WO2014045635A1 - デマンド制御装置 - Google Patents
デマンド制御装置 Download PDFInfo
- Publication number
- WO2014045635A1 WO2014045635A1 PCT/JP2013/063539 JP2013063539W WO2014045635A1 WO 2014045635 A1 WO2014045635 A1 WO 2014045635A1 JP 2013063539 W JP2013063539 W JP 2013063539W WO 2014045635 A1 WO2014045635 A1 WO 2014045635A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- heat source
- demand control
- unit
- output
- energy
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F11/46—Improving electric energy efficiency or saving
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
- F24F11/63—Electronic processing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/70—Control systems characterised by their outputs; Constructional details thereof
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00004—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00016—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00028—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
- F24F11/63—Electronic processing
- F24F11/64—Electronic processing using pre-stored data
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2140/00—Control inputs relating to system states
- F24F2140/60—Energy consumption
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/26—Pc applications
- G05B2219/2642—Domotique, domestic, home control, automation, smart house
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
- H02J2310/14—The load or loads being home appliances
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
- Y02P80/14—District level solutions, i.e. local energy networks
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/242—Home appliances
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/242—Home appliances
- Y04S20/244—Home appliances the home appliances being or involving heating ventilating and air conditioning [HVAC] units
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/124—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
Definitions
- the present invention relates to a demand control device.
- Patent Document 1 Japanese Patent Laid-Open No. 2007-2120378
- the heat source system of Patent Document 1 includes a heat source device that can control energy consumption and a heat source device that cannot control energy consumption.
- a plurality of heat source devices that can control energy consumption have the same capacity and load characteristics.
- a method is adopted in which energy consumption is controlled at a constant rate all at once for all of a plurality of heat source devices that can control energy consumption so as to obtain required energy consumption. Yes.
- some heat source systems include a plurality of heat source units having different capacities and / or output characteristics.
- a plurality of heat source devices having different capacities and / or output characteristics may have different responsiveness from the start of demand control to the target energy consumption for each heat source device.
- the responsiveness of the entire heat source system to demand control is also reduced.
- the present invention has been made in view of the above points, and an object of the present invention is to provide a demand control device that improves responsiveness even in a heat source system having a plurality of heat source units having different capacities and / or output characteristics. There is.
- a demand control device is a demand control device that performs demand control for suppressing energy consumption of a heat source unit for a heat source system having a plurality of heat source units having different capacities and / or output characteristics.
- Unit a suppression energy amount value calculation unit, a heat source output determination unit, and an operation unit.
- the receiving unit receives a demand signal that requests the start of demand control.
- the suppression energy amount value calculation unit calculates a suppression energy amount value that is a value related to the energy amount to be suppressed during demand control.
- a heat source output determination part determines an output separately with respect to each of a several heat source machine based on the amount value of suppression energy.
- the operation unit causes each of the plurality of heat source machines to operate with individual outputs determined by the heat source output determination unit.
- this demand control device after receiving a demand signal, a suppression energy amount value is calculated, and control is required among a plurality of heat source units having different capacities and / or output characteristics based on the suppression energy amount value. Only the heat source machine is directly controlled by the demand control device. Therefore, the demand control device can improve the responsiveness after receiving the demand signal.
- the demand control device is the demand control device according to the first aspect, and further includes a load performance coefficient storage unit.
- the load performance coefficient storage unit stores load performance coefficient information, which is information for associating the loads of the plurality of heat source units with the performance coefficients of the plurality of heat source units.
- a heat source output determination part determines an output separately with respect to each of a some heat source machine based on load performance coefficient information.
- each heat source in order to realize a required suppression energy amount value in demand control of a heat source system having a plurality of heat source units having different capacities and / or output characteristics, each heat source is based on load performance coefficient information. Suppress energy consumption so that every machine has a good coefficient of performance. Therefore, the output of each heat source machine can be controlled so that the operation efficiency of the whole heat source machine with respect to the energy consumption of the whole heat source machine approaches the maximum.
- the “load” corresponds to the energy actually consumed by the heat source device.
- the ratio of the energy actually consumed from the maximum energy consumed by the heat source machine is indicated by the number of steps of the compressor.
- Output is the amount of heat that the heat source machine actually outputs.
- Coefficient of performance refers to Coefficient of Performance (COP) and represents the cooling capacity (kW) per 1 kW of power consumption.
- Energy refers to electric power expressed in watts (W) when the energy is electricity.
- “Energy amount” refers to the amount of power expressed in watt hours (Wh) when the energy is electricity.
- the demand control device is the demand control device according to the second aspect, and further includes a rated capacity storage unit.
- the rated capacity storage unit stores rated capacity information that is information on the rated capacity of each of the plurality of heat source units.
- a heat source output determination part determines an output separately with respect to each of a some heat source machine based on load performance coefficient information.
- this demand control device in demand control of a heat source system having a plurality of heat source units having different capacities and / or output characteristics, based on the rated capacity information and load performance coefficient information of each heat source unit, Increase or decrease the number to determine the individual output of the heat source machine. Therefore, the operation efficiency of the entire heat source device can be brought close to the maximum.
- the demand control device is the demand control device according to the first aspect, and further includes a heat source unit output storage unit.
- the heat source unit output storage unit stores heat source unit output information that is information for associating the total amount of energy consumption of all the heat source units with the outputs of the plurality of heat source units.
- the heat source output determination unit calculates an upper limit value of the total amount of energy consumption of all the heat source units based on the suppression energy amount value.
- the heat source output determination unit individually determines the output for each of the plurality of heat source units based on the upper limit value of the total amount of consumed energy and the heat source unit output information.
- the heat source output determination unit determines the total amount of energy consumption of the entire heat source system based on the suppression energy amount value.
- a heat source output determination part determines the load of each heat source machine.
- the load of the heat source unit is determined based on the heat source unit output information stored in the heat source unit output storage unit from the total amount of energy consumption of the entire heat source system.
- the heat source unit output information includes information on a plurality of total amounts of energy consumption of the entire heat source system.
- the information on the total amount of energy consumed by the entire heat source system includes information on loads with good coefficient of performance for each heat source unit. Therefore, the heat source output determining unit can quickly determine the load of each heat source machine having a good coefficient of performance.
- the operation unit can quickly control the output of each heat source device according to the determined load of each heat source device.
- a demand control device is the demand control device according to any of the first to fourth aspects, wherein the operation unit stops any of the plurality of heat source devices based on the suppression energy amount value.
- the energy consumption of the entire heat source system can be controlled flexibly in the demand control of the heat source system having a plurality of heat source units having different capacities and / or output characteristics.
- the demand control device After receiving a demand signal, it is possible to realize an energy amount to be suppressed with good responsiveness.
- the demand control device according to the second aspect it is possible to control the output of each heat source device so that the required suppression energy amount value is realized and the operation efficiency of the entire heat source device approaches the maximum.
- the demand control device it is possible to control the increase and decrease of the heat source unit and the output of each heat source unit so that the operation efficiency of the entire heat source unit approaches the maximum.
- the output of each heat source device can be quickly determined and controlled so that the operation efficiency with respect to the energy consumption of the entire heat source system approaches the maximum.
- the energy consumption of the entire heat source system can be controlled flexibly.
- FIG. 1 shows an energy management system 200 according to the present embodiment.
- the energy management system 200 is a system that manages power supplied from the power company 1 to the building 2.
- the building 2 is an office building, a tenant building, a factory, a general household, and the like.
- the electric power company 1 has an energy management device 90.
- the building 2 includes a demand control device 10 and a heat source system 100. As shown in FIG.
- the heat source system 100 includes heat source units 50a, 50b, and 50c, air conditioners 32a, 32b, and 32c, primary pumps 41a, 41b, and 41c, a first header 20, and a second header 21. And an upstream pipe 60 and a downstream pipe 61.
- the plurality of heat source units 50a, 50b, and 50c may have different capacities and / or output characteristics.
- the heat source devices 50a, 50b, and 50c are, for example, an air-cooled inverter chiller and an air-cooled screw chiller.
- water that is cold water or hot water is sent to the heat source units 50a, 50b, and 50c by the primary pumps 41a, 41b, and 41c.
- the water sent out from the heat source devices 50 a, 50 b, 50 c gathers in the first header 20.
- the water gathered in the first header 20 passes through the upstream pipe 60 and is sent to the air conditioners 32a, 32b, and 32c.
- the water gathered in the second header 21 is returned to the heat source units 50a, 50b, and 50c by the primary pumps 41a, 41b, and 41c.
- the 1st header 20 says the header which the water from each heat-source equipment 50a, 50b, 50c gathers, and sends water to the air conditioners 32a, 32b, 32c after that.
- the 2nd header 21 says the header which the water which returned from air conditioner 32a, 32b, 32c gathers, and sends water to the primary pumps 41a, 41b, 41c after that.
- the demand control device 10 receives a demand signal for requesting the start of demand control from the energy management device 90.
- the demand control apparatus 10 controls the energy consumption of each heat source machine 50a, 50b, 50c.
- the energy management device 90 and the demand control device 10 are connected via a communication network 80 such as the Internet.
- the demand control device 10 is connected to the heat source devices 50a, 50b, and 50c via a communication network 81 such as a LAN.
- the demand control device 10 can control the energy consumption of the heat source devices 50a, 50b, and 50c by transmitting commands to the heat source devices 50a, 50b, and 50c via the communication network 81.
- the energy management device 90 is a device that includes one or more computers.
- the energy management device 90 manages energy in one or more buildings. Between the energy management apparatus 90 and the demand control apparatus 10, various information regarding energy demand is transmitted / received.
- the electric power company 1 transmits a request for suppressing energy consumption during the demand control period from the energy management device 90 to the demand control device 10 in the building 2 via the communication network 80.
- the demand control device 10 receives the suppression request sent from the energy management device 90. Based on the received suppression request, the demand control device 10 performs demand control of each of the heat source units 50a, 50b, and 50c.
- (2) Configuration of Each Device Hereinafter, the energy management device 90 and the demand control device 10 included in the energy management system 200 will be described.
- FIG. 2 shows a schematic configuration diagram of the energy management device 90.
