WO2013042774A1 - ワイピング装置およびこれを用いた溶融めっき装置 - Google Patents

ワイピング装置およびこれを用いた溶融めっき装置 Download PDF

Info

Publication number
WO2013042774A1
WO2013042774A1 PCT/JP2012/074264 JP2012074264W WO2013042774A1 WO 2013042774 A1 WO2013042774 A1 WO 2013042774A1 JP 2012074264 W JP2012074264 W JP 2012074264W WO 2013042774 A1 WO2013042774 A1 WO 2013042774A1
Authority
WO
WIPO (PCT)
Prior art keywords
wiping
steel plate
gas
suction
edge
Prior art date
Application number
PCT/JP2012/074264
Other languages
English (en)
French (fr)
Inventor
今井 武
田村 武
杉山 誠司
宮元 一浩
三男 西俣
靖司 山根
Original Assignee
新日鐵住金株式会社
日鉄住金鋼板株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 新日鐵住金株式会社, 日鉄住金鋼板株式会社 filed Critical 新日鐵住金株式会社
Priority to BR112014004234-9A priority Critical patent/BR112014004234B1/pt
Priority to MX2014002386A priority patent/MX358301B/es
Priority to EP12832927.3A priority patent/EP2759618B1/en
Priority to JP2013512900A priority patent/JP5851492B2/ja
Priority to KR1020137018938A priority patent/KR101532496B1/ko
Priority to US14/237,660 priority patent/US9708702B2/en
Priority to CN201280007048.4A priority patent/CN103380226B/zh
Priority to AU2012310530A priority patent/AU2012310530B2/en
Publication of WO2013042774A1 publication Critical patent/WO2013042774A1/ja

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/14Removing excess of molten coatings; Controlling or regulating the coating thickness
    • C23C2/16Removing excess of molten coatings; Controlling or regulating the coating thickness using fluids under pressure, e.g. air knives
    • C23C2/18Removing excess of molten coatings from elongated material
    • C23C2/20Strips; Plates
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/003Apparatus
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/14Removing excess of molten coatings; Controlling or regulating the coating thickness
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/14Removing excess of molten coatings; Controlling or regulating the coating thickness
    • C23C2/16Removing excess of molten coatings; Controlling or regulating the coating thickness using fluids under pressure, e.g. air knives
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/14Removing excess of molten coatings; Controlling or regulating the coating thickness
    • C23C2/16Removing excess of molten coatings; Controlling or regulating the coating thickness using fluids under pressure, e.g. air knives
    • C23C2/18Removing excess of molten coatings from elongated material

Definitions

  • the present invention relates to a wiping apparatus and a hot dipping apparatus using the same.
  • This application claims priority on September 22, 2011 based on Japanese Patent Application No. 2011-208118 for which it applied to Japan, and uses the content here.
  • FIG. 14 is a cross-sectional view showing an outline of a continuous hot dip plating apparatus.
  • the steel plate P is immersed in the hot dipping bath 12 from the snout 13, so that the molten steel is plated on the steel plate P, pulled up via the sink roll 14, and wiped.
  • Plating is performed by performing gas wiping with the nozzle 15.
  • Gas wiping by the wiping nozzle 15 is performed by wiping gas from the wiping nozzles 15 disposed on both sides of the steel plate P so that the molten metal adhering to the surface of the steel plate P has a uniform plating thickness in the plate width direction and the plate longitudinal direction. By spraying, the excess molten metal is wiped off and the adhesion amount of the molten metal is controlled.
  • the wiping nozzle 15 ejects wiping gas from a slit extending in the width direction of the steel sheet P, and this slit is longer than the width of the steel sheet P in order to correspond to various widths of the steel sheet P.
  • the steel plate P extends outward from the edge portion.
  • the wiping gas blown from the wiping nozzle 15 collides with the steel sheet P as a high-speed jet and then is separated in the vertical direction, so that excess molten metal is wiped in the vertical direction to achieve a uniform plating thickness. It is what. However, as for the edge portion of the steel plate P, the jet flow colliding with the edge portion escapes in the lateral direction, so that the collision force of the jet flow is reduced and the plating thickness of the edge portion becomes thicker than that of the center portion. Overcoat occurs.
  • the molten metal scatters to the surroundings due to the turbulence of the jet that collides with the edge portion, and a so-called splash is generated and adheres to the surface of the steel sheet P, thereby deteriorating the surface quality of the steel sheet P.
  • the main nozzle that mainly injects the gas for controlling the thickness of the deposited metal is injected into the main nozzle with respect to the injection direction of the gas injected from the main nozzle. It has been proposed to provide a sub-nozzle that injects a gas at a lower speed than the gas injected from the main nozzle, and to prevent the jet flow injected from the main nozzle from being diffused by the low-speed jet flow from the sub-nozzle.
  • Patent Document 2 an edge plate (0.5 mm thickness, 755 mm width) is disposed on both sides in the width direction of the steel plate in parallel with the steel plate, and the edge plate is appropriately spaced from the side end surface of the steel plate, The edge overcoat prevents the gas on the edge plate side and the gas on the steel plate side from colliding with each other by attaching a band plate to the part of the edge plate that faces the side surface of the steel plate. It has been proposed to prevent this. Further, Patent Document 3 proposes an apparatus that removes excess molten metal by providing a suction nozzle facing the side end surface of a steel plate and utilizing air pressure.
  • an object of the present invention is to provide a wiping apparatus capable of preventing edge overcoat and splash by improving the flow of wiping gas at the edge of a steel sheet, and a hot dipping apparatus using the same. To do.
  • One aspect of the present invention is a wiping device that blows wiping gas onto a steel sheet from a pair of wiping nozzles disposed on both sides of the steel sheet that is pulled up from a hot dipping bath toward the plate surface of the steel sheet. And, on both sides in the width direction of the steel plate between the pair of wiping nozzles, each is arranged in parallel with the steel plate, a suction port for sucking air is arranged toward the side end surface of the steel plate, and the cross-sectional shape is A suction tube that is wide in the pulling direction of the steel plate is provided.
  • the suction pipe may have a width in the pulling direction of the steel plate of 15 mm or more and 50 mm or less.
  • the suction tube may have a ratio of a long side to a short side of the cross section of 1.2 to 10.
  • a distance between the suction port and the side end surface of the steel plate may be 2 mm or more and 15 mm or less.
  • a distance between the suction port and the side end surface of the steel plate may be 2 mm or more and 15 mm or less.
  • a hot dipping apparatus includes the wiping apparatus according to (1) or (2).
  • a hot dipping apparatus includes the wiping apparatus described in (3) above.
  • a hot dipping apparatus includes the wiping apparatus described in (4) above.
  • a hot dipping apparatus includes the wiping apparatus described in (5) above.
  • the wiping gas blown from the wiping nozzle collides with the steel plate as a high-speed jet, and then is separated vertically so that excess molten metal is wiped up and down and in the plate width direction.
  • a uniform plating thickness is realized by uniformizing the pressure distribution.
  • the wiping gas blown from the pair of wiping nozzles on the outer side in the width direction of the steel sheet collides with suction pipes disposed on both sides in the width direction of the steel sheet between the pair of wiping nozzles and is separated vertically.
  • the suction pipe is wide in the direction of pulling up the steel plate, the wiping gas that collides with the suction pipe and is separated up and down is guided up and down along the convex shape outside the suction pipe and rectified. Therefore, the generation of turbulence due to the direct collision of the wiping gases outside the steel plate is prevented.
  • the suction of air from the suction port arranged toward the side end surface of the steel sheet suppresses the fluctuation of the collision point position of the wiping gas between the edge of the steel sheet and the tip of the suction pipe, resulting from the fluctuation of the collision point. Since the pressure drop of the gas to be reduced is reduced, it is possible to suppress a reduction in the collision force of the wiping gas jet at the edge of the steel plate. Furthermore, the occurrence of splash due to the generation of turbulent flow can be prevented, and quality troubles can be avoided.
  • the suction ports that are arranged in parallel to the steel plate on both sides in the width direction of the steel plate between the pair of wiping nozzles are provided on the side end surfaces of the steel plate. It is arranged toward. And by providing the suction pipe whose cross-sectional shape is wide in the pulling-up direction of the steel plate, it is possible to prevent the occurrence of turbulent flow due to the direct collision of the wiping gases on the outside of the steel plate, and the wiping gas at the edge of the steel plate It is possible to suppress a decrease in the impact force of the jet of water on the steel plate. Therefore, edge overcoat and splash can be prevented.
  • FIG. 2 is an AA arrow view of the edge portion of the steel plate of FIG. 1. It is sectional drawing of the center part of the width direction of a steel plate.
  • FIG. 3 is a view taken along arrow BB in FIG. 2.
  • FIG. 3 is a view taken along the line BB in FIG. 2 when there is no suction pipe.
  • It is a figure which shows the graph of the collision gas pressure fluctuation
  • theta It is the schematic of the splash scattering angle (theta) in the edge part of a steel plate. It is a related figure of collision gas pressure ratio (Pe / Pc) and splash scattering angle (theta). It is a figure which shows the relationship between the distance of an edge plate and the edge part of a steel plate, the collision gas pressure ratio (Pe / Pc), and the splash scattering angle
  • Pe / Pc collision gas pressure ratio
  • corner corner
  • the collision gas pressure ratio (Pe / Pc) of the edge portion to the center portion of the steel plate and the splash on the device at the distance between each rectifying device and the edge portion of the steel plate It is a figure which shows the relationship with the adhesion amount (g / Hr). It is a figure which shows the cross-sectional shape of the suction tube which concerns on a modification. It is a figure which shows the cross-sectional shape of the suction tube which concerns on a modification. It is a figure which shows the cross-sectional shape of the suction tube which concerns on a modification. It is a figure which shows the cross-sectional shape of the suction tube which concerns on a modification.
  • FIG. 1 is a longitudinal sectional view of a wiping device 1 according to an embodiment of the present invention.
  • FIG. 2 is an AA arrow view of the edge portion of the steel plate P of FIG.
  • the wiping apparatus 1 As shown in FIGS. 1 and 2, the wiping apparatus 1 according to the embodiment of the present invention is provided in a continuous hot dipping apparatus 11 as shown in FIG. A pair of wiping nozzles 2a and 2b disposed on both sides of the steel plate P pulled up from the hot dipping bath 12 and a steel plate P on both sides in the width direction of the steel plate P between the pair of wiping nozzles 2a and 2b. And suction pipes 3 arranged in parallel with each other.
  • the wiping nozzles 2a and 2b are nozzles that eject the wiping gas G from linear slits 4a and 4b extending in the width direction of the steel sheet toward the surface of the steel sheet P, respectively.
  • the slits 4a and 4b are formed to be longer than the width of the steel plate P and extend outward from the edge E of the steel plate P as shown in FIG.
  • the wiping gas G sprayed on the plate surface of the steel plate P from the wiping nozzles 2a and 2b is separated in the vertical direction after colliding with the steel plate P as a high-speed jet, and wipes off excess molten metal.
  • the suction tube 3 is a tube having an oval cross-sectional shape in which the suction port 3a for sucking air is disposed toward the side end surface of the steel plate P.
  • the suction tube 3 is arranged such that the long side of the elliptical cross section is in the pulling direction D of the steel plate P.
  • a supply pipe 3b for supplying a driving gas g for operating the suction pipe 3 as an ejector is provided in the middle of the suction pipe 3.
  • 3A, 3B, and 3C are diagrams visualizing the flow of the wiping gas G ejected from the wiping nozzles 2a and 2b.
  • 3A is a cross-sectional view of the center portion C in the width direction of the steel plate P.
  • FIG. 3B is a BB arrow view of FIG.
  • the wiping gas G that has collided with the steel plate P is uniformly distributed vertically.
  • the wiping gas G that has collided with the suction tube 3 is separated vertically and then guided up and down along the convex shape outside the suction tube 3 having an elliptical cross section.
  • the center of the suction pipe 3 becomes the collision point of the wiping gas G as if the steel plate P exists as in the width direction center portion C, and a stable flow is formed.
  • the wiping gases G ejected from the pair of wiping nozzles 2a and 2b directly collide with each other.
  • the gas flow is not defined by the solid (steel plate P or suction pipe 3) as in FIGS. 3A and 3B, all slight fluctuations in the gas flow at each spatial point are reflected and wiped.
  • the collision point between the gases is determined. For this reason, as shown in FIG. 3C, the collision point of the wiping gas G is not fixed at a single point, but the position fluctuates, so that the surroundings become complicated turbulent flow.
  • the wiping gas G blown from the wiping nozzles 2a and 2b is separated into the upper and lower sides after colliding with the steel sheet P as a high-speed jet, so that excess molten metal is wiped up and down.
  • a uniform plating thickness is realized by making the pressure distribution in the plate width direction uniform.
  • the wiping gas G blown from the wiping nozzles 2a and 2b to the outside in the width direction of the steel plate P is guided up and down along the convex shape outside the suction pipe 3 as described above, and thus rectified. Generation of turbulence due to direct collision of the wiping gases G on the outside of the steel plate P is prevented.
  • the suction pipe 3 is moved from the edge portion E of the steel sheet P by suction of air from the suction port 3a of the suction pipe 3 disposed toward the side end surface of the steel sheet P.
  • the fluctuation of the collision point of the wiping gas G formed therebetween is suppressed, and the wiping gas G escaping in the lateral direction from the edge E of the steel sheet P is reduced by suppressing the gas pressure drop.
  • the fall of the collision force of the jet of the wiping gas G in the edge part E of the steel plate P is also suppressed.
  • the wiping condition is that the distance d1 between the wiping nozzles 2a, 2b and the steel plate P is 8 mm, and the amount of gas from the wiping nozzles 2a, 2b is 700 Nm 3 / Hr, respectively.
  • the suction pipe condition is that the distance d2 between the edge portion E of the steel plate P and the suction pipe 3 is 5 mm, the elliptical suction pipe 3 having a long side of 25 mm and a short side of 15 mm, and the circular suction pipe 103 having a diameter of 15 mm. used.
  • the collision gas pressure was measured with a pressure gauge A (using a digital pressure gauge from Okano Seisakusho).
  • the measurement in FIG. 4A was performed at a point F (see FIG. 4C) 3 mm inside from the edge portion E of the steel plate P to the center portion C of the steel plate P.
  • the average collision gas pressure at the point F 3 mm inside from the edge portion E of the steel plate P to the center portion C of the steel plate P is close to the pressure of the center portion C.
  • the edge portion E of the steel sheet P can be obtained as compared with the case where no suction tube or a circular suction tube 103 is used.
  • the pressure drop at the point F 3 mm inside is suppressed.
  • the collision gas average pressure at the point F 3 mm inside from the edge portion E of the steel plate P to the center portion C of the steel plate P by the suction pipe 3 is the pressure of the center portion C. Since the pressure is close and the pressure fluctuation is small and the pressure drop at the point F 3 mm inside from the edge E of the steel plate P to the center C of the steel plate P is also suppressed, the center C of the steel plate P from the edge E of the steel plate P is suppressed. A wiping effect similar to that of the center portion C is obtained at a point F on the inner side of 3 mm, and edge overcoat can be prevented.
  • the splash S prevention effect by the wiping device 1 in the present embodiment will be described in detail (FIG. 6).
  • the generation conditions of the molten metal splash S wiped by the wiping gas G are quantified by similar experiments using various liquids.
  • the splash S of molten metal is related to the inertial force ( ⁇ ⁇ ⁇ 0 2 ⁇ Ug 2 ) due to the wiping gas G and the surface tension ( ⁇ / ⁇ 0 ) acting on the molten metal (where ⁇ : density , ⁇ 0 : lifted liquid film by strip, Ug: wiping gas velocity, ⁇ : surface tension of molten metal).
  • the collision gas average pressure at the edge portion E is increased as shown in FIGS. 4A and 5A.
  • the flow of the wiping gas G at the edge portion E by the shape of the suction pipe 3 and the suction of air from the suction port 3a as described above, the flow is improved from the outside of the steel plate P in the vertical direction of the steel plate P.
  • the splash S is prevented from scattering to the outside of the steel plate P.
  • the driving gas g is supplied to the supply pipe 3b of the suction pipe 3 and the air is sucked from the suction port 3a, whereby the edge portion of the steel plate P is obtained. Even if the distance to E is increased, the collision of the wiping gas G outside the edge portion E can be stabilized and the pressure drop at the edge portion E can be suppressed.
  • the collision gas pressure ratio (Pe / Pc) of the edge portion E with respect to the center portion C of the steel plate P is defined as an index indicating the rectification effect by the suction pipe 3, the edge plate B, etc.
  • the collision gas pressure ratio (Pe) / Pc) and the splash scattering angle ⁇ were experimentally investigated (Pe: collision gas pressure at the edge E of the steel plate P, Pc: collision gas pressure at the center C of the steel plate P).
  • the collision gas pressure ratio (Pe / Pc) was adjusted by changing the cross-sectional shape of the suction pipe 3 and the suction pipe air supply amount. It can be seen from FIG. 8B that the splash S in the lateral direction increases as the gas pressure at the edge E decreases.
  • the collision gas pressure ratio (Pe / Pc) of the edge portion E with respect to the center portion C of the steel plate P is used as an index for rectification.
  • the relationship between the installation position of the edge plate B and the suction pipe 3, the collision gas pressure ratio (Pe / Pc), and the splash scattering angle ⁇ is arranged.
  • the collision gas pressure ratio (Pe / Pc) is less than 0.8, an edge overcoat is generated. Pc) needs to be 0.8 or more.
  • the distance between the edge plate B and the edge portion E of the steel plate P needs to be secured within 6 mm.
  • the splash scattering angle ⁇ is about 10 °, but the edge plate B is close to the edge portion E of the steel plate P. And when the distance of the edge plate B and the edge part E of the steel plate P is 7 mm or less, it became clear that the splash S adhered and the operation for a long period of time was difficult.
  • the edge overcoat can be stably avoided by keeping the distance between the suction tube 3 and the edge portion E of the steel plate P within 15 mm as shown in FIG. It becomes possible to do. Moreover, by making the distance between the suction tube 3 and the edge portion E of the steel plate P 2 mm or more, the adhesion of the splash S can be avoided more reliably. From the above, it has been found that by installing the distance between the suction tube 3 and the edge portion E of the steel plate P in the range of 2 to 15 mm, it can be used for a long time operation.
  • the pressure drop of the edge portion E can be suppressed by setting the distance from the edge portion E of the steel sheet P to a predetermined condition.
  • the collision gas pressure ratio (Pe / Pc) is greatly improved by using the suction pipe 3. This is because, by using the suction pipe 3, the wiping gas G between the wiping gases G by the air suction from the suction pipe 3 in addition to the effect of suppressing the generation of turbulent flow due to direct collision between the wiping gases G outside the steel plate P. This is because the fluctuation of the collision point is suppressed.
  • the cross-sectional shape of the suction tube 3 is elliptical.
  • suction pipes 3B, 3C, and 3D having similar shapes that exhibit a rectifying effect by the rectifying plate p as shown in FIG. 12B, FIG. 12C, or FIG. 12D can be used.
  • the cross-sectional shape is wide in the pulling direction D of the steel plate P and is convex outward.
  • the wiping gas G that collides with the suction pipe 3 and is separated vertically is guided up and down along the convex shape outside the suction pipe 3 and rectified, so that the wiping gas G is outside the steel plate P. Generation of turbulence due to collision is prevented, and the same rectification effect as described above can be obtained.
  • FIG. 13 also shows the case of the suction tube 103 having a circular cross section.
  • the wiping gas G collides with the suction pipe 103 having a circular cross section, and then travels around the suction pipe 3 having a circular cross section and collides again. Therefore, the gas flow is disturbed and the collision point vibrates.
  • the suction tube 3 ellipse
  • the suction tube 3A rectangular shape
  • the direction of the gas flow at the separation point of the gas from the wall surface of the suction tube 3 is closer to the vertical direction in the suction tube 3 (ellipse) or the suction tube 3A (rectangle). And the occurrence of turbulence is prevented. Therefore, it has been found that the rectification effect is lower than that of an ellipse or rectangle, and the amount of splash adhesion is larger than that of other shapes. In the case of a circular cross section, it is necessary to make the long side length (diameter) of the suction tube about 35 mm in order to eliminate the edge overcoat. On the other hand, since the minimum value of the distance between the wiping nozzles 2a and 2b shown in FIG.
  • the wiping device 1 needs to be set to about 10 to 20 mm in the manufacturing conditions of the hot dip plated steel sheet, it is difficult to install the suction pipe having this circular cross section. It is. Therefore, in the wiping device 1 according to the present embodiment, the cross-sectional shape is wide in the pulling direction D of the steel plate P, and the suction pipe 3 is convex outward so that it can be installed between the wiping nozzles 2a and 2b, and The rectifying effect can be exhibited even under various operating conditions.
  • the wiping device 1 in order to exert a rectifying effect, it is experimentally determined that it is desirable that the long side length is 15 to 50 mm, and the ratio of the long side to the short side of the cross section is 1.2 to 10. Revealed. The contents will be described below.
  • the pressure drop of the edge portion E was large, and the collision gas pressure ratio (Pe / Pc) was about 0.46. Therefore, the target pressure ratio of the wiping device 1 using the suction pipe 3 was set to 0.8 or more, and the shape of the suction pipe that can be improved was investigated.
  • the cross-sectional shape of the suction pipe it is desirable to use an ellipse having the greatest rectification effect in the flow after the collision of the wiping gas G as described in FIG. Further, since the minimum value of the distance between the wiping nozzles 2a and 2b shown in FIG. 1 must be set to about 10 to 20 mm, the supply pipe 3b for the driving gas g to the suction pipe 3 shown in FIG. The diameter (short side) needs to be 10 to 20 mm or less. In order to exert the ejector effect in the driving gas g from the supply pipe 3b in the suction pipe 3, it is possible to maximize the function as the ejector by reducing the diameter of the supply pipe 3b and improving the flow velocity in the suction pipe 3. I found out that I could make it work. Therefore, when a circular shape is used as the cross-sectional shape of the gas supply pipe, 6A (outer diameter 10.5 mm), which is the minimum diameter in industrial piping, is used.
  • Tables 1 to 3 show the results of investigating the effect of eliminating the edge overcoat when various elliptical suction pipes 3 are manufactured and compressed air is introduced as the driving gas g from the supply pipe 3b.
  • the edge overcoat improvement effect is displayed in four levels. 4: Pe / Pc> 0.9, 3: 0.8 ⁇ Pe / Pc ⁇ 0.9, 2: 0.6 ⁇ Pe / Pc ⁇ 0.8, 1: 0.6> Pe / Pc Indicates. It is assumed that the edge overcoat improvement effect is larger as the numerical value is larger in the four-step display.
  • the metal adhesion status is displayed in three stages, 3: No metal adhesion, 2: Metal adheres, but operation is possible for a long time. 1: It is impossible to operate for a long time due to metal adhesion.
  • the elliptical tube is manufactured by deforming the circular tube, but the rectangular tube can be manufactured by welding a steel plate, and thus can be manufactured using a material having an arbitrary thickness.
  • the outer diameter of the supply tube 3 b needs to be 5 mm or less, so the suction air volume is 30 Nm 3 / Hr.
  • the long side length which exhibits an effect becomes 50 mm or less like an ellipse.
  • the suction air volume is improved by increasing the cross-sectional area as in the elliptical shape, but the effect of improving the edge overcoat is small because the suction air speed decreases with respect to the short side of 5 mm. became.
  • the long side / short side ratio capable of exhibiting the effect of improving the edge overcoat was 10 or less.
  • the adhesion amount of the splash was as small as about several g / Hr, and no trouble accompanying the increase in adhesion was confirmed.
  • the long side length of the suction tube was set to 15 mm to 50 mm, and the ratio of the long side to the short side of the cross section was set to 1.2 to 10 as the optimum shape. Note that the optimum shape of the suction pipe differs depending on the target of the collision gas pressure ratio (Pe / Pc) necessary for overcoat improvement. Should be effective.
  • the provision of the suction tube whose cross-sectional shape is wide in the pulling direction of the steel sheet prevents the occurrence of turbulent flow due to direct collision of wiping gases outside the steel sheet, and the edge of the steel sheet. It is possible to suppress a reduction in the collision force of the jet of wiping gas on the steel plate to the steel plate. Therefore, edge overcoat and splash can be prevented.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Coating With Molten Metal (AREA)
  • Magnetically Actuated Valves (AREA)

Abstract

 このワイピング装置は、溶融めっき浴から引き上げられる鋼板を挟んで、両側に前記鋼板の板面に向かってそれぞれ配置された一対のワイピングノズルから、ワイピングガスを前記鋼板に吹き付けるワイピング装置であって、前記一対のワイピングノズル間の前記鋼板の幅方向の両側に、前記鋼板と平行にそれぞれ配置され、エアーを吸引する吸込口が前記鋼板の側端面に向かって配置され、断面形状が前記鋼板の引き上げ方向に幅広である吸引管を備えている。

Description

ワイピング装置およびこれを用いた溶融めっき装置
 本発明は、ワイピング装置およびこれを用いた溶融めっき装置に関する。
 本願は、2011年09月22日に、日本に出願された特願2011-208118号に基づき優先権を主張し、その内容をここに援用する。
 図14は、連続式溶融めっき装置の概要を示す断面図である。図14に示すように、連続式の溶融めっき装置11では、鋼板Pをスナウト13から溶融めっき浴12に浸漬することで、鋼板Pに溶融金属をめっきし、シンクロール14を介して引き上げ、ワイピングノズル15によるガスワイピングを行うことでめっきを行う。
 ワイピングノズル15によるガスワイピングは、鋼板P表面に付着した溶融金属が板幅方向および板長手方向に均一なめっき厚となるように、鋼板Pを挟んで両側に配置されたワイピングノズル15からワイピングガスを吹き付けることにより、過剰な溶融金属を払拭し、溶融金属の付着量を制御するものである。ワイピングノズル15は、鋼板Pの幅方向に延設されたスリットからワイピングガスを噴出するものであり、このスリットは、多様な鋼板Pの幅に対応するため、鋼板Pの幅よりも長く、すなわち鋼板Pのエッジ部より外側まで延びている。
 このようなワイピングノズル15から吹き付けられたワイピングガスは、高速噴流として鋼板Pに衝突した後に上下方向に分離されることで、過剰な溶融金属が上下方向に払拭され、均一なめっき厚を実現しようとするものである。ところが、鋼板Pのエッジ部については、このエッジ部に衝突する噴流が横方向に逃げてしまうため、噴流の衝突力が減少してエッジ部のめっき厚がセンター部に比べて厚くなる、いわゆるエッジオーバーコートが発生する。また、エッジ部に衝突した噴流の乱れによって溶融金属が周囲に飛び散る、いわゆるスプラッシュが発生して鋼板表面に付着することにより、鋼板Pの表面品質の低下を招く。
 このような問題を解決する試みとして、例えば特許文献1に記載のように、主に付着金属の厚さを制御するガスを噴射する主ノズルに、主ノズルから噴射されるガスの噴射方向に対して傾斜した、主ノズルから噴射するガスよりも低速のガスを噴射する副ノズルを設け、副ノズルからの低速の噴流によって主ノズルから噴射される噴流の拡散を防止することが提案されている。
 また、特許文献2には、鋼板の幅方向の両側に、鋼板と平行にエッジプレート(0.5mm厚、755mm幅)を配設し、エッジプレートを鋼板の側端面から適宜間隔を隔てること、エッジプレートの鋼板の側端面に対向する部分に帯板を取り付けることで、エッジプレート側のガスと鋼板側のガスとが衝突しないようにし、ガスの乱流を発生させないようにして、エッジオーバーコートを防止することが提案されている。また、特許文献3では、鋼板の側端面に対向して吸引用ノズルを設け、エアー圧を利用することで、余分の溶融金属を除去する装置が提案されている。
日本国特開2007-84878号公報 日本国特開平10-36953号公報 日本国特開平9-143663号公報
 特許文献1に記載のように主ノズル上に副ノズルが固定された場合、鋼板の両側の主ノズル間の距離が拡大するなどして変更されると、副ノズルが主ノズルの噴流を阻害することになるため、ワイピング効果が減少する。また、特許文献2に記載のようにエッジプレートおよび帯板を設置すると、鋼板のエッジ部へのワイピングガスの衝突圧が増加するため、溶融金属のスプラッシュが増加し、鋼板と帯板との間にスプラッシュが付着してエッジの品質不良を引き起こす。
 また、特許文献3の装置では、吸引管形状が円形となっているため、吸引管周辺の流れが乱れスプラッシュが発生し易い。そして、吸引用ノズルにより溶融金属を吸引するため、吸引した溶融金属がノズルに付着し、ノズルを閉塞してしまうという問題がある。
 そこで、本発明においては、鋼板のエッジ部のワイピングガスの流れを改善することによりエッジオーバーコートおよびスプラッシュを防止することが可能なワイピング装置およびこれを用いた溶融めっき装置を提供することを目的とする。
 本発明者らは、上記課題を解決して係る目的を達成するために、以下を採用するに到った。
(1)本発明の一態様は、溶融めっき浴から引き上げられる鋼板を挟んで、両側に前記鋼板の板面に向かってそれぞれ配置された一対のワイピングノズルから、ワイピングガスを前記鋼板に吹き付けるワイピング装置であって、前記一対のワイピングノズル間の前記鋼板の幅方向の両側に、前記鋼板と平行にそれぞれ配置され、エアーを吸引する吸込口が前記鋼板の側端面に向かって配置され、断面形状が前記鋼板の引き上げ方向に幅広である吸引管を備えている。
(2)上記(1)に記載のワイピング装置では、前記吸引管は、前記鋼板の前記引き上げ方向の幅が15mm以上50mm以下であってもよい。
(3)上記(1)又は(2)に記載のワイピング装置では、前記吸引管は、断面の短辺に対する長辺の比が1.2~10であってもよい。
(4)上記(1)又は(2)に記載のワイピング装置では、前記吸込口と前記鋼板の前記側端面との距離が2mm以上15mm以下であってもよい。
(5)上記(3)に記載のワイピング装置では、前記吸込口と前記鋼板の前記側端面との距離が2mm以上15mm以下であってもよい。
(6)本発明の別態様の溶融めっき装置は、上記(1)又は(2)に記載のワイピング装置を備えている。
(7)本発明の別態様の溶融めっき装置は、上記(3)に記載のワイピング装置を備えている。
(8)本発明の別態様の溶融めっき装置は、上記(4)に記載のワイピング装置を備えている。
(9)本発明の別態様の溶融めっき装置は、上記(5)に記載のワイピング装置を備えている。
 本発明のワイピング装置によれば、ワイピングノズルから吹き付けられたワイピングガスが高速噴流として鋼板に衝突した後に上下に分離されることで、過剰な溶融金属が上下方向に払拭されるとともに、板幅方向の圧力分布が均一化されることにより均一なめっき厚が実現される。このとき、鋼板の幅方向の外側で一対のワイピングノズルから吹き付けられたワイピングガスは、一対のワイピングノズル間の鋼板の幅方向の両側に配置された吸引管に衝突して上下に分離される。ここで、吸引管は、断面形状が鋼板の引き上げ方向に幅広であるため、吸引管に衝突して上下に分離されたワイピングガスは吸引管の外側の凸形状に沿って上下に導かれ、整流されるので、鋼板の外側でワイピングガス同士が直接衝突することによる乱流の発生が防止される。同時に、鋼板の側端面に向かって配置された吸引口からのエアーの吸引によって、鋼板のエッジ部から吸引管先端部間におけるワイピングガスの衝突点位置の変動が抑制され、衝突点の変動に起因するガスの圧力低下が小さくなるために、鋼板のエッジ部におけるワイピングガスの噴流の衝突力の低下を抑制することができる。更に前記乱流発生によるスプラッシュの発生を防止し、品質トラブルを回避可能となる。
 上記(1)~(9)に記載の態様によれば、一対のワイピングノズル間の鋼板の幅方向の両側に、鋼板と平行にそれぞれ配置され、エアーを吸引する吸込口が鋼板の側端面に向かって配置される。そして、断面形状が鋼板の引き上げ方向に幅広である吸引管を備えたことにより、鋼板の外側でワイピングガス同士が直接衝突することによる乱流の発生を防止するとともに、鋼板のエッジ部におけるワイピングガスの噴流の鋼板への衝突力の低下を抑制することができる。従って、エッジオーバーコートおよびスプラッシュを防止することが可能となる。
本発明の実施形態におけるワイピング装置の縦断面図である。 図1の鋼板のエッジ部のA-A矢視図である。 鋼板の幅方向のセンター部の断面図である。 図2のB-B矢視図である。 吸引管が無い場合の図2のB-B矢視図である。 鋼板のエッジ部におけるワイピングガスの衝突ガス圧力変動のグラフを示す図である。 鋼板のエッジ部におけるワイピングガスの衝突ガス圧力変動を測定する装置の概略図である。 鋼板のエッジ部におけるワイピングガスの衝突ガス圧力変動を測定する装置の配置図である。 鋼板の幅方向におけるワイピングガスの衝突ガス圧力分布のグラフを示す図である。 鋼板の幅方向におけるワイピングガスの衝突ガス圧力分布を測定する装置の配置図である。 スプラッシュ発生の概念図である。 鋼板のエッジ部におけるガス流れの概念図である(吸引管有無)。 鋼板のエッジ部におけるガス流れの概念図である(圧力低下が大きい場合)。 鋼板のエッジ部におけるガス流れの概念図である(エッジプレート有無)。 鋼板のエッジ部におけるスプラッシュ飛散角度θの概略図である。 衝突ガス圧力比(Pe/Pc)とスプラッシュ飛散角度θの関係図である。 エッジプレートを使用した場合の、エッジプレートと鋼板のエッジ部との距離と、衝突ガス圧力比(Pe/Pc)およびスプラッシュ飛散角度θとの関係を示す図である。 吸引管を使用した場合の、吸引管と鋼板のエッジ部との距離と、衝突ガス圧力比(Pe/Pc)およびスプラッシュ飛散角度θとの関係を示す図である。 本実施形態における吸引管と従来のエッジプレートについて、各整流化装置と鋼板のエッジ部との距離における、鋼板のセンター部に対するエッジ部の衝突ガス圧力比(Pe/Pc)と装置へのスプラッシュの付着量(g/Hr)との関係を示す図である。 変形例に係る吸引管の断面形状を示す図である。 変形例に係る吸引管の断面形状を示す図である。 変形例に係る吸引管の断面形状を示す図である。 変形例に係る吸引管の断面形状を示す図である。 吸引管の長辺長さと衝突ガス圧力比(Pe/Pc)及び、スプラッシュ付着量との関係を示す図である。 連続式溶融めっき装置の概要を示す断面図である。
 図1は、本発明の実施形態におけるワイピング装置1の縦断面図である。図2は、図1の鋼板Pのエッジ部のA-A矢視図である。
 図1および図2に示すように、本発明の実施形態におけるワイピング装置1は、前述の図14に示すような連続式の溶融めっき装置11に備えられるものである。そして、溶融めっき浴12から引き上げられる鋼板Pを挟んで両側に、それぞれ配置された一対のワイピングノズル2a,2bと、一対のワイピングノズル2a,2b間の鋼板Pの幅方向の両側に、鋼板Pと平行にそれぞれ配置された吸引管3とを備える。
 ワイピングノズル2a,2bは、鋼板Pの板面に向かって鋼板の幅方向に延設された直線状のスリット4a,4bからそれぞれワイピングガスGを噴出するノズルである。このスリット4a,4bは、多様な鋼板Pの幅に対応するため、図2に示すように、鋼板Pの幅よりも長く形成されており、鋼板Pのエッジ部Eより外側まで延びている。ワイピングノズル2a,2bから鋼板Pの板面に吹き付けられたワイピングガスGは、高速噴流として鋼板Pに衝突した後に上下方向に分離され、過剰な溶融金属を払拭する。
 吸引管3は、エアーを吸引する吸引口3aが鋼板Pの側端面に向かって配置された断面形状が楕円形(oval)の管である。吸引管3は、その楕円形断面の長辺が鋼板Pの引き上げ方向Dとなるように配置されている。また、吸引管3の途中には、吸引管3をエゼクタとして作動させるための駆動ガスgを供給する供給管3bが設けられている。この供給管3bに高圧の駆動ガスgを送り込むことにより、吸引管3aから鋼板Pのエッジ部E周辺のエアーが吸引される。
 図3A、図3B、図3Cは、ワイピングノズル2a,2bから噴出されたワイピングガスGの流れを可視化した図である。図3Aは、鋼板Pの幅方向のセンター部Cの断面図である。図3Bは、図2のB-B矢視図である。図3Aに示すように、鋼板Pの幅方向のセンター部Cにおいて、鋼板Pに衝突したワイピングガスGは上下に均一に分配される。一方、図3Bに示すように、吸引管3に衝突したワイピングガスGは、上下に分離された後、楕円形断面の吸引管3の外側の凸形状に沿って上下に導かれ、整流されるので、幅方向センター部Cと同様に鋼板Pが存在するかのように吸引管3の中心がワイピングガスGの衝突点となり、安定した流れが形成される。なお、吸引管3が存在しない場合には、一対のワイピングノズル2a,2bから噴出されたワイピングガスG同士が直接衝突する。この場合は、図3A、図3Bの場合のように固体(鋼板Pあるいは吸引管3)によって気体の流れが規定されないため、各空間点ごとのガス流れのわずかな揺らぎが全て反映されて、ワイピングガス同士の衝突点が決定される。そのため図3Cに示すようにワイピングガスGの衝突点が一点に固定されずに、位置が変動するため、その周辺は複雑な乱流となる。
 上記構成のワイピング装置1によれば、ワイピングノズル2a,2bから吹き付けられたワイピングガスGが高速噴流として鋼板Pに衝突した後に上下に分離されることで、過剰な溶融金属が上下方向に払拭され、板幅方向の圧力分布が均一化されることにより均一なめっき厚が実現される。このとき、鋼板Pの幅方向の外側にワイピングノズル2a,2bから吹き付けられたワイピングガスGは、前述のように吸引管3の外側の凸形状に沿って上下に導かれ、整流されるので、鋼板Pの外側でワイピングガスG同士が直接衝突することによる乱流の発生が防止される。
 また、このワイピング装置1では、上記の効果に加え、鋼板Pの側端面に向かって配置された吸引管3の吸引口3aからのエアーの吸引によって、鋼板Pのエッジ部Eから吸引管3の間に形成されるワイピングガスGの衝突点の変動が抑制され、ガス圧力低下が抑制されることで鋼板Pのエッジ部Eから横方向に逃げるワイピングガスGが減少する。これにより鋼板Pのエッジ部EにおけるワイピングガスGの噴流の衝突力の低下も抑制される。
 次に、本実施形態におけるワイピング装置1の吸引管3によるエッジオーバーコートおよびスプラッシュSの防止効果について確認試験を行った。ワイピング条件は、ワイピングノズル2a、2bと鋼板Pとの距離d1が8mmで、ワイピングノズル2a、2bからのガス量が各々700Nm/Hrである。吸引管条件は、鋼板Pのエッジ部Eと吸引管3との距離d2が5mmであり、長辺25mm、短辺15mmの楕円形状の吸引管3と、直径15mmの円形状の吸引管103を使用した。圧力計A(岡野製作所ディジタル圧力計を使用)により、衝突ガス圧力を測定した。図4Aの測定は、鋼板Pのエッジ部Eから鋼板Pのセンター部Cへ3mm内側の点F(図4C参照)で実施した。図4Aに示すように、本実施形態におけるワイピング装置1において、鋼板Pのエッジ部Eから鋼板Pのセンター部Cへ3mm内側の点Fの平均衝突ガス圧力は、センター部Cの圧力に近く、吸引管3が無い場合、また断面形状が円形の吸引管103を使用した場合よりも大きい。また、圧力変動も小さくなっており、吸引管3による整流効果が発揮されていると考えられる。
 図5Aに示すように、本実施形態におけるワイピング装置1では、楕円形状の吸引管3を設けることにより、吸引管無し、あるいは円形の吸引管103を使用した場合よりも、鋼板Pのエッジ部Eから鋼板Pのセンター部Cへ3mm内側の点Fでの圧力降下が抑制されている。
 以上のように、本実施形態におけるワイピング装置1において、吸引管3によって鋼板Pのエッジ部Eから鋼板Pのセンター部Cへ3mm内側の点Fの衝突ガス平均圧力は、センター部Cの圧力に近い圧力となり、圧力変動も小さく、鋼板Pのエッジ部Eから鋼板Pのセンター部Cへ3mm内側の点Fの圧力降下も抑制されるため、鋼板Pのエッジ部Eから鋼板Pのセンター部Cへ3mm内側の点Fにおいてセンター部Cと同様のワイピング効果が得られ、エッジオーバーコートを防止することが可能となる。
 次に、本実施形態におけるワイピング装置1によるスプラッシュS防止効果について詳述する(図6)。ワイピングガスGによって払拭された溶融金属のスプラッシュSの発生条件については、様々な液体を使用した相似実験により定量化されている。一つの考え方として溶融金属のスプラッシュSは、ワイピングガスGによる慣性力(ρ・δ0 2・Ug2)と溶融金属に働く表面張力(σ/δ0)に関係がある(但し、ρ:密度、δ0:ストリップによる持ち上げ液膜、Ug:ワイピングガス速度、σ:溶融金属の表面張力)。
 本実施形態におけるワイピング装置1では、図4Aおよび図5Aに示すようにエッジ部Eの衝突ガス平均圧力を増加させることになる。しかし、前述のように吸引管3の形状および吸引口3aからのエアーの吸引によって、エッジ部EのワイピングガスGの流れを整流化し、鋼板Pの外側から鋼板Pの上下方向へ改善することによって、スプラッシュSが鋼板Pの外側へ飛散することを防止している。
 ワイピングガスGは、鋼板Pに衝突すると上下方向に分配されるが、従来のワイピング装置1において、鋼板Pのエッジ部Eの外側では衝突点が変動するためにガスが持つ運動エネルギーが減少し、衝突ガス平均圧力が低下する。このように鋼板Pのエッジ部Eから鋼板Pのセンター部Cへ3mm内側の点Fの衝突ガス圧力が低下する結果、鋼板Pのエッジ部Eのガス圧力差が発生し、この圧力差によって鋼板Pのエッジ部Eに衝突したガスは外側に流れることになる。図7Bに示すように、鋼板Pのエッジ部Eの外側のガス流れの乱れが大きいほど、圧力勾配が大きくなり、鋼板外側へのガス流れが大きくなる。この場合、ワイピングガスGにより発生したスプラッシュSは、鋼板Pのエッジ部Eに飛散することになる。
 また、図7Cに示すように、鋼板Pのエッジ部Eの外側にエッジプレートB等の整流板を設置した場合、整流化効果によりエッジ部Eの圧力低下が抑制され、その結果、横方向へのスプラッシュSの飛散は抑制される。しかし、エッジプレートBは、鋼板Pのエッジ部Eに近接して設置する必要があるため、スプラッシュSが付着して堆積し、鋼板Pのエッジ部Eの擦り疵発生の原因となる。一方、図7Aに示すように、本実施形態におけるワイピング装置1では、吸引管3の供給管3bへ駆動ガスgを供給して、吸引口3aからエアーを吸引することで、鋼板Pのエッジ部Eとの距離を大きくしても、エッジ部Eの外側のワイピングガスGの衝突を安定化し、エッジ部Eの圧力低下を抑制することができる。
 次に、吸引管3やエッジプレートB等による整流化効果を示す指標として、鋼板Pのセンター部Cに対するエッジ部Eの衝突ガス圧力比(Pe/Pc)を定義し、衝突ガス圧力比(Pe/Pc)とスプラッシュ飛散角度θとの関係について実験的に調査を行った(Pe:鋼板Pのエッジ部Eの衝突ガス圧力、Pc:鋼板Pのセンター部Cの衝突ガス圧力)。衝突ガス圧力比(Pe/Pc)は、吸引管3の断面形状、吸引管エアー供給量を変更して調整した。図8Bからエッジ部Eのガス圧力が低下する程、横方向のスプラッシュS飛散が多くなることが分かる。したがって、鋼板Pのエッジ部Eと整流化装置との距離が小さいと、スプラッシュSの付着量が多くなることが考えられる。そこで、整流化の指標として、鋼板Pのセンター部Cに対するエッジ部Eの衝突ガス圧力比(Pe/Pc)を用いることとした。
 図9および図10に、それぞれエッジプレートBおよび吸引管3の設置位置と、衝突ガス圧力比(Pe/Pc)およびスプラッシュ飛散角度θとの関係を整理した。図9に示すように、エッジプレートBの場合、衝突ガス圧力比(Pe/Pc)が0.8未満では、エッジオーバーコートが発生したため、エッジオーバーコート対策のために衝突ガス圧力比(Pe/Pc)は0.8以上必要である。また、エッジプレートBと鋼板Pのエッジ部Eとの距離は、6mm以内を確保する必要がある。しかしながら、この場合、スプラッシュ飛散角度θは10°程度であるが、エッジプレートBが鋼板Pのエッジ部Eに近接している。そして、エッジプレートBと鋼板Pのエッジ部Eとの距離が7mm以下において、スプラッシュSが付着し、長期間での操業は困難であることが判明した。
 一方、本実施形態における吸引管3を使用した場合は、図10に示すように吸引管3と鋼板Pのエッジ部Eとの距離を15mm以内とすることで、エッジオーバーコートを安定して回避することが可能となる。また、吸引管3と鋼板Pのエッジ部Eとの距離を2mm以上とすることで、スプラッシュS付着をより確実に回避することができる。以上より、吸引管3と鋼板Pのエッジ部Eとの距離を2~15mmの範囲にて設置することで、長時間での操業で使用可能であることが判明した。
 図11の図中の数字は、各整流化装置と鋼板Pのエッジ部Eとの距離を示している。図9および図10に示すように、いずれの整流化装置においても鋼板Pのエッジ部Eとの距離を所定の条件とすることで、エッジ部Eの圧力低下を抑制することは可能であるが、同一距離の場合、吸引管3を用いる方が、衝突ガス圧力比(Pe/Pc)が大きく改善される。これは吸引管3を用いることで、鋼板Pの外側でワイピングガスG同士が、直接衝突することによる乱流発生が抑制される効果に加え、吸引管3からのエアー吸引によるワイピングガスG同士の衝突点の変動が抑制されるためである。所定の衝突ガス圧力比(Pe/Pc)(0.8以上)を得るために、エッジプレートBの場合には、図11に示すようにエッジプレートBへの付着量が増加することが判明した。図8Bに示したように、圧力比を改善した場合に、スプラッシュSの横方向の飛散が改善するものの、エッジプレートBの場合は、鋼板Pのエッジ部Eに近接させる必要があり、スプラッシュSの付着を回避することが困難なためである。一方、本実施形態におけるワイピング装置1では、吸引管3と鋼板Pのエッジ部Eとの距離を離すことが可能であり、圧力比に拘わらずスプラッシュSの付着を回避可能となる。したがって、連続式の溶融めっき装置において長期間に亘り、板幅方向のめっき厚みを均一化することが可能である。
 なお、本実施形態におけるワイピング装置1では、吸引管3の断面形状を楕円形としているが、変形例として、図12Aに示すようなエッジプレートBに吸引管3効果を取り入れた長方形の吸引管3Aとしたり、図12B、図12C或いは、図12Dの示すような整流プレートpによる整流効果を発揮する類似の形状の吸引管3B、3C、3Dにすることも可能である。なお、いずれの場合も、断面形状が鋼板Pの引き上げ方向Dに幅広で、かつ外側に凸形状とする。これにより、吸引管3に衝突して上下に分離されたワイピングガスGは、吸引管3の外側の凸形状に沿って上下に導かれ、整流されるので、鋼板Pの外側でワイピングガスGが衝突することによる乱流の発生が防止され、前述と同様の整流効果が得られる。
 次に、吸引管3の形状による整流効果について説明する(図13)。なお、比較のために図13では、円形断面の吸引管103の場合についても示している。円形断面の吸引管103の場合、ワイピングガスGが円形断面の吸引管103に衝突後、円形断面の吸引管3を回り込んで再び衝突するため、ガス流れが乱れて衝突点が振動する。一方吸引管3(楕円)や吸引管3A(長方形)の場合、これらの形状の吸引管3に衝突したワイピングガスGは、吸引管3に沿って上下方向向きに導かれる。ガスの吸引管3壁面からの剥離点でのガス流れの向きが、吸引管3(楕円)や吸引管3A(長方形)では上下方向寄りとなるため、ガス同士の再衝突の際の衝突圧が低下し、乱流の発生が防止される。そのため、楕円や長方形などと比較して整流効果が低下し、スプラッシュ付着量も他形状と比較して大きいことが判明した。円形断面の場合、エッジオーバーコート解消のためには、吸引管の長辺長さ(直径)を35mm程度にする必要がある。一方、溶融めっき鋼板の製造条件において、図1に記載のワイピングノズル2a,2b間の距離の最小値は、10~20mm程度に設定する必要があるため、この円形断面の吸引管では設置が困難である。そこで本実施形態におけるワイピング装置1では、断面形状を鋼板Pの引き上げ方向Dに幅広とし、かつ外側に凸形状である吸引管3とすることで、ワイピングノズル2a,2b間に設置可能とし、かつ種々の操業条件においても整流効果を発揮可能とした。
 次に吸引管の断面形状について、詳細検討を行った。本実施形態におけるワイピング装置1において、整流効果を発揮させるために、長辺長さで15~50mm、断面の短辺に対する長辺の比が1.2~10であることが望ましいことを実験により明らかにした。以下に、その内容について説明する。
 本実施形態におけるワイピング装置1の吸引管3の使用前には、エッジ部Eの圧力低下が大きく、衝突ガス圧力比(Pe/Pc)で0.46程度であった。そこで、吸引管3を使用したワイピング装置1の目標圧力比を0.8以上とし、改善可能な吸引管形状について調査を行った。
 吸引管の断面形状については、図13で述べたように、ワイピングガスGの衝突後の流れにおいて整流化効果が最も大きい楕円を使用することが望ましい。また、図1に記載のワイピングノズル2a,2b間の距離の最小値は10~20mm程度に設定する必要があるため、図2に記載の吸引管3への駆動ガスgの供給管3bは外径(短辺)を10~20mm以下とする必要がある。吸引管3内において、供給管3bからの駆動ガスgにおけるエゼクタ効果を発揮させるためには、供給管3b径を小さくして吸引管3内における流速を向上させることがエゼクタとしての機能を最大限発揮させることがわかった。よってガス供給管の断面形状として円形を使用する場合、工業用配管における最小径である6A(外径10.5mm)を使用することとした。
 表1~表3には、各種楕円形状の吸引管3を製作、供給管3bより駆動ガスgとして圧縮空気を導入した場合のエッジオーバーコート解消効果について調査した結果を示す。なお、以下の表中において、エッジオーバーコート改善効果は、4段階表示で、
 4:Pe/Pc>0.9、
 3:0.8≦Pe/Pc≦0.9、
 2:0.6≦Pe/Pc<0.8、
 1:0.6>Pe/Pc
を示す。4段階表示で数値が大きいほど、エッジオーバーコート改善効果が大きいとする。また、メタル付着状況は、3段階表示で、
 3:メタル付着なし、
 2:メタルは付着するが、長時間操業が可能、
 1:メタル付着により長時間操業が不可能
を示す。
Figure JPOXMLDOC01-appb-T000001
Figure JPOXMLDOC01-appb-T000002
Figure JPOXMLDOC01-appb-T000003
 表1より、短辺長さが最小の10mmとした場合、長辺長さが10mmの場合には、エッジオーバーコートの改善効果が不十分であり、さらに吸引管3へのメタル付着により長時間使用が困難であることが判明した。そこで、長辺長さを15mm以上に大きくした場合、吸引管3の吸引風量が増加し、衝突ガス圧力比(Pe/Pc)が大きく改善することが判明した。なお、長辺長さが55mm以上の場合、供給管3bの直径に対して吸引管3の断面積が大きくなりすぎるため、吸引風速が減少し、エッジオーバーコート改善効果が得られないことが判明した。これにより、長辺長さの最適範囲は15mm~50mmであることが確認できた。
 次に、表2より、短辺長さを15mmに設定した場合、同一長辺長さにおいて吸引風量が短辺10mmよりも増加するが、吸引管3の風速が低下するため、改善効果が減少することが判明した。同様に長辺長さを長くしたところ、改善効果を確認したが、長辺が55mmの場合、短辺長さ10mmと同様にエッジオーバーコートの改善効果が得られないことが判明した。また、表3より、短辺長さを20mmとした場合、短辺長さを15mmとした場合よりもさらに操業可能範囲は減少した。これにより、長辺/短辺の比の下限値は1.0~1.25であり、最適範囲は1.2以上であることが確認できた。
 次に、吸引管3の断面形状が長方形の吸引管3Aを用いる場合について、調査を行った。表4~表6は、その調査結果を示している。楕円管は円管を変形させて製作したが、長方形については鋼板を溶接して製作可能なため、任意の板厚の素材を用いて製作可能である。短辺長さとして5mmの長方形管の場合、供給管3bの外径も5mm以下とする必要があるため、吸引風量が30Nm3/Hrが上限となった。また、効果を発揮する長辺長さも楕円形同様、50mm以下となることが判明した。短辺長さが10mm、15mmの長方形管の場合は楕円形状同様、断面積増により吸引風量は改善されるものの、短辺5mmに対して吸引風速が低下するため、エッジオーバーコート改善効果が小さくなった。長方形管の場合、エッジオーバーコート改善効果を発揮可能な長辺/短辺比は10以下であることが確認できた。
Figure JPOXMLDOC01-appb-T000004
Figure JPOXMLDOC01-appb-T000005
Figure JPOXMLDOC01-appb-T000006
 次に、吸引管形状がひし形の吸引管3Bについての同様の検討を行った。表7~表9は、その調査結果を示している。ひし形の場合、長方形に対して吸引風量は減少するが、断面積が小さくなるため吸引風速が増加する。その結果、エッジオーバーコート改善効果は大きくなることが判明した。
Figure JPOXMLDOC01-appb-T000007
Figure JPOXMLDOC01-appb-T000008
Figure JPOXMLDOC01-appb-T000009
 なお、目標のエッジオーバーコート改善効果が得られた吸引管3の形状であれば、スプラッシュの付着量は数g/Hr程度と軽微であり、付着増に伴うトラブルは確認されなかった。
 以上の知見から、吸引管の長辺長さは15mm~50mmとし、断面の短辺に対する長辺の比が1.2~10を最適形状とした。なお、吸引管の最適形状について、オーバーコート改善に必要な衝突ガス圧力比(Pe/Pc)の目標に応じて異なるため、前記と同等の効果が得られた場合は、全て本発明と同様の効果とすべきである。
 本発明によれば、断面形状が鋼板の引き上げ方向に幅広である吸引管を備えたことにより、鋼板の外側でワイピングガス同士が直接衝突することによる乱流の発生を防止するとともに、鋼板のエッジ部におけるワイピングガスの噴流の鋼板への衝突力の低下を抑制することができる。従って、エッジオーバーコートおよびスプラッシュを防止することが可能となる。
 1:ワイピング装置
 2a、2b:ワイピングノズル
 3、3A、3B、3C、3D、103:吸引管
 3a:吸引口
 3b:供給管
 4a、4b:スリット
 11:溶融めっき装置
 12:溶融めっき浴
 13:スナウト
 14:シンクロール
 15:ワイピングノズル
 A:圧力計
 B:エッジプレート
 C:センター部
 D:引き上げ方向
 d1:ワイピングノズルと鋼板との距離
 d2:エッジ部と吸引管との距離
 E:エッジ部
 F:鋼板のエッジ部から鋼板のセンター部へ3mm内側の点
 G:ワイピングガス
 g:駆動ガス
 P:鋼板
 p:整流プレート
 S:スプラッシュ
 Ug:ワイピングガス速度
 δ0:ストリップによる持ち上げ液膜

Claims (9)

  1.  溶融めっき浴から引き上げられる鋼板を挟んで、両側に前記鋼板の板面に向かってそれぞれ配置された一対のワイピングノズルから、ワイピングガスを前記鋼板に吹き付けるワイピング装置であって、
     前記一対のワイピングノズル間の前記鋼板の幅方向の両側に、前記鋼板と平行にそれぞれ配置され、エアーを吸引する吸込口が前記鋼板の側端面に向かって配置され、断面形状が前記鋼板の引き上げ方向に幅広である吸引管を備えている
    ことを特徴とするワイピング装置。
  2.  前記吸引管は、前記鋼板の前記引き上げ方向の幅が15mm以上50mm以下であることを特徴とする請求項1に記載のワイピング装置。
  3.  前記吸引管は、断面の短辺に対する長辺の比が1.2~10であることを特徴とする請求項1又は2に記載のワイピング装置。
  4.  前記吸込口と前記鋼板の前記側端面との距離が2mm以上15mm以下であることを特徴とする請求項1又は2に記載のワイピング装置。
  5.  前記吸込口と前記鋼板の前記側端面との距離が2mm以上15mm以下であることを特徴とする請求項3に記載のワイピング装置。
  6.  請求項1又は2に記載のワイピング装置を備えていることを特徴とする溶融めっき装置。
  7.  請求項3に記載のワイピング装置を備えていることを特徴とする溶融めっき装置。
  8.  請求項4に記載のワイピング装置を備えていることを特徴とする溶融めっき装置。
  9.  請求項5に記載のワイピング装置を備えていることを特徴とする溶融めっき装置。
PCT/JP2012/074264 2011-09-22 2012-09-21 ワイピング装置およびこれを用いた溶融めっき装置 WO2013042774A1 (ja)

Priority Applications (8)

Application Number Priority Date Filing Date Title
BR112014004234-9A BR112014004234B1 (pt) 2011-09-22 2012-09-21 dispositivo de enxugar uma folha de aço e aparelho de revestimento por imersão a quente
MX2014002386A MX358301B (es) 2011-09-22 2012-09-21 Dispositivo de limpieza y dispositivo de platinado de inmersión en caliente usando el mismo.
EP12832927.3A EP2759618B1 (en) 2011-09-22 2012-09-21 Wiping device and hot-dip plating device using same
JP2013512900A JP5851492B2 (ja) 2011-09-22 2012-09-21 ワイピング装置およびこれを用いた溶融めっき装置
KR1020137018938A KR101532496B1 (ko) 2011-09-22 2012-09-21 와이핑 장치 및 이것을 사용한 용융 도금 장치
US14/237,660 US9708702B2 (en) 2011-09-22 2012-09-21 Wiping device and hot dip coating apparatus using the same
CN201280007048.4A CN103380226B (zh) 2011-09-22 2012-09-21 擦拭装置及使用了它的热浸镀装置
AU2012310530A AU2012310530B2 (en) 2011-09-22 2012-09-21 Wiping device and hot dip coating apparatus using the same

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011-208118 2011-09-22
JP2011208118 2011-09-22

Publications (1)

Publication Number Publication Date
WO2013042774A1 true WO2013042774A1 (ja) 2013-03-28

Family

ID=47914533

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/074264 WO2013042774A1 (ja) 2011-09-22 2012-09-21 ワイピング装置およびこれを用いた溶融めっき装置

Country Status (10)

Country Link
US (1) US9708702B2 (ja)
EP (1) EP2759618B1 (ja)
JP (1) JP5851492B2 (ja)
KR (1) KR101532496B1 (ja)
CN (1) CN103380226B (ja)
AU (1) AU2012310530B2 (ja)
BR (1) BR112014004234B1 (ja)
MX (1) MX358301B (ja)
MY (1) MY167950A (ja)
WO (1) WO2013042774A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6481806B1 (ja) * 2017-09-29 2019-03-13 新日鐵住金株式会社 ワイピング装置およびこれを用いた溶融めっき装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5291740A (en) * 1976-01-30 1977-08-02 Nisshin Steel Co Ltd Method of preventing edge overcoat in continuous hot dipping
JPH02502169A (ja) * 1987-11-12 1990-07-19 ジョン・リサート・(オーストラリア)・リミテッド 上方かつ垂直に移動している細片材料からの余分なコーテング液の取出し
JPH09143663A (ja) * 1995-11-15 1997-06-03 Daido Steel Sheet Corp 溶融金属めっきの余剰めっき液の除去装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3525116A (en) * 1969-03-12 1970-08-25 Bethlehem Steel Corp Air knife and vacuum doctoring apparatus
JPH05291740A (ja) * 1992-04-14 1993-11-05 Sharp Corp 端子接続装置
JP3069525B2 (ja) 1996-07-22 2000-07-24 大同鋼板株式会社 溶融金属めっきの余剰めっき液の除去装置
JP3506224B2 (ja) 1999-06-24 2004-03-15 Jfeエンジニアリング株式会社 溶融金属めっき金属帯の製造方法
JP2002030408A (ja) 2000-07-21 2002-01-31 Nisshin Steel Co Ltd 溶融めっき鋼帯端部のめっき付着量均一化方法及び溶融めっき装置
JP4451194B2 (ja) 2004-04-13 2010-04-14 三菱日立製鉄機械株式会社 液体ワイピング装置
JP4779529B2 (ja) 2005-09-22 2011-09-28 Jfeスチール株式会社 溶融金属めっき鋼帯の製造方法およびガスワイピングノズル

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5291740A (en) * 1976-01-30 1977-08-02 Nisshin Steel Co Ltd Method of preventing edge overcoat in continuous hot dipping
JPH02502169A (ja) * 1987-11-12 1990-07-19 ジョン・リサート・(オーストラリア)・リミテッド 上方かつ垂直に移動している細片材料からの余分なコーテング液の取出し
JPH09143663A (ja) * 1995-11-15 1997-06-03 Daido Steel Sheet Corp 溶融金属めっきの余剰めっき液の除去装置

Also Published As

Publication number Publication date
KR101532496B1 (ko) 2015-06-29
BR112014004234B1 (pt) 2020-11-10
AU2012310530B2 (en) 2016-07-07
AU2012310530A1 (en) 2014-02-27
JPWO2013042774A1 (ja) 2015-03-26
CN103380226A (zh) 2013-10-30
EP2759618A4 (en) 2015-04-29
US20140202380A1 (en) 2014-07-24
MX2014002386A (es) 2014-06-05
EP2759618B1 (en) 2018-10-31
BR112014004234A2 (pt) 2017-03-21
KR20130094349A (ko) 2013-08-23
MX358301B (es) 2018-08-14
JP5851492B2 (ja) 2016-02-03
MY167950A (en) 2018-10-08
EP2759618A1 (en) 2014-07-30
CN103380226B (zh) 2015-08-12
US9708702B2 (en) 2017-07-18

Similar Documents

Publication Publication Date Title
JP5549050B2 (ja) 溶融金属めっき鋼帯の製造装置
WO2009048031A1 (ja) 溶融金属めっき鋼帯製造装置及び溶融金属めっき鋼帯の製造方法
US20180251879A1 (en) Molten metal plating facility and method
JP5418550B2 (ja) 溶融金属めっき鋼帯の製造方法
JP4696690B2 (ja) 溶融金属めっき鋼帯の製造方法
JP5851492B2 (ja) ワイピング装置およびこれを用いた溶融めっき装置
JP4586423B2 (ja) 電気めっき鋼板の製造方法
WO2007132701A1 (ja) 溶融金属めっき鋼帯の製造方法
JP5444730B2 (ja) 溶融金属めっき鋼帯製造装置
JP6205753B2 (ja) ガスワイピングノズル及びガスワイピング方法
JP5565368B2 (ja) ワイピング装置およびこれを用いた溶融めっき装置
JP2008018424A (ja) ノズル装置、それを用いた薬液の付与方法及び薬液
JP2007031805A (ja) 溶融金属めっき鋼帯の製造方法
JP2008138259A (ja) 溶融金属めっき鋼帯の製造装置及び溶融金属めっき鋼帯の製造方法
JP5655978B2 (ja) ガスワイピング方法及びガスワイピング装置
JP2023068747A (ja) ワイピング装置及び溶融めっき装置
JP5825209B2 (ja) ガスワイピングノズル、及び、溶融金属めっき鋼板の製造方法
JP4765641B2 (ja) 溶融金属めっき鋼帯の製造方法
JPH11279736A (ja) 厚目付けに適したガスワイピング方法
JP4946167B2 (ja) 溶融金属めっき鋼帯の製造方法
JP2596240B2 (ja) 連続溶融金属めっき装置
JP2010144189A (ja) 溶融金属めっき鋼帯製造装置
CN117897515A (zh) 熔融金属镀覆钢带的制造方法
JP2022165049A (ja) 液体またはスラリーの塗布装置および塗装金属帯の製造方法
JP5556286B2 (ja) 溶融金属めっき鋼帯のガスワイピング装置

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2013512900

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12832927

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20137018938

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14237660

Country of ref document: US

ENP Entry into the national phase

Ref document number: 2012310530

Country of ref document: AU

Date of ref document: 20120921

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: MX/A/2014/002386

Country of ref document: MX

NENP Non-entry into the national phase

Ref country code: DE

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112014004234

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112014004234

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20140224