WO2012043318A1 - 原子力発電プラント制御システムおよび原子力発電プラント検査方法 - Google Patents

原子力発電プラント制御システムおよび原子力発電プラント検査方法 Download PDF

Info

Publication number
WO2012043318A1
WO2012043318A1 PCT/JP2011/071433 JP2011071433W WO2012043318A1 WO 2012043318 A1 WO2012043318 A1 WO 2012043318A1 JP 2011071433 W JP2011071433 W JP 2011071433W WO 2012043318 A1 WO2012043318 A1 WO 2012043318A1
Authority
WO
WIPO (PCT)
Prior art keywords
power plant
nuclear power
control
control signal
signal
Prior art date
Application number
PCT/JP2011/071433
Other languages
English (en)
French (fr)
Inventor
弘志 藤本
篠原 広信
安武 秋月
俊樹 福井
田中 佑一
信二 木内
寛司 白澤
Original Assignee
三菱重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱重工業株式会社 filed Critical 三菱重工業株式会社
Priority to US13/825,256 priority Critical patent/US9666316B2/en
Priority to EP11828875.2A priority patent/EP2624092B1/en
Publication of WO2012043318A1 publication Critical patent/WO2012043318A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C17/00Monitoring; Testing ; Maintaining
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • G21D3/001Computer implemented control
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • G21D3/008Man-machine interface, e.g. control room layout
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Definitions

