WO2013129199A1 - Installation de traitement de boues - Google Patents

Installation de traitement de boues Download PDF

Info

Publication number
WO2013129199A1
WO2013129199A1 PCT/JP2013/054116 JP2013054116W WO2013129199A1 WO 2013129199 A1 WO2013129199 A1 WO 2013129199A1 JP 2013054116 W JP2013054116 W JP 2013054116W WO 2013129199 A1 WO2013129199 A1 WO 2013129199A1
Authority
WO
WIPO (PCT)
Prior art keywords
sludge
sewage
water
hopper
treatment facility
Prior art date
Application number
PCT/JP2013/054116
Other languages
English (en)
Japanese (ja)
Inventor
超 堀池
和秀 ▲辻▼
Original Assignee
三菱マテリアル株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱マテリアル株式会社 filed Critical 三菱マテリアル株式会社
Priority to IN7256DEN2014 priority Critical patent/IN2014DN07256A/en
Priority to KR1020147023502A priority patent/KR101633574B1/ko
Priority to AU2013227605A priority patent/AU2013227605B2/en
Priority to CN201380011151.0A priority patent/CN104136382B/zh
Publication of WO2013129199A1 publication Critical patent/WO2013129199A1/fr

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/06Treatment of sludge; Devices therefor by oxidation
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B7/00Hydraulic cements
    • C04B7/24Cements from oil shales, residues or waste other than slag
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/12Treatment of sludge; Devices therefor by de-watering, drying or thickening
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P40/00Technologies relating to the processing of minerals
    • Y02P40/10Production of cement, e.g. improving or optimising the production methods; Cement grinding

Definitions

  • the present invention relates to a sludge treatment facility for making sewage sludge discharged from a sewage treatment plant into a cement kiln and turning it into a cement raw material.
  • Such treatment technology does not produce any secondary waste because the ash of inorganic components in the sewage dewatered sludge is used as a raw material for cement by being used as a part of clay raw material. Therefore, it can be said that this cementation raw material technology is an excellent treatment technology for protecting the environment.
  • such treatment technology collects sewage when cleaning sludge hopper storing water-containing sludge or piping connected to the sludge hopper, and returning the sewage to the sludge hopper.
  • a sewage recovery mechanism that collects and stores the sewage, a sewage return pipe that connects the sewage recovery tank and the sludge hopper, and a sewage recovery pipe provided in the sewage return pipe.
  • There has been proposed a sludge treatment facility that includes a sewage return pump that returns sewage in a tank to the sludge hopper, and that feeds and processes the hydrous sludge stored in the sludge hopper into a rotary kiln.
  • the hydrous sludge transported by a truck from a sewage treatment plant is stored in a sludge hopper as a storage tank, and the rotary kiln's kiln bottom is passed through the sludge introduction pipe from the sludge hopper. It was transferred by a pressure pump.
  • the sludge hopper 2 is always put in from the inlet 9 on one side of the sludge hopper 2.
  • the water-containing sludge 5 is not uniformly stored but is deposited on the one side.
  • the sprinkling part 7a of the sewage return pipe 7 for returning the sewage 6 from the sewage recovery tank to the sludge hopper 2 is an inlet 9 for the hydrated sludge 5 loaded on the truck 8.
  • the sewage 6 Since it is arranged on the other side of the sludge hopper 2 opposite to the one side, the sewage 6 is not mixed with the hydrated sludge 5, but only the sewage 6 is collected on the other side, and the hydrated sludge 5 is stored in the rotary kiln.
  • the burden on the rotary kiln increases.
  • the sewage 6 in the sewage collection tank freezes, and the sewage collection tank and the sewage return pump for returning the sewage 6 to the sludge hopper 2 and the sewage return pipe.
  • the above-mentioned waste water may be damaged by freezing.
  • the sludge hopper 2 and the pipe connected to the sludge hopper 2 are periodically cleaned with cleaning water, and the cleaning is appropriately performed.
  • the sewage 6 generated at this time is returned to the sludge hopper 2 through the sewage recovery mechanism, and is then put into the rotary kiln for processing.
  • the truck 8 transporting the sewage sludge 5 from the sewage treatment plant puts the sewage sludge 5 into the sludge hopper 2 and then leaves the sludge treatment facility as it is, the sewage sludge remaining on the loading platform 8a of the truck 8 remains. 5 is stuck to the loading platform 8a due to drying, or when the loading platform 8a is washed in another place, there is a problem that a separate sewage treatment is required.
  • the present invention has been made in view of the above circumstances, and it is an object of the present invention to provide a sludge treatment facility that can uniformly spray sewage to the hydrated sludge accumulated in the sludge hopper.
  • the present invention has the following aspects.
  • Sludge hopper storing sewage sludge transported by truck from sewage treatment plant or sewage recovery tank for collecting sewage when cleaning piping in sludge treatment facility, and water sent from the sewage recovery tank to the sludge hopper
  • the water spray part on the sludge hopper side of the sewage return pipe is A sludge treatment characterized in that the sludge treatment is arranged above the position where the water-containing sludge is dropped into the sludge hopper by the truck so as to sprinkle the sewage on the top of the water-containing sludge accumulated in the sludge hopper.
  • Facility storing sewage sludge transported by truck from sewage treatment plant or sewage recovery tank for collecting sewage when cleaning piping in sludge treatment facility, and water sent from the sewage recovery tank to the sludge hopper.
  • an in-pipe water channel is disposed in the vertical direction, and a baffle plate is disposed horizontally at a position spaced downward from the lower end of the sprinkling part.
  • the water spraying part on the sludge hopper side of the sewage return pipe is Since the sewage sludge is disposed above the drop position where the sewage is introduced from the inlet in the sludge hopper by the truck, the sewage is deposited on the surface along the slope from the top of the sewage sludge accumulated in a mountain shape. Can be watered. Thereby, it can prevent storing in the state which the said sewage and the said water-containing sludge isolate
  • the pipe water channel is arranged in the vertical direction, and the baffle plate is spaced downward from the lower end part of the watering part. Since it is horizontally arranged at the position, the entire surface from the top to the skirt of the hydrated sludge in which the sewage is piled up can be spread evenly.
  • the hydrated sludge stored in the sludge hopper is introduced into, for example, a cement kiln, the hydrated sludge without variation in moisture content can be introduced, and the burden on the cement kiln can be reduced.
  • the sewage recovery tank is provided with a circulation device that circulates the stored sewage to prevent freezing
  • the sludge treatment facility is used in a cold district or the like. Even in such a case, it is possible to prevent damage to the sewage recovery tank and the pipes and pumps connected to the sewage recovery tank due to freezing of the sewage.
  • the truck carrying the water-containing sludge is disposed on the truck.
  • the adhering water-containing sludge can be easily washed by putting it in the sludge hopper and washing it. As a result, the water-containing sludge can be washed before drying and can be washed with relatively little washing water.
  • the sewage generated at the time of washing is collected and sent to the sewage collection tank, so that the sewage can be put into a cement kiln for treatment.
  • the treatment of the water-containing sludge remaining on the truck can be easily performed, and the environment can be considered.
  • FIG. 1 shows an embodiment of a sludge treatment facility according to the present invention. It is a block diagram of a sludge acceptance equipment and the sludge hopper storage equipment in an underground pit. 1 shows an embodiment of a sludge treatment facility according to the present invention. It is a block diagram of the sludge hopper storage equipment in an underground pit. It is a top view of the sludge acceptance apparatus of FIG. 1, FIG. 2A and FIG. 2B.
  • a sludge treatment facility 1 includes a cement production facility (cement production process) 13 having a preheater 23 and a dry rotary kiln 18 for preheating cement raw material C, and water from a sewage treatment plant.
  • cement production process cement production process 13 having a preheater 23 and a dry rotary kiln 18 for preheating cement raw material C, and water from a sewage treatment plant.
  • the sludge receiving facility 15 that receives the truck 8 that transports the sludge 5, the watering device 11 disposed in the sludge receiving facility 15, the sludge hopper 2 that stores the hydrous sludge 5, and the sludge hopper 2 or the sludge hopper 2
  • the sludge hopper storage facility 28 having a sewage collection tank 3 for collecting and storing the sewage 6 when the pipe connected to the pipe is washed, and the kiln bottom of the dry rotary kiln 18 through the sludge introduction pipe 17 for containing the sewage sludge 5
  • a sludge charging mechanism 16 that is charged from the 19a side is schematically configured.
  • the water-containing sludge 5 is sewage dewatered sludge with a water content of about 80%. Moreover, although this water-containing sludge is not pre-processed, such as additive addition, what carried out pre-processes, such as additive addition, may be used. Furthermore, the truck 8 is, for example, a sealed container-equipped vehicle that can seal the hydrous sludge 5 in the loading platform 8a.
  • the cement production facility 13 is pulverized by a raw material mill (not shown), and a preheater 23 for preheating the cement raw material C fed from the chute S is connected to the kiln bottom 19a of the dry rotary kiln 18 via the housing 22.
  • the cement raw material C is supplied to the kiln bottom part 19a through the preheater 23 and the housing 22.
  • the preheater 23 is mainly configured by a plurality of cyclones 23a provided in a row in the vertical direction and a rising duct 23b connecting the cyclones 23a so as to raise the exhaust gas from the dry rotary kiln 18.
  • symbol F is an induction fan and raises the exhaust gas from the dry-type rotary kiln 18 via each cyclone 23a and each rise duct 23b, and makes it discharge
  • the dry rotary kiln 18 has a housing 22 connected to the kiln butt portion 19a, a cylindrical kiln shell 19 that is inclined slightly downward and rotated in the circumferential direction, and a downstream side of the kiln shell 19.
  • a burner 20 that is provided and uses heavy oil or pulverized coal as fuel, and a clinker cooler 21 that is provided below the downstream portion of the kiln shell 19 are provided.
  • the housing 22 is connected to a rising duct 23b at the bottom of the preheater 23 at the top, and the bottom surface 22a is a slope inclined upward toward the upstream side.
  • the sludge charging mechanism 16 is provided for charging the water-containing sludge 5 from the kiln bottom 19a side of the dry rotary kiln 18.
  • the sludge charging mechanism 16 is connected to the sludge hopper 2 that stores the water-containing sludge 5 conveyed by the truck 8, and the sludge introduction pipe 17 that pumps the water-containing sludge 5 through the pressure feed pump 24, and the sludge introduction pipe 17
  • the front end is provided above the bottom surface 22a of the housing 22 and has a sludge inlet 14 through which the hydrous sludge 5 is dropped toward the bottom surface 22a. That is, the sludge inlet 14 is provided on the inner wall of the housing 22, which is a connection portion between the preheater 23 and the kiln bottom 19 a.
  • the sludge receiving facility 15 has a substantially square-shaped building 15b in plan view, and a plan view in which the truck 8 can enter and exit from each continuous wall surface of the building 15b.
  • a rectangular sludge receiving chamber 15a is connected.
  • a plurality of nozzles (watering devices) 11 for spraying and washing the washing water on the loading platform 8a of the truck 8 are provided on the ceiling side, and the water-containing sludge 5 is placed on the floor surface.
  • An opening 15c for feeding into the sludge hopper 2 is provided.
  • a cleaning water supply pipe 42 for feeding cleaning water to the nozzle by a truck cleaning water pump 40 is connected to the nozzle 11 via a valve 41.
  • a cleaning water supply source (not shown) is connected to the base end side of the cleaning water supply pipe 42.
  • the sludge receiving facility 15 has an underground pit 12 buried under the building 15b. Further, in this underground pit 12, as shown in FIG. 2A, a sludge hopper storage facility 28 is disposed. As shown in FIG. 2B, the sludge hopper storage facility 28 (lower structure) stores two sludge hoppers 2 in the underground pit 12 and is connected to each sludge hopper 2 or each sludge hopper 2. A sewage recovery mechanism 4 is provided for recovering the sewage 6 when the pipes are washed and feeding the sewage 6 to the sludge hopper 2.
  • the two sludge hoppers 2 each include a lid member 2a that can be freely opened and closed.
  • a storage pit 30 for temporarily storing the sewage 6 is provided on the floor of the underground pit 12. Further, the storage pit 30 is connected to a recovery pipe 31 that connects the storage pit 30 and the sewage recovery tank 3 via a check valve 31a, and the sewage in the storage pit 30 is supplied to the recovery pit 30.
  • a sewage recovery pump 32 is provided as a submersible pump to be sent to the sewage recovery tank 3.
  • the sewage recovery mechanism 4 collects the sewage 6, the sewage recovery tank 3 that stores the sewage 6, the sewage return pipe 7 that connects the sewage recovery tank 3 to each sludge hopper 2, and the sewage
  • a sewage return pump 25 which is provided in the return pipe 7 and is a submersible pump for feeding the sewage 6 in the sewage recovery tank 3 to the sludge hopper 2 is provided.
  • a stirring blade (circulation device) 10 is provided at the bottom of the sewage recovery tank 3. The stirring blade 10 is rotatably provided by a driving device (not shown) in order to convect the sewage 6 collected and stored in the sewage recovery tank 3 and prevent the sewage 6 from freezing.
  • the sewage return pipe 7 has a sprinkler 7 a from which the sewage 6 on the sludge hopper 2 side is discharged by a truck 8 from the inlet 9 side into which the sewage sludge 5 of the sludge hopper 2 is introduced. It is disposed above the position where the hydrated sludge 5 falls when thrown. That is, the center of the water sprinkling part 7 a of the sewage return pipe 7 is generally disposed at the position of the top part 5 a of the water-containing sludge 5.
  • the sprinkling part 7a of the sewage return pipe 7 has a pipe water channel 7b which is a flow path of the sewage 6 arranged in the vertical direction. Further, the water spray 7 a is provided with a baffle plate 7 c so that the discharged sewage 6 scatters from above the top 5 a of the accumulated water-containing sludge 5.
  • the baffle plate 7c is horizontally disposed at a position spaced downward from the lower end of the water sprinkling portion 7a.
  • the sewage return pipe 7 is connected to the two sludge hoppers 2 with a branch pipe 7d interposed in the middle.
  • Each of the branch pipes 7d is provided with a check valve 26 and a flexible joint 27 on the way.
  • at least one of the two sludge hoppers 2 is selected and a sewage return switching valve 29 as a return switching mechanism capable of returning the sewage 6 is provided in the middle of the branch pipe 7d and the check valve 26 Each is provided on the upstream side.
  • the sludge introduction pipe 17 branches from the sludge introduction pipe 17 via the drain valve 33 and is connected to the sewage collection tank 3 to return the sewage 6 in the sludge introduction pipe 17 to the sewage collection tank 3.
  • a tube 34 is connected.
  • the sewage recovery tank 3 is installed at a position lower than the dry rotary kiln 18, and the sludge introduction pipe 17 is inclined upward from the sewage recovery tank 3 to the dry rotary kiln 18.
  • the sludge introduction pipe 17 is connected to a downstream side of the branch position of the sewage return pipe 34 on the base end side through a valve 37 through a valve 37 for supplying cleaning water into the pipe by a cleaning pump 35. Yes.
  • a cleaning water supply source (not shown) is connected to the base end side of the cleaning water supply pipe 36.
  • the sludge introduction pipe 17 is provided with a cleaning device insertion portion 38 for inserting the cleaning device into the pipe downstream of the connection portion with the cleaning water supply tube 36 on the base end side.
  • This washer has a spherical shape larger than the inner diameter of the sludge introduction pipe 17, and a sponge or the like soaked with soapy water is used.
  • a spherical sponge is used, even if the pipe is bent or the inside diameter is changed, the inside of the pipe can be smoothly washed and pushed forward with washing water. Moreover, by including soapy water, it is easier to enter the tube more smoothly and to proceed.
  • the storage pit 30 and the sewage collection tank 3 are provided with level meters 39 for measuring the amount of sewage, respectively.
  • a method for treating the water-containing sludge 5 and a method for cleaning the truck carrying the water-containing sludge 5 will be described using the sludge treatment facility 1 having the above-described configuration.
  • the solid line arrow in FIG. 1 shows the transfer direction of the cement raw material C and the hydrous sludge 5
  • the broken line arrow shows the flow direction of gas.
  • the cement raw material C is put into the rising duct 23b at the uppermost part of the preheater 23.
  • the cement raw material C descends while exchanging heat with the exhaust from the dry rotary kiln 18 rising from the rising duct 23b at the lowermost part of the preheater 23. It enters into the rotary rotary kiln 18 which rotates through the part 19a.
  • the hydrated sludge 5 transported from the sewage treatment plant by the truck 8 enters the sludge receiving chamber 15a of the sludge receiving facility 15 from behind, and the hydrated sludge 5 loaded on the cargo bed 8a
  • the lid member 2a of the sludge hopper 2 is opened and charged and temporarily stored.
  • the water-containing sludge 5 loaded on the loading platform 8a of the truck 8 is dropped from the inlet 9 of the sludge hopper 2 as shown in FIG.
  • the water-containing sludge 5 always accumulates at the same drop position, and accumulates in a mountain shape on the inlet 9 side of the sludge hopper 2 to form the top portion 5a.
  • the hydrous sludge 5 stored in the sludge hopper 2 is pumped from the sludge introduction pipe 17 to the sludge inlet 14 by the pump 24.
  • the hydrated sludge 5 fed by pressure is fed into the dry rotary kiln 18 from the sludge inlet 14.
  • the water-containing sludge 5 thrown into the kiln shell 19 is baked together with the cement raw material C by heating the burner 20 to become a cement clinker C1, and after being cooled by the clinker cooler 21 provided in the downstream portion of the kiln shell 19. Discharged.
  • the clinker C1 is pulverized with gypsum in a finishing mill (not shown) to become a cement as a final product.
  • each sludge hopper 2 and the sewage 6 generated when the pipes in the underground pit 12 are washed are collected in the storage pit 30 in the floor of the underground pit 12 and temporarily stored. And the sewage 6 stored in the storage pit 30 is sent and stored in the sewage recovery tank 3 through the recovery pipe 31 by the sewage recovery pump 32.
  • the sewage 6 in the sewage recovery tank 3 is returned to the sludge hopper 2 via the sewage return pipe 7 by the sewage return pump 25.
  • the amount of the sewage 6 to be returned is appropriately controlled according to the state of the sewage sludge 5 in the sludge hopper 2 (particularly the water concentration), and the sewage 6 is sent by opening and closing the sewage return switching valve 29 arbitrarily.
  • the pipe 7d is selected, and at least one of the two sludge hoppers 2 is selected as the return destination of the sewage 6.
  • the sewage 6 is fed into the sludge hopper 2 from the sewage return pipe 7, the sewage 6 is sprinkled from the water sprinkling part 7a of the sewage return pipe 7.
  • the water sprinkling part 7a is disposed above the top part 5a of the water-containing sludge 5 accumulated in a mountain shape in the sludge hopper 2, the water sprinkling part 7a is disposed in all directions through baffle plates 7c provided in the water sprinkling part 7a.
  • the sewage 6 is scattered evenly from the top 5a to the skirt of the hydrated sludge 5 in which the sewage 6 accumulates in a mountain shape.
  • the sewage 6 sprayed on the hydrated sludge 5 in this manner is mixed with the hydrated sludge 5 and, as described above, is pumped from the sludge hopper 2 to the sludge inlet 14 via the sludge introduction pipe 17 by the pressure feed pump 24. Then, it is introduced into the dry rotary kiln 18 from the sludge inlet 14.
  • tube 17 with a wash water is demonstrated.
  • the washing machine is inserted into the pipe from the washing machine insertion portion 38, the valve 37 is opened, and the sludge introduction pipe 17 is passed through the washing water supply pipe 36 by the washing pump 35. Feed cleaning water into the inside.
  • the upstream side of the sludge introduction pipe 17 is closed by a valve (not shown) and the drain valve 33 is also closed so that the washing water does not flow to the sewage collection tank 3. Yes.
  • the washing water sent into the sludge introduction pipe 17 pushes the washing machine in the pipe to the dry rotary kiln 18 and at the same time flushes the inside of the pipe.
  • the sewage 6 in the sludge introduction pipe 17 is collected in the sewage collection tank 3. That is, when the valve 37 is closed and the drain valve 33 is opened, the sewage 6 in the sludge introduction pipe 17 inclined as described above enters the sewage collection tank 3 through the sewage return pipe 34 by its own weight. Flows in. Then, the collected sewage 6 is appropriately sprinkled on the sewage sludge 5 in the sludge hopper 2 through the sewage return pipe 7 as described above according to the state of the sewage sludge 5 in the sludge hopper 2.
  • the hydrous sludge 5 transported from the sewage treatment plant is introduced from one of the inlets 9 of the two sludge hoppers 2, and then the loading platform 8a is inclined.
  • the washing water is sprinkled all at once from the plurality of nozzles 11 in the state.
  • the lid member 2a of the sludge hopper 2 is closed.
  • the water-containing sludge 5 remaining on the cargo bed 8a is washed with the washing water sprayed from the plurality of nozzles 11.
  • This washing water is sent from the washing water supply source to the nozzle 11 by the truck washing water pump 40 from the washing water supply pipe 42 in which the valve 41 is interposed. And the said washing water is sprinkled for a fixed time, and the water-containing sludge 5 which remained on the loading platform 8a is washed away.
  • the sewage 6a generated at the time of washing flows into the underground pit 12 from the floor surface of the building 15b of the sludge receiving facility 15, and gathers in the storage pit 30 provided on the floor of the underground pit 12, and the sewage 6 As temporarily stored.
  • the sewage 6 stored in the storage pit 30 is sent and stored in the sewage recovery tank 3 through the recovery pipe 31 by the sewage recovery pump 32.
  • the sewage 6 collected and stored in the sewage recovery tank 3 is appropriately contained in the sludge hopper 2 through the sewage return pipe 7 as described above according to the state of the sewage sludge 5 in the sludge hopper 2. Watered.
  • the water-containing sludge 5 to which the sewage 6 has been sprinkled is pumped from the sludge hopper 2 to the sludge inlet 14 via the sludge inlet pipe 17 by the pressure feed pump 24, and from the sludge inlet 14. It is put into the dry rotary kiln 18 and fired together with the cement raw material C.
  • the sludge hopper 2 side of the sewage return pipe 7 The water sprinkling part 7a is disposed above the drop position where the sewage sludge 5 is introduced from the inlet 9 in the sludge hopper by the truck 8, so that the top of the sewage sludge 5 in which the sewage 6 is accumulated in a mountain shape. Water can be sprinkled on the surface along the slope from 5a. Thereby, it can prevent storing in the state which the sewage 6 and the water-containing sludge 5 isolate
  • the in-pipe water channel 7b of the sprinkling part 7a of the sewage return pipe 7 is arranged in the vertical direction, and the baffle plate 7c is arranged horizontally at a position spaced downward from the lower end of the sprinkling part 7a. Therefore, by sprinkling the sewage 6 from above the top 5a of the hydrated sludge 5 deposited in a mountain shape, the entire surface from the top 5a to the skirt can be spread evenly. As a result, when the hydrated sludge 5 stored in the sludge hopper 2 is charged into the dry rotary kiln 18, the hydrated sludge 5 having no variation in moisture content can be charged, and the burden on the dry rotary kiln 18 can be reduced.
  • the stirring blade 10 which prevents the freezing which circulates the sewage 6 stored in the sewage recovery tank 3 is rotatably provided at the bottom of the sewage recovery tank 3, the sludge treatment facility 1 can be used in a cold district or the like. Even when it is used, it is possible to prevent damage to the sewage recovery tank 3 due to freezing of the sewage 6 and the pipes connected to the sewage recovery tank 3 and the sewage return pump 25.
  • the sludge receiving facility 15 is provided with a nozzle 11 for washing the loading platform 8a of the truck 8 with washing water after the hydrous sludge 5 is put into the sludge hopper 2, so that the truck 8 carrying the hydrous sludge 5 is provided.
  • the water-containing sludge 5 remaining on the loading platform 8a can be easily washed. As a result, the water-containing sludge 5 can be washed before drying, and washing can be performed with relatively little washing water.
  • the sewage 6a generated during the cleaning is temporarily stored in a storage pit 30 provided at the bottom of the underground pit 12, and the sewage 6a is supplied by sending water from the storage pit 30 to the sewage recovery tank 3. It can be put into a dry rotary kiln 18 for processing. Thereby, the process of the water-containing sludge 5 which remained in the truck 8 can be performed simply, and it can consider an environment.
  • the sewage 6 is stored in the sewage recovery tank 3 by the sewage recovery mechanism 4, and the amount of the sewage 6 that is appropriately returned by the sewage return pump 25 is controlled according to the state of the sewage sludge 5 in the sludge hopper 2.
  • the water content of the water-containing sludge 5 can be adjusted. Accordingly, the sewage 6 can be returned to the respective sludge hoppers 2 while adjusting the return amount, and the water-containing sludge 5 with the moisture adjusted appropriately can be supplied from the sludge hopper 2 to the dry rotary kiln 18. The burden can be reduced.
  • the sewage recovery mechanism 4 includes the sewage return switching valve 29 that can return at least one of the two sludge hoppers 2 and return the sewage 6, the sewage sludge 5 in each sludge hopper 2 is provided.
  • the return to each sludge hopper 2 can be adjusted according to the state.
  • the sewage return pipe 34 for sending the sewage 6 in the sludge introduction pipe 17 to the sewage collection tank 3 is provided, the sewage 6 in the sludge introduction pipe 17 can be directly collected in the sewage collection tank 3, and the sludge introduction A large amount of sewage 6 generated during the cleaning of the tube 17 can be easily treated.
  • the sludge introduction pipe 17 is inclined upward from the sewage collection tank 3 to the dry rotary kiln 18, the sewage 6 in the sludge introduction pipe 17 is collected by its own weight without using a pump or the like. It can be collected in the tank 3.
  • the water-containing sludge 5 or the cleaning water is sent upward from the lower side of the sludge introduction pipe 17, the air escapes upward so that the air does not easily accumulate in the pipe, and the water-containing sludge 5 is easily pumped and supplied with cleaning water. It becomes easy to do.
  • the circulation device provided in the sewage recovery tank 3 has been described only when the stirring blade 10 is used.
  • the present invention is not limited to this. It is also possible to provide a circulation pipe provided with a pump and circulate the sewage 6 collected in the sewage collection tank 3. Moreover, the effect of preventing freezing can be improved by providing a heat source device such as a heater on the outer periphery of the sewage recovery tank 3 or the circulation pipe.
  • sludge hopper It is possible to automatically measure the moisture concentration of the hydrated sludge 5 in the sensor 2 with a sensor or the like, and automatically control the amount of sewage returned from the sewage recovery tank 3 based on a signal from the sensor or the like. It is.
  • tube 7 although demonstrated only when the sewage return pipe
  • the present invention is not limited to this.
  • the sludge collected at the bottom of the sewage recovery tank 3 Even if a sludge return pump for extracting and returning the sludge to the sludge hopper 2 is installed, it can be handled.
  • the hydrous sludge 5 of the sludge hopper 2 was thrown into the kiln bottom part 19a of the dry-type rotary kiln 18 was demonstrated, it is not limited to this, For example, a calcining furnace, the preheater 23 lowest part It is possible to respond to the case where it is put into the rising duct 23b or after the water-containing sludge 5 is dried and then put into the dry rotary kiln 18.
  • the water-containing sludge transported from the sewage treatment plant can be used in a sludge treatment facility that directly or after drying is put into a cement kiln for treatment.
  • SYMBOLS 1 Sludge processing equipment 2 Sludge hopper 3 Sewage collection tank 4 Sewage collection mechanism 5 Hydrous sludge 5a Top part 6 Sewage 6a Sewage 7 Sewage return pipe 7a Sprinkling part 7b In-pipe waterway 7c Baffle plate 8 Truck 8a Carriage base 9 Entry port 9 ) 11 Nozzle (watering device) 12 Underground pit 13 Cement production facility (cement production process) 15 Sludge receiving equipment

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Organic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Ceramic Engineering (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Treatment Of Sludge (AREA)

Abstract

L'invention concerne une installation de traitement de boue qui peut pulvériser de l'eau contaminée de façon égale dans une boue contenant de l'eau qui a été déposée dans un concentrateur de boue. Cette installation de traitement de boue (1) comporte un mécanisme de récupération d'eau contaminée (4) qui comprend : un réservoir de récupération d'eau contaminée (3) pour récupérer de l'eau contaminée (6) résultant du nettoyage soit d'un concentrateur de boue (2) qui stocke de la boue contenant de l'eau (5) transportée à partir de l'installation de traitement des eaux d'égout par camion (8) ou tuyaux dans l'installation de traitement de boue (1) ; et un tuyau de retour d'eau contaminée (7) qui transporte l'eau du réservoir de récupération d'eau contaminée (3) au concentrateur de boue (2). La boue contenant de l'eau (5) qui est stockée dans le concentrateur de boue (2) est traitée par un procédé de fabrication de ciment (13). Une unité de pulvérisation d'eau (7a) sur le côté concentrateur de boue (2) du tuyau de retour d'eau contaminée (7) est disposée au-dessus de la position de chute pour la boue contenant de l'eau (5) dans le concentrateur de boue (2) à partir du camion (8) de telle sorte que l'eau contaminée (6) est pulvérisée sur le pic (5a) de la boue contenant de l'eau (5) qui a été collectée à l'intérieur du concentrateur de boue (2).
PCT/JP2013/054116 2012-02-29 2013-02-20 Installation de traitement de boues WO2013129199A1 (fr)

Priority Applications (4)

Application Number Priority Date Filing Date Title
IN7256DEN2014 IN2014DN07256A (fr) 2012-02-29 2013-02-20
KR1020147023502A KR101633574B1 (ko) 2012-02-29 2013-02-20 오니 처리 설비
AU2013227605A AU2013227605B2 (en) 2012-02-29 2013-02-20 Sludge disposal facility
CN201380011151.0A CN104136382B (zh) 2012-02-29 2013-02-20 污泥处理设备

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012-042786 2012-02-29
JP2012042786A JP5569547B2 (ja) 2012-02-29 2012-02-29 汚泥処理設備

Publications (1)

Publication Number Publication Date
WO2013129199A1 true WO2013129199A1 (fr) 2013-09-06

Family

ID=49082399

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/054116 WO2013129199A1 (fr) 2012-02-29 2013-02-20 Installation de traitement de boues

Country Status (6)

Country Link
JP (1) JP5569547B2 (fr)
KR (1) KR101633574B1 (fr)
CN (1) CN104136382B (fr)
AU (1) AU2013227605B2 (fr)
IN (1) IN2014DN07256A (fr)
WO (1) WO2013129199A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113087100A (zh) * 2021-04-16 2021-07-09 西昌市蓝鼎环保科技有限公司 一种废水处理用沉淀池
CN113294784A (zh) * 2021-05-25 2021-08-24 中国华能集团清洁能源技术研究院有限公司 一种处置废弃风机叶片的水泥回转窑系统及其工作方法
CN116105150A (zh) * 2023-02-28 2023-05-12 鹏鹞环保股份有限公司 一种小型污泥干化焚烧装置及其焚烧方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108101398B (zh) * 2018-01-31 2023-08-08 江西银杉白水泥股份有限公司 一种漂白均匀的水泥漂白机

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51103680A (ja) * 1975-03-08 1976-09-13 Shigeo Isobe Haikibutsushokyakusochi
JPH0550100A (ja) * 1991-08-27 1993-03-02 Mitsui Eng & Shipbuild Co Ltd 高分子凝集剤添加汚泥の焼却方法
JPH08276199A (ja) * 1995-04-07 1996-10-22 Mitsubishi Materials Corp 汚泥処理方法
JP2002224692A (ja) * 2001-01-31 2002-08-13 Mitsubishi Materials Corp 汚泥ホッパ収納設備及び汚泥処理設備
JP2003090195A (ja) * 2001-07-12 2003-03-28 Hanshin Kensetsu Co Ltd 泥濃式または泥土圧式推進工法における排泥処理設備
JP2005342558A (ja) * 2004-05-31 2005-12-15 Taisei Rotec Corp 戻り生コンの再生処理施設及び再生骨材の管理方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10325161A (ja) * 1997-05-27 1998-12-08 Mitsubishi Heavy Ind Ltd 高架水槽の凍結防止方法及び装置
KR100247114B1 (ko) * 1998-03-11 2000-03-15 양태열 수중 폭기기
CN201648206U (zh) * 2010-02-05 2010-11-24 湖南湘润环保节能股份有限公司 污泥处理设备
CN202063810U (zh) * 2011-03-15 2011-12-07 大连力达环境工程有限公司 一种坡底滑道式污泥接受槽

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51103680A (ja) * 1975-03-08 1976-09-13 Shigeo Isobe Haikibutsushokyakusochi
JPH0550100A (ja) * 1991-08-27 1993-03-02 Mitsui Eng & Shipbuild Co Ltd 高分子凝集剤添加汚泥の焼却方法
JPH08276199A (ja) * 1995-04-07 1996-10-22 Mitsubishi Materials Corp 汚泥処理方法
JP2002224692A (ja) * 2001-01-31 2002-08-13 Mitsubishi Materials Corp 汚泥ホッパ収納設備及び汚泥処理設備
JP2003090195A (ja) * 2001-07-12 2003-03-28 Hanshin Kensetsu Co Ltd 泥濃式または泥土圧式推進工法における排泥処理設備
JP2005342558A (ja) * 2004-05-31 2005-12-15 Taisei Rotec Corp 戻り生コンの再生処理施設及び再生骨材の管理方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113087100A (zh) * 2021-04-16 2021-07-09 西昌市蓝鼎环保科技有限公司 一种废水处理用沉淀池
CN113294784A (zh) * 2021-05-25 2021-08-24 中国华能集团清洁能源技术研究院有限公司 一种处置废弃风机叶片的水泥回转窑系统及其工作方法
CN116105150A (zh) * 2023-02-28 2023-05-12 鹏鹞环保股份有限公司 一种小型污泥干化焚烧装置及其焚烧方法
CN116105150B (zh) * 2023-02-28 2023-10-24 鹏鹞环保股份有限公司 一种小型污泥干化焚烧装置及其焚烧方法

Also Published As

Publication number Publication date
KR101633574B1 (ko) 2016-06-24
IN2014DN07256A (fr) 2015-04-24
AU2013227605B2 (en) 2015-10-08
JP5569547B2 (ja) 2014-08-13
AU2013227605A1 (en) 2014-09-18
JP2013176738A (ja) 2013-09-09
CN104136382A (zh) 2014-11-05
KR20140113744A (ko) 2014-09-24
CN104136382B (zh) 2015-12-02

Similar Documents

Publication Publication Date Title
JP5569547B2 (ja) 汚泥処理設備
CN201670797U (zh) 污泥干燥焚烧系统
JP2009522538A (ja) 選択的非触媒還元法(sncr)により回転キルン内のnox排出量を低減させる方法および装置
JP2013224810A (ja) 有機汚泥の処理装置と処理方法
KR101481947B1 (ko) 슬러지를 이용한 고형연료 제조장치와 제조방법 및 이에 의한 고형연료
CN107954565A (zh) 一种化工排放物综合处理系统
CN102120941A (zh) 褐煤干燥冲激除尘洗涤干燥工艺
CN102531317B (zh) 一种污泥干化系统
CN103130393A (zh) 污泥干化处理方法及系统
CN107721112A (zh) 城市污泥干化热解气化自持焚烧系统
CN102557378B (zh) 一种污泥干化工艺
CN105546549A (zh) 一种垃圾脱氯装置及其脱氯方法
CN105366913B (zh) 高效污泥脱水干燥处理系统
KR101160469B1 (ko) 생활 및 난연성 폐기물 혼합 소각시 발생되는 배가스 처리 시스템
CN103789200A (zh) 干式发酵系统
CN209098489U (zh) 污泥冷却传送结构及污泥处理设备
CN108036327B (zh) 一种小型节能高效生活垃圾焚烧处理系统
CN106422599A (zh) 干熄焦焦炭增湿、抑尘、水循环利用工艺及装置
CN205874169U (zh) 钻井污泥处理系统
JP4228545B2 (ja) 汚泥ホッパ収納設備及び汚泥処理設備
KR101384181B1 (ko) 배설물을 연료로 사용하는 난방시스템
CN202786125U (zh) 一种热废气入炉煤预热及脱水装置
KR101261460B1 (ko) 생활 및 난연성 폐기물 혼합 소각 시스템.
KR20240054959A (ko) 슬러지 소각 시스템 및 슬러지 소각 방법
CN103087742B (zh) 一种热废气入炉煤预热及脱水装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13754658

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20147023502

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2013227605

Country of ref document: AU

Date of ref document: 20130220

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: IDP00201405740

Country of ref document: ID

122 Ep: pct application non-entry in european phase

Ref document number: 13754658

Country of ref document: EP

Kind code of ref document: A1