WO2014136227A1 - 歪測定装置、取付装置 - Google Patents

歪測定装置、取付装置 Download PDF

Info

Publication number
WO2014136227A1
WO2014136227A1 PCT/JP2013/056168 JP2013056168W WO2014136227A1 WO 2014136227 A1 WO2014136227 A1 WO 2014136227A1 JP 2013056168 W JP2013056168 W JP 2013056168W WO 2014136227 A1 WO2014136227 A1 WO 2014136227A1
Authority
WO
WIPO (PCT)
Prior art keywords
electrode
rod
metal member
insulating
pipe
Prior art date
Application number
PCT/JP2013/056168
Other languages
English (en)
French (fr)
Inventor
田中 誠
秀雄 石丸
Original Assignee
中国電力株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中国電力株式会社 filed Critical 中国電力株式会社
Priority to JP2013530463A priority Critical patent/JP5426054B1/ja
Priority to PCT/JP2013/056168 priority patent/WO2014136227A1/ja
Publication of WO2014136227A1 publication Critical patent/WO2014136227A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B7/00Measuring arrangements characterised by the use of electric or magnetic techniques
    • G01B7/16Measuring arrangements characterised by the use of electric or magnetic techniques for measuring the deformation in a solid, e.g. by resistance strain gauge
    • G01B7/18Measuring arrangements characterised by the use of electric or magnetic techniques for measuring the deformation in a solid, e.g. by resistance strain gauge using change in resistance
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B7/00Measuring arrangements characterised by the use of electric or magnetic techniques
    • G01B7/16Measuring arrangements characterised by the use of electric or magnetic techniques for measuring the deformation in a solid, e.g. by resistance strain gauge
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D5/00Mechanical means for transferring the output of a sensing member; Means for converting the output of a sensing member to another variable where the form or nature of the sensing member does not constrain the means for converting; Transducers not specially adapted for a specific variable
    • G01D5/12Mechanical means for transferring the output of a sensing member; Means for converting the output of a sensing member to another variable where the form or nature of the sensing member does not constrain the means for converting; Transducers not specially adapted for a specific variable using electric or magnetic means
    • G01D5/14Mechanical means for transferring the output of a sensing member; Means for converting the output of a sensing member to another variable where the form or nature of the sensing member does not constrain the means for converting; Transducers not specially adapted for a specific variable using electric or magnetic means influencing the magnitude of a current or voltage
    • G01D5/24Mechanical means for transferring the output of a sensing member; Means for converting the output of a sensing member to another variable where the form or nature of the sensing member does not constrain the means for converting; Transducers not specially adapted for a specific variable using electric or magnetic means influencing the magnitude of a current or voltage by varying capacitance
    • G01D5/241Mechanical means for transferring the output of a sensing member; Means for converting the output of a sensing member to another variable where the form or nature of the sensing member does not constrain the means for converting; Transducers not specially adapted for a specific variable using electric or magnetic means influencing the magnitude of a current or voltage by varying capacitance by relative movement of capacitor electrodes

Definitions

  • the present invention relates to a strain measuring device and a mounting device.
  • a strain measurement device that measures the amount of strain of a measurement object based on the capacitance value of a capacitor formed by a first electrode and a second electrode is known (for example, Patent Document 1).
  • the main present invention that solves the above-described problems includes a first electrode body having a cylindrical electrode, a second electrode body having a rod-shaped electrode inserted into the cylindrical electrode, and the rod-shaped electrode inserted into the cylindrical electrode.
  • a first insulating member surrounding the first electrode body, a second insulating member surrounding the second electrode body so that the rod-shaped electrode is inserted into the cylindrical electrode, and a device under test In order to attach the first electrode body to an object, the first insulating member is surrounded between the first insulating member and the object to be measured so that the rod electrode is inserted into the cylindrical electrode.
  • the rod-shaped electrode is inserted between the cylindrical electrode and the second insulating member and the object to be measured.
  • Second gold surrounding the second insulating member And a member in a direction in which the rod-shaped electrode of the object to be measured is inserted based on a capacitance value determined according to the length of the portion of the rod-shaped electrode inserted into the cylindrical electrode.
  • a strain measuring apparatus characterized by measuring a strain amount.
  • FIG. 1 is a perspective view showing a part of the strain measuring apparatus in the present embodiment.
  • the measurement cables 4A and 4B (FIG. 2) are omitted for convenience of explanation.
  • the strain measuring device 100 is a device for measuring the strain amount of a welded portion of a boiler, a turbine, a pipe, etc. provided in, for example, a thermal power plant.
  • the strain amount indicates, for example, the amount of displacement of the measurement object according to the deformation of the measurement object.
  • the strain measuring apparatus 100 is, for example, an electrostatic capacity for measuring the strain amount of a measurement target portion 401 such as a welded portion in a metal pipe 400 (measurement object) having a relatively high temperature of, for example, 600 ° C. or more. This is a displacement meter of the type.
  • One side ( ⁇ X) from the measurement target portion 400 of the pipe 400 in the longitudinal direction (Z axis) of the pipe 400 corresponds to the first pipe.
  • the other side (+ X) of the measurement target portion 400 of the pipe 400 in the longitudinal direction of the pipe 400 corresponds to the second pipe.
  • the strain measuring device 100 includes a first measuring device 200, a second measuring device 800, and a strain detecting device 9 (FIG. 7).
  • the Z axis is an axis along the height direction (vertical direction) where the first measuring device 200 and the second measuring device 800 are erected, and + Z is the first measuring device 200 from the pipe 400.
  • Z indicates the upward direction toward the second measuring apparatus 800 (the direction away from the pipe 400 in the vertical direction)
  • ⁇ Z indicates the downward direction toward the pipe 400 from the first measuring apparatus 200 and the second measuring apparatus 800 (the pipe in the vertical direction). (Direction approaching 400).
  • the X axis is an axis along the direction in which the first measuring device 200 and the second measuring device 800 are adjacent to each other, + X indicates the direction from the first measuring device 200 to the second measuring device 800, and ⁇ X is The direction from the second measuring device 800 toward the first measuring device 200 is indicated.
  • the Y axis is an axis orthogonal to the X axis and the Z axis, and + Y is the other side surface where the slit 2B is not provided from the one side surface where the slit 2B is provided in the first measuring device 200.
  • -Y represents a direction from the other side surface to the one side surface of the first measuring apparatus 200.
  • the first measuring device 200 and the second measuring device 800 measure the strain amount of the measurement target portion 401 in the metal pipe 400
  • the first measurement device 200 and the second measurement device 800 have the measurement target portion 401 in the direction (X axis) in which the pipe 400 extends. It is a device provided on both sides.
  • the first measuring device 200 and the second measuring device 800 function as sensors for measuring the strain amount in the direction in which the pipe 400 extends in the measurement target portion 401.
  • the first measuring device 200 and the second measuring device 800 will be described later.
  • the strain detection device 9 is a device that measures the strain amount of the measurement target portion 401 based on the displacement amounts of the first measurement device 200 and the second measurement device 800. The strain detection device 9 will be described later.
  • FIG. 2 is a cross-sectional view showing a part of the strain measuring apparatus according to the present embodiment.
  • FIG. 2 shows the first measurement device 200 and the second measurement device 800 in a state viewed from the XZ plane passing through the approximate center of the first measurement device 200 in FIG. 1 toward the + Y direction.
  • FIG. 3 is a perspective view showing the first electrode device and the second electrode device in the present embodiment. The first electrode 32 is not visible, but is shown by a dotted line for convenience of explanation.
  • the first measuring device 200 is fixed by welding, for example, on one side ( ⁇ X) of the measurement target portion 401 in the pipe 400.
  • the first measuring device 200 includes a first mounting device 2 and a first electrode device 3 (first electrode body).
  • the first attachment device 2 is a device for attaching the first electrode device 3 to the pipe 400, and is fixed to the pipe 400.
  • the first mounting device 2 will be described later.
  • the first electrode device 3 is a device for forming the capacitor C0 (FIG. 7) together with the second electrode device 7.
  • the first electrode device 3 includes a housing 31 (first case), a first electrode 32 (cylindrical electrode), and a fixing member 33 (first support member).
  • the housing 31 is, for example, a metal housing for holding the first electrode 32 in a state where the first electrode 32 is accommodated.
  • the outer shape (FIG. 3) of the housing 31 has, for example, a cylindrical shape.
  • the housing 31 has a hollow structure so that the first electrode 32 can be accommodated therein. Note that the inner diameter of the housing 31 is set larger than the outer diameter of the first electrode 32.
  • the fixing member 33 is an insulating member such as ceramics for fixing the first electrode 32 inside the housing 31.
  • the fixing member 33 supports the first electrode 32 inside the housing 31.
  • the first electrode 32 is a metal member for forming the capacitor C0 (FIG. 7) together with the second electrode 72. That is, the first electrode 32 functions as one of the two electrodes in the capacitor C0.
  • the first electrode 32 extends in a rod shape along the longitudinal direction (X axis) of the pipe 400.
  • the external shape of the 1st electrode 32 exhibits elongate cylindrical shape, for example.
  • the first electrode 32 has a hollow structure so that the end portion 72A of the second electrode 72 can be inserted into the first electrode 32 so as to freely advance and retract. That is, the first electrode 32 has a cylindrical shape.
  • a substantially circular opening 32A for inserting the second electrode 72 into the first electrode 32 is formed at the end of the first electrode 32 on the second electrode 72 side (+ X).
  • the diameter of the opening 32 ⁇ / b> A is set larger than the diameter of the second electrode 72 so that the second electrode 72 can be inserted into the first electrode 32.
  • the first electrode 32 is fixed inside the casing 31 by a fixing member 33 so as not to contact the casing 31. That is, the first electrode 32 is in a state of being electrically insulated from the housing 31 without contacting the housing 31. Further, the first electrode 32 is in a state of being accommodated in the housing 31 so that the second electrode 72 is inserted into the first electrode 32.
  • the second measuring device 800 is fixed by welding, for example, to the other side (+ X) of the measurement target portion 401 in the pipe 400.
  • the second measuring device 800 includes a second attachment device 8 and a second electrode device 7 (second electrode body).
  • the second attachment device 8 is a device for attaching the second electrode device 7 to the pipe 400, and is fixed to the pipe 400.
  • the second mounting device 8 will be described later.
  • the second electrode device 7 is a device for forming the capacitor C0 together with the first electrode device 3.
  • the second electrode device 7 includes a housing 71 (second case), a second electrode 72 (bar-shaped electrode), and a fixing member 73 (second support member).
  • the housing 71 is, for example, a metal housing for holding the second electrode 72 in a state where a part of the second electrode 72 is accommodated.
  • the outer shape (FIG. 3) of the housing 71 has, for example, a cylindrical shape.
  • the casing 71 has a hollow structure so that a part of the second electrode 72 can be accommodated therein. Note that the inner diameter of the casing 71 is set larger than the outer diameter of the second electrode 72.
  • the fixing member 73 is an insulating member such as ceramic for fixing a part of the second electrode 72 inside the casing 71.
  • the fixing member 73 supports the second electrode 72 inside the housing 71.
  • the second electrode 72 is a metal member for forming the capacitor C0 (FIG. 7) together with the first electrode 32. That is, the second electrode 72 functions as the other electrode of the two electrodes in the capacitor C0.
  • the second electrode 72 extends in a rod shape along the longitudinal direction (X axis) of the pipe 400. That is, the second electrode 72 extends in the same direction as the first electrode 32 and is substantially parallel to the first electrode 32.
  • the outer shape of the second electrode 72 has, for example, a long cylindrical shape.
  • the second electrode 72 protrudes toward the first electrode 32 so that the end 72A is inserted into the first electrode 32 through the opening 32A so as to freely advance and retract.
  • the second electrode 72 is fixed inside the casing 71 by a fixing member 73 so as not to contact the casing 71. That is, the second electrode 72 is not electrically in contact with the casing 71 and is electrically insulated from the casing 71.
  • the end 72A of the second electrode 72 is inserted into the first electrode 32.
  • the outer surface of the end portion 72 ⁇ / b> A (hereinafter also referred to as “insertion portion of the second electrode 72”) inserted into the first electrode 32 in the second electrode 72 faces the inner surface of the first electrode 32.
  • the insertion portion of the second electrode 72 functions as the other electrode of the capacitor C0, and a part of the first electrode 32 facing the insertion portion of the second electrode 72 (hereinafter referred to as “the opposing portion of the first electrode 32”). Will also function as one electrode of the capacitor C0.
  • the second electrode 72 is fixed to the housing 71 so as not to contact the first electrode 32. Further, the second electrode 72 is in a state of being accommodated in the casing 71 such that the second electrode 72 is inserted into the first electrode 32.
  • the capacitance value of the capacitor C0 (FIG. 7) formed by the first electrode 32 and the second electrode 72 is the first measuring device 200 and the second measuring device 800 in the direction (X axis) in which the pipe 400 extends. Is determined according to the distance D1 between the two. That is, the value of the capacitance of the capacitor C0 is determined according to the length of the portion of the second electrode 72 inserted into the first electrode 32.
  • the length of the portion inserted into the first electrode 32 at the end 72A of the second electrode 72 becomes shorter. Therefore, as the distance D1 increases, the area of the insertion portion of the second electrode 72 and the area of the opposing portion of the first electrode 32 become narrower. That is, the area of one electrode and the area of the other electrode in the capacitor C0 are reduced, and the capacitance value of the capacitor C0 is reduced.
  • the distance D1 becomes shorter, the length of the portion inserted into the first electrode 32 in the end portion 72A of the second electrode 72 becomes longer. Therefore, as the distance D1 becomes shorter, the area of the insertion portion of the second electrode 72 and the area of the opposing portion of the first electrode 32 become wider. That is, the area of one electrode and the area of the other electrode in the capacitor C0 are increased, and the capacitance value of the capacitor C0 is increased.
  • the fluctuation range of the distance D1 can be obtained based on the fluctuation range of the capacitance value of the capacitor C0. That is, based on the fluctuation range of the capacitance value of the capacitor C0, it is possible to determine the amount of distortion in the direction (X axis) in which the second electrode 72 in the measurement target portion 401 is inserted into the first electrode 32. .
  • FIG. 4 is a perspective view showing the first attachment device in the present embodiment. Although a part of the metal member 21, a part of the insulating member 22, and a part of the insulating member 23 are invisible, they are shown by dotted lines for convenience of explanation.
  • the first attachment device 2 is a device for holding the first electrode device 3 and attaching the first electrode device 3 to the pipe 400.
  • the first attachment device 2 includes a metal member 21, insulating members 22 and 23 (first member and second member), adjustment screws 26 and 27, and legs 25.
  • the metal member 21 is a metal member that forms the outer shape of the first mounting device 2.
  • the metal member 21 has, for example, a substantially rectangular column extending along the direction (X axis) in which the first electrode device 3 (FIG. 3) extends.
  • the metal member 21 has a hollow shape in which a holding hole 2 ⁇ / b> A is formed that extends along the direction in which the first electrode device 3 extends so as to hold the housing 31 of the first electrode device 3.
  • the metal member 21 has a shape surrounding the insulating members 22 and 23 so that the second electrode 72 is inserted into the first electrode 32.
  • the inner shape of the metal member 21 is shaped to be bent along the outer shape of the housing 31 so that the housing 31 can be held in the holding hole 2A.
  • the metal member 21 has a slit 2B.
  • the slit 2 ⁇ / b> B is a gap for deforming the metal member 21. The deformation of the metal member 21 will be described later.
  • the slit 2B is provided in one wall body 211 ( ⁇ Y) that partitions the inside and the outside of the metal member 21.
  • the slit 2B is provided along the direction (X axis) in which the metal member 21 extends so as to divide the wall body 211 into, for example, an upper part and a lower part.
  • Metal legs 25 are, for example, welded to the four corners of the lower ( ⁇ Z) surface of the metal member 21.
  • the leg 25 is welded to the pipe 400, for example. That is, the metal member 21 is firmly fixed to the pipe 400 by the legs 25. That is, the metal member 21 is provided between the insulating members 22 and 23 and the pipe 400 in order to attach the first electrode device 3 to the pipe 400.
  • the insulating members 22 and 23 are a pair of insulating members such as ceramics for electrically insulating the first electrode device 3 from the pipe 400.
  • the insulating members 22 and 23 also function as a gripping member that grips the casing 31 of the first electrode device 3.
  • the insulating member 23 is fixed inside the metal member 21 as an inner wall of the holding hole 2A.
  • the insulating member 23 is provided along the inner surface of the metal member 21.
  • the insulating member 23 is provided on the lower side ( ⁇ Z) than the slit 2B in the direction (Z axis) in which the first mounting device 2 stands. That is, the insulating member 23 is provided at a position avoiding the slit 2B.
  • the insulating member 23 has a curved shape along the outer shape of the housing 31 so that the housing 31 can be gripped.
  • the insulating member 22 is fixed inside the metal member 21 as an inner wall of the holding hole 2A.
  • the insulating member 22 is provided along the inner surface of the metal member 21.
  • the insulating member 22 is provided on the upper side (+ Z) of the slit 2B in the direction in which the first mounting device 2 is erected. That is, the insulating member 22 is provided at a position avoiding the slit 2B.
  • the insulating member 22 has a curved shape along the outer shape of the housing 31 so that the housing 31 can be gripped. That is, the insulating members 22 and 23 surround the electrode device 3 so that the second electrode 72 is inserted into the first electrode 32.
  • the insulating members 22 and 23 are secondly formed so that a gap 22A (first gap) (FIG. 4) is formed along the direction (X-axis) in which the second electrode 72 is inserted into the first electrode 32.
  • the electrode 72 is divided along the direction in which the electrode 72 is inserted into the first electrode 32.
  • the insulating members 22 and 23 are opposed to each other through the gap 22A.
  • Adjustment screws 26 and 27 are screws for adjusting the deformation amount of the metal member 21. The deformation of the metal member 21 and the adjusting screws 26 and 27 will be described later.
  • the second attachment device 8 is a device for holding the second electrode device 7 and attaching the second electrode device 7 to the pipe 400.
  • the second attachment device 8 includes a metal member 81, insulating members 82 and 83 (third member, fourth member), adjustment screws (not shown), and legs 85.
  • the metal member 81, the insulating members 82 and 83, the adjusting screw (not shown), and the leg 85 have the same configuration as the metal member 21, the insulating members 22 and 23, the adjusting screws 26 and 27, and the leg 25, respectively. That is, the configuration of the second mounting device 8 is the same as the configuration of the first mounting device 2.
  • FIG. 5 is a front view showing the first attachment device in the present embodiment. Note that a part of the adjusting screw 26 and the screw holes 21A and 21B are invisible, but are shown by dotted lines for convenience of explanation.
  • the adjusting screws 26 and 27 are screws for adjusting the deformation amount of the metal member 21 as described above.
  • the adjusting screw 26 is a male screw extending along a direction (Z axis) in which the first mounting device 2 is erected.
  • the adjusting screw 26 is screwed onto the wall body 211 of the metal member 21 from above.
  • the adjustment screw 26 is inserted into the screw hole 21 ⁇ / b> A of the first wall body 213 in the direction in which the first attachment device 2 is erected, and then screwed into the screw hole 21 ⁇ / b> B of the second wall body 214.
  • the first wall body 213 is a part above (+ Z) the slit 2B in the wall body 211.
  • the wall body 213 is provided with a screw hole 21A along the direction (Z axis) in which the adjusting screw 26 extends.
  • the screw hole 21 ⁇ / b> A is provided at a position avoiding the insulating member 22.
  • the screw hole 21A is, for example, an insertion hole formed such that the diameter increases from the lower side ( ⁇ Z) to the upper side, and the adjustment screw 26 is inserted therethrough.
  • the second wall 214 is a part ( ⁇ Z) below the slit 2B in the wall 211.
  • the second wall 214 is provided with a screw hole 21B along the direction in which the adjusting screw 26 extends.
  • the screw hole 21 ⁇ / b> B is provided at a position avoiding the insulating member 23.
  • the screw hole 21B is, for example, a female screw in which a screw groove that is screwed with a screw thread of the adjustment screw 26 is formed.
  • the adjustment screw 26 moves from the upper side to the lower side by the rotation of the adjustment screw 26 in the A1 direction (FIG. 4), and the adjustment screw 26 moves in the A2 direction. It is assumed that the adjusting screw 26 is formed so as to move from the lower side to the upper side by rotating to the right.
  • the adjustment screw 27 has the same configuration as the adjustment screw 26.
  • a female screw (not shown) having the same configuration as the screw holes 21A and 21B is provided at a position where the adjustment screw 27 is screwed in the metal member 21.
  • FIG. 6 is a front view showing the first attachment device in a state where the metal member in the present embodiment is deformed. Note that a part of the adjusting screw 26 and the screw holes 21A and 21B are invisible, but are shown by dotted lines for convenience of explanation.
  • the metal member 21 is deformed to hold the casing 31 of the first electrode device 3 by the insulating members 22 and 23.
  • the amount of deformation of the metal member 21 is adjusted by operating the adjusting screws 26 and 27. Since the operation of the adjustment screw 26 and the operation of the adjustment screw 27 when adjusting the deformation amount of the metal member 21 are the same, only the operation of the adjustment screw 26 will be described, and the operation of the adjustment screw 27 will be described. The description is omitted.
  • the adjustment screw 26 when the adjustment screw 26 is rotated in the A2 direction (FIG. 4), the adjustment screw 26 moves from the lower side ( ⁇ Z) to the upper side (+ Z), and the tip 261 of the adjustment screw 26 is removed from the screw hole 21B. It will be. At this time, the metal member 21 is not deformed (FIG. 5). When the metal member 21 is not deformed, it is assumed that the diameter D21 (FIG. 5) of the holding hole 2A is larger than the diameter D3 of the housing 31.
  • the adjustment screw 26 when the adjustment screw 26 is rotated in the A1 direction (FIG. 4) with the tip 261 of the adjustment screw 26 screwed into the screw hole 21B, the adjustment screw 26 moves from the upper side to the lower side.
  • the head 262 of the adjusting screw 26 comes into contact with the upper surface of the first wall body 213 (FIG. 6).
  • a force from the upper side to the lower side is transmitted from the head 262 to the first wall body 213.
  • the metal member 21 is deformed so that the first wall body 213 moves downward according to the force transmitted from the head 262.
  • the deformation amount of the metal member 21 is adjusted according to the amount of rotation of the adjusting screw 26 in the A1 direction or A2 direction.
  • the diameter D22 of the holding hole 2A is smaller than the diameter D21 when the metal member 21 is not deformed.
  • the fluctuation range of the diameter D21 with respect to the diameter D22 is determined according to the amount of rotation of the adjusting screw 26 in the A1 direction or A2 direction.
  • the holding of the first electrode device 3 by the first mounting device 2 and the holding of the second electrode device 7 by the second mounting device 8 have the same configuration, the first electrode device 3 by the first mounting device 2 Only the holding will be described, and the description of the holding of the second electrode device 7 by the second mounting device 8 will be omitted.
  • the adjusting screw 26 is rotated in the A2 direction (FIG. 4) so that the tip 261 of the adjusting screw 26 is removed from the screw hole 21B.
  • the adjustment screw 26 moves from the lower side to the upper side, and the tip of the adjustment screw 26 is removed from the screw hole 21B.
  • the metal member 21 is not deformed.
  • the housing 31 is inserted into the holding hole 2A in the direction (X axis) in which the first electrode device 3 extends.
  • the adjusting screw 26 is moved downward ( ⁇ Z) so that the tip 261 of the adjusting screw 26 is screwed into the screw hole 21B.
  • the screw 26 is rotated in the A1 direction.
  • the diameter D22 of the holding hole 2A decreases. Therefore, the housing 31 is gripped by the insulating members 22 and 23 inside the holding hole 2A. That is, the metal member 21 is in a direction (Z axis) intersecting the direction (X axis) in which the second electrode 72 is inserted into the first electrode 32 so that the housing 31 is gripped by the insulating members 22 and 23.
  • the metal member 21 can be deformed so that the gap 22 ⁇ / b> A is adjusted when the first electrode device 3 is held by the insulating members 22 and 23.
  • the gripping force with which the insulating members 22 and 23 grip the casing 31 can be adjusted by adjusting the amount of rotation of the adjusting screw 26. As described above, the first electrode device 3 is held by the first mounting device 2.
  • FIG. 7 is a circuit diagram showing an equivalent circuit of the strain measuring apparatus in the present embodiment.
  • the capacitor C0 is a capacitor formed by the first electrode 32 and the second electrode 72, for example.
  • the capacitor C ⁇ b> 1 indicates, for example, a parasitic capacitance between the first electrode 32 and the pipe 400 and an electrostatic capacitance between the conductive wire 41 ⁇ / b> A and the pipe 400.
  • the capacitor C ⁇ b> 2 indicates, for example, a parasitic capacitance between the second electrode 72 and the pipe 400 and a capacitance between the conductive line 41 ⁇ / b> B and the pipe 400.
  • the insulation resistance R0 indicates, for example, the insulation resistance between the first electrode 32 and the second electrode 72.
  • the insulation resistance R1 indicates, for example, an insulation resistance between the first electrode 32 and the pipe 400, and an insulation resistance between the conductive wire 41A and the pipe 400.
  • the insulation resistance R ⁇ b> 2 indicates, for example, an insulation resistance between the second electrode 72 and the pipe 400 and an insulation resistance between the conductive wire 41 ⁇ / b> B and the pipe 400.
  • the strain detection device 9 has a first terminal 901 and a second terminal 902.
  • the first terminal 901 and the second terminal 902 are terminals for applying an alternating voltage, for example.
  • An alternating voltage is applied between the electrodes of both the first terminal 901 and the second terminal 902.
  • the first terminal 901 or the second terminal 902 also functions as a terminal for detecting the current flowing through the conductive line 41A and the conductive line 41B based on the capacitance of the capacitor CO by the applied voltage.
  • the second terminal 902 may be grounded or may not be grounded.
  • the strain detection device 9 is connected to the first electrode 32 and the second electrode 72 via the measurement cables 4A and 4B (FIG. 2) in order to measure the capacitance of the capacitor C0. Specifically, the first terminal 901 of the strain detection device 9 is connected to the first electrode 32 via the conductive wire 41A of the measurement cable 4A. The second terminal 902 of the strain detection device 9 is connected to the second electrode 72 via the conductive wire 41B of the measurement cable 4B.
  • the measurement cables 4A and 4B are, for example, coaxial cables.
  • the conductive wires 41A and 41B indicate the inner conductors of the measurement cables 4A and 4B, respectively, and the conductive wires 42A and 42B indicate the outer conductors of the measurement cables 4A and 4B, respectively.
  • one end of each of the conductive wires 42A and 42B is connected relatively firmly to the casings 31 and 71, for example, but in FIG. 2, it is connected at one point for convenience of explanation. It is shown.
  • FIG. 8 is a block diagram illustrating functions of the distortion detection apparatus according to the present embodiment.
  • the strain detection device 9 is a device that measures the strain amount of the measurement target portion 401 based on the capacitance value of the capacitor C0.
  • the strain detection device 9 includes a capacitance measurement unit 91, a strain detection unit 92, and a display unit 93.
  • the capacitance measuring unit 91 measures the capacitance of the capacitor C0 formed by the first electrode 32 and the second electrode 72.
  • the capacitance measuring unit 91 applies (outputs) an AC voltage from the first terminal 901 and the second terminal 902, for example, and passes through the capacitor C0 via the conductive lines 41A and 42A when the voltage is output.
  • AC current (hereinafter, also referred to as “detection current”) is detected by either the first terminal 901 or the second terminal 902.
  • the capacitance measuring unit 91 calculates the capacitance of the capacitor C0 based on, for example, the applied (output) AC voltage value and the detected current value.
  • an AC current based on the AC voltage is connected to a first terminal or a second terminal with a current detection resistor or ammeter.
  • the capacitance of the capacitor C0 is calculated from the magnitude and frequency of the applied AC voltage and the magnitude of the detected current.
  • the strain detection unit 92 calculates the strain amount of the measurement target portion 401 based on the capacitance value of the capacitor C0 calculated (measured) by the capacitance measurement unit 91.
  • the strain detection unit 92 performs the second time from the first time based on the value of the capacitance of the capacitor C0 at the first time and the value of the capacitor C0 at the second time after the first time.
  • the distortion amount of the measurement target portion 401 in a predetermined time (predetermined period) until is calculated.
  • the value of the capacitance of the capacitor C0 is determined according to the distance D1 (FIG. 2) between the first measuring device 200 and the second measuring device 800. Further, the distortion amount is calculated as a fluctuation range (difference) of the distance D1 in a predetermined time. Therefore, for example, the fluctuation range of the capacitance value of the capacitor C0 at a predetermined time represents the distortion amount at the predetermined time, and the distortion amount of the measurement target portion 401 is the value of the capacitance value of the capacitor C0. It can be obtained based on the fluctuation range. Note that the capacitance of the capacitor C0 is also referred to as a capacitance C0.
  • the strain detection unit 9 information in which the capacitance value of the capacitor C0 and the distance D1 are associated with each other may be stored in advance in a storage unit (not shown) of the strain detection device 9. .
  • the strain detection unit 92 converts the capacitance C0 into the distance D1 based on the measurement result of the capacitance measurement unit 91 and the information stored in the storage unit, and stores the value of D1. Then, the distortion amount of the measurement target portion 401 is calculated by taking the difference of D1 in a predetermined time.
  • the display unit 93 is, for example, a monitor that displays the calculation result of the distortion detection unit 92.
  • the first attachment device 2 and the second attachment device 8 are attached to the pipe 400.
  • the first attachment device 2 and the second attachment device 8 are, for example, welded to both sides of the measurement target portion 401 in the direction (X axis) in which the pipe 400 extends.
  • the first electrode device 3 and the second electrode device 7 are attached to the first attachment device 2 and the second attachment device 8, respectively. That is, the first electrode device 3 and the second electrode device 7 are held by the first attachment device 2 and the second attachment device 8, respectively.
  • the second electrode 72 is inserted into the first electrode 32 in order to measure the strain amount of the measurement target portion 401. Note that one end of the measurement cable 4A and one end of the measurement cable 4B are connected in advance to the first electrode device 3 and the second electrode device 7, respectively.
  • the strain detection device 9 measures the capacitance of the capacitor C0 at the first time and the capacitance of the capacitor C0 at the second time after the first time.
  • the first electrode device 3 is surrounded by the insulating members 22 and 23 of the first mounting device 2. That is, the resistance value of the insulation resistance R1 becomes relatively high.
  • the second electrode device 7 is surrounded by the insulating members 82 and 83 of the second mounting device 8. That is, the resistance value of the insulation resistance R2 is relatively high. Therefore, for example, the values of the leakage currents I1 and I2 (FIG. 2) when measuring the capacitance of the capacitor C0 can be reduced.
  • the leakage current I1 is, for example, from the second electrode 72 to the fixing member 73, the casing 71, the insulating member 83, the metal member 81, the leg 85, the pipe 400, the leg 25, the metal member 25, the insulating member 23, and the casing.
  • the leakage current I2 is a current supplied from the first electrode 32 to the second electrode 72 via a path opposite to the leakage current I1. Therefore, the measurement accuracy of the capacitance of the capacitor C0 by the strain detection device 9 is improved.
  • the strain detection device 9 calculates the strain amount of the measurement target portion 401 during a predetermined time (predetermined period) from the first time to the second time based on the above-described measurement result and the like.
  • the distortion detection device 9 causes the display unit 93 to display the calculation result.
  • FIG. 9 is a perspective view showing the first attachment device in the present embodiment. Although a part of the metal members 61 and 64, a part of the insulating members 62 and 63, and the hinges 681 and 682 are invisible, they are indicated by dotted lines for convenience of explanation.
  • the 1st electrode apparatus 3 and the 2nd electrode apparatus 7 were hold
  • the 1st electrode device 3 and the 2nd electrode device 7 are the 1st attachment device 6 and the 2nd attachment device of the same composition as the 1st attachment device 6 (henceforth, "for holding the 2nd electrode device 7", respectively). It is good also as hold
  • the first attachment device 6 is a device for holding the first electrode device 3.
  • the first mounting device 6 is, for example, a shape in which a substantially rectangular column member is vertically divided into two by a plane (XY plane) that passes through the approximate center of the first mounting device 6 and is orthogonal to the height direction (Z axis). Presents.
  • the first mounting device 6 is formed so as to form a holding hole 6 ⁇ / b> A extending along the direction (X axis) in which the first electrode device 3 extends so as to hold the first electrode device 3.
  • the first attachment device 6 includes metal members 61 and 64, insulating members 62 and 63, hinges 681 and 682, fixing screws 66 and 67, and legs 65.
  • the metal member 64 is a metal member on the lower side ( ⁇ Z) in the first attachment device 6 that forms the outer shape of the first attachment device 6 together with the metal member 61.
  • the metal member 64 is attached to the pipe 400.
  • the metal member 64 has metal legs 65 welded to the four corners of the lower surface of the metal member 64.
  • the leg 65 is welded to the pipe 400. That is, the metal member 64 is firmly fixed to the pipe 400 by the legs 64.
  • the upper part (+ Z) of the metal member 64 has a shape that is partially bent so as to bend along the outer shape of the casing 31 so that the casing 31 of the first electrode device 3 can be held.
  • the metal member 61 is fixed to the metal member 64 by hinges 681 and 682.
  • the metal member 61 is fixed to the metal member 64 so as to be rotatable about an axis parallel to the direction in which the first electrode device 3 extends.
  • the hinges 681 and 682 are provided on one side surface (+ Y) of the metal members 61 and 64.
  • the lower part of the metal member 61 has a shape in which a part thereof is bent so as to bend along the outer shape of the housing 31 so that the housing 31 of the first electrode device 3 can be held.
  • the insulating members 62 and 63 are a pair of insulating members such as ceramics for electrically insulating the first electrode device 3 from the pipe 400.
  • the insulating members 62 and 63 also function as a gripping member that grips the casing 31 of the first electrode device 3.
  • the insulating member 62 is provided along the lower surface of the metal member 61 as the inner wall of the holding hole 6A.
  • the insulating member 62 has a curved shape along the outer shape of the housing 31 so that the housing 31 can be gripped.
  • the insulating member 63 is provided along the upper surface of the metal member 64 as the inner wall of the holding hole 6A.
  • the insulating member 63 has a curved shape along the outer shape of the housing 31 so that the housing 31 can be gripped.
  • the fixing screws 66 and 67 are, for example, male screws for prohibiting or permitting the rotation of the metal member 61. Furthermore, the fixing screws 66 and 67 are also operated to adjust the gripping force when gripping the casing 31 of the first electrode device 3. The fixing screws 66 and 67 will be described later.
  • FIG. 10 is a front view showing the first attachment device in the present embodiment. Note that a part of the fixing screw 66 and the screw holes 61A and 64A are invisible, but are shown by dotted lines for convenience of explanation.
  • the fixing screws 66 and 67 are, for example, male screws for prohibiting or allowing the metal member 61 to rotate. The rotation of the metal member 61 will be described later.
  • the fixing screw 66 is continuously screwed to the metal members 61 and 64 from above.
  • the fixing screw 66 is screwed into the screw hole 61 ⁇ / b> A of the wall body 611 in the metal member 61 and the screw hole 64 ⁇ / b> A of the wall body 641 in the metal member 64.
  • the wall body 611 is provided with a screw hole 61A penetrating along the direction (Z axis) in which the fixing screw 66 extends.
  • the screw hole 61 ⁇ / b> A is a female screw that is provided at a position avoiding the insulating member 62 and has a screw groove that is screwed with a screw thread of the fixed screw 66.
  • the wall body 641 is provided with a screw hole 64A along the direction in which the fixing screw 66 extends.
  • the screw hole 64 ⁇ / b> A is a female screw that is provided at a position avoiding the insulating member 63 and has a screw groove that is screwed with a screw thread of the fixed screw 66.
  • the fixing screw 66 moves from the upper side to the lower side by the rotation of the fixing screw 66 in the A1 direction (FIG. 9). It is assumed that the fixing screw 66 is formed to move from the lower side to the upper side by turning in the A2 direction.
  • FIG. 11 is a front view showing the rotated metal member in the present embodiment. Note that a part of the fixing screw 66 and the screw holes 61A and 64A are invisible, but are shown by dotted lines for convenience of explanation.
  • the rotation shaft 681A is an axis along the direction (X axis) in which the attachment device 6 extends.
  • the configuration of the hinge 682 (FIG. 9) is the same as the configuration of the hinge 681, and therefore the description of the hinge 682 is omitted.
  • the first attachment device 6 is in a closed state. At this time, the diameter of the holding hole 6 ⁇ / b> A is set to be a size such that the casing 31 of the first electrode device 3 is gripped by the insulating members 62 and 63.
  • the fixing screw 66 is engaged with both the screw holes 61A and 64A by the rotation of the fixing screw 66 in the A1 direction (FIG. 9). At this time, the metal member 61 cannot be rotated. That is, the opening and closing of the first attachment device 6 is prohibited.
  • the fixing screw 66 moves from the upper side to the lower side by further rotation of the fixing screw 66 in the A1 direction.
  • the wall body 611 is based on the downward force from the head 662. Will move down.
  • the diameter of the holding hole 6A becomes smaller.
  • the fixing screw 66 is rotated in the A2 direction so that the tip 661 of the fixing screw 66 is removed from the screw hole 64A.
  • the fixing screw 66 moves from the lower side toward the upper side.
  • the tip 661 of the fixing screw 66 is disengaged from the screw hole 64A.
  • the metal member 61 is in a rotatable state.
  • the metal member 61 When the turning force in the E2 direction is transmitted to the metal member 61, the metal member 61 is rotated in the E2 direction around the rotation shaft 681A of the hinge 681. The casing 31 of the first electrode device 3 is placed on the insulating member 63. At this time, the first attachment device 6 is in an open state.
  • the metal member 61 is rotated in the E1 direction around the rotation shaft 681A of the hinge 681. At this time, the first attachment device 6 is in a closed state. By the rotation of the fixing screw 66 in the A1 direction, the fixing screw 66 is engaged with both the screw holes 61A and 64A. At this time, the opening and closing of the first attachment device 6 is prohibited.
  • the downward force from the head 662 based on the further rotation of the fixing screw 66 in the A1 direction is transmitted to the upper surface of the wall body 611. Based on the transmitted force, the diameter of the holding hole 6A decreases as the wall body 611 moves downward. That is, the casing 31 is gripped relatively firmly based on the further rotation of the fixing screw 66 in the A1 direction.
  • the strain measuring device 100 includes the first electrode device 3, the second electrode device 7, the first mounting device 2, and the second mounting device 8.
  • the first electrode device 3 has a cylindrical first electrode 32.
  • the second electrode device 7 has a rod-shaped second electrode 72 that is inserted into the first electrode 32.
  • the first attachment device 2 includes insulating members 22 and 23 and a metal member 21.
  • the insulating members 22 and 23 surround the first electrode device 3 so that the second electrode 72 is inserted into the first electrode 32.
  • the metal member 21 is provided between the insulating members 22 and 23 and the pipe 400 in order to attach the first electrode device 3 to the pipe 400.
  • the metal member 21 surrounds the insulating members 22 and 23 so that the second electrode 72 is inserted into the first electrode 32.
  • the second attachment device 8 includes insulating members 82 and 83 and a metal member 81.
  • the insulating members 82 and 83 surround the second electrode device 7 so that the second electrode 72 is inserted into the first electrode 32.
  • the metal member 81 is provided between the insulating members 82 and 83 and the pipe 400 in order to attach the second electrode device 7 to the pipe 400.
  • the metal member 81 surrounds the insulating members 22 and 23 so that the second electrode 72 is inserted into the first electrode 32.
  • the second electrode in the pipe 400 is inserted based on the capacitance value of the capacitor C0 determined according to the length of the portion of the second electrode 72 inserted into the first electrode 32. The amount of strain in the direction (X axis) is measured.
  • the first electrode 32 and the pipe 400 are electrically insulated by the insulating members 22 and 23. Further, the second electrode 72 and the pipe 400 are electrically insulated by the insulating members 82 and 83. Therefore, when measuring the strain amount in the pipe 400, the values of the leakage currents I1 and I2 (FIG. 2) are suppressed to be relatively small. Therefore, the strain measuring device 100 can improve the measurement accuracy of the capacitance of the capacitor C0 and improve the measurement accuracy of the strain amount of the pipe 400 in the direction (X axis) in which the second electrode 72 is inserted. .
  • the first electrode device 3 further includes a metal casing 31 and an insulating fixing member 33.
  • the housing 31 accommodates the first electrode 32 such that the second electrode 72 is inserted into the first electrode 31.
  • the inner diameter of the housing 31 is set larger than the outer shape of the first electrode 32.
  • the fixing member 33 supports the first electrode 32 inside the housing 31 so that the first electrode 32 does not contact the housing 31. With these configurations, the first electrode 32 and the pipe 400 are electrically insulated by the insulating fixing member 33.
  • the values of the leakage currents I1 and I2 can be further reduced. Accordingly, the measurement accuracy of the capacitance of the capacitor C0 can be further improved, and the measurement accuracy of the strain amount of the pipe 400 can be further improved.
  • the second electrode device 7 further includes a metal casing 71 and an insulating fixing member 73.
  • the casing 71 accommodates the second electrode 72 such that the second electrode 72 is inserted into the first electrode 31.
  • the inner diameter of the housing 71 is set larger than the outer shape of the second electrode 72.
  • the fixing member 73 supports the second electrode 72 inside the casing 71 so that the second electrode 72 does not contact the casing 71. With these configurations, the second electrode 72 and the pipe 400 are electrically insulated by the insulating fixing member 73.
  • the insulating members 22 and 23 are divided along the direction (X axis) in which the second electrode 72 is inserted into the first electrode 32.
  • the insulating members 22 and 23 are fixed to the metal member 21 so as to face each other through a gap 22A along the direction in which the second electrode 72 is inserted into the first electrode 32.
  • the metal member 21 can be deformed so that the gap 22 ⁇ / b> A is adjusted when the first electrode device 3 is held by the insulating members 22 and 23.
  • the first attachment device 2 can reliably hold the first electrode device 2 by adjusting the gap 22A. Therefore, the first electrode device 3 can be reliably attached to the pipe 400. Therefore, for example, it is possible to prevent the first electrode device 3 from being displaced with respect to the pipe 400.
  • the strain measuring apparatus 100 can further improve the measurement accuracy of the strain amount of the pipe 400. Further, since the insulating members 22 and 23 are divided in advance, it is possible to prevent the force for holding the first electrode device 3 from being transmitted to the insulating members 22 and 23. That is, for example, the insulating members 22 and 23 can be prevented from cracking based on the force for holding the first electrode device 3.
  • the insulating members 82 and 83 are divided along the direction in which the second electrode 72 is inserted into the first electrode 32.
  • the insulating members 82 and 83 are fixed to the metal member 81 so as to face each other through a gap 82A (FIG. 1) along the direction in which the second electrode 72 is inserted into the first electrode 32.
  • the metal member 81 can be deformed so that the gap 82A is adjusted when the second electrode device 7 is held by the insulating members 82 and 83.
  • the second attachment device 8 can reliably hold the second electrode device 7 by adjusting the gap 82A. Therefore, the second electrode device 7 can be reliably attached to the pipe 400. Therefore, for example, it is possible to prevent the displacement of the second electrode device 7 with respect to the pipe 400.
  • the strain measuring apparatus 100 can further improve the measurement accuracy of the strain amount of the pipe 400. Further, since the insulating members 82 and 83 are divided in advance, it is possible to prevent the force for holding the second electrode device 7 from being transmitted to the insulating members 82 and 83. That is, for example, the insulating members 82 and 83 can be prevented from cracking based on the force for holding the second electrode device 7.
  • the first electrode device 3 is attached to one side ( ⁇ X) of the measurement target portion 401 in the pipe 400.
  • the second electrode device 7 is attached to the other side (+ X) of the measurement target portion 401 in the pipe 400. Therefore, the strain measuring apparatus 100 can measure the strain amount of the pipe 400 according to the strain of the measurement target portion 401 such as a welded portion.
  • the insulating members 22, 23, 82, 83 are made of, for example, ceramics. That is, the resistance values of the insulating members 22, 23, 82, and 83 can be made relatively high. Therefore, the current values of the leakage currents I1 and I2 can be kept relatively small. Therefore, the measurement accuracy of the strain amount of the pipe 400 can be further improved.
  • the first attachment device 2 and the second attachment device 8 are devices for attaching the first electrode device 3 and the second electrode device 7 of the strain measuring device 100 to the pipe 400, respectively.
  • the one-electrode device 3 has a cylindrical first electrode 32.
  • the second electrode device 7 has a rod-shaped second electrode 72 that is inserted into the first electrode 32.
  • the second electrode in the pipe 400 is inserted based on the capacitance value of the capacitor C0 determined according to the length of the portion of the second electrode 72 inserted into the first electrode 32. Measure the amount of distortion in the direction.
  • the first attachment device 2 includes insulating members 22 and 23 and a metal member 21. The insulating members 22 and 23 surround the first electrode device 3 so that the second electrode 72 is inserted into the first electrode 32.
  • the metal member 21 is provided between the insulating members 22 and 23 and the pipe 400 in order to attach the first electrode device 3 to the pipe 400.
  • the metal member 21 surrounds the insulating members 22 and 23 so that the second electrode 72 is inserted into the first electrode 32.
  • the second attachment device 8 includes insulating members 82 and 83 and a metal member 81.
  • the insulating members 82 and 83 surround the second electrode device 7 so that the second electrode 72 is inserted into the first electrode 32.
  • the metal member 81 is provided between the insulating members 82 and 83 and the pipe 400 in order to attach the second electrode device 7 to the pipe 400.
  • the metal member 81 surrounds the insulating members 22 and 23 so that the second electrode 72 is inserted into the first electrode 32.
  • the first electrode 32 and the pipe 400 are electrically insulated by the insulating members 22 and 23. Further, the second electrode 72 and the pipe 400 are electrically insulated by the insulating members 82 and 83. Therefore, when measuring the strain amount in the pipe 400, the values of the leakage currents I1 and I2 (FIG. 2) described above can be kept small. Therefore, the first attachment device 2 and the second attachment device 8 improve the measurement accuracy of the capacitance of the capacitor C0 by the strain measurement device 100, and improve the measurement accuracy of the strain amount of the pipe 400 by the strain measurement device 100. be able to.
  • the insulating members 22 and 23 are divided along the direction in which the second electrode 72 is inserted into the first electrode 32.
  • the insulating members 22 and 23 are fixed to the metal member 21 so as to face each other through a gap 22A along the direction in which the second electrode 72 is inserted into the first electrode 32.
  • the metal member 21 can be deformed so that the gap 22 ⁇ / b> A is adjusted when the first electrode device 3 is held by the insulating members 22 and 23.
  • the first attachment device 2 can reliably hold the first electrode device 2 by adjusting the gap 22A. Therefore, the first electrode device 3 can be reliably attached to the pipe 400. Therefore, for example, it is possible to prevent the first electrode device 3 from being displaced with respect to the pipe 400.
  • the first attachment device 2 can further improve the measurement accuracy of the strain amount of the pipe 400 by the strain measurement device 100. Further, since the insulating members 22 and 23 are divided in advance, it is possible to prevent the force for holding the first electrode device 3 from being transmitted to the insulating members 22 and 23. That is, for example, the insulating members 22 and 23 can be prevented from cracking based on the force for holding the first electrode device 3.
  • the insulating members 82 and 83 are divided along the direction in which the second electrode 72 is inserted into the first electrode 32.
  • the insulating members 82 and 83 are fixed to the metal member 81 so as to face each other through a gap 82A (FIG. 1) along the direction in which the second electrode 72 is inserted into the first electrode 32.
  • the metal member 81 can be deformed so that the gap 82A is adjusted when the second electrode device 7 is held by the insulating members 82 and 83.
  • the second attachment device 8 can reliably hold the second electrode device 7 by adjusting the gap 82A. Therefore, the second electrode device 7 can be reliably attached to the pipe 400. Therefore, for example, it is possible to prevent the displacement of the second electrode device 7 with respect to the pipe 400.
  • the second attachment device 8 can further improve the measurement accuracy of the strain amount of the pipe 400 by the strain measurement device 100. Further, since the insulating members 82 and 83 are divided in advance, it is possible to prevent the force for holding the second electrode device 7 from being transmitted to the insulating members 82 and 83. That is, for example, the insulating members 82 and 83 can be prevented from cracking based on the force for holding the second electrode device 7.
  • the first and second embodiments are for facilitating the understanding of the present invention, and are not intended to limit the present invention.
  • the present invention can be changed and improved without departing from the gist thereof, and the present invention includes equivalents thereof.
  • the 1st measuring apparatus 200 and the 2nd measuring apparatus 800 were attached to the both sides of the measurement object part 401 in the piping 400 extended along the predetermined direction (X-axis).
  • the present invention is not limited to this.
  • the first pipe extending along the first direction for example, the X axis in FIG. 1
  • the second pipe extending along the second direction intersecting the first direction are respectively first.
  • the measuring device 200 and the second measuring device 800 may be attached.
  • the strain measuring apparatus 100 can measure the amount of strain between the first pipe and the second pipe that intersect each other.
  • the capacitance measuring unit 91 outputs an AC voltage from the first terminal 901 and the second terminal 902 to the capacitor C0, and the magnitude and frequency of the AC voltage, the first terminal 901, and the first terminal
  • the capacitance of the capacitor C0 is measured from the magnitude of the current detected at the two terminals 902
  • the present invention is not limited to this.
  • the capacitance measuring unit 91 outputs an alternating current from the first terminal 901 and the second terminal 902 to the capacitor C0, and detects the magnitude and frequency of the alternating current and the first terminal 901 and the second terminal 902.
  • the capacitance of the capacitor C0 may be measured from the magnitude of the voltage that has been applied.
  • Second attachment device Second attachment device 22, 23, 62, 63, 82, 83 Insulating member 22A, 82A Clearance 21, 61, 64, 81 Metal member 31, 71 Housing 32 First electrode 33, 73 Fixing member 72 Second electrode 100 Strain measuring device 400 Piping C0, C1, C2 Capacitor

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Measurement Of Length, Angles, Or The Like Using Electric Or Magnetic Means (AREA)

Abstract

【解決手段】筒状電極を有する第1電極体と、前記筒状電極に挿入される棒状電極を有する第2電極体と、前記棒状電極が前記筒状電極に挿入されるように前記第1電極体の周囲を取り囲む第1絶縁部材と、前記棒状電極が前記筒状電極に挿入されるように前記第2電極体の周囲を取り囲む第2絶縁部材と、被測定物に対して前記第1電極体を取り付けるべく、前記棒状電極が前記筒状電極に挿入されるように前記第1絶縁部材と前記被測定物との間において前記第1絶縁部材の周囲を取り囲む第1金属部材と、前記被測定物に対して前記第2電極体を取り付けるべく、前記棒状電極が前記筒状電極に挿入されるように前記第2絶縁部材と前記被測定物との間において前記第2絶縁部材の周囲を取り囲む第2金属部材と、を備える。

Description

歪測定装置、取付装置
 本発明は、歪測定装置、取付装置に関する。
 例えば、例えば、第1電極と第2電極とによって形成されるコンデンサの静電容量の値に基づいて被測定物の歪量を測定する歪測定装置が知られている(例えば特許文献1)。
特開平11-132706号公報
 例えば、特許文献1の歪測定装置においては、静電容量を測定する際に、第1電極から第2電極に対して被測定物を介して供給される漏れ電流が発生することがある。この漏れ電流により、静電容量の測定精度が低下し、被測定物の歪量の測定精度が低下する虞がある。
 前述した課題を解決する主たる本発明は、筒状電極を有する第1電極体と、前記筒状電極に挿入される棒状電極を有する第2電極体と、前記棒状電極が前記筒状電極に挿入されるように前記第1電極体の周囲を取り囲む第1絶縁部材と、前記棒状電極が前記筒状電極に挿入されるように前記第2電極体の周囲を取り囲む第2絶縁部材と、被測定物に対して前記第1電極体を取り付けるべく、前記棒状電極が前記筒状電極に挿入されるように前記第1絶縁部材と前記被測定物との間において前記第1絶縁部材の周囲を取り囲む第1金属部材と、前記被測定物に対して前記第2電極体を取り付けるべく、前記棒状電極が前記筒状電極に挿入されるように前記第2絶縁部材と前記被測定物との間において前記第2絶縁部材の周囲を取り囲む第2金属部材と、を備え、前記棒状電極の前記筒状電極に挿入されている部分の長さに応じて定まる静電容量の値に基づいて、前記被測定物における前記棒状電極が挿入される方向の歪量を測定することを特徴とする歪測定装置である。
 本発明の他の特徴については、添付図面及び本明細書の記載により明らかとなる。
 本発明によれば、被測定物における歪量の測定精度を向上させることができる。
本発明の第1実施形態における歪測定装置の一部を示す斜視図である。 本発明の第1実施形態における歪測定装置の一部を示す断面図である。 本発明の第1実施形態における第1電極装置及び第2電極装置を示す斜視図である。 本発明の第1実施形態における第1取付装置を示す斜視図である。 本発明の第1実施形態における第1取付装置を示す正面図である。 本発明の第1実施形態における金属部材が変形された状態の第1取付装置を示す正面図である。 本発明の第1実施形態における歪測定装置の等価回路を示す回路図である。 本発明の第1実施形態歪検出装置の機能を示すブロック図である。 本発明の第2実施形態における第1取付装置を示す斜視図である。 本発明の第2実施形態における第1取付装置を示す正面図である。 本発明の第2実施形態における回動された状態の金属部材を示す正面図である。
 本明細書および添付図面の記載により、少なくとも以下の事項が明らかとなる。
[第1実施形態]
===歪測定装置===
 以下、図1を参照して、本実施形態における歪測定装置について説明する。図1は、本実施形態における歪測定装置の一部を示す斜視図である。尚、図1においては、説明の便宜上、測定ケーブル4A、4B(図2)は省略されている。
 歪測定装置100は、例えば火力発電所に設けられた、ボイラ、タービン、配管等における溶接されている部分の歪量を測定するための装置である。尚、歪量とは、例えば、測定対象物の変形に応じた、当該測定対象物の変位量を示すものとする。歪測定装置100は、例えば600℃以上の比較的高温となっている金属製の配管400(被測定物)における例えば溶接部等の測定対象部分401の歪量を測定するための例えば静電容量方式の変位計である。配管400の長手方向(Z軸)における配管400の測定対象部分400よりも一方側(-X)が、第1配管に相当する。又、配管400の長手方向における配管400の測定対象部分400よりも他方側(+X)が、第2配管に相当する。
 歪測定装置100は、第1測定装置200、第2測定装置800、歪検出装置9(図7)を有する。尚、本実施形態において、Z軸は、第1測定装置200及び第2測定装置800が立設する高さ方向(垂直方向)に沿う軸であり、+Zは、配管400から第1測定装置200及び第2測定装置800に向かう上方向(垂直方向において配管400から離れる方向)を示し、-Zは、第1測定装置200及び第2測定装置800から配管400に向かう下方向(垂直方向において配管400に近づく方向)を示すものとする。又、X軸は、第1測定装置200及び第2測定装置800が隣接する方向に沿う軸であり、+Xは、第1測定装置200から第2測定装置800に向かう方向を示し、-Xは、第2測定装置800から第1測定装置200に向かう方向を示すものとする。又、Y軸は、X軸及びZ軸に対して直行する軸であり、+Yは、第1測定装置200におけるスリット2Bが設けられている一方の側面からスリット2Bが設けられていない他方の側面に向かう方向を示し、-Yは、第1測定装置200における他方の側面から一方の側面に向かう方向を示すものとする。
 第1測定装置200及び第2測定装置800は、金属製の配管400における測定対象部分401の歪量を測定する際に、配管400が延在する方向(X軸)において、測定対象部分401の両側に設けられる装置である。第1測定装置200及び第2測定装置800は、測定対象部分401における当該配管400が延在する方向の歪量を測定するためのセンサとして機能する。尚、第1測定装置200、第2測定装置800については、後述する。
 歪検出装置9は、第1測定装置200及び第2測定装置800の変位量に基づいて、測定対象部分401の歪量を測定する装置である。尚、歪検出装置9については、後述する。
===第1測定装置、第2測定装置===
 以下、図1乃至図3を参照して、本実施形態における第1測定装置及び第2測定装置について説明する。図2は、本実施形態における歪測定装置の一部を示す断面図である。尚、図2は、図1における第1測定装置200の略中央を通るXZ平面から+Y方向へ向かって見た状態の、第1測定装置200及び第2測定装置800を示している。図3は、本実施形態における第1電極装置及び第2電極装置を示す斜視図である。尚、第1電極32は、見えない状態となっているが、説明の便宜上、点線で示されている。
 第1測定装置200は、配管400における測定対象部分401よりも一方側(-X)に例えば溶接されて固定される。第1測定装置200は、第1取付装置2、第1電極装置3(第1電極体)を有する。
 第1取付装置2は、第1電極装置3を配管400に対して取り付けるための装置であり、配管400に固定される。尚、第1取付装置2については、後述する。
 第1電極装置3は、第2電極装置7とともにコンデンサC0(図7)を形成するための装置である。第1電極装置3は、筐体31(第1ケース)、第1電極32(筒状電極)、固定部材33(第1支持部材)を有する。
 筐体31は、第1電極32を収容した状態で当該第1電極32を保持するための例えば金属製の筐体である。筐体31の外形(図3)は、例えば、円柱形状を呈する。筐体31は、内部に第1電極32を収容できるように、中空構造を呈する。尚、筐体31の内径は、第1電極32の外径よりも大きく設定されている。
 固定部材33は、筐体31の内部に第1電極32を固定するための例えばセラミックス等の絶縁性の部材である。固定部材33は、筐体31の内部において第1電極32を支持している。
 第1電極32は、第2電極72と共にコンデンサC0(図7)を形成するための金属製の部材である。つまり、第1電極32は、コンデンサC0における2個の電極のうちの一方の電極として機能する。第1電極32は、配管400の長手方向(X軸)に沿って棒状に延在している。第1電極32の外形は、例えば長尺状の円柱形状を呈する。第1電極32は、内部に第2電極72の端部72Aを進退自在に挿入できるように、中空構造を呈する。つまり、第1電極32は、筒形状を呈している。又、第1電極32における第2電極72側(+X)の端部には、第2電極72を第1電極32の内部に挿入するための例えば略円形の開口32Aが形成されている。尚、第1電極32の内部に対して第2電極72を挿入できるように、開口32Aの径は、第2電極72の径よりも大きく設定されている。第1電極32は、筐体31と接触しないように、固定部材33によって筐体31の内部に固定される。つまり、第1電極32は、筐体31と接触せずに、筐体31に対して電気的に絶縁された状態となる。又、第1電極32は、第2電極72が第1電極32に挿入されるように筐体31に収容された状態となる。
 第2測定装置800は、配管400における測定対象部分401よりも他方側(+X)に例えば溶接されて固定される。第2測定装置800は、第2取付装置8、第2電極装置7(第2電極体)を有する。
 第2取付装置8は、第2電極装置7を配管400に対して取り付けるための装置であり、配管400に固定される。尚、第2取付装置8については、後述する。
 第2電極装置7は、第1電極装置3とともにコンデンサC0を形成するための装置である。第2電極装置7は、筐体71(第2ケース)、第2電極72(棒状電極)、固定部材73(第2支持部材)を有する。
 筐体71は、第2電極72の一部を収容した状態で当該第2電極72を保持するための例えば金属製の筐体である。筐体71の外形(図3)は、例えば、円柱形状を呈する。筐体71は、内部に第2電極72の一部を収容できるように、中空構造を呈する。尚、筐体71の内径は、第2電極72の外径よりも大きく設定されている。
 固定部材73は、筐体71の内部に第2電極72の一部を固定するための例えばセラミックス等の絶縁性の部材である。固定部材73は、筐体71の内部において第2電極72を支持している。
 第2電極72は、第1電極32と共にコンデンサC0(図7)を形成するための金属製の部材である。つまり、第2電極72は、コンデンサC0における2個の電極のうちの他方の電極として機能する。第2電極72は、配管400の長手方向(X軸)に沿って棒状に延在している。つまり、第2電極72は、第1電極32と同じ方向に延在し、当該第1電極32と略平行となっている。第2電極72の外形は、例えば長尺状の円柱形状を呈する。第2電極72は、端部72Aが開口32Aから第1電極32の内部に進退自在に挿入されるように、第1電極32に向かって突出している。第2電極72は、筐体71と接触しないように、固定部材73によって筐体71の内部に固定される。つまり、第2電極72は、筐体71と接触せずに、筐体71に対して電気的に絶縁された状態となる。
 第2電極72は、端部72Aが第1電極32の内部に挿入される。第2電極72における第1電極32の内部に挿入されている端部72A(以下「第2電極72の挿入部分」とも称する)の外面は、第1電極32の内面と対向することとなる。そして、第2電極72の挿入部分がコンデンサC0の他方の電極として機能し、第2電極72の挿入部分と対向している第1電極32の一部(以下、「第1電極32の対向部分」とも称する)がコンデンサC0の一方の電極として機能することになる。尚、第2電極72は、第1電極32と接触しないように、筐体71に固定されていることとする。又、第2電極72は、第2電極72が第1電極32に挿入されるように筐体71に収容された状態となる。
===コンデンサの静電容量===
 以下、図2を参照して、本実施形態におけるコンデンサの静電容量について説明する。
 第1電極32及び第2電極72によって形成されるコンデンサC0(図7)の静電容量の値は、配管400が延在する方向(X軸)における第1測定装置200と第2測定装置800との間の距離D1に応じて定められることになる。つまり、コンデンサC0の静電容量の値は、第2電極72の第1電極32に挿入される部分の長さに応じて定まることになる。
 例えば、距離D1が長くなるにつれて、第2電極72の端部72Aにおける第1電極32の内部に挿入されている部分の長さが短くなる。よって、距離D1が長くなるにつれて、第2電極72の挿入部分の面積及び第1電極32の対向部分の面積は、狭くなる。つまり、コンデンサC0における一方の電極の面積と他方の電極の面積が狭くなり、コンデンサC0の静電容量の値は小さくなる。
 一方、例えば、距離D1が短くなるにつれて、第2電極72の端部72Aにおける第1電極32の内部に挿入されている部分の長さが長くなる。よって、距離D1が短くなるにつれて、第2電極72の挿入部分の面積及び第1電極32の対向部分の面積は、広くなる。つまり、コンデンサC0における一方の電極の面積と他方の電極の面積が広くなり、コンデンサC0の静電容量の値は大きくなる。
 以上より、例えば、コンデンサC0の静電容量の値の変動幅に基づいて、距離D1の変動幅を求めることが可能となる。つまり、コンデンサC0の静電容量の値の変動幅に基づいて、測定対象部分401における第2電極72が第1電極32に挿入される方向(X軸)の歪量を求めることが可能となる。
===第1取付装置、第2取付装置===
 以下、図2及び図4を参照して、本実施形態における第1取付装置及び第2取付装置について説明する。図4は、本実施形態における第1取付装置を示す斜視図である。尚、金属部材21の一部、絶縁部材22の一部、絶縁部材23の一部は見えない状態となっているが、説明の便宜上、点線で示されている。
 第1取付装置2は、第1電極装置3を保持して、当該第1電極装置3を配管400に対して取り付けるための装置である。第1取付装置2は、金属部材21、絶縁部材22、23(第1部材、第2部材)、調整螺子26、27、脚25を有する。
 金属部材21は、第1取付装置2の外形を形成する金属製の部材である。金属部材21は、第1電極装置3(図3)が延在する方向(X軸)に沿って延在した例えば略矩形柱を呈する。金属部材21は、第1電極装置3の筐体31を保持できるように、第1電極装置3が延在する方向に沿って延在して貫通する保持孔2Aが形成されるような中空形状を呈する。つまり、金属部材21は、第2電極72が第1電極32に挿入されるように絶縁部材22、23の周囲を取り囲む形状を呈する。金属部材21の内形は、保持孔2Aにおいて筐体31を保持できるように、筐体31の外形に沿って湾曲するように抉られた形状を呈する。
 金属部材21は、スリット2Bを有する。スリット2Bは、金属部材21を変形させるための隙間である。尚、金属部材21の変形については、後述する。スリット2Bは、金属部材21における内部と外部とを区画する一方の壁体211(-Y)に設けられる。スリット2Bは、壁体211を例えば上下に2分割するように、金属部材21が延在する方向(X軸)に沿って設けられる。
 金属部材21における下側(-Z)の面の四隅に金属製の脚25が、例えば溶接されている。当該脚25は、配管400に対して例えば溶接される。つまり、金属部材21は、配管400に対して脚25によって強固に固定されることとなる。つまり、金属部材21は、配管400に対して第1電極装置3を取り付けるべく、絶縁部材22、23と配管400との間に設けられている。
 絶縁部材22、23は、配管400に対して第1電極装置3を電気的に絶縁するための例えばセラミックス等の一対の絶縁部材である。絶縁部材22、23は、第1電極装置3の筐体31を把持する把持部材としても機能する。
 絶縁部材23は、保持孔2Aの内壁として、金属部材21の内部に固定される。絶縁部材23は、金属部材21の内面に沿って設けられる。絶縁部材23は、第1取付装置2が立設する方向(Z軸)においてスリット2Bよりも下側(-Z)に設けられる。つまり、絶縁部材23は、スリット2Bを避けた位置に設けられる。絶縁部材23は、筐体31を把持できるように、筐体31の外形に沿って湾曲した形状を呈する。
 絶縁部材22は、保持孔2Aの内壁として、金属部材21の内部に固定される。絶縁部材22は、金属部材21の内面に沿って設けられる。絶縁部材22は、第1取付装置2が立設する方向においてスリット2Bよりも上側(+Z)に設けられる。つまり、絶縁部材22は、スリット2Bを避けた位置に設けられる。絶縁部材22は、筐体31を把持できるように、筐体31の外形に沿って湾曲した形状を呈する。つまり、絶縁部材22、23は、第2電極72が第1電極32に挿入されるように電極装置3の周囲を取り囲んでいる。又、絶縁部材22、23は、第2電極72が第1電極32に挿入される方向(X軸)に沿った隙間22A(第1隙間)(図4)が形成されるように、第2電極72が第1電極32に挿入される方向に沿って分割されている。そして、絶縁部材22、23は、隙間22Aを介して対向することとなる。
 調整螺子26、27は、金属部材21の変形量を調整するための螺子である。尚、金属部材21の変形、調整螺子26、27については後述する。
 第2取付装置8は、第2電極装置7を保持して、当該第2電極装置7を配管400に対して取り付けるための装置である。第2取付装置8は、金属部材81、絶縁部材82、83(第3部材、第4部材)、調整螺子(不図示)、脚85を有する。金属部材81、絶縁部材82、83、調整螺子(不図示)、脚85は夫々、金属部材21、絶縁部材22、23、調整螺子26、27、脚25と同様な構成である。つまり、第2取付装置8の構成は、第1取付装置2の構成と同様である。
===調整螺子===
 以下、図4及び図5を参照して、本実施形態における調整螺子について説明する。図5は、本実施形態における第1取付装置を示す正面図である。尚、調整螺子26の一部、螺子孔21A、21Bは、見えない状態となっているが、説明の便宜上、点線で示されている。
 調整螺子26、27は、前述したように、金属部材21の変形量を調整するための螺子である。
 調整螺子26は、第1取付装置2が立設する方向(Z軸)に沿って延在する雄螺子である。調整螺子26は、金属部材21における壁体211に対して上側から螺着される。調整螺子26は、第1取付装置2が立設する方向における、第1壁体213の螺子孔21Aに挿通された後、第2壁体214の螺子孔21Bに螺合される。
 第1壁体213は、壁体211におけるスリット2Bよりも上側(+Z)の一部である。壁体213には、調整螺子26が延在する方向(Z軸)に沿って螺子孔21Aが設けられる。螺子孔21Aは、絶縁部材22を避けた位置に設けられる。螺子孔21Aは、例えば、下側(-Z)から上側に向かうにつれて径が大きくなるように形成され、調整螺子26が挿通される挿通孔である。
 第2壁体214は、壁体211におけるスリット2Bよりも下側(-Z)の一部である。第2壁体214には、調整螺子26が延在する方向に沿って螺子孔21Bが設けられる。螺子孔21Bは、絶縁部材23を避けた位置に設けられる。螺子孔21Bは、例えば、調整螺子26の螺子山と螺合する螺子溝が形成されている雌螺子である。尚、例えば、螺子孔21Bに形成されている螺子溝は、調整螺子26のA1方向(図4)への回動により当該調整螺子26が上側から下側に移動し、調整螺子26のA2方向への回動により当該調整螺子26が下側から上側に移動するように形成されていることとする。
 尚、調整螺子27は、調整螺子26と同様な構成である。金属部材21における調整螺子27が螺合される位置には、螺子孔21A、21Bと同様な構成の雌螺子(不図示)が設けられる。
===金属部材の変形===
 以下、図5及び図6を参照して、本実施形態における金属部材の変形について説明する。図6は、本実施形態における金属部材が変形された状態の第1取付装置を示す正面図である。尚、調整螺子26の一部、螺子孔21A、21Bは、見えない状態となっているが、説明の便宜上、点線で示されている。
 金属部材21は、第1電極装置3の筐体31を絶縁部材22、23によって把持するべく変形される。金属部材21の変形量の調整は、調整螺子26、27の操作によって行われる。尚、金属部材21の変形量を調整する際の、調整螺子26の操作と調整螺子27の操作とは、夫々同様であるので、調整螺子26の操作についてのみ説明し、調整螺子27の操作については、その説明を省略する。
 例えば、調整螺子26がA2方向(図4)に回動された場合、調整螺子26が下側(-Z)から上側(+Z)に移動し、調整螺子26の先端261は螺子孔21Bから外れることになる。このとき、金属部材21は、変形されていない状態(図5)となる。尚、金属部材21が変形されていないとき、保持孔2Aの径D21(図5)は、筐体31の径D3よりも大きくなっていることとする。
 又、例えば、調整螺子26の先端261が螺子孔21Bに螺合された状態で、調整螺子26がA1方向(図4)に回動された場合、調整螺子26が上側から下側に移動し、調整螺子26のヘッド262が第1壁体213の上面に当接することになる(図6)。このとき、上側から下側に向かう力が、ヘッド262から第1壁体213に対して伝達されることになる。金属部材21は、当該ヘッド262から伝達される力に応じて第1壁体213が下側に移動するように、変形することになる。尚、このとき、金属部材21の変形量は、調整螺子26のA1方向又はA2方向への回動量に応じて調整される。尚、金属部材21が変形されたとき、保持孔2Aの径D22は、金属部材21が変形されていないときの径D21よりも小さくなる。尚、径D22に対する径D21の変動幅は、調整螺子26のA1方向又はA2方向への回動量に応じて定まることになる。
===取付装置による電極装置の保持===
 以下、図5及び図6を参照して、本実施形態における取付装置による電極装置の保持について説明する。
 第1取付装置2による第1電極装置3の保持と、第2取付装置8による第2電極装置7の保持とは、同様な構成であるので、第1取付装置2による第1電極装置3の保持についてのみ説明し、第2取付装置8による第2電極装置7の保持については、その説明を省略する。
 例えば、調整螺子26の先端261が螺子孔21Bから外れるように、調整螺子26がA2方向(図4)に回動される。調整螺子26が下側から上側へ移動し、調整螺子26の先端は、螺子孔21Bから外れる。このとき、金属部材21は、変形されていない状態となる。例えば第1電極装置3が延在する方向(X軸)において、筐体31が保持孔2Aの内部に挿入される。
 この後、例えば、調整螺子26の先端261が螺子孔21Bに螺合されるように、調整螺子26が下側(-Z)に向かって移動される。先端261が螺子孔21Bと螺合された状態で、螺子26がA1方向に回動される。A1方向への回動量が増加するにつれて、保持孔2Aの径D22が小さくなる。よって、保持孔2Aの内部において、筐体31は、絶縁部材22、23によって把持されることになる。つまり、金属部材21は、絶縁部材22、23によって筐体31が把持されるように、第2電極72が第1電極32に挿入される方向(X軸)と交差する方向(Z軸)における絶縁部材22、23の間の距離を調整するべく変形されることになる。つまり、金属部材21は、絶縁部材22、23によって第1電極装置3が保持されるとき、隙間22Aが調整されるように変形可能とされている。尚、絶縁部材22、23が筐体31を把持する把持力は、調整螺子26の回動量の調整によって調整可能となる。以上より、第1電極装置3は、第1取付装置2よって保持されることになる。
===歪検出装置の接続===
 以下、図7を参照して、本実施形態における歪検出装置の接続について説明する。図7は、本実施形態における歪測定装置の等価回路を示す回路図である。
 尚、コンデンサC0は、例えば、第1電極32と第2電極72によって形成されるコンデンサを示している。コンデンサC1は、例えば、第1電極32と配管400との間の寄生容量、導電線41Aと配管400との間の静電容量を示している。コンデンサC2は、例えば、第2電極72と配管400との間の寄生容量、導電線41Bと配管400との間の静電容量を示している。
 絶縁抵抗R0は、例えば、第1電極32と第2電極72との間の絶縁抵抗を示している。絶縁抵抗R1は、例えば、第1電極32と配管400との間の絶縁抵抗、導電線41Aと配管400との間の絶縁抵抗を示している。絶縁抵抗R2は、例えば、第2電極72と配管400との間の絶縁抵抗、導電線41Bと配管400との間の絶縁抵抗を示している。
 歪検出装置9は、第1端子901、第2端子902を有する。
 第1端子901および第2端子902は、例えば、交流の電圧を印加するための端子である。交流の電圧は,第1端子901および第2端子902の両方の電極間に印加される。また,第1端子901または第2端子902は,印加された電圧によってコンデンサCOの静電容量に基づいて導電線41Aおよび導電線41Bを流れる電流を検出するための,端子としても機能する。尚、第2端子902は、接地されていることとしてもよく、接地されていないこととしてもよい。
 歪検出装置9は、コンデンサC0の静電容量を測定するために、測定ケーブル4A、4B(図2)を介して第1電極32、第2電極72に接続される。具体的には、歪検出装置9の第1端子901が、測定ケーブル4Aの導電線41Aを介して第1電極32に接続される。歪検出装置9の第2端子902が、測定ケーブル4Bの導電線41Bを介して第2電極72に接続される。
 尚、測定ケーブル4A、4Bは、例えば同軸ケーブルである。導電線41A、41Bは夫々、測定ケーブル4A、4Bの内部導体を示し、導電線42A、42Bは夫々、測定ケーブル4A、4Bの外部導体を示していることとする。尚、導電線42A、42B夫々の一端は、例えば、筐体31、71に対して比較的強固に接続されているが、図2においては、説明の便宜上、1点で接続されているように示されている。
===歪検出装置の機能===
 以下、図2、図7及び図8を参照して、本実施形態における歪検出装置の機能について説明する。図8は、本実施形態における歪検出装置の機能を示すブロック図である。
 歪検出装置9は、コンデンサC0の静電容量の値に基づいて、測定対象部分401の歪量を測定する装置である。歪検出装置9は、静電容量測定部91、歪検出部92、表示部93を有する。
 静電容量測定部91は、第1電極32と第2電極72によって形成されるコンデンサC0の静電容量を測定する。静電容量測定部91は、例えば、第1端子901及び第2端子902から交流電圧を印加(出力)して、当該電圧が出力されたときに導電線41A、42Aを介してコンデンサC0を通過する交流電流(以下、「検出電流」とも称する)を第1端子901及び第2端子902のどちらかで検出する。静電容量測定部91は、例えば、当該印加(出力)された交流電圧の値と検出電流の値とに基づいて、コンデンサC0の静電容量を算出する。
 例えば、第1端子901および第2端子902を用いて交流電圧を印加した場合、当該交流電圧に基づく交流電流は、第1端子もしくは第2端子に,電流検出用の抵抗もしくは電流計を接続することで検出でき,印加した交流電圧の大きさと周波数および検出された電流の大きさから,コンデンサC0の静電容量を算出する。
 歪検出部92は、静電容量測定部91で算出(測定)されたコンデンサC0の静電容量の値に基づいて、測定対象部分401の歪量を算出する。
 歪検出部92は、例えば、第1時刻におけるコンデンサC0の静電容量の値と、当該第1時刻よりも後の第2時刻におけるコンデンサC0の値とに基づいて、第1時刻から第2時刻までの間の所定時間(所定期間)における測定対象部分401の歪量を算出する。
 ここで、前述したように、コンデンサC0の静電容量の値は、第1測定装置200と第2測定装置800との間の距離D1(図2)に応じて定まることになる。また,歪量は,所定時間における距離D1の変動幅(差分)として計算される。よって、例えば、所定時間におけるコンデンサC0の静電容量の値の変動幅は、所定時間における歪量を表すことになり,測定対象部分401の歪量については、コンデンサC0の静電容量の値の変動幅に基づいて求めることが可能となる。尚、コンデンサC0の静電容量を、静電容量C0とも称することとする。
 尚、例えば、歪検出装置9において、コンデンサC0の静電容量の値と,距離D1が対応づけられた情報が予め歪検出装置9の記憶部(不図示)に記憶されていることとしてもよい。このとき、歪検出部92は、例えば、静電容量測定部91の測定結果と当該記憶部に記憶されている情報に基づいて、静電容量C0を距離D1に変換してD1の値を記憶し,その後,所定時間におけるD1の差分をとることによって,測定対象部分401の歪量を算出することとする。
 表示部93は、歪検出部92での算出結果を表示する例えばモニタである。
===歪測定装置を用いた測定対象部分の歪量の測定===
 以下、図1及び図7を参照して、本実施形態における歪測定装置を用いた測定対象部分の歪量の測定について説明する。
 第1取付装置2、第2取付装置8が、配管400に対して取り付けられる。第1取付装置2、第2取付装置8は、配管400が延在する方向(X軸)において測定対象部分401の両側に例えば溶接される。
 第1取付装置2、第2取付装置8に対して夫々、第1電極装置3、第2電極装置7が取付けられる。つまり、第1電極装置3、第2電極装置7が夫々、第1取付装置2、第2取付装置8に保持される。尚、このとき、第2電極72は、測定対象部分401の歪量を測定するべく、第1電極32の内部に挿入される。尚、第1電極装置3、第2電極装置7に対しては夫々、測定ケーブル4Aの一端、測定ケーブル4Bの一端が予め接続されていることとする。
 歪検出装置9は、第1時刻におけるコンデンサC0の静電容量と、第1時刻よりも後の第2時刻におけるコンデンサC0の静電容量とを測定する。
 ここで、第1電極装置3は、第1取付装置2の絶縁部材22、23によって周囲を取り囲まれた状態となっている。つまり、絶縁抵抗R1の抵抗値が比較的高くなることになる。又、第2電極装置7は、第2取付装置8の絶縁部材82、83によって周囲を取り囲まれた状態となっている。つまり、絶縁抵抗R2の抵抗値が比較的高くなることになる。従って、例えば、コンデンサC0の静電容量を測定する際の漏れ電流I1、I2(図2)の値を低下させることができる。尚、漏れ電流I1は、例えば、第2電極72から、固定部材73、筐体71、絶縁部材83、金属部材81、脚85、配管400、脚25、金属部材25、絶縁部材23、筐体31、固定部材33を介して第1電極32に供給される電流である。漏れ電流I2は、漏れ電流I1とは反対の経路を介して、第1電極32から第2電極72に対して供給される電流である。従って、歪検出装置9によるコンデンサC0の静電容量の測定精度が向上されることになる。
 この後、歪検出装置9は、上述の測定結果等に基づいて、第1時刻から第2時刻までの間の所定時間(所定期間)における測定対象部分401の歪量を算出する。歪検出装置9は、当該算出結果を表示部93に表示させる。
[第2実施形態]
===第1取付装置===
 以下、図9を参照して、本実施形態における第1取付装置について説明する。図9は、本実施形態における第1取付装置を示す斜視図である。尚、金属部材61、64の一部、絶縁部材62、63の一部、蝶番681、682は見えない状態となっているが、説明の便宜上、点線で示されている。
 第1実施形態においては、第1電極装置3、第2電極装置7が夫々、第1取付装置2、第2取付装置8に保持されることについて説明したが、これに限定されるものではない。例えば、第1電極装置3、第2電極装置7が夫々、第1取付装置6、第1取付装置6と同様な構成の第2取付装置(以下、「第2電極装置7を保持するための第2取付装置」とも称する)に保持されることとしてもよい。尚、第1取付装置6と、第2電極装置7を保持するための第2取付装置とは、同様な構成であるので、第1取付装置6についてのみ説明し、第2電極装置7を保持するための第2取付装置については、その説明を省略する。
 第1取付装置6は、第1電極装置3を保持するための装置である。第1取付装置6は、例えば略矩形柱の部材を、第1取付装置6の略中央を通り高さ方向(Z軸)に対して直交する平面(XY平面)によって上下に二分割された形状を呈する。第1取付装置6は、第1電極装置3を保持できるように、第1電極装置3が延在する方向(X軸)に沿って延在して貫通する保持孔6Aが形成されるように中空形状を呈する。第1取付装置6は、金属部材61、64、絶縁部材62、63、蝶番681、682、固定螺子66、67、脚65を有する。
 金属部材64は、金属部材61と共に第1取付装置6の外形を形成する、第1取付装置6における下側(-Z)の金属製の部材である。金属部材64は、配管400に取り付けられる。金属部材64は、金属部材64の下側の面の四隅に金属製の脚65が溶接されている。当該脚65は、配管400に溶接される。つまり、金属部材64は、配管400に対して脚64によって強固に固定されることとなる。金属部材64における上部(+Z)は、第1電極装置3の筐体31を保持できるように、筐体31の外形に沿って湾曲するように一部が抉られた形状を呈する。
 金属部材61は、蝶番681、682によって金属部材64に固定される。金属部材61は、第1電極装置3が延在する方向に平行な軸を中心に、回動できるように金属部材64に固定される。尚、蝶番681、682は、金属部材61、64における一方の側面(+Y)に設けられている。金属部材61における下部は、第1電極装置3の筐体31を保持できるように、筐体31の外形に沿って湾曲するように一部が抉られた形状を呈する。
 絶縁部材62、63は、配管400に対して第1電極装置3を電気的に絶縁するための例えばセラミックス等の一対の絶縁部材である。絶縁部材62、63は、第1電極装置3の筐体31を把持する把持部材としても機能する。絶縁部材62は、保持孔6Aの内壁として、金属部材61の下面に沿って設けられる。絶縁部材62は、筐体31を把持できるように、筐体31の外形に沿って湾曲した形状を呈する。絶縁部材63は、保持孔6Aの内壁として、金属部材64の上面に沿って設けられる。絶縁部材63は、筐体31を把持できるように、筐体31の外形に沿って湾曲した形状を呈する。
 固定螺子66、67は、金属部材61の回動を禁止したり、許可したりするための例えば雄螺子である。更に、固定螺子66、67は、第1電極装置3の筐体31を把持する際の、把持力を調整するためにも操作される。尚、固定螺子66、67については、後述する。
===固定螺子===
 以下、図9及び図10を参照して、本実施形態における固定螺子について説明する。図10は、本実施形態における第1取付装置を示す正面図である。尚、固定螺子66の一部、螺子孔61A、64Aは、見えない状態となっているが、説明の便宜上、点線で示されている。
 固定螺子66、67は、前述したように、金属部材61の回動を禁止したり、許可したりするための例えば雄螺子である。尚、金属部材61の回動については、後述する。固定螺子66は、金属部材61、64に対して上側から連続的に螺着される。固定螺子66は、金属部材61における壁体611の螺子孔61A、金属部材64における壁体641の螺子孔64Aに螺合される。
 ここで、壁体611には、固定螺子66が延在する方向(Z軸)に沿って貫通している螺子孔61Aが設けられる。螺子孔61Aは、絶縁部材62を避けた位置に設けられ、固定螺子66の螺子山と螺合する螺子溝を有する雌螺子である。壁体641には、固定螺子66が延在する方向に沿って螺子孔64Aが設けられる。螺子孔64Aは、絶縁部材63を避けた位置に設けられ、固定螺子66の螺子山と螺合する螺子溝を有する雌螺子である。尚、例えば、螺子孔61A、64Aに形成されている螺子溝は、固定螺子66のA1方向(図9)への回動により当該固定螺66が上側から下側に移動し、固定螺子66のA2方向への回動により当該固定螺子66が下側から上側に移動するように形成されていることとする。
===金属部材の回動===
 以下、図10及び図11を参照して、本実施形態における金属部材の回動について説明する。図11は、本実施形態における回動された状態の金属部材を示す正面図である。尚、固定螺子66の一部、螺子孔61A、64Aは、見えない状態となっているが、説明の便宜上、点線で示されている。
 金属部材61のE1方向への回動(図10)により、第1取付装置6が閉じられる場合と、金属部材61のE2方向への回動(図11)により、第1取付装置6が開かれる場合とについて説明する。
<金属部材61のE1方向への回動>
 金属部材61に対してE1方向への回動力が伝達されたとき、金属部材61は、蝶番681の回動軸681Aを中心にE1方向に回動される。尚、回動軸681Aは、取付装置6が延在する方向(X軸)に沿った軸である。蝶番682(図9)の構成は、蝶番681の構成と同様であるので、蝶番682については、その説明を省略する。第1取付装置6は、閉じた状態となる。このとき、保持孔6Aの径は、第1電極装置3の筐体31が絶縁部材62、63に把持されるような大きさとなるように設定されていることとする。
 この後、固定螺子66のA1方向(図9)への回動により、固定螺子66が螺子孔61A、64Aの双方と螺合された状態となる。このとき、金属部材61は、回動できない状態となる。つまり、第1取付装置6の開閉が禁止された状態となる。
 この後、固定螺子66のA1方向への更なる回動により、固定螺子66は、上側から下側に移動することになる。固定螺子66のヘッド662が壁体611の上面に当接した際、固定螺子66がA1方向へ更に回動された場合、壁体611は、ヘッド662からの下側への力に基づいて、下側に移動することになる。そして、壁体611が上側から下側に移動するにつれて、保持孔6Aの径が、小さくなることとなる。
<金属部材61のA2方向への回動>
 固定螺子66のA2方向(図9)への回動により、固定螺子66が下側から上側へ向かって移動する。当該移動により固定螺子66の先端661が、螺子孔64Aが外れる。このとき、金属部材61は、回動可能な状態となる。つまり、第1取付装置6の開閉が許可された状態となる。
 この後、金属部材61に対してE2方向への回動力が伝達されたとき、金属部材61は、蝶番681の回動軸681Aを中心にE2方向に回動される。
===取付装置による電極装置の保持===
 以下、図10及び図11を参照して、本実施形態における取付装置による電極装置の保持について説明する。
 例えば、固定螺子66の先端661が螺子孔64Aから外れるように、固定螺子66がA2方向に回動される。固定螺子66は、下側から上側に向かって移動することになる。当該移動により固定螺子66の先端661が、螺子孔64Aが外れる。このとき、金属部材61は、回動可能な状態となる。
 金属部材61に対してE2方向への回動力が伝達されたとき、金属部材61は、蝶番681の回動軸681Aを中心にE2方向に回動される。第1電極装置3の筐体31が絶縁部材63上に載置される。このとき、第1取付装置6は、開いた状態となる。
 金属部材61が、蝶番681の回動軸681Aを中心にE1方向に回動される。このとき、第1取付装置6は、閉じた状態となる。固定螺子66のA1方向への回動により、固定螺子66が螺子孔61A、64Aの双方と螺合された状態となる。このとき、第1取付装置6の開閉が禁止された状態となる。
 固定螺子66のA1方向への更なる回動に基づくヘッド662からの下側への力が、壁体611の上面に伝達されることになる。当該伝達された力に基づいて、壁体611が下側へ移動するにつれて、保持孔6Aの径が小さくなる。つまり、固定螺子66のA1方向への更なる回動に基づいて、筐体31が、比較的強固に把持されることになる。
 前述したように、歪測定装置100は、第1電極装置3、第2電極装置7、第1取付装置2、第2取付装置8を有する。第1電極装置3は、筒状の第1電極32を有する。第2電極装置7は、第1電極32に挿入される棒状の第2電極72を有する。第1取付装置2は、絶縁部材22、23、金属部材21を有する。絶縁部材22、23は、第2電極72が第1電極32に挿入されるように第1電極装置3の周囲を取り囲む。金属部材21は、配管400に対して第1電極装置3を取り付けるべく、絶縁部材22、23と配管400との間に設けられる。金属部材21は、第2電極72が第1電極32に挿入されるように絶縁部材22、23の周囲を取り囲んでいる。第2取付装置8は、絶縁部材82、83、金属部材81を有する。絶縁部材82、83は、第2電極72が第1電極32に挿入されるように第2電極装置7の周囲を取り囲む。金属部材81は、配管400に対して第2電極装置7を取り付けるべく、絶縁部材82、83と配管400とのの間に設けられる。金属部材81は、第2電極72が第1電極32に挿入されるように絶縁部材22、23の周囲を取り囲んでいる。歪測定装置100は、第2電極72の第1電極32に挿入されている部分の長さに応じて定まるコンデンサC0の静電容量の値に基づいて、配管400における第2電極が挿入される方向(X軸)の歪量を測定する。これらの構成により、第1電極32と配管400は、絶縁部材22、23によって電気的に絶縁されることになる。又、第2電極72と配管400は、絶縁部材82、83によって電気的に絶縁されることになる。よって、配管400における歪量を測定する際に、前述の漏れ電流I1、I2(図2)の値は比較的小さく抑えられることになる。従って、歪測定装置100は、コンデンサC0の静電容量の測定精度を向上させて、第2電極72が挿入される方向(X軸)における配管400の歪量の測定精度を向上させることができる。
 又、第1電極装置3は、金属製の筐体31、絶縁性の固定部材33を更に有する。筐体31は、第2電極72が第1電極31に挿入されるように第1電極32を収容する。筐体31の内径は、第1電極32の外形よりも大きく設定されている。固定部材33は、筐体31に対して第1電極32が接触しないように、筐体31の内部において第1電極32を支持する。これらの構成により、第1電極32と配管400は、絶縁性の固定部材33によって電気的に絶縁されることになる。配管400における歪量を測定する際に、前述の漏れ電流I1、I2の値を更に小さく抑えることができる。従って、コンデンサC0の静電容量の測定精度を更に向上させて、配管400の歪量の測定精度を更に向上させることができる。
 又、第2電極装置7は、金属製の筐体71、絶縁性の固定部材73を更に有する。筐体71は、第2電極72が第1電極31に挿入されるように第2電極72を収容する。筐体71の内径は、第2電極72の外形よりも大きく設定されている。固定部材73は、筐体71に対して第2電極72が接触しないように、筐体71の内部において第2電極72を支持する。これらの構成により、又、第2電極72と配管400は、絶縁性の固定部材73によって電気的に絶縁されることになる。配管400における歪量を測定する際に、前述の漏れ電流I1、I2の値を更に小さく抑えることができる。従って、コンデンサC0の静電容量の測定精度を更に向上させて、配管400の歪量の測定精度を更に向上させることができる。
 又、絶縁部材22、23は、第2電極72が第1電極32に挿入される方向(X軸)に沿って分割されている。絶縁部材22、23は、第2電極72が第1電極32に挿入される方向に沿った隙間22Aを介して相互に対向するように金属部材21に固定される。金属部材21は、絶縁部材22、23によって第1電極装置3が保持されるとき、隙間22Aが調整されるように変形可能とされている。これらの構成により、第1取付装置2は、隙間22Aの調整により、第1電極装置2を確実に保持することができる。従って、配管400に対して第1電極装置3を確実に取付けることができる。従って、例えば、配管400に対する第1電極装置3の位置ずれが生じるのを防止することができる。よって、歪測定装置100は、配管400の歪量の測定精度を更に向上させることができる。又、絶縁部材22、23が予め分割されているので、第1電極装置3を保持するための力が絶縁部材22、23に伝達されるのを防止することができる。つまり、例えば、第1電極装置3を保持するための力に基づいて、絶縁部材22、23が割れるのを防止することができる。
 又、絶縁部材82、83は、第2電極72が第1電極32に挿入される方向に沿って分割されている。絶縁部材82、83は、第2電極72が第1電極32に挿入される方向に沿った隙間82A(図1)を介して相互に対向するように金属部材81に固定される。金属部材81は、絶縁部材82、83によって第2電極装置7が保持されるとき、隙間82Aが調整されるように変形可能とされている。これらの構成により、第2取付装置8は、隙間82Aの調整により、第2電極装置7を確実に保持することができる。従って、配管400に対して第2電極装置7を確実に取付けることができる。従って、例えば、配管400に対する第2電極装置7の位置ずれが生じるのを防止することができる。よって、歪測定装置100は、配管400の歪量の測定精度を更に向上させることができる。又、絶縁部材82、83が予め分割されているので、第2電極装置7を保持するための力が絶縁部材82、83に伝達されるのを防止することができる。つまり、例えば、第2電極装置7を保持するための力に基づいて、絶縁部材82、83が割れるのを防止することができる。
 又、第1電極装置3は、配管400における測定対象部分401よりも一方側(-X)に取り付けられる。第2電極装置7は、配管400における測定対象部分401よりも他方側(+X)に取り付けられる。よって、歪測定装置100は、例えば溶接部分等の測定対象部分401の歪みに応じた、配管400の歪量を測定することができる。
 又、絶縁部材22、23、82、83は、例えば、セラミックス等からなる。つまり、絶縁部材22、23、82、83抵抗の値を、比較的高くすることができる。従って、漏れ電流I1、I2の電流値を比較的小さく抑えることができる。よって、配管400の歪量の測定精度を更に向上させることができる。
 又、第1取付装置2、第2取付装置8は夫々、歪測定装置100の第1電極装置3、第2電極装置7を配管400に取り付けるための装置である。1電極装置3は、筒状の第1電極32を有する。第2電極装置7は、第1電極32に挿入される棒状の第2電極72を有する。歪測定装置100は、第2電極72の第1電極32に挿入されている部分の長さに応じて定まるコンデンサC0の静電容量の値に基づいて、配管400における第2電極が挿入される方向の歪量を測定する。第1取付装置2は、絶縁部材22、23、金属部材21を有する。絶縁部材22、23は、第2電極72が第1電極32に挿入されるように第1電極装置3の周囲を取り囲む。金属部材21は、配管400に対して第1電極装置3を取り付けるべく、絶縁部材22、23と配管400との間に設けられる。金属部材21は、第2電極72が第1電極32に挿入されるように絶縁部材22、23の周囲を取り囲んでいる。第2取付装置8は、絶縁部材82、83、金属部材81を有する。絶縁部材82、83は、第2電極72が第1電極32に挿入されるように第2電極装置7の周囲を取り囲む。金属部材81は、配管400に対して第2電極装置7を取り付けるべく、絶縁部材82、83と配管400とのの間に設けられる。金属部材81は、第2電極72が第1電極32に挿入されるように絶縁部材22、23の周囲を取り囲んでいる。これらの構成により、第1電極32と配管400は、絶縁部材22、23によって電気的に絶縁されることになる。又、第2電極72と配管400は、絶縁部材82、83によって電気的に絶縁されることになる。よって、配管400における歪量を測定する際に、前述の漏れ電流I1、I2(図2)の値を小さく抑えることができる。従って、第1取付装置2、第2取付装置8は、歪測定装置100によるコンデンサC0の静電容量の測定精度を向上させて、歪測定装置100による配管400の歪量の測定精度を向上させることができる。
 又、絶縁部材22、23は、第2電極72が第1電極32に挿入される方向に沿って分割されている。絶縁部材22、23は、第2電極72が第1電極32に挿入される方向に沿った隙間22Aを介して相互に対向するように金属部材21に固定される。金属部材21は、絶縁部材22、23によって第1電極装置3が保持されるとき、隙間22Aが調整されるように変形可能とされている。これらの構成により、第1取付装置2は、隙間22Aの調整により、第1電極装置2を確実に保持することができる。従って、配管400に対して第1電極装置3を確実に取付けることができる。従って、例えば、配管400に対する第1電極装置3の位置ずれが生じるのを防止することができる。よって、第1取付装置2は、歪測定装置100による配管400の歪量の測定精度を更に向上させることができる。又、絶縁部材22、23が予め分割されているので、第1電極装置3を保持するための力が絶縁部材22、23に伝達されるのを防止することができる。つまり、例えば、第1電極装置3を保持するための力に基づいて、絶縁部材22、23が割れるのを防止することができる。
 又、絶縁部材82、83は、第2電極72が第1電極32に挿入される方向に沿って分割されている。絶縁部材82、83は、第2電極72が第1電極32に挿入される方向に沿った隙間82A(図1)を介して相互に対向するように金属部材81に固定される。金属部材81は、絶縁部材82、83によって第2電極装置7が保持されるとき、隙間82Aが調整されるように変形可能とされている。これらの構成により、第2取付装置8は、隙間82Aの調整により、第2電極装置7を確実に保持することができる。従って、配管400に対して第2電極装置7を確実に取付けることができる。従って、例えば、配管400に対する第2電極装置7の位置ずれが生じるのを防止することができる。よって、第2取付装置8は、歪測定装置100による配管400の歪量の測定精度を更に向上させることができる。又、絶縁部材82、83が予め分割されているので、第2電極装置7を保持するための力が絶縁部材82、83に伝達されるのを防止することができる。つまり、例えば、第2電極装置7を保持するための力に基づいて、絶縁部材82、83が割れるのを防止することができる。
 尚、上記第1乃至第2実施形態は、本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得るとともに、本発明にはその等価物も含まれる。
 第1実施形態においては、所定方向(X軸)に沿って延在している配管400における測定対象部分401の両側に第1測定装置200及び第2測定装置800が取り付けられることについて説明したが、これに限定されるものではない。例えば、第1方向(例えば図1のX軸)に沿って延在する第1配管と、第1方向と交差する第2方向に沿って延在する第2配管とに対して夫々、第1測定装置200、第2測定装置800が取り付けられることとしてもよい。この場合、歪測定装置100は、互いに交差している第1配管と第2配管との間の歪量を測定することが可能となる。
 第1実施形態においては、静電容量測定部91は、第1端子901及び第2端子902からコンデンサC0に対して交流電圧を出力し、当該交流電圧の大きさと周波数及び第1端子901及び第2端子902で検出された電流の大きさ等からコンデンサC0の静電容量を測定することについて説明したが、これに限定されるものではない。例えば、静電容量測定部91は、第1端子901及び第2端子902からコンデンサC0に対して交流電流を出力し、当該交流電流の大きさと周波数及び第1端子901及び第2端子902で検出された電圧の大きさ等からコンデンサC0の静電容量を測定することとしてもよい。
2、6                     第1取付装置
3                       第1電極装置
8                       第2取付装置
7                       第2電極装置
22、23、62、63、82、83       絶縁部材
22A、82A                 隙間
21、61、64、81             金属部材
31、71                   筐体
32                      第1電極
33、73                   固定部材
72                      第2電極
100                     歪測定装置
400                     配管
C0、C1、C2                コンデンサ

