WO2006123687A1 - デフロスト制御システム、デフロスト制御装置、及びデフロスト制御方法 - Google Patents

デフロスト制御システム、デフロスト制御装置、及びデフロスト制御方法 Download PDF

Info

Publication number
WO2006123687A1
WO2006123687A1 PCT/JP2006/309811 JP2006309811W WO2006123687A1 WO 2006123687 A1 WO2006123687 A1 WO 2006123687A1 JP 2006309811 W JP2006309811 W JP 2006309811W WO 2006123687 A1 WO2006123687 A1 WO 2006123687A1
Authority
WO
WIPO (PCT)
Prior art keywords
defrost
information
peak
time
power demand
Prior art date
Application number
PCT/JP2006/309811
Other languages
English (en)
French (fr)
Inventor
Toshiyuki Miki
Original Assignee
Daikin Industries, Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries, Ltd. filed Critical Daikin Industries, Ltd.
Publication of WO2006123687A1 publication Critical patent/WO2006123687A1/ja

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D21/00Defrosting; Preventing frosting; Removing condensed or defrost water
    • F25D21/002Defroster control
    • F25D21/006Defroster control with electronic control circuits

Definitions

  • Defrost control system defrost control device, and defrost control method
  • the present invention relates to a defrost control system, a defrost control device, and a defrost control method.
  • Patent Document 1 JP 2001-197661 (Pages 1-9, Figure 1-15)
  • the defrost time is passively shifted in response to an increase in the total power demand value of the target property.
  • the total power demand value is a value obtained by averaging the total power of the target property over the first hour. Therefore, if the peak value of the total power demand value comes after the total power demand value of the target property decreases and defrosting begins, the maximum total power demand value of the target property increases. There are things to do. For this reason, there is a tendency for the power charge of the target property to increase.
  • An object of the present invention is to provide a defrost control system and a defrost control method that can reduce an increase in the power charge of a target property.
  • a defrost control system includes a first storage unit and a first determination unit.
  • the first storage unit stores peak information. Peak information is information about one or more peak times.
  • the peak time is the peak time in the trend related to the total power of the target property.
  • the first determination unit determines at least one defrost time based on at least peak information.
  • the defrost time is the time when the defrosting of the refrigerator / freezer is performed.
  • the freezer / refrigerator performs at least one of freezing and refrigeration on the target property.
  • the first storage unit stores peak information.
  • First decision The unit can receive at least peak information.
  • the first determining unit determines one or more defrost times based on at least the peak information.
  • the first determination unit determines the defrost time based on the peak information
  • the defrost time can be determined in consideration of the peak in the trend related to the total power of the target property. For this reason, since the increase in the maximum value of the total power demand value of the target property can be reduced, the increase in the power charge of the target property can be reduced.
  • the defrost control system according to the second invention is the defrost control system according to the first invention, and the trend relating to the total power of the target property includes a trend of the total power demand value.
  • the total power demand value is the average of the total power of the target property over the first hour.
  • the trend regarding the total power of the target property includes the trend of the total power demand value.
  • the peak time is, for example, the peak time in the trend of the total power demand value.
  • the first determination unit determines at least one defrost time based on at least peak information.
  • the trend regarding the total power includes the trend of the total power demand value
  • the defrost control system according to the third invention is the defrost control system of the first invention or the second invention, wherein the first determination unit avoids one or more peak times based on at least peak information Determine the defrost time of 1 or more.
  • the first determining unit can receive at least peak information.
  • the first determining unit determines one or more defrost times so as to avoid one or more peak times based on at least peak information.
  • a defrost control system is the defrost control system according to the third aspect of the present invention, in which the refrigeration apparatus includes a cooling unit and a heating unit.
  • the heating unit is provided in the vicinity of the cooling unit, and heats when energized. And defrost is performed by energizing a heating part in defrost time.
  • the defrost is executed by energizing the heating unit at the defrost time.
  • the defrost needs to be energized, so the total power of the target property tends to increase.
  • the first determination unit determines the defrost time of 1 or more so as to avoid the peak time of 1 or more, the total power demand value of the target property is small! /, And the control unit performs defrosting in the time zone Can be made. For this reason, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • a defrost control system is the defrost control system according to the third aspect of the present invention, wherein the refrigeration apparatus has a heat exchanger that functions as an evaporator during the refrigeration operation. And defrost is performed by making heat exchange function as a condenser at the time of defrost.
  • defrost is performed by causing the heat exchanger to function as a condenser at the time of defrost.
  • the heat exchanger acts as a condenser, so that the total power of the target property tends to increase due to the defrosting.
  • the first determination unit determines the defrost time of 1 or more so as to avoid the peak time of 1 or more, the total power demand value of the target property is small! be able to. For this reason, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • a defrost control system is the defrost control system according to the first invention or the second invention, wherein the first determination unit overlaps at least one peak time based on at least peak information Determine the defrost time of 1 or more.
  • the first determining unit can receive at least peak information.
  • the first determining unit is based on at least peak information and at one or more peak times Decide one or more defrost times so that they overlap.
  • the first determination unit determines one or more defrost times so as to overlap one or more peak times, the total power demand value of the target property can determine the defrost time in a large time zone. For this reason, even if the total power of the target property decreases due to defrosting, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • a defrost control system is the defrost control system according to the sixth aspect, wherein the first determination unit determines one or more defrost times so as to avoid immediately before one or more peak times.
  • the; L determining unit determines one or more defrost times so as to overlap one or more peak times based on at least peak information.
  • the first determination unit determines one or more defrost times based on at least the peak information so as to avoid immediately before one or more peak times.
  • the first determination unit determines a defrost time of 1 or more so as to avoid immediately before the peak time of 1 or more, the total power demand value of the target property is large 1, the time zone and the defrost time. It is possible to reduce the overlap with the immediately following timing. For this reason, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • a defrost control system is the defrost control system according to the sixth aspect or the seventh aspect of the present invention, wherein the defrost is executed when the refrigeration unit is stopped.
  • the defrost is executed by stopping the freezer / refrigerator.
  • the control unit since the refrigeration system is stopped in the defrost, the total power of the target property tends to decrease due to the defrost.
  • the defrost time of the first determining unit force S1 or more is determined so as to overlap with the peak time of 1 or more, the control unit must perform defrosting in the time zone when the total power demand value of the target object is large. Is possible. For this reason, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • a defrost control system is the differential system according to any one of the first to eighth aspects of the present invention.
  • the lost control system further includes a first detection unit and a second determination unit.
  • the first detector detects the total power demand value of the target property.
  • the second determination unit determines peak information based on the total power demand value of the target property.
  • the first detection unit detects the total power demand value of the target property.
  • the second decision unit can receive information on the total power demand value of the target property.
  • the second determination unit determines peak information based on the total power demand value of the target property.
  • the second determination unit determines peak information based on the total power demand value of the target property. Considering the peak in the trend of the total power demand value of the target property, it is possible to determine one or more defrost times.
  • the defrost control system is the defrost control system according to any one of the first to eighth inventions, wherein the trend related to the total power of the target property is the trend related to the total power demand value and the first power demand. Including trending values.
  • the total power demand value is the average of the total power of the target property over the first hour.
  • the 1st electricity demand value is the average of the electricity required for defrosting in the target property over the 1st hour.
  • the defrost control system further includes a first detection unit and a third determination unit.
  • the first detector detects the total power demand value of the target property.
  • the third determination unit determines peak information based on the total power demand value of the target property and the first power demand value.
  • the 1st electric power demand value is the average value of the electric power required for defrosting in the target property over the 1st hour.
  • the first detection unit detects the total power demand value of the target property.
  • the third determining unit can receive the information on the total power demand value of the target property and the information on the first power demand value.
  • the third determination unit determines peak information based on the total power demand value and the first power demand value of the target property.
  • the trend regarding the total power of the target property includes the trend regarding the total power demand value and the first power demand value. That is, the peak information is, for example, information regarding the time when the peak occurs in the trend related to the total power demand value and the first power demand value.
  • the third determining unit is based on the total power demand value and the first power demand value of the target property. Therefore, one or more defrost times can be determined in consideration of the peak in the trend related to the total power demand value and the first power demand value. As a result, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • a defrost control system is the defrost control system according to the tenth aspect of the present invention, further comprising a third input unit.
  • the first power demand value is input to the third input unit.
  • the first power demand value is input to the third input unit.
  • the third determination unit can receive information on the first power demand value input to the third input unit.
  • the peak information can be determined based on the total power demand value and the first power demand value of the target property.
  • a defrost control system is the defrost control system according to the tenth aspect of the present invention, further comprising a second detector.
  • the second detector detects the first power demand value.
  • the second detector detects the first power demand value.
  • the third determination unit can receive information on the first power demand value detected by the second detection unit.
  • peak information can be determined based on the total power demand value and the first power demand value of the target property.
  • the defrost control system is the defrost control system according to any one of the first to eighth inventions, wherein the trend related to the total power of the target property is the trend related to the second power demand value.
  • the second power demand value is a value obtained by averaging the power of at least one of the air conditioner and the refrigeration unit for the first time.
  • the air conditioner harmonizes the space around the refrigeration unit.
  • the defrost control system further includes a third detection unit and a fourth determination unit.
  • the third detector detects the second power demand value.
  • the second power demand value is a value obtained by averaging the power of at least one of the air conditioner and the refrigeration unit for the first time.
  • the air conditioner air-conditions the space around the freezer / refrigerator.
  • the 4th decision part determines the peak based on the 2nd power demand value of the target property. Determine the information.
  • the third detector detects the second power demand value.
  • the fourth determination unit can receive information on the second power demand value.
  • the fourth determination unit determines peak information based on the second power demand value of the target property.
  • the trend related to the total power of the target property includes the trend related to the second power demand value. That is, the peak information is, for example, information regarding the time when the peak occurs in the trend regarding the second power demand value.
  • the fourth determining unit determines peak information based on the second power demand value of the target property, one or more defrosts are taken into account in consideration of the peak in the trend of the second power demand value of the target property.
  • the time can be determined.
  • the increase in the maximum value of the total power demand value of the target property can be reduced.
  • a defrost control system is the defrost control system according to any one of the first to thirteenth aspects, wherein the trend relating to the total power of the target property includes a trend in the second time.
  • the trend regarding the total power of the target property includes the trend in the second hour. That is, the peak information is, for example, information regarding the peak time in the trend regarding the total power in the second time of the target property.
  • the defrost time can be determined in consideration of the peak in the trend regarding the total power at the second time of the target property. For this reason, the increase in the maximum value of the total power demand value in the second hour of the target property can be reduced.
  • a defrost control system is the defrost control system according to the fourteenth aspect of the present invention, wherein a plurality of defrost times exist in the second time.
  • the defrost control system further includes a second storage unit.
  • the second storage unit stores the upper limit interval.
  • the upper limit interval is the upper limit of the defrost time interval.
  • the first determination unit determines one or more defrost times based on the upper limit interval and peak information.
  • the second storage unit stores the upper limit interval.
  • the first determination unit can receive information on the upper limit interval and peak information.
  • the first decision part One or more defrost times are determined based on the interval and peak information.
  • each defrost time can be determined so that the defrost operation is performed at an appropriate interval.
  • a defrost control system is the defrost control system according to the fifteenth aspect of the present invention, wherein the second storage unit further stores a lower limit interval.
  • the lower limit interval is the lower limit of the defrost time interval.
  • the first determination unit determines one or more defrost times based on the upper limit interval, the lower limit interval, and the peak information.
  • the second storage unit stores the upper limit interval.
  • the second storage unit further stores the lower limit interval.
  • the first determination unit can receive the upper limit interval information, the lower limit interval information, and the peak information.
  • the first determination unit determines one or more defrost times based on the upper limit interval, the lower limit interval, and the peak information.
  • the first determination unit determines one or more defrost times based on the upper limit interval, the lower limit interval, and the peak information. Therefore, each defrost time is determined so that the defrost operation is performed at an appropriate interval. be able to.
  • a defrost control system is the defrost control system according to the fourteenth invention, wherein a plurality of peak times exist in the second time.
  • the defrost control system further includes a third storage unit.
  • the third storage unit stores the number of peaks.
  • the peak number is the number of peak times included in the peak information among a plurality of peak times.
  • the first determination unit determines one or more defrost times based on the defrost interval, the number of peaks, and the peak information.
  • the third storage unit stores the number of peaks.
  • the first determination unit can receive defrost interval information, peak number information, and peak information.
  • the first determination unit determines one or more differential aperture times based on the defrost interval, the number of peaks, and peak information.
  • each defrost time can be determined in consideration of the peak time of the number of peaks. it can. For this reason, the time period when the total power demand value of the target property is small The defrost time can be determined.
  • a defrost control system is the defrost control system according to the fourteenth aspect of the present invention, further comprising a fourth storage unit.
  • the fourth storage unit stores the lower limit number.
  • the lower limit is the lower limit of the number of defrost times in the second hour.
  • the first determination unit determines one or more defrost times based on the lower limit number and the peak information.
  • the fourth storage unit stores the lower limit number of times.
  • the first determination unit can receive information on the lower limit number and peak information.
  • the first determination unit determines one or more defrost times based on the lower limit number and the peak information.
  • each defrost time can be determined so that an appropriate number of defrost operations are performed. .
  • a defrost control system is the defrost control system according to the eighteenth aspect of the present invention, wherein the fourth storage unit further stores an upper limit number of times.
  • the upper limit is the upper limit of the number of defrost times in the second hour.
  • the first determination unit determines one or more defrost times based on the lower limit count, the upper limit count, and the peak information.
  • the fourth storage unit stores the lower limit number of times.
  • the fourth storage unit further stores the upper limit number of times.
  • the first determining unit can receive information on the lower limit number, information on the upper limit number, and peak information.
  • the first determination unit determines one or more defrost times based on the lower limit count, the upper limit count, and the peak information.
  • the first determination unit determines one or more defrost times based on the lower limit number, the upper limit number, and the peak information, so that each defrost time is determined so that an appropriate number of defrost operations can be performed. be able to.
  • a defrost control system is the defrost control system according to any one of the first to nineteenth aspects of the present invention, further comprising a fourth detector.
  • the fourth detector detects event information.
  • Event information is information related to the event occurrence status in the target property.
  • the first determination unit determines one or more defrost times based on the peak information and the event information.
  • the fourth detector detects event information.
  • First decision The department can receive peak information and event information.
  • the first determination unit determines one or more defrost times based on the peak information and the event information.
  • the first determination unit determines one or more defrost times based on peak information and event information, the peak in the trend related to the total power of the target property and the occurrence status of the event are taken into account.
  • the above defrost time can be determined.
  • a defrost control system is the defrost control system according to any one of the first to nineteenth inventions, further comprising a fourth input unit.
  • Event information is input to the fourth input section.
  • Event information is information about the occurrence of events in the target property.
  • the first determination unit determines one or more defrost times based on the peak information and the event information.
  • event information is input to the fourth input unit.
  • the first decision unit can receive peak information and event information.
  • the first determination unit determines one or more defrost times based on the peak information and the event information.
  • the first determination unit determines one or more defrost times based on peak information and event information, the peak in the trend related to the total power of the target property and the occurrence status of the event are taken into account.
  • the above defrost time can be determined.
  • a defrost control system is the defrost control system according to any one of the first to twenty-second inventions, further comprising a first input unit. At least one of seasonal information, weather information, and local information (hereinafter referred to as seasonal information) is input to the first input section.
  • the first determination unit determines one or more defrost times based on seasonal information and peak information.
  • season information and the like are input to the i-th input unit.
  • the first decision unit can receive seasonal information and peak information.
  • the first determination unit determines one or more defrost times based on seasonal information and peak information.
  • a defrost control system is the defrost control system according to any one of the first to eighth inventions, further comprising a second input section. Peak information is input to the second input section.
  • peak information is input to the second input unit.
  • the first decision unit can receive at least peak information.
  • peak information is input to the second input unit, one or more defrost times can be determined based on the peak information.
  • a defrost control device includes a first storage unit and a first determination unit.
  • the first storage unit stores peak information. Peak information is information about one or more peak times.
  • the peak time is the peak time in the trend related to the total power of the target property.
  • the first determination unit determines one or more defrost times based on at least the peak information.
  • the defrost time is the time when the defrosting of the refrigerator / freezer is performed.
  • the refrigeration / freezing device will refrigerate and / or refrigerate the target property.
  • the first storage unit stores peak information.
  • the first determination unit can receive at least peak information.
  • the first determination unit determines one or more defrost times based on at least the peak information.
  • the first determination unit determines one or more defrost times based on the peak information, it is possible to determine one or more differential mouth times in consideration of the peak in the trend related to the total power of the target property. it can. For this reason, since the increase in the maximum value of the total power demand value of the target property can be reduced, the increase in the electricity charge of the target property can be reduced.
  • a defrost control method includes a storage step and a determination step.
  • peak information is stored.
  • Peak information is information about one or more peak times.
  • the peak time is the peak time in the trend related to the total power of the target property.
  • at least one defrost time is determined based on at least the peak information.
  • the defrost time is the time when the refrigeration unit is defrosted.
  • the freezer / refrigerator performs at least one of freezing and refrigeration at the target property.
  • peak information is stored in the storing step.
  • the decision step at least peak information can be received.
  • decision step at least peak information can be received.
  • At least one defrost time is determined based on the peak information.
  • one or more defrost times are determined based on the peak information, one or more defrost times can be determined in consideration of the peak in the trend related to the total power of the target property. For this reason, since the increase in the maximum value of the total power demand value of the target property can be reduced, the increase in the power charge of the target property can be reduced.
  • a defrost control method is the defrost control method of the twenty-fifth aspect of the present invention, wherein in the determination step, at least one defrost time is determined so as to avoid one or more peak times based on at least peak information. It is determined.
  • At least peak information can be received in the determination step.
  • at least one defrost time is determined so as to avoid one or more peak times based on at least peak information.
  • the total power demand value of the target property is small, and the defrost time can be determined in a time zone. For this reason, even if the total power of the target property increases due to defrosting, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • a defrost control method is the defrost control method according to the twenty-fifth aspect of the present invention, wherein, in the determining step, at least one defrost time is overlapped with one or more peak times based on at least peak information. It is determined.
  • At least peak information can be received in the determination step.
  • at least one defrost time is determined so as to overlap one or more peak times based on at least peak information.
  • the first determination unit determines the defrost time based on the peak information, so that the defrost time is determined in consideration of the peak in the trend related to the total power of the target property. Can do. For this reason, the increase in the maximum value of the total power demand value of the target property can be reduced, so the increase in the electricity charge of the target property can be reduced.
  • the trend regarding the total power includes the trend of the total power demand value
  • one or more defrost times are determined in consideration of the peak in the trend of the total power demand value of the target property. be able to. For this reason, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • the defrost time is determined in a time zone when the total power demand value of the target property is small. can do. Therefore, even if the total power of the target property increases due to defrosting, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • the control unit may cause the control unit to perform defrost during the time when the total power demand value of the target property is small. it can. For this reason, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • the defrost control system since the heat exchanger works as a condenser when defrosting is performed, the total power of the target property tends to increase as a result of defrosting. Even in this case, the defrost time is determined so as to avoid the peak time of 1 or more, so that the total power demand value of the target property is small and the control unit is allowed to defrost in the time zone. Can do. For this reason, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • the first determination unit determines one or more defrost times so as to overlap one or more peak times, defrosting is performed in a time zone when the total power demand value of the target property is large. The time can be determined. For this reason, defrosting Even if the total power of the target property decreases, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • the first determination unit determines one or more defrost times so as to avoid immediately before one or more peak times, the time period when the total power demand value of the target property is large. And the timing immediately after the defrost time can be reduced. For this reason, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • the defrost control system since the freezing and refrigeration apparatus is stopped after the defrost, the total power of the target property tends to decrease due to the defrost.
  • the first determination unit determines one or more defrost times so that it overlaps with one or more peak times, so the control unit must defrost during the time when the total power demand value of the target property is large. Can do. For this reason, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • the second determining unit determines peak information based on the total power demand value of the target property, so the peak in the trend of the total power demand value of the target property. Taking into account, one or more defrost times can be determined.
  • the third determining unit determines peak information based on the total power demand value and the first power demand value of the target property, so the trend and the first One or more defrost times can be determined taking into account trends in power demand values and peaks. As a result, the increase in the maximum value of the total power demand value of the object can be reduced.
  • the peak information is determined based on the total power demand value and the first power demand value of the target property. be able to.
  • the peak is calculated based on the total power demand value and the first power demand value of the target property. Information can be determined.
  • the fourth determination unit determines peak information based on the second power demand value of the target property, so the peak in the trend of the second power demand value of the target property is determined. In view of this, one or more defrost times can be determined. As a result, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • the defrost time is set in consideration of the peak in the trend related to the total power in the second time of the target property. Can be determined. For this reason, the increase in the maximum value of the total power demand value in the second hour of the target property can be reduced.
  • the first determination unit determines one or more defrost times based on the upper limit interval and the peak information, so that each defrost operation is performed at an appropriate interval. Defrost time can be determined.
  • the first determining unit determines one or more defrost times based on the upper limit interval, the lower limit interval, and the peak information, so that the defrost operation is performed at a more appropriate interval.
  • Each defrost time can be determined.
  • the first determination unit determines one or more defrost times based on the defrost interval, the number of peaks, and the peak information. Defrost time can be determined. For this reason, the defrost time can be determined in a time zone in which the total power demand value of the target property is small.
  • each defrost operation is performed so that an appropriate number of defrost operations are performed. Defrost time can be determined.
  • the first determination unit determines one or more defrost times based on the lower limit number, the upper limit number, and the peak information, so that a more appropriate number of defrost operations can be performed. Each defrost time can be determined.
  • the defrost time is determined based on the peak information and the event information! Taking into account the event occurrence status, at least 1 defrost The time can be determined.
  • the defrost time is determined based on the peak information and the event information!
  • One or more defrost times can be determined taking into account the peak at and the event occurrence.
  • the defrost control system since the first determination unit determines the defrost time based on the season information and the peak information, the defrost time can be changed according to a change in the season and the like. For this reason, even when the trend related to the total power of the target property changes according to changes in the season, etc., the defrost time can be determined in consideration of the peak in the trend related to the total power of the target property.
  • peak information is input to the second input unit, so that one or more defrost times can be determined based on the peak information.
  • the first determination unit determines one or more defrost times based on the peak information, so that the peak in the trend related to the total power of the target property is considered, One or more defrost times can be determined. For this reason, the increase in the maximum value of the total power demand value of the target object can be reduced, so that the increase in the power charge of the target property can be reduced.
  • one or more defrost times are determined based on the peak information. Therefore, one or more defrost times must be determined in consideration of the peak in the trend related to the total power of the target property. Can do. For this reason, since the increase in the maximum value of the total power demand value of the target property can be reduced, the increase in the power charge of the target property can be reduced.
  • the defrost control method since one or more defrost times are determined so as to avoid one or more peak times, the total power demand value of the target property is small, and the defrost time is determined in a time zone. can do. For this reason, even if the total power of the target property increases due to defrosting, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • the defrost control method since one or more defrost times are determined so as to overlap one or more peak times, the total power demand value of the target property is large, and the defrost time is determined in a time zone. Can do. For this reason, even if the total power of the target property decreases due to defrosting, the increase in the maximum value of the total power demand value of the target property can be reduced.
  • FIG. 1 is a configuration diagram of a defrost control system according to a first embodiment of the present invention.
  • FIG. 2 is a refrigerant circuit diagram of a freezer / refrigerator.
  • FIG. 4 is a flowchart showing a flow of processing in which the defrost control system controls the defrost of the refrigeration apparatus.
  • FIG. 5 A diagram showing an operation of the first determination unit in the first embodiment of the present invention.
  • FIG. 6 is a diagram showing the operation of the first determination unit in the first embodiment of the present invention.
  • FIG. 11 is a refrigerant circuit diagram of the refrigeration apparatus.
  • FIG. 14 is a refrigerant circuit diagram of a refrigeration apparatus.
  • 16 A configuration diagram of a defrost control system according to a modification of the first embodiment of the present invention.
  • FIG. 19 is a configuration diagram of a defrost control system according to a second embodiment of the present invention.
  • FIG. 22 is a configuration diagram of a defrost control system according to a modification of the second embodiment of the present invention.
  • FIG. 23 is a configuration diagram of a management center in a modification of the second embodiment of the present invention.
  • FIG. 24 is a configuration diagram of a defrost control system according to a third embodiment of the present invention.
  • FIG. 25 is a configuration diagram of a management center according to the third embodiment of the present invention.
  • FIG. 26 is a diagram showing the operation of the first determination unit in the third embodiment of the present invention.
  • FIG. 27 is a configuration diagram of a defrost control system according to a fourth embodiment of the present invention.
  • FIG. 28 is a block diagram of a management center in the fourth embodiment of the present invention.
  • FIG. 1 shows a configuration diagram of the defrost control system 1 according to the first embodiment of the present invention.
  • a defrost control system 1 shown in FIG. 1 is a system that mainly controls the defrost of the refrigeration units 51a, 52a,..., 51b, 52b,.
  • the showcase 61a, 62a, ⁇ , 61b, 62b, ⁇ which is equipped with a refrigerator / freezer 51a, ⁇ , lib,... and other equipment 12a, 12b,... etc. are installed.
  • the air conditioners 11a,... Harmonize the surrounding spaces of the freezer / refrigerators 51a, 52a,.
  • the defrost control system 1 mainly includes the first demand meter group 94 (94a, 94b,%), The first line 5, the second line group 6 (6a, 6b,...), The third line group 7 (7a , 7b,...;), 4th line group 8 (8a, 8b,...;), modem group 20 (20a, 20b,-. 30), group 30 (30 &, 30b,...;) and management center 70 .
  • the management center 70 and the modem group 20 (20a, 20b,...) Are connected by the first line 5.
  • the first demand meter group 94 (94a, 94b, '' And 1 ⁇ group 30 (30 &, 30b,...) Are connected by a fourth line group 8 (8a, 8b,).
  • the freezer / refrigerators 51a, 52a,..., 51b, 52b,... are installed in the showcases 61a, 62a, ..., 6 lb, 62b,.
  • the management center 70 is connected to the first line 5, the modem group 20 (20a, 20b, "'), the third line group 7 (7 &, 7b,'', the 1 ⁇ group 30 (30 &, 30b, ...) and the The temperature in the showcase 61a, 62a, ..., 61b, 62b, ... is adjusted by the freezer / refrigerator 51a, ... via the two line groups 6 (6a, 6b, ...;).
  • the management center 70 is connected to the first line 5, the modem group 20 (20a, 20b, '-'), the third line group 7 (7 &, 7b, '-'), and the 1 ⁇ group 30 (30 &, 30b, ...) and second line group 6 (6a, 6b, ...), cause showcase 61a, ... to defrost.
  • the refrigerant circuit of the refrigerator / freezer 51a Mainly includes a compressor 516a, a second heat exchanger 513a, and an expansion valve 512a installed outside the showcase 61a.
  • a first heat exchange 511 a installed inside the Shoke over scan 61a.
  • the high-temperature high-pressure refrigerant compressed by the compressor 516a is condensed by the second heat exchanger 513 & and releases heat.
  • the refrigerant becomes a low temperature is evaporated in the first heat exchange 511 a is reduced by the expansion valve 512a.
  • refrigerant flowing through the first heat exchange 511 a is by being Ru heat exchange with the air supplied to the showcases 61a, the inside of the showcase 61a is frozen 'refrigerated.
  • frost tends to adhere to the first heat exchanger 511a. If frost covers the surface of the first heat exchanger 511a, the heat exchange capability of the first heat exchanger la may be reduced.
  • the freezer / refrigerator 51a,... Further has a heater 517a, and the first heat exchange 51la is heated by the heater 517a to remove frost.
  • the compressor 516a is stopped.
  • the first demand meter group 94 (94a, 94b,...) Is provided in the power supply equipment group 90.
  • the power supply facility group 90 further includes a power supply source 91, a first power supply line 92, and a second power supply line 93a, 93b,.
  • the power supply source 91 is connected to the showcase 61a, ... via the first power supply line 92, the second power supply line 93a, 93b, ... and the first demand meter 94a, 94b, ... It is connected to the air conditioner 11a,... 'And other equipment 12a,.
  • a first demand meter 94a, 94b, ... is provided for each store A, ....
  • Showcase 61a, ..., air conditioner 11a, ... and other equipment 12a, '", etc. Are supplied with power from the power supply source 91 via the first power supply line 92, the second power supply lines 93a, 93b,... And the first demand meters 94a, 94b,.
  • the power demand value of the supplied power is measured by the first demand meter 94a, 94b,. That is, the first demand meter 94a, 94b,... Detects the total power demand value of the store A,.
  • the total power demand value is the average value of the total power of stores A, ... for 30 minutes each.
  • the first demand meter 94a, 94b, ⁇ sends the information on the total power demand value of the store building A, ⁇ to the LC30a, ⁇ via the fourth line 8a, ⁇ Send.
  • the management center 70 includes a transmission / reception unit 71, a control unit 72, a first determination unit 73, a second determination unit 74, a first storage unit 75, a second storage unit 76, a third storage unit 77, A fourth storage unit 78 and a fifth input unit 79 are provided.
  • the fifth input unit 79 receives an upper limit interval and a lower limit interval.
  • the upper limit interval is the upper limit of the time interval of the defrost time.
  • the lower limit interval is the lower limit of the defrost time interval.
  • the defrost time is the time when the defrost is performed in showcase 6 la,.
  • the control unit 72 receives the upper limit interval information and the lower limit interval information from the fifth input unit 79 and passes them to the second storage unit 76.
  • the second storage unit 76 stores an upper limit interval and a lower limit interval.
  • the number of peaks is input to the fifth input unit 79.
  • the peak number is the number of peak times included in peak information described later among a plurality of peak times.
  • the peak time is the peak time in the trend of the total power demand value of the stores A,.
  • the control unit 72 receives the peak number information from the fifth input unit 79 and passes it to the third storage unit 77.
  • the third storage unit 77 stores the number of peaks.
  • the lower limit number and the upper limit number are input to the fifth input unit 79.
  • the lower limit number of times is the lower limit of the number of times of defrost performed in one day, that is, the lower limit of the number of times of defrost in one day.
  • the maximum number of times is the upper limit of the number of defrosts performed per day, that is, the upper limit of the number of defrost times per day.
  • the control unit 72 receives the lower limit number information and the upper limit number information from the fifth input unit 79 and passes them to the fourth storage unit 78.
  • the fourth storage unit 78 stores the lower limit number and the upper limit number.
  • the transmitting / receiving unit 71 receives information on the total power demand value of the stores A,...
  • the control unit 72 receives information on the total power demand value of the stores A,. Then, the control unit 72 passes the information on the total power demand value of 30 minutes for each of the stores A,.
  • the first storage unit 75 stores information on the total power demand value for 30 minutes for each store A,.
  • the second determination unit 74 receives information on the total power demand value for 30 minutes for each store A,... On the day from the first storage unit 75 via the control unit 72. In addition, the second determination unit 74 receives the peak number information from the third storage unit 77 via the control unit 72. The second determination unit 74 determines the peak information based on the information on the total power demand value for each 30 minutes of the store A,. Here, the peak information is information relating to one or more peak times. The peak time is the peak time in the trend of the total power demand value of stores A,. Specifically, the second determination unit 74 selects the value of the number of top peaks from the ones with a large total power demand value of 30 minutes for each store A,. The control unit 72 receives the peak information from the second determination unit 74 and passes it to the first storage unit 75. The first storage unit 75 stores peak information.
  • the first determination unit 73 receives peak information from the first storage unit 75 via the control unit 72, receives upper limit interval information and lower limit interval information from the second storage unit 76 via the control unit 72, and Information on the number of peaks is received from the third storage unit 77 via the control unit 72, and information on the lower limit number and upper limit number of times are received from the fourth storage unit 78 via the control unit 72.
  • the defrost time is determined when the total power demand value of store A, ⁇ is large, the total power of store A ⁇ ⁇ ⁇ increases further by the amount of power consumed by the heater. As a result, the maximum value of the total power demand in one day for store A, ⁇ may increase.
  • the first determination unit 73 sets the defrost time to avoid one or more peak times based on the upper limit interval, the lower limit interval, the lower limit number, the upper limit number, the peak number, and the peak information. decide. Specifically, the first determination unit 73 determines the number of defrosts so that the number is less than the lower limit number and less than the upper limit number. Here, the number of defrosts is the number of times defrosting is performed in one day. In addition, the first determination unit 73 is not less than the lower limit interval and not more than the upper limit interval. Thus, the defrost interval is determined.
  • the defrost interval is a time interval at which defrost is performed.
  • the first determination unit 73 determines each defrost time so that each peak time comes between defrost times corresponding to the number of defrosts separated from each other by the defrost interval. As a result, the defrost time is determined in a time zone in which the total power demand value of the stores A,.
  • the control unit 72 receives information on each defrost time from the first determination unit 73, generates defrost command information, and passes it to the transmission / reception unit 71.
  • the transmission / reception unit 71 transmits the defrost command information to the store A via the first line 5.
  • the modem group 20 (20a, 20b, '' shown in FIG. 1 connects the first line 5 and the third line group 7 (7 &, 7b,... Where the first line 5 is an analog line.
  • the third line group 7 (7a, 7b,...) Is a digital line (eg, RS-232C line)
  • Each modem 20a, 20b,. Is a normal modem that converts the signal of the first line and the signal of the digital line to each other, that is, the modem 20a, ... converts the signal of the first line 5 and the signal of the second line 6a, ... to each other. .
  • the modem 20a, ⁇ receives defrost command information (analog signal) from the management center 70 via the first line 5, and converts it into defrost command information (digital signal). Modem 20a, ⁇ sends the defrost command information (digital signal) to LC3 la, 32a,... via second line 6a.
  • LC group 30 (30a, 30b,...;) is connected to modem group 20 (2 Oa, ⁇ ) via third line group 7 (7a, 7b,...;). 6 is connected to the freezer / refrigerator 5 la,... Via 6 (6a,).
  • Each LC 30a, ⁇ receives information on the total power demand value of store A, ⁇ from the first demand meter 94a, ⁇ 'through the fourth line 8a.
  • LC30a, ... is the management center for the total power demand value information of store A, ... via the second line 7a, ..., the modem 20a, ..., and the first line 5. Send to 170.
  • each LC30a, ⁇ sends the defrost command information to the modem 2 via the third line 7a, ⁇ '. Oa, ⁇ Receive from '.
  • LC30a converts the defrost command information into a format that can be read by the freezer / refrigerator 5 la, and then passes through the second circuit 6a, the freezer / refrigerator 51a, Send to '.
  • the freezer / refrigerator 51a, ⁇ receives the defrost command information from LC30a via the second circuit 6a.
  • the freezer / refrigerators 51a, ... perform defrosting at a predetermined defrost time based on the defrost command information.
  • step S1 the upper limit interval and the lower limit interval are stored. That is, the upper limit interval and the lower limit interval are input to the fifth input unit 79 of the management center 70.
  • the upper limit interval is the upper limit of the time interval of the defrost time.
  • the lower limit interval is the lower limit of the defrost time interval.
  • the defrost time is the time when defrost is performed in showcase 6 la,.
  • the control unit 72 receives the upper limit interval information and the lower limit interval information from the fifth input unit 79 and passes them to the second storage unit 76.
  • the second storage unit 76 stores an upper limit interval and a lower limit interval.
  • step S2 the number of peaks is stored. That is, the peak number is input to the fifth input unit 79 of the management center 70.
  • the peak number is the number of peak times included in the peak information described later among a plurality of peak times.
  • the peak time is the peak time in the trend of the total power demand value of store A,.
  • the control unit 72 receives the peak number information from the fifth input unit 79 and passes it to the third storage unit 77.
  • the third storage unit 77 stores the number of peaks.
  • step S3 the lower limit number and the upper limit number are stored. That is, the lower limit number and the upper limit number are input to the fifth input unit 79 of the management center 70.
  • the lower limit number is the lower limit of the number of times of defrost performed on one day, that is, the lower limit of the number of times of defrost time per day.
  • the upper limit is the upper limit of the number of defrosts performed per day, that is, the upper limit of the number of defrost times per day.
  • the control unit 72 receives the information on the lower limit number and the information on the upper limit number from the fifth input unit 79 and passes them to the fourth storage unit 78.
  • the fourth storage unit 78 stores the lower limit number and the upper limit number.
  • step S4 peak information is stored. That is, the first demand meter 94a, 94b, • ⁇ detects the total power demand value of store A, ⁇ . Then, the first demand meters 94a, 94b,... Transmit information on the total power demand value of the stores A,... To the management center 70 via the first line 5.
  • the transmission / reception unit 71 of the management center 70 receives information on the total power demand value of the stores A,... From the first demand meters 94a, 94b,.
  • the control unit 72 receives information on the total power demand value of the stores A,. Then, the control unit 72 passes the information on the total power demand value for 30 minutes for each store A,... To the first storage unit 75.
  • the first storage unit 75 stores information on the total power demand value for 30 minutes for each store A,.
  • the second determination unit 74 receives information on the total power demand value for 30 minutes for each store A,... On the day from the first storage unit 75 via the control unit 72. In addition, the second determination unit 74 receives the peak number information from the third storage unit 77 via the control unit 72.
  • the second determination unit 74 determines the peak information based on the information on the total power demand value for each 30 minutes of the store A,.
  • the peak information is information relating to one or more peak times.
  • the peak time is the peak time in the trend of the total power demand value of stores A,.
  • the second determination unit 74 selects the value of the number of top peaks from the ones with a large total power demand value of 30 minutes for each store A,.
  • the control unit 72 receives the peak information from the second determination unit 74 and passes it to the first storage unit 75.
  • the first storage unit 75 stores peak information.
  • step S6 the defrost time is provisionally determined. That is, the first determination unit 73 temporarily stores the previous determination content in the memory (not shown) via the control unit 72.
  • the first determination unit 73 receives peak information from the first storage unit 75 via the control unit 72, receives upper limit interval information and lower limit interval information from the second storage unit 76 via the control unit 72, and The information on the number of peaks is received from the third storage unit 77 via the control unit 72, and the information on the lower limit number and the information on the upper limit number are received from the fourth storage unit 78 via the control unit 72.
  • the first determination unit 73 determines the defrost time based on the upper limit interval, the lower limit interval, the lower limit number, the upper limit number, the peak number, and the peak information so as to avoid one or more peak times. Ingredients Specifically, the first determination unit 73 determines the defrost number so that the number is less than the lower limit number and less than the upper limit number. Here, the number of defrosts is the number of times defrosting is performed in one day. Further, the first determination unit 73 determines the defrost interval so as to be not less than the lower limit interval and not more than the upper limit interval. Here, the defrost interval is a time interval at which defrost is performed.
  • the first determination unit 73 determines each defrost time so that each peak time comes between defrost times corresponding to the number of defrosts separated from each other by the defrost interval. As a result, the defrost time is provisionally determined in a time zone in which the total power demand value of the stores A,.
  • the defrost time is determined as shown in FIG. 5 (a). That is, since the peak time of peak P1, which has the power demand value ranking of 1st, is 12:00, the defrost time is determined as time T1 and time T2 that are separated by At.
  • twelve o'clock is preferably the middle time between time T1 and time T2.
  • the electric power of the freezer / refrigerator 51a,... Changes as shown by the two-dot chain line in FIG.
  • the power other than ⁇ changes as shown by the dashed line in Fig. 5 (b).
  • the total power of store A, ... changes as shown by the solid line in Fig. 5 (c).
  • the total power demand value near 12:00 remains the same as W 1 before the defrost time is determined. That is, an increase in the maximum value of the total power demand value is suppressed.
  • the defrost time is determined as shown in FIG. That is, the peak time of peak P1 with the power demand value rank of 1st is 12:00 and the peak time of peak P2 with the power demand rank of 2nd is 18:00, so the defrost time is only At The time T3 and the time T4 are set apart.
  • the time from time T3 to 12:00 is preferably equal to the time from 18:00 to time T4.
  • step S7 it is determined whether or not the defrost time overlaps with the peak time. That is, the first determination unit 73 determines whether or not the force includes the peak time within a predetermined time before and after the defrost time. If it is determined that they overlap, the process proceeds to step S10. If it is determined that they do not overlap, the process proceeds to step S8.
  • step S8 it is determined whether or not N is equal to or greater than the number of peaks. That is, the first decision
  • the fixing unit 73 receives the peak number information from the third storage unit 77 via the control unit 72.
  • the first determination unit 73 compares the value of the variable N of the power demand value rank with the number of peaks, and determines whether N is equal to or greater than the number of peaks. If it is determined that N is greater than or equal to the number of peaks, the process proceeds to step S10. If N is determined not to be greater than or equal to the number of peaks, the process proceeds to step S9.
  • N + 1 is set to N. That is, the first determining unit 73 newly sets a value obtained by adding 1 to the value of the variable N in the power demand value order as the value of the variable N in the power demand value order.
  • step S10 the previous decision is recalled. That is, the first determination unit 73 recalls the previous determination content stored at 1 o'clock from the memory via the control unit 72.
  • step S11 the defrost time is determined. That is, the first determination unit 73 determines the defrost time definitely.
  • the control unit 72 receives information on each defrost time from the first determination unit 73 and passes it to the transmission / reception unit 71.
  • the transmission / reception unit 71 transmits the defrost command information to the store A via the first line 5.
  • the modem 20a Receives the defrost command information (analog signal) from the management center 70 via the first line 5 and converts it into the defrost command information (digital signal).
  • Modem 20a, ⁇ sends the defrost command information (digital signal) to LC3 la, 32a,... via third line 7a, ⁇ .
  • Each LC30a receives the defrost command information from the modem 20a via the third line 7a.
  • LC30a, ⁇ ⁇ ⁇ converts the defrost command information into a format that can be read by the freezer / refrigerator 51a, ⁇ ⁇ ⁇ via the second circuit 6a, ⁇ ⁇ ⁇ via the freezer / refrigerator 51a, ⁇ ⁇ ' Send to.
  • the freezer / refrigerator 51a receives the defrost command information from the LC 30a via the second circuit 6a.
  • the freezer / refrigerators 51a,... Perform defrosting at a predetermined defrost time based on the defrost command information.
  • the first storage unit 75 stores peak information.
  • the first determination unit 73 receives the peak information from the first storage unit 75 via the control unit 72.
  • the first determination unit 73 determines one or more defrost times based on peak information and the like. In this way, since the first determining unit 73 determines the defrost time based on the peak information and the like, the defrost time is determined in consideration of the peak in the trend regarding the total power of the store skin A,. .
  • the first determination unit 73 receives the peak information from the first storage unit 75 via the control unit 72.
  • the first determination unit 73 determines one or more defrost times based on peak information or the like so as to avoid one or more peak times.
  • the first determination unit 73 determines one or more defrost times so as to avoid one or more peak times, the total power demand value of the store A, ⁇ The defrost time is determined. Therefore, even if the total power of the target property increases due to defrosting, the increase in the maximum value of the total power demand value of stores A, ... will be reduced.
  • control unit 72 causes the showcase 6 la,... To defrost based on one or more defrost times.
  • defrosting is performed in the showcase 6 la, ⁇ , frost adhering to the first heat exchange ⁇ 511a, ⁇ ⁇ ⁇ is heated by the heater 517a, ⁇ & Removed from, ...
  • the first determining unit 73 determines the defrost time of 1 or more so as to avoid the peak time of 1 or more, so the showcase 61a, ⁇ ⁇ ⁇ ⁇ ⁇ Defrost will be done. For this reason, the increase in the maximum value of the total power demand value of the stores A, ... is reduced.
  • the first demand meter 94a, ⁇ detects the total power demand value of the store A, ⁇ .
  • the second determination unit 74 receives information on the total power demand value of the store A, ⁇ from the first demand meter 94a, ⁇ via the first line 5, the transmission / reception unit 71, and the control unit 72. .
  • Second decision part 74 Determines peak information based on the total power demand value of the stores A,.
  • the second determination unit 74 determines peak information based on the total power demand value of the stores A,..., The peak in the trend of the total power demand value of the stores A,. It has become possible to determine more than one defrost time.
  • the trend of the total power demand value of the stores A is the trend in one day.
  • the peak information is information regarding the peak time in the trend of the total power demand value in one day for the stores A,.
  • the second storage unit 76 stores an upper limit interval and a lower limit interval.
  • the first determination unit 73 receives upper limit interval information and lower limit interval information from the second storage unit 76 via the control unit 72, and receives peak information from the first storage unit 75 via the control unit 72.
  • the first determination unit determines one or more defrost times based on the upper limit interval and peak information.
  • each defrost time is determined so that the defrost operation is performed at an appropriate interval.
  • the third storage unit 77 stores the number of peaks.
  • the first determination unit 73 receives the peak number information from the third storage unit 77.
  • the first determination unit 73 determines the defrost time based on the number of peaks and peak information.
  • the first determination unit 73 determines the defrost time based on the number of peaks and peak information, the peak number peak in the trend of the total power demand value of the store A,. Each defrost time is determined.
  • the fourth storage unit 78 stores the lower limit number and the upper limit number.
  • the first determination unit 73 receives the lower limit number information and the upper limit number information from the fourth storage unit 78 via the control unit 72, and receives peak information from the first storage unit 75 via the control unit 72.
  • the first determination unit 73 determines one or more defrost times based on the lower limit number, the upper limit number, the peak information, and the like.
  • the first determination unit 73 determines one or more defrost times based on the lower limit number, the upper limit number, the peak information, and the like, each defrost operation is performed so that an appropriate number of defrost operations are performed. The time is determined.
  • the management center 70a further includes a first input unit 81a, a first determination unit 73a instead of the first determination unit 73, and a control unit 72.
  • a control unit 72a may be provided.
  • at least one of seasonal information, weather information, and regional information (hereinafter referred to as seasonal information, etc.) is input to the first input unit 81a.
  • the first determination unit 73a receives seasonal information and the like from the first input unit 81a via the control unit 72a.
  • the first determination unit 73a receives peak information from the first storage unit 75 via the control unit 72a.
  • the first determination unit 73a determines the defrost time based on seasonal information and peak information.
  • the management center 70a may include a second storage unit 76a instead of the second storage unit 76.
  • the second storage unit 76a stores the lower limit number of table information shown in FIG.
  • the table information includes a season field 761a and a lower limit number field 762a.
  • an appropriate lower limit can be determined according to the season. That is, the amount of frost (frosting amount) adhering to the first heat exchanger 51 la of the refrigeration apparatus 51a,... Tends to be larger in summer than in winter.
  • the first determination unit 73a receives information on the season from the first input unit 81a via the control unit 72a.
  • the first decision The determination unit 73a receives the table information of the lower limit number of times from the second storage unit 76a via the control unit 72a. Then, the first determination unit 73a determines the defrost interval based on the table information on the lower limit number of times and the information on the season. Further, the first determination unit 73a determines the defrost time based on the determined defrost interval, peak information, and the like.
  • the first determination unit 73a determines the defrost time based on the seasonal information and the peak information, etc., the trend of the total power demand value of the stores A,. Even if it changes, the defrost time is determined in consideration of the peak in the trend of the total power demand value of store A,.
  • seasonal information or the like may be acquired via a network or the like instead of being input by the user.
  • the table information stored in the second storage unit 76a may be a record of the relationship between at least one of the season information, the weather information, and the region information and the defrost interval.
  • the defrost time per summer may be set longer than in winter. Furthermore, it is possible to increase the defast time per summer in summer than in winter, and increase the number of summer frosts in winter.
  • the management center 70a further includes a second input unit 82a, a first determination unit 73a instead of the first determination unit 73, and a control unit instead of the control unit 72.
  • 72a may be provided.
  • peak information is input to the second input unit 82a.
  • the first determination unit 73a receives the peak information from the second input unit 82a via the control unit 72a.
  • the first determination unit 73a determines the defrost time based on the peak information.
  • the defrost time is determined so as to change the defrost time according to the user's request. Therefore, the defrost time is determined in a time zone where the total power demand value of the store A,.
  • the freezer / refrigerator 51ak further includes a four-way switching valve 514ak so that the refrigerant cycle can be reversed.
  • control unit 72k of the management center 70k shown in FIG. 10 causes the showcase 6la,... To defrost based on one or more defrost times.
  • the control unit 72k switches the four-way switching valve 514ak to the path indicated by the solid line when the freezing and refrigeration in the showcase 6la is performed by the freezing and refrigeration apparatus 5lak.
  • the control unit 72k causes the first heat exchangers 511a,... To function as an evaporator (a cycle indicated by a solid arrow in FIG. 11).
  • control unit 72k switches the four-way switching valve 514ak to a route indicated by a broken line when defrosting is performed in the showcase 6la.
  • the control unit 72k causes the first heat exchangers 511a,... To function as a condenser (a cycle indicated by a dashed arrow in FIG. 11).
  • the first heat exchange la when defrosting is performed, the first heat exchange la,... Acts as a condenser, so that the total power of the stores A,.
  • the control unit 72 k since the first determination unit 73 determines the defrost time of 1 or more so as to avoid the peak time of 1 or more, the control unit 72 k performs the defrost in the time zone when the total power demand value of the store A,. Will be done. For this reason, the increase in the maximum value of the total power demand value of stores A,.
  • the management center 70b includes a first determination unit 73b instead of the first determination unit 73 as shown in FIG. A control unit 72b may be provided. Further, the refrigeration apparatus 5 lab,... May be turned off to remove frost (off-cycle defrost) instead of removing frost by heating with the heater.
  • control unit 72b of the management center 70b causes the showcase 61a, ... to perform defrosting based on one or more defrosting times.
  • control unit 72b causes the showcase 61a to perform defrosting, the control unit 72b turns off the freezing and refrigeration apparatus 51ab.
  • the control unit 72b turns off the refrigeration unit 51ab, so that the defrosting reduces the total power of the store A,. Tend to.
  • the freezer / refrigerator 51ab is turned off and the power is turned on. Then, immediately after being turned on, the power consumption of the freezer / refrigerator 5 la, ⁇ tends to increase temporarily. That is, the power value of the freezer / refrigerator 5 lab when the defrost is performed changes as shown by a two-dot chain line in FIG. 15 (b).
  • the first determination unit 73b receives the peak information from the first storage unit 75 via the control unit 72b.
  • the first determination unit 73b determines one or more defrost times so as to overlap one or more peak times based on peak information or the like (see FIG. 15 (a)).
  • the first determination unit 73b further determines one or more defrost times based on the peak information or the like so as to avoid immediately before one or more peak times.
  • the defrost time is determined as shown in FIG. That is, since the peak time of peak P1, which has the highest power demand value rank, is 12:00, the defrost time is determined as time Tib and time T2b that are separated by At. Here, 12:00 is preferably the same time as the time Tib.
  • the power of the freezer / refrigerator 51a, ⁇ in the store A, ⁇ changes as shown by a two-dot chain line in Fig. 15 (b).
  • the power other than ⁇ changes as shown by the dashed line in Fig.
  • the defrost time is determined in the time zone when the total power demand value of the store A, ... is large. Is done. Therefore, even if the total power of store A, ... decreases due to defrosting, the increase in the maximum value of the total power demand value of store A, ... will decrease.
  • the first determination unit 73b determines the defrost time of 1 or more so as to avoid the time immediately before the peak time of 1 or more, the time zone where the total power demand value of the store A, ... is large and the time immediately after the defrost time are determined. Overlap with timing is reduced. For this reason, the increase in the maximum value of the total power demand value of stores A, ⁇ will be reduced.
  • the freezer / refrigerator 51a may be provided in a freezer, refrigerator, warehouse, or the like instead of the showcase 61a,.
  • the showcase 6 la, ⁇ , a freezer, a refrigerator, a warehouse, etc. may be installed in a department store, supermarket, etc. instead of store building A, ⁇ '.
  • the freezing and refrigeration equipment 5 la, ⁇ provided in the showcase 61a, ⁇ of the store A, ⁇ can be only frozen or refrigerated instead of freezing and refrigeration. It may be a mixture of those that only perform freezing and those that perform only refrigeration, or those that perform freezing and refrigeration, those that perform only freezing, and those that perform only refrigeration. It may be a mixture of two or more.
  • the defrost control system li shown in FIG. 16 has an event detection sensor group 9i (9a, 9b,
  • the management center 70i may include a first determination unit 73i instead of the first determination unit 73, and may include a control unit 72i instead of the control unit 72.
  • the transmission / reception unit 71 receives event information from each event detection sensor 9a,... 'Via the modem 20a,.
  • the first determination unit 73i receives event information from the transmission / reception unit 71 via the control unit 72i, and receives peak information from the first storage unit 75 via the control unit 72i.
  • the first determination unit 73i determines the defrost time based on the peak information and the event information.
  • each event detection sensor 9a,... Is installed at the entrance of the store A,..., And may detect the number of customers at the store A,.
  • the event information may be, for example, the number of customers who have made shopping in the past at the same time in IIA.
  • each event detection sensor 9a,... Is linked to a POS (Point of Sales) system, and detects and stores information on the number of customers who have made a purchase at store A,.
  • the transmission / reception unit 71 receives event information from each event detection sensor 9a via the first line 5.
  • the management center 70j of the defrost control system lj further includes a fourth input unit 86j, a first determination unit 73 ⁇ 4 instead of the first determination unit 73, and a control unit 72. Instead, a control unit 73 ⁇ 4 is provided.
  • event information is input to the fourth input unit 86j.
  • the first determination unit 73i receives event information from the fourth input unit 86j via the control unit 73 ⁇ 4, and receives peak information from the first storage unit 75 via the control unit 73 ⁇ 4.
  • the first determination unit 73 ⁇ 4 determines the defrost time based on the peak information and the event information.
  • the first determination unit 73 ⁇ 4 determines the defrost time based on the peak information and the event information, the peak in the trend of the total power demand value of the store A, ... Considering the occurrence situation, one or more defrost times will be determined.
  • the event information is, for example, the correlation between the number of customers at the store A,. This event information may be based on specific past data or based on the subjectivity of the user.
  • FIG. 19 shows a configuration diagram of a defrost control system according to the second embodiment of the present invention.
  • FIG. 20 shows a configuration diagram of components of the defrost control system 100 according to the second embodiment of the present invention. 19 and 20, the same components as those of the defrost control system 1 in FIGS. 1 and 2 are denoted by the same reference numerals.
  • a defrost control system 100 shown in FIG. 19 is a system that mainly controls the defrost of the refrigeration units 51a, 52a,..., 51b, 52b,.
  • the defrost control system 100 has the same basic configuration as that of the first embodiment, but includes a management center 170 instead of the management center 70.
  • Demand meter group 196 (196a, 197a, ..., 196b, 197b, ...) This is different from the first embodiment.
  • the second demand meter group 196 (196a, 197a, ⁇ , 196b, 197b, ⁇ ) is connected to the first demand meter 94a, ⁇ and the freezer / refrigerator 5 la, ⁇ on the second power supply line 93a. ⁇ Between. Each second demand meter 196a is provided for each freezer / refrigerator 51a.
  • the management center 170 includes a third determination unit 183 instead of the second determination unit 74, includes a first storage unit 175 instead of the first storage unit 75, and includes a control unit 172 instead of the control unit 72.
  • the second demand meter 196a, ⁇ detects the first power demand value.
  • the first power demand value is an average value of power required for defrosting in the refrigerator / freezer 51a,... For each 30 minutes.
  • the second demand meter 196a, ⁇ is the first power demand value via the fourth line 8a, ⁇ and L C130a, ⁇ and the modem 20a, ⁇ and the first line 5. Send information to Administration Center 170.
  • the transmission / reception unit 71 of the management center 170 transmits the information on the total power demand value of the store A,... And the information on the first power demand value via the first line 5 to the first demand meter 94a, 94b,. Receive from.
  • the control unit 172 receives the information on the total power demand value and the information on the first power demand value of the stores A,.
  • the control unit 172 obtains a power demand value obtained by subtracting the first power demand value of the total power demand value of the store A,... Every 30 minutes.
  • the first storage unit 175 stores information of “total power demand value ⁇ first power demand value” for 30 minutes for each store A,.
  • the third determination unit 183 stores information on “total power demand value—first power demand value” for 30 minutes for each store A,... On the day from the first storage unit 175 via the control unit 172. receive. In addition, the third determination unit 183 receives information on the number of peaks from the third storage unit 77 via the control unit 172. The third determination unit 183 determines peak information based on the information of “total power demand value ⁇ first power demand value” for 30 minutes for each store A,. Here, the peak information is information on one or more peak times. The peak time is the time when the total power demand value of the stores A,. Specifically, the third determining unit 183 calculates the “total power demand value—the first power demand value” for 30 minutes each for the store skin A,. From the largest value, the value of the number of upper peaks is selected as peak information. The control unit 172 receives the peak information from the third determination unit 183 and passes it to the first storage unit 175. The first storage unit 175 stores peak information.
  • the defrost time is determined as shown in FIG. That is, since the peak time of the peak P101 with the power demand value ranking of 1st is 12:00, the defrost time is determined as a time T101 and a time T102 that are separated by At.
  • 12 o'clock is preferably the middle time between time T101 and time T102.
  • the vertical axis is “total power demand value minus first power demand value”.
  • the third determining unit 183 determines peak information based on the total power demand value and the first power demand value of the stores A,...
  • the peak information is the total of the stores A,.
  • the power demand values excluding the first power demand value will match the actual results.
  • the defrost time is determined in the time zone when the power demand value is small, excluding the first power demand value of the total power demand value of store A,.
  • the increase in the maximum value of the total power demand value of the stores A, ... is reduced.
  • the peak is determined in a manner that eliminates the effects of fluctuations in the first power demand value, errors are reduced when the defrost time is determined in a time zone when the total power demand value is small.
  • the first determination unit 73 determines the defrost time based on the peak information, the point that the defrost time is determined in a time zone in which the total power demand value of the store A,. It is the same. Therefore, even with such a defrost control system 100, the increase in the maximum value of the total power demand value of the stores A,.
  • the defrost dredge control system lOOi shown in Fig. 22 has the second demand meter group 196 (196a, 197a,
  • the management center 170i may further include a third input unit 185i as shown in FIG.
  • the first power demand value is input to the third input unit 185 i.
  • the control unit 172i stores information on the first power demand value.
  • the third input 185 is received.
  • the peak information is determined based on the total power demand value and the first power demand value of the store A,. Become so.
  • timing at which the third input unit 185i is input is preferably the time when the refrigeration apparatus 51a,... Is installed in the store A,.
  • FIG. 24 shows a configuration diagram of a defrost control system according to the third embodiment of the present invention.
  • FIG. 25 shows a configuration diagram of the components of the defrost control system 200 according to the third embodiment of the present invention.
  • 24 and 25 the same components as the components of the defrost control system 1 in FIGS. 1 and 2 are denoted by the same reference numerals.
  • the defrost control system 200 shown in FIG. 24 is a system that mainly controls the defrost of the refrigeration units 51a, 52a,..., 51b, 52b,.
  • the defrost control system 200 has the same basic configuration as that of the first embodiment, but includes a management center 270 instead of the management center 70.
  • the third demand meter group 296 (296a, 297a, ..., 296b, 297b,...;) force i and the fourth demand meter group 298 (298a, 298b,...;) Different from one embodiment.
  • the third demand meter group 296 (296a, 297a, ⁇ , 296b, 297b,...;) is connected to the first demand meter 94a, ⁇ and the freezer / refrigerator 5 la, ⁇ on the second power supply line 93a. ⁇ Between. Each third demand meter 296a,... Is provided for each freezer / refrigerator 51a,.
  • the fourth demand meter group 298 (298a, 298b, ...) is provided between the first demand meter 94a, ... and the air conditioner 11a, ... on the second power supply line 93a. Yes.
  • Each fourth demand meter 298a is provided for each air conditioner 11a.
  • the management center 270 includes a fourth determination unit 284 instead of the second determination unit 74, a first storage unit 275 instead of the first storage unit 75, and a control unit instead of the control unit 72. It has 272. Then, the third demand meter 296a,... Detects the third power demand value.
  • the third power demand value is the power demand value of the refrigeration equipment 51a,.
  • the third demand meter 296a, ⁇ sends the information of the third power demand value to LC230a, ⁇ 'via the fourth line 8a.
  • the fourth demand meter 298a, ⁇ detects the fourth power demand value.
  • the fourth power demand value is the power demand value of the air conditioner 11a.
  • the fourth demand meter 298a,... Transmits information on the fourth power demand value to the LC 230a,.
  • LC 230a,... Transmits information on the fourth power demand value to the management center 270 via the third line 7a, .. and the modem 20a,.
  • the transmission / reception unit 71 of the management center 270 receives the information on the third power demand value and the information on the fourth power demand value in the first time instead of receiving the information on the total power demand value of the stores A,. Receive from modem 20a, ⁇ ⁇ 'via line 5.
  • the control unit 272 receives the information on the third power demand value and the information on the fourth power demand value from the transmission / reception unit 71.
  • the control unit 272 obtains a power demand value that is a sum of the third power demand value and the fourth power demand value as the second power demand value every 30 minutes.
  • the second power demand value is a value obtained by averaging the total power of the power of the freezer / refrigerator 5 la, ⁇ and the power of the air conditioner 11a, ⁇ for 30 minutes each.
  • the first storage unit 275 stores information on the second power demand value for 30 minutes for each store A,.
  • the fourth determination unit 284 receives information on the second power demand value for 30 minutes for each store A,... On the day from the first storage unit 275 via the control unit 272. Further, the fourth determination unit 284 receives the information on the number of peaks from the third storage unit 77 via the control unit 272. The fourth determination unit 284 determines peak information based on the information on the second power demand value for 30 minutes for each store A,. Here, the peak information is information relating to one or more peak times. The peak time is the peak time of the total power demand value of store A,. Specifically, the fourth determining unit 284 selects the value of the number of top peaks from the one with the second power demand value of 30 minutes for each store A, ⁇ on a day as peak information. . The control unit 272 receives the peak information from the fourth determination unit 284 and passes it to the first storage unit 275. The first storage unit 275 stores peak information.
  • the defrost time is determined as shown in FIG. That is, the peak time of peak P201 with the power demand value rank of 1st is 12:00, and the peak time of peak P202 with the power demand value rank of 2nd is 18:00, so the defrost time is A It is determined at time T203 and time T204 that are separated by t. Here, it is preferable that the time from T203 to 12:00 is equal to the time from 18:00 to T204.
  • the fourth determining unit 284 determines the peak information based on the second power demand value of the store A,..., So that the peak information is the actual value of the second power demand value of the store A,. It will be suitable for. For this reason, the defrost time is determined in a time zone in which the second power demand value of the store A,. As a result, the increase in the maximum value of the total power demand value of the stores A, ... is reduced. In addition, since the peak is determined in a manner that eliminates the effect of fluctuations in the first power demand value, the error is reduced when the defrost time is determined in a time zone when the total power demand value is small.
  • the first determination unit 73 determines the defrost time based on the peak information, the point that the defrost time is determined in a time zone in which the total power demand value of the store A,. It is the same. Therefore, even with such a defrost control system 200, an increase in the maximum value of the total power demand value of the stores A,... .
  • the fourth determination unit 284 may obtain only the third power demand value every 30 minutes. At this time, the fourth determination unit 284 selects the value of the number of upper peaks from the ones with a large third power demand value for 30 minutes for each store A,. Even in this case, since the fourth determining unit 284 determines the peak information based on the third power demand value of the store A,..., The peak information is the third power demand value of the store A,. It will be suitable for your achievements. For this reason, the defrost time is determined in a time zone where the third power demand value S of the store A,. As a result, the increase in the maximum value of the total power demand value of store A, ... is reduced.
  • the fourth determination unit 284 may obtain only the fourth power demand value every 30 minutes. At this time, the fourth determination unit 284 selects the value of the number of upper peaks from the ones with a large fourth power demand value for 30 minutes for each store A,. Even in this case, since the fourth determining unit 284 determines peak information based on the fourth power demand value of the stores A,..., The peak information matches the results of the fourth power demand values of the stores A,. It becomes a thing. For this reason, the defrost time is determined in the time zone where the fourth power demand value of store A,. As a result, the increase in the maximum value of the total power demand value of the stores A, ... is reduced.
  • FIG. 27 shows a configuration diagram of a defrost control system according to the fourth embodiment of the present invention.
  • FIG. 28 shows a configuration diagram of components of a defrost control system 200 according to the fourth embodiment of the present invention.
  • the defrost control system 300 shown in FIG. 27 is a system that mainly controls the defrost of the freezer / refrigerators 51a, 52a,..., 51b, 52b,.
  • the defrost control system 200 has the same basic configuration as that of the first embodiment, but the management center 70, the first line 5, and the modem group 20 (20a, 20a, ) And third line group 7 (7a, '' are not provided, but instead of 1 ⁇ group 30 (30 & , ...), LC group 330 (330a, ... This is different from the first embodiment.
  • the fifth input unit 339a is provided in the LC 30a instead of the management center 70. The same applies to the other LC30b.
  • the defrost time is determined in a time zone where the total power demand value of the store A, ... is small. Is the same as in the first embodiment. Therefore, such a defrost control system 300 0 also reduces the increase in the maximum value of the total power demand value of the store A,. The increase in the electricity charge at P.A.
  • the defrost control system and the defrost control method according to the present invention have an effect of reducing the increase in the electricity charge of the target property, and are useful as a defrost control system and a defrost control method.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Defrosting Systems (AREA)

Abstract

 対象物件の電力料金の増加を低減することができるデフロスト制御システム及びデフロスト制御方法を提供する。デフロスト制御システム(1,1a,1b,1i,1j,1k,100,100i,200,300)は、第1記憶部(75,175,275,335a,・・・)と、第1決定部(73,73a,73b,73i,73j,333a,・・・)とを備える。第1記憶部は、対象物件の総電力に関するトレンドにおいてピークとなる時刻である1以上のピーク時刻に関する情報であるピーク情報を記憶する。第1決定部は、少なくともピーク情報に基づいて、対象物件において冷凍及び冷蔵の少なくとも一方を行う冷凍冷蔵装置(51a,・・・)のデフロストが行われる時刻である1以上のデフロスト時刻を決定する。

Description

明 細 書
デフロスト制御システム、デフロスト制御装置、及びデフロスト制御方法 技術分野
[0001] 本発明は、デフロスト制御システム、デフロスト制御装置、及びデフロスト制御方法 に関する。
背景技術
[0002] 従来から、冷凍及び冷蔵の少なくとも一方を行う冷凍冷蔵装置のデフロストが行わ れる時刻である 1以上のデフロスト時刻を変更可能なシステムが提案されている。 特許文献 1 :特開 2001— 197661 (第 1—9頁、第 1— 15図)
発明の開示
発明が解決しょうとする課題
[0003] しかし、特許文献 1の技術では、対象物件の総電力デマンド値が増加したことに応 じて、受動的にデフロスト時刻がシフトされている。ここで、総電力デマンド値は、対象 物件の総電力を第 1時間について平均した値である。このため、対象物件の総電力 デマンド値が減少してデフロストが行われ始めた後に、その総電力デマンド値のピー クが来たような場合に、対象物件の総電力デマンド値の最大値が増加することがある 。このため、対象物件の電力料金が増加する傾向がある。
本発明の課題は、対象物件の電力料金の増加を低減することができるデフロスト制 御システム及びデフロスト制御方法を提供することにある。
課題を解決するための手段
[0004] 第 1発明に係るデフロスト制御システムは、第 1記憶部と、第 1決定部とを備える。第 1記憶部は、ピーク情報を記憶する。ピーク情報は、 1以上のピーク時刻に関する情 報である。ピーク時刻は、対象物件の総電力に関するトレンドにおいてピークとなる 時刻である。第 1決定部は、少なくともピーク情報に基づいて、 1以上のデフロスト時 刻を決定する。デフロスト時刻は、冷凍冷蔵装置のデフロストが行われる時刻である。 冷凍冷蔵装置は、対象物件にお!ヽて冷凍及び冷蔵の少なくとも一方を行う。
このデフロスト制御システムでは、第 1記憶部は、ピーク情報を記憶する。第 1決定 部は、少なくともピーク情報を受け取ることができる。第 1決定部は、少なくともピーク 情報に基づいて、 1以上のデフロスト時刻を決定する。
このように、第 1決定部がピーク情報に基づいてデフロスト時刻を決定するので、対 象物件の総電力に関するトレンドにおけるピークを考慮して、デフロスト時刻を決定 することができる。このため、対象物件の総電力デマンド値の最大値の増加を低減す ることができるので、対象物件の電力料金の増加を低減することができる。
[0005] 第 2発明に係るデフロスト制御システムは、第 1発明のデフロスト制御システムであつ て、対象物件の総電力に関するトレンドは、総電力デマンド値のトレンドを含む。総電 力デマンド値は、対象物件の総電力を第 1時間について平均した値である。
このデフロスト制御システムでは、対象物件の総電力に関するトレンドは、総電力デ マンド値のトレンドを含む。すなわち、ピーク時刻は、例えば、総電力デマンド値のト レンドにおいてピークとなる時刻である。第 1決定部は、少なくともピーク情報に基づ いて、 1以上のデフロスト時刻を決定する。
このように、総電力に関するトレンドが総電力デマンド値のトレンドを含むので、対象 物件の総電力デマンド値のトレンドにおけるピークを考慮して、 1以上のデフロスト時 刻を決定することができる。このため、対象物件の総電力デマンド値の最大値の増加 を低減することができる。
[0006] 第 3発明に係るデフロスト制御システムは、第 1発明または第 2発明のデフロスト制 御システムであって、第 1決定部は、少なくともピーク情報に基づいて、 1以上のピー ク時刻を避けるように 1以上のデフロスト時刻を決定する。
このデフロスト制御システムでは、第丄決定部は、少なくともピーク情報を受け取るこ とができる。第 1決定部は、少なくともピーク情報に基づいて、 1以上のピーク時刻を 避けるように 1以上のデフロスト時刻を決定する。
このように、 1以上のピーク時刻を避けるように第 1決定部が 1以上のデフロスト時刻 を決定するので、対象物件の総電力デマンド値が小さ!、時間帯にデフロスト時刻を 決定することができる。このため、デフロストが行われることにより対象物件の総電力 が増加する場合でも、対象物件の総電力デマンド値の最大値の増加を低減すること ができる。 [0007] 第 4発明に係るデフロスト制御システムは、第 3発明のデフロスト制御システムであつ て、冷凍冷蔵装置は、冷却部と、加熱部とを有する。加熱部は、冷却部の近傍に設 けられており、通電が行われることによって加熱する。そして、デフロストは、デフロスト 時刻において加熱部に通電が行われることによって実行される。
このデフロスト制御システムでは、デフロストが、デフロスト時刻において加熱部に通 電が行われることによって実行される。
このように、デフロストに通電が必要となるので、対象物件の総電力が増加する傾向 にある。この場合でも、 1以上のピーク時刻を避けるように第 1決定部が 1以上のデフ ロスト時刻を決定するので、対象物件の総電力デマンド値が小さ!/、時間帯に制御部 がデフロストを行わせることができる。このため、対象物件の総電力デマンド値の最大 値の増加を低減することができる。
[0008] 第 5発明に係るデフロスト制御システムは、第 3発明のデフロスト制御システムであつ て、冷凍冷蔵装置は、冷凍冷蔵運転時に蒸発器として機能する熱交換器を有する。 そして、デフロストは、デフロスト時刻において熱交 を凝縮器として機能させるこ とによって実行される。
このデフロスト制御システムでは、デフロストが、デフロスト時刻において熱交換器を 凝縮器として機能させることによって実行される。
このように、デフロストが行われる場合に熱交^^が凝縮器として働くので、デフ口 ストが行われることにより対象物件の総電力が増加する傾向にある。この場合でも、 1 以上のピーク時刻を避けるように第 1決定部が 1以上のデフロスト時刻を決定するの で、対象物件の総電力デマンド値が小さ!、時間帯に制御部がデフロストを行わせる ことができる。このため、対象物件の総電力デマンド値の最大値の増加を低減するこ とがでさる。
[0009] 第 6発明に係るデフロスト制御システムは、第 1発明または第 2発明のデフロスト制 御システムであって、第 1決定部は、少なくともピーク情報に基づいて、 1以上のピー ク時刻に重なるように 1以上のデフロスト時刻を決定する。
このデフロスト制御システムでは、第丄決定部は、少なくともピーク情報を受け取るこ とができる。第 1決定部は、少なくともピーク情報に基づいて、 1以上のピーク時刻に 重なるように 1以上のデフロスト時刻を決定する。
このように、 1以上のピーク時刻に重なるように第 1決定部が 1以上のデフロスト時刻 を決定するので、対象物件の総電力デマンド値が大き ヽ時間帯にデフロスト時刻を 決定することができる。このため、デフロストが行われることにより対象物件の総電力 が減少する場合でも、対象物件の総電力デマンド値の最大値の増加を低減すること ができる。
[0010] 第 7発明に係るデフロスト制御システムは、第 6発明のデフロスト制御システムであつ て、第 1決定部は、 1以上のピーク時刻の直前を避けるように 1以上のデフロスト時刻 を決定する。
このデフロスト制御システムでは、第 ;L決定部は、少なくともピーク情報に基づいて、 1以上のピーク時刻に重なるように 1以上のデフロスト時刻を決定する。第 1決定部は 、少なくともピーク情報に基づいて、さらに、 1以上のピーク時刻の直前を避けるように 1以上のデフロスト時刻を決定する。
このように、さらに、 1以上のピーク時刻の直前を避けるように第 1決定部が 1以上の デフロスト時刻を決定するので、対象物件の総電力デマンド値が大き 1、時間帯とデフ ロスト時刻の直後のタイミングとが重なることを低減できる。このため、対象物件の総 電力デマンド値の最大値の増加を低減することができる。
[0011] 第 8発明に係るデフロスト制御システムは、第 6発明または第 7発明のデフロスト制 御システムであって、デフロストは、冷凍冷蔵装置が停止されることによって実行され る。
このデフロスト制御システムでは、デフロストが、冷凍冷蔵装置が停止されることによ つて実行される。
このように、デフロストにおいて冷凍冷蔵装置が停止されるので、デフロストが行わ れることにより対象物件の総電力が減少する傾向にある。この場合に、 1以上のピー ク時刻に重なるように第 1決定部力 S1以上のデフロスト時刻を決定するので、対象物 件の総電力デマンド値が大きい時間帯に制御部がデフロストを行わせることができる 。このため、対象物件の総電力デマンド値の最大値の増加を低減することができる。
[0012] 第 9発明に係るデフロスト制御システムは、第 1発明から第 8発明のいずれかのデフ ロスト制御システムであって、第 1検知部と、第 2決定部とをさらに備える。第 1検知部 は、対象物件の総電力デマンド値を検知する。第 2決定部は、対象物件の総電力デ マンド値に基づいて、ピーク情報を決定する。
このデフロスト制御システムでは、第丄検知部は、対象物件の総電力デマンド値を 検知する。第 2決定部は、対象物件の総電力デマンド値の情報を受け取ることができ る。第 2決定部は、対象物件の総電力デマンド値に基づいて、ピーク情報を決定する このように、第 2決定部が対象物件の総電力デマンド値に基づ 、てピーク情報を決 定するので、対象物件の総電力デマンド値のトレンドにおけるピークを考慮して、 1以 上のデフロスト時刻が決定されるようにすることができる。
第 10発明に係るデフロスト制御システムは、第 1発明から第 8発明のいずれかのデ フロスト制御システムであって、対象物件の総電力に関するトレンドは、総電力デマン ド値に関するトレンドと第 1電力デマンド値に関するトレンドとを含む。総電力デマンド 値は、対象物件の総電力を第 1時間について平均した値である。第 1電力デマンド値 は、対象物件におけるデフロストに要する電力を第 1時間について平均した値である 。デフロスト制御システムは、第 1検知部と、第 3決定部とをさらに備える。第 1検知部 は、対象物件の総電力デマンド値を検知する。第 3決定部は、対象物件の総電力デ マンド値と第 1電力デマンド値とに基づいて、ピーク情報を決定する。第 1電力デマン ド値は、対象物件におけるデフロストに要する電力を第 1時間について平均した値で ある。
このデフロスト制御システムでは、第丄検知部は、対象物件の総電力デマンド値を 検知する。第 3決定部は、対象物件の総電力デマンド値の情報と第 1電力デマンド値 の情報とを受け取ることができる。第 3決定部は、対象物件の総電力デマンド値と第 1 電力デマンド値とに基づいて、ピーク情報を決定する。ここで、対象物件の総電力に 関するトレンドは、総電力デマンド値と第 1電力デマンド値とに関するトレンドを含む。 すなわち、ピーク情報は、例えば、総電力デマンド値と第 1電力デマンド値とに関す るトレンドにおいてピークとなる時刻に関する情報である。
このように、第 3決定部が対象物件の総電力デマンド値と第 1電力デマンド値とに基 づいてピーク情報を決定するので、総電力デマンド値と第 1電力デマンド値とに関す るトレンドにおけるピークを考慮して、 1以上のデフロスト時刻が決定されるようにする ことができる。この結果、対象物件の総電力デマンド値の最大値の増加を低減できる
[0014] 第 11発明に係るデフロスト制御システムは、第 10発明のデフロスト制御システムで あって、第 3入力部をさらに備える。第 3入力部には、第 1電力デマンド値が入力され る。
このデフロスト制御システムでは、第 3入力部に、第 1電力デマンド値が入力される。 第 3決定部は、第 3入力部に入力された第 1電力デマンド値の情報を受け取ることが できる。
このように、第 3入力部に第 1電力デマンド値が入力されるので、対象物件の総電 力デマンド値と第 1電力デマンド値とに基づいてピーク情報を決定することができる。
[0015] 第 12発明に係るデフロスト制御システムは、第 10発明のデフロスト制御システムで あって、第 2検知部をさらに備える。第 2検知部は、第 1電力デマンド値を検知する。 このデフロスト制御システムでは、第 2検知部は、第 1電力デマンド値を検知する。 第 3決定部は、第 2検知部が検知した第 1電力デマンド値の情報を受け取ることがで きる。
このように、第 2検知部が第 1電力デマンド値を検知するので、対象物件の総電力 デマンド値と第 1電力デマンド値とに基づいてピーク情報を決定することができる。
[0016] 第 13発明に係るデフロスト制御システムは、第 1発明から第 8発明のいずれかのデ フロスト制御システムであって、対象物件の総電力に関するトレンドは、第 2電力デマ ンド値に関するトレンドを含む。第 2電力デマンド値は、空気調和装置並びに冷凍冷 蔵装置の少なくとも一方の電力を第 1時間について平均した値である。空気調和装 置は、冷凍冷蔵装置の周辺空間を空気調和する。デフロスト制御システムは、第 3検 知部と、第 4決定部とをさらに備える。第 3検知部は、第 2電力デマンド値を検知する 。第 2電力デマンド値は、空気調和装置並びに冷凍冷蔵装置の少なくとも一方の電 力を第 1時間について平均した値である。空気調和装置は、冷凍冷蔵装置の周辺空 間を空気調和する。第 4決定部は、対象物件の第 2電力デマンド値に基づいて、ピー ク情報を決定する。
このデフロスト制御システムでは、第 3検知部は、第 2電力デマンド値を検知する。 第 4決定部は、第 2電力デマンド値の情報を受け取ることができる。第 4決定部は、対 象物件の第 2電力デマンド値に基づいて、ピーク情報を決定する。ここで、対象物件 の総電力に関するトレンドは、第 2電力デマンド値に関するトレンドを含む。すなわち 、ピーク情報は、例えば、第 2電力デマンド値に関するトレンドにおいてピークとなる 時刻に関する情報である。
このように、第 4決定部が対象物件の第 2電力デマンド値に基づ 、てピーク情報を 決定するので、対象物件の第 2電力デマンド値のトレンドにおけるピークを考慮して、 1以上のデフロスト時刻が決定されるようにすることができる。この結果、対象物件の 総電力デマンド値の最大値の増加を低減できる。
[0017] 第 14発明に係るデフロスト制御システムは、第 1発明から第 13発明のいずれかの デフロスト制御システムであって、対象物件の総電力に関するトレンドは、第 2時間に おけるトレンドを含む。
このデフロスト制御システムでは、対象物件の総電力に関するトレンドは、第 2時間 におけるトレンドを含む。すなわち、ピーク情報は、例えば、対象物件の第 2時間にお ける総電力に関するトレンドにおいて、ピークとなる時刻に関する情報である。
このように、対象物件の総電力に関するトレンドが第 2時間におけるトレンドを含む ので、対象物件の第 2時間における総電力に関するトレンドにおけるピークを考慮し て、デフロスト時刻を決定することができる。このため、対象物件の第 2時間における 総電力デマンド値の最大値の増加を低減することができる。
[0018] 第 15発明に係るデフロスト制御システムは、第 14発明のデフロスト制御システムで あって、デフロスト時刻は、第 2時間において複数存在する。デフロスト制御システム は、第 2記憶部をさらに備える。第 2記憶部は、上限間隔を記憶する。上限間隔は、 デフロスト時刻の時間間隔の上限である。第 1決定部は、上限間隔とピーク情報とに 基づいて、 1以上のデフロスト時刻を決定する。
このデフロスト制御システムでは、第 2記憶部は、上限間隔を記憶する。第 1決定部 は、上限間隔の情報とピーク情報とを受け取ることができる。第 1決定部は、上限間 隔とピーク情報とに基づいて、 1以上のデフロスト時刻を決定する。
このように、第 1決定部が上限間隔とピーク情報とに基づいて 1以上のデフロスト時 刻を決定するので、適切な間隔でデフロスト運転が行われるように、各デフロスト時刻 を決定することができる。
[0019] 第 16発明に係るデフロスト制御システムは、第 15発明のデフロスト制御システムで あって、第 2記憶部は、下限間隔をさらに記憶する。下限間隔は、デフロスト時刻の時 間間隔の下限である。第 1決定部は、上限間隔と下限間隔とピーク情報とに基づい て、 1以上のデフロスト時刻を決定する。
このデフロスト制御システムでは、第 2記憶部は、上限間隔を記憶する。第 2記憶部 は、下限間隔をさらに記憶する。第 1決定部は、上限間隔の情報と下限間隔の情報 とピーク情報とを受け取ることができる。第 1決定部は、上限間隔と下限間隔とピーク 情報とに基づいて、 1以上のデフロスト時刻を決定する。
このように、第 1決定部が上限間隔と下限間隔とピーク情報とに基づいて 1以上の デフロスト時刻を決定するので、さらに適切な間隔でデフロスト運転が行われるように 、各デフロスト時刻を決定することができる。
[0020] 第 17発明に係るデフロスト制御システムは、第 14発明のデフロスト制御システムで あって、ピーク時刻は、第 2時間において複数存在する。デフロスト制御システムは、 第 3記憶部をさらに備える。第 3記憶部は、ピーク数を記憶する。ピーク数は、複数の ピーク時刻のうちピーク情報に含められるピーク時刻の数である。第 1決定部は、デ フロスト間隔とピーク数とピーク情報とに基づいて、 1以上のデフロスト時刻を決定す る。
このデフロスト制御システムでは、第 3記憶部は、ピーク数を記憶する。第 1決定部 は、デフロスト間隔の情報とピーク数の情報とピーク情報とを受け取ることができる。 第 1決定部は、デフロスト間隔とピーク数とピーク情報とに基づいて、 1以上のデフ口 スト時刻を決定する。
このように、第 1決定部がデフロスト間隔とピーク数とピーク情報とに基づいて 1以上 のデフロスト時刻を決定するので、ピーク数のピーク時刻を考慮して、各デフロスト時 刻を決定することができる。このため、対象物件の総電力デマンド値が小さい時間帯 にデフロスト時刻を決定することができる。
[0021] 第 18発明に係るデフロスト制御システムは、第 14発明のデフロスト制御システムで あって、第 4記憶部をさらに備える。第 4記憶部は、下限回数を記憶する。下限回数 は、第 2時間におけるデフロスト時刻の回数の下限である。第 1決定部は、下限回数 とピーク情報とに基づいて、 1以上のデフロスト時刻を決定する。
このデフロスト制御システムでは、第 4記憶部は、下限回数を記憶する。第 1決定部 は、下限回数の情報とピーク情報とを受け取ることができる。第 1決定部は、下限回 数とピーク情報とに基づいて、 1以上のデフロスト時刻を決定する。
このように、第 1決定部が下限回数とピーク情報とに基づいて 1以上のデフロスト時 刻を決定するので、適切な回数のデフロスト運転が行われるように、各デフロスト時刻 を決定することができる。
[0022] 第 19発明に係るデフロスト制御システムは、第 18発明のデフロスト制御システムで あって、第 4記憶部は、上限回数をさらに記憶する。上限回数は、第 2時間における デフロスト時刻の回数の上限である。第 1決定部は、下限回数と上限回数とピーク情 報とに基づいて、 1以上のデフロスト時刻を決定する。
このデフロスト制御システムでは、第 4記憶部は、下限回数を記憶する。第 4記憶部 は、上限回数をさらに記憶する。第 1決定部は、下限回数の情報と上限回数の情報 とピーク情報とを受け取ることができる。第 1決定部は、下限回数と上限回数とピーク 情報とに基づいて、 1以上のデフロスト時刻を決定する。
このように、第 1決定部が下限回数と上限回数とピーク情報とに基づいて 1以上の デフロスト時刻を決定するので、さらに適切な回数のデフロスト運転が行われるように 、各デフロスト時刻を決定することができる。
[0023] 第 20発明に係るデフロスト制御システムは、第 1発明から第 19発明のいずれかの デフロスト制御システムであって、第 4検知部をさらに備える。第 4検知部は、イベント 情報を検知する。イベント情報は、対象物件におけるイベントの発生状況に関する情 報である。第 1決定部は、ピーク情報とイベント情報とに基づいて、 1以上のデフロスト 時刻を決定する。
このデフロスト制御システムでは、第 4検知部は、イベント情報を検知する。第 1決定 部は、ピーク情報とイベント情報とを受け取ることができる。第 1決定部は、ピーク情報 とイベント情報とに基づいて、 1以上のデフロスト時刻を決定する。
このように、ピーク情報とイベント情報とに基づいて第 1決定部が 1以上のデフロスト 時刻を決定するので、対象物件の総電力に関するトレンドにおけるピークと、イベント の発生状況とを考慮して、 1以上のデフロスト時刻を決定することができる。
[0024] 第 21発明に係るデフロスト制御システムは、第 1発明から第 19発明のいずれかの デフロスト制御システムであって、第 4入力部をさらに備える。第 4入力部には、ィベン ト情報が入力される。イベント情報は、対象物件におけるイベントの発生状況に関す る情報である。第 1決定部は、ピーク情報とイベント情報とに基づいて、 1以上のデフ ロスト時刻を決定する。
このデフロスト制御システムでは、第 4入力部に、イベント情報が入力される。第 1決 定部は、ピーク情報とイベント情報とを受け取ることができる。第 1決定部は、ピーク情 報とイベント情報とに基づいて、 1以上のデフロスト時刻を決定する。
このように、ピーク情報とイベント情報とに基づいて第 1決定部が 1以上のデフロスト 時刻を決定するので、対象物件の総電力に関するトレンドにおけるピークと、イベント の発生状況とを考慮して、 1以上のデフロスト時刻を決定することができる。
[0025] 第 22発明に係るデフロスト制御システムは、第 1発明から第 22発明のいずれかの デフロスト制御システムであって、第 1入力部をさらに備える。第 1入力部には、季節 に関する情報、気象情報及び地域に関する情報の少なくとも 1つ (以下、季節情報等 )が入力される。第 1決定部は、季節情報等とピーク情報とに基づいて、 1以上のデフ ロスト時刻を決定する。
このデフロスト制御システムでは、第 i入力部に、季節情報等が入力される。第 1決 定部は、季節情報等とピーク情報とを受け取ることができる。第 1決定部は、季節情 報等とピーク情報とに基づいて、 1以上のデフロスト時刻を決定する。
このように、第 1決定部が季節情報等とピーク情報とに基づいてデフロスト時刻を決 定するので、季節等の変化に応じて対象物件の総電力に関するトレンドが変わる場 合でも、対象物件の総電力に関するトレンドにおけるピークを考慮して、デフロスト時 刻を決定することができる。 [0026] 第 23発明に係るデフロスト制御システムは、第 1発明から第 8発明のいずれかのデ フロスト制御システムであって、第 2入力部をさらに備える。第 2入力部には、ピーク情 報が入力される。
このデフロスト制御システムでは、第 2入力部に、ピーク情報が入力される。第 1決 定部は、少なくともピーク情報を受け取ることができる。
このように、第 2入力部にピーク情報が入力されるので、ピーク情報に基づいて 1以 上のデフロスト時刻が決定されるようにすることができる。
[0027] 第 24発明に係るデフロスト制御装置は、第 1記憶部と、第 1決定部とを備える。第 1 記憶部は、ピーク情報を記憶する。ピーク情報は、 1以上のピーク時刻に関する情報 である。ピーク時刻は、対象物件の総電力に関するトレンドにおいてピークとなる時 刻である。第 1決定部は、少なくともピーク情報に基づいて、 1以上のデフロスト時刻 を決定する。デフロスト時刻は、冷凍冷蔵装置のデフロストが行われる時刻である。冷 凍冷蔵装置は、対象物件にお!ヽて冷凍及び冷蔵の少なくとも一方を行う。
このデフロスト制御装置では、第 1記憶部は、ピーク情報を記憶する。第 1決定部は 、少なくともピーク情報を受け取ることができる。第 1決定部は、少なくともピーク情報 に基づいて、 1以上のデフロスト時刻を決定する。
このように、第 1決定部がピーク情報に基づいて 1以上のデフロスト時刻を決定する ので、対象物件の総電力に関するトレンドにおけるピークを考慮して、 1以上のデフ口 スト時刻を決定することができる。このため、対象物件の総電力デマンド値の最大値 の増加を低減することができるので、対象物件の電力料金の増加を低減することが できる。
[0028] 第 25発明に係るデフロスト制御方法は、記憶ステップと、決定ステップとを備える。
記憶ステップでは、ピーク情報が記憶される。ピーク情報は、 1以上のピーク時刻に 関する情報である。ピーク時刻は、対象物件の総電力に関するトレンドにおいてピー クとなる時刻である。決定ステップでは、少なくともピーク情報に基づいて、 1以上の デフロスト時刻が決定される。デフロスト時刻は、冷凍冷蔵装置のデフロストが行われ る時刻である。冷凍冷蔵装置は、対象物件において冷凍及び冷蔵の少なくとも一方 を行う。 このデフロスト制御方法では、記憶ステップにおいて、ピーク情報が記憶される。決 定ステップにおいて、少なくともピーク情報が受け取られ得る。決定ステップにおいて
、少なくともピーク情報に基づいて、 1以上のデフロスト時刻が決定される。
このように、ピーク情報に基づいて 1以上のデフロスト時刻が決定されるので、対象 物件の総電力に関するトレンドにおけるピークを考慮して、 1以上のデフロスト時刻を 決定することができる。このため、対象物件の総電力デマンド値の最大値の増加を低 減することができるので、対象物件の電力料金の増加を低減することができる。
[0029] 第 26発明に係るデフロスト制御方法は、第 25発明のデフロスト制御方法であって、 決定ステップでは、少なくともピーク情報に基づいて、 1以上のピーク時刻を避けるよ うに 1以上のデフロスト時刻が決定される。
このデフロスト制御方法では、決定ステップにおいて、少なくともピーク情報が受け 取られ得る。決定ステップにおいて、少なくともピーク情報に基づいて、 1以上のピー ク時刻を避けるように 1以上のデフロスト時刻が決定される。
このように、 1以上のピーク時刻を避けるように 1以上のデフロスト時刻が決定される ので、対象物件の総電力デマンド値が小さ 、時間帯にデフロスト時刻を決定すること ができる。このため、デフロストが行われることにより対象物件の総電力が増加する場 合でも、対象物件の総電力デマンド値の最大値の増加を低減することができる。
[0030] 第 27発明に係るデフロスト制御方法は、第 25発明のデフロスト制御方法であって、 決定ステップでは、少なくともピーク情報に基づいて、 1以上のピーク時刻に重なるよ うに 1以上のデフロスト時刻が決定される。
このデフロスト制御方法では、決定ステップにおいて、少なくともピーク情報が受け 取られ得る。決定ステップにおいて、少なくともピーク情報に基づいて、 1以上のピー ク時刻に重なるように 1以上のデフロスト時刻が決定される。
このように、 1以上のピーク時刻に重なるように 1以上のデフロスト時刻が決定される ので、対象物件の総電力デマンド値が大き 、時間帯にデフロスト時刻を決定すること ができる。このため、デフロストが行われることにより対象物件の総電力が減少する場 合でも、対象物件の総電力デマンド値の最大値の増加を低減することができる。 発明の効果 [0031] 第 1発明に係るデフロスト制御システムでは、第 1決定部がピーク情報に基づいて デフロスト時刻を決定するので、対象物件の総電力に関するトレンドにおけるピーク を考慮して、デフロスト時刻を決定することができる。このため、対象物件の総電力デ マンド値の最大値の増加を低減することができるので、対象物件の電力料金の増加 を低減することができる。
第 2発明に係るデフロスト制御システムでは、総電力に関するトレンドが総電力デマ ンド値のトレンドを含むので、対象物件の総電力デマンド値のトレンドにおけるピーク を考慮して、 1以上のデフロスト時刻を決定することができる。このため、対象物件の 総電力デマンド値の最大値の増加を低減することができる。
第 3発明に係るデフロスト制御システムでは、 1以上のピーク時刻を避けるように第 1 決定部が 1以上のデフロスト時刻を決定するので、対象物件の総電力デマンド値が 小さい時間帯にデフロスト時刻を決定することができる。このため、デフロストが行わ れることにより対象物件の総電力が増加する場合でも、対象物件の総電力デマンド 値の最大値の増加を低減することができる。
[0032] 第 4発明に係るデフロスト制御システムでは、デフロストに通電が必要となるので、 対象物件の総電力が増加する傾向にある。この場合でも、 1以上のピーク時刻を避 けるように第 1決定部が 1以上のデフロスト時刻を決定するので、対象物件の総電力 デマンド値が小さい時間帯に制御部がデフロストを行わせることができる。このため、 対象物件の総電力デマンド値の最大値の増加を低減することができる。
第 5発明に係るデフロスト制御システムでは、デフロストが行われる場合に熱交換器 が凝縮器として働くので、デフロストが行われることにより対象物件の総電力が増加 する傾向にある。この場合でも、 1以上のピーク時刻を避けるように第 1決定部力 ^以 上のデフロスト時刻を決定するので、対象物件の総電力デマンド値が小さ 、時間帯 に制御部がデフロストを行わせることができる。このため、対象物件の総電力デマンド 値の最大値の増加を低減することができる。
[0033] 第 6発明に係るデフロスト制御システムでは、 1以上のピーク時刻に重なるように第 1 決定部が 1以上のデフロスト時刻を決定するので、対象物件の総電力デマンド値が 大きい時間帯にデフロスト時刻を決定することができる。このため、デフロストが行わ れることにより対象物件の総電力が減少する場合でも、対象物件の総電力デマンド 値の最大値の増加を低減することができる。
第 7発明に係るデフロスト制御システムでは、さらに、 1以上のピーク時刻の直前を 避けるように第 1決定部が 1以上のデフロスト時刻を決定するので、対象物件の総電 力デマンド値が大きい時間帯とデフロスト時刻の直後のタイミングとが重なることを低 減できる。このため、対象物件の総電力デマンド値の最大値の増加を低減することが できる。
第 8発明に係るデフロスト制御システムでは、デフロストにぉ 、て冷凍冷蔵装置が停 止されるので、デフロストが行われることにより対象物件の総電力が減少する傾向に ある。この場合に、 1以上のピーク時刻に重なるように第 1決定部が 1以上のデフロス ト時刻を決定するので、対象物件の総電力デマンド値が大きい時間帯に制御部がデ フロストを行わせることができる。このため、対象物件の総電力デマンド値の最大値の 増加を低減することができる。
[0034] 第 9発明に係るデフロスト制御システムでは、第 2決定部が対象物件の総電力デマ ンド値に基づ 、てピーク情報を決定するので、対象物件の総電力デマンド値のトレン ドにおけるピークを考慮して、 1以上のデフロスト時刻が決定されるようにすることがで きる。
第 10発明に係るデフロスト制御システムでは、第 3決定部が対象物件の総電力デ マンド値と第 1電力デマンド値とに基づいてピーク情報を決定するので、総電力デマ ンド値に関するトレンドと第 1電力デマンド値に関するトレンドとにおけるピークを考慮 して、 1以上のデフロスト時刻が決定されるようにすることができる。この結果、対象物 件の総電力デマンド値の最大値の増加を低減できる。
第 11発明に係るデフロスト制御システムでは、第 3入力部に第 1電力デマンド値が 入力されるので、対象物件の総電力デマンド値と第 1電力デマンド値とに基づいてピ ーク情報を決定することができる。
[0035] 第 12発明に係るデフロスト制御システムでは、第 2検知部が第 1電力デマンド値を 検知するので、対象物件の総電力デマンド値と第 1電力デマンド値とに基づ 、てピ ーク情報を決定することができる。 第 13発明に係るデフロスト制御システムでは、第 4決定部が対象物件の第 2電力デ マンド値に基づ 、てピーク情報を決定するので、対象物件の第 2電力デマンド値のト レンドにおけるピークを考慮して、 1以上のデフロスト時刻が決定されるようにすること ができる。この結果、対象物件の総電力デマンド値の最大値の増加を低減できる。 第 14発明に係るデフロスト制御システムでは、対象物件の総電力に関するトレンド が第 2時間におけるトレンドを含むので、対象物件の第 2時間における総電力に関す るトレンドにおけるピークを考慮して、デフロスト時刻を決定することができる。このた め、対象物件の第 2時間における総電力デマンド値の最大値の増加を低減すること ができる。
[0036] 第 15発明に係るデフロスト制御システムでは、第 1決定部が上限間隔とピーク情報 とに基づいて 1以上のデフロスト時刻を決定するので、適切な間隔でデフロスト運転 が行われるように、各デフロスト時刻を決定することができる。
第 16発明に係るデフロスト制御システムでは、第 1決定部が上限間隔と下限間隔と ピーク情報とに基づいて 1以上のデフロスト時刻を決定するので、さらに適切な間隔 でデフロスト運転が行われるように、各デフロスト時刻を決定することができる。
第 17発明に係るデフロスト制御システムでは、第 1決定部がデフロスト間隔とピーク 数とピーク情報とに基づいて 1以上のデフロスト時刻を決定するので、ピーク数のピ ーク時刻を考慮して、各デフロスト時刻を決定することができる。このため、対象物件 の総電力デマンド値が小さい時間帯にデフロスト時刻を決定することができる。
[0037] 第 18発明に係るデフロスト制御システムでは、第 1決定部が下限回数とピーク情報 とに基づいて 1以上のデフロスト時刻を決定するので、適切な回数のデフロスト運転 が行われるように、各デフロスト時刻を決定することができる。
第 19発明に係るデフロスト制御システムでは、第 1決定部が下限回数と上限回数と ピーク情報とに基づいて 1以上のデフロスト時刻を決定するので、さらに適切な回数 のデフロスト運転が行われるように、各デフロスト時刻を決定することができる。
第 20発明に係るデフロスト制御システムでは、ピーク情報とイベント情報とに基づ!/ヽ て第 1決定部力 ^以上のデフロスト時刻を決定するので、対象物件の総電力に関す るトレンドにおけるピークと、イベントの発生状況とを考慮して、 1以上のデフロスト時 刻を決定することができる。
[0038] 第 21発明に係るデフロスト制御システムでは、ピーク情報とイベント情報とに基づ!/ヽ て第 1決定部力 ^以上のデフロスト時刻を決定するので、対象物件の総電力に関す るトレンドにおけるピークと、イベントの発生状況とを考慮して、 1以上のデフロスト時 刻を決定することができる。
第 22発明に係るデフロスト制御システムでは、第 1決定部が季節情報等とピーク情 報とに基づいてデフロスト時刻を決定するので、季節等の変化に応じてデフロスト時 刻を変えることができる。このため、季節等の変化に応じて対象物件の総電力に関す るトレンドが変わる場合でも、対象物件の総電力に関するトレンドにおけるピークを考 慮して、デフロスト時刻を決定することができる。
第 23発明に係るデフロスト制御システムでは、第 2入力部にピーク情報が入力され るので、ピーク情報に基づいて 1以上のデフロスト時刻が決定されるようにすることが できる。
[0039] 第 24発明に係るデフロスト制御装置では、第 1決定部がピーク情報に基づいて 1以 上のデフロスト時刻を決定するので、対象物件の総電力に関するトレンドにおけるピ ークを考慮して、 1以上のデフロスト時刻を決定することができる。このため、対象物 件の総電力デマンド値の最大値の増加を低減することができるので、対象物件の電 力料金の増加を低減することができる。
第 25発明に係るデフロスト制御方法では、ピーク情報に基づいて 1以上のデフロス ト時刻が決定されるので、対象物件の総電力に関するトレンドにおけるピークを考慮 して、 1以上のデフロスト時刻を決定することができる。このため、対象物件の総電力 デマンド値の最大値の増加を低減することができるので、対象物件の電力料金の増 加を低減することができる。
[0040] 第 26発明に係るデフロスト制御方法では、 1以上のピーク時刻を避けるように 1以上 のデフロスト時刻が決定されるので、対象物件の総電力デマンド値が小さ 、時間帯 にデフロスト時刻を決定することができる。このため、デフロストが行われることにより 対象物件の総電力が増加する場合でも、対象物件の総電力デマンド値の最大値の 増加を低減することができる。 第 27発明に係るデフロスト制御方法では、 1以上のピーク時刻に重なるように 1以 上のデフロスト時刻が決定されるので、対象物件の総電力デマンド値が大き 、時間 帯にデフロスト時刻を決定することができる。このため、デフロストが行われることによ り対象物件の総電力が減少する場合でも、対象物件の総電力デマンド値の最大値 の増加を低減することができる。
図面の簡単な説明
[図 1]本発明の第 1実施形態に係るデフロスト制御システムの構成図。
[図 2]冷凍冷蔵装置の冷媒回路図。
圆 3]本発明の第 1実施形態における管理センターの構成図。
[図 4]デフロスト制御システムが冷凍冷蔵装置のデフロストを制御する処理の流れを 示すフローチャート。
圆 5]本発明の第 1実施形態における第 1決定部の動作を示す図。
圆 6]本発明の第 1実施形態における第 1決定部の動作を示す図。
圆 7]本発明の第 1実施形態の変形例における管理センターの構成図。
圆 8]上限間隔のテーブル情報を示す図。
圆 9]本発明の第 1実施形態の変形例に係るデフロスト制御システムの構成図。 圆 10]本発明の第 1実施形態の変形例における管理センターの構成図。
[図 11]冷凍冷蔵装置の冷媒回路図。
圆 12]本発明の第 1実施形態の変形例に係るデフロスト制御システムの構成図。 圆 13]本発明の第 1実施形態の変形例における管理センターの構成図。
[図 14]冷凍冷蔵装置の冷媒回路図。
圆 15]本発明の第 1実施形態の変形例における第 1決定部の動作を示す図。 圆 16]本発明の第 1実施形態の変形例に係るデフロスト制御システムの構成図。 圆 17]本発明の第 1実施形態の変形例における管理センターの構成図。
圆 18]本発明の第 1実施形態の変形例における管理センターの構成図。
[図 19]本発明の第 2実施形態に係るデフロスト制御システムの構成図。
圆 20]本発明の第 2実施形態における管理センターの構成図。
圆 21]本発明の第 2実施形態における第 1決定部の動作を示す図。 [図 22]本発明の第 2実施形態の変形例に係るデフロスト制御システムの構成図。
[図 23]本発明の第 2実施形態の変形例における管理センターの構成図。
[図 24]本発明の第 3実施形態に係るデフロスト制御システムの構成図。
[図 25]本発明の第 3実施形態における管理センターの構成図。
[図 26]本発明の第 3実施形態における第 1決定部の動作を示す図。
[図 27]本発明の第 4実施形態に係るデフロスト制御システムの構成図。
[図 28]本発明の第 4実施形態における管理センターの構成図。
符号の説明
1, la, lb, li, lj, lk, 100, lOOi, 200, 300 デフロス卜制御システム 11a等 空気調和装置
51a等, 51ak等, 51ab等, 冷凍冷蔵装置
73, 73a, 73b, 73i, 73j, 333a等 第 1決定部
74, 334a等 第 2決定部
75, 175, 275, 335a等 第 1記憶部
76, 336a等 第 2記憶部
77, 337a等 第 3記憶部
78, 338a等 第 4記憶部
81a 第 1入力部
82a 第 2入力部
86j 第 4入力部
94 第 1デマンド計群
183 第 3決定部
1851 第 3入力部
196 第 2デマンド計群
284 第 4決定部
296 第 3デマンド計群
298 第 4デマンド計群
A等 店舗 発明を実施するための最良の形態
[0043] <第 1実施形態 >
本発明の第 1実施形態に係るデフロスト制御システム 1の構成図を図 1に示す。図 1 に示すデフロスト制御システム 1は、主として、店舗 A, B, ···において冷凍冷蔵装置 51a, 52a, ···, 51b, 52b, ···のデフロストを制御するシステムである。冷凍冷蔵装 置 51a, 52a, ···, 51b, 52b, ··· ίま、冷凍及び冷蔵を行 ヽ、ショーケース 6 la, 62 a, ···, 61b, 62b, · · ·内の温度を調節する。なお、店舗 A, · · ·には、冷凍冷蔵装 置 51a, ···が設けられているショーケース 61a, 62a, ···, 61b, 62b, ···の他に、 空気調和装置 11a, lib,…や他の設備機器 12a, 12b, …などが設置されている 。ここで、空気調和装置 11a, · · ·は、冷凍冷蔵装置 51a, 52a, · ··の周辺空間を空 気調和する。
[0044] (デフロスト制御システムの全体構成)
デフロスト制御システム 1は、主として、第 1デマンド計群 94 (94a, 94b, · · ·)、第 1 回線 5、第 2回線群 6 (6a, 6b, …;)、第 3回線群 7 (7a, 7b, …;)、第 4回線群 8 (8a , 8b, …;)、モデム群 20 (20a, 20b, -- ュ。群30(30&, 30b,…;)及び管理セ ンター 70を備える。
管理センター 70とモデム群 20 (20a, 20b, · · ·)とは、第 1回線 5で接続されている 。モデム群 20 (20a, 20b,—)と1^群30(30&, 30b,—)とは、第3回線群7(7&, 7b, '' で接続されてぃる。1^群30(30&, 30b, '' と冷凍冷蔵装置51&, 52a, • · ·とは、第 2回線群 6 (6a, 6b, · · で接続されている。第 1デマンド計群 94 (94a, 94b, '' と1^群30(30&, 30b, · · ·)とは、第 4回線群 8 (8a, 8b, ···)で接続され ている。
[0045] 冷凍冷蔵装置 51a, 52a, · · ·, 51b, 52b, ···は、ショーケース 61a, 62a, ···, 6 lb, 62b, ···に設置されている。管理センター 70は、第 1回線 5とモデム群 20 (20a , 20b, "')と第3回線群7(7&, 7b, '' と1^群30(30&, 30b, ···)と第 2回線群 6 (6a, 6b,…;)とを経由して、ショーケース 61a, 62a, ···, 61b, 62b, …内の温 度を、冷凍冷蔵装置 51a,…に調節させる。また、管理センター 70は、第 1回線 5と モデム群 20 (20a, 20b, '-')と第3回線群7(7&, 7b, '-')と1^群30(30&, 30b, · ··)と第 2回線群 6 (6a, 6b, ···)とを経由して、ショーケース 61a, ···にデフロストを 行わせる。
ここで、デフロストとは、蒸発器に発生した霜を除去することである。具体的には、図 2に示すように、冷凍冷蔵装置 51a, · ··の冷媒回路は、主として、ショーケース 61a の外部に設置される圧縮機 516a、第 2熱交換器 513a及び膨張弁 512aと、ショーケ ース 61aの内部に設置される第 1熱交 511aとを有する。その冷媒回路において 、圧縮機 516aで圧縮された高温高圧冷媒が第 2熱交 513&で凝縮されて熱を 放出する。そして低温となった冷媒が膨張弁 512aで減圧され第 1熱交 511aで 蒸発する。このとき、第 1熱交 511aを流れる冷媒がショーケース 61aに供給され る空気と熱交換することにより、ショーケース 61aの内部が冷凍'冷蔵される。しかし、 ショーケース 61aの内部の湿度が高いような場合、第 1熱交換器 511aには、霜が付 着する傾向がある。そして、第 1熱交換器 511aの表面を霜が覆ってしまうと、第 1熱 交 laの熱交換能力が低下するおそれがある。このため、冷凍冷蔵装置 51a, ···は、さらにヒーター 517aを有しており、そのヒーター 517aで第 1熱交翻 51 laを 加熱することにより霜を除去する。なお、このとき、圧縮機 516aは停止される。このよ うにして、第 1熱交換器 51 laの熱交換能力の低下を抑えている。ただし、ショーケー ス 61a, ···においてデフロストが行われる際にヒーター 517aが加熱を行うので、冷 凍冷蔵装置 51a, · · ·は、ヒーター 517aが消費する電力の分だけ余分に電力を消費 することになる。このため、ショーケース 61a, · · ·においてデフロストが行われると、ヒ 一ターの電力の分だけ店舗 A, · ··の総電力が増加することになる。
(第 1デマンド計群の構成)
第 1デマンド計群 94 (94a, 94b, ···)は、電力供給設備群 90に備えられている。 電力供給設備群 90は、電力供給源 91、第 1電力供給線 92及び第 2電力供給線 93 a, 93b, · ··をさらに備えている。電力供給源 91は、第 1電力供給線 92、第 2電力供 給線 93a, 93b, ···及び第 1デマンド計 94a, 94b, ···を介して、ショーケース 61a, ···、空気調和装置 11a, · · '及び他の設備機器 12a, · · 'などに接続されている。な お、第 1デマンド計 94a, 94b, …は、店舗 A, …ごとに設けられている。
ショーケース 61a, …、空気調和装置 11a, ···及び他の設備機器 12a, '"など は、第 1電力供給線 92、第 2電力供給線 93a, 93b,…及び第 1デマンド計 94a, 9 4b, · · ·を経由して、電力供給源 91から電力の供給を受ける。この供給される電力の 電力デマンド値は、第 1デマンド計 94a, 94b, · · ·により計測されるようになっている 。すなわち、第 1デマンド計 94a, 94b, · · ·は、店舗 A, · · ·の総電力デマンド値を検 知する。ここで、総電力デマンド値は、店舗 A, · · ·の総電力を各 30分間について平 均した値である。
[0047] そして、第 1デマンド計 94a, 94b, · · ·は、店舎膚 A, · · ·の総電力デマンド値の情報 を第 4回線 8a, · · ·経由で LC30a, · · ·へ送信する。
(管理センターの構成)
管理センター 70は、図 3に示すように、送受信部 71,制御部 72,第 1決定部 73, 第 2決定部 74,第 1記憶部 75,第 2記憶部 76,第 3記憶部 77,第 4記憶部 78及び 第 5入力部 79を備える。
第 5入力部 79には、上限間隔と下限間隔とが入力される。ここで、上限間隔は、デ フロスト時刻の時間間隔の上限である。下限間隔は、デフロスト時刻の時間間隔の下 限である。デフロスト時刻は、ショーケース 6 la, · · ·においてデフロストが行われる時 刻である。制御部 72は、上限間隔の情報と下限間隔の情報とを第 5入力部 79から受 け取り第 2記憶部 76へ渡す。第 2記憶部 76は、上限間隔と下限間隔とを記憶する。
[0048] また、第 5入力部 79には、ピーク数が入力される。ここで、ピーク数は、複数のピー ク時刻のうち後述のピーク情報に含められるピーク時刻の数である。ピーク時刻は、 店舗 A,…の総電力デマンド値のトレンドにおいてピークとなる時刻である。制御部 72は、ピーク数の情報を第 5入力部 79から受け取り、第 3記憶部 77へ渡す。第 3記 憶部 77は、ピーク数を記憶する。
さらに、第 5入力部 79には、下限回数と上限回数とが入力される。ここで、下限回数 は、 1日に行われるデフロストの回数の下限、すなわち、 1日におけるデフロスト時刻 の回数の下限である。上限回数は、 1日に行われるデフロストの回数の上限、すなわ ち、 1日におけるデフロスト時刻の回数の上限である。制御部 72は、下限回数の情報 と上限回数の情報とを第 5入力部 79から受け取り第 4記憶部 78へ渡す。第 4記憶部 78は、下限回数と上限回数とを記憶する。 [0049] 送受信部 71は、店舗 A, · · ·の総電力デマンド値の情報を、第 1回線 5経由でモデ ム 20a, · · 'から受信する。制御部 72は、店舗 A, · · ·の総電力デマンド値の情報を、 送受信部 71から受け取る。そして、制御部 72は、店舗 A, · · ·の各 30分の総電力デ マンド値の情報を第 1記憶部 75へ渡す。第 1記憶部 75は、 1日における店舗 A, · · · の各 30分の総電力デマンド値の情報を記憶する。
第 2決定部 74は、 1日における店舗 A,…の各 30分の総電力デマンド値の情報を 制御部 72経由で第 1記憶部 75から受け取る。また、第 2決定部 74は、ピーク数の情 報を制御部 72経由で第 3記憶部 77から受け取る。第 2決定部 74は、 1日における店 舗 A, · · ·の各 30分の総電力デマンド値の情報と、ピーク数の情報とに基づいて、ピ ーク情報を決定する。ここで、ピーク情報は、 1以上のピーク時刻に関する情報である 。ピーク時刻は、店舗 A, · · ·の総電力デマンド値のトレンドにおいてピークとなる時 刻である。具体的には、第 2決定部 74は、 1日における店舗 A, · · ·の各 30分の総電 力デマンド値が大きいものから、上位ピーク数の値を選択してピーク情報とする。制 御部 72は、ピーク情報を第 2決定部 74から受け取り、第 1記憶部 75へ渡す。第 1記 憶部 75は、ピーク情報を記憶する。
[0050] 第 1決定部 73は、ピーク情報を制御部 72経由で第 1記憶部 75から受け取り、上限 間隔の情報と下限間隔の情報とを制御部 72経由で第 2記憶部 76から受け取り、ピ ーク数の情報を制御部 72経由で第 3記憶部 77から受け取り、下限回数の情報と上 限回数の情報とを制御部 72経由で第 4記憶部 78から受け取る。
ここで、仮に、店舗 A, · · ·の総電力デマンド値が大きい時間帯にデフロスト時刻が 決定されると、店舗 A, · · ·の総電力がヒーターの消費電力の分だけさらに増加する ことになり、店舗 A, · · ·の 1日における総電力デマンド値の最大値が増加するおそれ がある。
しかし、本発明では、第 1決定部 73は、上限間隔と下限間隔と下限回数と上限回 数とピーク数とピーク情報とに基づいて、 1以上のピーク時刻を避けるように、デフロス ト時刻を決定する。具体的には、第 1決定部 73は、下限回数以上上限回数以下とな るように、デフロスト回数を決める。ここで、デフロスト回数は、 1日においてデフロスト が行われる回数である。また、第 1決定部 73は、下限間隔以上上限間隔以下となる ように、デフロスト間隔を決める。ここで、デフロスト間隔は、デフロストが行われる時間 間隔である。第 1決定部 73は、デフロスト間隔だけ互いに離れているデフロスト回数 分のデフロスト時刻の間に各ピーク時刻がくるように、各デフロスト時刻を決定する。 これにより、店舗 A, · ··の総電力デマンド値が小さい時間帯にデフロスト時刻が決定 される。
[0051] 制御部 72は、各デフロスト時刻の情報を第 1決定部 73から受け取り、デフロストの 指令情報を生成して送受信部 71へ渡す。送受信部 71は、デフロストの指令情報を 第 1回線 5経由で店舗 A, ···へ送信する。
(モデム群の構成)
図 1に示すモデム群 20 (20a, 20b, '' は、第1回線5と第3回線群7(7&, 7b, ·· とを接続している。ここで、第 1回線 5はアナログ回線 (例えば、電話回線)であり、 第 3回線群 7(7a, 7b, ···)はデジタル回線 (例えば、 RS— 232C回線)である。 各モデム 20a, 20b, ···は、アナログ回線の信号とデジタル回線の信号とを相互に 変換する通常のモデムである。すなわち、モデム 20a, · · ·は、第 1回線 5の信号と第 2回線 6a,…の信号とを相互に変換する。
[0052] モデム 20a, · · ·は、デフロストの指令情報 (アナログ信号)を、第 1回線 5経由で管 理センター 70から受け取り、デフロストの指令情報 (デジタル信号)へ変換する。モデ ム 20a, · · ·は、デフロストの指令情報 (デジタル信号)を第 2回線 6a, · · ·経由で LC3 la, 32a, …へ送信する。
(LC群の構成)
LC群 30 (30a, 30b, …;)は、第 3回線群 7 (7a, 7b,…;)を介してモデム群 20 (2 Oa, ···)に接続されており、第 2回線群 6 (6a, ···)を介して冷凍冷蔵装置 5 la, ··· に接続されている。
各 LC30a, · · ·は、店舗 A, · ··の総電力デマンド値の情報を、第 4回線 8a経由で 第 1デマンド計 94a, · · 'から受信する。また、 LC30a,…は、店舗 A, · · ·の総電力 デマンド値の情報を、第 2回線 7a, ···とモデム 20a, ···と第 1回線 5とを経由して管 理センター 170へ送信する。
[0053] 一方、各 LC30a, · · ·は、デフロストの指令情報を第 3回線 7a, · · '経由でモデム 2 Oa, · · 'から受け取る。 LC30a, · · ·は、デフロストの指令情報を、冷凍冷蔵装置 5 la , · · ·が読み取り可能なフォーマットに変換して、第 2回線 6a, · · ·経由で冷凍冷蔵装 置 51a, · · 'へ送信する。冷凍冷蔵装置 51a, · · ·は、デフロストの指令情報を第 2回 線 6a, · · ·経由で LC30a, · · ·から受信する。これにより、冷凍冷蔵装置 51a, · · ·は 、デフロストの指令情報に基づいて、所定のデフロスト時刻にデフロストを行う。
(デフロスト制御システムが冷凍冷蔵装置のデフロストを制御する処理の流れ) デフロスト制御システムがデフロストを制御する処理の流れを、図 4に示すフローチ ヤートを用いて説明する。
[0054] ステップ S1では、上限間隔と下限間隔とが記憶される。すなわち、管理センター 70 の第 5入力部 79に、上限間隔と下限間隔とが入力される。ここで、上限間隔は、デフ ロスト時刻の時間間隔の上限である。下限間隔は、デフロスト時刻の時間間隔の下限 である。デフロスト時刻は、ショーケース 6 la, · · ·においてデフロストが行われる時刻 である。制御部 72は、上限間隔の情報と下限間隔の情報とを第 5入力部 79から受け 取り第 2記憶部 76へ渡す。第 2記憶部 76は、上限間隔と下限間隔とを記憶する。 ステップ S2では、ピーク数が記憶される。すなわち、管理センター 70の第 5入力部 79には、ピーク数が入力される。ここで、ピーク数は、複数のピーク時刻のうち後述の ピーク情報に含められるピーク時刻の数である。ピーク時刻は、店舗 A, · · ·の総電 力デマンド値のトレンドにおいてピークとなる時刻である。制御部 72は、ピーク数の情 報を第 5入力部 79から受け取り、第 3記憶部 77へ渡す。第 3記憶部 77は、ピーク数 を記憶する。
[0055] ステップ S3では、下限回数と上限回数とが記憶される。すなわち、管理センター 70 の第 5入力部 79には、下限回数と上限回数とが入力される。ここで、下限回数は、 1 日に行われるデフロストの回数の下限、すなわち、 1日におけるデフロスト時刻の回数 の下限である。上限回数は、 1日に行われるデフロストの回数の上限、すなわち、 1日 におけるデフロスト時刻の回数の上限である。制御部 72は、下限回数の情報と上限 回数の情報とを第 5入力部 79から受け取り第 4記憶部 78へ渡す。第 4記憶部 78は、 下限回数と上限回数とを記憶する。
ステップ S4では、ピーク情報が記憶される。すなわち、第 1デマンド計 94a, 94b, · • ·は、店舗 A, · · ·の総電力デマンド値を検知する。そして、第 1デマンド計 94a, 94 b, · · ·は、店舗 A, · · ·の総電力デマンド値の情報を第 1回線 5経由で管理センター 70へ送信する。
[0056] 管理センター 70の送受信部 71は、店舗 A, · · ·の総電力デマンド値の情報を、第 1 回線 5経由で第 1デマンド計 94a, 94b, …から受信する。制御部 72は、店舗 A, · · •の総電力デマンド値の情報を、送受信部 71から受け取る。そして、制御部 72は、店 舗 A, · · ·の各 30分の総電力デマンド値の情報を第 1記憶部 75へ渡す。第 1記憶部 75は、 1日における店舗 A,…の各 30分の総電力デマンド値の情報を記憶する。 第 2決定部 74は、 1日における店舗 A,…の各 30分の総電力デマンド値の情報を 制御部 72経由で第 1記憶部 75から受け取る。また、第 2決定部 74は、ピーク数の情 報を制御部 72経由で第 3記憶部 77から受け取る。第 2決定部 74は、 1日における店 舗 A, · · ·の各 30分の総電力デマンド値の情報と、ピーク数の情報とに基づいて、ピ ーク情報を決定する。ここで、ピーク情報は、 1以上のピーク時刻に関する情報である 。ピーク時刻は、店舗 A, · · ·の総電力デマンド値のトレンドにおいてピークとなる時 刻である。具体的には、第 2決定部 74は、 1日における店舗 A, · · ·の各 30分の総電 力デマンド値が大きいものから、上位ピーク数の値を選択してピーク情報とする。制 御部 72は、ピーク情報を第 2決定部 74から受け取り、第 1記憶部 75へ渡す。第 1記 憶部 75は、ピーク情報を記憶する。
[0057] ステップ S5では、 N= 1にセットされる。すなわち、第 1決定部 73は、電力デマンド 値順位の変数 Nを初期値 1にセットする。
ステップ S6では、デフロスト時刻が仮決定される。すなわち、第 1決定部 73は、前 回の決定内容を制御部 72経由でメモリ(図示せず)に一時記憶させる。また、第 1決 定部 73は、ピーク情報を制御部 72経由で第 1記憶部 75から受け取り、上限間隔の 情報と下限間隔の情報とを制御部 72経由で第 2記憶部 76から受け取り、ピーク数の 情報を制御部 72経由で第 3記憶部 77から受け取り、下限回数の情報と上限回数の 情報とを制御部 72経由で第 4記憶部 78から受け取る。
第 1決定部 73は、上限間隔と下限間隔と下限回数と上限回数とピーク数とピーク情 報とに基づいて、 1以上のピーク時刻を避けるように、デフロスト時刻を決定する。具 体的には、第 1決定部 73は、下限回数以上上限回数以下となるように、デフロスト回 数を決める。ここで、デフロスト回数は、 1日においてデフロストが行われる回数である 。また、第 1決定部 73は、下限間隔以上上限間隔以下となるように、デフロスト間隔を 決める。ここで、デフロスト間隔は、デフロストが行われる時間間隔である。第 1決定部 73は、デフロスト間隔だけ互いに離れているデフロスト回数分のデフロスト時刻の間 に各ピーク時刻がくるように、各デフロスト時刻を決定する。これにより、店舗 A, · · · の総電力デマンド値が小さい時間帯にデフロスト時刻が仮決定される。
[0058] 例えば、デフロスト回数 = 2回、デフロスト間隔 = A t、 N= lである場合、図 5 (a)に 示すようにデフロスト時刻が決定される。すなわち、電力デマンド値順位が 1位である ピーク P1のピーク時刻が 12時であるので、デフロスト時刻は、 A tだけ離れている時 刻 T1と時刻 T2とに決定される。ここで、 12時は、時刻 T1と時刻 T2との真ん中の時 刻となっていることが好ましい。これにより、店舗 A, · · ·において、冷凍冷蔵装置 51a , · · ·の電力は、図 5 (b)に 2点鎖線で示すように変化することになり、冷凍冷蔵装置 5 la, · · ·以外の電力は、図 5 (b)に 1点鎖線で示すように変化することになる。このた め、店舗 A, · · ·の総電力は、図 5 (c)に実線で示すように変化することになる。この結 果、 12時近傍の総電力デマンド値の大きさは、デフロスト時刻を決定する前と同じ W 1のままである。すなわち、総電力デマンド値の最大値の増加が抑えられている。
[0059] あるいは、例えば、デフロスト回数 = 2回、デフロスト間隔 = A t、 N = 2である場合、 図 6に示すようにデフロスト時刻が決定される。すなわち、電力デマンド値順位が 1位 であるピーク P1のピーク時刻が 12時であり、電力デマンド値順位が 2位であるピーク P2のピーク時刻が 18時であるので、デフロスト時刻は、 A tだけ離れている時刻 T3と 時刻 T4とに決定される。ここで、時刻 T3から 12時までの時間と、 18時から時刻 T4ま での時間とは、等しいことが好ましい。
ステップ S7では、デフロスト時刻がピーク時刻に重なる力否かが判断される。すな わち、第 1決定部 73は、デフロスト時刻の前後の所定時間以内にピーク時刻が含ま れている力否かが判断される。重なると判断された場合、ステップ S 10へ進められ、 重ならな 、と判断された場合、ステップ S8へ進められる。
[0060] ステップ S8では、 Nがピーク数以上である力否かが判断される。すなわち、第 1決 定部 73は、ピーク数の情報を制御部 72経由で第 3記憶部 77から受け取る。第 1決 定部 73は、電力デマンド値順位の変数 Nの値とピーク数と比較し、 Nがピーク数以上 であるか否かを判断する。 Nがピーク数以上であると判断された場合、ステップ S10 へ進められ、 Nがピーク数以上でないと判断された場合、ステップ S9へ進められる。 ステップ S9では、 N+ 1が Nにセットされる。すなわち、第 1決定部 73は、電力デマ ンド値順位の変数 Nの値に 1をカ卩えた数を、電力デマンド値順位の変数 Nの値として 新たにセットする。
ステップ S10では、前回の決定内容が呼び戻される。すなわち、第 1決定部 73は、 1時記憶されていた前回の決定内容を制御部 72経由でメモリから呼び戻す。
[0061] ステップ S11では、デフロスト時刻が決定される。すなわち、第 1決定部 73は、デフ ロスト時刻を確定的に決定する。制御部 72は、各デフロスト時刻の情報を、第 1決定 部 73から受け取り送受信部 71へ渡す。送受信部 71は、デフロストの指令情報を第 1 回線 5経由で店舗 A, · · ·へ送信する。
モデム 20a, · · ·は、デフロストの指令情報 (アナログ信号)を、第 1回線 5経由で管 理センター 70から受け取り、デフロストの指令情報 (デジタル信号)へ変換する。モデ ム 20a, · · ·は、デフロストの指令情報 (デジタル信号)を第 3回線 7a, · · ·経由で LC3 la, 32a, …へ送信する。
各 LC30a, · · ·は、デフロストの指令情報を第 3回線 7a, · · '経由でモデム 20a, · · 'から受け取る。 LC30a, · · ·は、デフロストの指令情報を、冷凍冷蔵装置 51a, · · · が読み取り可能なフォーマットに変換して、第 2回線 6a, · · ·経由で冷凍冷蔵装置 51 a, · · 'へ送信する。冷凍冷蔵装置 51a, · · ·は、デフロストの指令情報を第 2回線 6a , · · ·経由で LC30a, · · ·から受信する。これにより、冷凍冷蔵装置 51a, · · ·は、デフ ロストの指令情報に基づいて、所定のデフロスト時刻にデフロストを行う。
[0062] (デフロスト制御システムに関する特徴)
(1)
ここでは、第 1記憶部 75は、ピーク情報を記憶する。第 1決定部 73は、ピーク情報 を制御部 72経由で第 1記憶部 75から受け取る。第 1決定部 73は、ピーク情報などに 基づいて、 1以上のデフロスト時刻を決定する。 このように、第 1決定部 73がピーク情報などに基づいてデフロスト時刻を決定する ので、店舎膚 A, · · ·の総電力に関するトレンドにおけるピークを考慮して、デフロスト時 刻は決定される。このため、店舗 A, · · ·の総電力デマンド値の最大値の増加が低減 するので、店舗 A, · · ·の電力料金の増加は低減する。
(2)
ここでは、第 1決定部 73は、ピーク情報を制御部 72経由で第 1記憶部 75から受け 取る。第 1決定部 73は、ピーク情報などに基づいて、 1以上のピーク時刻を避けるよう に 1以上のデフロスト時刻を決定する。
[0063] このように、 1以上のピーク時刻を避けるように第 1決定部 73が 1以上のデフロスト時 刻を決定するので、店舎 A, · · ·の総電力デマンド値が小さい時間帯にデフロスト時 刻は決定される。このため、デフロストが行われることにより対象物件の総電力が増加 しても、店舗 A,…の総電力デマンド値の最大値の増加は低減する。
(3)
ここでは、制御部 72は、 1以上のデフロスト時刻に基づいて、ショーケース 6 la, · · · にデフロストを行わせる。ショーケース 6 la, · · ·においてデフロストが行われる際、第 1熱交^^ 511a, · · ·に付着した霜は、ヒーター 517a, · · ·で加熱されることによって 第 1熱交翻511&,…から除去される。
このように、冷凍冷蔵装置 51a, · · ·においてデフロストが行われる際、第 1熱交換 器 511a,…に付着した霜力 Sヒータ 517a,…で加熱されることにより第 1熱交 5 11a, · · ·から除去されるので、デフロストが行われることにより店舗 A, · · ·の総電力 が増加する傾向にある。この場合でも、 1以上のピーク時刻を避けるように第 1決定部 73が 1以上のデフロスト時刻を決定するので、店舗 A, · · ·の総電力デマンド値が小 さい時間帯にショーケース 61a, · · ·においてデフロストが行われることになる。このた め、店舗 A, · · ·の総電力デマンド値の最大値の増加は低減する。
[0064] (4)
ここでは、第 1デマンド計 94a, · · ·は、店舗 A, · · ·の総電力デマンド値を検知する 。第 2決定部 74は、第 1回線 5と送受信部 71と制御部 72とを経由して、店舗 A, · · · の総電力デマンド値の情報を第 1デマンド計 94a, · · ·から受け取る。第 2決定部 74 は、店舗 A, · · ·の総電力デマンド値などに基づいて、ピーク情報を決定する。
このように、第 2決定部 74が店舗 A, · · ·の総電力デマンド値などに基づいてピーク 情報を決定するので、店舗 A, …の総電力デマンド値のトレンドにおけるピークを考 慮して、 1以上のデフロスト時刻を決定することができるようになつている。
(5)
ここでは、店舗 A, · · ·の総電力デマンド値のトレンドは、 1日におけるトレンドである 。すなわち、ピーク情報は、店舗 A, · · ·の 1日における総電力デマンド値のトレンドに おいて、ピークとなる時刻に関する情報である。
[0065] このように、店舗 A, · · ·の総電力デマンド値のトレンドが 1日におけるトレンドである ので、店舎膚 A, · · ·の 1日における総電力デマンド値のトレンドにおけるピークを考慮 して、デフロスト時刻は決定される。このため、店舗 A, · · ·の 1日における総電力デマ ンド値の最大値の増加が低減される。
(6)
ここでは、第 2記憶部 76は、上限間隔と下限間隔とを記憶する。第 1決定部 73は、 上限間隔の情報と下限間隔の情報とを制御部 72経由で第 2記憶部 76から受け取り 、ピーク情報を制御部 72経由で第 1記憶部 75から受け取る。第 1決定部は、上限間 隔とピーク情報とに基づいて、 1以上のデフロスト時刻を決定する。
このように、第 1決定部が上限間隔と下限間隔とピーク情報となどに基づいて 1以上 のデフロスト時刻を決定するので、適切な間隔でデフロスト運転が行われるように、各 デフロスト時刻は決定される。
[0066] (7)
ここでは、第 3記憶部 77は、ピーク数を記憶する。第 1決定部 73は、ピーク数の情 報を第 3記憶部 77から受け取る。第 1決定部 73は、ピーク数とピーク情報となどに基 づいて、デフロスト時刻を決定する。
このように、第 1決定部 73がピーク数とピーク情報となどに基づいてデフロスト時刻 を決定するので、店舗 A, · · ·の総電力デマンド値のトレンドにおけるピーク数のピー クを考慮して、各デフロスト時刻は決定される。
(8) このデフロスト制御システムでは、第 4記憶部 78は、下限回数と上限回数とを記憶 する。第 1決定部 73は、下限回数の情報と上限回数の情報とを制御部 72経由で第 4 記憶部 78から受け取り、ピーク情報を制御部 72経由で第 1記憶部 75から受け取る。 第 1決定部 73は、下限回数と上限回数とピーク情報となどに基づいて、 1以上のデフ ロスト時刻を決定する。
[0067] このように、第 1決定部 73が下限回数と上限回数とピーク情報となどに基づいて 1 以上のデフロスト時刻を決定するので、適切な回数のデフロスト運転が行われるよう に、各デフロスト時刻は決定される。
(第 1実施形態の変形例)
(A)デフロスト制御システム laにおいて、管理センター 70aは、図 7に示すように、 第 1入力部 81aをさらに備え、第 1決定部 73の代わりに第 1決定部 73aを備え、制御 部 72の代わりに制御部 72aを備えていても良い。この場合、第 1入力部 81aには、季 節に関する情報、気象情報及び地域に関する情報の少なくとも 1つ (以下、季節情報 等とする)が入力される。第 1決定部 73aは、季節情報等を制御部 72a経由で第 1入 力部 81aから受け取る。また、第 1決定部 73aは、ピーク情報を制御部 72a経由で第 1記憶部 75から受け取る。第 1決定部 73aは、季節情報等とピーク情報となどに基づ いて、デフロスト時刻を決定する。
[0068] ここで、管理センター 70aは、第 2記憶部 76の代わりに第 2記憶部 76aを備えて ヽ ても良い。第 2記憶部 76aは、図 8に示す下限回数のテーブル情報を記憶する。その テーブル情報には、季節欄 761aと下限回数欄 762aとが設けられている。このテー ブル情報を参照することにより、季節に応じて適切な下限回数を決めることができるよ うになつている。すなわち、冷凍冷蔵装置 51a, · · ·の第 1熱交換器 51 laに付着する 霜の量 (着霜量)は、冬より夏の方が多い傾向がある。そこで、ショーケース 61a, · · · にお 、てデフロストが行われる際にヒーター 517aが 1回当たり消費する電力が決めら れている場合、霜を除去するために最低必要なデフロスト回数 (下限回数)も、冬より 夏の方が多くなる。つまり、下限回数のテーブル情報では、 N1 >N2となっている。
[0069] このとき、第 1入力部 81aには、季節に関する情報が入力される。第 1決定部 73aは 、季節に関する情報を制御部 72a経由で第 1入力部 81aから受け取る。また、第 1決 定部 73aは、下限回数のテーブル情報を制御部 72a経由で第 2記憶部 76aから受け 取る。そして、第 1決定部 73aは、下限回数のテーブル情報と季節に関する情報とな どに基づいて、デフロスト間隔を決定する。さらに、第 1決定部 73aは、決定されたデ フロスト間隔と、ピーク情報となどに基づいて、デフロスト時刻を決定する。
このように、第 1決定部 73aが季節情報等とピーク情報となどに基づいてデフロスト 時刻を決定するので、季節等の変化に応じて店舗 A, · · ·の総電力デマンド値のトレ ンドが変わる場合でも、店舗 A, · · ·の総電力デマンド値のトレンドにおけるピークを 考慮して、デフロスト時刻は決定される。
[0070] なお、第 1入力部 81aには、利用者により季節情報等が入力される代わりに、ネット ワーク等経由で季節情報等が取得されるようになって ヽても良 ヽ。
また、第 2記憶部 76aに記憶されるテーブル情報は、季節に関する情報、気象情報 及び地域に関する情報の少なくとも 1つとデフロスト間隔との関係が記録されたもので あっても良い。
なお、冬よりも夏のデフロスト回数を多くするのではなぐ冬よりも夏の 1回当たりの デフロスト時間を長くするようにしてもよい。さらには、冬よりも夏の 1回当たりのデフ口 スト時間を長くするようにし、加えて冬よりも夏のデフロスト回数を多くするようにしても かまわない。
(B)デフロスト制御システム laにおいて、管理センター 70aは、第 2入力部 82aをさ らに備え、第 1決定部 73の代わりに第 1決定部 73aを備え、制御部 72の代わりに制 御部 72aを備えていても良い。この場合、第 2入力部 82aには、ピーク情報が入力さ れる。第 1決定部 73aは、ピーク情報を制御部 72a経由で第 2入力部 82aから受け取 る。第 1決定部 73aは、ピーク情報に基づいて、デフロスト時刻を決定する。
[0071] このように、第 2入力部 82aにピーク情報が入力されるので、ピーク情報が利用者の 要望に合ったものになる。そして、利用者の要望に応じてデフロスト時刻を変えるよう に、デフロスト時刻が決定されることになる。このため、利用者の要望に応じて、店舗 A, · · ·の総電力デマンド値が小さい時間帯にデフロスト時刻は決定される。
(C)図 9に示すデフロスト制御システム lkにおいて、冷凍冷蔵装置 51ak, · · ·は、 そのヒーターで加熱することにより霜を除去する(ヒーターデフロスト)代わりに、冷媒 サイクルを反転させることにより霜を除去 (ホットガスデフロスト)しても良い。すなわち
、冷凍冷蔵装置 51ak, · · ·は、図 11に示すように、四路切替弁 514akをさらに備え ており、冷媒サイクルを反転することができるようになって 、る。
すなわち、図 10に示す管理センター 70kの制御部 72kは、 1以上のデフロスト時刻 に基づいて、ショーケース 6 la, · · ·にデフロストを行わせる。制御部 72kは、ショーケ ース 6 laの内部の冷凍'冷蔵を冷凍冷蔵装置 5 lak, · · ·に行わせる場合に、四路切 替弁 514akを実線で示す経路に切り替える。これにより、制御部 72kは、第 1熱交換 器 511a, · · ·を蒸発器として働かせる(図 11に実線の矢印で示すサイクル)。
[0072] また、制御部 72kは、デフロストをショーケース 6 la, · · ·に行わせる場合に、四路切 替弁 514akを破線で示す経路に切り替える。これにより、制御部 72kは、第 1熱交換 器 511a, · · ·を凝縮器として働かせる(図 11に破線の矢印で示すサイクル)。
このように、デフロストが行われる場合に第 1熱交 la,…が凝縮器として働 くので、デフロストが行われることにより店舗 A, · · ·の総電力が増加する傾向にある。 この場合でも、 1以上のピーク時刻を避けるように第 1決定部 73が 1以上のデフロスト 時刻を決定するので、店舗 A,…の総電力デマンド値が小さい時間帯に制御部 72 kがデフロストを行わせることになる。このため、店舗 A, · · ·の総電力デマンド値の最 大値の増加は低減する。
[0073] (D)図 12に示すデフロスト制御システム lbにおいて、管理センター 70bは、図 13 に示すように、第 1決定部 73の代わりに第 1決定部 73bを備え、制御部 72の代わりに 制御部 72bを備えていても良い。また、冷凍冷蔵装置 5 lab, · · ·は、そのヒーターで 加熱することにより霜を除去する代わりに、オフされることにより霜を除去 (オフサイク ルデフロスト)しても良い。
すなわち、管理センター 70bの制御部 72bは、 1以上のデフロスト時刻に基づいて、 ショーケース 61a, · · ·にデフロストを行わせる。制御部 72bは、ショーケース 61a, · · •にデフロストを行わせる際に、冷凍冷蔵装置 51ab, · · ·をオフする。
このように、冷凍冷蔵装置にデフロストを行わせる際に、制御部 72bが冷凍冷蔵装 置 51ab, · · ·をオフするので、デフロストが行われることにより店舗 A, · · ·の総電力が 減少する傾向にある。また、冷凍冷蔵装置 51ab, · · ·がォフされて力もオンされるの で、オンされた直後に冷凍冷蔵装置 5 la, · · ·の消費電力は一時的に増加する傾向 にある。すなわち、デフロストが行われた場合の冷凍冷蔵装置 5 lab, · · ·の電力値は 、図 15 (b)に 2点鎖線で示すように変化する。
[0074] この場合でも、第 1決定部 73bは、ピーク情報を制御部 72b経由で第 1記憶部 75か ら受け取る。第 1決定部 73bは、ピーク情報などに基づいて、 1以上のピーク時刻に 重なるように 1以上のデフロスト時刻を決定する(図 15 (a)参照)。また、第 1決定部 7 3bは、ピーク情報などに基づいて、さらに、 1以上のピーク時刻の直前を避けるように 1以上のデフロスト時刻を決定する。
例えば、デフロスト回数 = 2回、デフロスト間隔 = A t, N= lである場合、図 15 (a) に示すようにデフロスト時刻が決定される。すなわち、電力デマンド値順位が 1位であ るピーク P1のピーク時刻が 12時であるので、デフロスト時刻は、 A tだけ離れている 時刻 Tibと時刻 T2bとに決定される。ここで、 12時は、時刻 Tibと同じ時刻となって いることが好ましい。これにより、店舗 A, · "において、冷凍冷蔵装置 51a, · · ·の電 力は、図 15 (b)に 2点鎖線で示すように変化することになり、冷凍冷蔵装置 5 la, · · · 以外の電力は、図 15 (b)に 1点鎖線で示すように変化することになる。このため、店 舗 A, · · ·の総電力は、図 15 (c)に実線で示すように変化することになる。この結果、 12時近傍の総電力デマンド値の大きさは、デフロスト時刻を決定する前の値 W1より も小さな値 Wlb (ピーク Plb)になる。すなわち、総電力デマンド値の最大値の増加 が抑えられている。
[0075] このように、 1以上のピーク時刻に重なるように第 1決定部 73bが 1以上のデフロスト 時刻を決定するので、店舗 A, …の総電力デマンド値が大きい時間帯にデフロスト 時刻は決定される。このため、デフロストが行われることにより店舗 A, · · ·の総電力が 減少しても、店舗 A,…の総電力デマンド値の最大値の増加は低減する。
また、さらに、 1以上のピーク時刻の直前を避けるように第 1決定部 73bが 1以上の デフロスト時刻を決定するので、店舗 A, …の総電力デマンド値が大きい時間帯と デフロスト時刻の直後のタイミングとが重なることは低減される。このため、店舗 A, · · •の総電力デマンド値の最大値の増加は低減する。
以上より、店舗 A, · · ·の電力料金の増加は低減される。 なお、この場合に、冷凍冷蔵装置 51ab, · · ·は、図 14に示すように、ヒーター 517a , …(図 2参照)を有していなくても良い。
[0076] (E)冷凍冷蔵装置 51a, · · ·が設けられているのは、ショーケース 61a, · · 'である代 わりに、冷凍庫、冷蔵庫、倉庫などであってもよい。また、ショーケース 6 la, · · ·、冷 凍庫、冷蔵庫、倉庫などが設置されているのは、店舎 A, · · 'である代わりに、デバー ト、スーパーなどであってもよい。
また、店舗 A, · · ·のショーケース 61a, · · ·に設けられている冷凍冷蔵装置 5 la, · · 'は、冷凍及び冷蔵を行う代わりに、冷凍のみ行っても良いし、冷蔵のみ行っても良 いし、冷凍のみを行うものと冷蔵のみを行うものとが混在したものであっても良いし、 冷凍及び冷蔵を行うものと冷凍のみを行うものと冷蔵のみを行うものとの少なくとも 2 つ以上が混在したものであっても良い。
(F)図 16に示すデフロスト制御システム liは、イベント検知センサー群 9i (9a, 9b,
• · をさらに備えてもよい。各イベント検知センサー 9a,…は、それぞれ、店舗 A, ·
• ·に設置されており、主として、イベント情報を検知する。ここで、イベント情報は、店 舗 A, · · ·におけるイベントの発生状況に関する情報である。具体的には、イベント情 報は、例えば、店舗 A, · · ·の来店客数である。また、管理センター 70iは、図 17に示 すように、第 1決定部 73の代わりに第 1決定部 73iを備え、制御部 72の代わりに制御 部 72iを備えてもよい。
[0077] この場合、送受信部 71は、イベント情報を、モデム 20a, · · ·および第 1回線 5経由 で各イベント検知センサー 9a, · · 'から受信する。第 1決定部 73iは、イベント情報を、 制御部 72i経由で送受信部 71から受け取り、ピーク情報を制御部 72i経由で第 1記 憶部 75から受け取る。第 1決定部 73iは、ピーク情報とイベント情報となどに基づいて 、デフロスト時刻を決定する。
このように、ピーク情報とイベント情報となどに基づいて第 1決定部 73iがデフロスト 時刻を決定するので、店舗 A, · · ·の総電力デマンド値のトレンドにおけるピークと、ィ ベントの発生状況とを考慮して、 1以上のデフロスト時刻は決定されることになる。 ここで、各イベント検知センサー 9a, · · ·は、店舗 A, · · ·の入り口に設置されており 、赤外線などを介して店舗 A, · · ·の来店客数を検知してもよい。 [0078] あるいは、イベント情報は、例えば、 IIA, · · ·において過去の同時期に買い物を した客数であってもよい。この場合、各イベント検知センサー 9a, · · ·は、 POS (Poin t of Sales)システムとリンクされており、店舗 A, · · ·において買い物をした客数の 情報を検知するとともに記憶する。そして、送受信部 71は、イベント情報を、第 1回線 5経由で各イベント検知センサー 9a, · · ·から受信する。
(G)デフロスト制御システム ljの管理センター 70jは、図 18に示すように、第 4入力 部 86jをさらに備え、第 1決定部 73の代わりに第 1決定部 7¾を備え、制御部 72の代 わりに制御部 7¾を備えてもょ 、。
この場合、第 4入力部 86jには、イベント情報が入力される。第 1決定部 73iは、ィべ ント情報を、制御部 7¾経由で第 4入力部 86jから受け取り、ピーク情報を制御部 7¾ 経由で第 1記憶部 75から受け取る。第 1決定部 7¾は、ピーク情報とイベント情報とな どに基づいて、デフロスト時刻を決定する。
[0079] このように、ピーク情報とイベント情報となどに基づいて第 1決定部 7¾がデフロスト 時刻を決定するので、店舗 A, · · ·の総電力デマンド値のトレンドにおけるピークと、ィ ベントの発生状況とを考慮して、 1以上のデフロスト時刻は決定されることになる。 ここで、イベント情報は、例えば、店舗 A, · · ·の来店客数と時間帯との相関関係で ある。このイベント情報は、具体的な過去のデータに基づいたものであっても良いし、 利用者の主観に基づ 、たものであっても良 、。
<第 2実施形態 >
本発明の第 2実施形態に係るデフロスト制御システムの構成図を図 19に示す。また 、本発明の第 2実施形態に係るデフロスト制御システム 100の構成要素の構成図を 図 20に示す。図 19,図 20において、図 1,図 2のデフロスト制御システム 1の構成要 素と同様の構成要素は同じ番号で示してある。図 19に示すデフロスト制御システム 1 00は、主として、店舎甫 A, · · ·において冷凍冷蔵装置 51a, 52a, · · · , 51b, 52b, · · .のデフロストを制御するシステムである。
[0080] このデフロスト制御システム 100は、図 19及び図 20に示すように、基本的な構成は 第 1実施形態と同様であるが、管理センター 70の代わりに管理センター 170が備えら れ、第 2デマンド計群 196 (196a, 197a, · · · , 196b, 197b, · · ·)力さらに備えられ ている点で、第 1実施形態と異なる。
第 2デマンド計群 196 (196a, 197a, · · · , 196b, 197b, · · · )は、第 2電力供給線 93aにおいて、第 1デマンド計 94a, · · ·と冷凍冷蔵装置 5 la, · · ·との間に設けられ ている。各第 2デマンド計 196a, · · ·は、冷凍冷蔵装置 51a, · · 'ごとに設けられてい る。
一方、管理センター 170は、第 2決定部 74の代わりに第 3決定部 183を備え、第 1 記憶部 75の代わりに第 1記憶部 175を備え、制御部 72の代わりに制御部 172を備 える。
[0081] そして、第 2デマンド計 196a, · · ·は、第 1電力デマンド値を検知する。ここで、第 1 電力デマンド値は、冷凍冷蔵装置 51a, · · ·におけるデフロストに要する電力を各 30 分間について平均した値である。第 2デマンド計 196a, · · ·は、第 4回線 8a, · · ·と L C130a, · · ·とモデム 20a, · · ·と第 1回線 5とを経由して、第 1電力デマンド値の情報 を管理センター 170へ送信する。
管理センター 170の送受信部 71は、店舗 A, · · ·の総電力デマンド値の情報と第 1 電力デマンド値の情報とを、第 1回線 5経由で第 1デマンド計 94a, 94b, · · ·から受 信する。制御部 172は、店舗 A, · · ·の総電力デマンド値の情報と第 1電力デマンド 値の情報とを、送受信部 71から受け取る。制御部 172は、 30分ごとに、店舗 A, · · · の総電力デマンド値力 第 1電力デマンド値を引いた電力デマンド値を求める。第 1 記憶部 175は、 1日における店舗 A, …の各 30分の「総電力デマンド値-第 1電力 デマンド値」の情報を記憶する。
[0082] 第 3決定部 183は、 1日における店舗 A, · · ·の各 30分の「総電力デマンド値—第 1 電力デマンド値」の情報を制御部 172経由で第 1記憶部 175から受け取る。また、第 3決定部 183は、ピーク数の情報を制御部 172経由で第 3記憶部 77から受け取る。 第 3決定部 183は、 1日における店舗 A, …の各 30分の「総電力デマンド値-第 1 電力デマンド値」の情報と、ピーク数の情報とに基づいて、ピーク情報を決定する。こ こで、ピーク情報は、 1以上のピーク時刻に関する情報である。ピーク時刻は、店舗 A , · · ·の総電力デマンド値のピークとなる時刻である。具体的には、第 3決定部 183は 、 1日における店舎膚 A,…の各 30分の「総電力デマンド値—第 1電力デマンド値」が 大きいものから、上位ピーク数の値を選択してピーク情報とする。制御部 172は、ピ ーク情報を第 3決定部 183から受け取り、第 1記憶部 175へ渡す。第 1記憶部 175は 、ピーク情報を記憶する。
[0083] 例えば、デフロスト回数 = 2回、デフロスト間隔 = A t、 N= lである場合、図 21に示 すようにデフロスト時刻が決定される。すなわち、電力デマンド値順位が 1位であるピ ーク P101のピーク時刻が 12時であるので、デフロスト時刻は、 A tだけ離れている時 刻 T101と時刻 T102とに決定される。ここで、 12時は、時刻 T101と時刻 T102との 真ん中の時刻となっていることが好ましい。なお、図 21において、縦軸が「総電力デ マンド値一第 1電力デマンド値」となっている。
このように、第 3決定部 183が店舗 A, · · ·の総電力デマンド値と第 1電力デマンド 値とに基づいてピーク情報を決定するので、ピーク情報は、店舗 A, · · ·の総電力デ マンド値のうち第 1電力デマンド値を除外した電力デマンド値の実績に合ったものに なる。このため、店舗 A, · · ·の総電力デマンド値力 第 1電力デマンド値を除外した 電力デマンド値が小さい時間帯にデフロスト時刻が決定されるようになる。この結果、 店舗 A, · · ·の総電力デマンド値の最大値の増加は低減される。また、第 1電力デマ ンド値の変動の影響を除去した形でピークが決められるので、総電力デマンド値が 小さい時間帯にデフロスト時刻が決定される際に、誤差が低減される。
[0084] これらの点で第 1実施形態と異なる。
第 1決定部 73がピーク情報に基づいてデフロスト時刻を決定するので、店舗 A, · · •の総電力デマンド値が小さい時間帯にデフロスト時刻が決定されることになる点は、 第 1実施形態と同様である。したがって、このようなデフロスト制御システム 100によつ ても、店舗 A,…の総電力デマンド値の最大値の増加が低減されるので、店舗 A, ·
• ·の電力料金の増加は低減される。
(第 2実施形態の変形例)
図 22に示すデフロス卜制御システム lOOiは、第 2デマンド計群 196 (196a, 197a,
· · · , 196b, 197b, · · ·)を備える代わりに、図 23に示すように、管理センター 170i が第 3入力部 185iをさらに有するようになつていても良い。この場合、第 3入力部 185 iには、第 1電力デマンド値が入力される。制御部 172iは、第 1電力デマンド値の情 報を第 3入力部 185 受け取る。
[0085] このように、第 3入力部 185iに第 1電力デマンド値が入力されるので、店舗 A, · · · の総電力デマンド値と第 1電力デマンド値とに基づいてピーク情報が決定されるよう になる。
なお、第 3入力部 185iが入力されるタイミングは、冷凍冷蔵装置 51a, · · ·が店舗 A , · · ·に設置されるときかその前であることが好ましい。
<第 3実施形態 >
本発明の第 3実施形態に係るデフロスト制御システムの構成図を図 24に示す。また 、本発明の第 3実施形態に係るデフロスト制御システム 200の構成要素の構成図を 図 25に示す。図 24,図 25において、図 1,図 2のデフロスト制御システム 1の構成要 素と同様の構成要素は同じ番号で示してある。図 24に示すデフロスト制御システム 2 00は、主として、店舎甫 A, ···において冷凍冷蔵装置 51a, 52a, ···, 51b, 52b, ·· .のデフロストを制御するシステムである。
[0086] このデフロスト制御システム 200は、図 24及び図 25に示すように、基本的な構成は 第 1実施形態と同様であるが、管理センター 70の代わりに管理センター 270が備えら れ、第 3デマンド計群 296 (296a, 297a, ···, 296b, 297b,…;)力 iえられ、第 4 デマンド計群 298 (298a, 298b, …;)がさらに備えられている点で、第 1実施形態と 異なる。
第 3デマンド計群 296 (296a, 297a, · · ·, 296b, 297b,…;)は、第 2電力供給線 93aにおいて、第 1デマンド計 94a, ···と冷凍冷蔵装置 5 la, ···との間に設けられ ている。各第 3デマンド計 296a, · · ·は、冷凍冷蔵装置 51a, · · 'ごとに設けられてい る。
第 4デマンド計群 298 (298a, 298b, ···)は、第 2電力供給線 93aにおいて、第 1 デマンド計 94a, ···と空気調和装置 11a, ···との間に設けられている。各第 4デマ ンド計 298a, ···は、空気調和装置 11a, ···ごとに設けられている。
[0087] 一方、管理センター 270は、第 2決定部 74の代わりに第 4決定部 284を備え、第 1 記憶部 75の代わりに第 1記憶部 275を備え、制御部 72の代わりに制御部 272を備 える。 そして、第 3デマンド計 296a, · · ·は、第 3電力デマンド値を検知する。ここで、第 3 電力デマンド値は、冷凍冷蔵装置 51a, · · ·の電力デマンド値である。第 3デマンド計 296a, · · ·は、第 3電力デマンド値の情報を第 4回線 8a経由で LC230a, · · 'へ送信 する。 LC230a, · · ·は、第 3回線 7a, · · ·とモデム 20a, · · ·と第 1回線 5とを経由して 、第 3電力デマンド値の情報を管理センター 270へ送信する。
第 4デマンド計 298a, · · ·は、第 4電力デマンド値を検知する。ここで、第 4電力デ マンド値は、空気調和装置 11a, · · ·の電力デマンド値である。第 4デマンド計 298a , · · ·は、第 4電力デマンド値の情報を第 4回線 8a経由で LC230a, · · 'へ送信する。 LC230a, · · ·は、第 3回線 7a, · · ·とモデム 20a, · · ·と第 1回線 5とを経由して、第 4 電力デマンド値の情報を管理センター 270へ送信する。
管理センター 270の送受信部 71は、店舗 A, · · ·の総電力デマンド値の情報を受 信する代わりに、第 3電力デマンド値の情報と第 4電力デマンド値の情報とを、第 1回 線 5経由でモデム 20a, · · 'から受信する。制御部 272は、第 3電力デマンド値の情 報と第 4電力デマンド値の情報とを、送受信部 71から受け取る。制御部 272は、 30 分ごとに、第 3電力デマンド値と第 4電力デマンド値とを合計した電力デマンド値を第 2電力デマンド値として求める。ここで、第 2電力デマンド値は、冷凍冷蔵装置 5 la, · • ·の電力と空気調和装置 11a, · · ·の電力との合計の電力を各 30分間について平 均した値である。第 1記憶部 275は、 1日における店舗 A, · · ·の各 30分の第 2電力 デマンド値の情報を記憶する。
第 4決定部 284は、 1日における店舗 A, · · ·の各 30分の第 2電力デマンド値の情 報を制御部 272経由で第 1記憶部 275から受け取る。また、第 4決定部 284は、ピー ク数の情報を制御部 272経由で第 3記憶部 77から受け取る。第 4決定部 284は、 1 日における店舗 A, · · ·の各 30分の第 2電力デマンド値の情報と、ピーク数の情報と に基づいて、ピーク情報を決定する。ここで、ピーク情報は、 1以上のピーク時刻に関 する情報である。ピーク時刻は、店舗 A, · · ·の総電力デマンド値のピークとなる時刻 である。具体的には、第 4決定部 284は、 1日における店舗 A, · · ·の各 30分の第 2 電力デマンド値が大き 、ものから、上位ピーク数の値を選択してピーク情報とする。 制御部 272は、ピーク情報を第 4決定部 284から受け取り、第 1記憶部 275へ渡す。 第 1記憶部 275は、ピーク情報を記憶する。
[0089] 例えば、デフロスト回数 = 2回、デフロスト間隔 = A t、 N = 2である場合、図 26に示 すようにデフロスト時刻が決定される。すなわち、電力デマンド値順位が 1位であるピ ーク P201のピーク時刻が 12時であり、電力デマンド値順位が 2位であるピーク P202 のピーク時刻が 18時であるので、デフロスト時刻は、 A tだけ離れている時刻 T203と 時刻 T204とに決定される。ここで、時刻 T203から 12時までの時間と、 18時から時 刻 T204までの時間とは、等し 、ことが好まし 、。
このように、第 4決定部 284が店舗 A, · · ·の第 2電力デマンド値に基づいてピーク 情報を決定するので、ピーク情報は、店舗 A, · · ·の第 2電力デマンド値の実績に合 つたものになる。このため、店舗 A, · · ·の第 2電力デマンド値が小さい時間帯にデフ ロスト時刻が決定されるようになる。この結果、店舗 A, · · ·の総電力デマンド値の最 大値の増加は低減される。また、第 1電力デマンド値の変動の影響を除去した形でピ ークが決められるので、総電力デマンド値が小さい時間帯にデフロスト時刻が決定さ れる際に、誤差が低減される。
[0090] これらの点で第 1実施形態と異なる。
第 1決定部 73がピーク情報に基づいてデフロスト時刻を決定するので、店舗 A, · · •の総電力デマンド値が小さい時間帯にデフロスト時刻が決定されることになる点は、 第 1実施形態と同様である。したがって、このようなデフロスト制御システム 200によつ ても、店舗 A,…の総電力デマンド値の最大値の増加が低減されるので、店舗 A, · • ·の電力料金の増加は低減される。
(第 3実施形態の変形例)
第 4決定部 284は、 30分ごとに、第 3電力デマンド値のみを求めても良い。このとき 、第 4決定部 284は、 1日における店舗 A, · · ·の各 30分の第 3電力デマンド値が大 きいものから、上位ピーク数の値を選択してピーク情報とする。この場合でも、第 4決 定部 284が店舗 A, · · ·の第 3電力デマンド値に基づいてピーク情報を決定するので 、ピーク情報は、店舗 A, · · ·の第 3電力デマンド値の実績に合ったものになる。この ため、店舗 A, …の第 3電力デマンド値力 S小さい時間帯にデフロスト時刻が決定され るようになる。この結果、店舗 A, · · ·の総電力デマンド値の最大値の増加は低減され る。
[0091] あるいは、第 4決定部 284は、 30分ごとに、第 4電力デマンド値のみを求めても良い 。このとき、第 4決定部 284は、 1日における店舗 A, · · ·の各 30分の第 4電力デマン ド値が大きいものから、上位ピーク数の値を選択してピーク情報とする。この場合でも 、第 4決定部 284が店舗 A,…の第 4電力デマンド値に基づいてピーク情報を決定 するので、ピーク情報は、店舗 A, · · ·の第 4電力デマンド値の実績に合ったものにな る。このため、店舗 A, · · ·の第 4電力デマンド値が小さい時間帯にデフロスト時刻が 決定されるようになる。この結果、店舗 A, · · ·の総電力デマンド値の最大値の増加は 低減される。
<第 4実施形態 >
本発明の第 4実施形態に係るデフロスト制御システムの構成図を図 27に示す。また 、本発明の第 4実施形態に係るデフロスト制御システム 200の構成要素の構成図を 図 28に示す。図 27,図 28において、図 1,図 2のデフロスト制御システム 1の構成要 素と同様の構成要素は同じ番号で示してある。図 27に示すデフロスト制御システム 3 00は、主として、店舎甫 A, · · ·において冷凍冷蔵装置 51a, 52a, · · · , 51b, 52b, · · .のデフロストを制御するシステムである。
[0092] このデフロスト制御システム 200は、図 27及び図 28に示すように、基本的な構成は 第 1実施形態と同様であるが、管理センター 70と第 1回線 5とモデム群 20 (20a, · · · )と第 3回線群 7 (7a, ' ' とが備ぇられてぉらず、1^群30 (30&, · · ·)の代わりに LC 群 330 (330a, · · が備えられている点で、第 1実施形態と異なる。
すなわち、送受信部 331a,送受信部 341a,制御部 332a,第 1決定部 333a,第 2 決定部 334a,第 1記憶部 335a,第 2記憶部 336a,第 3記憶部 337a,第 4記憶部 33 8a及び第 5入力部 339aは、管理センター 70の代わりに LC30aに備えられる。他の LC30b, · · ·についても同様である。
第 1決定部 333a, · · ·がピーク情報に基づいてデフロスト時刻を決定するので、店 舗 A, · · ·の総電力デマンド値が小さい時間帯にデフロスト時刻が決定されることにな る点は、第 1実施形態と同様である。したがって、このようなデフロスト制御システム 30 0によっても、店舗 A, · · ·の総電力デマンド値の最大値の増加が低減されるので、店 舗 A, · · ·の電力料金の増加は低減される。
産業上の利用可能性
本発明に力かるデフロスト制御システム及びデフロスト制御方法は、対象物件の電 力料金の増加を低減することができるという効果を有し、デフロスト制御システム及び デフロスト制御方法等として有用である。

Claims

請求の範囲
[1] 対象物件の総電力に関するトレンドにおいてピークとなる時刻である 1以上のピーク 時刻に関する情報であるピーク情報を記憶する第 1記憶部(75, 175, 275, 335a, …;)と、
少なくとも前記ピーク情報に基づ!、て、前記対象物件にお!、て冷凍及び冷蔵の少 なくとも一方を行う冷凍冷蔵装置(51a, · · の前記デフロストが行われる時刻である 1以上のデフロスト時刻を決定する第 1決定部(73, 73a, 73b, 73i, 73j, 333a, · · と、
を備えた、デフロス卜制御システム(1, la, lb, li, lj, lk, 100, lOOi, 200, 300)
[2] 前記対象物件の前記総電力に関するトレンドは、前記対象物件の前記総電力を第 1時間について平均した値である総電力デマンド値のトレンドを含む、
請求項 1に記載のデフロス卜制御システム(1, la, lb, li, lj, lk, 100, lOOi, 200 , 300)。
[3] 前記第 1決定部(73, 73a, 73i, 73j, 333a, · · は、少なくとも前記ピーク情報に 基づいて、前記 1以上のピーク時刻を避けるように前記 1以上のデフロスト時刻を決 定する、
請求項 1または 2に記載のデフロスト制御システム(1, la, li, lj, lk, 100, lOOi, 2 00, 300)。
[4] 前記冷凍冷蔵装置(51a, · · · )は、冷却部(511a, · · · )と、前記冷却部の近傍に 設けられ通電が行われることによって加熱する加熱部(517a, · · とを有し、 前記デフロストは、前記デフロスト時刻において前記加熱部に通電が行われること によって実行される、
請求項 3に記載のデフロス卜制御システム(1, la, li, lj, 100, 100i, 200, 300) 0
[5] 前記冷凍冷蔵装置 (51ak, · · · )は、冷凍冷蔵運転時に蒸発器として機能する熱交 m^ (511a, · · · )を有し、
前記デフロストは、前記デフロスト時刻において前記熱交翻を凝縮器として機能 させること〖こよって実行される、 請求項 3に記載のデフロスト制御システム(lk)。
[6] 前記第 1決定部(73b)は、少なくとも前記ピーク情報に基づいて、前記 1以上のピ ーク時刻に重なるように前記 1以上のデフロスト時刻を決定する、
請求項 1または 2に記載のデフロスト制御システム(lb)。
[7] 前記第 1決定部(73b)は、前記 1以上のピーク時刻の直前を避けるように前記 1以 上のデフロスト時刻を決定する、
請求項 6に記載のデフロスト制御システム(lb)。
[8] 前記デフロストは、前記冷凍冷蔵装置(5 lab, · · が停止されることによって実行 される、
請求項 6または 7に記載のデフロスト制御システム(lb)。
[9] 前記対象物件の前記総電力デマンド値を検知する第 1検知部(94a, · · · )と、 前記対象物件の前記総電力デマンド値に基づ!、て、前記ピーク情報を決定する第 2決定部(74)と、
をさらに備えた、
請求項 1から 8のいずれかに記載のデフロスト制御システム(1, la, lb, li, lj, lk)
[10] 前記対象物件の前記総電力に関するトレンドは、前記対象物件の前記総電力を第 1時間について平均した値である総電力デマンド値に関するトレンドと、前記対象物 件における前記デフロストに要する電力を前記第 1時間について平均した値である 第 1電力デマンド値に関するトレンドとを含み、
前記対象物件の前記総電力デマンド値を検知する第 1検知部(94a, · · · )と、 前記対象物件の前記総電力デマンド値と前記第 1電力デマンド値とに基づいて、 前記ピーク情報を決定する第 3決定部(183)と、
をさらに備えた、
請求項 1から 8のいずれかに記載のデフロスト制御システム(100, 100i)。
[11] 前記第 1電力デマンド値が入力される第 3入力部(185i)をさらに備えた、
請求項 10に記載のデフロスト制御システム(100i)。
[12] 前記第 1電力デマンド値を検知する第 2検知部(196a, · · をさらに備えた、 請求項 10に記載のデフロスト制御システム(100)。
[13] 前記対象物件の前記総電力に関するトレンドは、前記冷凍冷蔵装置(5 la, " の 周辺空間を空気調和する空気調和装置(11a, · · · )並びに前記冷凍冷蔵装置 (51a
, · · の少なくとも一方の電力を第 1時間について平均した値である第 2電力デマン ド値に関するトレンドを含み、
前記第 2電力デマンド値を検知する第 3検知部(296a, · · · , 298a, · · · )と、 前記対象物件の前記第 2電力デマンド値に基づ 、て、前記ピーク情報を決定する 第 4決定部(284)と、
をさらに備えた、
請求項 1から 8のいずれかに記載のデフロスト制御システム(200)。
[14] 前記対象物件の前記総電力に関するトレンドは、第 2時間におけるトレンドを含む、 請求項 1から 13のいずれかに記載のデフロスト制御システム(1, la, lb, li, lj, lk
, 100, lOOi, 200, 300)。
[15] 前記デフロスト時刻は、第 2時間において複数存在し、
前記デフロスト時刻の時間間隔の上限である上限間隔を記憶する第 2記憶部(76,
76a, 336a, · · · )をさらに備え、
前記第 1決定部(73, 73a, 73b, 73i, 73j, 333a, · · · )は、前記上限間隔と前記 ピーク情報とに基づいて、前記 1以上のデフロスト時刻を決定する、
請求項 14に記載のデフロス卜制御システム(1, la, lb, li, lj, lk, 100, lOOi, 20
0, 300)。
[16] 前記第 2記憶部(76, 76a, 336a, · · · )は、前記デフロスト時刻の時間間隔の下限 である下限間隔をさらに記憶し、
前記第 1決定部(73, 73a, 73b, 73i, 73j, 333a, · · · )は、前記上限間隔と前記 下限間隔と前記ピーク情報とに基づいて、前記 1以上のデフロスト時刻を決定する、 請求項 15に記載のデフロス卜制御システム(1, la, lb, li, lj, lk, 100, lOOi, 20 0, 300)。
[17] 前記ピーク時刻は、前記第 2時間において複数存在し、
複数の前記ピーク時刻のうち前記ピーク情報に含められる前記ピーク時刻の数で あるピーク数を記憶する第 3記憶部(77, 337a, · · ·)をさらに備え、 前記第 1決定部(73, 73a, 73b, 73i, 73j, 333a, · · · )は、前記ピーク数と前記ピ ーク情報とに基づいて、前記 1以上のデフロスト時刻を決定する、
請求項 14に記載のデフロス卜制御システム(1, la, lb, li, lj, lk, 100, lOOi, 20 0, 300)。
[18] 前記第 2時間における前記デフロスト時刻の回数の下限である下限回数を記憶す る第 4記憶部(78, 338a, · · · )をさらに備え、
前記第 1決定部(73, 73a, 73b, 73i, 73j, 333a, · · · )は、前記下限回数と前記 ピーク情報とに基づいて、前記 1以上のデフロスト時刻を決定する、
請求項 14に記載のデフロス卜制御システム(1, la, lb, li, lj, lk, 100, lOOi, 20 0, 300)。
[19] 第 4記憶部(78, 338a, · · · )は、前記第 2時間における前記デフロスト時刻の回数 の上限である上限回数をさらに記憶し、
前記第 1決定部(73, 73a, 73b, 73i, 73j, 333a, · · · )は、前記下限回数と前記 上限回数と前記ピーク情報とに基づいて、前記 1以上のデフロスト時刻を決定する、 請求項 18に記載のデフロス卜制御システム(1, la, lb, li, lj, lk, 100, lOOi, 20 0, 300)。
[20] 前記対象物件におけるイベントの発生状況に関する情報であるイベント情報を検知 する第 4検知部(9a, · · ·)をさらに備え、
前記第 1決定部(73i)は、前記ピーク情報と前記イベント情報とに基づいて、前記 1 以上のデフロスト時刻を決定する、
請求項 1から 19のいずれかに記載のデフロスト制御システム(li)。
[21] 前記対象物件におけるイベントの発生状況に関する情報であるイベント情報が入 力される第 4入力部 (86j)をさらに備え、
前記第 1決定部(7¾)は、前記ピーク情報と前記イベント情報とに基づいて、前記 1 以上のデフロスト時刻を決定する、
請求項 1から 19のいずれかに記載のデフロスト制御システム(lj)。
[22] 季節に関する情報、気象情報及び地域に関する情報の少なくとも 1つが入力される 第 1入力部 (81a)をさらに備え、
前記第 1決定部(73a)は、前記季節に関する情報、前記気象情報及び前記地域 に関する情報の少なくとも 1つと前記ピーク情報とに基づいて、前記 1以上のデフロス ト時刻を決定する、
請求項 1から 22のいずれかに記載のデフロスト制御システム(la)。
[23] 前記ピーク情報が入力される第 2入力部(82a)をさらに備えた、
請求項 1から 8の!、ずれかに記載のデフロスト制御システム(la)。
[24] 対象物件の総電力に関するトレンドにおけるピークとなる時刻である 1以上のピーク 時刻に関する情報であるピーク情報を記憶する第 1記憶部(75, 175, 275, 335a,
…;)と、
少なくとも前記ピーク情報に基づ!、て、前記対象物件にお!、て冷凍及び冷蔵の少 なくとも一方を行う前記冷凍冷蔵装置(51a, · · の前記デフロストが行われる時刻 である 1以上のデフロスト時刻を決定する第 1決定部(73, 73a, 73b, 73i, 73j, 33 3a, · · · )と、
を備えた、デフロス卜制御装置(70, 70a, 70b, 70i, 70j, 70k, 170, 270, 330a, · · · )。
[25] 対象物件の総電力に関するトレンドにおいてピークとなる時刻である 1以上のピーク 時刻に関する情報であるピーク情報が記憶される記憶ステップと、
少なくとも前記ピーク情報に基づ!、て、前記対象物件にお!、て冷凍及び冷蔵の少 なくとも一方を行う前記冷凍冷蔵装置(51a, · · の前記デフロストが行われる時刻 である 1以上のデフロスト時刻が決定される決定ステップと、
を備えた、
デフロスト制御方法。
[26] 前記決定ステップでは、少なくとも前記ピーク情報に基づ!、て、前記 1以上のピーク 時刻を避けるように前記 1以上のデフロスト時刻が決定される、
請求項 25に記載のデフロスト制御方法。
[27] 前記決定ステップでは、少なくとも前記ピーク情報に基づ 、て、前記 1以上のピーク 時刻に重なるように前記 1以上のデフロスト時刻が決定される、 請求項 25に記載のデフロスト制御方法。
PCT/JP2006/309811 2005-05-17 2006-05-17 デフロスト制御システム、デフロスト制御装置、及びデフロスト制御方法 WO2006123687A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2005-143913 2005-05-17
JP2005143913A JP3856039B2 (ja) 2005-05-17 2005-05-17 デフロスト制御システム、デフロスト制御装置、及びデフロスト制御方法

Publications (1)

Publication Number Publication Date
WO2006123687A1 true WO2006123687A1 (ja) 2006-11-23

Family

ID=37431260

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2006/309811 WO2006123687A1 (ja) 2005-05-17 2006-05-17 デフロスト制御システム、デフロスト制御装置、及びデフロスト制御方法

Country Status (2)

Country Link
JP (1) JP3856039B2 (ja)
WO (1) WO2006123687A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2021001969A1 (ja) * 2019-07-03 2021-01-07

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09189474A (ja) * 1996-01-10 1997-07-22 Tokyo Electric Power Co Inc:The 低温ショーケースの制御装置及び低温ショーケースの制御方法
JPH10339546A (ja) * 1997-06-06 1998-12-22 Mitsubishi Electric Corp 冷凍機のデマンド制御装置
JP2001272083A (ja) * 2000-03-29 2001-10-05 Daikin Ind Ltd 空気調和装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09189474A (ja) * 1996-01-10 1997-07-22 Tokyo Electric Power Co Inc:The 低温ショーケースの制御装置及び低温ショーケースの制御方法
JPH10339546A (ja) * 1997-06-06 1998-12-22 Mitsubishi Electric Corp 冷凍機のデマンド制御装置
JP2001272083A (ja) * 2000-03-29 2001-10-05 Daikin Ind Ltd 空気調和装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2021001969A1 (ja) * 2019-07-03 2021-01-07
WO2021001969A1 (ja) * 2019-07-03 2021-01-07 三菱電機株式会社 冷凍サイクル装置
CN114026373A (zh) * 2019-07-03 2022-02-08 三菱电机株式会社 制冷环路装置
JP7150177B2 (ja) 2019-07-03 2022-10-07 三菱電機株式会社 冷凍サイクル装置
CN114026373B (zh) * 2019-07-03 2023-01-10 三菱电机株式会社 制冷环路装置

Also Published As

Publication number Publication date
JP3856039B2 (ja) 2006-12-13
JP2006322629A (ja) 2006-11-30

Similar Documents

Publication Publication Date Title
US8341970B2 (en) Refrigeration equipment with control system and device for controlling defrosting operation
US7403827B2 (en) Equipment control system
JP5362537B2 (ja) 空調制御装置、冷却システム及び空調制御プログラム
WO2011016551A1 (ja) 冷凍機の運転管理装置
EP0021151A1 (en) Adaptive defrost control and method
CN101765750B (zh) 控制制冷剂分配的方法
EP3534095B1 (en) Adaptive control method for refrigeration systems
US8161758B2 (en) Automatic defrost evaporator systems
Maldonado et al. Frost detection method on evaporator in vapour compression systems
Fricke et al. Energy use of doored and open vertical refrigerated display cases
US4694657A (en) Adaptive defrost control and method
Maldonado et al. Control strategies for defrost and evaporator fans operation in walk-in freezers
WO2006123687A1 (ja) デフロスト制御システム、デフロスト制御装置、及びデフロスト制御方法
JP4739922B2 (ja) 冷却システム
BR Becker PhD Comparison of vertical display cases: Energy and productivity impacts of glass doors versus open vertical display cases
JP6528307B2 (ja) 制御装置およびショーケース制御システム
JPH1163744A (ja) ショーケースの除霜制御方法
Foster et al. Technological options for retail refrigeration
JP2013011398A (ja) 冷凍システムの制御装置
CN103348189A (zh) 用于辅助热源的各部件的耗损水平测量
JP2845315B2 (ja) ショーケースの除霜制御方法
JPH09287868A (ja) ショーケースの除霜制御方法
JP5914815B2 (ja) 制御システム
Cortella et al. Demand side management through latent thermal storage in HVAC systems coupled with commercial refrigeration units
Cai et al. An active defrost scheme with a balanced energy consumption and food quality loss in supermarket refrigeration systems

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
NENP Non-entry into the national phase

Ref country code: DE

NENP Non-entry into the national phase

Ref country code: RU

122 Ep: pct application non-entry in european phase

Ref document number: 06746514

Country of ref document: EP

Kind code of ref document: A1