WO2012096240A1 - 測定装置および測定システム - Google Patents

測定装置および測定システム Download PDF

Info

Publication number
WO2012096240A1
WO2012096240A1 PCT/JP2012/050215 JP2012050215W WO2012096240A1 WO 2012096240 A1 WO2012096240 A1 WO 2012096240A1 JP 2012050215 W JP2012050215 W JP 2012050215W WO 2012096240 A1 WO2012096240 A1 WO 2012096240A1
Authority
WO
WIPO (PCT)
Prior art keywords
measurement
unit
smartphone
data
display
Prior art date
Application number
PCT/JP2012/050215
Other languages
English (en)
French (fr)
Inventor
和孝 峯村
Original Assignee
日置電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日置電機株式会社 filed Critical 日置電機株式会社
Priority to CN201280005361.4A priority Critical patent/CN103329180B/zh
Publication of WO2012096240A1 publication Critical patent/WO2012096240A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q9/00Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/06Measuring leads; Measuring probes
    • G01R1/067Measuring probes
    • G01R1/06788Hand-held or hand-manipulated probes, e.g. for oscilloscopes or for portable test instruments
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/28Testing of electronic circuits, e.g. by signal tracer
    • G01R31/302Contactless testing
    • G01R31/3025Wireless interface with the DUT
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q2209/00Arrangements in telecontrol or telemetry systems
    • H04Q2209/40Arrangements in telecontrol or telemetry systems using a wireless architecture
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q2209/00Arrangements in telecontrol or telemetry systems
    • H04Q2209/80Arrangements in the sub-station, i.e. sensing device
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q2209/00Arrangements in telecontrol or telemetry systems
    • H04Q2209/80Arrangements in the sub-station, i.e. sensing device
    • H04Q2209/88Providing power supply at the sub-station

Definitions

  • the present invention relates to a measurement apparatus configured to be able to measure an electrical parameter of a measurement object, and a measurement system configured to include the measurement apparatus.
  • a multimeter disclosed in Japanese Utility Model Publication No. 5-52765 discloses a jack to which a pair of probes can be connected, various buttons for setting and operating measurement conditions, and a liquid crystal display for displaying measurement results Are arranged on one surface of the casing (housing) so that any one of a voltage value, a current value, and a resistance value can be measured and the measurement result can be displayed on the liquid crystal display.
  • the select button is operated to select, for example, a voltage value measurement process, and both probes are connected to a jack associated with this process.
  • the voltage value is measured by the measurement circuit, and the measurement result is displayed numerically on the liquid crystal display.
  • the select button is operated to select the current value measurement process, and both probes are connected to the jack associated with this process. .
  • the current value is measured by the measurement circuit, and the measurement result is displayed numerically on the liquid crystal display.
  • the conventional multimeter has the following problems. That is, the conventional multimeter employs a configuration in which measurement results such as a voltage value, a current value, and a resistance value are displayed on a liquid crystal display disposed on one surface of the casing. In this case, there is a strong demand for this type of measuring device to be small and light in order to be easily portable and to reduce the occupied space (storage space) when not in use. .
  • the liquid crystal display for displaying the measurement result must be downsized, and there is a possibility that it is difficult to read the measurement result. For this reason, in a conventional measuring device such as a multimeter, it is necessary to mount a display that is large enough to easily read measurement results, which makes it difficult to reduce the size and weight. There is a problem of becoming.
  • the present invention has been made in view of such problems, and a main object of the present invention is to provide a measuring apparatus and a measuring system that can reduce the size and weight of the measuring apparatus without making it difficult to read the measurement result. And
  • the measuring device is a measuring device including a measuring unit that measures an electrical parameter, and displays an operation state of the measuring device and a measurement result of the measuring unit on a smartphone.
  • a processing unit that generates display data to be displayed on the unit, and a wireless communication unit that transmits the display data to the smartphone according to the control of the processing unit.
  • the measuring device according to claim 2 is the measuring device according to claim 1, wherein the processing unit controls the measuring unit according to operation data transmitted from the smartphone to measure the electrical parameter. .
  • the measurement apparatus according to claim 3 is configured to be connectable to the smartphone via a signal cable in the measurement apparatus according to claim 1, and is connected to the smartphone via the signal cable according to the control of the processing unit.
  • a wired communication unit that transmits display data is provided.
  • the measuring device according to claim 4 is configured to be connectable to the smartphone via a signal cable in the measuring device according to claim 2, and the smartphone is connected to the smartphone via the signal cable according to the control of the processing unit.
  • a wired communication unit is provided that transmits display data and receives the operation data from the smartphone via the signal cable.
  • the measurement device includes a control unit that executes a power shut-off process for shutting off a power source of the measurement device in the measurement device according to claim 1, wherein the control unit is connected to the smartphone from the smartphone.
  • the power shutdown process is executed according to the control data.
  • the measurement device includes a control unit that executes a power shut-off process for shutting off a power source of the measurement device in the measurement device according to claim 2 or 4, and the control unit receives the power from the smartphone.
  • the power shutdown process is executed according to the control data.
  • the measuring device according to claim 7 is the measuring device according to claim 5 or 6, wherein the control unit is released from a communicable state in which the display data can be transmitted to the smartphone.
  • the power shutdown process is executed when data cannot be transmitted.
  • the measurement system according to claim 8 is configured to display the operation state of the measurement apparatus and the measurement result based on the measurement apparatus according to claim 1 or 3 and the display data transmitted from the measurement apparatus. And the smart phone installed with the measuring apparatus program to be displayed on the unit.
  • a measurement system that generates the operation data based on the measurement apparatus according to the second or fourth aspect and an output signal output from an operation unit and transmits the operation data to the measurement apparatus. Based on the display data transmitted from the mobile phone, and the smart phone installed with a measurement device program for displaying the operation state of the measurement device and the measurement result on the display unit.
  • a measurement system is a measurement system configured to include the measurement apparatus according to claim 5 and the smartphone having a current position positioning unit that measures a current position and outputs current position information.
  • the smart phone causes the display unit to display the operation state and the measurement result of the measurement device based on the display data transmitted from the measurement device, and is output from the current position measurement unit.
  • a measurement apparatus program is installed that transmits the control data to the measurement apparatus and executes the power-off process when the current position specified based on the current position information is out of a preset range. .
  • a measurement system is a measurement system configured to include the measurement apparatus according to claim 6 and the smartphone having a current position positioning unit that measures a current position and outputs current position information. Then, the smartphone generates the operation data based on an output signal output from the operation unit and transmits the operation data to the measurement device, and based on the display data transmitted from the measurement device, The operation state and the measurement result are displayed on the display unit, and the control is performed when a current position specified based on the current position information output from the current position measurement unit is out of a preset range.
  • a measuring apparatus program for transmitting data to the measuring apparatus and executing the power-off process is installed.
  • the measurement system according to claim 12 is the measurement system according to claim 10 or 11, wherein the smart phone causes the measurement device to execute the power-off process as the measurement device program.
  • a program programmed to end the program for the measuring apparatus after transmitting is installed.
  • the measurement system according to claim 13 is the measurement system according to any one of claims 5 to 12, wherein the smartphone extracts the measurement result from the display data as the measurement device program.
  • a program capable of executing data storage processing stored in the storage memory is installed.
  • the measuring device a measuring unit that measures an electrical parameter, an operation state of the measuring device, and a processing unit that generates display data for displaying a measurement result of the measuring unit on a display unit of the smartphone; And a wireless communication unit that transmits display data to the smartphone according to the control of the processing unit.
  • the measurement apparatus and the measurement apparatus program for displaying the operation state of the measurement apparatus and the measurement result on the display unit based on the display data transmitted from the measurement apparatus are installed. With a smart phone.
  • the measurement apparatus even if the display unit for displaying the operation state and the measurement result is not present in the measurement apparatus, the measurement is transmitted from the wireless communication unit. Because it is possible to display the operation state of the measuring device and the measurement result by the measurement unit on the display unit of the smartphone based on the display data, the display unit is unnecessary without causing a situation where reading of the measurement result becomes difficult, The measuring device can be sufficiently reduced in size and weight. Further, unlike a configuration in which a dedicated display device is provided separately from the measurement device, a measurement system can be constructed at a low cost for a person who owns a smartphone.
  • the communication cable is not entangled, so that the measurement device and the smartphone can be handled easily.
  • the measurement result can be transmitted to an arbitrary place using various communication networks (such as a mobile phone communication network) to which a smartphone can be connected without separately preparing other communication devices.
  • the processing unit controls the measuring unit according to the operation data transmitted from the smartphone to measure the electrical parameter.
  • operation data is generated based on the measurement apparatus and an output signal output from the operation unit, and the operation data is transmitted to the measurement apparatus, and the display data transmitted from the measurement apparatus is displayed.
  • a smart phone installed with a measurement device program for displaying the operation state of the measurement device and measurement results on a display unit. Therefore, according to the measuring apparatus according to claim 2 and the measuring system according to claim 9, the measurement processing operation switch is not required except for the minimum necessary operation switch such as a power switch. The apparatus can be further reduced in size and weight.
  • the measuring apparatus further includes a wired communication unit that transmits display data to the smartphone via the signal cable according to the control of the processing unit.
  • the measurement apparatus includes a wired communication unit that transmits display data to the smartphone via the signal cable according to control of the processing unit and receives operation data from the smartphone via the signal cable. . Therefore, according to the measuring apparatus of Claim 3, 4, display data etc. can be transmitted to a smart phone from a measuring apparatus via a signal cable also in the place where execution of radio
  • wired communication requires less power consumption in measurement devices and smartphones than wireless communication, so when the measurement device or smartphone battery is low, measurement processing is performed while performing wireless communication. The measurement process can be performed over a longer time than that.
  • the control unit executes the power-off process according to the control data to turn on the power of the measuring apparatus. Cut off. Further, in the measurement system according to claim 10, the operation state and measurement result of the measurement apparatus are displayed on the display unit based on the measurement apparatus according to claim 5 and display data transmitted from the measurement apparatus, A measurement device program is installed that transmits control data to the measurement device to execute power-off processing when the current position specified based on the current position information output from the position measurement unit is out of a preset range. With a smart phone.
  • operation data is generated based on the measurement device according to claim 6 and the output signal output from the operation unit, and the operation data is transmitted to the measurement device and the display transmitted from the measurement device.
  • the operating state of the measuring device and the measurement result are displayed on the display unit based on the data, and the current position specified based on the current position information output from the current position measuring unit is out of the preset range
  • a smartphone installed with a measurement device program that transmits control data to the measurement device to execute a power-off process.
  • the measuring device can be sufficiently miniaturized and the display unit becomes unnecessary without causing a situation where reading of the measurement result becomes difficult. Not only can it be reduced in weight, but even if you forget to shut off the power of the measuring device after the measurement process is completed, if you leave the measurement site with the measurement system in that state (the smartphone is out of the preset range)
  • the measurement apparatus is powered off when the measurement apparatus is moved to (1), so that it is possible to reliably and easily avoid a situation in which unnecessary power is consumed by the measurement apparatus not performing the measurement process.
  • the measurement apparatus can be sufficiently provided by eliminating the need for a display unit without causing a situation where reading of the measurement result becomes difficult.
  • the measuring device can be reduced in size and weight, and the measuring device can be further reduced in size and weight by the amount that the operation switch for measurement processing is not required. Even if you forget to shut down, when you leave the measurement site with the measurement system in that state (when the smartphone moves out of the preset range), the power of the measurement device is cut off, so the measurement process It is possible to reliably and easily avoid a situation in which unnecessary power is consumed by a measuring device that does not execute the operation.
  • the measurement device of claim 7 by executing the power shut-off process when the communication possible state in which the display data can be transmitted to the smartphone is released and the display data cannot be transmitted, Even if you forget to shut down the power supply of the measuring device after the measurement process is finished, when the display device can no longer send display data to the smartphone (when the communicable state is canceled), the power supply of the measuring device Therefore, when the screen based on the display data is not displayed on the smartphone, that is, when the measurement process is not executed, it is possible to reliably and easily avoid the situation where unnecessary power is consumed by the measurement device. can do.
  • the smartphone programmed with the program programmed to terminate the measurement device program after transmitting control data for causing the measurement device to execute power-off processing.
  • the measurement device is powered off, that is, when the measurement process is finished, the measurement device program that does not need to be continuously executed on the smartphone is automatically executed without performing the end operation. Therefore, it is possible to avoid a situation in which the power of the smartphone is consumed due to unnecessary execution of the measurement device program.
  • a program capable of executing a data saving process for extracting the measurement result from the display data and storing it in the storage memory as the measurement result data is installed in the smartphone as the measurement device program.
  • the measurement result by the measurement unit can be stored in the storage memory in the smartphone and stored without mounting a large-capacity memory in the measurement apparatus.
  • the manufacturing cost of the measuring device can be sufficiently reduced.
  • FIG. 1 is a block diagram showing a configuration of a measurement system 100.
  • FIG. 1 is an external view of a measurement device 1 and a smartphone 2 in a measurement system 100.
  • FIG. It is an external view of the smart phone 2 of the state which displayed the power-off process start message 36 on the display part 23.
  • FIG. 1 is a block diagram showing a configuration of a measurement system 100.
  • FIG. 1 is an external view of a measurement device 1 and a smartphone 2 in a measurement system 100.
  • FIG. It is an external view of the smart phone 2 of the state which displayed the power-off process start message 36 on the display part 23.
  • the “smart phone” broadly means a mobile phone having a PDA (personal digital assistant) function.
  • the “smart phone” in the broad sense means “by installing various programs”. "Those that can add arbitrary functions or customize the operating environment or display environment of the terminal” are called “smartphones”.
  • the smartphone 2 includes an existing “smartphone” in which a “measurement device program” dedicated to the measurement system 100 is installed.
  • the measuring apparatus 1 includes a measuring unit 11, an operating unit 12, an indicator 13, a wireless communication unit 14, a wired communication unit 15, and a processing unit 16.
  • the measuring device 1 includes, as an example, a main body portion 10a configured by housing each of the elements 11 to 16 in a cylindrical casing, and a main body portion 10a (measuring portion). 11) and a test lead 10b connected via a cable 11c.
  • the measurement unit 11 includes a contact 11a disposed on the main body 10a and a contact 11b disposed on the test lead 10b and connected via a cable 11c.
  • the measurement unit 11 has a DC voltage value (DCV), an AC voltage value (ACV), and a resistance value ( ⁇ ) as examples of “electrical parameters” in accordance with a control signal S2 from the processing unit 16. Any one of the three types is measured, and the measurement result can be output to the processing unit 16.
  • DCV DC voltage value
  • ACV AC voltage value
  • resistance value
  • the operation unit 12 includes a push switch that functions as an operation switch for executing a function assigned in advance according to an operation time (a time during which the pressed state is maintained). Specifically, in the measurement apparatus 1, as an example, the power is turned on by performing a long press operation for 1 second or more and less than 3 seconds in a state where the power is cut off, and 1 in the state where the power is turned on. A function to shift to a pairing mode (to be described later) after the power is turned on by performing a long press operation for 3 seconds or more in a state where the power is cut off by performing a long press operation for more than 2 seconds. It is assigned to the operation switch of the operation unit 12.
  • the indicator 13 is composed of, for example, an LED, and, as an example, is lit in a power-on state and blinks in a state in which the pairing mode is being changed according to the control of the processing unit 16.
  • the wireless communication unit 14 is configured to be capable of performing short-range wireless communication in accordance with the Bluetooth (registered trademark) standard, and, as will be described later, the smartphone 2 in which a “measurement device program” is installed.
  • the operation data D0 transmitted from the smartphone 2 is received and output to the processing unit 16 and the display data D1 is transmitted to the smartphone 2 according to the control of the processing unit 16.
  • the wired communication unit 15 includes a connection connector 15a (see FIG. 2) conforming to the USB standard, and can be connected to the smartphone 2 via a signal cable C (see FIG. 1) connected to the connection connector 15a. It is configured.
  • the wired communication unit 15 receives the operation data D0 transmitted from the smartphone 2 and outputs the operation data D0 to the processing unit 16 in a state where the wired communication unit 15 is connected to the smartphone 2 via the signal cable C.
  • the display data D1 is transmitted to the smartphone 2.
  • the wireless communication unit 14 shifts to an off state, and when the signal cable C is removed from the connection connector 15a, wireless communication is performed.
  • the unit 14 is configured to shift to the on state.
  • the processing unit 16 controls the measuring device 1 overall. Specifically, the processing unit 16 controls the measurement unit 11 according to the operation data D0 transmitted from the smartphone 2 and received by the wireless communication unit 14 or the wired communication unit 15 (outputs a control signal S2). Thus, any one of the DC voltage value measurement process, the AC voltage value measurement process, and the resistance value measurement process of the resistor is executed.
  • the processing unit 16 also displays display data D1 for causing the smartphone 2 to display the content of the measurement process executed by the measurement unit 11 (an example of “operating state of the measurement device”) and the measurement result of the measurement unit 11. Generated and transmitted to the smartphone 2 via the wireless communication unit 14 or the wired communication unit 15.
  • the processing unit 16 constitutes a “control unit” and executes a “power cutoff process” for shutting off the power supply of the measuring apparatus 1. Specifically, the processing unit 16 monitors whether or not a communicable state in which display data D1 can be transmitted from the wireless communication unit 14 or the wired communication unit 15 to the smartphone 2 is maintained, and as an example, communication A process of automatically shutting off the power supply of the measuring apparatus 1 when 30 seconds have elapsed from the time when the display state D1 cannot be transmitted after the possible state is released is executed as a “power shutoff process”. Further, as described later, the processing unit 16 transmits the operation data transmitted when the operation data D0 (an example of “control data”) instructing execution of the “power-off process” is transmitted from the smartphone 2. The process of shutting off the power supply of the measuring device 1 according to D0 is executed as a “power shutoff process”.
  • the operation data D0 an example of “control data”
  • the smartphone 2 is configured by an existing “smartphone” in which the “program for measuring apparatus” is installed, and as illustrated in FIG. 1, as an example, a main body memory 21, an operation unit 22, a display unit. 23, a wireless communication unit 24, a wired communication unit 25, a processing unit 26, a storage memory mounting unit 27, a mobile phone communication unit 28, and a GPS receiver 29.
  • a main body memory 21 stores an operation program of the smartphone 2 and stores various programs installed by the user.
  • the operation unit 22 includes a touch panel disposed on the surface side of the display unit 23 in addition to a power switch (not shown), and an operation signal S1 (“output from the operation unit” corresponding to these operations).
  • An example of “output signal” is output to the processing unit 26.
  • the display unit 23 displays various display screens according to the control of the processing unit 26.
  • the measurement processing screen 30 shown in FIG. 2 is displayed on the display unit 23.
  • a function selection key display 31 a for causing the measurement apparatus 1 to execute a DC voltage measurement process by operating the touch panel in the operation unit 22, and alternating current to the measurement apparatus 1 by operating the touch panel.
  • Function selection key display 31b for causing voltage value measurement processing to be executed
  • function selection key display 31c for causing measurement device 1 to execute resistance value measurement processing by operating the touch panel
  • Function display 32 showing the content of the measurement process
  • measurement result display 33 displaying the measurement result by the measuring apparatus 1 (measurement unit 11)
  • Menu key display for displaying a menu screen (not shown) on the display unit 23 by operating the touch panel 34, and “measurement” by touch panel operation End key display 35 to terminate the ⁇ program "is displayed.
  • the wireless communication unit 24 is configured to be able to perform short-range wireless communication in accordance with the Bluetooth standard in the same manner as the wireless communication unit 14 of the measurement device 1 and is paired with the measurement device 1 as described later.
  • the operation data D0 is transmitted to the measuring device 1 according to the control of the processing unit 26, and the display data D1 transmitted from the measuring device 1 is received and output to the processing unit 26.
  • the wired communication unit 25 includes a connection connector conforming to the USB standard, and the measurement apparatus via a signal cable C (see FIG. 1) connected to the connection connector. 1 and various external devices (not shown) are connectable.
  • the wired communication unit 25 transmits the operation data D0 to the measurement device 1 according to the control of the processing unit 26 and the display data transmitted from the measurement device 1
  • the data D1 is received and output to the processing unit 26.
  • the processing unit 26 controls the smartphone 2 as a whole. Specifically, the processing unit 26 causes the display unit 23 to display the measurement processing screen 30 in accordance with the “measurement device program”. Further, the processing unit 26 generates operation data D0 for remotely operating the measuring device 1 based on the operation signal S1 output from the operation unit 22 (touch panel), and the wireless communication unit 24 or the wired communication unit 25 is operated. To be transmitted to the measuring apparatus 1. Further, the processing unit 26 displays the operation state of the measuring device 1 on the function display 32 of the measurement processing screen 30 based on the display data D1 transmitted from the measuring device 1 and received by the wireless communication unit 24 or the wired communication unit 25.
  • the processing unit 26 extracts the measurement result from the display data D1 transmitted from the measurement device 1 and received by the wireless communication unit 24 or the wired communication unit 25, and stores it as the measurement result data D2 in the storage memory M (or the main body). It is recorded in the memory 21). Furthermore, when the data transmission process is selected from the menu screen displayed by the operation of the menu key display 34, the processing unit 26 records the measurement result data recorded in the storage memory M (or the main body memory 21). A process of transmitting D2 to an arbitrary data server via the mobile phone communication network is executed.
  • the storage memory mounting unit 27 is configured so that an existing memory card can be mounted as the storage memory M.
  • the mobile phone communication unit 28 transmits / receives various data to / from a mobile phone base station (hereinafter also simply referred to as “base station”) that constitutes a public line network of the mobile phone, under the control of the processing unit 26. Specifically, the mobile phone communication unit 28 generates current position information Dp1 generated and transmitted in the public network management equipment or any one of the base stations based on the positions of a plurality of accessible base stations. And at the time of a call, call data is transmitted to and received from the base station. In addition, the mobile phone communication unit 28 uploads the measurement result data D2 to a predetermined server on the Internet via the base station, downloads update data of the “measurement device program” from the predetermined server, and the like. These data are transmitted and received at the time.
  • base station a mobile phone base station
  • the GPS receiver 29 receives the GPS signal Sg from the GPS satellite, specifies the current position of the smartphone 2, and outputs the specified result to the processing unit 26 as current position information Dp2.
  • the positioning method of the present position by the GPS receiver 29 and the generation method of the present position information Dp2 are publicly known, detailed description is omitted.
  • the GPS receiver 29 constitutes one of the “current position measurement unit”
  • the mobile phone communication unit 28 and the processing unit 26 constitute another one of the “current position measurement unit”. To do.
  • a “measurement device program” is installed in the smartphone 2.
  • an installation optical disk can be provided as an accessory of the measuring device 1, or can be downloaded from an arbitrary site on the Internet and used.
  • the installation work of the “measuring device program” is the same as the installation work of various programs for the “smartphone”, and thus the description thereof is omitted.
  • the installation destination of the “measuring device program” may be either the main body memory 21 or the storage memory M.
  • Bluetooth pairing is performed between the smartphone 2 and the measuring device 1. Since the pairing work is the same as the pairing work of various known Bluetooth devices, description thereof is omitted. Thereby, the measurement system 100 is ready for use.
  • the wireless communication unit 24 of the smartphone 2 is turned on (communicable state) and the “measurement device program” is set. Execute. In this state, when the operation unit 12 is operated to turn on the power to the measuring device 1, the indicator 13 of the measuring device 1 is turned on, and the wireless communication units 14 and 24 paired by the above pairing work communicate with each other. It becomes possible. At this time, the processing unit 16 of the measuring device 1 determines whether or not pairing between the wireless communication units 14 and 24 is maintained (whether or not a state in which communication with the smartphone 2 is possible is maintained). Start monitoring. In the smartphone 2, the measurement processing screen 30 is displayed on the display unit 23 by executing the “measuring device program”.
  • the processing unit 26 when the measurement process of the DC voltage value is executed, the display part of the function selection key display 31 a on the measurement process screen 30 of the smartphone 2 is touched. At this time, based on the operation signal S1 from the operation unit 22 (touch panel), the processing unit 26 generates operation data D0 corresponding to “operation to execute the DC voltage value measurement process”, and wirelessly The data is transmitted to the measuring apparatus 1 via the communication unit 24.
  • the processing unit 16 In response to this, in the measuring apparatus 1, the processing unit 16 outputs a control signal S2 to the measuring unit 11 in response to the operation data D0 received by the wireless communication unit 14, thereby starting a DC voltage value measurement process.
  • the processing unit 16 displays data D ⁇ b> 1 indicating that the measurement unit 11 has started the DC voltage value measurement process (the operation state of the measurement apparatus 1). Is generated and transmitted to the smartphone 2 via the wireless communication unit 14.
  • the processing unit 26 of the smartphone 2 controls the display unit 23 based on the display data D1 received by the wireless communication unit 24, and “Function: DCV” is displayed on the function display 32 of the measurement processing screen 30. Is displayed (information indicating that the measurement apparatus 1 is operating in the “DC voltage value measurement mode”).
  • the contacts 11a and 11b are measured by holding the main body 10a and the test lead 10b of the measuring device 1 in hand. Touch any measurement point of interest.
  • the measurement unit 11 measures the DC voltage value between the two measurement points, and the processing unit 16 displays the display data D1 (for displaying the measurement result on the display unit 23 of the smartphone based on the measurement result).
  • Display data D1) is generated and transmitted to the smartphone 2 via the wireless communication unit 14.
  • the processing unit 26 controls the display unit 23 based on the display data D ⁇ b> 1 received by the wireless communication unit 24, and the measurement value ( In this example, the DC voltage value) is displayed numerically.
  • the processing unit 26 extracts a measurement result (in this example, a DC voltage value) from the display data D1, and stores it in the storage memory M (or the main body memory 21) as measurement result data D2 associated with the measurement time.
  • a measurement result in this example, a DC voltage value
  • the processing unit 26 extracts a measurement result (in this example, a DC voltage value) from the display data D1, and stores it in the storage memory M (or the main body memory 21) as measurement result data D2 associated with the measurement time.
  • data storage process As for an example of a medium or folder for storing the measurement result data D2, related items are displayed on a menu screen (not shown) displayed by touching the display part of the menu key display 34 on the measurement processing screen 30. Registration is performed in advance on a setting screen displayed on the display unit 23 by selection. Thereby, the DC voltage value measurement process is completed.
  • the function selection key displays 31b and 31c are operated by operating the operation unit 22 (touch panel) of the smartphone 2. Touch one of the display areas.
  • the measurement process corresponding to the touched part is executed (not shown) in the same manner as when the DC voltage value measurement process is executed by touching the display part of the function selection key display 31a.
  • the result is displayed on the measurement result display 33 on the measurement processing screen 30, and the measurement result data D2 indicating the measurement result is stored in the storage memory M (or the main body memory 21).
  • this measurement system 100 a place where use of wireless communication (communication that emits radio waves) is restricted (such as in a medical facility or airport facility) (wireless communication between the wireless communication units 14 and 24 is not performed). It is configured so that various measurement processes can be executed even in a better place. Specifically, first, the wired communication unit 15 (connection connector 15a) of the measuring device 1 and the wired communication unit 25 of the smartphone 2 are connected to each other via the signal cable C.
  • the processing unit 16 shifts the wireless communication unit 14 to the off state, and instead of monitoring whether the pairing between the wireless communication units 14 and 24 is maintained, a signal Monitoring of whether or not the connection with the smartphone 2 via the cable C is maintained (whether or not a state where communication with the smartphone 2 is possible is maintained) is started.
  • the wireless communication unit 24 of the smartphone 2 is turned off and the “measuring device program” is executed.
  • the operation data D0 and the display data D1 transmitted and received by the wireless communication between the wireless communication units 14 and 24 are transmitted and received between the wired communication units 15 and 25.
  • the operation method of the smartphone 2 the measurement work by the measurement device 1, the measurement processing screen 30 displayed on the display unit 23 of the smartphone 2, and the storage of the measurement result data D2 in the storage memory M (or the main body memory 21).
  • the processing is the same as the above example in which the operation data D0 and the display data D1 are transmitted and received between the wireless communication units 14 and 24, and thus the description thereof is omitted.
  • the power-off processing is executed to avoid the situation where the power of the measuring device 1 is unnecessarily consumed.
  • the structure to be adopted is adopted. Specifically, after the measurement process using the wireless communication units 14 and 24, the measurement device 1 and the smartphone 2 in a state where the power to the measurement device 1 is forgotten to be turned off (a state in which the measurement device 1 is turned on).
  • the processing unit 16 waits for 30 seconds, The power supply of the measuring device 1 is shut off.
  • the processing unit 16 is also configured when the “measurement device program” is terminated in the smartphone 2 and the display data D ⁇ b> 1 cannot be transmitted from the measurement device 1 to the smartphone 2. Then, it is determined that the communicable state has been released, and the power shutdown process is executed.
  • the pairing between the measurement device 1 and the smartphone 2 is maintained after the measurement process using the wireless communication units 14 and 24 in a state where the power to the measurement device 1 is forgotten to be shut off.
  • the connection between the wired communication units 15 and 25 and the signal cable C is maintained when the power of the measuring apparatus 1 is forgotten to be cut off after the measurement processing using the wired communication units 15 and 25 and the signal cable C.
  • the measurement system 100 smart phone 2 in that state is out of a preset range centered on the current position of the smartphone 2 at the start of the measurement process, the measurement device 1 A configuration is adopted in which the power shut-off process is executed to shut off the power.
  • the “communication enabled state” is canceled and the power source of the measurement device 1 is shut off. Therefore, the operation of the measurement system 100 will be described by taking as an example a case where both the measurement device 1 and the smartphone 2 are separated from the measurement site after the measurement process is completed.
  • the processing unit 26 of the smartphone 2 when the processing unit 26 of the smartphone 2 is instructed to start the “measurement device program”, the current position of the smartphone 2 is identified, and the identified current position is stored in the storage memory mounting unit 27. Is stored in one of the storage memory M and the main body memory 21 set in advance. In this case, when power is supplied to the GPS receiver 29 and the GPS receiver 29 is ready to perform positioning of the current position based on the GPS signal Sg, the processing unit 26 outputs the current position output from the GPS receiver 29. The current position of the smartphone 2 is specified based on the information Dp2.
  • the processing unit 26 The current position information Dp1 from the base station is acquired via the mobile phone communication unit 28, and the current position of the smartphone 2 is specified based on the acquired current position information Dp1.
  • the processing unit 26 receives the current position information Dp2 output from the GPS receiver 29 or the current position received via the mobile phone communication unit 28 during the execution of the measurement process described above. Based on the information Dp1, the current position of the smartphone 2 is specified at a predetermined time interval (one minute interval as an example). Further, each time the processing unit 26 specifies the current position, the specified current position is a preset range centered on the current position of the smartphone 2 specified at the start of the measurement process (for example, a range having a radius of 50 m).
  • a process for determining whether or not the smartphone 2 has moved out of the preset range is displayed on the measurement processing screen 30 based on the display data D1 transmitted from the measurement apparatus 1. This process is executed in parallel with the process of displaying and the process of transmitting the operation data D0 output according to the operation of the operation unit 22 to the measuring apparatus 1.
  • the measurement apparatus 1 is forgotten to be turned off (while the measurement apparatus 1 is turned on), and the measurement apparatus 1 and the smartphone 2 are carried away from the measurement site.
  • the smartphone 2 is moved outside the preset range.
  • a range in which the current position specified by the processing unit 26 based on the current position information Dp2 output from the GPS receiver 29 or the current position information Dp1 received via the mobile phone communication unit 28 is set.
  • a power-off process start message 36 “Turn off the measuring device. Are you sure?” Is displayed on the measurement processing screen 30 (display unit 23).
  • the timing of “elapsed time from the time when the current position is out of the set range” is started.
  • the smartphone 2 changes the measurement site.
  • the power shutdown processing start message 36 is displayed even though the smartphone 2 is not in the set range, the user operates the operation unit 22 to perform “cancel”. select.
  • the power-off process start message 36 is deleted, and the measurement process is continued without transmitting the operation data D0 instructing the execution of the power-off process to the measuring apparatus 1 as will be described later.
  • the processing unit 26 causes the measuring device 1 to Operation data D0 for instructing execution of the power shutdown process is generated and transmitted to the measurement apparatus 1 via the wireless communication unit 24 or the smartphone 25.
  • the processing unit 16 executes a power shut-off process to shut off the power of the measuring apparatus 1.
  • the smartphone 2 ends the “measurement device program” after transmitting the operation data D0 instructing execution of the power-off process to the measurement device 1.
  • the smartphone 2 ends the “measurement device program” after transmitting the operation data D0 instructing execution of the power-off process to the measurement device 1.
  • the measurement result data D2 stored in the storage memory M (or the main body memory 21) of the smartphone 2 is transmitted from the mobile phone communication unit 28 via the mobile phone communication network or the Internet communication network. It can be transferred to a preset data server.
  • the data server of the transfer destination is displayed by selecting a related item on a menu screen (not shown) displayed by touching the display part of the Menu key display 34 on the measurement processing screen 30. Registration is performed in advance on the setting screen displayed on the unit 23.
  • the processing unit 26 selects from the storage memory M by selecting a related item on a menu screen (not shown) displayed by touching the display portion of the Menu key display 34.
  • the measurement result data D2 is read out and transmitted to the registered data server via each communication network. Note that the measurement result data D2 can be transferred from the smartphone 2 to an arbitrary mail server as an attached file of an e-mail.
  • the measurement unit 11 that measures “electrical parameters (in this example, a DC voltage value, an AC voltage value, and a resistance value)” for the measurement target, the operating state of the measuring apparatus 1, And a processing unit 16 that generates display data D1 for displaying the measurement result of the measuring unit 11 on the display unit 23 of the smartphone 2, and a wireless communication unit that transmits the display data D1 to the smartphone 2 according to the control of the processing unit 16.
  • a “measurement device program” for displaying the operation state of the measurement device 1 and the measurement result on the display unit 23 based on the display data D1 transmitted from the measurement device 1 is provided. It comprises an installed smartphone 2.
  • the measurement device 1 and the measurement system 100 even if the display unit for displaying the operation state and the measurement result does not exist in the measurement device 1, the display device D1 is based on the display data D1 transmitted from the wireless communication unit 14. Since the operation state of the measuring device 1 and the measurement result by the measurement unit 11 can be displayed on the display unit 23 of the smartphone 2, the measurement unit 1 can be measured without requiring a display unit without causing a situation in which the measurement result is difficult to read.
  • the apparatus 1 can be sufficiently reduced in size and weight. Further, unlike the configuration in which a dedicated “display device” is provided separately from the “measurement device”, the measurement system 100 can be constructed at a low cost for those who own the “smartphone”.
  • measurement results can be arbitrarily selected using various communication networks (such as a mobile phone communication network) to which the smartphone 2 can be connected without separately preparing other communication devices. Can be sent to any location.
  • the processing unit 16 controls the measurement unit 11 in accordance with the operation data D0 transmitted from the smartphone 2 to measure “electrical parameter”.
  • operation data D0 is generated based on the measurement device 1 and the operation signal S1 output from the operation unit 22, and is transmitted to the measurement device 1 and display data transmitted from the measurement device 1.
  • It is configured to include a smartphone 2 on which is installed a measurement device program that causes the display unit 23 to display the operation state and measurement results of the measurement device 1 based on D1. Therefore, according to the measurement apparatus 1 and the measurement system 100, the measurement apparatus 1 is further reduced in size and weight by the amount that the operation switch for measurement processing is not necessary except for the minimum necessary operation switches such as a power switch. Can be
  • the measurement apparatus 1 includes a wired communication unit 15 that transmits display data D1 to the smartphone 2 via the signal cable C according to the control of the processing unit 16.
  • the display data D1 is transmitted to the smartphone 2 through the signal cable C according to the control of the processing unit 16, and the operation data D0 from the smartphone 2 is transmitted through the signal cable C.
  • a wired communication unit 15 for receiving is provided. Therefore, according to the measurement device 1 and the measurement system 100, display data D1 and the like can be transmitted from the measurement device 1 to the smartphone 2 via the signal cable C even in a place where execution of wireless communication is restricted. .
  • wired communication requires less power consumption in the measurement device 1 and the smartphone 2 than wireless communication. Therefore, when the measurement device 1 and the smartphone 2 are low in battery power, wireless communication is performed. However, it is possible to execute the measurement process for a longer time than to execute the measurement process.
  • the processing unit 16 executes the power-off processing according to the operation data D0 to turn on the power of the measuring device 1. Cut off. Further, in the measurement system 100, operation data D0 is generated based on the measurement device 1 and the operation signal S1 output from the operation unit 22, and is transmitted to the measurement device 1 and display data transmitted from the measurement device 1.
  • the operating state of the measuring apparatus 1 and the measurement result are displayed on the display unit 23, and the current position information Dp1 received from the mobile phone communication unit 28 or the current position information Dp2 output from the GPS receiver 29
  • a smartphone 2 installed with a “measuring device program” that transmits operation data D0 to the measuring device 1 to execute a power shut-off process when the current position specified based on the above is out of a preset range. Configured.
  • the measurement device 1 can be sufficiently reduced in size and weight without causing a display unit without causing a situation in which reading of measurement results becomes difficult.
  • the measurement apparatus 1 can be further reduced in size and weight by the amount that the operation switch for measurement processing becomes unnecessary, and after the measurement processing is completed. Even if you forget to shut off the power supply of the measuring device 1, when you leave the measuring site with the measuring system 100 in that state (when the smartphone 2 moves out of the preset range), Since the power supply is cut off, it is possible to reliably and easily avoid a situation in which unnecessary power is consumed by the measurement apparatus 1 that is not executing the measurement process.
  • this measuring apparatus 1 when the communicable state in which the display data D1 can be transmitted to the smartphone 2 is released and the display data D1 cannot be transmitted, the power shut-off process is executed. Even if it is forgotten to shut off the power supply of the measuring device 1 after the measurement process is finished, when the display data D1 cannot be transmitted from the measuring device 1 to the smartphone 2 (when the communicable state is canceled), Since the power supply of the measuring device 1 is cut off, it is unnecessary by the measuring device 1 when the measurement processing screen 30 based on the display data D1 is not displayed on the smartphone 2, that is, when the measurement processing is not executed. A situation where power is consumed can be avoided reliably and easily.
  • a program programmed to end the measurement apparatus program after transmitting the operation data D0 for causing the measurement apparatus 1 to execute the power-off process is referred to as a “measurement apparatus program”.
  • the program for the measuring device that does not need to be continuously executed on the smartphone 2 is terminated. Since it can be automatically terminated without performing, it is possible to avoid a situation in which the power of the smartphone 2 is consumed due to unnecessary execution of the measurement device program.
  • the “measurement device program” By installing the “measurement device program” in the smartphone 2, the measurement result obtained by the measurement unit 11 is stored in the storage memory M (or the main body memory 21) in the smartphone 2 without mounting a large-capacity memory in the measurement device 1. Can be stored and saved. Thereby, since the measuring device 1 can be manufactured by mounting a small memory, the manufacturing cost of the measuring device 1 can be sufficiently reduced.
  • the configuration of the measurement device and the measurement system is not limited to the configuration of the measurement device 1 and the measurement system 100 including the measurement device 1.
  • the measurement apparatus 1 including the wireless communication unit 14 capable of performing short-range wireless communication according to the Bluetooth standard has been described as an example, but instead of this configuration or in addition to this configuration, the IrDA standard
  • the “measuring device” can also be configured with a wireless communication unit (not shown) capable of performing infrared communication according to the above. Even when such a configuration is adopted, the same effects as those of the measurement apparatus 1 and the measurement system 100 can be obtained.
  • the operation data D0 and the display data D1 are transmitted / received by infrared communication
  • the operation data D0 and the display data D1 are stored even in places where the use of wireless communication that emits radio waves is restricted. It can be transmitted and received by wireless communication.
  • operation switch required for execution of a measurement process is shown as "measuring apparatus”.
  • the measurement process is performed by operating the operation switch of the “measuring device” without transmitting the operation data D0 from the “smartphone” to the measuring device 1, and the display corresponding to the measurement result
  • a configuration in which the data D1 is transmitted to the “smart phone” and the measurement result is displayed on the display unit 23 (a configuration in which the measurement process by the “measurement device” is not executed by the operation of the “smart phone”) may be employed. Even when such a configuration is employed, the “measuring device” can be sufficiently reduced in size and weight to the extent that the display unit for displaying the measurement result is not necessary for the “measuring device”.
  • the measurement result extracted from the display data D1 in the smartphone 2 can be stored in the storage memory M or the like as the measurement result data D2, or the measurement result data D2 stored in the storage memory M or the like can be transmitted to a data server or the like.
  • a “measuring device program” on the smartphone 2
  • the measurement result is simply displayed on the “display unit” without generating the measurement result data D2 and storing it in the storage memory M or the like.
  • a “measuring device program” that executes only the processing to be performed can also be installed in the smartphone 2.
  • the measurement device 1 including the main body 10a and the test leads 10b (contacts 11a and 11b) has been described as an example.
  • the “measurement device” is not limited to this, and one of the measurement devices 1 provided in the main body
  • the present invention can be applied to a measuring device configured to measure a voltage value and a resistance value between a contact and a ground potential (a measuring device that does not include a test lead 10b separate from the main body 10a).
  • a measurement unit that measures electrical parameters, an operation state of the measurement device, and a processing unit that generates display data for displaying the measurement result of the measurement unit on the display unit of the smartphone, And a wireless communication unit that transmits display data to the smartphone according to the control of the processing unit. Therefore, according to the measurement apparatus according to the present invention, the operation of the measurement apparatus is performed based on the display data transmitted from the wireless communication unit even if the display unit for displaying the operation state and the measurement result does not exist in the measurement apparatus. Since the status and measurement results from the measurement unit can be displayed on the display unit of the smartphone, there is no need to display the measurement unit without causing a situation that makes it difficult to read the measurement result, and the measurement device is sufficiently small and lightweight. can do.
  • Measurement processing screen 31a to 31c Function selection key display, 32 Function display, 33 Measurement result display, 34 Menu key display, 35 End key display, 36 Power shutdown processing start message, C signal cable, D0 operation data, D1 display data, D2 measurement result data, Dp1, Dp2 current position information, M storage memory, S1 operation signal, S2 control signal, Sg GPS signal

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Telephone Function (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

 測定結果の読み取りを困難とすることなく、小形化および軽量化を図り得る測定装置を提供することを目的とする。 電気的パラメータを測定する測定部11を備えた測定装置1であって、測定装置1の動作状態、および測定部11の測定結果をスマートフォン2の表示部23に表示させるための表示用データD1を生成する処理部16と、処理部16の制御に従ってスマートフォン2に表示用データD1を送信する無線通信部14とを備えている。

Description

測定装置および測定システム
 本発明は、測定対象についての電気的パラメータを測定可能に構成された測定装置、およびその測定装置を備えて構成された測定システムに関するものである。
 例えば、実開平5-52765号公報に開示されているマルチメータは、一対のプローブを接続可能なジャックと、測定条件を設定操作するための各種ボタンと、測定結果を表示するための液晶表示器とがケーシング(筐体)の一面に配設されて、電圧値、電流値および抵抗値のいずれかを測定して測定結果を液晶表示器に表示することができるように構成されている。このマルチメータの使用に際しては、まず、セレクトボタンを操作して、例えば電圧値の測定処理を選択すると共に、この処理に対応付けられたジャックに両プローブを接続する。次いで、両プローブを測定対象に接触させることにより、測定回路によって電圧値が測定されて、その測定結果が液晶表示器に数値で表示される。また、電圧値の測定に代えて、電流値を測定する際には、セレクトボタンを操作して、電流値の測定処理を選択すると共に、この処理に対応付けられたジャックに両プローブを接続する。次いで、両プローブを測定対象に接触させることにより、測定回路によって電流値が測定されて、その測定結果が液晶表示器に数値で表示される。
実開平5-52765号公報(第6-9頁、第1-4図)
 ところが、従来のマルチメータには、以下の問題点が存在する。すなわち、従来のマルチメータでは、電圧値、電流値および抵抗値などの測定結果を、ケーシングの一面に配設された液晶表示器に表示させる構成が採用されている。この場合、この種の測定装置に対しては、容易に持ち運び可能とし、かつ、不使用時における占有スペース(収納スペース)を小さくするため、小形化および軽量化を図るべきとの強い要望がある。しかしながら、従来のマルチメータを小形化する場合には、測定結果表示用の液晶表示器についても小形化せざるを得ず、測定結果の読み取りが困難になるおそれがある。このため、従来のマルチメータのような測定装置においては、測定結果を容易に読み取り得る十分な大きさの表示器を搭載する必要があり、これに起因して、小形化および軽量化が困難になっているという問題点がある。
 本発明は、かかる問題点に鑑みてなされたものであり、測定結果の読み取りを困難とすることなく、測定装置の小形化および軽量化を図り得る測定装置および測定システムを提供することを主目的とする。
 上記目的を達成すべく請求項1記載の測定装置は、電気的パラメータを測定する測定部を備えた測定装置であって、当該測定装置の動作状態、および前記測定部の測定結果をスマートフォンの表示部に表示させるための表示用データを生成する処理部と、前記処理部の制御に従って前記スマートフォンに前記表示用データを送信する無線通信部とを備えている。
 また、請求項2記載の測定装置は、請求項1記載の測定装置において、前記処理部は、前記スマートフォンから送信された操作データに応じて前記測定部を制御して前記電気的パラメータを測定させる。
 さらに、請求項3記載の測定装置は、請求項1記載の測定装置において、信号ケーブルを介して前記スマートフォンに接続可能に構成されて前記処理部の制御に従って当該信号ケーブルを介して前記スマートフォンに前記表示用データを送信する有線通信部を備えている。
 さらに、請求項4記載の測定装置は、請求項2記載の測定装置において、信号ケーブルを介して前記スマートフォンに接続可能に構成されて前記処理部の制御に従って当該信号ケーブルを介して前記スマートフォンに前記表示用データを送信すると共に当該信号ケーブルを介して当該スマートフォンからの前記操作データを受信する有線通信部を備えている。
 また、請求項5記載の測定装置は、請求項1または3記載の測定装置において、当該測定装置の電源を遮断する電源遮断処理を実行する制御部を備え、前記制御部は、前記スマートフォンから前記電源遮断処理の実行を指示する制御データが送信されたときに当該制御データに従って当該電源遮断処理を実行する。
 また、請求項6記載の測定装置は、請求項2または4記載の測定装置において、当該測定装置の電源を遮断する電源遮断処理を実行する制御部を備え、前記制御部は、前記スマートフォンから前記電源遮断処理の実行を指示する制御データが送信されたときに当該制御データに従って当該電源遮断処理を実行する。
 さらに、請求項7記載の測定装置は、請求項5または6記載の測定装置において、前記制御部は、前記スマートフォンへの前記表示用データの送信が可能な通信可能状態が解除されて当該表示用データを送信できなくなったときに前記電源遮断処理を実行する。
 また、請求項8記載の測定システムは、請求項1または3記載の測定装置と、当該測定装置から送信された前記表示用データに基づいて当該測定装置の前記動作状態および前記測定結果を前記表示部に表示させる測定装置用プログラムがインストールされた前記スマートフォンとを備えて構成されている。
 また、請求項9記載の測定システムは、請求項2または4記載の測定装置と、操作部から出力された出力信号に基づいて前記操作データを生成して前記測定装置に送信すると共に当該測定装置から送信された前記表示用データに基づいて当該測定装置の前記動作状態および前記測定結果を前記表示部に表示させる測定装置用プログラムがインストールされた前記スマートフォンとを備えて構成されている。
 また、請求項10記載の測定システムは、請求項5記載の測定装置と、現在位置を測位して現在位置情報を出力する現在位置測位部を有する前記スマートフォンとを備えて構成された測定システムであって、前記スマートフォンは、前記測定装置から送信された前記表示用データに基づいて当該測定装置の前記動作状態および前記測定結果を前記表示部に表示させ、かつ、前記現在位置測位部から出力された前記現在位置情報に基づいて特定した現在位置が予め設定された範囲を外れたときに前記制御データを前記測定装置に送信して前記電源遮断処理を実行させる測定装置用プログラムがインストールされている。
 また、請求項11記載の測定システムは、請求項6記載の測定装置と、現在位置を測位して現在位置情報を出力する現在位置測位部を有する前記スマートフォンとを備えて構成された測定システムであって、前記スマートフォンは、操作部から出力された出力信号に基づいて前記操作データを生成して前記測定装置に送信すると共に当該測定装置から送信された前記表示用データに基づいて当該測定装置の前記動作状態および前記測定結果を前記表示部に表示させ、かつ、前記現在位置測位部から出力された前記現在位置情報に基づいて特定した現在位置が予め設定された範囲を外れたときに前記制御データを前記測定装置に送信して前記電源遮断処理を実行させる測定装置用プログラムがインストールされている。
 また、請求項12記載の測定システムは、請求項10または11記載の測定システムにおいて、前記スマートフォンには、前記測定装置用プログラムとして、前記測定装置に前記電源遮断処理を実行させるための前記制御データを送信した後に当該測定装置用プログラムを終了するようにプログラムされたプログラムがインストールされている。
 さらに、請求項13記載の測定システムは、請求項5から12のいずれかに記載の測定システムにおいて、前記スマートフォンには、前記測定装置用プログラムとして、前記表示用データから前記測定結果を抽出してストレージメモリに記憶させるデータ保存処理を実行可能なプログラムがインストールされている。
 請求項1記載の測定装置では、電気的パラメータを測定する測定部と、測定装置の動作状態、および測定部の測定結果をスマートフォンの表示部に表示させるための表示用データを生成する処理部と、処理部の制御に従ってスマートフォンに表示用データを送信する無線通信部とを備えて構成されている。また、請求項8記載の測定システムでは、上記の測定装置と、測定装置から送信された表示用データに基づいて測定装置の動作状態および測定結果を表示部に表示させる測定装置用プログラムがインストールされたスマートフォンとを備えて構成されている。
 したがって、請求項1記載の測定装置、および請求項8記載の測定システムによれば、動作状態や測定結果を表示するための表示部が測定装置に存在しなくても、無線通信部から送信した表示用データに基づいて測定装置の動作状態や測定部による測定結果をスマートフォンの表示部に表示させることができるため、測定結果の読み取りが困難となる事態を招くことなく、表示部を不要として、測定装置を十分に小形化および軽量化することができる。また、測定装置とは別体に専用の表示装置を設ける構成とは異なり、スマートフォンを所有している者にとっては、測定システムを安価に構築することができる。さらに、無線通信によって測定装置からスマートフォンに表示用データを送信することにより、通信用のケーブルが絡み合うことがないため、測定装置やスマートフォンの取り扱いが十分に容易となる。加えて、他の通信機器を別途用意することなく、スマートフォンが接続可能な各種通信網(携帯電話通信網等)を利用して測定結果を任意の場所へ送信することができる。
 また、請求項2記載の測定装置では、処理部が、スマートフォンから送信された操作データに応じて測定部を制御して電気的パラメータを測定させる。また、請求項9記載の測定システムでは、上記の測定装置と、操作部から出力された出力信号に基づいて操作データを生成して測定装置に送信すると共に測定装置から送信された表示用データに基づいて測定装置の動作状態および測定結果を表示部に表示させる測定装置用プログラムがインストールされたスマートフォンとを備えて構成されている。したがって、請求項2記載の測定装置、および請求項9記載の測定システムによれば、電源スイッチ等の必要最低限の操作スイッチを除いて、測定処理用の操作スイッチが不要となる分だけ、測定装置を一層小形化および軽量化することができる。
 さらに、請求項3記載の測定装置では、処理部の制御に従って信号ケーブルを介してスマートフォンに表示用データを送信する有線通信部を備えている。また、請求項4記載の測定装置では、処理部の制御に従って信号ケーブルを介してスマートフォンに表示用データを送信すると共に信号ケーブルを介してスマートフォンからの操作データを受信する有線通信部を備えている。したがって、請求項3,4記載の測定装置によれば、無線通信の実行を制限されている場所においても信号ケーブルを介して表示用データ等を測定装置からスマートフォンに送信することができる。また、一般的には、無線通信よりも有線通信の方が測定装置やスマートフォンにおける電力消費量が少なくて済むため、測定装置やスマートフォンのバッテリ残量が少ないときに、無線通信しつつ測定処理を実行するよりも長い時間に亘って測定処理を実行することができる。
 また、請求項5,6記載の測定装置では、制御部が、スマートフォンから電源遮断処理の実行を指示する制御データが送信されたときに制御データに従って電源遮断処理を実行して測定装置の電源を遮断する。また、請求項10記載の測定システムでは、請求項5記載の測定装置と、測定装置から送信された表示用データに基づいて測定装置の動作状態および測定結果を表示部に表示させ、かつ、現在位置測位部から出力された現在位置情報に基づいて特定した現在位置が予め設定された範囲を外れたときに制御データを測定装置に送信して電源遮断処理を実行させる測定装置用プログラムがインストールされたスマートフォンとを備えて構成されている。さらに、請求項11記載の測定システムでは、請求項6記載の測定装置と、操作部から出力された出力信号に基づいて操作データを生成して測定装置に送信すると共に測定装置から送信された表示用データに基づいて測定装置の動作状態および測定結果を表示部に表示させ、かつ、現在位置測位部から出力された現在位置情報に基づいて特定した現在位置が予め設定された範囲を外れたときに制御データを測定装置に送信して電源遮断処理を実行させる測定装置用プログラムがインストールされたスマートフォンとを備えて構成されている。
 したがって、請求項5記載の測定装置、および請求項10記載の測定システムによれば、測定結果の読み取りが困難となる事態を招くことなく、表示部を不要として、測定装置を十分に小形化および軽量化することができるだけでなく、測定処理の終了後に測定装置の電源を遮断し忘れたとしても、その状態の測定システムを携行して測定現場を離れたとき(スマートフォンが予め設定された範囲外に移動したとき)に、測定装置の電源が遮断されるため、測定処理を実行していない測定装置によって不要な電力が消費される事態を確実かつ容易に回避することができ、請求項6記載の測定装置、および請求項11記載の測定システムによれば、測定結果の読み取りが困難となる事態を招くことなく、表示部を不要として、測定装置を十分に小形化および軽量化することができると共に、測定処理用の操作スイッチが不要となる分だけ、測定装置を一層小形化および軽量化することができるだけでなく、測定処理の終了後に測定装置の電源を遮断し忘れたとしても、その状態の測定システムを携行して測定現場を離れたとき(スマートフォンが予め設定された範囲外に移動したとき)に、測定装置の電源が遮断されるため、測定処理を実行していない測定装置によって不要な電力が消費される事態を確実かつ容易に回避することができる。
 さらに、請求項7記載の測定装置によれば、スマートフォンへの表示用データの送信が可能な通信可能状態が解除されて表示用データを送信できなくなったときに電源遮断処理を実行することにより、測定処理の終了後に測定装置の電源を遮断し忘れたとしても、測定装置からスマートフォンに表示用データを送信することができなくなったとき(通信可能状態が解除されたとき)に、測定装置の電源が遮断されるため、スマートフォンに表示用データに基づく画面を表示させていないとき、すなわち、測定処理を実行していないときに、測定装置によって不要な電力が消費される事態を確実かつ容易に回避することができる。
 また、請求項12記載の測定システムによれば、測定装置に電源遮断処理を実行させるための制御データを送信した後に測定装置用プログラムを終了するようにプログラムされたプログラムを測定装置用プログラムとしてスマートフォンにインストールしたことにより、測定装置の電源を遮断させたとき、すなわち、測定処理を終了したときに、スマートフォンにおいて継続して実行させる必要がなくなった測定装置用プログラムを、終了操作を行うことなく自動的に終了させることができるため、測定装置用プログラムの不要な実行によってスマートフォンの電力が消費される事態を回避することがきる。
 また、請求項13記載の測定システムによれば、表示用データから測定結果を抽出して測定結果データとしてストレージメモリに記憶させるデータ保存処理を実行可能なプログラムを測定装置用プログラムとしてスマートフォンにインストールしたことにより、測定装置内に大容量のメモリを搭載することなく、測定部による測定結果をスマートフォンにおいてストレージメモリに記憶させて保存することができる。これにより、小さなメモリを搭載して測定装置を製造できるため、測定装置の製造コストを十分に低減することができる。
測定システム100の構成を示すブロック図である。 測定システム100における測定装置1およびスマートフォン2の外観図である。 表示部23に電源遮断処理開始メッセージ36を表示させた状態のスマートフォン2の外観図である。
 以下、測定装置および測定システムの実施の形態について、添付図面を参照して説明する。
 図1,2に示す測定システム100は、測定装置1およびスマートフォン2を備えて構成されている。この場合、「スマートフォン」は、広義には、PDA(携帯情報端末)の機能が備わった携帯電話を意味するが、本明細書では、この広義の「スマートフォン」のうちの「各種プログラムのインストールによって、任意の機能を付加したり、端末の操作環境や表示環境等をカスタマイズしたりすることができるもの」を「スマートフォン」という。なお、上記のスマートフォン2は、後述するように、この測定システム100専用の「測定装置用プログラム」がインストールされた既存の「スマートフォン」で構成されている。
 測定装置1は、図1に示すように、測定部11、操作部12、インジケータ13、無線通信部14、有線通信部15および処理部16を備えて構成されている。この場合、この測定装置1は、図2に示すように、一例として、上記の各要素11~16が円筒状のケーシング内に収容されて構成された本体部10aと、本体部10a(測定部11)に対してケーブル11cを介して接続されたテストリード10bとを備えて構成されている。測定部11は、本体部10aに配設された接触子11aと、テストリード10bに配設されてケーブル11cを介して接続された接触子11bとを備えている。この測定部11は、後述するように、処理部16からの制御信号S2に従い、「電気的パラメータ」の一例である直流電圧値(DCV)、交流電圧値(ACV)および抵抗値(Ω)の3種類のうちのいずれかを測定し、その測定結果を処理部16に出力可能に構成されている。
 操作部12は、一例として、操作時間(押圧状態を維持する時間)に応じて、予め割り当てられた機能を実行するための操作スイッチとして機能するプッシュスイッチを備えて構成されている。具体的には、この測定装置1では、一例として、電源が遮断されている状態において1秒以上3秒未満の長押し操作を行うことで電源が投入され、電源が投入されている状態において1秒以上の長押し操作を行うことで電源が遮断され、電源が遮断されている状態において3秒以上の長押し操作を行うことで電源が投入された後に後述するペアリングモードに移行する機能が操作部12の操作スイッチに割り当てられている。インジケータ13は、例えばLEDで構成されて、処理部16の制御に従い、一例として、電源投入状態において点灯し、ペアリングモードに移行している状態において点滅する。
 無線通信部14は、一例として、ブルートゥース(Bluetooth:登録商標)規格に準じた近距離無線通信を実行可能に構成されて、後述するように、「測定装置用プログラム」がインストールされたスマートフォン2との間でペアリングされた状態において、スマートフォン2から送信された操作データD0を受信して処理部16に出力すると共に、処理部16の制御に従って表示用データD1をスマートフォン2に向けて送信する。有線通信部15は、一例として、USB規格に準じた接続コネクタ15a(図2参照)を備えて、この接続コネクタ15aに接続される信号ケーブルC(図1参照)を介してスマートフォン2と接続可能に構成されている。また、有線通信部15は、信号ケーブルCを介してスマートフォン2と接続された状態において、スマートフォン2から送信された操作データD0を受信して処理部16に出力すると共に、処理部16の制御に従って表示用データD1をスマートフォン2に向けて送信する。なお、この測定装置1では、一例として、接続コネクタ15aに信号ケーブルCが接続されたときに無線通信部14がオフ状態に移行し、接続コネクタ15aから信号ケーブルCが取り外されたときに無線通信部14がオン状態に移行するように構成されている。
 処理部16は、測定装置1を総括的に制御する。具体的には、処理部16は、スマートフォン2から送信されて無線通信部14または有線通信部15によって受信された操作データD0に応じて測定部11を制御する(制御信号S2を出力する)ことにより、直流電圧値の測定処理、交流電圧値の測定処理、および抵抗体の抵抗値の測定処理のいずれかを実行させる。また、処理部16は、測定部11に実行させた測定処理の内容(「測定装置の動作状態」の一例)、および測定部11の測定結果をスマートフォン2に表示させるための表示用データD1を生成して、無線通信部14または有線通信部15を介してスマートフォン2に送信させる。
 さらに、処理部16は、「制御部」を構成し、測定装置1の電源を遮断する「電源遮断処理」を実行する。具体的には、処理部16は、無線通信部14または有線通信部15からスマートフォン2への表示用データD1の送信が可能な通信可能状態が維持されているかを監視すると共に、一例として、通信可能状態が解除されて表示用データD1を送信することができなくなった時点から30秒が経過したときに測定装置1の電源を自動的に遮断する処理を「電源遮断処理」として実行する。また、処理部16は、後述するようにして、スマートフォン2から「電源遮断処理」の実行を指示する操作データD0(「制御データ」の一例)」が送信されたときに、送信された操作データD0に従って測定装置1の電源を遮断する処理を「電源遮断処理」として実行する。
 一方、スマートフォン2は、上記したように、「測定装置用プログラム」がインストールされた既存の「スマートフォン」で構成され、図1に示すように、一例として、本体メモリ21、操作部22、表示部23、無線通信部24、有線通信部25、処理部26、ストレージメモリ装着部27、携帯電話通信部28およびGPSレシーバ29を備えて構成されている。なお、スマートフォン2における「携帯電話としての機能」や「PDAとしての機能」を実現するための構成要素については公知のため、図示および説明を省略する。本体メモリ21は、スマートフォン2の動作プログラムを記憶すると共に、利用者がインストールする各種プログラムを記憶する。操作部22は、図示しない電源スイッチなどの他に、表示部23の表面側に配設されたタッチパネルを備えて構成されて、これらの操作に応じた操作信号S1(「操作部から出力された出力信号」の一例)を処理部26に出力する。
 表示部23は、処理部26の制御に従って各種の表示画面を表示する。この場合、この測定システム100では、後述するようにスマートフォン2において「測定装置用プログラム」が実行されたときに、図2に示す測定処理用画面30が表示部23に表示される。この測定処理用画面30には、一例として、操作部22におけるタッチパネルの操作によって測定装置1に直流電圧値の測定処理を実行させるためのファンクション選択キー表示31a、タッチパネルの操作によって測定装置1に交流電圧値の測定処理を実行させるためのファンクション選択キー表示31b、タッチパネルの操作によって測定装置1に抵抗値の測定処理を実行させるためのファンクション選択キー表示31c、測定装置1の動作状態(実行される測定処理の内容)を示すファンクション表示32、測定装置1(測定部11)による測定結果を表示する測定結果表示33、タッチパネルの操作によって図示しないメニュー画面を表示部23に表示させるためのMenuキー表示34、およびタッチパネルの操作によって「測定装置用プログラム」を終了させるためのEndキー表示35が表示される。
 無線通信部24は、測定装置1の無線通信部14と同様にして、ブルートゥース規格に準じた近距離無線通信を実行可能に構成されて、後述するように、測定装置1との間でペアリングされた状態において、処理部26の制御に従って測定装置1に操作データD0を送信すると共に、測定装置1から送信された表示用データD1を受信して処理部26に出力する。有線通信部25は、測定装置1の有線通信部15と同様にして、USB規格に準じた接続コネクタを備えて、この接続コネクタに接続される信号ケーブルC(図1参照)を介して測定装置1や図示しない各種の外部装置と接続可能に構成されている。この有線通信部25は、信号ケーブルCを介して測定装置1と接続された状態において、処理部26の制御に従って測定装置1に操作データD0を送信すると共に、測定装置1から送信された表示用データD1を受信して処理部26に出力する。
 処理部26は、スマートフォン2を総括的に制御する。具体的には、処理部26は、「測定装置用プログラム」に従い、表示部23に測定処理用画面30を表示させる。また、処理部26は、操作部22(タッチパネル)から出力された操作信号S1に基づき、測定装置1を遠隔操作するための操作データD0を生成して、無線通信部24または有線通信部25を介して測定装置1に送信させる。さらに、処理部26は、測定装置1から送信されて無線通信部24または有線通信部25によって受信された表示用データD1に基づき、測定処理用画面30のファンクション表示32に測定装置1の動作状態(測定部11によって実行されている測定処理の内容)を表示させると共に、測定結果表示33に測定結果を数値表示させる。また、処理部26は、測定装置1から送信されて無線通信部24または有線通信部25によって受信された表示用データD1から測定結果を抽出して測定結果データD2としてストレージメモリM(または、本体メモリ21)に記録させる。さらに、処理部26は、Menuキー表示34の操作によって表示されるメニュー画面のなかからデータ送信処理を選択されたときに、ストレージメモリM(または、本体メモリ21)に記録されている測定結果データD2を、携帯電話通信網を介して任意のデータサーバに送信する処理を実行する。ストレージメモリ装着部27は、既存のメモリカードをストレージメモリMとして装着可能に構成されている。
 携帯電話通信部28は、処理部26の制御に従い、携帯電話の公衆回線網を構成する携帯電話基地局(以下、単に「基地局」ともいう)との間で各種のデータを送受信する。具体的には、携帯電話通信部28は、アクセス可能な複数の基地局の各位置に基づいて上記の公衆回線網の管理設備やいずれかの基地局において生成されて送信される現在位置情報Dp1を受信すると共に、通話時には、基地局との間で通話データを送受信する。また、携帯電話通信部28は、基地局を介してインターネット上の所定のサーバーに上記の測定結果データD2をアップロードしたり、所定のサーバーから「測定装置用プログラム」の更新データなどをダウンロードしたりする際に、これらのデータを送受信する。GPSレシーバ29は、GPS衛星からのGPS信号Sgを受信してスマートフォン2の現在位置を特定し、その特定結果を現在位置情報Dp2として処理部26に出力する。なお、GPSレシーバ29による現在位置の測位方法や現在位置情報Dp2の生成方法については公知のため、詳細な説明を省略する。この場合、このスマートフォン2では、GPSレシーバ29が「現在位置測位部」の1つを構成すると共に、携帯電話通信部28および処理部26が相まって「現在位置測位部」の他の1つを構成する。
 この測定システム100の使用に際しては、まず、スマートフォン2に「測定装置用プログラム」をインストールする。この「測定装置用プログラム」については、一例として、測定装置1の附属品としてインストール用光ディスクを提供したり、インターネット内の任意のサイトからダウンロードして使用するようにしたりすることができる。なお、「測定装置用プログラム」のインストール作業に関しては、「スマートフォン」に対する各種プログラムのインストール作業と同様のため、説明を省略する。また、「測定装置用プログラム」のインストール先については、本体メモリ21およびストレージメモリMのいずれでもよい。次いで、スマートフォン2と測定装置1との間においてブルートゥースのペアリングを行う。なお、ペアリング作業に関しては、公知の各種ブルートゥース機器のペアリング作業と同様のため、その説明を省略する。これにより、測定システム100を使用する準備が整う。
 一方、測定システム100を使用して測定対象についての測定処理を実行する際には、スマートフォン2の無線通信部24をオン状態にする(通信可能な状態とする)と共に「測定装置用プログラム」を実行する。この状態において操作部12を操作して測定装置1に電源を投入すると、測定装置1のインジケータ13が点灯すると共に、上記のペアリング作業によってペアリングされた無線通信部14,24が相互に通信可能な状態となる。この際に、測定装置1の処理部16は、無線通信部14,24の間のペアリングが維持されているか否か(スマートフォン2との通信が可能な状態が維持されているか否か)の監視を開始する。また、スマートフォン2においては、「測定装置用プログラム」の実行によって表示部23に測定処理用画面30が表示される。ここで、例えば直流電圧値の測定処理を実行する際には、スマートフォン2の測定処理用画面30におけるファンクション選択キー表示31aの表示部位にタッチする。この際には、操作部22(タッチパネル)からの操作信号S1に基づいて、処理部26が「直流電圧値の測定処理を実行する旨の操作」に対応する操作データD0を生成して、無線通信部24を介して測定装置1に送信させる。
 これに応じて、測定装置1では、処理部16が、無線通信部14によって受信された操作データD0に応じて測定部11に制御信号S2を出力することにより、直流電圧値の測定処理を開始させる。また、処理部16は、測定部11への制御信号S2の出力と並行して、直流電圧値の測定処理を測定部11に開始させた旨を示す表示用データD1(測定装置1の動作状態を示す表示用データD1)を生成して、無線通信部14を介してスマートフォン2に送信させる。この際には、スマートフォン2の処理部26が無線通信部24によって受信された表示用データD1に基づき、表示部23を制御して、測定処理用画面30のファンクション表示32に「Function:DCV」との文字列(測定装置1が「直流電圧値の測定モード」で動作している旨を示す情報)を表示させる。
 次いで、一例として、測定処理用画面30を視認可能にスマートフォン2を任意の場所に載置した状態において、測定装置1の本体部10aおよびテストリード10bを手に持って接触子11a,11bを測定対象の任意の測定ポイントに接触させる。この際には、測定部11によって両測定ポイントの間の直流電圧値が測定され、処理部16がその測定結果に基づいて表示用データD1(測定結果をスマートフォンの表示部23に表示させるための表示用データD1)を生成して、無線通信部14を介してスマートフォン2に送信させる。この際に、スマートフォン2では、処理部26が、無線通信部24によって受信された表示用データD1に基づき、表示部23を制御して、測定処理用画面30の測定結果表示33に測定値(この例では、直流電圧値)を数値表示させる。
 また、処理部26は、表示用データD1から測定結果(この例では、直流電圧値)を抽出して、その測定時刻に対応付けた測定結果データD2としてストレージメモリM(または、本体メモリ21)に記憶させる(「データ保存処理」の実行)。なお、測定結果データD2を記憶させる媒体やフォルダについては、一例として、測定処理用画面30におけるMenuキー表示34の表示部位にタッチすることで表示されるメニュー画面(図示せず)において関連項目を選択することで表示部23に表示される設定画面において予め登録しておく。これにより、直流電圧値の測定処理が完了する。
 この後、直流電圧値の測定に代えて、交流電圧値の測定処理や、抵抗値の測定処理を実行するときには、スマートフォン2の操作部22(タッチパネル)を操作してファンクション選択キー表示31b,31cのいずれかの表示部位にタッチする。これにより、上記のファンクション選択キー表示31aの表示部位にタッチして直流電圧値の測定処理を実行したときと同様にして、タッチした部位に応じた測定処理が実行され(図示せず)、測定結果が測定処理用画面30の測定結果表示33に表示されると共に、測定結果を示す測定結果データD2がストレージメモリM(または、本体メモリ21)に記憶される。
 また、この測定システム100では、医療施設内や空港設備内のように無線通信(電波を発射する通信)の利用を制限されている場所(無線通信部14,24間での無線通信を行わない方がよい場所)においても各種測定処理を実行することができるように構成されている。具体的には、まず、信号ケーブルCを介して測定装置1の有線通信部15(接続コネクタ15a)とスマートフォン2の有線通信部25とを相互に接続する。この際には、測定装置1において処理部16が無線通信部14をオフ状態に移行させると共に、無線通信部14,24の間のペアリングが維持されているか否かの監視に代えて、信号ケーブルCを介してのスマートフォン2との接続が維持されているか否か(スマートフォン2との通信が可能な状態が維持されているか否か)の監視を開始する。
 次いで、スマートフォン2の無線通信部24をオフ状態にすると共に「測定装置用プログラム」を実行する。これにより、上記の無線通信部14,24間において無線通信によって送受信された操作データD0および表示用データD1が有線通信部15,25間において送受信される。なお、スマートフォン2の操作方法、測定装置1による測定作業、スマートフォン2の表示部23に表示される測定処理用画面30、およびストレージメモリM(または、本体メモリ21)への測定結果データD2の記憶処理については、無線通信部14,24間において操作データD0や表示用データD1を送受信した上記の例と同様のため、説明を省略する。
 一方、この測定システム100では、上記の測定処理の終了後に測定装置1の電源を遮断し忘れたときに、電源遮断処理が実行されて、測定装置1の電力が不要に消費される事態を回避する構成が採用されている。具体的には、無線通信部14,24を使用した測定処理の後に、測定装置1の電源を遮断し忘れた状態(測定装置1の電源が投入された状態)において、測定装置1およびスマートフォン2の間のペアリングが解除されたとき、すなわち、測定装置1からスマートフォン2に表示用データD1を送信可能な通信可能状態が解除されたときに、処理部16は、30秒間待機してから、測定装置1の電源を遮断する。また、有線通信部15,25および信号ケーブルCを使用した測定処理の後に、測定装置1の電源を遮断し忘れた状態(測定装置1の電源が投入された状態)において、有線通信部15,25のいずれか(または、双方)と信号ケーブルCとの接続が断たれたとき、すなわち、測定装置1からスマートフォン2に表示用データD1を送信可能な通信可能状態が解除されたときに、処理部16は、30秒間待機してから、測定装置1の電源を遮断する。
 この場合、この測定システム100では、上記の例においてペアリングが解除されたとき、または有線通信部15,25と信号ケーブルCとの接続が絶たれたときに、直ちに電源を遮断する構成とは異なり、例えば、通信状態の一時的な悪化に起因して測定装置1とスマートフォン2とのペアリングが一時的に解除されたときや、誤って有線通信部15,25から信号ケーブルCを引き抜いてしまったときなどに、測定装置1の電源が遮断されて測定処理が中断される事態が回避される。さらに、この測定システム100では、スマートフォン2において「測定装置用プログラム」が終了させられて、測定装置1からスマートフォン2に表示用データD1を送信することができなくなったときにも、処理部16が、通信可能状態が解除されたと判別して電源遮断処理を実行する。
 また、この測定システム100では、無線通信部14,24を使用した測定処理の後に、測定装置1の電源を遮断し忘れた状態において、測定装置1およびスマートフォン2の間のペアリングが維持されているときや、有線通信部15,25および信号ケーブルCを使用した測定処理の後に、測定装置1の電源を遮断し忘れた状態において、有線通信部15,25と信号ケーブルCとの接続が維持されているときであっても、その状態の測定システム100(スマートフォン2)が、測定処理の開始時点におけるスマートフォン2の現在位置を中心とする予め設定された範囲を外れたときに、測定装置1において電源遮断処理が実行されて電源が遮断される構成が採用されている。なお、測定装置1が測定現場に位置させられた状態においてスマートフォン2だけが測定現場から離間させられたときには、上記の「通信可能状態」が解除されて測定装置1の電源が遮断される。したがって、測定処理の終了後に、測定装置1およびスマートフォン2の双方が測定現場から離間させられたときを例にして、測定システム100の動作を説明する。
 この測定システム100では、スマートフォン2の処理部26が、「測定装置用プログラム」の開始を指示されたときに、スマートフォン2の現在位置を特定して、特定した現在位置を、ストレージメモリ装着部27に装着されたストレージメモリM、および本体メモリ21のいずれか予め設定された一方に記憶させる。この場合、GPSレシーバ29に電源が供給されてGPSレシーバ29がGPS信号Sgに基づく現在位置の測位を実行可能な状態となっているときには、処理部26は、GPSレシーバ29から出力された現在位置情報Dp2に基づいてスマートフォン2の現在位置を特定する。また、GPSレシーバ29に電源が投入されていないときや、GPSレシーバ29によるGPS信号Sgの受信が困難なとき(GPSレシーバ29による現在位置の測位が困難なとき)には、処理部26は、携帯電話通信部28を介して基地局からの現在位置情報Dp1を取得して、取得した現在位置情報Dp1に基づいてスマートフォン2の現在位置を特定する。
 また、処理部26は、「測定装置用プログラム」に従い、前述した測定処理の実行中に、GPSレシーバ29から出力された現在位置情報Dp2、または、携帯電話通信部28を介して受信した現在位置情報Dp1に基づき、スマートフォン2の現在位置を所定時間間隔(一例として、1分間隔)で特定する。さらに、処理部26は、現在位置を特定する都度、特定した現在位置が、測定処理の開始時に特定したスマートフォン2の現在位置を中心とする予め設定された範囲(一例として、半径50mの範囲)から外れているか否か(スマートフォン2が予め設定された範囲の外に移動したか否か)を判別する処理を、測定装置1から送信された表示用データD1に基づいて測定処理用画面30を表示させる処理、および操作部22の操作に応じて出力される操作データD0を測定装置1に送信する処理と並行して実行する。
 一方、測定システム100による測定処理が完了した後に、測定装置1の電源を遮断し忘れて(測定装置1の電源を投入したまま)、測定装置1およびスマートフォン2を携帯して測定現場を離れたときには、スマートフォン2が、予め設定された範囲の外に移動させられる。この際には、処理部26が、GPSレシーバ29から出力された現在位置情報Dp2、または、携帯電話通信部28を介して受信した現在位置情報Dp1に基づいて特定した現在位置が設定された範囲を外れたと判別し、一例として、図3に示すように、「測定装置をOFFにします。宜しいですか?」との電源遮断処理開始メッセージ36を測定処理用画面30(表示部23)に表示させると共に、「現在位置が設定された範囲を外れた時点からの経過時間」の計時を開始する。
 この際に、本例とは相違するが、例えば、GPSレシーバ29による測位の誤りや、基地局からの誤った現在位置を示す現在位置情報Dp1の送信に起因して、スマートフォン2が測定現場を離れていない(設定された範囲内にスマートフォン2が存在している)にも関わらず電源遮断処理開始メッセージ36が表示されたときには、利用者は、操作部22を操作して、「キャンセル」を選択する。これにより、電源遮断処理開始メッセージ36が消去されると共に、後述するように、電源遮断処理の実行を指示する操作データD0が測定装置1に送信されることなく、測定処理が継続される。
 一方、電源遮断処理開始メッセージ36の表示から30秒が経過するまでに「キャンセル」が選択されなかったとき、電源遮断処理開始メッセージ36の表示から30秒が経過する以前に「OK」が選択されたとき、並びに電源遮断処理開始メッセージ36の表示から30秒が経過するまでに「OK」および「キャンセル」のいずれも選択されなかったときのいずれかのときには、処理部26は、測定装置1に電源遮断処理を実行を指示する操作データD0を生成して、無線通信部24またはスマートフォン25を介して測定装置1に送信させる。これに応じて、測定装置1では、処理部16が電源遮断処理を実行して、測定装置1の電源を遮断する。また、スマートフォン2は、電源遮断処理の実行を指示する操作データD0を測定装置1に送信した後に、「測定装置用プログラム」を終了する。これにより、測定処理の終了後に測定装置1の電源を遮断し忘れたとしても、測定システム100が測定現場を離れることで、測定装置1の電源が自動的に遮断されて、不要な電力の消費が回避される。
 また、この測定システム100では、スマートフォン2のストレージメモリM(または、本体メモリ21)に記憶させた測定結果データD2を、携帯電話通信部28から、携帯電話通信網やインターネット通信網を介して、予め設定したデータサーバに転送することができる。なお、転送先のデータサーバについては、一例として、測定処理用画面30におけるMenuキー表示34の表示部位にタッチすることで表示されるメニュー画面(図示せず)において関連項目を選択することで表示部23に表示される設定画面において予め登録しておく。また、測定結果データD2の転送に際しては、Menuキー表示34の表示部位にタッチすることで表示されるメニュー画面(図示せず)において関連項目を選択することで、処理部26がストレージメモリMから測定結果データD2を読み出して、上記の各通信網を介して、登録されているデータサーバに送信する。なお、電子メールの添付ファイルとして測定結果データD2をスマートフォン2から任意のメールサーバに転送することもできる。
 このように、この測定装置1では、測定対象についての「電気的パラメータ(本例では、直流電圧値、交流電圧値および抵抗値)」を測定する測定部11と、測定装置1の動作状態、および測定部11の測定結果をスマートフォン2の表示部23に表示させるための表示用データD1を生成する処理部16と、処理部16の制御に従ってスマートフォン2に表示用データD1を送信する無線通信部14とを備えて構成されている。また、この測定システム100では、測定装置1と、測定装置1から送信された表示用データD1に基づいて測定装置1の動作状態および測定結果を表示部23に表示させる「測定装置用プログラム」がインストールされたスマートフォン2とを備えて構成されている。
 したがって、この測定装置1および測定システム100によれば、動作状態や測定結果を表示するための表示部が測定装置1に存在しなくても、無線通信部14から送信した表示用データD1に基づいて測定装置1の動作状態や測定部11による測定結果をスマートフォン2の表示部23に表示させることができるため、測定結果の読み取りが困難となる事態を招くことなく、表示部を不要として、測定装置1を十分に小形化および軽量化することができる。また、「測定装置」とは別体に専用の「表示装置」を設ける構成とは異なり、「スマートフォン」を所有している者にとっては、測定システム100を安価に構築することができる。さらに、無線通信によって測定装置1からスマートフォン2に表示用データD1を送信することにより、通信用のケーブルが絡み合うことがないため、測定装置1やスマートフォン2の取り扱いが十分に容易となる。加えて、他の通信機器を別途用意することなく、スマートフォン2が接続可能な各種通信網(携帯電話通信網等)を利用して「測定結果(本例では、測定結果データD2)」を任意の場所へ送信することができる。
 また、この測定装置1では、処理部16が、スマートフォン2から送信された操作データD0に応じて測定部11を制御して「電気的パラメータ」を測定させる。また、この測定システム100では、測定装置1と、操作部22から出力された操作信号S1に基づいて操作データD0を生成して測定装置1に送信すると共に測定装置1から送信された表示用データD1に基づいて測定装置1の動作状態および測定結果を表示部23に表示させる測定装置用プログラムがインストールされたスマートフォン2とを備えて構成されている。したがって、この測定装置1および測定システム100によれば、電源スイッチ等の必要最低限の操作スイッチを除いて、測定処理用の操作スイッチが不要となる分だけ、測定装置1を一層小形化および軽量化することができる。
 さらに、この測定装置1では、処理部16の制御に従って信号ケーブルCを介してスマートフォン2に表示用データD1を送信する有線通信部15を備えている。また、この測定システム100(測定装置1)では、処理部16の制御に従って信号ケーブルCを介してスマートフォン2に表示用データD1を送信すると共に信号ケーブルCを介してスマートフォン2からの操作データD0を受信する有線通信部15を備えている。したがって、この測定装置1および測定システム100によれば、無線通信の実行を制限されている場所においても信号ケーブルCを介して表示用データD1等を測定装置1からスマートフォン2に送信することができる。また、一般的には、無線通信よりも有線通信の方が測定装置1やスマートフォン2における電力消費量が少なくて済むため、測定装置1やスマートフォン2のバッテリ残量が少ないときに、無線通信しつつ測定処理を実行するよりも長い時間に亘って測定処理を実行することができる。
 また、この測定装置1では、処理部16が、スマートフォン2から電源遮断処理の実行を指示する操作データD0が送信されたときに操作データD0に従って電源遮断処理を実行して測定装置1の電源を遮断する。また、この測定システム100では、測定装置1と、操作部22から出力された操作信号S1に基づいて操作データD0を生成して測定装置1に送信すると共に測定装置1から送信された表示用データD1に基づいて測定装置1の動作状態および測定結果を表示部23に表示させ、かつ、携帯電話通信部28を介して受信した現在位置情報Dp1、またはGPSレシーバ29から出力された現在位置情報Dp2に基づいて特定した現在位置が予め設定された範囲を外れたときに操作データD0を測定装置1に送信して電源遮断処理を実行させる「測定装置用プログラム」がインストールされたスマートフォン2とを備えて構成されている。
 したがって、この測定装置1および測定システム100によれば、測定結果の読み取りが困難となる事態を招くことなく、表示部を不要として、測定装置1を十分に小形化および軽量化することができると共に、電源スイッチ等の必要最低限の操作スイッチを除いて、測定処理用の操作スイッチが不要となる分だけ、測定装置1を一層小形化および軽量化することができるだけでなく、測定処理の終了後に測定装置1の電源を遮断し忘れたとしても、その状態の測定システム100を携行して測定現場を離れたとき(スマートフォン2が予め設定された範囲外に移動したとき)に、測定装置1の電源が遮断されるため、測定処理を実行していない測定装置1によって不要な電力が消費される事態を確実かつ容易に回避することができる。
 さらに、この測定装置1によれば、スマートフォン2への表示用データD1の送信が可能な通信可能状態が解除されて表示用データD1を送信できなくなったときに電源遮断処理を実行することにより、測定処理の終了後に測定装置1の電源を遮断し忘れたとしても、測定装置1からスマートフォン2に表示用データD1を送信することができなくなったとき(通信可能状態が解除されたとき)に、測定装置1の電源が遮断されるため、スマートフォン2に表示用データD1に基づく測定処理用画面30を表示させていないとき、すなわち、測定処理を実行していないときに、測定装置1によって不要な電力が消費される事態を確実かつ容易に回避することができる。
 また、この測定システム100によれば、測定装置1に電源遮断処理を実行させるための操作データD0を送信した後に測定装置用プログラムを終了するようにプログラムされたプログラムを「測定装置用プログラム」としてスマートフォン2にインストールしたことにより、測定装置1の電源を遮断させたとき、すなわち、測定処理を終了したときに、スマートフォン2において継続して実行させる必要がなくなった測定装置用プログラムを、終了操作を行うことなく自動的に終了させることができるため、測定装置用プログラムの不要な実行によってスマートフォン2の電力が消費される事態を回避することがきる。
 また、この測定システム100によれば、表示用データD1から測定結果を抽出して測定結果データD2としてストレージメモリM(または、本体メモリ21)に記憶させる「データ保存処理」を実行可能なプログラムを「測定装置用プログラム」としてスマートフォン2にインストールしたことにより、測定装置1内に大容量のメモリを搭載することなく、測定部11による測定結果をスマートフォン2においてストレージメモリM(または、本体メモリ21)に記憶させて保存することができる。これにより、小さなメモリを搭載して測定装置1を製造できるため、測定装置1の製造コストを十分に低減することができる。
 なお、測定装置および測定システムの構成は、上記の測定装置1や、これを備えた測定システム100の構成に限定されない。例えば、ブルートゥース規格に準じた近距離無線通信を実行可能な無線通信部14を備えた測定装置1を例に挙げて説明したが、この構成に代えて、または、この構成に加えて、IrDA規格に準じた赤外線通信を実行可能な無線通信部(図示せず)を備えて「測定装置」を構成することもできる。このような構成を採用した場合においても、上記の測定装置1および測定システム100と同様の効果を奏することができる。また、赤外線通信によって操作データD0や表示用データD1を送受信する構成を採用した場合には、電波を発射する無線通信の利用を制限されている場所においても、操作データD0や表示用データD1を無線通信で送受信することができる。
 また、スマートフォン2の操作によってスマートフォン2から操作データD0を測定装置1に送信して測定装置1による測定処理を実行する例について説明したが、測定処理の実行に必要な操作スイッチを「測定装置」に設けると共に(図示せず)、「スマートフォン」から測定装置1に操作データD0を送信させずに「測定装置」の操作スイッチを操作して測定処理を実行し、その測定結果に対応する表示用データD1を「スマートフォン」に送信して測定結果を表示部23に表示させる構成(「測定装置」による測定処理を「スマートフォン」の操作によって実行しない構成)を採用することもできる。このような構成を採用した場合においても、測定結果を表示するための表示部が「測定装置」に不要となる分だけ、「測定装置」を十分に小形化および軽量化することができる。
 さらに、スマートフォン2において表示用データD1から抽出した測定結果を測定結果データD2としてストレージメモリM等に記憶させたり、ストレージメモリM等に記憶させた測定結果データD2をデータサーバ等に送信することができる「測定装置用プログラム」をスマートフォン2にインストールした例について説明したが、測定結果データD2の生成およびストレージメモリM等への記憶を実行することなく、単に、測定結果を「表示部」に表示させる処理だけを実行する「測定装置用プログラム」をスマートフォン2にインストールすることもできる。また、本体部10aおよびテストリード10b(接触子11a,11b)を備えた測定装置1を例に挙げて説明したが、「測定装置」はこれに限定されず、本体部に設けられた1つの接触子と接地電位との間の電圧値や抵抗値を測定する構成の測定装置(本体部10aとは別体のテストリード10bを備えていない測定装置)に本発明を適用することができる。
 本願発明に係る測定装置では、電気的パラメータを測定する測定部と、測定装置の動作状態、および測定部の測定結果をスマートフォンの表示部に表示させるための表示用データを生成する処理部と、処理部の制御に従ってスマートフォンに表示用データを送信する無線通信部とを備えて構成されている。したがって、本願発明に係る測定装置によれば、動作状態や測定結果を表示するための表示部が測定装置に存在しなくても、無線通信部から送信した表示用データに基づいて測定装置の動作状態や測定部による測定結果をスマートフォンの表示部に表示させることができるため、測定結果の読み取りが困難となる事態を招くことなく、表示部を不要として、測定装置を十分に小形化および軽量化することができる。
 100 測定システム、1 測定装置、2 スマートフォン、11 測定部、14,24 無線通信部、15,25 有線通信部、15a 接続コネクタ、16,26 処理部、21 本体メモリ、22 操作部、23 表示部、27 ストレージメモリ装着部、28 携帯電話通信部、29 GPSレシーバ、30 測定処理用画面、31a~31c ファンクション選択キー表示、32 ファンクション表示、33 測定結果表示、34 Menuキー表示、35 Endキー表示、36 電源遮断処理開始メッセージ、C 信号ケーブル、D0 操作データ、D1 表示用データ、D2 測定結果データ、Dp1,Dp2 現在位置情報、M ストレージメモリ、S1 操作信号、S2 制御信号、Sg GPS信号

Claims (13)

  1.  電気的パラメータを測定する測定部を備えた測定装置であって、
     当該測定装置の動作状態、および前記測定部の測定結果をスマートフォンの表示部に表示させるための表示用データを生成する処理部と、
     前記処理部の制御に従って前記スマートフォンに前記表示用データを送信する無線通信部とを備えている測定装置。
  2.  前記処理部は、前記スマートフォンから送信された操作データに応じて前記測定部を制御して前記電気的パラメータを測定させる請求項1記載の測定装置。
  3.  信号ケーブルを介して前記スマートフォンに接続可能に構成されて前記処理部の制御に従って当該信号ケーブルを介して前記スマートフォンに前記表示用データを送信する有線通信部を備えている請求項1記載の測定装置。
  4.  信号ケーブルを介して前記スマートフォンに接続可能に構成されて前記処理部の制御に従って当該信号ケーブルを介して前記スマートフォンに前記表示用データを送信すると共に当該信号ケーブルを介して当該スマートフォンからの前記操作データを受信する有線通信部を備えている請求項2記載の測定装置。
  5.  当該測定装置の電源を遮断する電源遮断処理を実行する制御部を備え、
     前記制御部は、前記スマートフォンから前記電源遮断処理の実行を指示する制御データが送信されたときに当該制御データに従って当該電源遮断処理を実行する請求項1または3記載の測定装置。
  6.  当該測定装置の電源を遮断する電源遮断処理を実行する制御部を備え、
     前記制御部は、前記スマートフォンから前記電源遮断処理の実行を指示する制御データが送信されたときに当該制御データに従って当該電源遮断処理を実行する請求項2または4記載の測定装置。
  7.  前記制御部は、前記スマートフォンへの前記表示用データの送信が可能な通信可能状態が解除されて当該表示用データを送信できなくなったときに前記電源遮断処理を実行する請求項5または6記載の測定装置。
  8.  請求項1または3記載の測定装置と、当該測定装置から送信された前記表示用データに基づいて当該測定装置の前記動作状態および前記測定結果を前記表示部に表示させる測定装置用プログラムがインストールされた前記スマートフォンとを備えて構成されている測定システム。
  9.  請求項2または4記載の測定装置と、操作部から出力された出力信号に基づいて前記操作データを生成して前記測定装置に送信すると共に当該測定装置から送信された前記表示用データに基づいて当該測定装置の前記動作状態および前記測定結果を前記表示部に表示させる測定装置用プログラムがインストールされた前記スマートフォンとを備えて構成されている測定システム。
  10.  請求項5記載の測定装置と、現在位置を測位して現在位置情報を出力する現在位置測位部を有する前記スマートフォンとを備えて構成された測定システムであって、
     前記スマートフォンは、前記測定装置から送信された前記表示用データに基づいて当該測定装置の前記動作状態および前記測定結果を前記表示部に表示させ、かつ、前記現在位置測位部から出力された前記現在位置情報に基づいて特定した現在位置が予め設定された範囲を外れたときに前記制御データを前記測定装置に送信して前記電源遮断処理を実行させる測定装置用プログラムがインストールされている測定システム。
  11.  請求項6記載の測定装置と、現在位置を測位して現在位置情報を出力する現在位置測位部を有する前記スマートフォンとを備えて構成された測定システムであって、
     前記スマートフォンは、操作部から出力された出力信号に基づいて前記操作データを生成して前記測定装置に送信すると共に当該測定装置から送信された前記表示用データに基づいて当該測定装置の前記動作状態および前記測定結果を前記表示部に表示させ、かつ、前記現在位置測位部から出力された前記現在位置情報に基づいて特定した現在位置が予め設定された範囲を外れたときに前記制御データを前記測定装置に送信して前記電源遮断処理を実行させる測定装置用プログラムがインストールされている測定システム。
  12.  前記スマートフォンには、前記測定装置用プログラムとして、前記測定装置に前記電源遮断処理を実行させるための前記制御データを送信した後に当該測定装置用プログラムを終了するようにプログラムされたプログラムがインストールされている請求項10または11記載の測定システム。
  13.  前記スマートフォンには、前記測定装置用プログラムとして、前記表示用データから前記測定結果を抽出してストレージメモリに記憶させるデータ保存処理を実行可能なプログラムがインストールされている請求項5から12のいずれかに記載の測定システム。
PCT/JP2012/050215 2011-01-14 2012-01-10 測定装置および測定システム WO2012096240A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201280005361.4A CN103329180B (zh) 2011-01-14 2012-01-10 测定装置及测定系统

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2011-005641 2011-01-14
JP2011005641 2011-01-14
JP2011288387A JP5839989B2 (ja) 2011-01-14 2011-12-28 測定システム
JP2011-288387 2011-12-28

Publications (1)

Publication Number Publication Date
WO2012096240A1 true WO2012096240A1 (ja) 2012-07-19

Family

ID=46507140

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/050215 WO2012096240A1 (ja) 2011-01-14 2012-01-10 測定装置および測定システム

Country Status (3)

Country Link
JP (1) JP5839989B2 (ja)
CN (1) CN103329180B (ja)
WO (1) WO2012096240A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015040858A (ja) * 2013-08-22 2015-03-02 テクトロニクス・インコーポレイテッドTektronix,Inc. プローブ及びその使用方法
WO2018145143A1 (en) * 2017-02-07 2018-08-16 Ingenuity Electronics Design Pty Ltd Electronic measuring device and method of use
CN112534275A (zh) * 2018-06-11 2021-03-19 特克特朗尼克公司 具有触摸屏的测试和测量探针

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5771645B2 (ja) * 2013-04-23 2015-09-02 日本電信電話株式会社 無線通信装置およびペアリング方法
JP7228261B2 (ja) * 2020-05-01 2023-02-24 共立電気計器株式会社 データ転送機能付きマルチメータ、マルチメータ本体、及びプログラム

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006005883A (ja) * 2004-06-21 2006-01-05 Matsushita Electric Ind Co Ltd 複合機及び複合機の遠隔操作方法
JP2006020016A (ja) * 2004-07-01 2006-01-19 Toshiba Lighting & Technology Corp 負荷制御システム
JP2006042070A (ja) * 2004-07-28 2006-02-09 Matsushita Electric Works Ltd 集合住宅用通話・監視統合システム
JP2007176042A (ja) * 2005-12-28 2007-07-12 King Jim Co Ltd ラベル印刷システム、ラベル印刷方法及びラベル印刷プログラム
JP2007193566A (ja) * 2006-01-19 2007-08-02 Mitsubishi Electric Corp Rfidシステム
JP2010218126A (ja) * 2009-03-16 2010-09-30 Toshiba Mitsubishi-Electric Industrial System Corp 人体装着センサ装置及びそれを含む行動解析監視装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006005883A (ja) * 2004-06-21 2006-01-05 Matsushita Electric Ind Co Ltd 複合機及び複合機の遠隔操作方法
JP2006020016A (ja) * 2004-07-01 2006-01-19 Toshiba Lighting & Technology Corp 負荷制御システム
JP2006042070A (ja) * 2004-07-28 2006-02-09 Matsushita Electric Works Ltd 集合住宅用通話・監視統合システム
JP2007176042A (ja) * 2005-12-28 2007-07-12 King Jim Co Ltd ラベル印刷システム、ラベル印刷方法及びラベル印刷プログラム
JP2007193566A (ja) * 2006-01-19 2007-08-02 Mitsubishi Electric Corp Rfidシステム
JP2010218126A (ja) * 2009-03-16 2010-09-30 Toshiba Mitsubishi-Electric Industrial System Corp 人体装着センサ装置及びそれを含む行動解析監視装置

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015040858A (ja) * 2013-08-22 2015-03-02 テクトロニクス・インコーポレイテッドTektronix,Inc. プローブ及びその使用方法
WO2018145143A1 (en) * 2017-02-07 2018-08-16 Ingenuity Electronics Design Pty Ltd Electronic measuring device and method of use
US11378589B2 (en) 2017-02-07 2022-07-05 Pokit Innovations Pty Ltd Electronic measuring device and method of use
AU2018218175B2 (en) * 2017-02-07 2022-12-22 Pokit Innovations Pty Ltd Electronic measuring device and method of use
CN112534275A (zh) * 2018-06-11 2021-03-19 特克特朗尼克公司 具有触摸屏的测试和测量探针
JP2021527215A (ja) * 2018-06-11 2021-10-11 テクトロニクス・インコーポレイテッドTektronix,Inc. タッチスクリーンを有する試験測定プローブ
US11719721B2 (en) 2018-06-11 2023-08-08 Tektronix, Inc. Test and measurement probe having a touchscreen
JP7402597B2 (ja) 2018-06-11 2023-12-21 テクトロニクス・インコーポレイテッド タッチスクリーンを有する試験測定プローブ

Also Published As

Publication number Publication date
JP5839989B2 (ja) 2016-01-06
JP2012160174A (ja) 2012-08-23
CN103329180B (zh) 2016-05-04
CN103329180A (zh) 2013-09-25

Similar Documents

Publication Publication Date Title
JP5839989B2 (ja) 測定システム
JP6310204B2 (ja) 測定システムに用いるゲートウェイデバイス及び携帯型測定デバイスから測定データを集める方法
JP6478915B2 (ja) モバイル装置ユーザインターフェースを備えた電子ロック
JP2014032677A (ja) パラメータ測定のためのハンドヘルド装置、システム、および方法
JP6576021B2 (ja) サーバ装置、制御システムおよび制御方法
EP3226015A1 (en) Wireless battery management system and method of operating the same
JP2015005856A5 (ja)
US20140287735A1 (en) Portable terminal, method for managing data in portable terminal, and storage medium storing data management processing program
WO2016037585A1 (en) Key ring attachable rechargeable mobile phone power and control device
EP2693941A1 (en) A device, a system and a method for alcohol measurement
JP2013243555A (ja) 情報処理装置、電源タップ、サーバ装置、情報処理システム、情報処理方法及びプログラム
US7602148B2 (en) Method for displaying battery charge levels of multiple apparatuses
JP5993598B2 (ja) ハンディ無線検針システムの一斉検針方法
JP5878411B2 (ja) 検針用無線子機、ハンディ無線検針システムおよび検針システム切り替え方法
JP2015118035A (ja) 充放電試験システムおよび試験結果管理方法
KR101773395B1 (ko) 스마트폰을 이용한 카드 타입 소지품 분실 방지 경보카드 및 그 장치
JP2010097390A (ja) データ書換システム
JP2012078001A (ja) 空気調和機
CN110646653A (zh) 电表移动检测方法、电路和装置
JP5408723B2 (ja) 車載装置
CN104000561A (zh) 多功能体温测量仪
JP5996300B2 (ja) 測定装置および測定システム
JP2022050749A (ja) データ処理用プログラム、データ処理装置および測定システム
JP6599101B2 (ja) 測定装置、携帯端末装置および測定システム
JP2003309494A (ja) 監視装置及び監視方法、並びに状態表示装置及び状態表示方法

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201280005361.4

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12734260

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12734260

Country of ref document: EP

Kind code of ref document: A1