WO2016002209A1 - 集熱換気システム - Google Patents
集熱換気システム Download PDFInfo
- Publication number
- WO2016002209A1 WO2016002209A1 PCT/JP2015/003285 JP2015003285W WO2016002209A1 WO 2016002209 A1 WO2016002209 A1 WO 2016002209A1 JP 2015003285 W JP2015003285 W JP 2015003285W WO 2016002209 A1 WO2016002209 A1 WO 2016002209A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- air
- temperature
- heat
- heat collection
- building
- Prior art date
Links
- 238000009423 ventilation Methods 0.000 title claims abstract description 109
- 238000010438 heat treatment Methods 0.000 claims description 41
- 238000009413 insulation Methods 0.000 claims description 25
- 238000010248 power generation Methods 0.000 claims description 9
- 238000010792 warming Methods 0.000 claims description 4
- 238000011144 upstream manufacturing Methods 0.000 description 5
- 230000005494 condensation Effects 0.000 description 2
- 238000009833 condensation Methods 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24S—SOLAR HEAT COLLECTORS; SOLAR HEAT SYSTEMS
- F24S20/00—Solar heat collectors specially adapted for particular uses or environments
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F5/00—Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F7/00—Ventilation
- F24F7/007—Ventilation with forced flow
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24S—SOLAR HEAT COLLECTORS; SOLAR HEAT SYSTEMS
- F24S10/00—Solar heat collectors using working fluids
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02S—GENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
- H02S20/00—Supporting structures for PV modules
- H02S20/20—Supporting structures directly fixed to an immovable object
- H02S20/22—Supporting structures directly fixed to an immovable object specially adapted for buildings
- H02S20/23—Supporting structures directly fixed to an immovable object specially adapted for buildings specially adapted for roof structures
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/10—Photovoltaic [PV]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/20—Solar thermal
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/40—Solar thermal energy, e.g. solar towers
- Y02E10/44—Heat exchange systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Definitions
- the present invention relates to a heat collection ventilation system, and more particularly, to a heat collection ventilation system provided to supply heat collection air produced by warming outside air to a heat insulating space of a building.
- Japanese Patent Publication No. 2011-1713 discloses a heat collection system. This heat collection system is configured to provide an air circulation layer between the solar cell module and the roof, and draw the air in the air circulation layer into the building.
- the above-described conventional heat collection system was not a system that considered the relationship with constant ventilation (24-hour ventilation) performed in a building.
- a heat collection ventilation system includes a heat collection device, an air supply path, an air supply device, an exhaust device for continuous ventilation, a first temperature sensor, a second temperature sensor, and a control unit.
- the heat collecting device is installed in a building and warms the outside air with sunlight to create heat collecting air.
- the air supply path is a path for supplying the collected air to the heat insulating space of the building.
- the air supply device forcibly supplies the collected air toward the heat insulation space through the air supply path.
- the exhaust device exhausts indoor air in the heat insulation space toward the outdoor space of the building.
- the first temperature sensor senses the temperature of the heat collecting air.
- the second temperature sensor senses the temperature of the indoor air.
- the control unit controls the operation of the air supply device and the exhaust device.
- the control unit includes: an air supply amount for supplying the collected air by the air supply device based on a temperature difference between the temperature of the heat collection air and the indoor air; and the indoor air by the exhaust device.
- the exhaust air volume for exhausting the air is controlled.
- the control unit has a control mode used in the heating period.
- the control unit causes the air supply device to operate together with the exhaust device, and when the temperature of the collected air is lower than the temperature of the heat insulation space, an exhaust air volume for exhausting the indoor air, A predetermined constant ventilation air volume is set, and a supply air volume for supplying the collected air is set to be equal to or smaller than the predetermined constant ventilation air volume.
- the control unit has a control mode used in the heating period.
- the control unit causes the air supply device to operate together with the exhaust device, and when the temperature of the collected air is higher than the temperature of the heat insulation space, an exhaust air volume for exhausting the indoor air, An air volume larger than a predetermined constant ventilation air volume is set, and a supply air volume for supplying the collected air is set to an air volume larger than the predetermined constant ventilation air volume.
- the building has a natural air inlet configured to perform natural ventilation between the heat insulating space and the outdoor space.
- the control unit controls the operation of the air supply device and the air supply device such that an air supply amount for supplying the collected air is equal to or less than an exhaust air amount for exhausting the indoor air.
- the heat insulating space has a room in which the exhaust device is installed.
- This room is a toilet room, a bathroom or a washroom.
- the heat collection device includes a photovoltaic power generation panel that is disposed above a roof of the building and forms an air layer with the roof.
- the heat collecting device is configured to create the heat collecting air by warming the outside air in the air layer.
- FIG. 1A to FIG. 1C schematically show a building 1 equipped with the heat collection and ventilation system of the present embodiment.
- FIG. 1A shows a state of operation of the heat collection ventilation system of the present embodiment outside the heating period
- FIGS. 1B and 1C illustrate states of operation of the heat collection ventilation system of the present embodiment during the heating period. Show. In each figure, the air flow is indicated by arrows.
- the heating period means a period of heating (such as winter) in the building 1.
- the heat collection ventilation system of this embodiment includes a heat collection device 2 installed on the roof 10 of the building 1.
- the roof 10 is an inclined roof inclined in one direction.
- the lower side of the roof 10 in the tilt direction is called “eave side”
- the upper side in the tilt direction is called “building side”.
- the heat collecting apparatus 2 includes a photovoltaic power generation panel 20 supported above the roof 10 (the upper surface of the roof 10).
- the photovoltaic power generation panel 20 is positioned at a distance from the roof 10 and is positioned in a posture parallel to the roof 10 (including a case of being substantially parallel).
- An air layer 21 is formed between the photovoltaic power generation panel 20 and the roof 10.
- Outside air is introduced into the air layer 21 through the end of the air layer 21 (end on the eaves side).
- the outside air introduced into the air layer 21 is heated on the back side of the photovoltaic power generation panel 20 and becomes heat collection air having a temperature higher than that of the surrounding outside air.
- the building 1 includes a heat insulating space 11 insulated from a space outside the building 1 (hereinafter referred to as “outdoor space”) and an air supply path 3.
- the heat insulating space 11 is a space partitioned from an outdoor space by a wall of the building 1 or the like.
- the air supply path 3 is a pipe line that communicates the air layer 21 of the heat collector 2 and the heat insulating space 11 of the building 1.
- the air supply path 3 is provided with an air supply device 4 for sending the collected air in the air layer 21 toward the heat insulating space 11.
- the air supply device 4 includes an air supply fan 40 interposed in the air supply path 3. When the control unit 9 described later operates the air supply fan 40, the heat collection air created by the heat collection device 2 is sequentially supplied into the heat insulating space 11 through the air supply path 3.
- the upstream end of the air supply path 3 communicates with the end of the air layer 21 on the ridge side.
