WO2014156279A1 - 巻上機寿命計算装置 - Google Patents
巻上機寿命計算装置 Download PDFInfo
- Publication number
- WO2014156279A1 WO2014156279A1 PCT/JP2014/051883 JP2014051883W WO2014156279A1 WO 2014156279 A1 WO2014156279 A1 WO 2014156279A1 JP 2014051883 W JP2014051883 W JP 2014051883W WO 2014156279 A1 WO2014156279 A1 WO 2014156279A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- load
- hoisting
- time
- unit
- hoisting machine
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/16—Applications of indicating, registering, or weighing devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C15/00—Safety gear
Definitions
- the present invention relates to a hoisting machine life calculation device.
- Patent Document 1 JP 2010-180001 (Patent Document 1). This publication states that “a crane operation status management device capable of obtaining information necessary for accurately estimating the life of a crane according to the operation status in consideration of the load factor, the number of operations and the operation time thereof, and the Provide a crane equipped with. "
- Patent Document 1 describes the measurement of the number of operations of the hoisting machine, which is necessary for estimating the life of the hoisting machine.
- Patent Document 1 “the configuration that counts both the number of times of ground cutting and the number of times of upper movement” does not count the number of times of lower movement. For this reason, it is impossible to accurately estimate the life of the hoisting machine.
- Patent Document 1 only the measurement of the number of operations and the operation time for each load is performed, and the measurement of the downtime is not performed. Therefore, it is impossible to accurately measure the ratio between the operation time and the downtime, that is, the use frequency, which is one of the measurement values for comprehensively determining the life of the hoisting machine.
- an object of the present invention is to provide a hoisting machine life calculation device that can accurately estimate the hoisting machine life.
- the present application includes a plurality of means for solving the above-described problems.
- a hoisting machine life calculation device that calculates the life of a hoisting machine that performs operations such as hoisting and lowering operations.
- a load calculation unit for calculating the load of the hoisting machine load from the current value of the control inverter of the hoisting machine and the number of rotations of the motor, and the upper operation of the hoisting machine for each load calculated by the load calculation unit.
- the operation frequency measurement unit that counts both the number of times and the lower operation frequency
- the operation time measurement unit that counts the operation time for each load calculated by the load calculation unit
- the operation time for each load that is measured by the operation time measurement unit
- a remaining life calculating unit that calculates the remaining life of the hoisting device from the obtained load rate.
- the winding machine lifetime calculation apparatus which can estimate the lifetime of a winding machine accurately can be provided.
- FIG. 1 is an example of a configuration diagram of a hoisting machine life calculation apparatus.
- FIG. 2 is a perspective view showing the overall configuration of an inverter crane apparatus in which the hoisting machine life calculation apparatus according to this embodiment is installed, and
- FIG. 3 is a block diagram showing the configuration of the main part of the inverter crane apparatus.
- the control unit of the hoisting machine operates the motor as the driving unit, and controls to operate the brake close to the motor to release, and drives the hoisting machine. .
- data on the operation status of the motor is sent to the control unit, and the control unit performs display control on the display unit and displays information listing the operation status corresponding to the operation content. Further, it may be possible to print the list displayed on the display unit.
- the inverter type crane apparatus 100 includes a crane hook 1, a wire rope 2, a hoisting induction motor 3, a hoisting apparatus 4, a traverse induction motor 5, a traverse apparatus 6, a traverse girder 7, a travel induction motor 8, and a travel apparatus.
- a traveling girder 10 a hoisting / traverse inverter device (referred to as a main control unit) 11, a hoisting / traverse inverter control unit 12, described later, an operation input device 13, an hoisting inverter 14, described later, and a traversing described later
- Inverter 15 induction motor brake 16 described later, travel inverter device 17, travel inverter control unit 18 described later, and travel inverter 19 described later.
- the inverter type crane apparatus 100 winds and unloads the load attached to the crane hook 1 by the hoisting apparatus 4 equipped with the hoisting induction motor 3 to wind and unwind the wire rope 2 in the Z direction (Z direction, ⁇ Z direction). (Indicated by arrows.) That is, the load is moved up and down. Further, in the X direction (indicated by arrows in the X direction and the ⁇ X direction), the traverse device 6 including the traverse induction motor 5 and the traverse girder 7 are moved in the X direction. Further, in the Y direction (indicated by arrows in the Y direction and the ⁇ Y direction), the traveling device 9 including the traveling induction motor 8 and the traveling girder 10 move in the Y direction.
- the hoisting and traverse induction motors 5 and the traverse induction motor 5 are controlled by the hoisting / traverse inverter control unit 12 shown in FIG. That is, when the operator inputs a predetermined instruction from the operation input device 13, the hoisting / traverse inverter control unit 12 controls the hoisting inverter 14 and the traverse inverter 15, and the hoisting inverter 14 and the traverse inverter 15, the frequency, voltage, and current necessary for control are applied to the hoisting induction motor 3 and the traverse induction motor 5, and simultaneously, the induction motor brake 16 is controlled to be released, so that the load attached to the crane hook 1 falls. Without moving in the Z direction. In the case of the traversing device 6, the hoisting device 4 is moved in the X direction along the traversing girder 7.
- the travel induction motor 8 attached to the travel device 9 causes the travel inverter control unit 18 of FIG. 3 stored in the travel inverter device 17 to travel. Winding along the traveling girder 10 by controlling the inverter 19 and applying the frequency, voltage and current necessary for the control from the traveling inverter 19 to the traveling induction motor 8 and simultaneously controlling the opening of the induction motor brake 16.
- the upper device 4 is moved in the Y direction.
- the hoisting inverter 14 has a current measuring unit 20.
- the current measuring unit 20 measures a current value for driving the hoisting induction motor 3.
- the hoisting / traversing inverter control unit 12 includes a load conversion unit 21.
- the load converting unit 21 converts the current value data measured by the current measuring unit 20 into load data by a predetermined calculation. That is, the current value for driving the hoisting induction motor 3 changes according to the weight of the load attached to the crane hook 1, and this current value is converted into load data by the load conversion unit 21. By doing so, the load can be measured. For example, if the load increases, the current value for driving the hoisting induction motor 3 increases, and if the load decreases, the current value for driving the hoisting induction motor 3 decreases.
- the hoisting / traverse inverter control unit 12 has a slip amount measuring unit 22.
