WO2015129134A1 - 鋳造物品の製造方法及び通気性鋳型 - Google Patents

鋳造物品の製造方法及び通気性鋳型 Download PDF

Info

Publication number
WO2015129134A1
WO2015129134A1 PCT/JP2014/083773 JP2014083773W WO2015129134A1 WO 2015129134 A1 WO2015129134 A1 WO 2015129134A1 JP 2014083773 W JP2014083773 W JP 2014083773W WO 2015129134 A1 WO2015129134 A1 WO 2015129134A1
Authority
WO
WIPO (PCT)
Prior art keywords
molten metal
product cavity
runner
flow path
mold
Prior art date
Application number
PCT/JP2014/083773
Other languages
English (en)
French (fr)
Inventor
麟 王
義正 藤井
徹 岩永
Original Assignee
日立金属株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日立金属株式会社 filed Critical 日立金属株式会社
Priority to CN201480076485.0A priority Critical patent/CN106061650B/zh
Priority to EP14883612.5A priority patent/EP3112049B1/en
Priority to KR1020167024369A priority patent/KR102153440B1/ko
Priority to JP2016505008A priority patent/JP6439790B2/ja
Priority to US15/121,654 priority patent/US10232431B2/en
Publication of WO2015129134A1 publication Critical patent/WO2015129134A1/ja
Priority to US16/262,096 priority patent/US10471498B2/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/02Sand moulds or like moulds for shaped castings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/08Features with respect to supply of molten metal, e.g. ingates, circular gates, skim gates
    • B22C9/082Sprues, pouring cups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D18/00Pressure casting; Vacuum casting
    • B22D18/04Low pressure casting, i.e. making use of pressures up to a few bars to fill the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D27/00Treating the metal in the mould while it is molten or ductile ; Pressure or vacuum casting
    • B22D27/09Treating the metal in the mould while it is molten or ductile ; Pressure or vacuum casting by using pressure
    • B22D27/13Treating the metal in the mould while it is molten or ductile ; Pressure or vacuum casting by using pressure making use of gas pressure

