WO2016060334A1 - 프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법 - Google Patents

프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법 Download PDF

Info

Publication number
WO2016060334A1
WO2016060334A1 PCT/KR2014/013096 KR2014013096W WO2016060334A1 WO 2016060334 A1 WO2016060334 A1 WO 2016060334A1 KR 2014013096 W KR2014013096 W KR 2014013096W WO 2016060334 A1 WO2016060334 A1 WO 2016060334A1
Authority
WO
WIPO (PCT)
Prior art keywords
segment
pier
tension member
hollow
precast
Prior art date
Application number
PCT/KR2014/013096
Other languages
English (en)
French (fr)
Inventor
심창수
이상용
Original Assignee
중앙대학교 산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 중앙대학교 산학협력단 filed Critical 중앙대학교 산학협력단
Publication of WO2016060334A1 publication Critical patent/WO2016060334A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Definitions

  • the present invention relates to a precast pier and a precast pier construction method using the same, and more particularly, to a precast pier and a precast pier construction method using the same to improve the prestress acting on the joint portion of the pier segment.
  • bridges supporting bridges are constructed mainly as concrete structures as compression members.
  • construction of bridges in urban centers has been increasing, and such bridges in urban centers are increasingly being built in aerial bridges as roads become more complex.
  • the bridges supporting the bridges have a long-standing structure.
  • the method of constructing such bridges includes a formwork mainly made of steel slip foam, and a fixing material is disposed therein. After the concrete is laid at a predetermined height interval from the ground surface, the slip foam is moved upwards to gradually increase the height of the piers.
  • One object of the present invention is to form a partial hollow temporarily on the lower surface of the pier segment to increase the prestressed compressive stress caused by the prestress generated at the joint between the pier segment and the base portion and a precast pier construction method using the same To provide.
  • Another object of the present invention is to provide a precast pier and a precast pier construction method using the same to increase the prestress acting on the lowermost segment by intermediately fixing a part of the tension member in the lowermost segment of the pier segment.
  • the base is fixed to the ground;
  • a pillar portion including a plurality of pier segments stacked on the foundation portion;
  • a coping part disposed on an upper part of the pillar part, wherein the lowermost segment of the plurality of pier segments has an area in contact with the base part at a lower surface of the lower part of the pier segment to be smaller than a shear surface.
  • the precast piers can be provided, characterized in that they are provided as hollow segments in which partial hollows are formed which are recessed from a central portion to a predetermined length.
  • a method comprising: pouring a foundation; Seating a lowermost segment on the foundation; Intermediately fixing a first tension member extending from the base portion to the bottom segment in a tensioned state on top of the bottom segment such that prestress is applied to the bottom segment; Stacking and installing a plurality of pier segments on an upper portion of the lowermost segment; Installing a coping portion on top of the plurality of pier segments; Securing a plurality of fixing members extending to the upper portion of the first tension member through a coupler to the upper portion of the coping portion in an untensioned state on the upper portion of the coping portion; And fixing the second tension member extending from the base portion to the coping portion on the upper surface of the coping portion in a tensioned state.
  • the precast pier construction method may be provided.
  • precast pier segments manufactured at the foundation are laminated in multiple stages, but the prestress acting on the first segment joint, which is the focus of the design, is increased by intermediate fixing the steel rods at the lowermost segment.
  • FIG. 1 is a perspective view of a precast piers in accordance with an embodiment of the present invention.
  • FIG. 2 is a cross-sectional view of a precast piers in accordance with an embodiment of the present invention.
  • FIG. 3 is a cross-sectional view of the base portion according to the embodiment of the present invention.
  • FIG. 4 is a cross-sectional view of a hollow segment in accordance with an embodiment of the present invention.
  • FIG. 5 is a cross-sectional view of a non-hollow segment in accordance with an embodiment of the present invention.
  • FIG. 6 is a flowchart of a precast pier construction method according to an embodiment of the present invention.
  • the base is fixed to the ground;
  • a pillar portion including a plurality of pier segments stacked on the foundation portion;
  • a coping part disposed on an upper part of the pillar part, wherein the lowermost segment of the plurality of pier segments has an area in contact with the base part at a lower surface of the lower part of the pier segment to be smaller than a shear surface.
  • the precast piers can be provided, characterized in that they are provided as hollow segments in which partial hollows are formed which are recessed from a central portion to a predetermined length.
  • the hollow segment may be provided from the pier segment closest to the lowermost segment among the plurality of pier segments to the pier segment adjacent to the nth (n is a natural number greater than 1).
  • the partial hollow may be formed in a shape having the same diameter and height.
  • the partial hollow may also be filled with a grouting agent after prestress is applied to the lowermost segment by a tension member.
  • first tension member is fixed to the base extending to protrude to the upper portion of the lowermost segment; And an intermediate fixing unit fixing the first tension member in a tensioned state to an upper surface of the lowermost segment.
  • the intermediate fixing unit is in contact with the upper surface of the lower segment, the anchor plate for transferring the prestress according to the tension state of the first tension member to the lower segment and the lock nut disposed on the anchor plate to tension the first tension member It may include.
  • the first tension member may be a steel bar.
  • the apparatus may further include a plurality of fixing members continuously connected in an untensioned state from an upper end of the first tension member to an upper surface of the coping portion.
  • the lowermost fixing member and the first tension member of the plurality of fixing members may be fastened by a coupler.
  • the second tension member is fixed to the base portion extending to the upper surface of the coping portion; And a tension fixing device configured to fix the second tension member in a tensile state on an upper surface of the coping portion.
  • the second tension member may be a stranded steel.
  • a method comprising: pouring a foundation; Seating a lowermost segment on the foundation; Intermediately fixing a first tension member extending from the base portion to the bottom segment in a tensioned state on top of the bottom segment such that prestress is applied to the bottom segment; Stacking and installing a plurality of pier segments on an upper portion of the lowermost segment; Installing a coping portion on top of the plurality of pier segments; Securing a plurality of fixing members extending to the upper portion of the first tension member through a coupler to the upper portion of the coping portion in an untensioned state on the upper portion of the coping portion; And fixing the second tension member extending from the base portion to the coping portion on the upper surface of the coping portion in a tensioned state.
  • the precast pier construction method may be provided.
  • bottom segment is provided as a hollow segment having a partial hollow; And filling the grouting agent in the partial hollow after the tensioning step is completed.
  • Precast is a concrete member that is placed or assembled in place after the concrete has hardened.
  • it is a concrete member that is pre-manufactured concrete products in factories and the like to be transported to the site. These precasts can significantly reduce air and reduce maintenance costs.
  • FIG. 1 is a perspective view of a precast pier 1000 according to an embodiment of the present invention
  • FIG. 2 is a cross-sectional view of a precast pier according to an embodiment of the present invention.
  • the precast pier 1000 may include a foundation 1100, a pillar portion 1200, and a coping portion 1300.
  • the foundation portion 1100, the pillar portion 1200, and the coping portion 1300 may be sequentially stacked upward from the ground.
  • the foundation 1100 serves to support the load of the entire precast pier 1000.
  • the foundation 1100 may be fixed or embedded in the ground.
  • the base portion 1100 may be provided in a size that can support the pillar portion 1200 and the coping portion 1300.
  • the pillar portion 1200 has a role of a bridge to make the precast pier 1000 has a certain height in the bridge.
  • the pillar portion 1200 may be formed by sequentially stacking a plurality of pier segments.
  • the coping portion 1300 forms the top of the piers. That is, the coping part 1300 is seated on the top of the pillar part 1200. The coping part 1300 receives a load from the shift and supports it.
  • Each of these components of the precast pier 1000 may be fastened by a fixture and a tension member.
  • the fixing member serves to fix the pier segments of the base portion 1100 and the pillar portion 1200, the pillar portion 1200 and the coping portion 1300, and the pillar portion 1200.
  • the tension member fixes the pier segments of the foundation portion 1100 and the pillar portion 1200, the pillar portion 1200 and the coping portion 1300, and the pillar portion 1200, and simultaneously serves to apply tension to them.
  • Low cost and easy to install reinforcing bar can be mainly used as a fixing material, steel bar or strand that can receive a tensile force may be mainly used as a tension material.
  • the steel bar 1420 is intermediately settled from the base portion 1100 to the bottom segment to apply tension to the base portion 1100 and the bottom segment, and the strand 1460 is a pillar portion 1200 from the base portion 1100.
  • the reinforcing bar 1440 may be connected to the coping part 1300 from the lowermost segment as a fixing material to fix each pier segment and the coping part 1300 to each other.
  • the fixing member and the tension member may be fixed or fixed by the fixing unit 1580 or the fixing unit, respectively. More specific information about the fixing material and the tension material will be described later.
  • the pier segment constituting the pillar portion 1200 may include a hollow segment 1200a and a non-hole segment 1200b.
  • the hollow segment 1200a refers to a pier segment in which a partial hollow 1240 is formed at the lower portion
  • the non-hollow segment 1200b refers to a pier segment in which there is no partial hollow 1240 formed in the hollow segment 1200a.
  • the hollow segment 1200a may be manufactured by inserting styrofoam into the load center of the formwork when forming a pier segment by pouring concrete into the formwork so that a partial hollow 1240 is formed in the corresponding portion.
  • the pillar part 1200 may be formed by stacking the hollow segment 1200a and the non-hollow segment 1200b.
  • the lower segment of the pillar part 1200 includes the hollow segment 1200a and the upper segment is non-hollow. Segment 1200b.
