WO2015173874A1 - 圃場の作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置 - Google Patents

圃場の作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置 Download PDF

Info

Publication number
WO2015173874A1
WO2015173874A1 PCT/JP2014/062641 JP2014062641W WO2015173874A1 WO 2015173874 A1 WO2015173874 A1 WO 2015173874A1 JP 2014062641 W JP2014062641 W JP 2014062641W WO 2015173874 A1 WO2015173874 A1 WO 2015173874A1
Authority
WO
WIPO (PCT)
Prior art keywords
work
period
field
work schedule
display
Prior art date
Application number
PCT/JP2014/062641
Other languages
English (en)
French (fr)
Inventor
本田 誠
由美子 長田
Original Assignee
富士通株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 富士通株式会社 filed Critical 富士通株式会社
Priority to JP2016519004A priority Critical patent/JP6332443B2/ja
Priority to PCT/JP2014/062641 priority patent/WO2015173874A1/ja
Publication of WO2015173874A1 publication Critical patent/WO2015173874A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining

Definitions

  • the present invention relates to a field work schedule display method, a work schedule display program, and a work schedule display device.
  • product image data that is a product sample indicating the shipment state of crops
  • production plan data that represents from the seeding date to the shipment date of crops
  • the present invention provides a field work schedule display method and a work for displaying in a distinguishable manner a period in which crops are planted but no work and a period in which crops are not planted and are vacant fields. It is an object to provide a schedule display program and a work schedule display device.
  • an input of a work schedule for cultivation of a specific crop in a specific field is received, and among the input work schedules, between the work showing cropping and the work showing harvesting
  • a display method, a work schedule display program, and a work schedule display device are proposed.
  • FIG. 1 is an explanatory diagram of an example of a work schedule display method according to the embodiment.
  • FIG. 2 is an explanatory diagram illustrating a system configuration example of the agricultural support system 200.
  • FIG. 3 is a block diagram illustrating a hardware configuration example of the work schedule display device 100.
  • FIG. 4 is a block diagram illustrating a hardware configuration example of the client device 201.
  • FIG. 5 is an explanatory diagram showing an example of the contents stored in the production plan DB 220.
  • FIG. 6 is an explanatory diagram illustrating an example of the contents stored in the component master 230.
  • FIG. 7 is an explanatory diagram illustrating a screen example of a pre-actual input screen.
  • FIG. 8 is a block diagram illustrating a functional configuration example of the work schedule display device 100.
  • FIG. 8 is a block diagram illustrating a functional configuration example of the work schedule display device 100.
  • FIG. 9 is an explanatory diagram showing a screen example of the production plan screen.
  • FIG. 10 is an explanatory diagram showing a pop-up display example of the production plan screen.
  • FIG. 11 is an explanatory diagram illustrating a display example of a work schedule.
  • FIG. 12 is a flowchart (part 1) illustrating an example of a work schedule display control processing procedure of the work schedule display device 100.
  • FIG. 13 is a flowchart (part 2) illustrating an example of a work schedule display control processing procedure of the work schedule display device 100.
  • FIG. 14 is a flowchart illustrating an example of a specific processing procedure of the results display control process.
  • FIG. 1 is an explanatory diagram of an example of a work schedule display method according to the embodiment.
  • a work schedule display device 100 is a computer that displays a work schedule of a farm field.
  • a farm is a field or vegetable garden for cultivating and growing crops.
  • a crop is a product produced by agricultural activities, and includes, for example, cereals, vegetables, fruits, and florets. Examples of each classification include items such as radish, cabbage, lettuce, mandarin orange, and carnation.
  • the work schedule is a work schedule related to crops planted on the field. The work is work for agricultural production, and includes, for example, tilling, sowing, planting, patrol, fertilizer application, pesticide application, additional fertilization, irrigation, and harvesting.
  • a work schedule display method that makes it possible to easily identify a period in which there is no work but a period in which there is no work and a period in which a field is not cultivated and is an empty field. explain.
  • work schedule display processing related to crop cultivation in the work schedule display device 100 will be described.
  • the work schedule display device 100 accepts an input of a work schedule for cultivation of a specific crop in a specific field. Specifically, for example, the work schedule display device 100 receives a scheduled start time and a scheduled end time of each work as a work schedule for each work by an operation input of a user using an input device (not shown).
  • the work schedule display device 100 determines whether or not there is a free period within the period between the work indicating cropping and the work indicating harvesting in the input work schedule.
  • the work showing the planting is, for example, a sowing work for seeding a crop in a field or a fixed planting work for transferring a seedling from a nursery and planting it in the field.
  • the work indicating harvesting is a harvesting work in which crops are taken. In other words, it is an operation in which cultivation of a certain crop is completed and the field is used up.
  • the period between the work showing cropping and the work showing harvesting is the cropping period of the crop planted on the field.
  • a period in which there is an interval between the end of the previous work and the start of the next work within the cropping period is a period in which the crop is planted in the field but there is no work on the field.
  • the vacant period can be said to be a period in which a plurality of dates on which no work schedule is set are consecutive among the cropping periods of the crops planted on the field.
  • an empty period in the work schedule between the work showing cropping and the work showing harvest may be referred to as an “empty period within the cropping period”.
  • the work schedule display device 100 determines that there is a free period within the cropping period within the period between the work “control” and the work “harvest”.
  • the work schedule display device 100 displays a state display different from the state display indicating that a specific field is vacant after the work indicating harvesting in the cropping period when there is an empty period within the cropping period. Assign to a free period and display.
  • the specific field is empty means that no crop is planted in the specific field, and the specific field is an empty field.
  • the work schedule display device 100 sets the color of the column displaying the work schedule for a specific field to a period indicating that the specific field is vacant after the harvesting work and an empty period within the cropping period. By changing the color to different colors, the images are displayed in an identifiable manner.
  • the period in which the field A is empty after the scheduled end time “late November” of the work “harvest” in the column 110 (dotted line frame in FIG. 1) for displaying the work schedule for the field A.
  • the background color 111 and the background color of the empty period 112 within the cropping period are set to different colors and displayed on the display 101.
  • the display 101 may be included in the work schedule display device 100 or may be included in another computer that can communicate with the work schedule display device 100.
  • the work schedule display device 100 can be identified by changing the color of the column displaying the work schedule for the field to different colors in the period indicating the work included in the work schedule and the empty period in the cropping period. May be displayed.
  • the background color of the period 113 indicating the work “control”
  • the background color of the period 114 indicating the work “harvest”
  • the background colors 112 are set to different colors and displayed on the display 101.
  • a specific field is planted, but there is no work (an empty period within the planting period), and the planting itself is not planted. Therefore, it is possible to display the period in which the field is empty. Thereby, it is possible to prevent another production plan from being erroneously set for a period in which the planting is performed but there is no work.
  • FIG. 2 is an explanatory diagram showing a system configuration example of the agricultural support system 200.
  • the agriculture support system 200 includes a work schedule display device 100 and client devices 201-1 to 201-n (n is a natural number of 2 or more).
  • the work schedule display device 100 and the client devices 201-1 to 201-n are connected via a wired or wireless network 210.
  • the network 210 is, for example, a LAN (Local Area Network), a WAN (Wide Area Network), the Internet, or the like.
  • the work schedule display device 100 has a production plan DB (database) 220 and a parts master 230, and performs display control of the client devices 201-1 to 201-n.
  • the work schedule display device 100 is a server, for example.
  • the contents stored in the various DBs 220 and 230 will be described later with reference to FIGS.
  • the client devices 201-1 to 201-n are computers that have a display (for example, a display 406 shown in FIG. 4 to be described later) and can display various screens according to the display control of the work schedule display device 100.
  • the client devices 201-1 to 201-n are, for example, PCs, notebook PCs, tablet PCs, smartphones, and the like used by farmers and workers.
  • the work schedule display device 100 receives a display request for various screens (for example, a preliminary input screen 700 and a production plan screen 900 described later) from the client devices 201-1 to 201-n, the various screens are displayed. Are generated and transmitted to the client apparatuses 201-1 to 201-n. As a result, various screens are displayed on the displays of the client apparatuses 201-1 to 201-n.
  • various screens for example, a preliminary input screen 700 and a production plan screen 900 described later
  • client apparatus 201 the client apparatuses 201-1 to 201-n may be simply referred to as “client apparatus 201”.
  • FIG. 3 is a block diagram illustrating a hardware configuration example of the work schedule display device 100.
  • the work schedule display device 100 includes a CPU (Central Processing Unit) 301, a memory 302, an I / F (Interface) 303, a disk drive 304, and a disk 305. Each component is connected by a bus 300.
  • CPU Central Processing Unit
  • I / F Interface
  • the CPU 301 controls the entire work schedule display device 100.
  • the memory 302 includes, for example, a ROM (Read Only Memory), a RAM (Random Access Memory), a flash ROM, and the like. Specifically, for example, a flash ROM or ROM stores various programs, and a RAM is used as a work area for the CPU 301. The program stored in the memory 302 is loaded into the CPU 301 to cause the CPU 301 to execute the coded process.
  • the I / F 303 is connected to the network 210 through a communication line, and is connected to another computer (for example, the client device 201 shown in FIG. 2) through the network 210.
  • the I / F 303 controls an internal interface with the network 210 and controls input / output of data from other computers.
  • a modem or a LAN adapter may be employed as the I / F 303.
  • the disk drive 304 controls reading / writing of data with respect to the disk 305 according to the control of the CPU 301.
  • the disk 305 stores data written under the control of the disk drive 304. Examples of the disk 305 include a magnetic disk and an optical disk.
  • the work schedule display device 100 may include, for example, an SSD (Solid State Drive), a keyboard, a mouse, and a display in addition to the above-described components.
  • SSD Solid State Drive
  • FIG. 4 is a block diagram illustrating a hardware configuration example of the client device 201.
  • the client device 201 includes a CPU 401, a memory 402, a disk drive 403, a disk 404, an I / F 405, a display 406, and an input device 407. Each component is connected by a bus 400.
  • the CPU 401 governs overall control of the client device 201.
  • the memory 402 includes, for example, a ROM, a RAM, a flash ROM, and the like. Specifically, for example, a flash ROM or ROM stores various programs, and the RAM is used as a work area of the CPU 401.
  • the program stored in the memory 402 is loaded on the CPU 401 to cause the CPU 401 to execute the coded process.
  • the disk drive 403 controls data read / write with respect to the disk 404 according to the control of the CPU 401.
  • the disk 404 stores data written under the control of the disk drive 403. Examples of the disk 404 include a magnetic disk and an optical disk.
  • the I / F 405 is connected to the network 210 via a communication line, and is connected to another computer (for example, the work schedule display device 100 shown in FIG. 2) via the network 210.
  • the I / F 405 controls an internal interface with the network 210 and controls data input / output from other computers.
  • the display 406 displays data such as a document, an image, and function information as well as a cursor, an icon, or a tool box.
  • a CRT Cathode Ray Tube
  • a liquid crystal display for example, a liquid crystal display, an organic EL (Electroluminescence) display, or the like can be adopted.
  • the display 101 illustrated in FIG. 1 corresponds to the display 406, for example.
  • the input device 407 has keys for inputting characters, numbers, various instructions, etc., and inputs data.
  • the input device 407 may be a keyboard or a mouse, or may be a touch panel type input pad or a numeric keypad.
  • the client device 201 may not include, for example, the disk drive 403 and the disk 404 among the above-described components.
  • the client device 201 may include, for example, an SSD, a scanner, and a printer in addition to the above-described components.
  • the various DBs 220 and 230 are realized by, for example, the memory 302 and the disk 305 of the work schedule display device 100 illustrated in FIG.
  • FIG. 5 is an explanatory diagram showing an example of the contents stored in the production plan DB 220.
  • the production plan DB 220 has fields of plan ID, field name, cropping area, item, product type, work type, scheduled period, and actual period.
  • production plan information (for example, production plan information 500-1 to 500-3) is stored as a record.
  • the production plan is a plan of how much and what work schedule to plant the crop to be produced in which field. Cultivation of crops in each field is performed according to the production plan.
  • the plan ID is an identifier for identifying a production plan. The plan ID is assigned in the order in which the production plan is established, for example.
  • plan ID may be reassigned in order of the first scheduled work date in the field, for example, every time a new production plan is created. Further, when a plurality of production plans are made for the same field, a branch number is used as the plan ID. A branch number is assigned a young number in order from the earliest scheduled work date.
  • the field name is the name of the field.
  • As the field name for example, a pen name that is a name of a section obtained by dividing one field may be used.
  • the planted area is the area where the crop is planted.
  • the item is a crop type. Examples of the item include cabbage, radish, tomato, and rice.
  • Species are types within the same item. For example, as a variety of cabbage, “Saifu” or “Green Ball” for summer-growing varieties, “Middle-early birth 2”, “Middle-early birth 3”, “early autumn”, “new style”, etc. There is.
  • the work type is obtained by dividing work for agricultural production by work contents.
  • the scheduled period is a period during which work related to crop cultivation is scheduled.
  • a period from the scheduled start time to the scheduled end time of the work is set as the schedule interval.
  • the actual period is an actual period in which work related to crop cultivation is performed.
  • a period from the start time to the end time of the work is set as the performance period.
  • FIG. 6 is an explanatory diagram illustrating an example of the contents stored in the component master 230.
  • the component master 230 has fields of work type, mark / color, line type / color, and background color, and by setting information in each field, component information (for example, component information 600-1 ⁇ 600-6) is stored as a record.
  • the work type is the work for agricultural production divided by work content.
  • the mark / color is information on the shape and color of the mark indicating the start time or end time of the work, for example, image information of the mark.
  • the line type / color is information on the line type and / or color of the line segment connecting the marks indicating the work start time or end time, and is, for example, line segment image information.
  • Background color indicates the background color of the scheduled period in which the work of each work type is performed or the empty period within the cropping period in the column displaying the work schedule for the field.
  • background color information information indicating the type of pattern such as shading may be registered instead of color or in combination with color information.
  • the background color is not only the meaning of the form that can be identified by the difference in color, but also the form and color that are the same color and can be identified by the type of pattern such as shading. Any form of display that can be identified by a combination of both the pattern type and the pattern type such as shading may be included.
  • the vacant period within the cropping period is a vacant period within the period between the work showing cropping and the work showing harvesting in the work schedule. A detailed description of the free period within the cropping period will be described later.
  • Different background colors are assigned to the scheduled period during which work of each work type is performed and the empty period within the cropping period. Further, a mark indicating the start time or end time of the work of each work type and a line segment arranged between the marks are assigned a color similar to the background color of the scheduled period in which the work of the same work type is performed. .
  • the work marks and line colors of the same work type are the same.
  • the color similar to the background color is, for example, a color similar to the background color and having a lower transparency than the background color, that is, a color darker than the background color. More specifically, a color having the same color as the background color has the same hue as the background color, and has a lower brightness than the background color and / or a higher saturation than the background color.
  • a combination of similar colors for example, a combination of colors adjacent to each other in a hue circle such as yellowish green and yellow can be cited.
  • a hue ring is a ring in which hues are arranged in a circle according to the order of the spectrum.
  • the line type of the pattern equivalent to the shaded color can be handled as the line type of the same color as the background color.
  • the line type is a line segment having a certain width, the line segment can be regarded as an elongated rectangle.
  • the lightness and saturation are the same in all the free periods in the planned period and the cropping period, and the hue is changed between the periods, so that the free periods in the planned period and the cropping period are different.
  • a background color is assigned.
  • the color of the same color as the background color of the scheduled period corresponding to all marks and all line segments can be obtained. Assigned to each.
  • FIG. 7 is an explanatory diagram showing a screen example of the preliminary input screen.
  • a pre-actual input screen 700 is an operation screen for inputting a scheduled period and an actual period of each work performed in the field.
  • the predictive input screen 700 displays the display of the client device 201 by designating a field to be input for the scheduled period and the actual period of each work, for example, by the user's operation input using the input device 407 shown in FIG. 406 is displayed.