- the heat insulation space 11 includes a living space 111 on the first floor and a living space 112 on the second floor located above the living space 111.
- the living space 111 on the first floor and the living space 112 on the second floor are partially in communication with each other.
- the living space 111 on the first floor includes a room 111a in which a pair of exhaust fans 50 and 51 for constant ventilation (so-called 24-hour ventilation) are installed on the wall, and another room 111b.
- the room 111a and the other room 111b communicate with each other.
- the room 111a in which the exhaust fans 50 and 51 are installed is a toilet room, a bathroom, a washroom, and the like.
- the other room 111b is a living room, a dining room, a kitchen, or the like.
- a natural air supply port 61 that allows the living space 111 to communicate with the outdoor space.
- the natural air inlet 61 is formed through the wall that partitions the other room 111b from the outdoor space.
- the living space 112 on the second floor includes a room 112a in which an exhaust fan 52 for constant ventilation is installed on the wall and another room 112b.
- the room 112a is a toilet room, a bathroom, a washroom, and the like.
- the other room 111b is a living room (bedroom) or the like.
- the room 112a and the other room 112b communicate with each other.
- a natural air inlet 62 similar to the natural air inlet 61 is provided in the living space 112 on the second floor.
- the natural air inlet 62 on the second floor is formed through the wall that partitions the other room 112b and the outdoor space.
- the natural air inlet 62 communicates the living space 112 with the outdoor space.
- the air supply port 30 located at the downstream end of the air supply path 3 is configured to supply heat collection air to the living space 111 on the first floor.
- the building 1 is provided with the 1st temperature sensor 7, the 2nd temperature sensor 8, and the control part 9 as shown in FIG.
- the first temperature sensor 7 senses the temperature of the heat collecting air supplied from the heat collecting device 2 to the heat insulating space 11.
- the temperature of the heat collecting air is denoted by reference numeral T1.
- the first temperature sensor 7 can be installed in the air supply path 3, or can be installed in the air layer 21 of the heat collecting device 2.
- the second temperature sensor 8 senses the temperature of the indoor air present in the heat insulating space 11.
- the temperature of the room air is denoted by reference symbol T2.
- the second temperature sensor 8 can be installed at an appropriate location in the heat insulating space 11.
- the control unit 9 which includes a microprocessor or the like, supplies air based on the temperature T 1 of the collected air sensed by the first temperature sensor 7 and the temperature T 2 of the indoor air sensed by the second temperature sensor 8. The operation of the air device 4 and the operation of the exhaust device 5 are controlled.
- the control unit 9 has a plurality of control modes for controlling the operation of the air supply device 4 and the operation of the exhaust device 5.
- the plurality of control modes can be switched automatically or manually.
- the plurality of control modes include a control mode (first control mode) used in periods other than the heating period (summer etc.) and a control mode (second control mode) used in the heating period (winter etc.).
- control modes other than the heating period will be described.
- control unit 9 operates the exhaust device 5 and constantly performs ventilation without operating the air supply device 4. That is, the heat collection air having a temperature higher than the outside air is not supplied to the heat insulating space 11 except during the heating period.
- the constant ventilation is performed with a predetermined constant ventilation air volume.
- the predetermined constant ventilation air volume is set to 75 [m 3 / h] on each floor.
- Each of the exhaust fans 50, 51, and 52 has an ability to exhaust at 75 [m 3 / h].
- the control unit 9 stops one of the exhaust fans 50 and 51 provided on the first floor of the building 1 and operates only the other exhaust fan 51.
- the control unit 9 operates the exhaust fan 52 on the second floor portion of the building 1.
- outside air is introduced into the heat insulating space 11 through the natural air inlets 61 and 62.
- the air volume of the outside air introduced from the natural air supply port 61 on the first floor is the same (including substantially the same case) as the air volume exhausted by the exhaust fan 51. That is, the air volume of the outside air introduced from the natural air supply port 61 on the first floor is the same (including substantially the same case) as the predetermined constant ventilation air volume.
- the air volume of the outside air introduced from the natural air supply port 62 on the second floor is the same (including substantially the same case) as the air volume exhausted by the exhaust fan 52. That is, the air volume of the outside air introduced from the natural air supply port 62 on the second floor is the same (including substantially the same case) as the predetermined constant ventilation air volume.
- control unit 9 operates the air supply device 4 together with the exhaust device 5.
- the control unit 9 Based on the temperature difference between the temperature T1 of the heat collection air and the temperature T2 of the indoor air, the control unit 9 supplies the amount of supply air to which the air supply device 4 supplies the heat collection air, and the exhaust from which the exhaust device 5 exhausts the indoor air.
- the air volume is controlled individually.
- the control unit 9 controls the operation of the air supply device 4 and the exhaust device 5 as shown in FIG. 1B.
- the control part 9 sets the exhaust air volume which exhausts indoor air in each floor to 75 [m ⁇ 3 > / h] which is a predetermined constant ventilation air volume.
- the control unit 9 sets the supply air volume for supplying the collected air to the first floor portion with the air supply device 4 to 75 [m 3 / h] so as to be the same as the predetermined constant ventilation air volume.
- the temperature T1 of the collected air is higher than the temperature of the outside air.
- the reference temperature T0 is given to the temperature of the outside air.
- T1 is 10 [° C.] whereas T0 is 5 [° C.].
- the heat collection and ventilation system of the present embodiment it is possible to suppress cold outside air from entering the heat insulating space 11 while always performing ventilation in the heating period, and to improve the efficiency of heating (in other words, suppression of heating load). Is realized.
- the supply air volume for supplying the collected air from the intake port 30 using the air supply device 4 is not limited to the same air volume (75 [m 3 / h]) as the predetermined constant ventilation air volume, but the predetermined constant ventilation. It is possible to set the air volume smaller than the air volume. Also in this case, the air volume of the outside air entering from the natural air inlet 61 on the first floor can be suppressed by the amount of the collected air supplied using the air supply device 4, and the efficiency of heating is realized.
- the control unit 9 sets the air supply amount for supplying the collected air to the first floor portion with the air supply device 4 to 150 [m 3 / h], which is twice the predetermined constant ventilation air amount.
- cold ventilation is prevented from entering the heat-insulating space 11 while constantly ventilating in the heating period, and the heat collection air having a temperature higher than the indoor air is supplied. Can do.
- the heated air in the building 1 is further improved in efficiency because the exhaust air flow is twice as high as the predetermined constant ventilation air flow and the heat collection air is hotter than the indoor air. .
- the air supply amount for supplying the collected air by the air supply device 4 it is preferable to set the air supply amount for supplying the collected air by the air supply device 4 to be equal to or less than the exhaust air amount for exhausting indoor air by the exhaust device 5.
- the supply air volume for supplying the collected air is larger than the exhaust air volume for exhausting the indoor air, the heated indoor air is exhausted to the outdoor space through the natural air inlet 61. In this case, excessive dew condensation tends to occur at the natural air supply port 61 and its vicinity, which is not preferable.
