応する主巻インバータ224A,224Bの動作を停止する。
ここで、バックアップモードとは、主巻モータ123の回転速度を通常時の定格回転速度に比べ低く抑えることによってより大きい出力トルクを得る動作モードのことをいう。モータの制御方法として、界磁の強弱を制御することで逆起電力の大小を変化させ、モータの出力を一定に保ちつつ、モータの回転速度を増加させたり、減少させたりする制御方法が知られている。バックアップモードでは、この界磁制御によって主巻モータ123の出力を維持しつつ回転速度を抑える。バックアップモードに切り替えることによって、主巻モータ123の回転速度が減少すると、主巻モータ123A,123B,123Cによる巻き上下げ速度が遅くなる。巻き上下げに必要な出力Pは、以下の式(1)で表すことができる。
P=(荷重W × 巻き上下げ速度V)÷(定数6.12×機械効率η)
・・・(1)
式(1)によれば、荷重Wを巻き上下げ速度Vが小さくなると、主巻モータ123A,123B,123Cに必要な出力Pを小さくすることができることがわかる。
P=(荷重W × 巻き上下げ速度V)÷(定数6.12×機械効率η)
・・・(1)
式(1)によれば、荷重Wを巻き上下げ速度Vが小さくなると、主巻モータ123A,123B,123Cに必要な出力Pを小さくすることができることがわかる。
例えば、通常モードで4台の主巻モータ123A、123B、123C、123Dが定格出力で駆動(定格回転速度で駆動)したときの巻き上下げ速度をVとする。また、巻き上下げ速度Vは、主巻モータ123A、123B、123C、123Dの回転速度に比例するものとする。主巻モータ123Dが故障し、制御装置230が動作モードをバックアップモードに切り替る。具体的には、制御装置230は、各主巻インバータ221A,221B,222A,222B,223A,223Bを介して,主巻モータ123A、123B、123Cの回転速度を3/4×定格回転速度に制御する。これにより、速度Vも3/4に制御される。式(1)により、荷重Wを巻き上下げする速度Vが3/4になれば必要な出力も3/4になる。一方、荷重Wを巻き上下げする主巻モータ123の数も4台から3台に減少したため、3台の主巻モータ123A、123B、123Cによる合計出力も3/4になる。従って、4台中1台の主巻モータ123が故障した場合であっても、制御装置230が、残りの主巻モータ123A、123B、123Cを定格出力を維持したまま回転速度を3/4にする界磁制御を行えば、3台の主巻モータ123A、123B、123Cは、定格出力で駆動したまま、荷重Wの巻き上下げを行うことができる。
上述した実施形態の駆動装置200A、レードルクレーン100によれば、主巻モータ123A,123B,123C,123Dは、4台で定格負荷に対応可能な定格容量をそれぞれ有しており、その定格容量を維持したまま回転速度を減じる性質を有している。従って、例えば、主巻モータ123のうち1台が故障しても、残りの3台の回転速度を低減して駆動することで、必要な出力Pも低減させ、定格負荷による荷重Wの巻き上下げを行うことができる。それにより、主巻モータ123の故障に備え予備用の主巻モータを備えたり、主巻モータ123の容量を故障に備えて大容量にしたりする必要が無く、バックアップ手段を備えつつ、駆動装置200Aおよびレードルクレーン100の機器の容量、コスト、設置スペースの低減を図ることが可能となる。
なお、速度低減量をできる限り小さくするために以下のような方法を用いて荷重Wを検出し、制御装置230が、その荷重Wの値を取得し、式(1)と予め定められた主巻モータ123の回転速度とトルクの関係の特性に基づいて、負荷の大きさに応じた回転速度を算出するようにしてもよい。荷重Wの検出方法としては、例えば、主巻装置122に荷重計を設け、荷重量を検出したり、主巻インバータ221Aなどの内部のトルク電流値を計測し、トルク電流値から荷重量を演算したり、主巻インバータ221Aなどの内部もしくは外部計器のモータ電流値を計測し、モータ電流値から荷重Wを演算したりする方法などでもよい。
図4は、第1実施形態における駆動装置に故障が生じた状態にあるときの構成を示す第二の図である。
図4は、1台の主巻インバータ224B(第一主インバータ)が故障した場合の動作について説明する図である。例えば、主巻インバータ224Bが故障した場合、制御装置230は、主巻インバータ221A,221B,222A,222B,223A,223B、224Aを過負荷耐性量で動作するよう制御する。これにより主巻モータ123A,123B,123C,123Dも過負荷状態で駆動する。荷重Wの巻き上下げに必要な出力をPとすると、通常運転時は、主巻モータ123A,123B,123C,123Dのそれぞれは、P/4の出力分を負担する。主巻インバータ224Bが故障すると、主巻モータ123Dを主巻インバータ324Aだけで駆動することとなり主巻モータ123Dに対応するインバータの容量が1/2となるため、主巻モータ123Dの出力も半減しP/8となる。制御装置230は、主巻インバータ221A,221B,222A,222B,223A,223B、224Aを8/7倍の過負荷状態で稼働させる。これにより、主巻モータ123A,123B,123C,123Dのそれぞれの出力も8/7倍となる。より詳細には、主巻モータ123A,123B,123Cのそれぞれは、荷重Wの巻き上下げに必要な出力Pの1/4×8/7分を負担し、主巻モータ123Dは、必要な出力Pの1/8×8/7分を負担する。これにより、駆動装置200Aは、必要な出力Pを得ることができる。
図4は、1台の主巻インバータ224B(第一主インバータ)が故障した場合の動作について説明する図である。例えば、主巻インバータ224Bが故障した場合、制御装置230は、主巻インバータ221A,221B,222A,222B,223A,223B、224Aを過負荷耐性量で動作するよう制御する。これにより主巻モータ123A,123B,123C,123Dも過負荷状態で駆動する。荷重Wの巻き上下げに必要な出力をPとすると、通常運転時は、主巻モータ123A,123B,123C,123Dのそれぞれは、P/4の出力分を負担する。主巻インバータ224Bが故障すると、主巻モータ123Dを主巻インバータ324Aだけで駆動することとなり主巻モータ123Dに対応するインバータの容量が1/2となるため、主巻モータ123Dの出力も半減しP/8となる。制御装置230は、主巻インバータ221A,221B,222A,222B,223A,223B、224Aを8/7倍の過負荷状態で稼働させる。これにより、主巻モータ123A,123B,123C,123Dのそれぞれの出力も8/7倍となる。より詳細には、主巻モータ123A,123B,123Cのそれぞれは、荷重Wの巻き上下げに必要な出力Pの1/4×8/7分を負担し、主巻モータ123Dは、必要な出力Pの1/8×8/7分を負担する。これにより、駆動装置200Aは、必要な出力Pを得ることができる。
しかしながら、このようにして主巻インバータ221A,221B,222A,222B,223A,223B、224A及び主巻モータ123A,123B,123C,123Dを過負荷状態で稼動させる場合には、通常、熱の発生などにより、その運転時間に制限が生じる。そこで、主巻インバータ221A,221B,222A,222B,223A,223B、224A及び主巻モータ123の仕様範囲内での過負荷運転となるように、制御装置230は、過負荷状態での運転時間、温度、電流などを監視し、それぞれの値が所定の閾値に達した場合、過負荷状態での運転を終了させ、機器の損傷を防止するようにしてもよい。
上述した実施形態の駆動装置200A、レードルクレーン100によれば、1台の主巻インバータ224Bが故障しても、残りの7台の主巻インバータ及び4台の主巻モータ123を過負荷状態で稼働することで、荷重Wの巻き上下げに必要な出力Pを得ることができる。これにより、主巻インバータ224Bの故障に備え予備用の主巻インバータ224を備えたり、主巻インバータ221A,221B,222A,222B,223A,223B、224A、224Bの容量を故障に備えて大容量にしたりする必要が無く、バックアップ手段を備えつつ、駆動装置200Aおよびレードルクレーン100の機器の容量、コスト、設置スペースの低減を図ることが可能となる。
なお、主巻インバータ224Bが故障した場合を例に説明を行ったが、主巻コンバータ214Bが故障した場合も同様のバックアップ手段を適用することができる。
なお、主巻インバータ224Bが故障した場合を例に説明を行ったが、主巻コンバータ214Bが故障した場合も同様のバックアップ手段を適用することができる。
図5は、第1実施形態における駆動装置に故障が生じた状態にあるときの構成を示す第三の図である。
図5は、1台の補巻インバータ225が故障した場合の動作について説明する図である。例えば、補巻インバータ225が故障した場合、制御装置230は、切替器294B、296を切り替え、主巻インバータ224Bと補巻モータ133とを接続する。制御装置230は、主巻インバータ224Bを制御し、補巻モータ133を駆動する。また、制御装置230は、主巻インバータ221A,221B,222A,222B,223A,223B、224Aを図4で説明したのと同様に8/7倍の過負荷状態で稼働させる。これにより、主巻モータ123A,123B,123C,123Dのそれぞれの出力も8/7倍となり、全体で荷重Wの巻き上下げに必要な出力Pを得ることができる。
なおこの場合も、主巻インバータ221A,221B,222A,222B,223A,223B、224A及び主巻モータ123A,123B,123C,123Dの過負荷状態での稼働が長引かないように、制御装置230は、過負荷状態を監視し、過負荷状態での稼働時間などが所定の閾値を超えると、過負荷状態での運転を終了させるようにしてもよい。本実施形態の場合、主巻モータ123に対し2台の主巻インバータを備えるため、過負荷状態における出力は、定格出力の8/7倍であって、定格容量を超過する量が比較的少ない。一般にインバータ等で過負荷状態を続けられる時間は、電流の2乗に比例する。定格容量を超過する量が少なければ、過負荷状態での稼働時間を長く取ることができる。本実施形態によれば、例えば、主巻インバータ224Bが故障した場合であっても、運用上問題とならない時間だけ過負荷状態での運転を続けられる可能性が高い。