  • the pre-actual input screen 700 displays a field name, a planted area, an item, and a variety of a field that are input targets of the scheduled period and the actual period of each work.
  • the boxes 701 to 704 are clicked by a user operation input on the preliminary input screen 700, the work type of work scheduled to be performed on the field can be selected.
  • an icon corresponding to the work type of the work can be selected.
  • This icon is a mark indicating the start time or end time of the above-described work. The user can arbitrarily select marks indicating the start time and end time of each work.
  • FIG. 8 is a block diagram illustrating a functional configuration example of the work schedule display device 100.
  • the work schedule display device 100 is configured to include a reception unit 801, a display control unit 802, and a determination unit 803.
  • the reception unit 801 to the determination unit 803 are functions as control units. Specifically, for example, by causing the CPU 301 to execute a program stored in a storage device such as the memory 302 and the disk 305 illustrated in FIG. Alternatively, the function is realized by the I / F 303.
  • the processing result of each functional unit is stored in a storage device such as the memory 302 and the disk 305, for example.
  • the accepting unit 801 accepts input of a work schedule related to cultivation of a specific crop in a specific field.
  • the specific farm field is a farm field for which a production plan is set, and is, for example, a farm field arbitrarily selected by the user of the client device 201.
  • the user is, for example, a worker who performs work for agricultural production or a farmer who manages the worker.
  • Specified crops are crops to be produced that are planned to be planted in specific fields.
  • the work schedule is a schedule of one or more work related to cultivation of a specific crop in a specific field.
  • the work schedule is specified by, for example, the work type, scheduled start time, and scheduled end time of each work.
  • the input of the work schedule is performed, for example, by a user operation input on the preliminary input screen 700 shown in FIG.
  • the client device 201 transmits the input work schedule input result to the work schedule display device 100.
  • the receiving unit 801 receives an input of the work schedule by receiving the input result of the work schedule from the client device 201.
  • the input work schedule is stored in, for example, the production plan DB 220 (see FIG. 5).
  • the display control unit 802 performs control to display a period corresponding to the work timing of the work in a color corresponding to the work type of the work.
  • the display control unit 802 differs from the first color in the period corresponding to the work time of the work of the first work type, and the period corresponding to the work time of the work of the second work type. Control to display in the second color is performed.
  • the work of the first work type and the work of the second work type are work planned to be executed in order regarding cultivation of a specific crop in a specific field.
  • the period corresponding to the work timing of each work is a scheduled period in which each work is performed, and is a period from the scheduled start time to the scheduled end time of each work.
  • the period corresponding to the work time of each work is specified from the inputted work schedule. In the following description, the period corresponding to the work time of work may be expressed as “scheduled period”.
  • the display control unit 802 changes the background color of the column displaying the work schedule for a specific field to a different color for each scheduled period indicating each work included in the work schedule. Control the display to be identifiable.
  • the column displaying the work schedule is a strip-shaped display column extending along the time axis.
  • a column displaying a work schedule may be referred to as a “work schedule display column”.
  • the display control unit 802 refers to the production plan information in the production plan DB 220, for example, and identifies the scheduled period of each work performed in a specific field. Further, the display control unit 802 refers to the component master 230 (see FIG. 6) and identifies the background color corresponding to the work type of each work performed in a specific field.
  • the display control unit 802 sets a background color corresponding to the work type of each work in the scheduled period of each work in the work schedule display field for a specific field in the production plan screen.
  • the production plan screen is a screen that displays a work schedule relating to cultivation of a specific crop in a specific field as a Gantt chart. A screen example of the production plan screen will be described later with reference to FIG.
  • the determination unit 803 determines whether or not there is a free period in the period between the work indicating cropping and the work indicating harvesting in the input work schedule.
  • the work showing the planting is, for example, a sowing work for seeding a crop in a field or a fixed planting work for transferring a seedling from a nursery and planting it in the field.
  • the work indicating harvesting is a harvesting work in which crops are taken. In other words, it is an operation in which cultivation of a certain crop is completed and the field is used up.
  • the period between the work showing cropping and the work showing harvesting is the cropping period of the crop planted on the field.
  • a period in which there is an interval between the end of the previous work and the start of the next work within the cropping period is a period in which the crop is planted in the field but there is no work on the field.
  • the vacant period can be said to be a period in which a plurality of dates on which no work schedule is set are consecutive among the cropping periods of the crops planted on the field.
  • an empty period in the work schedule between the work showing cropping and the work showing harvest may be referred to as an “empty period within the cropping period”.
  • the determination unit 803 refers to the production plan information in the production plan DB 220 to determine whether or not there is a free period within the cropping period in the work schedule for a specific field.
  • the determination unit 803 refers to the production plan information in the production plan DB 220 to determine whether or not there is a free period within the cropping period in the work schedule for a specific field.
  • an example of determining an empty period within the cropping period will be described using the production plan information 500-1 shown in FIG. 5 as an example.
  • the determination unit 803 determines whether the work type “seeding” is scheduled to start work “February 01, 2014” and the work type “harvest” work is scheduled to end “June 07, 2014”. Is specified as the cropping period. Then, the determination unit 803, for example, within the specified cropping period, for example, the scheduled end time “March 15” for the work type “fertilizer application” and the scheduled start time “May 21” for the work type “harvest”. It is determined that there is a vacant period between the date and day.
  • the display control unit 802 displays a state display different from the state display indicating that the specific farm is empty after the work indicating harvesting within the cropping period.
  • the display is assigned to the free period and displayed.
  • the specific field is empty means that no crop is planted in the specific field, and the specific field is an empty field.
  • a period in which no crop is planted in the field may be referred to as an “empty field period”.
  • the display control unit 802 changes the background color of the display column of the work schedule to a different color in each of the scheduled period indicating each work included in the work schedule and the free period in the cropping period.
  • the display is controlled so that it can be identified.
  • the display control unit 802 refers to the production plan information in the production plan DB 220, for example, and specifies an empty period within the cropping period.
  • the display control unit 802 refers to the component master 230 (see FIG. 6) and identifies the background color corresponding to the empty period within the cropping period. Then, the display control unit 802 sets the specified background color in the empty period within the cropping period in the work schedule display field for the specific field in the production plan screen.
  • the background color of the empty field period may be, for example, an initially set color (for example, white), or a color different from the scheduled period indicating each work included in the work schedule and the empty period within the cropping period. May be set.
  • the reception unit 801 receives input of the start time and end time of work related to cultivation of a specific crop in a specific field.
  • the start time and end time of the work are the start time and end time of the performance period in which the work was actually performed. That is, the accepting unit 801 accepts input of work results of work.
  • the input of the work start time and end time is performed by, for example, an operation input by the user of the client apparatus 201 on the preliminary input screen 700 (see FIG. 7).
  • the client device 201 transmits the input result of the input work start time and end time to the work schedule display device 100.
  • the reception unit 801 receives the input of the start time and end time of the work by receiving the input result of the start time and end time of the work from the client device 201.
  • the input work start time and end time are stored in, for example, the production plan DB 220 (see FIG. 5). However, the start time and end time of the work may be input all together, or may be input at different timings.
  • the display control unit 802 also displays a start mark indicating the work start time, an end mark indicating the work end time, and a line segment arranged between the work start mark and the end mark. Control to display in the same color as the period.
  • the work start mark and the end mark are, for example, the same mark, and different marks may be used for each work type.
  • the work results of the work of the first work type are input for a plurality of days over the scheduled time of the work of the second work type as well as the scheduled time of the work.
  • the start time of the work of the first work type is the first work result date related to the work of the first work type.
  • the end time of the work of the first work type is the last work result date related to the work of the first work type.
  • the display control unit 802 displays the line segment arranged between the first work record date and the last work record date related to the work of the first work type as the first work type work schedule period and the first work record date. Control is performed to display in the same color as the scheduled work period of the first work type over both the scheduled work period of the second work type.
  • the display control unit 802 sets the line segment arranged between the first work record date and the last work record date related to the work of the first work type as the scheduled work period of the first work type. Control is performed to display in a color similar to the scheduled period of the work of the first work type at a time when does not overlap.
  • the result period specified by the result date of the work of the first work type may overlap with another scheduled work time different from the first work type.
  • the determination unit 803 determines whether or not the end time of the work of the first work type and the start time of the work of the second work type overlap on the display scale.
  • the display scale is a scale for displaying the scheduled period and the actual period of each work.
  • the minimum unit of the display scale is set in advance and stored in a storage device such as the memory 302 and the disk 305, for example.
  • the display control unit 802 determines whether the work end time of the first work type and the work start time of the second work type belong to the same time on the display scale. To do. For example, when the minimum unit of the display scale is set to “seasonal unit”, the time on the display scale is one of the beginning, middle, and end of any month.
  • the display control unit 802 has a first mark (start mark) indicating the start time of the work of the first work type and the end time of the work of the first work type when the display scale overlaps. And a second mark (end mark) indicating “”. Further, the display control unit 802 does not set the mark indicating the start time of the work of the second work type as a display target, but the third mark (end mark) indicating the end time of the work of the second work type. Is the display target.
  • the display control unit 802 displays the first mark, the second mark, and the first line segment arranged between the first mark and the second mark in the same manner as the first color. Control to display in color. Further, the display control unit 802 displays the third mark and the second line segment arranged between the second mark and the third mark in a color similar to the second color. Take control.
  • the display control unit 802 specifies a mark / color and a line type / color corresponding to the first work type with reference to the component master 230 (see FIG. 6). Then, the display control unit 802 sets the identified mark as the first mark at the start time of the work of the first work type in the work schedule display field and at the end time of the work of the first work type. Set as 2 mark. Further, the display control unit 802 sets a line segment arranged between the first mark and the second mark with the specified line type / color as the first line segment.
  • the display control unit 802 specifies the mark and line type / color corresponding to the second work type with reference to the component master 230 (see FIG. 6). Then, the display control unit 802 sets the identified mark as the third mark at the end time of the work of the second work type in the work schedule display field. Further, the display control unit 802 sets a line segment arranged between the second mark and the third mark with the specified line type / color as the second line segment.
  • any one of the first mark, the second mark, and the third mark overlaps the scheduled period of the corresponding work, the scheduled period of another work that does not correspond, or the empty period in the cropping period.
  • the display control unit 802 sets the mark so as to be displayed superimposed on the scheduled period of the corresponding work, the scheduled period of another work that does not correspond, or the empty period in the cropping period.
  • the control unit 802 sets the line segment to be displayed so as to be superimposed on the scheduled period of the corresponding work, the scheduled period of another work that does not correspond, or the empty period in the cropping period. As a result, it is possible to output a display indicating the actual time of work superimposed on the scheduled period of each work included in the work schedule or an empty period within the cropping period.
  • the reception unit 801 may receive an input of a work schedule for cultivation different from cultivation of a specific crop in a specific farm field.
  • the work schedule for another cultivation is a work schedule for cultivation of a crop planted next to a specific crop in a specific field. For example, when a second crop or a continuous crop is performed in a specific field, a work schedule for a plurality of cultivations in the specific field is input.
  • the display control unit 802 does not intervene the work schedule of the crop in another field between the work schedule for the specific crop in the specific field and the work schedule for another cultivation in the specific field.
  • the work schedule for a specific crop in a specific field and the work schedule for another cultivation in a specific field may be displayed at adjacent positions.
  • the display control unit 802 may display a work schedule for a specific crop in a specific field and a work schedule for another cultivation in the specific field in time series. Specifically, for example, the display control unit 802 displays a plurality of work schedules in a specific farm field at positions adjacent to each other in order of the scheduled start time of the first work.
  • reception unit 801 may receive designation of a scheduled period for any work in the work schedule display field. Designation of the scheduled period is performed, for example, by a user operation input such as tap, click, mouse-over, etc. on the production plan screen.
  • the display control unit 802 may pop-up information indicating the work type of the work indicated by the designated scheduled period.
  • the information indicating the work type of the work may include, for example, information such as the scheduled start time and the scheduled end time of the work in addition to the work type of the work.
  • a pop-up display example of information indicating the work type of work will be described later with reference to FIG.
  • reception unit 801 may receive designation of an empty period within the cropping period in the work schedule display field. Designation of an empty period within the planting period is performed by, for example, a user operation input such as tap, click, or mouse-over on the production plan screen.
  • the display control unit 802 may pop-up information indicating that the empty period within the designated cropping period is a period in which cropping is performed but there is no work.
  • the information indicating the free period within the planting period includes, for example, a message indicating that the period has been planted but no work, as well as the scheduled start and end times of the free period within the planting period. Information may be included. An example of pop-up display of information indicating an empty period within the cropping period will be described later with reference to FIG.
  • the display control unit 802 may output a display indicating the actually elapsed period of the period superimposed on the empty period within the cropping period. As a result, it is possible to display the period that has actually passed for the period in which the work performance is not displayed because the planting has been performed but there is no work.
  • FIG. 9 is an explanatory diagram showing a screen example of the production plan screen.
  • a production plan screen 900 is a screen that displays a work schedule related to the cultivation of crops in each field from September 2014 to February 2015.
  • work schedules relating to crop cultivation in each field are displayed.
  • the display column 901 displays a work schedule related to the cultivation of the crop of the item “cabbage” and the variety “xx” in the field “Yokohama 1 (acreage: 25.0 [a])”. Specifically, in the display column 901, scheduled periods 911 to 913 of each work included in the work schedule for the field “Yokohama 1” are displayed in different background colors.
  • the scheduled period 911 indicates a period from the scheduled start time “early September” to the scheduled end time “mid-September” of the work type “seeding”.
  • the scheduled period 912 indicates the period from the scheduled start time “late September” to the scheduled end time “mid-October” for the work type “fertilizer application”.
  • the scheduled period 913 indicates a period from the scheduled start time “late November” to the scheduled end timing “early December” of the work of type “harvest”.
  • the display control unit 802 sets background colors corresponding to the work types “seeding”, “fertilizer application”, and “harvest” for each work in the scheduled periods 911 to 913 indicating the work in the display field 901. Thereby, the scheduled periods 911 to 913 of each operation planned to be executed in order regarding the cultivation of the crop of the item “cabbage” and the variety “xx” in the field “Yokohama 1” can be displayed in an identifiable manner. .
  • the work schedule for the field “Yokohama 1” includes the end of the previous work and the start of the next work within the period between the work of the work type “seeding” and the work of the work type “harvest”.
  • the display control unit 802 sets a background color different from the scheduled periods 911 to 913 in the empty period 914 within the cropping period of the display field 901. Thereby, the empty period 914 in the cropping period in the field “Yokohama 1” can be displayed in an identifiable manner.
