WO2014184870A1 - 負荷制御装置、負荷制御方法、及びプログラム - Google Patents

負荷制御装置、負荷制御方法、及びプログラム Download PDF

Info

Publication number
WO2014184870A1
WO2014184870A1 PCT/JP2013/063429 JP2013063429W WO2014184870A1 WO 2014184870 A1 WO2014184870 A1 WO 2014184870A1 JP 2013063429 W JP2013063429 W JP 2013063429W WO 2014184870 A1 WO2014184870 A1 WO 2014184870A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
load
load device
power
power failure
Prior art date
Application number
PCT/JP2013/063429
Other languages
English (en)
French (fr)
Inventor
忠昭 坂本
矢部 正明
聡司 峯澤
雄喜 小川
一郎 丸山
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to PCT/JP2013/063429 priority Critical patent/WO2014184870A1/ja
Priority to JP2015516793A priority patent/JP6091609B2/ja
Publication of WO2014184870A1 publication Critical patent/WO2014184870A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/062Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for AC powered loads

Definitions

  • the present invention relates to a load control device, a load control method, and a program.
  • Patent Document 1 discloses a demand-side management system that controls power supply to an electrical product so that as many electrical products as possible can operate when power is supplied using a storage battery.
  • Patent Document 2 discloses a power supply management device that controls the power consumption level of a load device in accordance with the power generation amount of a solar cell and the charge level of a power storage device.
  • the power source may be switched from external power to internal power.
  • many load devices stop operating, but even if the supply of internal power is started, it does not start or starts in a state different from the state before the power failure occurred. In this case, the user feels significant inconvenience / discomfort.
  • the present invention has been made in view of such problems, and provides a load control device, a load control method, and a program that can maintain the operation state of the load device with high convenience even when a power failure occurs. With the goal.
  • the load control device of the present invention is a load control device that controls a load device connected to a power supply system that can supply power to the load device using power supplied from the power supply device even after a power failure occurs.
  • the load control device controls the load device based on the past information after detecting the occurrence of the power failure, the power failure detection unit for detecting the occurrence of the power failure, the past information obtaining unit for obtaining the past information indicating the past operation state of the load device. Operation control means.
  • the operating state of the load device can be maintained with high convenience.
  • FIG. 3 is a flowchart for illustrating a load control process according to the first embodiment. It is a flowchart for demonstrating an operation state selection process.
  • 10 is a flowchart for illustrating a load control process according to the second embodiment.
  • 10 is a flowchart for illustrating a load control process according to the third embodiment.
  • the load control device 100 is a device for controlling the load device 400 connected to the power supply system 200.
  • the load device 400 is an electric device such as an air conditioner, a refrigerator, or lighting.
  • the load control device 100 can control the load device 400 by receiving the operating state of the load device 400 and transmitting control information.
  • the load device 400 to be controlled by the load control device 100 may not necessarily be all load devices in the house. For example, it is possible to control only main load devices in a house that consume a certain amount of power.
  • the power supply system 200 is a home power distribution system such as a single-phase three-wire power supply.
  • the power supply system 200 includes a switchboard 210 as shown in FIG.
  • the switchboard 210 distributes power supplied from the outside (hereinafter referred to as “external power”) to the load device 400 in the house.
  • a power storage device 300 is connected to the switchboard 210.
  • the power storage device 300 includes a secondary battery such as a lithium ion battery. When the external power is stopped, switchboard 210 supplies power to load device 400 using the power supplied from power storage device 300.
  • Measured device 500 for measuring external power is connected to the power line near the power line inlet.
  • the measuring device 500 includes an ammeter, a voltmeter, and the like.
  • the measuring device 500 measures the current and voltage flowing through the power line and the power consumed in the entire house, and transmits the measurement result to the load control device 100.
  • power failure that the supply of external power is stopped, and a power supply device such as a power storage device or power generation device is connected to the “power supply device” or power supply system.
  • the power supplied from the supplied power supply device is expressed as “internal power”.
  • the load control device 100 includes a communication unit 110 that communicates with the load device 400 and the like, a control unit 120 that controls each unit of the load control device 100, and various data that the control unit 120 uses for control. It comprises a storage unit 130 for storing.
  • the communication unit 110 is a device for communicating with the power storage device 300, the load device 400, the measurement device 500, and the like.
  • the communication unit 110 includes a wired communication device such as a LAN (Local Area Network) cable connection device and a wireless communication device such as a wireless LAN base unit.
  • the communication unit 110 receives various types of information such as the operating state from the load device 400 and the like, and transmits the received information to the control unit 120.
  • the communication unit 110 receives “control information” for the control unit 120 to control the load device 400 from the control unit 120, and transmits the received control information to the load device 400.
  • the control unit 120 includes a processing device such as a processor.
  • the control unit 120 operates according to a program stored in a ROM (Read Only Memory) or a RAM (Random Access Memory) (not shown), so that an “operation state information storage process”, “operation pattern information generation process”, which will be described later, Various operations including “load control processing” are executed.
  • the control unit 120 executes the “operation state information storage process”, “operation pattern information generation process”, and “load control process”. It functions as the generation unit 122, the power failure detection unit 123, the upper limit value information acquisition unit 124, the past information acquisition unit 125, and the operation control unit 126. These functions will be described in the description of “operation state information storage processing”, “operation pattern information generation processing”, and “load control processing” described later.
  • the storage unit 130 includes a storage device such as a DRAM (Dynamic Random Access Memory), an SRAM (Static Random Access Memory), a flash memory, and a hard disk.
  • the storage unit 130 stores various data such as operation state data 131 and operation pattern information 132.
  • the operating state data 131 is data in which the past operating state of the load device 400 is recorded at regular time intervals (for example, every second).
  • the operating state data 131 is composed of a plurality of data as shown in FIG. Each piece of data stores “operating state information” in which the operating state of the load device 400 is recorded, “date and time” when the operating state information is acquired, and “power consumption” information of the entire house in the operating state. Has been. This data is generated by an “operation state information storage process” to be described later.
  • the operating state information is past information indicating the past operating state of the load device 400.
  • the operation state information includes information indicating an operation state of the load device 400 such as an air conditioner, a refrigerator, and a lighting.
  • Examples of the operating state of the load device 400 include a device identification number, an ON / OFF state, and setting items for each device (eg, mode, set temperature, dimming) and the like.
  • the setting item column is “-(no value)” for devices in the OFF state, such as 002 for an air conditioner and 003 for lighting.
  • the operation pattern information 132 is past information indicating an operation pattern of the load device 400. As shown in FIG. 6, the operation pattern information 132 includes “attribute information” indicating an attribute of time, and “operation state information” that records an operation state frequently used by the load device 400 when the attribute information indicates. This is information that stores a plurality of pieces of information that associate the “power consumption” of the entire house in the operating state.
  • the “time attribute” is a property or characteristic indicating the target “time” and includes, for example, a season, a day of the week, a time zone, and the like. For example, if the current time is 7:00 am on January 1, 2013, the current “time attribute” is “winter”, “Tuesday”, “morning”, or the like.
  • the hour attribute includes the weather at that time, such as “sunny”, “rain”, and “cloudy”.
  • the operating state information recorded in the operating pattern information 132 may include the same items as the operating state information shown in FIG. Further, although one numerical value is recorded as the power consumption in FIG. 6, it may be recorded in a range such as 750 W to 1000 W. This is because the power consumption includes power consumption of devices that cannot be controlled by the load control device 100, and thus the power consumption may be different even if the operation state of the load device 400 that can be controlled is the same.
  • the operation of the load control device 100 is divided into “operation state information storage processing”, “operation pattern information storage processing”, and “load control processing”.
  • the control unit 120 of the load control device 100 operates according to, for example, a multi-process (multitask) type operating system, thereby performing “operation state information storage processing”, “operation pattern information storage processing”, and “load control processing”. Run in parallel.
  • the operation state information storage process is a process for storing the operation state of the load device 400 connected to the power supply system 200 in the storage unit 130.
