WO2012085486A1 PCT/FR2011/053166 FR2011053166W WO2012085486A1 WO 2012085486 A1 WO2012085486 A1 WO 2012085486A1 FR 2011053166 W FR2011053166 W FR 2011053166W WO 2012085486 A1 WO2012085486 A1 WO 2012085486A1
Authority
WO
WIPO (PCT)
Prior art keywords
facing
elements
stabilizing
stabilizing element
outer face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/FR2011/053166
Other languages
English (en)
French (fr)
Inventor
Nicolas Freitag
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Terre Armee Internationale
Original Assignee
Terre Armee Internationale
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to EP11815532.4A priority Critical patent/EP2655750B1/fr
Priority to US13/997,184 priority patent/US8845237B2/en
Priority to MX2013007239A priority patent/MX2013007239A/es
Priority to CA2822414A priority patent/CA2822414C/fr
Priority to AU2011346953A priority patent/AU2011346953B2/en
Priority to JP2013545482A priority patent/JP5932833B2/ja
Application filed by Terre Armee Internationale filed Critical Terre Armee Internationale
Priority to ES11815532.4T priority patent/ES2516215T3/es
Publication of WO2012085486A1 publication Critical patent/WO2012085486A1/fr
Priority to ZA2013/04567A priority patent/ZA201304567B/en
Priority to IN1194MUN2013 priority patent/IN2013MN01194A/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00—Repair of damaged foundations or foundation structures
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00—Independent underground or underwater structures; Retaining walls
    • E02D29/02—Retaining or protecting walls
    • E02D29/0225—Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0241—Retaining or protecting walls comprising retention means in the backfill the retention means being reinforced earth elements

Definitions

  • the present invention relates to a method of modifying a civil engineering work using reinforced soil techniques, for example a reinforced embankment work.
  • the works concerned by the invention may have various uses such as for example traffic lanes, extend a building space, prevent the deterioration, erosion or falling stones of walls or rock walls, or create an aesthetic mass .
  • a reinforced soil structure generally combines a compacted backfill, a facing and reinforcements or stabilizing elements connected to the facing.
  • the stabilizing elements are placed in the soil with a density depending on the stresses that can be exerted on the structure, the thrust forces of the ground being taken up by the soil-reinforcement friction.
  • the facing is most often made from prefabricated concrete elements in the form of slabs or blocks, juxtaposed to cover the front face of the structure. There may be horizontal recesses on this front face between different levels of the facing, when the structure has one or more terraces.
  • Stabilization elements placed in the embankment are usually joined to the facing with the help of mechanical connection members that can take various forms. Once the work is completed, the stabilization elements distributed in the embankment transmit high loads, up to several tons. Their connection to the facing must be robust to maintain the cohesion of the whole. Although these structures in reinforced soil are very robust and powerful, it happens that in use, one realizes that it is necessary to make modifications of the structure.
  • a structure initially supporting four traffic lanes may need to be modified to accommodate six lanes.
  • the siding deteriorates, for example due to a use of the work not originally planned or due to a defect in the manufacture of the siding.
  • Concrete facing elements can suffer from concrete pathologies.
  • the concrete pathologies known to those skilled in the art which may lead to swelling of the facing elements include, for example, alkaline reactions occurring within the concrete or internal sulphate reactions.
  • the internal swelling of the crystals can lead to the cracking then to the progressive fragmentation of the concrete composing the facing.
  • This swelling can take place over several months or years. However, it is not detectable at the time of construction of the structure and this swelling can also be accelerated by adverse weather conditions.
  • Facing elements of a structure in reinforced soil play an important role in the stabilization of the structure.
  • these facing elements also play an architectonic role.
  • repair solutions consist essentially of replacing damaged or degraded siding elements.
  • the embankment is stabilized by injection of a concrete at the rear of the facing element
  • a new facing element is cast in place or the old facing element is replaced by a prefabricated element.
  • the invention thus proposes a method of modifying a structure in reinforced soil, said structure comprising:
  • a first facing comprising an outer face defining the front face of the structure
  • the modification process comprising the steps in which:
  • a second facing is arranged along the outer face of the first facing
  • the stabilization element is connected to the second facing.
  • the method according to the invention does not require any removal operation of the facing elements.
  • the implementation of the method according to the invention does not present risks of landslide or erosion so that the operations are simplified and the security significantly improved.
  • a method according to the invention may further comprise one or more of the following optional features considered individually or according to all possible combinations:
  • the disconnection of the stabilizing element of the first facing is made by opening from the outer face of said first facing, for example by sawing, percussion or coring;
  • the method further comprises a step where there is disposed on the outer face of the first facing a geotextile seal;
  • the method further comprises a step where there is disposed between the first and second siding a compressible material
  • the method further comprises a step of mechanically tensioning the stabilizing element after disconnecting the stabilizing element from the first facing;
  • the method further comprises a step of setting up a system for maintaining the mechanical tension of the stabilizing element before disconnecting the stabilizing element from the first facing;
  • the second facing is disposed against the first facing
  • the second facing is disposed along the outer face of the first facing so as to define a volume to be backfilled, the method further comprising a step during which bringing backfill material into said volume;
  • the second facing is disposed along the outer face of the first facing so as to define a volume to be backfilled, the method further comprising the steps in which:
  • the first and second facings respectively comprise a first and a second set of prefabricated elements, the prefabricated elements of the first and second assemblies having substantially identical shapes and dimensions, and the prefabricated elements of the second set are arranged in a substantially identical arrangement to that prefabricated elements of the first facing; and or
  • the second facing comprises a mesh to which the stabilizing element is connected, the second facing element being then obtained by shotcrete.
  • the invention also relates to a reinforced soil structure modified by means of a method according to the invention.
  • the invention will be better understood on reading the description which follows, given solely by way of example and with reference to the appended drawings in which:
  • FIG. 1 is a schematic side sectional view of a reinforced soil structure under construction
  • FIGS. 2a to 2d illustrate the introduction of a second facing by means of a method according to a first embodiment of the invention
  • FIGS. 3a to 3b illustrate the establishment of a second facing by means of a method according to a second embodiment of the invention
  • Figure 4 is a schematic side sectional view of a reinforced soil structure obtained by means of a method according to a third embodiment of one invention.
  • Figure 1 illustrates a retaining wall on reinforced soil.
  • a compacted embankment 1 in which are distributed stabilizing elements 2 and delimited on the front face of the structure by a first facing 3 formed by juxtaposing prefabricated elements 4 in the form of panels and on the rear side by the ground 5 against which is directed the retaining wall.
  • the stabilizing elements 2 are linear elements such as rolled steel reinforcements or geotextile strips.
  • the stabilizing elements 2 may comprise metal or synthetic reinforcements for example in the form of flexible strips spreading in planes horizontally at the rear of the first siding 3. It may especially be reinforcing strips based on polyethylene fibers wrapped in polyethylene.
  • the stabilizing elements 2 are anchored to the rear face of the facing elements 4, for example by means of expansion plugs, sealed tabs, metal nails or rings or any other anchoring means known to the man. of career.
  • the method according to the invention makes it possible to modify a structure in reinforced soil as shown in FIG. 2a.
  • the method according to the invention can for example enlarge the structure in reinforced soil. This may be of interest especially if the reinforced soil structure supports a road and it is desirable to widen this road.
  • This reinforced soil structure comprising a backfill 1, a first facing 3 comprising an outer face 8 defining the front face of the structure.
  • the first facing being composed of a set of first facing elements 4.
  • the reinforced soil structure further comprises first stabilizing elements 2 connected to the different first facing elements 4 and extending into a reinforced area of the embankment 1 located at the rear of the front face of the work.
  • Figure 2a illustrates a first step of the method according to the invention.
  • this first step of the method at least one of the stabilizing elements 2 connected preferably to the lowest facing is disconnected.
  • the stabilizing element 4 can be tensioned by means of return elements as described in the FR0312083 application.
  • the method according to this first embodiment then comprises a step of setting up a second facing illustrated in Figure 2b.
  • an element 14 of the second facing is disposed along the outer face of the first facing 4 so as to define a volume to be backfilled 16.
  • the method according to this first embodiment then comprises an embankment step illustrated in FIG. 2c.
  • backfill material is brought and compacted progressively in the volume 16 defined between the first facing element 4 and the second facing element 14, until reaching the level of the coring made in the first element facing 4.
  • backfill material materials that can be used as backfill material are natural soils, soils treated or stabilized with lime or hydraulic binder, recycling materials such as recycled concrete, road mills, some industrial combustion residues. or garbage, etc.
  • the method then comprises a step of setting up a second stabilizing element illustrated in FIG. 2d.
  • a step of setting up a second stabilizing element there is a stabilizing element 12 on the embankment previously brought and compacted.
  • This second stabilizing element 12 is connected to the first stabilizing element 2, so as to form a new stabilizing element comprising the first stabilizing element 2 and the second stabilizing element 12 connected to each other.
  • the second stabilizing element 12 may be connected to the first stabilizing element 2 by any connection means known to those skilled in the art.
  • Backfill material is then provided over the second stabilizing element 12 which has just been installed. This backfill material is compacted as and when it is added.
  • the steps can be repeated as much as necessary if several levels of stabilizing elements are arranged in the reinforced soil structure to be modified.
  • the new stabilizing element comprising the first and second stabilizing elements 2 and 12 after connecting the first and second stabilizing elements to each other.
  • This power can be done for example by means of a mechanical clamping device such as a tensioner.
  • the second facing element 14 has substantially the same shape and dimension as the first facing elements 4.
  • the implementation of the method is simplified and this gives the reinforced soil structure flexibility properties substantially identical to those of the original structure.
  • the method according to the invention makes it possible to repair a structure in reinforced soil are the elements of facing would have degraded.
  • This reinforced soil structure comprises a backfill 1, a first facing 3 having an outer face 8 defining the front face of the structure.
  • the first facing being composed of a set of first facing elements 4.
  • the reinforced soil structure further comprises first stabilizing elements 2 connected to the different first facing elements 4 and extending into a reinforced area of the embankment 1 located at the rear of the front face of the work.
  • the method according to the invention makes it possible to repair the structure without the need to replace the facing elements 4 one by one, thus avoiding a long, minute and risky process.
  • the method according to the invention comprises a first step during which a first stabilizing element 2 connected to a first facing element 4, preferably one of the first facing elements located at the base, is disconnected. of the work on reinforced soil.
  • This disconnection can be achieved for example by opening from the outer face of the first facing element 4, for example by wake, percussion or coring. Following this disconnection, it comes to have a second facing element 14 along the outer face of the first facing element, preferably against the first facing element. The first stabilizing element 2 is then connected to the second facing element 14 as illustrated in FIG. 3b.
  • the stabilizing element 2 can be maintained in tension after the coring step or can be tensioned once connected to the second facing element 14.
  • the second facing member 14 may be provided with anchoring means for anchoring the first stabilizing element 2 to the second facing member 14 and tensioning means, for example a tensioner .
  • a complete geotextile seal on the front face of the structure to to fix.
  • This seal can also be placed so as to cover the joints between the elements of the first facing; for example by gluing geotextile joint strips on the first facing.
  • a compressible sheet for example made of elastomer, may be placed between the first facing elements 4 and the second facing elements 14.
  • the stabilizing elements 2 are brought into tension before being connected to the second facing element 14 is facilitated.
  • This variant of the invention is particularly advantageous when the first facing elements 4 may continue to degrade over time, in particular, by swelling.
  • the new facing elements are substantially identical to the old facing elements and arranged so substantially identical to these.
  • the implementation of the method is simplified and this gives the reinforced soil structure flexibility properties substantially identical to those of the original structure.
  • a second facing comprising a lattice 16, for example a metal lattice, to which the stabilizing elements 2 will be connected.
  • the second facing element is then constituted by means of concrete spraying methods on the trellis to which the stabilizing elements 2 have been previously connected.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Retaining Walls (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Road Paving Structures (AREA)
PCT/FR2011/053166 2010-12-23 2011-12-22 Procédé de modification d'un ouvrage en sol renforcé Ceased WO2012085486A1 (fr)

Priority Applications (9)

Application Number Priority Date Filing Date Title
US13/997,184 US8845237B2 (en) 2010-12-23 2011-12-22 Method for modifying a reinforced soil structure
MX2013007239A MX2013007239A (es) 2010-12-23 2011-12-22 Metodo para modificar una estructura con un piso reforzado.
CA2822414A CA2822414C (fr) 2010-12-23 2011-12-22 Procede de modification d'un ouvrage en sol renforce
AU2011346953A AU2011346953B2 (en) 2010-12-23 2011-12-22 Method for modifying a structure with a reinforced floor
JP2013545482A JP5932833B2 (ja) 2010-12-23 2011-12-22 補強土壌構造を改良する方法
EP11815532.4A EP2655750B1 (fr) 2010-12-23 2011-12-22 Procédé de modification d'un ouvrage en sol renforcé
ES11815532.4T ES2516215T3 (es) 2010-12-23 2011-12-22 Procedimiento de modificación de una construcción de terreno reforzado
ZA2013/04567A ZA201304567B (en) 2010-12-23 2013-06-20 Method for modifying a reinforced soil structure
IN1194MUN2013 IN2013MN01194A (enExample) 2010-12-23 2013-06-20

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1061210 2010-12-23
FR1061210A FR2969673B1 (fr) 2010-12-23 2010-12-23 Procede de modification d'un ouvrage en sol renforce

Publications (1)

Publication Number Publication Date
WO2012085486A1 true WO2012085486A1 (fr) 2012-06-28

Family

ID=43759978

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/FR2011/053166 Ceased WO2012085486A1 (fr) 2010-12-23 2011-12-22 Procédé de modification d'un ouvrage en sol renforcé

Country Status (12)

Country Link
US (1) US8845237B2 (enExample)
EP (1) EP2655750B1 (enExample)
JP (1) JP5932833B2 (enExample)
AU (1) AU2011346953B2 (enExample)
CA (1) CA2822414C (enExample)
ES (1) ES2516215T3 (enExample)
FR (1) FR2969673B1 (enExample)
IN (1) IN2013MN01194A (enExample)
MX (1) MX2013007239A (enExample)
MY (1) MY168679A (enExample)
WO (1) WO2012085486A1 (enExample)
ZA (1) ZA201304567B (enExample)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1040472C2 (nl) * 2013-10-31 2015-05-04 Voets Gewapende Grondconstructies B V Werkwijze voor het vervaardigen van een gestabiliseerde grondconstructie met een of meer bekledingselementen en een gestabiliseerde grondconstructie met een of meer bekledingselementen, bekledingselement voor een gestabiliseerde grondconstructie, samenstel van een bekledingselement en een langgerekt element.

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6002348B1 (ja) * 2016-06-02 2016-10-05 Jfe商事テールワン株式会社 擁壁構造の補修方法
US12129614B2 (en) * 2017-05-22 2024-10-29 Louis Structures, LLC Wall structures with solid-waste fill-material

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0290941A1 (de) * 1987-05-14 1988-11-17 Kurt G. Dipl.-Ing. Ross Verfahren zur Sicherung von Stützmauern
WO1997005335A1 (en) * 1995-07-27 1997-02-13 Michel Equilbec Wall retention system
FR2860811A1 (fr) * 2003-10-13 2005-04-15 Freyssinet Int Stup Ouvrage en sol renforce et procede pour sa construction
WO2007102070A2 (en) * 2006-03-09 2007-09-13 Terre Armee Internationale Stabilized soil structure and facing elements for its construction
FR2913436A1 (fr) * 2007-03-05 2008-09-12 Terre Armee Internationale Soc Ouvrage en sol renforce et elements de renfort pour sa construction
US20090041552A1 (en) * 2007-08-10 2009-02-12 Westblock Systems, Inc. Retaining wall system

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4728225A (en) * 1985-02-11 1988-03-01 Schnabel Foundation Company Method of rehabilitating a waterfront bulkhead
US4961673A (en) * 1987-11-30 1990-10-09 The Reinforced Earth Company Retaining wall construction and method for construction of such a retaining wall
US5368414A (en) * 1991-07-19 1994-11-29 Miller; Vincent G. Method and system for rehabilitating a bulkhead
JPH0641994A (ja) * 1991-08-21 1994-02-15 Oyo Kikaku:Kk 急勾配盛土の表面形成方法
US5350256A (en) * 1991-11-26 1994-09-27 Westblock Products, Inc. Interlocking retaining walls blocks and system
US5558470A (en) * 1992-10-09 1996-09-24 Jte, Inc. System and method for adjustably anchoring traffic barriers and wall facing panels to the soldier beams of a wall
US5551810A (en) * 1994-06-08 1996-09-03 Schnabel Foundation Company Retaining wall with an outer face and method of forming the same
JP2002339363A (ja) * 2001-05-17 2002-11-27 Kazuo Yasumoto 盛土補強構造
US6802675B2 (en) * 2002-05-31 2004-10-12 Reinforced Earth Company Two stage wall connector
FR2860529B1 (fr) * 2003-10-03 2006-12-15 France Gabion Ouvrage de genie civil, element individuel de construction et procede de renforcement d'un tel ouvrage
GB0514891D0 (en) 2005-07-20 2005-08-24 Pearsalls Ltd Improvements in and relating to implants

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0290941A1 (de) * 1987-05-14 1988-11-17 Kurt G. Dipl.-Ing. Ross Verfahren zur Sicherung von Stützmauern
WO1997005335A1 (en) * 1995-07-27 1997-02-13 Michel Equilbec Wall retention system
FR2860811A1 (fr) * 2003-10-13 2005-04-15 Freyssinet Int Stup Ouvrage en sol renforce et procede pour sa construction
WO2007102070A2 (en) * 2006-03-09 2007-09-13 Terre Armee Internationale Stabilized soil structure and facing elements for its construction
FR2913436A1 (fr) * 2007-03-05 2008-09-12 Terre Armee Internationale Soc Ouvrage en sol renforce et elements de renfort pour sa construction
US20090041552A1 (en) * 2007-08-10 2009-02-12 Westblock Systems, Inc. Retaining wall system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1040472C2 (nl) * 2013-10-31 2015-05-04 Voets Gewapende Grondconstructies B V Werkwijze voor het vervaardigen van een gestabiliseerde grondconstructie met een of meer bekledingselementen en een gestabiliseerde grondconstructie met een of meer bekledingselementen, bekledingselement voor een gestabiliseerde grondconstructie, samenstel van een bekledingselement en een langgerekt element.
WO2015065169A1 (en) * 2013-10-31 2015-05-07 Huesker Synthetic Gmbh A method of constructing a reinforced earth structure

Also Published As

Publication number Publication date
MY168679A (en) 2018-11-29
MX2013007239A (es) 2013-08-15
FR2969673B1 (fr) 2013-02-08
EP2655750A1 (fr) 2013-10-30
FR2969673A1 (fr) 2012-06-29
JP2014503721A (ja) 2014-02-13
IN2013MN01194A (enExample) 2015-06-05
ZA201304567B (en) 2014-09-25
AU2011346953B2 (en) 2017-02-02
JP5932833B2 (ja) 2016-06-08
AU2011346953A1 (en) 2013-07-11
US20130294846A1 (en) 2013-11-07
CA2822414A1 (fr) 2012-06-28
US8845237B2 (en) 2014-09-30
CA2822414C (fr) 2019-02-12
ES2516215T3 (es) 2014-10-30
EP2655750B1 (fr) 2014-07-30

Similar Documents

Publication Publication Date Title
EP2352884B1 (fr) Ouvrage en sol renforce et elements de parement pour sa construction
EP1520933A1 (fr) Ouvrage de génie civil, élément individuel de construction et procédé de renforcement d'un tel ouvrage
EP0833988B1 (fr) Remblai allege
EP2118384B1 (fr) Ouvrage en sol renforce et elements de renfort pour sa construction
FR2860811A1 (fr) Ouvrage en sol renforce et procede pour sa construction
EP2655750B1 (fr) Procédé de modification d'un ouvrage en sol renforcé
FR2878268A1 (fr) Ouvrage en sol renforce et elements de parement pour sa construction
FR2792354A1 (fr) Structure de maconnerie et procede de renforcement associe
FR2682700A1 (fr) Dispositif pour la realisation d'un remblai renforce.
EP4172416A1 (fr) Structure d'absorption d'une énergie d'impact
EP4041961B1 (fr) Bloc de construction compressible à vide préfabriqué, pouvant s'intégrer dans les revêtements de galeries par méthodes traditionnelles ou par méthode au tunnelier
EP2729626B1 (fr) Procede de construction d'une structure et d'un matelas de repartition
FR2953231A1 (fr) Procede de confortement d’un terrain et ouvrage de confortement
EP4803701A1 (fr) Dispositif de construction d'un support pour l'ancrage d'une structure sur une surface irrégulière, système et procédés correspondants
FR2807456A1 (fr) Dispositif de soutenement et/ou de stabilisation de mur, merlon, talus
FR2913035A1 (fr) Ouvrage comprenant un parement dresse devant une paroi et des moyens d'attache par friction qui s'etendent entre la paroi et le parement a l'interieur d'un remblai, et procede de construction
EP1045090B1 (fr) Reparation d'éléments de maçonnerie
FR3144172A1 (fr) Procédé de réparation d’un ouvrage de construction, et élément porteur de charge résultant du procédé
EP2912230A1 (fr) Structure geotextile
JP2001323473A (ja) 法面保護枠用フレーム基材
EP1045091A1 (fr) Procédé de renforcement d'un élément de construction
FR2741643A1 (fr) Procede de renforcement d'ouvrages, constitues au moins d'un materiau non coherent, au moyen d'elements allonges de renfort et element de renfort pour la mise en oeuvre du procede
FR2516113A1 (fr) Armature pour paroi moulee dans le sol, paroi comportant une telle armature et son procede de realisation

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11815532

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2011815532

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2822414

Country of ref document: CA

ENP Entry into the national phase

Ref document number: 2013545482

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 13997184

Country of ref document: US

Ref document number: MX/A/2013/007239

Country of ref document: MX

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2011346953

Country of ref document: AU

Date of ref document: 20111222

Kind code of ref document: A