WO2014084305A1 - 充電管理装置 - Google Patents

充電管理装置 Download PDF

Info

Publication number
WO2014084305A1
WO2014084305A1 PCT/JP2013/082035 JP2013082035W WO2014084305A1 WO 2014084305 A1 WO2014084305 A1 WO 2014084305A1 JP 2013082035 W JP2013082035 W JP 2013082035W WO 2014084305 A1 WO2014084305 A1 WO 2014084305A1
Authority
WO
WIPO (PCT)
Prior art keywords
charging
traffic demand
demand data
information
input
Prior art date
Application number
PCT/JP2013/082035
Other languages
English (en)
French (fr)
Inventor
加納 誠
鈴木 裕之
山本 純一
毅 島田
松井 清
中村 順一
Original Assignee
株式会社 東芝
東芝ソリューション株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社 東芝, 東芝ソリューション株式会社 filed Critical 株式会社 東芝
Priority to CN201380062408.5A priority Critical patent/CN105051800B/zh
Priority to EP13858263.0A priority patent/EP2927888B1/en
Publication of WO2014084305A1 publication Critical patent/WO2014084305A1/ja
Priority to US14/722,211 priority patent/US9656566B2/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/66Data transfer between charging stations and vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • B60L58/13Maintaining the SoC within a determined range
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/01Detecting movement of traffic to be counted or controlled
    • G08G1/0104Measuring and analyzing of parameters relative to traffic conditions
    • G08G1/0108Measuring and analyzing of parameters relative to traffic conditions based on the source of data
    • G08G1/0112Measuring and analyzing of parameters relative to traffic conditions based on the source of data from the vehicle, e.g. floating car data [FCD]
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/01Detecting movement of traffic to be counted or controlled
    • G08G1/0104Measuring and analyzing of parameters relative to traffic conditions
    • G08G1/0125Traffic data processing
    • G08G1/0129Traffic data processing for creating historical data or processing based on historical data
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/01Detecting movement of traffic to be counted or controlled
    • G08G1/0104Measuring and analyzing of parameters relative to traffic conditions
    • G08G1/0137Measuring and analyzing of parameters relative to traffic conditions for specific applications
    • G08G1/0141Measuring and analyzing of parameters relative to traffic conditions for specific applications for traffic information dissemination
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/065Traffic control systems for road vehicles by counting the vehicles in a section of the road or in a parking area, i.e. comparing incoming count with outgoing count
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/09Arrangements for giving variable traffic instructions
    • G08G1/0962Arrangements for giving variable traffic instructions having an indicator mounted inside the vehicle, e.g. giving voice messages
    • G08G1/0967Systems involving transmission of highway information, e.g. weather, speed limits
    • G08G1/096708Systems involving transmission of highway information, e.g. weather, speed limits where the received information might be used to generate an automatic action on the vehicle control
    • G08G1/096716Systems involving transmission of highway information, e.g. weather, speed limits where the received information might be used to generate an automatic action on the vehicle control where the received information does not generate an automatic action on the vehicle control
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/09Arrangements for giving variable traffic instructions
    • G08G1/0962Arrangements for giving variable traffic instructions having an indicator mounted inside the vehicle, e.g. giving voice messages
    • G08G1/0967Systems involving transmission of highway information, e.g. weather, speed limits
    • G08G1/096733Systems involving transmission of highway information, e.g. weather, speed limits where a selection of the information might take place
    • G08G1/096741Systems involving transmission of highway information, e.g. weather, speed limits where a selection of the information might take place where the source of the transmitted information selects which information to transmit to each vehicle
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/09Arrangements for giving variable traffic instructions
    • G08G1/0962Arrangements for giving variable traffic instructions having an indicator mounted inside the vehicle, e.g. giving voice messages
    • G08G1/0967Systems involving transmission of highway information, e.g. weather, speed limits
    • G08G1/096766Systems involving transmission of highway information, e.g. weather, speed limits where the system is characterised by the origin of the information transmission
    • G08G1/096775Systems involving transmission of highway information, e.g. weather, speed limits where the system is characterised by the origin of the information transmission where the origin of the information is a central station
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/10Vehicle control parameters
    • B60L2240/12Speed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/60Navigation input
    • B60L2240/62Vehicle position
    • B60L2240/622Vehicle position by satellite navigation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/60Navigation input
    • B60L2240/68Traffic data
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/70Interactions with external data bases, e.g. traffic centres
    • B60L2240/72Charging station selection relying on external data
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/80Time limits
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2250/00Driver interactions
    • B60L2250/16Driver interactions by display
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2260/00Operating Modes
    • B60L2260/40Control modes
    • B60L2260/44Control modes by parameter estimation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2260/00Operating Modes
    • B60L2260/40Control modes
    • B60L2260/50Control modes by future state prediction
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2260/00Operating Modes
    • B60L2260/40Control modes
    • B60L2260/50Control modes by future state prediction
    • B60L2260/58Departure time prediction
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/72Electric energy management in electromobility
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/14Plug-in electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles

Definitions

  • Embodiments of the present invention relate to a charge management device.
  • the charging station (CS: Charge Station), which is a facility for charging electric vehicles, is rarely crowded.
  • the driver is notified of charging recommendation information indicating which charging station can be charged smoothly, and It is necessary to level the congestion.
  • the above-described technology has a disadvantage that it is difficult to realize the present situation because, for example, it is necessary to measure the current position and the remaining battery level of all electric vehicles traveling on a toll road or the like.
  • the problem to be solved by the present invention is to provide a charge management device capable of notifying the driver of recommended charging information without measuring the current position and remaining battery level of all electric vehicles traveling on a toll road or the like. .
  • the charge management device of the embodiment includes an input unit, a first prediction unit, a determination unit, a generation unit, a second prediction unit, and an output unit.
  • the input means receives input of traffic demand data indicating the number of vehicles flowing in and out from a plurality of interchanges on toll roads.
  • the first prediction means executes a simulation using the traffic demand data that has received the input, and predicts charging wait times at a plurality of charging stations provided between the toll roads.
  • the determination means compares the predicted charging waiting time at each charging station to determine whether or not a desired condition is satisfied.
  • the generating unit generates charging recommendation information indicating a charging station that can be charged smoothly when the result of the determination by the determining unit indicates NO.
  • the second prediction means executes a simulation using the generated charge recommendation information in addition to the traffic demand data that has received the input, and again predicts the charging waiting time at each charging station.
  • the output means When the output means indicates that the determination result by the determination means satisfies a desired condition as a result of repeatedly executing the processing by the determination means, the generation means, and the second prediction means, the generated charge recommendation Output information to an external terminal.
  • FIG. 1 is a schematic diagram illustrating a configuration example of the charge management device according to the first embodiment.
  • FIG. 2 is a schematic diagram illustrating an example of traffic demand data.
  • FIG. 3 is a schematic diagram illustrating an example of SoC distribution data.
  • FIG. 4 is a schematic diagram illustrating an example of link information.
  • FIG. 5 is a schematic diagram illustrating an example of CS information.
  • FIG. 6 is a schematic diagram showing an example of ITS spot / electronic bulletin board information.
  • FIG. 7 is a schematic diagram illustrating an example of vehicle attribute information.
  • FIG. 8 is a schematic diagram illustrating an example of a simulation model used by the charging station state prediction unit according to the first embodiment.
  • FIG. 9 is a schematic diagram illustrating an example of notification of recommended charging information.
  • FIG. 1 is a schematic diagram illustrating a configuration example of the charge management device according to the first embodiment.
  • FIG. 2 is a schematic diagram illustrating an example of traffic demand data.
  • FIG. 3 is a schematic
  • FIG. 10 is a schematic diagram illustrating an example of prediction result information.
  • FIG. 11 is a schematic diagram illustrating an example of determination result information.
  • FIG. 12 is a schematic diagram illustrating an example of charging recommendation information.
  • FIG. 13 is a flowchart illustrating an operation example of the charge management device according to the first embodiment.
  • FIG. 14 is a schematic diagram illustrating an example of a simulation result by the charge management device according to the first embodiment.
  • FIG. 15 is a schematic diagram illustrating another example of a simulation result by the charge management device according to the first embodiment.
  • FIG. 16 is a schematic diagram illustrating still another example of the simulation result obtained by the charge management device according to the first embodiment.
  • FIG. 17 is a schematic diagram illustrating a configuration example of the charge management device according to the second embodiment.
  • FIG. 18 is a schematic diagram illustrating an example of planned power supply amount information.
  • FIG. 19 is a schematic diagram illustrating an example of usable charger number information.
  • FIG. 20 is a flowchart illustrating an operation example of the charge management device according to the embodiment.
  • FIG. 21 is a schematic diagram illustrating a configuration example of the charge management device according to the third embodiment.
  • FIG. 22 is a flowchart illustrating an operation example of the charge management device according to the third embodiment.
  • FIG. 1 is a schematic diagram illustrating a configuration example of the charge management device according to the first embodiment.
  • FIGS. 2 to 7 and FIGS. 9 to 12 are schematic diagrams showing examples of various information used by the charge management device according to the embodiment.
  • FIG. 8 is a schematic diagram illustrating an example of a simulation model used by the charge management device according to the embodiment.
  • the charge management device 1 shown in FIG. 1 includes a traffic demand data input unit 11, a charging station status prediction unit (hereinafter referred to as a CS status prediction unit) 12, a condition determination unit 13, a charge recommendation information generation unit 14, and A charging recommendation information output unit 15 is provided. Below, the function of each part 11 thru
  • the traffic demand data input unit 11 receives input of traffic demand data and SoC (State of Charge) distribution data transmitted from an external terminal (not shown), the traffic demand data and SoC distribution data that have received the input are converted into CS. It transmits to the situation prediction unit 12.
  • SoC State of Charge
  • the traffic demand data D1 is data indicating the number of vehicles flowing into and out of a plurality of interchanges (hereinafter referred to as IC (Inter Change)) provided on a toll road such as an expressway. is there.
  • IC Inter Change
  • FIG. 2 an example of the traffic demand data D1 indicating the number of vehicles in and out for 24 hours in each IC on a certain highway is shown as an OD (Origin-Destination) table, but the format of the traffic demand data is limited to this.
  • any format may be used as long as the format indicates the number of inflow / outflow vehicles per unit time at an arbitrary location.
  • the number of vehicles indicated by the traffic demand data D1 is the sum of the number of electric vehicles and the number of other types of vehicles (for example, gasoline vehicles and hybrid vehicles).
  • the SoC indicates the ratio of the remaining battery capacity to the maximum charge capacity of the battery mounted on the electric vehicle
  • the SoC distribution data D2 indicates, for example, the distribution of SoC of the electric vehicle flowing from each IC as shown in FIG. Is represented by a probability distribution.
  • Traffic demand data D1 and SoC distribution data D2 are data predicted based on past data.
  • the traffic demand data input unit 11 performs input according to whether or not it is desired to predict the congestion status of each CS related to what day (for example, weekday, holiday or special day) when the simulation is performed by the CS status prediction unit 12 described later.
  • the received data can be changed as appropriate. That is, when it is desired to predict the congestion situation related to holidays, the traffic demand data input unit 11 may accept only the input of traffic demand data related to holidays and SoC distribution data.
  • the input A simulation is executed using at least the traffic demand data and the SoC distribution data received, and the congestion status of a plurality of CSs provided at various places on the toll road is predicted.
  • the charging recommendation information is generated by the charging recommendation information generation unit 14 and the CS situation prediction unit 12 accepts the input of the charging recommendation information
  • the CS situation prediction unit 12 only includes the traffic demand data and the SoC distribution data.
  • the simulation is executed using the recommended charging information.
  • the congestion status of each CS is predicted, the CS status prediction unit 12 transmits prediction result information indicating a result of the prediction to the condition determination unit 13.
  • the CS situation prediction unit 12 is preset with link information, CS information, and ITS spot / electronic bulletin board information, for example, as shown in FIGS. These pieces of information are information for forming a virtual toll road that is applied when the simulation is executed. In the present embodiment, various types of information are set assuming a single highway.
  • the link information D3 is information associated with a link name, a downstream link name, a link length, an average power consumption, and an average speed, for example, as shown in FIG.
  • the link name indicates the name of a section (hereinafter referred to as a link) from one IC to an adjacent IC.
  • the downstream link name indicates the name of a link (downstream) adjacent to the link indicated by the associated link name.
  • the link length indicates the distance of the link indicated by the associated link name.
  • the average power consumption indicates an average distance that a vehicle traveling on a link indicated by an associated link name consumes 1 kWh of electric power when the CS situation prediction unit 12 executes a simulation.
  • the average speed indicates an average distance that a vehicle traveling on the link indicated by the associated link name can travel per second when the CS situation prediction unit 12 executes the simulation.
  • the CS information D4 is information in which the charging station name, the existing link name, the distance from the starting point, the number of chargers, and the charging speed are associated as shown in FIG. 5, for example.
  • the charging station name indicates the name of the CS provided at various places on the toll road.
  • the existing link name indicates the name of the link provided with the CS indicated by the associated charging station name.
  • the distance from the start point indicates the distance from the start point of the link indicated by the associated existing link name to the CS indicated by the associated charging station name.
  • the number of chargers indicates the number of chargers provided in the CS indicated by the associated charging station name.
  • the charging rate indicates the amount of power that the charger can charge to the vehicle per second in the CS indicated by the associated charging station name.
  • the ITS spot / electronic bulletin board information D5 is information in which the ITS spot name / electronic bulletin board name, the existing link name, the distance from the starting point, and the associated charging station name are associated, for example, as shown in FIG.
  • the ITS spot / electronic bulletin board name indicates the name of the ITS spot or electronic bulletin board.
  • the existing link name indicates the name of the link provided with the ITS spot or electronic bulletin board indicated by the associated ITS spot / electronic bulletin board name.
  • the distance from the start point indicates the distance from the start point of the link indicated by the associated link name to the ITS spot or electronic bulletin board indicated by the ITS spot / electronic bulletin board name.
  • the related charging station name indicates the name of the CS that can notify the congestion status in the ITS spot or electronic bulletin board indicated by the associated ITS spot / electronic bulletin board name.
  • the simulation executed by the CS situation prediction unit 12 will be described.
  • the simulation is composed of two stages, a preprocessing stage and an execution stage.
  • the CS situation prediction unit 12 generates a virtual vehicle including an electric vehicle and other types of vehicles based on the traffic demand data. For example, assuming that the CS situation prediction unit 12 has received the input of the traffic demand data D1 shown in FIG. 2, the CS situation prediction unit 12 flows in from the IC1 in accordance with the traffic demand data D1 that has received the input and from the IC2. A virtual vehicle is generated such that 160 virtual vehicles flow out, 160 virtual vehicles flow in from IC1 and flow out from IC3, 150 virtual vehicles flow in from IC2 and flow out from IC3, and so on. Note that the ratio between the electric vehicle and other types of vehicles follows a predetermined setting, and the setting can be arbitrarily set by the user.
  • the CS situation prediction unit 12 gives vehicle attribute information indicating the attribute of the virtual vehicle to each generated virtual vehicle.
  • the vehicle attribute information D6 is information associated with a vehicle ID, a departure time, an entrance IC name, an exit IC name, and an SoC initial value, for example, as shown in FIG.
  • the vehicle ID is identification information for identifying the virtual vehicle, and is set at random when the virtual vehicle is generated.
  • the departure time indicates the time at which the virtual vehicle departs from the entrance IC, and is set uniquely when the virtual vehicle is generated, as in the case of the vehicle ID (however, in order to follow the traffic demand data for each unit time, Randomly set within range).
  • the entrance IC name indicates the name of the IC into which the virtual vehicle flows, and is set according to the traffic demand data used when generating the virtual vehicle.
  • the exit IC name indicates the name of the IC from which the virtual vehicle flows out, and is set according to the traffic demand data used at the time of virtual vehicle generation, similarly to the entrance IC name.
  • the SoC initial value indicates the SoC when the virtual vehicle departs from the entrance IC, and is randomly set according to the SoC distribution data that has received the input (however, the SoC initial value of a type of virtual vehicle other than an electric vehicle is All are set to 0).
  • the CS situation prediction unit 12 executes a simulation using a driver model 121, a vehicle model 122, a battery model 123, a CS model 124, and an ITS spot / electronic bulletin board model 125 as shown in FIG.
  • the driver model 121 models a driver who drives a virtual vehicle.
  • various types of information are received from the vehicle model 122, the battery model 123, and the ITS spot / electronic bulletin board model 125, the various types of information received. Based on the above, a travel route selection process, a CS selection process, and a vehicle state selection process are executed.
  • the driver model 121 is a virtual vehicle based on the position speed information transmitted from the vehicle model 122, the SoC information transmitted from the battery model 123, and the recommended charging information transmitted from the ITS spot / electronic bulletin board model 125.
  • a selection process for selecting the CS located farthest from the current position among the CSs that can be reached is executed.
  • the driver model 121 selects the CS farthest from the current position among the CSs that can be reached by the virtual vehicle.
  • the present invention is not limited to this. For example, if the SoC is less than 20% even if it is reachable, the remaining battery level may run out, making it impossible to travel. Therefore, the CS that is reachable within the range where the SoC is 20% or more is the farthest from the current position.
  • a method such as selecting a CS located in a position may be used.
  • the driver model 121 is based on the position information of the vehicle transmitted from the vehicle model 122.
  • the driver model 121 is one of the three states of “running”, “charging”, and “waiting for charging”.
  • a selection process for selecting one is executed. For example, the driver model 121 selects “running” as the vehicle state until it arrives at the selected CS, and selects “charging” when the vehicle arrives at the selected CS and starts charging, If the battery arrives at the selected CS but the charger is full of other virtual vehicles, “waiting for charging” is selected as the vehicle state.
  • the driver model 121 selects one of the three vehicle states, the driver model 121 transmits state information indicating the state of the selected vehicle to the vehicle model 122.
  • the vehicle model 122 is a virtual vehicle itself.
  • a vehicle dynamics equation is obtained when the state of the vehicle indicated by the state information that has received the input is “running”. Then, an update process for updating the position and speed of the virtual vehicle is executed.
  • the vehicle model 122 updates the position and speed of the virtual vehicle, the vehicle model 122 transmits position / speed information indicating the updated position and speed of the virtual vehicle to the driver model 121 and the battery model 123, and the state information is transmitted to the battery model. 123.
  • the battery model 123 is a model of a battery mounted on a virtual vehicle.
  • the battery model 123 receives the input.
  • an update process for updating the remaining battery level is executed. Specifically, when the state of the vehicle indicated by the state information that has received the input is “running”, the battery model 123 calculates the power consumption from the position speed information that has received the input, and the virtual vehicle The battery remaining amount is calculated (updated) by subtracting the amount of power consumption from the SoC initial value in the vehicle attribute information given to.
  • the battery model 123 calculates (updates) the remaining battery level according to the charging speed indicated by the charging speed information received when the state of the vehicle indicated by the status information receiving the input is “charging”. ) When the battery remaining amount is updated, the battery model 123 transmits SoC information indicating the updated SoC (that is, remaining battery amount) to the driver model 121.
  • the CS model 124 is a model of CS provided at various places on the toll road, and transmits charging speed information indicating the charging speed to the battery model 123 in accordance with CS information D4 preset in the CS status prediction unit 12. .
  • the ITS spot / electronic bulletin board model 125 is a model of ITS spots and electronic bulletin boards provided at various places on the toll road.
  • the ITS spot / electronic bulletin board model 125 transmits recommended charging information to the driver model 121 when the virtual vehicle passes nearby (provided that charging recommended information is input from the recommended charging information generation unit 14).
  • FIG. 9 is a schematic diagram showing a display example of the recommended charging information displayed on the ITS spot and the electronic bulletin board.
  • FIG. 9 shows the charging waiting time when the virtual vehicle arrives at the target CS, not the charging waiting time when the virtual vehicle passes near the ITS spot or the electronic bulletin board.
  • the driver model 121 When the downstream CS indicated by the charging recommendation information transmitted from the ITS spot / electronic bulletin board model 125 matches the CS selected by the CS selection process, the driver model 121 has a desired ratio (for example, 30%). And the like, the CS that stops by is changed to a CS with a small charge waiting time, that is, the CS selection process is executed again.
  • the CS situation prediction unit 12 uses the models 121 to 125 to run the virtual vehicle generated in the preprocessing stage on the virtual toll road and simulate the congestion situation of each CS. . Then, the CS status prediction unit 12 transmits prediction result information indicating the prediction result of the congestion status of each CS to the condition determination unit 13.
  • the prediction result information D7 is information indicating the charging waiting time in each CS for each unit time as shown in FIG. 10, for example.
  • the charging waiting time indicates the waiting time from when the virtual vehicle arrives at CS until the start of charging.
  • FIG. 10 shows that a virtual vehicle that has left CS1 at 8:00 waits 500 seconds before starting charging when it arrives at CS3.
  • the time per unit time shown in FIG. 10 is the time when CS1 passes as a reference, and CS1 indicates the waiting time of the virtual vehicle that arrived at this time.
  • the waiting time when it arrives at the charging station is shown.
  • condition determination unit 13 When the condition determination unit 13 receives the input of the prediction result information transmitted from the CS situation prediction unit 12, the condition determination unit 13 compares the congestion status of each CS indicated by the prediction result information that has received the input for each unit time. Whether or not the above condition is satisfied is determined, and the result of the determination and the determination result information are transmitted to the recommended charging information generation unit 14.
  • the desired conditions include, for example, the following conditions, and assume that a desired condition is satisfied when any of these conditions is satisfied.
  • the number of adjustments of the recommended charging information that is, the output of the prediction result information by the CS situation prediction unit 12, the output of the judgment result information by the condition judgment unit 13, and the CS situation prediction unit 12 by the recommended charging information generation unit 14
  • the number of repetitions of a series of processing for outputting the recommended charging information is not less than a predetermined value.
  • the new recommended charging information is not generated, that is, the content of the judgment result indicated by the judgment result information that has received the input has already received the input, and the content of the judgment result information that has generated the recommended charging information related to the judgment result Must be the same.
  • the determination result information D ⁇ b> 8 indicates “OK” when the condition is satisfied as a result of the determination by the condition determination unit 13, and “NG” when the condition is not satisfied. It is information which shows. For example, in FIG. 11, when the virtual vehicle that departed CS1 at 8:10 arrives at CS2, the charging waiting time “100 seconds” and when the virtual vehicle that departed CS1 at 8:10 arrives at CS3. Since the difference from the charging waiting time “1800 seconds” is equal to or greater than a threshold value (here, the threshold value is set to “1200 seconds”), the condition determination unit 13 does not satisfy the above condition. In the determination result information transmitted by the condition determination unit 13, the corresponding part is “NG”.
  • the condition determination unit 13 conforms to the above condition.
  • the condition can be arbitrarily set by the user.
  • the condition can be arbitrarily set by the user.
  • the virtual vehicle if a virtual vehicle that is scheduled to be charged at the upstream CS is guided to the downstream CS, the virtual vehicle may cause a shortage of electricity, so charging is planned at the downstream CS.
  • This is a condition set on the assumption that the virtual vehicle being operated is guided to the upstream CS, but the virtual vehicle scheduled to be charged by the crowded CS is guided to the upstream or downstream CS. If it is desired to do so, a condition may be set that “the difference in charge waiting time is equal to or less than a threshold value when charging wait times of adjacent CSs are compared in all unit times”.
  • the recommended charging information generation unit 14 receives the determination result transmitted from the condition determination unit 13 and the input of the determination result information D8, if the determination result that has received the input does not satisfy the desired condition, Charge recommendation information related to a CS that does not satisfy the conditions is generated, and the charge recommendation information is transmitted to the CS status prediction unit 12.
  • the charge recommendation information generation unit 14 has already generated the charge recommendation information and has transmitted the charge recommendation information to the CS status prediction unit 12, the charge recommendation information generation unit 14 has already transmitted one or more The charging recommendation information set obtained by adding the generated charging recommendation information to the charging recommendation information is transmitted to the CS status prediction unit 12.
  • the recommended charging information generation unit 14 outputs the recommended charging information as one of the recommended charging information sets transmitted to the CS status prediction unit 12 when the determination result of receiving the input satisfies a desired condition. It transmits to the part 15.
  • which charging recommendation information is transmitted to the charging recommendation information output unit 15 is determined according to a predetermined setting, and the setting can be arbitrarily set by the user. Specifically, “send the charging recommendation information last output to the CS status prediction unit 12 to the charging recommendation information output unit 15” is exemplified.
  • the recommended charging information D9 is information notified to a vehicle traveling on a toll road by an ITS spot or an electronic bulletin board provided at various places on the toll road as shown in FIG. 12, for example, an ITS spot name / electronic bulletin board name, This is information in which the presentation start time, the presentation end time, and the charging waiting time in the upstream CS and the downstream CS are associated with each other.
  • the ITS spot name / electronic bulletin board name indicates the name of the ITS spot or electronic bulletin board.
  • the presentation start time indicates a time at which presentation of the recommended charging information starts on the ITS spot or the electronic bulletin board indicated by the associated ITS spot name / electronic bulletin board name.
  • the presentation end time indicates a time at which the presentation of the recommended charging information is ended in the ITS spot or the electronic bulletin board indicated by the associated ITS spot name / electronic bulletin board name.
  • the charging waiting time in the upstream CS and the downstream CS indicates the charging waiting time in each CS, and is a value according to the prediction result information used by the condition determination unit 13.
  • the recommended charging information output unit 15 When the recommended charging information output unit 15 receives an input of the recommended charging information transmitted from the recommended charging information generation unit 14, the recommended charging information output unit 15 receives the recommended charging information received from the external terminal (for example, an ITS provided in various places on a toll road). To a spot or an electronic bulletin board).
  • the external terminal for example, an ITS provided in various places on a toll road.
  • Step S1 when the traffic demand data input unit 11 receives the input of the traffic demand data and the SoC distribution data transmitted from the external terminal, the traffic demand data and the SoC distribution data that have been received are input to the CS situation prediction unit 12. (Step S1).
  • the CS situation prediction unit 12 uses at least the traffic demand data and the SoC distribution data that have received the input. Then, the simulation is executed to predict the congestion status of each CS, and the prediction result information indicating the prediction result is transmitted to the condition determination unit 13 (step S2).
  • the condition determination unit 13 compares the congestion situation of each CS indicated by the prediction result information that has received the input for each unit time. Then, it is determined whether or not a desired condition is satisfied (step S3).
  • the charging recommendation information generation unit 14 When the result of the determination by the process in step S3 indicates NO (No in step S3), the charging recommendation information generation unit 14 generates charging recommendation information related to a CS that does not satisfy a desired condition, and generates the charging recommendation information. After transmitting the charging recommendation information to the CS situation prediction unit 12 (step S4), the process returns to the process of step S2, that is, the CS situation prediction unit 12 not only receives the traffic demand data and SoC distribution data that have already received the input, The simulation is executed again using the recommended charging information transmitted from the recommended charging information generation unit 14 (step S2). However, the charging recommendation information generation unit 14 proceeds to the process of step S5 described later when either of the above conditions (2) or (3) is satisfied.
  • step S3 When the result of determination by the process of step S3 indicates that the desired condition is satisfied (Yes in step S3), the recommended charging information output unit 15 causes the recommended charging information generation unit 14 to contact the CS situation prediction unit 12. One of the transmitted recommended charging information sets is output to the external terminal (step S5).
  • the congestion situation in each CS was shown using the charge waiting time, it is not limited to this, for example, the number of vehicles waiting for charging, the number of vehicles waiting for charging per charger, etc. It may be used to indicate the congestion situation.
  • the charging waiting time at each CS is indicated by the charging recommendation information.
  • the present invention is not limited to this.
  • the charging charge is changed according to the charging waiting time, and the charging waiting time is large.
  • the charge rate at each CS may be indicated by the recommended charge information after setting the charge rate and charge rate at the CS with a low charge waiting time and charge rate at a low charge waiting time.
  • the charging management device that provides the driver with recommended charging information for a toll road on a single road has been described.
  • the present invention is not limited to this, and for example, a net-like network having a branching section and a merging section exists. A road may be targeted.
  • the CS situation prediction unit 12 generates a virtual vehicle and executes the simulation for each virtual vehicle.
  • Simulation may be executed using the model.
  • the charging behavior can be expressed stochastically.
  • the charging recommendation information is notified to the driver through the ITS spot or the electronic bulletin board.
  • the notification means for notifying the driver of the charging recommendation information is not particularly limited to these.
  • a CS situation prediction unit 12 that executes a simulation using at least traffic demand data and SoC distribution data, and a prediction result information by the CS situation prediction unit 12 is used to obtain a desired result.
  • a condition determination unit 13 that determines whether or not a condition is satisfied
  • a charge recommendation information generation unit 14 that generates charge recommendation information using the determination result information by the condition determination unit 13, and outputs the charge recommendation information, and a charge recommendation With the configuration including the information output unit 15, congestion at each CS on the toll road can be reduced.
  • FIG. 14 is a schematic diagram illustrating an example of the transition of the charging waiting time when the CS status prediction unit 12 predicts the congestion status of each CS without using the recommended charging information
  • FIG. 15 uses the recommended charging information. It is a schematic diagram which shows an example of transition of the charging waiting time when the CS situation prediction part 12 predicts the congestion situation of each CS. Comparing the schematic diagram of FIG. 14 with the schematic diagram of FIG. 15, the maximum value of the charging waiting time of the schematic diagram of FIG. 15 exceeds the maximum value of the charging waiting time of 7000 seconds. The value does not exceed 7000 seconds.
  • FIG. 16 is a schematic diagram showing an example of the transition of the maximum value of the charging waiting time in each CS predicted by the CS situation prediction unit 12.
  • FIG. 17 is a schematic diagram illustrating a configuration example of the charge management apparatus according to the second embodiment. Unlike the charge management apparatus according to the first embodiment described above, the charge management apparatus illustrated in FIG. The supply input unit 16 is further added.
  • the traffic demand data input unit 11 the condition determination unit 13, the recommended charging information generation unit 14, and the recommended charging information output unit 15 have the same functions as those in the first embodiment described above, detailed description will be given here. Omitted. Hereinafter, functions different from those of the first embodiment will be mainly described.
  • the CS state prediction unit 12 displays the planned power supply amount information that has received the input. Send to.
  • the planned power supply amount information D10 is information indicating the amount of power that can be supplied by each CS per unit time, as shown in FIG. 18, for example.
  • CS1 supplies 250 kWh of power between 0:00 and 1:00. It indicates that it is possible.
  • the CS situation prediction unit 12 includes the planned power supply from the power supply input unit 16 in addition to the traffic demand data and SoC distribution data from the traffic demand data input unit 11 and the recommended charging information from the charging recommendation information generation unit 14. Accept input of quantity information. Then, the CS situation prediction unit 12 determines the number of chargers that can be used in each CS for each unit time, for example, as shown in D11 of FIG. (After generating the usable charger number information D11), the simulation is executed and the congestion status of each CS is predicted in the same manner as in the first embodiment described above.
  • or S5 is the same as that of the above-mentioned 1st Embodiment, detailed description is abbreviate
  • the power supply input unit 16 After receiving the input of the planned power supply amount information transmitted from the external terminal, after receiving the input of the planned power supply amount information transmitted from the external terminal, the power supply input unit 16 transmits the received planned power supply amount information to the CS status prediction unit 12. (Step S2 ′).
  • the CS situation prediction unit 12 receives input of the traffic demand data and SoC distribution data transmitted from the traffic demand data input unit 11 and the planned power supply amount information transmitted from the power supply input unit 16, Based on the planned power supply information that has received the input, the number of chargers that can be used in each CS is determined for each unit time. Thereafter, the CS situation prediction unit 12 performs a simulation using at least the traffic demand data and the SoC distribution data that have been accepted, taking into account the number of chargers that can be used per unit time in each CS thus determined. To predict the congestion status of each CS, and transmit prediction result information indicating the result of the prediction to the condition determination unit 13 (step S2 ′′).
  • the configuration further including the power supply input unit 16 capable of inputting / outputting the planned power supply amount information can be used even when the planned power supply amount varies depending on the time zone.
  • the simulation can be executed by varying the number of chargers, and as a result, congestion at each CS on the toll road can be alleviated.
  • FIG. 21 is a schematic diagram illustrating a configuration example of the charge management device according to the third embodiment. Unlike the charge management devices according to the first and second embodiments described above, the charge management illustrated in FIG. A traffic state input unit 17 is further added to the apparatus.
  • condition determination unit 13, the recommended charging information generation unit 14, and the recommended charging information output unit 15 have the same functions as those in the first and second embodiments described above, and thus detailed description thereof is omitted here.
  • functions different from those in the first and second embodiments will be mainly described.
  • the traffic state input unit 17 When the traffic state input unit 17 receives the input of the measured traffic demand data transmitted from the external terminal, the traffic state input unit 17 transmits the measured traffic demand data that has received the input to the traffic demand data input unit 11.
  • the measured traffic demand data is traffic demand data measured by, for example, an ETC (Electronic Toll System) provided in an IC or the like, and is data for correcting the traffic demand data.
  • the traffic demand data input unit 11 accepts input of measured traffic demand data transmitted from the traffic state input unit 17 in addition to traffic demand data and SoC distribution data transmitted from an external terminal. And the traffic demand data input part 11 corrects the traffic demand data which received the input using the measured traffic demand data which received the input, and then the corrected traffic demand data and the SoC distribution data which received the input Is transmitted to the CS situation prediction unit 12.
  • the simulation is executed to predict the congestion status of each CS.
  • steps S3 to S5 are the same as those in the first and second embodiments described above, and a detailed description thereof will be omitted here.
  • the traffic state input unit 17 transmits the measured traffic demand data that has received the input to the traffic demand data input unit 11 (step S1 ′).
  • the traffic demand data input unit 11 receives the input of the traffic demand data and the SoC distribution data transmitted from the external terminal and the measured traffic demand data transmitted from the traffic state input unit 17, the traffic demand data input unit 11 accepts the input. After the traffic demand data is corrected using the measured traffic demand data that has received the input, the corrected traffic demand data and the SoC distribution data that has received the input are transmitted to the CS situation prediction unit 12 ( Step S1 '').
  • the CS situation prediction unit 12 receives the input of the corrected traffic demand data and the SoC distribution data transmitted from the traffic demand data input unit 11, the corrected traffic demand data and the SoC received the input.
  • a simulation is executed using at least the distribution data to predict the congestion status of each CS, and prediction result information indicating the result of the prediction is transmitted to the condition determination unit 13 (step S2 ′ ′′).
  • the traffic demand predicted based on the past data by the configuration further including the traffic state input unit 17 capable of inputting and outputting the measured traffic demand data for correcting the traffic demand data. Even when the data deviates from the actual traffic demand data, the error can be corrected, and the congestion at each CS of the toll road can be reduced.
  • a charge management device capable of notifying a driver of recommended charging information without measuring the current position and remaining battery level of all electric vehicles traveling on a toll road or the like. Can do.
  • the method described in each of the above embodiments is a program that can be executed by a computer, such as a magnetic disk (flexible disk, hard disk, etc.), an optical disk (CD-ROM, DVD, etc.), a magneto-optical disk (MO), It can also be stored and distributed in a storage medium such as a semiconductor memory.
  • a computer such as a magnetic disk (flexible disk, hard disk, etc.), an optical disk (CD-ROM, DVD, etc.), a magneto-optical disk (MO), It can also be stored and distributed in a storage medium such as a semiconductor memory.
  • the storage medium can store a program and can be read by a computer
  • the storage format may be any form.
  • an OS operating system
  • MW middleware
  • database management software network software
  • the storage medium in each embodiment is not limited to a medium independent of a computer, but also includes a storage medium in which a program transmitted via a LAN, the Internet, or the like is downloaded and stored or temporarily stored.
  • the number of storage media is not limited to one, and the case where the processing in each of the above embodiments is executed from a plurality of media is also included in the storage media in the present invention, and the media configuration may be any configuration.
  • the computer in each embodiment executes each process in each of the above embodiments based on a program stored in a storage medium, and a single device such as a personal computer or a plurality of devices are connected to a network. Any configuration of the system or the like may be used.
  • the computer in each embodiment is not limited to a personal computer, and includes an arithmetic processing device, a microcomputer, and the like included in an information processing device, and is a generic term for devices and devices that can realize the functions of the present invention by a program. Yes.

Abstract

 実施形態の充電管理装置の入力手段(11)は、有料道路の複数のインターチェンジからの車両の流出入台数を示す交通需要データの入力を受け付ける。第1予測手段(12)は、入力を受け付けた交通需要データを使用してシミュレーションを実行し、有料道路間に設けられた複数の充電ステーションでの充電待ち時間を予測する。判断手段(13)は、予測された各充電ステーションでの充電待ち時間を比較し、所望の条件を満たしているか否かを判断する。生成手段(14)は、判断手段による判断の結果が否を示すとき、円滑に充電可能な充電ステーションを示す充電推奨情報を生成する。出力手段(15)は、判断手段による判断の結果が所望の条件を満たす旨を示すとき、充電推奨情報を外部端末に出力する。

Description

充電管理装置
 本発明の実施形態は、充電管理装置に関する。
 現在、電気自動車の普及率は、ガソリン自動車の普及率に比べて低いため、電気自動車に充電するための施設である充電ステーション(CS: Charge Station)が混雑することは少ない。
 しかしながら、将来、電気自動車が普及すると、充電ステーションでの混雑が、交通渋滞と同様に、大きな問題になると考えられる。
 このため、電気自動車が一部の充電ステーションに集中して生じる混雑を避けるために、どの充電ステーションならば円滑に充電可能であるかを示す充電推奨情報をドライバーに通知して、充電ステーションでの混雑を平準化させる必要がある。
 そこで、充電推奨情報をドライバーに通知する技術として、例えば、全電気自動車の現在位置やバッテリ残量を計測した後に、当該計測の結果に基づいて充電推奨情報を生成し、当該生成した充電推奨情報をドライバーに通知する技術がある。
特開2011-191109号公報 特開2012-3391号公報 特開2012-48286号公報
 しかしながら、上記したような技術では、例えば有料道路等を走行する全電気自動車の現在位置やバッテリ残量を計測する必要があり、現状では実現が困難であるという不都合がある。
 本発明が解決しようとする課題は、有料道路等を走行する全電気自動車の現在位置やバッテリ残量を計測しなくとも、充電推奨情報をドライバーに通知し得る充電管理装置を提供することである。
 実施形態の充電管理装置は、入力手段、第1予測手段、判断手段、生成手段、第2予測手段及び出力手段を備えている。
 前記入力手段は、有料道路の複数のインターチェンジからの車両の流出入台数を示す交通需要データの入力を受け付ける。
 前記第1予測手段は、前記入力を受け付けた交通需要データを使用してシミュレーションを実行し、前記有料道路間に設けられた複数の充電ステーションでの充電待ち時間を予測する。
 前記判断手段は、前記予測された各充電ステーションでの充電待ち時間を比較し、所望の条件を満たしているか否かを判断する。
 前記生成手段は、前記判断手段による判断の結果が否を示すとき、円滑に充電可能な充電ステーションを示す充電推奨情報を生成する。
 前記第2予測手段は、前記入力を受け付けた交通需要データに加えて、前記生成された充電推奨情報を使用してシミュレーションを実行し、前記各充電ステーションでの充電待ち時間を再度予測する。
 前記出力手段は、前記判断手段、前記生成手段及び前記第2予測手段による処理を繰り返し実行した結果、前記判断手段による判断の結果が所望の条件を満たす旨を示すとき、前記生成された充電推奨情報を外部端末に出力する。
図1は、第1の実施形態に係る充電管理装置の構成例を示す模式図である。 図2は、交通需要データの一例を示す模式図である。 図3は、SoC分布データの一例を示す模式図である。 図4は、リンク情報の一例を示す模式図である。 図5は、CS情報の一例を示す模式図である。 図6は、ITSスポット・電子掲示板情報の一例を示す模式図である。 図7は、車両属性情報の一例を示す模式図である。 図8は、第1の実施形態に係る充電ステーション状況予測部により用いられるシミュレーションモデルの一例を示す模式図である。 図9は、充電推奨情報の通知例を示す模式図である。 図10は、予測結果情報の一例を示す模式図である。 図11は、判断結果情報の一例を示す模式図である。 図12は、充電推奨情報の一例を示す模式図である。 図13は、第1の実施形態に係る充電管理装置の動作例を示すフローチャートである。 図14は、第1の実施形態に係る充電管理装置によるシミュレーション結果の一例を示す模式図である。 図15は、第1の実施形態に係る充電管理装置によるシミュレーション結果の別の一例を示す模式図である。 図16は、第1の実施形態に係る充電管理装置によるシミュレーション結果の更に別の一例を示す模式図である。 図17は、第2の実施形態に係る充電管理装置の構成例を示す模式図である。 図18は、計画電力供給量情報の一例を示す模式図である。 図19は、利用可能充電器数情報の一例を示す模式図である。 図20は、同実施形態に係る充電管理装置の動作例を示すフローチャートである。 図21は、第3の実施形態に係る充電管理装置の構成例を示す模式図である。 図22は、第3の実施形態に係る充電管理装置の動作例を示すフローチャートである。
 [第1の実施形態]
 図1は第1の実施形態に係る充電管理装置の構成例を示す模式図である。図2乃至図7,図9乃至図12は同実施形態に係る充電管理装置により用いられる各種情報の一例を示す模式図である。図8は同実施形態に係る充電管理装置により用いられるシミュレーションモデルの一例を示す模式図である。図1に示す充電管理装置1は、交通需要データ入力部11、充電ステーション(Charge Station)状況予測部(以下、CS状況予測部と表記)12、条件判断部13、充電推奨情報生成部14及び充電推奨情報出力部15を備えている。以下に、充電管理装置1を構成する各部11乃至15の機能について詳細に説明する。
 交通需要データ入力部11は、図示されない外部端末から送信される交通需要データとSoC(State of Charge)分布データとの入力を受け付けると、当該入力を受け付けた交通需要データとSoC分布データとをCS状況予測部12に送信する。
 交通需要データD1とは、例えば図2に示すように、高速道路等の有料道路に設けられた複数のインターチェンジ(以下、IC(Inter Change)と表記)から流出入する車両の台数を示すデータである。図2では、ある高速道路の各ICにおける24時間分の流出入車両台数を示す交通需要データD1の一例をOD(Origin-Destination)表として示したが、交通需要データの形式はこれに限定されず、任意の場所における単位時間あたりの流出入車両台数を示す形式であれば、任意の形式で構わない。なお、交通需要データD1により示される車両の台数は、電気自動車の台数とそれ以外の種類の自動車(例えば、ガソリン自動車やハイブリッド自動車等)の台数との和である。
 SoCとは、電気自動車に搭載されたバッテリの最大充電容量に対するバッテリ残量の比率を示し、SoC分布データD2とは、例えば図3に示すように、各ICから流入する電気自動車のSoCの分布を確率分布にて示したデータである。
 交通需要データD1及びSoC分布データD2は過去のデータに基づいて予測されたデータである。交通需要データ入力部11は、後述するCS状況予測部12によるシミュレーション実行時に、どのような日(例えば、平日、休日又は特異日等)に関する各CSの混雑状況を予測したいかに応じて、入力を受け付けるデータを適宜変更可能である。即ち、休日に関する混雑状況を予測したい場合、交通需要データ入力部11は、休日に関する交通需要データとSoC分布データとの入力だけを受け付けても良い。
 CS状況予測部12は、交通需要データ入力部11から送信された交通需要データ及びSoC分布データと、後述する充電推奨情報生成部14から送信される充電推奨情報との入力を受け付けると、当該入力を受け付けた交通需要データとSoC分布データとを少なくとも使用してシミュレーションを実行し、有料道路の各所に設けられた複数のCSの混雑状況を予測する。但し、充電推奨情報生成部14により充電推奨情報が生成され、CS状況予測部12が当該充電推奨情報の入力も受け付けている場合、CS状況予測部12は、交通需要データとSoC分布データとだけでなく、当該充電推奨情報も使用してシミュレーションを実行する。また、CS状況予測部12は、各CSの混雑状況が予測されると、当該予測の結果を示す予測結果情報を条件判断部13に送信する。
 なお、CS状況予測部12には、シミュレーションを実行するために、例えば図4乃至図6に示すように、リンク情報、CS情報及びITSスポット・電子掲示板情報が予め設定されている。これら情報は、シミュレーション実行時に適用される仮想の有料道路を形成するための情報である。なお、本実施形態では、一本道の高速道路を想定して、各種情報が設定されている。
 リンク情報D3とは、例えば図4に示すように、リンク名、下流側リンク名、リンク長、平均電費及び平均速度が関連付けられた情報である。リンク名は、1つのICから隣接するICまでの区間(以下、リンクと表記)の名称を示す。下流側リンク名は、関連付けられたリンク名により示されるリンクに隣接する(下流側の)リンクの名称を示す。リンク長は、関連付けられたリンク名により示されるリンクの距離を示す。平均電費は、CS状況予測部12によるシミュレーション実行時に、関連付けられたリンク名により示されるリンクを走行する車両が1kWhの電力を消費することで走行可能な平均的な距離を示す。平均速度は、CS状況予測部12によるシミュレーション実行時に、関連付けられたリンク名により示されるリンクを走行する車両が1秒あたりに走行可能な平均的な距離を示す。
 CS情報D4とは、例えば図5に示すように、充電ステーション名、存在するリンク名、始点からの距離、充電器数及び充電速度が関連付けられた情報である。充電ステーション名は、有料道路の各所に設けられたCSの名称を示す。存在するリンク名は、関連付けられた充電ステーション名により示されるCSが設けられているリンクの名称を示す。始点からの距離は、関連付けられた存在するリンク名により示されるリンクの始点から、関連付けられた充電ステーション名により示されるCSまでの距離を示す。充電器数は、関連付けられた充電ステーション名により示されるCSに設けられた充電器の数を示す。充電速度は、関連付けられた充電ステーション名により示されるCSにおいて充電器が車両に対して1秒あたりに充電可能な電力量を示す。
 ITSスポット・電子掲示板情報D5とは、例えば図6に示すように、ITSスポット名・電子掲示板名、存在するリンク名、始点からの距離及び関連充電ステーション名が関連付けられた情報である。ITSスポット・電子掲示板名は、ITSスポット又は電子掲示板の名称を示す。存在するリンク名は、関連付けられたITSスポット・電子掲示板名により示されるITSスポット又は電子掲示板が設けられているリンクの名称を示す。始点からの距離は、関連付けられた存在するリンク名により示されるリンクの始点から、ITSスポット・電子掲示板名により示されるITSスポット又は電子掲示板までの距離を示す。関連充電ステーション名は、関連付けられたITSスポット・電子掲示板名により示されるITSスポット又は電子掲示板において混雑状況を通知可能なCSの名称を示す。
 ここで、CS状況予測部12により実行されるシミュレーションについて説明する。なお、当該シミュレーションは、前処理段階と実行段階との2つの段階によって構成される。
 まず、前処理段階について説明する。
 CS状況予測部12は、交通需要データに基づいて、電気自動車とそれ以外の種類の自動車とを含む仮想車両を生成する。例えば、CS状況予測部12が、図2に示した交通需要データD1の入力を受け付けたと仮定すると、CS状況予測部12は、当該入力を受け付けた交通需要データD1に従って、IC1から流入しIC2から流出する仮想車両を160台、IC1から流入しIC3から流出する仮想車両を160台、IC2から流入しIC3から流出する仮想車両を150台といった具合に仮想車両を生成する。なお、電気自動車とそれ以外の種類の自動車との比率は予め決められた設定に従うものとし、当該設定はユーザが任意に設定可能である。
 このとき、CS状況予測部12は、生成した仮想車両毎に、当該仮想車両の属性を示す車両属性情報を付与する。車両属性情報D6とは、例えば図7に示すように、車両ID、出発時刻、入口IC名、出口IC名及びSoC初期値が関連付けられた情報である。車両IDは、仮想車両を識別する識別情報であり、仮想車両生成時にランダムに設定される。出発時刻は、仮想車両が入口ICを出発する時刻を示しており、車両IDと同様に、仮想車両生成時にユニークに設定される(但し、単位時間毎の交通需要データに従うため、当該単位時間の範囲内でランダムに設定される)。入口IC名は、仮想車両が流入するICの名称を示しており、仮想車両生成時に用いられた交通需要データに従って設定される。出口IC名は、仮想車両が流出するICの名称を示しており、入口IC名と同様に、仮想車両生成時に用いられた交通需要データに従って設定される。SoC初期値は、仮想車両が入口ICを出発するときのSoCを示しており、入力を受け付けたSoC分布データに従ってランダムに設定される(但し、電気自動車以外の種類の仮想車両のSoC初期値は全て0に設定される)。
 次に、CS状況予測部12により実行されるシミュレーションの実行段階について説明する。ここでは、CS状況予測部12は、図8に示すような、ドライバーモデル121、車両モデル122、バッテリモデル123、CSモデル124及びITSスポット・電子掲示板モデル125を用いて、シミュレーションを実行する。
 ドライバーモデル121は、仮想車両を運転するドライバーをモデル化したものであり、車両モデル122、バッテリモデル123及びITSスポット・電子掲示板モデル125から各種情報の入力を受け付けると、当該入力を受け付けた各種情報に基づいて、走行経路の選択処理や、CSの選択処理、ならびに車両の状態の選択処理を実行する。
 例えば、ドライバーモデル121は、車両モデル122から送信される位置速度情報や、バッテリモデル123から送信されるSoC情報、ならびにITSスポット・電子掲示板モデル125から送信される充電推奨情報に基づいて、仮想車両が到達可能なCSのうち現在位置から最も遠くに位置するCSを選択する選択処理を実行する。なお、本実施形態では、ドライバーモデル121は、仮想車両が到達可能なCSのうち現在位置から最も遠くに位置するCSを選択するとしたが、これに限定されない。例えば、到達可能でもSoCが20%未満になる場合、電池残量がなくなり走行が不可能になる恐れがあるので、SoCが20%以上の範囲内で到達可能なCSのうち現在位置から最も遠くに位置するCSを選択するなどの方法でも良い。
 また、ドライバーモデル121は、車両モデル122から送信される車両の位置情報に基づいて、車両の状態、ここでは、「走行中」、「充電中」及び「充電待ち」の3つの状態のうちの1つを選択する選択処理を実行する。例えば、ドライバーモデル121は、選択したCSに到着するまでは車両の状態として「走行中」を選択し、当該選択したCSに到着し充電を開始すると車両の状態として「充電中」を選択し、当該選択したCSに到着したが充電器が他の仮想車両で一杯の場合には車両の状態として「充電待ち」を選択する。なお、ドライバーモデル121は3つの車両の状態のうちの1つを選択すると、当該選択した車両の状態を示す状態情報を車両モデル122に送信する。
 車両モデル122は、仮想車両そのものであり、ドライバーモデル121からの状態情報の入力を受け付けると、当該入力を受け付けた状態情報により示される車両の状態が「走行中」である場合に、車両ダイナミクス方程式に従って、仮想車両の位置や速度を更新する更新処理を実行する。なお、車両モデル122は、仮想車両の位置や速度を更新すると、当該更新後の仮想車両の位置や速度を示す位置速度情報をドライバーモデル121ならびにバッテリモデル123に送信し、且つ状態情報をバッテリモデル123に転送する。
 バッテリモデル123は、仮想車両に搭載されたバッテリをモデル化したものであり、車両モデル122からの位置速度情報及び状態情報と、CSモデル124からの充電速度情報との入力を受け付けると、当該入力を受け付けた状態情報により示される車両の状態に従って、バッテリ残量を更新する更新処理を実行する。具体的には、バッテリモデル123は、入力を受け付けた状態情報により示される車両の状態が「走行中」である場合に、入力を受け付けた位置速度情報から消費電力量を算出し、当該仮想車両に付与された車両属性情報内のSoC初期値から消費電力量を減算することでバッテリ残量を算出(更新)する。また、バッテリモデル123は、入力を受け付けた状態情報により示される車両の状態が「充電中」である場合に、入力を受け付けた充電速度情報により示される充電速度に従って、バッテリ残量を算出(更新)する。なお、バッテリモデル123は、バッテリ残量を更新すると、当該更新後のSoC(即ち、バッテリ残量)を示すSoC情報をドライバーモデル121に送信する。
 CSモデル124は、有料道路の各所に設けられるCSをモデル化したものであり、CS状況予測部12に予め設定されたCS情報D4に従って、充電速度を示す充電速度情報をバッテリモデル123に送信する。
 ITSスポット・電子掲示板モデル125は、有料道路の各所に設けられるITSスポット及び電子掲示板をモデル化したものである。当該ITSスポット・電子掲示板モデル125は、仮想車両が付近を通過するときに、充電推奨情報をドライバーモデル121に送信する(但し、充電推奨情報生成部14から充電推奨情報の入力ある場合に限る)。図9はITSスポット及び電子掲示板に表示される充電推奨情報の表示例を示す模式図である。図9は、仮想車両がITSスポット又は電子掲示板付近を通過したときの充電待ち時間ではなく、仮想車両が目的のCSに到着したときの充電待ち時間を示している。
 ドライバーモデル121は、ITSスポット・電子掲示板モデル125から送信された充電推奨情報により示される下流側のCSと、CSの選択処理により選択したCSとが一致する場合、所望の割合(例えば、3割の確率等)で立ち寄るCSを充電待ち時間の小さいCSに変更する、つまり、CSの選択処理を再度実行する。
 以上のようにして、CS状況予測部12は、各モデル121乃至125を用いて、仮想の有料道路上を、前処理段階において生成した仮想車両を走行させ、各CSの混雑状況をシミュレートする。そして、CS状況予測部12は、各CSの混雑状況の予測結果を示す予測結果情報を条件判断部13に送信する。
 予測結果情報D7とは、例えば図10に示すように、各CSでの充電待ち時間を単位時間毎に示す情報である。充電待ち時間は、仮想車両がCSに到着してから充電開始までの待ち時間を示している。例えば、図10では、CS1を8時に出発した仮想車両は、CS3に到着したときに充電開始までに500秒待つことを示している。ここで、図10に示す単位時間毎の時刻は、基準となるCS1通過時の時刻であり、CS1については、この時刻に到着した仮想車両の待ち時間を示している。そして、他の充電ステーションについては、この時刻にCS1を出発した車両が平均速度で走行した場合に、その充電ステーションに到着した場合の待ち時間を示している。
 条件判断部13は、CS状況予測部12から送信された予測結果情報の入力を受け付けると、当該入力を受け付けた予測結果情報により示される各CSの混雑状況を単位時間毎に比較して、所望の条件を満たしているか否かを判断し、当該判断の結果と、判断結果情報を充電推奨情報生成部14に送信する。
 所望の条件としては、例えば、以下の条件が挙げられ、これらの条件のうち、いずれかが満たされる場合に、所望の条件が満たされるとする。
 (1) 予測結果情報の全単位時間において、全ての隣接するCSの充電待ち時間を比較したときに、下流側のCSの充電待ち時間から上流側のCSの充電待ち時間を減算した値が閾値以下であること。
 (2) 充電推奨情報の調整回数、つまり、CS状況予測部12による予測結果情報の出力、条件判断部13による判断結果情報の出力、ならびに充電推奨情報生成部14によるCS状況予測部12への充電推奨情報の出力の一連の処理の繰り返し回数が予め決められた値以上であること。
 (3) 新たな充電推奨情報を生成しない、つまり、入力を受け付けた判断結果情報により示される判断結果の内容が、既に入力を受け付け、その判断結果に関する充電推奨情報を生成した判断結果情報の内容と同一であること。
 判断結果情報D8とは、例えば図11に示すように、条件判断部13による判断の結果、上記条件を満足している場合には「OK」を示し、満足していない場合には「NG」を示す情報である。例えば、図11では、CS1を8時10分に出発した仮想車両がCS2に到着したときの充電待ち時間「100秒」と、CS1を8時10分に出発した仮想車両がCS3に到着したときの充電待ち時間「1800秒」との差が閾値以上(但し、ここでは閾値が「1200秒」に設定されているものとする)であるため、条件判断部13は上記条件を満足しないとして、条件判断部13により送信される判断結果情報では、該当部分を「NG」とする。
 なお、本実施形態では、条件判断部13は、上記条件に従うものとしたが、これに限定されず、条件はユーザが任意に設定可能である。例えば、上記条件は、上流側のCSで充電を予定している仮想車両を下流側のCSに誘導すると、当該仮想車両が電欠を起こす可能性があるため、下流側のCSで充電を予定している仮想車両を上流側のCSに誘導することを想定して設定された条件であるが、混雑しているCSで充電を予定している仮想車両を上流側又は下流側のCSに誘導したい場合には、「全単位時間において、隣接するCSの充電待ち時間を比較したときに、この充電待ち時間の差が閾値以下であること」と条件を設定すれば良い。
 充電推奨情報生成部14は、条件判断部13から送信された判断結果と判断結果情報D8の入力を受け付けると、当該入力を受け付けた判断結果が所望の条件を満たしていない場合には、所望の条件を満たしていないCSに関する充電推奨情報を生成して、当該充電推奨情報をCS状況予測部12に送信する。
 但し、充電推奨情報生成部14が、既に、充電推奨情報を生成して当該充電推奨情報をCS状況予測部12に送信している場合、充電推奨情報生成部14は、既に送信した1つ以上の充電推奨情報に、当該生成した充電推奨情報を追加した充電推奨情報セットをCS状況予測部12に送信する。
 また、充電推奨情報生成部14は、入力を受け付けた判断結果が所望の条件を満たしている場合には、CS状況予測部12に送信した充電推奨情報セットのうちの1つを充電推奨情報出力部15に送信する。なお、どの充電推奨情報を充電推奨情報出力部15に送信するかは、予め決められた設定に従うものとし、当該設定はユーザが任意に設定可能である。具体的には、「CS状況予測部12に最後に出力した充電推奨情報を充電推奨情報出力部15に送信する」等が一例として挙げられる。
 充電推奨情報D9とは、例えば図12に示すように、有料道路の各所に設けられるITSスポットや電子掲示板により有料道路を走行する車両に通知される情報であり、ITSスポット名・電子掲示板名、提示開始時刻、提示終了時刻、ならびに上流側のCSと下流側のCSとにおける充電待ち時間が関連付けられた情報である。
 ITSスポット名・電子掲示板名は、ITSスポット又は電子掲示板の名称を示す。提示開始時刻は、関連付けられたITSスポット名・電子掲示板名により示されるITSスポット又は電子掲示板において当該充電推奨情報の提示を開始する時刻を示す。提示終了時刻は、関連付けられたITSスポット名・電子掲示板名により示されるITSスポット又は電子掲示板において当該充電推奨情報の提示を終了する時刻を示す。上流側のCSと下流側のCSとにおける充電待ち時間は、各CSでの充電待ち時間を示し、条件判断部13により用いられた予測結果情報に従った値である。
 充電推奨情報出力部15は、充電推奨情報生成部14から送信された充電推奨情報の入力を受け付けると、当該入力を受け付けた充電推奨情報を外部端末(例えば、有料道路の各所に設けられたITSスポットや電子掲示板等)に出力する。
 次に、以上のような充電管理装置1の動作の一例について、図13のフローチャートを参照しながら説明する。
 始めに、交通需要データ入力部11は、外部端末から送信された交通需要データとSoC分布データとの入力を受け付けると、当該入力を受け付けた交通需要データとSoC分布データとをCS状況予測部12に送信する(ステップS1)。
 続いて、CS状況予測部12は、交通需要データ入力部11から送信された交通需要データとSoC分布データとの入力を受け付けると、当該入力を受け付けた交通需要データとSoC分布データとを少なくとも使用してシミュレーションを実行して、各CSの混雑状況を予測し、当該予測の結果を示す予測結果情報を条件判断部13に送信する(ステップS2)。
 次に、条件判断部13は、CS状況予測部12から送信された予測結果情報の入力を受け付けると、当該入力を受け付けた予測結果情報により示される各CSの混雑状況を単位時間毎に比較して、所望の条件を満たしているか否かを判断する(ステップS3)。
 ステップS3の処理による判断の結果が否を示す場合(ステップS3のNo)には、充電推奨情報生成部14は、所望の条件を満たしていないCSに関する充電推奨情報を生成して、当該生成した充電推奨情報をCS状況予測部12に送信した後に(ステップS4)、ステップS2の処理に戻る、つまり、CS状況予測部12は、既に入力を受け付けた交通需要データ及びSoC分布データだけでなく、充電推奨情報生成部14から送信された充電推奨情報も使用して再度シミュレーションを実行する(ステップS2)。但し、充電推奨情報生成部14は、上記した(2)又は(3)のいずれかの条件が満足されている場合には、後述するステップS5の処理に進むものとする。
 ステップS3の処理による判断の結果が所望の条件を満たしている旨を示す場合(ステップS3のYes)には、充電推奨情報出力部15は、充電推奨情報生成部14がCS状況予測部12に送信した充電推奨情報セットのうちの1つを外部端末に出力する(ステップS5)。
 なお、本実施形態では、各CSでの混雑状況を充電待ち時間を用いて示したが、これに限定されず、例えば、充電待ちの車両台数や、充電器あたりの充電待ちの車両台数等を用いて混雑状況を示しても良い。
 また、本実施形態では、充電推奨情報により各CSでの充電待ち時間を示すとしたが、これに限定されず、例えば、充電料金を充電待ち時間にあわせて変化させ、充電待ち時間が大きいCSでの充電程、充電料金を高く、また、充電待ち時間が小さいCSでの充電程、充電料金を安く設定した上で、各CSでの充電料金を充電推奨情報により示しても良い。
 更に、本実施形態では、一本道の有料道路を対象として、充電推奨情報をドライバーに提供する充電管理装置を説明したが、これに限定されず、例えば、分岐部や合流部が存在する網状の道路を対象としても良い。
 また、本実施形態では、CS状況予測部12において仮想車両を生成し、この仮想車両単位でシミュレーションを実行するとしたが、これに限定されず、例えば、個々の車両単位ではなく、交通流を流体モデルとして用いてシミュレーションを実行しても良い。この場合、充電行動を確率的に表現することが可能である。
 更に、本実施形態では、充電推奨情報をITSスポット又は電子掲示板を通じてドライバーに通知するとしたが、充電推奨情報をドライバーに通知する通知手段は、特にこれらに限定するものでない。
 以上で説明した第1の実施形態によれば、交通需要データ及びSoC分布データを少なくとも使用してシミュレーションを実行するCS状況予測部12と、CS状況予測部12による予測結果情報を用いて所望の条件を満たしているか否かを判断する条件判断部13と、条件判断部13による判断結果情報を用いて充電推奨情報を生成し、当該充電推奨情報を出力する充電推奨情報生成部14及び充電推奨情報出力部15とを備えた構成により、有料道路の各CSでの混雑を緩和することができる。
 例えば、図14は充電推奨情報を用いずにCS状況予測部12において各CSの混雑状況を予測したときの充電待ち時間の推移の一例を示す模式図であり、図15は充電推奨情報を用いてCS状況予測部12において各CSの混雑状況を予測したときの充電待ち時間の推移の一例を示す模式図である。図14の模式図と図15の模式図とを比較すると、図14の模式図の充電待ち時間の最大値が7000秒を超えているのに対し、図15の模式図の充電待ち時間の最大値は7000秒を超えていない。このことから、CS状況予測部12による予測結果情報の出力、条件判断部13による判断結果情報の出力、ならびに充電推奨情報生成部14による充電推奨情報の出力を繰り返し実行することで、充電待ち時間の最大値を減少させ、有料道路の各CSでの混雑の緩和を実現していることが分かる。
 また、図16はCS状況予測部12により予測された各CSでの充電待ち時間の最大値の推移の一例を示す模式図である。ここでも、CS状況予測部12による予測結果情報の出力、条件判断部13による判断結果情報の出力、ならびに充電推奨情報生成部14による充電推奨情報の出力を繰り返し実行することで、充電待ち時間の最大値が減少していることが分かる他、充電待ち時間の最大値のばらつきが減少していることが分かる、つまり、有料道路の各CSでの混雑の緩和を実現していることが分かる。
 即ち、充電推奨情報生成部14により生成された充電推奨情報を提示することで、実際の有料道路においても、図15及び図16に示すように、有料道路の各CSでの混雑の緩和の実現を期待することができる。
 [第2の実施形態]
 図17は第2の実施形態に係る充電管理装置の構成例を示す模式図であって、上記した第1の実施形態に係る充電管理装置とは異なり、図1に示した充電管理装置に電力供給入力部16を更に加えた構成となっている。
 なお、交通需要データ入力部11、条件判断部13、充電推奨情報生成部14及び充電推奨情報出力部15は、上記した第1の実施形態と同様な機能を有するため、ここでは詳細な説明を省略する。以下では、主に、第1の実施形態と異なる機能について説明する。
 電力供給入力部16は、外部端末から送信され、各CSが供給可能な電力量を示す計画電力供給量情報の入力を受け付けると、当該入力を受け付けた計画電力供給量情報をCS状況予測部12に送信する。
 計画電力供給量情報D10とは、例えば図18に示すように、各CSが供給可能な電力量を単位時間毎に示す情報であり、例えば、0時から1時の間にCS1では250kWhの電力を供給可能な旨等が示されている。
 CS状況予測部12は、交通需要データ入力部11からの交通需要データ及びSoC分布データと、充電推奨情報生成部14からの充電推奨情報とに加えて、電力供給入力部16からの計画電力供給量情報の入力を受け付ける。そして、CS状況予測部12は、入力を受け付けた計画電力供給量情報に基づいて、例えば図19のD11に示すように、各CSにおいて利用可能な充電器の数を単位時間毎に決定した上で(利用可能充電器数情報D11を生成した上で)、上記した第1の実施形態と同様に、シミュレーションを実行し、各CSの混雑状況を予測する。
 ここで、本実施形態に係る充電管理装置1の動作の一例について、図20のフローチャートを参照しながら説明する。なお、ステップS1,S3乃至S5の処理は、上記した第1の実施形態と同様であるため、ここでは詳細な説明を省略する。
 ステップS1の処理の後に、電力供給入力部16は、外部端末から送信される計画電力供給量情報の入力を受け付けると、当該入力を受け付けた計画電力供給量情報をCS状況予測部12に送信する(ステップS2')。
 続いて、CS状況予測部12は、交通需要データ入力部11から送信された交通需要データ及びSoC分布データと、電力供給入力部16から送信された計画電力供給量情報との入力を受け付けると、当該入力を受け付けた計画電力供給量情報に基づいて、各CSにおいて利用可能な充電器の数を単位時間毎に決定する。その後、CS状況予測部12は、当該決定した各CSでの単位時間毎に利用可能な充電器の数を考慮しながら、入力を受け付けた交通需要データとSoC分布データとを少なくとも使用してシミュレーションを実行して、各CSの混雑状況を予測し、当該予測の結果を示す予測結果情報を条件判断部13に送信する(ステップS2'')。
 以上説明した第2の実施形態によれば、計画電力供給量情報を入出力可能な電力供給入力部16を更に備えた構成により、計画電力供給量が時間帯によって変化する場合においても、利用可能な充電器の数を変動させてシミュレーションを実行することができ、ひいては、有料道路の各CSでの混雑を緩和することができる。
 [第3の実施形態]
 図21は第3の実施形態に係る充電管理装置の構成例を示す模式図であって、上記した第1及び第2の実施形態に係る充電管理装置とは異なり、図1に示した充電管理装置に交通状態入力部17を更に加えた構成となっている。
 なお、条件判断部13、充電推奨情報生成部14及び充電推奨情報出力部15は、上記した第1及び第2の実施形態と同様な機能を有するため、ここでは詳細な説明を省略する。以下では、主に、第1及び第2の実施形態と異なる機能について説明する。
 交通状態入力部17は、外部端末から送信された実測交通需要データの入力を受け付けると、当該入力を受け付けた実測交通需要データを交通需要データ入力部11に送信する。なお、実測交通需要データとは、例えばIC等に設けられるETC(Electronic Toll System)で実測された交通需要データであり、交通需要データを補正するためのデータである。
 交通需要データ入力部11は、外部端末から送信された交通需要データとSoC分布データとに加えて、交通状態入力部17から送信された実測交通需要データの入力を受け付ける。そして、交通需要データ入力部11は、入力を受け付けた交通需要データを、入力を受け付けた実測交通需要データを用いて補正した後に、補正後の交通需要データと、入力を受け付けたSoC分布データとをCS状況予測部12に送信する。
 CS状況予測部12は、交通需要データ入力部11から送信された補正後の交通需要データとSoC分布データとの入力を受け付けると、当該入力を受け付けた補正後の交通需要データとSoC分布データとを少なくとも使用して、上記した第1の実施形態と同様に、シミュレーションを実行し、各CSの混雑状況を予測する。
 ここで、本実施形態に係る充電管理装置1の動作の一例について、図22のフローチャートを参照しながら説明する。なお、ステップS3乃至S5の処理は、上記した第1及び第2の実施形態と同様であるため、ここでは詳細な説明は省略する。
 始めに、交通状態入力部17は、外部端末から送信される実測交通需要データの入力を受け付けると、当該入力を受け付けた実測交通需要データを交通需要データ入力部11に送信する(ステップS1')。
 続いて、交通需要データ入力部11は、外部端末から送信される交通需要データ及びSoC分布データと、交通状態入力部17から送信された実測交通需要データとの入力を受け付けると、当該入力を受け付けた交通需要データを、当該入力を受け付けた実測交通需要データを用いて補正した後に、当該補正後の交通需要データと、当該入力を受け付けたSoC分布データとをCS状況予測部12に送信する(ステップS1'')。
 次に、CS状況予測部12は、交通需要データ入力部11から送信された補正後の交通需要データとSoC分布データとの入力を受け付けると、当該入力を受け付けた補正後の交通需要データとSoC分布データとを少なくとも使用してシミュレーションを実行して、各CSの混雑状況を予測し、当該予測の結果を示す予測結果情報を条件判断部13に送信する(ステップS2''')。
 以上説明した第3の実施形態によれば、交通需要データを補正する実測交通需要データを入出力可能な交通状態入力部17を更に備えた構成により、過去のデータに基づいて予測された交通需要データが実際の交通需要データと乖離している場合においても、誤差を補正することができ、ひいては、有料道路の各CSでの混雑を緩和することができる。
 以上説明した少なくとも1つの実施形態によれば、有料道路等を走行する全電気自動車の現在位置やバッテリ残量を計測しなくとも、充電推奨情報をドライバーに通知し得る充電管理装置を提供することができる。
 なお、上記の各実施形態に記載した手法は、コンピュータに実行させることのできるプログラムとして、磁気ディスク(フレキシブルディスク、ハードディスクなど)、光ディスク(CD-ROM、DVDなど)、光磁気ディスク(MO)、半導体メモリなどの記憶媒体に格納して頒布することもできる。
 また、この記憶媒体としては、プログラムを記憶でき、かつコンピュータが読み取り可能な記憶媒体であれば、その記憶形式は何れの形態であっても良い。
 また、記憶媒体からコンピュータにインストールされたプログラムの指示に基づきコンピュータ上で稼働しているOS(オペレーティングシステム)や、データベース管理ソフト、ネットワークソフト等のMW(ミドルウェア)等が上記実施形態を実現するための各処理の一部を実行しても良い。
 さらに、各実施形態における記憶媒体は、コンピュータと独立した媒体に限らず、LANやインターネット等により伝送されたプログラムをダウンロードして記憶または一時記憶した記憶媒体も含まれる。
 また、記憶媒体は1つに限らず、複数の媒体から上記の各実施形態における処理が実行される場合も本発明における記憶媒体に含まれ、媒体構成は何れの構成であっても良い。
 なお、各実施形態におけるコンピュータは、記憶媒体に記憶されたプログラムに基づき、上記の各実施形態における各処理を実行するものであって、パソコン等の1つからなる装置、複数の装置がネットワーク接続されたシステム等の何れの構成であっても良い。
 また、各実施形態におけるコンピュータとは、パソコンに限らず、情報処理機器に含まれる演算処理装置、マイコン等も含み、プログラムによって本発明の機能を実現することが可能な機器、装置を総称している。
 なお、本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。

Claims (5)

  1.  有料道路の複数のインターチェンジからの車両の流出入台数を示す交通需要データの入力を受け付ける入力手段(11)と、
     前記入力を受け付けた交通需要データを使用してシミュレーションを実行し、前記有料道路間に設けられた複数の充電ステーションでの充電待ち時間を予測する第1予測手段(12)と、
     前記予測された各充電ステーションでの充電待ち時間を比較し、所望の条件を満たしているか否かを判断する判断手段(13)と、
     前記判断手段による判断の結果が否を示すとき、円滑に充電可能な充電ステーションを示す充電推奨情報を生成する生成手段(14)と、
     前記入力を受け付けた交通需要データに加えて、前記生成された充電推奨情報を使用してシミュレーションを実行し、前記各充電ステーションでの充電待ち時間を再度予測する第2予測手段(12)と、
     前記判断手段、前記生成手段及び前記第2予測手段による処理を繰り返し実行した結果、前記判断手段による判断の結果が所望の条件を満たすとき、前記充電推奨情報を外部端末に出力する出力手段(15)と、
     を備えたことを特徴とする充電管理装置。
  2.  前記有料道路間に設けられた複数の充電ステーションが供給可能な電力量を示す計画電力供給量情報の入力を受け付ける第2入力手段(16)をさらに具備し、
     前記第1予測手段(12)は、前記交通需要データと前記計画電力供給量情報とを使用してシミュレーションを実行し、
     前記第2予測手段(12)は、前記交通需要データ及び前記計画電力供給量情報に加えて、前記充電推奨情報を使用してシミュレーションを実行する請求項1記載の充電管理装置。
  3.  前記入力を受け付けた交通需要データを補正する実測交通需要データの入力を受け付ける第2入力手段(17)をさらに具備し、
     前記第1予測手段は、前記実測交通需要データを用いて前記交通需要データを補正した後に、当該補正後の交通需要データを使用してシミュレーションを実行し、
     前記第2予測手段は、前記補正後の交通需要データに加えて、前記充電推奨情報を使用してシミュレーションを実行する請求項1記載の充電管理装置。
  4.  前記判断手段(13)は、
     隣接する各充電ステーションでの充電待ち時間を比較し、下流側の充電ステーションの充電待ち時間から上流側の充電ステーションの充電待ち時間を減算した値が閾値以下であるか否かを判断することを特徴とする請求項1記載の充電管理装置。
  5.  前記生成手段(14)は、
     前記判断手段による判断の結果が否を示すとき、円滑に充電可能な充電ステーションでの充電待ち時間又は充電料金のうちの少なくとも一方を示す充電推奨情報を生成することを特徴とする請求項1記載の充電管理装置。
PCT/JP2013/082035 2012-11-30 2013-11-28 充電管理装置 WO2014084305A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201380062408.5A CN105051800B (zh) 2012-11-30 2013-11-28 充电管理装置
EP13858263.0A EP2927888B1 (en) 2012-11-30 2013-11-28 Charge management device
US14/722,211 US9656566B2 (en) 2012-11-30 2015-05-27 Charge management apparatus

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012-263385 2012-11-30
JP2012263385A JP5818774B2 (ja) 2012-11-30 2012-11-30 充電管理装置

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/722,211 Continuation US9656566B2 (en) 2012-11-30 2015-05-27 Charge management apparatus

Publications (1)

Publication Number Publication Date
WO2014084305A1 true WO2014084305A1 (ja) 2014-06-05

Family

ID=50827937

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/082035 WO2014084305A1 (ja) 2012-11-30 2013-11-28 充電管理装置

Country Status (5)

Country Link
US (1) US9656566B2 (ja)
EP (1) EP2927888B1 (ja)
JP (1) JP5818774B2 (ja)
CN (1) CN105051800B (ja)
WO (1) WO2014084305A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104716706A (zh) * 2014-12-23 2015-06-17 北京交通大学 一种基于充电预约的电动汽车充电站充电管理方法
CN108829778A (zh) * 2018-05-30 2018-11-16 蔚来汽车有限公司 充电桩智能推荐方法、装置和系统

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6129701B2 (ja) * 2013-09-20 2017-05-17 株式会社東芝 充電管理装置、充電管理システムおよび充電管理方法
CN104598988A (zh) * 2014-12-23 2015-05-06 北京交通大学 一种基于充电预约的电动汽车充电站选择方法
DE102016202001A1 (de) * 2016-02-10 2017-08-10 Bayerische Motoren Werke Aktiengesellschaft Erkennen von Einstellungsabweichungen an einer Energiemanagementeinrichtung
KR101845241B1 (ko) 2016-07-07 2018-04-04 한화시스템(주) 멀티형 전기차 충전기의 충전 속도 선택 방법 및 충전 속도의 선택이 가능한 멀티형 전기차 충전기
US10180333B2 (en) * 2016-08-12 2019-01-15 Ford Global Technologies, Llc Crowd-sourced electric vehicle charging station identification
JP6863241B2 (ja) * 2017-11-13 2021-04-21 トヨタ自動車株式会社 情報提供システムおよび情報提供方法、ならびにそれに用いられるサーバ
CN109697876B (zh) * 2018-10-30 2021-06-29 百度在线网络技术(北京)有限公司 用于提供车辆信息的方法、装置、设备和存储介质
DE102018219388A1 (de) * 2018-11-14 2020-05-14 Robert Bosch Gmbh Betriebsassistenzverfahren und Betriebssystem für ein elektrisch betreibbares Fahrzeug
JP2020170244A (ja) * 2019-04-01 2020-10-15 株式会社東芝 情報処理システム、情報処理装置、方法及びプログラム
FR3096315A1 (fr) * 2019-05-24 2020-11-27 Psa Automobiles Sa Procédé et dispositif de gestion de la charge d’un véhicule électrique
CN112193112B (zh) * 2020-10-16 2022-06-14 安徽继远软件有限公司 一种电动汽车充电场站充电桩智能管理方法及装置
CN117172409B (zh) * 2023-09-05 2024-05-03 河海大学 基于光伏能源的电动汽车的智能充电方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011001595A1 (en) * 2009-07-01 2011-01-06 Nissan Motor Co., Ltd. Information providing system, information center, in-vehicle device and information providing method
JP2011164050A (ja) * 2010-02-15 2011-08-25 Alpine Electronics Inc 車載用ナビゲーション装置及び充電スタンド情報提供方法
WO2011102515A1 (ja) * 2010-02-22 2011-08-25 トヨタ自動車株式会社 電力供給制御装置、及び情報提供装置
JP2011191109A (ja) 2010-03-12 2011-09-29 Mitsubishi Electric Corp 電気自動車の交通ナビゲーション装置、及び電気自動車の交通ナビゲーションシステム
JP2011214930A (ja) * 2010-03-31 2011-10-27 Honda Motor Co Ltd 充電待ち時間情報提供装置およびカーナビゲーション装置
JP2011238182A (ja) * 2010-05-13 2011-11-24 Central Res Inst Of Electric Power Ind 交通シミュレーションプログラム、交通シミュレーション装置及び交通シミュレーション方法
JP2012003391A (ja) 2010-06-15 2012-01-05 Toshiba Corp 充電予約サーバ、充電予約システム、充電予約方法および充電予約プログラム。
JP2012048286A (ja) 2010-08-24 2012-03-08 Hitachi Ltd 電気自動車の充電制御方法、充電監視制御センタ、車載カーナビ装置、および電力系統安定化システム
WO2012114381A1 (ja) * 2011-02-24 2012-08-30 三菱電機株式会社 地図表示装置、ナビゲーション装置および地図表示方法

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5120204B2 (ja) * 2008-10-28 2013-01-16 アイシン・エィ・ダブリュ株式会社 走行案内装置、走行案内方法及びコンピュータプログラム
JP2010125868A (ja) * 2008-11-25 2010-06-10 Denso Corp 充放電計画装置
US8346420B2 (en) * 2010-03-23 2013-01-01 GM Global Technology Operations LLC System and method for predicting vehicle energy consumption
CN102859324B (zh) * 2010-04-19 2016-06-29 日产自动车株式会社 信息提供装置和信息提供方法
CN102103799A (zh) * 2011-01-27 2011-06-22 宁波伊司达锂电池有限公司 纯电动车辆动力管理系统及方法
JP5954584B2 (ja) * 2011-02-03 2016-07-20 日本電気株式会社 充電器配置計画支援装置、充電器配置計画支援方法、及びプログラム
JP5214764B2 (ja) * 2011-03-25 2013-06-19 株式会社東芝 電気自動車充電スケジューリングシステム
US8937456B2 (en) * 2011-04-21 2015-01-20 International Business Machines Corporation Real time system and method for optimizing and managing a load in an electrical grid

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011001595A1 (en) * 2009-07-01 2011-01-06 Nissan Motor Co., Ltd. Information providing system, information center, in-vehicle device and information providing method
JP2011013893A (ja) * 2009-07-01 2011-01-20 Nissan Motor Co Ltd 情報提供システム、情報センタ、車載装置及び情報提供方法
CN102473351A (zh) * 2009-07-01 2012-05-23 日产自动车株式会社 信息提供系统、信息中心、车载装置和信息提供方法
EP2449541A1 (en) * 2009-07-01 2012-05-09 Nissan Motor Co., Ltd. Information providing system, information center, in-vehicle device and information providing method
US20120098676A1 (en) * 2009-07-01 2012-04-26 Nissan Motor Co., Ltd. Information providing system, information center, in-vehicle device and information providing method
JP2011164050A (ja) * 2010-02-15 2011-08-25 Alpine Electronics Inc 車載用ナビゲーション装置及び充電スタンド情報提供方法
WO2011102515A1 (ja) * 2010-02-22 2011-08-25 トヨタ自動車株式会社 電力供給制御装置、及び情報提供装置
US20120306446A1 (en) * 2010-02-22 2012-12-06 Toyota Jidosha Kabushiki Kaisha Power supply control device and information provision device
DE112011100624T5 (de) * 2010-02-22 2013-01-17 Toyota Jidosha Kabushiki Kaisha Energieversorgungssteuervorrichtung und Informationsbereitstellungsvorrichtung
CN102770304A (zh) * 2010-02-22 2012-11-07 丰田自动车株式会社 电力供给控制装置以及信息提供装置
JP2011191109A (ja) 2010-03-12 2011-09-29 Mitsubishi Electric Corp 電気自動車の交通ナビゲーション装置、及び電気自動車の交通ナビゲーションシステム
JP2011214930A (ja) * 2010-03-31 2011-10-27 Honda Motor Co Ltd 充電待ち時間情報提供装置およびカーナビゲーション装置
JP2011238182A (ja) * 2010-05-13 2011-11-24 Central Res Inst Of Electric Power Ind 交通シミュレーションプログラム、交通シミュレーション装置及び交通シミュレーション方法
JP2012003391A (ja) 2010-06-15 2012-01-05 Toshiba Corp 充電予約サーバ、充電予約システム、充電予約方法および充電予約プログラム。
JP2012048286A (ja) 2010-08-24 2012-03-08 Hitachi Ltd 電気自動車の充電制御方法、充電監視制御センタ、車載カーナビ装置、および電力系統安定化システム
WO2012114381A1 (ja) * 2011-02-24 2012-08-30 三菱電機株式会社 地図表示装置、ナビゲーション装置および地図表示方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2927888A4

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104716706A (zh) * 2014-12-23 2015-06-17 北京交通大学 一种基于充电预约的电动汽车充电站充电管理方法
CN108829778A (zh) * 2018-05-30 2018-11-16 蔚来汽车有限公司 充电桩智能推荐方法、装置和系统

Also Published As

Publication number Publication date
EP2927888B1 (en) 2022-08-03
EP2927888A8 (en) 2015-12-16
EP2927888A1 (en) 2015-10-07
JP5818774B2 (ja) 2015-11-18
EP2927888A4 (en) 2016-06-29
US9656566B2 (en) 2017-05-23
US20150251553A1 (en) 2015-09-10
JP2014110667A (ja) 2014-06-12
CN105051800B (zh) 2016-12-21
CN105051800A (zh) 2015-11-11

Similar Documents

Publication Publication Date Title
WO2014084305A1 (ja) 充電管理装置
JP6129701B2 (ja) 充電管理装置、充電管理システムおよび充電管理方法
US11393335B2 (en) Power transfer managing apparatus, and computer-readable storage medium
Wu et al. The multi-depot electric vehicle scheduling problem with power grid characteristics
US10467556B2 (en) Information systems and methods for deployment of charging infrastructure in support of electric vehicles
US11124084B2 (en) Control apparatus, and computer-readable storage medium
US20140018985A1 (en) Hybrid Vehicle Fuel Efficiency Using Inverse Reinforcement Learning
US20200231058A1 (en) Control apparatus, and computer-readable storage medium
CN108215803B (zh) 联网车辆
JPWO2020100288A1 (ja) 充電支援システム、方法、及びコンピュータプログラム
Lu et al. Joint optimal scheduling for a mixed bus fleet under micro driving conditions
WO2018180583A1 (ja) プラン情報提供システム、プラン情報提供方法、および記憶媒体
CN106575403B (zh) 信息提供系统、显示控制装置、信息设备以及信息提供方法
JP2021018608A (ja) アグリゲーションシステム、アグリゲーション装置、およびアグリゲーション方法
WO2014064778A1 (ja) 列車運行管理装置、システム、および方法
Ma et al. Time-dependent vehicle routing problem with departure time and speed optimization for shared autonomous electric vehicle service
CN112529608A (zh) 信息处理系统以及程序
US20170039306A1 (en) Traffic System Optimization Device
Wang et al. Reliable dynamic wireless charging infrastructure deployment problem for public transport services
Alam et al. Co-optimization of charging scheduling and platooning for long-haul electric freight vehicles
JP2023155476A (ja) 情報処理システム、情報処理装置、情報処理方法及び情報処理プログラム
JP2014085272A (ja) 充電器管理システム、充電器管理用プログラム
CN114005294A (zh) 一种路径确定方法、装置、设备及介质
JP5749184B2 (ja) ナビゲーション装置
Shekari et al. Recognition of electric vehicles charging patterns with machine learning techniques

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201380062408.5

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13858263

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2013858263

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE