WO2015198742A1 - チラーシステム - Google Patents

チラーシステム Download PDF

Info

Publication number
WO2015198742A1
WO2015198742A1 PCT/JP2015/064033 JP2015064033W WO2015198742A1 WO 2015198742 A1 WO2015198742 A1 WO 2015198742A1 JP 2015064033 W JP2015064033 W JP 2015064033W WO 2015198742 A1 WO2015198742 A1 WO 2015198742A1
Authority
WO
WIPO (PCT)
Prior art keywords
chiller
chillers
refrigerant
defrost operation
defrost
Prior art date
Application number
PCT/JP2015/064033
Other languages
English (en)
French (fr)
Japanese (ja)
Inventor
宏太郎 南本
田中 雄一郎
裕之 西
Original Assignee
ヤンマー株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ヤンマー株式会社 filed Critical ヤンマー株式会社
Priority to AU2015282150A priority Critical patent/AU2015282150B2/en
Priority to CN201580034424.2A priority patent/CN106461300B/zh
Priority to EP15812743.1A priority patent/EP3163225A4/en
Priority to KR1020167032682A priority patent/KR101892378B1/ko
Publication of WO2015198742A1 publication Critical patent/WO2015198742A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/41Defrosting; Preventing freezing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B47/00Arrangements for preventing or removing deposits or corrosion, not provided for in another subclass
    • F25B47/02Defrosting cycles
    • F25B47/022Defrosting cycles hot gas defrosting
    • F25B47/025Defrosting cycles hot gas defrosting by reversing the cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/003Indoor unit with water as a heat sink or heat source
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/023Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units
    • F25B2313/0232Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units with bypasses
    • F25B2313/02322Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units with bypasses during defrosting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2327/00Refrigeration system using an engine for driving a compressor
    • F25B2327/001Refrigeration system using an engine for driving a compressor of the internal combustion type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/06Several compression cycles arranged in parallel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B27/00Machines, plants or systems, using particular sources of energy

Definitions

  • the present invention relates to a chiller system in which a plurality of heat pump chillers that adjust the temperature of a circulating fluid for temperature control as a heat medium by the heat of condensation or evaporation of refrigerant are connected.
  • Patent Document 1 discloses a configuration in which, during the defrost operation, the expansion valve for the indoor heat exchanger is fully closed and the refrigerant is evaporated by absorbing heat from the engine cooling water with the waste heat recovery unit without flowing the refrigerant through the indoor heat exchanger. Disclosure.
  • the heat pump chiller that adjusts the temperature of the circulating fluid for temperature control (for example, for air conditioning) as the heat medium by the heat of condensation or evaporation of the refrigerant is also attached to the piping in the refrigerant-air heat exchanger.
  • the temperature of the circulating fluid is not adjusted during the defrost operation. If a predetermined number or more of chillers (especially all chillers) perform the defrost operation at the same time, the temperature of the circulating fluid cannot be adjusted sufficiently (or at all).
  • Patent Document 2 discloses that when there is a request for defrosting operation from each chilling unit (chiller), a predetermined number of chilling units are executed so that only a preset number of chilling units (chillers) simultaneously execute the defrosting operation.
  • a defrost permission signal is output for each (chiller) (see paragraph 0104 of Patent Document 2).
  • the defrost permission signal is output until the number of possible defrost request signals is reached. Is output (see paragraph 0111 of Patent Document 2). That is, Patent Document 2 discloses a configuration in which defrost operation is permitted on a first-come-first-served basis up to the possible number of simultaneous defrost operations.
  • Patent Document 2 discloses a configuration that permits defrost operation on a first-come-first-served basis up to the number of units capable of simultaneous defrost operation, but does not disclose the priority order of chillers waiting for defrost operation.
  • the present invention is a chiller system in which a plurality of heat pump chillers are connected, and when defrosting operation is permitted on a first-come-first-served basis up to a predetermined number, the priority order of chillers waiting for defrosting operation is determined.
  • the purpose is to provide a chiller system that can be used.
  • the present invention is a chiller system in which a plurality of heat pump chillers that adjust the temperature of the circulating fluid for temperature adjustment as a heat medium by the heat of condensation or evaporation of the refrigerant are connected, Any one of the plurality of chillers is designated as a chiller of the main unit, and among the plurality of chillers, a chiller requiring defrost operation requests the defrost operation from the chiller of the main unit.
  • the chiller of the master unit permits the defrosting operation in a first-come-first-served basis up to a predetermined number of chillers that have requested the defrosting operation, and the chiller waiting for the defrosting operation is in a predetermined cycle.
  • the defrost operation is performed. Providing a chiller system and permits the next of the defrost operation in order of request count or request time.
  • the chiller of the master unit can be exemplified as a mode of permitting the next defrost operation in order of increasing or decreasing identification number for chillers having the same number of requests or the same time for the defrost operation.
  • the present invention is also a chiller system in which a plurality of heat pump chillers that adjust the temperature of the circulating fluid for temperature control as a heat medium by the heat of condensation or evaporation of the refrigerant are connected to the plurality of chillers.
  • a control mechanism that performs operation control on the chiller, and a chiller that requires defrost operation among the plurality of chillers requests the control mechanism to perform the defrost operation, and the control mechanism requests the defrost operation.
  • the defrost operation is permitted in a first-come-first-served basis to a predetermined number of chillers, and the chiller waiting for the defrost operation requests the control mechanism for the defrost operation at a predetermined cycle, and the control
  • the mechanism determines whether the next number of requests or the required time of the defrost operation is in descending order. Chiller system and permits the serial defrost operation is also provided.
  • the present invention in a chiller system in which a plurality of heat pump chillers are connected, it is possible to determine the priority order of chillers that are waiting for defrost operation when permitting defrost operation on a first-come-first-served basis up to a predetermined number of units. Become.
  • FIG. 1 is a system diagram showing a schematic configuration of a chiller system according to an embodiment of the present invention.
  • FIG. 2 is a schematic block diagram of one chiller in the chiller system.
  • FIG. 3 is a schematic block diagram of the chiller showing the cooling operation state in which the cooling operation is performed.
  • FIG. 4 is a schematic block diagram of a chiller showing a heating operation state in which a heating operation is performed.
  • FIG. 5 is a schematic block diagram of the chiller showing a defrost operation state in which the defrost operation is performed.
  • FIG. 1 is a system diagram showing a schematic configuration of a chiller system according to an embodiment of the present invention.
  • FIG. 2 is a schematic block diagram of one chiller in the chiller system.
  • FIG. 3 is a schematic block diagram of the chiller showing the cooling operation state in which the cooling operation is performed.
  • FIG. 4 is a schematic block diagram of a chiller showing a heating operation state in which a heating operation is performed.
  • FIG. 6 shows a request for defrost operation from each chiller to the chiller of the master unit and permission or prohibition of defrost operation for each chiller of the chiller of the master unit in a chiller system where the number of chillers is eight.
  • FIG. 7 shows a request for defrost operation from each chiller to the chiller of the master unit and permission or prohibition of defrost operation for each chiller of the chiller of the master unit in a chiller system in which the number of chillers is eight.
  • FIG. 7 is a conceptual diagram showing an example of a state where the chiller of the master unit is in a standby state where the number of requests is large in order of the number of defrost operation requests after the defrost operation of the two chillers shown in FIG. It is a figure which shows the state which permits the defrost driving of 1 and prohibits the defrost operation of one chiller smaller than two chillers.
  • FIG. 7 is a conceptual diagram showing an example of a state where the chiller of the master unit is in a standby state where the number of requests is large in order of the number of defrost operation requests after the defrost operation of the two chillers shown in FIG. It is a figure which shows the state which permits the defrost driving of 1
  • FIG. 8 shows a request for defrost operation from each chiller to the chiller of the master unit and permission or prohibition of defrost operation for each chiller of the chiller of the master unit in a chiller system in which the number of chillers is eight.
  • FIG. 9 is a graph showing the temperature control capability of the chiller system and the timing chart of the operating state of each chiller in the examples shown in FIGS.
  • FIG. 10 is a flowchart showing a flow of an example of a control operation by defrost control of each chiller of the master unit.
  • FIG. 1 is a system diagram showing a schematic configuration of a chiller system 1 according to an embodiment of the present invention.
  • the chiller system 1 shown in FIG. 1 is configured such that a plurality of heat pump chillers 100 are connected in parallel.
  • the heat pump chiller may be simply referred to as a chiller.
  • the chiller system 1 includes a plurality of chillers 100 (1) to 100 (n) (n is an integer of 2 or more) and a circulating fluid circuit 200.
  • Each chiller 100 (1) to 100 (n) has the same configuration. Therefore, the rated outputs of the chillers 100 (1) to 100 (n) are all the same.
  • the chillers 100 (1) to 100 (n) may be simply denoted by reference numeral 100.
  • the chiller system 1 includes a circulating fluid circuit 200 that is laid in a temperature control target area (for example, an air conditioning target area) that is not shown in the figure and that circulates a circulating fluid for temperature control (for example, for air conditioning) as a heat medium.
  • Circulation pumps 300 (1) to 300 (n) that are provided for each of the plurality of chillers 100 (1) to 100 (n) and circulate the circulating fluid in the circulating fluid circuit 200.
  • the temperature of the circulating fluid flowing into the circulating fluid circuit 200 is adjusted.
  • the circulating fluid may be any fluid as long as it acts as a heat medium, and representatively, water can be exemplified. However, it is not limited thereto, and the circulating fluid may be, for example, water containing an antifreeze.
  • the circulating fluid circuit 200 includes an inflow trunk 210 that allows the circulating fluid to flow into the plurality of chillers 100 (1) to 100 (n), and the circulating fluid from the inflow trunk 210 to the plurality of chillers 100 (1 ) To 100 (n), respectively, and the outflow trunks 211 (1) to 211 (n) to be diverted and the outflow stem to flow the circulating liquid in the direction of flowing out from the plurality of chillers 100 (1) to 100 (n).
  • the inflow branch pipes 211 (1) to 211 (n) are respectively connected to the branch portions corresponding to the chillers 100 (1) to 100 (n) of the inflow trunk pipe 210 and the chillers 100 (1) to 100 (n) circulating fluid inflow side is connected.
  • the outflow branch pipes 221 (1) to 221 (n) are respectively connected to the circulating fluid outflow side of the chillers 100 (1) to 100 (n) and the chillers 100 (1) to 100 (n) of the outflow trunk pipe 220. ) Is connected to the junction corresponding to.
  • One of the inflow branch pipes 211 (1) to 211 (n) and the outflow branch pipes 221 (1) to 221 (n) (in this example, the outflow branch pipes 221 (1) to 221 (n))
  • circulating pumps 300 (1) to 300 (n) for circulating the circulating fluid are provided.
  • the circulating fluid circulated by the circulation pumps 300 (1) to 300 (n) flows from the inflow trunk pipe 210 through the inflow branch pipes 211 (1) to 211 (n).
  • Each chiller 100 (1) to 100 (n) is distributed and the temperature is adjusted in each chiller 100 (1) to 100 (n).
  • the circulating fluid whose temperature is adjusted is joined from each chiller 100 (1) to 100 (n) to the outflow trunk 220 through each outflow branch 221 (1) to 221 (n). It circulates through the temperature control area (for example, the air conditioning area).
  • the load sides of the inflow trunk pipe 210 and the outflow trunk pipe 220 are connected via, for example, a heat exchanger (not shown) to form a closed circuit.
  • FIG. 2 is a schematic block diagram of one chiller 100 in the chiller system 1.
  • one inflow branch pipe 211 of the inflow branch pipes 211 (1) to 211 (n) is shown, and one outflow branch of the outflow branch pipes 221 (1) to 221 (n).
  • a pipe 221 is shown and one of the circulation pumps 300 (1) -300 (n) is shown.
  • the chiller 100 drives the compressor 10 that compresses the refrigerant, and adjusts the temperature of the circulating fluid by the heat of condensation or the heat of evaporation of the refrigerant.
  • the chiller 100 includes a compressor 10 that sucks and discharges refrigerant, a refrigerant-air heat exchanger 20 that exchanges heat between the refrigerant and air (specifically, outside air), and a refrigerant-air heat exchanger 20.
  • Refrigerant-air heat exchanger fan 30 for expansion an expansion valve 40 for expanding the refrigerant compressed by the compressor 10, a refrigerant-circulating liquid heat exchanger 50 for exchanging heat between the circulating liquid and the refrigerant, and compression
  • the engine 60 that drives the machine 10 and the engine exhaust heat recovery unit 70 that recovers the exhaust heat of the engine 60 are provided, and a heating operation, a cooling operation, or a defrost operation (defrosting operation) described later can be performed.
  • the expansion valve 40 includes a first expansion valve 41 that can be closed and a second expansion valve 42 that can be closed.
  • the compressor 10 may be a unit in which a plurality of compressors are connected in parallel.
  • the refrigerant-air heat exchanger 20 is a unit in which a plurality of refrigerant-air heat exchangers are connected in parallel. There may be.
  • the chiller 100 further includes a refrigerant circuit 110 for circulating the refrigerant, a cooling water circuit 120 for circulating engine cooling water for cooling the engine 60, a circulation pump 130 for the cooling water circuit 120, and a control device 140. I have.
  • the refrigerant circuit 110 is provided with a compressor 10, a refrigerant-air heat exchanger 20, a refrigerant-circulated liquid heat exchanger 50, an expansion valve 40, and an engine exhaust heat recovery unit 70.
  • the refrigerant circuit 110 includes a four-way valve 111, a bridge circuit 112, a high-pressure gas refrigerant path 113a, a first low-pressure gas refrigerant path 113b, a first gas refrigerant path 113c, a first refrigerant path 113d, a high-pressure liquid refrigerant path 113e, and a first low-pressure gas.
  • a liquid two-phase refrigerant path 113f, a second refrigerant path 113g, a second gas refrigerant path 113h, a second low-pressure gas-liquid two-phase refrigerant path 113i, and a second low-pressure gas refrigerant path 113j are provided.
  • the four-way valve 111 connects the inlet (lower side in FIG. 2) and one connection port (left side in FIG. 2) and the other connection port (FIG. 2) in response to an instruction signal from the control device 140.
  • the first connection state (the state shown in FIG. 2) connecting the outlet (upper side in FIG. 2), the inlet and the other connection port, and one connection port It is set as the structure switched to the 2nd connection state which connects an outflow port. Thereby, the four-way valve 111 can switch the flow direction of a refrigerant
  • the bridge circuit 112 includes four check valves (a first check valve 112a, a second check valve 112b, a third check valve 112c, and a fourth check valve 112d), and two check valves ( A first check valve row 1121 including a first check valve 112a and a second check valve 112b), and a second check valve including a remaining two check valves (a third check valve 112c and a fourth check valve 112d). 2 check valve trains 1122.
  • the first check valve row 1121 is formed by connecting the first check valve 112a and the second check valve 112b in series so that the refrigerant flows in the same direction.
  • the second check valve row 1122 is configured such that the third check valve 112c and the fourth check valve 112d are connected in series so that the refrigerant flows in the same direction.
  • the first check valve row 1121 and the second check valve row 1122 are connected in parallel so that the refrigerant flows in the same direction.
  • a connection point between the first check valve 112a and the second check valve 112b is a first intermediate connection point P1, and between the first check valve 112a and the third check valve 112c.
  • the connection point between the third check valve 112c and the fourth check valve 112d is the second intermediate connection point P3, and the second check valve 112b and the fourth check valve
  • a connection point between the stop valve 112d and the stop valve 112d is an inflow connection point P4.
  • the high-pressure gas refrigerant path 113 a connects the discharge port of the compressor 10 and the inflow port of the four-way valve 111.
  • the first low-pressure gas refrigerant path 113 b connects the outlet of the four-way valve 111 and the suction port of the compressor 10.
  • the first gas refrigerant path 113 c connects one connection port of the four-way valve 111 and one connection port of the refrigerant-air heat exchanger 20.
  • the first refrigerant path 113d connects the other connection port of the refrigerant-air heat exchanger 20 and the first intermediate connection point P1 of the bridge circuit 112.
  • the high-pressure liquid refrigerant path 113e connects the outflow connection point P2 of the bridge circuit 112 and one side of the expansion valve 40 (specifically, the first expansion valve 41 and the second expansion valve 42).
  • the first low-pressure gas-liquid two-phase refrigerant path 113f connects the other side of the first expansion valve 41 constituting the expansion valve 40 and the inflow connection point P4 of the bridge circuit 112.
  • the second refrigerant path 113g connects the second intermediate connection point P3 of the bridge circuit 112 and one refrigerant connection port of the refrigerant-circulating fluid heat exchanger 50.
  • the second gas refrigerant path 113h connects the other refrigerant connection port of the refrigerant-circulating fluid heat exchanger 50 and the other connection port of the four-way valve 111.
  • the second low-pressure gas-liquid two-phase refrigerant path 113 i connects the other side of the second expansion valve 42 constituting the expansion valve 40 and the refrigerant inlet of the engine exhaust heat recovery device 70.
  • the second low-pressure gas refrigerant path 113j connects the refrigerant outlet of the engine exhaust heat recovery unit 70 and a junction P5 in the middle of the first low-pressure gas refrigerant path 113b.
  • the downstream side (compressor 10 side) of the junction P5 in the first low-pressure gas refrigerant path 113b is a junction path 113b1.
  • Both the first expansion valve 41 and the second expansion valve 42 can be adjusted in opening degree by an instruction signal from the control device 140. Thereby, the first expansion valve 41 and the second expansion valve 42 can adjust the circulation amount of the refrigerant in the refrigerant circuit 110.
  • the first expansion valve 41 and the second expansion valve 42 are each formed by connecting a plurality of expansion valves that can be closed in parallel. By doing so, the first expansion valve 41 and the second expansion valve 42 can adjust the circulation amount of the refrigerant in the refrigerant circuit 110 by combining the expansion valves to be opened.
  • the chiller 100 further includes an oil separator 81, an accumulator 82, and a receiver 83.
  • the oil separator 81 is provided in the high-pressure gas refrigerant path 113a, and separates the lubricating oil of the compressor 10 contained in the refrigerant and compresses the separated lubricating oil through a valve 81a (specifically, an electromagnetic valve). Return to machine 10.
  • the accumulator 82 is provided in the merging path 113b1 of the first low-pressure gas refrigerant path 113b, and is evaporated by the refrigerant-circulating liquid heat exchanger 50 acting as an evaporator or the refrigerant-air heat exchanger 20 acting as an evaporator. The refrigerant liquid that did not run out is separated.
  • the receiver 83 is provided in the high-pressure liquid refrigerant path 113e, and temporarily stores the high-pressure liquid refrigerant from the bridge circuit 112.
  • the coolant circuit 120 constitutes an engine coolant path for cooling the engine 60, and includes a first thermostat type switching valve 121, a second thermostat type switching valve 122, a radiator 123, an outflow path 124a, An inflow path 124b and a first path 124c to a fifth path 124g are provided.
  • the outflow path 124a connects the outlet of the engine 60 and the inlet (lower side in FIG. 2) of the first thermostat type switching valve 121.
  • the inflow path 124 b connects the outlet of the radiator 123 and the inlet of the engine 60.
  • the first path 124c connects one outlet (upper side in FIG. 2) of the first thermostat type switching valve 121 and an inlet (left side in FIG. 2) of the second thermostat type switching valve 122.
  • the second path 124 d connects the other outlet (the right side in FIG. 2) of the first thermostat type switching valve 121 and the inlet of the radiator 123.
  • the third path 124e connects one outlet (the upper side in FIG. 2) of the second thermostat type switching valve 122 and the cooling water inlet of the engine exhaust heat recovery device 70.
  • the fourth path 124f connects the other outlet (the right side in FIG. 2) of the second thermostat type switching valve 122 and the junction P6 in the middle of the inflow path 124b.
  • the fifth path 124g connects the cooling water outlet of the engine exhaust heat recovery unit 70 and the junction P7 upstream of the junction P6 of the inflow path 124b.
  • Circulation pump 130 is provided between the inlet of engine 60 and junction P6 in inflow path 124b. Circulation pump 130 causes engine coolant to circulate in coolant circuit 120 in response to an instruction signal from control device 140.
  • the engine exhaust heat recovery device 70 belongs to both the refrigerant circuit 110 and the coolant circuit 120.
  • the first thermostat type switching valve 121 directs the engine cooling water from the engine 60 to the second thermostat type switching valve 122 when the temperature of the engine cooling water is lower than a predetermined first temperature (for example, 71 ° C.).
  • a predetermined first temperature for example, 71 ° C.
  • the engine coolant from the engine 60 is caused to flow toward the radiator 123.
  • the cooling water circuit 120 circulates the engine cooling water toward the second thermostat type switching valve 122 when the engine cooling water is lower than the first temperature, while the engine cooling water is higher than the first temperature.
  • the engine cooling water can be circulated toward the radiator 123.
  • the second thermostat type switching valve 122 is configured to cool the engine from the first thermostat type switching valve 121 when the temperature of the engine cooling water is lower than a predetermined second temperature (for example, 60 ° C.) lower than the first temperature. While water flows toward both the engine exhaust heat recovery unit 70 and the junction P6 of the inflow path 124b, when the temperature is equal to or higher than the second temperature, the engine coolant from the first thermostat type switching valve 121 is used as the engine exhaust heat recovery unit. It is designed to flow toward 70. As a result, when the engine coolant is lower than the second temperature, the coolant circuit 120 circulates the engine coolant toward the junction P6 of the engine exhaust heat recovery unit 70 and the inflow path 124b, while at the second temperature or higher. When the temperature is lower than the first temperature, the engine coolant can be circulated toward the engine exhaust heat recovery unit 70.
  • a predetermined second temperature for example, 60 ° C.
  • the temperature of the engine coolant can be detected by a temperature sensor (not shown) provided in the coolant circuit 120.
  • the inflow branch 211 constituting the circulating fluid circuit 200 connects the circulating fluid inlet of the refrigerant-circulating fluid heat exchanger 50 and the branch corresponding to the chiller 100 of the inflow trunk 210 (see FIG. 1).
  • the outlet branch pipe 221 constituting the circulating fluid circuit 200 connects the circulating fluid outlet of the refrigerant-circulating fluid heat exchanger 50 and the junction corresponding to the chiller 100 of the outlet trunk 220 (see FIG. 1).
  • the refrigerant-circulating fluid heat exchanger 50 belongs to both the refrigerant circuit 110 and the circulating fluid circuit 200.
  • the compressor 10 is connected to the engine 60 via the clutch 11.
  • the clutch 11 takes a connected state in which the driving force is transmitted from the engine 60 to the compressor 10 and a disconnected state in which the transmission of the driving force from the engine 60 to the compressor 10 is interrupted by an instruction signal from the control device 140. It has become.
  • the chiller 100 further includes a first pressure sensor 151, a first temperature sensor 161, a second pressure sensor 152, a second temperature sensor 162, and a rotation speed sensor 170.
  • the first pressure sensor 151 and the first temperature sensor 161 are respectively provided in the merging path 113b1 and detect the pressure and temperature of the refrigerant in the merging path 113b1.
  • the second pressure sensor 152 and the second temperature sensor 162 are provided in the second low-pressure gas refrigerant path 113j, respectively, and detect the pressure and temperature of the refrigerant in the second low-pressure gas refrigerant path 113j.
  • the rotation speed sensor 170 is provided in the engine 60 and detects the rotation speed of the engine 60.
  • the circulating fluid circuit 200 includes an inflowing circulating fluid temperature sensor 231 and an outflowing circulating fluid temperature sensor 232.
  • the inflowing circulating fluid temperature sensor 231 is provided in the inflowing branch pipe 211, and the temperature of the circulating liquid flowing into the refrigerant-circulating liquid heat exchanger 50 (specifically, the circulating liquid in the inflowing branch pipe 211). Is detected.
  • the outflow circulating fluid temperature sensor 232 is provided in the outflow branch 221 and detects the temperature of the circulating fluid flowing out from the refrigerant-circulating fluid heat exchanger 50 (specifically, the circulating fluid in the outflow branch 221). .
  • the control device 140 controls the driving of the refrigerant circuit 110, the cooling water circuit 120, and the circulating fluid circuit 200 based on detection signals from various sensors. Thereby, the chiller 100 can adjust the temperature of the circulating fluid flowing in the circulating fluid circuit 200.
  • the control device 140 compresses the refrigerant sucked from the first low-pressure gas refrigerant path 113b by the compressor 10, and discharges the compressed refrigerant to the high-pressure gas refrigerant path 113a.
  • the control device 140 causes the four-way valve 111 to communicate with the high-pressure gas refrigerant path 113a and the first gas refrigerant path 113c and to supply the second gas refrigerant path.
  • 113h and the 1st low pressure gas refrigerant path 113b are made into the 1st connection state which connects.
  • control device 140 communicates the four-way valve 111 with the high-pressure gas refrigerant path 113a and the second gas refrigerant path 113h and the first gas at the time of the heating operation for heating the circulating fluid in the circulating fluid circuit 200.
  • the refrigerant passage 113c and the first low-pressure gas refrigerant passage 113b are brought into a second connection state in which the refrigerant passage 113c communicates with the first low-pressure gas refrigerant passage 113b.
  • the refrigerant-air heat exchanger 20 functions as a condenser that radiates and liquefies the refrigerant during the cooling operation, and functions as an evaporator that absorbs and vaporizes the refrigerant during the heating operation.
  • the refrigerant-circulating fluid heat exchanger 50 functions as a cooler that cools the circulating fluid by absorbing heat during the cooling operation, and functions as a heater that heats the circulating fluid by dissipating heat during the heating operation.
  • the engine exhaust heat recovery unit 70 functions as an evaporator that absorbs heat and vaporizes the refrigerant.
  • the first expansion valve 41 and the second expansion valve 42 are arranged in parallel on the downstream side of the bridge circuit 112.
  • the first expansion valve 41 adjusts the flow rate of the refrigerant toward the refrigerant-circulating fluid heat exchanger 50 via the bridge circuit 112 during the cooling operation, and the bridge circuit 112 during the heating operation, based on the instruction signal from the control device 140.
  • the flow rate of the refrigerant toward the refrigerant-air heat exchanger 20 is adjusted.
  • the second expansion valve 42 adjusts the flow rate of the refrigerant toward the engine exhaust heat recovery device 70 according to an instruction signal from the control device 140.
  • the control device 140 includes a processing unit 141 including a microcomputer such as a CPU (Central Processing Unit), a nonvolatile memory such as a ROM (Read Only Memory), and a storage unit 142 including a volatile memory such as a RAM (Randam Access Memory). And have.
  • a processing unit 141 including a microcomputer such as a CPU (Central Processing Unit), a nonvolatile memory such as a ROM (Read Only Memory), and a storage unit 142 including a volatile memory such as a RAM (Randam Access Memory). And have.
  • the processing unit 141 controls the operation of various components by loading a control program stored in advance in the ROM of the storage unit 142 onto the RAM of the storage unit 142 and executing it. .
  • the temperature of the circulating fluid flowing in the circulating fluid circuit 200 can be adjusted by appropriately performing the cooling operation or the heating operation.
  • FIG. 3 is a schematic block diagram of the chiller 100 showing a cooling operation state in which the cooling operation is performed.
  • the control device 140 when performing the cooling operation, switches the four-way valve 111 to the first connection state so that the high-pressure gas refrigerant path 113a and the first gas refrigerant path 113c communicate with each other and the second gas refrigerant path 113h.
  • the first low-pressure gas refrigerant path 113b is communicated.
  • the refrigerant in the high-pressure gas state (hereinafter referred to as high-pressure gas refrigerant) discharged from the compressor 10 flows to the refrigerant-air heat exchanger 20 via the oil separator 81.
  • the temperature of the high-pressure gas refrigerant flowing through the refrigerant-air heat exchanger 20 is higher than the temperature of the air flowing through the refrigerant-air heat exchanger 20. For this reason, heat moves from the high-pressure gas refrigerant to the air. As a result, the high-pressure gas refrigerant loses heat of condensation and liquefies to become a high-pressure liquid refrigerant (hereinafter referred to as high-pressure liquid refrigerant). That is, in the cooling operation, the refrigerant-air heat exchanger 20 functions as a refrigerant condenser that dissipates heat from the high-pressure gas refrigerant.
  • the high-pressure liquid refrigerant flows from the refrigerant-air heat exchanger 20 to the first intermediate connection point P1 of the bridge circuit 112 via the first refrigerant path 113d. Since the first intermediate connection point P1 is located on the outlet side of the second check valve 112b and the inlet side of the first check valve 112a, the high-pressure liquid refrigerant is supplied from the second check valve 112b and the third check valve 112b. It does not flow toward the check valve 112c but flows from the first intermediate connection point P1 to the high-pressure liquid refrigerant path 113e via the first check valve 112a and the outflow connection point P2.
  • the control device 140 opens the first expansion valve 41 so that the high-pressure liquid refrigerant flows to the first expansion valve 41 side, but does not flow to the second expansion valve 42 side. 42 is closed. For this reason, the high-pressure liquid refrigerant passes through the first expansion valve 41 via the receiver 83 on the high-pressure liquid refrigerant path 113e.
  • the high-pressure liquid refrigerant expands into a low-pressure gas-liquid two-phase refrigerant (hereinafter referred to as a low-pressure gas-liquid two-phase refrigerant).
  • the low-pressure gas-liquid two-phase refrigerant flows from the first low-pressure gas-liquid two-phase refrigerant path 113f to the inflow connection point P4 of the bridge circuit 112.
  • the inflow connection point P4 is on the inflow side of the second check valve 112b and the fourth check valve 112d
  • the high-pressure liquid refrigerant described above flows to the first intermediate connection point P1 and the outflow connection point P2.
  • the low-pressure gas-liquid two-phase refrigerant is moved toward the second check valve 112b and the third check valve 112c due to the pressure difference between the high-pressure liquid refrigerant flowing through the first intermediate connection point P1 and the outflow connection point P2.
  • the refrigerant flows from the inflow connection point P4 to the refrigerant-circulating liquid heat exchanger 50 via the fourth check valve 112d, the second intermediate connection point P3, and the second refrigerant path 113g.
  • the temperature of the low-pressure gas-liquid two-phase refrigerant flowing to the refrigerant circuit 110 side of the refrigerant-circulating liquid heat exchanger 50 is lower than the temperature of the circulating liquid flowing to the circulating liquid circuit 200 side of the refrigerant-circulating liquid heat exchanger 50. For this reason, heat moves from the circulating fluid to the low-pressure gas-liquid two-phase refrigerant. As a result, the low-pressure gas-liquid two-phase refrigerant is vaporized by obtaining evaporation heat, and becomes a refrigerant in a low-pressure gas state (hereinafter referred to as a low-pressure gas refrigerant). On the other hand, the circulating fluid is cooled by the endothermic action of the refrigerant. That is, in the cooling operation, the refrigerant-circulating fluid heat exchanger 50 functions as a circulating fluid cooler that absorbs heat from the low-pressure gas-liquid two-phase refrigerant.
  • the low-pressure gas refrigerant flows from the refrigerant-circulated liquid heat exchanger 50 to the second gas refrigerant path 113h.
  • the control device 140 since the control device 140 communicates the second gas refrigerant path 113h and the first low-pressure gas refrigerant path 113b by the four-way valve 111, the low-pressure gas refrigerant is an accumulator on the first low-pressure gas refrigerant path 113b. It is sucked into the compressor 10 via 82.
  • FIG. 4 is a schematic block diagram of the chiller 100 showing a heating operation state in which a heating operation is performed.
  • the control device 140 when performing the heating operation, switches the four-way valve 111 to the second connection state to connect the high-pressure gas refrigerant path 113a and the second gas refrigerant path 113h and to the first gas refrigerant path 113c.
  • the first low-pressure gas refrigerant path 113b is communicated. By doing so, the high-pressure gas refrigerant discharged from the compressor 10 flows to the refrigerant-circulated liquid heat exchanger 50 via the oil separator 81.
  • the temperature of the high-pressure gas refrigerant flowing to the refrigerant circuit 110 side of the refrigerant-circulating liquid heat exchanger 50 is higher than the temperature of the circulating liquid flowing to the circulating liquid circuit 200 side of the refrigerant-circulating liquid heat exchanger 50. For this reason, heat moves from the high-pressure gas refrigerant to the circulating fluid. As a result, the high pressure gas refrigerant loses heat of condensation and liquefies to become a high pressure liquid refrigerant. On the other hand, the circulating fluid is heated by the heat dissipation action of the refrigerant. That is, in the heating operation, the refrigerant-circulating fluid heat exchanger 50 functions as a circulating fluid heater that radiates heat from the high-pressure gas refrigerant.
  • the high-pressure liquid refrigerant flows from the refrigerant-circulating liquid heat exchanger 50 to the second intermediate connection point P3 of the bridge circuit 112 via the second refrigerant path 113g. Since the second intermediate connection point P3 is located on the inlet side of the third check valve 112c and on the outlet side of the fourth check valve 112d, the high-pressure liquid refrigerant is supplied from the first check valve 112a and the fourth check valve 112a. It does not flow toward the check valve 112d but flows from the second intermediate connection point P3 to the high-pressure liquid refrigerant path 113e via the third check valve 112c and the outflow connection point P2.
  • the control device 140 opens the first expansion valve 41 so that the high-pressure liquid refrigerant flows to the first expansion valve 41 side but does not flow to the second expansion valve 42 side. 42 is closed. For this reason, the high-pressure liquid refrigerant passes through the first expansion valve 41 via the receiver 83 on the high-pressure liquid refrigerant path 113e.
  • the high-pressure liquid refrigerant expands to become a low-pressure gas-liquid two-phase refrigerant.
  • the low-pressure gas-liquid two-phase refrigerant flows from the first low-pressure gas-liquid two-phase refrigerant path 113f to the inflow connection point P4 of the bridge circuit 112.
  • the inflow connection point P4 is on the inflow side of the second check valve 112b and the fourth check valve 112d, but the high-pressure liquid refrigerant described above flows to the second intermediate connection point P3 and the outflow connection point P2.
  • the low-pressure gas-liquid two-phase refrigerant is moved toward the fourth check valve 112d and the first check valve 112a due to the pressure difference with the high-pressure liquid refrigerant flowing through the second intermediate connection point P3 and the outflow connection point P2.
  • the refrigerant flows from the inflow connection point P4 to the refrigerant-air heat exchanger 20 via the second check valve 112b and the first refrigerant path 113d.
  • the temperature of the low-pressure gas-liquid two-phase refrigerant flowing through the refrigerant-air heat exchanger 20 is lower than the temperature of the air flowing through the refrigerant-air heat exchanger 20. For this reason, heat moves from the air to the low-pressure gas-liquid two-phase refrigerant. As a result, the low-pressure gas-liquid two-phase refrigerant is vaporized by obtaining the evaporation heat, and becomes a low-pressure gas refrigerant. That is, in the heating operation, the refrigerant-air heat exchanger 20 functions as a refrigerant evaporator that absorbs heat from the low-pressure gas-liquid two-phase refrigerant.
  • the low-pressure gas refrigerant flows from the refrigerant-air heat exchanger 20 to the first gas refrigerant path 113c.
  • the control device 140 since the control device 140 communicates the first gas refrigerant path 113c and the first low-pressure gas refrigerant path 113b by the four-way valve 111, the low-pressure gas refrigerant is an accumulator on the first low-pressure gas refrigerant path 113b. It is sucked into the compressor 10 via 82.
  • FIG. 5 is a schematic block diagram of the chiller 100 showing a defrost operation state in which the defrost operation is performed.
  • the control device 140 when performing the defrost operation, switches the four-way valve 111 to the first connection state to communicate the high-pressure gas refrigerant path 113a and the first gas refrigerant path 113c and perform the second operation similarly to the cooling operation.
  • the gas refrigerant path 113h communicates with the first low-pressure gas refrigerant path 113b. By doing so, the high-pressure gas refrigerant discharged from the compressor 10 flows to the refrigerant-air heat exchanger 20 via the oil separator 81.
  • the high-pressure gas refrigerant flowing in the refrigerant-air heat exchanger 20 loses condensation heat and liquefies to become a high-pressure liquid refrigerant as in the cooling operation. That is, in the defrost operation, the refrigerant-air heat exchanger 20 functions as a refrigerant condenser that radiates heat from the high-pressure gas refrigerant.
  • the high-pressure liquid refrigerant passes from the refrigerant-air heat exchanger 20 through the first refrigerant path 113d, the first intermediate connection point P1, the first check valve 112a, and the outflow connection point P2 of the bridge circuit 112. And flows into the high-pressure liquid refrigerant path 113e.
  • the control device 140 opens the second expansion valve 42 so that the high-pressure liquid refrigerant flows to the second expansion valve 42 side but does not flow to the first expansion valve 41 side, while the first expansion valve 42 41 is closed. For this reason, the high-pressure liquid refrigerant passes through the second expansion valve 42 via the receiver 83 on the high-pressure liquid refrigerant path 113e.
  • the high-pressure liquid refrigerant expands to become a low-pressure gas-liquid two-phase refrigerant.
  • the low-pressure gas-liquid two-phase refrigerant flows from the second low-pressure gas-liquid two-phase refrigerant path 113i to the engine exhaust heat recovery unit 70.
  • the temperature of the low-pressure gas-liquid two-phase refrigerant that flows to the refrigerant circuit 110 side of the engine exhaust heat recovery unit 70 is lower than the temperature of the engine cooling water that flows to the cooling water circuit 120 side of the engine exhaust heat recovery unit 70. For this reason, heat moves from the engine coolant to the low-pressure gas-liquid two-phase refrigerant. As a result, the low-pressure gas-liquid two-phase refrigerant is vaporized by obtaining the evaporation heat, and becomes a low-pressure gas refrigerant. That is, in the defrost operation, the engine exhaust heat recovery unit 70 functions as a refrigerant evaporator that absorbs heat from the low-pressure gas-liquid two-phase refrigerant.
  • the low-pressure gas refrigerant is sucked into the compressor 10 from the engine exhaust heat recovery device 70 via the second low-pressure gas refrigerant path 113j, the junction P5 of the first low-pressure gas refrigerant path 113b, the junction path 113b1, and the accumulator 82.
  • the chiller system 1 includes a control mechanism that performs the following operation control on each of the chillers 100 (1) to 100 (n).
  • such a control mechanism is an aggregate of the control devices 140 of the chillers 100 (1) to 100 (n), and the control devices 140 (1) to 140 (n) can communicate with each other. It is connected.
  • any one of the plurality of chillers 100 (1) to 100 (n) is designated as the parent chiller 100 (i) (i is any integer from 1 to n).
  • the control mechanism may be a control device that performs overall control of each chiller 100 (1) to 100 (n), and the control device may be provided separately from each chiller 100 (1) to 100 (n). .
  • Each chiller 100 (1) to 100 (n) executes defrost control of defrost operation in order to remove frost adhering to the refrigerant-air heat exchanger 20.
  • the chiller 100 during the heating operation determines that the defrost operation is necessary when the continuous execution time of the heating operation exceeds a predetermined time.
  • Defrost control is prepared to deal with a case where it is determined that defrost operation is necessary.
  • the defrosting exceeds the predetermined number (the number of permitted simultaneous defrosts that is permitted for the defrost operation in the same period) predetermined for the chiller 100 in the heating operation that has been determined to require the defrost operation.
  • the defrost operation is executed without limiting the number of simultaneous defrost permitted units.
  • the simultaneous defrost permitted number is the permitted reference number (4 in this example) as a reference for permitting the defrost operation, which is obtained by subtracting one from the number of connected units to which the chiller 100 is connected. The number obtained by adding 1 to the value obtained by rounding down the decimals of the value divided by the number of units.
  • the simultaneous defrost permitted number m can be calculated by the following equation (1).
  • INT INT [(n ⁇ 1) / c] +1 Formula (1)
  • INT is a function for truncating the decimal part of the value of the expression [(n ⁇ 1) / c] in the square brackets.
  • the permitted reference number c is 4, when the number n of connections is 2 or more and 4 or less, the number m of simultaneous defrost permits is 1, and when the number of connections n is 5 or more and 8 or less, the number of simultaneous defrost permits m is two.
  • the chiller 100 that requires the defrost operation is The chiller 100 (i) (specifically, the control device 140 (i)) of the master unit is requested to request defrost operation (specifically, a signal for requesting defrost operation is transmitted).
  • the chiller 100 requesting the defrost operation is the chiller 100 (i) itself of the parent device, the chiller 100 (i) of the parent device requests the defrost operation from itself.
  • the chiller 100 (i) of the parent machine performs the defrosting operation on a first-come-first-served basis that requests the defrosting operation up to the number m of simultaneous defrosting permitted among the chillers 100 that request the defrosting operation to the chiller 100 (i) of the parent machine. It is configured to permit (specifically, send a signal permitting defrost operation).
  • the chiller 100 that receives permission for defrost operation is the chiller 100 (i) of the parent device, the chiller 100 (i) of the parent device receives permission for the defrost operation.
  • the chiller 100 waiting for the defrost operation is in a predetermined cycle (specifically, every predetermined processing time) with respect to the chiller 100 (i) of the master unit.
  • the defrost operation is requested (specifically, a signal requesting the defrost operation is transmitted).
  • the standby chiller 100 requests the chiller 100 (i) of the parent machine to perform the defrost operation, but the chiller 100 (i) of the parent machine does not permit the defrost operation (the operation is not allowed). A chiller that is prohibited.
  • the chiller 100 (i) of the master unit requires the number of defrost operation requests or the request time (the number of requests in the examples shown in FIGS. 6 to 10 described later). ), The next defrost operation is permitted in descending order.
  • the number of times of defrost operation requested is that the defrost operation is requested from the first request of the defrost operation by the chiller 100 that requires the defrost operation to the latest permission determination of the defrost operation by the chiller 100 (i) of the parent machine. Is the number of times.
  • the required time for the defrost operation is the time required from the initial request for the defrost operation by the chiller 100 that requires the defrost operation to the latest permission determination of the defrost operation by the chiller 100 (i) of the master unit.
  • each chiller 100 (1) to 100 (n) is assigned a different identification number (1 to n in this example), and the chiller 100 (i) of the master unit has the number of requested defrost operations or
  • the chillers 100 having the same request time are configured to permit the next defrost operation in the order of increasing or decreasing identification numbers (in the order of decreasing numbers in the examples shown in FIGS. 6 to 10).
  • FIGS. 6 to 8 show the defrost operation of each chiller 100 (1) to 100 (8) from the chiller 100 (1) to 100 (8) in the chiller system 1 when the number n of connected chillers 100 is eight.
  • FIG. 6 is a conceptual diagram showing an example of a request and a state in which defrosting operation is permitted or prohibited for each chiller 100 (1) to 100 (8) of the chiller 100 (i) of the parent device.
  • the operating capacity of six chillers 100 is sufficient for the load capacity.
  • An example is shown in which heating operation is performed with six chillers 100 (1), 100 (2), 100 (4), and 100 (6) to 100 (8) while 100 (5) is stopped. ing.
  • the chillers 100 (1), 100 (2), 100 (4), and 100 (6) to 100 (8) that perform the heating operation it is determined that the defrost operation is necessary, and the chiller of the parent device Of the chillers 100 (1), 100 (4), 100 (6) to 100 (8) that requested the defrost operation for 100 (i), the top two chillers 100 in the first-come-first-served basis that requested the defrost operation.
  • the order is the order of the chiller 100 (1) and the chiller 100 (4), and the order of the remaining chillers 100 (6) to 100 (8) is the order of the chiller 100 (6), An example in which the chiller 100 (8) and the chiller 100 (7) are arranged in this order is shown.
  • FIG. 6 shows that two chillers 100 (1) and 100 (4), which were earlier in the first-come-first-served basis in which the chiller 100 (i) of the parent machine requested the defrost operation, are permitted, and the two chillers 100 are allowed.
  • FIG. 7 shows that the chiller 100 (i) of the master unit is in a standby state in which the number of requests is large in the order of the number of requests for defrost operation after the defrost operation of the two chillers 100 (1) and 100 (4) shown in FIG. Allow defrost operation of two chillers 100 (6) and 100 (8), and prohibit defrost operation of one chiller 100 (7) that is smaller than two chillers 100 (6) and 100 (8) This indicates a state in which the standby state is continued.
  • FIG. 8 shows that the chiller 100 (i) of the master unit performs the defrosting operation of the remaining chiller 100 (7) after the defrosting operation of the two chillers 100 (6) and 100 (8) shown in FIG. Indicates the permitted state.
  • FIG. 9 is a graph showing a temperature control capability of the chiller system 1 and timing charts of operating states of the chillers 100 (1) to 100 (8) in the examples shown in FIGS.
  • thermo-on means a state where the compressor 10 is operating
  • thermo-off means a state where the compressor 10 is stopped
  • defrost operation on means a state in which the defrost operation is being performed
  • defrost operation off means a state in which the defrost operation is not being performed.
  • the chillers 100 (1), 100 (2), 100 (4), and 100 (6) to 100 (8) in the thermo-on state perform the heating operation when the defrost operation is off.
  • the defrost operation is on
  • the defrost operation is performed.
  • the chillers 100 (3) and 100 (5) that are originally stopped are stopped when the thermostat is off, and the heating operation is performed when the thermostat is on.
  • FIG. 10 is a flowchart showing a flow of an example of a control operation by defrost control to each chiller 100 (1) to 100 (n) of the chiller (i) of the parent device.
  • the chiller system 1 of the eight chillers 100 (1) to 100 (8), the two chillers 100 (3) and 100 (5) are stopped, and the six chillers 100 (1) and 100 (100) are stopped. (2), 100 (4), 100 (6) to 100 (8) are performing the heating operation (see ⁇ 1 in FIG. 9), the chillers 100 (1), 100 (2), 100 (4), 100 (6) to 100 (8) determine whether or not the defrost operation is necessary (step S1). Based on the determination result, five chillers 100 (1), 100 out of the six chillers 100 (1), 100 (2), 100 (4), 100 (6) to 100 (8) during the heating operation are obtained.
  • chillers 100 (1), 100 (4), 100 (6) to 100 (8) that require defrost operation are:
  • the defrost request flags FLa (1), FLa (4), FLa (6) to FLa (8) are turned on (see FIG. 6), and a defrost operation is requested to the chiller 100 (i) of the master unit (step S2). ).
  • defrost request flags FLa (1) to FLa (8) and defrost permission flags FLb (1) to FLb (8) described later are OFF in the initial state.
  • the chiller 100 (i) of the parent device sets the chiller 100 (i) of the parent device in the defrost permission flags FLb (1) to FLb (8) corresponding to the chillers 100 (1) to 100 (8).
  • the chillers 100 that require defrost operation in this example, chillers 100 (1), 100 (4), 100 (6) to 100 (8)
  • the number of units allowed to defrost simultaneously on a first-come-first-served basis that requested defrost operation are turned on (see FIG. 6).
  • the defrost operation is permitted to the chillers 100 (1) and 100 (4) for the simultaneous defrost permitted number (two in this example) in the first-come-first-served order that the operation is requested (step S3).
  • the two chillers 100 (1) and 100 (4) for which the defrost operation is permitted are changed from the heating operation to the defrost operation (step S4), and the chiller 100 during the heating operation is reduced from two to six. Since the chillers 100 (2) and 100 (6) to 100 (8) are used, the air capacity is reduced (see ⁇ 2 in FIG. 9). For this reason, the chiller 100 (i) of the master unit performs the heating operation with the two stopped chillers 100 (3) and 100 (5) being thermo-on, and performing the heating operation. The number of chillers is increased from two to six to make six chillers 100 (2), 100 (3), 100 (5), and 100 (6) to 100 (8) (see ⁇ 3 in FIG. 9).
  • step S5 when the chillers 100 (1) and 100 (4) in the defrost operation are in the defrost operation (step S5: No), the chillers 100 (6) to 100 (8) in the defrost operation standby are The defrost operation is requested to the chiller 100 (i) of the master unit at a predetermined cycle (step S6).
  • step S5 when the frost is removed and the defrost operation becomes unnecessary (step S5: Yes), the defrost operation is terminated (step S7), and the defrost request flag FLa (1), FLa (4) is turned off, and chiller 100 (i) of the master unit turns off defrost permission flags FLb (1), FLb (4) (see FIG. 7).
  • step S10 the process proceeds to step S10 through step S8 (step S8: Yes) and step S9 (step S9: Yes), and the chiller 100 (i) of the parent device defrosts against the chiller 100 (i) of the parent device.
  • the chiller 100 requesting operation in this example, chillers 100 (6) to 100 (8)
  • the chillers 100 having the same number of requests have a small identification number.
  • Rearranging in order (ascending order) step S10), the order of chillers 100 (6) to 100 (8) is changed to chiller 100 (6), chiller 100 (8), and chiller 100 (7).
  • the order of the chillers 100 (6) to 100 (8) is chiller 100 (6), chiller 100. (8) and chiller 100 (7) in this order.
  • the identification number of chiller 100 (8) is “8”.
  • the order of the chillers 100 (6) to 100 (8) is chiller 100 (6), chiller 100 (7), and chiller 100 ( 8).
  • the chiller 100 (i) of the parent device is in response to the chiller 100 (i) of the parent device in the defrost permission flags FLb (1) to FLb (8) corresponding to the chillers 100 (1) to 100 (8).
  • the chillers 100 that require defrost operation in this example, chillers 100 (6) to 100 (8)
  • the chillers that have the highest number of requests in the order of the number of requests for defrost operation and the same number of requests have a small identification number.
  • the defrost permission flags FLb (6) and FLb (8) of the chillers 100 (the chillers 100 (6) and 100 (8) in this example) for the simultaneous defrost permission number m (two in this example) are turned on (FIG. 7).
  • step S11 to allow the defrost operation for 100 (8) (step S11).
  • the two chillers 100 (6) and 100 (8) for which the defrosting operation is permitted are changed from the heating operation to the defrosting operation (step S4), and the chiller 100 during the heating operation is reduced from two to four. Since the chillers 100 (1), 100 (2), 100 (4), and 100 (7) are provided, the air capacity is reduced (see ⁇ 6 in FIG. 9). For this reason, the chiller 100 (i) of the master unit performs the heating operation with the two stopped chillers 100 (3) and 100 (5) being thermo-on, and performing the heating operation. Two chillers are added to six chillers 100 (1) to 100 (5), 100 (7) (see ⁇ 7 in FIG. 9).
  • step S5 when the chillers 100 (6) and 100 (8) in the defrost operation are in the defrost operation (step S5: No), the chiller 100 (7) in the defrost operation standby is set to the parent cycle at a predetermined cycle. The defrosting operation is requested to the chiller 100 (i) of the machine (step S6).
  • step S5 when the frost is removed and the defrost operation becomes unnecessary (step S5: Yes), the defrost operation is ended (step S7), and the defrost request flag FLa (6), FLa (8) is turned off, and chiller 100 (i) of the master unit turns off defrost permission flags FLb (6), FLb (8) (see FIG. 8).
  • step S12 the process proceeds to step S12 through step S8 (step S8: Yes) and step S9 (step S9: No), and the chiller 100 (i) of the parent device is transferred to each chiller 100 (1) to 100 (8).
  • the remaining one chiller 100 in this example, chiller 100 (7)
  • Defrost permission flag FLb (7) is turned on (see FIG. 8), and the remaining one chiller 100 (7) is permitted to defrost (step S12).
  • the one chiller 100 (7) in which the defrost operation is permitted is changed from the heating operation to the defrost operation (step S4), and the chiller 100 during the heating operation is reduced from one to six and five chillers 100 ( 1), 100 (2), 100 (4), 100 (6), 100 (8), the air capacity decreases (see ⁇ 10 in FIG. 9).
  • the chiller 100 (i) of the master unit performs the heating operation with one chiller 100 (in this example, the chiller 100 (3)) that is thermo-off turned on the thermo-on, and the chiller 100 during the heating operation is operated. Is increased from 5 to 1 to make 6 chillers 100 (1) to 100 (4), 100 (6), 100 (8) (see ⁇ 11 in FIG. 9).
  • step S5 when the frost is removed and the defrost operation becomes unnecessary (step S5: Yes), the defrost operation is terminated (step S7), and the defrost request flag FLa (7) is set.
  • the master unit chiller 100 (i) turns off the defrost permission flag FLb (7).
  • one chiller 100 (7) with the defrost request flag FLa (7) turned off returns from the defrost operation to the heating operation, and the number of chillers 100 during the heating operation increases by one from six to seven chillers 100 ( 1) to 100 (4) and 100 (6) to 100 (8), the air capacity increases (see ⁇ 12 in FIG. 9).
  • the chiller 100 (i) of the master unit is stopped by turning off the one chiller 100 (3) that is in the heating operation, which is thermo-on in spite of being stopped, by thermo-off.
  • the number of chillers 100 is reduced from seven to one to obtain six chillers 100 (1), 100 (2), 100 (4), and 100 (6) to 100 (8) (see ⁇ 13 in FIG. 9).
  • step S8: No the defrost control is terminated.
  • the number of chillers 100 is eight. However, the number of chillers 100 is not limited to this, and the number of chillers 100 may be two to seven or nine or more. Good.
  • the next defrost operation is permitted in order of the number of requests, but the next time in the order of request time.
  • the defrosting operation may be permitted.
  • the chiller 100 (i) of the master unit permits the next defrost operation for the chillers 100 having the same defrost operation request count in ascending order of the identification number.
  • the next defrost operation may be permitted in descending order of the identification number.
  • the control mechanism in this example, the chiller 100 (i) of the master unit
  • the chiller 100 (i) of the master unit is a predetermined predetermined among the chillers 100 that have requested the defrost operation.
  • the defrosting operation is permitted on a first-come-first-served basis until the number of units (simultaneous defrosting permitted number m), and the chiller 100 waiting for the defrosting operation is in a predetermined cycle with respect to the control mechanism (in this example, the chiller 100 (i) of the master unit).
  • the chiller 100 (i) of the master unit permits the next defrost operation in descending order of the number of requests or the required time of the defrost operation.
  • the next defrost operation can be permitted in the descending order of necessity between the chillers 100 waiting for the defrost operation. Therefore, when defrosting operation is permitted up to a predetermined number on a first-come-first-served basis, it is possible to determine the priority order of the chillers 100 that are waiting for defrosting operation.
  • control mechanism in this example, the chiller 100 (i) of the master unit
  • the chillers 100 having the same number of defrost operation requests or the same time as the next chiller 100, in the order of increasing or decreasing identification numbers.
  • the present invention relates to a chiller system in which a plurality of heat pump chillers are connected, and in particular, when defrosting operation is permitted on a first-come-first-served basis up to a predetermined number, priorities among chillers waiting for defrosting operation are determined. It can be applied to the purpose of doing.
  • Chiller System 10 Compressor 11 Clutch 20 Refrigerant-Air Heat Exchanger 30 Refrigerant-Air Heat Exchanger Fan 40 Expansion Valve 41 First Expansion Valve 42 Second Expansion Valve 50 Refrigerant-Circulating Fluid Heat Exchanger 60 Engine 70 Engine Waste Heat Recovery device 81 Oil separator 81a Valve 82 Accumulator 83 Receiver 100 Chiller 110 Refrigerant circuit 111 Four-way valve 112 Bridge circuit 1121 First check valve row 1122 Second check valve row 112a First check valve 112b Second check valve 112c Second 3 check valve 112d 4th check valve 113a high pressure gas refrigerant path 113b first low pressure gas refrigerant path 113b1 merge path 113c first gas refrigerant path 113d first refrigerant path 113e high pressure liquid refrigerant path 113f first low pressure gas-liquid two-phase refrigerant Route 113g Second refrigerant Path 113h Second gas refrigerant path 113

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Chemical & Material Sciences (AREA)
  • Signal Processing (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Air Conditioning Control Device (AREA)
  • Human Computer Interaction (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)
PCT/JP2015/064033 2014-06-24 2015-05-15 チラーシステム WO2015198742A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
AU2015282150A AU2015282150B2 (en) 2014-06-24 2015-05-15 Chiller system
CN201580034424.2A CN106461300B (zh) 2014-06-24 2015-05-15 冷却系统
EP15812743.1A EP3163225A4 (en) 2014-06-24 2015-05-15 Chiller system
KR1020167032682A KR101892378B1 (ko) 2014-06-24 2015-05-15 칠러 시스템

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014-129487 2014-06-24
JP2014129487A JP6290724B2 (ja) 2014-06-24 2014-06-24 チラーシステム

Publications (1)

Publication Number Publication Date
WO2015198742A1 true WO2015198742A1 (ja) 2015-12-30

Family

ID=54937840

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/064033 WO2015198742A1 (ja) 2014-06-24 2015-05-15 チラーシステム

Country Status (6)

Country Link
EP (1) EP3163225A4 (ko)
JP (1) JP6290724B2 (ko)
KR (1) KR101892378B1 (ko)
CN (1) CN106461300B (ko)
AU (1) AU2015282150B2 (ko)
WO (1) WO2015198742A1 (ko)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106763909A (zh) * 2017-01-21 2017-05-31 佛山市德天电器有限公司 三孔单向阀及具有三孔单向阀的无霜热泵系统
CN106765867A (zh) * 2016-11-14 2017-05-31 珠海格力电器股份有限公司 一种空调冷水机组控制方法及系统
CN114777357A (zh) * 2022-02-11 2022-07-22 广东芬尼克兹节能设备有限公司 一种协调除霜控制方法、装置、计算机设备及存储介质

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108731321B (zh) * 2017-04-25 2020-04-24 同方人工环境有限公司 一种空气源热泵系统的除霜控制方法
CN108286775B (zh) * 2017-12-29 2020-04-21 广东高而美制冷设备有限公司 一种具有余热回收及防结冰的化霜控制方法
CN110553439B (zh) * 2019-08-29 2021-07-20 浙江中广电器股份有限公司 一种空气源变频热泵冷水机组制冷启动防冻结的控制方法
CN113531776B (zh) * 2021-07-26 2022-05-10 珠海格力电器股份有限公司 空调机组的化霜控制方法、装置、存储介质及空调机组
IT202100025904A1 (it) * 2021-10-08 2023-04-08 Clivet S P A Metodo per sbrinare uno scambiatore di calore ad aria in una unità a pompa di calore polivalente

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5625631A (en) * 1979-08-06 1981-03-12 Daikin Ind Ltd Air conditioner
JPH07332817A (ja) * 1994-06-08 1995-12-22 Daikin Ind Ltd ヒートポンプ式冷凍装置
JP2009186123A (ja) * 2008-02-08 2009-08-20 Mitsubishi Electric Corp 空気調和装置

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0674531A (ja) * 1992-04-10 1994-03-15 Sanyo Electric Co Ltd 空気調和装置
JPH10122604A (ja) 1996-10-23 1998-05-15 Daikin Ind Ltd 冷凍装置の制御装置
JP4257351B2 (ja) 2006-08-07 2009-04-22 ヤンマー株式会社 エンジン駆動式ヒートポンプ
CN200961979Y (zh) * 2006-09-13 2007-10-17 东南大学 燃气机为动力的热泵除霜装置
KR101397217B1 (ko) * 2009-07-28 2014-05-20 도시바 캐리어 가부시키가이샤 열원 유닛
CN202101340U (zh) * 2011-05-24 2012-01-04 宁波奥克斯电气有限公司 热泵型螺杆式压缩多联中央空调装置
WO2013027757A1 (ja) * 2011-08-22 2013-02-28 東芝キヤリア株式会社 複合二元冷凍サイクル装置
KR101844860B1 (ko) * 2011-11-16 2018-04-03 엘지전자 주식회사 공기조화기 및 그 제어방법
JP5836083B2 (ja) * 2011-11-24 2015-12-24 三菱重工業株式会社 ヒートポンプシステムの除霜運転方法及びヒートポンプシステム
JP2014052123A (ja) * 2012-09-06 2014-03-20 Yanmar Co Ltd エンジン駆動ヒートポンプチラー
JP5841921B2 (ja) * 2012-09-06 2016-01-13 ヤンマー株式会社 エンジン駆動ヒートポンプチラー
JP6381927B2 (ja) * 2014-02-25 2018-08-29 三菱重工サーマルシステムズ株式会社 ヒートポンプシステムおよびその運転方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5625631A (en) * 1979-08-06 1981-03-12 Daikin Ind Ltd Air conditioner
JPH07332817A (ja) * 1994-06-08 1995-12-22 Daikin Ind Ltd ヒートポンプ式冷凍装置
JP2009186123A (ja) * 2008-02-08 2009-08-20 Mitsubishi Electric Corp 空気調和装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3163225A4 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106765867A (zh) * 2016-11-14 2017-05-31 珠海格力电器股份有限公司 一种空调冷水机组控制方法及系统
CN106765867B (zh) * 2016-11-14 2018-12-07 珠海格力电器股份有限公司 一种空调冷水机组控制方法及系统
US10899199B2 (en) 2016-11-14 2021-01-26 Gree Electric Appliances, Inc. Of Zhuhai Control method and system for air-conditioner water chilling units and air conditioning system
CN106763909A (zh) * 2017-01-21 2017-05-31 佛山市德天电器有限公司 三孔单向阀及具有三孔单向阀的无霜热泵系统
CN106763909B (zh) * 2017-01-21 2023-04-18 佛山市德天电器有限公司 三孔单向阀及具有三孔单向阀的无霜热泵系统
CN114777357A (zh) * 2022-02-11 2022-07-22 广东芬尼克兹节能设备有限公司 一种协调除霜控制方法、装置、计算机设备及存储介质
CN114777357B (zh) * 2022-02-11 2023-07-21 广东芬尼克兹节能设备有限公司 一种协调除霜控制方法、装置、计算机设备及存储介质

Also Published As

Publication number Publication date
EP3163225A4 (en) 2017-06-28
CN106461300A (zh) 2017-02-22
JP2016008774A (ja) 2016-01-18
CN106461300B (zh) 2019-09-17
EP3163225A1 (en) 2017-05-03
JP6290724B2 (ja) 2018-03-07
KR20160146931A (ko) 2016-12-21
AU2015282150B2 (en) 2019-01-03
KR101892378B1 (ko) 2018-08-27
AU2015282150A1 (en) 2017-02-16

Similar Documents

Publication Publication Date Title
JP6290724B2 (ja) チラーシステム
US20230143201A1 (en) Methods and systems for controlling integrated air conditioning systems
AU2017282098B2 (en) Phase change material-based enhancement for reversed-cycle defrosting in vapour compression refrigeration systems
JP5396246B2 (ja) 車両用空調装置
JP5452409B2 (ja) 熱サイクルシステム
CN112092566A (zh) 一种热管理系统
KR102065968B1 (ko) 자동차 공기 조화 시스템의 냉각제 분배 장치
JP2018124046A (ja) 空気調和装置
US11226112B2 (en) Air-conditioning system
WO2015198741A1 (ja) チラーシステム
KR20190005445A (ko) 멀티형 공기조화기
EP3236168B1 (en) Air conditioning device
WO2018043454A1 (ja) 空調給湯システム
JP6426024B2 (ja) 輸送用冷凍ユニット
JP2006220332A (ja) 複合型空気調和装置
JP6021943B2 (ja) 空気調和装置
JP5627564B2 (ja) 冷凍サイクルシステム
JP2006220335A (ja) 複合型空気調和装置
JP2022169906A (ja) 車両用空調システムおよび車両用空調方法
JP2018105588A (ja) ヒートポンプ
JP2019124401A (ja) 冷凍サイクル装置
JP2839066B2 (ja) ヒートポンプの除霜システム
KR102037715B1 (ko) 냉매시스템

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15812743

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20167032682

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

REEP Request for entry into the european phase

Ref document number: 2015812743

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2015812743

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2015282150

Country of ref document: AU

Date of ref document: 20150515

Kind code of ref document: A