  • the hollow segment 1200a is introduced into the lowermost segment immediately adjacent to the foundation 1100 in the pillar portion 1200, and the non-hollow segment 1200b is introduced into the remaining pier segments.
  • the precast pier 1000 should be robust against lateral external forces. For example, a lateral force may be applied to the precast pier 1000 due to an earthquake or wind pressure. In this case, the base portion 1100 and the pillar portion 1200 or the pillar portion 1200 and the coping portion 1300 may be applied. If the joints between the pier or each pier segment constituting the pillar portion 1200 are displaced by the lateral force, the entire precast pier 1000 may be damaged or collapse in severe cases. Therefore, in order to impart robustness against lateral external force to the precast pier 1000, an appropriate prestress should be applied to each joint, and in particular, the base, which is the lowest joint of the entire precast pier 1000, is applied. It is important to apply a strong tension to the site as it is most fragile between (1000) and the bottom segment.
  • the area where the base portion 1000 and the lowermost segment are in contact with each other decreases, and consequently, acts on the joints of the base portion 1100 and the lowermost segment.
  • the prestress is improved.
  • the hollow segment 1200a is introduced only in the lowermost segment of the pier segments constituting the pillar portion 1100, and the non-hollow segment 1200b is introduced in the pier segment.
  • the first pier segment may be introduced into the hollow segment 1200a, and the n + 1 pier segment to the top segment may be introduced into the non-hollow segment 1200b from the bottom.
  • N is defined as a natural number greater than one.
  • the pillar portion 1200 is formed by introducing the hollow segment 1200a at the lower portion and the non-hollow segment 1200b thereon, and the number of the hollow segments 1200a to be introduced is appropriate as necessary. Can be decided.
  • FIG. 3 is a cross-sectional view of the foundation 1100 according to an embodiment of the present invention
  • FIG. 4 is a cross-sectional view of the hollow segment 1200a according to an embodiment of the present invention
  • FIG. 5 is a non-hole according to an embodiment of the present invention.
  • the foundation 1100 may be installed on the ground.
  • the foundation 1100 may be installed at a point where the bridge is to be installed in a field casting method.
  • the steel bar 1420 may be embedded in the base portion 1100.
  • the steel bar 1420 may be fixed with its lower end embedded in the base portion 1100 by the fixing fixing unit 1520.
  • Grooves having a shape similar to that of the lower surface of the pier segment may be formed on the upper surface of the foundation 1100 so that the pier segment may be stably seated.
  • the base 1100 may be formed with a sheath tube 1120 for inserting the strand 1460.
  • the sheath tube 1120 may start to extend from the circumferential surface of the foundation 1100 and penetrate to the upper surface.
  • the strand wire 1460 may be inserted into and fixed to the sheath pipe 1120 penetrated in this way.
  • the inserted strand 1460 may be fixed to the foundation portion 1100 by a fixing anchorage 1520 on the circumferential surface of the foundation portion 1100.
  • the pier segments constituting the pillar portion 1200 may be provided in a pillar shape.
  • Pier segment is generally provided in the shape of a circular column, and in the drawings, although the pier segment is shown in the shape of a circular column, in the present invention, the shape of the pier segment is not limited to the circular column shape, and takes the form of an elliptical column or a polygonal column. It is also possible.
  • a protruding portion may be formed around the upper surface of the pier segment to stably seat the pier segment seated thereon, and a recessed portion having a shape corresponding to the protruding portion of the lower pier segment may be formed around the lower surface of the pier segment.
  • the hollow segment 1200a used as the lowermost segment or the lower segment may have a partial hollow 1240 recessed to a certain height.
  • the partial hollow 1240 may be provided to increase the prestress by minimizing the area of abutment between the base 1100 and the hollow segment 1200a.
  • the shape in which the partial hollow 1240 is recessed may be similar to the shape of a circular pillar, and may be, for example, in the form of a circular pillar, an elliptical pillar, or a polygonal pillar.
  • the diameter and height thereof may have a shape that substantially matches.
  • the partial hollow 1240 may be filled with concrete or mortar, or filled with a member such as styrofoam after the intermediate fixation is completed or after the tension using the strand 1460 is completed.
  • a sheath tube 1220 may be formed in the hollow segment 1200a.
  • the sheath tube 1220 may be provided to penetrate up and down along the circumference of the partial hollow 1240.
  • the steel bar 1420 and the strand 1460 may be alternately inserted.
  • the diameter of the sheath tube 1220 may be provided slightly larger than the diameter of the steel bar 1420 and the strand 1460.
  • the sheath tube 1220 may be filled with a grouting agent after the fixing of the tension member is completed.
  • the anchor plate 1542 for fixing the steel rod 1420 to the upper portion of the hollow segment 1200a is located in the sheath tube 1220.
  • 1222 may be formed by depression.
  • a sheath tube 1260 may be provided inside the non-hole segment 1200b.
  • the sheath tube 1260 may be provided in a size corresponding to the sheath tube 1220 formed in the hollow segment 1200a.
  • FIG. 6 is a flowchart of a precast pier construction method according to an embodiment of the present invention.
  • the precast pier construction method includes placing a foundation 1100 (S110), installing a hollow segment 1200a on the foundation 1100 (S120), and a steel bar 1420.
  • FIG. 7 to 11 are assembled views of the precast pier 1000 according to an embodiment of the present invention.
  • the foundation 1100 may be embedded or fixed on the ground (S110).
  • the foundation 1100 is generally formed in a way that is poured in the field, but if necessary, the foundation 1100 may also be installed on the ground in a precast manner.
  • the base 1100 may have a curved sheath tube 1120 formed therein, and the steel bar 1420 may be manufactured with its lower part embedded in the base 1100. The lower end of the steel bar 1420 is fixed in the base portion 1100 by the fixing fixing unit 1520.
  • a hollow segment 1200a may be installed on an upper portion of the foundation 1100 (S120).
  • the hollow segment 1200a may be a bottom segment or a pier segment from the bottom to the nth segment.
  • the hollow segment 1200a is a hollow segment on the base 1100 such that the steel rod 1420 is inserted into the sheath tube 1220 having a groove 1222 for intermediate fixing of the sheath tube 1220 of the hollow segment 1200a. 1200a may be seated. In this case, the sheath tube 1220 without the groove 1222 of the sheath tube 1220 of the hollow segment 1200a is installed to be connected to the sheath tube 1220 of the base 1100.
  • the steel bar 1420 is fixed in the middle (S130). After the hollow segment 1200a is seated on the foundation 1100, the steel bar 1420 extending from the foundation 1100 to the hollow segment 1200a is applied to the hollow segment 1200a so that prestress is applied to the hollow segment 1200a. Intermediate fixation can be made at the top in tension.
  • the steel rod 1420 may be intermediately fixed by the intermediate fixing unit 1540, that is, the anchor plate 1542 and the lock nut 1544.
  • the lock nut 1544 may be inserted into the steel bar 1420 protruding to the upper portion of the anchor plate 1542.
  • the lock nut 1544 may be tightened to fix the steel bar 1420 in a tensioned state.
  • the tensioned steel bar 1420 may apply a tension force to the hollow segment 1200a through the anchor plate 1542.
  • the rebar 1440 is connected (S140) and the non-hollow segment 1200b is installed (S150).
  • the rebar 1440 may be connected to the steel bar 1420 and the coupler 1480.
  • the reinforcing bar 1440 may be provided in substantially the same cross section as the steel bar 1420 and may be connected to the steel bar 1420 by the coupler 1480.
  • the non-hollow segment 1200b may be seated on the upper portion of the hollow segment 1200b so that the reinforcing bar 1440 may be inserted through the sheath tube 1260 of the non-hollow segment 1200b.
  • the reinforcing bar 1440 may serve as a fixing material for connecting and fixing the non-hole segment 1200b and the non-hole segment 1200b.
  • the reinforcing bars 1440 may be inserted into the sheath tube 1260 while continuously connecting the reinforcing bars 1440 and the reinforcing bars 1440 through the coupler 1480.
  • Other non-hollow segments 1200b are stacked on top of the non-hollow segments 1200b.
  • the reinforcing bar 1440 serves as a fixing material for fixing the connection between the non-hollow segments 1200b.
  • the coping part 1300 may be seated (S160).
  • the coping part 1300 is formed with a sheath tube 1320 connected to the sheath tube 1260 of the pier segment, through which the rebar 1440 may be inserted.
  • the rebar 1440 may be fixed using the fastener 1580 at the upper part of the coping part 1300 (S170).
  • the plurality of reinforcing bars 1440 may be fixed to the upper portion of the coping unit 1300 in an untensioned state through the fixture 1580.
  • the strand 1460 may be inserted into the sheath pipes 1120, 1220, 1260, and 1320 formed in each of them (S180). ). In this case, the strand 1460 may be inserted from the top to the bottom direction.
  • the strand 1460 may be provided to have a length connected from the circumferential surface of the base portion 1100 to the top surface of the coping portion 1300.
  • the inserted strand 1460 may be fixed to the circumferential surface of the base 1100 through the fixing fixing unit 1520.
  • the fixed strand 1460 extends from the base portion 1100 to the coping portion 1300 and may be fixed on the upper surface of the coping portion 1300 in a tensioned state through the tension fixing unit 1560. That is, the anchor plate 1562 is inserted into and fixed in the groove 1322 in which the strand 1460 is recessed in the upper portion of the coping part 1300, and then the lock nut 1460 is inserted into the strand wire 1460 protruding in the upper portion of the anchor plate 1562. 1564) can be inserted. In addition, the lock nut 1564 may be tightened to fix the strand 1460 in a tensioned state.
  • the stranded wire 1460 which undergoes such a process, may generate a compressive force due to tensile force. Due to the compression force generated as described above, the base 1100, the pillar part 1200, and the coping part 1300 may be compressed. Therefore, cracking, warping, etc. of the precast pier 1000 can be prevented.
  • mortar and concrete may be poured into the sheath pipes 1120, 1220, 1260, 1320 and the partial hollow 1240 of the hollow segment 1200a.
  • the partial hollow 1240 is connected to the sheath tube 1220 and thus the partial hollow 1240 may also be filled as the grouting agent is filled in the sheath tube 1220.
  • Precast pier according to the present invention and precast pier construction method using the same by increasing the compressive stress due to the prestress generated in the joint between the pier segment and the foundation to make the pier withstand earthquake, vibration, wind pressure, various pier manufacturing It can be usefully used.