- the energy management device 90 includes a communication unit 91, an output unit 92, an input unit 93, a storage unit 94, and a control unit 95.
- the communication unit 91 is a network interface that enables the energy management apparatus 90 to be connected to the communication network 80.
- Output unit The output unit 92 mainly includes a display.
- the output unit 92 displays a management screen showing various information stored in the storage unit 94 described later.
- Input unit The input unit 93 mainly includes operation buttons, a keyboard, a mouse, and the like.
- Storage Unit The storage unit 94 is mainly composed of a hard disk. The maximum energy consumption amount or the maximum suppression energy amount of the building 2 to be transmitted to the demand control device 10 is stored.
- the maximum energy consumption is the total amount of energy consumed when each heat source unit 50a, 50b, 50c of the building 2 is operated so as to have the maximum energy consumption.
- the maximum suppression energy amount is the total amount of energy that can be suppressed by the heat source units 50a, 50b, and 50c of the building 2.
- the control unit 95 mainly includes a CPU, a ROM, and a RAM. As shown in FIG. 2, the control unit 95 mainly functions as a request determination unit 95a, a suppression request calculation unit 95b, and a transmission instruction unit 95c by reading and executing the program stored in the storage unit 94. To do. (2-1-5-1) Request Determination Unit The request determination unit 95a predicts the supply amount and the demand amount for the energy of the entire energy management system 200. When the request determination unit 95a monitors the supply amount and the trend of the demand amount and determines that the demand amount may exceed the supply amount after a predetermined time, the request determination unit 95a suppresses energy to the demand control device 10. Decide to request.
- the suppression request calculation unit 95b is a demand for which the demand control device 10 performs demand control based on the maximum consumption energy amount and the maximum suppression energy amount stored in the storage unit 94. The length of the control period and information on the amount of energy to be suppressed are calculated.
- the transmission instructing unit 95c displays the length of the demand control period determined by the suppression request calculating unit 95b and information on the amount of energy to be suppressed along with the demand adjustment request for energy.
- the communication unit 91 is instructed to transmit to the control device 10.
- FIG. 3 is a schematic configuration diagram of the demand control device 10.
- the demand control apparatus 10 installed in the building 2 will be described with reference to FIG.
- the demand control device 10 mainly includes a receiving unit 11, a storage unit 12, and a control unit 13.
- the receiving unit 11 is an interface that enables the demand control apparatus 10 to be connected to the communication network 80. Further, the receiving unit 11 receives a demand signal for requesting the start of demand control from the energy management device 90. The receiving unit 11 receives, from the energy management device 90, the length of the demand control period and information regarding the amount of energy to be suppressed in the demand control. The receiving unit 11 stores the length of the demand control period and information regarding the amount of energy to be suppressed in the demand control in the storage unit 12. (2-2-2) Storage Unit
- the storage unit 12 includes a hard disk or the like, and includes a load performance coefficient storage unit 12a and a rated capacity storage unit 12b.
- the storage unit 12 stores a suppression energy amount value calculated by a suppression energy amount value calculation unit 13a described later.
- the storage unit 12 stores, in the storage unit 12, the length of the demand control period received by the reception unit 11 and information on the amount of energy to be suppressed in the demand control.
- the load performance coefficient storage unit 12a corresponds to the load of each heat source unit 50a, 50b, 50c and the load, for example, as shown in FIG.
- a load performance coefficient table associated with the performance coefficient is stored.
- the load performance coefficient table is a table in which the load of the heat source device is associated with the coefficient of performance when the heat source device is operated with the load.
- the load of the heat source machine is the number of steps of the compressor when the heat source machine has an inverter type compressor.
- the load of the heat source unit and the coefficient of performance at the load are associated with each number of the heat source unit.
- the rated capacity storage unit 12b includes the rated capacity of each of the heat source devices 50a, 50b, 50c and the heat source devices 50a, 50b. , 50c are stored.
- the control unit 13 includes a CPU, a ROM, a RAM, and the like.
- the control unit 13 mainly functions as a suppression energy amount value calculation unit 13a, a heat source output determination unit 13b, and an operation unit 13c by reading and executing the program stored in the storage unit 12 described above.
- the control part 13 receives the request
- the control unit 13 stores information on the collected energy in the storage unit 12.
- the suppression energy amount value calculation unit 13a receives information on energy consumed by all the heat source devices 50a, 50b, and 50c before starting demand control, and receives The energy which suppresses based on the information regarding the energy amount which the part 11 memorize
- the suppression energy amount value calculation unit 13a calculates a suppression energy amount value for a period from the start to the end of demand control.
- the suppression energy amount value is calculated from the length of the demand control period stored in the storage unit 12 and the above-described suppression energy.
- the suppression energy amount value calculation unit 13a stores the suppression energy amount value in the storage unit 12.
- the heat source output determining unit 13b is configured for each of the plurality of heat source units 50a, 50b, and 50c based on the suppression energy amount value calculated by the suppression energy amount value calculation unit 13a. Determine the output individually. Details of the determination method will be described later.
- (2-2-3-3) Operation Unit The operation unit 13c supplies the heat source devices 50a, 50b, and 50c to the outputs of the heat source devices 50a, 50b, and 50c determined by the heat source output determination unit 13b. Send a command.
- the operation unit 13c communicates with the heat source devices 50a, 50b, and 50c to control the heat source devices 50a, 50b, and 50c.
- the “output” is the amount of heat actually output by the heat source device.
- Coefficient of performance refers to Coefficient of Performance (COP) and represents the cooling capacity (kW) per 1 kW of power consumption.
- COP Coefficient of Performance
- kW cooling capacity
- Energy refers to electric power expressed in watts (W) when the energy is electricity.
- Energy amount refers to the amount of power expressed in watt hours (Wh) when the energy is electricity.
- step S ⁇ b> 101 it is determined whether the receiving unit 11 has received a demand control request from the energy management apparatus 90.
- the storage unit 12 stores the length of the demand control period from the energy management device 90 and information on the amount of energy to be suppressed in the demand control.
- the process proceeds to step S102.
- step S102 after receiving a demand control request signal, the control unit 13 collects energy consumed by all the heat source devices 50a, 50b, and 50c before the start of demand control, and stores them in the storage unit 12.
- the suppression energy amount value calculation unit 13a calculates a suppression energy amount value.
- the suppression energy amount value is calculated based on the information on the energy consumed by the heat source devices 50a, 50b, and 50c, the information on the energy amount to be suppressed, and the length of the demand control period, which are stored in the storage unit 12. Is done.
- the suppression energy amount value calculation unit 13a stores the calculated suppression energy amount value in the storage unit 12.
- the control part 13 calculates
- the operation unit 13c grasps the load values of the heat source units 50a, 50b, and 50c.
- the control part 13 grasps
- the control part 13 grasps
- the control part 13 calculates the power consumption of each heat-source equipment 50a, 50b, 50c using the following formula 1.
- Power consumption Rated capacity / Coefficient of performance (Equation 1)
- the power consumption before the start of demand control of each of the heat source devices 50a, 50b, 50c is stored in the storage unit 12.
- the heat source output determination unit 13b arranges the heat source devices 50a, 50b, and 50c in descending order of power consumption based on the power consumption of each heat source device obtained in step S104.
- the heat source output determination unit 13b causes the heat source units 50a, 50b, and 50c to have the same reduced energy amount and the suppression energy amount value described in the storage unit 12, respectively.
- 50c is determined.
- the heat source devices 50a, 50b, and 50c are arranged in descending order of power consumption in step S106.
- the heat source output determination unit 13b assigns the amount of energy to be suppressed in descending order of power consumption.
- the heat source output determination unit 13b assigns an energy amount to be suppressed in a range where the coefficient of performance of each of the heat source devices 50a, 50b, and 50c is good based on the load performance coefficient table stored in the load performance coefficient storage unit 12a.
- the heat source output determination part 13b determines the load of heat source machine 50a, 50b, 50c from the allocated energy amount. If the heat source output determination unit 13b determines that the suppression energy amount value cannot be achieved when all of the heat source units 50a, 50b, and 50c are operating, the operation of any of the heat source units 50a, 50b, and 50c is stopped. Reduce the energy consumption of all stopped heat source units.
- step S107 the operation unit 13c operates each heat source unit 50a, 50b, 50c so as to be a load of each heat source unit 50a, 50b, 50c determined by the heat source output determination unit 13b in step S106.
- the demand control device 10 calculates a suppression energy amount value after receiving a demand signal, and based on the suppression energy amount value, a plurality of heat source devices 50a, 50b, In 50c, only the heat source machine that needs to be controlled is directly controlled. Therefore, after receiving a demand signal, the amount of energy to be suppressed can be realized with good responsiveness. In actual demand control, suppression of energy consumption requires urgency.
- the demand control apparatus 10 can switch energy consumption by demand control with high responsiveness. Moreover, after ending demand control, it can return to the energy consumption before the demand control start with sufficient responsiveness. Therefore, it is possible to reduce the loss of user comfort.
- each heat source machine 50a, 50b, 50c can be operated with a load having a high coefficient of performance. Furthermore, the output of each heat source machine 50a, 50b, 50c can be controlled so that the operation efficiency of the whole heat source machine 50a, 50b, 50c approaches the maximum.
- the heat source units are based on the rated capabilities of the respective heat source units 50a, 50b, 50c.
- the number of heat source devices to be operated is increased or decreased so that the overall operation efficiency of 50a, 50b, and 50c approaches the maximum.
- the loads of the heat source units 50a, 50b, and 50c are controlled.
- the power consumption is calculated from the rated capacity of each heat source machine 50a, 50b, 50c and the coefficient of performance due to the load during operation. Therefore, the amount of energy to be suppressed at the time of demand control can be allocated quickly and reliably from the heat source device with large power consumption.
- the heat source output determination unit 13b assigns a suppression energy amount value to each of the heat source units 50a, 50b, and 50c. And the heat source output determination part 13b determines the load of each heat source machine 50a, 50b, 50c.
- the storage unit of the demand control device may further include a heat source unit output storage unit.