- the control unit 9 controls the operation of the air supply device 4 and the exhaust device 5 as shown in FIG.
- the temperature T1 is equal to or higher than the temperature T2 of the heat insulating space 11 (that is, when the temperature T1 is higher than the temperature T2 and when the temperature T1 is the same as the temperature T2), as shown in FIG. It is also possible to provide so as to control the operation of the exhaust device 5.
- the heat collection air is configured to be supplied to the first floor portion of the heat insulating space 11, but the heat collection air is configured to be supplied to the second floor portion, or the heat collection air is supplied to each floor portion. It can also be configured to supply.
- FIG. 3A shows a state of operation of the heat collection ventilation system of the present embodiment outside the heating period
- FIGS. 3B and 3C illustrate states of operation of the heat collection ventilation system of the present embodiment during the heating period. Show.
- the basic configuration of the heat collection ventilation system of the second embodiment is the same as that of the heat collection ventilation system of the first embodiment.
- the same components as those in the first embodiment described above are denoted by the same reference numerals, and detailed description thereof is omitted.
- the building 1 does not include the natural air supply ports 61 and 62 as in the first embodiment.
- the air supply into the heat insulating space 11 is forcedly (mechanically) using the air supply device 4. Do.
- the upstream end of the air supply path 3 provided in the heat collection ventilation system of the present embodiment is connected to the air layer 21 of the heat collection device 2 in communication.
- the downstream end of the air supply path 3 is bifurcated.
- An air supply port 30a for supplying heat collection air to the living space 111 on the first floor is positioned at one downstream end of the branched air supply path 3.
- An air supply port 30b for supplying heat collection air to the living space 112 on the second floor is located at the other downstream end of the air supply path 3 which is branched.
- the air supply fan 40 included in the air supply device 4 is located upstream of the branch point of the air supply path 3.
- the control unit 9 operates the air supply fan 40, the heat collection air created by the heat collection device 2 is supplied to the first and second floor living spaces 111 and 112 through the air supply path 3.
- the air supply path 3 further includes an outside air introduction path 31 that joins a position upstream of the air supply fan 40.
- the air supply device 4 further includes a first on-off valve 41 and a second on-off valve 42.
- the first on-off valve 41 is located upstream of the point where the outside air introduction path 31 joins in the air supply path 3.
- the second on-off valve 42 is located in the outside air introduction path 31.
- control unit 9 operates the air supply device 4 to introduce outside air even in a control mode other than the heating period (first control mode). To do.
- control unit 9 closes the first on-off valve 41 and opens the second on-off valve 42, operates the air supply fan 40, and controls the indoor air exhausted by the exhaust device 5.
- the outside air is introduced into the heat insulation space 11 by the same air volume as the exhaust air volume.
- control unit 9 opens the first on-off valve 41 and closes the second on-off valve 42 in the heating mode control mode (second control mode). Then, the air supply fan 40 is operated.
- the control unit 9 sets the exhaust air volume for exhausting indoor air on each floor to a predetermined constant ventilation air volume of 75 [ m 3 / h].
- the control unit 9 sets the supply air volume for supplying the collected air to each floor by the air supply device 4 to 75 [m 3 / h] so as to be the same as the predetermined constant ventilation air volume.
- T1 10 [° C.]
- the heat collection ventilation system of the present embodiment it is possible to supply heat collection air having a temperature higher than that of the outside air while always performing ventilation in the heating period, and thus the efficiency of heating is realized.
- the control unit 9 sets the supply air volume for supplying the collected air to the first floor using the air supply device 4 to 150 [m 3 / h], which is twice the predetermined constant ventilation air volume.
- the second floor portion is supplied with heat collection air at a predetermined constant ventilation air volume of 75 [m 3 / h].
- the control unit 9 controls the operation of the air supply device 4 and the exhaust device 5 as shown in FIG.
- the temperature T1 is equal to or higher than the temperature T2 of the heat insulation space 11 (that is, when the temperature T1 is higher than the temperature T2 and when the temperature T1 is the same as the temperature T2), as shown in FIG. It is also possible to provide so as to control the operation of the exhaust device 5.
- the heat collection air is configured to be supplied to the first floor portion and the second floor portion of the heat insulation space 11 respectively, but the configuration is also possible to supply the heat collection air only to the first floor portion. It is also possible to supply the heat collecting air only to the part.
- a natural air inlet similar to the natural air inlet 61 of the first embodiment may be provided in the first floor part, or a natural air inlet similar to the natural air inlet 62 of the first embodiment may be provided in the second floor part. Is possible.
- the heat collection and ventilation system of the first and second embodiments includes the heat collection device 2, the air supply path 3, the air supply device 4, the exhaust device 5 for regular ventilation, the first temperature sensor 7, and the second.
- a temperature sensor 8 and a control unit 9 are provided.
- the heat collector 2 is installed in the building 1 and warms the outside air with sunlight to create heat collection air.
- the air supply path 3 is a path for supplying heat collection air to the heat insulating space 11 of the building 1.
- the air supply device 4 forcibly supplies the heat collection air toward the heat insulating space 11 through the air supply path 3.
- the exhaust device 5 exhausts indoor air in the heat insulating space 11 toward the outdoor space of the building 1.
- the first temperature sensor 7 senses the temperature T1 of the heat collecting air.
- the second temperature sensor 8 senses the indoor air temperature T2.
- the control unit 9 controls the operation of the air supply device 4 and the exhaust device 5.
- the control unit 9 Based on the temperature difference between the temperature T1 of the heat collection air and the temperature T2 of the indoor air, the control unit 9 exhausts the indoor air using the air supply device 4 that supplies the heat collection air by the air supply device 4 and the exhaust device 5.
- the exhaust air volume to be controlled is controlled.
- the heat collection ventilation system of 1st and 2nd embodiment after considering the exhaust_gas
- FIG. Hot air can be supplied and the temperature in the heat insulation space 11 can be adjusted efficiently.
- the control of the supply air volume and the exhaust air volume may be performed for each floor of the heat insulation space 11 or may be performed for the entire heat insulation space 11.
- the control unit 9 has a control mode used in the heating period, and operates the air supply device 4 together with the exhaust device 5 in the control mode.
- the control unit 9 sets the exhaust air volume for exhausting the indoor air to a predetermined constant ventilation air volume,
- the supplied air volume is set to be equal to or smaller than a predetermined constant ventilation air volume.
- the heat collection air which warmed the outside air was supplemented so that the whole or a part of indoor air exhausted from the heat insulation space 11 for constant ventilation may be supplemented. It can supply to the heat insulation space 11, and the temperature adjustment in the heat insulation space 11 in a heating period can be performed efficiently.
- the control unit 9 has a control mode used in the heating period, and operates the air supply device 4 together with the exhaust device 5 in the control mode.
- the control unit 9 sets the exhaust air volume for exhausting the indoor air to an air volume larger than a predetermined constant ventilation air volume,
- the supply air volume for supplying the collected air is set to an air volume larger than a predetermined constant ventilation air volume.
- the heat collection is higher than the room air so as to supplement the whole or part of the indoor air exhausted from the heat insulating space 11 for constant ventilation. Air can be supplied to the heat insulating space 11. Moreover, the collected air supplied at this time is supplied with a supply air volume larger than a predetermined constant ventilation air volume. Therefore, the temperature adjustment in the heat insulation space 11 in the heating period can be performed efficiently.
- the building 1 has a natural air inlet 61 configured to perform natural ventilation between the heat insulating space 11 and the outdoor space.
- the control unit 9 controls the operation of the air supply device 4 and the exhaust device 5 so that the supply air amount for supplying the collected air is equal to or less than the exhaust air amount for exhausting the indoor air.
- the heat insulating space 11 has rooms 111a and 112a in which the exhaust device 5 is installed.
- the rooms 111a and 112a are a toilet room, a bathroom, or a washroom.
- the heat collection ventilation system of 1st and 2nd embodiment generally with respect to the toilet room, a bathroom, or a washroom which a temperature difference tends to produce between the other rooms 111b and 112b in the heating period It is possible to supply warm air and suppress the temperature difference.
- the heat collecting device 2 is arrange
- the heat collector 2 is configured to generate heat collection air by warming the outside air with the air layer 21.
- the heat collection ventilation system of 1st and 2nd embodiment in addition to collecting heat with the heat collecting device 2 installed on the roof 10, it can generate electric power with the photovoltaic power generation panel 20. And the fall of the power generation efficiency can be suppressed by suppressing the temperature rise of the photovoltaic power generation panel 20.
- the air volume is switched to a plurality of stages by providing a pair of exhaust fans 50 and 51 and switching between operation and stop, but the air volume is switched to a plurality of stages with one exhaust fan. It may be a configuration.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Sustainable Energy (AREA)
- Thermal Sciences (AREA)
- Electromagnetism (AREA)
- Acoustics & Sound (AREA)
- Building Environments (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
- Other Air-Conditioning Systems (AREA)
- Ventilation (AREA)
Abstract
建物内の温度調整を効率的に行うことのできる集熱換気システムを提供する。本発明の一様態に係る集熱換気システムは、集熱装置(2)、給気路(3)、給気装置(4)、排気装置(5)、第一温度センサ(7)、第二温度センサ(8)及び制御部(9)を備える。給気装置(4)は、給気路(3)を通じて集熱空気を断熱空間(11)に供給する。排気装置(5)は、断熱空間(11)内にある屋内空気を、屋外空間に排気する。第一温度センサ(7)は、集熱空気の温度(T1)を感知する。第二温度センサ(8)は、屋内空気の温度(T2)を感知する。制御部(9)は、集熱空気の温度(T1)と屋内空気の温度(T2)の温度差に基づいて、給気装置(4)で集熱空気を供給する給気風量と、排気装置(5)で屋内空気を排気する排気風量とを制御する。
Description
本発明は、集熱換気システムに関し、詳しくは、外気を温めて作った集熱空気を、建物の断熱空間に供給するように設けた集熱換気システムに関する。
日本国公開特許公報2011-1713号には、集熱システムが開示されている。この集熱システムは、太陽電池モジュールと屋根との間に空気流通層を設け、空気流通層にある空気を、建物内に引き込むように構成されている。
前記した従来の集熱システムは、建物で行う常時換気(24時間換気)との関係を考慮したシステムではなかった。
本発明は、建物で行う常時換気との関係を考慮して空気の供給を制御し、これにより建物内の温度調整を効率的に行うことのできる集熱換気システムを提供することを、目的とする。
本発明の一様態に係る集熱換気システムは、集熱装置と、給気路と、給気装置と、常時換気用の排気装置と、第一温度センサと、第二温度センサと、制御部とを備える。
前記集熱装置は、建物に設置され、太陽光で外気を温めて集熱空気を作り出す。
前記給気路は、前記建物が有する断熱空間に前記集熱空気を供給する経路である。
前記給気装置は、前記給気路を通じて、前記集熱空気を前記断熱空間に向けて強制的に供給する。
前記排気装置は、前記断熱空間にある屋内空気を、前記建物の屋外空間に向けて排気する。
前記第一温度センサは、前記集熱空気の温度を感知する。
前記第二温度センサは、前記屋内空気の温度を感知する。
前記制御部は、前記給気装置と前記排気装置の運転を制御する。前記制御部は、前記集熱空気の温度と、前記屋内空気の温度との温度差に基づいて、前記給気装置で前記集熱空気を供給する給気風量と、前記排気装置で前記屋内空気を排気する排気風量とを制御する。