Definitions

  • a molten metal that is smaller than the entire volume of the mold cavity and larger than the volume of the product cavity is poured into the air-permeable mold by gravity, and then gas is fed from the pouring gate so that the metal in the molten metal flow path
  • the present invention relates to a casting article manufacturing method (hereinafter also referred to as air supply pressure casting) and a breathable mold in which a molten metal is pushed up to push up a molten metal in the product cavity and fill a desired cavity portion with the molten metal. Is.
  • a mold formed using sand particles which is a breathable mold, that is, a so-called sand mold is most commonly used.
  • a gas-permeable mold hereinafter sometimes referred to as a mold
  • the molten metal is filled into the cavity having a specific shape
  • the remaining gas generally air
  • the entire cavity is filled with a molten metal (hereinafter sometimes referred to as a molten metal), and a casting substantially identical to the cavity can be obtained.
  • the mold cavity generally has a spout part, a runner part, a feeder part, and a product part, and the molten metal is supplied in this order.
  • the molten metal head height sufficient to fill the product portion is formed in the gate portion, and pouring is completed.
  • the cast article thus solidified has a form in which the gate, runner, feeder, and product are connected as a casting.
  • the feeder part is a cavity that is set for the health of the product and is not an unnecessary part, but the sprue part and the runner part are only the route of the molten metal to the product part and are essentially unnecessary. It is an important part. Therefore, the injection yield cannot be significantly improved as long as the molten metal is solidified in the gate or runner.
  • the casting is formed by connecting unnecessary parts, a considerable man-hour is required for sorting the product part and the unnecessary part in the separation process of the product part, which is a subsequent process, and the production efficiency is lowered. Therefore, in gravity pouring, the presence of a sprue part or a runner part as a casting has been a big problem.
  • JP 2007-75862 and JP 2010-269345 propose epoch-making methods for solving the above problems.
  • the technique is to fill a desired cavity portion, which is a part of a cavity of a gas-permeable mold (hereinafter sometimes referred to as a mold cavity), with a metal melt, so that it is smaller than the entire volume of the mold cavity, Gravity pouring of molten metal with a volume approximately equal to the desired cavity part, and before the molten metal solidifies, the compressed gas is sent from the sprue part to fill the desired cavity part with the molten metal and solidify it. It is.
  • the pressure required depending on the height of the molten metal head is compensated by the compressed gas, so that it is expected that the molten metal in the runner section as well as the sprue section can be almost unnecessary. Yes.
  • FIG. 8 (a) to FIG. 8 (c) show an example of the air / pressure casting according to JP 2007-75862 and JP 2010-269345 for each process.
  • the mold 101 is an example of using a fresh sand mold that is a breathable mold, and is held by an upper mold 101a held by an upper frame 102a that constitutes the casting frame 102 and a lower frame 102b that also constitutes the casting frame 102.
  • the lower mold 101b is matched with the mold and placed on the surface plate 103.
  • the mold cavity 104 includes a product cavity 105 including a product part 105a and a feeder part 105b, a horizontal runner 107 that forms a part of the molten metal flow path 106 and is connected to the product cavity 105, and a molten metal flow path.
  • a part of 106 is connected to a runway 107 and is constituted by a gate part 108 through which the molten metal flows down.
  • FIG. 8 (a) shows that a desired cavity portion is a product cavity 105 composed of a product portion 105a and a feeder portion 105b, and the volume of the product cavity 105 is substantially equal from a pouring device (not shown) to the gate portion 108.
  • the state immediately after gravity pouring the molten metal M of the volume is shown.
  • FIG. 8 (b) shows a state in which the molten metal M is successfully pushed into the product cavity 105 by the gas G discharged from the gas supply device 100 from the gate 108.
  • the molten metal M is filled in the product cavity 105, and a sound cast article can be obtained.
  • the gas G flows along the ceiling of the runner 107 as shown in FIG. It progresses ahead of the molten metal M inside and enters the product cavity 105, and as a result, the molten metal M is not sufficiently pushed into the product cavity 105, resulting in non-rotation and defective shrinkage in the cast article. There was a case.
  • the above-mentioned problem is more likely to occur as the amount of pouring is smaller, that is, as the amount of pouring is closer to the desired volume of the cavity portion necessary to obtain a sound casting article, and the amount of pouring is increased more than that. It was also found that it becomes harder to occur. However, an excessive amount of pouring is more than necessary, which is undesirable because it reduces the injection yield. For this reason, in order to obtain a sound casting article while ensuring the injection yield, it is necessary to develop a casting method with a necessary and sufficient amount of pouring so as to prevent the problem that the air supply gas enters the product cavity.
  • an object of the present invention is to provide a casting article having a necessary and sufficient amount of pouring that can prevent a part of the air feeding gas from entering the product part or the hot water feeding part in the method for producing a casting article by air feeding pressure casting. And a breathable mold.
  • the present inventors have proposed that a virtual liquid (coagulation, evaporation, expansion, contraction, mold application) should be eliminated from the viewpoint of eliminating control factors such as insufficient pressure and flow rate of the supplied gas as much as possible.
  • a virtual liquid coagulation, evaporation, expansion, contraction, mold application
  • the product cavity is statically filled and equilibrated, in which the virtual liquid fills the product cavity, and By adopting an imaginary liquid volume and a molten metal flow path that fills at least a part of the runner, air supply pressure casting can be performed without the air supply gas entering the product cavity.
  • the present invention has been conceived.
  • the method for producing a cast article according to the present invention includes a product cavity and a molten metal flow path as mold cavities, and the molten metal flow path includes a spout part through which the molten molten metal flows, and the product cavity and the spout part.
  • a metal mold that is smaller than the entire volume of the mold cavity and larger than the volume of the product cavity is poured into the gas-permeable mold by gravity, and then the gate A method for producing a cast article in which a gas is supplied from a portion, the metal melt in the product cavity is pushed up by pushing the metal melt in the melt flow path, and the product cavity is filled with the metal melt,
  • a virtual liquid (here, the virtual liquid is a liquid that does not solidify, evaporate, expand, contract, penetrate into the mold, and absorb or release gas) due to the gas supply.
  • the virtual liquid fills the product cavity and the liquid surface height hs of the virtual liquid remaining in the molten metal flow path
  • the height h1 of the lowest part of the ceiling part of the runway and the height h2 of the part where the ceiling part of the runway connects to the gate part satisfy the condition of h2> hs> h1
  • the volume of the liquid is calculated, and the amount of the molten metal having the same volume as the virtual liquid is poured.
  • the breathable mold of the present invention has a product cavity and a molten metal flow path, and the molten metal flow path includes a sprue part through which the molten metal poured by gravity pouring flows, and a runner connecting the product cavity and the sprue part.
  • a mold cavity, and molten metal is poured by gravity, and then gas is fed from the gate, pushing the molten metal in the molten metal flow path to push up the molten metal in the product cavity,
  • An air-permeable mold applied to fill a desired cavity portion with a molten metal, wherein the runner is a downward bent flow path that forms a downward flow formed in the middle of the runner, and the gate portion And a lower side of the downward bent flow path and a product cavity side flow path that connects the lower part of the downward bent flow path and the product cavity.
  • the ceiling is the downward bending flow path When the height of the portion P1 which connects H1, and the height of the lowest portion P2 of the ceiling portion of the sprue-side flow path and H2, is H1 ⁇ H2.
  • H1 ⁇ H3, where H3 is the height of the portion P3 where the bottom of the gate side channel is connected to the downward bent channel.
  • the present invention it is not necessary to strictly control factors that are greatly influenced by the characteristics of the molten metal and the shape of the cavity, such as imparting inertial force to the molten metal at the time of filling and accelerating the solidification rate. It becomes possible to supply a stable casting article stably.
  • Embodiment 1 of this invention it is a schematic diagram which shows the state immediately after the virtual liquid was inject
  • FIG. 5 is a schematic diagram showing a state in which a virtual liquid is pushed into a product cavity by an air supply gas and is in equilibrium in the first embodiment of the present invention.
  • FIG. 2 is an enlarged schematic view showing a vicinity A of a connecting portion between a product cavity and a runner surrounded by a one-dot chain line in FIG. 1 (a).
  • 6 is an enlarged schematic diagram showing an example of another embodiment similar to the first embodiment.
  • FIG. 6 is an enlarged schematic diagram showing an example of still another form similar to the first embodiment.
  • FIG. 5 is a schematic diagram showing a state in which a virtual liquid is pushed into a product cavity by an air supply gas and is in equilibrium in the first embodiment of the present invention.
  • FIG. 2 is an enlarged schematic view showing a vicinity A of a connecting portion between a product cavity
  • FIG. 2 of this invention it is a schematic diagram which shows the state which pushed the virtual liquid into the product cavity with air supply gas, and was equilibrating.
  • FIG. 3 is a schematic diagram showing an enlarged view of a vicinity B of a connecting portion between a runner and a product cavity surrounded by a one-dot chain line in FIG. 2 (a).
  • FIG. 4 is an enlarged schematic view showing a vicinity of a downward bent flow path C surrounded by an alternate long and short dash line in FIG. 3 (a).
  • FIG. 10 is an enlarged schematic diagram showing an example of another embodiment similar to Embodiment 3.
  • FIG. 10 is an enlarged schematic diagram showing another example of still another embodiment similar to Embodiment 3.
  • FIG. In Embodiment 4 of this invention it is a schematic diagram which shows the state which pushed the virtual liquid into the product cavity with air supply gas, and was equilibrating.
  • FIG. 5 is a schematic diagram showing an enlarged runner portion D having a low ceiling, surrounded by a one-dot chain line in FIG. 4 (a). It is a perspective view which shows typically the example which formed the runner part in which the ceiling was low formed wide.
  • FIG. 5 of this invention it is a schematic diagram which shows the state which pushed the virtual liquid into the product cavity with air supply gas, and was equilibrating.
  • FIG. 6 is an enlarged schematic view showing a vicinity E of a downward bent flow path surrounded by an alternate long and short dash line in FIG. 5 (a).
  • FIG. 10 is a schematic diagram showing an example of a breathable mold according to Embodiment 6 of the present invention.
  • FIG. 7 is a schematic diagram showing an enlarged view of the vicinity of a downward bent flow path F surrounded by a dashed line in FIG. 6 (a).
  • FIG. 10 is a schematic diagram showing another example of a breathable mold according to Embodiment 7 of the present invention.
  • FIG. 6 is an enlarged schematic view showing a vicinity E of a downward bent flow path surrounded by an alternate long and short dash line in FIG. 5 (a).
  • FIG. 10 is a schematic diagram showing an example of a breathable mold according to Embodiment 6 of the
  • FIG. 8 is an enlarged schematic view showing a vicinity of a downward bent flow path H surrounded by an alternate long and short dash line in FIG. 7 (a).
  • FIG. 5 is a schematic diagram showing an example of air-feeding and pressure casting according to Japanese Patent Laid-Open Nos. 2007-75862 and 2010-269345 for each process.
  • FIG. 5 is a schematic diagram showing an example of air-feeding and pressure casting according to Japanese Patent Laid-Open Nos. 2007-75862 and 2010-269345 for each process.
  • FIG. 5 is a schematic diagram showing an example of air-feeding and pressure casting according to Japanese Patent Laid-Open Nos. 2007-75862 and 2010-269345 for each process.
  • FIG. 2 is a schematic diagram showing an example in which the mold shown in FIG. 1 (a) is used but does not fall under the present invention.
  • the present invention is based on a casting article manufacturing method (air-feeding pressure casting method) to which a gas is applied as proposed in JP-A-2007-75862 and JP-A-2010-269345.
  • This technique is applied to the technology disclosed in the patent literature. However, it is not limited to the disclosure range of these patent documents.
  • the molten metal is supplied by supplying the molten metal into the molten metal flow path from the pouring part of the breathable mold, and then feeding the gas from the molten metal part and pushing the molten metal in the molten metal flow path.
  • the molten metal in the flow path is supplied to a desired cavity portion, and the product cavity constituting the desired cavity portion is filled with the molten metal.
  • the molten metal in the product cavity is pushed up by pushing in the molten metal in the molten metal flow path and a case where the molten metal in the product cavity is pushed down.
  • the method can be applied when the molten metal in the product cavity is pushed up, that is, when the product cavity is provided at a position higher than the runner.
  • the breathable mold applied in the present invention is not necessarily limited to a mold having a hot water.
  • the feeder part is a part that replenishes the molten metal as the product part solidifies and shrinks, so the molten metal part before the start of solidification does not fill the entire feeder part. Therefore, the hot water portion is preferably filled with the molten metal at least at the time of completion of filling by air supply and pressurization.
  • the hot metal part is exemplified by a form filled with the molten metal in the same manner as the product part.
  • the product part or the cavity that combines the product part and the feeder part may be referred to as a product cavity.
  • the breathable mold is generally a green sand mold, shell mold, self-hardening mold or other mold formed using sand particles, but a mold molded using ceramic particles or metal particles is also applicable. Even a mold that is hardly breathable, such as plaster, can be used as a breathable mold by mixing a breathable material, or by using a breathable material partially to provide sufficient breathability. Further, even a mold using a material having no air permeability such as a mold can be used as a gas permeable mold when other air holes such as a vent hole are provided to provide air permeability.
  • molten metal a molten metal material used for manufacturing general casting articles such as iron alloys such as cast iron and cast steel, aluminum alloys, copper alloys, magnesium alloys, and zinc alloys can be used.
  • the air-feeding pressure casting method it is possible to fill the product cavity with a molten metal having a volume smaller than the entire volume of the mold cavity by the method of feeding gas from the gate.
  • the casting method by gravity pouring using a conventional air-permeable mold, it is indispensable to obtain a healthy product by filling and solidifying not only the product part but also all cavities other than the product part in general. Therefore, the injection yield remains at most 70%, and no significant improvement can be expected.
  • the air-feeding pressure casting method in principle, the injection yield is almost 100% by gravity pouring a molten metal having a volume smaller than the entire volume of the mold cavity and larger than the product cavity. There is a possibility.
  • a virtual liquid liquid that does not solidify, evaporate, expand, contract, penetrate into the mold, and absorb or release gas
  • the volume of the imaginary liquid is calculated so that the height h2 of the portion to be connected satisfies h2> hs> h1, and the molten metal having the same volume is poured.
  • the state where h2> hs> h1 is satisfied for example, as shown in FIGS. 1 (a) and 1 (b), the virtual liquid remaining after filling the product cavity is at least part of the runner (see FIG. In FIG. 1 (b), the runner 27 is close to the product cavity 5), but the entire runner is not filled.
  • the state in which at least a part of the runner is blocked is a state in which the lowest part of the runway ceiling is filled with virtual liquid and communicates from the entrance to the product cavity into the molten metal flow path. There is no space to do.
  • the virtual liquid is in a state in which at least a part of the runner is blocked, and in addition, the virtual liquid is in a state where the entire runner is not filled, that is, in a state having a gap in a part of the runner. .
  • the amount of molten metal used can be further reduced, and the injection yield can be reduced. Can be increased.
  • the height ht of the highest portion of the bottom of the runner is hs ⁇ It is preferable to pour molten metal having the same volume as the virtual liquid in such an amount as to satisfy ht.
  • the amount of molten metal used can be further reduced.
  • the breathable mold of the present invention includes a product cavity and a molten metal flow path, and the molten metal flow path includes a spout part through which the molten metal poured by gravity pouring, and the product cavity and the spout part.
  • the air-permeable mold of the present invention is a method in which a molten metal is poured by gravity, and then gas is fed from a spout to push up the molten metal in the product cavity by pushing in the molten metal in the molten metal flow path. This method is applied to filling the cavity portion with molten metal, and is particularly suitable for the method for producing a cast article of the present invention.
  • the runner has the downward bent flow path in the middle to form a downward flow, and as shown in FIG. 6 (b), the flow path connecting the downward bent flow path to the product cavity. If there is an amount of molten metal that satisfies the height H1 of the part P1 where the ceiling part of the pipe connects to the downward bending flow path, even if a space occurs in the ceiling of the runway for some reason, the space is said to be the connecting part in an equilibrium state. Since it is shut off by P1, the possibility that a part of the air supply gas enters the product part or the hot water supply part can be greatly reduced. In order to obtain this effect, the height H1 of the connecting portion P1 and the height H2 of the lowest portion P2 of the ceiling portion of the gate side channel connecting the gate to the downward bent channel are H1 ⁇ It is necessary to satisfy the relationship of H2.
  • the runner has a downward bent flow path in the middle, thereby providing a downward bent flow path, a gate side flow path connecting the gate to the upper part of the lower bent flow path, and a lower bent flow path to the product cavity. And a product cavity side flow path connecting the two. That is, the runner is formed in the order of the gate side channel, the downward bent channel, and the product cavity side channel from the gate side toward the product cavity.
  • the downward bending flow path only needs to be configured to bend the molten metal flow from the gate side downward, and may be formed in the vertical direction, or from the gate side to the product cavity side. It may be formed to be inclined. When the downward bent flow path is inclined from the gate side toward the product cavity side, it is not always necessary to provide the product cavity side flow path, and the downward bent flow path is directly connected to the product cavity. Also good.
  • the difference between the height H1 of the part P1 where the ceiling part of the product cavity side flow path is connected to the downward bending flow path and the height H2 of the lowest part P2 of the ceiling part of the gate side flow path is better. Furthermore, when the height of the portion P3 where the bottom of the gate side channel is connected to the downward bent channel is H3, it is preferable that H1 ⁇ (H2 + H3) / 2 (see FIG. 6 (b)), It is more preferable that H1 ⁇ H3 (see FIG. 7B). Thus, the amount of molten metal used can be further reduced by satisfying H1 ⁇ (H2 + H3) / 2, and further satisfying H1 ⁇ H3.
  • the air-permeable mold has a pouring cup portion whose diameter is larger than that of the molten metal path that receives the molten metal flowing down from the pouring device. It is preferable.
  • Air may be used as the air supply gas from the viewpoint of cost, and argon, nitrogen, carbon dioxide, etc., which are non-oxidizing gases, are preferably used from the viewpoint of preventing oxidation of the molten metal.
  • argon, nitrogen, carbon dioxide, etc. which are non-oxidizing gases, are preferably used from the viewpoint of preventing oxidation of the molten metal.
  • For the gas flux to be sent whirling by a fan, blower or the like may be used, but using compressed gas by a compressor or the like is preferable because the molten metal can be pushed more uniformly in a pressurized state.
  • the connecting portion for connecting the gas supply device for supplying gas to the gate is in the form of a nozzle.
  • the connection portion can be easily fitted (inserted) into the gate portion (particularly, the introduction pipe portion connected to the gate portion), and the gas supply device can be quickly connected.
  • the nozzle it is preferable to further taper a tapered side surface. Further, if a tapered wall surface corresponding to the gate (introduction pipe portion) is formed, the nozzle and the gate (introduction pipe portion) can be securely fitted together.
  • FIG. 1 (a) to FIG. 1 (c) show each process assuming a static filling state of a virtual liquid (liquid Q) according to Embodiment 1 of the present invention.
  • FIGS. 1 (a) to 1 (c) are vertical sections of the mold cavity 4.
  • FIG. 1 (b) the vicinity of the connecting portion A between the product cavity 5 and the runner 7 surrounded by a one-dot chain line is enlarged. As shown in FIG.
  • Embodiment 1 shows an example in which a green sand mold which is a breathable mold is used as the mold 1.
  • the mold 1 is formed by aligning the upper mold 1a held by the upper frame 2a constituting the casting frame 2 and the lower mold 1b held by the lower frame 2b similarly constituting the casting frame 2 to the upper surface of the surface plate 3.
  • the mold cavity 4 includes a product cavity 5 composed of a product part 5a and a feeder part 5b provided on the side of the product part 5a, and a runner 7 formed horizontally toward the product cavity 5.
  • the molten metal flow path 6 is composed of a spout part 8 connected to the runway 7 and the molten metal flows down, and the ceiling part of the runway 7 is inclined downward toward the product cavity 5 in the vicinity of the product cavity 5. It is formed as follows.
  • the product cavity may be in a form that does not have a feeder. The same applies to other embodiments below.
  • FIG. 1 (a) shows a state immediately after the liquid Q is injected from the injection device 9 into the gate 8 of the mold 1 (injection completion stage).
  • the liquid Q is a virtual liquid that does not solidify, evaporate, expand, contract, penetrate into the mold, and absorb or release gas, and has a specific gravity value of 1 and is greater than the specific gravity of gas G described later. Let it be big. Hereinafter, the same applies to other embodiments.
  • FIG. 1 (b) is a diagram of fitting an air supply nozzle 10b that forms part of the air supply device 10 that discharges gas to the gate 8 and then supplying an air supply gas G indicated by a plurality of arrow lines from the air supply device main body 10a.
  • liquid Q is fed into the mold cavity 4 and the liquid Q is statically pushed by the air pressure by the gas feed gas G, and the liquid Q is pushed up and filled in the product cavity 5 to be in an equilibrium state ( Filling equilibrium).
  • Static here means that the liquid surface Sv of the liquid Q (the boundary surface between the liquid Q and the gas G) is always horizontal (perpendicular to the direction of gravity) without being disturbed.
  • the liquid Q fills the product cavity 5, and is continuously filled without interruption to the liquid level Sv located at the point Ps in the runner 7. ing.
  • the state shown in FIGS. 1 (b) and 1 (c) indicates that the liquid Q fills the product cavity 5 by the gas G being fed and the liquid level Sv of the liquid Q remaining in the molten metal flow path 6 is high.
  • the height h1 and the height h1 of the lowest part p1 of the ceiling of the runway 7 are in a state satisfying hs> h1.
  • the air supply gas G supplied from the gate 8 does not enter the product cavity 5 unless there is a special disturbance. That is, by using an amount of the liquid Q that satisfies hs> h1, the liquid Q can exist stably in an equilibrium state.
  • the lowest part p1 of the ceiling part of the runner 7 is located at the connection point with the product cavity 5, and is below the connection point p2 with the gate part 8. positioned. That is, when the height of the connection point p2 with the gate 8 is h2, h2> h1. For this reason, the liquid level Sv does not necessarily have to be higher than p2, and can be located in the runner 27. That is, h2> hs> h1, and the volume of the liquid Q can be reduced, which is preferable.
  • the height hs of the liquid level Sv is a height having a margin with respect to the height h1 of p1.
  • the liquid level Sv is only slightly higher than the height of the lowest part p1 of the ceiling of the runner 7, for example, the height hs of the liquid level Sv is h1 + 1 mm ⁇ hs
  • the metal melt is given a large inertial force by increasing the rate of increase of the air supply pressure at the initial stage of air supply. It is preferable to fill the cavity.
  • the height reference plane L may be set to an arbitrary horizontal plane at a position below the bottom of the mold cavity 4, but in the first embodiment, it is the upper surface of the surface plate 3, and the other embodiments are the same. did.
  • the actual amount of molten metal poured in the air pressure casting is the continuous liquid from the product cavity 5 to the liquid level Sv in the equilibrium state where the liquid Q shown in Fig. 1 (b) is assumed to be filled in the product cavity 5. It should be equal to the volume occupied by Q. That is, in the equilibrium state, the volume of the liquid Q is calculated, and the molten metal having the same volume as the volume is used as the amount of pouring, so that the gas G does not enter the product cavity 5 and is stably supplied and pressurized.
  • the cast article can be manufactured by the method.
  • the portion provided on the ceiling of the runner 7 of the mold 1 and inclined downward toward the product cavity 5 is directly connected to the product cavity 5 as shown in FIG.1 (c).
  • the inclined portion is not necessarily formed so as to be directly connected to the product cavity 5.
  • the inclined portion is formed in the vicinity of the middle portion of the runner 7, and from the lowest portion of the inclined portion (the lowest portion p1 of the ceiling portion of the runner 7) to the product cavity 5
  • the height of the ceiling portion may be the same as the height h1 of the lowest portion of the inclined portion.
  • a step formed vertically may be provided in place of the inclined portion formed near the middle portion of the runner 7.
  • the vertical section of the mold cavity 4 has been described with reference to FIGS. 1 (a) to 1 (c).