Abstract

본 발명은 프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법에 관한 것으로, 보다 상세하게는 최하부 세그먼트의 하면에 중공을 형성하여 교각 세그먼트와 기초 플레이트 사이 이음부에서 발생되는 프리스트레스를 증가시키는 프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법에 관한 것이다. 본 발명의 일 양상에 따르면, 지면에 고정 설치되는 기초부; 상기 기초부 상에 적층되는 복수의 교각 세그먼트를 포함하는 기둥부; 및 상기 기둥부의 상부에 배치되는 코핑부;를 포함하되, 상기 복수의 교각 세그먼트 중 최하부 세그먼트는, 상기 최하부 세그먼트에 작용하는 프리스트레스의 증가를 위해 그 하면에서 상기 기초부와 접촉하는 면적이 전단면보다 작아지도록 그 하면 중앙부로부터 미리 정해진 길이로 함몰되는 부분 중공이 형성된 중공 세그먼트로 제공되는 프리캐스트 교각이 제공될 수 있다.

Description

프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법
본 발명은 프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법에 관한 것으로, 보다 상세하게는 교각 세그먼트의 이음부에 작용하는 프리스트레스를 향상시키는 프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법에 관한 것이다.
일반적으로 교량을 지지하는 교각은 압축부재로서 주로 콘크리트 구조물로서 구축된다. 최근 들어 도심에서 교량을 건설하는 경우가 많아지고 있는데, 이와 같은 도심지의 교량은 도로가 복잡화됨에 따라서 고소 교량 방식으로 건설하는 경우가 증가하고 있다.
이와 같은 도심지에 교량을 건설함에 있어서 교량을 지지하는 교각은 장대화 되는 구조를 갖게 되는데, 이와 같은 교각을 시공하는 방식으로는 주로 강재의 슬립폼으로 이루어진 거푸집을 설치하고, 내부에 고정재를 배치한 후 지표면으로부터 소정의 높이 간격으로 콘크리트를 타설하면서 슬립폼을 상부로 이동시켜 점차 교각의 높이를 높여가는 방식을 취하는 것이다.
그러나 이와 같은 방식은 소정 높이에 타설된 콘크리트가 양생된 후에 콘크리트를 타설할 수 있으므로, 교량 건설에 많은 작업시간이 소요되고 이는 전체 교량의 시공기간을 늘리는 중요 원인이 된다. 따라서 당업계에서는 신속한 교각 건설을 위한 시공법의 개선이 크게 요구되는 실정이다.
본 발명의 일 과제는, 교각 세그먼트의 하면에 일시적으로 부분 중공을 형성하여 교각 세그먼트와 기초부 사이 이음부에서 발생되는 프리스트레스에 의한 도입 압축응력을 증가시키는 프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법을 제공하는 것이다.
본 발명의 다른 과제는, 교각 세그먼트 중 최하부 세그먼트에 긴장재의 일부를 중간 정착시켜 최하부 세그먼트에 작용하는 프리스트레스를 증대시키는 프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법을 제공하는 것이다.
본 발명이 해결하고자 하는 과제가 상술한 과제로 제한되는 것은 아니며, 언급되지 아니한 과제들은 본 명세서 및 첨부된 도면으로부터 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 명확하게 이해될 수 있을 것이다.
본 발명의 일 양상에 따르면, 지면에 고정 설치되는 기초부; 상기 기초부 상에 적층되는 복수의 교각 세그먼트를 포함하는 기둥부; 및 상기 기둥부의 상부에 배치되는 코핑부;를 포함하되, 상기 복수의 교각 세그먼트 중 최하부 세그먼트는, 상기 최하부 세그먼트에 작용하는 프리스트레스의 증가를 위해 그 하면에서 상기 기초부와 접촉하는 면적이 전단면보다 작아지도록 그 하면 중앙부로부터 미리 정해진 길이로 함몰되는 부분 중공이 형성된 중공 세그먼트로 제공되는 것을 특징으로 하는 프리캐스트 교각이 제공될 수 있다..
본 발명의 다른 양상에 따르면, 기초부를 타설하는 단계; 상기 기초부 상에 최하부 세그먼트를 안착시키는 단계; 상기 최하부 세그먼트에 프리스트레스가 인가되도록 상기 기초부로부터 상기 최하부 세그먼트까지 이어지는 제1 긴장재를 상기 최하부 세그먼트의 상부에 인장 상태로 중간 정착시키는 단계; 상기 최하부 세그먼트의 상부에 복수의 교각 세그먼트를 적층하여 설치하는 단계; 상기 복수의 교각 세그먼트의 상부에 코핑부를 설치하는 단계; 상기 제1 긴장재의 상단에 커플러를 통해 연속적으로 연장되어 상기 코핑부의 상부까지 이어지는 복수의 고정재를 비인장 상태로 상기 코핑부의 상부에 고정시키는 단계; 및 상기 기초부로부터 상기 코핑부까지 이어지는 제2 긴장재를 인장 상태로 상기 코핑부의 상면에서 정착시키는 단계;를 포함하는 프리캐스트 교각 시공 방법이 제공될 수 있다.
본 발명의 과제의 해결 수단이 상술한 해결 수단들로 제한되는 것은 아니며, 언급되지 아니한 해결 수단들은 본 명세서 및 첨부된 도면으로부터 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 명확하게 이해될 수 있을 것이다.
본 발명에 의하면, 교각 세그먼트의 하면 중심부에 부분 중공을 형성하여 교각 세그먼트와 기초부 사이 이음부에서 발생되는 프리스트레스에 의한 압축응력을 증가시킬 수 있다.
또 기초부에 공장에서 제작된 프리캐스트 교각 세그먼트들을 다단으로 적층 시공하되 최하부 세그먼트에 강봉을 중간 정착시킴으로써 설계의 주안점이 되는 첫 번째 세그먼트 이음부에 작용하는 프리스트레스가 증대되는 장점이 있다.
본 발명의 효과가 상술한 효과들로 제한되는 것은 아니며, 언급되지 아니한 효과들은 본 명세서 및 첨부된 도면으로부터 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 명확히 이해될 수 있을 것이다.
도 1은 본 발명의 실시예에 따른 프리캐스트 교각의 사시도이다.
도 2는 본 발명의 실시예에 따른 프리캐스트 교각의 단면도이다.
도 3은 본 발명의 실시예에 따른 기초부의 단면도이다.
도 4는 본 발명의 실시예에 따른 중공 세그먼트의 단면도이다.
도 5는 본 발명의 실시예에 따른 비중공 세그먼트의 단면도이다.
여기서, 도 2 및 도 5는 A-A'선을 따라 도시된 단면이다.
도 6은 본 발명의 실시예에 따른 프리캐스트 교각 시공 방법의 순서도이다.
도 7 내지 도 11은 본 발명의 실시예에 따른 프리캐스트 교각의 조립도이다.
본 명세서에 기재된 실시예는 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에게 본 발명의 사상을 명확히 설명하기 위한 것이므로, 본 발명이 본 명세서에 기재된 실시예에 의해 한정되는 것은 아니며, 본 발명의 범위는 본 발명의 사상을 벗어나지 아니하는 수정예 또는 변형예를 포함하는 것으로 해석되어야 한다.
본 명세서에서 사용되는 용어는 본 발명에서의 기능을 고려하여 가능한 현재 널리 사용되고 있는 일반적인 용어를 선택하였으나 이는 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자의 의도, 관례 또는 새로운 기술의 출현 등에 따라 달라질 수 있다. 다만, 이와 달리 특정한 용어를 임의의 의미로 정의하여 사용하는 경우에는 그 용어의 의미에 관하여 별도로 기재할 것이다. 따라서 본 명세서에서 사용되는 용어는 단순한 용어의 명칭이 아닌 그 용어가 가진 실질적인 의미와 본 명세서의 전반에 걸친 내용을 토대로 해석되어야 한다.
본 명세서에 첨부된 도면은 본 발명을 용이하게 설명하기 위한 것으로 도면에 도시된 형상은 본 발명의 이해를 돕기 위하여 필요에 따라 과장되어 표시된 것일 수 있으므로 본 발명이 도면에 의해 한정되는 것은 아니다.
본 명세서에서 본 발명에 관련된 공지의 구성 또는 기능에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우에 이에 관한 자세한 설명은 필요에 따라 생략하기로 한다.
본 발명의 일 양상에 따르면, 지면에 고정 설치되는 기초부; 상기 기초부 상에 적층되는 복수의 교각 세그먼트를 포함하는 기둥부; 및 상기 기둥부의 상부에 배치되는 코핑부;를 포함하되, 상기 복수의 교각 세그먼트 중 최하부 세그먼트는, 상기 최하부 세그먼트에 작용하는 프리스트레스의 증가를 위해 그 하면에서 상기 기초부와 접촉하는 면적이 전단면보다 작아지도록 그 하면 중앙부로부터 미리 정해진 길이로 함몰되는 부분 중공이 형성된 중공 세그먼트로 제공되는 것을 특징으로 하는 프리캐스트 교각이 제공될 수 있다.
또 상기 복수의 교각 세그먼트 중 상기 최하부 세그먼트에 가장 인접한 교각 세그먼트로부터 n번째(n은 1보다 큰 자연수임)인접한 교각 세그먼트까지 상기 중공 세그먼트로 제공되는 것을 특징으로 할 수 있다.
또 상기 부분 중공은, 직경과 높이가 동일한 형상으로 형성되는 것을 특징으로 할 수 있다.
또 상기 부분 중공은, 긴장재에 의해 상기 최하부 세그먼트에 프리스트레스가 가해진 후 그라우팅제에 의해 충진 될 수 있다.
또 상기 기초부에 고정 설치되어 상기 최하부 세그먼트의 상부로 돌출되도록 연장되는 제1 긴장재; 및 상기 최하부 세그먼트의 상면에 상기 제1 긴장재를 인장 상태로 정착시키는 중간 정착구;를 더 포함할 수 있다.
또 상기 중간 정착구는, 상기 최하부 세그먼트의 상면에 접촉하여 상기 제1 긴장재의 인장 상태에 따른 프리스트레스를 상기 최하부 세그먼트에 전달하는 앵커 플레이트 및 상기 앵커 플레이트 상에 배치되어 상기 제1 긴장재를 인장시키는 락 너트를 포함할 수 있다.
또 상기 제1 긴장재는, 강봉인 것을 특징으로 할 수 있다.
또 상기 제1 긴장재의 상단으로부터 상기 코핑부의 상면까지 비인장 상태로 연속 연결되는 복수의 고정재;를 더 포함할 수 있다.
또 상기 복수의 고정재 중 최하부 고정재와 상기 제1 긴장재는 커플러에 의해 체결될 수 있다.
또 상기 기초부에 고정 설치되어 상기 코핑부의 상면까지 연장되는 제2 긴장재; 및 상기 코핑부의 상면에 상기 제2 긴장재를 인장 상태로 정착시키는 긴장 정착구;를 더 포함할 수 있다.
또 상기 제2 긴장재는, 강연선인 것을 특징으로 할 수 있다.
본 발명의 다른 양상에 따르면, 기초부를 타설하는 단계; 상기 기초부 상에 최하부 세그먼트를 안착시키는 단계; 상기 최하부 세그먼트에 프리스트레스가 인가되도록 상기 기초부로부터 상기 최하부 세그먼트까지 이어지는 제1 긴장재를 상기 최하부 세그먼트의 상부에 인장 상태로 중간 정착시키는 단계; 상기 최하부 세그먼트의 상부에 복수의 교각 세그먼트를 적층하여 설치하는 단계; 상기 복수의 교각 세그먼트의 상부에 코핑부를 설치하는 단계; 상기 제1 긴장재의 상단에 커플러를 통해 연속적으로 연장되어 상기 코핑부의 상부까지 이어지는 복수의 고정재를 비인장 상태로 상기 코핑부의 상부에 고정시키는 단계; 및 상기 기초부로부터 상기 코핑부까지 이어지는 제2 긴장재를 인장 상태로 상기 코핑부의 상면에서 정착시키는 단계;를 포함하는 프리캐스트 교각 시공 방법이 제공될 수 있다.
또 최하부 세그먼트는 부분 중공을 가지는 중공 세그먼트로 제공되는 단계; 및 상기 긴장하는 단계가 완료된 뒤 상기 부분 중공에 그라우팅제를 충진하는 단계를 더 포함할 수 있다.
이하에서는 본 발명의 실시예에 따른 프리캐스트 교각(1000)에 관하여 설명한다.
프리캐스트는 콘크리트가 굳은 후에 제자리에 옮겨 놓거나 조립하는 콘크리트 부재이다. 즉 공장 등에서 미리 제조된 콘크리트 제품으로서 현장에 운반하여 사용하는 콘크리트 부재이다. 이러한 프리캐스트는 공기의 대폭 단축이 가능하고 관리비 등을 절감을 할 수 있다.
도 1은 본 발명의 실시예에 따른 프리캐스트 교각(1000)의 사시도이고, 도 2는 본 발명의 실시예에 따른 프리캐스트 교각의 단면도이다.
도 1을 참조하면, 프리캐스트 교각(1000)은 기초부(1100), 기둥부(1200) 및 코핑부(1300)를 포함할 수 있다. 프리캐스트 교각(1000)에서 기초부(1100), 기둥부(1200) 및 코핑부(1300)는 지면으로부터 차례대로 상부로 적층 될 수 있다.
먼저, 기초부(1100)는 프리캐스트 교각(1000) 전체의 하중을 지탱하는 역할을 한다. 기초부(1100)는 지면에 고정 또는 매설될 수 있다. 기초부(1100)는 기둥부(1200) 및 코핑부(1300)를 지탱할 수 있는 크기로 제공될 수 있다.
기둥부(1200)는 교량에서 프리캐스트 교각(1000)이 일정한 높이를 가지도록 하는 다리의 역할을 가진다. 이러한 기둥부(1200)는 복수의 교각 세그먼트를 차례로 적층시켜 형성할 수 있다.
코핑부(1300)는 교각의 최상부를 이룬다. 즉 코핑부(1300)는 기둥부(1200)의 상부에 안착된다. 이러한 코핑부(1300)는 교대로부터 하중을 받아 이를 지지하는 역할을 수행한다.
프리캐스트 교각(1000)의 이러한 각 구성 요소들은 고정재와 긴장재에 의해 체결될 수 있다. 여기서, 고정재는 기초부(1100)와 기둥부(1200), 기둥부(1200)와 코핑부(1300), 그리고 기둥부(1200)의 각 교각 세그먼트를 고정 체결시키는 역할을 수행한다. 또 긴장재는 기초부(1100)와 기둥부(1200), 기둥부(1200)와 코핑부(1300), 그리고 기둥부(1200)의 각 교각 세그먼트를 고정시킴과 동시에 이들에게 긴장력을 인가하는 역할을 수행한다. 고정재로는 가격이 저렴하고 설치가 용이한 철근을 주로 사용할 수 있으며, 긴장재로는 인장력을 받을 수 있는 강봉이나 강연선이 주로 사용될 수 있다.
본 발명에서는 강봉(1420)이 기초부(1100)로부터 최하부 세그먼트까지 중간 정착되어 기초부(1100)와 최하부 세그먼트에 긴장력을 인가하며, 강연선(1460)이 기초부(1100)로부터 기둥부(1200)를 통해 코핑부(1300)까지 정착되어 긴장력을 인가할 수 있다. 또 고정재로서 철근(1440)이 최하부 세그먼트로부터 코핑부(1300)까지 연결되어 각 교각 세그먼트와 코핑부(1300)를 서로 고정시킬 수 있다.
이러한 고정재와 긴장재는 각각 고정구(1580)나 정착구에 의해 고정되거나 정착될 수 있다. 고정재와 긴장재에 관한 보다 구체적인 내용은 후술하기로 한다.
한편, 본 발명에서 기둥부(1200)를 이루는 교각 세그먼트는 중공 세그먼트(1200a)와 비중공 세그먼트(1200b)를 포함할 수 있다. 여기서, 중공 세그먼트(1200a)란 하부에 부분 중공(1240)이 형성된 교각 세그먼트를 의미하고, 비중공 세그먼트(1200b)란 중공 세그먼트(1200a)에 형성되는 부분 중공(1240)이 없는 교각 세그먼트를 의미한다.
중공 세그먼트(1200a)는 거푸집에 콘크리트를 부어 교각 세그먼트를 제작할 때 거푸집의 하중앙부에 스티로폼 등을 삽입하여 해당 부분에 부분 중공(1240)이 형성되도록 하여 제조할 수 있다.
기둥부(1200)는 이러한 중공 세그먼트(1200a)와 비중공 세그먼트(1200b)가 적층되어 형성될 수 있는데, 기둥부(1200)의 하부 세그먼트는 중공 세그먼트(1200a)로 구성되고, 상부 세그먼트는 비중공 세그먼트(1200b)로 구성될 수 있다.
예를 들어, 도 2에 도시된 것과 같이 기둥부(1200)에서 기초부(1100)에 바로 인접한 최하부 세그먼트로는 중공 세그먼트(1200a)가 도입되고, 비중공 세그먼트(1200b)는 나머지 교각 세그먼트로 도입될 수 있다
프리캐스트 교각(1000)은 횡방향의 외력에 대하여 강건성을 가져야 한다. 예를 들어, 지진이나 풍압 등의 원인에 의해 프리캐스트 교각(1000)에 횡력이 가해질 수 있는데 이러한 경우에 기초부(1100)와 기둥부(1200) 간 또는 기둥부(1200)와 코핑부(1300) 간 또는 기둥부(1200)를 이루는 각 교각 세그먼트 간의 이음부가 횡력에 의해 어긋나게 되면 프리캐스트 교각(1000) 전체가 손상을 입거나 심한 경우에는 붕괴될 수 있다. 따라서 프리캐스트 교각(1000)에 횡방향 외력에 대한 강건성을 부여하기 위해서는 각 이음부에 적절한 긴장력(prestress)를 인가하여야 하며, 특히 프리캐스트 교각(1000) 전체 중 가장 하부에 위치하는 이음부인 기초부(1000)와 최하부 세그먼트 사이가 가장 취약하므로 해당 부위에 강한 긴장력을 인가하는 것이 중요하다.
상술한 것과 같이 최하부 세그먼트로 중공 세그먼트(1200a)를 도입하게 되면, 기초부(1000)와 최하부 세그먼트가 서로 접촉하는 면적이 감소하고 이에 따라 결과적으로 기초부(1100)와 최하부 세그먼트의 이음부에 작용하는 프리스트레스가 향상되는 효과가 있다.
마찬가지로 강봉(1420)이 기초부(1100)로부터 최하부 세그먼트까지 중간 정착됨에 따라 최하부 세그먼트에 가해지는 긴장력이 향상되는 효과가 더욱 발생하게 된다.
한편, 이상에서는 기둥부(1100)를 이루는 교각 세그먼트 중 최하부 세그먼트에만 중공 세그먼트(1200a)가 도입되고 이외에 교각 세그먼트는 비중공 세그먼트(1200b)가 도입되는 것으로 설명하였으나, 이와 달리 최하부 세그먼트로부터 하부로부터 n번째 교각 세그먼트까지는 중공 세그먼트(1200a)로 도입되고, 하부로부터 n+1번째 교각 세그먼트부터 최상부 세그먼트까지는 비중공 세그먼트(1200b)로 도입하는 것도 가능하다. 이때 n은 1보다 큰 자연수로 정의된다.
즉, 본 발명에서 기둥부(1200)는 하부에는 중공 세그먼트(1200a)가 도입되고 그 위로 비중공 세그먼트(1200b)가 도입되어 구성되는 것이며, 도입되는 중공 세그먼트(1200a)의 수는 필요에 따라 적절히 정해질 수 있다.
이하에서는 본 발명의 실시예에 따른 프리캐스트 교각(1000)의 각 구성 요소에 관하여 보다 상세하게 설명한다.
도 3은 본 발명의 실시예에 따른 기초부(1100)의 단면도이고, 도 4는 본 발명의 실시예에 따른 중공 세그먼트(1200a)의 단면도이고, 도 5는 본 발명의 실시예에 따른 비중공 세그먼트(1200b)의 단면도이다.
도 3을 참조하면, 기초부(1100)는 지면 상에 설치될 수 있다. 기초부(1100)는 교량을 설치하고자 하는 지점에 현장 타설 방식으로 설치될 수 있다.
기초부(1100)에는 강봉(1420)이 매립되어 설치될 수 있다. 강봉(1420)은 그 하단이 고정 정착구(1520)에 의해 기초부(1100)에 매립된 상태로 고정될 수 있다.
기초부(1100)의 상면에는 교각 세그먼트가 안정적으로 안착되도록 교각 세그먼트의 하면 형상과 유사한 형태의 홈이 형성될 수 있다.
또 기초부(1100)에는 강연선(1460)이 삽입되기 위한 쉬스관(1120)이 형성될 수 있다. 쉬스관(1120)은 기초부(1100)의 둘레면에서 연장되게 시작되어 상면으로 관통될 수 있다. 이렇게 관통된 쉬스관(1120)에는 강연선(1460)이 삽입되어 고정될 수 있다. 삽입된 강연선(1460)은 기초부(1100)의 둘레면에서 고정 정착구(1520)에 의해 기초부(1100)에 고정될 수 있다.
도 4 및 도 5를 참조하면, 기둥부(1200)를 구성하는 교각 세그먼트는 기둥 형상으로 제공될 수 있다. 교각 세그먼트는 원 기둥 형상으로 제공되는 것이 일반적이며 도면에서도 교각 세그먼트를 원 기둥 형상으로 도시하고 있으나, 본 발명에서 교각 세그먼트의 형태가 원 기둥 형상으로 한정되는 것은 아니며 타원 기둥이나 다각 기둥의 형태를 취하는 것도 가능하다.
또 이러한 교각 세그먼트의 상면 둘레에는 그 상부에 안착되는 교각 세그먼트가 안정적으로 안착되도록 돌출부가 형성되고 교각 세그먼트의 하면 둘레에는 그 하부 교각 세그먼트의 돌출부에 대응되는 형상의 함몰부가 형성될 수 있다.
도 4를 참조하면, 최하부 세그먼트 또는 하부 세그먼트로 이용되는 중공 세그먼트(1200a)는 그 하부에 일정한 높이까지 함몰되는 부분 중공(1240)이 형성될 수 있다. 부분 중공(1240)은 기초부(1100)와 중공 세그먼트(1200a) 사이 이음부에서 맞닿는 면적을 최소화하여 프리스트레스를 높이기 위해 제공될 수 있다.
부분 중공(1240)이 함몰되는 형태는 원 기둥의 형상과 유사할 수 있으며 예를 들어, 원 기둥이나 타원 기둥 또는 다각 기둥의 형태일 수 있다. 여기서, 원 기둥 형태로 함몰되는 부분 중공(1240)의 경우에는 그 직경과 높이가 실질적으로 일치하는 형태를 가질 수 있다. 부분 중공(1240)의 직경과 높이가 일치하면 부분 중공(1240)의 상면과 측면에 작용하는 응력이 균일해지는 효과가 있다.
이러한 부분 중공(1240)은 중간 정착이 종료된 뒤 또는 강연선(1460)을 이용한 긴장이 완료된 후에 콘크리트 또는 모르타르가 충진되거나, 스티로폼 등의 부재로 채워질 수 있다.
또 중공 세그먼트(1200a)에는 쉬스관(1220)이 형성될 수 있다. 쉬스관(1220)은 부분 중공(1240)의 주위를 따라 상하로 관통되게 제공될 수 있다. 이러한 쉬스관(1220)에는 강봉(1420)과 강연선(1460)이 차례로 번갈아 가며 삽입될 수 있다. 이때, 쉬스관(1220)의 직경은 강봉(1420) 및 강연선(1460)의 직경보다 약간 크게 제공될 수 있다. 쉬스관(1220)은 긴장재의 정착이 완료된 뒤 그라우팅제로 충진될 수 있다.
한편, 쉬스관(1220) 중 강봉(1420)이 삽입되는 쉬스관(1220)의 상부 지점에는 강봉(1420)을 중공 세그먼트(1200a)의 상부에 정착시키 위한 앵커 플레이트(1542)가 자리잡을 홈(1222)이 함몰되어 형성될 수 있다.
도 5를 참조하면, 비중공 세그먼트(1200b)의 내측에는 쉬스관(1260)이 제공될 수 있다. 쉬스관(1260)은 중공 세그먼트(1200a)에 형성되어 있는 쉬스관(1220)과 대응되는 크기로 제공될 수 있다.
이하에서는 상술한 프리캐스트 교각(1000)을 시공하는 방법에 관하여 설명한다. 도 6은 본 발명의 실시예에 따른 프리캐스트 교각 시공 방법의 순서도이다