図5は、1台の補巻インバータ225が故障した場合の動作について説明する図である。例えば、補巻インバータ225が故障した場合、制御装置230は、切替器294B、296を切り替え、主巻インバータ224Bと補巻モータ133とを接続する。制御装置230は、主巻インバータ224Bを制御し、補巻モータ133を駆動する。また、制御装置230は、主巻インバータ221A,221B,222A,222B,223A,223B、224Aを図4で説明したのと同様に8/7倍の過負荷状態で稼働させる。これにより、主巻モータ123A,123B,123C,123Dのそれぞれの出力も8/7倍となり、全体で荷重Wの巻き上下げに必要な出力Pを得ることができる。
なおこの場合も、主巻インバータ221A,221B,222A,222B,223A,223B、224A及び主巻モータ123A,123B,123C,123Dの過負荷状態での稼働が長引かないように、制御装置230は、過負荷状態を監視し、過負荷状態での稼働時間などが所定の閾値を超えると、過負荷状態での運転を終了させるようにしてもよい。本実施形態の場合、主巻モータ123に対し2台の主巻インバータを備えるため、過負荷状態における出力は、定格出力の8/7倍であって、定格容量を超過する量が比較的少ない。一般にインバータ等で過負荷状態を続けられる時間は、電流の2乗に比例する。定格容量を超過する量が少なければ、過負荷状態での稼働時間を長く取ることができる。本実施形態によれば、例えば、主巻インバータ224Bが故障した場合であっても、運用上問題とならない時間だけ過負荷状態での運転を続けられる可能性が高い。
このようにして、主巻インバータ224Bは、主巻モータ123Dの駆動用と、補巻モータ133の駆動用とで兼用される。制御装置230は、主巻インバータ224Bが主巻モータ123Dを駆動する場合には、主巻モータ123D用のパラメータを主巻インバータ224Bに出力する。制御装置230は、主巻インバータ224Bが補巻モータ133を駆動する場合には、補巻モータ133用のパラメータを主巻インバータ224Bに出力する。主巻インバータ224Bは、受け取ったパラメータに対応する運転状態となるように、主巻モータ123D、補巻モータ133をそれぞれ稼動させる。
上述した実施形態の駆動装置200A、レードルクレーン100によれば、補巻インバータ225が故障した場合、制御装置230は、主巻インバータ224Bを制御し、補巻モータ133を駆動する。また、制御装置230は、残りの主巻インバータ221A,221B,222A,222B,223A,223B、224Aを8/7倍の過負荷状態で稼働させ、荷重Wの巻き上下げに必要な出力Pを得る。これにより、補巻インバータ225の故障に備え、予備用の補巻インバータを備える必要が無く、バックアップ手段を備えつつ、駆動装置200Aおよびレードルクレーン100のコスト、機器の容量、設置スペースの低減を図ることが可能となる。
なお、補巻インバータ225の故障時には、以下のような対応をすることも可能である。例えば、主巻モータ123と補巻モータ133の同時駆動を禁止し、先に操作した側のみ運転可能とする。制御装置230は、主巻モータ123が先に駆動された場合、切替器294B、296を切り替え、主巻インバータ224Bを主巻モータ123Dに接続する。制御装置230は、補巻モータ133が先に駆動された場合、切替器294B、296を切り替え、主巻インバータ224Bを補巻モータ133に接続する。
なお、主巻インバータ224Bを補巻モータ133側に接続するようにしたが、これに限るものではない。他の主巻インバータ221A,221B,222A,222B,223A,223B,224Aを、補巻モータ133側に接続してもよい。さらには、主巻インバータ221A,221B,222A,222B,223A,223B,224A,224Bのうちの何れかを、補巻モータ133側に対して選択的に接続できるようにしてもよい。
(第2実施形態)
次に、この発明にかかる駆動装置、およびそれを用いたクレーン、駆動装置の制御方法の第2実施形態について説明する。この第2実施形態で示す駆動装置、およびそれを用いたクレーン、駆動装置の制御方法は、第1実施形態の駆動装置200Aに対して、主巻コンバータ、主巻インバータ、補巻コンバータ、補巻インバータの容量だけが異なるのみである。したがって、第2実施形態の説明においては、第1実施形態と同一部分に同一符号を付して説明するとともに重複説明を省略する。つまり、第1実施形態で説明した構成と共通するレードルクレーン100の全体構成については、その説明を省略する。
次に、この発明にかかる駆動装置、およびそれを用いたクレーン、駆動装置の制御方法の第2実施形態について説明する。この第2実施形態で示す駆動装置、およびそれを用いたクレーン、駆動装置の制御方法は、第1実施形態の駆動装置200Aに対して、主巻コンバータ、主巻インバータ、補巻コンバータ、補巻インバータの容量だけが異なるのみである。したがって、第2実施形態の説明においては、第1実施形態と同一部分に同一符号を付して説明するとともに重複説明を省略する。つまり、第1実施形態で説明した構成と共通するレードルクレーン100の全体構成については、その説明を省略する。
図6は、第2実施形態における駆動装置の構成を示す図である。
図6に示すように、駆動装置200Bは、主巻モータ123A,123B,123C,123Dと、補巻モータ133と、主巻コンバータ311A,311B,312A,312B,313A,313B,314A,314B、補巻コンバータ315と、主巻インバータ321A,321B,322A,322B,323A,323B,324A,324Bと、補巻インバータ325と、制御装置230と、を備えている。
図6に示すように、駆動装置200Bは、主巻モータ123A,123B,123C,123Dと、補巻モータ133と、主巻コンバータ311A,311B,312A,312B,313A,313B,314A,314B、補巻コンバータ315と、主巻インバータ321A,321B,322A,322B,323A,323B,324A,324Bと、補巻インバータ325と、制御装置230と、を備えている。
主巻コンバータ311Aには、主巻インバータ321Aが接続されている。主巻コンバータ311Bには、主巻インバータ321Bが接続されている。主巻コンバータ312Aには、主巻インバータ322Aが接続されている。主巻コンバータ312Bには、主巻インバータ322Bが接続されている。主巻コンバータ313Aには、主巻インバータ323Aが接続されている。主巻コンバータ313Bには、主巻インバータ323Bが接続されている。主巻コンバータ314Aには、主巻インバータ324Aが接続されている。主巻コンバータ314Bには、主巻インバータ324Bが接続されている。
主巻モータ123Aには、二個一対の主巻インバータ321A,321Bが並列接続されている。主巻モータ123Bには、二個一対の主巻インバータ322A,322Bが並列接続されている。主巻モータ123Cには、二個一対の主巻インバータ323A,323Bが並列接続されている。主巻モータ123Dには、二個一対の主巻インバータ324A,324Bが並列接続されている。
補巻モータ133には、1個の補巻インバータ325が接続されている。この補巻インバータ325は、補巻コンバータ315に接続されている。
主巻インバータ321A,321B,322A,322B,323A,323B,324A,324B、補巻インバータ325のそれぞれと、主巻モータ123A,123B,123C,123D、補巻モータ133との間には、切替器291A,291B,292A,292B,293A,293B,294A,294B、295、296が設けられている。
この実施形態において、定格負荷を1とした場合、主巻モータ123A,123B,123C,123Dのそれぞれは、1/4の定格容量を有している。これらの主巻モータ123A,123B,123C,123Dは、4台で連携して、主動作として、支持フレーム128を昇降動作させる。
また、主巻インバータ321A,321B,322A,322B,323A,323B,324A,324Bのそれぞれは、第1実施形態における主巻インバータ221A,221B,222A,222B,223A,223B,224A,224Bの8/7倍の容量を有している。
補巻インバータ325は、第1実施形態における補巻インバータ225の8/7倍の容量を有している。
補巻インバータ325は、第1実施形態における補巻インバータ225の8/7倍の容量を有している。
主巻コンバータ311A,311B,312A,312B,313A,313B,314A,314Bのそれぞれは、第1実施形態における主巻コンバータ211A,211B,212A,212B,213A,213B,214A,214Bの8/7倍の容量を有している。
補巻コンバータ315は、第一実施形態における補巻コンバータ215の8/7倍の容量を有している。
補巻コンバータ315は、第一実施形態における補巻コンバータ215の8/7倍の容量を有している。
第2実施形態において、第1実施形態の8/7倍の容量を有する主巻インバータ321A等,主巻コンバータ311A等を選定するのは、第1実施形態において4台の主巻モータ123のうち1台が故障したときに、主巻インバータ221A等,主巻コンバータ211A等を定格容量の8/7倍の過負荷状態で稼働したことによる。第2実施形態においては、例えば、主巻モータ123Dが故障した場合、制御装置230は、主巻インバータ321A,321B,322A,322B,323A,323B,324A,324B及び主巻コンバータ311A,311B,312A,312B,313A,313B,314A,314Bのそれぞれを定格容量で稼働し、主巻モータ123A,123B,123Cを過負荷状態で駆動する。これにより、主巻インバータ及び主巻コンバータに負担をかけることなく、定格負荷Wの巻き上下げを行うことができる。