  • the “operation state information storage process” will be described with reference to the flowchart of FIG.
  • the operation state information storage unit 121 of the control unit 120 acquires information indicating the current operation state of each load device 400 from each load device 400 via the communication unit 110 (step S101).
  • the operating state information storage unit 121 combines the information acquired in step S101 into one to generate operating state information as shown in FIG. 5 (step S102).
  • the operating state information storage unit 121 acquires information on the current power consumption of the entire house from the measuring device 500 (step S103).
  • the operating state information storage unit 121 adds the power consumption information acquired in step S103 and the current date information to the operating state information generated in step S102 to generate data as shown in FIG. 4 (step S104). .
  • the operating state information storage unit 121 adds the data generated in step S104 to the operating state data 131 (step S105). When the addition is completed, the control unit 120 ends the “operating state information saving process”.
  • the operation pattern information generation process is a process for generating operation pattern information used in an operation state selection process described later.
  • the “operation pattern information generation process” will be described below with reference to the flowchart of FIG.
  • the operation pattern information generation unit 122 of the control unit 120 acquires data for a certain past period (for example, for the past one year) from the operation state data 131 (step S201).
  • the operation pattern information generation unit 122 generates operation pattern information as shown in FIG. 6, for example, based on the data acquired in step S201 (step S202). Specifically, the operation pattern information generation unit 122 classifies the acquired data into a plurality of data groups based on the date and time information included in the data acquired in step S201. For example, if the data acquired in step S201 is data for one year, the operation pattern information generation unit 122 classifies the acquired data into a plurality of data groups in the same season and the same time zone. If there are four seasons: spring, summer, autumn and winter, and time zones are morning, noon, evening and night, the data is classified into 16 data groups.
  • the operation pattern information generation unit 122 analyzes the operation state information for each data group, and extracts an operation state having a high appearance frequency in the data group. There may be a plurality of operating states to be extracted per data group. For example, the operation pattern information generation unit 122 extracts a plurality of operation states with different power consumption levels. The operation pattern information generation unit 122 adds season and time zone information and power consumption information to each extracted operation state, and generates operation pattern information as shown in FIG. 6, for example.
  • the operation pattern information generation unit 122 stores the operation pattern information generated in step S202 in the storage unit 130 (step S203). When the storage is completed, the control unit 120 ends the “operation pattern information generation process”.
  • load control processing When the power is turned on to the load control device 100, the control unit 120 executes a load control process.
  • the load control process is a process for controlling the operating state of the load device 400 after the occurrence of a power failure.
  • the “load control process” will be described below with reference to the flowchart of FIG.
  • the power failure detection unit 123 of the control unit 120 acquires external power information (for example, measured values of current and voltage) from the measurement device 500 via the communication unit 110. And the power failure detection part 123 discriminate
  • produced step S310. If a power failure has not occurred (step S310: No), step S310 is repeated until the occurrence of a power failure is detected. When a power failure occurs (step S310: Yes), the process proceeds to step S320.
  • the upper limit value information acquisition unit 124 of the control unit 120 acquires specification information (for example, information on the maximum discharge output value) and information on the current power storage amount from the power storage device 300, and the load device 400 consumes based on the acquired information.
  • An upper limit value of possible power consumption is calculated (step S320).
  • the upper limit value may be a value (for example, 80% of the maximum value) reduced by a certain amount from the maximum discharge output value (specification value) of power storage device 300. Further, it is also possible to assume a power failure period (or input from the user), calculate the amount of power used per hour from the current power storage amount, and determine the upper limit value based on that value.
  • the charged amount is 5 kWh and used for 5 hours, it is 1 kWh per hour, and the upper limit value is determined to be 1 kW from this value.
  • the upper limit value may be set to 2 kW.
  • the discharge output maximum value in use is set as the upper limit value.
  • the past information acquisition unit 125 of the control unit 120 acquires the data recorded immediately before the occurrence of the power failure from the operation state data 131 (step S330).
  • the operation control unit 126 of the control unit 120 determines whether the power consumption of the house immediately before the occurrence of the power failure recorded in the data acquired in step S330 is equal to or less than the upper limit value acquired in step S320 (step S340).
  • step S340 When the value is equal to or lower than the upper limit (step S340: Yes), the operation control unit 126 sets the load device 400 so that the operation state of the load device 400 becomes the operation state immediately before the occurrence of the power failure recorded in the data acquired in step S330. Control. More specifically, the operation control unit 126 transmits control information to each of the load devices 400 via the communication unit 110 so that the load device 400 is in an operation state immediately before the occurrence of a power failure (step S350).
  • step S340 When the upper limit value is exceeded (step S340: No), the operation control unit 126 selects an operation state that the load device 400 should take based on the past operation state information (operation pattern information 132) of the load device 400.
  • the “operation state selection process” is executed (step S360).
  • the “operation state selection process” will be described with reference to the flowchart of FIG. 10.
  • the operation control unit 126 extracts information satisfying the standard from the information recorded in the operation pattern information 132. Specifically, the operation control unit 126 has attribute information that matches the current “hour attribute” from the information recorded in the operation pattern information 132, and the power consumption is acquired in step S320. Information having power consumption information equal to or lower than the upper limit value is extracted (step S361). For example, if the current time is 7:00 am on January 1, 2013, and the upper limit value acquired in step S320 is 1300 W, the operation control unit 126 may select the current operation pattern information 132 shown in FIG. “Information 1” and “Information 2” having attribute information matching the “time attribute” (ie, winter, morning) and having power consumption of 1300 W or less are extracted.
  • the operation control unit 126 determines whether the extracted information exists (step S362). When the extracted information does not exist (step S362: No), the operation control unit 126 ends the operation state selection process. When the extracted information exists (step S362: Yes), the operation control unit 126 further determines whether there is a plurality of extracted information (step S363).
  • step S363 When there is only one piece of extracted information (step S363: No), the operation control unit 126 uses the operation state information recorded in the extracted information as the selected operation state information, for example, a RAM (not shown). (Step S364).
  • the operation control unit 126 sets the operation state information recorded in the information with the maximum power consumption among the extracted information as the selected operation state information. For example, it is stored in a RAM (not shown) (step S365).
  • the flow returns to the flow of FIG. 9, and the operation control unit 126 causes the load device 400 to be in the operation state recorded in the operation state information selected in step S330.
  • the operation control unit 126 transmits control information to each of the load devices 400 via the communication unit 110 so that the load device 400 enters the operation state recorded in the operation state information selected in step S330. (Step S370).
  • control unit 120 When the transmission of the control information is finished, the control unit 120 returns to step S310 and waits for the occurrence of a power failure.
  • the load control device 100 controls the load device 400 based on past information after the occurrence of a power failure, the operating state of the load device 400 remains highly convenient even if a power failure occurs. Can be maintained.
  • the load control device 100 is loaded so that the operation state of the load device 400 is the same as the operation state immediately before the occurrence of the power failure. Since the apparatus 400 is controlled, inconvenience and discomfort for the user can be extremely reduced.
  • the load control device 100 causes the load device 400 to be in the same operating state as that normally used in the same season and time period in the past. Since the control is performed, it is possible to minimize a decrease in convenience for the user.
  • the load control device 100 when a plurality of candidate operation states are extracted from the operation pattern information 132, the load control device 100 has the maximum power consumption within a range not exceeding the upper limit value from the extracted operation states. The operating status is selected. Therefore, since the operating state of the load device 400 can be brought closer to the normal operating state, it is possible to minimize a decrease in user convenience.
  • the load control device 100 controls the load device 400 based on the selection result of the operation state selection process (see FIG. 9). Step S360, step S370).
