WO2010007779A1 - 工事情報管理装置及び工事情報管理システム - Google Patents
工事情報管理装置及び工事情報管理システム Download PDFInfo
- Publication number
- WO2010007779A1 WO2010007779A1 PCT/JP2009/003331 JP2009003331W WO2010007779A1 WO 2010007779 A1 WO2010007779 A1 WO 2010007779A1 JP 2009003331 W JP2009003331 W JP 2009003331W WO 2010007779 A1 WO2010007779 A1 WO 2010007779A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- information
- construction
- construction information
- information management
- history
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
Definitions
- the present invention relates to a construction information management apparatus and a construction information management system for managing information related to construction history of roads and the like.
- management information such as an optical fiber to be managed, wiring piping buried in the ground, and road equipment is stored in an IC tag, and an IC tag reader is used when performing construction on the management target.
- a technique is disclosed in which the management information is read and referenced by a writer, and the management information is updated by an IC tag reader / writer when construction is completed.
- the present invention has been made in view of the above-described conventional problems, and an object of the present invention is to provide a construction information management device that can easily grasp history information of each layer below the road surface of a road on which construction has been performed a plurality of times. And providing a construction information management system.
- the invention of the construction information management device includes construction information receiving means for receiving construction information, pavement configuration analyzing means for analyzing a pavement configuration based on the construction information, and a pavement configuration.
- History information acquisition means for acquiring the history information
- history information update means for updating the history information in a superimposed manner based on the analysis result of the pavement configuration analysis means.
- the history information updating means is configured to obtain information on a point or section where the pavement configuration is discontinuous due to each construction based on the history information. It is characterized by updating.
- the invention of the construction information management system according to claim 3 is the construction information management device according to claim 1 or claim 2, position information acquisition means for acquiring position information for specifying the history information, and the position information.
- a construction information processing terminal having position information transmitting means for transmitting the information to the construction information management apparatus, and history information receiving means for receiving history information specified by the position information from the construction information management apparatus. It is characterized by.
- the invention described in claim 4 is characterized in that at least one construction information management system according to claim 3 is provided in the vicinity of the construction section, and further comprises information holding means for holding construction information relating to the construction. .
- the invention according to claim 5 is the construction information management system according to claim 4, wherein the construction information includes section information for identifying the construction section.
- the information holding unit stores installation position information indicating an installation position of the information holding unit.
- the construction information processing terminal further reads the construction information from the information holding means. It is characterized by having.
- the invention described in claim 8 is the construction information management system according to any one of claims 3 to 7, wherein the construction information in the construction section further specified by the construction information management device based on the position information.
- the construction information processing terminal comprises storage information reception means for receiving the storage information from the construction information management device. To do.
- the construction information can be stored at the site where the construction is performed.
- the number of information holding means for holding construction information can be reduced.
- the installation position information can be easily grasped at the site where the construction is performed.
- construction information can be acquired at the site where the construction is performed.
- FIG. 1 It is a figure which shows the structural example of one Embodiment of the construction information management system concerning this invention. It is a figure which shows the structural example of the construction information processing terminal concerning this invention. It is a figure which shows the example of the hardware constitutions of the computer which comprises the construction information management apparatus etc. concerning this invention. It is a functional block diagram of one Embodiment of the construction information management apparatus concerning this invention. It is a figure which shows the example of construction information. It is a flowchart of the operation example of the construction information management system concerning this invention. It is explanatory drawing of the update process of the historical information which used a part of historical information. It is explanatory drawing of the construction area in case construction is performed in a superimposed manner. It is a flowchart of the other operation example of the construction information management system concerning this invention.
- 10 information holding device 12 construction information processing terminal, 14 construction information management device, 16 reader / writer unit, 18 input unit, 20 communication unit, 22 display unit, 24 control unit, 26 CPU, 28 RAM, 30 ROM, 32 communication interface , 34 hard disk device, 36 bus, 38 construction information reception unit, 40 pavement configuration analysis unit, 42 history information acquisition unit, 44 history information update unit, 46 position information reception unit, 48 history information transmission unit, 50 storage information acquisition unit.
- FIG. 1 shows a configuration example of an embodiment of a construction information management system according to the present invention.
- the construction information management system includes an information holding device 10, a construction information processing terminal 12, and a construction information management device 14.
- the information holding device 10 is configured by an IC tag (RFID) or the like, and information (construction information) related to the construction such as construction contents and construction sections is written therein.
- RFID IC tag
- construction information information related to the construction such as construction contents and construction sections is written therein.
- These IC tags can be installed at the start and end points of road construction sections, or at arbitrary positions inside and outside the construction sections. For example, these IC tags can be installed on metal fences embedded in roads.
- Each information holding device 10 is assigned identification information. As this identification information, for example, “ucode (registered trademark)” or the like can be used.
- the information holding device 10 can store installation position information representing the installation position of the metal fence as the contents of the construction information or separately from the construction information.
- the installation position information may be latitude / longitude information or a distance (distance marker) from the starting point of the road.
- the information holding device 10 may be a code corresponding to longitude / latitude information or a distance marker.
- the information holding device 10 has the installation position information, it can also be used as a distance marker.
- the information holding device 10 is installed at the start point or end point of the road work section or at any position in the road work section, and is written together with the start and end points of the road work section to specify the work section. It is also possible to store it as information.
- the construction information processing terminal 12 has a function as a reader / writer that writes the construction information, installation position information, and the like in the information holding device 10 and reads out the information from the information holding device 10.
- it has a communication function for transmitting construction information and the like to the construction information management device 14 via an appropriate communication means, and receiving history information related to a pavement configuration such as a road from the construction information management device 14.
- the construction information management device 14 operates on an appropriate computer, receives construction information from the construction information processing terminal 12 and updates the history information regarding the construction, and updates the history information in response to a request from the construction information processing terminal 12.
- the history information refers to information relating to the current state of the road (pavement configuration, etc.) as a result of construction performed in the past.
- the history information may include construction information including the time of construction performed in the past.
- a request for history information from the construction information processing terminal 12 is made by transmitting position information for specifying the history information to the construction information management apparatus 14.
- the position information the installation position information of the information holding device 10 can be used, and details will be described later.
- the construction information management device 14 stores storage information related to the storage location of media such as paper and CD-ROM in which construction information related to past pavement work is described, and in response to a request from the construction information processing terminal 12 It is preferable that the storage information is transmitted. As a result, it is possible to easily manage a medium on which construction information relating to past pavement work that has been individually managed by an office or local government is described.
- FIG. 2 shows a configuration example of the construction information processing terminal 12.
- the construction information processing terminal 12 includes a reader / writer unit 16, an input unit 18, a communication unit 20, a display unit 22, and a control unit 24.
- the reader / writer unit 16 writes and reads construction information, installation position information, and the like with respect to the information holding device 10 configured by an IC tag or the like.
- the reader / writer unit 16 exchanges information with the information holding device 10 by non-contact short-range wireless communication.
- the construction information held by the information holding device 10 can be easily read and written on site.
- the said installation position information can be confirmed, for example using GPS, or based on a road ledger etc., you may confirm by another method.
- the input unit 18 is composed of a keyboard or the like, and is used by a user to input instructions, information, and the like to the construction information processing terminal 12. In addition, the installation position information acquired from the road ledger or the like by the user can be input.
- the communication unit 20 includes an appropriate communication interface, and exchanges data with the construction information management device 14.
- the construction information processing terminal 12 has means for transmitting construction information to the construction information management apparatus 14, means for transmitting position information for specifying history information to the construction information management apparatus 14, and construction information management apparatus 14 can function as means for receiving history information from the storage 14 and means for receiving storage information relating to the storage location of the medium in which the past construction information is described from the construction information management apparatus 14.
- the communication part 20 is good also as a structure which functions as a GPS receiver and acquires the said installation position information.
- the display unit 22 is composed of a liquid crystal display (LCD) or the like, and displays construction information, history information about construction, pavement configuration information, and the like.
- LCD liquid crystal display
- the control unit 24 includes a central processing unit (for example, a CPU can be used) and a program for controlling the processing operation of the CPU, and controls the operation of each of the above units.
- a central processing unit for example, a CPU can be used
- a program for controlling the processing operation of the CPU controls the operation of each of the above units.
- FIG. 3 shows an example of the hardware configuration of a computer constituting the construction information management device 14 and the like.
- the construction information management device 14 includes a central processing unit (for example, a CPU can be used) 26, a random access memory (RAM) 28, a read-only memory (ROM) 30, a communication interface 32, and a hard disk device (HDD). 34 is comprised. These components are connected to each other by a bus 36.
- a central processing unit for example, a CPU can be used
- RAM random access memory
- ROM read-only memory
- HDD hard disk device
- the CPU26 controls operation
- the RAM 28 mainly functions as a work area for the CPU 26, and the ROM 30 stores control programs such as BIOS and other data used by the CPU 26.
- the communication interface 32 includes a USB (Universal Serial Bus) port, a network port, and other appropriate interfaces, and is used by the CPU 26 to exchange data with an external device via a communication means such as a network.
- USB Universal Serial Bus
- the hard disk device 34 is a storage device and can store various data necessary for processing to be described later.
- FIG. 4 shows a functional block diagram of an embodiment of the construction information management apparatus 14.
- the construction information management apparatus 14 includes a construction information receiving unit 38, a pavement configuration analyzing unit 40, a history information acquiring unit 42, a history information updating unit 44, a position information receiving unit 46, a history information transmitting unit 48, and storage information acquisition.
- the functions are realized by the CPU 26 and a program for controlling the processing operation of the CPU 26.
- the construction information receiving unit 38 receives the construction information transmitted from the construction information processing terminal 12 via the communication interface 32.
- the construction information includes the construction date and time (construction period), the route name, the positions of the start and end points of the road construction section, the construction content, the identification number of the information holding device 10 installed in the field, and the like.
- the pavement configuration analysis unit 40 analyzes the pavement configuration of the section where the construction has been performed based on the construction information received by the construction information reception unit 38.
- the pavement configuration refers to information relating to the configuration (material, thickness, etc.) of each level below the road surface constituting the paved road, for example, surface layer, base layer, upper layer roadbed, lower layer roadbed, barrier layer, etc. .
- the history information acquisition unit 42 acquires construction history information about the construction target road stored in the hard disk device 34 or the like.
- the history information may be stored in a location different from the computer provided with the construction information management device 14.
- the history information acquisition unit 42 is configured to acquire history information from the storage location via the communication interface 32.
- the history information update unit 44 updates the history information in a superimposed manner based on the analysis result of the pavement configuration analysis unit 40.
- “superimposing” means overwriting the construction information related to the newly performed construction with the construction information related to the construction up to the previous time. That is, in the history information up to the previous time, a section that overlaps with the newly performed work is replaced with the work information related to the newly performed work. Thereby, states, such as a pavement structure of the road after construction, can be reflected in history information.
- the position information receiving unit 46 receives position information (longitude / latitude information, distance indicator, etc.) transmitted from the construction information processing terminal 12 for specifying history information via the communication interface 32.
- the received position information is transferred to the history information transmission unit 48 and the storage information acquisition unit 50.
- the history information transmission unit 48 When the history information transmission unit 48 receives the position information, the history information transmission unit 48 acquires the history information specified by the position information and transmits it to the construction information processing terminal 12 via the communication interface 32. A method for specifying the history information will be described later.
- the storage information acquisition unit 50 When the storage information acquisition unit 50 receives the position information, the storage information acquisition unit 50 acquires storage information regarding the storage location of the medium in which the past construction information in the construction section specified by the position information is described, and performs the construction information processing via the communication interface 32. Transmit to the terminal 12.
- This storage information may be stored in the hard disk device 34 or may be stored in a location different from the computer in which the construction information management device 14 is provided.
- Fig. 5 shows an example of construction information.
- the construction information includes a route to be constructed, a construction start point, an end point, a subject, a construction period, a construction method, a construction contractor, and a pavement configuration.
- the pavement configuration includes a roadway portion and a bridge portion, and the surface layer and the base layer have a pavement configuration common to both.
- each structure of an upper layer roadbed, a lower layer roadbed, and a barrier layer is a paved structure of only a roadway. Note that the construction information is not limited to the example of FIG.
- FIG. 6 shows a flow of an operation example of the construction information management system according to the present embodiment.
- FIGS. 7A and 7B are explanatory diagrams of history information update processing using a part of history information.
- FIG. 8 shows an explanatory diagram of a construction section when construction is performed in a superimposed manner.
- construction was carried out on the five layers of the surface layer, the base layer, the upper layer roadbed, the lower layer roadbed, and the barrier layer as the pavement structure for each section of the road to be constructed displayed by the distance markers.
- the date is listed. This date is associated with the construction information shown in FIG. 5. For example, when the display of the date displayed in a list on the screen of the construction information processing terminal 12 is clicked, the construction information is displayed. Is preferred.
- FIG. 8 shows a case where the construction of the section CC is further performed from the state where the construction is already performed in the sections AA and BB.
- history information update processing will be described based on the state shown in FIG.
- the construction of the section AA and the section BB shown in FIG. 8 is reflected. That is, the section AA is a section of 0 to 500 m of the distance marker, and the section BB is a section of 400 to 1000 m of the distance marker.
- section AA all five layers are constructed, and in section BB, the surface layer and base layer are constructed, showing that the pavement structure of that part is different from section AA.
- FIG. 7B the section CC shown in FIG.
- the section CC is a section of the distance marker of 200 to 600 m, and the construction of all five layers is performed, and the pavement configuration of that portion is overwritten. As a result, it is shown that the pavement configuration of the section CC is different from the sections AA and BB.
- the history information includes information on a point or a section where the pavement configuration is discontinuous due to construction.
- the user creates construction information of the construction at the construction information processing terminal 12 (S101).
- the construction information has the contents illustrated in FIG. 5, the construction information is created by inputting predetermined information from the input unit 18 using an appropriate user interface displayed on the display unit 22 of the construction information processing terminal 12. This can be done.
- the created construction information is written by the reader / writer unit 16 of the construction information processing terminal 12 into the information holding device 10 installed at the start point and end point of the work (S102).
- construction information is transmitted to the construction information management apparatus 14 by the communication unit 20 of the construction information processing terminal 12 (S103).
- the construction information is received by the construction information receiving unit 38 of the construction information management apparatus 14 (S104).
- the pavement configuration analyzing unit 40 analyzes the pavement configuration based on the construction information received by the construction information receiving unit 38 (S105). Further, the history information acquisition unit 42 acquires construction history information about the road to be constructed, which is stored in the hard disk device 34 or other places (S106). In this history information, as shown in FIG. 7 (a), the pavement configuration for each construction section, which is the result of the construction performed in the past, is described, so that the construction analyzed by the pavement configuration analysis unit 40 Based on the construction information, the history information update unit 44 updates the history information in a superimposed manner (S107).
- “updating in a superimposed manner” means overwriting the history information of the section corresponding to the construction with the construction information of the construction.
- the section AA and the section B- B was under construction.
- the construction is performed in the section CC, and construction information relating to this construction is created by the construction information processing terminal 12.
- the construction information of the construction is overwritten on the history information of the section CC (distance marker 200 to 600 m section).
- the history information update unit 44 performs a process of updating information on a point or section where the pavement configuration is discontinuous due to the construction based on the history information.
- FIG. 9 shows a flow of another operation example of the construction information management system according to the present embodiment.
- the construction information processing terminal 12 refers to the construction history information.
- the location information regarding the point on the road to be referred to is acquired from the construction information processing terminal 12, and this is transmitted as a request signal to the construction information management device 14 (S201).
- the position information is directly measured using, for example, GPS, or estimated from the position of the mobile phone base station. Or it is good also as a structure which reads this from the information holding
- the location information reception unit 46 of the construction information management device 14 receives the request signal and passes it to the history information transmission unit 48.
- the history information transmission unit 48 specifies the position of the history information requested by the position information included in the request signal.
- the history information is specified by specifying a point on the road by using the position information as a distance marker in the example shown in FIGS. 7A and 7B, for example, and the pavement configuration at this point, that is, history information. To get.
- a table for associating the position information with the numerical value of the distance marker may be created in advance and specified based on the table. Further, a table associating the date and position information shown in FIGS. 7A and 7B may be used.
- the history information transmission unit 48 acquires the identified history information from the storage location such as the hard disk device 34 and transmits it to the construction information processing terminal 12 via the communication interface 32 (S202).
- the construction information processing terminal 12 receives the updated history information (S203), and the display unit 22 displays the history information on the screen (S204).
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Road Repair (AREA)
Abstract
Description
Claims (8)
- 工事情報を受け付ける工事情報受付手段と、
前記工事情報に基づいて舗装構成を解析する舗装構成解析手段と、
舗装構成の履歴情報を取得する履歴情報取得手段と、
前記舗装構成解析手段の解析結果に基づいて前記履歴情報を重畳的に更新する履歴情報更新手段と、
を備えることを特徴とする工事情報管理装置。 - 請求項1記載の工事情報管理装置において、前記履歴情報更新手段は、各工事によって舗装構成が不連続となっている地点または区間に関する情報を前記履歴情報を元に更新することを特徴とする工事情報管理装置。
- 請求項1または請求項2記載の工事情報管理装置と、
前記履歴情報を特定するための位置情報を取得する位置情報取得手段と、
前記位置情報を前記工事情報管理装置に送信する位置情報送信手段と、
前記工事情報管理装置から前記位置情報により特定された履歴情報を受信する履歴情報受信手段と、を有する工事情報処理端末と、
を備えることを特徴とする工事情報管理システム。 - 請求項3記載の工事情報管理システムが、さらに工事区間の近傍に少なくとも1つ設置され、当該工事にかかる工事情報を保持する情報保持手段を備えることを特徴とする工事情報管理システム。
- 請求項4記載の工事情報管理システムにおいて、前記工事情報は、前記工事区間を特定する区間情報を含むことを特徴とする工事情報管理システム。
- 請求項4または請求項5記載の工事情報管理システムにおいて、前記情報保持手段は、前記情報保持手段の設置位置を表す設置位置情報を格納することを特徴とする工事情報管理システム。
- 請求項4から請求項6のいずれか一項記載の工事情報管理システムにおいて、前記工事情報処理端末が、さらに前記情報保持手段から前記工事情報を読み出す工事情報読出手段を有することを特徴とする工事情報管理システム。
- 請求項3から請求項7のいずれか一項記載の工事情報管理システムにおいて、前記工事情報管理装置が、さらに前記位置情報により特定した工事区間における過去の前記工事情報が記載された媒体の保管場所に関する保管情報を取得する保管情報取得手段を備え、前記工事情報処理端末が、前記工事情報管理装置から前記保管情報を受信する保管情報受信手段を備えることを特徴とする工事情報管理システム。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009801247475A CN102077232A (zh) | 2008-07-17 | 2009-07-15 | 工程信息管理装置和工程信息管理系统 |
JP2010520773A JP5244180B2 (ja) | 2008-07-17 | 2009-07-15 | 工事情報管理装置及び工事情報管理システム |
EP09797707A EP2325799A1 (en) | 2008-07-17 | 2009-07-15 | Construction information management device and construction information management system |
US13/054,328 US20110125808A1 (en) | 2008-07-17 | 2009-07-15 | Construction information management device and construction information management system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2008-185988 | 2008-07-17 | ||
JP2008185988 | 2008-07-17 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2010007779A1 true WO2010007779A1 (ja) | 2010-01-21 |
Family
ID=41550189
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2009/003331 WO2010007779A1 (ja) | 2008-07-17 | 2009-07-15 | 工事情報管理装置及び工事情報管理システム |
Country Status (5)
Country | Link |
---|---|
US (1) | US20110125808A1 (ja) |
EP (1) | EP2325799A1 (ja) |
JP (1) | JP5244180B2 (ja) |
CN (1) | CN102077232A (ja) |
WO (1) | WO2010007779A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015152264A1 (ja) * | 2014-03-31 | 2015-10-08 | 日本信号株式会社 | 電文情報生成回路、電文書込み装置及び地上子 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10317410A (ja) * | 1997-05-20 | 1998-12-02 | Haneda Hume Pipe Co Ltd | 地下埋設物等の情報システム |
JPH1181214A (ja) * | 1997-09-09 | 1999-03-26 | Haneda Hume Pipe Co Ltd | 縁 石 |
JP2007163962A (ja) | 2005-12-15 | 2007-06-28 | Mitsubishi Electric Corp | 道路管理システム及び道路管理端末装置並びに道路管理方法 |
JP2008059376A (ja) * | 2006-08-31 | 2008-03-13 | Toen Kk | 道路情報管理装置 |
-
2009
- 2009-07-15 WO PCT/JP2009/003331 patent/WO2010007779A1/ja active Application Filing
- 2009-07-15 US US13/054,328 patent/US20110125808A1/en not_active Abandoned
- 2009-07-15 CN CN2009801247475A patent/CN102077232A/zh active Pending
- 2009-07-15 JP JP2010520773A patent/JP5244180B2/ja active Active
- 2009-07-15 EP EP09797707A patent/EP2325799A1/en not_active Withdrawn
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10317410A (ja) * | 1997-05-20 | 1998-12-02 | Haneda Hume Pipe Co Ltd | 地下埋設物等の情報システム |
JPH1181214A (ja) * | 1997-09-09 | 1999-03-26 | Haneda Hume Pipe Co Ltd | 縁 石 |
JP2007163962A (ja) | 2005-12-15 | 2007-06-28 | Mitsubishi Electric Corp | 道路管理システム及び道路管理端末装置並びに道路管理方法 |
JP2008059376A (ja) * | 2006-08-31 | 2008-03-13 | Toen Kk | 道路情報管理装置 |
Non-Patent Citations (2)
Title |
---|
HIDEMI FUKADA ET AL.: "RFID to GIS no Renkei ni yoru Doro Shisetsu Kanri System no Teian", IPSJ SIG NOTES, vol. 2007, no. 25, 15 March 2007 (2007-03-15), pages 45 - 52, XP008145696 * |
MAKOTO KATO ET AL.: "RFID o Mochiita Doro Iji Kanri Shien System no Jissho Jikken", IPSJ SIG NOTES, vol. 2006, no. 27, 17 March 2006 (2006-03-17), pages 101 - 108, XP008145697 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015152264A1 (ja) * | 2014-03-31 | 2015-10-08 | 日本信号株式会社 | 電文情報生成回路、電文書込み装置及び地上子 |
CN106170424A (zh) * | 2014-03-31 | 2016-11-30 | 日本信号株式会社 | 电文信息生成电路、电文写入装置以及地面单元 |
Also Published As
Publication number | Publication date |
---|---|
EP2325799A1 (en) | 2011-05-25 |
JP5244180B2 (ja) | 2013-07-24 |
CN102077232A (zh) | 2011-05-25 |
US20110125808A1 (en) | 2011-05-26 |
JPWO2010007779A1 (ja) | 2012-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100955592B1 (ko) | Rfid와 gis를 활용한 시설물 관리 시스템 및 그 제어 방법 | |
US20120330849A1 (en) | Methods, apparatus, and systems for performing installations of engineered systems and generating site visit manifests for same | |
US9086290B2 (en) | Map data distribution server, map data distribution system, and map data distribution method | |
CN104361766B (zh) | 基于三维数字建模实现停车导航的系统 | |
US20090202101A1 (en) | Electronic manifest of underground facility locate marks | |
KR100875690B1 (ko) | Rfid 태그 내장형 지중표시기 및 그 운용 시스템 | |
EP2131148A1 (en) | Pedestrian support system | |
CN1771426A (zh) | 导航标签 | |
CN101167092A (zh) | 用于建筑的工程数据传递系统 | |
US20130238648A1 (en) | Road data creating device, road data creating method, and program | |
EP1403837B1 (en) | Map distribution system and terminal device | |
KR20080104278A (ko) | 지도 정보 분배 센터 및 지도 정보 분배 방법 | |
WO2010035319A1 (ja) | 地理情報システムを用いた施設管理システム | |
JP4588670B2 (ja) | 地図情報配信センタ及び地図情報配信方法 | |
JP4684043B2 (ja) | 電力設備情報提供システム | |
JP2007240271A (ja) | ナビゲーション装置及びナビゲーションシステム | |
JP5310839B2 (ja) | 情報提供方法、情報提供システム、並びに、その情報提供システムを構成する情報提供センタ及び車載機 | |
Chang et al. | Development of a road monitoring and reporting system based on location-based services and augmented-reality technologies | |
JP5244180B2 (ja) | 工事情報管理装置及び工事情報管理システム | |
JP2006031673A (ja) | 管理方法、および管理システム | |
JP2007114021A (ja) | 地図情報配信システム | |
KR100509158B1 (ko) | 도로 관리 시스템 및 방법 | |
JP4997978B2 (ja) | 住所情報管理プログラム、住所情報管理方法及び住所情報管理装置 | |
KR20120025279A (ko) | 내비게이션에서 실시간 교통정보 제공 방법 | |
JP2009282693A (ja) | 登記情報取得方法および登記情報取得システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 200980124747.5 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 09797707 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13054328 Country of ref document: US |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2010520773 Country of ref document: JP |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2009797707 Country of ref document: EP |