WO2014015682A1 - 基于城市道路中的扭转式立交桥的结构及其用途 - Google Patents
基于城市道路中的扭转式立交桥的结构及其用途 Download PDFInfo
- Publication number
- WO2014015682A1 WO2014015682A1 PCT/CN2013/073652 CN2013073652W WO2014015682A1 WO 2014015682 A1 WO2014015682 A1 WO 2014015682A1 CN 2013073652 W CN2013073652 W CN 2013073652W WO 2014015682 A1 WO2014015682 A1 WO 2014015682A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- lane
- straight
- motor vehicle
- lanes
- twisting
- Prior art date
Links
- 241000283070 Equus zebra Species 0.000 claims description 12
- 238000013459 approach Methods 0.000 claims 1
- 238000000926 separation method Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 8
- 238000010276 construction Methods 0.000 description 7
- 206010039203 Road traffic accident Diseases 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 230000037361 pathway Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000004397 blinking Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
- E01C1/04—Road crossings on different levels; Interconnections between roads on different levels
Definitions
- the invention relates to the structure and use of a torsional overpass in an urban road, and belongs to the field of overpass construction in urban traffic.
- the current transportation system is mainly composed of express roads, trunk roads, trunk roads, and branches.
- Road constitutes, in order to alleviate traffic congestion, mainly through the establishment of interchange bridges, the addition of ring roads, the addition of ramps, these methods will occupy a large amount of land, for some large cities, the land occupied by traffic roads is close to the country It is stipulated that with the development of automobile family, the improvement made only by the existing traffic mode cannot meet the serious traffic problems caused by the increasing number of cars.
- the traditional overpass can only pass two intersections when the motor vehicle is in transit.
- the capacity of passing is very limited. In the morning and evening shifts or holidays, there are often congestions. In the case of motor vehicles, etc. Waiting for a number of traffic lights for a long time, it is impossible to carry out at the same time, and the cost is high and the floor space is large.
- pedestrian/non-motorized vehicles are cross-shaped, which causes at least one traffic signal if they want to go diagonally opposite the intersection.
- the transformation of the lights In other words, it is necessary to wait for the diagonally opposite side to make a waiting in the middle, so the passage time is long and the efficiency is low.
- the object of the present invention is to overcome the above-mentioned shortcomings and deficiencies of the prior art, and to provide a structure and a use thereof based on a torsion type overpass in an urban road, the structure and the use thereof can effectively solve the traffic passage at the intersection of the city, realize the motor vehicle and the non- The separate passage of the motor vehicle can ensure that the motor vehicle travels in any direction, and there is no direction or route crossing, which ensures smooth passage.
- the object of the invention is achieved by the following technical solution: Based on the structure of a torsional overpass in an urban road, comprising a motor vehicle lane and a non-motor vehicle lane, the motor vehicle lane is divided into three layers, one of which is a twisted lane and the other two It is a linear lane, and the first layer, the second layer and the third layer are spatially staggered, and the twisted lane is connected to the linear lane through the ramps provided on both sides thereof, and the non-motor vehicle lane is disposed in the two lanes of the linear lane side.
- the three-story motor vehicle lane can be divided into a tunnel through the tunnel, a surface lane and a viaduct, or a surface lane, a first viaduct and a second viaduct.
- the three-story motorway forms a cross, wherein the surface lanes are connected to the other two floors, and the non-motor vehicle lanes are only set. On the side of the surface lane.
- the torsion lane is divided into a straight lane and a reverse lane, and both the straight lane and the reverse lane include a torsion section and a straight section, and the torsion section is simultaneously disposed at both ends of the straight section, and the torsion section of the straight lane and the corresponding reverse lane are twisted.
- the segments form a spatial intersection.
- the linear lane includes a down tunnel located at the bottom layer and a surface lane disposed above the tunnel below, and both sides of the entrance and the exit of the tunnel are provided with turn-by-turn motorway and non-motor vehicle lanes, and one end of the ramp
- the straight section is connected, the other end is connected to the turning motorway corresponding to the side, and the end of the torsion section away from the straight section is connected with the surface lane.
- the torsion lane uses the viaduct to change the left and right sides of the vehicle and the road to the left, which makes it easier for the vehicle to make a left turn, which reduces the distance of the ramp and saves space and restores after passing through the intersection.
- the linear lane includes a viaduct located on the upper floor and a surface lane disposed under the viaduct.
- the entrance and exit sides of the viaduct are respectively provided with turn-by-turn motorway and non-motorized vehicle lanes, and one end of the ramp is connected with the straight section, and One end is connected to the turning motorway corresponding to the side, and one end of the torsion section away from the straight section is connected with the surface lane.
- the ramp is curved at 90°, corresponding to the torsion lane and the surface lane.
- the underpass tunnel and the twisted lane ensure the straight direction of the motor vehicle.
- the surface lane can ensure the traffic in any direction except the straight line. .
- the surface lane has a cross-shaped structure, and both sides of the cross-shaped structure are provided with a non-motor vehicle lane.
- the cross-shaped lanes on the surface of the road can pass at the same time during the transit time of the motor vehicle, and there is no lane overlap, and there is no need to wait for other vehicles to pass.
- a zebra crossing perpendicular to the surface lane is disposed on the surface lane, and both ends of the zebra crossing are respectively connected to the corresponding road sidewall.
- the line is simple, no turning back, no 270 degree bend, easy for the driver to recognize the road, not easy to get lost.
- Figure 1 is a schematic view showing the structure of a torsion type overpass
- FIG. 2 is a schematic structural view of a torsional overpass without a tunnel
- Figure 3 is a simplified schematic view of Figure 2;
- Figure 4 is a schematic view of the passage of the surface lane;
- Figure 5 is a schematic view showing the structure of a four-way torsion type overpass.
- the motor vehicle lane is divided into three layers, one of which is a twisted lane, and the other two are straight lines.
- Lane, and the first, second and third layers are spatially staggered, the twisted lanes are connected to the linear lane by the ramps 1 provided on both sides thereof, and the non-motor vehicle lanes 4 are arranged in the two lanes of the linear lane side.
- Pedestrians and non-motor vehicles pass through the surface, which is more convenient and faster. Battery cars, bicycles do not need to cross the bridge over the bridge. It avoids traffic accidents caused by steep slopes in rainy weather and reduces safety hazards.
- the twisted lane is divided into a straight lane and a reverse lane, and both the straight lane and the reverse lane include a torsion section 6 and a straight section 5, and the torsion section 6 is simultaneously disposed at both ends of the straight section 5, and the torsion section 6 of the straight lane and the corresponding
- the torsional section 6 of the retrograde lane forms a spatial intersection.
- the floor space is 898 M 2 , which is smaller than the traditional overpass bridge.
- the traditional overpass covers an area of thousands of square meters, occupies a large amount of land, and the cost is high, and the cost of the invention is high. low cost.
- the linear lane includes a lower tunnel 3 located at the bottom layer and a lower tunnel 3
- the roadway 2, the entrance and the exit of the tunnel 3 are provided with turn-by-turn motorway and non-motor vehicle lane 4, and one end of the ramp 1 is connected with the straight section 5, and the other end is a turning motorway corresponding to the side.
- one end of the torsion section 6 away from the straight section 5 is in communication with the surface lane 2 .
- the surface lane 2 has a cross-shaped structure, and both sides of the cross-shaped structure are provided with a non-motor vehicle lane 4.
- the cross-shaped structure of the surface lane 2 facilitates the steering of the motor vehicle, while the non-motor vehicles and pedestrians pass through the intersection of the zebra crossings on the surface lane 2 provided on the ground surface. Any route (four straight, left turn, right turn, turn) at the intersection of the four sides of the car has made a specific route plan. There is no repetition on the same plane, no crossover, and each line does not interfere with each other.
- the vehicle passes through the bridge, turning left to the left, right to the right, the bridge to the head, and the pedestrian/non-motor vehicle passing the ground.
- the surface lane 2 is provided with a zebra crossing perpendicular to the surface lane 2, and the ends of the zebra crossing are respectively connected to the corresponding road side walls.
- motor vehicles, non-motor vehicles and pedestrians adopt a time-space diversion method and do not interfere with each other.
- the traffic pressure is greatly relieved, and the time passed by people is saved.
- the signal light indicates that the non-motor vehicle is passing, all the vehicles on the surface stop are allowed to pass, and the non-motor vehicle passes through the zebra crossing to reach any intersection.
- the traffic command signal can be set to two simple parts: motor vehicle transit time, non-motorized/passenger transit time.
- the two passages have a transit time of 45 seconds and a period of 90 seconds.
- General traffic signal intersections at Yongfeng Interchange 1 vertical straight/vertical pedestrian 45 seconds; 2 vertical left turn 45 seconds; 3 horizontal straight/horizontal pedestrian 45 seconds; 4 horizontal left turn 45 seconds, total 180 seconds A cycle.