Claims (10)

  1.  筒状電極を有する第1電極体と、
     前記筒状電極に挿入される棒状電極を有する第2電極体と、
     前記棒状電極が前記筒状電極に挿入されるように前記第1電極体の周囲を取り囲む第1絶縁部材と、
     前記棒状電極が前記筒状電極に挿入されるように前記第2電極体の周囲を取り囲む第2絶縁部材と、
     被測定物に対して前記第1電極体を取り付けるべく、前記棒状電極が前記筒状電極に挿入されるように前記第1絶縁部材と前記被測定物との間において前記第1絶縁部材の周囲を取り囲む第1金属部材と、
     前記被測定物に対して前記第2電極体を取り付けるべく、前記棒状電極が前記筒状電極に挿入されるように前記第2絶縁部材と前記被測定物との間において前記第2絶縁部材の周囲を取り囲む第2金属部材と、を備え、
     前記棒状電極の前記筒状電極に挿入されている部分の長さに応じて定まる静電容量の値に基づいて、前記被測定物における前記棒状電極が挿入される方向の歪量を測定する
     ことを特徴とする歪測定装置。
  2.  前記第1電極体は、前記筒状電極の外径よりも大きい内径を有すると共に前記棒状電極が前記筒状電極に挿入されるように前記筒状電極を収容する金属製の第1ケースと、前記第1ケースに対して前記筒状電極が接触しないように前記第1ケースの内部において前記筒状電極を支持する絶縁性の第1支持部材と、を更に有する
     ことを特徴とする請求項1に記載の歪測定装置。
  3.  前記第2電極体は、前記棒状電極の外径よりも大きい内径を有すると共に前記棒状電極が前記筒状電極に挿入されるように前記棒状電極を収容する金属製の第2ケースと、前記第2ケースに対して前記棒状電極が接触しないように前記第2ケースの内部において前記棒状電極を支持する絶縁性の第2支持部材と、を更に有する
     ことを特徴とする請求項1又は2に記載の歪測定装置。
  4.  前記第1絶縁部材は、前記棒状電極が挿入される方向に沿って分割された第1部材及び第2部材を含み、
     前記第1部材及び前記第2部材は、前記棒状電極が挿入される方向に沿った第1隙間を介して相互に対向するように前記第1金属部材に固定され、
     前記第1金属部材は、前記第1部材及び前記第2部材によって前記第1電極体が保持されるとき、前記第1隙間が調整されるように変形可能とされる
     ことを特徴とする請求項1乃至3の何れかに記載の歪測定装置。
  5.  前記第2絶縁部材は、前記棒状電極が挿入される方向に沿って分割された第3部材及び第4部材を含み、
     前記第3部材及び前記第4部材は、前記棒状電極が挿入される方向に沿った第2隙間を介して相互に対向するように前記第2金属部材に固定され、
     前記第2金属部材は、前記第3部材及び前記第4部材によって前記第2電極体が保持されるとき、前記第2隙間が調整されるように変形可能とされる
     ことを特徴とする請求項1乃至4の何れかに記載の歪測定装置。
  6.  前記被測定物は、第1配管と前記第1配管に接続される第2配管と、を含み、
     前記第1電極体は、前記第1配管に取り付けられ、
     前記第2電極体は、前記第2配管に取り付けられる
     ことを特徴とする請求項1乃至5の何れかに記載の歪測定装置。
  7.  前記第1絶縁部材及び前記第2絶縁部材は、セラミックスからなる
     ことを特徴とする請求項1乃至6の何れかに記載の歪測定装置。
  8.  筒状電極を有する第1電極体と、前記筒状電極に挿入される棒状電極を有する第2電極体と、を有し、前記棒状電極の前記筒状電極に挿入されている部分の長さに応じて定まる静電容量の値に基づいて、被測定物における前記棒状電極が挿入される方向の歪量を測定する歪測定装置の前記第1電極体と前記第2電極体を前記被測定物に取り付けるための取付装置であって、
     前記棒状電極が前記筒状電極に挿入されるように前記第1電極体の周囲を取り囲む第1絶縁部材と、
     前記棒状電極が前記筒状電極に挿入されるように前記第2電極体の周囲を取り囲む第2絶縁部材と、
     被測定物に対して前記第1電極体を取り付けるべく、前記棒状電極が前記筒状電極に挿入されるように前記第1絶縁部材と前記被測定物との間において前記第1絶縁部材の周囲を取り囲む第1金属部材と、
     前記被測定物に対して前記第2電極体を取り付けるべく、前記棒状電極が前記筒状電極に挿入されるように前記第2絶縁部材と前記被測定物との間において前記第2絶縁部材の周囲を取り囲む第2金属部材と、
     を備えたことを特徴とする取付装置。
  9.  前記第1絶縁部材は、前記棒状電極が挿入される方向に沿って分割された第1部材及び第2部材を含み、
     前記第1部材及び前記第2部材は、前記棒状電極が挿入される方向に沿った第1隙間を介して相互に対向するように前記第1金属部材に固定され、
     前記第1金属部材は、前記第1部材及び前記第2部材によって前記第1電極体が保持されるとき、前記第1隙間が調整されるように変形可能とされる
     ことを特徴とする請求項8に記載の取付装置。
  10.  前記第2絶縁部材は、前記棒状電極が挿入される方向に沿って分割された第3部材及び第4部材を含み、
     前記第3部材及び前記第4部材は、前記棒状電極が挿入される方向に沿った第2隙間を介して相互に対向するように前記第2金属部材に固定され、
     前記第2金属部材は、前記第3部材及び前記第4部材によって前記第2電極体が保持されるとき、前記第2隙間が調整されるように変形可能とされる
     ことを特徴とする請求項8又は9に記載の取付装置。
PCT/JP2013/056168 2013-03-06 2013-03-06 歪測定装置、取付装置 WO2014136227A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2013530463A JP5426054B1 (ja) 2013-03-06 2013-03-06 歪測定装置、取付装置
PCT/JP2013/056168 WO2014136227A1 (ja) 2013-03-06 2013-03-06 歪測定装置、取付装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2013/056168 WO2014136227A1 (ja) 2013-03-06 2013-03-06 歪測定装置、取付装置

Publications (1)

Publication Number Publication Date
WO2014136227A1 true WO2014136227A1 (ja) 2014-09-12

Family

ID=50287329

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/056168 WO2014136227A1 (ja) 2013-03-06 2013-03-06 歪測定装置、取付装置

Country Status (2)

Country Link
JP (1) JP5426054B1 (ja)
WO (1) WO2014136227A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2818922T3 (es) * 2014-03-12 2021-04-14 Chugoku Electric Power Método de medición de una distancia
JP6115499B2 (ja) * 2014-03-12 2017-04-19 中国電力株式会社 歪測定装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3729985A (en) * 1972-02-09 1973-05-01 C Sikorra Strain gage
JP2001264007A (ja) * 2000-03-15 2001-09-26 Sumitomo Chem Co Ltd 静電容量式検出装置及び自己診断装置
JP2011089936A (ja) * 2009-10-23 2011-05-06 Chugoku Electric Power Co Inc:The 歪計の取付構造、歪計の取付方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3729985A (en) * 1972-02-09 1973-05-01 C Sikorra Strain gage
JP2001264007A (ja) * 2000-03-15 2001-09-26 Sumitomo Chem Co Ltd 静電容量式検出装置及び自己診断装置
JP2011089936A (ja) * 2009-10-23 2011-05-06 Chugoku Electric Power Co Inc:The 歪計の取付構造、歪計の取付方法

Also Published As

Publication number Publication date
JP5426054B1 (ja) 2014-02-26
JPWO2014136227A1 (ja) 2017-02-09

Similar Documents

Publication Publication Date Title
WO2015137017A1 (ja) 非接触電圧計測装置
JP2016223866A5 (ja)
JP5426054B1 (ja) 歪測定装置、取付装置
JP2018204963A (ja) センサおよび測定装置
CN105829897B (zh) 非接触电压测量装置
EP3502713B1 (en) Sensor and measuring apparatus
JP4989276B2 (ja) 測定システム
JP5358755B1 (ja) 歪測定装置、静電容量測定装置、歪測定方法、静電容量測定方法
CN205483316U (zh) 大型水轮机高可靠性定子温度传感器
CN113375575A (zh) 一种线径测量装置
RU2517798C1 (ru) Тензорезисторный датчик давления на основе тонкопленочной нано- и микроэлектромеханической системы
CN103226083B (zh) 插头插销位移检测试验机
JP4662307B2 (ja) ポリイミドをコーティングしたシース熱電対
US9081036B2 (en) Adjustable measurement device
JP6115499B2 (ja) 歪測定装置
CN114200262A (zh) 高压电缆肘形终端局部放电和暂稳态电压在线测量装置
JP5426055B1 (ja) 余寿命推定装置
JP5925824B2 (ja) 補正装置
JP5944930B2 (ja) 歪測定装置
CN103348425B (zh) 仪表用变压器
JP2015175596A (ja) インピーダンス測定方法、インピーダンス測定装置
JP6501559B2 (ja) 計測機器
JP6324648B1 (ja) プローブ
JP6587841B2 (ja) 検出装置および測定装置
JP6692611B2 (ja) 検出装置および測定装置

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2013530463

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13876957

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13876957

Country of ref document: EP

Kind code of ref document: A1