WO2012045629A2 - Procédé et dispositif de fabrication d'une bande métallique par coulée continue et laminage - Google Patents

Procédé et dispositif de fabrication d'une bande métallique par coulée continue et laminage Download PDF

Info

Publication number
WO2012045629A2
WO2012045629A2 PCT/EP2011/066889 EP2011066889W WO2012045629A2 WO 2012045629 A2 WO2012045629 A2 WO 2012045629A2 EP 2011066889 W EP2011066889 W EP 2011066889W WO 2012045629 A2 WO2012045629 A2 WO 2012045629A2
Authority
WO
WIPO (PCT)
Prior art keywords
slab
furnace
rolling
casting
thickness
Prior art date
Application number
PCT/EP2011/066889
Other languages
German (de)
English (en)
Other versions
WO2012045629A3 (fr
Inventor
Erich Hovestädt
Jürgen Seidel
Original Assignee
Sms Siemag Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sms Siemag Ag filed Critical Sms Siemag Ag
Priority to RU2013120545/02A priority Critical patent/RU2537629C2/ru
Priority to EP11763652.2A priority patent/EP2624971B1/fr
Publication of WO2012045629A2 publication Critical patent/WO2012045629A2/fr
Publication of WO2012045629A3 publication Critical patent/WO2012045629A3/fr

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/46Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
    • B21B1/463Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a continuous process, i.e. the cast not being cut before rolling

Definitions

  • the invention relates to a method for producing a metal strip by casting rolls, in which first in a casting machine a slab with nominal slab thickness is poured by discharging metal at a nominal casting speed from a mold, wherein the slab in the region of a strand guide by a number rollers are subjected to a thickness reduction, wherein the slab is then tempered in a furnace of defined length, wherein the slab is rolled behind the furnace in a rolling train and wherein in particular the slab behind the casting machine and in front of the furnace in a roughing mill of a reduction in thickness to a nominal deformed slab thickness or Vorbanddicke is subjected. Furthermore, the invention relates to a casting rolling mill.
  • the slabs or pre-strips are separated into individual slabs or individual pre-slats so that coils of the desired size are produced after hot-rolling.
  • Thin slab plants mainly work as a slab process.
  • the slab process it is characteristic that the conservation of energy and the required heating of the slab, for example in a roller hearth furnace, which is longer than the maximum slab length. This allows all slabs to be separated in such a way that the individual slab is completely in the oven within a certain period of time, ie neither in the casting machine nor in the casting machine.
  • nen Scheme still in the rolling range of the finishing train is engaged.
  • Typical thicknesses of the slabs are between 40 mm and 100 mm.
  • the so-called ISP process works with smaller intermediate strip thicknesses, which are typically in the range between 10 and 20 mm.
  • the individual intermediate belts are always engaged either in the casting area or in the rolling area of the finishing train.
  • the intermediate buffering of the pre-bands is carried out by means of two heated coiling ovens, which conserves the temperature of the pre-bands after reheating.
  • ESP process also known is the so-called ESP process. This is an endless process that originated from the ISP process. Since the ESP process must operate without a thermal intermediate buffer, all distances between the individual devices of the plant must be minimized in order to avoid the unprotected radiation of the heat of the intermediate strips to the environment. This inevitably results in small distances between the facilities.
  • the advantages and disadvantages of the ESP process are as follows:
  • the disadvantage is as follows: It is difficult to adhere to the final rolling temperature, since the rolling speed in the finishing train is coupled directly to the mass flow from the casting machine. This can only be achieved by a consistently high casting performance and by reheating the intermediate belt to very high temperatures after roughing. Furthermore, the required final rolling temperatures can not be achieved for all steel grades, so that certain grades can not be produced in continuous operation. Then it is disadvantageous that in a required roll change, the sequence must be completely stopped. In case of faults, for example, in the casting operation, the continuous operation is interrupted, it must then be converted to batch mode. be switched.
  • DE 10 2008 020 412 A1 describes a method for producing a metal strip by casting rolls, in which first a thin slab is cast in a casting machine. This is then rolled in a rolling mill using the primary heat of the casting process.
  • a first mode of operation can be carried out by direct coupling of the casting machine with the at least one rolling train, a continuous production of the metal strip (endless rolling);
  • a discontinuous production of the metal strip can take place by decoupling the casting machine from the at least one rolling train (batch operation).
  • the removed slabs or pre-bands can be brought to a desired temperature or kept at a desired temperature prior to being transported back into the main transport line.
  • an additional slab storage area - accessible by ferry - is created next to the main transport line.
  • the invention has for its object to provide a method of the type mentioned so or to create a corresponding device with which it is possible, without great effort on the one hand a sufficient buffer memory in the event of roll interruptions, z. B. due to a roll change, on the other hand to ensure the smallest possible furnace length to work optimally in continuous operation can.
  • a combined continuous / batch process is to be provided which overcomes the above disadvantages of the ESP process with cost effective means.
  • additional storage ovens adjacent to the transport line or oven extensions should be avoided.
  • the solution of this problem by the invention according to the method is characterized in that for temporary reduction, in particular for temporary interruption, the supply of rolling stock in the rolling mill at least one of the measures is performed: a) Increase the slab thickness behind the casting machine by reducing the thickness reduction of the slab in the field of strand guidance; b) lowering the casting speed from the nominal casting speed to a reduced value;
  • At least two of the measures a), b) or c) can also be used in combination in order to increase the desired effect.
  • the slab may be cut (separated) on a pair of shears located in front of the furnace.
  • the inlet velocity of the slab into the furnace is preferably reduced by at least a factor of 2 compared to the nominal value.
  • the thickness reduction of the slab in the area of the strand guide is preferably reduced by up to 40 mm.
  • the thickness reduction of the slab in the roughing mill can be reduced to zero.
  • the temporary reduction, in particular the temporary interruption, the supply of rolling stock in the rolling train can be made while in the rolling mill a roll change is made or there is a different production delay in the rolling mill.
  • the slab After making the temporary reduction in the supply of rolling stock in the rolling mill, the slab can be processed in batch batch operation. This is due to the process for the first slab after a Walzun- break.
  • the slab can, as long as a temporary reduction of the supply of rolling stock in the rolling train is not carried out, be processed in the continuous rolling process.
  • the method is applicable to a rolling mill, which is operated in continuous mode or in batch mode.
  • a), b) or c) such a buffer time or rolling interruption in the rolling train can be created or made possible, so that no casting breakage must take place in the casting machine, with a short furnace being used in particular.
  • the slab may also be subjected to heating by means of induction heating in front of or behind the furnace.
  • the casting rolling mill which comprises a casting machine, an oven and a rolling mill connected downstream of the furnace, wherein the furnace has a number of heating elements in order to temper a cast slab, is inventively characterized in that the furnace has a total length between 30 and 120 m ,
  • the furnace is preferably formed as a roller hearth furnace or as roller-skating encapsulation, wherein it preferably has insulated roller conveyor rollers.
  • heating elements for heating the slab may be arranged, in particular inductive heating elements.
  • a roughing mill or multiple roughing mills can be arranged.
  • the heating elements of the furnace are preferably arranged out of the transport line.
  • insulation elements may be present, which can be retracted as needed in the area of the furnace instead of the heating elements.
  • the proposed method allows maximizing the slab puff mass or buffer time in a furnace (preferably in a roller hearth furnace or a walking beam furnace) by increasing the casting thickness in comparison with the (nominal) production thickness. Furthermore, alternatively or additionally, a lowering of the casting speed can be provided in comparison with the (nominal) production speed.
  • the method further provides alternatively or additionally that a reduction of the decrease in an in-line roughing stand or Vorgerüsten behind the casting plant and in front of the furnace in comparison with the (nominal) decrease takes place during regular production.
  • the method may provide for maximizing the oven bake time (in a hot strip and continuous hot rolling mill) where the feed rate of the slabs into the oven in the buffer phase is at least a factor of 2 over the nominal (normal) feed rate in the case of normal production is reduced.
  • the casting thickness can be adjusted by LCR (liquid core reduction) of preferably 0 to 40 mm in order to influence the slab segment length in the furnace, preferably with the same ring weight.
  • the finished strip is changed to a desired practical finished strip thickness.
  • the process provides buffering time for a roll change or for bridging other production delays.
  • the proposed casting mill allows the combined batch and final rolling of hot strip.
  • the oven - preferably designed as a roller hearth furnace - is preferably between 30 and 120 m long.
  • the use of an inline roughing stand is preferred, but not mandatory.
  • the use of the change in thickness in the caster and in the in-line scaffold for the purpose of increasing the buffer time or shortening the kiln length can be provided in a single-strand caster rolling mill, but also in a multi-strand caster rolling mill.
  • the roller hearth furnace can be designed as a temperature holding furnace or alternatively serve for heating the slabs or intermediate bands.
  • roller table cover (roller table encapsulation) can also be used partially or instead of a roller hearth furnace.
  • An induction heater which is preferably arranged behind it, brings the pre-strip or the slab in front of the rolling train to the desired inlet temperature.
  • the induction heaters can be displaced laterally or upwards out of the line in order to be able to heat at a thin strip and to be able to drive out the induction heaters with a thick strip, in order to replace them with insulation elements (insulating elements, roller shutter encapsulation).
  • At least one inductive heating can also be provided between the stands of the finishing train.
  • a buffer time can be created or a rolling interruption can be realized in the rolling train (For example, to change a roller in the finishing train), without a casting demolition must be done in the casting machine.
  • FIG. 1 is a schematic side view of a casting and rolling plant according to a first embodiment of the invention
  • FIG. 2 shows in the illustration according to FIG. 1 a cast roll mill according to an alternative embodiment of the invention and in the illustration according to FIG. 1 a cast roll mill according to the alternative embodiment of the invention.
  • FIGS. 1 to 3 each show a cast roll plant in which a metal strip 1 is produced.
  • the cast strand is deflected by means of a strand guide 5 from the vertical to the horizontal.
  • rollers which are arranged in the strand guide 5 and exert a normal force on both sides of the slab surface.
  • the slab 3 leaves the casting machine 2 with the nominal thickness d 0 and speed v 0 in the belt conveying direction F.
  • the nominal values for the casting speed v 0 and the slab thickness d 0 are those values which are present in the scheduled production of the metal strip 1.
  • an in-line roughing stand 8 (rough rolling mill) is directly arranged, with which the slab 3 is further reduced in thickness.
  • a pair of scissors 9 Behind the pair of scissors 9, there follows an oven 6, which is designed, for example, as a roller hearth oven.
  • an oven 6 which is designed, for example, as a roller hearth oven.
  • At the position of the furnace 6 is also optionally the arrangement of a roller table cover or encapsulation preferably with insulated roller table rollers conceivable.
  • the cast rolling mill still has various other elements, which are shown in the three embodiments.
  • Fig. 1 is located behind the furnace 6, an induction heater 10.
  • This induction heating can optionally be arranged laterally displaced orWhenhebbar from the working position.
  • the tape can be heated by the induction heater; then be provided with thicker slabs that the induction heater is moved out of the working position and replaced by insulating elements to reduce the heat radiation from the slab.
  • the exemplary six rolling mills of the finishing train 7 are designated F1 to F6.
  • further induction heaters 1 1 can be provided between the rolling stands.
  • Behind the finishing train 7 are a cooling section 12 and reels 13. Further scissors 14 and 15 are provided.
  • Fig. 2 is a heat-insulating hood in the field of cold strand disposal 16 behind the roughing mill 8 and the scissors 9 mentioned. It can be equipped with a swiveling thermal insulation hood and insulated furnace rollers be. When casting the tape is observable here (pivoting the employment of the framework).
  • An induction heater 10 is provided here in front of the roller hearth furnace 6. In the solution according to FIG. 3 no induction heating is provided in the region of the furnace 6, however, in this embodiment the furnace 6 is made slightly longer.
  • the intermediate thickness or the inlet thickness in the roller hearth furnace 6 can be flexibly adjusted.
  • the buffer time results from the Ofen Pilllzeit given boundary conditions minus the rolling time in the finishing mill for the previously produced slab minus a reserve distance.
  • a final thickness is selected such that a high draw-in speed results in the finishing train.
  • the finished strip thickness is also increased accordingly to a desired practical finished strip thickness.
  • the stator windows are to be dimensioned sufficiently, it is a large stroke of the thickness adjustment (long-stroke cylinder or additional mechanical employment in the front scaffolding or a wedge adjustment) provided further, the engine speed ranges are provided in the finishing mill accordingly.
  • the roller hearth furnace is designed for the mode of operation and the maximum and minimum thin slab thicknesses of, for example, 120 or 20 (25) mm, and corresponding roller spacings and diameters are used.
  • the furnace length between the roughing stand 8 and the finishing train 7 is short and is preferably between 30 m and 120 m, depending on the required boundary conditions.
  • the kiln length is shorter than with conventional CSP plants (where it is between 200 and 240 m).
  • the shorter oven advantageously reduces the energy losses.
  • the heating of the (transformed) slab 3 can take place with a roller hearth furnace or the roller hearth furnace is operated as a temperature holding furnace and assisted by inductive heaters upstream and / or behind or inside the roller hearth furnace (see the three exemplary embodiments according to FIGS.
  • Parts of the furnace or the entire furnace may alternatively be designed in the form of a rolling cover or encapsulation with insulated roller table rollers.
  • the above procedure applies to continuous and batch operation in a 1-line system. In order to make better use of the production capacity of the finishing train, it may be useful to integrate a second casting strand in the case of batch operation. In the case of a 2-line system, the above procedure of batch operation is also carried out on the second line in order to reduce the roller hearth furnace length in total.
  • a flexible two-part ferry can be provided.
  • the half parallel ferry transports the thick slabs and the whole double ferry is intended for the normal thinner, longer slabs.
  • the ring weight of the slabs can be the same.
  • the slab 3 is understood to be the cast slab behind the casting machine 2 or else the deformed slab behind the rough rolling mill 8.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metal Rolling (AREA)

Abstract

L'invention concerne un procédé de fabrication d'une bande métallique (1) par coulée continue et laminage, consistant tout d'abord à couler dans une machine de coulée (2) une brame (3) d'une épaisseur nominale (d) par l'amenée de métal à une vitesse de coulée nominale (v) à partir d'une coquille (4), la brame (3) étant soumise dans la zone d'un corset de guidage (5) à une réduction d'épaisseur par un certain nombre de rouleaux, la brame (3) étant ensuite tempérée dans un four (6) d'une longueur définie, laminée dans un train de laminage (7) en aval du four (6) et en particulier soumise à une réduction d'épaisseur à une épaisseur nominale transformée ou à une épaisseur d'ébauche de bande en aval de la machine de coulée (2) et en amont du four (6) dans un laminoir dégrossisseur (8). L'invention vise d'une part à créer sans dépense excessive une réserve tampon suffisante en cas d'interruption du laminage et d'autre part à assurer une longueur de four aussi que courte que possible pour permettre un fonctionnement optimal en mode continu. A cet effet, au moins une des mesures suivantes est prise pour réduire temporairement, en particulier pour interrompre temporairement, l'amenée de produit à laminer dans le train de laminage (7) : a) l'augmentation de l'épaisseur de brame (d0) en aval de la machine de coulée (2) par une diminution de la réduction de l'épaisseur de la brame (3) dans la zone du corset de guidage (5) ; b) l'abaissement de la vitesse de coulée à une valeur réduite par rapport à la vitesse de coulée nominale (v0) ; c) la diminution de la réduction de l'épaisseur de la brame (3) dans le laminoir dégrossisseur (8). L'invention concerne également une installation de coulée continue et laminage.
PCT/EP2011/066889 2010-10-07 2011-09-28 Procédé et dispositif de fabrication d'une bande métallique par coulée continue et laminage WO2012045629A2 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
RU2013120545/02A RU2537629C2 (ru) 2010-10-07 2011-09-28 Способ и устройство для изготовления металлической полосы бесслитковой прокаткой
EP11763652.2A EP2624971B1 (fr) 2010-10-07 2011-09-28 Procédé de fabrication d'une bande métallique par coulée continue et laminage

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
DE102010047569.6 2010-10-07
DE102010047569 2010-10-07
DE201110004245 DE102011004245A1 (de) 2010-10-07 2011-02-16 Verfahren und Vorrichtung zum Herstellen eines Metallbandes durch Gießwalzen
DE102011004245.8 2011-02-16

Publications (2)

Publication Number Publication Date
WO2012045629A2 true WO2012045629A2 (fr) 2012-04-12
WO2012045629A3 WO2012045629A3 (fr) 2012-06-14

Family

ID=44719950

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2011/066889 WO2012045629A2 (fr) 2010-10-07 2011-09-28 Procédé et dispositif de fabrication d'une bande métallique par coulée continue et laminage

Country Status (4)

Country Link
EP (1) EP2624971B1 (fr)
DE (1) DE102011004245A1 (fr)
RU (1) RU2537629C2 (fr)
WO (1) WO2012045629A2 (fr)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109433826A (zh) * 2018-11-22 2019-03-08 中冶南方工程技术有限公司 中薄板坯连铸连轧机组及其生产方法
CN111633196A (zh) * 2020-06-16 2020-09-08 华南理工大学广州学院 一种小型压铸件废料清理机构
CN112218730A (zh) * 2018-05-23 2021-01-12 西马克集团有限公司 用于分批和连续操作的铸轧设备
CN115679232A (zh) * 2022-11-05 2023-02-03 中铝瑞闽股份有限公司 一种7系铝合金薄板的穿带生产方法

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT201700039423A1 (it) * 2017-04-10 2018-10-10 Arvedi Steel Eng S P A Impianto e procedimento per la produzione in molteplici modalita' di nastri e lamiere d’acciaio
CN112497018B (zh) * 2020-11-26 2022-12-23 昆山大庚不锈钢有限公司 一种合金钢板制备方法
WO2024023858A1 (fr) * 2022-07-29 2024-02-01 Danieli & C. Officine Meccaniche S.P.A. Four de chauffage pour une installation de production de produits laminés

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008020412A1 (de) 2007-08-24 2009-02-26 Sms Demag Ag Verfahren und Vorrichtung zum Herstellen eines Metallbandes durch Gießwalzen

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3821188A1 (de) * 1988-06-23 1989-12-28 Schloemann Siemag Ag Bandgiessanlage mit drehherdofen
TWI288676B (en) * 2002-07-06 2007-10-21 Sms Demag Ag Method and casting roller plant for the semi-endless or endless rolling by casting of a metal in particular a steel strip which may be transversely cut as required after solidification
AU2005339365B2 (en) * 2005-12-22 2011-12-01 Giovanni Arvedi Process and related plant for producing steel strips with solution of continuity
DE102008003222A1 (de) * 2007-09-13 2009-03-19 Sms Demag Ag Kompakte flexible CSP-Anlage für Endlos-, Semi-Endlos- und Batchbetrieb

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008020412A1 (de) 2007-08-24 2009-02-26 Sms Demag Ag Verfahren und Vorrichtung zum Herstellen eines Metallbandes durch Gießwalzen

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112218730A (zh) * 2018-05-23 2021-01-12 西马克集团有限公司 用于分批和连续操作的铸轧设备
CN112218730B (zh) * 2018-05-23 2024-01-30 西马克集团有限公司 用于分批和连续操作的铸轧设备
CN109433826A (zh) * 2018-11-22 2019-03-08 中冶南方工程技术有限公司 中薄板坯连铸连轧机组及其生产方法
CN109433826B (zh) * 2018-11-22 2023-09-15 中冶南方工程技术有限公司 中薄板坯连铸连轧机组及其生产方法
CN111633196A (zh) * 2020-06-16 2020-09-08 华南理工大学广州学院 一种小型压铸件废料清理机构
CN115679232A (zh) * 2022-11-05 2023-02-03 中铝瑞闽股份有限公司 一种7系铝合金薄板的穿带生产方法
CN115679232B (zh) * 2022-11-05 2023-09-08 中铝瑞闽股份有限公司 一种7系铝合金薄板的穿带生产方法

Also Published As

Publication number Publication date
EP2624971A2 (fr) 2013-08-14
RU2013120545A (ru) 2014-11-20
WO2012045629A3 (fr) 2012-06-14
DE102011004245A1 (de) 2012-04-12
EP2624971B1 (fr) 2018-02-21
RU2537629C2 (ru) 2015-01-10

Similar Documents

Publication Publication Date Title
DE69730750T2 (de) Verfahren zur herstellung eines stahlbandes
EP2624971B1 (fr) Procédé de fabrication d'une bande métallique par coulée continue et laminage
EP2195124B1 (fr) Installation csp compacte et flexible pour un fonctionnement continu, semi-continu et par lots
EP2964404B1 (fr) Procédé de production d'une bande métallique au moyen de cylindres de coulée
WO2009027045A1 (fr) Procédé et dispositif permettant la fabrication d'une bande métallique par coulée et laminage en continu
EP2462248B1 (fr) Procédé et dispositif de fabrication d'un acier micro-allié, en particulier d'un acier pour tubes
DE2256030A1 (de) Verfahren und vorrichtung zum walzen von heissen metallwerkstuecken sowie aufwickler zur anwendung beim aufwickeln von heissen metallwerkstuecken
WO2007090455A1 (fr) Four à rouleaux destiné au chauffage et/ou à la compensation de température de produits de coulée continue en acier ou en alliages d'acier et disposition d'un tel four en amont d'un train finisseur à feuillards à chaud
DE10038292A1 (de) Produktionsverfahren und -anlage zur Erzeugung von dünnen Flachprodukten
DE102017200731A1 (de) Verfahren zum Herstellen eines metallischen Bandes in einer Gießwalzanlage
WO2010121763A1 (fr) Procédé et dispositif de coulée continue d'une brame
DE10304318B4 (de) Verfahren zum Walzen von dünnen und/oder dicken Brammen aus Stahlwerkstoffen zu Warmband
EP3558563A1 (fr) Procédé servant à fabriquer en continu un feuillard à chaud enroulé dans une installation mixte de coulée-laminage, procédé servant à démarrer une installation mixte de coulée-laminage et installation mixte de coulée-laminage
WO1997004891A1 (fr) Procede de fonctionnement d'une installation de coulee continue et dispositif de mise en oeuvre
EP3016762B1 (fr) Installation de laminage de coulée continue et procédé de fabrication de produit laminé métallique
WO2016165933A1 (fr) Installation de coulée et de laminage et procédé servant à faire fonctionner ladite installation
EP2663412B1 (fr) Installation et procédé destinés à produire des bandes d'acier laminées à chaud
DE10357363B4 (de) Verfahren und Anlage zum Gießen und unmittelbar anschließenden Walzen von Gießsträngen aus Metall, insbesondere aus Stahlwerkstoffen, vorzugsweise Dünnsträngen
EP1474252B1 (fr) Procede de laminage continu d'un boyau de metal, notamment d'un boyau d'acier, produit a une vitesse de coulee et dont la section est celle d'une fine brame, et machine de coulee continue correspondante
WO2015014865A1 (fr) Installation de laminage de coulée continue de bandes métalliques
EP3027331B1 (fr) Installation de laminage de coulée continue et procédé de fabrication de brames
DE19639298C2 (de) Verfahren und Vorrichtung zur Erzeugung von dünnen Brammen mit direkt anschließendem Walzprozeß/Walzwerk
DE10025080A1 (de) Verfahren zum Herstellen von Metallband

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11763652

Country of ref document: EP

Kind code of ref document: A2

DPE2 Request for preliminary examination filed before expiration of 19th month from priority date (pct application filed from 20040101)
WWE Wipo information: entry into national phase

Ref document number: 2011763652

Country of ref document: EP

ENP Entry into the national phase in:

Ref document number: 2013120545

Country of ref document: RU

Kind code of ref document: A