  • the present invention relates to a nuclear power plant control system and a nuclear power plant inspection method, and more particularly to a nuclear power plant control system and a nuclear power plant inspection method capable of performing a test during operation of the nuclear power plant.
  • Nuclear power plant control systems that control nuclear power plants are required to test each function periodically in order to maintain high reliability.
  • the test of each function of the nuclear power plant control system that controls the nuclear power plant is performed, for example, using a test apparatus during a periodic inspection period in which the nuclear reactor is stopped (see, for example, Patent Document 1).
  • the length of the periodic inspection period is limited, it is desirable to test each function of the nuclear power plant control system during plant operation as much as possible.
  • the periodic inspection period has been shortened, and there is a strong demand for enabling testing during plant operation.
  • the present invention has been made in view of the above, and an object of the present invention is to provide a nuclear power plant control system and a nuclear power plant inspection method capable of performing a test during operation of the nuclear power plant.
  • the present invention is a nuclear power plant control system, an operation unit that receives an operation for controlling a specific part of the nuclear power plant, and a control signal corresponding to the operation received by the operation unit.
  • Notification means for notifying that the signal has been transmitted to a predetermined position on a route connected to the part, and the control signal reaches the part at any position from the predetermined position to the part on the route
  • blocking means for blocking the operation.
  • the operation unit is provided in a central control room of the nuclear power plant, and the notification means notifies an operator located in the central control room.
  • the blocking means blocks the control signal from reaching the part when receiving a signal indicating that a test is being performed.
  • the test can be performed while the operation of the nuclear power plant is continued.
  • the blocking means is a majority circuit that allows a control signal to reach the part only when a plurality of control signals are received through different paths.
  • the test can be performed while the operation of the nuclear power plant is continued.
  • the blocking means receives a reactor trip signal as a control signal from at least two detection means among a plurality of detection means.
  • the operation unit is provided corresponding to each of the plurality of systems of detecting means, and a control signal indicating that the operation unit has been operated is detected at the predetermined position. Before the operation, a logical sum operation is performed with the signal output from the detection means of the system corresponding to the operation unit.
  • the present invention is a nuclear power plant inspection method, wherein the operation unit accepts an operation through an operation unit that accepts an operation for controlling a specific part of the nuclear power plant. Detecting a control signal corresponding to an operation at a predetermined position on a route leading to the part; notifying that the control signal is transmitted to the predetermined position; and the predetermined signal on the route And preventing the control signal from reaching the part at any position from the position to the part.
  • the control signal can be prevented from reaching the control target, and even when the control signal is blocked, the fact that the control signal is detected at a predetermined position is notified. It is possible to test whether or not the control signal reaches a predetermined position while continuing the operation of the nuclear power plant.
  • the nuclear power plant control system and the nuclear power plant inspection method according to the present invention have an effect that a test can be performed during operation of the nuclear power plant.
  • FIG. 1 is a diagram illustrating a schematic configuration of a nuclear power plant control system according to the first embodiment.
  • FIG. 2 is a flowchart illustrating the operation of the control device according to the first embodiment.
  • FIG. 3 is a diagram illustrating a schematic configuration of the nuclear power plant control system according to the second embodiment.
  • FIG. 4 is a flowchart illustrating the operation of the nuclear power plant control system according to the second embodiment.
  • FIG. 1 is a diagram illustrating a schematic configuration of a nuclear power plant control system 1 according to the first embodiment.
  • the nuclear power plant control system 1 includes an operation terminal 10, an operation panel 20, a control device 30, and a control target device 40.
  • the operation terminal 10 and the operation panel 20 are installed in the central control room 6.
  • the operation terminal 10 accepts various operations for the operation of the nuclear power plant and presents various information related to the operation status of the nuclear power plant.
  • the operation panel 20 includes a control button 21 and transmits a control signal for controlling the control target device 40 to the control device 30 in accordance with an operation received by the control button 21.
  • the operation panel 20 may be provided integrally with the operation terminal 10. Further, the control button 21 may be a physical button or a virtual button displayed on the screen.
  • the control target device 40 exhibits a predetermined function based on the control signal transmitted from the operation panel 20.
  • the control target device 40 corresponds to, for example, a valve, a pump, a heater, or the like provided in the nuclear power plant.
  • the control device 30 performs a predetermined calculation process based on the input signal and outputs a signal corresponding to the calculation result. Further, the control device 30 has a function of performing a test related to the operation of the control button 21 without stopping the operation of the nuclear power plant. As a configuration related to this function, the control device 30 includes a digital input unit (DI) 31, a digital output unit (DO) 32, and a control signal blocking unit 33.
  • DI digital input unit
  • DO digital output unit
  • the DI 31 receives the control signal transmitted from operation panel 20.
  • the DO 32 transmits a control signal to the control target device 40.
  • the control signal blocking unit 33 includes a NOT circuit 33a and an AND circuit 33b. Based on an operation performed on the operation terminal 10, a control signal received by the DI 31 is transmitted from the DO 32 to the control target device 40. To stop.
  • the operation terminal 10 is provided with a test permission button 11, and the operation terminal 10 is 1 (High) or 0 (Low) depending on the operation performed on the test permission button 11. Is transmitted to the control signal blocking unit 33 as a test permission signal.
  • the test permission signal is 1, it means that the test relating to the operation of the control button 21 is being performed, and when the test permission signal is 0, it means that the normal operation is being performed.
  • the test permission button 11 may be a physical button or a virtual button displayed on the screen.
  • the control signal blocking unit 33 inverts the test permission signal by the NOT circuit 33a and inputs it to the AND circuit 33b. Further, the control signal blocking unit 33 inputs the control signal received by the DI 31 to the AND circuit 33b.
  • the AND circuit 33b performs a logical product operation of the inverted test permission signal and the control signal, and outputs the operation result to the DO 32.
  • the control signal blocking unit 33 transmits the control signal received by the DI 31 from the DO 32 to the control target device 40. To stop. Further, when the test permission signal is 0, that is, during normal operation, the control signal blocking unit 33 causes the control signal received by the DI 31 to be transmitted from the DO 32 to the control target device 40.
  • control device 30 is configured so that the control signal received by the DI 31 is branched before being input to the control signal blocking unit 33, and the branched control signal is transmitted to the operation terminal 10.
  • the operation terminal 10 includes a notification lamp 12 and turns on the notification lamp 12 when a control signal is transmitted from the control device 30. That is, in the nuclear power plant control system 1, the control signal transmitted in response to the operation of the control button 21 is transmitted from the DI 31 to the control signal blocking unit 33 regardless of whether or not the control signal blocking unit 33 blocks the control signal.
  • the notification lamp 12 notifies that effect when the information is output toward.
  • test target portion 7 portions before and after DI 31
  • the operator in the central control room 6 performs the following operation.
  • the operator operates the test permission button 11 so that a signal indicating that a test relating to the operation of the control button 21 is being performed is transmitted from the operation terminal 10 to the control device 30. Subsequently, the operator operates the control button 21 and confirms that notification by the notification lamp 12 is performed according to the operation. At this time, the control signal is blocked by the control signal blocking unit 33 and does not reach the control target device 40. Then, after confirming the notification by the notification lamp 12, the control button 21 is returned to the original state, and the test permission button 11 is returned to the original state.
  • Such an operation makes it possible to test whether or not the test target portion 7 functions normally without changing the control state of the control target device 40 even when the nuclear power plant is in operation.
  • the nuclear power plant control system 1 has an advantage that equipment and personnel required for the test can be reduced.
  • a test of a nuclear power plant control system has been performed using a test device associated with a control device included in the nuclear power plant control system.
  • it is necessary to arrange an operator for operating the test device in the vicinity of the control device in addition to the operator in the central control room was there.
  • the nuclear power plant control system 1 since an operator can perform a test while being in the central control room 6, it is not necessary to place an operator near the control device 30, and a test device is not necessary.
  • FIG. 2 is a flowchart showing the operation of the control device 30.
  • the control device 30 turns on the notification lamp 12 of the operation terminal 10 as step S11.
  • step S12, Yes When the test permission signal transmitted from the operation terminal 10 is 1, that is, when the test relating to the operation of the control button 21 is being performed (step S12, Yes), the control signal blocking unit 33 performs step S13. The control signal is prevented from being transmitted to the device 40 to be controlled. On the other hand, when the test permission signal transmitted from the operation terminal 10 is 0, that is, during normal operation (step S12, No), the control signal blocking unit 33 sets the control signal as step S14. It transmits to the control object apparatus 40.
  • the control signal blocking unit 33 that blocks the control signal based on the operation of the test permission button 11 is provided, and the status of the control signal is notified regardless of the operation of the control signal blocking unit 33. Since the notification lamp 12 is provided, the operator located in the central control room 6 can perform the test of the nuclear power plant control system 1 while continuing the operation of the nuclear power plant.
  • the control signal reaches the control target device 40 during the test by operating the operation terminal 10 and transmitting a signal indicating that the test is being performed from the operation terminal 10 to the control signal blocking unit 33.
  • blocking it is also possible to block the control signal from reaching the controlled device during the test by another mechanism. Therefore, in the second embodiment, an example will be described in which a majority circuit is used to prevent a control signal from reaching a device to be controlled during a test.
  • FIG. 3 is a diagram illustrating a schematic configuration of the nuclear power plant control system 2 according to the second embodiment.
  • the nuclear power plant control system 2 includes operation terminals 50a to 50d, detection units 60a to 60d, control devices 70a to 70d, a trip control device 80, and a control rod drive device 90.
  • the operation terminals 50a to 50d are installed in the central control room 6.
  • Each of the detection units 60a to 60d includes a sensor for detecting the occurrence of an event that requires a reactor trip, and a threshold calculation unit for calculating a threshold value of the detection value of the sensor.
  • the detection units 60a to 60d transmit a reactor trip signal, which is a control signal for executing a reactor trip, to the control device 70 when the detection value of the sensor exceeds the threshold value.
  • the nuclear power plant control system 2 is configured such that the four systems independently detect the occurrence of an event that requires a reactor trip.
  • the trip control device 80 opens the power supply circuit to the control rod drive device 90 according to the detection status of the detection units 60a to 60d.
  • the trip control device 80 includes a majority circuit 81, and the majority circuit 81 is a control rod driving device when a reactor trip signal is transmitted from at least two of the four systems.
  • the power supply circuit to 90 is opened.
  • the majority circuit 81 By providing the majority circuit 81 in this way, the nuclear power plant control system 2 can be properly operated even if an abnormality occurs in a part of the system. Further, as will be described later, the majority circuit 81 also functions as a control signal blocking unit that blocks the power supply circuit to the control rod driving device 90 from being opened during the test.
  • the control rod driving device 90 trips the reactor by driving the control rod when the power supply circuit is opened in the trip control device 80 and power is supplied.
  • the control devices 70a to 70d perform predetermined calculation processing based on the input signal and output a signal corresponding to the calculation result.
  • the control device 70a includes a DI 71a, an OR circuit 72a, and a DO 73a as a configuration related to the reactor trip signal.
  • the control apparatus 70b has DI71b, OR circuit 72b, and DO73b as a structure relevant to a reactor trip signal.
  • the control apparatus 70c has DI71c, OR circuit 72c, and DO73c as a structure relevant to a reactor trip signal.
  • the control device 70d includes a DI 71d, an OR circuit 72d, and a DO 73d as a configuration related to the reactor trip signal.
  • the DIs 71a to 71d receive the reactor trip signals transmitted from the detection units 60a to 60d, respectively.
  • Each of the OR circuits 72a to 72d outputs, to the DOs 73a to 73d, signals obtained by ORing the reactor trip signals received by the DIs 71a to 71d and the pseudo reactor trip signals transmitted from the operation terminals 50a to 50d.
  • the DOs 73a to 73d transmit the signals output from the OR circuits 72a to 72d to the trip control device 80 as reactor trip signals, respectively. That is, from the control devices 70a to 70d, both the reactor trip signal transmitted from the detectors 60a to 60d and the pseudo reactor trip signal transmitted from the operation terminals 50a to 50d are both converted into the reactor trip signal. Is transmitted to the trip control device 80.
  • the operation terminals 50a to 50d accept various operations for the operation of the nuclear power plant and present various information regarding the operation status of the nuclear power plant.
  • the operation terminal 50a includes a pseudo trip button 51a and a notification lamp 52a as a configuration relating to the test of the nuclear power plant control system 2.
  • the operation terminal 50b includes a pseudo trip button 51b and a notification lamp 52b as a configuration relating to the test of the nuclear power plant control system 2.
  • the operation terminal 50c includes a pseudo trip button 51c and a notification lamp 52c as a configuration relating to the test of the nuclear power plant control system 2.
  • the operation terminal 50d includes a pseudo trip button 51d and a notification lamp 52d as a configuration relating to the test of the nuclear power plant control system 2.
  • the operation terminal 50a is the same system as the control device 70a.
  • the operation terminal 50b is the same system as the control device 70b.
  • the operation terminal 50c is the same system as the control device 70c.
  • the operation terminal 50d is the same system as the control device 70d.
  • the pseudo trip buttons 51a to 51d may be physical buttons or virtual buttons displayed on the screen.
  • the operation terminals 50a to 50d transmit a pseudo reactor trip signal to the corresponding system according to the performed operation.
  • the pseudo reactor trip signal transmitted from the operation terminal 50 reaches the trip control device 80 via the control device 70 of the same system.
  • at least two or more trip control devices 80 are provided.
  • the power supply circuit to the control rod driving device 90 is opened. Therefore, even if one of the pseudo trip buttons 51a to 51d is operated and a pseudo reactor trip signal is transmitted, the trip control device 80 does not open the power supply circuit to the control rod drive device 90. Absent.
  • the nuclear power plant control system 2 is configured such that the signal transmitted from the DOs 73a to 73d is branched before reaching the trip control device 80, and the branched signal is transmitted to the operation terminal 50 of the same system. ing.
  • the operation terminals 50a to 50d turn on the notification lamp 52 of the own device. That is, in the nuclear power plant control system 2, the signal transmitted in response to the operation of the pseudo trip buttons 51a to 51d is transmitted from the DO 73a to 73d even when the trip control device 80 blocks the reactor trip signal.
  • the notification lamps 52a to 52d notify that effect.
  • the test of the test target portion 8 (portion where signals are output from the DOs 73a to 73d) shown in FIG. 3 becomes necessary during operation of the nuclear power plant.
  • the operator in the central control room 6 performs the following operation.
  • the operator operates one of the pseudo trip buttons 51a to 51d to cause a pseudo reactor trip signal to be transmitted from the operation terminal 50, and the one corresponding to the operated button among the notification lamps 52a to 52d. Check that it lights up. The operator performs the same operation on the other buttons of the pseudo trip buttons 51a to 51d to confirm lighting.
  • test target portion 8 functions normally without opening the power supply circuit to the control rod drive device 90. can do.
  • the test can be performed while the operator is in the central control room 6, so that, similarly to the nuclear power plant control system 1, the test apparatus and the operation for operating the test apparatus It becomes unnecessary.
  • FIG. 4 is a flowchart showing the operation of the nuclear power plant control system 2.
  • the control device 70 when receiving a signal (reactor trip signal or pseudo reactor trip signal) as step S20, the control device 70 directs the received signal to the trip control device 80 as step S21. Send.
  • a signal reactor trip signal or pseudo reactor trip signal
  • the nuclear power plant control system 2 turns on the system corresponding to the received signal among the notification lamps 52a to 52d as step S22.
  • the trip control device 80 prevents the reactor trip signal from being transmitted to the control rod drive device 90 as step S24 if signals are not received from two or more systems (step S23, No). On the other hand, if the trip control device 80 has received signals from two or more systems (step S23, Yes), it transmits a reactor trip signal to the control rod drive device 90 as step S25.
  • the second embodiment it is possible to transmit a pseudo reactor trip signal for each system to the trip control device 80 having the majority circuit 81, and trip regardless of the operation of the majority circuit 81. Since the notification lamps 52a to 52d for notifying the transmission status of signals to the control device 80 are provided, the operator located in the central control room 6 can test the nuclear power plant control system 2 while continuing the operation of the nuclear power plant. Can be implemented.
  • the configuration of the nuclear power plant control system shown in each of the above embodiments can be arbitrarily changed without departing from the gist of the present invention.
  • the configuration of the nuclear power plant control system shown in each of the above embodiments can be arbitrarily combined.
  • the notification lamp is turned on to notify the result of the test.
  • a method of notifying the result of the test a method using a notification sound, a character or a symbol on the screen is used.
  • Various methods such as a method for displaying the results can be used.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Safety Devices In Control Systems (AREA)

Abstract

 原子力発電プラント制御システム1は、制御対象装置40を制御するための操作を受け付ける制御ボタン21と、制御ボタン21が受け付けた操作に対応する制御信号が操作盤20から制御対象装置40へとつながる経路上の所定の位置へ伝達されたことを通知する通知ランプ12と、試験許可ボタン11が受け付けた操作に応じて、経路上の前記所定の位置から制御対象装置40までの途中において、制御信号が制御対象装置40へ到達することを阻止する制御信号阻止部33とを備える。

Description

原子力発電プラント制御システムおよび原子力発電プラント検査方法
 本発明は、原子力発電プラント制御システムおよび原子力発電プラント検査方法に関し、特に、原子力発電プラントの運転中に試験を実施することができる原子力発電プラント制御システムおよび原子力発電プラント検査方法に関する。
 原子力発電プラントを制御する原子力発電プラント制御システムは、高い信頼性を維持するために、各機能を定期的に試験することを求められている。原子力発電プラントを制御する原子力発電プラント制御システムの各機能の試験は、例えば、原子炉が停止される定期点検期間に試験装置を用いて行われる(例えば、特許文献1参照)。
 近年では、ディジタル制御装置の適用により、原子力発電プラント制御システムに含まれる制御装置内のソフトウェアは、自己診断により、従来のような定期試験なしに信頼性を維持可能となっている。このため、手動による試験が必要な部位は、入出力部や外部のハードワイヤード機器(スイッチ、ケーブル等)となっている。
特開2002-108443号公報
 しかしながら、定期点検期間の長さには限りがあるため、原子力発電プラント制御システムの各機能の試験は、できるだけプラントの運転中に行うことが望ましい。特に、米国では、定期点検期間が短縮されており、プラントの運転中に試験を可能にすることへの要望が強くなっている。
 本発明は、上記に鑑みてなされたものであって、原子力発電プラントの運転中に試験を実施することができる原子力発電プラント制御システムおよび原子力発電プラント検査方法を提供することを目的とする。
 本発明は、1つの態様において、原子力発電プラント制御システムであって、原子力発電プラントの特定の部位を制御するための操作を受け付ける操作部と、前記操作部が受け付けた操作に対応する制御信号が前記部位へとつながる経路上の所定の位置へ伝達されたことを通知する通知手段と、前記経路上の前記所定の位置から前記部位までのいずれかの位置において、前記制御信号が前記部位へ到達することを阻止する阻止手段とを備える。
 この原子力発電プラント制御システムでは、制御信号が制御対象へ到達することを阻止可能にするとともに、制御信号を阻止した場合でも、制御信号が所定の位置で検出されたことを通知することとしたので、原子力発電プラントの運転を継続したままで、所定の位置まで制御信号が到達するか否かを試験することができる。
 また、本発明の他の態様において、前記操作部は、前記原子力発電プラントの中央制御室に設けられ、前記通知手段は、前記中央制御室に所在する運転員に対して通知を行う。
 この態様では、中央制御室に所在する運転員が試験を実施することができるので、試験に必要な要員を減らすことができる。
 また、本発明の他の態様において、前記阻止手段は、試験中である旨を示す信号を受信している場合に前記制御信号が前記部位へ到達することを阻止する。
 この態様では、試験中である旨を示す信号を送信することによって、原子力発電プラントの運転を継続したままで試験を実施することができる。
 また、本発明の他の態様において、前記阻止手段は、異なる経路を通じて複数の制御信号を受信した場合にのみ前記部位へ制御信号を到達させる多数決回路である。
 この態様では、複数の系統から信号を送信しないようにすることによって、原子力発電プラントの運転を継続したままで試験を実施することができる。
 また、本発明の他の態様において、前記阻止手段は、複数の系統の検出手段のうち、少なくとも2系統の検出手段から制御信号として原子炉トリップ信号を受信した場合に前記部位へ原子炉トリップ信号を到達させる多数決回路であり、前記操作部は、前記複数の系統の検出手段のそれぞれに対応して設けられ、前記操作部が操作されたことを示す制御信号は、前記所定の位置で検出される前に、前記操作部に対応する系統の検出手段が出力する信号と論理和演算される。
 この態様では、1つの系統から信号を送信することによって、原子力発電プラントの運転を継続したままで、原子炉トリップに関する試験を実施することができる。
 また、本発明は、他の態様において、原子力発電プラント検査方法であって、原子力発電プラントの特定の部位を制御するための操作を受け付ける操作部を通じて操作を受け付けるステップと、前記操作部が受け付けた操作に対応する制御信号を、前記部位へとつながる経路上の所定の位置で検出するステップと、前記制御信号が前記所定の位置へ伝達されたことを通知するステップと、前記経路上の前記所定の位置から前記部位までのいずれかの位置において、前記制御信号が前記部位へ到達することを阻止するステップとを含む。
 この原子力発電プラント検査方法では、制御信号が制御対象へ到達することを阻止可能にするとともに、制御信号を阻止した場合でも、制御信号が所定の位置で検出されたことを通知することとしたので、原子力発電プラントの運転を継続したままで、所定の位置まで制御信号が到達するか否かを試験することができる。
 本発明に係る原子力発電プラント制御システムおよび原子力発電プラント検査方法は、原子力発電プラントの運転中に試験を実施することができるという効果を奏する。
図1は、実施例1に係る原子力発電プラント制御システムの概略構成を示す図である。 図2は、実施例1に係る制御装置の動作を示すフロー図である。 図3は、実施例2に係る原子力発電プラント制御システムの概略構成を示す図である。 図4は、実施例2に係る原子力発電プラント制御システムの動作を示すフロー図である。
 以下に、本発明に係る原子力発電プラント制御システムおよび原子力発電プラント検査方法の実施例を図面に基づいて詳細に説明する。なお、この実施例によりこの発明が限定されるものではない。また、この実施例における構成要素には、当業者が容易に想定できるもの、実質的に同一のもの、いわゆる均等の範囲のものが含まれる。
 まず、図1を参照しながら、実施例1に係る原子力発電プラント制御システムの構成について説明する。図1は、実施例1に係る原子力発電プラント制御システム1の概略構成を示す図である。図1に示すように、原子力発電プラント制御システム1は、操作端末10と、操作盤20と、制御装置30と、制御対象装置40とを有する。操作端末10と操作盤20は、中央制御室6内に設置される。
 操作端末10は、原子力発電プラントの運転のための各種操作を受け付けるとともに、原子力発電プラントの運転状況に関する各種情報を提示する。操作盤20は、制御ボタン21を有し、制御ボタン21が受け付けた操作に応じて、制御対象装置40を制御するための制御信号を制御装置30へ送信する。なお、操作盤20は、操作端末10と一体に設けられていてもよい。また、制御ボタン21は、物理的なボタンであってもよいし、画面上に表示される仮想的なボタンであってもよい。
 制御対象装置40は、操作盤20が送信した制御信号に基づいて所定の機能を発揮する。制御対象装置40は、例えば、原子力発電プラントに設けられた弁、ポンプ、ヒータ等に相当する。
 制御装置30は、入力された信号に基づいて所定の演算処理を行い、演算結果に応じた信号を出力する。また、制御装置30は、原子力発電プラントの運転を停止することなく制御ボタン21の操作に関する試験を行う機能をもつ。この機能に関連する構成として、制御装置30は、デジタル入力部(DI)31と、デジタル出力部(DO)32と、制御信号阻止部33とを有する。
 DI31は、操作盤20から送信された制御信号を受信する。DO32は、制御対象装置40へ制御信号を送信する。制御信号阻止部33は、NOT回路33aと、AND回路33bとを備え、操作端末10に対して行われた操作に基づいて、DI31で受信された制御信号がDO32から制御対象装置40へ送信されるのを阻止する。
 具体的には、操作端末10には、試験許可ボタン11が設けられており、操作端末10は、試験許可ボタン11に対して行われた操作に応じて、1(High)または0(Low)を試験許可信号として制御信号阻止部33へ送信する。ここで、試験許可信号が1である場合、制御ボタン21の操作に関する試験中であることを意味し、試験許可信号が0である場合、通常の運転中であることを意味するものとする。なお、試験許可ボタン11は、物理的なボタンであってもよいし、画面上に表示される仮想的なボタンであってもよい。
 制御信号阻止部33は、試験許可信号をNOT回路33aで反転させてAND回路33bに入力させる。また、制御信号阻止部33は、DI31で受信された制御信号をAND回路33bに入力させる。AND回路33bは、反転された試験許可信号と制御信号の論理積演算を行い、演算結果をDO32へ出力する。
 したがって、制御信号阻止部33は、試験許可信号が1の場合、すなわち、制御ボタン21の操作に関する試験中である場合には、DI31で受信された制御信号がDO32から制御対象装置40へ送信されるのを阻止する。また、制御信号阻止部33は、試験許可信号が0の場合、すなわち、通常の運転中である場合には、DI31で受信された制御信号をDO32から制御対象装置40へ送信させる。
 また、制御装置30は、DI31で受信された制御信号が制御信号阻止部33に入力される前に分岐され、分岐された制御信号が操作端末10へ送信されるように構成されている。操作端末10は、通知ランプ12を備え、制御装置30から制御信号が送信されると通知ランプ12を点灯させる。すなわち、原子力発電プラント制御システム1は、制御信号阻止部33が制御信号を阻止しているか否かに関わらず、制御ボタン21の操作に応じて送信された制御信号がDI31から制御信号阻止部33へ向けて出力されると、その旨が通知ランプ12によって通知されるように構成されている。
 以上のような構成を有する原子力発電プラント制御システム1において、原子力発電プラントの運転中に制御ボタン21の操作に関して図1に示す試験対象部分7(DI31の前後の部分)の試験が必要になった場合、中央制御室6内の運転員は以下のような操作を行う。
 まず、運転員は、試験許可ボタン11を操作して、制御ボタン21の操作に関する試験中であることを示す信号が操作端末10から制御装置30へ送信される状態とする。続いて、運転員は、制御ボタン21を操作し、操作に応じて通知ランプ12による通知が行われるのを確認する。このとき、制御信号は制御信号阻止部33によって阻止され、制御対象装置40へは到達しない。そして、通知ランプ12による通知を確認した後、制御ボタン21を元の状態へ戻し、さらに、試験許可ボタン11を元の状態へ戻す。
 このような操作により、原子力発電プラントが運転中であっても、制御対象装置40の制御状態を変更することなく、試験対象部分7が正常に機能するか否かを試験することができる。
 また、原子力発電プラント制御システム1には、試験に必要な設備と要員を減らすことができるという利点がある。従来、原子力発電プラント制御システムの試験は、原子力発電プラント制御システムに含まれる制御装置に付随する試験装置を用いて行われていた。このため、従来の原子力発電プラント制御システムでは、原子力発電プラントの運転中に試験を行うには、中央制御室内の運転員に加えて、制御装置近辺に試験装置を操作する操作員を配置する必要があった。原子力発電プラント制御システム1では、運転員が中央制御室6に所在したまま試験を実施できるため、制御装置30近辺に操作員を配置する必要がなく、また、試験装置が不要となっている。
 次に、図1に示した制御装置30の動作について図2を参照しながら説明する。図2は、制御装置30の動作を示すフロー図である。図2に示すように、ステップS10として、制御装置30のDI31で制御信号が受信されると、制御装置30は、ステップS11として、操作端末10の通知ランプ12を点灯させる。
 そして、操作端末10から送信される試験許可信号が1である場合、すなわち、制御ボタン21の操作に関する試験中である場合には(ステップS12,Yes)、制御信号阻止部33が、ステップS13として、制御信号が制御対象装置40へ送信されるのを阻止する。一方、操作端末10から送信される試験許可信号が0である場合、すなわち、通常の運転中である場合には(ステップS12,No)、制御信号阻止部33は、ステップS14として、制御信号を制御対象装置40へ送信させる。
 上述してきたように、実施例1では、試験許可ボタン11の操作に基づいて制御信号を阻止する制御信号阻止部33を設けるとともに、制御信号阻止部33の動作にかかわらず制御信号の状況を通知する通知ランプ12を設けたので、中央制御室6に所在する運転員が、原子力発電プラントの運転を継続したまま原子力発電プラント制御システム1の試験を実施することができる。
 実施例1では、操作端末10を操作して操作端末10から制御信号阻止部33へ試験中である旨を示す信号を送信することによって試験中に制御信号が制御対象装置40へ到達するのを阻止する例を示したが、他の仕組みによって試験中に制御信号が制御対象の装置へ到達するのを阻止することとしてもよい。そこで、実施例2では、多数決回路を利用して、試験中に制御信号が制御対象の装置へ到達するのを阻止する例について説明する。
 まず、図3を参照しながら、実施例2に係る原子力発電プラント制御システムの構成について説明する。図3は、実施例2に係る原子力発電プラント制御システム2の概略構成を示す図である。図3に示すように、原子力発電プラント制御システム2は、操作端末50a~50dと、検出部60a~60dと、制御装置70a~70dと、トリップ制御装置80と、制御棒駆動装置90とを有する。操作端末50a~50dは、中央制御室6内に設置される。
 検出部60a~60dは、それぞれ、原子炉のトリップが必要な事象の発生を検出するためのセンサと、センサの検出値を閾値演算するための閾値演算部とを有する。そして、検出部60a~60dは、センサの検出値が閾値を超過した場合に、原子炉のトリップを実行させるための制御信号である原子炉トリップ信号を制御装置70へ送信する。このように、原子力発電プラント制御システム2は、4つの系統が、それぞれ独立して、原子炉のトリップが必要な事象の発生を検出するように構成されている。
 トリップ制御装置80は、検出部60a~60dでの検出状況に応じて、制御棒駆動装置90への電源供給回路を開放する。具体的には、トリップ制御装置80は、多数決回路81を備え、多数決回路81は、4つの系統のうち、少なくとも2つ以上の系統から原子炉トリップ信号が送信された場合に、制御棒駆動装置90への電源供給回路を開放する。
 このように多数決回路81を設けることにより、一部の系統に異常が生じても、原子力発電プラント制御システム2を適正に動作させることができる。また、多数決回路81は、後述するように、試験中に制御棒駆動装置90への電源供給回路が開放されるのを阻止する制御信号阻止部としても機能する。
 制御棒駆動装置90は、トリップ制御装置80において電源供給回路が開放され、電源が供給されるようになると、制御棒を駆動して原子炉をトリップさせる。
 制御装置70a~70dは、入力された信号に基づいて所定の演算処理を行い、演算結果に応じた信号を出力する。制御装置70aは、原子炉トリップ信号に関連する構成として、DI71aと、OR回路72aと、DO73aとを有する。制御装置70bは、原子炉トリップ信号に関連する構成として、DI71bと、OR回路72bと、DO73bとを有する。制御装置70cは、原子炉トリップ信号に関連する構成として、DI71cと、OR回路72cと、DO73cとを有する。制御装置70dは、原子炉トリップ信号に関連する構成として、DI71dと、OR回路72dと、DO73dとを有する。
 DI71a~71dは、それぞれ、検出部60a~60dから送信された原子炉トリップ信号を受信する。OR回路72a~72dは、それぞれ、DI71a~71dで受信された原子炉トリップ信号と操作端末50a~50dから送信された擬似的な原子炉トリップ信号を論理和演算した信号をDO73a~73dへ出力する。DO73a~73dは、それぞれ、OR回路72a~72dから出力された信号を、原子炉トリップ信号としてトリップ制御装置80へ送信する。すなわち、制御装置70a~70dからは、検出部60a~60dから送信された原子炉トリップ信号と、操作端末50a~50dから送信された擬似的な原子炉トリップ信号のいずれもが、原子炉トリップ信号としてトリップ制御装置80へ送信される。
 操作端末50a~50dは、原子力発電プラントの運転のための各種操作を受け付けるとともに、原子力発電プラントの運転状況に関する各種情報を提示する。操作端末50aは、原子力発電プラント制御システム2の試験に関する構成として、疑似トリップボタン51aと、通知ランプ52aとを有する。操作端末50bは、原子力発電プラント制御システム2の試験に関する構成として、疑似トリップボタン51bと、通知ランプ52bとを有する。操作端末50cは、原子力発電プラント制御システム2の試験に関する構成として、疑似トリップボタン51cと、通知ランプ52cとを有する。操作端末50dは、原子力発電プラント制御システム2の試験に関する構成として、疑似トリップボタン51dと、通知ランプ52dとを有する。
 操作端末50aは、制御装置70aと同一の系統である。操作端末50bは、制御装置70bと同一の系統である。操作端末50cは、制御装置70cと同一の系統である。操作端末50dは、制御装置70dと同一の系統である。なお、疑似トリップボタン51a~51dは、物理的なボタンであってもよいし、画面上に表示される仮想的なボタンであってもよい。
 操作端末50a~50dは、疑似トリップボタン51a~51dが操作されると、行われた操作に応じて、対応する系統へ向けて擬似的な原子炉トリップ信号を送信する。操作端末50から送信された擬似的な原子炉トリップ信号は、同一系統の制御装置70を経て、トリップ制御装置80へと到達するが、上述したように、トリップ制御装置80は、少なくとも2つ以上の系統から信号が送信された場合に、制御棒駆動装置90への電源供給回路を開放する。このため、疑似トリップボタン51a~51dの1つが操作されて擬似的な原子炉トリップ信号が送信されても、トリップ制御装置80によって、制御棒駆動装置90への電源供給回路が開放されることはない。
 また、原子力発電プラント制御システム2は、DO73a~73dから送信された信号がトリップ制御装置80に到達する前に分岐され、分岐された信号が同一系統の操作端末50へ送信されるように構成されている。操作端末50a~50dは、分岐された信号を受信すると、自装置の通知ランプ52を点灯させる。すなわち、原子力発電プラント制御システム2は、トリップ制御装置80が原子炉トリップ信号を阻止している場合であっても、疑似トリップボタン51a~51dの操作に応じて送信された信号がDO73a~73dからトリップ制御装置80へ向けて出力されると、その旨が通知ランプ52a~52dによって通知されるように構成されている。
 以上のような構成を有する原子力発電プラント制御システム2において、原子力発電プラントの運転中に図3に示す試験対象部分8(DO73a~73dから信号が出力される部分)の試験が必要になった場合、中央制御室6内の運転員は以下のような操作を行う。
 まず、運転員は、疑似トリップボタン51a~51dの1つを操作して、擬似的な原子炉トリップ信号を操作端末50から送信させ、通知ランプ52a~52dのうち操作したボタンに対応するものが点灯するのを確認する。運転員は、疑似トリップボタン51a~51dの他のボタンについても同様の操作を行って点灯の確認を行う。
 このような操作により、原子力発電プラントが運転中であっても、制御棒駆動装置90への電源供給回路を開放させることなく、試験対象部分8が正常に機能するか否かを系統ごとに試験することができる。
 また、原子力発電プラント制御システム2では、運転員が中央制御室6に居ながらにして試験を行うことができるため、原子力発電プラント制御システム1と同様に、試験装置と、試験装置を操作する操作員とが不要となっている。
 次に、図3に示した原子力発電プラント制御システム2の動作について図4を参照しながら説明する。図4は、原子力発電プラント制御システム2の動作を示すフロー図である。図4に示すように、制御装置70は、ステップS20として、信号(原子炉トリップ信号または擬似的な原子炉トリップ信号)を受信すると、ステップS21として、受信した信号をトリップ制御装置80へ向けて送信する。
 このとき、原子力発電プラント制御システム2は、ステップS22として、通知ランプ52a~52dのうち受信した信号に対応する系統のものを点灯させる。
 そして、トリップ制御装置80は、信号を2系統以上から受信していなければ(ステップS23,No)、ステップS24として、原子炉トリップ信号が制御棒駆動装置90へ送信されるのを阻止する。一方、トリップ制御装置80は、信号を2系統以上から受信していれば(ステップS23,Yes)、ステップS25として、原子炉トリップ信号を制御棒駆動装置90へ送信する。
 上述してきたように、実施例2では、多数決回路81を有するトリップ制御装置80へ1系統ずつ擬似的な原子炉トリップ信号を送信することを可能にするとともに、多数決回路81の動作にかかわらずトリップ制御装置80への信号の送信状況を通知する通知ランプ52a~52dを設けたので、中央制御室6に所在する運転員が、原子力発電プラントの運転を継続したまま原子力発電プラント制御システム2の試験を実施することができる。
 なお、上記の各実施例で示した原子力発電プラント制御システムの構成は、本発明の要旨を逸脱しない範囲で任意に変更することができる。例えば、上記の各実施例で示した原子力発電プラント制御システムの構成は、任意に組み合わせることができる。
 また、上記の各実施例では試験の結果を通知するために通知ランプを点灯させることとしたが、試験の結果を通知する方式としては、通知音を用いる方式、画面上に文字やシンボルを用いて結果を表示する方式等の各種方式を用いることができる。
1、2 原子力発電プラント制御システム
6 中央制御室
7、8 試験対象部分
10、50a~50d 操作端末
11 試験許可ボタン
12、52a~52d 通知ランプ
20 操作盤
21 制御ボタン
30、70a~70d 制御装置
31、71a~71d DI
32、73a~73d DO
33 制御信号阻止部
33a NOT回路
33b AND回路
40 制御対象装置
51a~51d 疑似トリップボタン
60a~60d 検出部
72a~72d OR回路
80 トリップ制御装置
81 多数決回路
90 制御棒駆動装置

Claims (6)

  1.  原子力発電プラントの特定の部位を制御するための操作を受け付ける操作部と、
     前記操作部が受け付けた操作に対応する制御信号が前記部位へとつながる経路上の所定の位置へ伝達されたことを通知する通知手段と、
     前記経路上の前記所定の位置から前記部位までのいずれかの位置において、前記制御信号が前記部位へ到達することを阻止する阻止手段と
     を備えることを特徴とする原子力発電プラント制御システム。
  2.  前記操作部は、前記原子力発電プラントの中央制御室に設けられ、
     前記通知手段は、前記中央制御室に所在する運転員に対して通知を行うことを特徴とする請求項1に記載の原子力発電プラント制御システム。
  3.  前記阻止手段は、試験中である旨を示す信号を受信している場合に前記制御信号が前記部位へ到達することを阻止することを特徴とする請求項1または2に記載の原子力発電プラント制御システム。
  4.  前記阻止手段は、異なる経路を通じて複数の制御信号を受信した場合にのみ前記部位へ制御信号を到達させる多数決回路であることを特徴とする請求項1または2に記載の原子力発電プラント制御システム。
  5.  前記阻止手段は、複数の系統の検出手段のうち、少なくともN(Nは2以上の整数)系統の検出手段から制御信号として原子炉トリップ信号を受信した場合に前記部位へ原子炉トリップ信号を到達させる多数決回路であり、
     前記操作部は、前記複数の系統の検出手段のそれぞれに対応して設けられ、
     前記操作部が操作されたことを示す制御信号は、前記所定の位置で検出される前に、前記操作部に対応する系統の検出手段が出力する信号と論理和演算されることを特徴とする請求項4に記載の原子力発電プラント制御システム。
  6.  原子力発電プラントの特定の部位を制御するための操作を受け付ける操作部を通じて操作を受け付けるステップと、
     前記操作部が受け付けた操作に対応する制御信号を、前記部位へとつながる経路上の所定の位置で検出するステップと、
     前記制御信号が前記所定の位置へ伝達されたことを通知するステップと、
     前記経路上の前記所定の位置から前記部位までのいずれかの位置において、前記制御信号が前記部位へ到達することを阻止するステップと
     を含むことを特徴とする原子力発電プラント検査方法。
PCT/JP2011/071433 2010-09-30 2011-09-21 原子力発電プラント制御システムおよび原子力発電プラント検査方法 WO2012043318A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US13/825,256 US9666316B2 (en) 2010-09-30 2011-09-21 Nuclear power plant control system and method of testing nuclear power plant
EP11828875.2A EP2624092B1 (en) 2010-09-30 2011-09-21 System for controlling nuclear power plant and method for inspecting nuclear power plant

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2010-222485 2010-09-30
JP2010222485A JP5660832B2 (ja) 2010-09-30 2010-09-30 原子力発電プラント制御システムおよび原子力発電プラント検査方法

Publications (1)

Publication Number Publication Date
WO2012043318A1 true WO2012043318A1 (ja) 2012-04-05

Family

ID=45892780

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2011/071433 WO2012043318A1 (ja) 2010-09-30 2011-09-21 原子力発電プラント制御システムおよび原子力発電プラント検査方法

Country Status (4)

Country Link
US (1) US9666316B2 (ja)
EP (1) EP2624092B1 (ja)
JP (1) JP5660832B2 (ja)
WO (1) WO2012043318A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6067539B2 (ja) * 2013-11-01 2017-01-25 株式会社東芝 タービン保護装置およびその診断方法
CN112415985B (zh) * 2020-11-30 2022-01-18 中广核工程有限公司 核电站闸门与主控通讯验证装置、方法及其相关设备

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6136809A (ja) * 1984-07-30 1986-02-21 Toshiba Corp 発電プラントの分散階層制御装置
JPS63281597A (ja) * 1987-05-14 1988-11-18 Yokogawa Electric Corp 分散形制御システムの機能検査方式
JPH05158531A (ja) * 1991-12-05 1993-06-25 Hitachi Ltd システムの安全保護系健全性確認方法及び装置
JP2002108443A (ja) 2000-10-04 2002-04-10 Mitsubishi Heavy Ind Ltd 制御機器の試験装置および試験方法

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3826094A (en) * 1971-10-14 1974-07-30 Westinghouse Electric Corp System and method for operating a steam turbine with independent overspeed protection especially adapted for a nuclear reactor powered steam turbine
US4584165A (en) * 1983-02-09 1986-04-22 General Electric Company Redundant reactivity control system
JPH0731537B2 (ja) * 1987-09-11 1995-04-10 株式会社日立製作所 多重化制御装置
US5817958A (en) * 1994-05-20 1998-10-06 Hitachi, Ltd. Plant monitoring and diagnosing method and system, as well as plant equipped with the system
JP3230947B2 (ja) * 1995-05-12 2001-11-19 株式会社日立製作所 プラント制御・試験方法及びその装置
JP2000056803A (ja) * 1998-08-04 2000-02-25 Toshiba Corp オペレーションシステム
JP2001195104A (ja) * 2000-01-11 2001-07-19 Mitsubishi Electric Corp インターロック回路
JP2003015733A (ja) * 2001-07-05 2003-01-17 Meidensha Corp 遠方監視制御システム

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6136809A (ja) * 1984-07-30 1986-02-21 Toshiba Corp 発電プラントの分散階層制御装置
JPS63281597A (ja) * 1987-05-14 1988-11-18 Yokogawa Electric Corp 分散形制御システムの機能検査方式
JPH05158531A (ja) * 1991-12-05 1993-06-25 Hitachi Ltd システムの安全保護系健全性確認方法及び装置
JP2002108443A (ja) 2000-10-04 2002-04-10 Mitsubishi Heavy Ind Ltd 制御機器の試験装置および試験方法

Also Published As

Publication number Publication date
EP2624092A4 (en) 2017-06-28
US9666316B2 (en) 2017-05-30
JP2012079011A (ja) 2012-04-19
EP2624092A1 (en) 2013-08-07
JP5660832B2 (ja) 2015-01-28
US20130301771A1 (en) 2013-11-14
EP2624092B1 (en) 2018-07-18

Similar Documents

Publication Publication Date Title
KR102034894B1 (ko) 배전반 내 차단기 관리 시스템
CN113692730A (zh) 控制装置、网络系统、网络系统的控制方法以及控制程序
JP5660832B2 (ja) 原子力発電プラント制御システムおよび原子力発電プラント検査方法
JP7014140B2 (ja) 電磁ブレーキ制御装置及び制御装置
JP2007067540A (ja) 二重系系切替装置
CN112938681B (zh) 用于安全链的自动检查的电子测试节点
JP2009192339A (ja) 臨界警報装置および臨界警報発生ユニット
JP4387994B2 (ja) 臨界警報装置およびその試験方法
JP7135211B2 (ja) 車載制御装置
JP2010208760A (ja) エレベータ運転制御装置
JP2005065424A (ja) 保護継電装置の自動監視回路
JP6692251B2 (ja) 臨界警報装置及び臨界警報方法
KR101582250B1 (ko) 선로 결함 감시장치
JP2012095479A (ja) 電力系統監視制御装置
JP3230947B2 (ja) プラント制御・試験方法及びその装置
JP3792416B2 (ja) 臨界警報装置
JP6625964B2 (ja) 昇降機制御装置および昇降機制御方法
JP2018159636A (ja) 感震器
JP6015521B2 (ja) 伝送路試験装置および伝送路試験方法
JP2017068392A (ja) 火災報知設備及び火災受信機
WO2017047149A1 (ja) 入出力制御装置、入出力制御方法、および監視制御システム
JPH04348405A (ja) 制御装置故障表示システム
JPWO2013021608A1 (ja) 画像処理装置
JP5665507B2 (ja) 保護継電装置
JPH08336230A (ja) ディジタル保護リレー装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11828875

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 13825256

Country of ref document: US

Ref document number: 2011828875

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE