WO2015045337A1 - Dispositif de gestion de puissance, procédé de gestion de puissance et programme - Google Patents

Dispositif de gestion de puissance, procédé de gestion de puissance et programme Download PDF

Info

Publication number
WO2015045337A1
WO2015045337A1 PCT/JP2014/004798 JP2014004798W WO2015045337A1 WO 2015045337 A1 WO2015045337 A1 WO 2015045337A1 JP 2014004798 W JP2014004798 W JP 2014004798W WO 2015045337 A1 WO2015045337 A1 WO 2015045337A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
target period
information
storage facility
unit
Prior art date
Application number
PCT/JP2014/004798
Other languages
English (en)
Japanese (ja)
Inventor
徳永 吉彦
靖一 宮崎
尚弘 福田
博之 栗山
法正 大田
Original Assignee
パナソニックIpマネジメント株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニックIpマネジメント株式会社 filed Critical パナソニックIpマネジメント株式会社
Priority to EP14849053.5A priority Critical patent/EP3054551A4/fr
Priority to US15/025,444 priority patent/US10365677B2/en
Publication of WO2015045337A1 publication Critical patent/WO2015045337A1/fr

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05FSYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
    • G05F1/00Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
    • G05F1/66Regulating electric power
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/008Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/14Marketing, i.e. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards

Definitions

  • the present invention relates to a power management apparatus, a power management method, and a program, and more particularly, to a power management apparatus that manages power output from a power storage facility, a power management method used by the power management apparatus, and a program that implements the power management apparatus.
  • Document 1 describes a technique in which a reduction schedule for a plurality of consumers is generated using a power generation amount of a power generation device, a discharge amount of a power storage device, and the like so as to satisfy a power consumption reduction amount.
  • a power storage device that can supply power to an electric load at a consumer has a large cost at the time of introduction, and the size of the cost is one factor that hinders the spread of the power storage facility.
  • the technology described in Document 1 can provide a price for a demand response request, it cannot always provide sufficient motivation to promote the spread of power storage facilities.
  • an object of the present invention is to provide a power management apparatus that can provide motivation for promoting the use of power storage equipment, and further, a power management method used by the power management apparatus and a program for realizing the power management apparatus. It is to provide.
  • the power management apparatus predicts, as first power information, an acquisition unit that acquires DR information including a reduction value for requesting reduction of received power and a target period, and an electric load consumed by the electric load in the target period.
  • a target unit period a management unit that manages, as second power information, a power that can be output from a power supply facility including a power storage facility, and the first power information and the second power information.
  • a determination unit that determines that a condition for participating in a power trading market has been established when it is determined that the reduction value can be achieved.
  • the acquisition unit acquires DR information including a reduction value for requesting reduction of received power and a target period
  • the prediction unit uses the first power to calculate the power consumed by the electric load in the target period.
  • the determination unit determines that a condition for participating in the market for power trading is satisfied. It is characterized by.
  • the program according to the present invention causes a computer to function as any of the power management devices described above.
  • the present invention is not limited to a program, and may be a computer-readable storage medium storing the program.
  • the configuration of the present invention when a reduction in power received by a customer's building is requested, it is possible to use the power of the power storage facility for power reduction in the target period, and the end of the target period Occasionally, the electricity remaining in the storage facility can be bid on the electricity trading market. Therefore, while using power storage equipment to contribute to the reduction of received power based on DR information, power to be traded in the power trading market can be supplied from the power storage equipment, improving the profits brought to consumers by introducing power storage equipment There is an advantage of doing.
  • FIG. 1 is a block diagram illustrating a first embodiment. It is a figure which shows the example of a setting of the value of electricity transaction in Embodiment 1.
  • FIG. It is a figure which shows the example of a setting of the price in Embodiment 1.
  • 4A and 4B are diagrams illustrating examples of power transactions in the first embodiment.
  • FIG. 6 is a block diagram illustrating a second embodiment.
  • the power management apparatus 10 described below includes an acquisition unit 11, a prediction unit 12, a management unit 13, and a determination unit 14.
  • the acquisition unit 11 acquires DR (Demand Response) information including a reduction value for requesting reduction of received power and a target period.
  • the prediction unit 12 predicts the power consumed by the electrical load 2 during the target period as the first power information.
  • the management unit 13 manages power that can be output from the power supply facility 20 including the power storage facility 21 as second power information. If the determination unit 14 determines from the first power information and the second power information that the reduction value in the target period can be achieved, the determination unit 14 determines that the condition for participating in the power trading market is satisfied.
  • the management unit 13 is preferably configured to manage the remaining capacity of the power storage facility 21 as the second power information.
  • the determination unit 14 determines that the reduction value can be achieved in the target period
  • the power obtained by subtracting the power corresponding to the first power information from the power corresponding to the second power information is used in the power transaction. Desirable for bidding.
  • the management unit 13 may be configured to predict the remaining capacity of the power storage equipment 21 at the start of the target period as the second power information before the start of the target period.
  • the determination unit 14 predicts and obtains the remaining capacity of the power storage facility 21 at the end of the target period when the reduction value in the target period is achieved from the first power information and the second power information. And when the said remaining capacity exceeds a predetermined reference value, it is desirable for the judgment part 14 to make the electric power exceeding a reference value among the said 2nd electric power information into the object of a bid in an electric power transaction.
  • the power supply facility 20 generates power using natural energy, and supplies the generated power to the electric load 2 in preference to the power output from the power storage facility 21 (solar power generation facility). 22) is desirable.
  • the second power information managed by the management unit 13 includes power generated by the power generation facility in the target period.
  • the management unit 13 calculates the total of the remaining capacity of the power storage facility 21 at the start of the target period and the amount of power generated by the power generation facility (solar power generation facility 22) in the target period. It is desirable that the power information be managed as the second power information.
  • the determination unit 14 predicts and obtains the remaining capacity of the power storage facility 21 at the end of the target period when the reduction value in the target period is achieved from the first power information and the second power information. And when the said remaining capacity exceeds a predetermined reference value, it is desirable for the judgment part 14 to make the electric power which exceeds reference value among the said 2nd electric power information into the object of a bid in electric power transaction.
  • the power management method described below includes three steps.
  • the acquisition unit 11 acquires DR information including a reduction value for requesting reduction of received power and a target period.
  • the prediction unit 12 predicts the power consumed by the electrical load 2 in the target period as the first power information.
  • the determination unit 14 determines that the reduction value can be achieved in the target period by using the first power information, the determination unit 14 determines that the condition for participating in the power trading market is satisfied.
  • the program described below causes a computer to function as the power management apparatus 10 described above.
  • This program is provided through a telecommunication line such as the Internet, or is provided by a computer-readable storage medium.
  • the transaction apparatus 40 demonstrated below is constructed
  • the power management apparatus 10 includes a processor that operates according to a program as a main hardware element.
  • This type of processor may take any form such as a microcomputer integrated with a memory, a configuration independent of the memory, or a configuration in which a plurality of processors cooperate.
  • the power storage equipment 21 is provided in the customer's building 1 (installed in or around the building 1) as shown in FIG.
  • the power storage facility 21 includes a storage battery, and includes a power converter that charges and discharges the storage battery.
  • a photovoltaic power generation facility 22 including solar cells may be provided in or around the customer building 1.
  • the storage battery provided in the power storage facility 21 is charged with the power received from the power system 30.
  • the solar power generation facility 22 is provided in addition to the power storage facility 21, the storage battery provided in the power storage facility 21 is charged not only with the power received from the power system 30 but also with the power generated by the solar power generation facility 22. It is also done by.
  • the electric power output from the power storage facility 21 may be supplied to one or a plurality of electric loads 2 provided in or around the customer's building 1 and may be supplied to the electric power system 30.
  • the power generated by the solar power generation facility 22 is supplied to one or a plurality of electric loads 2 provided in or around the customer's building 1 and used for charging the power storage facility 21. In some cases, the power is supplied to the power system 30.
  • the power supply destination of the power storage facility 21 and the solar power generation facility 22 is determined by various conditions described below.
  • the power storage equipment 21 may be a portable type as well as a stationary type installed at a fixed position in the customer's building 1, and is further mounted on an electric vehicle (electric vehicle, plug-in hybrid vehicle, etc.).
  • working may be sufficient.
  • the power converter provided in the power storage facility 21 converts the DC power output from the storage battery into AC power equivalent to AC power received from the power system 30.
  • the power storage facility 21 may have a configuration including a large-capacity capacitor instead of a storage battery, a configuration in which electric power is converted into other energy and stored.
  • the solar power generation facility 22 can be replaced with a power generation facility that uses energy such as wind power, hydraulic power, and geothermal heat, as long as it converts natural energy into electric power.
  • Building 1 is assumed to be a hospital, hotel, factory, etc. Further, the building 1 is an apartment house, an office building, a commercial building, and the like, and even when a plurality of customer spaces exist in the building 1, when the power of the entire building can be handled collectively, the following description will be given. It is possible to apply the technology to For example, a distribution board may be arranged in the space of individual consumers, and a main distribution board that distributes power for the entire building may be arranged in an administrator room or an electrical room. Alternatively, when high-voltage collective power reception is performed in a building, a watt-hour meter for performing high-voltage collective power reception is installed as a metering device, so that the power received by the entire building can be measured.
  • a power aggregator that collectively handles the power of the power storage equipment 21 provided in each building 1 If there exists, the technique described below can be adopted.
  • the power capacity of the power storage facility 21 is 100 kWh or more, and the power storage facility 21 having a power capacity exceeding 1000 kWh is installed. In some cases. Similarly, when the power storage equipment 21 is shared in an area where a plurality of detached houses are gathered, it is possible to install a large capacity power storage equipment 21.
  • an electric power supplier that supplies power to the customer building 1 through the power system 30 collects one consumer building 1 in the collective.
  • a service provider that manages the building 1 of a plurality of consumers so that it can be handled as the building 1.
  • This type of service provider provides a service to a set of buildings 1 of a plurality of consumers as a substitute for an electric power company that performs a power generation business.
  • Such a service provider may be a demand response provider including a power aggregator, for example.
  • electric power companies can be selected from wholesalers, specified electric power companies, specific electric power companies, etc. It may be a service provider who purchases and sells to consumers.
  • the power capacity of the power storage facility 21 is about 1 to 10 kWh.
  • the power capacity of the power storage facility 21 is about 1 to 10 kWh.
  • FIG. 1 a plurality of electrical loads 2 (two in FIG. 1) that consume power and a power storage facility that enables power supply to an electric power system 30 in a building 1 of a consumer.
  • a distribution board 32 is installed in the customer's building 1, and a power system 30, a power storage facility 21, and a plurality of electrical loads 2 are connected to the distribution board 32.
  • the distribution board 32 forms a main circuit (not shown) that receives power from the power system 30 and a branch circuit (not shown) branched from the main circuit into a plurality of systems. That is, the distribution board 32 forms a branch circuit by branching the electric circuit so as to supply the electric power received from the power system 30 to the electric loads 2 of a plurality of systems, and protects against an abnormal current for each branch circuit.
  • the control unit 16 controls the charging and discharging periods and power of the storage battery included in the storage facility 21.
  • the storage battery included in the power storage facility 21 is charged with the power received from the power system 30.
  • the power storage facility 21 has a function of measuring the remaining capacity (power storage amount) of a storage battery (not shown) provided in the power storage facility 21.
  • the remaining capacity of the storage battery does not need to be measured in real time, and at least the remaining capacity at the time when charging or discharging of the storage battery is started can be measured. Further, it is better if the remaining capacity when charging or discharging is completed can be measured.
  • the supply destination of the electric power output from the power storage facility 21 is selected by the control unit 16 switching a switch (not shown) built in the distribution board 32. That is, the switch is controlled by the control unit 16 to be in a first state in which power is supplied from the power storage facility 21 to the electric load 2 and a second state in which power is supplied from the power storage facility 21 to the power system 30. Select one of them.
  • the control unit 16 selects the first state, at least a part of the power required by the electric load 2 in the building 1 is satisfied by the power of the power storage facility 21, and the power received from the power system 30 is reduced.
  • the control unit 16 selects the second state, a reverse power flow to the power system 30 is performed.
  • the distribution board 32 is provided with a measuring device 31 for measuring the power passing through the main circuit and the branch circuits of a plurality of systems.
  • the weighing device 31 is housed in a housing of the distribution board 32 or in a housing separate from the distribution board 32.
  • the value of the power that has passed through the main circuit may be a value measured by a watt hour meter (power meter) installed in the building 1.
  • the value of the power passing through each branch circuit may be a value measured by a measurement unit provided separately from the distribution board 32.
  • the power received from the power system 30 and the power flowing backward to the power system 30 are individually measured.
  • the weighing device 31 calculates power using a current sensor (not shown) that measures a current passing through the circuit of interest, a voltage value between lines of the circuit of interest, and a current value measured by the current sensor. It is desirable that the electronic wattmeter is provided with a section (not shown). Note that the measuring device 31 of the present embodiment may not be able to measure the power that has passed for each branch circuit, and may only be able to measure the total power consumed by at least the plurality of electric loads 2.
  • the power management apparatus 10 defines the necessary conditions for consumers to sell power in the power trading market. This necessary condition is determined using DR information for an electric power company to request the customer to adjust the received power.
  • the DR information means information including a reduction value that is a target value for reduction of received power and a target period for requesting reduction of received power.
  • DR information is usually notified to the customer before the start of the target period. That is, DR information is registered in a management device (for example, a web server) operated by an electric power provider on the day before the target period or in the morning of that day. It is desirable that the management device notifies the power management device 10 of the DR information by push type information distribution through the telecommunication line NT such as the Internet or a mobile telephone network.
  • the DR information registered in the management device in this way is notified to the power management device 10 of the consumer who is requesting a reduction in received power by the electric power company, and the acquisition unit 11 acquires this DR information.
  • the target period starts immediately after the DR information is notified to the power management apparatus 10.
  • the target period starts without prior notice.
  • the DR information may be received by a person through a telephone or electronic mail and given to the acquisition unit 11.
  • the acquisition unit 11 may receive the DR information notified by the management device through a telephone or electronic mail on behalf of a person.
  • the condition that the electrical load 2 receives power from the power storage facility 21 in the target period, and the power that is sold when executed in the power trading market is the power stored in the power storage facility 21.
  • the condition that it exists is defined.
  • the power consumed by the electrical load 2 during the target period is predicted by the prediction unit 12 as first power information.
  • the first power information may be a transition of power in the target period, but it is not easy to predict a change in power over time in the target period.
  • the amount of power consumed by the electrical load 2 during the target period is used as the first power information.
  • the management unit 13 manages the power that can be output from the power storage facility 21 as the second power information.
  • the second power information for example, the remaining capacity of the power storage facility 21 at the date and time when the acquisition unit 11 acquires the DR information is used.
  • the second power information may be the remaining capacity of the power storage facility 21 at the start of the target period.
  • the management part 13 grasps
  • the prediction unit 12 stores the history information that stores the transition of the power consumption due to the electric load 2 in the customer's building 1 together with the conditions that affect the power consumption in order to predict the first power information, and the prediction The value of the power consumed at the time of performing is used.
  • Conditions that affect power consumption include at least the date and time (season and time zone), and it is more desirable if it includes the distinction between weekdays and holidays, weather conditions (weather, temperature, etc.), and the like. Information corresponding to these conditions can be easily obtained through a clock unit (not shown) built in the power management apparatus 10 or a telecommunication line.
  • the prediction unit 12 stores history information related to power consumption by the electric load 2 together with the above-described conditions. Then, when the acquisition unit 11 acquires the DR information, the prediction unit 12 extracts a condition similar to the condition of the target period included in the DR information from the history information, and is consumed in the target period based on the extracted history information. Predict the amount of power. In short, if the conditions are similar, the amount of power in the target period is predicted based on the prediction that the amount of power consumed by the electric load 2 is also similar. When other information useful for predicting the amount of power consumed in the target period is obtained, the accuracy of the prediction can be increased by using the information.
  • the management unit 13 predicts the remaining capacity of the power storage facility 21 at the start of the target period. That is, when the acquisition unit 11 acquires the DR information, the management unit 13 creates a plan for charging and discharging the power storage facility 21 in a period from the acquisition point of the DR information to the start point of the target period. Furthermore, the management unit 13 predicts the remaining capacity of the power storage facility 21 at the start of the target period based on this plan.
  • the plan for charging and discharging the power storage equipment 21 varies depending on the purpose of use of the power storage equipment 21.
  • the power storage equipment 21 is used for purposes such as saving electricity charges, leveling the power used, and suppressing the maximum value of power used. Therefore, the management unit 13 makes a plan for charging and discharging in consideration of the purpose of use of the power storage equipment 21 expected by the consumer and the usage status of the electrical load 2 at the consumer.
  • the management unit 13 can estimate the amount of power that can be charged from the time when the DR information is acquired until the start of the target period.
  • the reduction point of power in the target period is taken into consideration, and the end point of the target period. It is possible to estimate the remaining capacity of the power storage equipment 21 at.
  • the reduction value is often given as a reduction rate of the amount of power in the target period, but may be given as a reduction amount of the power amount in the target period for each consumer.
  • the determination unit 14 determines whether or not the reduction value can be achieved from the first power information, the second power information, and the reduction value included in the DR information. For example, when the determination unit 14 defines a reference value for the remaining capacity of the power storage facility 21 and the remaining capacity (predicted remaining capacity) of the power storage facility 21 at the end of the target period is predicted to be greater than or equal to the reference value, It is determined that the reduction value included in the DR information can be achieved. And when the judgment part 14 judges that the reduction value in an object period can be achieved, it will judge that the conditions which participate in the market of electric power trading were materialized.
  • the determination unit 14 uses the power stored in the power storage facility 21 when the condition for participating in the market is satisfied. Bid on the market. That is, the power obtained by removing the power corresponding to the first power information predicted by the prediction unit 12 from the power corresponding to the second power information managed by the management unit 13 is set as a bid target in the power transaction. .
  • ⁇ Determining unit 14 communicates with transaction device 40, which will be described later, through telecommunication line NT, and bids on the power transaction market.
  • the amount of power for bidding is the reference value of the remaining capacity (predicted remaining capacity) of the power storage facility 21 at the end of the target period.
  • the upper limit is the amount of electric power that exceeds.
  • the reference value is set in preparation for prediction errors of the prediction unit 12 and the management unit 13, and the remaining capacity (predicted remaining capacity) of the power storage equipment 21 at the end of the target period is a margin (margin) for the reference value. Will have.
  • the power stored in the power storage facility 21 can be sold in the power trading market, it can be used for a part of the cost required for the introduction of the power storage facility 21. Therefore, the introduction cost of the power storage facility 21 is substantially reduced, and the customer is motivated to introduce the power storage facility 21. Moreover, since the financial incentive may be received by achieving the reduction value in the DR information, this is also an incentive when the customer introduces the power storage equipment 21.
  • the determining unit 14 determines that participation in the power trading market is impossible.
  • the remaining capacity (predicted remaining capacity) of the power storage equipment 21 matches the reference value at the end of the target period, it is possible to supply power to the electric load 2 during the target period.
  • the remaining capacity (predicted remaining capacity) of the power storage equipment 21 is lower than the reference value at the end of the target period, there is a possibility that the power for achieving the reduction value in the target period is insufficient.
  • the determination unit 14 prohibits power supply from the power storage facility 21 to the electrical load 2 in the target period. It is desirable to limit the type or operation of the electrical load 2 fed from the power storage facility 21.
  • the electrical load 2 that can be fed from the power storage facility 21 during the target period may be determined in advance according to the importance or priority of the electrical load 2. In this case, it is desirable that the prediction unit 12 predicts the amount of power consumed by the electrical load 2 on the assumption that the type or operation of the electrical load 2 to be fed during the target period is limited.
  • the degree of restriction may be set in a plurality of stages.
  • the determination unit 14 When participating in the power trading market and further contracting with the power trading, the determination unit 14 sets the second state (that is, the state in which power is supplied from the power storage facility 21 to the power system 30) to the control unit 16. Instruct to select. In this way, the determination unit 14 communicates with the transaction device 40 to participate in the power transaction market and instruct the control unit 16 to select the second state if contracted by the power transaction. Then, the power of the power storage facility 21 is supplied to the power system 30.
  • the second state that is, the state in which power is supplied from the power storage facility 21 to the power system 30
  • the power transaction is not executed, for example, when the transaction conditions do not match or when the transaction conditions by other sellers are advantageous to the buyer. In some cases.
  • the determination unit 14 does not supply power from the power storage facility 21 to the power system 30, and supplies the power of the power storage facility 21 to the electric load 2 as necessary. Instruct. That is, the determination unit 14 instructs the control unit 16 to select the second state when the power transaction is executed, and instructs the control unit 16 to select the first state if the power transaction is not established. .
  • the judgment unit 14 to bid on the power trading market with respect to the target period T1, as indicated by x1 to x4 in FIG.
  • the target period T1 may be before or after the period for executing the power transaction, and may partially or entirely overlap with the period for executing the power transaction.
  • the timing x1 is set to a period from the time t0 when the DR information is acquired to the start time t1 of the target period T1
  • the timing x2 is the start time t1 of the target period T1
  • the timing x3 is within the target period T1. Is set.
  • the management unit 13 predicts the remaining capacity of the power storage facility 21 at the end of the target period T1 based on the remaining capacity delivered from the power storage facility 21.
  • the determination unit 14 can predict the remaining capacity of the power storage facility 21 at the end of the target period T1 as long as it is from the acquisition of DR information to the end of the target period T1. Therefore, the determination unit 14 always uses the power stored in the power storage facility 21 as long as the condition can be predicted to be satisfied at the end time t2 in the period from the time t0 when the DR information is acquired to the end time t2 of the target period T1. To be able to participate in the electricity trading market.
  • a power transaction is established when there is a buyer of power and there is a seller who can meet the buyer's request. Power trading is solicited by buyers and sellers of power indicating the terms of the transaction.
  • a device for managing the market of power transactions is a transaction device 40.
  • a buyer and a seller's terminal device indicate transaction conditions to the transaction device 40 through a telecommunication line NT such as the Internet, and a power transaction is performed.
  • the transaction device 40 searches for an equilibrium point between supply and demand from the transaction condition indicated by the buyer and the transaction condition indicated by the seller, and when the equilibrium point is obtained, establishes (contracts) an electric power transaction and does not obtain the equilibrium point. In this case, the power transaction is not established.
  • the transaction conditions include an implementation period of electric power exchange, electric power (or electric energy) in the implementation period, and electric power price (unit price or total amount).
  • the transaction device 40 notifies the buyer and seller terminal devices of the result of the power transaction, and when the power transaction is contracted, also notifies the terminal device of the contracted transaction conditions.
  • the power management apparatus 10 corresponds to a terminal device.
  • the power seller and the buyer each present a plurality of stages of transaction conditions.
  • the implementation period of the transaction conditions if there is at least some overlap between the transaction conditions indicated by the buyer and the transaction conditions indicated by the seller, electric power transactions are possible. That is, if the implementation period provided by the seller overlaps with the implementation period requested by the buyer, power trading is possible.
  • the power and price in the transaction conditions both the seller and the buyer each indicate a plurality of types of combinations.
  • the transaction device 40 sets a point where the prices match between the seller's transaction condition and the buyer's transaction condition as an equilibrium point.
  • the transaction apparatus 40 can find an equilibrium point.
  • FIG. 3 shows the relationship between the amount of electric power that can be purchased per hour and the unit price for the power buyer in FIG. 4A, and the amount of electric power that can be sold per hour and the unit price for the power seller in FIG. 4B. Assume a relationship.
  • the power buyer can purchase 28,000 kWh if the unit price is 7.00 yen or less, and the unit price is more than 8.50 yen and 9.00 yen or less. 5,000 kWh can be purchased. The power buyer gives up purchasing power when the unit price exceeds 9.00 yen.
  • the electricity seller can sell up to 7,000 kWh if the unit price is over 7.00 yen and below 7.20 yen, and can be sold up to 25,000 kWh if the unit price exceeds 9.00 yen. is there. The power seller does not sell the power if the unit price is 7.00 yen or less.
  • the graph representing the buyer is referred to as a demand line L1
  • the graph representing the seller is referred to as a supply line L2.
  • the point (equilibrium) where the amount of power required by the buyer and the amount of transaction power that can be supplied by the seller is represented by the intersection P1 between the demand line L1 and the supply line L2. That is, in the relationship shown in FIG. 3, the contracted electric energy is 12,000 kWh per hour, and the unit price per kWh at this time is 8.10 yen.
  • the transaction device 40 when an equilibrium point is obtained between the seller and the buyer, the transaction device 40 notifies the seller and the buyer that the transaction has been executed together with the established condition.
  • the shortage is procured separately.
  • the contracted amount of electricity is 12,000 kWh per hour and the buyer needs 13,000 kWh per hour, there is a shortage of 1000 kWh, so this shortage is procured separately.
  • the above-mentioned transaction example is an example, and it is assumed that there are actually a larger number of participants. Therefore, there is a possibility that the number of combinations that make a promise is enormous. Therefore, it is desirable to extract an appropriate combination by an algorithm that can obtain a relatively good solution in a finite time, such as a stochastic algorithm or a genetic algorithm.
  • the demand line L1 and the supply line L2 are both expressed as discontinuous lines by a combination of straight lines, but may be expressed as smoothly continuous curves.
  • the relationship between the demand line L1 and the supply line L2 is variously set according to the environmental conditions of the buyer and the seller.
  • the environmental conditions here mean the financial power of the buyer or seller, the urgency of power demand, and the like.
  • the acquisition unit 11, the prediction unit 12, the management unit 13, and the control unit 16 can be provided in the building 1, and what is the building 1 except for the control unit 16? It is also possible to provide it separately.
  • the power management apparatus 10 may be realized using a web server or a cloud computer system.
  • a communication interface unit in the building 1 in order to hand over the remaining capacity of the storage battery weighed by the power storage facility 21 to the management unit 13 and to hand over the measured power value of the weighing device 31 to the prediction unit 12. Further, it is desirable to provide a communication interface unit in the building 1 in order to notify the control unit 16 whether or not the determination unit 14 has been executed.
  • the building 1 can enjoy the service provided by the transaction apparatus 40 without providing the acquisition unit 11, the prediction unit 12, the management unit 13, and the determination unit 14 in the building 1. It becomes possible to do.
  • the power storage facility 21 is assumed to be installed in the building 1, but the storage battery of the power storage facility 21 may be a storage battery mounted on an electric vehicle. In order to finally determine whether to supply power to the electrical load 2 from the power storage facility 21 or to supply power to the power system 30, other conditions may be considered.
  • the present embodiment illustrates a case where a photovoltaic power generation facility 22 is installed in the building 1 as the power supply facility 20 in addition to the power storage facility 21.
  • the solar power generation equipment 22 does not need to consider charging unlike the power storage equipment 21.
  • the power generated by the solar power generation facility 22 is not constant, and the power that can be output is the intensity of light incident on the solar cells constituting the solar power generation facility 22, the incident angle of light, the wavelength component, and the temperature. It changes every moment depending on etc.
  • the photovoltaic power generation facility 22 is configured not to output a constant voltage, but so that the output voltage follows the line voltage of the electric circuit connected to the photovoltaic power generation facility 22. That is, when the power generated by the solar power generation facility 22 varies while receiving power from the power system 30, the voltage output from the solar power generation facility 22 is maintained at the voltage of the power system 30, and the current is power. It fluctuates following the fluctuation of
  • the electric power generated by the solar power generation facility 22 is predicted according to the weather, temperature, and the like.
  • the management unit 13 of this embodiment has a function of predicting the power generated by the solar power generation facility 22.
  • the management unit 13 has a function of acquiring the power generated by the solar power generation facility 22 from a sensor (not shown) that monitors current and voltage in the same manner as the weighing device 31 and storing the acquired power transition together with the date and time. Since the information stored by the management unit 13 is used to predict the amount of power generated by the solar power generation facility 22, other conditions that contribute to the amount of power generated by the solar power generation facility 22 are stored in addition to the date and time. It is desirable. Such conditions include sunshine, temperature, season, etc.
  • the management unit 13 determines the amount of power generated by the photovoltaic power generation facility 22 during the target period based on the stored past power transition (history) and information such as weather forecasts (particularly weather and temperature). Predict. The amount of power predicted by the management unit 13 is used when the remaining capacity of the power storage facility 21 is predicted. Here, the management unit 13 adds a condition that the power generated by the photovoltaic power generation facility 22 is supplied to the electric load 2 in preference to the power output from the power storage facility 21 during the target period. The remaining capacity of the power storage equipment 21 at the end time is predicted.
  • the electric power generated by the solar power generation facility 22 is supplied to the electric load 2, and the amount of power generated by the solar power generation facility 22 relative to the amount of power required by the electric load 2.
  • the condition that the power storage facility 21 supplies power to the electric load 2 is set when the power is insufficient. Under this condition, the management unit 13 predicts the remaining capacity of the power storage facility 21 at the end of the target period. With this configuration, the remaining capacity of the power storage facility 21 at the end of the target period is more likely to increase than the configuration of the first embodiment.
  • the management unit 13 adds the remaining capacity of the power storage facility 21 at the start of the target period and the amount of power generated by the solar power generation facility 22 in the target period before the start of the target period. Is managed as the second power information. Therefore, the determination unit 14 predicts and obtains the remaining capacity of the power storage facility 21 at the end of the target period when the reduction value in the target period is achieved from the first power information and the second power information. become.
  • the opportunity to participate in the power trading market increases, and the amount of power that can be bid in the power trading also increases.
  • the value obtained by the power transaction increases, and it becomes possible to shorten the collection period of the expenses caused by the introduction of the power storage facility 21 and the solar power generation facility 22. If the amount of power generated by the solar power generation facility 22 during the target period is greater than the amount of power required by the electrical load 2 and the power storage facility 21 is not fully charged, the amount of power generated by the solar power generation facility 22 It is possible to use the surplus for charging the power storage equipment 21. In this case, the remaining capacity of the power storage facility 21 at the end of the target period further increases.
  • whether or not to participate in the power trading market is determined based on the remaining capacity of the power storage equipment 21 on the assumption that the reduction value indicated by the DR information is achieved. .
  • the operation that achieves the reduction value of the DR information in the target period is set as the first operation mode
  • the operation that bids the power corresponding to the second power information in the target period in the power trading market is the second operation mode.
  • the selection unit 15 provided in the power management apparatus 10 selects either the first operation mode or the second operation mode.
  • the selection unit 15 compares the profit when the first operation mode is selected (first profit) and the profit when the second operation mode is selected (second profit), and the profit is larger. Select an action.
  • the first profit is a profit that is expected to be obtained when bidding on the power trading market in response to the DR information as described above, and the first profit includes the electric business with respect to the implementation of the DR information.
  • a monetary incentive given to a consumer by a person may be included.
  • the power storage facility 21 is not used for reducing the power received by the customer building 1 in the target period, and is sold to the power trading market except for the power consumed by the electric load 2.
  • the selection unit 15 compares the obtained first profit and the second profit, and selects an operation mode having a larger profit from the first operation mode and the second operation mode. Revenue when bidding on the electricity trading market is not completely predictable, but the expected value calculated in consideration of conditions such as when the deal is executed or not, when the purchase price is high or low is used. That's fine.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Automation & Control Theory (AREA)
  • Game Theory and Decision Science (AREA)
  • Power Engineering (AREA)
  • Data Mining & Analysis (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Electromagnetism (AREA)
  • Human Resources & Organizations (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • General Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Primary Health Care (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