  • the processing of steps S360 and S370 may be removed from the load control processing shown in FIG. 9, and the load control device 100 may control the load device 400 only when the power consumption immediately before the occurrence of a power failure is equal to or less than the upper limit value. Even with such a configuration, it is possible to sufficiently suppress a decrease in user convenience.
  • the load device 400 is controlled using the operation pattern information 132 when the power consumption immediately before the occurrence of a power failure exceeds the upper limit value of the power supply capability of the power storage device 300.
  • the load control device 100 that controls the load device 400 using the operation pattern information 132 regardless of whether or not the power consumption immediately before the occurrence of the power failure exceeds the upper limit value will be described.
  • the load control device 100 includes a communication unit 110, a control unit 120, and a storage unit 130, as in the first embodiment. Since the configuration of the communication unit 110, the control unit 120, and the storage unit 130 is the same as that of the first embodiment, the description thereof is omitted.
  • the operation of the load control device 100 is divided into “operation state information storage processing”, “operation pattern information storage processing”, and “load control processing”. Since “operation state information storage processing” and “operation pattern information storage processing” are the same as those in the first embodiment, description thereof is omitted.
  • the control unit 120 executes load control processing.
  • load control process will be described with reference to the flowchart of FIG. 11.
  • the power failure detection unit 123 determines whether a power failure has occurred based on the external power information acquired from the measuring device 500 (step S310). If a power failure has not occurred (step S310: No), step S310 is repeated until the occurrence of a power failure is detected. When a power failure occurs (step S310: Yes), the process proceeds to step S320.
  • the upper limit information acquisition unit 124 calculates the upper limit value of power consumption that can be consumed by the load device 400 based on the information acquired from the power storage device 300 (step S320).
  • the operation control unit 126 executes an “operation state selection process” for selecting an operation state that the load device 400 should take based on the operation pattern information 132 (step S360). Since the operation state selection process is the same as that of the first embodiment, the description thereof is omitted.
  • the operation control unit 126 controls the load device 400 so that the operation state of the load device 400 becomes the operation state recorded in the operation state information selected in step S330 (step S370).
  • step S370 When the execution of step S370 ends, the control unit 120 returns to step S310 and waits for the occurrence of a power failure again.
  • the operation state of the load device 400 can be maintained with high convenience.
  • the load device 400 is controlled using the operation pattern information 132 only when the power consumption immediately before the occurrence of a power failure exceeds the upper limit value of the power supply capability of the power storage device 300.
  • the operation pattern information 132 can also be used when the power consumption immediately before the occurrence of a power failure is less than or equal to the upper limit value.
  • the load control apparatus 100 that uses the operation pattern information 132 even when the power consumption immediately before the occurrence of a power failure is equal to or less than the upper limit value will be described.
  • the load control device 100 includes a communication unit 110, a control unit 120, and a storage unit 130, as in the first embodiment. Since the configuration of the communication unit 110, the control unit 120, and the storage unit 130 is the same as that of the first embodiment, the description thereof is omitted.
  • the operation of the load control device 100 is divided into “operation state information storage processing”, “operation pattern information storage processing”, and “load control processing”. Since “operation state information storage processing” and “operation pattern information storage processing” are the same as those in the first embodiment, description thereof is omitted.
  • the control unit 120 executes load control processing.
  • load control process will be described with reference to the flowchart of FIG.
  • the power failure detection unit 123 determines whether a power failure has occurred based on the external power information acquired from the measuring device 500 (step S310). If a power failure has not occurred (step S310: No), step S310 is repeated until the occurrence of a power failure is detected. When a power failure occurs (step S310: Yes), the process proceeds to step S320.
  • the upper limit information acquisition unit 124 calculates the upper limit value of power consumption that can be consumed by the load device 400 based on the information acquired from the power storage device 300 (step S320).
  • the past information acquisition unit 125 of the control unit 120 acquires the data recorded immediately before the occurrence of the power failure from the operation state data 131 (step S330).
  • the operation control unit 126 of the control unit 120 determines whether the power consumption of the house immediately before the occurrence of the power failure is equal to or less than the upper limit value acquired in Step S320 (Step S340). When it is larger than the upper limit value, the operation control unit 126 proceeds to step S360. If it is less than or equal to the upper limit value, the operation control unit 126 proceeds to step S380.
  • the operation control unit 126 of the control unit 120 determines whether the power consumption of the house immediately before the occurrence of the power failure is a value close to the upper limit value (step S380). At the time of determination, a threshold value (for example, 80% of the upper limit) is set in advance, and if it is exceeded, it is regarded as a close value. When it is close to the upper limit (step S380: Yes), the operation control unit 126 controls the load device 400 so that the operation state of the load device 400 becomes the operation state immediately before the occurrence of the power failure (step S350).
  • a threshold value for example, 80% of the upper limit
  • step S340 When the upper limit value is exceeded (step S340: No), or when the value is a certain value or less than the upper limit value (step S380: No), the operation control unit 126 should adopt the load device 400 based on the operation pattern information 132.
  • the “operation state selection process” for selecting the operation state is executed (step S360). Since the operation state selection process is the same as that of the first embodiment, the description thereof is omitted.
  • the operation control unit 126 controls the load device 400 so that the operation state of the load device 400 becomes the operation state recorded in the operation state information selected in step S330 (step S370).
  • step S370 or step S350 the control unit 120 returns to step S310 and waits for the occurrence of a power failure again.
  • the load device 400 when the upper limit value is close to the power consumption of the entire house immediately before the power failure, the load device 400 is controlled so that the operating state of the load device 400 becomes the operating state immediately before the power failure.
  • the load device 400 is controlled so as to be in an operation state normally used in the same season and time period in the past. Therefore, the operation state immediately after the power failure of the load device 400 can be brought closer to the normal operation state. As a result, user inconvenience and discomfort can be minimized.
  • the load device 400 can be additionally operated, inconvenience and discomfort for the user can be further suppressed.
  • the power supply system 200 has been described as a single-phase three-wire power supply in the above-described embodiment, the power supply system 200 is not limited to a single-phase three-wire power supply, and may be, for example, a single-phase two-wire power supply.
  • the power supply system 200 is described as an in-house distribution system.
  • the power supply system 200 is not limited to the in-house distribution system, and may be a distribution system such as an office building or a factory.
  • the power storage device 300 is described as a lithium ion battery.
  • the power storage device 300 is not limited to a lithium ion battery.
  • other secondary batteries such as a lead battery, a nickel cadmium battery, and a nickel metal hydride battery are used. It may be a battery.
  • the power storage device 300 is not limited to a stationary storage battery that is fixed to a residential site or the like, and may be a mobile storage battery such as a battery of an electric vehicle or a hybrid vehicle, for example.
  • the power supply device that supplies power to the load device 400 at the time of a power failure is not limited to the power storage device, and may be a power generation device such as a solar cell panel or a generator.
  • the load control apparatus 100 may be realized by a dedicated system or may be realized by a normal computer system.
  • the load control device 100 is configured by storing and distributing a program for performing the above-described operation on a computer-readable recording medium, installing the program in a computer, and executing the above-described processing. Also good. Further, it may be stored in a disk device provided in a server device on a network such as the Internet so that it can be downloaded to a computer, for example. Further, the above-described functions may be realized by joint operation of the OS and application software. In this case, only the part other than the OS may be stored and distributed in a medium, or may be downloaded to a computer.
  • 100 load control device 110 communication unit, 120 control unit, 121 operation state information storage unit, 122 operation pattern information generation unit, 123 power outage detection unit, 124 upper limit information acquisition unit, 125 past information acquisition unit, 126 operation control unit, 130 storage unit, 131 operating state data, 132 operating pattern information, 200 power supply system, 210 switchboard, 300 power storage device, 400 load device, 500 measuring device.

Abstract

 負荷制御装置(100)は、停電発生後も給電装置から供給される電力を使って負荷装置(400)に電力を供給可能な電源系(200)に接続された負荷装置(400)を制御する装置である。負荷制御装置(100)は、停電の発生を検出する停電検出部と、負荷装置(400)の過去の稼動状態を示す過去情報を取得する過去情報取得部と、停電発生検出後、過去情報に基づき負荷装置(400)を制御する稼動制御部と、を備えている。

Description

負荷制御装置、負荷制御方法、及びプログラム
 本発明は、負荷制御装置、負荷制御方法、及びプログラムに関する。
 住宅内の機器を外部電力ではなく内部電力(例えば、蓄電装置や発電装置等の住宅に設置された給電装置が供給する電力)で動作させる場合がある。この場合、給電装置の電力供給能力に限度があることから、給電装置が供給できる電力の上限を考慮して、機器の稼動を抑制する必要がある。
 特許文献1には、蓄電池を活用して電力供給するときに、なるべく多くの電気製品が動作できるように電気製品への電力供給を制御するデマンドサイドマネージメントシステムが開示されている。また、特許文献2には、太陽電池の発電量や蓄電装置の充電レベルに合わせて、負荷装置の消費電力レベルを制御する給電管理装置が開示されている。
特開2000-023359号公報 特開2011-082277号公報
 停電の発生により、電力源が外部電力から内部電力に切り替わることがある。停電が発生すると多くの負荷装置は動作を停止するが、内部電力の供給が開始されたとしても、起動しないか、もしくは、停電発生前の状態とは異なった状態で起動する。この場合、ユーザは著しい不便・不快を感じることになる。
 また、内部電力で負荷装置を動作させる場合、負荷装置の使用電力が蓄電装置や発電装置の給電能力を超えないよう負荷装置の使用電力を抑制する必要がある。特許文献1や2の装置を使用すれば、負荷装置の使用電力を給電装置の給電能力以下に抑制できる。しかしながら、特許文献1や2の装置は、抑制する負荷が固定的であり、ユーザの利便性を考慮して負荷を抑制するものではない。そのため、例え特許文献1や2の装置に停電を検出する機能を追加し、特許文献1や2の装置を停電発生後に負荷装置の使用電力を抑制できるよう構成したとしても、ユーザの不便・不快は解消できない。
 本発明はこのような問題に鑑みてなされたものであり、停電が発生したとしても負荷装置の稼動状態を利便性が高いまま維持可能な負荷制御装置、負荷制御方法、及びプログラムを提供することを目的とする。
 本発明の負荷制御装置は、停電発生後も給電装置から供給される電力を使って負荷装置に電力を供給可能な電源系に接続された負荷装置を制御する負荷制御装置である。負荷制御装置は、停電の発生を検出する停電検出手段と、負荷装置の過去の稼動状態を示す過去情報を取得する過去情報取得手段と、停電発生検出後、過去情報に基づき負荷装置を制御する稼動制御手段と、を備えている。
 本発明によれば、停電が発生したとしても負荷装置の稼動状態を利便性が高いまま維持できる。
本発明の実施の形態に係る負荷制御装置の設置状態を説明するための図である。 本発明の実施の形態に係る負荷制御装置の構成を説明するための図である。 図2に示す制御部が有する機能を説明するための機能ブロック図である。 図2に示す記憶部に記憶される稼動状態データを説明するための図である。 稼動状態データに格納される稼動状態情報を説明するための図である。 図2に示す記憶部に記憶される稼動パターン情報を説明するための図である。 稼動状態情報保存処理を説明するためのフローチャートである。 稼動パターン情報生成処理を説明するためのフローチャートである。 実施の形態1の負荷制御処理を説明するためのフローチャートである。 稼動状態選択処理を説明するためのフローチャートである。 実施の形態2の負荷制御処理を説明するためのフローチャートである。 実施の形態3の負荷制御処理を説明するためのフローチャートである。
 以下、本発明を実施するための形態について図面を参照しながら説明する。
(実施の形態1)
 本発明の実施の形態に係る負荷制御装置100は、電源系200に接続された負荷装置400を制御するための装置である。負荷装置400は、例えば、エアコン、冷蔵庫、照明等の電気機器である。負荷制御装置100は、これら負荷装置400の稼動状態を受信するとともに、制御情報を送信する等して負荷装置400を制御可能となっている。なお、負荷制御装置100が制御対象とする負荷装置400は、必ずしも住宅内の全ての負荷装置でなくてもよい。例えば、一定量の電力を消費する住宅内の主な負荷装置のみを制御対象とすることも可能である。
 電源系200は、単相三線電源等の宅内配電系統である。電源系200は、図1に示すように、配電盤210を備えている。配電盤210は、外部から供給される電力(以下、「外部電力」という。)を住宅内の負荷装置400に分配する。配電盤210には、蓄電装置300が接続されている。蓄電装置300は、リチウムイオン電池等の二次電池から構成される。配電盤210は、外部電力が停止すると、蓄電装置300から供給される電力を使って負荷装置400に電力を供給する。
 給電線引込口付近の電力線には、外部電力を計測するための計測装置500が接続されている。計測装置500は、電流計や電圧計等から構成されている。計測装置500は、電力線に流れる電流や電圧、及び住宅全体で消費された電力を計測し、その計測結果を負荷制御装置100に送信する。
 なお、以下の説明では、理解を容易にするため、外部電力の供給が停止されることを「停電」、蓄電装置や発電装置等の電力を供給する装置を「給電装置」、電源系に接続された給電装置から供給される電力を「内部電力」と表現する。
 以下、負荷制御装置100の構成について詳細に説明する。
 負荷制御装置100は、図2に示すように、負荷装置400等と通信する通信部110と、負荷制御装置100の各部を制御する制御部120と、制御部120が制御に使用する各種データを記憶する記憶部130とから構成される。
 通信部110は、蓄電装置300、負荷装置400、計測装置500等と通信するための装置である。通信部110は、LAN(Local Area Network)ケーブル接続装置等の有線通信装置、無線LAN親機等の無線通信装置から構成される。通信部110は、負荷装置400等から稼動状態等の各種情報を受信するとともに、受信した情報を制御部120に送信する。また、通信部110は、制御部120が負荷装置400を制御するための「制御情報」を制御部120から受信するとともに、受信した制御情報を負荷装置400に送信する。
 制御部120は、プロセッサ等の処理装置から構成される。制御部120は不図示のROM(Read Only Memory)やRAM(Random Access Memory)に格納されているプログラムに従って動作することで、後述の「稼動状態情報保存処理」、「稼動パターン情報生成処理」、「負荷制御処理」を含む種々の動作を実行する。制御部120は、「稼動状態情報保存処理」、「稼動パターン情報生成処理」、「負荷制御処理」を実行することで、図3に示すように、稼動状態情報保存部121と、稼動パターン情報生成部122と、停電検出部123と、上限値情報取得部124と、過去情報取得部125と、稼動制御部126として機能する。なお、これらの機能については、後述の「稼動状態情報保存処理」、「稼動パターン情報生成処理」、「負荷制御処理」の説明の箇所で述べる。
 図2に戻り、記憶部130は、DRAM(Dynamic Random Access Memory)、SRAM(Static Random Access Memory)、フラッシュメモリ、ハードディスク等の記憶装置から構成される。記憶部130には、稼動状態データ131、稼動パターン情報132等の各種データが格納されている。
 稼動状態データ131は、負荷装置400の過去の稼動状態を一定時間毎(例えば1秒毎)に記録したデータである。稼動状態データ131は、図4に示すように、複数のデータから構成されている。データそれぞれには、負荷装置400の稼動状態を記録した「稼動状態情報」と、その稼動状態情報を取得した「日時」と、その稼動状態における家全体の「消費電力」の情報と、が格納されている。このデータは、後述の「稼動状態情報保存処理」で生成される。
 稼動状態情報は、負荷装置400の過去の稼動状態を示す過去情報である。稼動状態情報は、例えば図5に示すように、エアコン、冷蔵庫、照明等の負荷装置400の稼動状態を示す情報から構成されている。負荷装置400の稼動状態としては、例えば、機器の識別番号、ON/OFF状態、機器毎の設定項目(例えば、モード、設定温度、調光)等があげられる。なお、エアコンの002番や照明の003番のように、OFF状態の機器については、設定項目の欄は「-(値なし)」となる。
 稼動パターン情報132は、負荷装置400の稼動パターンを示す過去情報である。稼動パターン情報132は、図6に示すように、時の属性を示す「属性情報」と、その属性情報が示す時に負荷装置400が採る頻度の高かった稼動状態を記録した「稼動状態情報」と、その稼動状態における住宅全体の「消費電力」と、を関連付けた情報を複数記憶した情報である。ここで、「時の属性」とは、対象となる“時”を示す性質や特徴のことであり、例えば、季節、曜日、時間帯等があげられる。例えば、現在が2013年1月1日午前7時00分なのであれば、現在の“時の属性”は、“冬”、“火曜日”、“朝”等である。なお、時の属性には、“晴れ”、“雨”、“曇り”等、その時の天気も含まれる。
 なお、稼動パターン情報132に記録される稼動状態情報は、図5に示す稼動状態情報と同じ項目から構成されていてもよい。また、図6では消費電力として1つの数値を記録しているが、750W~1000Wといったように範囲で記録してもよい。これは、消費電力には、負荷制御装置100から制御できない機器の消費電力も含まれているため、制御できる負荷装置400の稼動状態が同じでも消費電力が異なる場合があるためである。
 次に、このような構成を有する負荷制御装置100の動作について説明する。
 負荷制御装置100の動作は、「稼動状態情報保存処理」、「稼動パターン情報保存処理」、「負荷制御処理」に分けられる。負荷制御装置100の制御部120は、例えば、マルチプロセス(マルチタスク)式のオペレーティングシステムに従って動作することで、「稼動状態情報保存処理」、「稼動パターン情報保存処理」、「負荷制御処理」を並行して実行する。
 最初に、「稼動状態情報保存処理」について説明する。負荷制御装置100に電源が投入されると、制御部120は一定時間毎(例えば、1秒毎)に稼動状態情報保存処理を実行する。稼動状態情報保存処理は、電源系200に接続された負荷装置400の稼動状態を記憶部130に保存するための処理である。以下、図7のフローチャートを参照して「稼動状態情報保存処理」を説明する。
 制御部120の稼動状態情報保存部121は、通信部110を介して、負荷装置400それぞれから、負荷装置400それぞれの現在の稼動状態を示す情報を取得する(ステップS101)。
 稼動状態情報保存部121は、ステップS101で取得した情報を1つにまとめて図5に示すような稼動状態情報を生成する(ステップS102)。
 図7のフローに戻り、稼動状態情報保存部121は、計測装置500から住宅全体の現在の消費電力の情報を取得する(ステップS103)。
 稼動状態情報保存部121は、ステップS102で生成した稼動状態情報にステップS103で取得した消費電力の情報と現在日時の情報とを付して図4に示すようなデータを生成する(ステップS104)。
 図7のフローに戻り、稼動状態情報保存部121は、ステップS104で生成したデータを稼動状態データ131の中に追加する(ステップS105)。追加が完了したら、制御部120は「稼動状態情報保存処理」を終了する。
 次に、「稼動パターン情報生成処理」について説明する。負荷制御装置100に電源が投入されると、制御部120は一定期間毎(例えば、1週間毎)に稼動パターン情報生成処理を実行する。稼動パターン情報生成処理は、後述の稼動状態選択処理で使用する稼動パターン情報を生成するための処理である。以下、図8のフローチャートを参照して「稼動パターン情報生成処理」を説明する。
 制御部120の稼動パターン情報生成部122は、稼動状態データ131から過去一定期間分(例えば、過去1年間分)のデータを取得する(ステップS201)。
 稼動パターン情報生成部122は、ステップS201で取得したデータに基づいて、例えば図6に示すような稼動パターン情報を生成する(ステップS202)。具体的には、稼動パターン情報生成部122は、ステップS201で取得したデータに含まれる日時の情報に基づき、取得したデータを複数のデータ群に分類する。例えば、ステップS201で取得したデータが一年間分のデータなのであれば、稼動パターン情報生成部122は、取得したデータを同一季節及び同一時間帯の複数のデータ群に分類する。季節が春、夏、秋、冬の4通り、時間帯が朝、昼、夕、夜の4通りとすれば、データは16個のデータ群に分類される。そして、稼動パターン情報生成部122は、データ群毎に稼動状態情報を解析し、そのデータ群において出現頻度の高い稼動状態を抽出する。なお、抽出する稼動状態はデータ群1つにつき複数あってもよい。例えば、稼動パターン情報生成部122は、消費電力レベルが異なる複数の稼動状態を抽出する。稼動パターン情報生成部122は、抽出した稼動状態それぞれに季節及び時間帯の情報と消費電力の情報とを付し、例えば図6に示すような稼動パターン情報を生成する。
 図8のフローに戻り、稼動パターン情報生成部122は、ステップS202で生成した稼動パターン情報を記憶部130に保存する(ステップS203)。保存が完了したら、制御部120は「稼動パターン情報生成処理」を終了する。
 次に、「負荷制御処理」について説明する。負荷制御装置100に電源が投入されると、制御部120は負荷制御処理を実行する。負荷制御処理は、停電発生後に負荷装置400の稼動状態を制御するための処理である。以下、図9のフローチャートを参照して「負荷制御処理」を説明する。
 制御部120の停電検出部123は、通信部110を介して計測装置500から外部電力の情報(例えば、電流や電圧の計測値)を取得する。そして、停電検出部123は、取得した外部電力の情報に基づいて外部電力の供給が停止したか、すなわち停電が発生したか判別する(ステップS310)。停電が発生していない場合(ステップS310:No)、停電の発生を検出するまでステップS310を繰り返す。停電が発生した場合(ステップS310:Yes)、ステップS320に進む。
 制御部120の上限値情報取得部124は、蓄電装置300から仕様情報(例えば、放電出力最大値の情報)や現在の蓄電量の情報を取得し、取得した情報に基づいて負荷装置400が消費可能な消費電力の上限値を算出する(ステップS320)。なお、上限値は、蓄電装置300の放電出力最大値(仕様値)から一定量削減した値(例えば最大値の80%)であってもよい。また、停電期間を想定(またはユーザから入力)し、現在の蓄電量から1時間あたり使用電力量を計算し、その値に基づいて上限値を決定してもよい。例えば、蓄電量が5kWhで、5時間使用するとすれば、1時間当たり1kWhであり、この値から上限値を1kWに決定する。あるいは、1kWhを30分で使用し、残りの30分は使用しないと仮定し、上限値を2kWとしてもよい。なお、算出した上限値が、蓄電装置300の仕様上の放電出力最大値を超えた場合は、使用上の放電出力最大値を上限値とする。
 制御部120の過去情報取得部125は、稼動状態データ131から停電発生の直前に記録されたデータを取得する(ステップS330)。
 制御部120の稼動制御部126は、ステップS330で取得したデータに記録されている停電発生直前の住宅の消費電力が、ステップS320で取得した上限値以下か判別する(ステップS340)。
 上限値以下の場合(ステップS340:Yes)、稼動制御部126は、負荷装置400の稼動状態がステップS330で取得したデータに記録されている停電発生直前の稼動状態となるよう、負荷装置400を制御する。より具体的には、稼動制御部126は、負荷装置400が停電発生直前の稼動状態となるよう、通信部110を介して負荷装置400それぞれに制御情報を送信する(ステップS350)。
 上限値を超えている場合(ステップS340:No)、稼動制御部126は、負荷装置400の過去の稼動状態の情報(稼動パターン情報132)に基づいて負荷装置400が採るべき稼動状態を選択する「稼動状態選択処理」を実行する(ステップS360)。以下、図10のフローチャートを参照して「稼動状態選択処理」を説明する。
 稼動制御部126は、稼動パターン情報132に記録されている情報の中で基準を満たす情報を抽出する。具体的には、稼動制御部126は、稼動パターン情報132に記録されている情報の中から、現在の“時の属性”と一致する属性情報を持ち、かつ、消費電力がステップS320で取得した上限値以下の消費電力情報を持つ情報を抽出する(ステップS361)。例えば、現在が2013年1月1日午前7時00分であり、ステップS320で取得した上限値が1300Wなのであれば、稼動制御部126は、図6に示す稼動パターン情報132の中から、現在の“時の属性”(すなわち、冬、朝)と一致する属性情報を持ち、消費電力が1300W以下となっている“情報1”と“情報2”を抽出する。
 稼動制御部126は、抽出された情報は存在するか判別する(ステップS362)。抽出された情報が存在しない場合(ステップS362:No)、稼動制御部126は稼動状態選択処理を終了する。抽出された情報が存在する場合(ステップS362:Yes)、稼動制御部126は、さらに抽出された情報が複数あるか判別する(ステップS363)。
 抽出された情報が1つしかない場合(ステップS363:No)、稼動制御部126は、その抽出された情報に記録されている稼動状態情報を、選択した稼動状態情報として、例えば不図示のRAMに保存する(ステップS364)。
 抽出された情報が複数ある場合(ステップS363:Yes)、稼動制御部126は、抽出された情報の中で消費電力が最大の情報に記録されている稼動状態情報を、選択した稼動状態情報として、例えば不図示のRAMに保存する(ステップS365)。
 RAMへの保存が完了したら、図9のフローに戻り、稼動制御部126は、負荷装置400の稼動状態がステップS330で選択した稼動状態情報に記録されている稼動状態となるよう、負荷装置400を制御する。より具体的には、稼動制御部126は、負荷装置400がステップS330で選択した稼動状態情報に記録されている稼動状態となるよう、通信部110を介して負荷装置400それぞれに制御情報を送信する(ステップS370)。
 制御情報の送信が終わったら、制御部120は、ステップS310に戻り、停電の発生を待機する。
 本実施の形態によれば、停電発生後に、負荷制御装置100が過去情報に基づいて負荷装置400を制御しているので、停電が発生しても負荷装置400の稼動状態を利便性が高いまま維持できる。特に、停電発生直前の消費電力が蓄電装置300の電力供給能力の上限値を超えない場合は、負荷装置400の稼動状態が停電発生直前の稼動状態と同じになるよう、負荷制御装置100が負荷装置400を制御しているので、ユーザの不便・不快を極めて少なくできる。
 また、停電発生前の消費電力が上限値を超えている場合も、過去の同一季節、同一時間帯に通常使用されている稼動状態と同じ稼動状態になるよう負荷制御装置100が負荷装置400を制御しているので、ユーザの利便性の低下を最小限に抑えることができる。
 また、稼動パターン情報132の中から候補となる稼動状態が複数抽出された場合、負荷制御装置100は、抽出された複数の稼動状態の中から上限値を超えない範囲で最大の消費電力となる稼動状態を選択している。そのため、負荷装置400の稼動状態をより普段の稼動状態に近づけることができるので、ユーザの利便性の低下を最小限に抑えることができる。
 なお、上述の実施の形態では、負荷制御装置100は、停電発生直前の消費電力が上限値を超えている場合は、稼動状態選択処理の選択結果に基づき負荷装置400を制御した(図9に示すステップS360、ステップS370)。しかしながら、図9に示す負荷制御処理からステップS360とステップS370の処理を取り除き、停電発生直前の消費電力が上限値以下の場合のみ負荷制御装置100が負荷装置400を制御するようにしてもよい。このような構成であっても、ユーザの利便性の低下を十分に抑制できる。
(実施の形態2)
 実施の形態1では、停電発生直前の消費電力が蓄電装置300の電力供給能力の上限値を超えている場合に、稼動パターン情報132を使って負荷装置400を制御した。しかし、停電発生直前の消費電力が上限値を超えているか否かに関わらず、稼動パターン情報132を使って負荷装置400を制御することも可能である。以下、停電発生直前の消費電力が上限値を超えているか否かに関わらず、稼動パターン情報132を使って負荷装置400を制御する負荷制御装置100について説明する。
 負荷制御装置100は、実施の形態1と同様に、通信部110と、制御部120と、記憶部130とから構成される。通信部110と、制御部120と、記憶部130との構成は実施の形態1と同じであるので説明を省略する。
 負荷制御装置100の動作は、「稼動状態情報保存処理」、「稼動パターン情報保存処理」、「負荷制御処理」に分けられる。「稼動状態情報保存処理」と「稼動パターン情報保存処理」は実施の形態1と同じであるので説明を省略する。
 負荷制御装置100に電源が投入されると、制御部120は負荷制御処理を実行する。以下、図11のフローチャートを参照して「負荷制御処理」を説明する。
 停電検出部123は、計測装置500から取得した外部電力の情報に基づいて停電が発生したか判別する(ステップS310)。停電が発生していない場合(ステップS310:No)、停電の発生を検出するまでステップS310を繰り返す。停電が発生した場合(ステップS310:Yes)、ステップS320に進む。
 上限値情報取得部124は、蓄電装置300から取得した情報に基づいて負荷装置400が消費可能な消費電力の上限値を算出する(ステップS320)。
 稼動制御部126は、稼動パターン情報132に基づいて負荷装置400が採るべき稼動状態を選択する「稼動状態選択処理」を実行する(ステップS360)。稼動状態選択処理は実施の形態1と同じであるので説明を省略する。
 稼動制御部126は、負荷装置400の稼動状態がステップS330で選択した稼動状態情報に記録されている稼動状態となるよう、負荷装置400を制御する(ステップS370)。
 ステップS370の実行が終わったら、制御部120は、ステップS310に戻り、再び、停電の発生を待機する。
 本実施の形態によれば、停電発生直前と同じ稼動状態となるよう負荷制御装置100が負荷装置400を制御しない場合であっても、負荷装置400の稼動状態を利便性が高いまま維持できる。
(実施の形態3)
 実施の形態1では、停電発生直前の消費電力が蓄電装置300の電力供給能力の上限値を超えている場合のみ、稼動パターン情報132を使用して負荷装置400を制御した。しかし、稼動パターン情報132は、停電発生直前の消費電力が上限値以下の場合も使用可能である。以下、停電発生直前の消費電力が上限値以下の場合も稼動パターン情報132を使用する負荷制御装置100について説明する。
 負荷制御装置100は、実施の形態1と同様に、通信部110と、制御部120と、記憶部130とから構成される。通信部110と、制御部120と、記憶部130との構成は実施の形態1と同じであるので説明を省略する。
 負荷制御装置100の動作は、「稼動状態情報保存処理」、「稼動パターン情報保存処理」、「負荷制御処理」に分けられる。「稼動状態情報保存処理」と「稼動パターン情報保存処理」は実施の形態1と同じであるので説明を省略する。
 負荷制御装置100に電源が投入されると、制御部120は負荷制御処理を実行する。以下、図12のフローチャートを参照して「負荷制御処理」を説明する。
 停電検出部123は、計測装置500から取得した外部電力の情報に基づいて停電が発生したか判別する(ステップS310)。停電が発生していない場合(ステップS310:No)、停電の発生を検出するまでステップS310を繰り返す。停電が発生した場合(ステップS310:Yes)、ステップS320に進む。
 上限値情報取得部124は、蓄電装置300から取得した情報に基づいて負荷装置400が消費可能な消費電力の上限値を算出する(ステップS320)。
 制御部120の過去情報取得部125は、稼動状態データ131から停電発生の直前に記録されたデータを取得する(ステップS330)。
 制御部120の稼動制御部126は、停電発生直前の住宅の消費電力が、ステップS320で取得した上限値以下か判別する(ステップS340)。上限値より大きい場合、稼動制御部126はステップS360に進む。上限値以下の場合、稼動制御部126はステップS380に進む。
 制御部120の稼動制御部126は、停電発生直前の住宅の消費電力が、上限値に近い値かどうかを判別する(ステップS380)。判定に際しては、予め閾値(例えば、上限の80%)を設定しておき、それを超えれば近い値と見なす。上限値に近い場合(ステップS380:Yes)、稼動制御部126は、負荷装置400の稼動状態が停電発生直前の稼動状態となるよう、負荷装置400を制御する(ステップS350)。
 上限値を超えている場合(ステップS340:No)、もしくは上限値より一定以上小さい値の場合(ステップS380:No)、稼動制御部126は、稼動パターン情報132に基づいて負荷装置400が採るべき稼動状態を選択する「稼動状態選択処理」を実行する(ステップS360)。稼動状態選択処理は実施の形態1と同じであるので説明を省略する。
 稼動制御部126は、負荷装置400の稼動状態がステップS330で選択した稼動状態情報に記録されている稼動状態となるよう、負荷装置400を制御する(ステップS370)。
 ステップS370またはステップS350の実行が終わったら、制御部120は、ステップS310に戻り、再び、停電の発生を待機する。
 本実施の形態によれば、上限値が停電直前の住宅全体の消費電力に近い場合には、負荷装置400の稼動状態が停電直前の稼動状態となるよう負荷装置400を制御し、そうでない場合には、過去の同季節、同時間帯に通常使用されている稼動状態となるよう負荷装置400を制御している。そのため、負荷装置400の停電直後の稼動状態を、より普段の稼動状態に近づけることができる。その結果、ユーザの不便・不快を最小限に抑えることができる。
 また、停電直前の家全体の消費電力が、上限値と比べて一定量以上小さい場合には、過去の同季節、同時間帯に通常使用されている稼動状態の中で、上限値に近い消費電力の稼動状態を選択している。負荷装置400を追加的に稼動させることができるので、ユーザの不便・不快をさらに抑制できる。
 なお、上述の各実施の形態は一例であり、種々の変更及び応用が可能である。
 例えば、上述の実施の形態では電源系200を単相三線電源として説明したが、電源系200は単相三線電源に限定されず、例えば、単相二線電源であってもよい。
 また、上述の実施の形態では電源系200を宅内配電系統として説明したが、電源系200は宅内配電系統に限定されず、例えば、オフィスビルや工場等の配電系統であってもよい。
 また、上述の実施の形態では蓄電装置300をリチウムイオン電池として説明したが、蓄電装置300はリチウムイオン電池に限定されず、例えば、鉛電池、ニッケルカドミウム電池、ニッケル水素電池等の他の二次電池であってもよい。また、蓄電装置300は、住宅の敷地等に固定される定置型の蓄電池に限定されず、例えば、電気自動車やハイブリッド車のバッテリ等の移動型の蓄電池であってもよい。
 また、停電時に負荷装置400に電力を供給する給電装置は蓄電装置に限定されず、例えば、太陽電池パネルや発電機等の発電装置であってもよい。
 本実施の形態の負荷制御装置100は、専用のシステムにより実現してもよいし、通常のコンピュータシステムにより実現してもよい。例えば、上述の動作を実行するためのプログラムをコンピュータ読み取り可能な記録媒体に格納して配布し、該プログラムをコンピュータにインストールして、上述の処理を実行することによって負荷制御装置100を構成してもよい。また、インターネット等のネットワーク上のサーバ装置が備えるディスク装置に格納しておき、例えばコンピュータにダウンロード等できるようにしてもよい。また、上述の機能を、OSとアプリケーションソフトとの共同により実現してもよい。この場合には、OS以外の部分のみを媒体に格納して配布してもよく、また、コンピュータにダウンロード等してもよい。
 本発明は、本発明の広義の精神と範囲を逸脱することなく、様々な実施の形態及び変形が可能とされるものである。また、上述した実施の形態は、本発明を説明するためのものであり、本発明の範囲を限定するものではない。つまり、本発明の範囲は、実施の形態ではなく、特許請求の範囲によって示される。そして、特許請求の範囲内及びそれと同等の発明の意義の範囲内で施される様々な変形が、本発明の範囲内とみなされる。
 100 負荷制御装置、110 通信部、120 制御部、121 稼動状態情報保存部、122 稼動パターン情報生成部、123 停電検出部、124 上限値情報取得部、125 過去情報取得部、126 稼動制御部、130 記憶部、131 稼動状態データ、132 稼動パターン情報、200 電源系、210 配電盤、300 蓄電装置、400 負荷装置、500 計測装置。

Claims (10)

  1.  停電発生後も給電装置から供給される電力を使って負荷装置に電力を供給可能な電源系に接続された前記負荷装置を制御する負荷制御装置であって、
     停電の発生を検出する停電検出手段と、
     前記負荷装置の過去の稼動状態を示す過去情報を取得する過去情報取得手段と、
     停電発生検出後、前記過去情報に基づき前記負荷装置を制御する稼動制御手段と、を備える、
     負荷制御装置。
  2.  前記給電装置が供給可能な電力の上限値の情報を取得する上限値情報取得手段、を備え、
     前記稼動制御手段は、停電発生検出後、前記過去情報と前記上限値とに基づき前記負荷装置を制御する、
     請求項1に記載の負荷制御装置。
  3.  前記負荷装置の現在の稼動状態の情報を所定時間毎に記憶部に保存する稼動状態情報保存手段、を備え、
     前記過去情報取得手段は、前記停電発生検出後、前記記憶部から前記停電発生直前の前記負荷装置の稼動状態の情報を前記過去情報として取得し、
     前記稼動制御手段は、
     前記停電発生直前の前記負荷装置の稼動状態において消費される消費電力が前記上限値以下に収まっているか否か判別し、
     収まっている場合には、前記負荷装置の稼動状態が、前記停電発生直前の前記負荷装置の稼動状態となるように前記負荷装置を制御する、
     請求項2に記載の負荷制御装置。
  4.  前記過去情報取得手段は、時の属性を示す属性情報とその属性情報が示す時に前記負荷装置が採る頻度の高かった稼動状態とを関連付けた情報を複数記憶した稼動パターン情報を前記過去情報として取得し、
     前記稼動制御手段は、現在の時の属性と一致する属性情報が関連付けられた稼動状態であってその消費電力が前記上限値以下となる稼動状態を前記稼動パターン情報の中から選択し、選択した稼動状態となるように前記負荷装置を制御する、
     請求項2に記載の負荷制御装置。
  5.  前記負荷装置の現在の稼動状態の情報を所定時間毎に記憶部に保存する稼動状態情報保存手段、を備え、
     前記過去情報取得手段は、
     前記停電発生検出後、前記記憶部から前記停電発生直前の前記負荷装置の稼動状態の情報を前記過去情報として取得し、
     時の属性を示す属性情報とその属性情報が示す時に前記負荷装置が採る頻度の高い稼動状態とを関連付けた情報を複数記憶した稼動パターン情報を前記過去情報として取得し、
     前記稼動制御手段は、
     前記停電発生直前の前記負荷装置の稼動状態において消費される消費電力が前記上限値以下でありかつ上限値から一定の範囲に収まっているか否か判別し、
     収まっている場合には、前記負荷装置の稼動状態が、前記停電発生直前の前記負荷装置の稼動状態となるように前記負荷装置を制御し、
     収まっていない場合には、現在の時の属性と一致する属性情報が関連付けられた稼動状態であってその消費電力が前記上限値以下となる稼動状態を前記稼動パターン情報の中から選択し、選択した稼動状態となるように前記負荷装置を制御する、
     請求項2に記載の負荷制御装置。
  6.  前記過去情報取得手段は、時の属性を示す属性情報とその属性情報が示す時に前記負荷装置が採る頻度の高い稼動状態とを関連付けた情報を複数記憶した稼動パターン情報を前記過去情報として取得し、
     前記稼動制御手段は、
     前記停電発生直前の前記負荷装置の稼動状態において消費される消費電力が前記上限値以下に収まっているか否か判別し、
     収まっている場合には、前記負荷装置の稼動状態が、前記停電発生直前の前記負荷装置の稼動状態となるように前記負荷装置を制御し、
     収まっていない場合には、現在の時の属性と一致する属性情報が関連付けられた稼動状態であってその消費電力が前記上限値以下となる稼動状態を前記稼動パターン情報の中から選択し、選択した稼動状態となるように前記負荷装置を制御する、
     請求項3に記載の負荷制御装置。
  7.  前記記憶部に保存されている前記負荷装置の過去の稼動状態の情報に基づいて前記稼動パターン情報を生成する稼動パターン情報生成手段、を備える、
     請求項4乃至6のいずれか1項に記載の負荷制御装置。
  8.  前記給電装置は、蓄電装置であり、
     前記上限値情報取得手段は、前記蓄電装置の蓄電量の情報に基づいて前記上限値を算出する、
     請求項2乃至7のいずれか1項に記載の負荷制御装置。
  9.  停電発生後も給電装置から供給される電力を使って負荷装置に電力を供給可能な電源系に接続された前記負荷装置を制御する負荷制御方法であって、
     停電の発生を検出する停電検出ステップと、
     前記負荷装置の過去の稼動状態を示す過去情報を取得する過去情報取得ステップと、
     停電発生検出後、前記過去情報に基づき前記負荷装置を制御する稼動制御ステップと、を有する、
     負荷制御方法。
  10.  停電発生後も給電装置から供給される電力を使って負荷装置に電力を供給可能な電源系に接続された前記負荷装置を制御する負荷制御装置を制御するコンピュータに、
     停電の発生を検出する停電検出機能と、
     前記負荷装置の過去の稼動状態を示す過去情報を取得する過去情報取得機能と、
     停電発生検出後、前記過去情報に基づき前記負荷装置を制御する稼動制御機能と、を実現させる、
     プログラム。
PCT/JP2013/063429 2013-05-14 2013-05-14 負荷制御装置、負荷制御方法、及びプログラム WO2014184870A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/JP2013/063429 WO2014184870A1 (ja) 2013-05-14 2013-05-14 負荷制御装置、負荷制御方法、及びプログラム
JP2015516793A JP6091609B2 (ja) 2013-05-14 2013-05-14 負荷制御装置、負荷制御方法、及びプログラム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2013/063429 WO2014184870A1 (ja) 2013-05-14 2013-05-14 負荷制御装置、負荷制御方法、及びプログラム

Publications (1)

Publication Number Publication Date
WO2014184870A1 true WO2014184870A1 (ja) 2014-11-20

Family

ID=51897891

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/063429 WO2014184870A1 (ja) 2013-05-14 2013-05-14 負荷制御装置、負荷制御方法、及びプログラム

Country Status (2)

Country Link
JP (1) JP6091609B2 (ja)
WO (1) WO2014184870A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016163360A (ja) * 2015-02-26 2016-09-05 株式会社東芝 負荷制御装置、負荷制御システム、負荷制御方法、及びプログラム
JP2016226141A (ja) * 2015-05-29 2016-12-28 三菱電機株式会社 制御装置、エネルギー管理システム、制御方法及びプログラム
JPWO2018033983A1 (ja) * 2016-08-18 2019-03-14 三菱電機株式会社 電気機器、消費電力削減システム、通信アダプタ及び消費電力削減方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011142330A1 (ja) * 2010-05-11 2011-11-17 三洋電機株式会社 電力供給システム
JP2013017293A (ja) * 2011-07-04 2013-01-24 Yahoo Japan Corp 節電情報提供装置、方法、システム及びプログラム
WO2013062016A1 (ja) * 2011-10-24 2013-05-02 パナソニック株式会社 負荷制御装置、プログラム、負荷制御システム

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5015293B2 (ja) * 2010-07-23 2012-08-29 シャープ株式会社 電力制御ネットワークシステム、電力制御方法、および電力制御コントローラ

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011142330A1 (ja) * 2010-05-11 2011-11-17 三洋電機株式会社 電力供給システム
JP2013017293A (ja) * 2011-07-04 2013-01-24 Yahoo Japan Corp 節電情報提供装置、方法、システム及びプログラム
WO2013062016A1 (ja) * 2011-10-24 2013-05-02 パナソニック株式会社 負荷制御装置、プログラム、負荷制御システム

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016163360A (ja) * 2015-02-26 2016-09-05 株式会社東芝 負荷制御装置、負荷制御システム、負荷制御方法、及びプログラム
JP2016226141A (ja) * 2015-05-29 2016-12-28 三菱電機株式会社 制御装置、エネルギー管理システム、制御方法及びプログラム
JPWO2018033983A1 (ja) * 2016-08-18 2019-03-14 三菱電機株式会社 電気機器、消費電力削減システム、通信アダプタ及び消費電力削減方法

Also Published As

Publication number Publication date
JP6091609B2 (ja) 2017-03-08
JPWO2014184870A1 (ja) 2017-02-23

Similar Documents

Publication Publication Date Title
EP3002848B1 (en) Demand-side grid-level load balancing aggregation system
US11271400B2 (en) Power control device, operation plan planning method, and recording medium
JP5663645B2 (ja) 制御装置及び制御方法
US10243396B2 (en) Control device, power control system, and power control method
JP6249895B2 (ja) 電力制御システム、方法及び電力制御装置
JP6893906B2 (ja) 管理方法、制御装置及び通信処理デバイス
US10033214B2 (en) Power supply-demand adjusting apparatus, power system and power supply-demand adjusting method
WO2015122196A1 (ja) 在宅状況判定装置、配送システム、在宅状況判定方法、在宅状況判定プログラム、および配送端末
JP5946919B2 (ja) 管理システム、管理方法及び機器
JP5592772B2 (ja) 電力供給制御装置及びそれを用いた電力供給システム
JP5747610B2 (ja) 充電制御装置、充電制御方法、プログラム及びシステム
JP2013207933A (ja) 制御装置、制御システム、及び制御方法
WO2016002346A1 (ja) 電力制御システム及び電力制御装置
JP6091609B2 (ja) 負荷制御装置、負荷制御方法、及びプログラム
JP2015053846A (ja) 蓄電装置の放電開始時刻決定システム及び蓄電装置の放電開始時刻の決定方法
JP6069738B2 (ja) 充放電制御システム、充放電制御方法、および充放電制御プログラム
JP6142057B2 (ja) 電力管理システム、制御装置及び蓄電池装置
JP2016073042A (ja) 電力管理システム及び電力管理方法
JP6456153B2 (ja) 電力制御装置、充放電制御方法およびプログラム
JP2018038229A (ja) 蓄電システム
WO2015162997A1 (ja) 電力制御装置、電力制御方法、プログラム、および電力制御システム
JP6523120B2 (ja) 電力供給システム
JP6299514B2 (ja) 電力供給システム
AU2021106600A4 (en) Smart Load Management For Home Using Energy Meter
ES2685868A1 (es) Método y dispositivo para prosumo eléctrico inteligente

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13884870

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2015516793

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13884870

Country of ref document: EP

Kind code of ref document: A1