図7は、第2実施形態における駆動装置に故障が生じた状態にあるときの構成を示す第一の図である。
図7は、1台の主巻インバータ324Bが故障した場合の動作について説明する図である。例えば、主巻インバータ324Bが故障した場合、制御装置230は、主巻インバータ321A,321B,322A,322B,323A,323B、324Aを最大定格出力で動作するよう制御する。これにより、主巻モータ123A,123B,123C,123Dのそれぞれは、定格出力の8/7倍に相当する過負荷状態で駆動する。より詳細には、主巻モータ123A,123B,123Cのそれぞれは、荷重Wの巻き上下げに必要な出力Pの1/4×8/7分を出力し、主巻モータ123Dは、必要な出力Pの1/8×8/7分を出力する。従って、1台の主巻インバータ324Bが故障した場合でも、4台の主巻モータ123A、123B、123C、123Dによって、必要な出力Pを得ることができる。
図7は、1台の主巻インバータ324Bが故障した場合の動作について説明する図である。例えば、主巻インバータ324Bが故障した場合、制御装置230は、主巻インバータ321A,321B,322A,322B,323A,323B、324Aを最大定格出力で動作するよう制御する。これにより、主巻モータ123A,123B,123C,123Dのそれぞれは、定格出力の8/7倍に相当する過負荷状態で駆動する。より詳細には、主巻モータ123A,123B,123Cのそれぞれは、荷重Wの巻き上下げに必要な出力Pの1/4×8/7分を出力し、主巻モータ123Dは、必要な出力Pの1/8×8/7分を出力する。従って、1台の主巻インバータ324Bが故障した場合でも、4台の主巻モータ123A、123B、123C、123Dによって、必要な出力Pを得ることができる。
なおこの場合も、主巻モータ123A,123B,123C,123Dの過負荷状態での稼働が長引かないように、制御装置230は、過負荷状態を監視し、過負荷状態での稼働時間などが所定の閾値を超えると、過負荷状態での運転を終了させるようにしてもよい。
上述した実施形態の駆動装置200B、レードルクレーン100によれば、機器の故障に備え、通常時に必要な容量を必要最低限だけ上回る(例えば8/7倍)大きい容量の主巻インバータ321A等,及び主巻コンバータ311A等を選定することで、1台の主巻インバータ224Bが故障しても、残りの7台を定格出力で稼働することで、4台の主巻モータ123を過負荷状態で稼働することができ、荷重Wの巻き上下げに必要な出力Pを得ることができる。これにより、主巻インバータ224Bの故障に備え予備用の主巻インバータを備える必要がない。これにより、バックアップ手段を備えつつ、駆動装置200Bおよびレードルクレーン100のコスト、機器の容量、設置スペースの低減を図ることが可能となる。また、本実施形態によれば、主巻インバータ321A等,及び主巻コンバータ311A等の容量の増大分を必要最低限に抑えながら、比較的故障しやすい電子機器である主巻インバータ321A等及び主巻コンバータ311A等の出力を、バックアップ時の動作においても定格容量内に抑えることができる。
なお、主巻インバータ324Bが故障した場合を例に説明を行ったが、主巻コンバータ314Bが故障した場合も同様のバックアップ手段を適用することができる。
なお、主巻インバータ324Bが故障した場合を例に説明を行ったが、主巻コンバータ314Bが故障した場合も同様のバックアップ手段を適用することができる。
図8は、第2実施形態における駆動装置に故障が生じた状態にあるときの構成を示す第三の図である。
図8は、1台の補巻インバータ325が故障した場合の動作について説明する図である。例えば、補巻インバータ325が故障した場合、制御装置230は、切替器294B、296を切り替え、主巻インバータ324Bと補巻モータ133とを接続する。制御装置230は、主巻インバータ324Bを補巻モータ133用のパラメータを用いて制御し、補巻モータ133を駆動する。
また、制御装置230は、主巻インバータ321A,321B,322A,322B,323A,323B、324Aを最大定格出力で稼働させる。これにより、主巻モータ123A,123B,123C,123Dのそれぞれは、定格出力の8/7倍に相当する過負荷状態で駆動する。主巻モータ123A,123B,123Cのそれぞれは、荷重Wの巻き上下げに必要な出力Pの1/4×8/7を負担し、主巻モータ123Dは、必要な出力Pの1/8×8/7を負担する。これにより、全体で荷重Wの巻き上下げに必要な出力Pを得ることができる。
図8は、1台の補巻インバータ325が故障した場合の動作について説明する図である。例えば、補巻インバータ325が故障した場合、制御装置230は、切替器294B、296を切り替え、主巻インバータ324Bと補巻モータ133とを接続する。制御装置230は、主巻インバータ324Bを補巻モータ133用のパラメータを用いて制御し、補巻モータ133を駆動する。