Le but de la présente invention est de rendre possible le fait de donner une incitation pour promouvoir l'utilisation d'une installation de stockage d'électricité. Un dispositif de gestion de puissance (10) comprend une unité d'acquisition (11), une unité d'estimation (12), une unité de gestion (13) et une unité de détermination (14). L'unité d'acquisition (11) acquiert des informations DR comprenant une valeur de réduction et une période cible qui sont requises pour réduire la puissance reçue. L'unité d'estimation (12) estime, en tant que premières informations de puissance, la puissance consommée par des charges électriques (2) durant la période cible. L'unité de gestion (13) gère, en tant que secondes informations de puissance, la puissance qui peut être délivrée par une installation d'alimentation électrique (20) comprenant une installation de stockage d'électricité (21). Lorsqu'il a été déterminé à partir des premières et secondes informations de puissance que la valeur de réduction durant la période cible peut être obtenue, l'unité de détermination (14) détermine qu'une condition pour participer à un marché de transaction de puissance a été satisfaite.
PCT/JP2014/004798 2013-09-30 2014-09-18 Dispositif de gestion de puissance, procédé de gestion de puissance et programme WO2015045337A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP14849053.5A EP3054551A4 (fr) 2013-09-30 2014-09-18 Dispositif de gestion de puissance, procédé de gestion de puissance et programme
US15/025,444 US10365677B2 (en) 2013-09-30 2014-09-18 Power management system, power management method, and computer program

