WO2014013714A1 - エネルギ管理装置、エネルギ管理方法及びエネルギ管理プログラム - Google Patents

エネルギ管理装置、エネルギ管理方法及びエネルギ管理プログラム Download PDF

Info

Publication number
WO2014013714A1
WO2014013714A1 PCT/JP2013/004327 JP2013004327W WO2014013714A1 WO 2014013714 A1 WO2014013714 A1 WO 2014013714A1 JP 2013004327 W JP2013004327 W JP 2013004327W WO 2014013714 A1 WO2014013714 A1 WO 2014013714A1
Authority
WO
WIPO (PCT)
Prior art keywords
demand
energy management
energy
supply
amount
Prior art date
Application number
PCT/JP2013/004327
Other languages
English (en)
French (fr)
Inventor
熊澤 俊光
鳥羽 廣次
元紀 木谷
宮崎 保幸
操 木村
小坂 葉子
喜仁 木下
保博 田口
Original Assignee
株式会社 東芝
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社 東芝 filed Critical 株式会社 東芝
Priority to BR112015000767A priority Critical patent/BR112015000767A2/pt
Priority to CN201380038104.5A priority patent/CN104620456A/zh
Priority to EP13820449.0A priority patent/EP2876766A4/en
Publication of WO2014013714A1 publication Critical patent/WO2014013714A1/ja
Priority to US14/583,902 priority patent/US20150120077A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/04Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
    • H02J3/06Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00028Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/0205Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05FSYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
    • G05F1/00Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
    • G05F1/66Regulating electric power
    • H02J13/0086
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/20Information technology specific aspects, e.g. CAD, simulation, modelling, system security

Definitions

  • Embodiments described herein relate generally to an energy management apparatus, an energy management method, and an energy management program.
  • a smart grid that aims to realize an energy supply and demand management system with high efficiency, high quality, and high reliability is drawing attention.
  • the smart grid uses information and power from distributed power sources such as solar power generation and wind power generation using recent information and communication technology (ICT). Enables integrated management of information on the customer side.
  • ICT information and communication technology
  • a method for controlling and managing power for a plurality of devices for example, a method in which a higher-level device of a hierarchically configured system performs control based on more abstract power supply and demand data, or a single function module A method of controlling the supply and demand of electric power by distributing the power supply has been proposed.
  • a method for controlling and managing power supply and demand by automatically linking devices together a specific device existing on the communication network automatically becomes the master of management, and the total power of the managed devices is determined in advance.
  • a method of performing control so that the value is less than the value is also known.
  • the conventional energy supply and demand management system with a large-scale hierarchical configuration requires adjustment between energy management devices when adding, deleting, or changing energy management devices. Is getting harder.
  • a problem to be solved by the present invention is to provide an energy management device, an energy management method, and an energy management program that can easily cope with a change in a system that manages the supply and demand of electric power.
  • the energy management apparatus of the embodiment includes first and second registration units, first and second reception units, a totaling unit, first and second transmission units, and a proration unit.
  • the first registration unit manages the first energy management device when acquiring information indicating registration permission as a response to the registration request requested from the energy management device of the embodiment to the first energy management device. Registered as an upper energy management device.
  • the second registration unit sets the second energy management device as a lower-order energy management device to be managed. sign up.
  • the first receiving unit includes an energy supply and demand adjustable amount representing an energy supply and demand amount representing the current power supply and demand amount and an adjustable amount with respect to the current power supply and demand amount from each of the plurality of registered lower energy management devices.
  • the totaling unit totals the received energy demand and supply amount and the energy supply and demand adjustable amount for each lower-order energy management device.
  • the first transmission unit transmits the totaled result to the registered upper energy management apparatus.
  • the second receiving unit receives an energy supply / demand adjustment amount representing an adjustment amount for adjusting the power supply / demand calculated based on the aggregation result from a higher-order energy management device.
  • the prorated portion apportions the received energy supply / demand adjustment amount for a plurality of lower energy management devices.
  • the second transmission unit transmits individual power supply / demand adjustment amounts prorated from the energy supply / demand adjustment amounts to the plurality of lower energy management devices.
  • the energy supply and demand management system 15 including the energy management apparatus according to the first to fifth embodiments classifies the position of hierarchical management of power supply and demand into groups A to D, for example.
  • a plurality of EMSs (Energy Management Systems) 1 to 14 are provided.
  • an energy management apparatus belonging to group A is an energy management apparatus in which both a lower-order energy management apparatus to be managed and a higher-order energy management apparatus to be managed exist on the system. 6 etc. correspond.
  • the energy management apparatus belonging to group B is an energy management apparatus in which there is no higher-order energy management apparatus to be managed on the system, and corresponds to EMS1.
  • the energy management apparatus belonging to group C is an energy management apparatus in which there is no lower-order energy management apparatus to be managed, and corresponds to, for example, EMS2, 7, 9-14.
  • the energy management apparatus belonging to group D is an energy management apparatus in which there are a plurality of higher-order energy management apparatuses that receive management, and corresponds to EMS8.
  • the EMS 1 is configured as a micro EMS (Micro Energy Management System) that manages the power supply and demand of the entire energy supply and demand management system 15 in cooperation with an electric power company and the like.
  • the EMS 2 manages the supply and demand of electric power for large-scale PV (Photovoltaic) power generation and, for example, a stationary smart battery linked with an electric power system.
  • EMS3 collects and analyzes information transmitted from smart meters that monitor power generation and consumer-side power consumption, and sets power rates and provides efficient energy use to consumers MDMS (Meter Data Management System) and the like.
  • the EMS 4 is configured as a CEMS (Community Energy Management System) that manages the amount of power supplied at a power plant including a solar power plant and a wind power plant and the demand for power within the region.
  • the EMS 5 includes a BEMS (Building Energy Management System) that manages the supply and demand of electric power for power distribution equipment, air conditioning equipment, lighting equipment, ventilation equipment, OA equipment, and the like in the building.
  • CEMS Common Energy Management System
  • BEMS Building Energy Management System
  • the EMS 6 is configured as, for example, a HEMS (Home Energy Management System) that manages power supply and demand in the home in conjunction with a HAN (Home Area Network) or the like.
  • the EMSs 9 to 13 are configured as energy management devices that respectively manage the supply and demand of electric power for air conditioners in buildings, lighting, electric vehicles (EV: Electric Vehicle) at home, washing dryers, and air conditioners.
  • the energy management apparatus 20 As shown in FIGS. 1 and 2, the energy management apparatus 20 according to the first embodiment is configured as, for example, EMS 3, 5, 6, etc. belonging to the group A described above. As shown in FIG. 2, the energy management device 20 receives management of power supply and demand from a single host device (upper energy management device) 21. On the other hand, the energy management device 20 sets a plurality of lower-level devices (lower-level energy management devices) 23 as power supply / demand management targets.
  • the energy management apparatus 20 of the present embodiment has a function for realizing three processes such as a cooperation management process, a measurement and monitoring process, and a control process.
  • the energy management device 20 includes a higher-level device registration unit 31 and a lower-level device management unit 32 for realizing cooperation management processing, and a lower-level device data reception unit for realizing measurement and monitoring processing. 24, energy supply and demand totaling unit 25, energy supply and demand adjustable amount totaling unit 26 and host device data transmission unit 27, host device data receiving unit 28 for realizing control processing, energy demand and supply adjustment amount proposing unit 29 and lower A device data transmission unit 30.
  • the host device 21, the slave device 23, and the energy management device 20 are connected to a network communication applying a short-range wireless communication standard such as ZigBee (registered trademark) or a wireless or wired communication line such as a LAN or Bluetooth (registered trademark). And are connected to each other via a higher-level device data transmission unit 27, a higher-level device data reception unit 28, a lower-level device data transmission unit 30, and a lower-level device data reception unit 24.
  • a short-range wireless communication standard such as ZigBee (registered trademark) or a wireless or wired communication line such as a LAN or Bluetooth (registered trademark).
  • the higher-level device registration unit 31 has a function as a first registration unit, and receives a registration request from the higher-level device 21 when receiving management of power supply and demand from the higher-level device 21 ( Create registration application data for registration application.
  • the registration application data includes at least unique information for identifying the energy management device 20 (for example, a preset serial number, IP address, physical address of a communication adapter, etc.).
  • the host device 21 receives the registration request requested via the registration application data, and registers the energy management device 20 as a management target.
  • the higher-level device registration unit 31 acquires (receives via the higher-level device data receiving unit 28) information indicating registration permission (a signal indicating acceptance of registration application) as a response from the higher level device 21 to the registration request.
  • the host device registration unit 31 registers the host device 21 as a host energy management device to be managed (registers identification information unique to the host device 21). Thereby, cooperation with the high-order apparatus 21 and the energy management apparatus 20 is established.
  • the host device registration unit 31 acquires information indicating permission for deregistration as a response to the registration cancel request requested to the registered host device 21, the host device registration unit 31 receives the information from the management target. exclude. In other words, the host device 21 replies to the energy management device 20 with the registration cancellation data that permits the cancellation of the registration when the appropriate cancellation application data from the energy management device 20 is received.
  • the host device registration unit 31 detects whether or not a registration cancellation trigger is input from the outside.
  • the host device registration unit 31 generates release application data as release application processing to the host device 21 when detecting an input of a registration release trigger.
  • the generated cancellation application data is transmitted to the host device 21 by the host device data transmission unit 27.
  • the above-described deregistration trigger may be directly input artificially via an input interface installed in the higher-level device registration unit 31. Further, the deregistration trigger may be indirectly input from a device other than the energy management device 20 via a communication line or the like.
  • the lower device management unit 32 has a function as a second registration unit.
  • the lower device management unit 32 registers the lower device 23 as a lower energy management device to be managed.
  • the lower-level device management unit 32 determines whether the lower-level device data receiving unit 24 has received registration application data from the lower-level device 23.
  • This registration application data is at least unique information for identifying the lower device 23 (for example, a preset serial number, IP address, physical address of the communication adapter) as in the case of registration application data for the upper device 21. Etc.).
  • the low order device management unit 32 acquires registration application data from the low order device 23 via the low order device data receiving unit 24, the low order device 23 is registered as a device to be managed for power supply and demand (a diagram to be described later). 3), and a signal indicating acceptance of the registration application is transmitted from the lower apparatus data transmission unit 30 to the lower apparatus 23.
  • the lower device management unit 32 when the lower device management unit 32 receives a registration cancellation request from the registered lower device 23, the lower device management unit 32 excludes the lower device 23 from the management target. Specifically, when the lower-level device data receiving unit 24 receives the cancellation application data from the lower-level device 23, the lower-level device management unit 32 cancels the registration of the lower-level device 23 that has been the management target (the lower level illustrated in FIG. 3). The device-specific symbol or the like is deleted), and a signal indicating acceptance of the cancellation application is transmitted from the lower-level device data transmission unit 30 to the lower-level device 23.
  • the lower-level device data receiving unit 24 has a function as a first receiving unit.
  • the low-order device data receiving unit 24 adjusts the energy supply / demand amount representing the current power supply / demand amount and the current power supply / demand amount from each of the plurality of low-order devices 23 registered as management targets.
  • the energy supply and demand adjustable amount representing the possible amount is received together with the lower device unique symbol that can identify the lower device 23.
  • the energy supply / demand amount is a value obtained by adding, for example, the power consumption on the customer side (demand amount of power on the load side) monitored by a smart meter or the like and the power supply amount from the power supplier side. .
  • the energy supply and demand adjustable amount is an energy supply and demand increase adjustable amount upper limit value and an energy supply and demand reduction adjustable amount lower limit that respectively represent an upper limit value and a lower limit value that can be adjusted with respect to the current power supply and demand amount. Value. More specifically, such an energy supply and demand adjustable amount is set to a target value based on, for example, the current indoor temperature when the power device to be managed for supply and demand of power by the lower device (lower energy management device) 23 is, for example, an air conditioner. Based on the temperature difference required until the set temperature is reached, the remaining time from the current time to the time required to reach the set temperature, etc., the lower-level device 23 calculates.
  • the energy supply / demand adjustment amount is an electric vehicle or the like
  • the amount of energy that can be adjusted for energy supply and demand is added, for example, from the current charge amount to full charge. And the remaining time from the current time to the time required to be fully charged, and the like.
  • the energy supply and demand totaling unit 25 and the energy supply and demand adjustable amount totaling unit 26 include the energy supply and demand amount and the energy supply and demand adjustable amount for each of the plurality of lower devices 23 received by the lower device data receiving unit 24. It is a totaling unit (first totaling unit) that totals (energy energy supply / demand increase adjustable amount upper limit value and energy supply / demand reduction adjustable amount lower limit value).
  • the host device data transmission unit 27 has a function as a first transmission unit.
  • the higher-level device data transmission unit 27 transmits the totaling results (total values) illustrated in FIG. 4 that have been totaled by the energy supply and demand amount totaling unit 25 and the energy demand and supply adjustable amount totaling unit 26 to the registered higher-level device 21.
  • the host device data receiving unit 28 has a function as a second receiving unit.
  • the host device data receiving unit 28 receives from the host device 21 an energy supply and demand adjustment amount that represents an adjustment amount for adjusting the power supply and demand.
  • the energy supply / demand adjustment amount is calculated by the host device 21 based on the above-described total result.
  • the host device 21 is managed by EMS 7 and 8 in addition to EMS 6.
  • the host device 21 calculates the energy supply and demand adjustment amount based on the above-mentioned total result after ensuring the supply of electric power of a predetermined value or more to the EMS 7 and 8 side.
  • This energy supply and demand adjustment amount substantially adjusts the supply amount of power managed by the host device 21 with respect to the energy management device 20 side.
  • the energy supply / demand adjustment amount is calculated by adding a total value (for example, 678 W) of the energy supply / demand amount (amount obtained by adding the power demand amount and the power supply amount) illustrated in FIG. With respect to the above-mentioned 678 W, for example, it is calculated as an increased or decreased value within the range of +209 W of the upper limit value to ⁇ 144 W of the lower limit value.
  • the energy supply / demand adjustment amount distribution unit 29 distributes the energy supply / demand adjustment amount received by the host device data reception unit 28 from the host device 21 to the plurality of lower devices 23 (first distribution unit). Prorated part).
  • a method of apportioning (distributing) the energy supply / demand adjustment amount received from the host device 21 an apportionment method proportional to the energy supply / demand amount of each sub-device 23 can be considered.
  • the apportionment amount pi of the lower apparatus (23) i is calculated by, for example, the following formula 1, where P is the energy supply and demand adjustment amount received from the upper apparatus 21 and di is the energy supply and demand amount of the lower apparatus i. Is possible.
  • the apportionment amount pi of the lower apparatus (23) i is the energy supply / demand adjustment amount received from the upper apparatus 21, P, the upper limit value of the energy supply / demand increase adjustable amount of the lower apparatus i, ui, and the energy of the lower apparatus i.
  • the lower limit value of the supply / demand reduction adjustable amount is l i, it is possible to calculate with the following formula 2.
  • the lower-level device data transmission unit 30 has a function as a second transmission unit.
  • the lower device data transmission unit 30 transmits the individual power supply / demand adjustment amounts prorated from the energy supply / demand adjustment amounts to the plurality of lower devices 23.
  • the low-order device 23 is the EMS 12 (lowest energy management device) shown in FIG. 1 or the like
  • the electric equipment managed by the EMS 12 based on the adjustment amount of the electric power supply and demand allocated to the EMS 12 Supply of electric power to the (washer / dryer) is controlled.
  • the unit 28, the energy supply / demand adjustment amount allocation unit 29, and the lower-level device data transmission unit 30 may be realized by software by executing an energy management program on a computer, and each may be configured by hardware. May be.
  • registration application data is transmitted from the upper apparatus data transmission unit 27 to the upper apparatus 21 (S1), and information indicating acceptance of the registration application is received as a response to the registration application (registration request) to the upper apparatus 21.
  • the registration unit 31 obtains the data via the host device data reception unit 28, the host device registration unit 31 registers the host device 21 as a host energy management device to be managed. Thereby, cooperation with the high-order apparatus 21 and the energy management apparatus 20 is established.
  • the lower device management unit 32 determines whether or not the lower device data reception unit 24 has received the management registration application (or the lower device 23) depending on whether the registration application data (or the cancellation application data) has been received from the lower device 23. It is determined whether or not there is a management registration cancellation application (S2). When the lower device management unit 32 receives a management registration application (or management registration cancellation application) from the lower device 23 (YES in S2), the lower device 23 is registered as a management target (or excluded from the management target). (S3).
  • the lower device data receiving unit 24 determines whether or not the energy supply / demand amount and the energy supply / demand adjustable amount are received from the plurality of lower devices 23 registered as management targets, as shown in FIG. S4).
  • the energy supply and demand amount and the energy supply and demand adjustable amount are received (YES in S4), the energy supply and demand amount totaling unit 25 and the energy demand and supply adjustable amount totaling unit 26, as shown in FIG.
  • the supply and demand amount and the energy supply and demand adjustable amount (the energy supply and demand increase adjustable amount upper limit value and the energy supply and demand reduction adjustable amount lower limit value) are totalized.
  • the higher-level device data transmission unit 27 transmits, for example, the aggregate value illustrated in FIG. 4 that is aggregated by the energy supply / demand aggregation unit 25 to the higher-level device 21 (S5).
  • the lower device data receiving unit 24, the energy supply / demand totaling unit 25, the energy supply / demand adjustable amount totaling unit 26, and the upper device data transmitting unit 27 are the results of measurement and monitoring related to the power supply / demand of each lower device 23. To the host device 21 is realized.
  • the host device data receiving unit 28 determines whether or not the energy supply / demand adjustment amount is received from the host device 21 (S6).
  • the host device data reception unit 28 receives the energy supply / demand adjustment amount from the host device 21 (YES in S6)
  • the energy supply / demand adjustment amount distribution unit 29 receives the energy supply / demand balance received from the host device 21 by the host device data reception unit 28.
  • the adjustment amount is prorated to a plurality of subordinate devices 23 to be managed.
  • the lower device data transmission unit 30 transmits the individual power supply and demand adjustment amounts prorated from the energy supply and demand adjustment amounts to the respective lower device 23 (S7).
  • the upper device data receiving unit 28, the energy supply / demand adjustment amount allocation unit 29, and the lower device data transmission unit 30 apportion the energy supply / demand adjustment amount from the upper device 21 and notify each of the lower devices 23. To implement the control process.
  • the host device registration unit 31 detects whether or not a registration cancellation trigger is input from the outside (S8).
  • the host device registration unit 31 generates cancellation application data when detecting an input of a registration cancellation trigger (YES in S8).
  • This cancellation application data is transmitted to the host device 21 by the host device data transmission unit 27.
  • an application for canceling the management registration is made to the higher-level device 21 (S9).
  • the higher-level device registration unit 31 and the lower-level device management unit 32 described above realize cooperative management processing between the higher-level device 21 and the lower-level device 23 and the energy management device 20.
  • the energy management apparatus 20 of the present embodiment cooperation between the upper apparatus 21 to be managed and the plurality of lower apparatuses 23 to be managed is performed, and accurate information on the supply and demand of power is passed. Can do.
  • the energy management device 20 of the present embodiment it is possible to easily cope with, for example, a partial change (addition or deletion of an upper or lower energy management device) in the energy supply and demand management system 15 having a hierarchical configuration. can do.
  • the energy management device 50 is an energy management device in which there is no upper energy management device.
  • the energy management apparatus 50 is configured as, for example, EMS ( ⁇ EMS) 1 belonging to the group B shown in FIG. That is, as shown in FIG. 6, the energy management device 50 is replaced with a higher-level device data transmission unit 27, a higher-level device data reception unit 28, and a higher-level device registration unit 31 included in the energy management device 20 of the first embodiment.
  • the energy supply / demand adjustment amount calculation unit 54 is provided.
  • the energy supply / demand adjustment amount calculation unit 54 calculates the aggregation results (the energy supply / demand amount for each of the lower devices 23, the energy supply / demand increase adjustable upper limit value, the energy supply / demand balance) and the energy supply / demand adjustment amount calculation unit 54. This is a calculation unit (first calculation unit) that calculates an energy supply and demand adjustment amount based on a total value of the reduction adjustment possible amount lower limit value).
  • the energy supply / demand adjustment amount allocation unit 29 apportions the energy supply / demand adjustment amount for each lower device 23.
  • the energy supply / demand adjustment amount calculation unit 54 acquires, as necessary, measurement data regarding the power supply / demand of each of the lower-level devices 23 from an external sensor 55 that is different from the above-described smart sensor, for example. This measurement data may be reflected in the calculated energy supply and demand adjustment amount.
  • the energy management device 50 of the present embodiment configured as described above is positioned at the top of other energy management devices, and can substantially play a role of managing the entire energy supply and demand management system 15.
  • the energy management device 70 is an energy management device in which no lower-order energy management device exists.
  • the energy management device 70 is configured as, for example, EMS2, 7, 9 to 14 belonging to the group C shown in FIG.
  • the energy management device 70 includes the lower device management unit 32, the lower device data reception unit 24, the energy supply / demand totaling unit 25, and the energy included in the energy management device 20 of the first embodiment.
  • an energy supply and demand control unit 77 In place of the supply and demand adjustable amount totaling unit 26, the energy supply and demand adjustment amount allocation unit 29, and the lower device data transmission unit 30, an energy supply and demand control unit 77, an energy supply and demand adjustable amount calculation unit 78 as a second calculation unit, and An energy supply / demand measuring unit 79 is provided.
  • an energy supply and demand device 72 is connected to the energy management device 70.
  • the energy supply and demand device 72 is configured as a power supply and demand device capable of supplying power to electric devices such as a distributed power source such as a solar power generation device and a power storage device, an air conditioner, and lighting.
  • the energy supply / demand control unit 77 controls the operation of the energy supply / demand device 72 based on the adjustment amount of the individual power supply / demand that is prorated based on the energy supply / demand adjustment amount from the host device 21.
  • the energy supply / demand measurement unit 79 is a measurement unit (first measurement unit) such as a smart meter that measures the current supply / demand amount of electric power by the energy supply / demand device 72 as the energy supply / demand amount described above.
  • the energy supply and demand adjustable amount calculation unit 78 determines the amount of energy supply and demand that can be adjusted by the energy supply and demand device 72 as the energy supply and demand adjustable amount (the energy supply and demand increase adjustable amount upper limit value and the energy supply and demand reduction adjustable amount lower limit value). ).
  • the energy supply and demand adjustable amount may be calculated based on the ratio of supply and demand measured by the energy supply and demand measurement unit 79 (ratio between power demand and power supply).
  • the energy supply / demand adjustable amount may be calculated as a difference from the energy supply / demand amount up to a predetermined threshold.
  • the energy supply and demand adjustable amount may be calculated based on other algorithms and rules.
  • the energy supply / demand control unit 77 described above is based on the energy supply / demand adjustment amount received by the host device data reception unit 28 from the host device 21, and the power supply / demand by the energy supply / demand device 72 within the range of the energy supply / demand adjustment possible amount. To control.
  • the energy management device 70 of the present embodiment is an energy management device positioned at the lowest level in the energy supply and demand management system 15 having a hierarchical configuration. That is, the energy management device 70 can manage the supply and demand of electric power for electric devices such as distributed power sources, air conditioners, lighting, and washing and drying machines.
  • the function of the energy management device 70 and the function of the energy supply and demand device 72 may be mounted on the electric device itself.
  • the energy management device 80 is an energy management device in which a plurality of higher-order energy management devices that receive management exist.
  • the energy management device 80 is configured as, for example, EMS 8 belonging to the group D shown in FIG.
  • the EMS 8 illustrated in FIG. 1 has a single lower device as a management target, a plurality of lower devices may be managed as in the energy management device 80 of this embodiment shown in FIG.
  • the energy management device 80 of the present embodiment has an energy supply and demand adjustment amount totaling unit as a second totaling unit in addition to the configuration of the energy management device 20 of the first embodiment. 82 and a subordinate device data total value prorated portion 83 as a second prorated portion.
  • the lower device data total value drafting unit 83 proposes a tabulated result in which the energy supply / demand amount and the energy supply / demand adjustable amount for each of the plurality of lower devices 23 are totaled for a plurality of registered upper devices 21. Divide.
  • the prorated proportion for each higher-level device may be determined in advance as a fixed value. Further, the prorated method may be a method in which the prorated proportion is increased, for example, in a device having a higher priority according to a preset priority for each higher-level device. Furthermore, the prorated method may be prorated based on other algorithms and rules.
  • the higher-level device data transmission unit 27 transmits the individual aggregation results prorated from the aggregation results by the lower-level device data aggregation value allocation unit 83 to the plurality of higher-level devices 21.
  • the host device data receiving unit 28 receives each energy supply / demand adjustment amount calculated by each host device 21 based on the individual tabulation results from each of the plurality of host devices 21.
  • the energy supply / demand adjustment amount totaling unit 82 totals the received energy supply / demand adjustment amounts for each of the plurality of higher-level devices 21.
  • the energy supply and demand adjustment amount proposing unit 29 apportions the energy supply and demand adjustment amount (the total value) calculated by the energy supply and demand adjustment amount totaling unit 82 for a plurality of lower devices 23.
  • the energy management device 80 of the present embodiment even when there are a plurality of higher-order devices 21 that receive management, current data relating to power supply and demand obtained from a plurality of lower-order devices 23 is converted into a plurality of higher-order devices 21. The device 21 is notified accurately. Furthermore, the energy management device 80 aggregates a plurality of energy supply and demand adjustment amounts respectively returned from the host devices 21 and apportions them. Therefore, according to the energy management device 80, it is possible to appropriately manage the supply and demand of the electric power of each lower device 23.
  • the energy management device 90 is configured by partially changing the energy management device 20 of the first embodiment shown in FIG.
  • the energy management device 90 replaces the lower device data reception unit 24 and the energy supply and demand adjustment amount distribution unit 29 included in the energy management device 20 of the first embodiment.
  • a data receiving unit 94 and an energy supply and demand adjustment amount proposing unit 99 are provided.
  • the lower device data receiving unit 94 calculates the energy supply and demand adjustable amount.
  • Supplementary information related to the condition is received from each of the plurality of lower-level devices 23.
  • the energy supply and demand adjustment amount proposing part 99 corrects the energy supply and demand adjustment amount according to the received supplementary information.
  • the supplementary information described above for example, information on power costs (electricity charges) that associates the operating efficiency of electric equipment with the amount of power supplied, and the stability (instability) related to the amount of power supplied and the operation of the electric equipment.
  • the associated uncertainty information, the attribute information of the lower device 23 (information indicating the installation location of the lower device and the output capacity of the lower device), and the like can be exemplified.
  • the attribute information of the lower-level device 23 the probable amount of the energy supply and demand adjustment amount is corrected in consideration of, for example, a loss, voltage fluctuation, frequency fluctuation, etc. during power transmission based on the attribute information. can do.
  • the energy supply and demand adjustment amount prorated portion 99 uses these supplementary information together to apportion only the subordinate devices that reflect the cost optimization and uncertainty, or the subordinate devices having specific attributes. Make it possible to target.
  • the prorated amount pi of the subordinate device (23) i to be managed is P for the energy supply / demand adjustment amount received from the upper device 21, e for the allowable adjustment error, di for the energy supply / demand for the subordinate device i, and energy supply / demand
  • the cost per unit amount of the adjustment amount is ci
  • it is calculated as a prorated amount that satisfies the condition of the following Equation 3, so that it is possible to adjust the energy supply and demand with the cost optimized.
  • the energy management device 90 of the present embodiment it is possible to stabilize the operation of the load-side electric device and optimize the power cost in consideration of the operation efficiency of the electric device.
  • an energy management device including all the components of the first to fifth embodiments may be configured, or some components may be configured from the energy management device including all such components.
  • the deleted energy management apparatus may be applied.
  • each component for example, the energy supply and demand amount totaling unit 25, the energy demand and supply adjustable amount totaling unit 26 shown in FIG. 2, the energy supply and demand adjustment amount plan shown in FIG. 2 provided in the energy management devices according to the first to fifth embodiments.
  • the splitting unit 29, the higher-level device registration unit 31, the lower-level device management unit 32, etc. are provided as magnetic disks (flexible disks, hard disks, etc.), optical disks (CD-ROM, DVD, etc.). It can also be stored and distributed in a storage medium such as a semiconductor memory.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • General Physics & Mathematics (AREA)
  • Artificial Intelligence (AREA)
  • Medical Informatics (AREA)
  • Software Systems (AREA)
  • Evolutionary Computation (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Health & Medical Sciences (AREA)
  • Electromagnetism (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

 電力の需給を管理するシステムの変更に対して容易に対応する。実施形態のエネルギ管理装置は、以下の構成要素を備える。第1の登録部は、登録の許可を表す情報を返信してきた第1のエネルギ管理装置を上位のエネルギ管理装置として登録する。第2の登録部は、登録要求を受け付けた第2のエネルギ管理装置を下位のエネルギ管理装置として登録する。第1の受信部は、複数の下位のエネルギ管理装置からエネルギ需給量とエネルギ需給調整可能量とを受信する。集計部はこれらを集計する。第1の送信部は、集計結果を上位のエネルギ管理装置へ送信する。第2の受信部は、集計結果を基に算出されたエネルギ需給調整量を上位のエネルギ管理装置より受信する。案分部は、エネルギ需給調整量を、下位の各エネルギ管理装置を対象として案分する。第2の送信部は、案分されたエネルギ需給調整量を下位の各エネルギ管理装置へ送信する。

Description

エネルギ管理装置、エネルギ管理方法及びエネルギ管理プログラム
 本発明の実施形態は、エネルギ管理装置、エネルギ管理方法及びエネルギ管理プログラムに関する。
 高効率及び高品質で、しかも信頼度の高いエネルギ需給管理システムの実現を目指すスマートグリッドが注目されている。スマートグリッドは、従来の集中型電源と送電系統との一体運用に加え、近年の情報通信技術(ICT)を活用し、太陽光発電、風力発電などの分散型電源の情報や、電力を使用する需要家側の情報を統合した管理を可能にする。
 ところで、上記した情報通信技術が様々な機器に適用されるようになると、より緻密に、電力の需給に関する情報の取得や制御が可能となる。これに伴い、多種多様な複数の機器を対象として電力の需給を管理するためのエネルギ管理装置が必要となる。
 複数の機器に対し電力を制御及び管理する方法としては、例えば階層的に構成されるシステムの上位側の装置が、より抽象的な電力の需給データに基づいて制御を行う方法や、単機能モジュールを分散配置して電力の需給を制御する方法などが提案されている。また、機器どうしが自動的に連携して電力の需給を制御及び管理する方法として、通信ネットワーク上に存在する特定の機器が自動的に管理のマスタとなり、管理下の機器の電力の総和を所定値以下にするよう制御を行う方法なども知られている。
特開2000-112515号公報 特開2000-116000号公報 特開2010-166690号公報
 前述したように、情報通信技術が様々な機器に適用されることによって、電力の需給に関する情報の取得や制御を可能とする機器が増えてくることが想定される。これに伴い、複数のエネルギ管理装置を介して階層的に管理を行うエネルギ需給管理システムの変更の機会も増加することが予想される。
 しかしながら、これまでの特に大規模な階層的構成のエネルギ需給管理システムは、エネルギ管理装置の追加、削除、変更の際には、エネルギ管理装置間の調整などを行う必要があり、この場合の対応が難しくなっている。
 そこで、本発明が解決しようとする課題は、電力の需給を管理するシステムの変更に対して容易に対応することができるエネルギ管理装置、エネルギ管理方法及びエネルギ管理プログラムを提供することである。
 実施形態のエネルギ管理装置は、第1及び第2の登録部、第1及び第2の受信部、集計部、第1及び第2の送信部、並びに案分部を備えている。第1の登録部は、当該実施形態のエネルギ管理装置から第1のエネルギ管理装置に要求した登録要求に対する応答として登録の許可を表す情報を取得した場合に、第1のエネルギ管理装置を、管理を受ける上位のエネルギ管理装置として登録する。第2の登録部は、第2のエネルギ管理装置から当該実施形態のエネルギ管理装置が登録要求を受け付けた場合に、前記第2のエネルギ管理装置を、管理の対象とする下位のエネルギ管理装置として登録する。第1の受信部は、登録された複数の下位のエネルギ管理装置それぞれから、現状の電力の需給量を表すエネルギ需給量と現状の電力の需給量に対する調整可能な量を表すエネルギ需給調整可能量とを受信する。集計部は、受信された下位のエネルギ管理装置毎のエネルギ需給量とエネルギ需給調整可能量とをそれぞれ集計する。第1の送信部は、集計された集計結果を、登録された上位のエネルギ管理装置へ送信する。第2の受信部は、集計結果に基づき算出された電力の需給を調整する調整量を表すエネルギ需給調整量を上位のエネルギ管理装置より受信する。案分部は、受信されたエネルギ需給調整量を、複数の下位のエネルギ管理装置を対象として案分する。第2の送信部は、エネルギ需給調整量から案分された個別の電力需給の調整量を複数の下位のエネルギ管理装置へそれぞれ送信する。
第1~第5の実施形態に係るエネルギ管理装置を含むエネルギ需給管理システムの構成を例示した図。 第1の実施形態に係るエネルギ管理装置の構成を示す図。 図2のエネルギ管理装置が備えた下位装置データ受信部が下位装置から受信するエネルギ需給量とエネルギ需給調整可能量とを例示した図。 図2のエネルギ管理装置が備えた上位装置データ送信部が上位装置へ送信するエネルギ需給量とエネルギ需給調整可能量とのそれぞれの集計値を例示した図。 図2のエネルギ管理装置の動作を示すフローチャート。 第2の実施形態に係るエネルギ管理装置の構成を示す図。 第3の実施形態に係るエネルギ管理装置の構成を示す図。 第4の実施形態に係るエネルギ管理装置の構成を示す図。 第5の実施形態に係るエネルギ管理装置の構成を示す図。
 以下、実施の形態を図面に基づき説明する。
 図1に示すように、第1~第5の実施形態に係るエネルギ管理装置を含むエネルギ需給管理システム15は、電力の需給の階層的な管理の位置付けについて例えばグループA~Dなどにそれぞれ分類することの可能な複数のEMS(Energy Management System/エネルギ管理装置)1~14を備えている。
 例えばグループAに属するエネルギ管理装置は、管理の対象となる下位のエネルギ管理装置と、管理を受ける上位のエネルギ管理装置と、の双方がシステム上に存在するエネルギ管理装置であって、例えばEMS3~6などが該当する。また、グループBに属するエネルギ管理装置は、管理を受ける上位のエネルギ管理装置がシステム上に存在しないエネルギ管理装置であって、EMS1が該当する。
 さらに、グループCに属するエネルギ管理装置は、管理の対象となる下位のエネルギ管理装置が存在しないエネルギ管理装置であって、例えばEMS2、7、9~14が該当する。また、グループDに属するエネルギ管理装置は、管理を受ける上位のエネルギ管理装置が複数存在するエネルギ管理装置であって、EMS8が該当する。
 具体的には、EMS1は、電力会社などと協調してエネルギ需給管理システム15全体の電力の需給を管理するμEMS(Micro Energy Management System)などとして構成されている。EMS2は、大規模PV(Photovoltaic)発電や、電力系統と連携する例えば定置型のスマートバッテリなどについての電力の需給を管理する。EMS3は、発電量や需要家側の電力消費量をモニタするスマートメータなどから送信されてきた情報を収集して分析し、電力料金の設定や需要家に対して効率的なエネルギの利用を提供するMDMS(Meter Data Management System)などで構成されている。
 EMS4は、太陽光発電所や風力発電所などを含む発電所での電力の供給量と地域内での電力の需要を管理するCEMS(Community Energy Management System)などとして構成されている。EMS5は、ビル内の配電設備、空調設備、照明設備、換気設備、OA機器などに対する電力の需給を管理するBEMS(Building Energy Management System)などで構成されている。
 EMS6は、例えばHAN(Home Area Network)などと連動し家庭内での電力の需給を管理するHEMS(Home Energy Management System)などとして構成されている。さらに、例えばEMS9~13は、ビル内のエアコン、照明、家庭での電気自動車(EV : Electric Vehicle)、洗濯乾燥機、エアコンに対する電力の需給をそれぞれ管理するエネルギ管理装置として構成されている。
 以降、上記したグループA~Dに属するエネルギ管理装置の構成を第1~第4の実施形態、及び第5の実施形態によって具体的に説明する。
[第1の実施の形態]
 図1、図2に示すように、第1の実施形態に係るエネルギ管理装置20は、上述したグループAに属する例えばEMS3、5、6などとして構成されている。このエネルギ管理装置20は、図2に示すように、単一の上位装置(上位のエネルギ管理装置)21から電力の需給についての管理を受ける。この一方で、エネルギ管理装置20は、複数の下位装置(下位のエネルギ管理装置)23を電力の需給の管理対象とする。
 ここで、上位装置21及び下位装置23の構成については、後記の第2の実施形態及び第3の実施形態で詳述する。本実施形態のエネルギ管理装置20は、大きく分けて、連携管理処理、計測及び監視処理、並びに、制御処理といった3つの処理を実現するための機能を有している。
 つまり、エネルギ管理装置20は、図2に示すように、連携管理処理を実現するための上位装置登録部31及び下位装置管理部32と、計測及び監視処理を実現するための下位装置データ受信部24、エネルギ需給量集計部25、エネルギ需給調整可能量集計部26並びに上位装置データ送信部27と、制御処理を実現するための上位装置データ受信部28、エネルギ需給調整量案分部29及び下位装置データ送信部30と、を備えている。
 上位装置21及び下位装置23とエネルギ管理装置20とは、ZigBee(登録商標)などの近距離無線通信規格を適用したネットワーク通信や、LAN、ブルートゥース(登録商標)などの無線又は有線による通信回線を利用し、上位装置データ送信部27、上位装置データ受信部28、下位装置データ送信部30及び下位装置データ受信部24を介して互いに接続されている。
 図2に示すように、上位装置登録部31は、第1の登録部としての機能を有し、上位装置21から電力の需給についての管理を受ける際に、上位装置21に対して登録要求(登録申請)を行うための登録申請データを作成する。登録申請データは、少なくとも当該エネルギ管理装置20を識別するための固有の情報(例えば予め設定したシリアル番号、IPアドレス、通信アダプタの物理アドレスなど)を含むものとする。
 上位装置21は、登録申請データを介して要求された登録要求を受け付けて、エネルギ管理装置20を管理対象として登録する。上位装置登録部31は、この登録要求に対する上位装置21からの応答として、登録の許可を表す情報(登録申請の受理を示す信号)を取得(上位装置データ受信部28を介して受信)した場合に、上位装置登録部31は、当該上位装置21を、管理を受ける上位のエネルギ管理装置として登録(上位装置21固有の識別情報などを登録)する。これにより、上位装置21とエネルギ管理装置20との連携が確立する。
 また、上位装置登録部31は、登録された上位装置21に要求した登録の解除要求に対する応答として、登録解除の許可を表す情報を取得した場合に、当該上位装置21を、管理を受ける対象から除外する。言い換えると、上位装置21は、エネルギ管理装置20からの適正な解除申請データを受け付けた場合に、登録の解除を許可する登録解除データをエネルギ管理装置20に返信する。
 詳述すると、上位装置登録部31は、登録解除のトリガが外部より入力されたか否かを検出する。上位装置登録部31は、登録解除のトリガの入力を検出した場合、上位装置21への解除申請処理として解除申請データを生成する。生成されたこの解除申請データは、上位装置データ送信部27によって上位装置21へ送信される。上記した登録解除のトリガは、上位装置登録部31に搭載された入力インタフェースを介して人為的に直接入力されるものであってもよい。さらに、登録解除のトリガは、エネルギ管理装置20とは別の他の装置から通信回線などを介して間接的に入力されるものであってもよい。
 図2に示すように、下位装置管理部32は、第2の登録部としての機能を有する。下位装置管理部32は、下位装置23から登録要求を受け付けた場合に、当該下位装置23を、管理の対象とする下位のエネルギ管理装置として登録する。具体的には、下位装置管理部32は、下位装置データ受信部24が登録申請データを下位装置23から受信したか否かを判定する。この登録申請データは、上位装置21に対する登録申請データの場合と同様に、少なくとも、当該下位装置23を識別するための固有の情報(例えば予め設定したシリアル番号や、IPアドレス、通信アダプタの物理アドレスなど)を含むものとする。
 つまり、下位装置管理部32は、下位装置データ受信部24を介して下位装置23から登録申請データを取得した場合に、下位装置23を、電力の需給の管理対象の装置として登録(後述する図3に例示した下位装置固有記号などを登録)し、さらに、下位装置23へ登録申請の受理を示す信号を下位装置データ送信部30から送信させる。
 また、下位装置管理部32は、登録されている下位装置23から登録の解除要求を受け付けた場合に、当該下位装置23を管理の対象から除外する。具体的には、下位装置データ受信部24が下位装置23から解除申請データを受信した場合に、下位装置管理部32は、管理対象としていた下位装置23の登録を解除(図3に例示する下位装置固有記号などを削除)し、さらに、下位装置23へ解除申請の受理を示す信号を下位装置データ送信部30から送信させる。
 図2に示すように、下位装置データ受信部24は、第1の受信部としての機能を有する。下位装置データ受信部24は、管理対象として登録された複数の下位装置23それぞれから、図3に示すように、現状の電力の需給量を表すエネルギ需給量と、現状の電力の需給量に対する調整可能な量を表すエネルギ需給調整可能量とを、下位装置23を識別可能な下位装置固有記号と共に受信する。ここで、エネルギ需給量は、例えばスマートメータなどでモニタされる需要家側の電力消費量(負荷側の電力の需要量)と電力の供給者側からの電力供給量とを加算した値である。
 図3に示すように、エネルギ需給調整可能量は、現状の電力の需給量に対する調整可能な上限の値及び下限の値をそれぞれ表すエネルギ需給増加調整可能量上限値とエネルギ需給削減調整可能量下限値とを有している。詳述すると、このようなエネルギ需給調整可能量は、下位装置(下位のエネルギ管理装置)23による電力の需給の管理対象となる電力機器が例えばエアコンなどである場合、例えば現在の室内温度から目標の設定温度にするまでに必要な温度差と、現在の時刻から設定温度にすることが必要な時刻までの残り時間などとに基づいて、下位装置23が算出する。
 また例えば、エネルギ需給調整可能量は、下位装置(下位のエネルギ管理装置)23による電力の需給の管理対象が電気自動車などである場合、例えば現状の充電量から満充電にするまでに必要な追加の充電量と、現在の時刻から満充電にさせることが必要な時刻までの残り時間などとに基づき、下位装置23によって算出される。
 エネルギ需給量集計部25及びエネルギ需給調整可能量集計部26は、図4に示すように、下位装置データ受信部24で受信された複数の下位装置23毎のエネルギ需給量とエネルギ需給調整可能量(エネルギ需給増加調整可能量上限値及びエネルギ需給削減調整可能量下限値)とをそれぞれ集計する集計部(第1の集計部)である。上位装置データ送信部27は、第1の送信部としての機能を有する。上位装置データ送信部27は、エネルギ需給量集計部25及びエネルギ需給調整可能量集計部26で集計された図4に例示する集計結果(集計値)を、登録された上位装置21へ送信する。
 図2に示すように、上位装置データ受信部28は、第2の受信部としての機能を有する。上位装置データ受信部28は、電力の需給を調整する調整量を表すエネルギ需給調整量を上位装置21から受信する。このエネルギ需給調整量は、上記の集計結果に基づき上位装置21によって算出される。図1に示すように、例えば、本実施形態のエネルギ管理装置20がEMS6であり、上位装置21がEMS3である場合、上位装置21は、EMS6の他、EMS7、8が管理対象となる。
 つまり、上位装置21は、EMS7、8側への所定値以上の電力の供給を確保したうえで、上記の集計結果に基づきエネルギ需給調整量を算出する。このエネルギ需給調整量は、上位装置21側がエネルギ管理装置20側に対して管理する電力の供給量を実質的に調整するものである。このエネルギ需給調整量は、図4に例示したエネルギ需給量(電力需要量と電力供給量とを加算した量)の集計値(例えば678W)を、エネルギ需給調整可能量の集計値の範囲内(前記の678Wを基準として例えば上限値の+209W~下限値の-144Wの範囲内)で、増減させた値として算出される。
 エネルギ需給調整量案分部29は、上位装置21から上位装置データ受信部28が受信したエネルギ需給調整量を、複数の下位装置23を対象として案分(配分)する案分部(第1の案分部)である。上位装置21から受信したエネルギ需給調整量を案分する(振り分ける)方法としては、個々の下位装置23のエネルギ需給量に比例した案分方法が考えられる。具体的には、下位装置(23)iの案分量piは、上位装置21から受信したエネルギ需給調整量をP、下位装置iのエネルギ需給量をdi、とすると、例えば次の数式1で計算することが可能である。
Figure JPOXMLDOC01-appb-M000001
 また、上位装置21から受信したエネルギ需給調整量を案分する別の方法としては、個々の下位装置23のエネルギ需給調整可能量に比例した案分方法も考えられる。具体的には、下位装置(23)iの案分量piは、上位装置21から受信したエネルギ需給調整量をP、下位装置iのエネルギ需給増加調整可能量上限値をui、下位装置iのエネルギ需給削減調整可能量下限値をli、とすると、次のような数式2で計算することが可能である。
Figure JPOXMLDOC01-appb-M000002
 下位装置データ送信部30は、第2の送信部としての機能を有する。下位装置データ送信部30は、エネルギ需給調整量から案分された個別の電力需給の調整量を複数の下位装置23へそれぞれ送信する。ここで、下位装置23が、図1に示したEMS12(最下位のエネルギ管理装置)などである場合、EMS12へと案分された電力需給の調整量に基づいて、このEMS12が管理する電気機器(洗濯乾燥機)への電力の供給が制御される。
 また、前述した上位装置登録部31、下位装置管理部32、下位装置データ受信部24、エネルギ需給量集計部25、エネルギ需給調整可能量集計部26、上位装置データ送信部27、上位装置データ受信部28、エネルギ需給調整量案分部29、下位装置データ送信部30は、コンピュータ上でエネルギ管理プログラムを実行することによってソフトウェアで実現されるものであってもよいし、各々がハードウェアで構成されていてもよい。
 次に、このように構成されたエネルギ管理装置20によって実行されるエネルギ管理方法を図5に示すフローチャートに基づき説明する。まず、上位装置データ送信部27から登録申請データが上位装置21に送信され(S1)、この上位装置21への登録申請(登録要求)に対する応答として、登録申請の受理を示す情報を、上位装置登録部31が、上位装置データ受信部28を介して取得した場合に、上位装置登録部31は、当該上位装置21を、管理を受ける上位のエネルギ管理装置として登録する。これにより、上位装置21とエネルギ管理装置20との連携が確立する。
 また、下位装置管理部32は、下位装置データ受信部24が、登録申請データ(又は解除申請データ)を下位装置23から受信したか否かに応じて、下位装置23からの管理登録申請(又は管理登録の解除申請)の有無を判定する(S2)。下位装置管理部32は、下位装置23から管理登録申請(又は管理登録の解除申請)を受け付けた場合(S2のYES)、当該下位装置23を、管理対象として登録(又は管理対象から除外するために登録を解除)する(S3)。
 さらに、下位装置データ受信部24は、管理対象として登録された複数の下位装置23から、図3に示すように、エネルギ需給量とエネルギ需給調整可能量とを受信したか否かを判別する(S4)。エネルギ需給量とエネルギ需給調整可能量が受信された場合(S4のYES)、エネルギ需給量集計部25及びエネルギ需給調整可能量集計部26は、図4に示すように、下位装置23毎のエネルギ需給量とエネルギ需給調整可能量(エネルギ需給増加調整可能量上限値及びエネルギ需給削減調整可能量下限値)とをそれぞれ集計する。
 さらに、上位装置データ送信部27は、エネルギ需給量集計部25で集計された例えば図4に例示する集計値を上位装置21へ送信する(S5)。このようにして、下位装置データ受信部24、エネルギ需給量集計部25、エネルギ需給調整可能量集計部26及び上位装置データ送信部27は、各下位装置23の電力の需給に関する計測及び監視の結果を上位装置21へと通知する計測及び監視処理を実現する。
 次に、上位装置データ受信部28は、エネルギ需給調整量を上位装置21から受信したか否かを判別する(S6)。上位装置データ受信部28が上位装置21からエネルギ需給調整量を受信した場合(S6のYES)、エネルギ需給調整量案分部29は、上位装置21から上位装置データ受信部28が受信したエネルギ需給調整量を、管理対象とした複数の下位装置23へ案分する。
 次いで、下位装置データ送信部30は、エネルギ需給調整量から案分された個別の電力需給の調整量を各下位装置23へそれぞれ送信する(S7)。このようにして、上位装置データ受信部28、エネルギ需給調整量案分部29及び下位装置データ送信部30は、上位装置21からのエネルギ需給調整量を案分して各下位装置23へと通知する制御処理を実現する。
 この後、上位装置登録部31は、登録解除のトリガが外部より入力されたか否かを検出する(S8)。上位装置登録部31は、登録解除のトリガの入力を検出した場合(S8のYES)、解除申請データを生成する。この解除申請データは、上位装置データ送信部27によって上位装置21へと送信される。これにより、上位装置21に対して管理登録の解除が申請される(S9)。このようにして上位装置登録部31及び前述した下位装置管理部32は、上位装置21及び下位装置23と、エネルギ管理装置20と、の間での連携管理処理を実現する。
 既述したように、本実施形態のエネルギ管理装置20では、管理を受ける上位装置21と管理対象の複数の下位装置23との間で連携を図り、電力の需給に関する的確な情報を受け渡しすることができる。これにより、本実施形態のエネルギ管理装置20によれば、階層的構成のエネルギ需給管理システム15における例えば部分的変更(上位又は下位のエネルギ管理装置の追加、削除)などに対して、容易に対応することができる。
[第2の実施の形態]
 次に、第2の実施形態を主に図6に基づいて説明する。なお、図6において、図2に示した第1の実施形態中の構成要素と同一の構成要素については、同一の符号を付与し重複する説明を省略する。
 図1、図6に示すように、この実施形態に係るエネルギ管理装置50は、上位のエネルギ管理装置が存在しないエネルギ管理装置である。エネルギ管理装置50は、図1に示したグループBに属する例えばEMS(μEMS)1などとして構成されている。つまり、エネルギ管理装置50は、図6に示すように、第1の実施形態のエネルギ管理装置20が備えていた上位装置データ送信部27、上位装置データ受信部28、上位装置登録部31に代えて、エネルギ需給調整量算出部54を備えている。
 エネルギ需給調整量算出部54は、エネルギ需給量集計部25及びエネルギ需給調整可能量集計部26で集計した集計結果(下位装置23毎のエネルギ需給量、エネルギ需給増加調整可能量上限値及びエネルギ需給削減調整可能量下限値の集計値)に基づき、エネルギ需給調整量を算出する算出部(第1の算出部)である。エネルギ需給調整量案分部29は、個々の下位装置23を対象としてエネルギ需給調整量を案分する。
 なお、エネルギ需給調整量算出部54は、前述したスマートセンサとは例えば別系統の外部センサ55から、各下位装置23の電力の需給についての計測データを必要に応じて取得するようにし、取得したこの計測データを、算出されるエネルギ需給調整量に反映させるようにしてもよい。
 このようにして構成される本実施形態のエネルギ管理装置50は、他のエネルギ管理装置の最上位に位置し、実質的にエネルギ需給管理システム15全体を管理する役割を担うことができる。
[第3の実施の形態]
 次に、第3の実施形態を主に図7に基づいて説明する。なお、図7において、図2に示した第1の実施形態中の構成要素と同一の構成要素については、同一の符号を付与し重複する説明を省略する。
 図1、図7に示すように、この実施形態に係るエネルギ管理装置70は、下位のエネルギ管理装置が存在しないエネルギ管理装置である。エネルギ管理装置70は、図1に示したグループCに属する例えばEMS2、7、9~14などとして構成されている。
 つまり、エネルギ管理装置70は、図7に示すように、第1の実施形態のエネルギ管理装置20が備えていた下位装置管理部32、下位装置データ受信部24、エネルギ需給量集計部25、エネルギ需給調整可能量集計部26、エネルギ需給調整量案分部29、下位装置データ送信部30に代えて、エネルギ需給制御部77、第2の算出部としてのエネルギ需給調整可能量算出部78、及びエネルギ需給量計測部79を備えている。また、エネルギ管理装置70には、エネルギ需給装置72が接続されている。エネルギ需給装置72は、例えば太陽光発電装置や蓄電装置などの分散型電源、エアコン、照明といった電気機器へ電力を供給可能な電力需給装置として構成されている。
 エネルギ需給制御部77は、上位装置21からのエネルギ需給調整量より案分された個別の電力需給の調整量に基づいて、エネルギ需給装置72の動作を制御する。エネルギ需給量計測部79は、エネルギ需給装置72による現状の電力の需給量を上記したエネルギ需給量として計測するスマートメータなどの計測部(第1の計測部)である。エネルギ需給調整可能量算出部78は、エネルギ需給装置72により電力の需給を調整可能な量を、上記したエネルギ需給調整可能量(エネルギ需給増加調整可能量上限値及びエネルギ需給削減調整可能量下限値)として算出する。
 エネルギ需給調整可能量は、エネルギ需給量計測部79で計測した需給量の比率(電力需要量と電力供給量との比率)を基に算出されてもよい。また、エネルギ需給調整可能量は、予め定めた閾値までのエネルギ需給量との差分として算出されてもよい。さらには、エネルギ需給調整可能量は、その他のアルゴリズムやルールに基づいて算出されてもよい。詳述すると、前述したエネルギ需給制御部77は、上位装置データ受信部28が上位装置21から受信したエネルギ需給調整量に基づき、エネルギ需給調整可能量の範囲内でエネルギ需給装置72による電力の需給を制御する。
 既述したように、本実施形態のエネルギ管理装置70は、階層的構成のエネルギ需給管理システム15において最下位に位置するエネルギ管理装置である。つまり、エネルギ管理装置70は、分散型電源、エアコン、照明、洗濯乾燥機などの電気機器を対象として、電力の需給を管理することが可能となる。なお、上述した電気機器は、エネルギ管理装置70の機能やエネルギ需給装置72の機能が当該電気機器自体に実装されていてもよい。
[第4の実施の形態]
 次に、第4の実施形態を主に図8に基づいて説明する。なお、図8において、図2に示した第1の実施形態中の構成要素と同一の構成要素については、同一の符号を付与し重複する説明を省略する。
 図1、図8に示すように、この実施形態に係るエネルギ管理装置80は、管理を受ける上位のエネルギ管理装置が複数存在するエネルギ管理装置である。エネルギ管理装置80は、図1に示したグループDに属する例えばEMS8などとして構成されている。図1に例示したEMS8は、単一の下位装置を管理対象としているが、図8に示す本実施形態のエネルギ管理装置80のように複数の下位装置を管理の対象としてもよい。
 具体的には、本実施形態のエネルギ管理装置80は、図8に示すように、第1の実施形態のエネルギ管理装置20の構成に加え、第2の集計部としてのエネルギ需給調整量集計部82と第2の案分部としての下位装置データ集計値案分部83とをさらに備えている。下位装置データ集計値案分部83は、複数の下位装置23毎のエネルギ需給量とエネルギ需給調整可能量とがそれぞれ集計された集計結果を、各々登録された複数の上位装置21を対象として案分する。
 案分の方法は、予め個々の上位装置に対する案分割合を固定値として決めておいてもよい。また、案分の方法は、予め設定しておいた上位装置毎の優先順位に従って優先順位の高い装置ほど、例えば案分割合を多くするような方法であってもよい。さらには、案分の方法は、その他のアルゴリズムやルールに基づいて案分するものであってもよい。
 上位装置データ送信部27は、下位装置データ集計値案分部83により前記集計結果から案分された個別の集計結果を、複数の上位装置21へそれぞれ送信する。さらに、この個別の集計結果に基づき各上位装置21がそれぞれ算出した各エネルギ需給調整量を、上位装置データ受信部28は、複数の上位装置21それぞれから受信する。また、エネルギ需給調整量集計部82は、受信された複数の上位装置21毎のエネルギ需給調整量を集計する。さらに、エネルギ需給調整量案分部29は、エネルギ需給調整量集計部82により集計されたエネルギ需給調整量(の集計値)を、複数の下位装置23を対象として案分する。
 このように、本実施形態のエネルギ管理装置80では、管理を受ける上位装置21が複数存在する場合であっても、複数の下位装置23から取得した電力の需給に関する現状のデータを、複数の上位装置21に対して的確に通知する。さらに、エネルギ管理装置80は、各上位装置21からそれぞれ返信される複数のエネルギ需給調整量を集計しこれを案分する。したがって、エネルギ管理装置80によれば、各下位装置23の電力の需給を適切に管理することが可能となる。
[第5の実施の形態]
 次に、第5の実施形態を図9に基づき説明する。なお、図9において、図2に示した第1の実施形態中の構成要素と同一の構成要素については、同一の符号を付与し重複する説明を省略する。図9に示すように、この実施形態に係るエネルギ管理装置90は、図2に示した第1の実施形態のエネルギ管理装置20に対し一部変更を加えて構成されている。
 つまり、エネルギ管理装置90は、図9に示すように、第1の実施形態のエネルギ管理装置20が備えていた下位装置データ受信部24及びエネルギ需給調整量案分部29に代えて、下位装置データ受信部94及びエネルギ需給調整量案分部99を備えている。下位装置データ受信部94は、エネルギ需給量及びエネルギ需給調整可能量(エネルギ需給増加調整可能量上限値及びエネルギ需給削減調整可能量下限値)に加えて、前記のエネルギ需給調整可能量を算出した条件に関連する補足情報を、複数の下位装置23それぞれから受信する。エネルギ需給調整量案分部99は、受信された補足情報に基づいて、エネルギ需給調整量の案分に補正を加える。
 上記した補足情報としては、例えば電気機器の運転効率と電力の供給量とを対応付けた電力コスト(電気料金)の情報、電力の供給量と電気機器の動作に関する安定性(不安定性)とを対応付けた不確実性の情報、下位装置23の属性情報(下位装置の設置場所や下位装置の出力容量を表す情報)などを例示することができる。下位装置23の例えば上記属性情報を適用することで、属性情報を基に想定される例えば電力送電時のロス、電圧変動、周波数変動などを加味したうえで、エネルギ需給調整量の案分を補正することができる。つまり、エネルギ需給調整量案分部99は、これらの補足情報を併用することで、コストの最適化や不確実性を反映させた案分や、特定の属性を有する下位装置のみを案分の対象にすることなどを可能にする。
 例えば、管理対象の下位装置(23)iの案分量piは、上位装置21から受信したエネルギ需給調整量をP、許容可能な調整誤差をe、下位装置iのエネルギ需給量をdi、エネルギ需給調整量の単位量当たりのコストをciとすると、次の数式3の条件を満たす案分量として計算されることにより、コストを最適化したエネルギ需給の調整が可能となる。
Figure JPOXMLDOC01-appb-M000003
 既述したように、本実施形態のエネルギ管理装置90によれば、負荷側の電気機器における動作の安定化や、電気機器の運転効率を考慮した電力コストの最適化を図ることができる。
 以上、本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施することが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これらの実施形態やその変形例は、発明の範囲や要旨に含まれると共に、特許請求の範囲に記載された発明とその均等の範囲に含まれる。
 より詳細には、第1~第5の実施形態の全ての構成要素を含むエネルギ管理装置を構成してもよいし、このような全ての構成要素を含むエネルギ管理装置から幾つかの構成要素を削除したエネルギ管理装置を適用してもよい。また、第1~第5の実施形態に係るエネルギ管理装置がそれぞれ備えた各構成要素(例えば図2に示したエネルギ需給量集計部25、エネルギ需給調整可能量集計部26、エネルギ需給調整量案分部29、上位装置登録部31、下位装置管理部32など)を、コンピュータに実行させることのできるエネルギ管理プログラムとして、磁気ディスク(フレキシブルディスク、ハードディスクなど)、光ディスク(CD-ROM、DVDなど)、半導体メモリなどの記憶媒体に、格納して頒布することもできる。
 1~14…EMS、15…エネルギ需給管理システム、20,50,70,80,90…エネルギ管理装置、21…上位装置、23…下位装置、24,94…下位装置データ受信部、25…エネルギ需給量集計部、26…エネルギ需給調整可能量集計部、27…上位装置データ送信部、28…上位装置データ受信部、29,99…エネルギ需給調整量案分部、30…下位装置データ送信部、31…上位装置登録部、32…下位装置管理部、54…エネルギ需給調整量算出部、72…エネルギ需給装置、77…エネルギ需給制御部、78…エネルギ需給調整可能量算出部、79…エネルギ需給量計測部、82…エネルギ需給調整量集計部、83…下位装置データ集計値案分部。

Claims (8)

  1.  第1のエネルギ管理装置に要求した登録要求に対する応答として登録の許可を表す情報を取得した場合に、前記第1のエネルギ管理装置を、管理を受ける上位のエネルギ管理装置として登録する第1の登録部と、
     第2のエネルギ管理装置から登録要求を受け付けた場合に、前記第2のエネルギ管理装置を、管理の対象とする下位のエネルギ管理装置として登録する第2の登録部と、
     登録された複数の前記下位のエネルギ管理装置それぞれから、現状の電力の需給量を表すエネルギ需給量と前記現状の電力の需給量に対する調整可能な量を表すエネルギ需給調整可能量とを受信する第1の受信部と、
     前記受信された前記下位のエネルギ管理装置毎の前記エネルギ需給量と前記エネルギ需給調整可能量とをそれぞれ集計する集計部と、
     前記集計された集計結果を、登録された前記上位のエネルギ管理装置へ送信する第1の送信部と、
     前記集計結果に基づき算出された電力の需給を調整する調整量を表すエネルギ需給調整量を前記上位のエネルギ管理装置より受信する第2の受信部と、
     前記受信されたエネルギ需給調整量を、前記複数の下位のエネルギ管理装置を対象として案分する案分部と、
     前記エネルギ需給調整量から案分された個別の電力需給の調整量を前記複数の下位のエネルギ管理装置へそれぞれ送信する第2の送信部と、
    を備えるエネルギ管理装置。
  2.  前記第1の登録部は、登録された前記上位のエネルギ管理装置に要求した登録の解除要求に対する応答として登録解除の許可を表す情報を取得した場合に、当該上位のエネルギ管理装置を、管理を受ける対象から除外し、
     前記第2の登録部は、登録された前記下位のエネルギ管理装置から登録の解除要求を受け付けた場合に、当該下位のエネルギ管理装置を管理の対象から除外する、
    請求項1に記載のエネルギ管理装置。
  3.  前記エネルギ需給調整量を前記集計結果に基づいて算出する算出部、
    を備える請求項1又は2に記載のエネルギ管理装置。
  4.  電気機器へ電力を供給可能なエネルギ需給装置の動作を、前記エネルギ需給調整量から案分された個別の電力需給の調整量に基づいて、制御するエネルギ需給制御部と、
     前記エネルギ需給装置による現状の電力の需給量を前記エネルギ需給量として計測する計測部と、
     前記エネルギ需給装置により電力の需給を調整可能な量を前記エネルギ需給調整可能量として算出する第2の算出部と、
    をさらに備える請求項1ないし3のいずれか1項に記載のエネルギ管理装置。
  5.  前記複数の下位のエネルギ管理装置毎の前記エネルギ需給量と前記エネルギ需給調整可能量とがそれぞれ集計された集計結果を、各々登録された複数の前記上位のエネルギ管理装置を対象として案分する第2の案分部をさらに備え、
     前記第1の送信部は、前記第2の案分部により前記集計結果から案分された個別の集計結果を、前記複数の上位のエネルギ管理装置へそれぞれ送信し、
     さらに、前記第2の受信部は、前記個別の集計結果に基づきそれぞれ算出された各エネルギ需給調整量を前記複数の上位のエネルギ管理装置それぞれから受信し、
     前記受信された複数の上位のエネルギ管理装置毎のエネルギ需給調整量を集計する第2の集計部をさらに備え、
     前記案分部は、前記第2の集計部により集計されたエネルギ需給調整量を、前記複数の下位のエネルギ管理装置を対象として案分する、
    請求項1ないし4のいずれか1項に記載のエネルギ管理装置。
  6.  前記第1の受信部は、前記複数の前記下位のエネルギ管理装置それぞれから、前記エネルギ需給量及び前記エネルギ需給調整可能量に加え、前記エネルギ需給調整可能量を算出した条件に関連する補足情報を受信し、
     前記案分部は、前記受信された補足情報に基づいて、前記エネルギ需給調整量の案分に補正を加える、
    請求項1ないし5のいずれか1項に記載のエネルギ管理装置。
  7.  第1のエネルギ管理装置に要求した登録要求に対する応答として登録の許可を表す情報を取得した場合に、前記第1のエネルギ管理装置を、管理を受ける上位のエネルギ管理装置として登録するステップと、
     第2のエネルギ管理装置から登録要求を受け付けた場合に、前記第2のエネルギ管理装置を、管理の対象とする下位のエネルギ管理装置として登録するステップと、
     登録された複数の前記下位のエネルギ管理装置それぞれから、現状の電力の需給量を表すエネルギ需給量と前記現状の電力の需給量に対する調整可能な量を表すエネルギ需給調整可能量とを受信するステップと、
     前記受信された前記下位のエネルギ管理装置毎の前記エネルギ需給量と前記エネルギ需給調整可能量とをそれぞれ集計するステップと、
     前記集計された集計結果を、登録された前記上位のエネルギ管理装置へ送信するステップと、
     前記集計結果に基づき算出された電力の需給を調整する調整量を表すエネルギ需給調整量を前記上位のエネルギ管理装置より受信するステップと、
     前記受信されたエネルギ需給調整量を、前記複数の下位のエネルギ管理装置を対象として案分するステップと、
     前記エネルギ需給調整量から案分された個別の電力需給の調整量を前記複数の下位のエネルギ管理装置へそれぞれ送信するステップと、
    を有するエネルギ管理方法。
  8.  第1のエネルギ管理装置に要求した登録要求に対する応答として登録の許可を表す情報を取得した場合に、前記第1のエネルギ管理装置を、管理を受ける上位のエネルギ管理装置として登録する第1の登録部と、
     第2のエネルギ管理装置から登録要求を受け付けた場合に、前記第2のエネルギ管理装置を、管理の対象とする下位のエネルギ管理装置として登録する第2の登録部と、
     登録された複数の前記下位のエネルギ管理装置それぞれから、現状の電力の需給量を表すエネルギ需給量と前記現状の電力の需給量に対する調整可能な量を表すエネルギ需給調整可能量とを受信する第1の受信部と、
     前記受信された前記下位のエネルギ管理装置毎の前記エネルギ需給量と前記エネルギ需給調整可能量とをそれぞれ集計する集計部と、
     前記集計された集計結果を、登録された前記上位のエネルギ管理装置へ送信する第1の送信部と、
     前記集計結果に基づき算出された電力の需給を調整する調整量を表すエネルギ需給調整量を前記上位のエネルギ管理装置より受信する第2の受信部と、
     前記受信されたエネルギ需給調整量を、前記複数の下位のエネルギ管理装置を対象として案分する案分部と、
     前記エネルギ需給調整量から案分された個別の電力需給の調整量を前記複数の下位のエネルギ管理装置へそれぞれ送信する第2の送信部、
    としてコンピュータを機能させるエネルギ管理プログラム。
PCT/JP2013/004327 2012-07-17 2013-07-16 エネルギ管理装置、エネルギ管理方法及びエネルギ管理プログラム WO2014013714A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
BR112015000767A BR112015000767A2 (pt) 2012-07-17 2013-07-16 sistema de gerenciamento de energia, método de gerenciamento de energia e programa de gerenciamento de energia
CN201380038104.5A CN104620456A (zh) 2012-07-17 2013-07-16 能量管理系统、能量管理方法和计算机可读介质
EP13820449.0A EP2876766A4 (en) 2012-07-17 2013-07-16 ENERGY MANAGEMENT DEVICE, ENERGY MANAGEMENT PROCESS AND ENERGY MANAGEMENT PROGRAM
US14/583,902 US20150120077A1 (en) 2012-07-17 2014-12-29 Energy management system, energy management method and computer-readable medium

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012158363A JP2014023232A (ja) 2012-07-17 2012-07-17 エネルギ管理装置、エネルギ管理方法及びエネルギ管理プログラム
JP2012-158363 2012-07-17

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/583,902 Continuation US20150120077A1 (en) 2012-07-17 2014-12-29 Energy management system, energy management method and computer-readable medium

Publications (1)

Publication Number Publication Date
WO2014013714A1 true WO2014013714A1 (ja) 2014-01-23

Family

ID=49948557

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/004327 WO2014013714A1 (ja) 2012-07-17 2013-07-16 エネルギ管理装置、エネルギ管理方法及びエネルギ管理プログラム

Country Status (6)

Country Link
US (1) US20150120077A1 (ja)
EP (1) EP2876766A4 (ja)
JP (1) JP2014023232A (ja)
CN (1) CN104620456A (ja)
BR (1) BR112015000767A2 (ja)
WO (1) WO2014013714A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017038502A (ja) * 2015-08-12 2017-02-16 株式会社東芝 エネルギー管理装置、エネルギー管理方法、およびプログラム
JP2022535374A (ja) * 2019-05-31 2022-08-08 アーベーベー・シュバイツ・アーゲー 分散型エネルギー資源登録

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014167830A1 (ja) * 2013-04-09 2014-10-16 日本電気株式会社 電力制御システム
US10490999B2 (en) * 2014-12-22 2019-11-26 Battelle Memorial Institute Hierarchical operational control of aggregated load management resources
JP6213931B2 (ja) * 2015-07-31 2017-10-18 パナソニックIpマネジメント株式会社 グループ制御方法およびグループ制御装置
KR101734352B1 (ko) * 2015-11-12 2017-05-15 한국에너지기술연구원 자율형 분산에너지관리시스템
KR101734346B1 (ko) * 2015-12-14 2017-05-15 한국에너지기술연구원 이중화 기술 기반 분산제어 시스템 및 에이전트
KR101927759B1 (ko) 2017-07-17 2018-12-11 (주)유에너지 태양광에너지 발전시스템의 최적 제어시스템
DE102017221145A1 (de) * 2017-11-27 2019-05-29 Siemens Aktiengesellschaft Energieversorgungsnetzwerke und -verfahren
JP2019146298A (ja) * 2018-02-16 2019-08-29 富士ゼロックス株式会社 情報処理装置及びプログラム
WO2020121447A1 (ja) 2018-12-12 2020-06-18 東芝エネルギーシステムズ株式会社 水素システムの制御装置、および水素システムの制御方法
US10903652B2 (en) 2019-02-13 2021-01-26 Abb Power Grids Switzerland Ag Control architectures for power distribution networks with distributed energy resource
CN111367169A (zh) * 2020-02-07 2020-07-03 大连富士冰山智控系统有限公司 控制系统、控制装置以及控制方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000116000A (ja) 1998-10-06 2000-04-21 Seiji Miyamoto 電力デマンド制御装置
JP2000112515A (ja) 1998-10-06 2000-04-21 Tokyo Electric Power Co Inc:The 系統模擬装置および計算機が読取り可能な記憶媒体
JP2009100550A (ja) * 2007-10-17 2009-05-07 Meidensha Corp 分散電源系統の電力・熱需給制御方法
JP2010166690A (ja) 2009-01-15 2010-07-29 Panasonic Corp 電気機器およびその制御方法、プログラム
JP2010279238A (ja) * 2009-04-28 2010-12-09 Tokyo Electric Power Co Inc:The 系統監視制御システム
JP2013117769A (ja) * 2011-12-01 2013-06-13 Daikin Ind Ltd 中間装置

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62159706A (ja) * 1986-01-09 1987-07-15 Fuji Electric Co Ltd タ−ビン発電機の負荷配分制御装置
US8291251B2 (en) * 2006-07-18 2012-10-16 Agere Systems Inc. Systems and methods for modular power management
CN1972059A (zh) * 2006-12-06 2007-05-30 中国科学院电工研究所 一种微型电网系统
EP2061131B1 (de) * 2007-11-15 2010-12-29 Elro (Holding ) AG Verfahren und Vorrichtung zur Steuerung der Verteilung von elektrischer Energie für eine Mehrzahl von elektrischen Heizeinrichtungen einer Küche
JP2009130986A (ja) * 2007-11-20 2009-06-11 Panasonic Electric Works Co Ltd エネルギーマネジメントシステム
WO2010025307A1 (en) * 2008-08-27 2010-03-04 Convia, Inc. Energy distribution management system
AU2009290591B2 (en) * 2008-09-15 2015-10-01 Haier Us Appliance Solutions, Inc. Energy management of clothes washer appliance
US8548638B2 (en) * 2008-09-15 2013-10-01 General Electric Company Energy management system and method
US20110016063A1 (en) * 2009-07-17 2011-01-20 Gridpoint, Inc. System and methods for smart charging techniques
US8626344B2 (en) * 2009-08-21 2014-01-07 Allure Energy, Inc. Energy management system and method
JP4806059B2 (ja) * 2009-09-09 2011-11-02 株式会社東芝 エネルギー管理システムおよびエネルギー管理方法
US20110231320A1 (en) * 2009-12-22 2011-09-22 Irving Gary W Energy management systems and methods
JP2011135651A (ja) * 2009-12-22 2011-07-07 Panasonic Electric Works Co Ltd 電力供給システム
US20120065793A1 (en) * 2010-02-25 2012-03-15 Kaji Mitsuru Demand and supply control apparatus, demand and supply control method, and program
JP5646205B2 (ja) * 2010-04-28 2014-12-24 株式会社東芝 消費電力管理システム、およびこれに利用される消費電力管理装置、消費電力管理方法、中央供給電力管理装置、供給電力管理方法
DE102010025157A1 (de) * 2010-06-25 2011-12-29 Solarnext Ag Verfahren zum Betrieb eines verteilten thermischen Energiesystems
JP5481305B2 (ja) * 2010-07-30 2014-04-23 株式会社東芝 出力配分制御装置
US20120065802A1 (en) * 2010-09-14 2012-03-15 Joulex, Inc. System and methods for automatic power management of remote electronic devices using a mobile device
KR101736900B1 (ko) * 2010-09-29 2017-05-17 삼성전자주식회사 전기기기, 그를 가지는 전력 관리 시스템 및 그 제어 방법
KR101820738B1 (ko) * 2010-10-05 2018-01-23 삼성전자주식회사 홈 네트워크에서 기기 간에 에너지 프로파일을 설정하기 위한 방법 및 시스템
US8938320B2 (en) * 2011-02-23 2015-01-20 Kabushiki Kaisha Toshiba Regional energy management system, regional energy integrated management device and regional energy integrated management method used in regional energy management system
CN103502042B (zh) * 2011-05-04 2017-10-27 西门子公司 用于提供电能的方法和装置
CA2860743C (en) * 2012-02-02 2017-11-14 Hitachi, Ltd. Power demand adjustment system and power demand adjustment method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000116000A (ja) 1998-10-06 2000-04-21 Seiji Miyamoto 電力デマンド制御装置
JP2000112515A (ja) 1998-10-06 2000-04-21 Tokyo Electric Power Co Inc:The 系統模擬装置および計算機が読取り可能な記憶媒体
JP2009100550A (ja) * 2007-10-17 2009-05-07 Meidensha Corp 分散電源系統の電力・熱需給制御方法
JP2010166690A (ja) 2009-01-15 2010-07-29 Panasonic Corp 電気機器およびその制御方法、プログラム
JP2010279238A (ja) * 2009-04-28 2010-12-09 Tokyo Electric Power Co Inc:The 系統監視制御システム
JP2013117769A (ja) * 2011-12-01 2013-06-13 Daikin Ind Ltd 中間装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2876766A4

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017038502A (ja) * 2015-08-12 2017-02-16 株式会社東芝 エネルギー管理装置、エネルギー管理方法、およびプログラム
JP2022535374A (ja) * 2019-05-31 2022-08-08 アーベーベー・シュバイツ・アーゲー 分散型エネルギー資源登録
JP7437591B2 (ja) 2019-05-31 2024-02-26 アーベーベー・シュバイツ・アーゲー 分散型エネルギー資源登録

Also Published As

Publication number Publication date
US20150120077A1 (en) 2015-04-30
EP2876766A4 (en) 2016-03-09
BR112015000767A2 (pt) 2017-06-27
EP2876766A1 (en) 2015-05-27
CN104620456A (zh) 2015-05-13
JP2014023232A (ja) 2014-02-03

Similar Documents

Publication Publication Date Title
WO2014013714A1 (ja) エネルギ管理装置、エネルギ管理方法及びエネルギ管理プログラム
JP6646283B2 (ja) 電力制御システム、方法、及び、情報伝達能力制御システム、方法
US20170133866A1 (en) Power control system, method, and power control apparatus
US20130311236A1 (en) System, method and computer program for energy consumption management
US11949269B2 (en) Management server, management system, and management method
WO2013099156A1 (ja) スマートグリッドシステムのグリッドコントローラ、それを備えたスマートグリッドシステムおよびその制御方法
JP5909555B2 (ja) 需要家協調支援装置
CN105940584A (zh) 需求控制装置及程序
US9257840B2 (en) Synchronized PWM randomization for coordinated load management
JP2017017779A (ja) 電力供給システムおよび電力供給方法
WO2016137619A1 (en) Variable feed-out energy management
WO2015115385A1 (ja) 電力制御システム、方法、及び、情報伝達能力制御システム、方法
CN106605345B (zh) 用于控制装置的能量管理系统和方法以及计算机可读介质
JP7377854B2 (ja) 蓄電要素の受電制御方法、及び受電制御装置
WO2012144044A1 (ja) 電力管理システム及び方法
JP5738533B2 (ja) 電力管理システム
JP5905760B2 (ja) 制御装置、制御システム、及び制御方法
JP6701761B2 (ja) 電力消費管理装置、電力消費管理システムおよび電力消費管理プログラム
WO2018029871A1 (ja) 電力需要制御システム、電力需要制御方法、アグリゲータシステム、需要家電力管理システム、及びプログラム
JP2016046934A (ja) 電力管理システム、地域電力管理装置、需要家電力管理装置
JP5951270B2 (ja) 空気調和機の消費電力量管理制御システム、サーバ装置、クライアント装置及び空気調和機の消費電力量管理制御方法
CN106408444A (zh) 将模块与相应逆变器自动关联的方法、模块和发电系统
CN104272548A (zh) 电力管理装置、电力管理系统以及电力管理方法
US20140039715A1 (en) System-side controller and method
US20160241033A1 (en) Control device, control method, and program

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13820449

Country of ref document: EP

Kind code of ref document: A1

REEP Request for entry into the european phase

Ref document number: 2013820449

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2013820449

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112015000767

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112015000767

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20150113