  • a mark 915 indicating the start time of the work of the work type “seeding” and a mark 916 indicating the end time of the work of the work type “seeding” are displayed superimposed on the scheduled periods 911 and 912, respectively.
  • a line segment 917 arranged between the mark 915 and the mark 916 is displayed so as to be superimposed on the scheduled periods 911 and 912.
  • the mark 915 and the mark 916 are the same mark.
  • the mark 915, the mark 916, and the line segment 917 are displayed in a color similar to the background color of the scheduled period 911 and darker than the background color of the scheduled period 911.
  • the display control unit 802 sets the mark 915 and the mark 916 as the first mark and the second mark described above, and sets the line segment 917 as the first line segment described above.
  • the work performance of the work type “seeding” can be displayed in a color similar to the work schedule of the work type “seeding” work, and the work schedule and work performance of the work type “seeding” work can be displayed. This makes it easier to understand the correspondence between
  • a mark 918 indicating the end time of the work of the work type “fertilizer application” is displayed superimposed on the scheduled period 912.
  • the work start time of the work type “fertilizer application” is overlapped on the display scale with the end time of the work of the previous work type “seeding”, and therefore the work start time of the work type “fertilizer application” is indicated.
  • the mark is not displayed.
  • a line segment 919 disposed between the mark 916 and the mark 918 is displayed so as to overlap the scheduled period 912.
  • the mark 918 and the line segment 919 are displayed in a color similar to the background color of the scheduled period 912 and darker than the background color of the scheduled period 912.
  • the display control unit 802 sets the mark 918 as the above-described third mark, and sets the line segment 919 as the above-described second line segment.
  • the work type “fertilizer spraying” is performed when the end time of the work type “seeding” work performed before and after and the work start time of the work type “fertilizer spraying” are the same time due to display convenience.
  • the line segment indicating the work period in which the work of the work type “fertilizer application” is performed can be displayed while omitting the display of the start time of the work.
  • a mark 920 indicating the start time of the work of the work type “harvest” and a mark 921 indicating the end time of the work of the work type “harvest” are displayed superimposed on the scheduled period 913.
  • a line segment 922 arranged between the mark 920 and the mark 921 is displayed so as to be superimposed on the scheduled period 913.
  • the mark 920 and the mark 921 are the same mark.
  • the mark 920, the mark 921, and the line segment 922 are displayed in a color similar to the background color of the scheduled period 913 and darker than the background color of the scheduled period 913.
  • the work performance of the work type “harvest” can be displayed in a color similar to the work schedule of the work type “harvest” work, and the work schedule and work performance of the work type “harvest” work can be displayed. This makes it easier to understand the correspondence between
  • the display fields 902 and 903 both indicate the same field name “Odawara 1” so that both can be visually recognized.
  • the present invention is not limited to this.
  • a branch number By attaching a branch number to the field name, it can be shown that the cultivation schedule is for different cultivations for the same field. In this case, for example, a hyphen and a branch number can be displayed following the field name, such as “Odawara 1-1” at 902 and “Odawara 1-2” at 903 in the field of field name.
  • the display column 904 displays a work schedule related to the cultivation of the crops of the item “asparagus” and the variety “ ⁇ ⁇ ” in the fields “Kawasaki 1” and “Acreage: 13.0 [a]”.
  • the display field 904 displays a background color set for the scheduled work period 923 included in the work schedule for the field “Kawasaki 1”.
  • the scheduled period 923 indicates a period from the scheduled start time “early September” to the scheduled end time “mid-September” of the work type “reaping”.
  • the display control unit 802 sets a background color corresponding to the work type “reaping” in the scheduled period 923 indicating the work in the display field 904.
  • the scheduled period 923 of the work of the work type “reaping” scheduled to be executed for the cultivation of the crop of the item “asparagas” and the variety “ ⁇ ⁇ ” in the field “Kawasaki 1” is displayed in an identifiable manner. be able to.
  • the display control unit 802 sets a background color different from the scheduled period 923 in the empty period 924 within the cropping period of the display field 904. Thereby, the vacant period 924 within the cropping period in the field “Kawasaki 1” can be displayed in an identifiable manner.
  • the empty period 924 is during the planting period. If the background color is not set in the empty period 924 and the background color is set only in the period when the work is clearly planned, the empty field 924 and the empty field where the crop is not planted It becomes difficult to distinguish the period. As a result, even though it is an empty period during the planting period, it may be misunderstood as an empty field period, and an error may occur in that other crops are planned for the field. is there.
  • a mark 925 indicating the work start time of the work type “reaping” and a mark 926 indicating the work end time of the work type “reaping” are displayed superimposed on the scheduled period 923.
  • a line segment 927 connecting the mark 925 and the mark 926 is displayed so as to be superimposed on the scheduled period 923.
  • the mark 925 and the mark 926 are the same mark.
  • the mark 925, the mark 926, and the line segment 927 are displayed in a color similar to the background color of the scheduled period 923 and darker than the background color of the scheduled period 923.
  • the work performance of the work type “reaping” can be displayed in the same color as the work schedule of the work type “reaping”, and the work schedule and work performance of the work type “reaping” work can be displayed. This makes it easier to understand the correspondence between
  • the display column 906 displays a work schedule related to the cultivation of the crop of the item “Sunny Lettuce” and the variety “Ox” in the field “Akiruno 2”.
  • a mark 934 indicating the time when the work of “pesticidal spraying” is started
  • a mark 936 indicating the time when the work is ended, is arranged between both marks.
  • Both the line segments 935 are displayed during the empty period 932, which is a period that does not overlap the scheduled period 931. In this way, even if the scheduled period and the actual period are shifted so as not to overlap, and the actual period takes another scheduled period of work, as shown in FIG.
  • the relationship between the schedule and the achievements can be easily understood. If the mark indicating the scheduled period and the result for the same work, or the mark and the line segment are not shown in similar colors, the schedule 934, 936 and the result shown in the line segment 935 indicate which schedule the result is. It ’s difficult to see at a glance.
  • FIG. 10 is an explanatory diagram showing a pop-up display example of the production plan screen.
  • a display column 901 in the production plan screen 900 shown in FIG. 9 is displayed.
  • the display column 901 displays a work schedule related to the cultivation of the crop of the item “cabbage” and the variety “xx” in the field “Yokohama 1 (acreage: 25.0 [a])”.
  • the production plan screen 900 when any one of the scheduled periods 911 to 913 in the display column 901 is designated by a user operation input using the input device 407, the work indicated by the designated scheduled period is displayed.
  • Information indicating the work type is displayed in a pop-up.
  • the scheduled period 912 is specified, and information 1001 indicating the work type “fertilizer application” of the work indicated by the scheduled period 912 is displayed in a pop-up ((10-1) in FIG. 10).
  • a vacant period 914 within the planting period in the display field 901 when a vacant period 914 within the planting period in the display field 901 is designated, information indicating that the vacant period 914 within the planting period is a period in which cropping is performed but no work is performed. 1002 is popped up ((10-2) in FIG. 10).
  • the user can confirm the work type of work corresponding to the scheduled period and the period during which cropping has been done but no work only by performing a simple operation such as mouse-over.
  • Example of work schedule display Next, a display example of a work schedule in the case of outputting a display indicating a period that has actually elapsed in a vacant period within a specific cropping period in a specific field will be described.
  • FIG. 11 is an explanatory diagram showing a display example of a work schedule.
  • a display column 904 of the production plan screen 900 is displayed. However, here, it is assumed that time has passed until early November.
  • the display column 904 displays a work schedule related to the cultivation of the crops of the item “asparagas” and the variety “ ⁇ ⁇ ” in the fields “Kawasaki 1” and “Acreage: 13.0 [a]”.
  • a line segment 1101 indicating the actually elapsed period of the empty period 924 in the planting period is superimposed and displayed.
  • the line segment 1101 is displayed in a color similar to the background color of the empty period 924 in the cropping period and darker than the empty period 924 in the cropping period.
  • the line segment 1101 is displayed with a line type different from the line segment 927 indicating the actual time of work of the work type “reaping”.
  • the user can specify the actually elapsed period for the period in which the work results are not displayed because there is no work but planting.
  • FIG. 12 and 13 are flowcharts showing an example of a work schedule display control processing procedure of the work schedule display device 100.
  • the work schedule display device 100 first selects unselected production plan information from the production plan DB 220 in ascending order of plan ID number (step S1201). At this time, if a branch number exists in the plan ID, the work schedule display device 100 selects unselected production plan information in ascending order of the branch number.
  • the work schedule display device 100 refers to the selected production plan information, and sets the field name, planted area, item, and product type in the work schedule display field in the production plan screen (step S1202).
  • the work schedule display device 100 refers to the selected production plan information, and selects unselected work in order from the earliest scheduled start time of the scheduled period (step S1203).
  • the selected work may be described as “target work”.
  • the work schedule display device 100 refers to the component master 230 and identifies the background color corresponding to the work type of the target work (step S1204). Then, the work schedule display device 100 sets the specified background color for the scheduled period of the target work in the work schedule display field (step S1205).
  • the work schedule display device 100 refers to the selected production plan information and determines whether there is a work performance of the target work (step S1206).
  • step S1206 No
  • the work schedule display device 100 proceeds to step S1208.
  • step S1206 when there is a work result of the target work (step S1206: Yes), the work schedule display device 100 executes a result display control process (step S1207).
  • step S1207 the specific process sequence of the results display control process will be described later with reference to FIG.
  • the work schedule display device 100 refers to the selected production plan information and determines whether there is an unselected work that has not been selected (step S1208). Here, when there is an unselected work (step S1208: Yes), the work schedule display device 100 returns to step S1203.
  • step S1208 No
  • the work schedule display device 100 proceeds to step S1301 shown in FIG.
  • the work schedule display device 100 refers to the selected production plan information and determines whether there is a vacant period within the cropping period (step S1301).
  • the work schedule display device 100 proceeds to step S1304.
  • the work schedule display device 100 refers to the component master 230 and specifies a background color corresponding to the empty period within the cropping period (step S1301). S1302). Then, the work schedule display device 100 sets the specified background color in the empty period within the cropping period in the work schedule display field (step S1303).
  • the work schedule display device 100 determines whether there is unselected production plan information not selected from the production plan DB 220 (step S1304). If there is unselected production plan information (step S1304: YES), the work schedule display device 100 switches the work schedule display field in the production plan screen (step S1305), and the steps shown in FIG. The process returns to S1201.
  • step S1304 when there is no unselected production plan information (step S1304: No), the work schedule display device 100 transmits the screen information of the production plan screen to the client device 201 (step S1306), and a series of processes according to this flowchart. Exit.
  • a production plan screen for displaying a work schedule related to cultivation of a crop to be produced in each field where a production plan is established can be displayed on the display 406 of the client device 201.
  • all the production plan information in the production plan DB 220 is the display target of the work schedule, but the present invention is not limited to this.
  • the work schedule display device 100 may set production plan information arbitrarily selected by the user of the client device 201 as a work schedule display target.
  • FIG. 14 is a flowchart showing an example of a specific processing procedure of the results display control process.
  • the work schedule display device 100 refers to the component master 230 (see FIG. 6), and specifies the mark / color and line type / color corresponding to the work type of the target work (step S1401). ).
  • the work schedule display device 100 determines whether or not the end time of the work selected immediately before (hereinafter referred to as “immediate work”) and the start time of the target work are overlapped on the display scale. Judgment is made (step S1402).
  • step S1402 when the relationship does not overlap on the display scale (step S1402: No), the work schedule display device 100 sets the start mark of the specified mark / color at the start time of the target work in the work schedule display field ( Step S1403). Next, the work schedule display device 100 sets the specified mark / color end mark at the end time of the target work in the work schedule display field (step S1404).
  • the work schedule display device 100 sets a line segment arranged between the set start mark and end mark with the specified line type / color (step S1405), and calls the result display control process. Return to.
  • step S1402 if the relationship is overlapped on the display scale (step S1402: Yes), the work schedule display device 100 displays the specified mark / color end mark at the end time of the target work in the work schedule display field. Setting is performed (step S1406).
  • the work schedule display device 100 sets a line segment arranged between the end mark of the immediately preceding work and the end mark of the target work with the specified line type / color (step S1407), and results display control processing Return to the step that called.
  • the work start mark and work end mark, and the line segment connecting the work start mark and work end mark are similar in color to the work scheduled period and are less transparent than the color of the work scheduled period. It can be displayed in color, i.e. dark color.
  • the post work was performed while omitting the display of the start time of the post work.
  • a line segment indicating the work period can be displayed.
  • the work schedule display device 100 may skip steps S1404 to S1407.
  • the work schedule display device 100 it is possible to accept an input of a work schedule related to cultivation of a specific crop in a specific field. Then, according to the work schedule display device 100, it is possible to control to display the scheduled period of each work included in the input work schedule in a color corresponding to the work type of each work.
  • the work schedule display device 100 when there is a vacant period within the cropping period in the input work schedule, a state display different from the state display indicating that a specific field is vacant after the harvesting work, It is possible to control the display by allocating to an empty period within the planting period.
  • the background color of the column that displays the work schedule for a specific farm field is different for each of the scheduled period indicating each work included in the work schedule and the free period within the cropping period. Can be changed.
  • a graph such as a Gantt chart, it is possible to display the scheduled period of each operation planned to be executed in order with respect to cultivation of a specific crop in a specific field and an empty period within the cropping period in an identifiable manner. .
  • the work schedule display device 100 it is possible to accept an input of a work schedule for cultivation different from cultivation of a specific crop in a specific field. And according to the work schedule display apparatus 100, the work schedule of the crop in another field is interposed between the work schedule about the specific crop in the specific field and the work schedule about another cultivation in the specific field. Without doing so, the work schedule for a specific crop in a specific field and the work schedule for another cultivation in the specific field can be displayed at adjacent positions.
  • the work schedule for a specific crop in a specific field and the work schedule for another cultivation in the specific field can be displayed in time series.
  • the user can grasp
  • information indicating the work type of the work indicated by the designated scheduled period in response to the designation of the scheduled period of any work in the work schedule display field. Can pop up. Thereby, the user can confirm the work type of the work corresponding to the scheduled period only by performing a simple operation such as mouse over. Further, as compared with a case where all the information indicating the work type of the work indicated by the scheduled period is displayed in advance, it is possible to suppress the amount of information to be displayed on one screen and prevent the listability from being lowered.
  • the period in response to accepting designation of an empty period within the cropping period in the display column of the work schedule, the period is a period in which cropping is performed but there is no work.
  • Information indicating that can be displayed in a pop-up As a result, the user can confirm a period in which work is done in the work schedule but there is no work, simply by performing a simple operation such as mouse over.
  • the work schedule display device 100 it is possible to output a display indicating the actual period of the period superimposed on the empty period within the cropping period. As a result, the user can specify the actually elapsed period for the period in which the work performance is not displayed because the planting is performed but there is no work.
  • the work schedule display method related to crop cultivation described in the present embodiment can be realized by executing a program prepared in advance on a computer such as a personal computer or a workstation.
  • the work schedule display program is recorded on a computer-readable recording medium such as a hard disk, a flexible disk, a CD-ROM, an MO, and a DVD, and is executed by being read from the recording medium by the computer.
  • the work schedule display program may be distributed through a network such as the Internet.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Health & Medical Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Primary Health Care (AREA)
  • Animal Husbandry (AREA)
  • Mining & Mineral Resources (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

 作業スケジュール表示装置(100)は、特定の圃場における特定の作物の栽培についての作業スケジュールの入力を受け付ける。作業スケジュール表示装置(100)は、入力された作業スケジュールのうち、作付けを示す作業と、収穫を示す作業との間の期間内に、前の作業の終わりと次の作業の始まりとの間が空いた空き期間が存在するか否かを判断する。作業スケジュール表示装置(100)は、作付期間内の空き期間が存在する場合に、収穫を示す作業後に特定の圃場が空いていることを示す状態表示とは異なる状態表示を、作付期間内の空き期間に割り当てて表示する。

Description

圃場の作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置
 本発明は、圃場の作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置に関する。
 従来、圃場における作物の栽培に関して実行されることが計画された農作業の予定と実績を、ガントチャートなどのグラフを用いて表示する場合がある。
 関連する先行技術としては、例えば、農作物の出荷状態を示す商品見本となる商品画像データと、農作物の播種日から出荷日までを表わす生産計画データとを表示し、表示された各商品に対して注文を受け付ける農作物の販売管理システムがある。
特開2005-78238号公報
 しかしながら、従来技術では、ガントチャートなどのグラフを用いて圃場の作業スケジュールを表示する場合に、作物は作付けされているが作業がない期間がわかりにくいものとなってしまう。例えば、作付けされているが作業がない期間を識別できないと、作付け自体されておらず空き圃場となっている期間と判断されて、誤って別の生産計画が立てられる場合がある。
 一つの側面では、本発明は、作物は作付けされているが作業がない期間と、作付け自体されておらず空き圃場となっている期間とを識別可能に表示する圃場の作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置を提供することを目的とする。
 本発明の一側面によれば、特定の圃場における特定の作物の栽培についての作業スケジュールの入力を受け付け、入力された前記作業スケジュールのうち、作付けを示す作業と、収穫を示す作業との間の期間内に、空き期間が存在する場合に、前記収穫を示す作業後に前記特定の圃場が空いていることを示す状態表示とは異なる状態表示を、前記空き期間に割り当てて表示する圃場の作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置が提案される。
 本発明の一態様によれば、作物は作付けされているが作業がない期間と、作付け自体されておらず空き圃場となっている期間とを識別可能に表示することができるという効果を奏する。
図1は、実施の形態にかかる作業スケジュール表示方法の一実施例を示す説明図である。 図2は、農業支援システム200のシステム構成例を示す説明図である。 図3は、作業スケジュール表示装置100のハードウェア構成例を示すブロック図である。 図4は、クライアント装置201のハードウェア構成例を示すブロック図である。 図5は、生産計画DB220の記憶内容の一例を示す説明図である。 図6は、部品マスタ230の記憶内容の一例を示す説明図である。 図7は、予実入力画面の画面例を示す説明図である。 図8は、作業スケジュール表示装置100の機能的構成例を示すブロック図である。 図9は、生産計画画面の画面例を示す説明図である。 図10は、生産計画画面のポップアップ表示例を示す説明図である。 図11は、作業スケジュールの表示例を示す説明図である。 図12は、作業スケジュール表示装置100の作業スケジュール表示制御処理手順の一例を示すフローチャート(その1)である。 図13は、作業スケジュール表示装置100の作業スケジュール表示制御処理手順の一例を示すフローチャート(その2)である。 図14は、実績表示制御処理の具体的処理手順の一例を示すフローチャートである。
 以下に図面を参照して、本発明にかかる圃場の作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置の実施の形態を詳細に説明する。
(作業スケジュール表示方法の一実施例)
 図1は、実施の形態にかかる作業スケジュール表示方法の一実施例を示す説明図である。図1において、作業スケジュール表示装置100は、圃場の作業スケジュールを表示するコンピュータである。
 圃場とは、作物を栽培、生育するための田畑、菜園などである。作物とは、農業活動によって生産される物であり、例えば、穀類、野菜、果物、花卉などの分類がある。それぞれの分類の例として例えば、大根、キャベツ、レタス、みかん、カーネーションなどの品目がある。作業スケジュールとは、圃場に作付けされる作物に関する作業の予定である。作業は、農業生産のための作業であり、例えば、耕耘、播種、定植、見回り、肥料散布、農薬散布、追肥、灌水、収穫などである。
 ここで、圃場に作付けされる作物の中には、ある作業が行われた後、次に予定されている作業まで、例えば1ヶ月以上のような比較的長い期間にわたり作業が行われないものがある。このため、ガントチャートなどのグラフを用いて圃場の作業スケジュールを管理する場合に、作付けはされているが作業がない期間を識別できないと、作付けされていない空き圃場と判断されて、誤って別の生産計画が立てられる恐れがある。
 例えば、アスパラガスの栽培の場合、刈り取りの作業が行われた後は、収穫時期まで6ヶ月程度作業が行われない期間がある。例えば、10月に刈り取り作業を行い、翌年の3~4月に収穫作業が行われる。このため、作付けはされているが作業がない期間を識別できないと、その圃場が空いている、すなわち他の作物を作付できる圃場であると誤解され、その期間に対して二十日大根などのように作付期間が短い作物の生産計画が誤って立てられる場合がある。
 そこで、本実施の形態では、ある圃場について、作付けはされているが作業がない期間と、作付け自体されておらず空き圃場となっている期間とを容易に識別可能にする作業スケジュール表示方法について説明する。以下、作業スケジュール表示装置100の作物の栽培に関する作業スケジュール表示処理例について説明する。
 (1)作業スケジュール表示装置100は、特定の圃場における特定の作物の栽培についての作業スケジュールの入力を受け付ける。具体的には、例えば、作業スケジュール表示装置100は、不図示の入力装置を用いたユーザの操作入力により、各作業の作業スケジュールとして、各作業の開始予定時期及び終了予定時期を受け付ける。
 図1の例では、圃場Aに作付けされる品目「こんにゃく」の作物について、作業「防除」の開始予定時期「7月上旬」及び終了予定時期「8月中旬」と、作業「収穫」の開始予定時期「10月下旬」及び終了予定時期「11月下旬」を受け付けた場合を想定する。
 (2)作業スケジュール表示装置100は、入力された作業スケジュールのうち、作付けを示す作業と、収穫を示す作業との間の期間内に、空き期間が存在するか否かを判断する。ここで、作付けを示す作業とは、例えば、圃場に作物の種をまく播種作業や、苗を苗床から移して圃場に植える定植作業である。換言すれば、ある作物の栽培のために圃場が使われ始める作業である。また、収穫を示す作業とは、作物をとりいれる収穫作業である。換言すれば、ある作物の栽培が終了し圃場が使われ終わる作業である。なお、収穫作業の後に、例えば、トマトの枝など、収穫後に残る作物の一部を圃場から除去する作業や、さらにその後に圃場を整地する作業がある場合には、それらの作業が終わった後に圃場が使われ終わることになる。従ってその場合は、上記の“収穫を示す作業”を、“圃場から作物の残りを除去する作業”“圃場を整地する作業”と読み替えてもよい。
 すなわち、作付けを示す作業と、収穫を示す作業との間の期間とは、圃場に作付けされる作物の作付期間である。また、作付期間内で、前の作業の終わりと次の作業の始まりとの間が空いた期間は、圃場に作物を作付けしてはいるが、その圃場に対する作業がない期間である。空き期間は、圃場に作付けされる作物の作付期間のうち、作業スケジュールが設定されていない日付が複数連続する期間ということもできる。
 以下の説明では、作業スケジュールのうち、作付けを示す作業と収穫を示す作業との間の期間内の空き期間を「作付期間内の空き期間」と表記する場合がある。
 図1の例では、作業113「防除」の終了予定時期「8月中旬」と、次に予定されている作業である作業114「収穫」の開始予定時期「10月下旬」との間に、2ヶ月(8月下旬~10月中旬)の作付期間内の空き期間112が存在する。このため、作業スケジュール表示装置100は、作業「防除」と作業「収穫」との間の期間内に、作付期間内の空き期間が存在すると判断する。
 (3)作業スケジュール表示装置100は、作付期間内の空き期間が存在する場合に、収穫を示す作業後に特定の圃場が空いていることを示す状態表示とは異なる状態表示を、作付期間内の空き期間に割り当てて表示する。ここで、特定の圃場が空いているとは、特定の圃場に作物が作付けされていない状態であり、特定の圃場が空き圃場であることを意味する。
 具体的には、例えば、作業スケジュール表示装置100は、特定の圃場についての作業スケジュールを表示する欄の色を、収穫作業後に特定の圃場が空いていることを示す期間および作付期間内の空き期間のそれぞれで異なる色に変化させることで識別可能に表示する。
 図1の例では、圃場Aについての作業スケジュールを表示する欄110(図1中、点線枠)のうち、作業「収穫」の終了予定時期「11月下旬」後の圃場Aが空いている期間111の背景色と、作付期間内の空き期間112の背景色とがそれぞれ異なる色に設定されてディスプレイ101に表示される。
 なお、図1で用いた各期間112~114の色と、後述の図6に示す部品マスタ230で用いる背景色とは対応していない。また、ディスプレイ101は、作業スケジュール表示装置100が有していてもよく、また、作業スケジュール表示装置100と通信可能な他のコンピュータが有していてもよい。
 また、作業スケジュール表示装置100は、圃場についての作業スケジュールを表示する欄の色を、作業スケジュールに含まれる作業を示す期間および作付期間内の空き期間のそれぞれで異なる色に変化させることで識別可能に表示することにしてもよい。
 図1の例では、圃場Aについての作業スケジュールを表示する欄110のうち、作業「防除」を示す期間113の背景色、作業「収穫」を示す期間114の背景色および作付期間内の空き期間112の背景色がそれぞれ異なる色に設定されてディスプレイ101に表示される。
 このように、作業スケジュール表示装置100によれば、ガントチャートなどのグラフにおいて、特定の圃場について、作付けはされているが作業がない期間(作付期間内の空き期間)と、作付け自体されておらず空き圃場となっている期間とを識別可能に表示することができる。これにより、作付けされているが作業がない期間に対して、誤って別の生産計画が立てられることを防ぐことができる。
(農業支援システム200のシステム構成例)
 つぎに、図1に示した作業スケジュール表示装置100を農業支援システム200に適用した場合について説明する。
 図2は、農業支援システム200のシステム構成例を示す説明図である。図2において、農業支援システム200は、作業スケジュール表示装置100と、クライアント装置201-1~201-nと、を含む構成である(nは、2以上の自然数)。農業支援システム200において、作業スケジュール表示装置100とクライアント装置201-1~201-nは、有線または無線のネットワーク210を介して接続される。ネットワーク210は、例えば、LAN(Local Area Network)、WAN(Wide Area Network)、インターネットなどである。
 ここで、作業スケジュール表示装置100は、生産計画DB(データベース)220および部品マスタ230を有し、クライアント装置201-1~201-nの表示制御を行う。作業スケジュール表示装置100は、例えば、サーバである。各種DB等220,230の記憶内容については、図5および図6を用いて後述する。
 クライアント装置201-1~201-nは、ディスプレイ(例えば、後述する図4に示すディスプレイ406)を有し、作業スケジュール表示装置100の表示制御に従って、各種画面を表示可能なコンピュータである。クライアント装置201-1~201-nは、例えば、農業経営者や作業者が使用するPC、ノートPC、タブレット型PC、スマートフォンなどである。
 具体的には、例えば、作業スケジュール表示装置100は、クライアント装置201-1~201-nから各種画面(例えば、後述する予実入力画面700や生産計画画面900)の表示要求を受信すると、各種画面の画面情報を生成してクライアント装置201-1~201-nに送信する。この結果、クライアント装置201-1~201-nのディスプレイに各種画面が表示される。
 以下の説明では、クライアント装置201-1~201-nを単に「クライアント装置201」と表記する場合がある。
(作業スケジュール表示装置100のハードウェア構成例)
 図3は、作業スケジュール表示装置100のハードウェア構成例を示すブロック図である。図3において、作業スケジュール表示装置100は、CPU(Central Processing Unit)301と、メモリ302と、I/F(Interface)303と、ディスクドライブ304と、ディスク305と、を有する。また、各構成部は、バス300によってそれぞれ接続される。
 ここで、CPU301は、作業スケジュール表示装置100の全体の制御を司る。メモリ302は、例えば、ROM(Read Only Memory)、RAM(Random Access Memory)およびフラッシュROMなどを有する。具体的には、例えば、フラッシュROMやROMが各種プログラムを記憶し、RAMがCPU301のワークエリアとして使用される。メモリ302に記憶されるプログラムは、CPU301にロードされることで、コーディングされている処理をCPU301に実行させる。
 I/F303は、通信回線を通じてネットワーク210に接続され、ネットワーク210を介して他のコンピュータ(例えば、図2に示したクライアント装置201)に接続される。そして、I/F303は、ネットワーク210と内部のインターフェースを司り、他のコンピュータからのデータの入出力を制御する。I/F303には、例えば、モデムやLANアダプタなどを採用することができる。
 ディスクドライブ304は、CPU301の制御に従ってディスク305に対するデータのリード/ライトを制御する。ディスク305は、ディスクドライブ304の制御で書き込まれたデータを記憶する。ディスク305としては、例えば、磁気ディスク、光ディスクなどが挙げられる。
 なお、作業スケジュール表示装置100は、上述した構成部のほか、例えば、SSD(Solid State Drive)、キーボード、マウス、ディスプレイなどを有することにしてもよい。
(クライアント装置201のハードウェア構成例)
 図4は、クライアント装置201のハードウェア構成例を示すブロック図である。図4において、クライアント装置201は、CPU401と、メモリ402と、ディスクドライブ403と、ディスク404と、I/F405と、ディスプレイ406と、入力装置407と、を有する。また、各構成部はバス400によってそれぞれ接続される。
 ここで、CPU401は、クライアント装置201の全体の制御を司る。メモリ402は、例えば、ROM、RAMおよびフラッシュROMなどを有する。具体的には、例えば、フラッシュROMやROMが各種プログラムを記憶し、RAMがCPU401のワークエリアとして使用される。メモリ402に記憶されるプログラムは、CPU401にロードされることで、コーディングされている処理をCPU401に実行させる。
 ディスクドライブ403は、CPU401の制御に従ってディスク404に対するデータのリード/ライトを制御する。ディスク404は、ディスクドライブ403の制御で書き込まれたデータを記憶する。ディスク404としては、例えば、磁気ディスク、光ディスクなどが挙げられる。
 I/F405は、通信回線を通じてネットワーク210に接続され、ネットワーク210を介して他のコンピュータ(例えば、図2に示した作業スケジュール表示装置100)に接続される。そして、I/F405は、ネットワーク210と内部のインターフェースを司り、他のコンピュータからのデータの入出力を制御する。
 ディスプレイ406は、カーソル、アイコンあるいはツールボックスをはじめ、文書、画像、機能情報などのデータを表示する。ディスプレイ406は、例えば、CRT(Cathode Ray Tube)、液晶ディスプレイ、有機EL(Electroluminescence)ディスプレイなどを採用することができる。図1に示したディスプレイ101は、例えば、ディスプレイ406に対応する。