- the signal lamp only needs to adopt two kinds of traffic modes, which reduces the traditional signal blinking frequency, and adopts the two-pass scheme, which reduces the waiting time by half compared with the conventional traffic, and the traffic capacity is greatly improved, and the waiting time is reduced.
- the structure of Embodiment 2 is basically the same as that of Embodiment 1, except that: the linear lane includes a viaduct 7 located on the upper floor and a surface lane 2 disposed under the viaduct 7, and the viaduct 7 Both sides of the inlet and the outlet are provided with a turning motor vehicle lane and a non-motor vehicle lane 4, and one end of the tunnel 1 is connected with the straight section 5, and the other end is connected with the turning motorway corresponding to the side, and the torsion section 6 is away from the straight section. One end of 5 is connected to the surface lane 2 .
- the solution reduces the setting of the tunnel below, and replaces the tunnel 3 with the viaduct 7, which reduces the excavation cost of the underground tunnel during the construction process, and at the same time stabilizes the structure, and the passage of the straight-through vehicle is completed by the viaduct 7 and the torsion lane.
- the turn is completed by the lanes set on the ground surface.
- the combination of the ramps and the twisting lanes can be increased, the convenience during the turning process can be increased, and the traffic conditions on the main traffic lanes of the city can be compared and recorded, except for the different conditions of the overpass. All are the same, get the following data:
- Time period the invention is determined by the number of vehicles, the traffic condition is judged
- the torsional overpass with the present invention has a large capacity per unit time and does not cause traffic congestion.
- the vehicle passes through the viaduct 7 or the twisted lane quickly, on the ground.
- the motor vehicle or non-motor vehicle is guided by the signal light.
- the four-way intersection is faster than the two-way intersection. During the peak hours, it can effectively carry the traffic of the vehicle, improve its traffic capacity and save people's time. .
- Embodiment 3 is basically the same as that of Embodiment 1, except that:
- This solution adopts a four-way twisting lane, and two twisted lanes are arranged above the roadway on the ground surface to improve Capacity, while reducing the occupation of land, the cost is cheaper.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Signs Or Road Markings (AREA)
- Road Paving Structures (AREA)
Abstract
基于城市道路中的扭转式立交桥的结构及其用途,包括机动车道和非机动车道,所述机动车道分为三层,其中一层为扭转式车道,另外两层为直线式车道,且第一层、第二层以及第三层在空间上错开,扭转式车道通过设置在其两侧上的匝道与直线式车道连通,非机动车道设置在直线式车道的两侧。该结构及其用途能够有效解决城市交叉路口的交通通行,实现机动车与非机动车的分开通行,能够保证机动车通行时间的任意方向行驶,不会出现方向或者路线交叉,保证了通行的顺畅。
Description
基于城市道路中的扭转式立交桥的结构及其用途 技术领域
本发明涉及基于城市道路中的扭转式立交桥的结构及其用途, 属于城市 交通中的立交桥建筑领域。
背景技术
随着科学技术的进步和工业的发展, 城市中交通量激增, 原始的交 通方式已不能满足要求; 同时, 由于工业发展为城市交通提供的各种交 通工具越来越多, 从而加速了城市交通事业的发展, 也导致了城市交通 的压力, 给人们出行造成了诸多不便, 设计者们通过设计试图改善主要 交叉路口的压力, 目前的交通系统主要由快速路、 主干路、 支干路、 支 路 (小区路)构成, 为了缓解交通堵塞, 主要是通过设立互通式立交桥、 增 加环形快速路、 增设匝道, 这些方式会大量占用土地, 对于一些大城市 其交通道路的土地占用面积已经接近国家的规定, 随着汽车家庭化的发 展, 仅仅在现有的交通模式上所作的改进无法满足汽车数量日益增长所 带来的严重的交通问题。
传统的立交桥在机动车通行的时候, 同时只能通行两个路口, 通行 的能力十分有限, 在早晚上班或者节假日等高峰时段, 经常出现拥堵的 现象, 在机动车在进行转向等情况下, 需要进行多次的交通灯等待, 时 间长, 无法同时进行, 且造价高, 占地面积大。
在使用传统的交通信号灯的路口, 行人 /非机动车的行止是十字交叉式, 这就造成了如果他们想要到十字路口的斜对面去, 至少要经过一次交通信号
灯的变换。 也就是说想到到达斜对面必须在中途进行一次等待, 所以通过时 间长, 效率低。
发明内容
本发明的目的在于克服上述现有技术的缺点和不足, 提供基于城市道路 中的扭转式立交桥的结构及其用途, 该结构及其用途能够有效解决城市交叉 路口的交通通行, 实现机动车与非机动车的分开通行, 能够保证机动车通行 时间的任意方向行驶, 不会出现方向或者路线交叉, 保证了通行的顺畅。 本发明的目的通过下述技术方案实现: 基于城市道路中的扭转式立交桥 的结构, 包括机动车道和非机动车道, 所述机动车道分为三层, 其中一层为 扭转式车道, 另外两层为直线式车道, 且第一层、 第二层以及第三层在空间 上错开, 扭转式车道通过设置在其两侧上的匝道与直线式车道连通, 非机动 车道设置在直线式车道的两侧。 三层机动车道可以分为下穿隧道、 地表车道 以及高架桥, 或者地表车道、 第一高架桥以及第二高架桥, 三层机动车道形 成交叉, 其中地表车道均与另外两层连通, 非机动车道只设置在地表车道的 侧边上。
所述扭转式车道分为直行车道和逆行车道, 直行车道和逆行车道均包括 扭转段和直线段, 扭转段同时设置在直线段的两端, 且直行车道的扭转段和 对应的逆行车道的扭转段形成空间上的交叉。
所述直线式车道包括位于底层的下穿隧道和设置在下穿隧道上方的地表 车道, 下穿隧道的入口和出口两侧均设置向外依次设置有转弯机动车道和非 机动车道, 且匝道一端与直线段连通, 另一端与该侧对应的转弯机动车道连 通, 扭转段远离直线段的一端均与地表车道连通。 采用扭转式车道, 使得机
动车在进行左转时的距离减小, 减小了匝道的长度, 占地面积更小, 结构性 更稳定。 扭转式车道利用高架桥将来车与去车路面左右调换, 便于车辆进行 左转弯, 减少了匝道的距离, 同时节约了空间, 在通过路口之后还原。
所述直线式车道包括位于上层的高架桥和设置在高架桥下方的地表车 道, 高架桥的入口和出口两侧均设置向外依次设置有转弯机动车道和非机动 车道, 且匝道一端与直线段连通, 另一端与该侧对应的转弯机动车道连通, 扭转段远离直线段的一端均与地表车道连通。 匝道弯曲为 90° , 对应与扭转 式车道和地表车道连接, 下穿隧道和扭转式车道能够保证机动车的十字方向 的直行穿行, 通过地表车道能够保证机动车除直行外的任意方向上的通行。
所述地表车道呈十字型结构,该十字型结构的两侧均设置有非机动车道。 地表上的十字型车道在机动车通行时间均能同时进行通行, 且不会出现车道 重合, 不用等待其他机动车的通过。
所述地表车道上设置有与该地表车道垂直的斑马线, 斑马线两端分别与 对应的道路侧壁连接。
基于城市道路中的扭转式立交桥的用途, 包括以下途径:
(a)机动车的直行通过下穿隧道、 高架桥或者扭转式车道实现, 在任意 方向任意时间均无需停止, 在交通灯指示机动车通行时, 机动车的左转弯通 过扭转式车道上的匝道实现, 地表面上的机动车的掉头、 右转弯或者左转弯 均通过设置在地表面上的直线式车道同时实现;
(b )在交通灯指示非机动车通行时,地表车道中的所有机动车停止通行, 非机动车通过斑马线进行任意方向上的通行。 扭转式车道或者高架桥、 下穿 隧道中的车辆在进行通行时不受交通信号灯的限制, 地表车道中的机动车在
信号灯显示机动车通行时, 所有机动车均能同时进行行进, 减少了等待的时 间, 避免了车辆排队造成的压力; 在信号灯显示非机动车通行时, 所有地表 车道中的机动车停止通行, 非机动车通过斑马线通行到任意路口, 想要到十 字路口的斜对面去, 不需要经过一次交通信号灯的变换。 也就是说想要到达 斜对面不需要在中途进行一次等待, 所以通过时间短, 效率高。
综上所述, 本发明的有益效果是:
(a)、 结构紧凑, 占地面积小, 节约土地, 能够在已经存在固定建筑的 路口建设, 空间距离小, 桥体总高度低, 无陡坡, 无长坡, 提高安全性, 降 低施工难度, 节约建设成本;
(b)、 机动车, 非机动车和行人在经过路口时, 采取时空分流方式, 互 不干扰, 加快车辆, 行人的通过速度;
(c )、 线路简单, 无回头弯, 无 270度弯,便于驾驶员认路, 不易迷路。
(d)、 行人和非机动车在地表通过, 更方便, 快捷, 电瓶车, 自行车无 需上天桥过隧道, 避免了阴雨天气因坡陡路滑造成的交通事故, 降低了安全 隐患;
(e )、 对其中各元素的行驶路线做出了详细的规划, 在地表车道上, 各 元素行驶、 停止时间的划分不在使用传统的交通信号灯系统, 而是将时间简 单地分为机动车时间和非机动车 /行人时间。
附图说明
图 1是扭转式立交桥结构示意图;
图 2是无下穿隧道的扭转式立交桥结构示意图;
图 3是图 2的改进示意图;
图 4是地表车道通行示意图;
图 5是四向扭转式立交桥结构示意图。
附图中标记及相应的零部件名称: 1一匝道; 2—地表车道; 3—下穿隧道; 4一非机动车道; 5—直线段; 6—扭转段; 7—高架桥。
具体实施方式
下面结合实施例及附图, 对本发明作进一步的详细说明, 但本发明的实 施方式不仅限于此。
实施例 1:
如图 1、 图 4所示, 基于城市道路中的扭转式立交桥的结构, 包括机动 车道和非机动车道, 所述机动车道分为三层, 其中一层为扭转式车道, 另外 两层为直线式车道, 且第一层、 第二层以及第三层在空间上错开, 扭转式车 道通过设置在其两侧上的匝道 1与直线式车道连通, 非机动车道 4设置在直 线式车道的两侧。 行人和非机动车在地表通过, 更方便, 快捷。 电瓶车, 自 行车无需上天桥过隧道。 避免了阴雨天气因坡陡路滑造成的交通事故, 降低 了安全隐患。
所述扭转式车道分为直行车道和逆行车道, 直行车道和逆行车道均包括 扭转段 6和直线段 5, 扭转段 6同时设置在直线段 5的两端, 且直行车道的 扭转段 6和对应的逆行车道的扭转段 6形成空间上的交叉。 采用本发明的结 构, 占地面积为 898M2, 比传统的立交桥占地面积少, 传统的立交桥占地面 积都是上千平方米, 占用了大量的土地, 使得造价成本高, 本发明的造价成 本低。
所述直线式车道包括位于底层的下穿隧道 3和设置在下穿隧道 3上方的
地表车道 2, 下穿隧道 3的入口和出口两侧均设置向外依次设置有转弯机动 车道和非机动车道 4, 且匝道 1一端与直线段 5连通, 另一端与该侧对应的 转弯机动车道连通, 扭转段 6远离直线段 5的一端均与地表车道 2连通。 采 用本发明的结构, 线路简单, 无回头弯, 无 270度弯, 便于驾驶员认路, 不 易迷路。 桥体总高度低, 无陡坡, 无长坡, 提高安全性, 降低施工难度, 节 约建设成本。
所述地表车道 2呈十字型结构, 该十字型结构的两侧均设置有非机动车 道 4。 地表车道 2的十字型结构, 方便机动车能够进行转向, 同时非机动车 和行人均通过设置在地表面上的地表车道 2上的斑马线进行过路口。 十字路 口四方来车的任意走向 (直行、 左转、 右转、 调头) 均做出了具体的路线规 划。 在同一平面上无重复, 无交叉, 各行其道, 互不干扰。 车辆通过此桥, 左转靠左, 右转靠右, 桥下调头, 行人 /非机动车载地面通过。
所述地表车道 2上设置有与该地表车道 2垂直的斑马线, 斑马线两端分 别与对应的道路侧壁连接。 机动车, 非机动车和行人在经过路口时, 采取时 空分流方式, 互不干扰。
基于城市道路中的扭转式立交桥的用途, 包括以下途径:
(a)机动车的直行通过下穿隧道 3、 高架桥 7或者扭转式车道实现, 在 任意方向任意时间均无需停止, 在交通灯指示机动车通行时, 机动车的左转 弯通过扭转式车道上的匝道实现, 地表面上的机动车的掉头、 右转弯或者左 转弯均通过设置在地表面上的直线式车道同时实现;
(b )在交通灯指示非机动车通行时,地表车道 2中的所有机动车停止通 行, 非机动车通过斑马线进行任意方向上的通行。
机动车时间: 地表面上的直线式车道中所有机动车通行, 所有行人和非 机动车停止;非机动车 /行人时间:地表面上的直线式车道中所有机动车停止, 所有行人和非机动车通行。 地表面规划有专用的机动车停止等待区域, 行人 和非机动车停止等待区域, 通过下穿隧道 3和上跨线桥过路口的直行车辆, 任意方向任意时间均无需停止。 在本方案中, 将行止时间分为机动车时间和 行人 /非机动车时间。在行人和非机动车时间,所有行人和非机动车同时行驶, 无任何方向限制。 这种方式解决了前面提到的行人和非机动车无法一次性到 达路口斜对面的问题, 节约了时间, 提高的效率, 解决了行人和非机动车在 路口大量滞留的问题。
以成都人南立交为例, 在进行地面车道中的车辆拐弯通行时, 另外两个 路口的机动车以及非机动车均停止通行,左转等待时间为 30秒,在上下班的 高峰时间段, 车流量为 113辆 /分, 在等待的 30秒时间中, 共有 56辆车在排 队, 而通行时间同样为 30秒, 在进行通行时, 排队车辆不能一次性通过, 造 成了交通的拥堵, 导致另外的两个路口的车辆缓行, 采用本发明后, 在机动 车通行时间, 四个路口的所有转弯车辆均能一次性通过, 通行时间可以延长 一倍, 且车辆之间不会出现线路的重复, 如图 4所示, 大大缓解交通的压力, 节省了人们通过的时间, 在信号灯指示为非机动车通行时, 地表上所有机动 车停止通行, 非机动车在通过斑马线到达任意路口。
由于地表机动车行驶路线无交叉, 且通过的车辆也少。 所以可以将交通 指挥信号设置成简单的两部分: 机动车通行时间, 非机动车 /行人通行时间。 在本发明中的立交桥, 两个垂直通行路口的各自通行时间均为 45秒, 90秒 为一个周期。
以永丰立交的普通交通信号灯路口情况: ①竖向直行 /竖向行人 45秒; ②竖向左转 45秒; ③横向直行 /横向行人 45秒; ④横向左转 45秒, 共 180 秒为一个周期。 通过本发明, 信号灯只需采用两种通行方式, 减少了传统的 信号闪亮频率, 采用两两通行方案, 比传统通行减少了一半的等待时间, 通 行能力大大提高, 减少了人们等待的时间。
实施例 2:
如图 2、 图 3所示, 实施例 2与实施例 1的结构基本相同, 不同之处在 于: 所述直线式车道包括位于上层的高架桥 7和设置在高架桥 7下方的地表 车道 2, 高架桥 7的入口和出口两侧均设置向外依次设置有转弯机动车道和 非机动车道 4, 且匝道 1一端与直线段 5连通, 另一端与该侧对应的转弯机 动车道连通, 扭转段 6远离直线段 5的一端均与地表车道 2连通。 本方案减 少了下穿隧道 3的设置, 利用高架桥 7代替下穿隧道 3, 减少了建造过程中 对地下隧道的挖掘成本, 同时能够稳定结构, 直行车辆的通行通过高架桥 7 和扭转式车道完成, 转弯通过设置在地表面的车道完成, 同时还能增加匝道 实现与扭转车道的结合, 增加转弯过程中的便捷性, 在城市主要交通要道上 的车辆通行情况进行对比记录, 除立交桥不同外其它状况均相同, 得到如下 数据:
表 1 :
8: 30—9:00 11673 拥堵
9: 00—9:30 9028 缓行
表 2:
时间段 本发明立交通过车辆数 交通状况判断
(单位: 辆)
7: 00—7:30 7206 正常
7: 30—8:00 13021 正常
8: 00—8:30 18427 缓行
8: 30—9:00 17540 缓行
9: 00—9:30 14015 正常
通过表 1和表 2上的数据能够得出, 采用本发明的扭转式立交桥的单位 时间通行能力大, 不会造成交通拥堵的现象, 车辆在高架桥 7或者扭转式车 道上快速进行通过, 地面上的机动车或者非机动车利用信号灯的指导进行通 行, 采用四个路口同时通行比两两式路口通行速度快, 在上班高峰期间, 能 够有效承载车辆的通行, 提高其通行能力, 节约人们的时间。
实施例 3 :
如图 5所示, 实施例 3与实施例 1的结构基本相同, 不同之处在于: 本 方案采用四向扭转式车道, 在地表面的车行道的上方设置两层扭转式车道, 提高其通行能力, 同时减小了对土地的占用, 造价更加便宜。
对于某些国家采取行者靠左方式的交通, 此方案仍然可行。 只需要将路 线, 桥体按照天桥行驶方向进行镜像调换即可。
采取上述方式, 就能较好地实现本发明
Claims
1、基于城市道路中的扭转式立交桥的结构,包括机动车道和非机动车道, 其特征在于: 所述机动车道分为三层, 其中一层为扭转式车道, 另外两层为 直线式车道, 且第一层、 第二层以及第三层在空间上错开, 扭转式车道通过 设置在其两侧上的匝道 (1 ) 与直线式车道连通, 非机动车道 (4) 设置在直 线式车道的两侧。
2、根据权利要求 1所述的基于城市道路中的扭转式立交桥的结构,其特 征在于: 所述扭转式车道分为直行车道和逆行车道, 直行车道和逆行车道均 包括扭转段(6)和直线段(5 ), 扭转段(6) 同时设置在直线段(5 )的两端, 且直行车道的扭转段 (6) 和对应的逆行车道的扭转段 (6) 形成空间上的交 叉。
3、根据权利要求 2所述的基于城市道路中的扭转式立交桥的结构,其特 征在于:所述直线式车道包括位于底层的下穿隧道(3 )和设置在下穿隧道(3 ) 上方的地表车道(2), 下穿隧道(3 )的入口和出口两侧均设置向外依次设置 有转弯机动车道和非机动车道 (4), 且匝道 (1 ) 一端与直线段 (5 ) 连通, 另一端与该侧对应的转弯机动车道连通, 扭转段 (6) 远离直线段 (5 ) 的一 端均与地表车道 (2) 连通。
4、根据权利要求 2所述的基于城市道路中的扭转式立交桥的结构,其特 征在于: 所述直线式车道包括位于上层的高架桥 (7) 和设置在高架桥 (7 ) 下方的地表车道(2), 高架桥(7 )的入口和出口两侧均设置向外依次设置有 转弯机动车道和非机动车道 (4), 且匝道 (1 ) 一端与直线段 (5 ) 连通, 另 一端与该侧对应的转弯机动车道连通, 扭转段 (6) 远离直线段 (5 ) 的一端
均与地表车道 (2) 连通。
5、根据权利要求 3所述的基于城市道路中的扭转式立交桥的结构,其特 征在于: 所述地表车道(2)呈十字型结构, 该十字型结构的两侧均设置有非 机动车道 (4)。
6、根据权利要求 3所述的基于城市道路中的扭转式立交桥的结构,其特 征在于: 所述地表车道 (2) 上设置有与该地表车道 (2) 垂直的斑马线, 斑 马线两端分别与对应的道路侧壁连接。
7、根据权利要求 1所述的基于城市道路中的扭转式立交桥的用途,其特 征在于, 包括以下途径:
(a) 机动车的直行通过下穿隧道 (3 )、 高架桥 (7 ) 或者扭转式车道实 现, 在任意方向任意时间均无需停止, 在交通灯指示机动车通行时, 机动车 的左转弯通过扭转式车道上的匝道实现, 地表面上的机动车的掉头、 右转弯 或者左转弯均通过设置在地表面上的直线式车道同时实现;
( b ) 在交通灯指示非机动车通行时, 地表车道 (2) 中的所有机动车停 止通行, 非机动车通过斑马线进行任意方向上的通行。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210262391.5 | 2012-07-27 | ||
CN201210262391.5A CN102747661B (zh) | 2012-07-27 | 2012-07-27 | 基于城市道路中的扭转式立交桥的结构及其用途 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014015682A1 true WO2014015682A1 (zh) | 2014-01-30 |
Family
ID=47028131
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2013/073652 WO2014015682A1 (zh) | 2012-07-27 | 2013-04-02 | 基于城市道路中的扭转式立交桥的结构及其用途 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN102747661B (zh) |
WO (1) | WO2014015682A1 (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104480820A (zh) * | 2014-11-20 | 2015-04-01 | 富阳新鼎机械有限公司 | 一种城市快速通道交通系统及其通行控制方法 |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102747661B (zh) * | 2012-07-27 | 2016-02-03 | 蒋雨良 | 基于城市道路中的扭转式立交桥的结构及其用途 |
CN103726424B (zh) * | 2014-01-10 | 2016-01-06 | 王小军 | 旋进式双向单行道立体道路 |
CN111501448A (zh) * | 2019-01-30 | 2020-08-07 | 周立新 | 新型分离式交通系统及具有其的城市交通系统 |
CN111501447A (zh) * | 2019-01-30 | 2020-08-07 | 周立新 | 新型交通系统及具有其的城市交通系统 |
CN110629612A (zh) * | 2018-06-20 | 2019-12-31 | 周立新 | 一种交通系统 |
CN110616605A (zh) * | 2018-06-20 | 2019-12-27 | 周立新 | 立体交通系统及具有其的城市交通系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005256578A (ja) * | 2004-03-08 | 2005-09-22 | Takuya Ono | 階層道路を用いた都市型無信号立体交差点 |
CN101787669A (zh) * | 2010-02-11 | 2010-07-28 | 汪洋翰 | 易于左转弯的高速公路立交桥 |
GEP20115262B (en) * | 2009-08-07 | 2011-08-10 | Junction of automobile overpass | |
CA2736686A1 (en) * | 2010-11-13 | 2012-05-13 | Antonio M. Loro | Weaving-free interchange with few bridges and exterior exits and entrances only |
CN102747661A (zh) * | 2012-07-27 | 2012-10-24 | 蒋雨良 | 基于城市道路中的扭转式立交桥的结构及其用途 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1131352C (zh) * | 2001-02-21 | 2003-12-17 | 伦玉民 | 提高繁华道路路口通流能力的交通设施及其使用方法 |
CN2589497Y (zh) * | 2002-07-12 | 2003-12-03 | 吕乐民 | 新一代剪式置换立交桥 |
CN200974950Y (zh) * | 2006-08-23 | 2007-11-14 | 杜三平 | 城市交通组合立交桥 |
-
2012
- 2012-07-27 CN CN201210262391.5A patent/CN102747661B/zh not_active Expired - Fee Related
-
2013
- 2013-04-02 WO PCT/CN2013/073652 patent/WO2014015682A1/zh active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005256578A (ja) * | 2004-03-08 | 2005-09-22 | Takuya Ono | 階層道路を用いた都市型無信号立体交差点 |
GEP20115262B (en) * | 2009-08-07 | 2011-08-10 | Junction of automobile overpass | |
CN101787669A (zh) * | 2010-02-11 | 2010-07-28 | 汪洋翰 | 易于左转弯的高速公路立交桥 |
CA2736686A1 (en) * | 2010-11-13 | 2012-05-13 | Antonio M. Loro | Weaving-free interchange with few bridges and exterior exits and entrances only |
CN102747661A (zh) * | 2012-07-27 | 2012-10-24 | 蒋雨良 | 基于城市道路中的扭转式立交桥的结构及其用途 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104480820A (zh) * | 2014-11-20 | 2015-04-01 | 富阳新鼎机械有限公司 | 一种城市快速通道交通系统及其通行控制方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102747661A (zh) | 2012-10-24 |
CN102747661B (zh) | 2016-02-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2014015682A1 (zh) | 基于城市道路中的扭转式立交桥的结构及其用途 | |
WO2005031069A1 (fr) | Systeme routier urbain d'echangeur complet et sa methode d'utilisation par le trafic | |
WO2008031309A1 (fr) | Système d'autoroute à péage comprenant moins d'arrêts, aucun changement et un trajet convenable | |
WO2005019534A1 (fr) | Autopont echangeur aerien a un seul niveau | |
CN2797426Y (zh) | 环形叠合式立体钢结构互通立交桥 | |
CN102268852A (zh) | 一种城市道路交通系统的两相位实施方法 | |
CN202247573U (zh) | 一种城市十字路口立交桥 | |
CN202099708U (zh) | 一种新型式道路十字路口的低立交桥 | |
CN101709561B (zh) | 交通十字路口畅通立交桥 | |
CN204530358U (zh) | 十字路口车道无交叉连续通行交通系统 | |
CN101492904B (zh) | 一种交通路口车道 | |
CN102127886A (zh) | 多功能隧道、道路泊车场 | |
CN202390736U (zh) | 城区单层全封闭全互通立交桥 | |
CN209602887U (zh) | 一种无红灯十字路口立交桥 | |
WO2021036902A1 (zh) | 互通式立交桥 | |
CN101487214A (zh) | 城市十字路口人性化多功能立交桥 | |
CN116289368A (zh) | 城市无红灯综合立交桥 | |
CN1851129B (zh) | 行人直穿式丁字路口全互通立交桥 | |
CN202194042U (zh) | 应用变道方式的交通路口 | |
CN111501449A (zh) | 半环岛组合立交桥 | |
CN101187192B (zh) | 十字路口免红绿灯回转行车交通道路系统 | |
CN104612012A (zh) | 十字路口车道无交叉连续通行交通系统及其控制方法 | |
CN202559200U (zh) | 城市道路交通优化功能系统 | |
WO2019080763A1 (zh) | 十字路口永通立交桥道路交通系统 | |
WO2022057639A1 (zh) | 城市轴心干道十字立交 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13822742 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 13822742 Country of ref document: EP Kind code of ref document: A1 |