- the heat source unit output storage unit may store a table of outputs of the heat source units corresponding to the total amount of energy consumption of the heat source system.
- FIG. 7 shows a case where the heat source system has three heat source units.
- each heat source unit 7 shows the total amount of energy consumed by the three heat source units of the heat source system in the leftmost vertical column.
- the load of each heat source unit is shown together with the heat source unit number of each heat source unit.
- the total load of each heat source unit is a value that realizes the total amount of energy consumption in the left column.
- the output value of each heat source machine is such that the coefficient of performance of the entire heat source system is close to the maximum.
- the suppression energy amount calculation unit calculates the suppression energy amount value.
- the control unit calculates the total amount of energy consumed by all the heat source devices before demand control, and stores it in the storage unit.
- the heat source output determination unit calculates the upper limit value of the total amount of energy consumed in demand control by subtracting the suppression energy amount value from the total energy amount value.
- the heat source output determining unit searches for a column in which the upper limit value of the calculated total amount of consumed energy is close to the total amount of consumed energy at the left end in FIG.
- the heat source output determination unit determines the load values of the three heat source devices in the column next to the total amount of consumed energy found as the loads of the respective heat source devices in the demand control.
- an operation part operates three heat source machines with the load used as the output which the heat source output determination part determined.
- the table of FIG. The load of each heat source machine can be determined easily and quickly. Furthermore, the determined loads of the three heat source machines can bring the coefficient of performance of the entire heat source system close to the maximum.
- the number of heat source units is three, but the number of heat source units is not limited to three.
- the unit price of energy to be consumed is controlled to be constant. However, as shown in FIG. 8, the unit price of energy may change depending on the time zone.
- the demand control device of Modification B performs control for suppressing the amount of energy used with high responsiveness.
- the demand control apparatus 10 of this modification B performs control, such as precooling and preheating, with good responsiveness when the unit price of energy is low.
- the demand control device of Modification B can control the heat source system with high responsiveness to fluctuations in the unit price of energy consumption. Therefore, the energy consumption can be controlled with high driving efficiency without impairing the user's convenience and comfort.
- the present invention can be applied to a demand control device that suppresses the amount of energy by transmitting predetermined information from an energy management device to a system having a plurality of equipment having different capacities and / or output characteristics.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Power Engineering (AREA)
- Signal Processing (AREA)
- Physics & Mathematics (AREA)
- Fuzzy Systems (AREA)
- Mathematical Physics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Computer Networks & Wireless Communication (AREA)
- Air Conditioning Control Device (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
容量および出力特性が異なる複数の熱源機を有する熱源システムにおいても応答性を向上させるデマンド制御装置を提供する。容量および/または出力特性が異なる複数の熱源機(50a,50b,50c)を有する熱源システム(100)に対して、前記熱源機の消費エネルギーを抑制するデマンド制御を行うデマンド制御装置(10)であって、前記デマンド制御の開始を要求するデマンド信号を受信する受信部(11)と、前記デマンド制御時の抑制するエネルギー量に関する値である抑制エネルギー量値を算出する抑制エネルギー量値算出部(13a)と、前記抑制エネルギー量値に基づき、前記複数の熱源機それぞれに対して、個別に出力を決定する熱源出力決定部(13b)と、前記複数の熱源機それぞれを前記出力で運転させる運転部(13c)と、を備える。
Description
本発明は、デマンド制御装置に関する。
従来より、複数の熱源機を有する熱源システムに対して、消費エネルギーを一定期間抑制するデマンド制御が行われている。このデマンド制御を行うデマンド制御装置としては、例えば、特許文献1(特開2007-212038)に示される装置が知られている。特許文献1の熱源システムは、消費エネルギーを制御できる熱源機と、消費エネルギーを制御できない熱源機とを含む。消費エネルギーを制御できる複数の熱源機は、それぞれの容量と負荷特性とが同じである。特許文献1に係るデマンド制御装置では、要求される消費エネルギーとなるように、消費エネルギーを制御できる複数の熱源機全てに対して、一定の割合で一斉に消費エネルギーを抑制する方法が採られている。
ここで、熱源システムには容量および/または出力特性が異なる複数の熱源機を含むものも存在する。容量および/または出力特性が異なる複数の熱源機は、デマンド制御を開始してから目標の消費エネルギーとなるまでの応答性が熱源機ごとに異なる場合がある。その結果、デマンド制御に対する熱源システム全体の応答性も低下する。
本発明は上述した点に鑑みてなされたものであり、本発明の課題は、容量および/または出力特性が異なる複数の熱源機を有する熱源システムにおいても応答性を向上させるデマンド制御装置を提供することにある。
本発明は上述した点に鑑みてなされたものであり、本発明の課題は、容量および/または出力特性が異なる複数の熱源機を有する熱源システムにおいても応答性を向上させるデマンド制御装置を提供することにある。
第1観点に係るデマンド制御装置は、容量および/または出力特性が異なる複数の熱源機を有する熱源システムに対して、熱源機の消費エネルギーを抑制するデマンド制御を行うデマンド制御装置であって、受信部と、抑制エネルギー量値算出部と、熱源出力決定部と、運転部と、を備える。受信部は、デマンド制御の開始を要求するデマンド信号を受信する。抑制エネルギー量値算出部は、デマンド制御時の抑制するエネルギー量に関する値である抑制エネルギー量値を算出する。熱源出力決定部は、抑制エネルギー量値に基づき、複数の熱源機それぞれに対して、個別に出力を決定する。運転部は、複数の熱源機それぞれを、熱源出力決定部が決定した個別の出力で運転させる。
このデマンド制御装置では、デマンド信号を受信した後、抑制エネルギー量値を算出し、その抑制エネルギー量値に基づき、容量および/または出力特性が異なる複数の熱源機の中で、制御を必要とする熱源機のみを、デマンド制御装置が直接制御する。従って、デマンド制御装置は、デマンド信号を受信した後の、応答性を向上させることができる。
このデマンド制御装置では、デマンド信号を受信した後、抑制エネルギー量値を算出し、その抑制エネルギー量値に基づき、容量および/または出力特性が異なる複数の熱源機の中で、制御を必要とする熱源機のみを、デマンド制御装置が直接制御する。従って、デマンド制御装置は、デマンド信号を受信した後の、応答性を向上させることができる。
第2観点に係るデマンド制御装置は、第1観点に係るデマンド制御装置であって、負荷成績係数記憶部をさらに備える。負荷成績係数記憶部は、複数の熱源機それぞれの負荷と複数の熱源機それぞれの成績係数とを対応づける情報である負荷成績係数情報を記憶する。熱源出力決定部は、負荷成績係数情報に基づいて、複数の熱源機それぞれに対して、個別に出力を決定する。
このデマンド制御装置では、容量および/または出力特性が異なる複数の熱源機を有する熱源システムのデマンド制御において、要求された抑制エネルギー量値を実現するため、負荷成績係数情報に基づいて、それぞれの熱源機ごとに良い成績係数の負荷となるように消費エネルギーを抑制する。よって、熱源機全体の消費エネルギーに対する熱源機全体の運転効率が最大に近づくように、それぞれの熱源機の出力を制御することができる。
このデマンド制御装置では、容量および/または出力特性が異なる複数の熱源機を有する熱源システムのデマンド制御において、要求された抑制エネルギー量値を実現するため、負荷成績係数情報に基づいて、それぞれの熱源機ごとに良い成績係数の負荷となるように消費エネルギーを抑制する。よって、熱源機全体の消費エネルギーに対する熱源機全体の運転効率が最大に近づくように、それぞれの熱源機の出力を制御することができる。
なお、「負荷」とは、熱源機が実際に消費するエネルギーに相当する。インバーター方式の熱源機の場合、圧縮機のステップ数などで、その熱源機が最大消費するエネルギーから実際に消費するエネルギーの割合が示される。「出力」とは熱源機が実際に出力する熱量である。「成績係数」とは、Coefficient of Performance(COP)のことであり、消費電力1kW当たりの冷房能力(kW)を表したものである。「エネルギー」とは、エネルギーが電気の場合、ワット(W)で表される電力のことである。「エネルギー量」とはエネルギーが電気の場合、ワット時(Wh)で表される電力量のことである。
第3観点に係るデマンド制御装置は、第2観点に係るデマンド制御装置であって、定格能力記憶部をさらに備える。定格能力記憶部は、複数の熱源機それぞれの定格能力の情報である定格能力情報を記憶する。熱源出力決定部は、負荷成績係数情報に基づいて、複数の熱源機それぞれに対して、個別に出力を決定する。
このデマンド制御装置では、容量および/または出力特性が異なる複数の熱源機を有する熱源システムのデマンド制御において、それぞれの熱源機の定格能力情報と負荷成績係数情報とに基づいて、運転する熱源機の数を増減し、熱源機の個別の出力を決定する。よって、熱源機全体の運転効率を最大に近づけることができる。
第4観点に係るデマンド制御装置は、第1観点に係るデマンド制御装置であって、熱源機出力記憶部をさらに備える。熱源機出力記憶部は、全ての熱源機の消費エネルギーの総量と複数の熱源機それぞれの出力とを対応づける情報である熱源機出力情報を記憶する。熱源出力決定部は、抑制エネルギー量値に基づき、全ての熱源機の消費エネルギーの総量の上限値を算出する。熱源出力決定部は、消費エネルギーの総量の上限値と熱源機出力情報に基づいて、複数の熱源機それぞれに対して、個別に出力を決定する。
このデマンド制御装置では、容量および/または出力特性が異なる複数の熱源機を有する熱源システムのデマンド制御において、熱源出力決定部は、熱源システム全体の消費エネルギーの総量を、抑制エネルギー量値に基づいて求める。次に、熱源出力決定部は、それぞれの熱源機の負荷を決める。熱源機の負荷は、熱源システム全体の消費エネルギーの総量より、熱源機出力記憶部に記憶されている熱源機出力情報に基づいて決められる。熱源機出力情報には、熱源システム全体の消費エネルギーの複数の総量の情報がある。熱源システム全体の消費エネルギーの総量の情報は、熱源機それぞれの成績係数の良い負荷の情報を有する。よって、熱源出力決定部は、成績係数が良い、それぞれの熱源機の負荷を迅速に決めることができる。さらに、運転部は、決められたそれぞれの熱源機の負荷により、それぞれの熱源機の出力を迅速に制御することができる。
第5観点に係るデマンド制御装置は、第1観点から第4観点のいずれかに係るデマンド制御装置であって、運転部は、抑制エネルギー量値に基づいて、複数の熱源機のいずれかを停止させる制御を行う。
このデマンド制御装置では、容量および/または出力特性が異なる複数の熱源機を有する熱源システムのデマンド制御において、柔軟性をもって、熱源システム全体の消費エネルギーの制御をすることができる。
このデマンド制御装置では、容量および/または出力特性が異なる複数の熱源機を有する熱源システムのデマンド制御において、柔軟性をもって、熱源システム全体の消費エネルギーの制御をすることができる。
第1観点に係るデマンド制御装置では、デマンド信号を受信した後、応答性良く、抑制するエネルギー量を実現することができる。
第2観点に係るデマンド制御装置では、要求された抑制エネルギー量値を実現するとともに、熱源機全体の運転効率が最大に近づくように、それぞれの熱源機の出力を制御することができる。
第3観点に係るデマンド制御装置では、熱源機全体の運転効率が最大に近づくように、熱源機の増段と減段、および、それぞれの熱源機の出力を制御することができる。
第4観点に係るデマンド制御装置では、熱源システム全体の消費エネルギーに対する運転効率が最大に近づくように、それぞれの熱源機の出力を迅速に決め、制御することができる。
第2観点に係るデマンド制御装置では、要求された抑制エネルギー量値を実現するとともに、熱源機全体の運転効率が最大に近づくように、それぞれの熱源機の出力を制御することができる。
第3観点に係るデマンド制御装置では、熱源機全体の運転効率が最大に近づくように、熱源機の増段と減段、および、それぞれの熱源機の出力を制御することができる。
第4観点に係るデマンド制御装置では、熱源システム全体の消費エネルギーに対する運転効率が最大に近づくように、それぞれの熱源機の出力を迅速に決め、制御することができる。
第5観点に係るデマンド制御装置では、柔軟性をもって、熱源システム全体の消費エネルギーの制御をすることができる。
以下、図面を参照しながら、本発明の実施形態に係るエネルギー管理システム200について説明する。
(1)エネルギー管理システム200の全体の概略構成
図1に、本実施形態に係るエネルギー管理システム200を示す。エネルギー管理システム200は、電力会社1から建物2に供給される電力を管理するシステムである。建物2は、オフィスビル、テナントビル、工場、および一般家庭などである。
電力会社1は、エネルギー管理装置90を有する。建物2は、デマンド制御装置10と、熱源システム100とを有する。熱源システム100は、図1に示すように、熱源機50a,50b,50cと、空調機32a,32b,32cと、1次ポンプ41a,41b,41cと、第1ヘッダ20と、第2ヘッダ21と、上流側配管60と、下流側配管61と、を有する。複数の熱源機50a,50b,50cは、それぞれの容量および/または出力特性が異なっていてもよい。熱源機50a,50b,50cは、例えば、空冷インバータチラー、空冷スクリューチラーである。
(1)エネルギー管理システム200の全体の概略構成
図1に、本実施形態に係るエネルギー管理システム200を示す。エネルギー管理システム200は、電力会社1から建物2に供給される電力を管理するシステムである。建物2は、オフィスビル、テナントビル、工場、および一般家庭などである。
電力会社1は、エネルギー管理装置90を有する。建物2は、デマンド制御装置10と、熱源システム100とを有する。熱源システム100は、図1に示すように、熱源機50a,50b,50cと、空調機32a,32b,32cと、1次ポンプ41a,41b,41cと、第1ヘッダ20と、第2ヘッダ21と、上流側配管60と、下流側配管61と、を有する。複数の熱源機50a,50b,50cは、それぞれの容量および/または出力特性が異なっていてもよい。熱源機50a,50b,50cは、例えば、空冷インバータチラー、空冷スクリューチラーである。
熱源システム100では、1次ポンプ41a,41b,41cにより冷水または温水である水が、熱源機50a,50b,50cへ送られる。熱源機50a,50b,50cから送り出される水は、第1ヘッダ20に集合する。第1ヘッダ20に集合した水は、上流側配管60を通って、空調機32a,32b,32cに送られる。水は、空調機32a,32b,32cから下流側配管61を通って、第2ヘッダ21に集合する。第2ヘッダ21に集合した水は、1次ポンプ41a,41b,41cにより、熱源機50a,50b,50cに戻る。水は、空調機32a,32b,32cにより、室内空気と熱交換される。なお、図1では、建物2が有する熱源機および空調機を3つ記載しているが、熱源機および空調機の数は、3つに限定されるものではない。
ここで、第1ヘッダ20は、各熱源機50a,50b,50cからの水が集合し、その後、水を空調機32a,32b,32cへ送るヘッダをいう。また、第2ヘッダ21は、空調機32a,32b,32cから戻ってきた水が集合し、その後、水を1次ポンプ41a,41b,41cに送るヘッダをいう。
ここで、第1ヘッダ20は、各熱源機50a,50b,50cからの水が集合し、その後、水を空調機32a,32b,32cへ送るヘッダをいう。また、第2ヘッダ21は、空調機32a,32b,32cから戻ってきた水が集合し、その後、水を1次ポンプ41a,41b,41cに送るヘッダをいう。
デマンド制御装置10は、エネルギー管理装置90からデマンド制御の開始を要求するデマンド信号を受信する。デマンド制御装置10は、それぞれの熱源機50a,50b,50cの消費エネルギーを制御する。
エネルギー管理装置90とデマンド制御装置10とは、インターネット等の通信ネットワーク80を介して接続されている。また、デマンド制御装置10は、熱源機50a,50b,50cとLAN等の通信ネットワーク81とを介して接続されている。デマンド制御装置10は、通信ネットワーク81を介して熱源機50a,50b,50cに対して命令を送信することにより、熱源機50a,50b,50cの消費エネルギーを制御することができる。
エネルギー管理装置90は、1つ以上のコンピュータから構成される装置である。エネルギー管理装置90は、1つまたは複数の建物におけるエネルギーを管理する。エネルギー管理装置90とデマンド制御装置10との間では、エネルギー需要に関する各種の情報の送受信が行われる。
エネルギー管理装置90とデマンド制御装置10とは、インターネット等の通信ネットワーク80を介して接続されている。また、デマンド制御装置10は、熱源機50a,50b,50cとLAN等の通信ネットワーク81とを介して接続されている。デマンド制御装置10は、通信ネットワーク81を介して熱源機50a,50b,50cに対して命令を送信することにより、熱源機50a,50b,50cの消費エネルギーを制御することができる。
エネルギー管理装置90は、1つ以上のコンピュータから構成される装置である。エネルギー管理装置90は、1つまたは複数の建物におけるエネルギーを管理する。エネルギー管理装置90とデマンド制御装置10との間では、エネルギー需要に関する各種の情報の送受信が行われる。
電力会社1は、デマンド制御期間における消費エネルギーの抑制要求を、エネルギー管理装置90から建物2にあるデマンド制御装置10に通信ネットワーク80を介して送信する。
デマンド制御装置10は、エネルギー管理装置90から送られた抑制要求を受信する。デマンド制御装置10は、受信した抑制要求に基づき、それぞれの熱源機50a,50b,50cのデマンド制御を行う。
(2)各装置の構成
以下、エネルギー管理システム200に含まれる、エネルギー管理装置90およびデマンド制御装置10について説明する。
(2-1)エネルギー管理装置の構成
図2にエネルギー管理装置90の概略構成図を示す。エネルギー管理装置90は、通信部91、出力部92、入力部93、記憶部94および制御部95を備える。
デマンド制御装置10は、エネルギー管理装置90から送られた抑制要求を受信する。デマンド制御装置10は、受信した抑制要求に基づき、それぞれの熱源機50a,50b,50cのデマンド制御を行う。
(2)各装置の構成
以下、エネルギー管理システム200に含まれる、エネルギー管理装置90およびデマンド制御装置10について説明する。
(2-1)エネルギー管理装置の構成
図2にエネルギー管理装置90の概略構成図を示す。エネルギー管理装置90は、通信部91、出力部92、入力部93、記憶部94および制御部95を備える。
(2-1-1)通信部
通信部91は、エネルギー管理装置90を通信ネットワーク80に接続を可能にするネットワークインターフェースである。
(2-1-2)出力部
出力部92は、主としてディスプレイから構成される。出力部92には、後述する記憶部94に記憶される各種情報を示す管理画面が表示される。
(2-1-3)入力部
入力部93は、主として操作ボタン、キーボード、およびマウス等から構成される。
(2-1-4)記憶部
記憶部94は、主としてハードディスクから構成される。デマンド制御装置10へ送信する建物2の最大消費エネルギー量または最大抑制エネルギー量などが記憶されている。ここで、最大消費エネルギーとは、建物2のそれぞれの熱源機50a,50b,50cが最大の消費エネルギーとなるように運転した場合の消費エネルギーの総量である。また、最大抑制エネルギー量とは、建物2のそれぞれの熱源機50a,50b,50cが抑制できるエネルギーの総量である。
通信部91は、エネルギー管理装置90を通信ネットワーク80に接続を可能にするネットワークインターフェースである。
(2-1-2)出力部
出力部92は、主としてディスプレイから構成される。出力部92には、後述する記憶部94に記憶される各種情報を示す管理画面が表示される。
(2-1-3)入力部
入力部93は、主として操作ボタン、キーボード、およびマウス等から構成される。
(2-1-4)記憶部
記憶部94は、主としてハードディスクから構成される。デマンド制御装置10へ送信する建物2の最大消費エネルギー量または最大抑制エネルギー量などが記憶されている。ここで、最大消費エネルギーとは、建物2のそれぞれの熱源機50a,50b,50cが最大の消費エネルギーとなるように運転した場合の消費エネルギーの総量である。また、最大抑制エネルギー量とは、建物2のそれぞれの熱源機50a,50b,50cが抑制できるエネルギーの総量である。
(2-1-5)制御部
制御部95は、主としてCPU、ROMおよびRAMから構成されている。制御部95は、上述の記憶部94に記憶されているプログラムを読み出して実行することにより、図2に示すように、主として、要求決定部95a、抑制要求算出部95b、送信指示部95cとして機能する。
(2-1-5-1)要求決定部
要求決定部95aは、エネルギー管理システム200全体のエネルギーについて、供給量および需要量との予測を行う。要求決定部95aは、供給量と需要量のトレンドとを監視して、所定時間後に需要量が供給量を上回る可能性があると判断した場合には、デマンド制御装置10に対してエネルギーの抑制を要求することを決定する。
制御部95は、主としてCPU、ROMおよびRAMから構成されている。制御部95は、上述の記憶部94に記憶されているプログラムを読み出して実行することにより、図2に示すように、主として、要求決定部95a、抑制要求算出部95b、送信指示部95cとして機能する。
(2-1-5-1)要求決定部
要求決定部95aは、エネルギー管理システム200全体のエネルギーについて、供給量および需要量との予測を行う。要求決定部95aは、供給量と需要量のトレンドとを監視して、所定時間後に需要量が供給量を上回る可能性があると判断した場合には、デマンド制御装置10に対してエネルギーの抑制を要求することを決定する。
(2-1-5-2)抑制要求算出部
抑制要求算出部95bは、記憶部94に記憶された最大消費エネルギー量および最大抑制エネルギー量に基づいて、デマンド制御装置10がデマンド制御を行うデマンド制御期間の長さと、抑制するエネルギー量に関する情報と、を算出する。
(2-1-5-3)送信指示部
送信指示部95cは、抑制要求算出部95bで決定されたデマンド制御期間の長さと、抑制するエネルギー量に関する情報と、をエネルギーの需要調整要求と共にデマンド制御装置10に送信することを通信部91に指示する。
(2-2)デマンド制御装置の構成
図3は、デマンド制御装置10の概略構成図である。以下、図3を用いて、建物2に設置されるデマンド制御装置10について説明する。デマンド制御装置10は、主として、受信部11と、記憶部12と、制御部13と、を有する。
抑制要求算出部95bは、記憶部94に記憶された最大消費エネルギー量および最大抑制エネルギー量に基づいて、デマンド制御装置10がデマンド制御を行うデマンド制御期間の長さと、抑制するエネルギー量に関する情報と、を算出する。
(2-1-5-3)送信指示部
送信指示部95cは、抑制要求算出部95bで決定されたデマンド制御期間の長さと、抑制するエネルギー量に関する情報と、をエネルギーの需要調整要求と共にデマンド制御装置10に送信することを通信部91に指示する。
(2-2)デマンド制御装置の構成
図3は、デマンド制御装置10の概略構成図である。以下、図3を用いて、建物2に設置されるデマンド制御装置10について説明する。デマンド制御装置10は、主として、受信部11と、記憶部12と、制御部13と、を有する。
(2-2-1)受信部
受信部11は、デマンド制御装置10を通信ネットワーク80に接続可能にするインターフェースである。また、受信部11は、エネルギー管理装置90からのデマンド制御の開始を要求するデマンド信号を受信する。受信部11は、エネルギー管理装置90から、デマンド制御期間の長さと、デマンド制御において抑制するエネルギー量に関する情報と、を受信する。受信部11は、デマンド制御期間の長さと、デマンド制御において抑制するエネルギー量に関する情報と、を記憶部12に記憶する。
(2-2-2)記憶部
記憶部12は、ハードディスク等から構成され、負荷成績係数記憶部12aと、定格能力記憶部12bと、を有する。また、記憶部12は、後述の抑制エネルギー量値算出部13aが算出する抑制エネルギー量値を記憶する。記憶部12は、受信部11が受信したデマンド制御期間の長さと、デマンド制御において抑制するエネルギー量に関する情報と、を記憶部12に記憶する。
受信部11は、デマンド制御装置10を通信ネットワーク80に接続可能にするインターフェースである。また、受信部11は、エネルギー管理装置90からのデマンド制御の開始を要求するデマンド信号を受信する。受信部11は、エネルギー管理装置90から、デマンド制御期間の長さと、デマンド制御において抑制するエネルギー量に関する情報と、を受信する。受信部11は、デマンド制御期間の長さと、デマンド制御において抑制するエネルギー量に関する情報と、を記憶部12に記憶する。
(2-2-2)記憶部
記憶部12は、ハードディスク等から構成され、負荷成績係数記憶部12aと、定格能力記憶部12bと、を有する。また、記憶部12は、後述の抑制エネルギー量値算出部13aが算出する抑制エネルギー量値を記憶する。記憶部12は、受信部11が受信したデマンド制御期間の長さと、デマンド制御において抑制するエネルギー量に関する情報と、を記憶部12に記憶する。
(2-2-2-1)負荷成績係数記憶部
負荷成績係数記憶部12aは、例えば、図4に示されるように、それぞれの熱源機50a,50b,50cの負荷と、その負荷に対応した成績係数とを関連づけた負荷成績係数表を記憶する。負荷成績係数表とは、熱源機の負荷と、その負荷で熱源機を運転させた場合の成績係数とが関連づけられている表である。熱源機の負荷とは、熱源機がインバーター方式の圧縮機を有する場合は、圧縮機のステップ数となる。また、負荷成績係数表は、熱源機の番号ごとに、熱源機の負荷と、その負荷での成績係数とが関連づけられている。
(2-2-2-2)定格能力記憶部
定格能力記憶部12bは、例えば、図5に示されるように、それぞれの熱源機50a,50b,50cの定格能力と、各熱源機50a,50b,50cの番号を関連付けた定格能力表を記憶する。
負荷成績係数記憶部12aは、例えば、図4に示されるように、それぞれの熱源機50a,50b,50cの負荷と、その負荷に対応した成績係数とを関連づけた負荷成績係数表を記憶する。負荷成績係数表とは、熱源機の負荷と、その負荷で熱源機を運転させた場合の成績係数とが関連づけられている表である。熱源機の負荷とは、熱源機がインバーター方式の圧縮機を有する場合は、圧縮機のステップ数となる。また、負荷成績係数表は、熱源機の番号ごとに、熱源機の負荷と、その負荷での成績係数とが関連づけられている。
(2-2-2-2)定格能力記憶部
定格能力記憶部12bは、例えば、図5に示されるように、それぞれの熱源機50a,50b,50cの定格能力と、各熱源機50a,50b,50cの番号を関連付けた定格能力表を記憶する。
(2-2-3)制御部
制御部13は、CPU、ROM、RAM等から構成される。制御部13は、上述の記憶部12に記憶されているプログラムを読み出して実行することにより、主として、抑制エネルギー量値算出部13a、熱源出力決定部13b、および運転部13c、として機能する。
なお、制御部13は、エネルギー管理装置90からデマンド制御の要求を受信すると、デマンド制御を行う前に、全ての熱源機50a,50b,50cでそれぞれ消費されるエネルギーに関する情報を収集する。制御部13は、収集したエネルギーに関する情報を記憶部12に記憶させる。
(2-2-3-1)抑制エネルギー量値算出部
抑制エネルギー量値演算部13aは、デマンド制御を開始する前の全ての熱源機50a,50b,50cで消費されるエネルギーに関する情報と、受信部11が記憶部12に記憶した抑制するエネルギー量に関する情報とに基づき抑制するエネルギーを求める。抑制エネルギー量値算出部13aは、デマンド制御の開始から終了までの期間の抑制エネルギー量値を算出する。抑制エネルギー量値は、記憶部12に記憶されたデマンド制御期間の長さと、上述の抑制するエネルギーとより算出される。抑制エネルギー量値算出部13aは、抑制エネルギー量値を記憶部12に記憶する。
制御部13は、CPU、ROM、RAM等から構成される。制御部13は、上述の記憶部12に記憶されているプログラムを読み出して実行することにより、主として、抑制エネルギー量値算出部13a、熱源出力決定部13b、および運転部13c、として機能する。
なお、制御部13は、エネルギー管理装置90からデマンド制御の要求を受信すると、デマンド制御を行う前に、全ての熱源機50a,50b,50cでそれぞれ消費されるエネルギーに関する情報を収集する。制御部13は、収集したエネルギーに関する情報を記憶部12に記憶させる。
(2-2-3-1)抑制エネルギー量値算出部
抑制エネルギー量値演算部13aは、デマンド制御を開始する前の全ての熱源機50a,50b,50cで消費されるエネルギーに関する情報と、受信部11が記憶部12に記憶した抑制するエネルギー量に関する情報とに基づき抑制するエネルギーを求める。抑制エネルギー量値算出部13aは、デマンド制御の開始から終了までの期間の抑制エネルギー量値を算出する。抑制エネルギー量値は、記憶部12に記憶されたデマンド制御期間の長さと、上述の抑制するエネルギーとより算出される。抑制エネルギー量値算出部13aは、抑制エネルギー量値を記憶部12に記憶する。
(2-2-3-2)熱源出力決定部
熱源出力決定部13bは、抑制エネルギー量値算出部13aが算出した抑制エネルギー量値に基づき、複数の熱源機50a,50b,50cそれぞれに対して、個別に出力を決定する。決定する方法の詳細については後述する。
(2-2-3-3)運転部
運転部13cは、熱源出力決定部13bが決定したそれぞれの熱源機50a,50b,50cの出力となるように、それぞれの熱源機50a,50b,50cに指令を送る。運転部13cは、それぞれの熱源機50a,50b,50cと通信して、それぞれの熱源機50a,50b,50cを制御する。
なお、「出力」とは熱源機が実際に出力する熱量である。「成績係数」とは、Coefficient of Performance(COP)のことであり、消費電力1kW当たりの冷房能力(kW)を表したものである。「エネルギー」とは、エネルギーが電気の場合、ワット(W)で表される電力のことである。「エネルギー量」とはエネルギーが電気の場合、ワット時(Wh)で表される電力量のことである。
熱源出力決定部13bは、抑制エネルギー量値算出部13aが算出した抑制エネルギー量値に基づき、複数の熱源機50a,50b,50cそれぞれに対して、個別に出力を決定する。決定する方法の詳細については後述する。
(2-2-3-3)運転部
運転部13cは、熱源出力決定部13bが決定したそれぞれの熱源機50a,50b,50cの出力となるように、それぞれの熱源機50a,50b,50cに指令を送る。運転部13cは、それぞれの熱源機50a,50b,50cと通信して、それぞれの熱源機50a,50b,50cを制御する。
なお、「出力」とは熱源機が実際に出力する熱量である。「成績係数」とは、Coefficient of Performance(COP)のことであり、消費電力1kW当たりの冷房能力(kW)を表したものである。「エネルギー」とは、エネルギーが電気の場合、ワット(W)で表される電力のことである。「エネルギー量」とはエネルギーが電気の場合、ワット時(Wh)で表される電力量のことである。
(3)デマンド制御装置10で行われる制御処理について
以下、デマンド制御装置10における、デマンド制御の処理の流れを、図6を用いて説明する。
まず、ステップS101では、受信部11がエネルギー管理装置90からデマンド制御の要求を受信したか否かを判定する。受信部11がデマンド制御の要求を受信したと判定される場合は、エネルギー管理装置90からのデマンド制御期間の長さと、デマンド制御において抑制するエネルギー量に関する情報とを記憶部12に記憶する。そして、ステップS102へ移行する。一方、受信していないと判定される場合は、ステップS101に戻る。
ステップS102では、デマンド制御の要求信号を受け付けた後、制御部13が、デマンド制御開始前の全ての熱源機50a,50b,50cが、それぞれ消費するエネルギーを収集し、記憶部12に記憶させる。
以下、デマンド制御装置10における、デマンド制御の処理の流れを、図6を用いて説明する。
まず、ステップS101では、受信部11がエネルギー管理装置90からデマンド制御の要求を受信したか否かを判定する。受信部11がデマンド制御の要求を受信したと判定される場合は、エネルギー管理装置90からのデマンド制御期間の長さと、デマンド制御において抑制するエネルギー量に関する情報とを記憶部12に記憶する。そして、ステップS102へ移行する。一方、受信していないと判定される場合は、ステップS101に戻る。
ステップS102では、デマンド制御の要求信号を受け付けた後、制御部13が、デマンド制御開始前の全ての熱源機50a,50b,50cが、それぞれ消費するエネルギーを収集し、記憶部12に記憶させる。
ステップS103では、抑制エネルギー量値算出部13aが、抑制エネルギー量値を算出する。抑制エネルギー量値は、記憶部12に記憶された、熱源機50a,50b,50cが、それぞれ消費されるエネルギーに関する情報と、抑制するエネルギー量に関する情報と、デマンド制御期間の長さとに基づいて算出される。抑制エネルギー量値算出部13aは、算出した抑制エネルギー量値を記憶部12に記憶する。
ステップS104では、制御部13が、デマンド制御開始前のそれぞれの熱源機50a,50b,50cの消費電力を、後述の方法より求める。運転部13cは、それぞれの熱源機50a,50b,50cの負荷の値を把握している。よって、制御部13は、負荷成績係数記憶部12aに記憶された負荷成績係数表に基づいて、それぞれの熱源機50a,50b,50cの成績係数の値を把握する。制御部13は、定格能力記憶部12bに記憶された定格能力表により、それぞれの熱源機50a,50b,50cの定格能力を把握する。制御部13は、下記の式1を用いて、それぞれの熱源機50a,50b,50cの消費電力を算出する。
ステップS104では、制御部13が、デマンド制御開始前のそれぞれの熱源機50a,50b,50cの消費電力を、後述の方法より求める。運転部13cは、それぞれの熱源機50a,50b,50cの負荷の値を把握している。よって、制御部13は、負荷成績係数記憶部12aに記憶された負荷成績係数表に基づいて、それぞれの熱源機50a,50b,50cの成績係数の値を把握する。制御部13は、定格能力記憶部12bに記憶された定格能力表により、それぞれの熱源機50a,50b,50cの定格能力を把握する。制御部13は、下記の式1を用いて、それぞれの熱源機50a,50b,50cの消費電力を算出する。
消費電力=定格能力/成績係数 (式1)
それぞれの熱源機50a,50b,50cのデマンド制御開始前の消費電力は、記憶部12に記憶される。
ステップS105では、熱源出力決定部13bが、ステップS104で求めたそれぞれの熱源機の消費電力に基づいて、消費電力が大きい順に、それぞれの熱源機50a,50b,50cを並べる。
ステップS106では、熱源出力決定部13bが、熱源機50a,50b,50c全体の削減エネルギー量と、記憶部12に記載された抑制エネルギー量値と、が等しくなるようにそれぞれの熱源機50a,50b,50cの負荷を決める。熱源機50a,50b,50cは、ステップS106で、消費電力が大きい順に並んでいる。よって、熱源出力決定部13bは、消費電力が大きい順に、抑制するエネルギー量を割り当てる。熱源出力決定部13bは、負荷成績係数記憶部12aが記憶する負荷成績係数表に基づき、それぞれの熱源機50a,50b,50cの成績係数が良い範囲で抑制するエネルギー量を割り当てる。そして、熱源出力決定部13bは、割り当てたエネルギー量より、熱源機50a,50b,50cの負荷を決める。熱源出力決定部13bが、熱源機50a,50b,50c全てを運転していると、抑制エネルギー量値を実現できないと判断した場合は、熱源機50a,50b,50cのいずれかの運転を停止して、停止した熱源機全ての消費エネルギーを削減する。
それぞれの熱源機50a,50b,50cのデマンド制御開始前の消費電力は、記憶部12に記憶される。
ステップS105では、熱源出力決定部13bが、ステップS104で求めたそれぞれの熱源機の消費電力に基づいて、消費電力が大きい順に、それぞれの熱源機50a,50b,50cを並べる。
ステップS106では、熱源出力決定部13bが、熱源機50a,50b,50c全体の削減エネルギー量と、記憶部12に記載された抑制エネルギー量値と、が等しくなるようにそれぞれの熱源機50a,50b,50cの負荷を決める。熱源機50a,50b,50cは、ステップS106で、消費電力が大きい順に並んでいる。よって、熱源出力決定部13bは、消費電力が大きい順に、抑制するエネルギー量を割り当てる。熱源出力決定部13bは、負荷成績係数記憶部12aが記憶する負荷成績係数表に基づき、それぞれの熱源機50a,50b,50cの成績係数が良い範囲で抑制するエネルギー量を割り当てる。そして、熱源出力決定部13bは、割り当てたエネルギー量より、熱源機50a,50b,50cの負荷を決める。熱源出力決定部13bが、熱源機50a,50b,50c全てを運転していると、抑制エネルギー量値を実現できないと判断した場合は、熱源機50a,50b,50cのいずれかの運転を停止して、停止した熱源機全ての消費エネルギーを削減する。
ステップS107では、運転部13cが、ステップS106で熱源出力決定部13bが決定した、それぞれの熱源機50a,50b,50cの負荷となるように、それぞれの熱源機50a,50b,50cを運転する。
(4)特徴
(4-1)
本実施形態に係るデマンド制御装置10は、デマンド信号を受信した後、抑制エネルギー量値を算出し、その抑制エネルギー量値に基づき、容量および/または出力特性が異なる複数の熱源機50a,50b,50cの中で、制御を必要とする熱源機のみを、直接制御する。よって、デマンド信号を受信した後、抑制すべきエネルギー量を応答性良く実現することができる。実際のデマンド制御においては、消費エネルギーの抑制は、緊急性を要する。これに対し、本実施形態に係るデマンド制御装置10は、デマンド制御による消費エネルギーの切り替えを応答性良く行うことができる。また、デマンド制御を終了した後、応答性良くデマンド制御開始前の消費エネルギーに戻すことができる。よって、ユーザーの快適性を損なうことを少なくすることができる。
(4)特徴
(4-1)
本実施形態に係るデマンド制御装置10は、デマンド信号を受信した後、抑制エネルギー量値を算出し、その抑制エネルギー量値に基づき、容量および/または出力特性が異なる複数の熱源機50a,50b,50cの中で、制御を必要とする熱源機のみを、直接制御する。よって、デマンド信号を受信した後、抑制すべきエネルギー量を応答性良く実現することができる。実際のデマンド制御においては、消費エネルギーの抑制は、緊急性を要する。これに対し、本実施形態に係るデマンド制御装置10は、デマンド制御による消費エネルギーの切り替えを応答性良く行うことができる。また、デマンド制御を終了した後、応答性良くデマンド制御開始前の消費エネルギーに戻すことができる。よって、ユーザーの快適性を損なうことを少なくすることができる。
(4-2)
本実施形態では、容量および/または出力特性が異なる複数の熱源機50a,50b,50cを有する熱源システム100のデマンド制御において、要求された抑制エネルギー量値を実現するときにそれぞれの熱源機50a,50b,50cの成績係数に基づいて抑制するエネルギーを決定する。よって、それぞれの熱源機50a,50b,50cを成績係数が高い負荷で運転することができる。さらに、熱源機50a,50b,50c全体の運転効率が最大に近づくように、それぞれの熱源機50a,50b,50cの出力を制御することができる。
(4-3)
本実施形態では、容量および/または出力特性が異なる複数の熱源機50a,50b,50cを有する熱源システム100のデマンド制御において、それぞれの熱源機50a,50b,50cの定格能力に基づいて、熱源機50a,50b,50c全体の運転効率が最大に近づくように、運転する熱源機の数を増減する。また、それぞれ熱源機50a,50b,50cの負荷を制御する。さらに、それぞれの熱源機50a,50b,50cの定格能力と、運転時の負荷による成績係数とから、消費電力を算出する。よって、消費電力が大きい熱源機から、迅速且つ確実にデマンド制御時に抑制するエネルギー量を割り当てることができる。
本実施形態では、容量および/または出力特性が異なる複数の熱源機50a,50b,50cを有する熱源システム100のデマンド制御において、要求された抑制エネルギー量値を実現するときにそれぞれの熱源機50a,50b,50cの成績係数に基づいて抑制するエネルギーを決定する。よって、それぞれの熱源機50a,50b,50cを成績係数が高い負荷で運転することができる。さらに、熱源機50a,50b,50c全体の運転効率が最大に近づくように、それぞれの熱源機50a,50b,50cの出力を制御することができる。
(4-3)
本実施形態では、容量および/または出力特性が異なる複数の熱源機50a,50b,50cを有する熱源システム100のデマンド制御において、それぞれの熱源機50a,50b,50cの定格能力に基づいて、熱源機50a,50b,50c全体の運転効率が最大に近づくように、運転する熱源機の数を増減する。また、それぞれ熱源機50a,50b,50cの負荷を制御する。さらに、それぞれの熱源機50a,50b,50cの定格能力と、運転時の負荷による成績係数とから、消費電力を算出する。よって、消費電力が大きい熱源機から、迅速且つ確実にデマンド制御時に抑制するエネルギー量を割り当てることができる。
(4-4)
本実施形態では、容量および/または出力特性が異なる複数の熱源機50a,50b,50cを有する熱源システムのデマンド制御において、運転する熱源機50a,50b,50cの数を調整して抑制エネルギー量値を実現する。具体的には、複数の熱源機50a,50b,50cのうちいずれかの熱源機を停止して、抑制エネルギー量値を実現する。よって、柔軟性をもって、熱源システム全体の消費エネルギーの制御をすることができる。
(5)変形例
以上、本発明の実施形態について図面に基づいて説明したが、具体的な構成は、上記の実施形態に限られるものではなく、発明の要旨を逸脱しない範囲で変更可能である。以下に本実施形態の変形例を示す。なお複数の変形例は適宜組み合されてもよい。
本実施形態では、容量および/または出力特性が異なる複数の熱源機50a,50b,50cを有する熱源システムのデマンド制御において、運転する熱源機50a,50b,50cの数を調整して抑制エネルギー量値を実現する。具体的には、複数の熱源機50a,50b,50cのうちいずれかの熱源機を停止して、抑制エネルギー量値を実現する。よって、柔軟性をもって、熱源システム全体の消費エネルギーの制御をすることができる。
(5)変形例
以上、本発明の実施形態について図面に基づいて説明したが、具体的な構成は、上記の実施形態に限られるものではなく、発明の要旨を逸脱しない範囲で変更可能である。以下に本実施形態の変形例を示す。なお複数の変形例は適宜組み合されてもよい。
(5-1)変形例A
上記実施形態では、デマンド制御装置10がデマンド制御要求を受ける受信するごとに、熱源出力決定部13bが抑制エネルギー量値を、それぞれの熱源機50a,50b,50cに割り当てている。そして、熱源出力決定部13bが、それぞれの熱源機50a,50b,50cの負荷を決めている。
ここで、デマンド制御装置の記憶部が熱源機出力記憶部をさらに備えてもよい。さらに、熱源機出力記憶部が図7に示されるように、熱源システムの消費エネルギーの総量に対応する、熱源機それぞれの出力の表を記憶しても良い。図7は、熱源システムが3つの熱源機を有する場合を示している。図7は、左端の縦の欄に熱源システムの3つの熱源機が消費するエネルギーの総量が示されている。また、各消費エネルギーの総量の横の欄には、各熱源機の熱源機番号とともに、各熱源機の負荷が示されている。この各熱源機の負荷は、合計すると左の欄の消費エネルギーの総量を実現する値となっている。また、この各熱源機の出力の値は、熱源システム全体の成績係数が最大に近くなる値となっている。
上記実施形態では、デマンド制御装置10がデマンド制御要求を受ける受信するごとに、熱源出力決定部13bが抑制エネルギー量値を、それぞれの熱源機50a,50b,50cに割り当てている。そして、熱源出力決定部13bが、それぞれの熱源機50a,50b,50cの負荷を決めている。
ここで、デマンド制御装置の記憶部が熱源機出力記憶部をさらに備えてもよい。さらに、熱源機出力記憶部が図7に示されるように、熱源システムの消費エネルギーの総量に対応する、熱源機それぞれの出力の表を記憶しても良い。図7は、熱源システムが3つの熱源機を有する場合を示している。図7は、左端の縦の欄に熱源システムの3つの熱源機が消費するエネルギーの総量が示されている。また、各消費エネルギーの総量の横の欄には、各熱源機の熱源機番号とともに、各熱源機の負荷が示されている。この各熱源機の負荷は、合計すると左の欄の消費エネルギーの総量を実現する値となっている。また、この各熱源機の出力の値は、熱源システム全体の成績係数が最大に近くなる値となっている。
ここでは、抑制エネルギー量算出部が、抑制エネルギー量値を算出する。制御部がデマンド制御前の全ての熱源機が消費する総エネルギー量を算出し、記憶部に記憶させる。熱源出力決定部は、総エネルギー量の値から抑制エネルギー量値を減算して、デマンド制御における消費エネルギーの総量の上限値を算出する。次に、熱源出力決定部は、算出した消費エネルギーの総量の上限値が、図7の左端の消費エネルギーの総量と近い欄を探し出す。熱源出力決定部は、探し出した消費エネルギーの総量の横の欄の3つの熱源機の負荷の値を、デマンド制御における各熱源機の負荷と決定する。次に運転部は、熱源出力決定部が決定した出力となる負荷で3つの熱源機を運転する。
本変形例では、容量および/または出力特性が異なる複数の熱源機を有する熱源システムのデマンド制御において、熱源システム全体の消費エネルギーの総量が算出されれば、図8の表を検索することにより、容易且つ迅速に、それぞれの熱源機の負荷を決めることができる。さらに決められた3つの熱源機の負荷は、熱源システム全体の成績係数を最大に近くすることができる。なお、本変形例では、熱源機の数を3つにしたが、熱源機の数は、3つに限定されるものではない。
本変形例では、容量および/または出力特性が異なる複数の熱源機を有する熱源システムのデマンド制御において、熱源システム全体の消費エネルギーの総量が算出されれば、図8の表を検索することにより、容易且つ迅速に、それぞれの熱源機の負荷を決めることができる。さらに決められた3つの熱源機の負荷は、熱源システム全体の成績係数を最大に近くすることができる。なお、本変形例では、熱源機の数を3つにしたが、熱源機の数は、3つに限定されるものではない。
(5-2)変形例B
上記実施形態および変形例Aにおいては、消費するエネルギーの単価は一定として制御していた。しかし、図8に示すように、時間帯によってエネルギーの単価が変わる場合もある。これに対し、本変形例Bのデマンド制御装置は、エネルギーの単価が高いときは、エネルギーの使用量を抑える制御を応答性良く行う。また、本変形例Bのデマンド制御装置10は、エネルギーの単価が安い場合は、予冷、予熱などの制御を応答性良く行う。このように、本変形例Bのデマンド制御装置は、消費エネルギーの単価の変動に対して応答性良く、熱源システムを制御することができる。従って、運転効率良く、ユーザーの利便性、快適性を損なわないように消費エネルギーの制御を行うことができる。
上記実施形態および変形例Aにおいては、消費するエネルギーの単価は一定として制御していた。しかし、図8に示すように、時間帯によってエネルギーの単価が変わる場合もある。これに対し、本変形例Bのデマンド制御装置は、エネルギーの単価が高いときは、エネルギーの使用量を抑える制御を応答性良く行う。また、本変形例Bのデマンド制御装置10は、エネルギーの単価が安い場合は、予冷、予熱などの制御を応答性良く行う。このように、本変形例Bのデマンド制御装置は、消費エネルギーの単価の変動に対して応答性良く、熱源システムを制御することができる。従って、運転効率良く、ユーザーの利便性、快適性を損なわないように消費エネルギーの制御を行うことができる。
本発明は、容量および/また出力特性が異なる複数の設備機器を有するシステムに対して、エネルギー管理装置から所定の情報が送信されてエネルギー量の抑制を行うデマンド制御装置に適用可能である。
1 電力会社
2 建物
10 デマンド制御装置
11 受信部
12 記憶部
12a 負荷成績係数記憶部
12b 定格能力記憶部
13 制御部
13a 抑制エネルギー量値算出部
13b 熱源出力決定部
13c 運転部
20 第1ヘッダ
21 第2ヘッダ
32a,32b,32c 空調機
41a,41b,41c 1次ポンプ
50a,50b,50c 熱源機
60 上流側配管
61 下流側配管
80 インターネット等の通信ネットワーク
81 LAN等の通信ネットワーク
90 エネルギー管理装置
100 熱源システム
200 エネルギー管理システム
2 建物
10 デマンド制御装置
11 受信部
12 記憶部
12a 負荷成績係数記憶部
12b 定格能力記憶部
13 制御部
13a 抑制エネルギー量値算出部
13b 熱源出力決定部
13c 運転部
20 第1ヘッダ
21 第2ヘッダ
32a,32b,32c 空調機
41a,41b,41c 1次ポンプ
50a,50b,50c 熱源機
60 上流側配管
61 下流側配管
80 インターネット等の通信ネットワーク
81 LAN等の通信ネットワーク
90 エネルギー管理装置
100 熱源システム
200 エネルギー管理システム
Claims (5)
- 容量および/または出力特性が異なる複数の熱源機(50a,50b,50c)を有する熱源システム(100)に対して、前記熱源機の消費エネルギーを抑制するデマンド制御を行うデマンド制御装置(10)であって、
前記デマンド制御の開始を要求するデマンド信号を受信する受信部(11)と、
前記デマンド制御時の抑制するエネルギー量に関する値である抑制エネルギー量値を算出する抑制エネルギー量値算出部(13a)と、
前記抑制エネルギー量値に基づき、前記複数の熱源機それぞれに対して、個別に出力を決定する熱源出力決定部(13b)と、
前記複数の熱源機それぞれを前記出力で運転させる運転部(13c)と、
を備えるデマンド制御装置。 - 前記複数の熱源機それぞれの負荷と前記複数の熱源機それぞれの成績係数とを対応づける情報である負荷成績係数情報を記憶する負荷成績係数記憶部(12a)をさらに備え、
前記熱源出力決定部が、前記負荷成績係数情報に基づいて、前記複数の熱源機それぞれに対して、個別に出力を決定する、
請求項1に記載のデマンド制御装置。 - 前記複数の熱源機それぞれの定格能力の情報である定格能力情報を記憶する定格能力記憶部(12b)をさらに備え、
前記熱源出力決定部が、前記定格能力情報に基づいて、前記複数の熱源機それぞれに対して、個別に出力を決定する、
請求項2に記載のデマンド制御装置。 - 全ての前記熱源機の前記消費エネルギーの総量と前記複数の熱源機それぞれの出力とを対応づける情報である熱源機出力情報を記憶する熱源機出力記憶部をさらに備え、
前記熱源出力決定部が、前記抑制エネルギー量値に基づき、全ての前記熱源機の前記消費エネルギーの総量の上限値を算出し、前記上限値と前記熱源機出力情報に基づいて、前記複数の熱源機それぞれに対して、個別に出力を決定する、
請求項1に記載のデマンド制御装置。 - 前記運転部は、前記抑制エネルギー量値に基づいて、前記複数の熱源機のいずれかを停止させる運転を行う、
請求項1から4のいずれか1項に記載のデマンド制御装置。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP13838999.4A EP2918932B1 (en) | 2012-09-20 | 2013-05-15 | Demand control device |
ES13838999T ES2738851T3 (es) | 2012-09-20 | 2013-05-15 | Dispositivo de control de demanda |
CN201380048983.XA CN104662376B (zh) | 2012-09-20 | 2013-05-15 | 需求控制装置 |
US14/428,916 US9618916B2 (en) | 2012-09-20 | 2013-05-15 | Demand control device |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012-207103 | 2012-09-20 | ||
JP2012207103A JP5472413B2 (ja) | 2012-09-20 | 2012-09-20 | デマンド制御装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014045635A1 true WO2014045635A1 (ja) | 2014-03-27 |
Family
ID=50340967
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2013/063539 WO2014045635A1 (ja) | 2012-09-20 | 2013-05-15 | デマンド制御装置 |
Country Status (6)
Country | Link |
---|---|
US (1) | US9618916B2 (ja) |
EP (1) | EP2918932B1 (ja) |
JP (1) | JP5472413B2 (ja) |
CN (1) | CN104662376B (ja) |
ES (1) | ES2738851T3 (ja) |
WO (1) | WO2014045635A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015206543A (ja) * | 2014-04-21 | 2015-11-19 | 株式会社竹中工務店 | 氷蓄熱システム |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5403076B2 (ja) * | 2012-01-13 | 2014-01-29 | ダイキン工業株式会社 | エネルギー制御装置 |
WO2015186181A1 (ja) * | 2014-06-02 | 2015-12-10 | 三菱電機株式会社 | 冷凍空調装置用制御装置 |
JP6539897B2 (ja) * | 2015-03-31 | 2019-07-10 | 三菱重工サーマルシステムズ株式会社 | 空気調和システム |
GB2558116B (en) * | 2015-11-27 | 2020-09-23 | Mitsubishi Electric Corp | Refrigeration cycle apparatus |
JP6824648B2 (ja) * | 2016-07-04 | 2021-02-03 | 三菱重工サーマルシステムズ株式会社 | 熱源システム及び熱源システムの制御方法並びに熱源システムの制御プログラム |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10311585A (ja) * | 1997-05-12 | 1998-11-24 | Chubu Electric Power Co Inc | 蓄熱式空気調和機のデマンド制御装置 |
JP2007212038A (ja) | 2006-02-09 | 2007-08-23 | Daikin Ind Ltd | デマンド制御装置、デマンド制御方法およびデマンド制御プログラム |
JP2011002112A (ja) * | 2009-06-16 | 2011-01-06 | Shimizu Corp | 空調熱源機運転ナビゲーションシステム |
JP2012154563A (ja) * | 2011-01-26 | 2012-08-16 | Mitsubishi Heavy Ind Ltd | 運転パターン作成装置及びその方法並びにプログラム |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1117952C (zh) * | 1999-02-09 | 2003-08-13 | 煜丰企业有限公司 | 空调机能量自动调节控制系统 |
CN1170092C (zh) * | 2001-11-26 | 2004-10-06 | 煜丰科技股份有限公司 | 按输出功率供给空调系统热源机组能量的控制方法和装置 |
JP4158820B2 (ja) * | 2006-07-07 | 2008-10-01 | ダイキン工業株式会社 | 電力量制御装置 |
US8600556B2 (en) | 2009-06-22 | 2013-12-03 | Johnson Controls Technology Company | Smart building manager |
US8626344B2 (en) * | 2009-08-21 | 2014-01-07 | Allure Energy, Inc. | Energy management system and method |
US8498749B2 (en) | 2009-08-21 | 2013-07-30 | Allure Energy, Inc. | Method for zone based energy management system with scalable map interface |
CN101650056B (zh) * | 2009-09-09 | 2011-09-14 | 北京康孚环境控制有限公司 | 冷却塔和冷水机组联合供冷系统及其控制方法 |
KR101611287B1 (ko) * | 2009-11-13 | 2016-04-11 | 엘지전자 주식회사 | 지능형 계측 기기 |
JP5627234B2 (ja) * | 2009-12-28 | 2014-11-19 | 三洋電機株式会社 | 熱源機、熱源システム、熱源機の運転制御方法 |
JP5696877B2 (ja) * | 2010-10-01 | 2015-04-08 | 清水建設株式会社 | 運転管理装置、運転管理方法、および運転管理プログラム |
JP2012145263A (ja) * | 2011-01-11 | 2012-08-02 | Hitachi Plant Technologies Ltd | 熱源システム、その制御方法およびそのプログラム |
-
2012
- 2012-09-20 JP JP2012207103A patent/JP5472413B2/ja active Active
-
2013
- 2013-05-15 WO PCT/JP2013/063539 patent/WO2014045635A1/ja active Application Filing
- 2013-05-15 CN CN201380048983.XA patent/CN104662376B/zh active Active
- 2013-05-15 ES ES13838999T patent/ES2738851T3/es active Active
- 2013-05-15 US US14/428,916 patent/US9618916B2/en active Active
- 2013-05-15 EP EP13838999.4A patent/EP2918932B1/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10311585A (ja) * | 1997-05-12 | 1998-11-24 | Chubu Electric Power Co Inc | 蓄熱式空気調和機のデマンド制御装置 |
JP2007212038A (ja) | 2006-02-09 | 2007-08-23 | Daikin Ind Ltd | デマンド制御装置、デマンド制御方法およびデマンド制御プログラム |
JP2011002112A (ja) * | 2009-06-16 | 2011-01-06 | Shimizu Corp | 空調熱源機運転ナビゲーションシステム |
JP2012154563A (ja) * | 2011-01-26 | 2012-08-16 | Mitsubishi Heavy Ind Ltd | 運転パターン作成装置及びその方法並びにプログラム |
Non-Patent Citations (1)
Title |
---|
See also references of EP2918932A4 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015206543A (ja) * | 2014-04-21 | 2015-11-19 | 株式会社竹中工務店 | 氷蓄熱システム |
Also Published As
Publication number | Publication date |
---|---|
JP5472413B2 (ja) | 2014-04-16 |
EP2918932A1 (en) | 2015-09-16 |
ES2738851T3 (es) | 2020-01-27 |
EP2918932B1 (en) | 2019-05-01 |
CN104662376B (zh) | 2016-05-25 |
US9618916B2 (en) | 2017-04-11 |
CN104662376A (zh) | 2015-05-27 |
US20150253752A1 (en) | 2015-09-10 |
EP2918932A4 (en) | 2017-03-01 |
JP2014062668A (ja) | 2014-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5472413B2 (ja) | デマンド制御装置 | |
JP5908302B2 (ja) | 蓄電蓄熱最適化装置、最適化方法及び最適化プログラム | |
JP5994900B1 (ja) | 複数の空気調和装置の管理装置 | |
US10763027B2 (en) | Method to optimize operation of a transformer cooling system, the corresponding system and a method to determine the VFD capacity | |
JP2014236605A (ja) | 空気調和装置の管理システム | |
JP6225419B2 (ja) | 空調機の制御装置 | |
JP5158236B2 (ja) | 設備機器の制御装置 | |
WO2013105567A1 (ja) | エネルギー制御装置 | |
JP5584024B2 (ja) | 空気調和機群制御装置及び空気調和システム | |
JP5088436B1 (ja) | 設備機器の制御装置 | |
JP5310880B2 (ja) | エネルギー制御装置及びエネルギー制御装置を備えたエネルギー制御システム | |
JP2015169348A (ja) | 消費電力削減装置および消費電力削減方法 | |
JP2018146229A (ja) | 空気調和装置 | |
JP2012039856A (ja) | エネルギー制御装置 | |
JP2012193877A (ja) | 空調機とデータ処理負荷分配の連係制御方法 | |
JP6587166B1 (ja) | 制御装置、空調機、空調システム、制御方法及びプログラム | |
JP5773727B2 (ja) | 空調圧縮機電力量集中監視フィードバック制御装置、空調設備、及び空調設備制御方法 | |
JP6379729B2 (ja) | 空気調和装置 | |
JP7117443B1 (ja) | 需要調整管理サーバ、需要調整管理方法、需要調整管理プログラム | |
JP2020048370A (ja) | 電力管理方法および電力管理システム | |
JP2014062667A (ja) | 熱源制御装置 | |
JP6910017B2 (ja) | 自家発電出力抑制緩和装置及び自家発電出力抑制緩和方法 | |
JP6008988B2 (ja) | 電力需要調整システムおよび電力需要調整方法 | |
JP7412638B2 (ja) | 空調システム | |
JP5732420B2 (ja) | 複数軸発電設備の発電スケジュール演算装置及び方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13838999 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 14428916 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2013838999 Country of ref document: EP |