WO2012117810A1 - 蒸気タービンシステム及びその暖機方法 - Google Patents

蒸気タービンシステム及びその暖機方法 Download PDF

Info

Publication number
WO2012117810A1
WO2012117810A1 PCT/JP2012/052633 JP2012052633W WO2012117810A1 WO 2012117810 A1 WO2012117810 A1 WO 2012117810A1 JP 2012052633 W JP2012052633 W JP 2012052633W WO 2012117810 A1 WO2012117810 A1 WO 2012117810A1
Authority
WO
WIPO (PCT)
Prior art keywords
steam
turbine
pressure
temperature
casing
Prior art date
Application number
PCT/JP2012/052633
Other languages
English (en)
French (fr)
Japanese (ja)
Inventor
英司 齋藤
Original Assignee
三菱重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱重工業株式会社 filed Critical 三菱重工業株式会社
Priority to CN201280004526.6A priority Critical patent/CN103282607B/zh
Priority to KR1020137016506A priority patent/KR101520561B1/ko
Publication of WO2012117810A1 publication Critical patent/WO2012117810A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/08Cooling; Heating; Heat-insulation
    • F01D25/10Heating, e.g. warming-up before starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D17/00Regulating or controlling by varying flow
    • F01D17/20Devices dealing with sensing elements or final actuators or transmitting means between them, e.g. power-assisted
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D17/00Regulating or controlling by varying flow
    • F01D17/20Devices dealing with sensing elements or final actuators or transmitting means between them, e.g. power-assisted
    • F01D17/22Devices dealing with sensing elements or final actuators or transmitting means between them, e.g. power-assisted the operation or power assistance being predominantly non-mechanical
    • F01D17/24Devices dealing with sensing elements or final actuators or transmitting means between them, e.g. power-assisted the operation or power assistance being predominantly non-mechanical electrical
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D19/00Starting of machines or engines; Regulating, controlling, or safety means in connection therewith
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2260/00Function
    • F05D2260/85Starting

Definitions

  • the present invention relates to a steam turbine system in which steam is supplied from a boiler to a turbine, and a warming-up method thereof.
  • Patent Document 1 discloses a technique for solving a problem when shifting from a warm-up operation while a steam turbine ship is anchored to a normal operation when leaving a port.
  • the steam for warming up the turbine is a main steam pipe connected from the boiler to a high-pressure turbine used during ship forward operation, and a branch pipe branched from the main steam pipe (hereinafter also referred to as a warm-up steam pipe). ) And a supply port provided in the turbine.
  • the warm-up steam pipe is provided with a pressure adjustment valve that adjusts the steam pressure while being controlled by the control unit.
  • turbine all turbines in the case of a steam turbine system including a plurality of turbines such as a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine are collectively referred to simply as “turbine”.
  • the amount of warm-up steam flowing into the turbine was adjusted to a uniquely determined steam pressure. That is, it is not set to a value other than one preset steam pressure, and whether or not appropriate warm-up steam is supplied.
  • the steam supplied from the boiler changes the steam temperature, that is, the energy of the steam, according to the boiler load. For this reason, when the amount of warm-up steam is controlled so as to achieve a uniquely determined steam pressure, the turbine cannot be warmed up in a state where the turbine can always be expected. In other words, the relationship between the steam pressure in the warm-up steam pipe and the turbine casing temperature can be confirmed by a preliminary test, but in actual operation, the steam temperature varies depending on the boiler load, so the steam pressure must be unique. In the method of adjusting to a predetermined value, the turbine cannot always be warmed up properly.
  • the present invention has been made in view of such circumstances, and is a steam turbine capable of stably maintaining the turbine casing temperature regardless of the steam energy from the boiler that changes according to the boiler load. It is an object of the present invention to provide a system and its warm-up method.
  • the steam turbine system and the warm-up method thereof according to the present invention employ the following means. That is, the steam turbine system according to the first aspect of the present invention is a supply that supplies steam discharged from a boiler from a branched steam pipe branched from a main steam pipe to the first turbine casing.
  • a steam which is provided in the opening, a first temperature measuring unit for measuring the temperature inside and outside the first turbine casing, and a branch steam pipe, and is supplied into the first turbine casing based on the measured temperature outside the casing
  • a pressure control unit for adjusting the pressure.
  • the steam passes through the branch steam pipe branched from the main steam pipe and is supplied to the first turbine casing. Further, the temperature inside and outside the first turbine casing is measured, and the pressure of the steam supplied to the first turbine casing is adjusted based on the measured outside temperature inside the casing. Therefore, the pressure of the steam supplied to the first turbine casing is not constant and changes according to the temperature outside the casing of the first turbine casing.
  • the flow rate of steam supplied to the first turbine casing depending on the temperature condition of the steam discharged from the boiler Changes. Therefore, the first turbine cannot be properly warmed up due to the temperature condition of the steam discharged from the boiler.
  • the first turbine since the flow rate of the steam supplied to the first turbine casing is controlled according to the measured temperature outside the vehicle interior, the first turbine is appropriately set regardless of the temperature condition of the steam discharged from the boiler. Can warm up.
  • the pressure of steam supplied to the first turbine casing is increased to increase the energy flowing into the first turbine. , Eliminate the lack of warm-up. Conversely, when the temperature inside and outside the first turbine casing is higher than a predetermined upper temperature limit, the pressure of the steam supplied to the first turbine casing is reduced to reduce the energy flowing into the first turbine. To prevent overheating.
  • the pressure control unit further includes a second temperature measuring unit that measures an exhaust temperature of steam discharged from the second turbine casing after being supplied from the first turbine casing to the second turbine casing.
  • the pressure of the steam supplied to the first turbine casing may be adjusted based on the measured temperature inside and outside the vehicle and the exhaust temperature.
  • the steam discharged from the boiler passes through the first turbine casing, is supplied from the first turbine casing to the second turbine casing, and then passes through the second turbine casing. , Exhausted from the second turbine casing. Then, the exhaust temperature of the steam discharged from the second turbine casing is measured, and the pressure of the steam supplied into the first turbine casing is adjusted based on the measured outside temperature and exhaust temperature. Therefore, the pressure of the steam supplied to the first turbine casing changes according to not only the temperature outside the casing of the first turbine casing but also the exhaust temperature of the steam discharged from the second turbine casing. Therefore, the exhaust temperature of the steam discharged from the second turbine casing serves as an index, and not only the first turbine but also the second turbine can be appropriately warmed up.
  • the energy flowing into the first turbine by reducing the pressure of the steam supplied to the first turbine casing To prevent overwarming.
  • the above configuration further includes a reheat steam pipe that supplies steam from the first turbine casing to the reheater, and a warm pipe steam pipe that supplies steam from the branch steam pipe into the reheat steam pipe.
  • the pressure of the steam supplied into the warm pipe steam pipe may be adjusted based on the measured temperature inside and outside the vehicle or the exhaust temperature.
  • the steam turbine system of the reheat cycle in which the reheater is provided and the steam is supplied from the first turbine casing to the reheater, the steam is supplied from the branch steam pipe into the reheat steam pipe. Is done. And the pressure of the steam supplied into the first turbine casing and the reheat steam pipe is adjusted based on the measured temperature outside the vehicle interior or exhaust temperature. Therefore, not only the pressure of the steam supplied to the first turbine casing but also the pressure of the steam supplied to the reheat steam pipe changes. Therefore, not only the first turbine and the second turbine but also the reheat steam pipe can be appropriately warmed up.
  • the steam turbine system warming-up method includes a step of supplying steam discharged from a boiler from a branch steam pipe branched from a main steam pipe into a first turbine casing, A step of measuring the temperature inside and outside the turbine casing of the one turbine casing, and a step of adjusting the pressure of steam supplied to the first turbine casing based on the measured temperature outside the casing in the branch steam pipe. .
  • the first turbine since the flow rate of the steam supplied to the first turbine casing is adjusted according to the measured temperature outside the vehicle interior, the first turbine is independent of the temperature condition of the steam discharged from the boiler. Can be warmed up properly.
  • the turbine casing temperature can be stably maintained regardless of the steam energy from the boiler that changes according to the boiler load.
  • FIG. 1 is a configuration diagram showing a steam turbine system 1 according to the present embodiment.
  • the steam turbine system 1 includes a high-pressure turbine 2H, an intermediate-pressure turbine 2M, a low-pressure turbine 2L, a main boiler 4H, a reheater 4R, and the like.
  • the high-pressure turbine 2H and the intermediate-pressure turbine 2M are housed inside the high-medium-pressure turbine casing 3, and the low-pressure turbine 2L is housed inside the low-pressure turbine casing 5.
  • the high-pressure turbine 2H, the intermediate-pressure turbine 2M, and the low-pressure turbine 2L are collectively referred to simply as “turbine”.
  • the steam turbine system 1 applies a reheat cycle in which the steam discharged from the high pressure turbine 2H is reheated by the reheater 4R, and the reheated steam is supplied to the intermediate pressure turbine 2M to be expanded.
  • Main steam supplied from the main boiler 4H to the high-pressure turbine 2H during ship forward operation passes through the main steam pipes L1-1 and L1-2 shown in FIG. 1 and is supplied to the high-pressure turbine 2H.
  • the steam turbine system 1 has a turbine warm-up system.
  • the turbine warm-up system holds the steam turbine system 1 in a warm-up state by warming the high-pressure turbine 2H, the intermediate-pressure turbine 2M, and the high-medium-pressure turbine casing 3 with steam supplied from the main boiler 4H.
  • Steam for warming up the high-pressure turbine 2H, the intermediate-pressure turbine 2M, and the high- and intermediate-pressure turbine casing 3 is supplied from the main steam pipe L1-1 connected to the high-pressure turbine 2H from the main boiler 4H, and the main steam pipe L1-1. It is supplied to the high and medium pressure turbine casing 3 through a turbine warming system comprising a branching branch warming steam pipe L2, a pressure control valve 7, a shutoff valve 8, a supply port 9, and the like.
  • the turbine warm-up system is provided in front of the high-pressure turbine 2H, and supplies the steam discharged from the boiler 4H into the high / medium-pressure turbine casing 3.
  • the pressure control valve 7 provided in the warm-up steam pipe L2 is adjusted by the control unit 6 so as to allow energy suitable for the turbine warm-up state to flow into the high / medium-pressure turbine casing 3, and controls the steam pressure.
  • the control unit 6 variably adjusts the pressure control valve 7 based on the temperatures measured by the temperature measurement units 12, 13, and 14.
  • the pressure control valve 7 changes the steam flowing through the warm-up steam pipe L2 to various pressures.
  • the temperature measuring units 12 and 13 are an example of a first temperature measuring unit.
  • the temperature measuring unit 12 measures the temperature inside and outside the high and medium pressure turbine casing 3 in the high-pressure turbine 2H, and the temperature measuring unit 13 The inside / outside temperature of the high / intermediate pressure turbine casing 3 in the pressure turbine 2M is measured.
  • the temperature measurement unit 14 is an example of a second temperature measurement unit, and measures the exhaust temperature of the steam discharged from the low-pressure turbine 2L.
  • the warm-up steam pipe L2 is provided with a shut-off valve 8 that shuts off steam so that steam does not flow into the high and intermediate pressure turbine casing 3 from the supply port 9 except during warm-up.
  • the turbine warm-up system warms up the turbine while it is anchored so that the ship can be taken off immediately in response to an earthquake or tsunami warning issued when the terminal is anchored.
  • the turbine warm-up is not performed while the turbine is being driven in a state such as when the ship is operating, but is performed when the turbine is stopped in a state such as a cargo handling operation at the terminal or in the standby mode.
  • the steam pressure of the warm-up steam is controlled so that the steam flow or steam energy equivalent to the starting torque that enables the turbine to be driven from the stationary state of the turbine does not flow into the high / medium pressure turbine casing 3 or the low pressure turbine casing 5.
  • the upper limit is set for the pressure of the steam flowing through the warm-up steam pipe L2
  • the upper limit is set for the exhaust temperature of the steam discharged from the low-pressure turbine 2L, thereby adjusting the steam pressure of the warm-up steam.
  • the vehicle interior / external temperature of the high / medium pressure turbine casing 3 may be measured at one location for each of the high pressure turbine 2H and the intermediate pressure turbine 2M, particularly on the main steam inlet side. As shown in FIG. 2, the measurement may be made at a plurality of locations in the turbine axial direction or the radial direction of the turbine.
  • FIG. 2 is an end view showing the lower half casing of the high and medium pressure turbine casing 3.
  • the high and medium pressure turbine casing 3 has a space S in which the high pressure turbine 2H and the intermediate pressure turbine 2M are housed, as shown in FIG.
  • the left end of the high and medium pressure turbine casing 3 in FIG. 2 is the exhaust side of the high pressure turbine 2H
  • the right end of the high and medium pressure turbine casing 3 in FIG. 2 is the exhaust side of the intermediate pressure turbine 2M.
  • the intermediate part of the high and medium pressure turbine casing 3 in FIG. 2 is the steam inlet side for both the high pressure turbine 2H and the intermediate pressure turbine 2M.
  • the high and medium pressure turbine casing 3 includes a vehicle interior temperature sensor 31H at the high pressure side entrance, a vehicle exterior temperature sensor 32H at the high pressure side entrance, a vehicle interior temperature sensor 31M at the medium pressure side entrance, and a vehicle exterior temperature sensor at the intermediate pressure side entrance. 32M is provided.
  • the control in the control unit 6 mainly includes measurement of a vehicle interior temperature sensor 31H at the high pressure side inlet, a vehicle exterior temperature sensor 32H at the high pressure side entrance, a vehicle interior temperature sensor 31M at the intermediate pressure side entrance, and a vehicle exterior temperature sensor 32M at the intermediate pressure side entrance. This is done based on the signal.
  • the vehicle interior temperature sensor 31H at the high-pressure side inlet and the vehicle exterior temperature sensor 32H at the high-pressure side entrance are regions where main steam flows into the high-pressure turbine 2H.
  • the temperature of the inner wall surface (the temperature of the area adjacent to the space) and the outer wall surface of the passenger compartment 3 in the virtual cross section including the point where the distance between them is farthest is measured.
  • the vehicle interior temperature sensor 31M at the intermediate pressure side inlet and the vehicle exterior temperature sensor 32M at the intermediate pressure side inlet are regions where reheated steam flows into the intermediate pressure turbine 2M.
  • the temperature of the inner wall surface and the outer wall surface of the vehicle interior 3 in the virtual cross section including the point where the distance between them is farthest is measured.
  • the high- and medium-pressure turbine casing 3 includes a high-pressure-side outlet cabin temperature sensor 33H, a high-pressure-side outlet cabin temperature sensor 34H, a medium-pressure-side outlet cabin temperature sensor 33M, and a medium-pressure-side outlet cabin temperature.
  • a sensor 34 ⁇ / b> M may be provided to measure the temperature of the high and medium pressure turbine casing 3 and used for control in the control unit 6.
  • the measurement signals of the high-pressure-side outlet cabin temperature sensor 33H, the high-pressure-side outlet cabin temperature sensor 34H, the intermediate-pressure-side outlet cabin temperature sensor 33M, and the intermediate-pressure-side outlet cabin temperature sensor 34M are used as reference information.
  • the vehicle interior temperature sensor 33H at the high pressure side outlet and the vehicle exterior temperature sensor 34H at the high pressure side exit measure the temperatures of the inner wall surface and the outer wall surface of the vehicle chamber 3 in a virtual section of the region where the main steam flows out from the high pressure turbine 2H. It is.
  • the vehicle interior temperature sensor 33M at the intermediate pressure side outlet and the vehicle interior outside temperature sensor 34M at the intermediate pressure side outlet have an inner wall surface and an outer wall surface of the vehicle cabin 3 in a virtual cross section of the region where the reheat steam flows out from the intermediate pressure turbine 2M. The temperature is measured.
  • the high and medium pressure turbine casing 3 is provided with a high pressure side inlet bolt temperature sensor 35H, a medium pressure side inlet bolt temperature sensor 35M, a high pressure side outlet bolt temperature sensor 36H, and a medium pressure side outlet bolt temperature sensor 36M.
  • the temperature of the bolt in the bolt hole 41 may be measured and used as a reference temperature for control in the control unit 6.
  • the measurement signals of the high pressure side inlet bolt temperature sensor 35H, the intermediate pressure side inlet bolt temperature sensor 35M, the high pressure side outlet bolt temperature sensor 36H, and the intermediate pressure side outlet bolt temperature sensor 36M indicate that the corresponding bolt temperature is the adjacent high and medium pressure turbine casing. 3 is used to check whether the temperature changes in conjunction with the temperature inside and outside the vehicle.
  • FIG. 3 is a flowchart showing the operation of the steam turbine system 1 according to the present embodiment.
  • Turbine warm-up maintenance is achieved by a heat balance such as heat input into the turbine, heat dissipation / exhaust heat from the turbine, heat retention of the turbine, etc.
  • the turbine can maintain warm-up. The determination of whether or not is quantitatively performed using temperature.
  • control unit 6 determines whether or not the temperature inside and outside the high and medium pressure turbine casing 3 that has once reached a steady state is appropriate as the warm-up state of the turbine.
  • the warm-up maintenance state is insufficient, the flow rate of steam flowing through the warm-up steam pipe L2 is increased to increase the amount of heat supplied to the inside of the high / medium pressure turbine casing 3, or when the warm-up maintenance state is excessive Restricts the amount of heat supplied to the inside of the high and medium pressure turbine casing 3 by restricting the flow rate of the steam flowing through the warm-up steam pipe L2.
  • the effect of the turbine warm-up system is quantitatively evaluated based on the temperature inside and outside the high- and medium-pressure turbine casing 3, and the flow rate of the steam flowing into the high and medium-pressure turbine casing 3 is controlled so that the warm-up state is appropriate for the turbine. To do.
  • the steam flowing through the warm-up steam pipe was fixed at a preset pressure P1. Therefore, even if the turbine casing temperature is measured, it is only measured as a result of changing according to the state of the steam flowing into the turbine casing.
  • the steam source valve is opened so that the steam flows into the warm-up steam pipe L2, and at the same time, water accumulated in the warm-up steam pipe L2 is discharged by opening the drain valve (step). S1).
  • the shutoff valve 8 is opened so that the warm-up steam flows into the high and medium pressure turbine casing 3 (step S2).
  • the actual pressure P0 of the warm-up steam after the pressure control valve 7 is first adjusted as the warm-up steam set pressure P1 (step S3).
  • the state is maintained until the thermal saturation state is reached (step S4).
  • the saturated state is when the temperature change rate is smaller than 1 ° C./hr, for example.
  • the turbine exhaust temperature TE is TE ⁇ TEmax with respect to the turbine exhaust temperature upper limit TEmax (for example, 75 ° C.) that is a guideline for the overwarm condition, and the turbine casing wall actual
  • the warm-up steam set pressure P1 is controlled such that the temperature T0 is TL ⁇ T0 ⁇ TH with respect to the target passenger compartment temperature lower limit TL (eg, 200 ° C.) and the target passenger compartment temperature upper limit TH (eg, 250 ° C.).
  • the warm-up state is maintained at a pressure P1 that satisfies TE ⁇ TEmax and TL ⁇ T0 ⁇ TH.
  • the turbine exhaust temperature TE is the temperature of the steam exhausted from the low-pressure turbine 2L, that is, the temperature measured by the temperature measuring unit 14.
  • the turbine casing wall actual temperature T0 is, for example, the vehicle interior temperature sensor 31H at the high pressure side inlet, the vehicle exterior temperature sensor 32H at the high pressure side entrance, the vehicle interior temperature sensor 31M at the intermediate pressure side entrance, and the vehicle at the intermediate pressure side entrance shown in FIG. It is a measured temperature based on the outdoor temperature sensor 32M, and is an average temperature obtained from these sensors or a temperature at any one point.
  • the turbine casing wall actual temperature T0 is the target casing temperature lower limit.
  • TL the target passenger compartment temperature cannot be achieved with the current steam temperature (steam energy). Therefore, the operator is cautioned to improve the steam state, for example, increase the boiler load to raise the steam temperature.
  • FIG. 4 is a configuration diagram showing a steam turbine system 11 according to a modification of the embodiment of the present invention.
  • the reheat steam pipe is a pipe from the high pressure turbine 2H to the intermediate pressure turbine 2M through the reheater 4R.
  • This modification is different from the steam turbine system of FIG. 1 in that a warm pipe steam pipe L3 is provided.
  • Steam for warming up the reheat steam pipe is a main steam pipe L1-1 connected from the main boiler 4H to the high-pressure turbine 2H, and a warm-up steam that is a branch pipe branched from the main steam pipe L1-1. It passes through the pipe L2 and the warm pipe steam pipe L3 branched from the warm-up steam pipe L2, and is supplied to the reheat steam pipe.
  • the warm pipe steam pipe L3 is provided with a shutoff valve 15 for shutting off steam so that steam does not flow into the reheat steam pipe except during warm-up.
  • the pressure of the steam supplied into the reheat steam pipe is adjusted based on the measured turbine casing wall actual temperature T0 or exhaust temperature. Therefore, not only the pressure of the steam supplied to the high and medium pressure turbine casing 3 but also the pressure of the steam supplied to the reheat steam pipe changes. Therefore, not only the high pressure turbine 2H and the intermediate pressure turbine 2M but also the reheat steam pipe can be appropriately warmed up. Therefore, even when the steam turbine system is driven suddenly, the reheat steam pipe is not rapidly heated, and the thermal stress on the reheat steam pipe can be reduced.
  • the warm-up steam set pressure P1 to be adjusted is set in the above-described embodiment. It becomes larger than the pressure P1.
  • the steam pressure is controlled so that the expected turbine warm-up state is maintained, and the inflow steam energy is actively adjusted regardless of the steam temperature condition. And the warm-up state is properly maintained.
  • the inflow energy due to the steam can be controlled so as to approach the target values of the turbine vehicle interior / outside temperature and the turbine exhaust temperature regardless of the boiler load, it is possible to prevent the turbine from being overheated or insufficiently warmed up.
  • the related technology adjusts so that steam with a uniquely determined pressure is supplied to the turbine.
  • the steam flow rate flowing into the turbine increases due to the specific volume. Therefore, there is a problem that excessive steam flows through the low-pressure turbine, which overheats the low-pressure turbine, and the low-pressure turbine is overheated.
  • the steam pressure is controlled using the turbine exhaust temperature TE, which is the temperature of the steam exhausted from the low-pressure turbine 2L, as an index. Therefore, overheating of the low pressure turbine 2L can be prevented.
  • the present invention is not limited to this example.
  • the turbine warm-up system of the present invention can be installed, and the turbine can be warmed up appropriately.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Turbines (AREA)
PCT/JP2012/052633 2011-02-28 2012-02-06 蒸気タービンシステム及びその暖機方法 WO2012117810A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201280004526.6A CN103282607B (zh) 2011-02-28 2012-02-06 蒸汽涡轮机系统及其预热方法
KR1020137016506A KR101520561B1 (ko) 2011-02-28 2012-02-06 증기 터빈 시스템 및 그 난기 방법

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011-043298 2011-02-28
JP2011043298A JP5683321B2 (ja) 2011-02-28 2011-02-28 蒸気タービンシステム及びその暖機方法

Publications (1)

Publication Number Publication Date
WO2012117810A1 true WO2012117810A1 (ja) 2012-09-07

Family

ID=46757749

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/052633 WO2012117810A1 (ja) 2011-02-28 2012-02-06 蒸気タービンシステム及びその暖機方法

Country Status (4)

Country Link
JP (1) JP5683321B2 (zh)
KR (1) KR101520561B1 (zh)
CN (1) CN103282607B (zh)
WO (1) WO2012117810A1 (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9878159B2 (en) 2011-09-30 2018-01-30 Adi Mashiach Hypertension therapy implant apparatus

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437835A (zh) * 2013-08-29 2013-12-11 中国神华能源股份有限公司 对燃气蒸汽联合循环机组进行高压缸暖缸的装置和方法
JP6479468B2 (ja) * 2014-12-26 2019-03-06 三菱重工業株式会社 蒸気タービン設備、船舶、および蒸気タービン設備の制御方法
JP6938394B2 (ja) * 2018-01-25 2021-09-22 三菱パワー株式会社 蒸気タービンの暖機方法および蒸気タービン

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55163411U (zh) * 1979-05-15 1980-11-25
JPS61171807A (ja) * 1985-01-28 1986-08-02 Toshiba Corp タ−ビンウオ−ミング制御装置
JP2002070506A (ja) * 2000-08-31 2002-03-08 Toshiba Corp コンバインドサイクル発電プラントおよびコンバインドサイクル発電プラントの暖・冷用蒸気供給方法
JP2003020905A (ja) * 2001-07-06 2003-01-24 Mitsubishi Heavy Ind Ltd 再熱発電プラントの運転装置および運転方法
JP2004300991A (ja) * 2003-03-31 2004-10-28 Kawasaki Shipbuilding Corp 蒸気タービン船の主タービン暖機・暖管装置と暖機・暖管方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09303110A (ja) * 1996-05-09 1997-11-25 Toshiba Corp 蒸気タービンのウォーミングシステム
JP3890104B2 (ja) * 1997-01-31 2007-03-07 株式会社東芝 コンバインドサイクル発電プラントおよびその冷却用蒸気供給方法
EP0933505B1 (en) * 1998-01-29 2006-05-24 Mitsubishi Heavy Industries, Ltd. Steam cooled system in combined cycle power plant
US8359824B2 (en) * 2008-07-29 2013-01-29 General Electric Company Heat recovery steam generator for a combined cycle power plant

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55163411U (zh) * 1979-05-15 1980-11-25
JPS61171807A (ja) * 1985-01-28 1986-08-02 Toshiba Corp タ−ビンウオ−ミング制御装置
JP2002070506A (ja) * 2000-08-31 2002-03-08 Toshiba Corp コンバインドサイクル発電プラントおよびコンバインドサイクル発電プラントの暖・冷用蒸気供給方法
JP2003020905A (ja) * 2001-07-06 2003-01-24 Mitsubishi Heavy Ind Ltd 再熱発電プラントの運転装置および運転方法
JP2004300991A (ja) * 2003-03-31 2004-10-28 Kawasaki Shipbuilding Corp 蒸気タービン船の主タービン暖機・暖管装置と暖機・暖管方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9878159B2 (en) 2011-09-30 2018-01-30 Adi Mashiach Hypertension therapy implant apparatus

Also Published As

Publication number Publication date
JP5683321B2 (ja) 2015-03-11
CN103282607A (zh) 2013-09-04
JP2012180775A (ja) 2012-09-20
KR20130098418A (ko) 2013-09-04
CN103282607B (zh) 2015-06-03
KR101520561B1 (ko) 2015-05-14

Similar Documents

Publication Publication Date Title
CN103089339B (zh) 用于燃气涡轮机的主动间隙控制系统和方法
RU2393357C2 (ru) Способ активного регулирования осевого давления в паровой турбине
TWI692576B (zh) 廠房控制裝置、廠房控制方法及發電廠
JP5683321B2 (ja) 蒸気タービンシステム及びその暖機方法
US8201525B2 (en) Cooling device for engine
EP2239438B1 (en) Systems and Methods for Controlling Compressor Extraction Cooling
JP2010163920A (ja) エンジンの冷却装置
WO2015052837A1 (ja) 吸気バイパス装置を備えたエンジンシステム
US9581049B2 (en) Warming arrangement for a power plant
JP2013238228A (ja) 蒸気タービンにおける能動的温度制御のためのシステム及び方法
US8015824B2 (en) Method and system for regulating a cooling fluid within a turbomachine in real time
RU2498098C2 (ru) Система охлаждения турбины и способ охлаждения секции турбины с промежуточным давлением
JP2012145109A (ja) ロータを通る流れを制御するためのシステム及び方法
WO2012117554A1 (ja) 内燃機関の暖機促進装置
JP4868944B2 (ja) ガスハイドレートを利用したガス複合発電システム及び方法
KR20170114943A (ko) 증기 터빈 플랜트
JP4657057B2 (ja) 再熱型蒸気タービンプラント
JP5374317B2 (ja) 蒸気タービンおよび蒸気タービンの運転方法
JP4294508B2 (ja) 冷却装置の運転方法
CN106555618B (zh) 燃气轮机的叶尖间隙控制系统及其方法
JP5851773B2 (ja) 舶用主機蒸気タービン設備、およびそれを具備した船舶、ならびに舶用主機蒸気タービン設備の運用方法
JP4335665B2 (ja) シリンダ冷却水温度制御装置付き内燃機関
JP6479468B2 (ja) 蒸気タービン設備、船舶、および蒸気タービン設備の制御方法
JP2005214047A (ja) コンバインドサイクル発電プラントおよびその運転方法
JP5357741B2 (ja) 蒸気タービンおよび蒸気タービンの運転方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12752880

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20137016506

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12752880

Country of ref document: EP

Kind code of ref document: A1