また、制御装置230は、主巻インバータ321A,321B,322A,322B,323A,323B、324Aを最大定格出力で稼働させる。これにより、主巻モータ123A,123B,123C,123Dのそれぞれは、定格出力の8/7倍に相当する過負荷状態で駆動する。主巻モータ123A,123B,123Cのそれぞれは、荷重Wの巻き上下げに必要な出力Pの1/4×8/7を負担し、主巻モータ123Dは、必要な出力Pの1/8×8/7を負担する。これにより、全体で荷重Wの巻き上下げに必要な出力Pを得ることができる。
上述した実施形態の駆動装置200B、レードルクレーン100によれば、補巻インバータ325が故障した場合、制御装置230は、主巻インバータ324Bを制御し、補巻モータ133を駆動する。また、制御装置230は、残りの主巻インバータ321A,321B,322A,322B,323A,323B、324Aを最大定格出力で稼働させ、荷重Wの巻き上下げに必要な出力Pを得る。これにより、補巻インバータ325の故障に備え、予備用の補巻インバータを備える必要が無く、バックアップ手段を備えつつ、駆動装置200Bおよびレードルクレーン100のコスト、機器の容量、設置スペースの低減を図ることが可能となる。
(第2実施形態の変形例)
第2実施形態では、必要な容量の8/7倍の容量を有する主巻インバータ321A等、主巻コンバータ311A等を選定したが、加えて主巻モータ123についても、必要な容量の8/7倍の容量を持つモータを選定する構成としてもよい。
第2実施形態では、必要な容量の8/7倍の容量を有する主巻インバータ321A等、主巻コンバータ311A等を選定したが、加えて主巻モータ123についても、必要な容量の8/7倍の容量を持つモータを選定する構成としてもよい。
(その他の実施形態)
なお、この発明は、上述した実施形態に限定されるものではなく、この発明の趣旨を逸脱しない範囲において、設計変更可能である。
例えば、以上に記載した実施形態では4系統の駆動装置が対象となったが、当然ながら、この発明は2以上の任意の数の系統を有した駆動装置に適用できる。また、1台のインバータまたはモータだけが故障した場合を想定したが、当然ながら、この発明は、1台以上のインバータが故障した場合、1台以上のモータが故障した場合、又は、1台以上のインバータ及び1台以上のモータが故障した場合のいずれにも対応可能なように拡張できる。
なお、この発明は、上述した実施形態に限定されるものではなく、この発明の趣旨を逸脱しない範囲において、設計変更可能である。
例えば、以上に記載した実施形態では4系統の駆動装置が対象となったが、当然ながら、この発明は2以上の任意の数の系統を有した駆動装置に適用できる。また、1台のインバータまたはモータだけが故障した場合を想定したが、当然ながら、この発明は、1台以上のインバータが故障した場合、1台以上のモータが故障した場合、又は、1台以上のインバータ及び1台以上のモータが故障した場合のいずれにも対応可能なように拡張できる。
また、駆動装置200A~200Bをレードルクレーン100に用いるようにしたが、これに限らない。駆動装置200は、例えば、工場内などに設置される天井クレーン、港湾等に設置される門型クレーン等、にも用いることができる。
上述した駆動装置、およびそれを用いたクレーン、駆動装置の制御方法によれば、機器の容量、コスト、設置スペースの低減を図ることが可能となる。
100 レードルクレーン
110 走行レール
111 ガータ
120 主横行レール
121 主トロリ
122 主巻装置
123,123A,123B,123C,123D 主巻モータ
124 減速機
125 ワイヤドラム
126 ワイヤ
127 フック
128 支持フレーム
130 補横行レール
131 補トロリ
132 補巻装置
133 補巻モータ(補モータ)
135 ワイヤドラム
136 ワイヤ
137 フック
140 鍋
141 支持部
200A,200B 駆動装置
211A,211B,212A,212B,213A,213B,214A,214B 主巻コンバータ
215 補巻コンバータ
221A,221B,222A,222B,223A,223B,224A,224B 主巻インバータ
225 補巻インバータ
230 制御装置
291A,291B,292A,292B,293A,293B,294A,294B,295,296 切替器
110 走行レール
111 ガータ
120 主横行レール
121 主トロリ
122 主巻装置
123,123A,123B,123C,123D 主巻モータ
124 減速機
125 ワイヤドラム
126 ワイヤ
127 フック
128 支持フレーム
130 補横行レール
131 補トロリ
132 補巻装置
133 補巻モータ(補モータ)
135 ワイヤドラム
136 ワイヤ
137 フック
140 鍋
141 支持部
200A,200B 駆動装置
211A,211B,212A,212B,213A,213B,214A,214B 主巻コンバータ
215 補巻コンバータ
221A,221B,222A,222B,223A,223B,224A,224B 主巻インバータ
225 補巻インバータ
230 制御装置
291A,291B,292A,292B,293A,293B,294A,294B,295,296 切替器
Claims (8)
- 定格容量の合計が負荷に対応した容量に設定され、連携して主動作を行うための複数の主モータと、
定格容量の合計が前記主モータの定格容量に対応した容量に設定された、前記主モータと接続された1つ又は複数の主インバータと、
前記主インバータを制御する制御装置と、
を備え、
前記制御装置は、前記複数の主モータの全てを駆動する場合、それぞれの主モータが定格回転速度で駆動するように前記主モータのそれぞれに接続された前記主インバータを制御し、
前記複数の主モータのうち一部が故障した場合、残りの主モータそれぞれの回転速度を低減して、前記負荷を低減するとともに、当該残りの主モータそれぞれの出力が回転速度を低減する前と同じ値となるよう、前記主インバータを制御する、
駆動装置。 - 前記制御装置は、前記複数の主モータのうち一部が故障した場合、前記負荷の大きさを示す値を取得し、当該負荷の大きさに応じて、残りの前記主モータそれぞれの回転速度を算出する、
請求項1に記載の駆動装置。 - 前記制御装置は、前記複数の主モータに接続された主インバータのうちの一部が故障した場合、残りの主インバータそれぞれの出力が、当該各主インバータの定格容量に、前記故障前と同じ出力を行った場合における、前記残りの主インバータの全てによる出力に対する、故障した分を含む全ての前記主インバータによる出力の割合、を乗じた値となるよう、前記残りの各主インバータを稼働する、
請求項1または請求項2に記載の駆動装置。 - 前記主インバータのそれぞれは、
前記主インバータを所定の数だけ減じた場合の全ての前記主インバータによる出力に対する、減じる前の全ての前記主インバータによる出力の割合、を前記主モータの定格容量に対応した容量、に乗じた値を定格容量として有する、
請求項1または請求項2に記載の駆動装置。 - 前記主インバータは、前記主モータ1つに対して少なくとも2つ並列に接続されている、
請求項1から請求項4の何れか1項に記載の駆動装置。 - 補動作を行うための補モータと、
前記補モータの定格容量に対応した容量を定格容量として有する、前記補モータと接続された補インバータと、
をさらに備え、
前記主インバータのうちの一つである第一主インバータは、当該主モータに接続された前記主モータの他に、前記補モータと切り替え可能な切替部を介して接続され、
前記制御装置は、前記補インバータが故障した場合、前記切替部により、前記第一主インバータを、前記切替部を介して前記補モータと接続させ、前記第一主インバータを介して前記補モータを駆動する、
請求項1から請求項5の何れか1項に記載の駆動装置。 - 請求項1から6の何れか一項に記載の駆動装置と、
前記駆動装置により駆動する主巻装置と、
前記駆動装置により駆動する補巻装置と、
を備えるクレーン。 - 定格容量の合計が負荷に対応した容量に設定され、連携して主動作を行うための複数の主モータと、
定格容量の合計が前記主モータの定格容量に対応した容量に設定された、前記主モータと接続された1つ又は複数の主インバータと、
前記主インバータを制御する制御装置と、
を備えた駆動装置の制御方法であって、
前記制御装置は、前記複数の主モータの全てを駆動する場合、それぞれの主モータが定格回転速度で駆動するように前記主モータのそれぞれに接続された前記主インバータを制御し、
前記複数の主モータのうち一部が故障した場合、残りの主モータそれぞれの回転速度を低減して、前記負荷を低減するとともに、当該残りの主モータそれぞれの出力が回転速度を低減する前と同じ値となるよう、前記主インバータを制御する、
駆動装置の制御方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2015/053099 WO2016125267A1 (ja) | 2015-02-04 | 2015-02-04 | 駆動装置、クレーン、及び駆動装置の制御方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2015/053099 WO2016125267A1 (ja) | 2015-02-04 | 2015-02-04 | 駆動装置、クレーン、及び駆動装置の制御方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2016125267A1 true WO2016125267A1 (ja) | 2016-08-11 |
Family
ID=56563631
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2015/053099 WO2016125267A1 (ja) | 2015-02-04 | 2015-02-04 | 駆動装置、クレーン、及び駆動装置の制御方法 |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2016125267A1 (ja) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000238989A (ja) * | 1999-02-22 | 2000-09-05 | Toshiba Corp | 移動機械の運転制御装置 |
JP2001163579A (ja) * | 1999-12-14 | 2001-06-19 | Mitsubishi Heavy Ind Ltd | クレーン |
JP2010041890A (ja) * | 2008-08-08 | 2010-02-18 | Fuji Electric Systems Co Ltd | 電動機駆動装置 |
WO2013128713A1 (ja) * | 2012-02-27 | 2013-09-06 | 三菱重工マシナリーテクノロジー株式会社 | 駆動装置、クレーン、及び駆動装置の制御方法 |
-
2015
- 2015-02-04 WO PCT/JP2015/053099 patent/WO2016125267A1/ja active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000238989A (ja) * | 1999-02-22 | 2000-09-05 | Toshiba Corp | 移動機械の運転制御装置 |
JP2001163579A (ja) * | 1999-12-14 | 2001-06-19 | Mitsubishi Heavy Ind Ltd | クレーン |
JP2010041890A (ja) * | 2008-08-08 | 2010-02-18 | Fuji Electric Systems Co Ltd | 電動機駆動装置 |
WO2013128713A1 (ja) * | 2012-02-27 | 2013-09-06 | 三菱重工マシナリーテクノロジー株式会社 | 駆動装置、クレーン、及び駆動装置の制御方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6042078B2 (ja) | クレーン装置、及びクレーン装置の制御方法 | |
CN111039208B (zh) | 变频起升机构及塔机 | |
WO2007132523A1 (ja) | エレベータの制御装置 | |
JPH06331470A (ja) | ブレーキの負荷保持トルクのチェック方法 | |
JP2011057329A (ja) | エレベータの制御装置及びその制御方法 | |
JP2004032849A (ja) | エレベータの制御装置 | |
JP5241367B2 (ja) | 電動巻上機 | |
CN115485229A (zh) | 起重机的升降装置及其操作方法 | |
WO2016125267A1 (ja) | 駆動装置、クレーン、及び駆動装置の制御方法 | |
JP4397721B2 (ja) | エレベータの制御装置 | |
CN101525107B (zh) | 变频起重控制系统 | |
JP2017017785A (ja) | 電動巻上機 | |
JP6169936B2 (ja) | インバータ装置 | |
WO2017073571A1 (ja) | 作業車両 | |
JP2007238300A (ja) | エレベータ | |
KR101335496B1 (ko) | 다이내믹 제동을 이용하는 더블랩 트랙션 엘리베이터 기계의 모듈 구성부 | |
JP2011195279A (ja) | エレベータの制御装置 | |
JP5951899B2 (ja) | 駆動装置、およびそれを用いたクレーン、駆動装置の制御方法 | |
CN102267663A (zh) | 起重机用轻载系统 | |
WO2014181460A1 (ja) | クレーンの制御装置 | |
JP3105892B1 (ja) | クレーン装置 | |
JP5640358B2 (ja) | 天井クレーン | |
JP6012529B2 (ja) | 補巻付電動巻上機 | |
JP6819453B2 (ja) | 電動ウィンチ装置 | |
JP4475881B2 (ja) | エレベータ制御装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 15881084 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 15881084 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: JP |