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013205076A JP6160957B2 (ja) 2013-09-30 2013-09-30 電力管理装置、電力管理方法、プログラム
JP2013-205076 2013-09-30

Publications (1)

Publication Number Publication Date
WO2015045337A1 true WO2015045337A1 (fr) 2015-04-02

Family

ID=52742509

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/004798 WO2015045337A1 (fr) 2013-09-30 2014-09-18 Dispositif de gestion de puissance, procédé de gestion de puissance et programme

Country Status (4)

Country Link
US (1) US10365677B2 (fr)
EP (1) EP3054551A4 (fr)
JP (1) JP6160957B2 (fr)
WO (1) WO2015045337A1 (fr)

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9960637B2 (en) * 2015-07-04 2018-05-01 Sunverge Energy, Inc. Renewable energy integrated storage and generation systems, apparatus, and methods with cloud distributed energy management services
US10444806B2 (en) * 2015-09-24 2019-10-15 Causam Energy, Inc. Systems and methods for aggregation and integration of distributed grid elements inputs for providing an interactive electric power grid geographic visualization
JP2017153274A (ja) * 2016-02-25 2017-08-31 オムロン株式会社 電力取引マッチングシステム、電力取引マッチング方法および電力取引マッチングプログラム
JP6642291B2 (ja) * 2016-06-15 2020-02-05 住友電気工業株式会社 成功確率算出装置、成功確率算出方法および成功確率算出プログラム
WO2018031798A1 (fr) * 2016-08-11 2018-02-15 Iteros, Inc. Partage de puissance dans un système d'énergie maillé
US11061424B2 (en) 2017-01-12 2021-07-13 Johnson Controls Technology Company Building energy storage system with peak load contribution and stochastic cost optimization
US11010846B2 (en) 2017-01-12 2021-05-18 Johnson Controls Technology Company Building energy storage system with multiple demand charge cost optimization
US11238547B2 (en) 2017-01-12 2022-02-01 Johnson Controls Tyco IP Holdings LLP Building energy cost optimization system with asset sizing
US10324483B2 (en) 2017-01-12 2019-06-18 Johnson Controls Technology Company Building energy storage system with peak load contribution cost optimization
US10282796B2 (en) 2017-01-12 2019-05-07 Johnson Controls Technology Company Building energy storage system with multiple demand charge cost optimization
US10949777B2 (en) * 2017-06-07 2021-03-16 Johnson Controls Technology Company Building energy optimization system with economic load demand response (ELDR) optimization
US11847617B2 (en) 2017-02-07 2023-12-19 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with financial analysis functionality
US11900287B2 (en) 2017-05-25 2024-02-13 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with budgetary constraints
JP2018166361A (ja) * 2017-03-28 2018-10-25 東芝ライテック株式会社 情報処理装置および蓄電制御システム
US11416955B2 (en) 2017-05-25 2022-08-16 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with integrated measurement and verification functionality
US11409274B2 (en) 2017-05-25 2022-08-09 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system for performing maintenance as soon as economically viable
US11120411B2 (en) 2017-05-25 2021-09-14 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with incentive incorporation
EP4421695A2 (fr) 2017-05-25 2024-08-28 Johnson Controls Tyco IP Holdings LLP Système de maintenance prédictive de modèle pour équipement de construction
US11747800B2 (en) 2017-05-25 2023-09-05 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with automatic service work order generation
US11636429B2 (en) 2017-05-25 2023-04-25 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance systems and methods with automatic parts resupply
US11022947B2 (en) 2017-06-07 2021-06-01 Johnson Controls Technology Company Building energy optimization system with economic load demand response (ELDR) optimization and ELDR user interfaces
US10732584B2 (en) 2017-06-07 2020-08-04 Johnson Controls Technology Company Building energy optimization system with automated and dynamic economic load demand response (ELDR) optimization
JP6414870B1 (ja) * 2018-04-18 2018-10-31 松尾建設株式会社 逆潮流防止型自家消費用再エネ発電蓄電制御装置
JP7091277B2 (ja) * 2019-03-28 2022-06-27 Kddi株式会社 約定価格決定装置及び約定価格決定方法
US11480360B2 (en) 2019-08-06 2022-10-25 Johnson Controls Tyco IP Holdings LLP Building HVAC system with modular cascaded model
JP7470551B2 (ja) * 2020-03-27 2024-04-18 本田技研工業株式会社 入札管理装置
KR102542282B1 (ko) * 2022-06-27 2023-06-13 주식회사 해줌 신재생에너지 발전을 이용한 수요반응 관리 시스템 및 방법

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002369385A (ja) * 2001-06-06 2002-12-20 Toshiba Eng Co Ltd 電力送電管理システム、電力受電管理システムおよび電力送受電管理システム
JP2011234570A (ja) * 2010-04-28 2011-11-17 Toshiba Corp 消費電力管理装置および消費電力管理方法
JP2012165513A (ja) 2011-02-04 2012-08-30 Toshiba Corp エネルギー管理システムおよびエネルギー管理方法