도 6을 참조하면, 프리캐스트 교각 시공 방법은 기초부(1100)를 타설하는 단계(S110), 기초부(1100) 상에 중공 세그먼트(1200a)를 설치하는 단계(S120), 강봉(1420)을 중간 정착하는 단계(S130), 철근(1440)을 연결하는 단계(S140), 비중공 세그먼트(1200b)를 설치하는 단계(S150), 코핑부(1300)를 설치하는 단계(S160), 철근을 고정시키는 단계(S170), 강연선(1460)을 삽입하고 긴장 정착시키는 단계(S180) 및 그라우팅 처리하는 단계(S190)을 포함할 수 있다.
이하에서는 상술한 각 단계에 관하여 보다 구체적으로 설명한다.
도 7 내지 도 11은 본 발명의 실시예에 따른 프리캐스트 교각(1000)의 조립도이다.
도 7을 참조하면, 프리캐스트 교각 시공 방법에서 먼저 기초부(1100)가 지면에 매설되거나 고정될 수 있다(S110). 기초부(1100)는 일반적으로 현장에서 타설되는 방식으로 형성되지만 필요에 따라서는 기초부(1100) 역시 프리캐스트 방식으로 지면 상에 설치될 수 있다. 여기서, 기초부(1100)는 그 내부에 굴곡진 쉬스관(1120)이 형성되며 또 강봉(1420)이 그 하부가 기초부(1100)에 매립된 상태로 제작될 수 있다. 강봉(1420)의 하단은 기초부(1100) 내에 고정 정착구(1520)에 의해 고정된 상태이다.
도 8을 참조하면, 기초부(1100)의 상부에 중공 세그먼트(1200a)가 설치될 수 있다(S120). 중공 세그먼트(1200a)는 최하부 세그먼트 또는 최하부로부터 n번째 세그먼트까지의 교각 세그먼트일 수 있다.
중공 세그먼트(1200a)는 중공 세그먼트(1200a)의 쉬스관(1220) 중 중간 정착을 위한 홈(1222)이 있는 쉬스관(1220)에 강봉(1420)이 삽입되도록 기초부(1100) 상에 중공 세그먼트(1200a)가 안착될 수 있다. 이와 같이 설치되면 중공 세그먼트(1200a)의 쉬스관(1220) 중 홈(1222)이 없는 쉬스관(1220)은 기초부(1100)의 쉬스관(1220)과 연결되도록 설치된다.
중공 세그먼트(1200a)가 안착되면 강봉(1420)을 중간 정착시킨다(S130). 기초부(1100)에 중공 세그먼트(1200a)를 안착시킨 후, 중공 세그먼트(1200a)에 프리스트레스가 인가되도록 기초부(1100)로부터 중공 세그먼트(1200a)까지 이어지는 강봉(1420)을 중공 세그먼트(1200a)의 상부에 인장 상태로 중간 정착시킬 수 있다.
중간 정착 과정을 좀 더 상세하게 설명하면, 강봉(1420)은 중간 정착구(1540), 즉 앵커 플레이트(1542)와 락너트(1544)에 의해 중간 정착될 수 있다. 앵커 플레이트(1542)를 중공 세그먼트(1200a)의 상부에 함몰된 홈에 삽입 고정시킨 후, 앵커 플레이트(1542)의 상부로 돌출된 강봉(1420)에 락너트(1544)를 끼울 수 있다. 그리고 락너트(1544)를 조여 강봉(1420)을 인장 상태로 정착시킬 수 있다. 이와 같이 긴장된 강봉(1420)은 앵커 플레이트(1542)를 통해 중공 세그먼트(1200a)에 긴장력을 인가할 수 있다.
다음으로 도 9를 참조하면, 철근(1440)을 연결하고(S140) 비중공 세그먼트(1200b)를 설치하게 된다(S150).
철근(1440)은 강봉(1420)과 커플러(1480)를 통해 연결될 수 있다. 여기서 철근(1440)은 강봉(1420)과 그 단면이 실질적으로 동일하게 제공되어 커플러(1480)에 의해 강봉(1420)에 연결될 수 있다. 비중공 세그먼트(1200b)는 철근(1440)이 비중공 세그먼트(1200b)의 쉬스관(1260)에 관통 삽입되도록 중공 세그먼트(1200b)의 상부에 안착될 수 있다. 여기서, 철근(1440)은 비중공 세그먼트(1200b)와 비중공 세그먼트(1200b)를 연결 고정시키는 고정재 역할을 할 수 있다.
비중공 세그먼트(1200b) 복수 개를 연속적으로 적층시키는 경우에는 철근(1440)과 철근(1440)을 커플러(1480)를 통해 연속적으로 연결해가면서 철근(1440)이 쉬스관(1260)에 삽입될 수 있다. 비중공 세그먼트(1200b)의 상부에 다른 비중공 세그먼트(1200b)가 쌓여가며 적층된다. 여기서, 철근(1440)은 비중공 세그먼트(1200b) 간의 연결을 고정시키는 고정재 역할을 하게 된다.
최상단 세그먼트까지 비중공 세그먼트(1200b)가 적층된 후, 코핑부(1300)가 안착될 수 있다(S160). 코핑부(1300)에는 교각 세그먼트의 쉬스관(1260)에 연결되는 쉬스관(1320)이 형성되어 있으며, 이를 통해 철근(1440)이 삽입될 수 있다. 코핑부(1300)가 안착되면 코핑부(1300)의 상부에서 고정구(1580)를 이용하여 철근(1440)을 고정시킬 수 있다(S170). 이러한 복수의 철근(1440)은 고정구(1580)를 통해 비인장 상태로 코핑부(1300)의 상부에 고정될 수 있다.
기초부(1100), 기둥부(1200) 및 코핑부(1300)들을 적층한 후, 각각에 형성되어 있는 쉬스관(1120, 1220, 1260, 1320)에 강연선(1460)을 삽입할 수 있다(S180). 이때 강연선(1460)은 상부에서 하부 방향으로 삽입될 수 있다.
강연선(1460)은 기초부(1100)의 둘레면에서부터 코핑부(1300)의 상면까지 연결되는 길이로 제공될 수 있다.
삽입된 강연선(1460)은 고정 정착구(1520)를 통해 기초부(1100)의 둘레면에 고정될 수 있다. 고정된 강연선(1460)은 기초부(1100)로부터 코핑부(1300)까지 이어지며, 긴장 정착구(1560)를 통해 인장 상태로 코핑부(1300)의 상면에서 정착될 수 있다. 즉, 앵커 플레이트(1562)를 강연선(1460)이 코핑부(1300)의 상부에 함몰된 홈(1322)에 삽입 고정시킨 후, 앵커 플레이트(1562)의 상부에 돌출된 강연선(1460)에 락너트(1564)를 끼울 수 있다. 그리고 락너트(1564)를 조여 강연선(1460)을 인장상태로 정착시킬 수 있다. 이러한 과정을 거친 강연선(1460)은 인장력에 의한 압축력이 발생될 수 있다. 이렇게 발생된 압축력으로 인해, 기초부(1100), 기둥부(1200) 및 코핑부(1300)가 압축될 수 있다. 따라서 프리캐스트 교각(1000)의 균열, 휨 등을 방지할 수 있다.
마지막으로 쉬스관(1120, 1220, 1260, 1320) 및 중공 세그먼트(1200a)의 부분 중공(1240)에 모르타르 및 콘크리트(그라우팅제)를 타설 할 수 있다. 도면에는 도시되지 않았으나, 부분 중공(1240)은 쉬스관(1220)과 연결되어 있어 쉬스관(1220)에 그라우팅제가 충진됨에 따라 부분 중공(1240)도 충진될 수 있는 구조이다.
이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 이상에서 설명한 본 발명의 실시예들은 서로 별개로 또는 조합되어 구현되는 것도 가능하다.
따라서, 본 발명에 개시된 실시예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.
본 발명에 따른 프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법은 교각 세그먼트와 기초부 사이 이음부에서 발생되는 프리스트레스에 의한 압축응력을 증대시켜 교각이 지진이나 진동, 풍압에 견디도록 함으로써, 다양한 교각 제조에 유용하게 이용될 수 있다.

Claims (13)

  1. 지면에 고정 설치되는 기초부;
    상기 기초부 상에 적층되는 복수의 교각 세그먼트를 포함하는 기둥부; 및
    상기 기둥부의 상부에 배치되는 코핑부;를 포함하되,
    상기 복수의 교각 세그먼트 중 최하부 세그먼트는, 상기 최하부 세그먼트에 작용하는 프리스트레스의 증가를 위해 그 하면에서 상기 기초부와 접촉하는 면적이 전단면보다 작아지도록 그 하면 중앙부로부터 미리 정해진 길이로 함몰되는 부분 중공이 형성된 중공 세그먼트로 제공되는 것을 특징으로 하는
    프리캐스트 교각.
  2. 제1 항에 있어서,
    상기 복수의 교각 세그먼트 중 상기 최하부 세그먼트에 가장 인접한 교각 세그먼트로부터 n번째(n은 1보다 큰 자연수임)인접한 교각 세그먼트까지 상기 중공 세그먼트로 제공되는 것을 특징으로 하는
    프리캐스트 교각.
  3. 제1 항에 있어서,
    상기 부분 중공은, 직경과 높이가 동일한 형상으로 형성되는 것을 특징으로 하는
    프리캐스트 교각.
  4. 제1 항에 있어서,
    상기 부분 중공은, 긴장재에 의해 상기 최하부 세그먼트에 프리스트레스가 가해진 후 그라우팅제에 의해 충진되는
    프리캐스트 교각.
  5. 제1 항에 있어서,
    상기 기초부에 고정 설치되어 상기 최하부 세그먼트의 상부로 돌출되도록 연장되는 제1 긴장재; 및
    상기 최하부 세그먼트의 상면에 상기 제1 긴장재를 인장 상태로 정착시키는 중간 정착구;를 더 포함하는
    프리캐스트 교각.
  6. 제5 항에 있어서,
    상기 중간 정착구는, 상기 최하부 세그먼트의 상면에 접촉하여 상기 제1 긴장재의 인장 상태에 따른 프리스트레스를 상기 최하부 세그먼트에 전달하는 앵커 플레이트 및 상기 앵커 플레이트 상에 배치되어 상기 제1 긴장재를 인장시키는 락 너트를 포함하는
    프리캐스트 교각.
  7. 제5 항에 있어서,
    상기 제1 긴장재는, 강봉인 것을 특징으로 하는
    프리캐스트 교각.
  8. 제5 항에 있어서,
    상기 제1 긴장재의 상단으로부터 상기 코핑부의 상면까지 비인장 상태로 연속 연결되는 복수의 고정재;를 더 포함하는
    프리캐스트 교각.
  9. 제5 항에 있어서,
    상기 복수의 고정재 중 최하부 고정재와 상기 제1 긴장재는 커플러에 의해 체결되는
    프리캐스트 교각.
  10. 제5 항에 있어서,
    상기 기초부에 고정 설치되어 상기 코핑부의 상면까지 연장되는 제2 긴장재; 및
    상기 코핑부의 상면에 상기 제2 긴장재를 인장 상태로 정착시키는 긴장 정착구;를 더 포함하는
    프리캐스트 교각.
  11. 제10 항에 있어서,
    상기 제2 긴장재는, 강연선인 것을 특징으로 하는
    프리캐스트 교각.
  12. 기초부를 타설하는 단계;
    상기 기초부 상에 최하부 세그먼트를 안착시키는 단계;
    상기 최하부 세그먼트에 프리스트레스가 인가되도록 상기 기초부로부터 상기 최하부 세그먼트까지 이어지는 제1 긴장재를 상기 최하부 세그먼트의 상부에 인장 상태로 중간 정착시키는 단계;
    상기 최하부 세그먼트의 상부에 복수의 교각 세그먼트를 적층하여 설치하는 단계;
    상기 복수의 교각 세그먼트의 상부에 코핑부를 설치하는 단계;
    상기 제1 긴장재의 상단에 커플러를 통해 연속적으로 연장되어 상기 코핑부의 상부까지 이어지는 복수의 고정재를 비인장 상태로 상기 코핑부의 상부에 고정시키는 단계; 및
    상기 기초부로부터 상기 코핑부까지 이어지는 제2 긴장재를 인장 상태로 상기 코핑부의 상면에서 정착시키는 단계;를 포함하는
    프리캐스트 교각 시공 방법.
  13. 제12 항에 있어서,
    최하부 세그먼트는 부분 중공을 가지는 중공 세그먼트로 제공되는 단계; 및
    상기 긴장하는 단계가 완료된 뒤 상기 부분 중공에 그라우팅제를 충진하는 단계를 더 포함하는
    프리캐스트 교각 시공 방법.
PCT/KR2014/013096 2014-10-15 2014-12-31 프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법 WO2016060334A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2014-0139362 2014-10-15
KR1020140139362A KR101687072B1 (ko) 2014-10-15 2014-10-15 프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법

Publications (1)

Publication Number Publication Date
WO2016060334A1 true WO2016060334A1 (ko) 2016-04-21

Family

ID=55746852

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2014/013096 WO2016060334A1 (ko) 2014-10-15 2014-12-31 프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법

Country Status (2)

Country Link
KR (1) KR101687072B1 (ko)
WO (1) WO2016060334A1 (ko)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107794837A (zh) * 2016-08-31 2018-03-13 南京理工大学 适用于中强震区的预制装配式桥墩及其施工方法
CN108342983A (zh) * 2018-01-15 2018-07-31 中铁大桥局集团有限公司 用于深水桥梁基础施工中水下钢护筒的接高方法
CN108660912A (zh) * 2017-03-31 2018-10-16 比亚迪股份有限公司 预制桥墩、轨道支撑组件及其制造安装方法
CN108867341A (zh) * 2018-06-11 2018-11-23 浙江大学城市学院 一种gfrp管-混凝土-型钢组合柱脚节点及其施工方法
CN111648247A (zh) * 2020-05-29 2020-09-11 中铁建大桥工程局集团第二工程有限公司 一种多阶段拼装式盖梁及其施工工艺
CN112239996A (zh) * 2020-11-06 2021-01-19 华侨大学 自复位空心桥墩及其施工方法
CN112627016A (zh) * 2021-01-11 2021-04-09 深圳市天健(集团)股份有限公司 一种具备自复位与强耗能的装配式桥墩及其施工方法
CN112627017A (zh) * 2021-01-11 2021-04-09 深圳市天健(集团)股份有限公司 刚度渐变且可更换耗能棒的装配式桥墩及其施工方法
CN114541252A (zh) * 2022-04-07 2022-05-27 安徽省交通规划设计研究总院股份有限公司 一种带芯柱的节段预应力拼装桥墩及施工方法
CN114775412A (zh) * 2022-05-07 2022-07-22 广州机施建设集团有限公司 一种预制节段式桥墩及其施工方法
CN115075146A (zh) * 2022-07-22 2022-09-20 北京城建设计发展集团股份有限公司 一种通过预应力筋及钢筋连接预制盖梁的方法

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884383A (zh) * 2017-01-24 2017-06-23 北京交通大学 一种基于装配式技术的单轨交通混凝土桥墩制作方法
CN108660910A (zh) * 2017-03-31 2018-10-16 比亚迪股份有限公司 预制桥墩、轨道支撑组件及其制造安装方法
CN111455833A (zh) * 2020-04-14 2020-07-28 北京工业大学 一种自复位预制拼装桥墩及其施工方法
CN111455834A (zh) * 2020-04-14 2020-07-28 北京工业大学 一种自复位预制拼装桥墩及其施工方法
CN113481870A (zh) * 2021-08-11 2021-10-08 柳州欧维姆机械股份有限公司 一种多节段桥墩拼装用预应力锚固结构体系及多节段桥墩拼装施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06264413A (ja) * 1992-10-08 1994-09-20 Keihan Concrete Kogyo Kk 橋脚のプレハブ工法及び橋脚用コンクリ−トブロック
KR20070020826A (ko) * 2005-08-17 2007-02-22 고려대학교 산학협력단 내부구속 중공 콘크리트 충전유닛을 사용한 프리스트레스연결형 조립식교각 및 그 시공방법
KR100860591B1 (ko) * 2007-06-19 2008-09-26 삼성물산 주식회사 Pc블럭을 이용한 수직구조물 축조공법

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100804149B1 (ko) * 2006-11-24 2008-02-19 전영총 피씨구조체 교각 및 피씨구조체 교각의 시공방법

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06264413A (ja) * 1992-10-08 1994-09-20 Keihan Concrete Kogyo Kk 橋脚のプレハブ工法及び橋脚用コンクリ−トブロック
KR20070020826A (ko) * 2005-08-17 2007-02-22 고려대학교 산학협력단 내부구속 중공 콘크리트 충전유닛을 사용한 프리스트레스연결형 조립식교각 및 그 시공방법
KR100860591B1 (ko) * 2007-06-19 2008-09-26 삼성물산 주식회사 Pc블럭을 이용한 수직구조물 축조공법

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107794837A (zh) * 2016-08-31 2018-03-13 南京理工大学 适用于中强震区的预制装配式桥墩及其施工方法
CN108660912A (zh) * 2017-03-31 2018-10-16 比亚迪股份有限公司 预制桥墩、轨道支撑组件及其制造安装方法
CN108342983A (zh) * 2018-01-15 2018-07-31 中铁大桥局集团有限公司 用于深水桥梁基础施工中水下钢护筒的接高方法
CN108867341A (zh) * 2018-06-11 2018-11-23 浙江大学城市学院 一种gfrp管-混凝土-型钢组合柱脚节点及其施工方法
CN111648247A (zh) * 2020-05-29 2020-09-11 中铁建大桥工程局集团第二工程有限公司 一种多阶段拼装式盖梁及其施工工艺
CN112239996A (zh) * 2020-11-06 2021-01-19 华侨大学 自复位空心桥墩及其施工方法
CN112627016A (zh) * 2021-01-11 2021-04-09 深圳市天健(集团)股份有限公司 一种具备自复位与强耗能的装配式桥墩及其施工方法
CN112627017A (zh) * 2021-01-11 2021-04-09 深圳市天健(集团)股份有限公司 刚度渐变且可更换耗能棒的装配式桥墩及其施工方法
CN114541252A (zh) * 2022-04-07 2022-05-27 安徽省交通规划设计研究总院股份有限公司 一种带芯柱的节段预应力拼装桥墩及施工方法
CN114775412A (zh) * 2022-05-07 2022-07-22 广州机施建设集团有限公司 一种预制节段式桥墩及其施工方法
CN115075146A (zh) * 2022-07-22 2022-09-20 北京城建设计发展集团股份有限公司 一种通过预应力筋及钢筋连接预制盖梁的方法

Also Published As

Publication number Publication date
KR101687072B1 (ko) 2016-12-16
KR20160044709A (ko) 2016-04-26

Similar Documents

Publication Publication Date Title
WO2016060334A1 (ko) 프리캐스트 교각 및 이를 이용하는 프리캐스트 교각 시공 방법
WO2016129826A1 (ko) 안전성이 강화된 피씨 트러스 벽체 구조물 및 이를 이용한 지하구조물 시공방법
WO2016043406A1 (ko) 마이크로파일을 이용한 송전철탑 기초체
ES2243365T3 (es) Conducto receptor de cable pretensado con canales longitudinales.
WO2017069313A1 (ko) 프리캐스트 바닥판과 충전강관 트러스 거더의 조립을 이용한 교량의 런칭시공방법
WO2016178451A2 (ko) 삼각망 배근에 의한 psc구조 및 이의 시공방법
WO2019054703A1 (ko) Cip벽체 형성장치 및 이를 이용한 시공방법
WO2020050531A1 (ko) 배관 내부 보수장치
WO2021066294A1 (ko) 선조립 벽체 모듈을 이용한 선조립 벽체의 시공 방법
KR20080073279A (ko) 강재 덕트와 강관 및 철근을 구비하는 프리캐스트 콘크리트세그먼트로 조립된 psc 교각 및 이의 시공 방법
KR101478131B1 (ko) 블록을 이용한 조립식 교각의 시공방법
WO2018070634A1 (ko) 철근콘크리트 프레임 내진 보강용 pc 벽 패널, pc 벽 패널을 이용한 철근콘크리트 프레임 내진 보강 구조 및 이의 시공 방법
WO2014069971A1 (ko) 강선사용 프리텐션 조적벽체 보강장치 및 이를 이용한 조적벽체 보강방법
CN112681117B (zh) 连接装置及桥梁墩柱与承台连接处的施工方法
WO2015088297A1 (ko) 콘크리트 기둥의 보강장치 및 이를 이용한 콘크리트 기둥의 보강방법
JP3635004B2 (ja) 橋梁の片持式架設工法
WO2018186612A1 (ko) 현장 타설 보강 팽이말뚝 기초 및 이의 시공방법
WO2021187873A1 (ko) 건축기초시스템에 있어 임플란트식 파일압입장치 및 이를 이용한 임플란트식 파일링공법
WO2013081408A1 (ko) 블록들의 연결부 접합면의 간극차이를 이용하여 거더에 프리스트레스를 도입할 수 있는 조립식 하이브리드 거더, 조립식 하이브리드 거더에 프리스트레스를 도입하는 방법, 조립식 하이브리드 거더의 연속화 방법 및, 그 제작 및 조립방법
WO2011059145A1 (ko) 강관 말뚝을 이용한 구조물
KR101910081B1 (ko) 분절 프리캐스트 세그먼트를 이용한 아치교량의 시공방법
KR100860796B1 (ko) 상하 대칭 또는 비대칭 정착브라켓을 이용한 프리스트레스트 콘크리트 거더의 연속화 방법
WO2021015442A1 (ko) 건축기초시스템에 있어 임플란트식 파일 설치구 및 이를 이용한 임플란트식 파일공법
WO2014116057A1 (ko) 시스템 데크 플레이트의 데크 연결 구조 및 이를 구비한 시스템 데크 플레이트
CN112900267B (zh) 碳纤维板束的张拉锚固系统及其张拉方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14904049

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14904049

Country of ref document: EP

Kind code of ref document: A1