本発明の一様態に係る集熱換気システムにおいて、前記制御部は、暖房期に用いる制御モードを有する。前記制御部は、前記制御モードにおいて、前記給気装置を前記排気装置と共に運転させ、前記集熱空気の温度が前記断熱空間の温度よりも低いときに、前記屋内空気を排気する排気風量を、所定の常時換気風量に設定し、前記集熱空気を供給する給気風量を、前記所定の常時換気風量と同一又はこれよりも小さな風量に設定する。
本発明の一様態に係る集熱換気システムにおいて、前記制御部は、暖房期に用いる制御モードを有する。前記制御部は、前記制御モードにおいて、前記給気装置を前記排気装置と共に運転させ、前記集熱空気の温度が前記断熱空間の温度よりも高いときに、前記屋内空気を排気する排気風量を、所定の常時換気風量よりも大きな風量に設定し、前記集熱空気を供給する給気風量を、前記所定の常時換気風量よりも大きな風量に設定する。
本発明の一様態に係る集熱換気システムにおいて、前記建物は、前記断熱空間と前記屋外空間との間で自然換気を行うように構成された自然給気口を有する。前記制御部は、前記制御モードにおいて、前記集熱空気を供給する給気風量が、前記屋内空気を排気する排気風量以下となるように、前記給気装置と前記給気装置の運転を制御する。
本発明の一様態に係る集熱換気システムにおいて、前記断熱空間は、前記排気装置が設置される部屋を有する。この部屋は、トイレ室、浴室又は洗面室である。
本発明の一形態に係る集熱換気システムにおいて、前記集熱装置は、前記建物が有する屋根の上方に配置され、前記屋根との間で空気層を形成する太陽光発電パネルを備える。前記集熱装置は、前記空気層で前記外気を温めることで前記集熱空気を作り出すように構成されている。
(第1実施形態)
第1実施形態の集熱換気システムについて、図1A~図1C、図2に基づいて説明する。
第1実施形態の集熱換気システムについて、図1A~図1C、図2に基づいて説明する。
図1A~図1Cには、本実施形態の集熱換気システムを備えた建物1を、概略的に示している。図1Aには、本実施形態の集熱換気システムの暖房期以外での運転の様子を示し、図1Bと図1Cには、本実施形態の集熱換気システムの暖房期での運転の様子を示す。各図では、空気の流れを矢印で示している。暖房期は、建物1内で暖房を行う時期(冬等)を意味する。
本実施形態の集熱換気システムは、建物1の屋根10に設置される集熱装置2を備える。屋根10は、一方向に傾斜した傾斜屋根である。本文中では、屋根10の傾斜方向の下側を「軒側」といい、傾斜方向の上側を「棟側」という。
集熱装置2は、屋根10(屋根10の上面)の上方に支持された太陽光発電パネル20を備える。太陽光発電パネル20は、屋根10との間に距離をあけて位置し、且つ、屋根10と平行(略平行な場合を含む)な姿勢で位置する。太陽光発電パネル20と屋根10との間には、空気層21が形成される。
空気層21には、空気層21の端部(軒側の端部)を通じて、外気が導入される。空気層21に導入された外気は、太陽光発電パネル20の裏側で温められ、周囲の外気よりも高温の集熱空気となる。
建物1は、建物1の外部の空間(以下「屋外空間」という。)から断熱された断熱空間11と、給気路3を備える。断熱空間11は、建物1の壁等で屋外空間から仕切られた空間である。給気路3は、集熱装置2の空気層21と、建物1の断熱空間11とを連通させる管路である。
給気路3には、空気層21内の集熱空気を断熱空間11に向けて送り出すための給気装置4を設けている。給気装置4は、給気路3の経路中に介在する給気ファン40を含む。後述の制御部9が給気ファン40を運転することで、集熱装置2で作り出した集熱空気が、給気路3を通じて断熱空間11内に順次供給される。
給気路3の上流端は、空気層21の棟側の端部に連通する。空気層21の集熱空気が給気路3を通じて供給されることで、空気層21においては、軒側から棟側に向けて集熱空気を移動させる流れが生じる。
断熱空間11は、一階の居住空間111と、居住空間111の上方に位置する二階の居住空間112とを含む。一階の居住空間111と二階の居住空間112とは、互いに一部が連通している。
一階の居住空間111は、常時換気(いわゆる24時間換気)用の一対の排気ファン50,51が壁に設置された部屋111aと、他の部屋111bとを含む。部屋111aと他の部屋111bは、連通している。排気ファン50,51が設置された部屋111aは、トイレ室、浴室、洗面室等である。他の部屋111bは、居室、食事室、台所等である。
一階の居住空間111には、居住空間111と屋外空間とを連通させる自然給気口61を設けている。自然給気口61は、他の部屋111bと屋外空間とを仕切る壁に、貫通形成されている。
二階の居住空間112は、常時換気用の排気ファン52が壁に設置された部屋112aと、他の部屋112bとを含む。部屋112aはトイレ室、浴室、洗面室等である。他の部屋111bは、居室(寝室)等である。部屋112aと他の部屋112bは、連通している。
二階の居住空間112にも、自然給気口61と同様の自然給気口62を設けている。二階の自然給気口62は、他の部屋112bと屋外空間とを仕切る壁に、貫通形成されている。自然給気口62は、居住空間112と屋外空間とを連通させる。
本実施形態の集熱換気システムにおいて、給気路3の下流端に位置する給気口30は、一階の居住空間111に集熱空気を供給するように構成されている。
更に、本実施形態の集熱換気システムにおいては、図2に示すような第一温度センサ7、第二温度センサ8及び制御部9を、建物1に備えている。
第一温度センサ7は、集熱装置2から断熱空間11に供給される集熱空気の温度を、感知する。以下においては、この集熱空気の温度に符号T1を付す。第一温度センサ7は、給気路3に設置することも可能であるし、集熱装置2の空気層21に設置することも可能である。
第二温度センサ8は、断熱空間11に存在する屋内空気の温度を、感知する。以下においては、この室内空気の温度に符号T2を付す。第二温度センサ8は、断熱空間11内の適宜箇所に設置することが可能である。
マイクロプロセッサ等を構成要素とする制御部9は、第一温度センサ7で感知される集熱空気の温度T1と、第二温度センサ8で感知される屋内空気の温度T2とに基づいて、給気装置4の運転と排気装置5の運転を制御する。
制御部9は、給気装置4の運転と排気装置5の運転を制御する制御モードを、複数有する。複数の制御モードは、自動的にまたは手動で切り替え可能である。複数の制御モードは、暖房期以外(夏等)で用いる制御モード(第一の制御モード)と、暖房期(冬等)で用いる制御モード(第二の制御モード)を含む。
図1Aを参照して、暖房期以外の制御モードについて説明する。
暖房期以外の制御モードにおいて、制御部9は、給気装置4を運転させることなく、排気装置5を運転して常時換気を行う。即ち、暖房期以外には、外気よりも高温となった集熱空気を、断熱空間11に供給しない。
暖房期以外の制御モードにおいて、常時換気は、所定の常時換気風量で行われる。本実施形態において、所定の常時換気風量は、各階で75[m3/h]に設定している。排気ファン50,51,52は、それぞれが75[m3/h]で排気を行う能力を有する。
制御部9は、建物1の一階部分に一対備える排気ファン50,51のうち一方の排気ファン50を停止させ、他方の排気ファン51だけを運転させる。制御部9は、建物1の二階部分では排気ファン52を運転させる。
建物1の各階においては、自然給気口61,62を通じて、断熱空間11内に外気が導入される。一階の自然給気口61から導入される外気の風量は、排気ファン51で排気する風量と同一(略同一の場合を含む)になる。即ち、一階の自然給気口61から導入される外気の風量は、所定の常時換気風量と同一(略同一の場合を含む)になる。
同様に、二階の自然給気口62から導入される外気の風量は、排気ファン52で排気する風量と同一(略同一の場合を含む)になる。即ち、二階の自然給気口62から導入される外気の風量は、所定の常時換気風量と同一(略同一の場合を含む)になる。
次に、図1B、図1Cを参照して、暖房期の制御モードについて説明する。
暖房期の制御モードにおいては、制御部9が、給気装置4を排気装置5と共に運転させる。
制御部9は、集熱空気の温度T1と屋内空気の温度T2の温度差に基づいて、給気装置4が集熱空気を供給する給気風量と、排気装置5が屋内空気を排気する排気風量とを、それぞれ制御する。
具体的には、集熱空気の温度T1が、暖房された断熱空間11の温度T2以下の場合(つまり温度T1が温度T2よりも小さな場合と、温度T1が温度T2と同一の場合であり、例えばT1=10[℃]、T2=20[℃])に、制御部9は、図1Bに示すように、給気装置4と排気装置5の運転を制御する。この場合、制御部9は、各階において屋内空気を排気する排気風量を、所定の常時換気風量である75[m3/h]に設定する。制御部9は、給気装置4で一階部分に集熱空気を供給する給気風量を、所定の常時換気風量と同一の風量となるように、75[m3/h]に設定する。
これにより、断熱空間11の一階部分では、自然給気口61を通じて外気が略導入されない。集熱空気の温度T1は、外気の温度よりも高い。以下においては、この外気の温度に符号T0を付す。例えばT1が10[℃]であるのに対して、T0が5[℃]である。断熱空間11の一階部分には、温度T0(=5[℃])の外気が導入される代わりに、屋根10上で温めた温度T1(=10[℃])の集熱空気が導入される。
本実施形態の集熱換気システムによれば、暖房期において常時換気を行いながら、断熱空間11内に冷たい外気が侵入することを抑えることでき、暖房の効率化(換言すると、暖房負荷の抑制)が実現される。
給気装置4を用いて給気口30から集熱空気を供給する給気風量は、所定の常時換気風量と同一の風量(75[m3/h])に限定されず、所定の常時換気風量よりも小さな風量に設定することが可能である。この場合も、給気装置4を用いて供給した集熱空気の給気風量分だけ、一階の自然給気口61から侵入する外気の風量を抑えることができ、暖房の効率化が実現される。
集熱空気の温度T1が、暖房された断熱空間11の温度T2よりも高い場合(例えばT1=30[℃]、T2=20[℃]の場合)に、制御部9は、図1Cに示すように、一階部分に設置した排気ファン50,51を共に運転させる。これにより、一階部分で屋内空気を排気する排気風量は、所定の常時換気風量の2倍の風量である150[m3/h]に設定される。
制御部9は、給気装置4で一階部分に集熱空気を供給する給気風量を、所定の常時換気風量の2倍の風量である150[m3/h]に設定する。
これにより、断熱空間11の一階部分では、屋内空気よりも低い温度T0(=5[℃])の外気が導入される代わりに、屋内空気よりも高い温度T1(=30[℃])の集熱空気が導入される。
本実施形態の集熱換気システムによれば、暖房期において常時換気を行いながら、断熱空間11内に冷たい外気が侵入することを抑え、且つ、屋内空気よりも高温となった集熱空気を供給することできる。
しかも、本実施形態の集熱換気システムでは、所定の常時換気風量の2倍の排気風量で、屋内空気よりも更に高温の集熱空気を供給するため、建物1の暖房が一層効率化される。
ところで、暖房期の制御モードにおいて、給気装置4で集熱空気を供給する給気風量は、排気装置5で屋内空気を排気する排気風量以下に設定することが好ましい。
仮に、集熱空気を供給する給気風量が、屋内空気を排気する排気風量よりも大きな場合には、自然給気口61を通じて、暖房された屋内空気が屋外空間に排気される。この場合には、自然給気口61やその近傍において過剰な結露が生じやすくなり、好ましくない。
なお、制御部9を、集熱空気の温度T1が断熱空間11の温度T2よりも小さな場合には、図1Bに示すように給気装置4と排気装置5の運転を制御し、集熱空気の温度T1が断熱空間11の温度T2以上の場合(つまり温度T1が温度T2よりも大きな場合と、温度T1が温度T2と同一の場合)には、図1Cに示すように給気装置4と排気装置5の運転を制御するように設けることも可能である。
本実施形態では、断熱空間11の一階部分に集熱空気を供給するように構成しているが、二階部分に集熱空気を供給するように構成することや、各階部分に集熱空気を供給するように構成することも可能である。
(第2実施形態)
第2実施形態の集熱換気システムについて、図3A~図3Cに基づいて説明する。図3Aには、本実施形態の集熱換気システムの暖房期以外での運転の様子を示し、図3Bと図3Cには、本実施形態の集熱換気システムの暖房期での運転の様子を示す。
第2実施形態の集熱換気システムについて、図3A~図3Cに基づいて説明する。図3Aには、本実施形態の集熱換気システムの暖房期以外での運転の様子を示し、図3Bと図3Cには、本実施形態の集熱換気システムの暖房期での運転の様子を示す。
第2実施形態の集熱換気システムの基本的な構成は、第1実施形態の集熱換気システムと同様である。以下において、前記した第1実施形態と同様の構成については、同一符号を付して詳しい説明を省略する。
本実施形態の集熱換気システムでは、第1実施形態のような自然給気口61,62を建物1に備えない。本実施形態の集熱換気システムにおいては、図3A~図3Cに示すいずれの場合であっても、断熱空間11内への給気を、給気装置4を用いて強制的(機械的)に行う。
本実施形態の集熱換気システムが備える給気路3の上流端は、集熱装置2の空気層21に連通接続される。給気路3の下流端は、二手に分岐している。給気路3の分岐した一方の下流端には、一階の居住空間111に集熱空気を供給する給気口30aが位置する。給気路3の分岐した他方の下流端には、二階の居住空間112に集熱空気を供給する給気口30bが位置する。
給気装置4が備える給気ファン40は、給気路3の分岐点よりも上流側に位置する。制御部9が給気ファン40を運転することで、集熱装置2で作り出した集熱空気が、給気路3を通じて一階と二階の居住空間111,112にそれぞれ供給される。
給気路3は、給気ファン40よりも上流側の位置に合流する外気導入路31を、更に含む。
給気装置4は、第一開閉弁41と第二開閉弁42を、更に含む。第一開閉弁41は、給気路3において、外気導入路31が合流する地点よりも、上流側に位置する。第二開閉弁42は、外気導入路31の経路中に位置する。
図3Aに示すように、本実施形態の集熱換気システムでは、制御部9は、暖房期以外の制御モード(第一の制御モード)においても、外気を導入するために給気装置4を運転する。
具体的には、制御部9は、第一開閉弁41を閉弁させ、第二開閉弁42を開弁させたうえで、給気ファン40を運転させ、排気装置5で排気する屋内空気の排気風量と同一の風量だけ、断熱空間11内に外気を導入する。
図3Bや図3Cに示すように、制御部9は、暖房期の制御モード(第二の制御モード)においては、第一開閉弁41を開弁させ、第二開閉弁42を閉弁させたうえで、給気ファン40を運転する。
具体的には、集熱空気の温度T1が、暖房された断熱空間11の温度T2以下の場合(つまり温度T1が温度T2よりも小さな場合と、温度T1が温度T2と同一の場合であり、例えばT1=10[℃]、T2=20[℃])には、制御部9は、図3Bに示すように、各階で屋内空気を排気する排気風量を、所定の常時換気風量である75[m3/h]に設定する。制御部9は、給気装置4で各階に集熱空気を供給する給気風量を、所定の常時換気風量と同一の風量となるように、75[m3/h]に設定する。給気ファン40では、150(=75+75)[m3/h]の風量で給気を行う。
断熱空間11の各階部分には、屋根10上で温めた温度T1(=10[℃])の集熱空気が導入される。本実施形態の集熱換気システムによれば、暖房期において常時換気を行いながら、外気よりも高温の集熱空気を供給することでき、暖房の効率化が実現される。
集熱空気の温度T1が、暖房された断熱空間の温度T2よりも高い場合(例えばT1=30[℃]、T2=20[℃]の場合)には、制御部9は、図3Cに示すように、一階部分に設置した排気ファン50,51を共に運転させる。これにより、一階部分で屋内空気を排気する排気風量は、所定の常時換気風量の2倍の風量である150[m3/h]に設定される。
制御部9は、給気装置4を用いて一階部分に集熱空気を供給する給気風量を、所定の常時換気風量の2倍の風量である150[m3/h]に設定する。二階部分には、所定の常時換気風量である75[m3/h]の風量で、集熱空気を供給する。給気ファン40では、225(=150+75)[m3/h]の風量で給気を行う。
これにより、断熱空間11の一階部分においては、屋内空気よりも更に高い温度T1=30[℃]の集熱空気が、所定の常時換気風量の2倍の排気風量で供給される。そのため、建物1の暖房が一層効率化される。
なお、制御部9を、集熱空気の温度T1が断熱空間11の温度T2よりも小さな場合には、図3Bに示すように給気装置4と排気装置5の運転を制御し、集熱空気の温度T1が断熱空間11の温度T2以上の場合(つまり温度T1が温度T2よりも大きな場合と、温度T1が温度T2と同一の場合)には、図3Cに示すように給気装置4と排気装置5の運転を制御するように設けることも可能である。
本実施形態では、断熱空間11の一階部分と二階部分にそれぞれ集熱空気を供給するように構成しているが、一階部分だけに集熱空気を供給するように構成することや、二階部分だけに集熱空気を供給するように構成することも可能である。また、実施形態1の自然給気口61と同様の自然給気口を一階部分に備えることや、実施形態1の自然給気口62と同様の自然給気口を二階部分に備えることも可能である。
以上、第1及び第2実施形態の集熱換気システムについて、添付図面に基づいて述べた。
前述したように、第1及び第2実施形態の集熱換気システムは、集熱装置2、給気路3、給気装置4、常時換気用の排気装置5、第一温度センサ7、第二温度センサ8及び制御部9を備える。
集熱装置2は、建物1に設置され、太陽光で外気を温めて集熱空気を作り出す。給気路3は、建物1が有する断熱空間11に集熱空気を供給する経路である。給気装置4は、給気路3を通じて、集熱空気を断熱空間11に向けて強制的に供給する。排気装置5は、断熱空間11にある屋内空気を、建物1の屋外空間に向けて排気する。第一温度センサ7は、集熱空気の温度T1を感知する。第二温度センサ8は、屋内空気の温度T2を感知する。制御部9は、給気装置4と排気装置5の運転を制御する。
制御部9は、集熱空気の温度T1と、屋内空気の温度T2との温度差に基づいて、給気装置4で集熱空気を供給する給気風量と、排気装置5で屋内空気を排気する排気風量とを制御する。
そのため、第1及び第2実施形態の集熱換気システムによれば、常時換気のために行われる排気や、集熱空気と室内空気の温度差を考慮にいれたうえで、断熱空間11に集熱空気を供給し、断熱空間11内の温度調整を効率的に行うことができる。なお、供給風量と排気風量の制御は、断熱空間11の階ごとに行ってもよいし、断熱空間11の全体で行ってもよい。
また、第1及び第2実施形態の集熱換気システムにおいて、制御部9は、暖房期に用いる制御モードを有し、前記制御モードにおいて、給気装置4を排気装置5と共に運転させる。制御部9は、前記制御モードにおいて、集熱空気の温度T1が断熱空間11の温度T2よりも低いときには、屋内空気を排気する排気風量を、所定の常時換気風量に設定し、集熱空気を供給する給気風量を、所定の常時換気風量と同一又はこれよりも小さな風量に設定する。
そのため、第1及び第2実施形態の集熱換気システムによれば、常時換気のために断熱空間11から排気される屋内空気の全体又は一部を補うように、外気を温めた集熱空気を断熱空間11に供給することができ、暖房期における断熱空間11内の温度調整を効率的に行うことができる。
また、第1及び第2実施形態の集熱換気システムにおいて、制御部9は、暖房期に用いる制御モードを有し、前記制御モードにおいて、給気装置4を排気装置5と共に運転させる。制御部9は、前記制御モードにおいて、集熱空気の温度T1が断熱空間11の温度T2よりも高いときには、屋内空気を排気する排気風量を、所定の常時換気風量よりも大きな風量に設定し、集熱空気を供給する給気風量を、所定の常時換気風量よりも大きな風量に設定する。
そのため、第1及び第2実施形態の集熱換気システムによれば、常時換気のために断熱空間11から排気される屋内空気の全体又は一部を補うように、室内空気よりも高温の集熱空気を断熱空間11に供給することができる。しかも、このとき供給する集熱空気は、所定の常時換気風量よりも大きな供給風量で供給する。そのため、暖房期における断熱空間11内の温度調整を、効率的に行うことができる。
また、第1実施形態の集熱換気システムにおいて、建物1は、断熱空間11と屋外空間との間で自然換気を行うように構成された自然給気口61を有する。制御部9は、前記制御モードにおいて、集熱空気を供給する給気風量が、屋内空気を排気する排気風量以下となるように、給気装置4と排気装置5の運転を制御する。
そのため、第1実施形態の集熱換気システムによれば、暖房によって高温になった室内空気が、自然給気口61等を通じて屋外空間に排気される際に結露を生じるという事態を、抑制することができる。
また、第1及び第2実施形態の集熱換気システムにおいて、断熱空間11は、排気装置5が設置される部屋111a,112aを有する。この部屋111a,112aは、トイレ室、浴室又は洗面室である。
そのため、第1及び第2実施形態の集熱換気システムによれば、一般的に、暖房期において他の部屋111b,112bとの間で温度差が生じやすいトイレ室、浴室又は洗面室に対して温かい空気を供給し、温度差を抑えることが可能となる。
また、第1及び第2実施形態の集熱換気システムにおいて、集熱装置2は、建物1が有する屋根10の上方に配置され、屋根10との間で空気層21を形成する太陽光発電パネル20を備える。集熱装置2は、空気層21で外気を温めることで集熱空気を作り出すように構成されている。
そのため、第1及び第2実施形態の集熱換気システムによれば、屋根10上に設置した集熱装置2で集熱を行うことに加えて、太陽光発電パネル20で発電を行うことができ、しかも、太陽光発電パネル20の温度上昇を抑えて発電効率の低下を抑制することができる。
以上、本発明を添付図面に示す実施形態に基づいて説明したが、本発明は前記した各実施形態に限定されない。
例えば、前記した各実施形態では、一対の排気ファン50,51を備えてそれぞれの運転、停止を切り替えることで、風量を複数段階に切り替えているが、一つの排気ファンで風量を複数段階に切り替える構成であってもよい。
その他の構成についても、本発明の意図する範囲内であれば、各例において適宜の設計変更を行うことや、各例の構成を適宜組み合わせて適用することが可能である。
Claims (6)
- 建物に設置され、太陽光で外気を温めて集熱空気を作り出す集熱装置と、
前記建物が有する断熱空間に前記集熱空気を供給する経路である給気路と、
前記給気路を通じて、前記集熱空気を前記断熱空間に向けて強制的に供給する給気装置と、
前記断熱空間にある屋内空気を、前記建物の屋外空間に向けて排気する常時換気用の排気装置と、
前記集熱空気の温度を感知する第一温度センサと、
前記屋内空気の温度を感知する第二温度センサと、
前記給気装置と前記排気装置の運転を制御する制御部とを備え、
前記制御部は、
前記集熱空気の温度と、前記屋内空気の温度との温度差に基づいて、前記給気装置で前記集熱空気を供給する給気風量と、前記排気装置で前記屋内空気を排気する排気風量とを制御することを特徴とする建物の集熱換気システム。 - 前記制御部は、
暖房期に用いる制御モードを有し、
前記制御モードにおいて、前記給気装置を前記排気装置と共に運転させ、
前記集熱空気の温度が前記断熱空間の温度よりも低いときに、前記屋内空気を排気する排気風量を、所定の常時換気風量に設定し、前記集熱空気を供給する給気風量を、前記所定の常時換気風量と同一又はこれよりも小さな風量に設定することを特徴とする請求項1に記載の建物の集熱換気システム。 - 前記制御部は、
暖房期に用いる制御モードを有し、
前記制御モードにおいて、前記給気装置を前記排気装置と共に運転させ、