 入力装置407は、文字、数字、各種指示などの入力のためのキーを有し、データの入力を行う。入力装置407は、キーボードやマウスなどであってもよく、また、タッチパネル式の入力パッドやテンキーなどであってもよい。
 なお、クライアント装置201は、上述した構成部のうち、例えば、ディスクドライブ403、ディスク404などを有さないことにしてもよい。また、クライアント装置201は、上述した構成部のほか、例えば、SSD、スキャナ、プリンタなどを有することにしてもよい。
(各種DB220,230の記憶内容)
 つぎに、図5および図6を用いて各種DB220,230の記憶内容について説明する。各種DB220,230は、例えば、図3に示した作業スケジュール表示装置100のメモリ302、ディスク305により実現される。
<生産計画DB220の記憶内容>
 図5は、生産計画DB220の記憶内容の一例を示す説明図である。図5において、生産計画DB220は、計画ID、圃場名、作付面積、品目、品種、作業種別、予定期間および実績期間のフィールドを有する。各フィールドに情報を設定することで、生産計画情報(例えば、生産計画情報500-1~500-3)がレコードとして記憶される。
 ここで、生産計画とは、生産対象となる作物を、どの圃場にどのくらい、どのような作業スケジュールで作付けするのかの計画である。各圃場における作物の栽培は、生産計画に沿って行われる。計画IDは、生産計画を識別する識別子である。計画IDは、例えば、生産計画が立てられた順に割り振られる。
 また、計画IDは、例えば、新たな生産計画が作成されるたびに、圃場における最初の作業予定日が早い順に振り直されることにしてもよい。また、同一圃場について複数の生産計画が立てられた場合は、計画IDとして枝番が用いられる。枝番には、最初の作業予定日が早い順に若い番号が割り振られる。
 圃場名は、圃場の名称である。圃場名として、例えば、1つの圃場を区切って分割した区画の名称である分筆名称を用いることにしてもよい。作付面積は、作物を作付けする面積である。品目は、作物の種類である。品目としては、例えば、キャベツ、二十日大根、トマト、水稲などがある。
 品種は、同一品目の中の種類である。例えば、キャベツの品種として、夏蒔きの品種であれば「彩風」「グリーンボール」、春蒔きの品種であれば「中早生2号」「中早生3号」「秋早生」「新風」などがある。作業種別は、農業生産のための作業を作業内容で区分けしたものである。
 予定期間は、作物の栽培に関する作業が行われる予定の期間である。ここでは、予定間として、作業の開始予定時期から終了予定時期までの期間が設定される。実績期間は、作物の栽培に関する作業が行われた実際の期間である。ここでは、実績期間として、作業の開始時期から終了時期までの期間が設定される。
<部品マスタ230の記憶内容>
 図6は、部品マスタ230の記憶内容の一例を示す説明図である。図6において、部品マスタ230は、作業種別、マーク/色、線種/色、背景色のフィールドを有し、各フィールドに情報を設定することで、部品情報(例えば、部品情報600-1~600-6)がレコードとして記憶される。
 ここで、作業種別は、農業生産のための作業を作業内容で区分けしたものである。マーク/色は、作業の開始時期または終了時期を示すマークの形状と色の情報であり、例えば、マークの画像情報である。線種/色は、作業の開始時期または終了時期を示すマーク間を結ぶ線分の線種およびまたは色の情報であり、例えば、線分の画像情報である。
 背景色は、圃場についての作業スケジュールを表示する欄のうち、各作業種別の作業が行われる予定期間または作付期間内の空き期間の背景色を示す。背景色の情報として、色の代わりに、もしくは色の情報と組み合わせて、網掛けなどの模様の種類を示す情報が登録されていてもよい。以下の説明において、背景色と記載する箇所は、色の違いにより識別可能に表示する形態の意味だけではなく、同じ色であって網掛けなどの模様の種類で識別可能に表示する形態、色と網掛けなどの模様の種類との両方の組み合わせにより識別可能に表示する形態、いずれの意味を含めてもよい。
 作付期間内の空き期間とは、作業スケジュールのうち、作付けを示す作業と収穫を示す作業との間の期間内の空いた期間である。作付期間内の空き期間についての詳細な説明は後述する。
 各作業種別の作業が行われる予定期間および作付期間内の空き期間には、それぞれ異なる背景色が割り当てられる。また、各作業種別の作業の開始時期または終了時期を示すマークとマーク間に配置される線分とには、同一作業種別の作業が行われる予定期間の背景色と同系色の色が割り当てられる。同一作業種別の作業のマークと線分の色は同一である。
 ここで、背景色と同系色の色とは、例えば、背景色と同系色であって、背景色よりも透過性が低い色、すなわち、背景色よりも濃い色である。より詳細に説明すると、背景色と同系色の色は、背景色と色相が同じであり、背景色よりも明度が低い、およびまたは、背景色よりも彩度が高い色である。同系色の組み合わせとしては、例えば、黄緑と黄色のような色相環で隣り合った色の組み合わせが挙げられる。色相環とは、色相をスペクトルの順にしたがって環状に配列したものである。
 なお、背景色として網掛けの模様の種類が登録されている場合、網掛けと同等の模様の線種を背景色と同系色の線種として扱うことができる。例えば、背景色として右上がりの斜線の網掛け模様が登録されている場合、右上がりの斜線の模様の線がこれに相当する。従って、線種はある程度の幅を持った線分であるので、線分は、細長い長方形とみなすこともできる。
 本実施の形態では、予定期間および作付期間内の空き期間の全期間で、明度と彩度を同一にし、色相を期間同士で変化させることで、予定期間および作付期間内の空き期間にそれぞれ異なる背景色が割り当てられる。また、全マーク、全線分で、明度と彩度を同一にし、色相をマーク同士、線分同士で変化させることで、全マークおよび全線分に対応する予定期間の背景色と同系色の色がそれぞれ割り当てられる。
 このように、作業予定を示す予定期間および作付期間内の空き期間、作業実績を示すマーク、線分のそれぞれにおいて、各色の明度、彩度をそろえることで、作業予定(予定期間および作付期間内の空き期間)についての色のグループや、作業実績(マークおよび線分)についての色のグループを、人が認識しやすくなる。すなわち、予定に関する情報と、実績に関する情報とを、人が区別しやすくなる。
(予実入力画面の画面例)
 つぎに、クライアント装置201のディスプレイ406に表示される予実入力画面の画面例について説明する。以下の説明においては、操作画面に表示されている項目をユーザが選択する操作としてクリック操作を行うことを例として説明する。
 図7は、予実入力画面の画面例を示す説明図である。図7において、予実入力画面700は、圃場で行われる各作業の予定期間および実績期間を入力する操作画面である。予実入力画面700は、例えば、図4に示した入力装置407を用いたユーザの操作入力により、各作業の予定期間および実績期間の入力対象となる圃場を指定することにより、クライアント装置201のディスプレイ406に表示される。
 予実入力画面700には、各作業の予定期間および実績期間の入力対象となる圃場の圃場名、作付面積、品目、品種が表示される。予実入力画面700において、ユーザの操作入力により、ボックス701~704をクリックすると、圃場で行う予定の作業の作業種別を選択することができる。
 また、予実入力画面700において、ボックス705~708をクリックすると、作業の作業種別に対応するアイコンを選択することができる。このアイコンは、上述した作業の開始時期または終了時期を示すマークである。ユーザは、各作業の開始時期および終了時期を示すマークを任意に選択することができる。
 また、予実入力画面700において、ボックス709~712をクリックすると、各作業の開始予定時期および終了予定時期を入力することができる。また、予実入力画面700において、ボックス713~716をクリックすると、各作業の開始時期および終了時期を入力することができる。
 なお、図7の例では、各作業の予定期間および作業実績の両方が入力された状態を示したが、各作業の作業実績は、例えば、各作業が行われる度に、その都度入力される。
(作業スケジュール表示装置100の機能的構成例)
 図8は、作業スケジュール表示装置100の機能的構成例を示すブロック図である。図8において、作業スケジュール表示装置100は、受付部801と、表示制御部802と、判断部803と、を含む構成である。受付部801~判断部803は制御部となる機能であり、具体的には、例えば、図3に示したメモリ302、ディスク305などの記憶装置に記憶されたプログラムをCPU301に実行させることにより、または、I/F303により、その機能を実現する。各機能部の処理結果は、例えば、メモリ302、ディスク305などの記憶装置に記憶される。
 受付部801は、特定の圃場における特定の作物の栽培に関する作業スケジュールの入力を受け付ける。ここで、特定の圃場とは、生産計画が立てられた圃場であり、例えば、クライアント装置201のユーザにより任意に選択される圃場である。ユーザは、例えば、農業生産のための作業を行う作業者や、作業者を管理する農業経営者などである。
 特定の作物とは、特定の圃場に作付けされることが計画された生産対象となる作物である。作業スケジュールとは、特定の圃場における特定の作物の栽培に関する1以上の作業の予定である。作業スケジュールは、例えば、各作業の作業種別、開始予定時期および終了予定時期により指定される。
 作業スケジュールの入力は、例えば、図7に示した予実入力画面700において、ユーザの操作入力により行われる。クライアント装置201は、入力された作業スケジュールの入力結果を作業スケジュール表示装置100に送信する。この場合、受付部801は、クライアント装置201から作業スケジュールの入力結果を受信することにより、作業スケジュールの入力を受け付ける。入力された作業スケジュールは、例えば、生産計画DB220(図5参照)に記憶される。
 表示制御部802は、作業の作業時期に対応する期間を、作業の作業種別に対応する色で表示する制御を行う。例えば、表示制御部802は、第1の作業種別の作業の作業時期に対応する期間を第1の色、第2の作業種別の作業の作業時期に対応する期間を第1の色とは異なる第2の色で表示する制御を行う。ここで、第1の作業種別の作業と第2の作業種別の作業は、特定の圃場における特定の作物の栽培に関して順に実行されることが計画された作業である。
 また、各作業の作業時期に対応する期間とは、各作業が行われる予定期間であり、各作業の開始予定時期から終了予定時期までの期間である。各作業の作業時期に対応する期間は、入力された作業スケジュールから特定される。以下の説明では、作業の作業時期に対応する期間を「予定期間」と表記する場合がある。
 具体的には、例えば、表示制御部802は、特定の圃場についての作業スケジュールを表示する欄の背景色を、作業スケジュールに含まれる各作業を示す予定期間のそれぞれで異なる色に変化させることで識別可能に表示する制御を行う。ここで、作業スケジュールを表示する欄とは、時間軸に沿って延びる帯状の表示欄である。以下の説明では、作業スケジュールを表示する欄を「作業スケジュールの表示欄」と表記する場合がある。
 より詳細に説明すると、表示制御部802は、例えば、生産計画DB220の生産計画情報を参照して、特定の圃場で行われる各作業の予定期間を特定する。また、表示制御部802は、部品マスタ230(図6参照)を参照して、特定の圃場で行われる各作業の作業種別に対応する背景色を特定する。
 そして、表示制御部802は、生産計画画面内の特定の圃場についての作業スケジュールの表示欄の各作業の予定期間に、各作業の作業種別に対応する背景色を設定する。ここで、生産計画画面とは、特定の圃場における特定の作物の栽培に関する作業スケジュールをガントチャートとして表示する画面である。生産計画画面の画面例については、図9を用いて後述する。
 判断部803は、入力された作業スケジュールのうち、作付けを示す作業と、収穫を示す作業との間の期間内に、空き期間が存在するか否かを判断する。ここで、作付けを示す作業とは、例えば、圃場に作物の種をまく播種作業や、苗を苗床から移して圃場に植える定植作業である。換言すれば、ある作物の栽培のために圃場が使われ始める作業である。また、収穫を示す作業とは、作物をとりいれる収穫作業である。換言すれば、ある作物の栽培が終了し圃場が使われ終わる作業である。
 すなわち、作付けを示す作業と、収穫を示す作業との間の期間とは、圃場に作付けされる作物の作付期間である。また、作付期間内で、前の作業の終わりと次の作業の始まりとの間が空いた期間は、圃場に作物を作付けしてはいるが、その圃場に対する作業がない期間である。空き期間は、圃場に作付けされる作物の作付期間のうち、作業スケジュールが設定されていない日付が複数連続する期間ということもできる。
 以下の説明では、作業スケジュールのうち、作付けを示す作業と収穫を示す作業との間の期間内の空き期間を「作付期間内の空き期間」と表記する場合がある。
 具体的には、例えば、判断部803は、生産計画DB220の生産計画情報を参照して、特定の圃場についての作業スケジュールのうち、作付期間内の空き期間が存在するか否かを判断する。ここで、図5に示した生産計画情報500-1を例に挙げて、作付期間内の空き期間の判断例について説明する。
 まず、判断部803は、作業種別「播種」の作業の開始予定時期「2014年02月01日」と、作業種別「収穫」の作業の終了予定時期「2014年06月07日」との間の期間を作付期間として特定する。そして、判断部803は、特定した作付期間内に、例えば、作業種別「肥料散布」の作業の終了予定時期「3月15日」と作業種別「収穫」の作業の開始予定時期「5月21日」との間が空いた空き期間が存在すると判断する。
 また、表示制御部802は、作付期間内の空き期間が存在すると判断された場合に、収穫を示す作業後に特定の圃場が空いていることを示す状態表示とは異なる状態表示を、作付期間内の空き期間に割り当てて表示する制御を行う。ここで、特定の圃場が空いているとは、特定の圃場に作物が作付けされていない状態であり、特定の圃場が空き圃場であることを意味する。以下の説明では、圃場に作物が作付けされていない期間を「空圃場期間」と表記する場合がある。
 具体的には、例えば、表示制御部802は、作業スケジュールの表示欄の背景色を、作業スケジュールに含まれる各作業を示す予定期間および作付期間内の空き期間のそれぞれで異なる色に変化させることで識別可能に表示する制御を行う。
 より詳細に説明すると、表示制御部802は、例えば、生産計画DB220の生産計画情報を参照して、作付期間内の空き期間を特定する。また、表示制御部802は、部品マスタ230(図6参照)を参照して、作付期間内の空き期間に対応する背景色を特定する。そして、表示制御部802は、生産計画画面内の特定の圃場についての作業スケジュールの表示欄の作付期間内の空き期間に、特定した背景色を設定する。
 なお、空圃場期間の背景色は、例えば、初期設定の色(例えば、白)であってもよいし、作業スケジュールに含まれる各作業を示す予定期間および作付期間内の空き期間とは異なる色が設定されることにしてもよい。
 また、受付部801は、特定の圃場における特定の作物の栽培に関する作業の開始時期および終了時期の入力を受け付ける。ここで、作業の開始時期および終了時期は、作業が実際に行われた実績期間の開始時期および終了時期である。すなわち、受付部801は、作業の作業実績の入力を受け付ける。
 作業の開始時期および終了時期の入力は、例えば、予実入力画面700(図7参照)において、クライアント装置201のユーザの操作入力により行われる。クライアント装置201は、入力された作業の開始時期および終了時期の入力結果を作業スケジュール表示装置100に送信する。
 この場合、受付部801は、クライアント装置201から作業の開始時期および終了時期の入力結果を受信することにより、作業の開始時期および終了時期の入力を受け付ける。入力された作業の開始時期および終了時期は、例えば、生産計画DB220(図5参照)に記憶される。ただし、作業の開始時期および終了時期は一括して入力されてもよく、また、それぞれ別々のタイミングで入力されてもよい。
 また、表示制御部802は、作業の開始時期を示す開始マークと、作業の終了時期を示す終了マークと、作業の開始マークと終了マークとの間に配置される線分とを、作業の予定期間と同系色の色で表示する制御を行う。ここで、作業の開始マークと終了マークとは、例えば、同じマークであり、作業の作業種別ごとに異なるものを用いることにしてもよい。