  • the actual mold cavity 4 also extends in the direction perpendicular to the paper surface, that is, a three-dimensional solid body.
  • the volume of the liquid Q is obtained from the design drawing of the mold cavity 4, the dimensions of the model of the casting simulation by the computer, and the like, and the molten metal corresponding to the volume is poured.
  • the weight rather than the volume of the molten metal.
  • the product of the obtained volume of the liquid Q and the specific gravity (density) of the molten metal to be poured is defined as the molten metal pouring weight.
  • the other embodiments are also the same.
  • FIG. 2 (a) and FIG. 2 (b) show the filling equilibrium state of the liquid Q according to the second embodiment of the present invention.
  • the basic configuration of the breathable mold in the second embodiment is the same as that of the first embodiment except that the runner 17 of the mold 11 is inclined downward from the gate 18 toward the product cavity 5.
  • the process from injecting the liquid Q into the mold, statically pushing in the liquid Q by the air supply pressure by the air supply gas G, and pushing up the liquid Q into the product cavity 5 to be filled is the same as in the first embodiment. is there.
  • FIG. 2 (a) is a vertical cross section of the mold cavity 14, and FIG. 2 (b) shows an enlarged view of the vicinity B of the runner 17 and the product cavity 5 surrounded by an alternate long and short dash line.
  • the liquid Q fills the product cavity 5 and is continuously filled without interruption until the liquid level Sv located at the point ps in the runner 17.
  • 2 (a) and 2 (b) show a form in which the entire runner 17 is inclined, but a part of the runner 17 on the side of the sprue 18 or a part on the side of the product cavity 5 is horizontal. It may be formed.
  • the volume of the liquid Q is set to the height h1 of the lowest part p1 of the ceiling portion of the runner 17 that forms the molten metal flow path 16, and the height of the liquid level Sv.
  • the lowest part p1 of the ceiling part of the runner 17 is located at the connection point with the product cavity 5, and is located below the connection point p2 with the gate part 18. H2> h1. Therefore, even in the second embodiment, the liquid level Sv does not necessarily have to be higher than the connection point p2. Therefore, the liquid level Sv can be set in the runner 17, that is, h2> hs> h1, and the volume of the liquid Q can be reduced, which is preferable.
  • the volume of the liquid Q can be further reduced by setting the volume of the liquid Q so that the maximum height ht of the bottom of the runner 17 satisfies hs ⁇ ht. .
  • the maximum height of the bottom of the runner 17 is the height of the connection point pt with the spout 18 at the bottom of the runner 17.
  • FIG. 3 (a) and FIG. 3 (b) are shown assuming a filling equilibrium state of the liquid Q according to Embodiment 3 of the present invention.
  • the basic configuration of the breathable mold in the third embodiment is the same as in the first embodiment except that the runner 27 of the mold 21 has a downward bent flow path 27c that is bent downward in the middle thereof to form a downward flow. It is. Also, the process from injecting the liquid Q into the mold, statically pushing in the liquid Q by the air supply pressure by the air supply gas G, and pushing up the liquid Q into the product cavity 5 to be filled is the same as in the first embodiment. is there.
  • FIG. 3 (a) is a vertical section of the mold cavity 24.
  • FIG. 3 (b) is an enlarged view of the vicinity of the downward bent flow path 27c surrounded by the alternate long and short dash line.
  • the liquid Q fills the product cavity 5 and is continuously filled up to the liquid level Sv located at the point ps in the runner 27 without interruption.
  • the horizontal portion on the product cavity 5 side with respect to the downward bent flow path 27c is the runner 27a
  • the horizontal portion on the side of the gate 8 with respect to the downward bent flow path 27c is the runner 27b.
  • the lowest part p1 of the ceiling part of the runway 27 is the lowest part of the ceiling part of the runway 27a.
  • 3 (a) and 3 (b) exemplify a form in which the ceiling of the runner 27a is inclined upward toward the product cavity 5, p1 is bent downward with the runner 27a. As shown in FIG. 3 (c), in the case where the ceiling portion of the runner 27a is inclined downward toward the product cavity 5, as shown in FIG.
  • the ceiling of the runner 27a The lowest part p1 is the position of the connection point p4 with the product cavity 5. Further, as shown in FIG. 3 (d), in the case where the ceiling portion of the runner 27a is formed horizontally, the lowest part p1 of the ceiling portion of the runner 27a includes the runner 27a and the downward bent flow path 27c. Or a connection point p4 with the product cavity 5.
  • the volume of the liquid Q is set to the height h1 of the lowest part p1 of the ceiling part of the runner 27 forming the melt flow path 26, and the liquid level Sv.
  • the liquid level Sv can be a position in the runner 27 that satisfies h2> hs> h1, and the volume of the liquid Q can be reduced.
  • the height hs of the liquid level Sv is higher than p1 and lower than p3.
  • the position, i.e. h3 ⁇ hs> h1 can be established.
  • the liquid level Sv does not exist in the runner 27b, the liquid Q can be further reduced, which is the most preferable mode.
  • the product cavity 5 continues to the liquid level Sv in an equilibrium state assuming that the liquid Q shown in FIG. 3 (a) is filled in the product cavity 5.
  • the molten metal corresponding to the volume occupied by the liquid Q is poured.
  • FIG. 4 (a) and FIG. 4 (b) show the filling equilibrium state of the liquid Q according to Embodiment 4 of the present invention.
  • the basic structure of the breathable mold in the fourth embodiment is the same as in the first embodiment except that the ceiling portion of the runner 37 of the mold 31 is formed lower than the other portions near the middle of the runner 37. It is the same. Also, the process from injecting the liquid Q into the mold, statically pushing in the liquid Q by the air pressure by the air supply gas G, and pushing up the liquid Q into the product cavity 5 to fill it is the same as in the first embodiment It is.
  • FIG. 4 (a) is a vertical section of the mold cavity 34
  • FIG. 4 (b) is an enlarged view of a portion D where the ceiling portion near the middle of the runway 37 surrounded by the alternate long and short dash line is formed low.
  • the liquid Q fills the product cavity 5 and is continuously filled up to the liquid level Sv located at the point ps in the runner 37 without interruption.
  • the volume of the liquid Q is set to the height h1 of the lowest part p1 of the ceiling part of the runner 37 forming the molten metal flow path 36, and the height of the liquid level Sv.
  • the lowest part p1 of the ceiling part of the runner 37 is located at a portion where the ceiling part near the middle of the runner 37 is formed low, and the first to the previous embodiments described above. As shown in FIG. 3, it is positioned below the connection point p2 with the gate 8.
  • the liquid level Sv does not necessarily have to be higher than p2. Therefore, the liquid level Sv can be set in the runner 37, that is, h2> hs> h1, and the volume of the liquid Q can be reduced, which is preferable.
  • the portion where the ceiling portion of the runner 37 is formed low may be formed wide as shown in FIG. 4 (c). Note that the wide shape shown in FIG. 4C is an example, and the present invention is not limited to this. Thus, by forming the runner 37 wide, the cross-sectional area of the flow path does not decrease even when the ceiling is formed low, so that the molten metal can be supplied without hindering the flow.
  • the liquid Q shown in FIG. 4 (a) is continuous from the product cavity 5 to the liquid level Sv in an equilibrium state assuming that the product cavity 5 is filled.
  • the molten metal corresponding to the volume occupied by the liquid Q is poured.
  • FIG. 5 (a) and FIG. 5 (b) show the filling equilibrium state of the liquid Q according to the fifth embodiment of the present invention.
  • the process from injecting the liquid Q into the mold, statically pushing in the liquid Q by the air supply pressure by the air supply gas G, and pushing up the liquid Q into the product cavity 5 to be filled is the same as in the first embodiment. is there.
  • FIG. 5 (a) is a vertical section of the mold cavity 44.
  • FIG. 5 (b) is an enlarged view of the vicinity E of the downward bent flow path 47c surrounded by the one-dot chain line.
  • the liquid Q fills the product cavity 5 and is continuously filled up to the liquid level Sv located at the point ps in the runner 47 without interruption.
  • the horizontal portion of the runner 47 on the side of the product cavity 5 with respect to the downward bent flow passage 47c is referred to as a runner 47a, and the horizontal portion on the side of the gate 18 with respect to the downward bent flow passage 47c is referred to as a runner 47b.
  • the lowest part p1 of the ceiling part of the runway 47 is the lowest part of the ceiling part of the runway 47a.
  • the volume of the liquid Q is set to the height h1 of the lowest part p1 of the ceiling part of the runway 47 forming the molten metal flow path 46, and the liquid level Sv.
  • the liquid level Sv can be a position in the runner 47 that satisfies h2> hs> h1, and the volume of the liquid Q can be reduced.
  • the fifth embodiment is different from the third embodiment in that the ceiling portion in the vicinity of the connecting portion between the runner 47b and the runner 47c is low and the runner 47b is formed thin. Solidification of the molten metal is promoted, and the backflow of the molten metal from the product cavity 5 can be stopped early. Note that the portion of the runner 47b where the ceiling portion is formed low may be formed wider as in the case of the fourth embodiment.
  • the liquid Q shown in FIG. 5 (a) is continuous from the product cavity 5 to the liquid level Sv in an equilibrium state assuming that the product cavity 5 is filled.
  • the molten metal corresponding to the volume occupied by the liquid Q is poured.
  • Embodiment 6 (a) and 6 (b) show an example of a breathable mold according to Embodiment 6 of the present invention.
  • the basic configuration of the breathable mold in the fourth embodiment is that the runner 57 of the mold 51 has a downward bending channel 9 that bends downward in the middle, and the breathable mold shown in FIG. It is the same composition as.
  • a downward bent flow path 9 that forms a downward flow is formed in a substantially vertical direction in the middle of the runner 57.
  • the upper part of the downward bending channel 9 is connected to a runner 57b extending to the gate 8 and the lower part of the downward bending channel 9 is connected to a runner 57a extending to the product cavity 5.
  • the runner 57 is divided into a horizontal runner 57a on the product cavity 5 side from the downward bent flow path 9, a horizontal runner 57b on the side of the gate, and a downward bent flow path 9. .
  • 6 (a) and 6 (b) show a configuration in which the downward bending channel 9 is formed in a substantially vertical direction, the downward bending channel 9 is directed from the gate 8 side to the product cavity 5 side. It may be formed as an inclined channel. The same applies to the seventh embodiment.
  • the flow path connecting the downward bending flow path 9 to the product cavity 5, that is, the height of the portion P1 where the ceiling portion of the runner 57a connects to the downward bending flow path is H1, and from the gate 8 to the downward bending flow path
  • H1 ⁇ H2 is satisfied.
  • the downward bent flow path 9 is not formed, and the conventional air-permeable mold having a runner that linearly extends in the horizontal direction, for example, as shown in FIG. 8 (a), fills the runner. If the molten metal is to be reduced, the molten metal must be solidified in the middle of the runway while keeping the shape against gravity, and therefore, it is necessary to incorporate a high-pressure control means and a rapid cooling means for the molten metal.
  • FIGS. 6 (a) and 6 (b) show an example in which the ceiling portion of the runner 57b has a uniform height and a monotonous horizontal shape.
  • the ceiling of the runner 57b may be inclined obliquely upward or obliquely downward, may have a step or bend, and the runner 57b itself is upward or downward. It may be inclined in the direction.
  • the downward bending channel 9 may be at an arbitrary position in the middle of the horizontal runner 57, but it is preferable that the amount of pouring is set smaller as it is provided as close as possible to the product cavity 5. The same applies to the seventh embodiment.
  • FIG. 7 (a) and FIG. 7 (b) show an example of a breathable mold according to Embodiment 7 of the present invention.
  • the basic configuration of the breathable mold in Embodiment 5 is that the height H1 of the portion P1 where the ceiling portion of the runner 67a on the product cavity 5 side connects to the downward bending flow path and the bottom portion of the runner 67b on the gate side This is the same as the air-permeable mold of Embodiment 6, except that the downward bending channel 69 is formed so that the height H3 of the portion P3 connected to the downward bending channel satisfies H1 ⁇ H3.
  • Embodiment 7 shows a more preferable form of the breathable mold of the present invention.
  • the portion P1 where the ceiling portion of the runner 67a connects to the downward bent flow path and the portion P3 where the bottom portion of the runner side 67b on the gate side connects to the downward bent flow path are positioned at the same height, for example
  • H1 H3 is set on the same parting surface, there is an advantage that the mold matching between the upper mold 1a and the lower mold 1b is easy.
  • FIG. 7 (b) shows that the portion P1 where the ceiling portion of the runner 67a is connected to the downward bent flow path is located below the portion P3 where the bottom portion of the runner 67b on the gate side is connected to the lower bent flow passage.
  • H1 ⁇ H3 it is possible to position the hot water surface pushed down by the gas in the downward bending channel 69 below the lowest part P3, and the amount of pouring remaining in the runner 67b This is a more preferable form.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

 鋳型キャビティとして製品キャビティと溶湯流路とを有し、湯流路が、重力注湯した溶湯が流下する湯口部及び製品キャビティと湯口部とを連結する湯道からなる通気性鋳型を用いて、鋳型キャビティの全体の体積よりも小さく、製品キャビティの体積よりも大きい金属溶湯を重力注湯し、次いで湯口部からガスを送気して、溶湯流路内の金属溶湯を押し込むことで製品キャビティ内の金属溶湯を押し上げて、製品キャビティを金属溶湯で充填する鋳造物品の製造方法であって、ガスの送気により仮想の液体が製品キャビティ内に充填されて平衡した状態を仮定したとき、仮想の液体が製品キャビティを充満して、かつ溶湯流路内に残存する仮想の液体の液面の高さhs、湯道の天井部の最も低い部分の高さh1、及び湯道の天井部が湯口部と接続する部分の高さh2が、h2>hs>h1を満たした状態になるような仮想の液体の体積と同体積の金属溶湯を注湯する量とする鋳造物品の製造方法。

Description

鋳造物品の製造方法及び通気性鋳型
 本発明は、鋳型キャビティの全体の体積よりも小さく、製品キャビティの体積よりも大きい金属溶湯を通気性鋳型に重力注湯し、次いで湯口部からガスを送気して、溶湯流路内の金属溶湯を押し込むことで前記製品キャビティ内の金属溶湯を押し上げて、所望のキャビティ部分を金属溶湯で充填する鋳造物品の製造方法(以下、送気加圧鋳造という場合がある。)及び通気性鋳型に関するものである。
 重力注湯(以下、注湯という場合がある。)における鋳造物品の製造には、通気性鋳型である砂粒子を用いて造型された鋳型、いわゆる砂型が最も一般的に用いられている。このような通気性鋳型(以下、鋳型という場合がある。)を使用すれば、特定形状のキャビティに溶湯が充填される際に、残留する気体(一般には空気)がキャビティ表面から押し出されることになり、キャビティ全体に金属溶湯(以下、溶湯という場合がある)が充満し、キャビティと実質同一の鋳物を得ることができる。鋳型のキャビティは、一般に湯口部、湯道部、押湯部及び製品部を有するものであり、この順で溶湯が供給される。そして、従来の技術においては、製品部を満たすだけの溶湯ヘッド高さを湯口部に形成して注湯が終了する。
 こうして凝固した鋳造物品は、湯口部、湯道部、押湯部及び製品部が鋳物として連結した形態となっている。ここで、押湯部は製品の健全化のために設定されるキャビティであり不要な部分とはいえないが、湯口部や湯道部は製品部までの溶湯の経路に過ぎず、本来全く不要な部分である。従って、湯口部や湯道部に溶湯が充填された状態で凝固させる限り、注入歩留りの大幅な改善を図ることはできない。また、不要な部分が連結した鋳物であると、後工程である製品部の分離工程において製品部と不要な部分との仕分け作業に相当な工数を要し、生産効率の低下をきたす。従って、重力注湯において、鋳物として湯口部や湯道部の存在は大きな問題であった。
 特開2007-75862号及び特開2010-269345号は、上記のような問題を解決する画期的な手法を提案している。その手法とは、通気性鋳型のキャビティ(以下、鋳型キャビティという場合がある。)のうちの一部である所望のキャビティ部分に金属溶湯を充填するため、鋳型キャビティの全体の体積よりも小さく、所望のキャビティ部分とほぼ等しい体積の溶湯を重力注湯し、注湯された溶湯が凝固する前に、湯口部から圧縮ガスを送気して所望のキャビティ部分に溶湯を充填して凝固させるものである。この手法によれば、溶湯ヘッド高さによって必要であった圧力が、圧縮ガスによって補填されるため、湯口部はもちろん、湯道部の溶湯も、ほぼ不要とすることが可能となると期待されている。
 本発明者らは、特開2007-75862号及び特開2010-269345号に記載される手法を実現化するための検討を行った結果、所望のキャビティ部分に相当する体積の溶湯を注湯する場合に、ガス送気装置の動作の不安定などに起因してガスの送気速度や送気圧力に不具合が発生すると、送気ガスの一部が製品部又は押湯部に侵入し、製品に不回り不良や、引け巣不良を生じることがあることを見出した。この現象について、以下、図面を用いて説明する。
 図8(a)~図8(c)は、特開2007-75862号及び特開2010-269345号に係る送気加圧鋳造の一例を工程毎に示す。鋳型101は、通気性鋳型である生砂型を使用する一例であり、鋳枠102を構成する上枠102aで保持された上鋳型101aと、同じく鋳枠102を構成する下枠102bで保持された下鋳型101bとが型合わせされて定盤103の上に配置される。鋳型キャビティ104は、製品部105aと押湯部105bとで構成される製品キャビティ105と、溶湯流路106の一部をなして製品キャビティ105に連結する水平方向の湯道107と、溶湯流路106の一部をなして湯道107に連結し溶湯が流下する湯口部108とから構成される。
 図8(a)は、所望のキャビティ部分を製品部105aと押湯部105bとからなる製品キャビティ105として、注湯装置(図示せず)から湯口部108に、製品キャビティ105の体積とほぼ等しい体積の溶湯Mを重力注湯した直後の状態を示す。図8(b)は、次いで、湯口部108よりガス送気装置100から吐出されたガスGによって溶湯Mが良好に製品キャビティ105に押し込まれて充填された状態を示す。このように、送気加圧が適切に行われた場合は製品キャビティ105内に溶湯Mが充満し、健全な鋳造物品を得ることができる。
 ところが、充填過程において何らかの原因でガスGの送気速度や送気圧力に不具合が生じると、図8(c)に示すように、ガスGは湯道107の天井部に沿って、湯道107内の溶湯Mよりも先走って進行し、製品キャビティ105に侵入してしまい、その結果、製品キャビティ105への溶湯Mの押し込みが不十分となって、鋳造物品に不回りや引け巣不良が生じてしまうことがあった。
 本発明者らの検討によれば、特開2007-75862号等の方法では、適切な送気状態が保たれた場合においては、金属溶湯に慣性力が付与され、金属溶湯が湯道部に押し詰まった状態となる。このように十分な慣性力によって押し詰められた金属溶湯は湯道部で即時に凝固されるため、送気ガスが溶湯よりも先走って製品キャビティに侵入することなく、金属溶湯が製品キャビティに正常に充填される。しかしながら、送気ガスの圧力不足等によって送気状態が変動した場合には、送気ガスが溶湯よりも早くに湯道の天井部を這って製品キャビティに侵入してしまうという問題が発生する場合があり、その問題に対する有効な解決策は提案されていない。
 従って、送気加圧鋳造によって鋳造物品を安定的に量産しようとする際には、送気加圧が適切に行われるようにガスの送気条件を探索し、かつこれを量産においても維持する厳格な制御が必要となる。しかしながら、製品キャビティには様々な大きさや形状のものが存在するため、製品キャビティの大きさや形状が変更された場合、少なくとも前記のような厳格な制御を確立するまでは、前述したように鋳造物品に不回りや引け巣不良等の不具合が多発する虞があった。
 上述の不具合は、注湯量が少ないほど、つまり、健全な鋳造物品を得るために最低限必要な所望のキャビティ部分の体積に近い注湯量であるほど生じやすく、それよりも注湯量を多くしていくほど生じにくくなることも知見された。しかし、注湯量を必要よりも過剰にするほど、注入歩留りの低下をきたすので望ましくない。このため、注入歩留りを確保しつつ健全な鋳造物品を得るために、送気ガスが製品キャビティに侵入する不具合を防止できるような必要かつ十分な注湯量とする鋳造方法の開発が必要である。
 従って本発明の目的は、送気加圧鋳造による鋳造物品の製造方法において、送気ガスの一部が製品部又は押湯部に侵入するのを防止できる必要かつ十分な注湯量とする鋳造物品の製造方法及び通気性鋳型を提供することにある。
 上記目的に鑑み鋭意研究の結果、本発明者らは、送気ガスの圧力や流量の不足といった制御因子をできるだけ排除するという観点から、仮想の液体(凝固、蒸発、膨張、収縮、鋳型への浸み込み及び気体の吸収や放出がない液体)が静的に製品キャビティ内に充填されて平衡した状態を仮定し、そのような平衡状態において前記仮想の液体が前記製品キャビティを充満し、かつ前記湯道の少なくとも一部を塞いだ状態になるような仮想の液体の体積及び溶湯流路の形態を採用することにより、送気ガスが製品キャビティに侵入しないで送気加圧鋳造が可能となることを見出し、本発明に想到した。
 すなわち、本発明の鋳造物品の製造方法は、鋳型キャビティとして製品キャビティと溶湯流路とを有し、前記溶湯流路が、重力注湯した溶湯が流下する湯口部及び前記製品キャビティと前記湯口部とを連結する湯道からなる通気性鋳型を用いて、前記鋳型キャビティの全体の体積よりも小さく、前記製品キャビティの体積よりも大きい金属溶湯を前記通気性鋳型に重力注湯し、次いで前記湯口部からガスを送気して、前記溶湯流路内の金属溶湯を押し込むことで前記製品キャビティ内の金属溶湯を押し上げて、前記製品キャビティを金属溶湯で充填する鋳造物品の製造方法であって、前記ガスの送気により仮想の液体(ここで、仮想の液体とは、凝固、蒸発、膨張、収縮、鋳型への浸み込み及び気体の吸収や放出がない液体である。)が前記製品キャビティ内に充填されて平衡した状態を仮定したとき、前記仮想の液体が前記製品キャビティを充満して、かつ前記溶湯流路内に残存する前記仮想の液体の液面の高さhs、前記湯道の天井部の最も低い部分の高さh1、及び前記湯道の天井部が前記湯口部と接続する部分の高さh2が、h2>hs>h1を満たした状態になるような前記仮想の液体の体積を算出し、前記仮想の液体の体積と同体積の金属溶湯を注湯する量とする。
 前記ガスの送気により仮想の液体が平衡した状態において、前記溶湯流路内に残存する前記仮想の液体の液面の高さhsと、前記湯道の底部の最も高い部分の高さhtが、hs<htを満たすのが好ましい。
 本発明の通気性鋳型は、製品キャビティと溶湯流路とを有し、前記溶湯流路が、重力注湯した溶湯が流下する湯口部及び前記製品キャビティと前記湯口部とを連結する湯道からなる鋳型キャビティを有し、金属溶湯を重力注湯し、次いで前記湯口部からガスを送気して、前記溶湯流路内の金属溶湯を押し込むことで前記製品キャビティ内の金属溶湯を押し上げて、所望のキャビティ部分を金属溶湯で充填するのに適用される通気性鋳型であって、前記湯道は、前記湯道の途中に形成された下方流を形成する下方屈曲流路と、前記湯口部と前記下方屈曲流路の上部とを連結する湯口側流路と、前記下方屈曲流路の下部と前記製品キャビティとを連結する製品キャビティ側流路とを有し、前記製品キャビティ側流路の天井部が前記下方屈曲流路に接続する部分P1の高さをH1、及び前記湯口側流路の天井部の最低部P2の高さをH2とするとき、H1<H2である。
 前記湯口側流路の底部が前記下方屈曲流路に接続する部分P3の高さをH3とするとき、H1≦H3であるのが好ましい。
 本発明によれば、充填時の金属溶湯への慣性力の付与、凝固速度の促進等の、溶湯の特性やキャビティの形状等に大きく影響される因子の厳格な制御が必要でなくなるため、健全な鋳造物品を安定して供給することが可能となる。
本発明の実施の形態1において、仮想の液体が鋳型の湯口部に注入された直後の状態を示す模式図である。 本発明の実施の形態1において、送気ガスによって仮想の液体を製品キャビティ内に押し込んで平衡した状態を示す模式図である。 図1(a)における一点鎖線で囲まれた、製品キャビティと湯道との連結部付近Aを拡大して示す模式図である。 実施の形態1に類似する別の形態の一例を拡大して示す模式図である。 実施の形態1に類似するさらに別の形態の一例を拡大して示す模式図である。 本発明の実施の形態2において、送気ガスによって仮想の液体を製品キャビティ内に押し込んで平衡した状態を示す模式図である。 図2(a)における一点鎖線で囲まれた、湯道と製品キャビティとの連結部付近Bを拡大して示す模式図である。 本発明の実施の形態3において、送気ガスによって仮想の液体を製品キャビティ内に押し込んで平衡した状態を示す模式図である。 図3(a)における一点鎖線で囲まれた下方屈曲流路付近Cを拡大して示す模式図である。 実施の形態3に類似する別の形態の一例を拡大して示す模式図である。 実施の形態3に類似するさらに別の形態の他の一例を拡大して示す模式図である。 本発明の実施の形態4において、送気ガスによって仮想の液体を製品キャビティ内に押し込んで平衡した状態を示す模式図である。 図4(a)における一点鎖線で囲まれた、天井が低く形成された湯道部分Dを拡大して示す模式図である。 天井が低く形成された湯道部分を幅広に形成した例を模式的に示す斜視図である。 本発明の実施の形態5において、送気ガスによって仮想の液体を製品キャビティ内に押し込んで平衡した状態を示す模式図である。 図5(a)における一点鎖線で囲まれた下方屈曲流路付近Eを拡大して示す模式図である。 本発明の実施の形態6における通気性鋳型の一例を示す模式図である。 図6(a)における一点鎖線で囲まれた下方屈曲流路付近Fを拡大して示す模式図である。 本発明の実施の形態7における通気性鋳型の他の一例を示す模式図である。 図7(a)における一点鎖線で囲まれた下方屈曲流路付近Hを拡大して示す模式図である。 特開2007-75862号及び特開2010-269345号に係る送気加圧鋳造の一例を工程毎に示す模式図である。 特開2007-75862号及び特開2010-269345号に係る送気加圧鋳造の一例を工程毎に示す模式図である。 特開2007-75862号及び特開2010-269345号に係る送気加圧鋳造の一例を工程毎に示す模式図である。 図1(a)に示す鋳型を用いたが、本発明に該当しない一例を示す模式図である。
[1] 鋳造物品の製造方法
 まず本発明の基本技術である送気加圧鋳造法について説明する。本発明は、特開2007-75862号及び特開2010-269345号に提案されるようなガスを適用する鋳造物品の製造方法(送気加圧鋳造法)を基本技術とするものであり、これらの特許文献に開示される技術に適用される。ただし、これらの特許文献の開示範囲に限定されるものではない。
 送気加圧鋳造法は、通気性鋳型の湯口部から溶湯流路内に金属溶湯を供給し、次いで湯口部からガスを送気して、溶湯流路内の金属溶湯を押し込むことで前記溶湯流路内の金属溶湯を所望のキャビティ部分に供給し、前記所望のキャビティ部分を構成する製品キャビティ内を金属溶湯で充填する方法である。このとき、製品キャビティの配置によって、前記溶湯流路内の金属溶湯を押し込むことにより、製品キャビティ内の金属溶湯を押し上げる場合と、製品キャビティ内の金属溶湯を押し下げる場合とがあるが、本発明の方法は、製品キャビティ内の金属溶湯を押し上げる場合、すなわち、湯道よりも製品キャビティが高い位置に設けられている場合に適用することができる。
 本発明において適用される通気性鋳型としては、必ずしも押湯をもつものに限られない。しかしながら、押湯部は製品部の凝固収縮に伴い溶湯を補給する役割を果たす部分であるため、凝固開始前の溶湯は押湯部全体にも充満されていないと押湯部はその役割を十分に果たせずに製品部に引け巣等の不良をきたしてしまうことがあるので、押湯部も、少なくとも送気加圧による充填の完了時点においては溶湯で充満されているのが好ましい。このため本発明の実施の形態では、押湯部も製品部と同様に溶湯で充満される形態で例示する。以下、製品部、又は製品部と押湯部とを合わせたキャビティを、製品キャビティという場合がある。
 通気性鋳型は、生砂型、シェル型、自硬性型その他の砂粒子を用いて造型された鋳型が一般的であるが、セラミックス粒子や金属粒子を用いて造型された鋳型も適用できる。石膏などのほとんど通気性のない鋳型でも、通気性材料を混在させる、又は部分的に通気性材料を用いて十分な通気性をもたせることによって通気性鋳型として使用可能である。さらに、金型のように全く通気性のない材料を用いた鋳型であっても、ベントホール等その他の通気孔を設けて通気性をもたせた場合には通気性鋳型として使用可能である。
 金属溶湯は、鋳鉄、鋳鋼などの鉄合金、アルミニウム合金、銅合金、マグネシウム合金、亜鉛合金などの一般的な鋳造物品の製造に使用される金属材料の溶湯を使用することができる。
 送気加圧鋳造法によれば、湯口部からガスを送気する方法により、鋳型キャビティ全体の体積よりも小さい体積の溶湯でも、製品キャビティに充填することが可能である。従来の通気性鋳型を用いた重力注湯による鋳造法では、製品部だけでなく、一般に製品部以外の全キャビティにも溶湯を充填して凝固させることが健全な製品を得るために不可欠であることから、注入歩留りは高々70%程度に留まって、それ以上に大幅な向上は見込めない。これに対して送気加圧鋳造方法を用いれば、鋳型キャビティの全体の体積よりも小さく、製品キャビティよりも大きい体積の溶湯を重力注湯することにより、原理的には注入歩留りをほぼ100%にできる可能性がある。
 ただし、本発明者らの検討により、従来の送気加圧鋳造法では、前述したとおり、ガスの送気状態等の変動によっては送気ガスの一部が製品キャビティに侵入する虞があることが分かったため、これを補償するために、注入歩留り100%を狙うような製品キャビティの体積と同等程度の溶湯量を注湯するのではなく、実際には、ある程度湯道に溶湯が滞留するような余裕をもたせた溶湯量を注湯していた。
 注湯量を単に多くしても、湯道の天井部までを満たさない量であれば、送気ガスの一部が製品キャビティに侵入する可能性は残ってしまう。そのため例えば、特開2007-75862号(図6~図8)又は特開2010-269345号(図8)のように、湯道内の溶湯が湯道に栓をするように重力に逆らった状態で凝固させるといった難しい冷却制御が必要となる。
 本発明の方法では、送気加圧鋳造法において、ガスを送気した状態で、仮想の液体(凝固、蒸発、膨張、収縮、鋳型への浸み込み及び気体の吸収や放出がない液体)が製品キャビティを充満して、かつ溶湯流路内に残存する仮想の液体の液面の高さhs、湯道の天井部の最も低い部分の高さh1、及び湯道の天井部が湯口部と接続する部分の高さh2が、h2>hs>h1を満たした状態になるような仮想の液体の体積を算出し、それと同体積の金属溶湯を注湯する。h2>hs>h1を満たした状態とは、例えば図1(a)及び図1(b)に示すように、製品キャビティを充満して余った仮想の液体が、湯道の少なくとも一部(図1(b)において、湯道27の製品キャビティ5への接続部付近)を塞いではいるが、湯道の全体を満たしてはいない状態である。
 湯道の少なくとも一部を塞いだ状態とは、湯道の天井部の最も低い部分まで仮想の液体で満たされている状態であり、溶湯流路内に、湯口部の入口から製品キャビティまで連通する空間がない状態である。このように湯道の少なくとも一部を塞いだ状態になるような仮想の液体体積と同体積の溶湯を注湯することにより、ガスを送気した状態で、溶湯が製品キャビティ内に充填され、溶湯流路内に製品キャビティから連続する溶湯の湯面が水平に安定して存在できるようになるので、たとえ、ガスの送気流量、送気圧等の変動が生じた場合でも、送気ガスが湯面に対して少なくとも垂直に押圧しているので原理的には送気ガスの一部が製品キャビティに侵入するような問題が発生しない。従って、慣性力によって溶湯を押し混んでなる非平衡状態を保持しつつ凝固させるといった操作を行う必要がなくなる。
 前述したように、仮想の液体は湯道の少なくとも一部を塞いだ状態であるのに加えて、湯道の全体を満たしてはいない状態、つまり湯道の一部に空隙を有する状態である。このように湯道の全体を満たしてはいない状態になるような仮想の液体体積と同体積の溶湯を注湯に使用することにより、より溶湯の使用量を減少させることができ、注入歩留りを高めることができる。
 さらに前記ガスの送気により仮想の液体が平衡した状態において、例えば図2(a)及び図2(b)に示すように、前記湯道の底部の最も高い部分の高さhtが、hs<htを満たすような量の仮想の液体と同体積の溶湯を注湯するのが好ましい。このように、hs<htを満たすことにより、溶湯の使用量をさらに減少させることができる。
[2] 通気性鋳型
 本発明の通気性鋳型は、製品キャビティと溶湯流路とからなり、前記溶湯流路が、重力注湯した溶湯が流下する湯口部及び前記製品キャビティと前記湯口部とを連結する湯道からなる鋳型キャビティを有し、例えば図6(a)に示すように、前記湯道の途中に、下方に屈曲し下方流を形成する下方屈曲流路を有する。本発明の通気性鋳型は、金属溶湯を重力注湯し、次いで湯口部からガスを送気して、溶湯流路内の金属溶湯を押し込むことで製品キャビティ内の金属溶湯を押し上げて、所望のキャビティ部分を金属溶湯で充填するのに適用され、特に本発明の鋳造物品の製造方法に好適である。
 前記湯道は、下方流を形成する前記下方屈曲流路を途中に有していることで、図6(b)に示すように、前記下方屈曲流路から前記製品キャビティまでを接続する流路の天井部が下方屈曲流路に接続する部分P1の高さH1までを満たす溶湯量があれば、何らかの原因で湯道の天井に空間が生じても、平衡状態においてはその空間は前記接続部P1で遮断されるため、送気ガスの一部が製品部又は押湯部に侵入する可能性を大きく減ずることができる。この効果を得るためには前記接続部P1の高さH1と、前記湯口部から前記下方屈曲流路までを接続する湯口側流路の天井部の最低部P2の高さH2とが、H1<H2の関係を満たすことが必要である。
 湯道は、下方屈曲流路を途中に有することにより、下方屈曲流路と、湯口部から下方屈曲流路の上部までを接続する湯口側流路と、下方屈曲流路の下部から製品キャビティまでを接続する製品キャビティ側流路とによって構成される。すなわち、湯口部側から製品キャビティに向かって、湯口側流路、下方屈曲流路及び製品キャビティ側流路の順に湯道が構成される。ここで、下方屈曲流路は、湯口側からの溶湯の流れを下方に屈曲させるように構成されていればよく、鉛直方向に形成されていても良いし、湯口側から製品キャビティ側に向かって傾斜して形成されていても良い。なお下方屈曲流路が湯口側から製品キャビティ側に向かって傾斜して形成されている場合は、必ずしも製品キャビティ側流路を設ける必要はなく、下方屈曲流路が直接製品キャビティに接続されていてもよい。
 製品キャビティ側流路の天井部が下方屈曲流路に接続する部分P1の高さH1と湯口側流路の天井部の最低部P2の高さH2との差は大きい程よい。さらに前記湯口側流路の底部が前記下方屈曲流路に接続する部分P3の高さをH3とするとき、H1<(H2+H3)/2である(図6(b)を参照)のが好ましく、H1≦H3である(図7(b)を参照)のがより好ましい。このように、H1<(H2+H3)/2、さらにはH1≦H3を満たすことにより、溶湯の使用量をより減少させることができる。
 以下、本発明のさらに好ましい形態について説明する。
 通気性鋳型は、所定の注湯量を効率よく鋳型キャビティ内に導入するために、湯口部が、注湯装置から流下された溶湯を受ける溶湯経路よりも拡径された湯口カップ部を有しているのが好ましい。
 送気ガスはコスト面からは空気を使用してもよく、溶湯の酸化防止という面からは非酸化性ガスであるアルゴン、窒素、二酸化炭素等を使用するのが好ましい。送気するガスの流束は、ファン、ブロワ等による旋風を用いてもよいが、コンプレッサー等による圧縮ガスを用いるのが、より加圧状態で溶湯を均一に押すことができる点で好ましい。
 ガスを送気するためのガス送気装置を湯口部に接続するための接続部は、ノズル状とするのが好ましい。ノズル状とすることで、接続部を湯口部(特に湯口カップ部に接続する導入管部)に容易に嵌め合わせる(差し込む)ことができ、ガス送気装置の迅速な接続が可能となる。
 前記ノズルとしては、さらにテーパ状側面を形成し先細りにしておくのが好ましい。また、さらに湯口部(導入管部)に対応するテーパ状壁面を形成しておけば、ノズルと湯口部(導入管部)とを確実に嵌め合わせることが可能となる。
 充填した溶湯を凝固させ溶湯の逆流を抑制する方法としては、押し上げた溶湯が逆流しない程度まで送気加圧を継続する方法、湯口部から水分を導入して凝固を促進させる方法等の他、特開2007-75862号及び特開2010-269345号が開示する方法を適用することができる。
[3] 実施の形態
 以下に種々の類型毎の実施の形態を、図面を参照しつつ詳しく説明する。本発明の要点を分かりやすくするために、以下の実施の形態は、製品キャビティと溶湯流路とを含む垂直断面図を用いて説明するが、実際の鋳型キャビティは一般的に紙面に垂直な方向にも形成されている。なお、以下に示す実施の形態は夫々の類型の一例であって、これらに限定されるものではない。
(実施の形態1)
 図1(a)~図1(c)は、本発明の実施の形態1に係る、仮想の液体(液体Q)の静的な充填状態を仮定して工程毎に示す。図1(a)~図1(c)は鋳型キャビティ4の垂直断面であり、図1(b)において一点鎖線で囲まれた製品キャビティ5と湯道7との連結部付近Aを拡大して図1(c)に示す。
 実施の形態1は、鋳型1として通気性鋳型である生砂型を使用した例で示す。鋳型1は、鋳枠2を構成する上枠2aで保持された上鋳型1aと、同じく鋳枠2を構成する下枠2bで保持された下鋳型1bとが型合わせされて定盤3の上に配置される。鋳型キャビティ4は、製品部5aと製品部5aの湯口部8側に設けられた押湯部5bとで構成される製品キャビティ5と、製品キャビティ5に向かって水平に形成された湯道7及び前記湯道7に連結し溶湯が流下する湯口部8から構成される溶湯流路6とからなり、前記湯道7の天井部が、製品キャビティ5付近で製品キャビティ5に向かって下方に傾斜するように形成されている。なお、製品キャビティは押湯を有さない形態であってもよい。以下、他の実施の形態についても同様である。
 図1(a)は、注入装置9から液体Qが、鋳型1の湯口部8に注入された直後の状態を仮定して示す(注入完了段階)。ここで液体Qは、凝固、蒸発、膨張、収縮、鋳型への浸み込み及び気体の吸収や放出がない仮想の液体で、比重の値は1であって、後述するガスGの比重よりも大きいものとする。以下、他の実施の形態においても同様とする。
 図1(b)は、次いで湯口部8にガスを吐出する送気装置10の一部をなす送気ノズル10bを嵌め合わせ、複数の矢印線で示す送気ガスGを送気装置本体10aから鋳型キャビティ4内に送気して、送気ガスGによる送気圧によって液体Qを静的に押し込んで、製品キャビティ5内に液体Qを押し上げて充満させて平衡した状態を仮定したものである(充填平衡状態)。ここでいう静的とは、液体Qの液面Sv(液体QとガスGとの境界面)が乱れることなく常に水平(重力方向に対しては垂直)を保った状態という意味である。以下、他の実施の形態についても同様とする。本実施の形態1では、液体Qは、図1(c)に示すように、製品キャビティ5を充満し、湯道7内の点Psに位置する液面Svまで途切れずに連続して満たされている。
 図1(b)及び図1(c)に示す状態は、ガスGの送気により液体Qが製品キャビティ5を充満して、かつ溶湯流路6内に残存した液体Qの液面Svの高さhs、及び湯道7の天井部の最低部p1の高さh1が、hs>h1を満たしている状態である。この状態において、湯口部8から供給される送気ガスGは、特別な外乱がない限り製品キャビティ5に侵入しない。つまり、hs>h1を満たすような量の液体Qを使用することにより、液体Qは平衡を保った状態で安定して存在することができる。
 ここでhs>h1を満たさない状態、すなわち、hs<h1となる体積の液体Qを注入した場合、送気ガスGにより液体Qを製品キャビティ5に押し込もうとすると、図9に示すように、液面Svが湯道7の天井部の最低部p1より低い高さまで押し下げられる。液面Svはp1よりも下方では水平面を維持して平衡状態を保つことができないので、湯道7内に侵入した液体Qよりも比重が小さいガスGは、湯道7の天井部を這って製品キャビティ5内に侵入してしまう。なお、hs=h1の場合は、ガスGは湯道7に理論上は侵入しないが、現実には鋳型のわずかな傾斜や振動等が生じた場合、送気ガスGが湯道7に侵入するので好ましくない。
 これに対して、図1(a)~図1(c)のように、hs>h1を満足する体積の液体Qを注入すれば、液体Qが製品キャビティ5に充満されてなお、液面Svが湯道7の最低部p1よりも上方に位置することになる。そして液体Qよりも比重が小さいガスGは液体Q内には侵入せず、製品キャビティ5にもガスGは到達しない。
 図1(c)に示す実施の形態1では、湯道7の天井部の最低部p1は、製品キャビティ5との接続点に位置しており、湯口部8との接続点p2よりも下方に位置している。すなわち湯口部8との接続点p2の高さをh2とするとき、h2>h1となっている。このため、液面Svは必ずしもp2よりも高位にある必要はなく、湯道27内に位置することができる。すなわちh2>hs>h1とすることができ、液体Qの体積を少なくできて好ましい。
 実際の送気加圧鋳造を考慮して、液面Svの高さhsは、p1の高さh1に対してやや余裕をもたせた高さであるのが好ましい。好ましくは、h1+1 mm≦hs≦h1+25 mmである。以下、実施の形態2~実施の形態5についても同様である。なお、hs>h1を満足はするが、液面Svが湯道7の天井部の最低部p1の高さよりわずかに高いだけの場合、例えば、液面Svの高さhsが、h1+1 mm>hs>h1を満たすような高さである場合は、実際の送気加圧鋳造においては、送気初期の送気圧の増加速度を大きくすることにより金属溶湯に大きな慣性力を付与して溶湯を製品キャビティに充填するのが好ましい。
 なお、高さ基準面Lは、鋳型キャビティ4の最底部以下の位置の任意の水平面に設定してよいが、本実施の形態1では定盤3の上面とし、他の実施の形態も同様とした。
 送気加圧鋳造における実際の金属溶湯の注湯量は、図1(b)に示した液体Qが製品キャビティ5に充満されたと仮定した平衡状態において、製品キャビティ5から液面Svまで連続する液体Qが占める体積と等しくすればよい。つまり前記平衡状態において、液体Qの体積を算出し、その体積と同体積の金属溶湯を注湯量とすることにより、製品キャビティ5にガスGが侵入することなく、安定して送気加圧鋳造法により鋳造物品の製造を行うことができる。
 なお実施の形態1では、鋳型1の湯道7の天井部に設けられた、製品キャビティ5に向かって下方に傾斜する部分が、図1(c)に示すように、製品キャビティ5に直接接続するように形成されているが、前記傾斜部分は、必ずしも製品キャビティ5に直接接続するように形成する必要はない。例えば、図1(d)に示すように、湯道7の中間部付近に前記傾斜部分を形成し、前記傾斜部分の最低部(湯道7の天井部の最低部p1)から製品キャビティ5までの天井部の高さを、前記傾斜部分の最低部の高さh1と同じになるように形成しても良い。また図1(e)に示すように、湯道7の中間部付近に形成した前記傾斜部分の代わりに、垂直に形成された段差を設けても良い。
 実施の形態1では、図1(a)~図1(c)において鋳型キャビティ4の垂直断面で説明したが、実際の鋳型キャビティ4は紙面に垂直方向にも広がりをもつ、すなわち3次元の立体形状であるため、具体的には、鋳型キャビティ4の設計図や、コンピュータによる鋳造シミュレーションのモデルの寸法等から液体Qの体積を求め、その体積に相当する金属溶湯を注湯する。実際の製造では溶湯の体積ではなく重量を用いることが一般的である。この場合は、求めた液体Qの体積と、注湯しようとする溶湯の比重(密度)との積を金属溶湯の注湯重量とする。以下、他の実施の形態も同様である。
(実施の形態2)
 図2(a)及び図2(b)は、本発明の実施の形態2に係る液体Qの充填平衡状態を仮定して示す。実施の形態2における通気性鋳型の基本的な構成は、鋳型11の湯道17が湯口部18から製品キャビティ5に向かって下方に傾斜していること以外、実施の形態1と同様である。また液体Qを鋳型に注入して、送気ガスGによる送気圧によって液体Qを静的に押し込んで、製品キャビティ5内に液体Qを押し上げて充満させるまでの工程も実施の形態1と同様である。
 図2(a)は鋳型キャビティ14の垂直断面であり、一点鎖線で囲まれた、湯道17と製品キャビティ5との連結部付近Bを拡大して図2(b)に示す。本実施の形態2では、液体Qは、製品キャビティ5を充満し、湯道17内の点psに位置する液面Svまで途切れずに連続して満たされている。なお図2(a)及び図2(b)では、湯道17全体が傾斜している形態を示したが、湯道17の湯口部18側の一部又は製品キャビティ5側の一部が水平に形成されていても良い。
 実施の形態1と同様に、実施の形態2においても、液体Qの体積を、溶湯流路16を形成する湯道17の天井部の最低部p1の高さh1と、液面Svの高さhsとの関係がhs>h1を満足する体積とすることにより、送気ガスGが製品キャビティ5に侵入するのを防止できる。実施の形態1と同様に、実施の形態2でも、湯道17の天井部の最低部p1は製品キャビティ5との接続点に位置し、湯口部18との接続点p2よりも下方に位置してh2>h1となっている。このため、実施の形態2でも、液面Svは必ずしも接続点p2よりも高位にある必要はない。従って、液面Svは湯道17内、すなわちh2>hs>h1とすることができ、液体Qの体積を少なくできて好ましい。
 図2(b)から明らかなように、前記湯道17の底部の最高高さhtが、hs<htを満足するように液体Qの体積を設定することにより、さらに液体Qの体積を少なくできる。なお、実施の形態2において湯道17の底部の最高高さとは、湯道17の底部の湯口部18との接続点ptの高さである。
 送気加圧鋳造における実際の金属溶湯の注湯にあたっては、図2(a)に示した液体Qが製品キャビティ5に充満されたと仮定した平衡状態において、製品キャビティ5から液面Svまで連続する液体Qが占める体積に相当する金属溶湯を注湯する。
(実施の形態3)
 図3(a)及び図3(b)は、本発明の実施の形態3に係る液体Qの充填平衡状態を仮定して示す。実施の形態3における通気性鋳型の基本的な構成は、鋳型21の湯道27がその途中に下方に屈曲し下方流を形成する下方屈曲流路27cを有すること以外、実施の形態1と同様である。また液体Qを鋳型に注入して、送気ガスGによる送気圧によって液体Qを静的に押し込んで、製品キャビティ5内に液体Qを押し上げて充満させるまでの工程も実施の形態1と同様である。
 図3(a)は鋳型キャビティ24の垂直断面であり、一点鎖線で囲まれた下方屈曲流路27c付近Cを拡大して図3(b)に示す。本実施の形態3では、液体Qは、製品キャビティ5を充満し、湯道27内の点psに位置する液面Svまで途切れずに連続して満たされている。
 湯道27の、下方屈曲流路27cに対して製品キャビティ5側の水平方向の部分を湯道27a、下方屈曲流路27cに対して湯口部8側の水平方向の部分を湯道27bとするとき、湯道27の天井部の最低部p1は、湯道27aの天井部の最低部となる。なお、図3(a)及び図3(b)では、湯道27aの天井部は製品キャビティ5に向かって上方に傾斜している形態を例示しているので、p1は湯道27aと下方屈曲流路27cとの接続点であるが、図3(c)に示すように、湯道27aの天井部が製品キャビティ5に向かって下方に傾斜している形態の場合は、湯道27aの天井部の最低部p1は製品キャビティ5との接続点p4の位置となる。また図3(d)に示すように、湯道27aの天井部が水平に形成された形態の場合は、湯道27aの天井部の最低部p1は、湯道27aと下方屈曲流路27cとの接続点、又は製品キャビティ5との接続点p4の位置となる。
 このように、下方屈曲流路27cをもつ実施の形態3においても、液体Qの体積を、溶湯流路26を形成する湯道27の天井部の最低部p1の高さh1と、液面Svの高さhsとの関係がhs>h1を満足する体積とすることにより、送気ガスGが製品キャビティ5に侵入するのを防止できる。実施の形態1及び実施の形態2と同様に、液面Svは湯道27内の、h2>hs>h1を満たす位置とすることができ、液体Qの体積を少なくできる。
 特に湯道27bの底部と下方屈曲流路27cとの接続点p3の高さh3とするとき、h3>h1である場合には、液面Svの高さhsをp1よりも上方かつp3以下の位置、すなわち、h3≧hs>h1とすることができる。この場合は、湯道27b内に液面Svが存在しなくなるので、液体Qをさらに少なくできるため最も好ましい形態である。
 送気加圧鋳造における実際の金属溶湯の注湯にあたっては、図3(a)に示した液体Qが製品キャビティ5に充満されたと仮定した平衡状態において、製品キャビティ5から液面Svまで連続する液体Qが占める体積に相当する金属溶湯を注湯する。
(実施の形態4)
 図4(a)及び図4(b)は、本発明の実施の形態4に係る液体Qの充填平衡状態を仮定して示す。実施の形態4における通気性鋳型の基本的な構成は、鋳型31の湯道37の天井部が、湯道37の中間付近で他の部分よりも低く形成されている以外、実施の形態1と同様である。また、液体Qを鋳型に注入して、送気ガスGによる送気圧によって液体Qを静的に押し込んで、製品キャビティ5内に液体Qを押し上げて充満させるまでの工程も実施の形態1と同様である。
 図4(a)は鋳型キャビティ34の垂直断面であり、一点鎖線で囲まれた湯道37の中間付近の天井部が低く形成されている部分Dを拡大して図4(b)に示す。本実施の形態4では、液体Qは、製品キャビティ5を充満し、湯道37内の点psに位置する液面Svまで途切れずに連続して満たされている。
 実施の形態2と同様に、実施の形態4においても、液体Qの体積を、溶湯流路36を形成する湯道37の天井部の最低部p1の高さh1と、液面Svの高さhsとの関係がhs>h1を満足する体積とすることにより、送気ガスGが製品キャビティ5に侵入するのを防止できる。実施の形態4では、湯道37の天井部の最低部p1は、湯道37の中間付近の天井部が低く形成されている部分に位置しており、前述した実施の形態1~実施の形態3のように、湯口部8との接続点p2よりも下方に位置している。すなわち湯口部8との接続点p2の高さをh2とするとき、h2>h1となっている。このため、実施の形態4では、液面Svは必ずしもp2よりも高位にある必要はない。従って、液面Svは湯道37内、すなわちh2>hs>h1とすることができ、液体Qの体積を少なくできて好ましい。
 湯道37の中間付近で天井部が低く形成されていることにより、実際の鋳造においてはこの部分の溶湯の凝固が促進されて、製品キャビティ5からの溶湯の逆流を早期に止めることができる。また湯道37の天井部が低く形成されている部分は、図4(c)に示すように、幅広に形成してもよい。なお、図4(c)に示す幅広の形状は一例であって、この限りではない。このように、湯道37の部分を幅広に形成することにより、天井部を低く形成した場合でも流路の断面積が小さくならないので、流れが阻害されることなく溶湯を供給できる。
 送気加圧鋳造における実際の金属溶湯の注湯にあたっては、図4(a)に示した液体Qが製品キャビティ5に充満されたと仮定した平衡状態において、製品キャビティ5から液面Svまで連続する液体Qが占める体積に相当する金属溶湯を注湯する。
(実施の形態5)
 図5(a)及び図5(b)は、本発明の実施の形態5に係る液体Qの充填平衡状態を仮定して示す。実施の形態5における通気性鋳型の基本的な構成は、鋳型41の湯道47がその途中に下方に屈曲する下方屈曲流路47c及び天井部のみが製品キャビティ5に向かって下方に傾斜している部分を有すること以外、実施の形態1と同様である。また液体Qを鋳型に注入して、送気ガスGによる送気圧によって液体Qを静的に押し込んで、製品キャビティ5内に液体Qを押し上げて充満させるまでの工程も実施の形態1と同様である。
 図5(a)は鋳型キャビティ44の垂直断面であり、一点鎖線で囲まれた下方屈曲流路47c付近Eを拡大して図5(b)に示す。本実施の形態5では、液体Qは、製品キャビティ5を充満し、湯道47内の点psに位置する液面Svまで途切れずに連続して満たされている。
 湯道47の、下方屈曲流路47cに対して製品キャビティ5側の水平方向の部分を湯道47a、下方屈曲流路47cに対して湯口部18側の水平方向の部分を湯道47bとするとき、湯道47の天井部の最低部p1は、湯道47aの天井部の最低部となる。
 このように、下方屈曲流路47cをもつ実施の形態5においても、液体Qの体積を、溶湯流路46を形成する湯道47の天井部の最低部p1の高さh1と、液面Svの高さhsとの関係がhs>h1を満足する体積とすることにより、送気ガスGが製品キャビティ5に侵入するのを防止できる。実施の形態1~実施の形態4と同様に、液面Svは湯道47内の、h2>hs>h1を満たす位置とすることができ、液体Qの体積を少なくできる。
 実施の形態5は実施の形態3に対して、湯道47bと湯道47cとの接続部付近の天井部分が低く湯道47bが薄く形成されているので、実際の鋳造においてはこの部分の溶湯の凝固が促進されて、製品キャビティ5からの溶湯の逆流を早期に止めることができる。なお湯道47bの天井部が低く形成されている部分は、実施の形態4の場合と同様、幅広に形成してもよい。
 送気加圧鋳造における実際の金属溶湯の注湯にあたっては、図5(a)に示した液体Qが製品キャビティ5に充満されたと仮定した平衡状態において、製品キャビティ5から液面Svまで連続する液体Qが占める体積に相当する金属溶湯を注湯する。
(実施の形態6)
 図6(a)及び図6(b)は、本発明の実施の形態6に係る通気性鋳型の一例を示す。実施の形態4における通気性鋳型の基本的な構成は、鋳型51の湯道57がその途中に下方に屈曲する下方屈曲流路9を有しており、図3(d)に示す通気性鋳型と同様の構成である。
 実施の形態6における通気性鋳型は、湯道57の途中に下方流を形成する下方屈曲流路9がほぼ鉛直方向に形成されている。下方屈曲流路9の上部は湯口部8に延びる湯道57bへ接続し、下方屈曲流路9の下部は製品キャビティ5に延びる湯道57aへ接続する。その結果、湯道57は下方屈曲流路9より製品キャビティ5側にある水平方向の湯道57aと、湯口部側にある水平方向の湯道57bと、下方屈曲流路9とに区分される。なお図6(a)及び図6(b)では、下方屈曲流路9がほぼ鉛直方向に形成された形態を示したが、下方屈曲流路9は湯口部8側から製品キャビティ5側に向かう傾斜した流路として形成しても良い。これは実施の形態7においても同様である。
 下方屈曲流路9から製品キャビティ5までを接続する流路、すなわち湯道57aの天井部が下方屈曲流路に接続する部分P1の高さをH1、及び湯口部8から下方屈曲流路までを接続する水平方向の湯道57bの天井部の最低部P2の高さをH2とするとき、H1<H2を満たす。H1<H2を満たすような下方屈曲流路9を形成することで、ガスの送気圧力や流量の変動等によって、湯道57bの天井部を這うように製品キャビティ5に向かって送気ガスが先走りした場合でも、下方屈曲流路9で遮断してそれより先に送気ガスが進行することを抑止できる。これに対して、下方屈曲流路9が形成されておらず、例えば図8(a)に示すように、水平方向に直線的に延びる湯道を有する従来の通気性鋳型では、湯道を満たす溶湯を削減しようとすると、溶湯を重力に逆らった形状のまま湯道の途中で凝固させなければならないため、送気圧の高度な調節手段や、溶湯の迅速な冷却手段を盛り込まなければならなくなる。
 さらに湯口側の水平方向の湯道57bの底部が前記下方屈曲流路に接続する部分P3の高さをH3とするとき、図6(b)に示すように、H1<(H2+H3)/2を満たすのが好ましい。
 図6(a)及び図6(b)は、湯道57bの天井部が一様な高さで、単調に水平な形状である例を示すが、本発明の通気性鋳型は、このような形状の湯道に限らず、湯道57bの天井部が斜め上方向又は斜め下方向に傾斜していたり、段差や屈曲を有していたりしてもよく、湯道57b自体が上方向又は下方向に傾斜していても良い。
 下方屈曲流路9は水平方向の湯道57の途中における任意の位置にあってよいが、製品キャビティ5にできるだけ近接させて設けるほど、注湯量をより少なく設定できて好ましい。これは実施の形態7においても同様である。
(実施の形態7)
 図7(a)及び図7(b)は、本発明の実施の形態7に係る通気性鋳型の一例を示す。実施の形態5における通気性鋳型の基本的な構成は、製品キャビティ5側の湯道67aの天井部が下方屈曲流路に接続する部分P1の高さH1と湯口側の湯道67bの底部が前記下方屈曲流路に接続する部分P3の高さH3とがH1≦H3を満たすように下方屈曲流路69を形成した以外、実施の形態6の通気性鋳型と同様である。実施の形態7は、本発明の通気性鋳型のさらに好ましい形態を示すものである。
 この形態において、湯道67aの天井部が下方屈曲流路に接続する部分P1と湯口側の湯道67bの底部が前記下方屈曲流路に接続する部分P3とを同じ高さに位置させる、例えば、同一の見切り面上に位置させて、H1=H3とする場合は、上鋳型1aと下鋳型1bとの型合わせが容易であるという利点がある。
 湯道67aの天井部が下方屈曲流路に接続する部分P1を湯口側の湯道67bの底部が前記下方屈曲流路に接続する部分P3よりも下方に位置させて、図7(b)に示すように、H1<H3とする場合では、下方屈曲流路69内においてガスによって押下げられる湯面を、最低部P3よりも下方に位置させることが可能となり、湯道67bに残留させる注湯量を確実に低減できるのでより好ましい形態である。

Claims (4)

  1.  鋳型キャビティとして製品キャビティと溶湯流路とを有し、前記溶湯流路が、重力注湯した溶湯が流下する湯口部及び前記製品キャビティと前記湯口部とを連結する湯道からなる通気性鋳型を用いて、前記鋳型キャビティの全体の体積よりも小さく、前記製品キャビティの体積よりも大きい金属溶湯を前記通気性鋳型に重力注湯し、次いで前記湯口部からガスを送気して、前記溶湯流路内の金属溶湯を押し込むことで前記製品キャビティ内の金属溶湯を押し上げて、前記製品キャビティを金属溶湯で充填する鋳造物品の製造方法であって、
    前記ガスの送気により仮想の液体(ここで、仮想の液体とは、凝固、蒸発、膨張、収縮、鋳型への浸み込み及び気体の吸収や放出がない液体である。)が前記製品キャビティ内に充填されて平衡した状態を仮定したとき、
    前記仮想の液体が前記製品キャビティを充満して、かつ
    前記溶湯流路内に残存する前記仮想の液体の液面の高さhs、前記湯道の天井部の最も低い部分の高さh1、及び前記湯道の天井部が前記湯口部と接続する部分の高さh2が、h2>hs>h1を満たした状態になるような前記仮想の液体の体積を算出し、
    前記仮想の液体の体積と同体積の金属溶湯を注湯する量とすることを特徴とする鋳造物品の製造方法。
  2.  請求項1に記載の鋳造物品の製造方法において、前記ガスの送気により仮想の液体が平衡した状態において、前記湯道の底部の最も高い部分の高さhtが、hs<htを満たすような前記仮想の液体の体積を算出し、前記仮想の液体の体積と同体積の金属溶湯を注湯する量とすることを特徴とする鋳造物品の製造方法。
  3.  製品キャビティと溶湯流路とを有し、前記溶湯流路が、重力注湯した溶湯が流下する湯口部及び前記製品キャビティと前記湯口部とを連結する湯道からなる鋳型キャビティを有し、金属溶湯を重力注湯し、次いで前記湯口部からガスを送気して、前記溶湯流路内の金属溶湯を押し込むことで前記製品キャビティ内の金属溶湯を押し上げて、所望のキャビティ部分を金属溶湯で充填するのに適用される通気性鋳型であって、
    前記湯道は、前記湯道の途中に形成された下方流を形成する下方屈曲流路と、前記湯口部と前記下方屈曲流路の上部とを連結する湯口側流路と、前記下方屈曲流路の下部と前記製品キャビティとを連結する製品キャビティ側流路とを有し、
    前記製品キャビティ側流路の天井部が前記下方屈曲流路に接続する部分P1の高さをH1、及び前記湯口側流路の天井部の最低部P2の高さをH2とするとき、
    H1<H2であることを特徴とする通気性鋳型。
  4.  請求項3に記載の通気性鋳型において、
     前記湯口側流路の底部が前記下方屈曲流路に接続する部分P3の高さをH3とするとき、H1≦H3であることを特徴とする通気性鋳型。
     
PCT/JP2014/083773 2014-02-28 2014-12-19 鋳造物品の製造方法及び通気性鋳型 WO2015129134A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
CN201480076485.0A CN106061650B (zh) 2014-02-28 2014-12-19 铸造物品的制造方法以及透气性铸型
EP14883612.5A EP3112049B1 (en) 2014-02-28 2014-12-19 Method for producing cast article and breathable mold
KR1020167024369A KR102153440B1 (ko) 2014-02-28 2014-12-19 주조 물품의 제조 방법 및 통기성 주형
JP2016505008A JP6439790B2 (ja) 2014-02-28 2014-12-19 鋳造物品の製造方法及び通気性鋳型
US15/121,654 US10232431B2 (en) 2014-02-28 2014-12-19 Production method of castings and gas-permeable casting mold
US16/262,096 US10471498B2 (en) 2014-02-28 2019-01-30 Production method of castings and gas-permeable casting mold

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2014-037839 2014-02-28
JP2014037839 2014-02-28
JP2014-075070 2014-04-01
JP2014075070 2014-04-01

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US15/121,654 A-371-Of-International US10232431B2 (en) 2014-02-28 2014-12-19 Production method of castings and gas-permeable casting mold
US16/262,096 Division US10471498B2 (en) 2014-02-28 2019-01-30 Production method of castings and gas-permeable casting mold

Publications (1)

Publication Number Publication Date
WO2015129134A1 true WO2015129134A1 (ja) 2015-09-03

Family

ID=54008474

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/083773 WO2015129134A1 (ja) 2014-02-28 2014-12-19 鋳造物品の製造方法及び通気性鋳型

Country Status (6)

Country Link
US (2) US10232431B2 (ja)
EP (1) EP3112049B1 (ja)
JP (1) JP6439790B2 (ja)
KR (1) KR102153440B1 (ja)
CN (1) CN106061650B (ja)
WO (1) WO2015129134A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114905006A (zh) * 2021-02-07 2022-08-16 中国航发商用航空发动机有限责任公司 一种铸棒的制备方法及其制备系统
CN116020981A (zh) * 2023-02-15 2023-04-28 太原市三高能源发展有限公司 一种汽车配件生产用铸造设备
JP7424935B2 (ja) 2020-07-29 2024-01-30 日立Astemo株式会社 鋳型および製造方法

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6439790B2 (ja) 2014-02-28 2018-12-19 日立金属株式会社 鋳造物品の製造方法及び通気性鋳型
CN111702133B (zh) * 2020-06-23 2021-12-07 马鞍山常裕机械设备有限公司 一种冒口用加压设备
CN111872354A (zh) * 2020-08-03 2020-11-03 湖北军威机械有限公司 一种降低缩孔和缩松的车前草帽浇注系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0452068A (ja) * 1990-06-19 1992-02-20 Mazda Motor Corp 加圧鋳造方法
JP2007075862A (ja) * 2005-09-15 2007-03-29 Masato Goie 鋳造法
JP2010269345A (ja) * 2009-05-22 2010-12-02 Foundry Tech Consulting:Kk 鋳造法

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2155800A (en) * 1937-03-06 1939-04-25 Peter L Perazo Sprue-forming device
US3256571A (en) * 1964-05-11 1966-06-21 Pettibone Mulliken Corp Pouring cup, sprue and riser pattern mounting for use in foundry mold forming machine
JPS60130447A (ja) * 1983-12-16 1985-07-11 Hitachi Metals Ltd 湯道遮断部材
US4614217A (en) * 1984-09-14 1986-09-30 The Garrett Corporation Method of assembling a horizontal shell mold casting system and the resulting system
JPH0315239Y2 (ja) * 1985-08-06 1991-04-03
DK0738192T3 (da) * 1994-01-03 1998-04-27 Georg Fischer Disa As Støbeform til samt støbe- og kølestrækning ved et strengformeanlæg
DE19511282A1 (de) * 1995-03-28 1996-10-02 Gerhard Dr Ing Betz Dauerform einer Gießanlage und Gießverfahren
JPH1015656A (ja) * 1996-06-29 1998-01-20 Ebisu:Kk 加圧鋳造方法及び装置
WO2005110645A1 (ja) * 2004-05-18 2005-11-24 Kosei Aluminum Co., Ltd 竪型鋳造装置及び竪型鋳造方法
JP6439790B2 (ja) 2014-02-28 2018-12-19 日立金属株式会社 鋳造物品の製造方法及び通気性鋳型

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0452068A (ja) * 1990-06-19 1992-02-20 Mazda Motor Corp 加圧鋳造方法
JP2007075862A (ja) * 2005-09-15 2007-03-29 Masato Goie 鋳造法
JP2010269345A (ja) * 2009-05-22 2010-12-02 Foundry Tech Consulting:Kk 鋳造法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7424935B2 (ja) 2020-07-29 2024-01-30 日立Astemo株式会社 鋳型および製造方法
CN114905006A (zh) * 2021-02-07 2022-08-16 中国航发商用航空发动机有限责任公司 一种铸棒的制备方法及其制备系统
CN116020981A (zh) * 2023-02-15 2023-04-28 太原市三高能源发展有限公司 一种汽车配件生产用铸造设备

Also Published As

Publication number Publication date
US10232431B2 (en) 2019-03-19
EP3112049B1 (en) 2020-01-08
KR20160124135A (ko) 2016-10-26
US20190160522A1 (en) 2019-05-30
JP6439790B2 (ja) 2018-12-19
US20160361757A1 (en) 2016-12-15
EP3112049A1 (en) 2017-01-04
JPWO2015129134A1 (ja) 2017-03-30
CN106061650A (zh) 2016-10-26
EP3112049A4 (en) 2017-08-02
US10471498B2 (en) 2019-11-12
CN106061650B (zh) 2018-02-16
KR102153440B1 (ko) 2020-09-08

Similar Documents

Publication Publication Date Title
JP6439790B2 (ja) 鋳造物品の製造方法及び通気性鋳型
KR102178655B1 (ko) 주조 물품의 제조 방법
KR102178737B1 (ko) 복잡한 형상의 주물을 주조하기 위한 주형 및 그러한 주형의 용도
US10688555B2 (en) Method and casting mould for the manufacture of cast parts, in particular cylinder blocks and cylinder heads, with a functional feeder connection
WO2001072452A1 (de) Verfahren zum steigenden giessen in sandformen mit gerichteter erstarrung von gussteilen
JP4292224B2 (ja) 金型、鋳造品の製造方法
JP2009274098A (ja) 低圧鋳造用砂型及びそれを利用した低圧鋳造装置
JP2905939B2 (ja) 連続鋳造プラントの鋳型および鋳込みおよび冷却域
JP5663800B1 (ja) 迅速な凝固が可能な湯道及び鋳造方法
JP2016002551A (ja) 鋳造物品の製造方法
RU2656897C1 (ru) Литник для устройства для литья под низким давлением и устройство для литья под низким давлением, имеющее упомянутый литник
KR101840274B1 (ko) 스프루와 라이저가 일체화된 사형 주조용 사형 몰드
KR102186888B1 (ko) 주조 물품의 제조 방법, 주조 장치, 및 상기 주조 장치에 사용되는 송기 노즐
JP2015193016A (ja) 鋳造物品の製造方法
JP6583603B2 (ja) 鋳造物品の製造方法
JP2008229708A (ja) インゴット製造用鋳型及び伸線用インゴット製造装置
JP2017217695A (ja) 鋼の連続鋳造方法
JP2015024442A (ja) 鋳造物品の製造方法
JP2018164926A (ja) 通気性鋳型
KR101616747B1 (ko) 모합금 제조용 주형
KR20090116961A (ko) 실린더 블록 주조방법
CN204396840U (zh) 一种适合塑形翻砂的铁水注入包
JP2019181550A (ja) 送気加圧鋳造法用の通気性鋳型
JP2020157345A (ja) 通気性鋳型およびそれを用いた鋳造物品の製造方法
CN108145074A (zh) 铸造法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14883612

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2016505008

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 15121654

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 20167024369

Country of ref document: KR

Kind code of ref document: A

REEP Request for entry into the european phase

Ref document number: 2014883612

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2014883612

Country of ref document: EP