前記集熱空気の温度が前記断熱空間の温度よりも高いときに、前記屋内空気を排気する排気風量を、所定の常時換気風量よりも大きな風量に設定し、前記集熱空気を供給する給気風量を、前記所定の常時換気風量よりも大きな風量に設定することを特徴とする請求項1に記載の建物の集熱換気システム。 - 前記建物は、
前記断熱空間と前記屋外空間との間で自然換気を行うように構成された自然給気口を有し、
前記制御部は、
前記制御モードにおいて、前記集熱空気を供給する給気風量が、前記屋内空気を排気する排気風量以下となるように、前記給気装置と前記給気装置の運転を制御することを特徴とする請求項2又は3に記載の建物の集熱換気システム。 - 前記断熱空間は、
前記排気装置が設置される部屋を有し、
この部屋は、トイレ室、浴室又は洗面室であることを特徴とする請求項1~4のいずれか一項に記載の建物の集熱換気システム。 - 前記集熱装置は、
前記建物が有する屋根の上方に配置され、前記屋根との間で空気層を形成する太陽光発電パネルを備え、
前記空気層で前記外気を温めることで前記集熱空気を作り出すように構成されていることを特徴とする請求項1~5のいずれか一項に記載の建物の集熱換気システム。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014134924A JP2016011816A (ja) | 2014-06-30 | 2014-06-30 | 集熱換気システム |
JP2014-134924 | 2014-06-30 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2016002209A1 true WO2016002209A1 (ja) | 2016-01-07 |
Family
ID=55018785
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2015/003285 WO2016002209A1 (ja) | 2014-06-30 | 2015-06-30 | 集熱換気システム |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP2016011816A (ja) |
WO (1) | WO2016002209A1 (ja) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0735419A (ja) * | 1993-07-22 | 1995-02-07 | Kanegafuchi Chem Ind Co Ltd | 太陽熱利用建築物 |
JP2005241073A (ja) * | 2004-02-25 | 2005-09-08 | Om Institute Inc | パッシブソーラーシステムハウス |
JP2005273970A (ja) * | 2004-03-24 | 2005-10-06 | Shiraiwa Komusho:Kk | 建物空調システム |
JP2006097425A (ja) * | 2004-09-30 | 2006-04-13 | Om Institute Inc | ソーラーシステムハウスの換気方法 |
JP2011163629A (ja) * | 2010-02-08 | 2011-08-25 | Toyota Home Kk | 建物の換気設備 |
JP2013007539A (ja) * | 2011-06-27 | 2013-01-10 | Jx Nippon Oil & Energy Corp | ソーラーシステム及びその制御方法 |
-
2014
- 2014-06-30 JP JP2014134924A patent/JP2016011816A/ja active Pending
-
2015
- 2015-06-30 WO PCT/JP2015/003285 patent/WO2016002209A1/ja active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0735419A (ja) * | 1993-07-22 | 1995-02-07 | Kanegafuchi Chem Ind Co Ltd | 太陽熱利用建築物 |
JP2005241073A (ja) * | 2004-02-25 | 2005-09-08 | Om Institute Inc | パッシブソーラーシステムハウス |
JP2005273970A (ja) * | 2004-03-24 | 2005-10-06 | Shiraiwa Komusho:Kk | 建物空調システム |
JP2006097425A (ja) * | 2004-09-30 | 2006-04-13 | Om Institute Inc | ソーラーシステムハウスの換気方法 |
JP2011163629A (ja) * | 2010-02-08 | 2011-08-25 | Toyota Home Kk | 建物の換気設備 |
JP2013007539A (ja) * | 2011-06-27 | 2013-01-10 | Jx Nippon Oil & Energy Corp | ソーラーシステム及びその制御方法 |
Also Published As
Publication number | Publication date |
---|---|
JP2016011816A (ja) | 2016-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2724090B1 (en) | Zero-emission dialysis clinic | |
CN102128481A (zh) | 空调器及其控制方法及装置 | |
WO2015139430A1 (zh) | 地板空气调节系统 | |
JP2011127845A (ja) | 空調システム | |
JP2008076015A (ja) | 地熱利用による建築物空調システム | |
JP5096788B2 (ja) | 換気システム | |
WO2016002209A1 (ja) | 集熱換気システム | |
JP2015064129A (ja) | 空調方法及び当該空調方法において使用する空調システム | |
CN106546074A (zh) | 一种车间及厂房内使用的烘房 | |
JP2016102644A (ja) | 空調住宅 | |
KR20170024901A (ko) | 조립식 주택 | |
JP2019100179A5 (ja) | ||
JP5057660B2 (ja) | 冷排熱利用システム及びその制御方法 | |
JP6763702B2 (ja) | 換気システム | |
JP6066570B2 (ja) | 乾燥機 | |
JP2013053845A (ja) | 空気調和システム | |
JP2004076985A (ja) | 建物の空調システム | |
JPH10266351A (ja) | 空調換気システムと、この空調換気システムが取り付けられたユニット建物および住宅 | |
JP2005163369A (ja) | 住宅の換気装置 | |
JP5943633B2 (ja) | ミストサウナ装置 | |
JP4980482B1 (ja) | 空調システム及び建物 | |
JP2007240028A (ja) | 発電用ボイラ設備の給排気制御方式 | |
JP2017067322A (ja) | 空調システム | |
JP2015114094A (ja) | 第二種換気型給気加温装置 | |
JP2016040007A (ja) | ミストサウナ装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 15814416 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 15814416 Country of ref document: EP Kind code of ref document: A1 |