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7274975B2 (en) * 2005-06-06 2007-09-25 Gridpoint, Inc. Optimized energy management system
US20100005730A1 (en) * 2008-07-11 2010-01-14 Kuo Liang Weng Building energy storage and conversion apparatus
US8406933B2 (en) * 2009-08-18 2013-03-26 Control4 Corporation Systems and methods for estimating the effects of a request to change power usage
JP5807171B2 (ja) * 2009-09-30 2015-11-10 パナソニックIpマネジメント株式会社 エネルギーマネジメントシステムおよび給電制御装置
JP2011101534A (ja) * 2009-11-06 2011-05-19 Panasonic Electric Works Co Ltd 電力融通システム
KR101097259B1 (ko) * 2009-12-11 2011-12-21 삼성에스디아이 주식회사 전력 저장을 위한 장치 및 제어 방법
EP2348596B1 (fr) * 2010-01-25 2021-09-08 Accenture Global Services Limited Statistiques pour la consommation d'énergie de consommateurs
US20120136496A1 (en) 2010-11-30 2012-05-31 General Electric Company System and method for estimating demand response in electric power systems
US20120179596A1 (en) * 2011-01-11 2012-07-12 Kenji Mitsumoto Power reserve margin trading system and power reserve margin trading method
JP5487125B2 (ja) 2011-01-11 2014-05-07 株式会社東芝 電力需給調整予備力取引システムおよび電力需給調整予備力取引方法
JP5662877B2 (ja) * 2011-06-03 2015-02-04 ルネサスエレクトロニクス株式会社 蓄電池システム
JP2013025359A (ja) * 2011-07-15 2013-02-04 Sony Corp 電力制御装置、電力管理装置、電力制御方法および電力管理システム
JP5726691B2 (ja) 2011-09-15 2015-06-03 株式会社東芝 家庭用エネルギー管理装置及び家庭用エネルギー管理システム
EP2763269B1 (fr) * 2011-09-28 2018-01-24 Kyocera Corporation Système de commande d'énergie, dispositif de commande d'énergie et procédé de commande d'énergie
WO2013088584A1 (fr) * 2011-12-14 2013-06-20 京セラ株式会社 Terminal d'affichage, système de commande d'énergie et procédé d'affichage
KR20130094925A (ko) * 2012-02-17 2013-08-27 한국전자통신연구원 에너지관리시스템의 에너지 제어 방법
JP5138110B1 (ja) 2012-05-24 2013-02-06 キャリアシステム株式会社 太陽光発電システム
US9595070B2 (en) * 2013-03-15 2017-03-14 Google Inc. Systems, apparatus and methods for managing demand-response programs and events

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002369385A (ja) * 2001-06-06 2002-12-20 Toshiba Eng Co Ltd 電力送電管理システム、電力受電管理システムおよび電力送受電管理システム
JP2011234570A (ja) * 2010-04-28 2011-11-17 Toshiba Corp 消費電力管理装置および消費電力管理方法
JP2012165513A (ja) 2011-02-04 2012-08-30 Toshiba Corp エネルギー管理システムおよびエネルギー管理方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3054551A4

Also Published As

Publication number Publication date
JP6160957B2 (ja) 2017-07-12
US10365677B2 (en) 2019-07-30
US20160216722A1 (en) 2016-07-28
EP3054551A4 (fr) 2016-09-07
JP2015070744A (ja) 2015-04-13
EP3054551A1 (fr) 2016-08-10

Similar Documents

Publication Publication Date Title
JP6160957B2 (ja) 電力管理装置、電力管理方法、プログラム
JP6268633B2 (ja) 電力管理装置、電力管理方法、プログラム
JP6512503B2 (ja) 電力調整装置、電力調整方法、プログラム
JP6233686B2 (ja) 電力調整装置、プログラム
JP6226282B2 (ja) 電力調整装置、電力調整方法、プログラム
JP2013025359A (ja) 電力制御装置、電力管理装置、電力制御方法および電力管理システム
JP2006158189A (ja) 電力取引と分散電源を組み合わせたコスト最小化電力管理システム
JP2007295650A (ja) 仮想電力貯蔵二次電池を用いた集合住宅戸別の電力管理システム、電力料金課金方法
WO2014136352A1 (fr) Système et procédé de gestion d'énergie, programme et serveur
JP6384502B2 (ja) 売電タイミング最適制御システム、売電タイミング最適制御方法および売電タイミング最適制御プログラム
JP4799517B2 (ja) 電力供給サービス提供システム
JPWO2019182016A1 (ja) 電力情報管理システム、管理方法、プログラム、電力情報管理サーバ、通信端末、及び、電力システム
JP6698371B2 (ja) 電気料金管理装置、電気料金管理方法及びプログラム
JP2021096872A (ja) 電力供給システム及び、電力管理方法
JP2021040403A (ja) 電力供給システム及び、電気料金の管理方法
JP6626359B2 (ja) 電力関連情報提示装置、電気関連情報提示方法及びプログラム
JP2018169860A (ja) 電力供給システム及び電力料金算出装置
WO2020012835A1 (fr) Système et procédé de commande
JP6447536B2 (ja) 逆潮流管理装置、逆潮流管理システム、逆潮流管理方法、および逆潮流管理プログラム
JP2005333751A (ja) 電力供給システム及び電力供給方法
JP2017163746A (ja) 電力供給システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14849053

Country of ref document: EP

Kind code of ref document: A1

REEP Request for entry into the european phase

Ref document number: 2014849053

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2014849053

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 15025444

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE