WO2013140611A1 - パワーコンディショナ、及び太陽光発電システム - Google Patents
パワーコンディショナ、及び太陽光発電システム Download PDFInfo
- Publication number
- WO2013140611A1 WO2013140611A1 PCT/JP2012/057554 JP2012057554W WO2013140611A1 WO 2013140611 A1 WO2013140611 A1 WO 2013140611A1 JP 2012057554 W JP2012057554 W JP 2012057554W WO 2013140611 A1 WO2013140611 A1 WO 2013140611A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power
- voltage
- charging
- capacitor
- charge
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M3/00—Conversion of dc power input into dc power output
- H02M3/02—Conversion of dc power input into dc power output without intermediate conversion into ac
- H02M3/04—Conversion of dc power input into dc power output without intermediate conversion into ac by static converters
- H02M3/10—Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
- H02M3/145—Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal
- H02M3/155—Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only
- H02M3/156—Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of output voltage or current, e.g. switching regulators
- H02M3/158—Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of output voltage or current, e.g. switching regulators including plural semiconductor devices as final control devices for a single load
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M7/00—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
- H02M7/42—Conversion of dc power input into ac power output without possibility of reversal
- H02M7/44—Conversion of dc power input into ac power output without possibility of reversal by static converters
- H02M7/48—Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/22—The renewable source being solar energy
- H02J2300/24—The renewable source being solar energy of photovoltaic origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Definitions
- the present invention relates to a power conditioner and a solar power generation system.
- the solar power generation system converts the DC power generated by the solar cell into AC power by the power conditioner, and is connected to a general commercial power supply (system) supplied from the electric power company. It is a power generation system that regenerates to the side and supplies insufficient power from the grid side.
- the power conditioner In the solar power generation system, when the generated power is insufficient even when the solar cell starts output, the power conditioner frequently enters a standby state, and the start and standby are frequently repeated. For this reason, it is necessary to turn off the output relay every time it enters the standby state, and the number of times the output relay is opened and closed increases, which may shorten the contact life of the output relay.
- Patent Document 1 in a power conditioner in which a capacitor for smoothing a DC voltage output from a converter is connected between a converter and an inverter, the input voltage of the converter detected by a first voltage detector and It is described that the maximum output estimated value of the solar cell module is estimated using the capacitor voltage detected by the voltage detector 2 to control the converter and the inverter. Specifically, when the converter is started, charging of the capacitor is started, and when charging of the capacitor is completed, the power required for charging the capacitor is obtained, and the maximum output estimated value of the solar cell module is estimated from the obtained power, The maximum output estimate is compared with a predetermined value. Thereby, according to patent document 1, it is supposed that the start determination of a power conditioner can be performed accurately and frequent repetition of start-up / standby can be suppressed.
- the capacitor is charged until all the electric power input from the solar cell module to the converter is accumulated in the capacitor at the input stage of the inverter, so the input voltage of the inverter is very high.
- the input voltage of the inverter rises to a higher value than during steady operation, it is necessary to use an element with a high withstand voltage for the switching element constituting the inverter. If an element having a high withstand voltage is used as the switching element constituting the inverter, the manufacturing cost of the power conditioner may increase.
- This invention is made
- a power conditioner is a power conditioner that converts DC power generated by a solar cell into AC power and outputs the AC power to a system.
- a converter that has a charge / discharge capacitor and boosts the generated DC power using the charge / discharge capacitor; a smoothing capacitor that smoothes the boosted DC power; and the smoothed DC power
- An inverter that converts AC power into AC power, an output relay that connects the inverter to the system, and an activation that determines whether the output power of the solar cell is greater than or equal to a threshold value according to the charging voltage of the charge / discharge capacitor
- the determination by the power determination unit and the startup power determination unit is performed, it is approximately half of the voltage to be charged to the smoothing capacitor during steady operation.
- a charging control unit for controlling the charging voltage of the charging and discharging capacitor.
- the input voltage of the inverter can be suppressed to a low value when starting is determined. That is, since the input voltage of the inverter can be suppressed to a lower value than that in the steady operation, it is not necessary to use an element having a high withstand voltage for a switching element (for example, an element such as a transistor or a freewheeling diode) constituting the inverter. As a result, the manufacturing cost of the power conditioner can be reduced.
- a switching element for example, an element such as a transistor or a freewheeling diode
- FIG. 1 is a diagram illustrating the configuration of the photovoltaic power generation system according to the first embodiment.
- FIG. 2 is a diagram showing a configuration related to steady operation in the first embodiment.
- FIG. 3 is a diagram showing a current path during steady operation in the first embodiment.
- FIG. 4 is a diagram showing a steady operation in the first embodiment.
- FIG. 5 is a diagram illustrating a current path at the time of starting power determination in the first embodiment.
- FIG. 6 is a diagram illustrating a configuration of the photovoltaic power generation system according to the second embodiment.
- FIG. 7 is a diagram illustrating a current path at the time of starting power determination in the second embodiment.
- FIG. 1 is a diagram illustrating a configuration of a solar power generation system 100.
- the solar cell 1 and the system 2 are interconnected by the power conditioner 3. That is, the power conditioner 3 converts the DC power generated by the solar cell 1 into AC power and outputs the AC power to the system 2.
- the solar cell 1 is, for example, one in which a plurality of solar cells are two-dimensionally arranged. For example, the solar cell 1 generates (generates) DC power according to the amount of solar radiation.
- the photovoltaic power generation system 100 when the generated power is insufficient even when the solar cell 1 starts outputting, if the frequency of the power conditioner 3 is in a standby state is high, the startup and standby are frequently repeated. For this reason, it is necessary to turn off the output relay 6 every time it enters a standby state, the number of times the output relay 6 is opened and closed increases, and the contact life of the output relay 6 may be shortened.
- the electric power charged in the smoothing capacitor Co is calculated from the change in the charging voltage of the smoothing capacitor Co for smoothing the DC voltage output from the converter 4 and the required time.
- the maximum power point of the solar cell 1 is estimated from the power calculated in the first step.
- the maximum power point of the solar cell 1 exists at a position corresponding to a voltage of about 80% of the voltage when the converter 4 is stopped in the curve indicating the change in the output power of the solar cell 1. Since the characteristics of the solar cell 1 are constant, the maximum power point of the solar cell 1 can be estimated from the calculated power if the ratio of the output voltage of the solar cell 1 when the power is calculated to the voltage at the maximum power point is known. .
- the third step it is determined whether or not it is possible to start from the estimated maximum power point.
- the inverter 5 is operated, and the inverter 5 is connected to the system 2 by the output relay 6 to supply power to the system 2. Is output.
- the fifth step it is determined that power generation is insufficient when the estimated maximum power point of the solar cell 1 is smaller than a predetermined value. After waiting for a predetermined time, the activation determination is performed again.
- the sixth step it is determined that the power generation is insufficient even when the time for completing the charging of the smoothing capacitor Co is longer than the predetermined time.
- the smoothing capacitor Co is charged until the electric power input from the solar cell 1 to the converter 4 is accumulated in the smoothing capacitor Co in the input stage of the inverter 5, so that the input voltage of the inverter 5 is very high.
- rise to a higher value That is, since the input voltage of the inverter 5 rises to a higher level than during steady operation, it is necessary to use a high withstand voltage element for the switching element SW (for example, an element such as the transistor Tr or the freewheeling diode D) that constitutes the inverter 5. is there. If an element having a high withstand voltage is used as the switching element SW constituting the inverter 5, the manufacturing cost of the power conditioner 3 may increase.
- the power conditioner 3 includes a smoothing capacitor Cin, a converter 4, a smoothing capacitor Co, an inverter 5, an output relay 6, a voltage detector 7, a voltage detector 8, a charge control unit 13, and a starting power determination unit 11.
- the smoothing capacitor Cin is arranged on the input side of the converter 4 and is electrically connected between the solar cell 1 and the converter 4. Smoothing capacitor Cin receives DC power generated by solar cell 1, that is, DC power (DC voltage) output from solar cell 1, smoothes DC power (DC voltage), and supplies it to converter 4.
- the converter 4 is electrically connected between the smoothing capacitor Cin and the smoothing capacitor Co.
- the converter 4 includes, for example, a reactor L, switches SW101 and SW102, diodes D1 and D2, charge / discharge capacitors Cf and Cfs, a diode D104, and a Zener diode ZD.
- Reactor L has one end connected to input terminal IN1 and the other end connected to node N2.
- the switch SW101 has one end connected to the node N2 and the other end connected to the node N3.
- the switch SW101 includes, for example, a transistor Tr101 (for example, a MOS transistor) and a free wheeling diode D101.
- the switch SW102 has one end connected to the input terminal IN2 via the node N4 and the other end connected to the node N3.
- the switch SW102 includes, for example, a transistor Tr102 (for example, a MOS transistor) and a free wheeling diode D102.
- the diode D1 has an anode connected to the node N2 and a cathode connected to the node N5.
- the diode D2 has an anode connected to the node N5 and a cathode connected to the output terminal OUT1.
- the charge / discharge capacitor Cf has one end connected to the node N5 and the other end connected to the node N3 via the node N6.
- the diode D104 has an anode connected to the node N6 and a cathode connected to the node N7.
- the charge / discharge capacitor Cfs has one end connected to the node N7 and the other end connected to the node N4 and the output terminal OUT2 via the node N8.
- the Zener diode ZD has an anode connected to the output terminal OUT3 and a cathode connected to the node N7.
- the output terminal OUT1 is connected to the P line Lp
- the output terminal OUT3 is connected to the intermediate line Lm
- the output terminal OUT2 is connected to the P line Ln.
- Converter 4 receives the smoothed DC power from smoothing capacitor Cin.
- the converter 4 boosts DC power (DC voltage) using, for example, the reactor L, the switches SW101 and SW102, the diodes D1 and D2, and the charge / discharge capacitor Cf, and converts the DC power (DC voltage) to a predetermined level of DC power (DC voltage).
- Converter 4 outputs the converted DC power (DC voltage).
- the smoothing capacitor Co is disposed on the output side of the converter 4 and is electrically connected between the converter 4 and the inverter 5.
- the smoothing capacitor Co includes, for example, a capacitor C1 and a capacitor C2 that are connected in series between the P line Lp and the N line Ln.
- the capacitor C1 has one end connected to the P line Lp and the other end connected to the intermediate line Lm at the intermediate node N1.
- Capacitor C2 has one end connected to N line Ln and the other end connected to intermediate line Lm at intermediate node N1.
- the P line Lp, the intermediate line Lm, and the N line Ln are connected to the converter 4 and the inverter 5, respectively.
- the smoothing capacitor Co receives the DC power (DC voltage) output from the converter 4, smoothes the DC power (DC voltage) using, for example, the capacitor C1 and the capacitor C2, and supplies the smoothed power to the inverter 5.
- the inverter 5 is electrically connected between the smoothing capacitor Co and the output relay 6.
- the inverter 5 includes, for example, a load resistor R and a plurality of switching elements SW-1 to SW-4.
- the load resistor R includes, for example, a resistor R1 and a resistor R2 that are connected in series between the input terminal P and the input terminal N.
- the resistor R1 has one end connected to the input terminal P and the other end connected to the input terminal M.
- the resistor R2 has one end connected to the input terminal N and the other end connected to the input terminal M.
- the input terminal P, the input terminal M, and the input terminal N are connected to the P line Lp, the intermediate line Lm, and the N line Ln, respectively.
- the plurality of switching elements SW-1 to SW-4 are connected between the input terminals P and N and the output terminals O1 and O2.
- the switching element SW-1 has one end connected to the input terminal P and the other end connected to the output terminal O1 via the output node ON-1.
- the switching element SW-2 has one end connected to the input terminal N and the other end connected to the output terminal O1 via the output node ON-1.
- the switching element SW-3 has one end connected to the input terminal P and the other end connected to the output terminal O2 via the output node ON-2.
- the switching element SW-4 has one end connected to the input terminal N and the other end connected to the output terminal O2 via the output node ON-2.
- Each of the switching elements SW-1 to SW-4 includes, for example, a transistor Tr (for example, a MOS transistor) and a free wheeling diode D.
- the inverter 5 receives the smoothed DC power (DC voltage) from the smoothing capacitor Co.
- the inverter 5 converts DC power (DC voltage) into AC power (AC voltage) using, for example, a plurality of switching elements SW-1 to SW-4.
- a plurality of switching elements SW-1 to SW-4 receive control signals from the starting power determination unit 11 at their control terminals, and each switching element SW-1 to SW-4 has a predetermined timing according to the control signal.
- the DC power (DC voltage) is converted into, for example, two-phase AC power (AC voltage) by performing a switching operation at.
- the inverter 5 outputs the converted AC power (AC voltage).
- the output relay 6 is electrically connected between the inverter 5 and the system 2.
- the output relay 6 includes, for example, a plurality of switches 6a and 6b.
- the switch 6 a has one end connected to the output terminal O ⁇ b> 1 of the inverter 5 and the other end connected to the one end 2 a of the system 2.
- the switch 6b has one end connected to the output terminal O2 of the inverter 5 and the other end connected to the other end 2b of the system 2.
- the output relay 6 conducts or cuts off (opens) the connection between the inverter 5 and the system 2 using, for example, a plurality of switches 6a and 6b.
- the output relay 6 is configured such that a plurality of switches 6a and 6b receive control signals from the activation power determination unit 11 at their control terminals, and the switches 6a and 6b are turned on (become closed) according to the control signals.
- the connection between the inverter 5 and the system 2 is made conductive, and the switches 6a and 6b are turned off according to the control signal (become open), thereby disconnecting the connection between the inverter 5 and the system 2.
- the voltage detector 7 detects the voltage across the smoothing capacitor Cin as the output voltage Vs of the solar cell 1. For example, the voltage detector 7 repeatedly detects the output voltage Vs of the solar cell 1 at a predetermined time interval. The voltage detector 7 supplies the detected output voltage Vs to the gate pulse calculator 9.
- the voltage detector 8 detects the voltage across the charge / discharge capacitor Cf, that is, the charge voltage Vcf of the charge / discharge capacitor Cf. For example, the voltage detector 8 repeatedly detects the charging voltage Vcf of the charging / discharging capacitor Cf at a predetermined time interval. The voltage detector 8 supplies the detected voltage Vcf to the gate pulse calculator 9.
- the charge control unit 13 controls the charge voltage Vcf of the charge / discharge capacitor Cf. That is, the charging control unit 13 receives the output voltage Vs of the solar cell 1 from the voltage detector 7, receives the charging voltage Vcf of the charging / discharging capacitor Cf from the voltage detector 8, and outputs the output voltage Vs of the solar cell 1 and the charging / discharging capacitor.
- the charging voltage Vcf of the charge / discharge capacitor Cf is controlled according to the charging voltage Vcf of Cf.
- the charging control unit 13 includes a gate pulse calculator 9 and a gate pulse generator 10.
- the gate pulse calculator 9 receives the detected output voltage Vs from the voltage detector 7 and receives the detected voltage Vcf from the voltage detector 8.
- the gate pulse calculator 9 calculates the pulse width of the gate signal ⁇ S1 of the switch SW101 and the pulse width of the gate signal ⁇ S2 of the switch SW102 according to the output voltage Vs of the solar cell 1 and the charging voltage Vcf of the charge / discharge capacitor Cf. To do.
- the gate pulse calculator 9 charges the charging / discharging capacitor Cf.
- the pulse width of the gate signal ⁇ S1 of the switch SW101 and the pulse width of the gate signal ⁇ S2 of the switch SW102 are calculated so that the voltage Vcf is approximately half of the voltage to be charged in the smoothing capacitor Co during the steady operation.
- the gate pulse calculator 9 determines that the charging voltage Vcf of the charging / discharging capacitor Cf becomes the output voltage Vs of the solar cell 1.
- the pulse width of the gate signal ⁇ S1 of the switch SW101 and the pulse width of the gate signal ⁇ S2 of the switch SW102 are calculated so as to have a value corresponding to the boost ratio of the converter 4.
- the gate pulse calculator 9 supplies the calculation result to the gate pulse generator 10.
- the gate pulse generator 10 receives the calculation result from the gate pulse calculator 9.
- the gate pulse generator 10 generates the gate signal ⁇ S1 of the switch SW101 according to the calculation result and supplies it to the control terminal of the switch SW101, and also generates the gate signal ⁇ S2 of the switch SW102 and supplies it to the control terminal of the switch SW102.
- the starting power determination unit 11 receives the charging voltage Vcf of the charging / discharging capacitor Cf from the voltage detector 8. The starting power determination unit 11 determines whether or not the output power of the solar cell 1 is greater than or equal to a threshold value, according to the charging voltage Vcf of the charge / discharge capacitor Cf. For example, the starting power determination unit 11 estimates the output power of the solar cell 1 according to the charging voltage Vcf of the charging / discharging capacitor Cf and the charging time of the charging / discharging capacitor Cf, and the estimated output power is greater than or equal to the threshold Pth. It is determined whether or not.
- the starting power determination unit 11 determines that charging of the charging / discharging capacitor Cf has started, and a timer (not shown) Z) is started, and measurement of the charging time of the charge / discharge capacitor Cf is started. For example, when the charging voltage Vcf of the charging / discharging capacitor Cf reaches a target value (for example, approximately half of the voltage to be charged to the smoothing capacitor Co during steady operation), the starting power determination unit 11 charges the charging / discharging capacitor Cf. It is determined that the timer has been completed, and a timer (not shown) is stopped.
- a target value for example, approximately half of the voltage to be charged to the smoothing capacitor Co during steady operation
- the starting power determination unit 11 acquires the value indicated by the timer as the charging time of the charge / discharge capacitor Cf.
- the starting power determination unit 11 estimates the output power of the solar cell 1 from the charging voltage Vcf of the charging / discharging capacitor Cf and the charging time of the charging / discharging capacitor Cf using Equation 7 to be described later. It is determined whether or not the output power is greater than or equal to a threshold value Pth.
- the threshold value Pth is, for example, a value obtained by experimentally obtaining a minimum value of the output power of the solar cell 1 that allows the inverter 5 to operate stably, and adding a predetermined margin to the minimum value. .
- the activation power determination unit 11 determines that the power conditioner 3 can be activated when the output power of the solar cell 1 is equal to or greater than the threshold value Pth.
- the starting power determination unit 11 controls the power conditioner 3 to perform steady operation in response to the determination that the power conditioner 3 can be started. That is, the starting power determination unit 11 controls the converter 4 to perform a boosting operation via the gate pulse calculator 9 and the gate pulse generator 10 and controls the inverter 5 and the output relay 6 to operate.
- the starting power determination unit 11 controls the power conversion operation (boost operation) by the converter 4 by causing the switches SW101 and SW102 in the converter 4 to perform a switching operation, and performs the switching operation on each switching element SW in the inverter 5.
- the power conversion operation by the inverter 5 is controlled, and the output relay 6 is controlled so as to make the connection between the inverter 5 and the system 2 conductive.
- the startup power determination unit 11 determines that the power conditioner 3 cannot be started when the output power of the solar cell 1 is less than the threshold value Pth.
- the activation power determination unit 11 controls the power conditioner 3 to enter a standby state in response to the determination that the power conditioner 3 cannot be activated. That is, the starting power determination unit 11 controls the converter 4 to be in a standby state via the gate pulse calculator 9 and the gate pulse generator 10 and controls the inverter 5 and the output relay 6 to be in a standby state. To do.
- the starting power determination unit 11 controls the switches SW101 and SW102 in the converter 4 to be maintained in an off state and controls the switching elements SW in the inverter 5 to be in an off state. 6 controls to disconnect (open) the connection between the inverter 5 and the system 2.
- the converter 4 boosts the DC power (DC voltage) using, for example, the reactor L, the switches SW101 and SW102, the diodes D101 and D102, and the charge / discharge capacitor Cf. Convert to level DC power (DC voltage).
- the charge / discharge capacitor Cfs, the diode D104, and the Zener diode ZD are not used for the boosting operation of the converter 4.
- the intermediate line Lm between the converter 4 and the inverter 5 also does not function, and the smoothing capacitor Co is equivalent to one having one end connected to the P line Lp and the other end connected to the N line Ln. Functions as a capacitor.
- the load resistance R in the inverter 5 functions equivalently as one resistor having one end connected to the input terminal P and the other end connected to the input terminal N.
- the converter 4 has, for example, four operation modes M1 to M4 as shown in FIGS.
- the switch SW101 is turned on and the switch SW102 is turned off.
- the output voltage Vs of the solar cell 1 as an equivalent voltage source
- a current as shown by a broken line flows, energy is accumulated in the reactor L, and energy is accumulated in the charge / discharge capacitor Cf. That is, the charging voltage Vcf corresponding to the output voltage Vs of the solar cell 1 is charged in the charging / discharging capacitor Cf.
- the switch SW101 is turned off and the switch SW102 is turned on.
- the output voltage Vs of the solar cell 1 as an equivalent voltage source
- a current as shown by a broken line flows, energy is accumulated in the reactor L, and energy accumulated in the charge / discharge capacitor Cf is smoothed by the smoothing capacitor Co. Is released. That is, the charge / discharge capacitor Cf is discharged, and the output voltage Vout of the converter 4 corresponding to the charge voltage Vcf is charged to the smoothing capacitor Co.
- both the switch SW101 and the switch SW102 are turned off.
- the output voltage Vs of the solar cell 1 as an equivalent voltage source
- a current as shown by a broken line flows, and the energy accumulated in the reactor L is released to the smoothing capacitor Co.
- both the switch SW101 and the switch SW102 are turned on.
- the output voltage Vs of the solar cell 1 as an equivalent voltage source, a current as shown by a broken line flows and energy is accumulated in the reactor L.
- Converter 4 can perform a boosting operation at an arbitrary boosting ratio by appropriately adjusting the time ratio of these four operation modes M1 to M4. For example, the converter 4 performs different operations when the boost ratio is less than twice and when the boost ratio is twice or more.
- the charging voltage Vcf of the charging / discharging capacitor Cf is controlled to be about a half of the output voltage Vout of the converter 4, and the input voltage of the converter 4 (that is, The magnitude relationship among the output voltage Vs of the solar cell 1, the output voltage Vout of the converter 4, and the charge voltage Vcf of the charge / discharge capacitor Cf is, for example, as in the following Equation 1.
- the gate pulse calculator 9 sets the pulse width and timing of the gate signal ⁇ S1 of the switch SW101 and the pulse width and timing of the gate signal ⁇ S2 of the switch SW102 so that an arbitrary step-up ratio of 1 to 2 is obtained.
- the calculation result is supplied to the gate pulse generator 10.
- the gate pulse generator 10 supplies a control signal as shown in the waveform diagram of FIG. 4A to the switches SW101 and SW102 according to the calculation result.
- the converter 4 outputs a voltage Vout having an arbitrary step-up ratio that is 1 to 2 times the input voltage Vs by repeating the above series of operations.
- the converter 4 mainly stores the input energy in the first half period TP11. During the period TP12, the stored energy output operation is mainly performed.
- the charging voltage Vcf of the charging / discharging capacitor Cf is controlled to be about a half of the output voltage Vout of the converter 4, and the input voltage of the converter 4 (that is, The magnitude relationship among the output voltage Vs of the solar cell 1, the output voltage Vout of the converter 4, and the charge voltage Vcf of the charge / discharge capacitor Cf is, for example, as shown in the following Expression 2.
- the gate pulse calculator 9 calculates the pulse width and timing of the gate signal ⁇ S1 of the switch SW101 and the pulse width and timing of the gate signal ⁇ S2 of the switch SW102 so that an arbitrary step-up ratio of 2 or more can be obtained.
- the operation result is supplied to the gate pulse generator 10.
- the gate pulse generator 10 supplies a control signal as shown in the waveform diagram of FIG. 4B to the switches SW101 and SW102 according to the calculation result.
- the converter 4 outputs the output voltage Vout having an arbitrary step-up ratio more than twice the input voltage Vs by repeating the above series of operations. That is, the converter 4 mainly performs the operation of storing the input energy in the first half period TP21 in one cycle TP2 in which the operation mode M4, the operation mode M1, the operation mode M4, and the operation mode M2 are sequentially performed. In the latter half period TP22, the operation of outputting the accumulated energy is mainly performed.
- Vip is the voltage across the capacitor C1 in the smoothing capacitor Co
- Vin is the voltage across the capacitor C2 in the smoothing capacitor Co (see FIG. 1).
- the converter 4 stops the boosting operation.
- the charging voltage Vcf of the charging / discharging capacitor Cf satisfies the relationship expressed by the following formula 5 between the voltage Vip across the capacitor C1 in the smoothing capacitor Co and the voltage drop Vzd of the Zener diode ZD.
- Vcf Vip ⁇ Vzd Equation 5
- the switch SW101 is turned on while maintaining the switch SW102 in the off state.
- the output voltage Vs of the solar cell 1 as an equivalent voltage source
- a current as shown by a broken line flows, energy is accumulated in the reactor L, and energy is accumulated in the charge / discharge capacitor Cf. That is, the charging voltage Vcf corresponding to the output voltage Vs of the solar cell 1 is charged in the charging / discharging capacitor Cf.
- the switch SW101 is turned off while maintaining the switch SW102 in the off state.
- a current as shown by a broken line flows, and the energy accumulated in the reactor L is transferred to the charge / discharge capacitor Cf and the charge / discharge capacitor Cfs.
- the gate pulse calculator 9 calculates the pulse width and timing of the gate signal ⁇ S1 of the switch SW101 and the pulse width and timing of the gate signal ⁇ S2 of the switch SW102 so that this series of operations is performed.
- the gate pulse calculator 9 supplies the calculation result to the gate pulse generator 10.
- the gate pulse generator 10 supplies control signals as shown in FIGS. 5A to 5C to the switches SW101 and SW102 according to the calculation result.
- the converter 4 can charge the charging voltage Vcf to the charging / discharging capacitor Cf by the series of operations described above.
- the starting power determination unit 11 charges the charging / discharging capacitor Cf.
- the output power P of the solar cell is estimated by the following formula 7.
- P (C * (Vcf2) 2/2-C * (Vcf1) 2/2) / ( ⁇ T) ⁇ equation (7)
- C represents the capacitor capacity of the charge / discharge capacitor Cf.
- Vcf2 represents the voltage at the end of the start-up power determination of the charge / discharge capacitor Cf.
- Vcf2 is a value of the charging voltage Vcf that satisfies Equation 4 above.
- Vcf1 represents a voltage at the start of determination of the starting power of the charge / discharge capacitor Cf.
- ⁇ T represents the time when the voltage of the charge / discharge capacitor Cf is charged from Vcf1 to Vcf2, that is, the charge time of the charge / discharge capacitor Cf.
- the starting electric power determination part 11 determines whether the estimated output electric power of the solar cell 1 is more than the threshold value Pth.
- the threshold value Pth is obtained, for example, by experimentally obtaining a minimum value (minimum starting power) of the output power of the solar cell 1 that allows the inverter 5 to operate stably and adding a predetermined margin to the minimum value. Value.
- the threshold value Pth is 100W.
- the threshold value Pth may be a value smaller than 100 W corresponding to the minimum activation power.
- the threshold value Pth may be a value larger than 100 W corresponding to the minimum starting power.
- the activation power determination unit 11 determines that the power conditioner 3 can be activated when the output power of the solar cell 1 is equal to or greater than the threshold value Pth.
- the startup power determination unit 11 determines that the power conditioner 3 cannot be started when the output power of the solar cell 1 is less than the threshold value Pth.
- the charging control unit 13 when the determination by the starting power determination unit 11 is performed, the charging control unit 13 is approximately half of the voltage to be charged to the smoothing capacitor Co during the steady operation.
- the charging voltage Vcf of the charging / discharging capacitor Cf is controlled.
- the input voltage of the inverter 5 can be suppressed to a low value. That is, since the input voltage of the inverter 5 can be suppressed to a lower value than in the steady operation, it is necessary to use an element having a high breakdown voltage for the switching element SW (for example, an element such as the transistor Tr or the freewheeling diode D) constituting the inverter 5. There is no. As a result, the manufacturing cost of the power conditioner 3 can be reduced.
- the starting power determination unit 11 estimates the output power P of the solar cell 1 according to the charging voltage Vcf of the charging / discharging capacitor Cf and the charging time of the charging / discharging capacitor Cf, and the estimated output It is determined whether or not the power P is greater than or equal to the threshold value Pth.
- the estimated output power P is greater than or equal to the threshold value Pth, it is determined that the power conditioner 3 can be activated, and the estimated output power P is equal to the threshold value.
- it is less than Pth it is determined that the power conditioner 3 cannot be activated.
- the time until the charging voltage Vcf of the charging / discharging capacitor Cf in the converter 4 becomes about 1 ⁇ 2 of the voltage to be output by the converter 4 in the steady operation is detected. By doing so, it can be determined whether the power conditioner 3 is at a level at which the power conditioner 3 can be activated with respect to the generated power of the solar cell 1.
- Embodiment 2 the photovoltaic power generation system 100i according to the second embodiment will be described. Below, it demonstrates focusing on a different part from Embodiment 1.
- FIG. 1 the photovoltaic power generation system 100i according to the second embodiment.
- the level of the initial voltage Vcf1 of the charging voltage Vcf of the charging / discharging capacitor Cf used for the start determination is not particularly considered, but if the initial voltage Vcf1 of the charging voltage Vcf is high, power calculation is performed. The accuracy is likely to be lowered, and the accuracy of the activation determination may be lowered.
- two charge / discharge capacitors Cf and Cfs are prepared as charge / discharge capacitor candidates used for the start determination, and the start determination is performed according to the initial voltages of the two charge / discharge capacitors Cf and Cfs. Select the charge / discharge capacitor to be used.
- the power conditioner 3i of the photovoltaic power generation system 100i further includes a voltage detector 12i, and includes a startup power determination unit 11i instead of the startup power determination unit 11 (see FIG. 1).
- the voltage detector 12i detects the voltage across the charge / discharge capacitor Cfs, that is, the charge voltage Vcfs of the charge / discharge capacitor Cf. For example, the voltage detector 12i repeatedly detects the charging voltage Vcfs of the charging / discharging capacitor Cfs at a predetermined time interval. The voltage detector 12 i supplies the detected voltage Vcf to the gate pulse calculator 9.
- the starting power determination unit 11i receives the charging voltage Vcf of the charging / discharging capacitor Cf from the voltage detector 8, and receives the charging voltage Vcfs of the charging / discharging capacitor Cfs from the voltage detector 12i. For example, the starting power determination unit 11i receives the initial voltage Vcf1 of the charge / discharge capacitor Cf from the voltage detector 8 and detects the initial voltage Vcfs1 of the charge / discharge capacitor Cfs before starting charging of the charge / discharge capacitors Cf, Cfs. Receive from vessel 12i.
- the starting power determination unit 11i selects a charge / discharge capacitor to be used for determination according to the initial voltage Vcf1 of the charge / discharge capacitor Cf and the initial voltage Vcfs1 of the charge / discharge capacitor Cfs. For example, the starting power determination unit 11i selects a charge / discharge capacitor having a smaller initial voltage among the charge / discharge capacitors Cf and Cfs.
- the starting electric power determination part 11i determines whether the output electric power of the solar cell 1 is more than the threshold value Pth according to the charging voltage of the selected charging / discharging capacitor
- the converter 4 performs an operation as shown in, for example, FIGS. 3 (a), 7 (a), and 7 (b).
- both the switch SW101 and the switch SW102 are turned on.
- the output voltage Vs of the solar cell 1 as an equivalent voltage source, a current as shown by a broken line flows and energy is accumulated in the reactor L.
- the switch SW101 is turned off while the switch SW102 is kept on.
- the output voltage Vs of the solar cell 1 as an equivalent voltage source, a current as shown by a broken line flows, and the energy accumulated in the reactor L is transferred to the charge / discharge capacitor Cfs.
- the starting power determination unit 11i selects a charge / discharge capacitor to be used for determination according to the initial voltage Vcf1 of the charge / discharge capacitor Cf and the initial voltage Vcfs1 of the charge / discharge capacitor Cfs. For example, the starting power determination unit 11i selects a charge / discharge capacitor having a smaller initial voltage among the charge / discharge capacitors Cf and Cfs. And starting power determination part 11i determines whether the output electric power of a solar cell is more than a threshold value according to the charge voltage of the selected charging / discharging capacitor
- the starting power determination unit 11i estimates the output power of the solar cell 1 according to the charging voltage of the selected charging / discharging capacitor and the charging time of the selected charging / discharging capacitor, and the estimated output power is the threshold value Pth. It is determined whether the power conditioner 3i can be activated when the estimated output power is greater than or equal to the threshold value Pth, and the power is output when the estimated output power is less than the threshold value Pth. It is determined that the conditioner 3i cannot be activated. Thereby, the calculation precision of the output electric power of the solar cell 1 can be improved, and the precision of starting determination of the power conditioner 3i can be improved.
- the power conditioner and the solar power generation system according to the present invention are useful for determining the start of the power conditioner.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Dc-Dc Converters (AREA)
- Photovoltaic Devices (AREA)
- Inverter Devices (AREA)
Abstract
パワーコンディショナは、太陽電池で発電された直流電力を交流電力に変換して系統へ出力するパワーコンディショナであって、充放電コンデンサを有し、前記充放電コンデンサを用いて前記発電された直流電力を昇圧するコンバータと、前記昇圧された直流電力を平滑化する平滑コンデンサと、前記平滑化された直流電力を交流電力に変換するインバータと、前記インバータを前記系統に接続する出力リレーと、前記充放電コンデンサの充電電圧に応じて、前記太陽電池の出力電力が閾値以上であるか否かを判定する起動電力判定部と、前記起動電力判定部による判定が行われる際に、定常動作時に前記平滑コンデンサに充電されるべき電圧の略半分になるように、前記充放電コンデンサの充電電圧を制御する充電制御部とを備える。
Description
本発明は、パワーコンディショナ、及び太陽光発電システムに関する。
太陽光発電システムは、太陽電池によって発電された直流電力をパワーコンディショナによって交流電力に変換するとともに、電力会社から供給される一般の商用電源(系統)と連系することで、余剰電力は系統側へ回生し、不足電力は系統側から供給されるようにした発電システムである。
太陽光発電システムでは、太陽電池が出力を開始しても発電電力が不足した場合、パワーコンディショナが待機状態になる頻度が高く、起動と待機とを頻繁に繰り返すことになる。このため、待機状態となる度に出力リレーをオフすることが必要となり、出力リレーの開閉回数が多くなって、出力リレーの接点寿命が短くなる可能性がある。
特許文献1には、コンバータから出力された直流電圧を平滑化するコンデンサがコンバータとインバータとの間に接続されたパワーコンディショナにおいて、第1の電圧検出器により検出されたコンバータの入力電圧と第2の電圧検出器により検出されたコンデンサ電圧とを用いて太陽電池モジュールの最大出力推定値を推定し、コンバータ及びインバータを制御することが記載されている。具体的には、コンバータが起動されたらコンデンサの充電が開始され、コンデンサの充電が完了したらコンデンサの充電に要した電力を求め、求められた電力から太陽電池モジュールの最大出力推定値を推定し、最大出力推定値を所定値と比較する。これにより、特許文献1によれば、パワーコンディショナの起動判定を精度よく行うことができ、頻繁な起動・待機の繰り返しを抑制できるとされている。
特許文献1に記載の技術では、コンデンサの充電電圧の変化と充電に要した時間とから電力を演算するため、判定開始時のコンデンサの充電電圧が高いと電力演算精度が低くなるので、判定を開始しようとしたときにコンデンサの充電電圧が高い場合にはインバータの入力電圧が所定電圧以下となるまで電力判定を待機する必要がある。また、朝夕など日射量が少ない場合には電力演算に時間がかかりやすい。これにより、パワーコンディショナを起動してよいかどうかを判定するまでの時間が長くなる傾向にある。
また、特許文献1に記載の技術では、太陽電池モジュールからコンバータに入力される電力がインバータの入力段のコンデンサに全て蓄積されるまでコンデンサが充電されるので、インバータの入力電圧が非常に高い値まで上昇する。すなわち、定常動作時に比べて、インバータの入力電圧が高い値まで上昇するため、インバータを構成するスイッチング素子に耐圧の高い素子を使う必要がある。インバータを構成するスイッチング素子に耐圧の高い素子を使うと、パワーコンディショナの製造コストが増大する可能性がある。
本発明は、上記に鑑みてなされたものであって、製造コストを低減できるパワーコンディショナ、及び太陽光発電システムを得ることを目的とする。
上述した課題を解決し、目的を達成するために、本発明の1つの側面にかかるパワーコンディショナは、太陽電池で発電された直流電力を交流電力に変換して系統へ出力するパワーコンディショナであって、充放電コンデンサを有し、前記充放電コンデンサを用いて前記発電された直流電力を昇圧するコンバータと、前記昇圧された直流電力を平滑化する平滑コンデンサと、前記平滑化された直流電力を交流電力に変換するインバータと、前記インバータを前記系統に接続する出力リレーと、前記充放電コンデンサの充電電圧に応じて、前記太陽電池の出力電力が閾値以上であるか否かを判定する起動電力判定部と、前記起動電力判定部による判定が行われる際に、定常動作時に前記平滑コンデンサに充電されるべき電圧の略半分になるように、前記充放電コンデンサの充電電圧を制御する充電制御部とを備えたことを特徴とする。
本発明によれば、起動判定時に、インバータの入力電圧を低い値に抑制できる。すなわち、定常動作時に比べて、インバータの入力電圧を低い値に抑制できるため、インバータを構成するスイッチング素子(例えば、トランジスタや還流ダイオードなどの素子)に耐圧の高い素子を使う必要がない。この結果、パワーコンディショナの製造コストを低減できる。
以下に、本発明にかかる太陽光発電システムの実施の形態を図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。
実施の形態1.
実施の形態1にかかる太陽光発電システム100について図1を用いて説明する。図1は、太陽光発電システム100の構成を示す図である。
実施の形態1にかかる太陽光発電システム100について図1を用いて説明する。図1は、太陽光発電システム100の構成を示す図である。
太陽光発電システム100では、太陽電池1と系統2とをパワーコンディショナ3によって連系させる。すなわち、パワーコンディショナ3は、太陽電池1で発電された直流電力を交流電力に変換して系統2へ出力する。太陽電池1は、例えば、複数の太陽電池セルが2次元状に配列されたものである。太陽電池1は、例えば、日射量に応じて直流電力を発生(発電)する。
太陽光発電システム100では、太陽電池1が出力を開始しても発電電力が不足した場合、パワーコンディショナ3が待機状態になる頻度が高いと、起動と待機を頻繁に繰り返すことになる。このため、待機状態となる度に出力リレー6をオフすることが必要となり、出力リレー6の開閉回数が多くなって、出力リレー6の接点寿命が短くなる可能性がある。
この課題を解決するために、例えば、次の第1の工程から第6の工程を含む方法を実施することが考えられる。
第1の工程では、コンバータ4から出力された直流電圧を平滑化するための平滑コンデンサCoの充電電圧変化とその所要時間から、平滑コンデンサCoに充電された電力を演算する。
第2の工程では、第1の工程により演算された電力より太陽電池1の最大電力点を推定する。太陽電池1の最大電力点は、太陽電池1の出力電力の変化を示すカーブにおいて、コンバータ4停止時の電圧の約8割の電圧に対応した位置に存在する。太陽電池1の特性は一定なので電力が演算された時の太陽電池1の出力電圧より最大電力点の電圧に対する割合がわかれば、演算された電力より太陽電池1の最大電力点が推定可能である。
第3の工程では、推定された最大電力点から起動可否を判定する。
第4の工程では、推定した太陽電池の最大電力点が所定値よりも大きい時に起動OKと判断し、インバータ5を動作させ、出力リレー6によりインバータ5を系統2に接続して系統2に電力を出力する。
第5の工程では、推定した太陽電池1の最大電力点が所定値よりも小さい時は発電不足と判断する。所定時間待機した後、再び起動判定を行う。
第6の工程では、平滑コンデンサCoへの充電を完了する時間が所定時間より長い場合も、発電不足と判断する。
この方法では、平滑コンデンサCoの充電電圧の変化と充電に要した時間とから電力を演算するため、判定開始時の平滑コンデンサCoの充電電圧が高いと電力演算精度が低くなるので、判定を開始しようとしたときに平滑コンデンサCoの充電電圧が高い場合にはインバータ5の入力電圧が所定電圧以下となるまで電力判定を待機する必要がある。また、朝夕など日射量が少ない場合には電力演算に時間がかかりやすい。これにより、パワーコンディショナ3を起動してよいかどうかを判定するまでの時間が長くなる傾向にある。
また、この方法では、太陽電池1からコンバータ4に入力される電力がインバータ5の入力段の平滑コンデンサCoに全て蓄積されるまで平滑コンデンサCoが充電されるので、インバータ5の入力電圧が非常に高い値まで上昇する。すなわち、定常動作時に比べて、インバータ5の入力電圧が高くまで上昇するため、インバータ5を構成するスイッチング素子SW(例えば、トランジスタTrや還流ダイオードDなどの素子)に耐圧の高い素子を使う必要がある。インバータ5を構成するスイッチング素子SWに耐圧の高い素子を使うと、パワーコンディショナ3の製造コストが増大する可能性がある。
そこで、パワーコンディショナ3の起動判定に要する時間を短縮するとともに、パワーコンディショナ3の製造コストを低減するために、実施の形態1では、次のような工夫を行う。以下、具体的に説明する。
パワーコンディショナ3は、平滑コンデンサCin、コンバータ4、平滑コンデンサCo、インバータ5、出力リレー6、電圧検出器7、電圧検出器8、充電制御部13、及び起動電力判定部11を備える。
平滑コンデンサCinは、コンバータ4の入力側に配され、太陽電池1とコンバータ4との間に電気的に接続されている。平滑コンデンサCinは、太陽電池1で発電された直流電力、すなわち太陽電池1から出力された直流電力(直流電圧)を受け、直流電力(直流電圧)を平滑化してコンバータ4へ供給する。
コンバータ4は、平滑コンデンサCinと平滑コンデンサCoとの間に電気的に接続されている。コンバータ4は、例えば、リアクトルL、スイッチSW101、SW102、ダイオードD1、D2、充放電コンデンサCf、Cfs、ダイオードD104、及びツェナーダイオードZDを有する。
リアクトルLは、一端が入力端子IN1に接続され、他端がノードN2に接続されている。スイッチSW101は、一端がノードN2に接続され、他端がノードN3に接続されている。スイッチSW101は、例えば、トランジスタTr101(例えば、MOSトランジスタ)及び還流ダイオードD101を有する。スイッチSW102は、一端がノードN4を介して入力端子IN2に接続され、他端がノードN3に接続されている。スイッチSW102は、例えば、トランジスタTr102(例えば、MOSトランジスタ)及び還流ダイオードD102を有する。ダイオードD1は、アノードがノードN2に接続され、カソードがノードN5に接続されている。ダイオードD2は、アノードがノードN5に接続され、カソードが出力端子OUT1に接続されている。充放電コンデンサCfは、一端がノードN5に接続され、他端がノードN6を介してノードN3に接続されている。ダイオードD104は、アノードがノードN6に接続され、カソードがノードN7に接続されている。充放電コンデンサCfsは、一端がノードN7に接続され、他端がノードN8を介してノードN4及び出力端子OUT2に接続されている。ツェナーダイオードZDは、アノードが出力端子OUT3に接続され、カソードがノードN7に接続されている。
なお、出力端子OUT1は、PラインLpに接続され、出力端子OUT3は、中間ラインLmに接続され、出力端子OUT2は、PラインLnに接続されている。
コンバータ4は、平滑化された直流電力を平滑コンデンサCinから受ける。コンバータ4は、例えば、リアクトルL、スイッチSW101、SW102、ダイオードD1、D2、及び充放電コンデンサCfを用いて直流電力(直流電圧)を昇圧し、所定レベルの直流電力(直流電圧)に変換する。コンバータ4は、変換された直流電力(直流電圧)を出力する。
平滑コンデンサCoは、コンバータ4の出力側に配され、コンバータ4とインバータ5との間に電気的に接続されている。平滑コンデンサCoは、例えば、PラインLpとNラインLnとの間で互に直列に接続されたコンデンサC1及びコンデンサC2を有する。例えば、コンデンサC1は、一端がPラインLpに接続され、他端が中間ノードN1で中間ラインLmに接続されている。コンデンサC2は、一端がNラインLnに接続され、他端が中間ノードN1で中間ラインLmに接続されている。なお、PラインLp、中間ラインLm、及びNラインLnは、それぞれ、コンバータ4及びインバータ5を接続している。
平滑コンデンサCoは、コンバータ4から出力された直流電力(直流電圧)を受け、例えばコンデンサC1及びコンデンサC2を用いて直流電力(直流電圧)を平滑化してインバータ5へ供給する。
インバータ5は、平滑コンデンサCoと出力リレー6との間に電気的に接続されている。インバータ5は、例えば、負荷抵抗R及び複数のスイッチング素子SW-1~SW-4を有する。負荷抵抗Rは、例えば、入力端子Pと入力端子Nとの間で互に直列に接続された抵抗R1及び抵抗R2を有する。例えば、抵抗R1は、一端が入力端子Pに接続され、他端が入力端子Mに接続されている。抵抗R2は、一端が入力端子Nに接続され、他端が入力端子Mに接続されている。なお、入力端子P、入力端子M、及び入力端子Nは、それぞれ、PラインLp、中間ラインLm、及びNラインLnに接続されている。
複数のスイッチング素子SW-1~SW-4は、入力端子P、Nと出力端子O1、O2との間に接続されている。例えば、スイッチング素子SW-1は、一端が入力端子Pに接続され、他端が出力ノードON-1を介して出力端子O1に接続されている。スイッチング素子SW-2は、一端が入力端子Nに接続され、他端が出力ノードON-1を介して出力端子O1に接続されている。スイッチング素子SW-3は、一端が入力端子Pに接続され、他端が出力ノードON-2を介して出力端子O2に接続されている。スイッチング素子SW-4は、一端が入力端子Nに接続され、他端が出力ノードON-2を介して出力端子O2に接続されている。各スイッチング素子SW-1~SW-4は、例えば、トランジスタTr(例えば、MOSトランジスタ)及び還流ダイオードDを有する。
インバータ5は、平滑化された直流電力(直流電圧)を平滑コンデンサCoから受ける。インバータ5は、例えば複数のスイッチング素子SW-1~SW-4を用いて直流電力(直流電圧)を交流電力(交流電圧)に変換する。例えば、インバータ5は、複数のスイッチング素子SW-1~SW-4がその制御端子で起動電力判定部11から制御信号を受け、各スイッチング素子SW-1~SW-4が制御信号に従って所定のタイミングでスイッチング動作を行うことにより、直流電力(直流電圧)を例えば2相の交流電力(交流電圧)に変換する。インバータ5は、変換された交流電力(交流電圧)を出力する。
出力リレー6は、インバータ5と系統2との間に電気的に接続されている。出力リレー6は、例えば複数の開閉器6a、6bを有する。例えば、開閉器6aは、一端がインバータ5の出力端子O1に接続され、他端が系統2の一端2aに接続されている。開閉器6bは、一端がインバータ5の出力端子O2に接続され、他端が系統2の他端2bに接続されている。
出力リレー6は、例えば複数の開閉器6a、6bを用いて、インバータ5と系統2との接続を導通したり遮断(開放)したりする。例えば、出力リレー6は、複数の開閉器6a、6bがその制御端子で起動電力判定部11から制御信号を受け、各開閉器6a、6bが制御信号に従ってオンする(閉状態になる)ことでインバータ5と系統2との接続を導通させ、各開閉器6a、6bが制御信号に従ってオフする(開状態になる)ことでインバータ5と系統2との接続を遮断させる。
電圧検出器7は、平滑コンデンサCinの両端の電圧を、太陽電池1の出力電圧Vsとして検出する。電圧検出器7は、例えば、所定の時間間隔で太陽電池1の出力電圧Vsを繰り返し検出する。電圧検出器7は、検出された出力電圧Vsをゲートパルス演算器9へ供給する。
電圧検出器8は、充放電コンデンサCfの両端の電圧、すなわち充放電コンデンサCfの充電電圧Vcfを検出する。電圧検出器8は、例えば、所定の時間間隔で充放電コンデンサCfの充電電圧Vcfを繰り返し検出する。電圧検出器8は、検出された電圧Vcfをゲートパルス演算器9へ供給する。
充電制御部13は、充放電コンデンサCfの充電電圧Vcfを制御する。すなわち、充電制御部13は、太陽電池1の出力電圧Vsを電圧検出器7から受け、充放電コンデンサCfの充電電圧Vcfを電圧検出器8から受け、太陽電池1の出力電圧Vsと充放電コンデンサCfの充電電圧Vcfとに応じて、充放電コンデンサCfの充電電圧Vcfを制御する。充電制御部13は、ゲートパルス演算器9及びゲートパルス発生器10を有する。
ゲートパルス演算器9は、検出された出力電圧Vsを電圧検出器7から受け、検出された電圧Vcfを電圧検出器8から受ける。ゲートパルス演算器9は、太陽電池1の出力電圧Vsと充放電コンデンサCfの充電電圧Vcfとに応じて、スイッチSW101のゲート信号φS1のパルス幅とスイッチSW102のゲート信号φS2のパルス幅とを演算する。
例えば、起動電力判定部11により、充放電コンデンサCfの充電電圧Vcfに応じて太陽電池1の発電電力を推定し起動可否の判定を行う場合、ゲートパルス演算器9は、充放電コンデンサCfの充電電圧Vcfが、定常動作時に平滑コンデンサCoに充電されるべき電圧の略半分になるように、スイッチSW101のゲート信号φS1のパルス幅とスイッチSW102のゲート信号φS2のパルス幅とを演算する。
あるいは、例えば、コンバータ4により、充放電コンデンサCfの充電電圧Vcfに応じて昇圧動作を行う場合、ゲートパルス演算器9は、充放電コンデンサCfの充電電圧Vcfが、太陽電池1の出力電圧Vsに対してコンバータ4の昇圧比に対応した割合の値になるように、スイッチSW101のゲート信号φS1のパルス幅とスイッチSW102のゲート信号φS2のパルス幅とを演算する。
ゲートパルス演算器9は、演算結果をゲートパルス発生器10へ供給する。
ゲートパルス発生器10は、演算結果をゲートパルス演算器9から受ける。ゲートパルス発生器10は、演算結果に従って、スイッチSW101のゲート信号φS1を発生させてスイッチSW101の制御端子に供給するとともに、スイッチSW102のゲート信号φS2を発生させてスイッチSW102の制御端子に供給する。
起動電力判定部11は、充放電コンデンサCfの充電電圧Vcfを電圧検出器8から受ける。起動電力判定部11は、充放電コンデンサCfの充電電圧Vcfに応じて、太陽電池1の出力電力が閾値以上であるか否かを判定する。例えば、起動電力判定部11は、充放電コンデンサCfの充電電圧Vcfと充放電コンデンサCfの充電時間とに応じて太陽電池1の出力電力を推定し、推定された出力電力が閾値Pth以上であるか否かを判定する。
具体的には、起動電力判定部11は、例えば、充放電コンデンサCfの充電電圧Vcfが初期値から上昇し始めたら、充放電コンデンサCfの充電が開始されたものと判断し、タイマ(図示せず)を起動させ、充放電コンデンサCfの充電時間の計測を開始する。起動電力判定部11は、例えば、充放電コンデンサCfの充電電圧Vcfが目標値(例えば、定常動作時に平滑コンデンサCoに充電されるべき電圧の略半分)に達したら、充放電コンデンサCfの充電が完了したものと判断し、タイマ(図示せず)を停止させる。起動電力判定部11は、タイマにより示された値を、充放電コンデンサCfの充電時間として取得する。起動電力判定部11は、充放電コンデンサCfの充電電圧Vcfと充放電コンデンサCfの充電時間とから、後述する数式7を用いて太陽電池1の出力電力を推定し、推定された太陽電池1の出力電力が閾値Pth以上であるか否かを判定する。閾値Pthは、例えば、インバータ5が安定して動作できるような太陽電池1の出力電力の最低値を実験的に求め、その最低値に所定のマージンを足し合わせることで、得られた値である。
例えば、起動電力判定部11は、太陽電池1の出力電力が閾値Pth以上である場合、パワーコンディショナ3が起動可能であると判定する。起動電力判定部11は、パワーコンディショナ3が起動可能であると判定されたことに応じて、パワーコンディショナ3が定常運転を行うように制御する。すなわち、起動電力判定部11は、ゲートパルス演算器9及びゲートパルス発生器10を介してコンバータ4が昇圧動作を行うように制御するとともに、インバータ5及び出力リレー6が動作するように制御する。例えば、起動電力判定部11は、コンバータ4におけるスイッチSW101、SW102にスイッチング動作を行わせてコンバータ4による電力変換動作(昇圧動作)を制御するとともに、インバータ5における各スイッチング素子SWにスイッチング動作を行わせてインバータ5による電力変換動作を制御し、出力リレー6がインバータ5と系統2との接続を導通させるように制御する。
あるいは、例えば、起動電力判定部11は、太陽電池1の出力電力が閾値Pth未満である場合、パワーコンディショナ3が起動不可であると判定する。起動電力判定部11は、パワーコンディショナ3が起動不可であると判定されたことに応じて、パワーコンディショナ3が待機状態になるように制御する。すなわち、起動電力判定部11は、ゲートパルス演算器9及びゲートパルス発生器10を介してコンバータ4が待機状態になるように制御するとともに、インバータ5及び出力リレー6が待機状態になるように制御する。例えば、起動電力判定部11は、コンバータ4におけるスイッチSW101、SW102をいずれもオフ状態に維持するように制御するとともに、インバータ5における各スイッチング素子SWをオフ状態に維持するように制御し、出力リレー6がインバータ5と系統2との接続を遮断(開放)させるように制御する。
次に、パワーコンディショナ3が定常運転を行う際におけるコンバータ4の動作(昇圧動作)について説明する。
パワーコンディショナ3の定常動作には、例えば、図2に示すようなコンバータ4における一部の構成要素が用いられる。すなわち、パワーコンディショナ3の定常動作時において、コンバータ4は、例えば、リアクトルL、スイッチSW101、SW102、ダイオードD101、D102、及び充放電コンデンサCfを用いて直流電力(直流電圧)を昇圧し、所定レベルの直流電力(直流電圧)に変換する。言い換えると、充放電コンデンサCfs、ダイオードD104、及びツェナーダイオードZDは、コンバータ4の昇圧動作に用いられない。
それに応じて、コンバータ4とインバータ5との間の中間ラインLmも機能せず、平滑コンデンサCoは、等価的に、一端がPラインLpに接続され他端がNラインLnに接続された1つのコンデンサとして機能する。また、インバータ5における負荷抵抗Rは、等価的に、一端が入力端子Pに接続され他端が入力端子Nに接続された1つの抵抗として機能する。
このとき、コンバータ4は、図3(a)~(d)に示すように、例えば4つの動作モードM1~M4を有する。
例えば、図3(a)に示す動作モードM1では、スイッチSW101がオンし、スイッチSW102がオフする。これにより、太陽電池1の出力電圧Vsを等価的な電圧源として、破線で示すような電流が流れ、リアクトルLにエネルギーが蓄積されるとともに、充放電コンデンサCfにエネルギーが蓄積される。すなわち、太陽電池1の出力電圧Vsに応じた充電電圧Vcfが、充放電コンデンサCfに充電される。
例えば、図3(b)に示す動作モードM2では、スイッチSW101がオフし、スイッチSW102がオンする。これにより、太陽電池1の出力電圧Vsを等価的な電圧源として、破線で示すような電流が流れ、リアクトルLにエネルギーが蓄積されるとともに、充放電コンデンサCfに蓄積されたエネルギーが平滑コンデンサCoへ放出される。すなわち、充放電コンデンサCfが放電され、充電電圧Vcfに応じたコンバータ4の出力電圧Voutが平滑コンデンサCoに充電される。
例えば、図3(c)に示す動作モードM3では、スイッチSW101とスイッチSW102とが共にオフする。これにより、太陽電池1の出力電圧Vsを等価的な電圧源として、破線で示すような電流が流れ、リアクトルLに蓄積されたエネルギーが平滑コンデンサCoへ放出される。
例えば、図3(d)に示す動作モードM4では、スイッチSW101とスイッチSW102とが共にオンする。これにより、太陽電池1の出力電圧Vsを等価的な電圧源として、破線で示すような電流が流れ、リアクトルLにエネルギーが蓄積される。
コンバータ4は、これら4つの動作モードM1~M4の時間的比率を適宜調整することで、任意の昇圧比の昇圧動作を行うことができる。例えば、コンバータ4は、昇圧比が2倍未満の場合と昇圧比が2倍以上の場合とで異なる動作を行う。
例えば、昇圧比が2倍未満の場合、図4(a)の波形図に示されるような動作を行う。定常状態(定常運転時)では、充放電コンデンサCfの充電電圧Vcfは、コンバータ4の出力電圧Voutの約2分の1の電圧になるように制御しており、コンバータ4の入力電圧(すなわち、太陽電池1の出力電圧)Vs、コンバータ4の出力電圧Vout、充放電コンデンサCfの充電電圧Vcfの大小関係は、例えば、次の数式1のようになっている。
Vout>Vs>Vcf・・・数式1
Vout>Vs>Vcf・・・数式1
スイッチSW101のゲート信号φS1がHigh、スイッチSW102のゲート信号φS2がLowの状態(動作モードM1)では、スイッチSW101がオンし、スイッチSW102がオフする。これにより、平滑コンデンサCin(図2参照)→リアクトルL→ダイオードD1→充放電コンデンサCf→スイッチSW101の経路で、平滑コンデンサCinからリアクトルLと充放電コンデンサCfとに、エネルギーが移行する(図3(a)参照)。
スイッチSW101のゲート信号φS1がLow、スイッチSW102のゲート信号φS2がLowの状態(動作モードM3)では、スイッチSW101がオフし、スイッチSW102がオフする。これにより、平滑コンデンサCin(図2参照)→リアクトルL→ダイオードD1→ダイオードD2→平滑コンデンサCoの経路で、リアクトルLに蓄積されたエネルギーが平滑コンデンサCinに重畳されて平滑コンデンサCoに移行する(図3(c)参照)。
スイッチSW101のゲート信号φS1がLow、スイッチSW102のゲート信号φS2がHighの状態(動作モードM2)では、スイッチSW101がオフし、スイッチSW102がオンする。これにより、平滑コンデンサCin(図2参照)→リアクトルL→スイッチSW102→充放電コンデンサCf→ダイオードD2→平滑コンデンサCoの経路で、充放電コンデンサCfに蓄積されたエネルギーが平滑コンデンサCinに重畳されて平滑コンデンサCoに移行するとともに、リアクトルLにエネルギーを蓄積する(図3(b)参照)。
スイッチSW101のゲート信号φS1がLow、スイッチSW102のゲート信号φS2がLowの状態(動作モードM3)では、スイッチSW101がオフし、スイッチSW102がオフする。これにより、平滑コンデンサCin(図2参照)→リアクトルL→ダイオードD1→ダイオードD2→平滑コンデンサCoの経路で、リアクトルLに蓄積されたエネルギーが平滑コンデンサCinに重畳されて平滑コンデンサCoに移行する(図3(c)参照)。
すなわち、ゲートパルス演算器9は、1倍から2倍の任意の昇圧比が得られるように、スイッチSW101のゲート信号φS1のパルス幅及びタイミングとスイッチSW102のゲート信号φS2のパルス幅及びタイミングとを演算し、演算結果をゲートパルス発生器10へ供給する。ゲートパルス発生器10は、演算結果に従い、図4(a)の波形図に示されるような制御信号をスイッチSW101、SW102へ供給する。
これに応じて、コンバータ4は、上記の一連動作の繰り返しにより、入力電圧Vsに対し、1倍から2倍の任意の昇圧比の電圧Voutを出力する。コンバータ4は、動作モードM1、動作モードM3、動作モードM2、及び動作モードM3の動作を順次に行う1周期TP1において、前半の期間TP11に、主として、入力されたエネルギーの蓄積動作を行い、後半の期間TP12に、主として、蓄積されたエネルギーの出力動作を行う。
あるいは、例えば、昇圧比が2倍以上の場合、図4(b)の波形図に示されるような動作を行う。定常状態(定常運転時)では、充放電コンデンサCfの充電電圧Vcfは、コンバータ4の出力電圧Voutの約2分の1の電圧になるように制御しており、コンバータ4の入力電圧(すなわち、太陽電池1の出力電圧)Vs、コンバータ4の出力電圧Vout、充放電コンデンサCfの充電電圧Vcfの大小関係は、例えば、次の数式2のようになっている。
Vout>Vcf>Vs・・・数式2
Vout>Vcf>Vs・・・数式2
スイッチSW101のゲート信号φS1がHigh、スイッチSW102のゲート信号φS2がHighの状態(動作モードM4)では、スイッチSW101がオンし、スイッチSW102がオンする。これにより、平滑コンデンサCin(図2参照)→リアクトルL→スイッチSW102→スイッチSW101の経路で、平滑コンデンサCinからリアクトルLにエネルギーが移行する(図3(d)参照)。
スイッチSW101のゲート信号φS1がHigh、スイッチSW102のゲート信号φS2がLowの状態(動作モードM1)では、スイッチSW101がオンし、スイッチSW102がオフする。これにより、平滑コンデンサCin(図2参照)→リアクトルL→ダイオードD1→充放電コンデンサCf→スイッチSW101の経路で、リアクトルLに蓄積されたエネルギーが平滑コンデンサCinに重畳されて充放電コンデンサCfに移行する(図3(a)参照)。
スイッチSW101のゲート信号φS1がHigh、スイッチSW102のゲート信号φS2がHighの状態(動作モードM4)では、スイッチSW101がオンし、スイッチSW102がオンする。これにより、平滑コンデンサCin(図2参照)→リアクトルL→スイッチSW102→スイッチSW101の経路で、平滑コンデンサCiからリアクトルLにエネルギーが移行する(図3(d)参照)。
スイッチSW101のゲート信号φS1がLow、スイッチSW102のゲート信号φS2がHighの状態(動作モードM2)では、スイッチSW101がオフし、スイッチSW102がオンする。これにより、平滑コンデンサCin(図2参照)→リアクトルL→スイッチSW102→充放電コンデンサCf→ダイオードD2→平滑コンデンサCoの経路で、リアクトルLと充放電コンデンサCfとに蓄積されたエネルギーが平滑コンデンサCiに重畳されて平滑コンデンサCoに移行する(図3(b)参照)。
すなわち、ゲートパルス演算器9は、2倍以上の任意の昇圧比が得られるように、スイッチSW101のゲート信号φS1のパルス幅及びタイミングとスイッチSW102のゲート信号φS2のパルス幅及びタイミングとを演算し、演算結果をゲートパルス発生器10へ供給する。ゲートパルス発生器10は、演算結果に従い、図4(b)の波形図に示されるような制御信号をスイッチSW101、SW102へ供給する。
これに応じて、コンバータ4は、上記の一連動作の繰り返しにより、入力電圧Vsに対し、2倍以上の任意の昇圧比の出力電圧Voutを出力する。すなわち、コンバータ4は、動作モードM4、動作モードM1、動作モードM4、及び動作モードM2の動作を順次に行う1周期TP2において、前半の期間TP21に、主として、入力されたエネルギーの蓄積動作を行い、後半の期間TP22に、主として、蓄積されたエネルギーの出力動作を行う。
このとき、図4(a)の波形図と図4(b)の波形図とを比較すると、例えば、次の数式3の関係が成立していることにより、図4(a)の場合に比べて、図4(b)の場合に、大きな昇圧比が得られることが理解される。
TP21/(TP22)>TP11/(TP12)・・・数式3
TP21/(TP22)>TP11/(TP12)・・・数式3
なお、図4(a)の場合及び図4(b)の場合のいずれにおいても、上記動作に加えて、コンバータ4において、コンバータ4が動作中の場合、充放電コンデンサCfの電圧Vcfは、例えば、次の数式4が成り立つように制御される。
Vcf≒(Vip+Vin)/2・・・数式4
Vcf≒(Vip+Vin)/2・・・数式4
数式4において、Vipは、平滑コンデンサCoにおけるコンデンサC1の両端電圧であり、Vinは、平滑コンデンサCoにおけるコンデンサC2の両端電圧である(図1参照)。
次に、起動電力判定部11によるパワーコンディショナ3の起動判定を行う際におけるコンバータ4の動作について説明する。
起動電力判定部11による判定が行われる際に、コンバータ4は、昇圧動作を停止している。このとき、充放電コンデンサCfの充電電圧Vcfは、平滑コンデンサCoにおけるコンデンサC1の両端電圧Vipと、ツェナーダイオードZDの電圧降下Vzdとの間で、次の数式5に示す関係を満たす。
Vcf=Vip-Vzd・・・数式5
Vcf=Vip-Vzd・・・数式5
この状態で、図5(a)に示すように、スイッチSW102をオフ状態に維持しながら、スイッチSW101をオンする。これにより、太陽電池1の出力電圧Vsを等価的な電圧源として、破線で示すような電流が流れ、リアクトルLにエネルギーが蓄積されるとともに、充放電コンデンサCfにエネルギーが蓄積される。すなわち、太陽電池1の出力電圧Vsに応じた充電電圧Vcfが、充放電コンデンサCfに充電される。
次に、図5(b)に示すように、スイッチSW102をオフ状態に維持しながら、スイッチSW101をオフする。これにより、太陽電池1の出力電圧Vsを等価的な電圧源として、破線で示すような電流が流れ、リアクトルLに蓄積されたエネルギーが充放電コンデンサCfと充放電コンデンサCfsとに移行する。
その後、リアクトルL及び充放電コンデンサCfに流れる電流がゼロとなってから、図5(c)に示すように、スイッチSW101を再びオンする。これにより、充放電コンデンサCfsに蓄積されたエネルギーは、ツェナーダイオードZDを介して、平滑コンデンサCoにおけるコンデンサC2に移行する。
すなわち、ゲートパルス演算器9は、この一連の動作が行われるように、スイッチSW101のゲート信号φS1のパルス幅及びタイミングとスイッチSW102のゲート信号φS2のパルス幅及びタイミングとを演算する。
例えば、ゲートパルス演算器9は、スイッチSW101のゲート信号φS1のパルス幅Dを、次の数式6が満たされるように演算する。また、ゲートパルス演算器9は、スイッチSW101のゲート信号φS1をオフレベルに固定するように演算する。
D=10/(Vs-Vcf)・・・数式6
D=10/(Vs-Vcf)・・・数式6
そして、ゲートパルス演算器9は、演算結果をゲートパルス発生器10へ供給する。ゲートパルス発生器10は、演算結果に従い、図5(a)~(c)に示されるような制御信号をスイッチSW101、SW102へ供給する。
これに応じて、コンバータ4は、上記の一連の動作により、充放電コンデンサCfへ充電電圧Vcfを充電可能である。
次に、起動電力判定部11によるパワーコンディショナ3の起動判定の動作について説明する。
ゲートパルス演算器9とゲートパルス発生器10とにより、充放電コンデンサCfの充電電圧Vcfを、上記の数式4を満たす値まで充電させるとすると、起動電力判定部11は、充放電コンデンサCfの充電電圧Vcfと充放電コンデンサCfの充電時間とに応じて、次の数式7により太陽電池の出力電力Pを推定する。
P=(C*(Vcf2)2/2-C*(Vcf1)2/2)/(ΔT)・・・数式7
P=(C*(Vcf2)2/2-C*(Vcf1)2/2)/(ΔT)・・・数式7
数式7において、Cは、充放電コンデンサCfのコンデンサ容量を表す。Vcf2は、充放電コンデンサCfの起動電力判定終了時の電圧を表す。例えば、Vcf2は、上記の数式4を満たす充電電圧Vcfの値である。Vcf1は、充放電コンデンサCfの起動電力判定開始時の電圧を表す。ΔTは、充放電コンデンサCfの電圧がVcf1からVcf2まで充電された時間、すなわち充放電コンデンサCfの充電時間を表す。
そして、起動電力判定部11は、推定された太陽電池1の出力電力が閾値Pth以上であるか否かを判定する。閾値Pthは、例えば、インバータ5が安定して動作できるような太陽電池1の出力電力の最低値(最低起動電力)を実験的に求め、その最低値に所定のマージンを足し合わせることで、得られた値である。例えば、閾値Pthは、100Wである。あるいは、例えば、パワーコンディショナ3の最低起動電力が100Wより小さい場合、閾値Pthは、その最低起動電力に応じた100Wより小さな値でもよい。あるいは、例えば、パワーコンディショナ3の最低起動電力が100Wより大きい場合、閾値Pthは、その最低起動電力に応じた100Wより大きな値でもよい。
例えば、起動電力判定部11は、太陽電池1の出力電力が閾値Pth以上である場合、パワーコンディショナ3が起動可能であると判定する。
あるいは、例えば、起動電力判定部11は、太陽電池1の出力電力が閾値Pth未満である場合、パワーコンディショナ3が起動不可であると判定する。
以上のように、実施の形態1では、充電制御部13が、起動電力判定部11による判定が行われる際に、定常動作時に平滑コンデンサCoに充電されるべき電圧の略半分になるように、充放電コンデンサCfの充電電圧Vcfを制御する。これにより、起動判定時に、インバータ5の入力電圧を低い値に抑制できる。すなわち、定常動作時に比べて、インバータ5の入力電圧を低い値に抑制できるため、インバータ5を構成するスイッチング素子SW(例えば、トランジスタTrや還流ダイオードDなどの素子)に耐圧の高い素子を使う必要がない。この結果、パワーコンディショナ3の製造コストを低減できる。
また、実施の形態1では、起動電力判定部11が、充放電コンデンサCfの充電電圧Vcfと充放電コンデンサCfの充電時間とに応じて太陽電池1の出力電力Pを推定し、推定された出力電力Pが閾値Pth以上であるか否かを判定し、推定された出力電力Pが閾値Pth以上である場合にパワーコンディショナ3が起動可能であると判定し、推定された出力電力Pが閾値Pth未満である場合にパワーコンディショナ3が起動不可であると判定する。これにより、パワーコンディショナ3の動作開始前に、コンバータ4内の充放電コンデンサCfの充電電圧Vcfが定常運転時にコンバータ4の出力すべき電圧の約1/2の電圧となるまでの時間を検出することで、太陽電池1の発電電力についてパワーコンディショナ3が起動可能なレベルか否かを判定できる。
実施の形態2.
次に、実施の形態2にかかる太陽光発電システム100iについて説明する。以下では、実施の形態1と異なる部分を中心に説明する。
次に、実施の形態2にかかる太陽光発電システム100iについて説明する。以下では、実施の形態1と異なる部分を中心に説明する。
実施の形態1では、起動判定に用いる充放電コンデンサCfの充電電圧Vcfの初期電圧Vcf1のレベルがどの程度であるかについて特に考慮していないが、充電電圧Vcfの初期電圧Vcf1が高いと電力演算精度が低くなりやすく起動判定の精度も低下する可能性がある。
そこで、実施の形態2では、起動判定に用いる充放電コンデンサの候補として例えば2つの充放電コンデンサCf、Cfsを用意し、2つの充放電コンデンサCf、Cfsのそれぞれの初期電圧に応じて起動判定に用いる充放電コンデンサを選択する。
具体的には、太陽光発電システム100iのパワーコンディショナ3iは、電圧検出器12iをさらに備え、起動電力判定部11(図1参照)に代えて起動電力判定部11iを備える。
電圧検出器12iは、充放電コンデンサCfsの両端の電圧、すなわち充放電コンデンサCfの充電電圧Vcfsを検出する。電圧検出器12iは、例えば、所定の時間間隔で充放電コンデンサCfsの充電電圧Vcfsを繰り返し検出する。電圧検出器12iは、検出された電圧Vcfをゲートパルス演算器9へ供給する。
起動電力判定部11iは、充放電コンデンサCfの充電電圧Vcfを電圧検出器8から受け、充放電コンデンサCfsの充電電圧Vcfsを電圧検出器12iから受ける。例えば、起動電力判定部11iは、充放電コンデンサCf、Cfsの充電を開始させる前において、充放電コンデンサCfの初期電圧Vcf1を電圧検出器8から受け、充放電コンデンサCfsの初期電圧Vcfs1を電圧検出器12iから受ける。
このとき、起動電力判定部11iは、充放電コンデンサCfの初期電圧Vcf1と充放電コンデンサCfsの初期電圧Vcfs1とに応じて判定に用いる充放電コンデンサを選択する。例えば、起動電力判定部11iは、充放電コンデンサCf、Cfsのうち初期電圧が小さい方の充放電コンデンサを選択する。
そして、起動電力判定部11iは、選択された充放電コンデンサの充電電圧に応じて、太陽電池1の出力電力が閾値Pth以上であるか否かを判定する。すなわち、起動電力判定部11iは、選択された充放電コンデンサの充電電圧と選択された充放電コンデンサの充電時間とに応じて太陽電池1の出力電力を推定し、推定された出力電力が閾値Pth以上であるか否かを判定し、推定された出力電力が閾値Pth以上である場合にパワーコンディショナ3iが起動可能であると判定し、推定された出力電力が閾値Pth未満である場合にパワーコンディショナ3iが起動不可であると判定する。
また、起動電力判定部11iによるパワーコンディショナ3iの起動判定を行う際におけるコンバータ4の動作が次の点で実施の形態1と異なる。
例えば、判定に用いる充放電コンデンサとして充放電コンデンサCfsが選択された場合、コンバータ4は、例えば図3(a)、図7(a)、(b)に示すような動作を行う。
すなわち、図3(a)に示すように、スイッチSW101及びスイッチSW102をともにオンする。これにより、太陽電池1の出力電圧Vsを等価的な電圧源として、破線で示すような電流が流れ、リアクトルLにエネルギーが蓄積される。
次に、図7(a)に示すように、スイッチSW102をオン状態に維持しながら、スイッチSW101をオフする。これにより、太陽電池1の出力電圧Vsを等価的な電圧源として、破線で示すような電流が流れ、リアクトルLに蓄積されたエネルギーが充放電コンデンサCfsに移行する。
その後、リアクトルL及び充放電コンデンサCfに流れる電流がゼロとなってから、図7(b)に示すように、スイッチSW102をオフしてから、スイッチSW101を再びオンする。これにより、充放電コンデンサCfsに蓄積されたエネルギーは、ツェナーダイオードZDを介して、平滑コンデンサCoにおけるコンデンサC2に移行する。
このように、実施の形態2では、起動電力判定部11iが、充放電コンデンサCfの初期電圧Vcf1と充放電コンデンサCfsの初期電圧Vcfs1とに応じて判定に用いる充放電コンデンサを選択する。例えば、起動電力判定部11iは、充放電コンデンサCf、Cfsのうち初期電圧が小さい方の充放電コンデンサを選択する。そして、起動電力判定部11iは、選択された充放電コンデンサの充電電圧に応じて、太陽電池の出力電力が閾値以上であるか否かを判定する。すなわち、起動電力判定部11iは、選択された充放電コンデンサの充電電圧と選択された充放電コンデンサの充電時間とに応じて太陽電池1の出力電力を推定し、推定された出力電力が閾値Pth以上であるか否かを判定し、推定された出力電力が閾値Pth以上である場合にパワーコンディショナ3iが起動可能であると判定し、推定された出力電力が閾値Pth未満である場合にパワーコンディショナ3iが起動不可であると判定する。これにより、太陽電池1の出力電力の演算精度を向上でき、パワーコンディショナ3iの起動判定の精度を向上できる。
以上のように、本発明にかかるパワーコンディショナ及び太陽光発電システムは、パワーコンディショナの起動判定に有用である。
1 太陽電池
2 系統
3 パワーコンディショナ
3i パワーコンディショナ
4 コンバータ
5 インバータ
6 出力リレー
7 電圧検出器
8 電圧検出器
9 ゲートパルス演算器
10 ゲートパルス発生器
11 起動電力判定部
11i 起動電力判定部
12i 電圧検出器
13 充電制御部
100 太陽光発電システム
100i 太陽光発電システム
Cf 充放電コンデンサ
Cfs 充放電コンデンサ
2 系統
3 パワーコンディショナ
3i パワーコンディショナ
4 コンバータ
5 インバータ
6 出力リレー
7 電圧検出器
8 電圧検出器
9 ゲートパルス演算器
10 ゲートパルス発生器
11 起動電力判定部
11i 起動電力判定部
12i 電圧検出器
13 充電制御部
100 太陽光発電システム
100i 太陽光発電システム
Cf 充放電コンデンサ
Cfs 充放電コンデンサ
Claims (6)
- 太陽電池で発電された直流電力を交流電力に変換して系統へ出力するパワーコンディショナであって、
充放電コンデンサを有し、前記充放電コンデンサを用いて前記発電された直流電力を昇圧するコンバータと、
前記昇圧された直流電力を平滑化する平滑コンデンサと、
前記平滑化された直流電力を交流電力に変換するインバータと、
前記インバータを前記系統に接続する出力リレーと、
前記充放電コンデンサの充電電圧に応じて、前記太陽電池の出力電力が閾値以上であるか否かを判定する起動電力判定部と、
前記起動電力判定部による判定が行われる際に、定常動作時に前記平滑コンデンサに充電されるべき電圧の略半分になるように、前記充放電コンデンサの充電電圧を制御する充電制御部と、
を備えたことを特徴とするパワーコンディショナ。 - 前記起動電力判定部は、前記充放電コンデンサの充電電圧と前記充放電コンデンサの充電時間とに応じて前記太陽電池の出力電力を推定し、推定された出力電力が前記閾値以上であるか否かを判定し、前記推定された出力電力が前記閾値以上である場合に前記パワーコンディショナが起動可能であると判定し、前記推定された出力電力が前記閾値未満である場合に前記パワーコンディショナが起動不可であると判定する
ことを特徴とする請求項1に記載のパワーコンディショナ。 - 太陽電池で発電された直流電力を交流電力に変換して系統へ出力するパワーコンディショナであって、
第1の充放電コンデンサ及び第2の充放電コンデンサを有し、前記発電された直流電力を昇圧するコンバータと、
前記昇圧された直流電力を平滑化する平滑コンデンサと、
前記平滑化された直流電力を交流電力に変換するインバータと、
前記インバータを前記系統に接続する出力リレーと、
前記第1の充放電コンデンサの初期電圧と前記第2の充放電コンデンサの初期電圧とに応じて判定に用いる充放電コンデンサを選択し、選択された充放電コンデンサの充電電圧に応じて、前記太陽電池の出力電力が閾値以上であるか否かを判定する起動電力判定部と、
前記起動電力判定部による判定が行われる際に、定常動作時に前記平滑コンデンサに充電されるべき電圧の略半分になるように、前記選択された充放電コンデンサの充電電圧を制御する充電制御部と、
を備えたことを特徴とするパワーコンディショナ。 - 前記起動電力判定部は、前記選択された充放電コンデンサの充電電圧と前記選択された充放電コンデンサの充電時間とに応じて前記太陽電池の出力電力を推定し、推定された出力電力が前記閾値以上であるか否かを判定し、前記推定された出力電力が前記閾値以上である場合に前記パワーコンディショナが起動可能であると判定し、前記推定された出力電力が前記閾値未満である場合に前記パワーコンディショナが起動不可であると判定する
ことを特徴とする請求項3に記載のパワーコンディショナ。 - 太陽電池と、
前記太陽電池で発電された直流電力を交流電力に変換して系統へ出力する請求項1に記載のパワーコンディショナと、
を備えたことを特徴とする太陽光発電システム。 - 太陽電池と、
前記太陽電池で発電された直流電力を交流電力に変換して系統へ出力する請求項3に記載のパワーコンディショナと、
を備えたことを特徴とする太陽光発電システム。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014505938A JP5642316B2 (ja) | 2012-03-23 | 2012-03-23 | パワーコンディショナ、及び太陽光発電システム |
PCT/JP2012/057554 WO2013140611A1 (ja) | 2012-03-23 | 2012-03-23 | パワーコンディショナ、及び太陽光発電システム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2012/057554 WO2013140611A1 (ja) | 2012-03-23 | 2012-03-23 | パワーコンディショナ、及び太陽光発電システム |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2013140611A1 true WO2013140611A1 (ja) | 2013-09-26 |
Family
ID=49222105
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2012/057554 WO2013140611A1 (ja) | 2012-03-23 | 2012-03-23 | パワーコンディショナ、及び太陽光発電システム |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP5642316B2 (ja) |
WO (1) | WO2013140611A1 (ja) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016158395A (ja) * | 2015-02-24 | 2016-09-01 | 本田技研工業株式会社 | 太陽光発電の電圧変換装置 |
WO2019035320A1 (ja) * | 2017-08-17 | 2019-02-21 | 株式会社村田製作所 | 太陽光発電システム、パワーコンディショナ |
CN111949065A (zh) * | 2020-08-25 | 2020-11-17 | 深圳市英威腾电气股份有限公司 | 一种光伏水泵系统及其功率调控方法、装置、设备及介质 |
JP2021035326A (ja) * | 2019-08-28 | 2021-03-01 | 台達電子工業股▲ふん▼有限公司Delta Electronics,Inc. | フライングキャパシタコンバータ |
JP2022528335A (ja) * | 2019-06-11 | 2022-06-10 | 陽光電源股▲ふん▼有限公司 | 3レベルブースト回路、多出力並列システム |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009247184A (ja) * | 2008-03-31 | 2009-10-22 | Mitsubishi Electric Corp | 太陽光発電システムおよびその起動方法 |
JP2010213466A (ja) * | 2009-03-11 | 2010-09-24 | Oki Power Tech Co Ltd | 電圧変換装置 |
JP2011188704A (ja) * | 2010-03-11 | 2011-09-22 | Omron Corp | 制御回路、この制御回路を備えるパワーコンディショナ、ならびに太陽光発電システム |
JP2011188705A (ja) * | 2010-03-11 | 2011-09-22 | Omron Corp | パワーコンディショナ内のコンデンサ容量抜け検出方法、それを実施するパワーコンディショナおよびそれを備えた太陽光発電システム |
JP2011199927A (ja) * | 2010-03-17 | 2011-10-06 | Mitsubishi Electric Corp | 太陽光発電システム |
-
2012
- 2012-03-23 JP JP2014505938A patent/JP5642316B2/ja not_active Expired - Fee Related
- 2012-03-23 WO PCT/JP2012/057554 patent/WO2013140611A1/ja active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009247184A (ja) * | 2008-03-31 | 2009-10-22 | Mitsubishi Electric Corp | 太陽光発電システムおよびその起動方法 |
JP2010213466A (ja) * | 2009-03-11 | 2010-09-24 | Oki Power Tech Co Ltd | 電圧変換装置 |
JP2011188704A (ja) * | 2010-03-11 | 2011-09-22 | Omron Corp | 制御回路、この制御回路を備えるパワーコンディショナ、ならびに太陽光発電システム |
JP2011188705A (ja) * | 2010-03-11 | 2011-09-22 | Omron Corp | パワーコンディショナ内のコンデンサ容量抜け検出方法、それを実施するパワーコンディショナおよびそれを備えた太陽光発電システム |
JP2011199927A (ja) * | 2010-03-17 | 2011-10-06 | Mitsubishi Electric Corp | 太陽光発電システム |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016158395A (ja) * | 2015-02-24 | 2016-09-01 | 本田技研工業株式会社 | 太陽光発電の電圧変換装置 |
WO2019035320A1 (ja) * | 2017-08-17 | 2019-02-21 | 株式会社村田製作所 | 太陽光発電システム、パワーコンディショナ |
JP2022528335A (ja) * | 2019-06-11 | 2022-06-10 | 陽光電源股▲ふん▼有限公司 | 3レベルブースト回路、多出力並列システム |
JP7266703B2 (ja) | 2019-06-11 | 2023-04-28 | 陽光電源股▲ふん▼有限公司 | 3レベルブースト回路、多出力並列システム |
US11671015B2 (en) | 2019-06-11 | 2023-06-06 | Sungrow Power Supply Co., Ltd. | Three-level boost circuit and multiple-output parallel system |
JP2021035326A (ja) * | 2019-08-28 | 2021-03-01 | 台達電子工業股▲ふん▼有限公司Delta Electronics,Inc. | フライングキャパシタコンバータ |
JP7026737B2 (ja) | 2019-08-28 | 2022-02-28 | 台達電子工業股▲ふん▼有限公司 | フライングキャパシタコンバータ |
CN111949065A (zh) * | 2020-08-25 | 2020-11-17 | 深圳市英威腾电气股份有限公司 | 一种光伏水泵系统及其功率调控方法、装置、设备及介质 |
Also Published As
Publication number | Publication date |
---|---|
JP5642316B2 (ja) | 2014-12-17 |
JPWO2013140611A1 (ja) | 2015-08-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5486604B2 (ja) | 無停電電源装置 | |
JP5642316B2 (ja) | パワーコンディショナ、及び太陽光発電システム | |
JP2007097252A (ja) | 電源装置およびその双方向昇降圧コンバータ | |
JP2008199808A (ja) | 系統連系インバータ装置 | |
JP2017147787A (ja) | 多出力dc−dcコンバータ | |
JP2012065434A (ja) | 直流電源装置及び電力貯蔵システム | |
JP2014176226A (ja) | Dc/dc変換装置及び分散電源システム | |
JP5941826B2 (ja) | 二次電池用双方向電源装置及びその制御方法 | |
JP2010051152A (ja) | 電流モード制御型スイッチングレギュレータ | |
JP5349687B2 (ja) | 系統連系形インバータ | |
JP4696212B2 (ja) | キャパシタ電源システム | |
JP2009022092A (ja) | 多出力電源回路 | |
JP5957373B2 (ja) | 充放電装置 | |
JP6354505B2 (ja) | スイッチング電源装置 | |
JP5586096B2 (ja) | 電力変換装置 | |
JP2015149815A (ja) | 電力変換装置 | |
JP2012005281A (ja) | 電圧変換回路装置 | |
US9537390B2 (en) | Control circuit, control method, DC-DC converter and electronic device | |
JP6146663B2 (ja) | 充電回路及び閃光放電ランプ点灯装置 | |
JP2013099093A (ja) | 電源装置 | |
JP2012249348A (ja) | 電源制御システム | |
JP2011087439A (ja) | 電源装置システム | |
JP4706886B1 (ja) | 電力伝達用絶縁回路および電力変換装置 | |
JP5483427B2 (ja) | 充電回路および充電方法 | |
JP6730893B2 (ja) | 電源制御装置、および絶縁型スイッチング電源装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12872049 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2014505938 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 12872049 Country of ref document: EP Kind code of ref document: A1 |