 例えば、第1の作業種別の作業の作業実績が、当該作業の予定時期だけでなく、第2の作業種別の作業の予定時期にも渡って複数日入力されたとする。この場合、第1の作業種別の作業の開始時期は、第1の作業種別の作業に関する最初の作業実績日となる。また、第1の作業種別の作業の終了時期は、第1の作業種別の作業に関する最後の作業実績日となる。そして、表示制御部802は、第1の作業種別の作業に関する最初の作業実績日と最後の作業実績日との間に配置される線分を、第1の作業種別の作業の予定期間と第2の作業種別の作業の予定期間との双方に渡って、第1の作業種別の作業の予定期間と同系色の色で表示する制御を行う。
 また、例えば、第1の作業種別の作業の作業実績が、当該作業の予定時期とは重ならない時期に複数日入力されたとする。この場合、表示制御部802は、第1の作業種別の作業に関する最初の作業実績日と最後の作業実績日との間に配置される線分を、第1の作業種別の作業の予定期間とは重ならない時期に、第1の作業種別の作業の予定期間と同系色の色で表示する制御を行う。この場合、第1の作業種別の作業の実績日により特定される実績期間は、第1の作業種別とは異なる別の作業の予定時期に重なっていてもよい。
 また、判断部803は、第1の作業種別の作業の終了時期と第2の作業種別の作業の開始時期とが表示スケール上重なる関係であるか否かを判断する。ここで、表示スケールは、上述したように、各作業の予定期間や実績期間を表示する際のスケールである。表示スケールの最小単位は、例えば、予め設定されてメモリ302、ディスク305などの記憶装置に記憶される。
 具体的には、例えば、表示制御部802は、第1の作業種別の作業の終了時期と第2の作業種別の作業の開始時期とが表示スケール上で同一の時期に属するか否かを判断する。表示スケール上の時期とは、例えば、表示スケールの最小単位が「旬単位」に設定された場合、いずれかの月の上旬、中旬、下旬のうちのいずれかである。
 また、表示制御部802は、表示スケール上重なる関係である場合に、第1の作業種別の作業の開始時期を示す第1のマーク(開始マーク)と、第1の作業種別の作業の終了時期を示す第2のマーク(終了マーク)とを表示対象にする。さらに、表示制御部802は、第2の作業種別の作業の開始時期を示すマークを表示対象にはせずに、第2の作業種別の作業の終了時期を示す第3のマーク(終了マーク)を表示対象とする。
 そして、表示制御部802は、第1のマークと、第2のマークと、第1のマークと第2のマークとの間に配置される第1の線分とを、第1の色と同系色の色で表示する制御を行う。さらに、表示制御部802は、第3のマークと、第2のマークと第3のマークとの間に配置される第2の線分とを、第2の色と同系色の色で表示する制御を行う。
 具体的には、例えば、表示制御部802は、部品マスタ230(図6参照)を参照して、第1の作業種別に対応するマーク/色および線種/色を特定する。そして、表示制御部802は、特定したマークを、作業スケジュールの表示欄の第1の作業種別の作業の開始時期に第1のマークとして設定するとともに第1の作業種別の作業の終了時期に第2のマークとして設定する。また、表示制御部802は、特定した線種/色で第1のマークと第2のマークとの間に配置される線分を第1の線分として設定する。
 さらに、表示制御部802は、部品マスタ230(図6参照)を参照して、第2の作業種別に対応するマークおよび線種/色を特定する。そして、表示制御部802は、特定したマークを、作業スケジュールの表示欄の第2の作業種別の作業の終了時期に第3のマークとして設定する。また、表示制御部802は、特定した線種/色で第2のマークと第3マークとの間に配置される線分を第2の線分として設定する。
 この際、第1のマーク、第2のマーク、第3のマークのいずれかのマークが、対応する作業の予定期間または、対応しない別の作業の予定期間または、作付期間内の空き期間と重なる場合は、表示制御部802は、対応する作業の予定期間、対応しない別の作業の予定期間、または作付期間内の空き期間に重畳して表示されるように当該マークを設定する。また、第1の線分、第2の線分のいずれかの線分が対応する作業の予定期間または、対応しない別の作業の予定期間または、作付期間内の空き期間と重なる場合は、表示制御部802は、対応する作業の予定期間、対応しない別の作業の予定期間、または作付期間内の空き期間に重畳して表示されるように当該線分を設定する。これにより、作業スケジュールに含まれる各作業の予定期間または作付期間内の空き期間に重畳して作業の実績時期を示す表示を出力することができる。
 また、受付部801は、特定の圃場における特定の作物の栽培とは別の栽培についての作業スケジュールの入力を受け付けることにしてもよい。ここで、別の栽培についての作業スケジュールとは、特定の圃場に特定の作物のつぎに作付けされる作物の栽培に関する作業スケジュールである。例えば、特定の圃場で二期作や連作が行われる場合などに、特定の圃場における複数の栽培についての作業スケジュールが入力される。
 ただし、同一の圃場における複数の栽培についての作業スケジュールを1つの表示欄に表示すると、作業スケジュール単位の作業予定と作業実績との対応関係がわかりにくくなる場合がある。例えば、ある栽培の作業予定と、別の栽培の作業実績とが時期的に重なったりすると、作業スケジュール単位の作業予定と作業実績との対応関係がわかりにくくなる。
 そこで、表示制御部802は、特定の圃場における特定の作物についての作業スケジュールと、特定の圃場における別の栽培についての作業スケジュールとの間に、他の圃場における作物の作業スケジュールを介在させずに、特定の圃場における特定の作物についての作業スケジュールと、特定の圃場における別の栽培についての作業スケジュールとを隣接した位置に表示することにしてもよい。
 この際、表示制御部802は、特定の圃場における特定の作物についての作業スケジュールと、特定の圃場における別の栽培についての作業スケジュールとを時系列に表示することにしてもよい。具体的には、例えば、表示制御部802は、特定の圃場における複数の作業スケジュールを、最初の作業の開始予定時期が早い順に隣接した位置に表示する。
 また、受付部801は、作業スケジュールの表示欄のうちのいずれかの作業の予定期間の指定を受け付けることにしてもよい。予定期間の指定は、例えば、生産計画画面におけるタップ、クリック、マウスオーバー等のユーザの操作入力により行われる。
 また、表示制御部802は、指定された予定期間が示す作業の作業種別を表す情報をポップアップ表示することにしてもよい。作業の作業種別を表す情報には、例えば、作業の作業種別のほかに、作業の開始予定時期、終了予定時期などの情報が含まれていてもよい。作業の作業種別を表す情報のポップアップ表示例については、図10を用いて後述する。
 また、受付部801は、作業スケジュールの表示欄のうちの作付期間内の空き期間の指定を受け付けることにしてもよい。作付期間内の空き期間の指定は、例えば、生産計画画面におけるタップ、クリック、マウスオーバー等のユーザの操作入力により行われる。
 また、表示制御部802は、指定された作付期間内の空き期間が作付けはされているが作業がない期間であることを示す情報をポップアップ表示することにしてもよい。作付期間内の空き期間を表す情報には、例えば、作付けはされているが作業がない期間であることを示すメッセージのほかに、作付期間内の空き期間の開始予定時期、終了予定時期などの情報が含まれていてもよい。作付期間内の空き期間を表す情報のポップアップ表示例については、図10を用いて後述する。
 また、表示制御部802は、作付期間内の空き期間に重畳して、当該期間のうち実際に経過した期間を示す表示を出力することにしてもよい。これにより、作付けはされているが作業がないために作業実績が表示されない期間について、実際に経過した期間を特定可能に表示することができる。
(生産計画画面の画面例)
 つぎに、クライアント装置201のディスプレイ406に表示される生産計画画面の画面例について説明する。
 図9は、生産計画画面の画面例を示す説明図である。図9において、生産計画画面900は、2014年9月~2015年2月の各圃場における作物の栽培に関する作業スケジュールを表示する画面である。生産計画画面900内の表示欄901~906には、各圃場における作物の栽培に関する作業スケジュールが表示されている。
 例えば、表示欄901には、圃場「横浜1(作付面積:25.0[a])」における品目「キャベツ」、品種「××」の作物の栽培に関する作業スケジュールが表示されている。具体的には、表示欄901には、圃場「横浜1」についての作業スケジュールに含まれる各作業の予定期間911~913がそれぞれ異なる背景色で表示されている。
 予定期間911は、作業種別「播種」の作業の開始予定時期「9月上旬」から終了予定時期「9月中旬」までの期間を示している。予定期間912は、作業種別「肥料散布」の作業の開始予定時期「9月下旬」から終了予定時期「10月中旬」までの期間を示している。予定期間913は、作業種別「収穫」の作業の開始予定時期「11月下旬」から終了予定時期「12月上旬」までの期間を示している。
 すなわち、表示制御部802により、表示欄901の各作業を示す予定期間911~913に、各作業の作業種別「播種」「肥料散布」「収穫」に対応する背景色がそれぞれ設定されている。これにより、圃場「横浜1」における品目「キャベツ」、品種「××」の作物の栽培に関して順に実行されることが計画された各作業の予定期間911~913を識別可能に表示することができる。
 また、圃場「横浜1」についての作業スケジュールには、作業種別「播種」の作業と、作業種別「収穫」の作業との間の期間内に、前の作業の終わりと次の作業の始まりとの間が空いた作付期間内の空き期間、すなわち、作業スケジュールが設定されていない日付が複数連続する空き期間914が存在する。すなわち、作業種別「肥料散布」の作業の終了予定時期「10月中旬」と作業種別「収穫」の作業の開始予定時期「11月下旬」との間が空いている。このため、表示欄901には、作付期間内の空き期間914が、予定期間911~913の背景色とは異なる背景色で表示されている。
 すなわち、表示制御部802により、表示欄901の作付期間内の空き期間914に、予定期間911~913とは異なる背景色が設定されている。これにより、圃場「横浜1」における作付期間内の空き期間914を識別可能に表示することができる。
 また、表示欄901には、作業種別「播種」の作業の開始時期を示すマーク915と、作業種別「播種」の作業の終了時期を示すマーク916が予定期間911,912にそれぞれ重畳して表示されている。また、マーク915とマーク916との間に配置される線分917が予定期間911,912に重畳して表示されている。ここで、マーク915とマーク916は同じマークである。また、マーク915、マーク916および線分917は、予定期間911の背景色と同系色であって、予定期間911の背景色よりも濃い色で表示されている。
 すなわち、表示制御部802により、マーク915およびマーク916が、上述した第1のマークおよび第2のマークとして設定され、線分917が、上述した第1の線分として設定されている。これにより、作業種別「播種」の作業の作業実績を、作業種別「播種」の作業の作業予定と同系色の色で表示することができ、作業種別「播種」の作業の作業予定と作業実績との対応関係を把握しやすくすることができる。
 また、表示欄901には、作業種別「肥料散布」の作業の終了時期を示すマーク918が予定期間912に重畳して表示されている。ここで、作業種別「肥料散布」の作業の開始時期は、直前の作業種別「播種」の作業の終了時期と表示スケール上重なっているため、作業種別「肥料散布」の作業の開始時期を示すマークは表示されない。このため、マーク916とマーク918との間に配置される線分919が予定期間912に重畳して表示されている。ここで、マーク918および線分919は、予定期間912の背景色と同系色であって、予定期間912の背景色よりも濃い色で表示されている。
 すなわち、表示制御部802により、マーク918が、上述した第3のマークとして設定され、線分919が、上述した第2の線分として設定されている。これにより、前後して行われる作業種別「播種」の作業の終了時期と作業種別「肥料散布」の作業の開始時期とが、表示の都合により同じ時期になる場合に、作業種別「肥料散布」の作業の開始時期の表示を省略しつつ、作業種別「肥料散布」の作業が実施された作業期間を示す線分を表示することができる。
 また、表示欄901には、作業種別「収穫」の作業の開始時期を示すマーク920と、作業種別「収穫」の作業の終了時期を示すマーク921が予定期間913に重畳して表示されている。また、マーク920とマーク921との間に配置される線分922が予定期間913に重畳して表示されている。ここで、マーク920とマーク921は同じマークである。また、マーク920、マーク921および線分922は、予定期間913の背景色と同系色であって、予定期間913の背景色よりも濃い色で表示されている。
 これにより、作業種別「収穫」の作業の作業実績を、作業種別「収穫」の作業の作業予定と同系色の色で表示することができ、作業種別「収穫」の作業の作業予定と作業実績との対応関係を把握しやすくすることができる。
 また、表示欄902,903には、圃場「小田原1」「作付面積:15.0[a]」における品目「二十日大根」、品種「△△」の作物の栽培に関する作業スケジュールがそれぞれ表示されている。すなわち、表示制御部802により、圃場「小田原1」という同一の圃場における異なる栽培についての作業スケジュールが、他の圃場における作物の作業スケジュールを介在させずに、互いに隣接した位置に時系列に表示されている。
 これにより、同一の圃場「小田原1」における別々の栽培についての作業スケジュールをそれぞれ異なる表示欄902,903に表示するとともに、同一の圃場「小田原1」における複数の作業スケジュールをまとめて表示することができる。なお、この表示例では、表示欄902、903ともに「小田原1」という同一の圃場名を示すことで、両者が同一の圃場であることを視認可能にしているが、これに限らず、例えば、圃場名に枝番を付すことで、同一の圃場に対する異なる栽培についての栽培スケジュールであることを示すこともできる。その場合、例えば、圃場名の欄に902では「小田原1-1」、903では「小田原1-2」というように、圃場名に続けてハイフンと枝番とを表示することができる。
 また、表示欄904には、圃場「川崎1」「作付面積:13.0[a]」における品目「アスパラガス」、品種「△×」の作物の栽培に関する作業スケジュールが表示されている。具体的には、表示欄904には、圃場「川崎1」についての作業スケジュールに含まれる作業の予定期間923に背景色が設定されて表示されている。予定期間923は、作業種別「刈り取り」の作業の開始予定時期「9月上旬」から終了予定時期「9月中旬」までの期間を示している。
 すなわち、表示制御部802により、表示欄904の作業を示す予定期間923に、作業の作業種別「刈り取り」に対応する背景色が設定されている。これにより、圃場「川崎1」における品目「アスパラガス」、品種「△×」の作物の栽培に関して実行されることが計画された作業種別「刈り取り」の作業の予定期間923を識別可能に表示することができる。
 また、圃場「川崎1」についての作業スケジュールには、作付けを示す作業と収穫を示す作業との間の期間内に、空き期間924が存在する。このため、表示欄904には、作付期間内の空き期間924が、予定期間923の背景色とは異なる背景色で表示されている。
 すなわち、表示制御部802により、表示欄904の作付期間内の空き期間924に、予定期間923とは異なる背景色が設定されている。これにより、圃場「川崎1」における作付期間内の空き期間924を識別可能に表示することができる。
 例えば、新たに作物の作付け計画を立てようとしているユーザが、図9のような画面を見た場合、空き期間924は作付け期間中であることが一目で認識可能である。もしも、空き期間924に背景色を設定せずに、明に作業が予定されている期間のみ背景色を設定したとすると、空き期間924と、圃場に作物が作付けされていない期間である空圃場期間とを識別することが難しくなる。その結果、作付け期間中の空き期間であるにもかかわらず、その期間を空圃場期間と誤解して、その圃場に対する他の作物の作付けを計画してしまうという誤りを発生させてしまう可能性がある。表示欄902や表示欄903に示す品目「二十日大根」のように、作付け期間が短い作物の作付け計画を立てる場合、1ヶ月程度の空圃場期間があれば作付け可能であるため、なおさらこのような誤りが発生しやすい。図9のように空き期間924にも対して背景色を設定して表示すれば、このような誤りの発生を抑止することができる。
 また、表示欄904には、作業種別「刈り取り」の作業の開始時期を示すマーク925と、作業種別「刈り取り」の作業の終了時期を示すマーク926が予定期間923に重畳して表示されている。また、マーク925とマーク926とを結ぶ線分927が予定期間923に重畳して表示されている。ここで、マーク925とマーク926は同じマークである。また、マーク925、マーク926および線分927は、予定期間923の背景色と同系色であって、予定期間923の背景色よりも濃い色で表示されている。
 これにより、作業種別「刈り取り」の作業の作業実績を、作業種別「刈り取り」の作業の作業予定と同系色の色で表示することができ、作業種別「刈り取り」の作業の作業予定と作業実績との対応関係を把握しやすくすることができる。
 また、表示欄906には、圃場「あきる野2」における品目「サニーレタス」、品種「○×」の作物の栽培に関する作業スケジュールが表示されている。この例では、作業種別「農薬散布」の予定期間931に対して、「農薬散布」の作業が開始された時期を示すマーク934、終了された時期を示すマーク936、両マークの間に配置された線分935ともに、予定期間931には重ならない時期である空き期間932の時期の間に表示されている。このように、予定期間と実績期間とが重ならないほどにずれて、実績期間が別の作業の予定期間にかかるような場合であっても、図9のように、同一の作業に対する予定期間と実績を示すマーク、もしくはマークと線分とを、同系色で表示することで、予定と実績との関係を把握しやすくできる。もしも、同一の作業に対する予定期間と実績を示すマーク、もしくはマークと線分とが同系色で示されない場合、マーク934、936と線分935に示される実績は、どの予定に対する実績であるかを、一目で視認することは難しい。
 なお、図9では、各圃場における作物の栽培に関する作業スケジュールを旬別(表示スケールの最小単位:旬単位)に表示する場合を例に挙げて説明したが、月別(表示スケールの最小単位:月単位)に変更可能である。また、生産計画画面900において、例えば、表示欄901~906のいずれかの予定期間がダブルクリックされると、当該予定期間が示す作業の実績期間を入力するための画面(例えば、予実入力画面700)が表示されることにしてもよい。
(生産計画画面のポップアップ表示例)
 ここで、図9に示した生産計画画面900を例に挙げて、生産計画画面900にポップアップ表示される情報について説明する。
 図10は、生産計画画面のポップアップ表示例を示す説明図である。図10において、図9に示した生産計画画面900内の表示欄901が表示されている。表示欄901には、圃場「横浜1(作付面積:25.0[a])」における品目「キャベツ」、品種「××」の作物の栽培に関する作業スケジュールが表示されている。
 生産計画画面900において、入力装置407を用いたユーザの操作入力により、表示欄901の予定期間911~913のうちのいずれかの予定期間が指定されると、指定された予定期間が示す作業の作業種別を示す情報がポップアップ表示される。ここでは、予定期間912が指定されて、予定期間912が示す作業の作業種別「肥料散布」を示す情報1001がポップアップ表示されている(図10の(10-1))。
 また、生産計画画面900において、表示欄901の作付期間内の空き期間914が指定されると、作付期間内の空き期間914が、作付けはしているが作業がない期間であることを示す情報1002がポップアップ表示される(図10の(10-2))。
 このように、ユーザは、マウスオーバー等の簡単な操作を行うだけで、予定期間に対応する作業の作業種別や、作付けはされているが作業がない期間を確認することができる。
(作業スケジュールの表示例)
 つぎに、特定の圃場における特定の作物の作付期間内の空き期間のうち実際に経過した期間を示す表示を出力する場合の作業スケジュールの表示例について説明する。
 図11は、作業スケジュールの表示例を示す説明図である。図11において、生産計画画面900の表示欄904が表示されている。ただし、ここでは11月上旬まで時間が経過した場合を想定する。表示欄904には、圃場「川崎1」「作付面積:13.0[a]」における品目「アスパラガス」、品種「△×」の作物の栽培に関する作業スケジュールが表示されている。
 また、表示欄904の作付期間内の空き期間924には、作付期間内の空き期間924のうち実際に経過した期間を示す線分1101が重畳表示されている。ここで、線分1101は、例えば、作付期間内の空き期間924の背景色と同系色であって、作付期間内の空き期間924よりも濃い色で表示される。また、線分1101は、作業種別「刈り取り」の作業の実績時期を示す線分927と異なる線種で表示される。
 これにより、ユーザは、作付けはされているが作業がないために作業実績が表示されない期間について、実際に経過した期間を特定することができる。
(作業スケジュール表示装置100の作業スケジュール表示制御処理手順)
 つぎに、作業スケジュール表示装置100の作業スケジュール表示制御処理手順について説明する。ここでは、生産計画DB220(図5参照)内の生産計画情報により特定される作業スケジュールを生産計画画面(例えば、生産計画画面900)に表示する場合を例に挙げて説明する。
 図12および図13は、作業スケジュール表示装置100の作業スケジュール表示制御処理手順の一例を示すフローチャートである。図12のフローチャートにおいて、まず、作業スケジュール表示装置100は、生産計画DB220から、計画IDの番号が若い順に未選択の生産計画情報を選択する(ステップS1201)。この際、計画IDに枝番が存在する場合には、作業スケジュール表示装置100は、枝番が若い順に未選択の生産計画情報を選択する。
 そして、作業スケジュール表示装置100は、選択した生産計画情報を参照して、生産計画画面内の作業スケジュールの表示欄に、圃場名、作付面積、品目および品種を設定する(ステップS1202)。つぎに、作業スケジュール表示装置100は、選択した生産計画情報を参照して、予定期間の開始予定時期が早い順に未選択の作業を選択する(ステップS1203)。
 以下の説明では、選択された作業を「対象作業」と表記する場合がある。
 つぎに、作業スケジュール表示装置100は、部品マスタ230を参照して、対象作業の作業種別に対応する背景色を特定する(ステップS1204)。そして、作業スケジュール表示装置100は、作業スケジュールの表示欄の対象作業の予定期間に、特定した背景色を設定する(ステップS1205)。
 つぎに、作業スケジュール表示装置100は、選択した生産計画情報を参照して、対象作業の作業実績があるか否かを判断する(ステップS1206)。ここで、対象作業の作業実績がない場合(ステップS1206:No)、作業スケジュール表示装置100は、ステップS1208に移行する。
 一方、対象作業の作業実績がある場合(ステップS1206:Yes)、作業スケジュール表示装置100は、実績表示制御処理を実行する(ステップS1207)。なお、実績表示制御処理の具体的な処理手順については、図14を用いて後述する。
 つぎに、作業スケジュール表示装置100は、選択した生産計画情報を参照して、選択されていない未選択の作業があるか否かを判断する(ステップS1208)。ここで、未選択の作業がある場合(ステップS1208:Yes)、作業スケジュール表示装置100は、ステップS1203に戻る。
 一方、未選択の作業がない場合(ステップS1208:No)、作業スケジュール表示装置100は、図13に示すステップS1301に移行する。
 図13のフローチャートにおいて、まず、作業スケジュール表示装置100は、選択した生産計画情報を参照して、作付期間内の空き期間が存在するか否かを判断する(ステップS1301)。ここで、作付期間内の空き期間が存在しない場合(ステップS1301:No)、作業スケジュール表示装置100は、ステップS1304に移行する。
 一方、作付期間内の空き期間が存在する場合(ステップS1301:Yes)、作業スケジュール表示装置100は、部品マスタ230を参照して、作付期間内の空き期間に対応する背景色を特定する(ステップS1302)。そして、作業スケジュール表示装置100は、作業スケジュールの表示欄の作付期間内の空き期間に、特定した背景色を設定する(ステップS1303)。
 つぎに、作業スケジュール表示装置100は、生産計画DB220から選択されていない未選択の生産計画情報があるか否かを判断する(ステップS1304)。ここで、未選択の生産計画情報がある場合(ステップS1304:Yes)、作業スケジュール表示装置100は、生産計画画面内の作業スケジュールの表示欄を切り替えて(ステップS1305)、図12に示したステップS1201に戻る。
 一方、未選択の生産計画情報がない場合(ステップS1304:No)、作業スケジュール表示装置100は、生産計画画面の画面情報をクライアント装置201に送信して(ステップS1306)、本フローチャートによる一連の処理を終了する。
 これにより、生産計画が立てられた各圃場における生産対象となる作物の栽培に関する作業スケジュールを表示する生産計画画面をクライアント装置201のディスプレイ406に表示することができる。
 なお、上述した説明では、生産計画DB220内のすべての生産計画情報を作業スケジュールの表示対象としたが、これに限らない。例えば、作業スケジュール表示装置100は、クライアント装置201のユーザにより任意に絞り込まれた生産計画情報を作業スケジュールの表示対象とすることにしてもよい。
<実績表示制御処理手順>
 つぎに、図12に示したステップS1207の実績表示制御処理の具体的な処理手順について説明する。
 図14は、実績表示制御処理の具体的処理手順の一例を示すフローチャートである。図14のフローチャートにおいて、まず、作業スケジュール表示装置100は、部品マスタ230(図6参照)を参照して、対象作業の作業種別に対応するマーク/色および線種/色を特定する(ステップS1401)。
 つぎに、作業スケジュール表示装置100は、一つ前に選択された作業(以下、「直前作業」という)の終了時期と、対象作業の開始時期とが表示スケール上重なる関係であるか否かを判断する(ステップS1402)。
 ここで、表示スケール上重なる関係ではない場合(ステップS1402:No)、作業スケジュール表示装置100は、作業スケジュールの表示欄の対象作業の開始時期に、特定したマーク/色の開始マークを設定する(ステップS1403)。つぎに、作業スケジュール表示装置100は、作業スケジュールの表示欄の対象作業の終了時期に、特定したマーク/色の終了マークを設定する(ステップS1404)。
 そして、作業スケジュール表示装置100は、特定した線種/色で、設定した開始マークと終了マークとの間に配置される線分を設定して(ステップS1405)、実績表示制御処理を呼び出したステップに戻る。
 また、ステップS1402において、表示スケール上重なる関係である場合(ステップS1402:Yes)、作業スケジュール表示装置100は、作業スケジュールの表示欄の対象作業の終了時期に、特定したマーク/色の終了マークを設定する(ステップS1406)。
 そして、作業スケジュール表示装置100は、特定した線種/色で、直前作業の終了マークと対象作業の終了マークとの間に配置される線分を設定して(ステップS1407)、実績表示制御処理を呼び出したステップに戻る。
 これにより、作業の開始マーク、終了マークと、作業の開始マークと終了マークとを結ぶ線分とを、作業の予定期間と同系色であって、作業の予定期間の色よりも透過性が低い色、すなわち濃い色で表示することができる。また、前後して行われる前作業の終了時期と後作業の開始時期とが、表示の都合により同じ時期になる場合に、後作業の開始時期の表示を省略しつつ、後作業が実施された作業期間を示す線分を表示することができる。
 なお、対象作業の作業実績として終了時期が未入力の場合は、作業スケジュール表示装置100は、ステップS1404~S1407をスキップすることにしてもよい。
 以上説明したように、実施の形態にかかる作業スケジュール表示装置100によれば、特定の圃場における特定の作物の栽培に関する作業スケジュールの入力を受け付けることができる。そして、作業スケジュール表示装置100によれば、入力された作業スケジュールに含まれる各作業の予定期間を、各作業の作業種別に対応する色で表示する制御を行うことができる。
 また、作業スケジュール表示装置100によれば、入力された作業スケジュールに作付期間内の空き期間が存在する場合、収穫作業後に特定の圃場が空いていることを示す状態表示とは異なる状態表示を、作付期間内の空き期間に割り当てて表示する制御を行うことができる。
 これにより、ガントチャートなどのグラフにおいて、特定の圃場について、作付けはされているが作業がない期間(作付期間内の空き期間)と、作付け自体されておらず空き圃場となっている期間とを識別可能に表示することができる。この結果、作付けされているが作業がない期間に対して、誤って別の生産計画が立てられることを防ぐことができる。
 また、作業スケジュール表示装置100によれば、特定の圃場についての作業スケジュールを表示する欄の背景色を、作業スケジュールに含まれる各作業を示す予定期間および作付期間内の空き期間のそれぞれで異なる色に変化させることができる。これにより、ガントチャートなどのグラフにおいて、特定の圃場における特定の作物の栽培に関して順に実行されることが計画された各作業の予定期間および作付期間内の空き期間を識別可能に表示することができる。
 また、作業スケジュール表示装置100によれば、特定の圃場における特定の作物の栽培とは別の栽培についての作業スケジュールの入力を受け付けることができる。そして、作業スケジュール表示装置100によれば、特定の圃場における特定の作物についての作業スケジュールと、特定の圃場における別の栽培についての作業スケジュールとの間に、他の圃場における作物の作業スケジュールを介在させずに、特定の圃場における特定の作物についての作業スケジュールと、特定の圃場における別の栽培についての作業スケジュールとを隣接した位置に表示することができる。
 これにより、同一の圃場における別々の栽培についての作業スケジュールをそれぞれ異なる表示欄に表示するとともに、同一の圃場における複数の作業スケジュールをまとめて表示することができる。このため、同一の圃場における作業スケジュール単位の作業予定と作業実績との対応関係を把握しやすくすることができる。
 また、作業スケジュール表示装置100によれば、特定の圃場における特定の作物についての作業スケジュールと、特定の圃場における別の栽培についての作業スケジュールとを時系列に表示することができる。これにより、ユーザは、特定の圃場における栽培単位の作業スケジュールを時系列に把握することができ、特定の圃場における複数の栽培についての作業の進捗を評価しやすくなる。
 また、作業スケジュール表示装置100によれば、作業スケジュールの表示欄のうちのいずれかの作業の予定期間の指定を受け付けたことに応じて、指定された予定期間が示す作業の作業種別を表す情報をポップアップ表示することができる。これにより、ユーザは、マウスオーバー等の簡単な操作を行うだけで、予定期間に対応する作業の作業種別を確認することができる。また、予定期間が示す作業の作業種別を表す情報を予め全表示する場合に比べて、一画面に表示する情報量を抑えて一覧性の低下を防ぐことができる。
 また、作業スケジュール表示装置100によれば、作業スケジュールの表示欄のうちの作付期間内の空き期間の指定を受け付けたことに応じて、当該期間が作付けはされているが作業がない期間であることを示す情報をポップアップ表示することができる。これにより、ユーザは、マウスオーバー等の簡単な操作を行うだけで、作業スケジュールのうちの作付けはされているが作業がない期間を確認することができる。
 また、作業スケジュール表示装置100によれば、作付期間内の空き期間に重畳して、当該期間のうち実際に経過した期間を示す表示を出力することができる。これにより、ユーザは、作付けはされているが作業がないために作業実績が表示されない期間について、実際に経過した期間を特定することができる。
 なお、本実施の形態で説明した作物の栽培に関する作業スケジュール表示方法は、予め用意されたプログラムをパーソナル・コンピュータやワークステーション等のコンピュータで実行することにより実現することができる。本作業スケジュール表示プログラムは、ハードディスク、フレキシブルディスク、CD-ROM、MO、DVD等のコンピュータで読み取り可能な記録媒体に記録され、コンピュータによって記録媒体から読み出されることによって実行される。また、本作業スケジュール表示プログラムは、インターネット等のネットワークを介して配布してもよい。
 100 作業スケジュール表示装置
 200 農業支援システム
 201,201-1~201-n クライアント装置
 210 ネットワーク
 220 生産計画DB
 230 部品マスタ
 700 予実入力画面
 801 受付部
 802 表示制御部
 803 判断部
 900 生産計画画面

Claims (6)

  1.  コンピュータが、
     特定の圃場における特定の作物の栽培についての作業スケジュールの入力を受け付け、
     入力された前記作業スケジュールのうち、作付けを示す作業と、収穫を示す作業との間の期間内に、空き期間が存在する場合に、前記収穫を示す作業後に前記特定の圃場が空いていることを示す状態表示とは異なる状態表示を、前記空き期間に割り当てて表示する、
     処理を実行することを特徴とする圃場の作業スケジュール表示方法。
  2.  前記空き期間は、前記作付けを示す作業と収穫を示す作業との間の期間内で、前の作業の終わりと次の作業の始まりとの間が空いた期間であることを特徴とする請求項1に記載の圃場の作業スケジュール表示方法。
  3.  前記表示する処理は、
     前記圃場についての作業スケジュールを表示する欄の背景色を、前記作業スケジュールに含まれる作業を示す期間および前記空き期間のそれぞれで異なる色に変化させることで識別可能に表示し、さらに、前記作業スケジュールに含まれる作業を示す期間または前記空き期間に重畳して作業の実績時期を示す表示を出力することを特徴とする請求項1または請求項2に記載の圃場の作業スケジュール表示方法。
  4.  前記コンピュータが、
     前記特定の圃場における前記特定の作物の栽培とは別の栽培についての作業スケジュールの入力を受け付け、
     前記特定の圃場とは異なる他の圃場における作物の作業スケジュールの入力を受け付け、
     前記特定の圃場における前記特定の作物についての作業スケジュールと、前記特定の圃場における前記別の栽培についての作業スケジュールとの間に、前記他の圃場における作物の作業スケジュールを介在させずに、前記特定の圃場における前記特定の作物についての作業スケジュールと、前記特定の圃場における前記別の栽培についての作業スケジュールとを隣接した位置に表示する、
     処理を実行することを特徴とする請求項1~3のいずれか一つに記載の圃場の作業スケジュール表示方法。
  5.  コンピュータに、
     特定の圃場における特定の作物の栽培についての作業スケジュールの入力を受け付け、
     入力された前記作業スケジュールのうち、作付けを示す作業と、収穫を示す作業との間の期間内に、空き期間が存在する場合に、前記収穫を示す作業後に前記特定の圃場が空いていることを示す状態表示とは異なる状態表示を、前記空き期間に割り当てて表示する、
     処理を実行させることを特徴とする圃場の作業スケジュール表示プログラム。
  6.  特定の圃場における特定の作物の栽培についての作業スケジュールの入力を受け付け、入力された前記作業スケジュールのうち、作付けを示す作業と、収穫を示す作業との間の期間内に、空き期間が存在する場合に、前記収穫を示す作業後に前記特定の圃場が空いていることを示す状態表示とは異なる状態表示を、前記空き期間に割り当てて表示する制御部、
     を有することを特徴とする圃場の作業スケジュール表示装置。
PCT/JP2014/062641 2014-05-12 2014-05-12 圃場の作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置 WO2015173874A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2016519004A JP6332443B2 (ja) 2014-05-12 2014-05-12 圃場の作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置
PCT/JP2014/062641 WO2015173874A1 (ja) 2014-05-12 2014-05-12 圃場の作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2014/062641 WO2015173874A1 (ja) 2014-05-12 2014-05-12 圃場の作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置

Publications (1)

Publication Number Publication Date
WO2015173874A1 true WO2015173874A1 (ja) 2015-11-19

Family

ID=54479446

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/062641 WO2015173874A1 (ja) 2014-05-12 2014-05-12 圃場の作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置

Country Status (2)

Country Link
JP (1) JP6332443B2 (ja)
WO (1) WO2015173874A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018088155A (ja) * 2016-11-29 2018-06-07 楽天株式会社 情報処理装置、情報処理方法及び情報処理プログラム
JP2020135261A (ja) * 2019-02-18 2020-08-31 Dgshape株式会社 デンタル加工機の稼働履歴表示システム

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11175609A (ja) * 1997-12-12 1999-07-02 Next One Kk 農産物の生産流通管理システム
JP2001142947A (ja) * 1999-11-11 2001-05-25 Sharp Corp スケジュール管理装置及びスケジュール管理プログラムを記録した記録媒体
JP2004094511A (ja) * 2002-08-30 2004-03-25 Ishikawajima Plant Construction Co Ltd 建設工事進捗管理システム
JP2005078238A (ja) * 2003-08-29 2005-03-24 Okinawa Midori Sangyo:Kk 農作物の販売管理システム
JP2010093227A (ja) * 2008-09-12 2010-04-22 Hitachi High-Technologies Corp 真空処理装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3362029B2 (ja) * 2000-09-21 2003-01-07 住友林業株式会社 家庭菜園運営システム

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11175609A (ja) * 1997-12-12 1999-07-02 Next One Kk 農産物の生産流通管理システム
JP2001142947A (ja) * 1999-11-11 2001-05-25 Sharp Corp スケジュール管理装置及びスケジュール管理プログラムを記録した記録媒体
JP2004094511A (ja) * 2002-08-30 2004-03-25 Ishikawajima Plant Construction Co Ltd 建設工事進捗管理システム
JP2005078238A (ja) * 2003-08-29 2005-03-24 Okinawa Midori Sangyo:Kk 農作物の販売管理システム
JP2010093227A (ja) * 2008-09-12 2010-04-22 Hitachi High-Technologies Corp 真空処理装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018088155A (ja) * 2016-11-29 2018-06-07 楽天株式会社 情報処理装置、情報処理方法及び情報処理プログラム
JP2020135261A (ja) * 2019-02-18 2020-08-31 Dgshape株式会社 デンタル加工機の稼働履歴表示システム
JP7198111B2 (ja) 2019-02-18 2022-12-28 Dgshape株式会社 デンタル加工機の稼働履歴表示システム

Also Published As

Publication number Publication date
JPWO2015173874A1 (ja) 2017-04-20
JP6332443B2 (ja) 2018-05-30

Similar Documents

Publication Publication Date Title
Aggarwal et al. Importance of considering technology growth in impact assessments of climate change on agriculture
US20210349933A1 (en) Farm work support device and method, program, recording medium, and farm work support system
US10171564B2 (en) Systems and methods for cloud-based agricultural data processing and management
CA3056955C (en) Crop management method and system
JP6264444B2 (ja) 収穫量分配方法、収穫量入力方法、収穫量分配プログラム、収穫量入力プログラムおよびシステム
US20170041407A1 (en) Systems and Methods for Efficiently Generating a Geospatial Data Map for Use in Agricultural Operations
CN111476544A (zh) 农业经营系统
WO2015173875A1 (ja) 栽培計画生成方法、栽培計画生成装置、および栽培計画生成プログラム
JP6213681B2 (ja) 収穫量記録方法、収穫量記録プログラムおよび収穫量記録装置
JP6332443B2 (ja) 圃場の作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置
JP5899307B2 (ja) Icタグを用いた植物生育履歴管理システム
WO2015173876A1 (ja) 作物の栽培に関する評価入力方法、作物の栽培に関する評価入力プログラム、および作物の栽培に関する評価入力装置
JP6290977B2 (ja) 営農システム
JP6264452B2 (ja) 作物の栽培に関する作業スケジュール表示方法、作業スケジュール表示プログラムおよび作業スケジュール表示装置
JP7174469B2 (ja) 作業情報分析装置および作業情報分析方法
JP6337955B2 (ja) 収穫量表示方法、変換方法、収穫量表示プログラム、変換プログラムおよびシステム
US20170032472A1 (en) Farm-work-detail input support method, recording medium, and input support apparatus
CN112906933A (zh) 农业辅助系统
Authority CEO Report
US20170053359A1 (en) Farm-work-detail input support method, recording medium, and input support apparatus
JP7327791B2 (ja) 農作物の生産支援システム及びほ場別アドバイス表示プログラム
Baumont de Oliveira et al. A Gateway for Technology Adoption in Agriculture: a Design-Thinking Approach for a Compliance Decision Support System
WO2023230226A1 (en) Systems and methods for agricultural risk management

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14891697

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2016519004

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14891697

Country of ref document: EP

Kind code of ref document: A1