- the slip amount measuring unit 22 converts the signal from the encoder 23 that outputs the rotation state of the hoisting induction motor 3 as a pulse signal into a rotation speed, and calculates the synchronous rotation speed calculated from the operating frequency and the measured actual rotation speed. The amount of slip that is the difference is measured. That is, since the amount of sliding changes according to the weight of the load attached to the crane hook 1, the load can be measured by converting this amount of sliding into load data by the load converting unit 21. . For example, if the load increases, the slip amount of the hoisting induction motor 3 increases, and if the load decreases, the slip amount of the hoisting induction motor 3 decreases.
- inverter control there is a case where it is operated at an operating frequency equal to or lower than the rated speed. Although it is difficult to accurately determine the load, having the load determining means based on the amount of sliding makes it possible to determine the load with high accuracy together with the load determination of the current value.
- the load detected as described above may be used for processing as it is, but the amount of data becomes enormous. Therefore, in this embodiment, with respect to the rated load (100%) of the hoisting machine, no load (0%), light load (1-25%), medium load (26-50%), heavy load (51 ⁇ 75%) and super heavy load (76% ⁇ ).
- the relationship between the current value and the load data or the relationship between the slip amount and the load data can be easily obtained experimentally in advance or by a predetermined calculation.
- FIGS. 4 is a flowchart showing the start timing of the load determination process
- FIG. 5 is a flowchart of the load determination process.
- the start of the load determination process is, for example, a software interruption process every 100 ms.
- the load determination process is started (S4).
- the counter of the total value of acquisition values and the number of acquisition times is cleared.
- the value of the output frequency output from the hoisting inverter 14 is compared with a set reference value (for example, 30 Hz) of the output frequency (S107). Is used as a load determination parameter, and the load class is determined from the average amount of sliding and the operation direction (S108). On the other hand, if the load class is larger than the reference value, the current value is used as the load determination parameter. The load class is determined from (112).
- either the current value or the slip amount may not be used as the load determination parameter, but both may be used as the load determination parameter.
- the load is classified into five patterns according to the categories determined in advance as shown in FIGS. For example, when the current value is detected as 11 A with an output frequency of 60 Hz and an upward operation, the load determination is determined as a medium load (S112).
- the hoisting / traverse inverter control unit 12 includes an operation time measuring unit 24.
- the operation time measurement unit 24 measures and integrates the release control time of the induction motor brake 16 controlled by the hoisting / traverse inverter control unit 12 to be released. That is, the total operation time is measured.
- the operating time measuring unit 24 measures and integrates the opening control time of the induction motor brake 16 for each load category determined by the load determining process. That is, the operation time for each load category is measured.
- FIG. 6 is a flowchart of the operation time measurement process.
- the start of the operation time measurement process is, for example, a software interrupt process every 100 ms.
- the operation time measurement process is started after the load determination process (S4) ends (S5). ).
- the total operation time is incremented by 1 (S201).
- the operation time count for each load category is incremented by 1 from the determined load category (S206 to S210). As described above, the total operation time and the operation time for each load category can be measured.
- the conversion to the actual operation time with respect to the accumulated number of operation times is determined by the execution interval of the operation time measurement process.
- the hoisting / traversing inverter control unit 12 includes an operation frequency measuring unit 25.
- the number-of-operations measurement unit 25 controls the release of the induction motor brake 16 controlled by the hoisting and traverse inverter control unit 12 and then returns to the original number for each load category determined by the load determination process. Is accumulated. That is, the number of operations for each load category is measured.
- FIG. 7 is a flowchart of the operation count measurement process.
- the operation frequency measurement process is started by, for example, a software interrupt process every 100 ms.
- the brake release flag is set to 1 (S2), and the induction motor
- the brake release flag is set to 0 (S3).
- the operation number measurement process is started after the brake release flag is operated as described above (S6).
- the state of the brake release flag is first confirmed every time the process is executed (S301), and the operation state of the brake is also confirmed (S302). If the brake release flag is 1 and the brake is in a braking state, the brake release flag is set to 0 (S303).
- the total operation count is advanced by 1 (S304).
- the count of the number of operations for each load category is advanced by 1 from the determined load category (S306 to S310). As described above, the total number of operations and the number of operations for each load category can be measured.
- the hoisting / traverse inverter control unit 12 includes a remaining life calculating unit 26 in order to calculate the remaining life of the hoisting machine.
- the remaining life calculation unit 26 calculates the remaining life from the operation time for each load category detected as described above.
- the remaining life is found from the above, but in order to comprehensively determine the remaining life of the hoisting machine, the ratio between the downtime and the operating time of the hoisting machine, that is, the load time rate is required. This is because when the hoisting machine is operated intensively in a short time, a load is applied to the hoisting induction motor 3 and the hoisting inverter 14.
- the hoisting / traverse inverter control unit 12 has a load time rate measuring unit 27.
- the load time rate measuring unit 27 calculates the load time rate by determining the operation time and the downtime by measuring the release control time of the brake 16 for the induction motor that is controlled to be released by the hoisting / traverse inverter control unit 12. To do.
- FIG. 8 is a flowchart of the load time rate measurement process.
- the load time rate is expressed by the unit% ED, indicating how many minutes the operation is performed during 60 minutes. Since the operation time can be measured by confirming the operation state of the induction motor brake 16, the downtime can also be measured by confirming the operation state of the induction motor brake 16.
- the load time rate is measured by software interrupt processing every 100 ms, for example, and the load time rate measurement processing is always performed regardless of the state of the induction motor brake 16 (S7).
- the operating state of the induction motor brake 16 is checked to determine whether it is operating or stopped (S401). If it is in operation, 100 ms is added to the cumulative operation time (S402).
- the operation time storage process (S404) will be described with reference to FIG.
- the past 60 operation times per minute that is, the operation time for the past 60 minutes can be stored in the storage unit 28 of the hoisting and traverse inverter control unit 12 for 60 storages.
- An area is provided ([1]).
- the storage area is, for example, an area for storing the latest operation time as area 1, an area for storing the next new operation time as area 2, and an area for storing the oldest operation time in the following order as area 60.
- the oldest data stored in the area is deleted ([2]).
- the oldest data is determined when 60 areas are stored in the storage unit. For example, the address of area 1 is 001, the address of area 2 is 002,... An address is automatically assigned. Since these addresses are continuous, the oldest data can be determined by checking the addresses.
- the calculation method is to calculate the load time ratio for 15 minutes by adding the operation time for 15 minutes from the latest data stored in the operation time storage process (S404) and dividing the total operation time by 15 minutes. Can do.
- the calculated load time rate for 15 minutes may be compared with the previously calculated load time rate for 15 minutes, and the larger one may be stored as the maximum value.
- the load time rate for 30 minutes (S407), the load time rate for 45 minutes (S408), the load time rate for 60 minutes (S409) are calculated, and the load time rate measurement process is terminated.
- the method of the load time rate calculation process at each time interval is the same as the load time rate calculation process for 15 minutes, and it goes without saying that each time. Further, it goes without saying that changes such as increasing or shortening each time interval of the load time rate calculation process are easy.
- the measured or calculated data is deleted every time the power is turned off, it is meaningless because the data cannot be stored. Therefore, it is necessary to store the data so that it is not erased when the power is cut off.
- the data is saved in the storage unit 28 in the hoisting / traverse inverter control unit 12. Further, it may be stored in an external storage device such as a hard disk or USB. As described above, as a format for outputting measured or calculated data, for example, if a diagram such as FIG. 10 is displayed by connecting to a PC, the measured and calculated data can be understood at a glance, and the remaining life of the hoisting machine can be comprehensively determined. It is easy to judge.
- the measured or calculated data may be displayed on a digital display mounted on the control unit of a general inverter crane apparatus.
- a method for displaying measured or calculated data on a digital display will be described with reference to FIGS.
- a 7-segment LED display 29 which is a digital display capable of displaying characters on the hoisting and traverse inverter control unit 12 and a display for operating the display.
- switches 30 are provided.
- FIG. 12 shows an example of the display configuration of the measured and calculated data displayed on the 7-segment LED display 29 and the operation method for displaying the data.
- the initial display is the number of operations, so operate the down arrow switch to select the operation time.
- operating the right arrow switch displays the total operating time.
- the no-load operation time is displayed. If the down arrow switch or the up arrow switch is operated below, the total operation time and the operation time for each load category can be displayed.
- the remaining life of the hoisting machine can be displayed, and by measuring the operation status including the downtime, the load time rate of the hoisting machine, that is, the usage frequency can be measured and displayed with high accuracy. It is possible to provide a hoisting machine life calculation device that can be used.
- the total number of operations, the number of operations for each load, the total operation time, and the operation time for each load can be measured and displayed, it is possible to provide a judgment material for estimating the life of the hoisting machine.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control And Safety Of Cranes (AREA)
- Maintenance And Inspection Apparatuses For Elevators (AREA)
Abstract
巻上機(4)の吊荷の荷重を巻上機の制御インバータの電流値とモータの回転数から計算する荷重計算部(21)と、荷重計算部(21)で算出した荷重ごとの巻上機の上動作回数及び下動作回数の双方をカウントする動作回数測定部(25)と、荷重計算部(21)で算出した荷重ごとの運転時間をカウントする運転時間測定部(24)と、運転時間測定部(24)で測定した荷重ごとの運転時間から荷重率を算出し、また、得られた荷重率から巻上用装置の残存寿命を計算する残存寿命算出部(26)とを有する。
Description
本発明は、巻上機寿命計算装置に関する。
本技術分野の背景技術として、特開2010-180001号公報(特許文献1)がある。この公報には、「クレーンの寿命を荷重率及びその動作回数や動作時間を考慮した稼働状況に応じて精度良く推測するために必要な情報を得ることができるクレーンの稼働状況管理装置及びそれを備えたクレーンを提供する。」と記載されている。
前記特許文献1には巻上機の寿命を推測するため必要になる、巻上機の動作回数の計測について記載されている。しかし、特許文献1では「地切り回数及び上動作回数の双方をカウントする構成」で、下動作回数のカウントは行わない。このため、巻上機の寿命を精度良く推測することができない。
また、特許文献1では荷重ごとの動作回数と運転時間の計測だけで、休止時間の計測を行わない。そのため、巻上機の寿命を総合的に判断する測定値の一つである、運転時間と休止時間の比、すなわち使用頻度が正確に計測できない。
上記課題を考慮し、本発明は、精度良く巻上機の寿命を推測できる巻上機寿命計算装置を提供することを目的とする。
上記課題を解決するために、例えば特許請求の範囲に記載の構成を採用する。
本願は上記課題を解決する手段を複数含んでいるが、その一例を挙げるならば、例えば、巻上及び巻下動作などの動作を行なう巻上機の寿命を計算する巻上機寿命計算装置であって、巻上機の吊荷の荷重を巻上機の制御インバータの電流値とモータの回転数から計算する荷重計算部と、前記荷重計算部で算出した荷重ごとの巻上機の上動作回数及び下動作回数の双方をカウントする動作回数測定部と、前記荷重計算部で算出した荷重ごとの運転時間をカウントする運転時間測定部と、前記運転時間測定部で測定した荷重ごとの運転時間から荷重率を算出し、また、得られた荷重率から巻上用装置の残存寿命を計算する残存寿命算出部と、を有することを特徴とする。
本願は上記課題を解決する手段を複数含んでいるが、その一例を挙げるならば、例えば、巻上及び巻下動作などの動作を行なう巻上機の寿命を計算する巻上機寿命計算装置であって、巻上機の吊荷の荷重を巻上機の制御インバータの電流値とモータの回転数から計算する荷重計算部と、前記荷重計算部で算出した荷重ごとの巻上機の上動作回数及び下動作回数の双方をカウントする動作回数測定部と、前記荷重計算部で算出した荷重ごとの運転時間をカウントする運転時間測定部と、前記運転時間測定部で測定した荷重ごとの運転時間から荷重率を算出し、また、得られた荷重率から巻上用装置の残存寿命を計算する残存寿命算出部と、を有することを特徴とする。
本発明によれば、精度良く巻上機の寿命を推測できる巻上機寿命計算装置を提供することができる。
上記した以外の課題、構成及び効果は、以下の実施形態の説明により明らかにされる。
上記した以外の課題、構成及び効果は、以下の実施形態の説明により明らかにされる。
以下、実施例を図面を用いて説明する。
図1は、巻上機寿命計算装置の構成図の例である。図2は本実施例による巻上機寿命計算装置を設置するインバータ式クレーン装置の全体構成を示す斜視図、図3はインバータ式クレーン装置の主要部の構成を示すブロック図である。
図1は、巻上機寿命計算装置の構成図の例である。図2は本実施例による巻上機寿命計算装置を設置するインバータ式クレーン装置の全体構成を示す斜視図、図3はインバータ式クレーン装置の主要部の構成を示すブロック図である。
まず、図1を用いて巻上機寿命計算装置と巻上機との関連動作について概要を説明する。入力装置より、入力された動作指示により、巻上機の制御部が駆動部であるモータ動作させ、また、モータに近接するブレーキを開放するように動作させるよう制御し、巻上機を駆動する。そして、モータの動作状況のデータが制御部に送られ、制御部では、表示部に対して表示制御を行い、運転内容と対応する運転状況をリストにした情報を表示する。また、表示部で表示したリストを印刷することが可能であってもよい。
次に図2を用いて、インバータ式クレーン装置の全体構成について説明する。
インバータ式クレーン装置100は、クレーンフック1、ワイヤーロープ2、巻上誘導電動機3、巻上用装置4、横行誘導電動機5、横行用装置6、横行用ガーダー7、走行誘導電動機8、走行用装置9、走行用ガーダー10、巻上・横行インバータ装置(主制御部と称す。)11、後述する巻上・横行インバータ制御部12、操作入力装置13、後述する巻上用インバータ14、後述する横行用インバータ15、後述する誘導電動機用ブレーキ16、走行用インバータ装置17、後述する走行インバータ制御部18および後述する走行用インバータ19から構成されている。
インバータ式クレーン装置100は、クレーンフック1、ワイヤーロープ2、巻上誘導電動機3、巻上用装置4、横行誘導電動機5、横行用装置6、横行用ガーダー7、走行誘導電動機8、走行用装置9、走行用ガーダー10、巻上・横行インバータ装置(主制御部と称す。)11、後述する巻上・横行インバータ制御部12、操作入力装置13、後述する巻上用インバータ14、後述する横行用インバータ15、後述する誘導電動機用ブレーキ16、走行用インバータ装置17、後述する走行インバータ制御部18および後述する走行用インバータ19から構成されている。
インバータ式クレーン装置100は、クレーンフック1に取り付けた荷物を、巻上誘導電動機3を備えた巻上用装置4によりワイヤーロープ2を巻上巻下することでZ方向(Z方向、-Z方向の矢印で示す。)即ち、上下方向に荷物を移動する。また、X方向(X方向、-X方向の矢印で示す。)には、横行誘導電動機5を備えた横行用装置6と、横行用ガーダー7によりX方向に移動する。また、Y方向(Y方向、-Y方向の矢印で示す。)には、走行誘導電動機8を備えた走行用装置9と走行用ガーダー10によりY方向に移動する。
次に、図3を用いてインバータ式クレーン装置の制御構成につき説明する。
巻上誘導電動機3と横行誘導電動機5は、巻上・横行用インバータ装置11に格納された図3の巻上・横行インバータ制御部12により制御される。即ち、オペレータが操作入力装置13からの所定の指示を入力すると、巻上・横行インバータ制御部12は、巻上用インバータ14と横行用インバータ15を制御し、巻上用インバータ14と横行用インバータ15から制御に必要な周波数、電圧、電流を巻上誘導電動機3と横行誘導電動機5に加え、同時に誘導電動機用ブレーキ16を開放制御することで、クレーンフック1に取り付けられた荷物が、落下することなくZ方向に移動させる。横行用装置6の場合、横行用ガーダー7に沿って巻上用装置4をX方向に移動させる。
巻上誘導電動機3と横行誘導電動機5は、巻上・横行用インバータ装置11に格納された図3の巻上・横行インバータ制御部12により制御される。即ち、オペレータが操作入力装置13からの所定の指示を入力すると、巻上・横行インバータ制御部12は、巻上用インバータ14と横行用インバータ15を制御し、巻上用インバータ14と横行用インバータ15から制御に必要な周波数、電圧、電流を巻上誘導電動機3と横行誘導電動機5に加え、同時に誘導電動機用ブレーキ16を開放制御することで、クレーンフック1に取り付けられた荷物が、落下することなくZ方向に移動させる。横行用装置6の場合、横行用ガーダー7に沿って巻上用装置4をX方向に移動させる。
同様に走行用装置9に取り付けてある走行誘導電動機8は、オペレータが操作入力装置13からの所定の指示を入力すると、走行用インバータ装置17に格納された図3の走行インバータ制御部18が走行用インバータ19を制御し、走行用インバータ19から制御に必要な周波数、電圧、電流を走行誘導電動機8に加え、同時に誘導電動機用ブレーキ16を開放制御することで、走行用ガーダー10に沿って巻上用装置4をY方向に移動させる。
また、巻上用インバータ14は、電流測定部20を有する。電流測定部20は、巻上用誘導電動機3を駆動するための電流値を測定する。
また、巻上・横行インバータ制御部12は、荷重変換部21を有する。荷重変換部21は、電流測定部20で測定された電流値データを所定の計算によって荷重データに変換する。即ち、巻上用誘導電動機3を駆動するための電流値は、クレーンフック1に取り付けた荷物の重さに応じて電流値が変化するので、この電流値を荷重変換部21で荷重データに変換することで、荷重を計測することができる。例えば、荷重が重くなれば、巻上用誘導電動機3を駆動する電流値は大きくなり、荷重が軽くなれば、巻上用誘導電動機3を駆動する電流値は小さくなる。
さらに、巻上・横行インバータ制御部12は、スベリ量測定部22を有する。スベリ量測定部22は、巻上誘導電動機3の回転状況をパルス信号で出力するエンコーダ23からの信号を回転数に換算し、運転周波数から算出される同期回転数と、測定した実回転数の差であるスベリ量を測定する。即ち、スベリ量は、クレーンフック1に取り付けた荷物の重さに応じてスベリ量が変化するので、このスベリ量を荷重変換部21で荷重データに変換することで、荷重を計測することができる。例えば、荷重が重くなれば、巻上用誘導電動機3のスベリ量は大きくなり、荷重が軽くなれば、巻上用誘導電動機3のスベリ量は小さくなる。
ここで、インバータ制御の場合、定格速度以下の運転周波数で動作させる場合があるが、この場合、荷物の重さに応じて変化する電流値の変化量が、特に下げ方向の場合少なくなるため、精度よく判別することが難しいが、前記スベリ量による荷重判別の手段を持つことで、前記電流値の荷重判別と合わせて、精度良く荷重の判別が行える。
前記により検出した荷重はそのまま処理に使用するものとしてもよいがデータ量が膨大になる。そこで、本実施例では、巻上機の定格荷重(100%)に対して、荷重無し(0%)、軽負荷(1~25%)、中負荷(26~50%)、重負荷(51~75%)、超重負荷(76%~)の5パターンに分類して処理に使用する。
なお、電流値と荷重データとの関係または、スベリ量と荷重データの関係は、前もって実験的に、あるいは、所定の計算により容易に求めることができることはいうまでもない。
荷重変換部21の具体的な荷重判別方法を図4、5を用いて説明する。図4は荷重判別処理の開始タイミングを示すフロー図、図5は荷重判別処理のフロー図である。
荷重判別処理の開始は、例えば100msごとのソフトウェア割込み処理で、誘導電動機用ブレーキ16が開放されたとき(S1)に、荷重判別処理を開始する(S4)。
荷重判別処理は、巻上機が加速中、減速中の状態の場合、前記電流値及びスベリ量が精度良く測定できないので一定速時に電流値及びスベリ量を測定する必要がある。そこで、図4に示すように「上」又は「下」方向の動作指示が有り(S101)、なおかつ、巻上用インバータ14が巻上誘導電動機3へ出力する周波数を、巻上・横行インバータ制御部12が指示する目標周波数と、実際に巻上用インバータ14が出力している出力周波数を比較し(S102)、指示周波数と出力周波数が同じ、または、指示周波数より出力周波数の方が大きければ、一定速状態であるので、電流値、スベリ量を取得する(S103)。
前記の条件を満たさない場合は、荷重判別処理を初期状態に戻し処理を終了する(S109)。
なお、電流値とスベリ量は加速中、減速中などの巻上機の状態に関わらず、常時検出を行っている。
設定された取得回数の電流値、スベリ量の取得し(S104)、電流値とスベリ量の取得が完了したら、取得値のばらつきを抑えるため、例えば、5回分の取得値を保存後に(S110)、平均値を算出する(S105)。
電流値及び、スベリ量各々の平均値を算出し終えたら、取得値の合計値及び取得回数のカウンタをクリアする。(S106)そして、巻上用インバータ14が出力している出力周波数の値と、設定された出力周波数の基準値(例えば30Hz)とを比較し(S107)、基準値以下である場合、スベリ量を荷重判別のパラメータとして使用し、スベリ量平均と操作方向とから荷重クラスを判定する(S108)、一方基準値より大きい場合は電流値を荷重判別のパラメータとして使用し、電流値平均と操作方向とから荷重クラスを判定する(112)。
また、巻上機の動作方向(Z方向)により、電流値、スベリ量は変化するので、荷重判別のパラメータには動作方向も判断する必要があるが、動作方向は操作入力装置13から巻上・横行インバータ制御部12への入力を確認すれば動作方向が分かる。
ここで、出力周波数により電流値またはスベリ量どちらか一方を荷重判別のパラメータに使用せず、両方を荷重判別のパラメータに使用してもよい。
前記により荷重を判別するパラメータが揃ったら、前もって図13、図14のように決めている、区分にそって、荷重を5パターンに分類する。例えば、出力周波数60Hz、上方向の動作で電流値を11Aと検出した場合、荷重判別は中負荷と判別する(S112)。
次に図4に示した運転時間測定処理S5について説明する。図3に示すように巻上・横行インバータ制御部12は、運転時間測定部24を有する。運転時間測定部24は、巻上・横行インバータ制御部12が開放制御する、誘導電動機用ブレーキ16の開放制御時間を測定し積算する。即ち、総運転時間を測定する。
さらに、運転時間測定部24は、前記荷重判別処理により判別した荷重区分ごとの誘導電動機用ブレーキ16の開放制御時間を測定し積算する。即ち、荷重区分ごとの運転時間を測定する。
運転時間測定部24の具体的な運転時間測定方法を図4及び6を用いて説明する。図6は運転時間測定処理のフロー図である。
運転時間測定処理の開始は、例えば100msごとのソフトウェア割込み処理で、誘導電動機用ブレーキ16が開放されたとき(S1)に、荷重判別処理(S4)終了後、運転時間測定処理を開始する(S5)。
運転時間測定処理は処理が実行される度にまず、総運転時間のカウントを1進める(S201)。次に、判別した荷重区分から、各荷重区分ごとの運転時間のカウントを1進める(S206~S210)。前記により総運転時間と荷重区分ごとの運転時間を測定できる。
なお、運転時間の積算した回数に対する実際の運転時間への換算は、運転時間測定処理の実行間隔で決定されることはいうまでもない。
次に図4に示した動作回数測定処理S6について説明する。図3に示すように巻上・横行インバータ制御部12は、動作回数測定部25を有する。動作回数測定部25は、巻上・横行インバータ制御部12が開放制御する、誘導電動機用ブレーキ16の状態が開放された後、元に戻るときの回数を前記荷重判別処理により判別した荷重区分ごとに積算する。即ち、荷重区分ごとの動作回数を測定する。
動作回数測定部25の具体的な動作回数測定方法を図4、7を用いて説明する。図7は動作回数測定処理のフロー図である。
図4で示すように、動作回数測定処理の開始は、例えば100msごとのソフトウェア割込み処理で、誘導電動機用ブレーキ16が開放されたときに、ブレーキ開放フラグを1にセットし(S2)、誘導電動機用ブレーキ16が制動されたときに、ブレーキ開放フラグを0にセットする(S3)。前記のようにブレーキ開放フラグの操作を行ってから動作回数測定処理を開始する(S6)。
図7に示すように、動作回数測定処理は処理が実行される度にまず、ブレーキ開放フラグの状態を確認し(S301)、また、ブレーキの動作状態も合わせて確認する(S302)。ブレーキ開放フラグが1、なおかつ、ブレーキが制動状態ならば、ブレーキ開放フラグを0にセットする(S303)。
ブレーキ開放フラグを0にセットしたら、総動作回数のカウントを1進める(S304)。次に、判別した荷重区分から、各荷重区分ごとの動作回数のカウントを1進める(S306~S310)。前記により総動作回数と荷重区分ごとの動作回数を測定できる。
次に図4に示した負荷時間率測定処理S7について説明する。まず残存寿命の算出に関して説明する。図3に示すように巻上機の残存寿命を算出するために巻上・横行インバータ制御部12は、残存寿命算出部26を有する。残存寿命算出部26は前記により検出した、荷重区分別の運転時間より、残存寿命の算出を行う。
残存寿命算出部26が行う巻上機の残存寿命算出の具体的な方法について説明する。巻上機の残存寿命はまず、[数1]にもとづいて荷重率を算出する。
[数1]の荷重区分別の運転時間、総運転時間は前記により測定した値を、また、荷重割合は図13、14に記載している値を用いる。
次に、[数1]により算出した荷重率を、巻上機を一般的に使用した場合の荷重率0.63で除算し、(数2)より価荷重率を算出する。
(数2)
等価荷重率=(荷重率/0.63)3
次に、(数3)より価運転時間を算出する。ここで、総運転時間は前記により測定した値を用いる。
(数3)
等価運転時間=総運転時間×等価荷重率
前記により、等価運転時間および、等価荷重率が判明したら、(数4)により残存寿命を算出する。
(数4)
残存寿命=設定総運転時間×等価運転時間
(数4)の設定総運転時間は、巻上機の仕様から判断できるので、残存寿命算出部26に初期値を設定しておけばよい。また、設定総運転時間は、後で変更可能にしておいてもよい。
(数2)
等価荷重率=(荷重率/0.63)3
次に、(数3)より価運転時間を算出する。ここで、総運転時間は前記により測定した値を用いる。
(数3)
等価運転時間=総運転時間×等価荷重率
前記により、等価運転時間および、等価荷重率が判明したら、(数4)により残存寿命を算出する。
(数4)
残存寿命=設定総運転時間×等価運転時間
(数4)の設定総運転時間は、巻上機の仕様から判断できるので、残存寿命算出部26に初期値を設定しておけばよい。また、設定総運転時間は、後で変更可能にしておいてもよい。
ここで、残存寿命は前記により判明するが、巻上機の残存寿命を総合的に判別するために巻上機の休止時間と運転時間の比、すなわち、負荷時間率が必要である。これは、短時間で集中的に巻上機を運転した場合、巻上誘導電動機3や巻上用インバータ14などに負荷が掛かるからである。
負荷時間率を測定するために、巻上・横行インバータ制御部12は、負荷時間率測定部27を有する。負荷時間率測定部27は、巻上・横行インバータ制御部12が開放制御する、誘導電動機用ブレーキ16の開放制御時間を測定することで、運転時間及び、休止時間を判断し負荷時間率を算出する。
負荷時間率の具体的な測定方法を図4、8を用いて説明する。図8は負荷時間率測定処理のフロー図である。
まず、負荷時間率の一般的な算出について説明する。負荷時間率は、60分間の間に何分間運転している時間があるのかを、単位%EDを用いて表す。運転時間の測定は前記の誘導電動機用ブレーキ16の動作状態を確認することで行えるので、休止時間の測定も同じく誘導電動機用ブレーキ16の動作状態を確認することで行える。
負荷時間率の計測は図4のように例えば100msごとのソフトウェア割込み処理で、誘導電動機用ブレーキ16の状態によらず、常時、負荷時間率測定処理を行う(S7)。
負荷時間率測定処理は処理が実行される度にまず、誘導電動機用ブレーキ16の動作状態を確認し運転中か停止中か判別する(S401)。運転中ならば運転時間累計に100msを加算する(S402)。
次に、運転時間累計と停止時間累計の合計が1分以上か確認する(S403)。1分未満ならば負荷時間率計測の割込み処理を終了する。1分以上の場合、運転時間保存処理(S404)を実施する。
ここで、運転時間保存処理(S404)について図9を用いて説明する。運転時間保存処理(S404)は例えば1分間の運転時間を過去60個すなわち、過去60分間の運転時間を保存できるように、巻上・横行インバータ制御部12の記憶部28に60個分の保存領域を設ける([1])。保存領域は、例えば、最新の運転時間を保存する領域を領域1、次に新しい運転時間を保存する領域を領域2、以下順番で、一番古い運転時間を保存する領域を領域60とする。
次に、運転時間保存処理(S404)が実行されるたびに、前記領域に保存したデータで、一番古いデータを消去する([2])。一番古いデータの判断は、前記記憶部に60個分の領域を取った時点で、例えば領域1のアドレスは001、領域2のアドレスは002、・・・領域60のアドレスは060のようにアドレスが自動的に割り付けられる。このアドレスは連続しているのでアドレスを確認すれば、一番古いデータが判別できる。
次に、領域59のデータを、領域60に移動させ、さらに領域58のデータを、領域59に移動させる処理を、領域1のデータをデータ2に移動させるまで繰り返す([3])。
次に、最新の運転時間を領域1に保存([4])することで、過去60分間の運転時間を保存することができる。
運転時間保存処理(S404)が終了したら、運転時間累計と停止時間累計をクリアする(S405)。クリアすることで、次の1分間の運転時間が測定可能になる。
次に、15分間の負荷時間率を算出する(S406)。算出方法は運転時間保存処理(S404)で保存した最新のデータから15分間分の運転時間を合計し、合計した運転時間を15分で除算することで、15分間の負荷時間率を算出することができる。ここで、算出した15分間の負荷時間率は、前回算出した15分間の負荷時間率と比較し、大きい方を最大値として保存してもよい。
次に、30分間の負荷時間率(S407)、45分間の負荷時間率(S408)、60分間の負荷時間率(S409)を算出し、負荷時間率計測処理を終了する。各時間間隔の負荷時間率算出処理の方法は、15分間の負荷時間率算出処理と同様であること、また、各時間は言うまでもない。また、負荷時間率算出処理の各時間間隔を増やしたり、短くするなどの変更は容易であることは言うまでもない。
前記により、測定や算出したデータが、電源が遮断される度に消去されると、データの蓄積ができないので意味がない。そこで、電源が遮断された際に消去されないよう保存する必要がある。
保存する方式としては、巻上・横行インバータ制御部12にある記憶部28に保存する。また、ハードディスクやUSB等の外部記憶装置に保存しても良い。前記により、測定や算出したデータを出力する形式として、例えばPCに接続し図10のような図象を表示すれば、ひと目で測定や算出したデータが分かり、巻上機の残存寿命を総合的に判断することが容易である。
また、一般的なインバータ式クレーン装置の制御部に搭載されているデジタル表示器で測定や算出したデータを表示してもよい。本実施例ではデジタル表示器で測定や算出したデータを表示する方法を、図11、図12を用いて説明する。
測定や算出したデータを表示するため図11のように、巻上横行インバータ制御部12に、文字を表示させることが出来るデジタル表示器である7セグメントLED表示器29と、表示を操作するためのスイッチ30を4つ備える。
図12に7セグメントLED表示器29で表示させる、測定や算出したデータの表示構成及び表示させる操作方法の例を示す。
例えば、運転時間を表示させたい場合の操作は、初期表示が動作回数なので下矢印スイッチを操作し運転時間を選択する。運転時間を選択後、右矢印スイッチを操作すると総運転時間が表示される。次に、下矢印スイッチを操作すると無負荷の運転時間が表示される。以下下矢印スイッチまたは上矢印スイッチを操作すれば、総運転時間と荷重区分ごとの運転時間を表示することができる。
本実施例により、巻上機の残存寿命を表示することができ、休止時間も含めた稼働状況の計測を行うことで、精度の良い巻上機の負荷時間率すなわち使用頻度を計測し表示することができる、巻上機寿命計算装置を提供することができる。
さらに、総動作回数、荷重別の動作回数、総運転時間、荷重別運転時間を測定し表示することができるので、巻上機の寿命を推測する上での判断材料も提供することができる。
1:クレーンフック
2:ワイヤーロープ
3:巻上誘導電動機
4:巻上用装置
5:横行誘導電動機
6:横行用装置
7:横行用ガーダー
8:走行誘導電動機
9:走行用装置
10:走行用ガーダー
11:巻上・横行インバータ装置
12:巻上・横行インバータ制御部
13:操作入力装置
14:巻上用インバータ
15:横行用インバータ
16:誘導電動機用ブレーキ
17:走行用インバータ装置
18:走行インバータ制御部
19:走行用インバータ
20:電流測定部
21:荷重変換部
22:スベリ量測定部
23:エンコーダ
24:運転時間測定部
25:動作回数測定部
26:残存寿命算出部
27:負荷時間率測定部
28:記憶部
29:7セグメントLED
30:操作スイッチ
2:ワイヤーロープ
3:巻上誘導電動機
4:巻上用装置
5:横行誘導電動機
6:横行用装置
7:横行用ガーダー
8:走行誘導電動機
9:走行用装置
10:走行用ガーダー
11:巻上・横行インバータ装置
12:巻上・横行インバータ制御部
13:操作入力装置
14:巻上用インバータ
15:横行用インバータ
16:誘導電動機用ブレーキ
17:走行用インバータ装置
18:走行インバータ制御部
19:走行用インバータ
20:電流測定部
21:荷重変換部
22:スベリ量測定部
23:エンコーダ
24:運転時間測定部
25:動作回数測定部
26:残存寿命算出部
27:負荷時間率測定部
28:記憶部
29:7セグメントLED
30:操作スイッチ
Claims (3)
- 巻上及び巻下動作などの動作を行なう巻上機の寿命を計算する巻上機寿命計算装置であって、
巻上機の吊荷の荷重を巻上機の制御インバータの電流値とモータの回転数から計算する荷重計算部と、
前記荷重計算部で算出した荷重ごとの巻上機の上動作回数及び下動作回数の双方をカウントする動作回数測定部と、
前記荷重計算部で算出した荷重ごとの運転時間をカウントする運転時間測定部と、
前記運転時間測定部で測定した荷重ごとの運転時間から荷重率を算出し、また、得られた荷重率から巻上用装置の残存寿命を計算する残存寿命算出部と、を有することを特徴とする巻上機寿命計算装置。 - 請求項1に記載の巻上機寿命計算装置であって、
前記運転時間測定部で測定した荷重ごとの運転時間から、運転時間と休止時間の割合である負荷時間率を測定する負荷時間率測定部を有することを特徴とする巻上機寿命計算装置。 - 請求項2に記載の巻上機寿命計算装置であって、
前記負荷時間率を、時間区分ごとに表示可能な表示部を有することを特徴とした巻上機寿命計算装置。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP18166581.1A EP3366634B1 (en) | 2013-03-29 | 2014-01-29 | Hoist life calculating device |
EP14774591.3A EP2980001B1 (en) | 2013-03-29 | 2014-01-29 | Hoist life calculating device |
CN201480003133.2A CN104822618B (zh) | 2013-03-29 | 2014-01-29 | 卷扬机寿命计算装置 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013-070982 | 2013-03-29 | ||
JP2013070982A JP6054795B2 (ja) | 2013-03-29 | 2013-03-29 | 巻上機寿命計算装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014156279A1 true WO2014156279A1 (ja) | 2014-10-02 |
Family
ID=51623281
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2014/051883 WO2014156279A1 (ja) | 2013-03-29 | 2014-01-29 | 巻上機寿命計算装置 |
Country Status (4)
Country | Link |
---|---|
EP (2) | EP3366634B1 (ja) |
JP (1) | JP6054795B2 (ja) |
CN (1) | CN104822618B (ja) |
WO (1) | WO2014156279A1 (ja) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017138311A1 (ja) * | 2016-02-10 | 2017-08-17 | 株式会社日立産機システム | 巻上機、巻上機の管理システムおよび管理方法 |
WO2020008948A1 (ja) * | 2018-07-06 | 2020-01-09 | 株式会社日立産機システム | クレーン装置及びクレーン装置の情報入出力方法 |
CN112326284A (zh) * | 2020-10-19 | 2021-02-05 | 南京中船绿洲机器有限公司 | 一种基于任务剖面的电动甲板起重机可靠性试验方法 |
WO2021070441A1 (ja) * | 2019-10-09 | 2021-04-15 | 株式会社日立産機システム | 巻上機、巻上機システム、吊荷質量推定装置及び吊荷質量推定方法 |
CN117902487A (zh) * | 2024-03-19 | 2024-04-19 | 山西六建集团有限公司 | 一种塔机任务的吊装循环数据统计与分析系统及方法 |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6670665B2 (ja) * | 2016-04-15 | 2020-03-25 | 株式会社日立産機システム | 操作入力装置 |
CN108197647B (zh) * | 2017-12-28 | 2021-08-31 | 中南大学 | 一种汽车起动机耐久测试数据的快速聚类方法 |
CN109462357B (zh) * | 2018-09-04 | 2020-08-18 | 中联重科股份有限公司 | 基于变频器的起升负载计算方法、装置以及电动机 |
JP7152226B2 (ja) * | 2018-09-12 | 2022-10-12 | 株式会社日立産機システム | ワイヤーロープ監視装置およびワイヤーロープ監視方法 |
JP7066867B2 (ja) * | 2018-09-13 | 2022-05-13 | 株式会社日立産機システム | 巻上機、及び巻上機の寿命推測方法、並びに巻上機の寿命推測システム |
WO2020170699A1 (ja) * | 2019-02-20 | 2020-08-27 | 株式会社日立産機システム | データロギング装置及びこれを備えた巻上機 |
CN110823544A (zh) * | 2019-11-20 | 2020-02-21 | 中国船舶重工集团海装风电股份有限公司 | 变桨电机刹车剩余寿命计算方法、装置、设备及介质 |
JP7402128B2 (ja) * | 2020-07-01 | 2023-12-20 | 株式会社日立産機システム | クレーン装置、及びクレーン装置の運転管理システム |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010180001A (ja) | 2009-02-04 | 2010-08-19 | Kamiuchi Electric Works Ltd | クレーンの稼動状況管理装置及びそれを備えたクレーン |
JP2011105470A (ja) * | 2009-11-19 | 2011-06-02 | Hitachi Industrial Equipment Systems Co Ltd | 巻上機 |
JP2012111617A (ja) * | 2010-11-26 | 2012-06-14 | Kito Corp | 巻上装置の動作状況測定装置、及び巻上装置 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3048964A1 (de) * | 1980-12-24 | 1982-07-08 | Mannesmann AG, 4000 Düsseldorf | Verfahren und vorrichtung zum ermitteln der belastung von hebezeugen |
JP3426455B2 (ja) * | 1996-12-02 | 2003-07-14 | 株式会社荏原製作所 | 汚水処理装置の運転方法 |
JPH11246184A (ja) * | 1998-02-27 | 1999-09-14 | Toyo Electric Mfg Co Ltd | ホイストクレーン装置 |
JP2004067379A (ja) * | 2002-08-09 | 2004-03-04 | Ishikawajima Transport Machinery Co Ltd | 作業状態検出装置 |
JP4459650B2 (ja) * | 2004-02-20 | 2010-04-28 | 株式会社日立プラントテクノロジー | クレーンの故障診断装置 |
JP5270404B2 (ja) * | 2009-03-05 | 2013-08-21 | 東京製綱株式会社 | ワイヤロープ寿命管理装置および方法 |
CN102070091B (zh) * | 2009-11-19 | 2014-01-15 | 株式会社日立产机系统 | 卷扬机 |
CN101850934A (zh) * | 2010-05-31 | 2010-10-06 | 大连美恒时代科技有限公司 | 起重机信息管理系统 |
-
2013
- 2013-03-29 JP JP2013070982A patent/JP6054795B2/ja active Active
-
2014
- 2014-01-29 EP EP18166581.1A patent/EP3366634B1/en active Active
- 2014-01-29 WO PCT/JP2014/051883 patent/WO2014156279A1/ja active Application Filing
- 2014-01-29 CN CN201480003133.2A patent/CN104822618B/zh active Active
- 2014-01-29 EP EP14774591.3A patent/EP2980001B1/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010180001A (ja) | 2009-02-04 | 2010-08-19 | Kamiuchi Electric Works Ltd | クレーンの稼動状況管理装置及びそれを備えたクレーン |
JP2011105470A (ja) * | 2009-11-19 | 2011-06-02 | Hitachi Industrial Equipment Systems Co Ltd | 巻上機 |
JP2012111617A (ja) * | 2010-11-26 | 2012-06-14 | Kito Corp | 巻上装置の動作状況測定装置、及び巻上装置 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017138311A1 (ja) * | 2016-02-10 | 2017-08-17 | 株式会社日立産機システム | 巻上機、巻上機の管理システムおよび管理方法 |
JPWO2017138311A1 (ja) * | 2016-02-10 | 2018-02-15 | 株式会社日立産機システム | 巻上機、巻上機の管理システムおよび管理方法 |
WO2020008948A1 (ja) * | 2018-07-06 | 2020-01-09 | 株式会社日立産機システム | クレーン装置及びクレーン装置の情報入出力方法 |
JPWO2020008948A1 (ja) * | 2018-07-06 | 2021-07-01 | 株式会社日立産機システム | クレーン装置及びクレーン装置の情報入出力方法 |
JP7000573B2 (ja) | 2018-07-06 | 2022-01-19 | 株式会社日立産機システム | クレーン装置及びクレーン装置の情報入出力方法 |
WO2021070441A1 (ja) * | 2019-10-09 | 2021-04-15 | 株式会社日立産機システム | 巻上機、巻上機システム、吊荷質量推定装置及び吊荷質量推定方法 |
CN112326284A (zh) * | 2020-10-19 | 2021-02-05 | 南京中船绿洲机器有限公司 | 一种基于任务剖面的电动甲板起重机可靠性试验方法 |
CN117902487A (zh) * | 2024-03-19 | 2024-04-19 | 山西六建集团有限公司 | 一种塔机任务的吊装循环数据统计与分析系统及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104822618A (zh) | 2015-08-05 |
EP3366634A1 (en) | 2018-08-29 |
EP2980001A1 (en) | 2016-02-03 |
CN104822618B (zh) | 2017-05-03 |
JP6054795B2 (ja) | 2016-12-27 |
EP3366634B1 (en) | 2020-01-29 |
EP2980001B1 (en) | 2018-07-18 |
JP2014193760A (ja) | 2014-10-09 |
EP2980001A4 (en) | 2016-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6054795B2 (ja) | 巻上機寿命計算装置 | |
JP5479728B2 (ja) | ワイヤーロープ監視装置およびワイヤーロープ監視方法 | |
JP6271364B2 (ja) | 電動ウインチ装置 | |
WO2018056026A1 (ja) | 電動ウインチ装置 | |
JP6286515B2 (ja) | 巻上機寿命計算装置 | |
CN110894048B (zh) | 钢缆监视装置和钢缆监视方法 | |
CN108529456A (zh) | 一种新型塔机力矩安全控制系统及方法 | |
CN203998761U (zh) | 一种测定放线长度的人工卷扬机 | |
JP6769785B2 (ja) | クレーンの吊上げ荷重の測定方法 | |
JP6280838B2 (ja) | 移動装置、巻上機、クレーン装置、及びそれらに用いる車輪寿命推測方法 | |
JP2011105470A (ja) | 巻上機 | |
CN102295236A (zh) | 双门机抬吊装置 | |
JP7346354B2 (ja) | ワイヤロープ監視装置およびクレーンシステム | |
JP5901166B2 (ja) | 荷役時間を短縮する港湾荷役機器の制御方法と港湾荷役機器 | |
JP6353798B2 (ja) | クライミングクレーンの可変制御方法 | |
CN203877819U (zh) | 一种测定放线长度的卷扬机 | |
JP6664280B2 (ja) | 電動ウインチ装置 | |
CN218860227U (zh) | 一种钻机绞车控制装置 | |
JP7402128B2 (ja) | クレーン装置、及びクレーン装置の運転管理システム | |
JP2023182303A (ja) | クレーン稼働計及びそのクレーン稼働計の機能を用いたクレーンの保守サービス方法 | |
EP4317043A1 (en) | Crane, and control method for crane | |
WO2014112044A1 (ja) | 荷役時間を短縮する港湾荷役機器の制御方法と港湾荷役機器 | |
CN203877814U (zh) | 一种测定放线长度的差速卷扬机 | |
CN203877820U (zh) | 一种测定放线长度的手控电控两用卷扬机 | |
CN203946829U (zh) | 一种测定放线长度的卷扬机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14774591 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2014774591 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: DE |