WO2021001969A1 - 冷凍サイクル装置 - Google Patents

冷凍サイクル装置 Download PDF

Info

Publication number
WO2021001969A1
WO2021001969A1 PCT/JP2019/026525 JP2019026525W WO2021001969A1 WO 2021001969 A1 WO2021001969 A1 WO 2021001969A1 JP 2019026525 W JP2019026525 W JP 2019026525W WO 2021001969 A1 WO2021001969 A1 WO 2021001969A1
Authority
WO
WIPO (PCT)
Prior art keywords
defrosting
refrigeration cycle
cycle unit
capacity
defrost
Prior art date
Application number
PCT/JP2019/026525
Other languages
English (en)
French (fr)
Inventor
正紘 伊藤
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to US18/000,149 priority Critical patent/US20230204276A1/en
Priority to CN201980097971.3A priority patent/CN114026373B/zh
Priority to PCT/JP2019/026525 priority patent/WO2021001969A1/ja
Priority to EP19936504.0A priority patent/EP3995763B1/en
Priority to JP2021529636A priority patent/JP7150177B2/ja
Publication of WO2021001969A1 publication Critical patent/WO2021001969A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D21/00Defrosting; Preventing frosting; Removing condensed or defrost water
    • F25D21/002Defroster control
    • F25D21/006Defroster control with electronic control circuits
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/41Defrosting; Preventing freezing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F3/00Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
    • F24F3/06Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the arrangements for the supply of heat-exchange fluid for the subsequent treatment of primary air in the room units
    • F24F3/065Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the arrangements for the supply of heat-exchange fluid for the subsequent treatment of primary air in the room units with a plurality of evaporators or condensers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B25/00Machines, plants or systems, using a combination of modes of operation covered by two or more of the groups F25B1/00 - F25B23/00
    • F25B25/005Machines, plants or systems, using a combination of modes of operation covered by two or more of the groups F25B1/00 - F25B23/00 using primary and secondary systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B47/00Arrangements for preventing or removing deposits or corrosion, not provided for in another subclass
    • F25B47/02Defrosting cycles
    • F25B47/022Defrosting cycles hot gas defrosting
    • F25B47/025Defrosting cycles hot gas defrosting by reversing the cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D21/00Defrosting; Preventing frosting; Removing condensed or defrost water
    • F25D21/002Defroster control
    • F25D21/008Defroster control by timer
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D21/00Defrosting; Preventing frosting; Removing condensed or defrost water
    • F25D21/06Removing frost
    • F25D21/08Removing frost by electric heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F5/00Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater
    • F24F5/0007Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater cooling apparatus specially adapted for use in air-conditioning
    • F24F5/001Compression cycle type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/003Indoor unit with water as a heat sink or heat source
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2339/00Details of evaporators; Details of condensers
    • F25B2339/04Details of condensers
    • F25B2339/047Water-cooled condensers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/06Several compression cycles arranged in parallel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/19Calculation of parameters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/021Inverters therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/025Compressor control by controlling speed
    • F25B2600/0253Compressor control by controlling speed with variable speed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/23Time delays
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Definitions

  • the present invention relates to a refrigeration cycle device.
  • an indirect air conditioner in which cold water or hot water is generated by a heat source machine such as a heat pump and transported to an indoor unit by a water pump and piping to cool and heat the room.
  • Japanese Patent Application Laid-Open No. 2013-108732 describes a method for defrosting a heat pump system that can prevent two or more heat pumps from defrosting at the same time as much as possible and prevent a decrease in water temperature in a water pipe. Is disclosed.
  • a water load device that utilizes the heat of water
  • the water temperature may drop if the possibility of load fluctuation is not taken into consideration.
  • the defrosting periods of two or more heat pumps may overlap to lower the water temperature, or the water temperature may drop due to a decrease in the capacity of the heat pumps due to delaying the start of defrosting of the heat pumps that defrost later.
  • the present invention has been made to solve the above problems, and is to avoid overlapping defrosting periods of a plurality of refrigeration cycle units that control the temperature of a heat medium such as water or brine, and to use the heat medium. It is an object of the present invention to provide a refrigerating cycle apparatus capable of suppressing a temperature drop.
  • the refrigeration cycle apparatus includes a first refrigeration cycle unit and a second refrigeration cycle unit, each of which has independent refrigerant circuits that use a refrigerant and is arranged in a common heat medium circulation path to control the temperature of the heat medium.
  • the first refrigerating cycle unit and the second refrigerating cycle unit are provided with a control device for controlling the heating capacity during the heating operation and the defrosting capacity during the defrosting operation.
  • the control device determines the defrosting capacity in the defrosting operation of the first refrigeration cycle unit and starts the defrosting operation.
  • the defrosting capacity of the first refrigeration cycle unit is determined within the range that satisfies the first determination condition and within the range that satisfies the second determination condition.
  • the first determination condition is that the total of the load capacity of the load device that utilizes the heat of the heat medium at the time when the first defrost start condition is satisfied and the defrost capacity of the first refrigeration cycle unit is the sum of the defrost capacity of the second refrigeration cycle unit.
  • the condition is that the heating capacity is not exceeded.
  • the second determination condition is the defrost interval between units and the defrost period of the first refrigeration cycle unit from the time when the defrost operation of the second refrigeration cycle unit is completed immediately before to the time when the first defrost start condition is satisfied. Is a condition that the total of the above does not exceed the shortest defrosting interval of the second refrigeration cycle unit when the second refrigeration cycle unit is operated at the upper limit heating capacity.
  • the defrosting capacity is appropriately determined at the start of defrosting, so that the heat medium is prevented from overlapping the defrosting periods of a plurality of refrigeration cycle units that control the temperature of the heat medium. It is possible to suppress the temperature drop of.
  • FIG. 1 is a diagram showing a configuration of an air conditioner according to the present embodiment.
  • the air conditioner 1 includes a heat source machine 2, a load device 3, pipes 4 and 5, and a pump 6.
  • the heat source machine 2 is a refrigeration cycle device including a first refrigeration cycle unit 201 and a second refrigeration cycle unit 202.
  • Refrigerant circulation paths are formed in each of the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202. Further, the heat medium circulates between the heat source machine 2 and the load device 3 by the pipes 4 and 5 and the pump 6.
  • water will be illustrated as a heat medium.
  • the heat medium may be brine or the like. Further, for the sake of simplicity, the temperature of the heat medium may be described as water temperature.
  • the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 are connected in series with the water circulation path, and are both configured to operate as a heat source or a cold heat source for water.
  • the first refrigeration cycle unit 201 includes a compressor 11, a four-way valve 12, a first heat exchanger 13, a fan 14, an electronic expansion valve 15, and a second heat exchanger 16.
  • the second refrigeration cycle unit 202 includes a compressor 21, a four-way valve 22, a first heat exchanger 23, a fan 24, an electronic expansion valve 25, and a second heat exchanger 26.
  • Compressors 11 and 21 compress the refrigerant.
  • the first heat exchangers 13 and 23 exchange heat between the refrigerant and the outside air blown by the fans 14 and 24.
  • the second heat exchangers 16 and 26 exchange heat between the refrigerant and water.
  • a plate heat exchanger can be used as the second heat exchangers 16 and 26, for example.
  • FIG. 1 shows a case where the four-way valves 12 and 22 are set to perform heating.
  • the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 act as heat sources. If the four-way valves 12 and 22 are switched to reverse the circulation direction of the refrigerant, cooling or defrosting is performed, and the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 act as cold heat sources.
  • the heat source machine 2 and the load device 3 are connected by pipes 4 and 5 for circulating water.
  • the load device 3 includes an indoor unit 30, an indoor unit 40, and an indoor unit 50.
  • the indoor units 30, 40, and 50 are connected between the pipe 4 and the pipe 5 in parallel with each other.
  • the indoor unit 30 includes a heat exchanger 31, a fan 32 for sending indoor air to the heat exchanger 31, and a flow rate adjusting valve 33 for adjusting the flow rate of water.
  • the heat exchanger 31 exchanges heat between water and indoor air.
  • the indoor unit 40 includes a heat exchanger 41, a fan 42 for sending indoor air to the heat exchanger 41, and a flow rate adjusting valve 43 for adjusting the flow rate of water.
  • the heat exchanger 41 exchanges heat between water and indoor air.
  • the indoor unit 50 includes a heat exchanger 51, a fan 52 for sending indoor air to the heat exchanger 51, and a flow rate adjusting valve 53 for adjusting the flow rate of water.
  • the heat exchanger 51 exchanges heat between water and indoor air.
  • a water circuit using water is formed by the pump 6, the second heat exchangers 16 and 26 connected in series, and the heat exchanger 31, the heat exchanger 41, and the heat exchanger 51 connected in parallel with each other. Has been done. Further, in the present embodiment, an air conditioner having two refrigeration cycle units and three indoor units is taken as an example. However, the number of refrigerating cycle units may be three or more, and the number of indoor units may be any number.
  • the control units 17 and 27 distributed and arranged in the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 operate as the control device 100 in cooperation with each other.
  • the control device 100 controls the compressors 11, 21, four-way valves 12, 22, fans 14, 24, and electronic expansion valves 15, 25 according to settings from a remote controller or the like (not shown) and outputs of pressure sensors and temperature sensors. To do.
  • the load device 3 includes control units 34, 44, 54 corresponding to the indoor units 30, 40, 50, respectively.
  • the control units 34, 44, 54 control the flow rate adjusting valves 33, 43, 53 and the fans 32, 42, 52, respectively.
  • control unit 17, 27, 34, 44, 54 may perform control as a control device.
  • the control device has compressors 11, 21, four-way valves 12, 22, fans 14, 24, electronic expansion valves 15, 25, pumps 6, and flow control valves 33, 43 based on the data detected by other control units. , 53 and fans 32, 42, 52 are controlled.
  • FIG. 2 is a waveform diagram for explaining changes in water temperature when overlap occurs during the defrosting period.
  • the first refrigeration cycle unit 201 is performing heating operation at the operating frequency f0 of the compressor 11
  • the second refrigeration cycle unit 202 is the compressor 21.
  • the defrosting operation is performed at the operating frequency f1 (f1> f0) of.
  • the operating frequency f1 of the compressor during defrosting is set to the upper limit frequency allowed during operation.
  • both the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 perform a heating operation.
  • the defrosting operation start condition of the first refrigeration cycle unit 201 is satisfied.
  • the first refrigeration cycle unit 201 performs defrosting operation at the operating frequency f1 of the compressor 11, and the second refrigeration cycle unit 202 has the operating frequency f0 (f1> f0) of the compressor 21.
  • the heating operation is performed at.
  • both the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 perform a heating operation.
  • the defrosting periods may overlap.
  • the second refrigerating cycle unit 202 performs the defrosting operation at times t4 to t6, and the first refrigerating cycle unit 201 performs the defrosting operation at times t5 to t7. Therefore, at times t5 to t6, the defrosting periods of the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 overlap.
  • the water temperature that passes through the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 and is sent from the outlet of the heat source machine 2 to the pipe 4 is as shown in the lower part of FIG. Changes to. That is, during the period when one refrigerating cycle unit performs the defrosting operation such as time t0 to t1, t2 to t3, t4 to t5, and t6 to t7, the water temperature drops from the temperature T2 to T1 and the two refrigeration units are refrigerated. At times t5 to t6 where the defrosting operation periods of the cycle units overlap, the water temperature further drops to T0.
  • the control device 100 adjusts the heating capacity and the defrosting capacity of the first refrigeration cycle units 201 and 202. Further, when the defrosting capacity is adjusted in this way, the control device 100 predicts in advance whether or not the defrosting periods overlap, and if it is unavoidable that the defrosting periods overlap, the defrosting is performed. Determine the defrost capacity so that the non-overlapping periods are prioritized.
  • the heating capacity per unit of the refrigeration cycle unit at the upper limit frequency of the compressor is set as an example in the case where the capacities of the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 are equal. It will be described as 100%.
  • FIG. 3 is a diagram showing the heating capacity during heating and the load capacity in the load device.
  • both the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 are in a heating operation, and each heating capacity is 40%. Therefore, heat corresponding to a total heating capacity of 80% is input to the water circulation path.
  • the load device 3 uses heat corresponding to 80% of this for heating. Therefore, the balance between the heat input from the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 into the water circulation path and the heat released from the water circulation path to the load device 3 becomes zero, so that the heat source machine The water temperature at the outlet of 2 is constant.
  • FIG. 4 is a diagram showing the heating capacity at the time of defrosting and the load capacity in the load device when the defrosting capacity and the heating capacity are not adjusted.
  • the defrosting capacity of the first refrigeration cycle unit 201 is set to 100%, which corresponds to the upper limit frequency of the compressor.
  • -120% of heat is taken out of the water circulation path. Therefore, the water temperature drops.
  • the heating capacity of the second refrigeration cycle unit 202 is increased to 100%, heat corresponding to ⁇ 80% is taken out from the water circulation path.
  • FIG. 5 is a diagram showing the heating capacity at the time of defrosting and the load capacity in the load device when the defrosting capacity and the heating capacity are adjusted.
  • the amount of heat released to the load device is an amount corresponding to 80% from FIG. If the same heat as this heat is input to the water circulation path by the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202, the water temperature is maintained constant.
  • the control device 100 raises the heating capacity of the second refrigeration cycle unit 202 on the non-defrosting side to 100%, which corresponds to the upper limit frequency of the compressor.
  • the defrosting capacity of the first refrigeration cycle unit 201 may be reduced to 20% in order not to change the water temperature.
  • such adjustment is carried out as long as the defrosting periods do not overlap.
  • FIG. 6 is a waveform diagram for explaining changes in water temperature when the defrosting capacity and the heating capacity are adjusted. From time t10 to t13, an example of defrosting the second refrigeration cycle unit 202 when the defrosting capacity is 100% is shown. Further, after t13, an example of defrosting the first refrigeration cycle unit 201 when the defrosting capacity is adjusted is shown.
  • the second refrigeration cycle unit 202 is performing the defrosting operation, and the first refrigeration cycle unit 201 is performing the heating operation.
  • the defrosting capacity of the second refrigeration cycle unit 202 is set to 100%, and the heating capacity of the first refrigeration cycle unit 201 is also set to 100% so as to minimize the decrease in water temperature.
  • the compressor frequencies of the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 are set to Fmax. During this period, heat is dissipated from the water circulation path to the load device 3, so that the heat balance becomes negative and the water temperature at the outlet of the heat source machine 2 drops to T10.
  • both the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 are in the heating operation.
  • the compressor frequencies are set to F h ave 1 and F h ave 1 so that the total heating capacity of the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 is equal to the load capacity of the load device 3.
  • the water temperature is stable at T11.
  • defrosting of the second refrigeration cycle unit 202 was executed in the same manner as at times t10 to t11, and the water temperature dropped to T10.
  • control unit 27 of the second refrigeration cycle unit 202 stores the defrosting interval Tinth 2 , which is the period from the end of defrosting at time t11 to the start of defrosting at time t12.
  • each capacity is estimated and adjusted at the defrosting start timing of the first refrigeration cycle unit 201 so that the load capacity, the heating capacity, and the defrosting capacity are balanced.
  • the load capacity on the load device side during defrosting is calculated by calculating the total value of the heating capacities of the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202. Can be estimated.
  • the control unit 17 cooperates with the control unit 27 to calculate the adjusted defrosting capacity described with reference to FIG. 5, and the defrosting periods Tinted 1 and 2 when defrosting is performed with the adjusted defrosting capacity.
  • one of defrosting and end defrosting time difference of the start between the refrigeration cycle unit (hereinafter, the inter-unit dividing that defrosting interval) total and Tint 21 determines whether shorter than the shortest defrost interval tINTH min2.
  • the defrosting capacity is inversely proportional to the defrosting capacity
  • the changed defrosting period is the reciprocal of the ratio of the changed defrosting capacity to the original defrosting capacity. For example, in the examples shown in FIGS. 4 and 5, the defrosting capacity is reduced from 100% to 20%, at which time the defrosting period is extended five-fold.
  • the defrosting interval is an interval (time difference from the end of defrosting to the start of defrosting) other than the refrigeration cycle unit for defrosting. It is assumed that as the heating capacity increases, the amount of frost formation increases and the defrosting interval is shortened. Therefore, the shortest defrost interval tINTH min2 is a value obtained by multiplying the defrost interval tINTH 2 immediately before the ratio of the heating capacity of the heating capacity of the immediately preceding and upper. For example, increasing the heating capacity from 50% to 100% reduces the defrost interval by half.
  • Defrosting period Tintd 1 considering reduction of the compressor frequency when defrosting, it is sufficient that remains below the sum of the shortest defrost interval tINTH min2 and inter-unit defrosting interval Tint 21. Then, even if the load capacity of the load device 3 increases and the heating capacity increases accordingly, the defrosting start timings of the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 coincide with each other. It will never be.
  • the defrosting of the first refrigeration cycle unit 201 is completed, and at times t15 to t16, the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 are heated with the same heating capacity as the times t11 to t12. There is.
  • the defrosting operation start condition is satisfied in the second refrigeration cycle unit 202.
  • each capacity is estimated and adjusted at the defrosting start timing of the second refrigeration cycle unit 202 in the same manner as at time t14 so that the load capacity, the heating capacity, and the defrosting capacity are balanced. Then, the defrosting operation of the second refrigeration cycle unit 202 is executed from time t16 to t17.
  • the defrosting is performed. It is possible to suppress a decrease in water temperature.
  • FIG. 7 is a diagram showing a configuration of a control device that controls an air conditioner and a remote controller that remotely controls the control device.
  • the remote controller 300 includes an input device 301, a processor 302, and a transmitter 303.
  • the input device 301 includes a push button for the user to switch ON / OFF of the indoor unit, a button for inputting a set temperature, and the like.
  • the transmission device 303 is for communicating with the control device 100.
  • the processor 302 controls the transmission device 303 according to the input signal given from the input device 301.
  • the control device 100 includes a receiving device 101 for receiving a signal from the remote controller, a processor 102, and a memory 103.
  • the memory 103 includes, for example, a ROM (Read Only Memory), a RAM (Random Access Memory), and a flash memory.
  • the flash memory stores the operating system, application programs, and various types of data.
  • the processor 102 controls the overall operation of the air conditioner 1.
  • the control device 100 shown in FIG. 1 is realized by the processor 102 executing the operating system and the application program stored in the memory 103. When executing the application program, various data stored in the memory 103 are referred to.
  • the receiving device 101 is for communicating with the remote controller 300. When there are a plurality of indoor units, the receiving device 101 is provided in each of the plurality of indoor units.
  • each of the plurality of control units includes a processor.
  • a plurality of processors cooperate to perform overall control of the air conditioner 1.
  • FIG. 8 is a flowchart for explaining the control of the first refrigeration cycle unit 201 at the time of defrosting.
  • FIG. 9 is a flowchart for explaining the details of the process of step S3 of FIG.
  • the processing of the flowcharts of FIGS. 8 and 9 is executed by the control device 100 in which the control unit 17 and the control unit 27 are linked.
  • the subscripts 1 and 2 indicate the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202, respectively, where ave indicates the average, max indicates the maximum, and min indicates the minimum.
  • step S1 the control device 100 calculates the actual value of the average frequency during heating of the compressor 11 of the first refrigeration cycle unit 201.
  • the average frequency Fha ve 1 is calculated in the order shown in the following equations (1) to (3).
  • Th 1 ⁇ dth 1 ...
  • Fh 1 ⁇ dfh 1 ...
  • Fh ave1 Fh 1 / Th 1 ... (3)
  • the heating time is integrated and the integrated time Th 1 is calculated.
  • the operating frequencies of the compressor 11 per unit time are integrated, and the integrated frequency Fh 1 is calculated.
  • the average frequency Fh ave 1 of the compressor 11 during the heating operation is calculated by dividing the integrated value Fh 1 by the integrated time Th 1 .
  • step S2 the control device 100 determines whether or not the defrosting start condition of the first refrigeration cycle unit 201 is satisfied.
  • the defrosting start condition is satisfied when the refrigerant temperature at the outlet of the first heat exchanger 13 or the inlet of the compressor 11 acting as an evaporator, that is, the evaporation temperature falls below the threshold value.
  • step S2 If the defrosting start condition is not satisfied in step S2, the calculation of the average frequency Fha ve 1 in step S1 is continued. On the other hand, when the defrosting start condition is satisfied in step S2, the operating frequency of the compressor 21 of the second refrigeration cycle unit 202 during the defrosting period is determined in step S3.
  • step S2 When the defrosting start condition is satisfied in step S2, it corresponds to the time t14 in FIG. Details of the process of the next step S3 are shown in FIG.
  • step S31 the control unit 100, by Equation (4), to calculate the shortest defrost interval tINTH min2 of the second refrigeration cycle unit 202.
  • Tinth min2 Tinth 2 x Fh ave2 / Fh max2 ... (4)
  • step S32 the control device 100 calculates the inter-unit defrosting interval Tin 21 according to the equation (5).
  • time2 dh indicates the time when the second refrigeration cycle unit 202 shifts from defrosting to heating, and corresponds to the time t13 in FIG.
  • time1 hd indicates the time when the first refrigeration cycle unit 201 shifts from heating to defrosting, and corresponds to the time t14 in FIG.
  • the first term of the formula (6) is a maximum heating capacity of 100% of the second refrigeration cycle unit 202 that maintains the heating operation during defrosting in FIG.
  • the second term of the formula (6) is the load capacity sent to the load device 3 in the period immediately before both the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 were performing the heating operation.
  • step S34 the control device 100 predicts the defrosting operation period of the first refrigeration cycle unit 201 when the defrosting operation capacity is changed by the equation (7).
  • td 1 indicates the defrosting operation period of the first refrigerating cycle unit 201 immediately before.
  • Tintd 1 td 1 ⁇ (defQ 1/100) / (Fd ave1 / Fd max1) ...
  • step S35 the control device 100 calculates the total time Tt 1 of the defrosting interval between units and the defrosting operation time according to the equation (8).
  • Tt 1 Tint 21 + Tinted 1 ...
  • step S36 the control device 100 determines whether or not the defrosting operation capacity defQ 1 calculated in step S33 is positive. If defQ 1> is 0 (YES at S36), at step S37, the control unit 100, the minimum defrost interval tINTH min2 of the second refrigeration cycle unit 202 determines whether a long or not than the total time Tt 1.
  • the control device 100 calculates the operating frequency defHz 1 of the compressor 11 at the time of defrosting by the equation (9) and applies it to the defrosting operation.
  • defHz 1 (defQ 1/100 ) ⁇ Fd max1 ... (9)
  • This operating frequency defHz 1 corresponds to the operating frequency of the compressor 11 at times t14 to t15 in FIG.
  • step S39 the control device 100 sets the operating frequency of the compressor 11 at the time of defrosting to the maximum value F max. Set to. In this case, the same defrosting operation as that performed for the second refrigeration cycle unit 202 is executed at times t10 to t11 and t12 to t13 in FIG.
  • step S3 when the operating frequency of the compressor 11 at the time of defrosting is determined in step S3, the control device 100 stores the defrosting start time time1 hd of the first refrigeration cycle unit 201 in step S4. Then, the defrosting operation is started.
  • step S5 if the defrosting end condition is not satisfied (NO in S6), in step S5, the actual value of the average frequency during defrosting of the compressor 11 is calculated by the following equations (10) and (11). , In the order of equation (12).
  • Td 1 ⁇ dtd 1 ... (10)
  • Fd 1 ⁇ dfd 1 ... (11)
  • Fd ave1 Fd 1 / Td 1 ...
  • the same process is also executed when the defrosting start condition of the second refrigeration cycle unit 202 is satisfied.
  • FIG. 10 is a flowchart for explaining the control of the second refrigeration cycle unit 202 at the time of defrosting.
  • FIG. 11 is a flowchart for explaining the details of the process of step S103 of FIG.
  • step S101 the control device 100 calculates the actual value of the average frequency during heating of the compressor 21 of the second refrigeration cycle unit 202.
  • the average frequency Fha ve 2 is calculated in the order shown in the following equations (21) to (23).
  • Th 2 ⁇ dth 2 ... (21)
  • Fh 2 ⁇ dfh 2 ... (22)
  • Fh ave2 Fh 2 / Th 2 ... (23)
  • the heating time is integrated and the integrated time Th 2 is calculated.
  • the operating frequencies of the compressor 21 per unit time are integrated, and the integrated frequency Fh 2 is calculated.
  • the average frequency Fh ave 2 of the compressor 21 during the heating operation is calculated by dividing the integrated value Fh 2 by the integrated time Th 2 .
  • step S102 the control device 100 determines whether or not the defrosting start condition of the second refrigeration cycle unit 202 is satisfied.
  • the defrosting start condition is satisfied when the refrigerant temperature at the outlet of the first heat exchanger 23 or the inlet of the compressor 21, which is acting as an evaporator, that is, the evaporation temperature falls below the threshold value.
  • step S102 If the defrosting start condition is not satisfied in step S102, the calculation of the average frequency Fha ve 2 in step S101 is continued. On the other hand, when the defrosting start condition is satisfied in step S102, the operating frequency of the compressor 21 of the second refrigeration cycle unit 202 during the defrosting period is determined in step S103.
  • step S102 When the defrosting start condition is satisfied in step S102, it corresponds to the time t16 in FIG. Details of the process of the next step S103 are shown in FIG.
  • step S131 the control device 100 calculates the shortest defrosting interval Tinth min 1 of the first refrigeration cycle unit 201 according to the equation (24).
  • Tinth min1 Tinth 1 x Fh ave1 / Fh max1 ... (24)
  • step S132 the control device 100 calculates the inter-unit defrosting interval Tint 12 according to the equation (25).
  • time1 dh indicates the time when the first refrigeration cycle unit 201 shifts from defrosting to heating, and corresponds to the time t15 in FIG.
  • time2 hd indicates the time when the second refrigeration cycle unit 202 shifts from heating to defrosting, and corresponds to the time t16 in FIG.
  • the first term of the formula (26) is the reverse of FIG. 5, in which the first refrigeration cycle unit 201 performs the heating operation and the second refrigeration cycle unit 202 performs the defrosting operation, and the heating operation is maintained at the time of defrosting.
  • the maximum heating capacity of the first refrigeration cycle unit 201 is 100%.
  • the second term of the formula (26) is the load capacity sent to the load device 3 in the period immediately before both the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 were performing the heating operation.
  • the control device 100 predicts the defrosting operation time of the second refrigeration cycle unit 202 when the defrosting operation capacity is changed by the equation (27).
  • Tintd 2 td 2 ⁇ (defQ 2/100) / (Fd ave2 / Fd max2) ...
  • step S135 the control device 100 calculates the total time Tt 2 of the defrosting interval between units and the defrosting operation time according to the equation (28).
  • Tt 2 Tint 12 + Tinted 2 ...
  • step S136 the control device 100 determines whether or not the defrosting operation capacity defQ 2 calculated in step S133 is positive.
  • step S137 the control device 100 determines whether or not the shortest defrost interval Tinth min 1 of the first refrigeration cycle unit 201 is longer than the total time Tt 2 .
  • the control device 100 calculates the operating frequency defHz 2 of the compressor 21 at the time of defrosting by the equation (29) and applies it to the defrosting operation.
  • defHz 2 (defQ 2/100 ) ⁇ Fd max2 ... (29)
  • This operating frequency defHz 2 corresponds to the operating frequency of the compressor 21 at times t16 to t17 in FIG.
  • step S139 the control device 100 sets the operating frequency of the compressor 21 at the time of defrosting to the maximum value F max. Set to. In this case, the same defrosting operation as that performed on the first refrigeration cycle unit 201 is performed on the second refrigeration cycle unit 202 at times t10 to t11 and t12 to t13 in FIG.
  • the heat source machine 2 shown in FIG. 1 includes a first refrigeration cycle unit 201, a second refrigeration cycle unit 202, and a control device 100.
  • the first refrigerating cycle unit 201 and the second refrigerating cycle unit 202 each have independent refrigerant circuits that use a refrigerant, are arranged in a common water circulation path, and control the water temperature.
  • the control device 100 controls the heating capacity of the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 during the heating operation and the defrosting capacity during the defrosting operation.
  • the control device 100 determines the defrosting capacity of the first refrigerating cycle unit 201 in the defrosting operation and starts the defrosting operation.
  • the first defrosting start condition is satisfied when, for example, as determined in step S2 of FIG. 8, the evaporation temperature of the first refrigeration cycle unit 201 falls below the threshold value.
  • the defrosting capacity of the first refrigeration cycle unit 201 is determined within a range that satisfies the first determination condition and within a range that satisfies the second determination condition.
  • the total of the load capacity of the load device 3 that utilizes the heat of the heat medium such as water when the first defrost start condition is satisfied and the defrost capacity of the first refrigeration cycle unit 201 is the second.
  • the condition is that the heating capacity of the refrigeration cycle unit 202 is not exceeded.
  • the defrosting operation capacity defQ 1 of the first refrigerating cycle unit 201 for keeping the water temperature unchanged is calculated so as to satisfy the first determination condition.
  • the second determination condition is the inter-unit defrost interval Tint 21 and the first refrigeration cycle unit 201 from the time when the defrost operation of the second refrigeration cycle unit 202 is completed to the time when the first defrost start condition is satisfied immediately before.
  • total time Tt 1 of the defrosting period Tintd 1 is located with the proviso that the second refrigeration cycle unit 202 does not exceed the minimum defrost interval tINTH min2 of the second refrigeration cycle unit 202 in the case of operating at the upper limit of the heating capacity .
  • the formula (7), (8) the total time Tt 1 calculated by the equation (4) is calculated shortest defrost interval tINTH min2 a second by the control unit 100 at step S37 are compared in FIG. 9 Judgment conditions are judged.
  • the first refrigeration cycle unit 201 includes a compressor 11 having a variable operating frequency, for example, an inverter compressor.
  • the control device 100 formulates the operating frequency of the compressor 11 in the defrosting operation so as to correspond to the determined defrosting capacity of the first refrigeration cycle unit 201. Calculate in (9) and change.
  • the control device 100 is the first refrigeration cycle unit when both the first refrigeration cycle unit 201 and the second refrigeration cycle unit 202 are in the heating operation when the first defrosting start condition is satisfied.
  • the total value of the heating capacity of 201 and the heating capacity of the second refrigeration cycle unit 202 is calculated, and the difference between the total value and the maximum heating capacity of the second refrigeration cycle unit 202 is the defrosting operation capacity that satisfies the first determination condition. Calculated as defQ 1 .
  • the control device 100 calculates the defrosting operation capacity defQ 1 by the equation (6).
  • the control device 100 calculates defrosting so as to satisfy the first determination condition of 100 ⁇ (Fd ave1 / Fd max1 ), which is the defrosting capacity in the defrosting period td 1 of the first refrigerating cycle unit 201 immediately before.
  • a value obtained by multiplying the ratio with the operating capacity defQ 1 to the defrosting period td 1 of the immediately preceding first refrigeration cycle unit 201 is applied as a new defrosting period Tinted 1 , and the second determination condition is satisfied in step S37.
  • the control device 100 has an average frequency corresponding to the actual value of the defrosting interval Tinth 2 of the second refrigerating cycle unit 202 immediately before and the actual value of the heating capacity of the second refrigerating cycle unit 202 in the immediately preceding defrosting interval. Multiply by Fh ave2 and divide by the operating frequency Fh max2 corresponding to the upper limit of the heating capacity of the second refrigeration cycle unit 202 to obtain the shortest defrost interval Tinth min2 .
  • the control device 100 determines the defrosting capacity of the first refrigerating cycle unit 201 so as to satisfy the first determination condition, and the determined first refrigerating cycle unit.
  • the defrosting period Tinted 1 when the defrosting operation is performed with the defrosting capacity of 201 is calculated by the equation (7).
  • the control device 100 determines the defrosting capacity of the first refrigerating cycle unit 201 so that the defrosting period of the first refrigerating cycle unit 201 is the shortest. To determine.
  • the heat source machine 2, the load device 3, and the pump 6 are separated.
  • the second heat exchangers 16 and 26 are separated from each other, and the pump 6 and the second heat exchangers 16 and 26 are separated. It may also be used as a repeater.
  • the main part of the control device 100 may be arranged in either the heat source machine 2 or the load device 3.
  • the heat medium may be any other medium as long as it carries heat.
  • brine may be used instead of water.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Defrosting Systems (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

制御装置(100)は、暖房運転時の暖房容量と除霜運転時の除霜容量とを制御する。制御装置(100)は、第1除霜開始条件が成立した場合に、第1冷凍サイクルユニット(201)の除霜運転における除霜容量を決定するとともに除霜運転を開始する。第1冷凍サイクルユニット(201)の除霜容量は、第1判定条件を満たす範囲内、かつ第2判定条件を満たす範囲内で決定される。第1判定条件は、第1除霜開始条件が成立したときにおける負荷装置(3)の負荷容量と第1冷凍サイクルユニット(201)の除霜容量との合計が第2冷凍サイクルユニット(202)の暖房容量を超えないという条件である。第2判定条件は、ユニット間除霜インターバルと第1冷凍サイクルユニット(201)の除霜期間との合計時間が第2冷凍サイクルユニット(202)の最短除霜インターバルを超えないという条件である。

Description

冷凍サイクル装置
 本発明は、冷凍サイクル装置に関する。
 従来、ヒートポンプなどの熱源機により冷水または温水を生成し、送水ポンプおよび配管で室内機へ搬送して室内の冷暖房を行なう間接式の空気調和装置が知られている。
 このような間接式の空気調和装置は、利用側の熱媒体として水またはブラインを使用するので、近年、使用冷媒量を削減するために注目されている。
 特開2013-108732号公報には、2台以上のヒートポンプが同時期に除霜運転することを極力回避し、水配管内の水温の低下を防止することが可能なヒートポンプシステムの除霜運転方法が開示されている。
特開2013-108732号公報
 特開2013-108732号公報に示された除霜運転方法のように、2台以上のヒートポンプが同時期に除霜運転することを回避する場合には、水の熱を利用する水負荷装置の負荷変動の可能性を考慮しないと水温が低下する可能性がある。たとえば、2台以上のヒートポンプの除霜期間が重なって水温が低下したり、後から除霜するヒートポンプの除霜開始を遅らせることによるヒートポンプの能力低下によって水温が低下したりする可能性がある。
 本発明は、上記課題を解決するためになされたものであって、水又はブラインなどの熱媒体の温度を制御する複数台の冷凍サイクルユニットの除霜期間の重なりを回避しつつ、熱媒体の温度低下を抑制することができる冷凍サイクル装置を提供することを目的とする。
 本開示は、冷凍サイクル装置に関する。冷凍サイクル装置は、各々が冷媒を使用する互いに独立した冷媒回路を有し、共通する熱媒体の循環路に配置され、熱媒体の温度を制御する第1冷凍サイクルユニットおよび第2冷凍サイクルユニットと、第1冷凍サイクルユニットおよび第2冷凍サイクルユニットの暖房運転時の暖房容量と除霜運転時の除霜容量とを制御する制御装置とを備える。制御装置は、第1除霜開始条件が成立した場合に、第1冷凍サイクルユニットの除霜運転における除霜容量を決定するとともに除霜運転を開始する。
 第1冷凍サイクルユニットの除霜容量は、第1判定条件を満たす範囲内、かつ第2判定条件を満たす範囲内で決定される。第1判定条件は、第1除霜開始条件が成立した時点における熱媒体の熱を利用する負荷装置の負荷容量と第1冷凍サイクルユニットの除霜容量との合計が、第2冷凍サイクルユニットの暖房容量を超えないという条件である。第2判定条件は、直前に第2冷凍サイクルユニットの除霜運転が終了した時点から第1除霜開始条件が成立した時点までのユニット間除霜インターバルと第1冷凍サイクルユニットの除霜期間との合計が、第2冷凍サイクルユニットが上限暖房容量で運転した場合の第2冷凍サイクルユニットの最短除霜インターバルを超えないという条件である。
 本開示の冷凍サイクル装置によれば、除霜開始時に除霜容量が適切に決定されるので、熱媒体の温度を制御する複数台の冷凍サイクルユニットの除霜期間の重なりを回避しつつ熱媒体の温度低下を抑制することができる。
本実施の形態に係る空気調和装置の構成を示す図である。 除霜期間に重なりが生じた場合の水温の変化について説明するための波形図である。 暖房時における暖房容量と負荷装置における負荷容量を示す図である。 除霜容量および暖房容量を調整しない場合の除霜時における暖房容量と負荷装置における負荷容量を示す図である。 除霜容量および暖房容量を調整した場合の除霜時における暖房容量と負荷装置における負荷容量を示す図である。 除霜容量および暖房容量を調整した場合の水温の変化について説明するための波形図である。 空気調和装置の制御を行なう制御装置と制御装置を遠隔制御するリモコンの構成を示す図である。 第1冷凍サイクルユニット201の除霜時の制御について説明するためのフローチャートである。 図8のステップS3の処理の詳細について説明するためのフローチャートである。 第2冷凍サイクルユニット202の除霜時の制御について説明するためのフローチャートである。 図10のステップS103の処理の詳細について説明するためのフローチャートである。
 以下、本発明の実施の形態について、図面を参照しながら詳細に説明する。以下では、複数の実施の形態について説明するが、各実施の形態で説明された構成を適宜組合わせることは出願当初から予定されている。なお、図中同一又は相当部分には同一符号を付してその説明は繰返さない。
 図1は、本実施の形態に係る空気調和装置の構成を示す図である。図1を参照して、空気調和装置1は、熱源機2と、負荷装置3と、配管4,5とポンプ6とを備える。熱源機2は、第1冷凍サイクルユニット201と第2冷凍サイクルユニット202とを備える冷凍サイクル装置である。
 第1冷凍サイクルユニット201と第2冷凍サイクルユニット202の各々においては、冷媒の循環経路が形成されている。また、配管4,5およびポンプ6によって熱源機2と負荷装置3との間において熱媒体が循環する。以下の説明において、熱媒体として水を例示する。なお、熱媒体はブラインなどであっても良い。また、説明の簡単のため、熱媒体の温度を水温と記載することもある。
 第1冷凍サイクルユニット201および第2冷凍サイクルユニット202は、水の循環経路に直列に接続され、ともに水に対する熱源または冷熱源として作動するように構成される。
 第1冷凍サイクルユニット201は、圧縮機11と、四方弁12と、第1熱交換器13と、ファン14と電子膨張弁15と、第2熱交換器16とを含む。
 第2冷凍サイクルユニット202は、圧縮機21と、四方弁22と、第1熱交換器23と、ファン24と電子膨張弁25と、第2熱交換器26とを含む。
 圧縮機11,21は、冷媒を圧縮する。第1熱交換器13,23は、冷媒とファン14,24で送風される外気との間で熱交換を行なう。第2熱交換器16,26は、冷媒と水との間で熱交換を行なう。第2熱交換器16,26として、たとえば、プレート熱交換器を用いることができる。
 図1には、四方弁12,22が暖房を行なうように設定されている場合が示される。この場合、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202は、熱源として作用する。四方弁12,22を切替えて冷媒の循環方向を逆向きにすれば、冷房または除霜を行なう場合となり、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202は冷熱源として作用する。
 熱源機2と負荷装置3とは、水を流通させる配管4,5によって接続されている。負荷装置3は、室内機30と、室内機40と、室内機50とを含む。室内機30,40,50は、互いに並列的に配管4と配管5との間に接続されている。
 室内機30は、熱交換器31と、室内空気を熱交換器31に送るためのファン32と、水の流量を調整する流量調整弁33とを含む。熱交換器31は、水と室内空気との熱交換を行なう。
 室内機40は、熱交換器41と、室内空気を熱交換器41に送るためのファン42と、水の流量を調整する流量調整弁43とを含む。熱交換器41は、水と室内空気との熱交換を行なう。
 室内機50は、熱交換器51と、室内空気を熱交換器51に送るためのファン52と、水の流量を調整する流量調整弁53とを含む。熱交換器51は、水と室内空気との熱交換を行なう。
 なお、ポンプ6と、直列接続された第2熱交換器16,26と、互いに並列接続された熱交換器31、熱交換器41、熱交換器51と、によって水を利用した水回路が形成されている。また、本実施の形態においては2台の冷凍サイクルユニットと3台の室内機を有する空気調和装置を例に挙げている。ただし、冷凍サイクルユニットの数は3台以上であっても良く、室内機の台数は何台であってもよい。
 第1冷凍サイクルユニット201および第2冷凍サイクルユニット202に分散配置された制御部17,27は、連携して制御装置100として動作する。制御装置100は、図示しないリモコン等からの設定と、圧力センサおよび温度センサの出力とに応じて圧縮機11,21、四方弁12,22、ファン14,24、電子膨張弁15,25を制御する。
 また、負荷装置3は、室内機30,40,50にそれぞれ対応する制御部34,44,54を備える。制御部34,44,54は、流量調整弁33,43,53およびファン32,42,52をそれぞれ制御する。
 なお、制御部17,27,34,44,54のいずれか1つが制御装置として制御を行なっても良い。その場合制御装置は、他の制御部が検出したデータに基づいて圧縮機11,21、四方弁12,22、ファン14,24、電子膨張弁15,25,ポンプ6、流量調整弁33,43,53およびファン32,42,52を制御する。
 図2は、除霜期間に重なりが生じた場合の水温の変化について説明するための波形図である。図1、図2を参照して、時刻t0~t1では、第1冷凍サイクルユニット201は、圧縮機11の運転周波数f0で暖房運転を行なっており、第2冷凍サイクルユニット202は、圧縮機21の運転周波数f1(f1>f0)で除霜運転を行なっている。
 除霜期間はなるべく短い方が良いため、除霜時の圧縮機の運転周波数f1は、運転時に許容される上限周波数に設定される。
 時刻t1において、第2冷凍サイクルユニット202の除霜運転が終了し、時刻t1~t2では、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202は、ともに暖房運転を行なう。
 時刻t2において、第1冷凍サイクルユニット201の除霜運転開始条件が成立する。時刻t2~t3では、第1冷凍サイクルユニット201は、圧縮機11の運転周波数f1で除霜運転を行なっており、第2冷凍サイクルユニット202は、圧縮機21の運転周波数f0(f1>f0)で暖房運転を行なっている。
 時刻t3において、第1冷凍サイクルユニット201の除霜運転が終了し、時刻t3~t4では、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202は、ともに暖房運転を行なう。
 しかし、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202において各々独立して除霜運転開始の判断を行なうと、除霜期間が重なってしまう場合がある。図2に示す例では、時刻t4~t6において第2冷凍サイクルユニット202が除霜運転を行ない、時刻t5~t7において第1冷凍サイクルユニット201が除霜運転を行なっている。したがって、時刻t5~t6においては、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202の除霜期間が重なってしまう。
 このような運転が行なわれた場合には、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202を通過し、熱源機2の出口から配管4に送出される水温は、図2下段に示すように変化する。すなわち、時刻t0~t1,t2~t3、t4~t5、t6~t7のように1台の冷凍サイクルユニットが除霜運転を行なう期間では、温度T2からT1に水温が低下し、2台の冷凍サイクルユニットの除霜運転期間が重なる時刻t5~t6では、さらに水温がT0に低下してしまう。
 このような水温の低下を抑制するために、本実施の形態では、2台の第1冷凍サイクルユニット201および第2冷凍サイクルユニット202から負荷装置3に水を介して供給される熱量が変化しないように、制御装置100が第1冷凍サイクルユニット201、202の暖房容量、除霜容量を調整する。さらに、そのように除霜容量の調整を行なった場合に、制御装置100は、予め除霜期間が重なるか否かを予測し、除霜期間が重なることが避けられない場合には、除霜期間が重ならないことを優先させるように除霜容量を決定する。
 以下、図3~図5を用いて暖房容量および除霜容量の調整について説明する。ここで、説明の簡単のため、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202の能力が等しい場合を例にして、圧縮機の上限周波数での冷凍サイクルユニットの1台あたりの暖房容量を100%として、説明する。
 図3は、暖房時における暖房容量と負荷装置における負荷容量を示す図である。図3では、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202はともに暖房運転をしており、各暖房容量は40%である。したがって、合計80%分の暖房容量に相当する熱が水の循環路に投入される。一方、負荷装置3は、この80%に相当する熱を用いて暖房を行なっている。したがって、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202から水の循環路に投入される熱と水の循環路から負荷装置3に放出される熱は、収支がゼロとなるので、熱源機2の出口における水温は一定である。
 図4は、除霜容量および暖房容量を調整しない場合の除霜時における暖房容量と負荷装置における負荷容量を示す図である。
 通常は、なるべく除霜を早期に終了させるため、第1冷凍サイクルユニット201の除霜容量は圧縮機の上限周波数に相当する100%に設定される。このときに、第2冷凍サイクルユニット202の暖房容量が図3に示した状態のまま40%に維持されていると、水の循環路の熱収支は、ΔQ=40%-100%-80%となり-120%に相当する熱が水の循環路から持ち出される。したがって、水温は低下する。このとき仮に第2冷凍サイクルユニット202の暖房容量を100%に増加させたとしても、-80%に相当する熱が水の循環路から持ち出される。
 このような温度低下を防ぐため、本実施の形態では、除霜容量および暖房容量が調整される。図5は、除霜容量および暖房容量を調整した場合の除霜時における暖房容量と負荷装置における負荷容量を示す図である。
 負荷装置に放出される熱は、図3から80%に相当する量である。この熱と同じ熱が第1冷凍サイクルユニット201および第2冷凍サイクルユニット202によって水の循環路に投入されていれば、水温は一定に維持される。
 まず、制御装置100は、除霜しない側の第2冷凍サイクルユニット202の暖房容量を圧縮機の上限周波数に相当する100%に引き上げる。このとき、負荷容量側で80%に相当する熱が使用されるので、水温を変化させないためには、第1冷凍サイクルユニット201の除霜容量を20%に下げれば良い。これにより、水の循環路の熱収支は、ΔQ=1000%-20%-80%となりゼロとなる。したがって、水温は変化しない。本実施の形態では、除霜期間に重なりが生じない限りは、このような調整が実施される。
 図6は、除霜容量および暖房容量を調整した場合の水温の変化について説明するための波形図である。時刻t10~t13までは、除霜容量を100%とした場合の第2冷凍サイクルユニット202の除霜例を示す。また、t13以降は、除霜容量が調整された場合の第1冷凍サイクルユニット201の除霜例を示す。
 まず時刻t10~t11では、第2冷凍サイクルユニット202が除霜運転を行なっており、第1冷凍サイクルユニット201は暖房運転を行なっている。第2冷凍サイクルユニット202の除霜容量が100%に設定され、水温の低下をなるべく少なくするように第1冷凍サイクルユニット201の暖房容量も100%に設定される。このとき、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202の圧縮機周波数はFmaxに設定される。この期間では、負荷装置3に対して水の循環路から放熱されているので、熱収支はマイナスとなり、熱源機2の出口の水温はT10に低下している。時刻t10~t12では、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202は、ともに暖房運転を行なっている。このとき、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202の暖房容量の合計が負荷装置3の負荷容量に等しくなるように、圧縮機周波数がFhave1,Fhave1に定められる。この間は、水温は、T11で安定している。
 時刻t12~t13においても、時刻t10~t11と同様に第2冷凍サイクルユニット202の除霜が実行され、水温がT10に低下している。
 以上において、第2冷凍サイクルユニット202の制御部27は、時刻t11の除霜終了から時刻t12の除霜開始までの期間である除霜インターバルTinth2を記憶する。
 時刻t14では、第1冷凍サイクルユニット201において除霜運転開始条件が成立する。本実施の形態では、負荷容量、暖房容量、除霜容量がバランスするように、第1冷凍サイクルユニット201の除霜開始タイミングで各容量の推定及び調整が行なわれる。
 図3で説明したように、除霜開始タイミングにおいて、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202の暖房容量の合計値を計算することで、除霜中の負荷装置側の負荷容量を推定することができる。
 制御部17は制御部27と連携し、図5で説明した調整後の除霜容量を算出すると共に、この調整後の除霜容量で除霜を行なった場合の除霜期間Tintdと、2つの冷凍サイクルユニット間の除霜終了と除霜開始の時間差(以下、ユニット間除霜インターバルという)Tint21との合計が最短除霜インターバルTinthmin2より短いか否かを判断する。
 着霜量が同じであるとすれば除霜容量を減少させると除霜期間が延びるはずである。除霜容量に除霜期間が反比例すると仮定すると、変更後の除霜期間は、もとの除霜容量に対して変更した除霜容量の比率の逆数を掛けた値となる。たとえば、図4と図5に示した例では、除霜容量が100%から20%に減少しており、このとき除霜期間は、5倍に伸びる。
 また、除霜インターバルは、除霜する冷凍サイクルユニット以外のインターバル(除霜終了から除霜開始までの時間差)である。暖房容量が増加すると、着霜量が増加するため除霜インターバルは短縮されると仮定する。よって、最短の除霜インターバルTinthmin2は、直前の暖房容量と上限の暖房容量との比率を直前の除霜インターバルTinth2に掛けた値となる。たとえば、暖房容量を50%から100%に増加させると、除霜インターバルは、2分の1に短縮される。
 除霜時の圧縮機周波数の低減を考慮した除霜期間Tintd1が、最短除霜インターバルTinthmin2とユニット間除霜インターバルTint21の合計値以下に収まっていればよい。そうすれば、負荷装置3の負荷容量が増加するなどして、これに伴い暖房容量が増加する場合にも、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202の除霜開始タイミングが同時となることはない。
 図6では、Tinthmin2>Tintd1+Tint21であったため、時刻t14~t15では、除霜容量を低減させた結果、第1冷凍サイクルユニット201の圧縮機周波数はdefHzに低下している。代わりに、第1冷凍サイクルユニット201の除霜期間(t14~t15)は、直前の第2冷凍サイクルユニット202の除霜期間(t12~t13)よりも伸びている。
 時刻t15では、第1冷凍サイクルユニット201の除霜が完了し、時刻t15~t16では、時刻t11~t12と同じ暖房容量で第1冷凍サイクルユニット201および第2冷凍サイクルユニット202が暖房運転している。
 時刻t16では、第2冷凍サイクルユニット202において除霜運転開始条件が成立する。このときは、負荷容量、暖房容量、除霜容量がバランスするように、第2冷凍サイクルユニット202の除霜開始タイミングで各容量の推定及び調整が時刻t14と同様に行なわれる。そして、時刻t16~t17において第2冷凍サイクルユニット202の除霜運転が実行される。
 以上図6の時刻t13以降に示すように、本実施の形態の冷凍サイクル装置では、2台の冷凍サイクルユニットの同時除霜を回避しつつ、除霜の容量を低減するため、除霜時の水温の低下を抑制することができる。
 図7は、空気調和装置の制御を行なう制御装置と制御装置を遠隔制御するリモコンの構成を示す図である。図7を参照して、リモコン300は、入力装置301と、プロセッサ302と、送信装置303とを含む。入力装置301は、ユーザが室内機のON/OFFを切り替える押しボタン、設定温度を入力するボタン等を含む。送信装置303は、制御装置100と通信を行なうためのものである。プロセッサ302は、入力装置301から与えられた入力信号に従って、送信装置303を制御する。
 制御装置100は、リモコンからの信号を受信する受信装置101と、プロセッサ102と、メモリ103とを含む。
 メモリ103は、たとえば、ROM(Read Only Memory)と、RAM(Random Access Memory)と、フラッシュメモリとを含んで構成される。なお、フラッシュメモリには、オペレーティングシステム、アプリケーションプログラム、各種のデータが記憶される。
 プロセッサ102は、空気調和装置1の全体の動作を制御する。なお、図1に示した制御装置100は、プロセッサ102がメモリ103に記憶されたオペレーティングシステムおよびアプリケーションプログラムを実行することにより実現される。なお、アプリケーションプログラムの実行の際には、メモリ103に記憶されている各種のデータが参照される。受信装置101は、リモコン300との通信を行なうためのものである。複数の室内機がある場合には、受信装置101は複数の室内機の各々に設けられる。
 なお、図1に示すように制御装置が複数の制御部に分割されている場合には、複数の制御部の各々にプロセッサが含まれる。このような場合には、複数のプロセッサが連携して空気調和装置1の全体制御を行なう。
 図8は、第1冷凍サイクルユニット201の除霜時の制御について説明するためのフローチャートである。図9は、図8のステップS3の処理の詳細について説明するためのフローチャートである。
 図8、図9のフローチャートの処理は、制御部17と制御部27とが連携した制御装置100において実行される。なお、以下の説明の数式等において、添え字の1,2は、それぞれ第1冷凍サイクルユニット201および第2冷凍サイクルユニット202を示し、aveは平均、maxは最大、minは最小を示す。
 ステップS1において、制御装置100は、第1冷凍サイクルユニット201の圧縮機11の暖房時の平均周波数の実績値を算出する。具体的には、以下の式(1)~(3)に示す順序で平均周波数Fhave1が算出される。
Th1=Σdth1  …(1)
Fh1=Σdfh1  …(2)
Fhave1=Fh1/Th1  …(3)
 式(1)では、暖房時間が積算され、積算時間Th1が算出される。式(2)では、単位時間あたりの圧縮機11の運転周波数が積算され、周波数の積算値Fh1が算出される。式(3)では、積算値Fh1を積算時間Th1で割ることによって、暖房運転時における圧縮機11の平均周波数Fhave1が算出される。
 ステップS2では、制御装置100は、第1冷凍サイクルユニット201の除霜開始条件が成立するか否かを判断する。たとえば、除霜開始条件は、蒸発器として働いている第1熱交換器13の出口または圧縮機11の入口における冷媒温度、すなわち蒸発温度がしきい値を下回った場合に成立する。
 ステップS2において、除霜開始条件が成立しない場合には、ステップS1における平均周波数Fhave1の算出が継続される。一方、ステップS2において、除霜開始条件が成立した場合には、ステップS3において第2冷凍サイクルユニット202の圧縮機21の除霜期間における運転周波数が決定される。
 ステップS2において、除霜開始条件が成立したときは、図6における時刻t14に相当する。次のステップS3の処理の詳細が図9に示される。
 まずステップS31において、制御装置100は、式(4)によって、第2冷凍サイクルユニット202の最短除霜インターバルTinthmin2を算出する。
Tinthmin2=Tinth2×Fhave2/Fhmax2  …(4)
 そして、ステップS32において、制御装置100は、式(5)によって、ユニット間除霜インターバルTint21を算出する。ここで、time2d-hは、第2冷凍サイクルユニット202が除霜から暖房に移行した時刻を示し、図6の時刻t13に該当する。また、time1h-dは、第1冷凍サイクルユニット201が暖房から除霜に移行した時刻を示し、図6の時刻t14に該当する。ユニット間除霜インターバルTint21は、言い換えると、除霜運転の合間において、2台の冷凍サイクルユニットがともに暖房を行なっている期間である。
Tint21=(time1h-d-time2d-h)  …(5)
 さらにステップS33において、制御装置100は、式(6)によって、水温を変化させないようにするための第1冷凍サイクルユニット201の除霜運転容量defQ1を計算する。式(6)の第1項は、図5において除霜時に暖房運転を維持する第2冷凍サイクルユニット202の最大暖房容量100%である。式(6)の第2項は、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202がともに暖房運転を行なっていた直前の期間において負荷装置3に送られていた負荷容量である。この負荷容量は、図3では、40%+40%に相当する。
defQ1=100-[(Fhave2/Fhmax2+Fhave1/Fhmax1)×100]  …(6)
 続いてステップS34において、制御装置100は、式(7)によって、除霜運転容量変更時の第1冷凍サイクルユニット201の除霜運転期間を予測する。なお、td1は、直前の第1冷凍サイクルユニット201の除霜運転期間を示す。
Tintd=td1×(defQ1/100)/(Fdave1/Fdmax1)  …(7)
 さらにステップS35において、制御装置100は、式(8)によって、ユニット間除霜インターバルと除霜運転時間との合計時間Tt1を算出する。
Tt1=Tint21+Tintd1  …(8)
 そして、ステップS36において、制御装置100は、ステップS33で計算した除霜運転容量defQ1が正であるか否かを判断する。defQ1>0である場合(S36でYES)、ステップS37において、制御装置100は、第2冷凍サイクルユニット202の最短除霜インターバルTinthmin2が合計時間Tt1よりも長いか否かを判断する。
 Tinthmin2>Tt1である場合(S37でYES)、制御装置100は、式(9)によって、除霜時の圧縮機11の運転周波数defHz1を算出し、除霜運転に適用する。
defHz1=(defQ1/100)×Fdmax1  …(9)
 この運転周波数defHz1は、図6の時刻t14~t15における圧縮機11の運転周波数に該当する。
 一方、ステップS36またはS37において、条件が成立しなかった場合は(S36でNOまたはS37でNO)、ステップS39において、制御装置100は、除霜時の圧縮機11の運転周波数を最大値Fmaxに設定する。この場合は、図6の時刻t10~t11、t12~t13において第2冷凍サイクルユニット202について実行されたと同様な除霜運転が実行される。
 再び図8に戻って、ステップS3において圧縮機11の除霜時の運転周波数が決定されると、ステップS4において、制御装置100は、第1冷凍サイクルユニット201の除霜開始時刻time1h-dを記憶し、除霜運転を開始する。除霜運転中は、除霜終了条件が成立しない場合(S6でNO)、ステップS5において、圧縮機11の除霜時平均周波数の実績値の算出が以下の式(10)、式(11)、式(12)の順に行なわれる。
Td1=Σdtd1  …(10)
Fd1=Σdfd1  …(11)
Fdave1=Fd1/Td1  …(12)
 ステップS6において除霜終了条件が成立した場合、制御装置100は、ステップS7において除霜終了時刻time1d-hを記憶するとともに、除霜運転を終了し、暖房運転再開させる。さらに、ステップS8において除霜インターバルTinth1を、式(13)によって計算する。
Tinth1=(time1h-d-time1d-h)  …(13)
 計算した除霜インターバルTinth1は、ステップS9において、以前記憶されていた除霜インターバルから更新され、次回の除霜開始条件成立時における除霜運転の圧縮機の運転周波数の算出および適用の判断に用いられる。
 以上説明した図8、図9では、第1冷凍サイクルユニット201の除霜開始条件が成立した場合に、どのように除霜容量が仮決定され、仮決定された除霜容量で除霜運転を行なった場合に、除霜期間の重なりが生じるか否かを予測し、除霜期間の重なりが生じない場合に仮決定した除霜容量を適用することを説明した。
 同様な処理は、第2冷凍サイクルユニット202の除霜開始条件が成立した場合にも実行される。
 図10は、第2冷凍サイクルユニット202の除霜時の制御について説明するためのフローチャートである。図11は、図10のステップS103の処理の詳細について説明するためのフローチャートである。
 図10、図11のフローチャートの処理は、制御部17と制御部27とが連携した制御装置100において実行される。
 ステップS101において、制御装置100は、第2冷凍サイクルユニット202の圧縮機21の暖房時の平均周波数の実績値を算出する。具体的には、以下の式(21)~(23)に示す順序で平均周波数Fhave2が算出される。
Th2=Σdth2  …(21)
Fh2=Σdfh2  …(22)
Fhave2=Fh2/Th2  …(23)
 式(21)では、暖房時間が積算され、積算時間Th2が算出される。式(22)では、単位時間あたりの圧縮機21の運転周波数が積算され、周波数の積算値Fh2が算出される。式(23)では、積算値Fh2を積算時間Th2で割ることによって、暖房運転時における圧縮機21の平均周波数Fhave2が算出される。
 ステップS102では、制御装置100は、第2冷凍サイクルユニット202の除霜開始条件が成立するか否かを判断する。たとえば、除霜開始条件は、蒸発器として働いている第1熱交換器23の出口または圧縮機21の入口における冷媒温度、すなわち蒸発温度がしきい値を下回った場合に成立する。
 ステップS102において、除霜開始条件が成立しない場合には、ステップS101における平均周波数Fhave2の算出が継続される。一方、ステップS102において、除霜開始条件が成立した場合には、ステップS103において第2冷凍サイクルユニット202の圧縮機21の除霜期間における運転周波数が決定される。
 ステップS102において、除霜開始条件が成立したときは、図6における時刻t16に相当する。次のステップS103の処理の詳細が図11に示される。
 まずステップS131において、制御装置100は、式(24)によって、第1冷凍サイクルユニット201の最短除霜インターバルTinthmin1を算出する。
Tinthmin1=Tinth1×Fhave1/Fhmax1  …(24)
 そして、ステップS132において、制御装置100は、式(25)によって、ユニット間除霜インターバルTint12を算出する。ここで、time1d-hは、第1冷凍サイクルユニット201が除霜から暖房に移行した時刻を示し、図6の時刻t15に該当する。また、time2h-dは、第2冷凍サイクルユニット202が暖房から除霜に移行した時刻を示し、図6の時刻t16に該当する。ユニット間除霜インターバルTint12は、言い換えると、除霜運転の合間において、2台の冷凍サイクルユニットがともに暖房を行なっている期間である。
Tint12=(time2h-d-time1d-h)  …(25)
 さらにステップS133において、制御装置100は、式(26)によって、水温を変化させないようにするための第2冷凍サイクルユニット202の除霜運転容量defQ2を計算する。式(26)の第1項は、図5の逆で第1冷凍サイクルユニット201が暖房運転を行ない、第2冷凍サイクルユニット202が除霜運転を行なう場合において、除霜時に暖房運転を維持する第1冷凍サイクルユニット201の最大暖房容量100%である。式(26)の第2項は、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202がともに暖房運転を行なっていた直前の期間において負荷装置3に送られていた負荷容量である。この負荷容量は、図3では、40%+40%に相当する。
defQ2=100-[(Fhave1/Fhmax1+Fhave2/Fhmax2)×100]  …(26)
 続いてステップS134において、制御装置100は、式(27)によって、除霜運転容量変更時の第2冷凍サイクルユニット202の除霜運転時間を予測する。
Tintd2=td2×(defQ2/100)/(Fdave2/Fdmax2)  …(27)
 さらにステップS135において、制御装置100は、式(28)によって、ユニット間除霜インターバルと除霜運転時間との合計時間Tt2を算出する。
Tt2=Tint12+Tintd2  …(28)
 そして、ステップS136において、制御装置100は、ステップS133で計算した除霜運転容量defQ2が正であるか否かを判断する。defQ2>0である場合(S136でYES)、ステップS137において、制御装置100は、第1冷凍サイクルユニット201の最短除霜インターバルTinthmin1が合計時間Tt2よりも長いか否かを判断する。
 Tinthmin1>Tt2である場合(S37でYES)、制御装置100は、式(29)によって、除霜時の圧縮機21の運転周波数defHz2を算出し、除霜運転に適用する。
defHz2=(defQ2/100)×Fdmax2  …(29)
 この運転周波数defHz2は、図6の時刻t16~t17における圧縮機21の運転周波数に該当する。
 一方、ステップS136またはS137において、条件が成立しなかった場合は(S136でNOまたはS137でNO)、ステップS139において、制御装置100は、除霜時の圧縮機21の運転周波数を最大値Fmaxに設定する。この場合は、図6の時刻t10~t11、t12~t13において第1冷凍サイクルユニット201に対して実行されたと同様な除霜運転が第2冷凍サイクルユニット202に対して実行される。
 再び図10に戻って、ステップS103において圧縮機21の除霜時の運転周波数が決定されると、ステップS104において、制御装置100は、第2冷凍サイクルユニット202の除霜開始時刻time2h-dを記憶し、除霜運転を開始する。除霜運転中は、除霜終了条件が成立しない場合(S106でNO)、ステップS105において、圧縮機21の除霜時平均周波数の実績値の算出が以下の式(30)、式(31)、式(32)の順に行なわれる。
Td2=Σdtd2  …(30)
Fd2=Σdfd2  …(31)
Fdave2=Fd2/Td2  …(32)
 ステップS106において除霜終了条件が成立した場合、制御装置100は、ステップS107において除霜終了時刻time2d-hを記憶するとともに、除霜運転を終了し、暖房運転再開させる。さらに、ステップS108において除霜インターバルTinth2を、式(33)によって計算する。
Tinth2=(time2h-d-time2d-h)  …(33)
 計算した除霜インターバルTinth2は、ステップS109において、以前記憶されていた除霜インターバルから更新され、次回の除霜開始条件成立時における除霜運転の圧縮機の運転周波数の算出および適用の判断に用いられる。
 以上説明した図10、図11では、第2冷凍サイクルユニット202の除霜開始条件が成立した場合に、どのように除霜容量が仮決定されるかを示した。さらに、仮決定された除霜容量で除霜運転を行なった場合に、除霜期間の重なりが生じるか否かを予測し、除霜期間の重なりが生じない場合に仮決定した除霜容量を適用することを説明した。
 最後に、本実施の形態について、再び図面を参照しつつ総括する。図1に示す熱源機2は、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202と、制御装置100とを備える。
 第1冷凍サイクルユニット201および第2冷凍サイクルユニット202は、各々が冷媒を使用する互いに独立した冷媒回路を有し、共通する水の循環路に配置され、水温を制御する。制御装置100は、第1冷凍サイクルユニット201および第2冷凍サイクルユニット202の暖房運転時の暖房容量と除霜運転時の除霜容量とを制御する。制御装置100は、第1除霜開始条件が成立した場合に、第1冷凍サイクルユニット201の除霜運転における除霜容量を決定するとともに除霜運転を開始する。第1除霜開始条件は、たとえば図8のステップS2で判定されたように、第1冷凍サイクルユニット201の蒸発温度がしきい値を下回った場合に成立する。
 第1冷凍サイクルユニット201の除霜容量は、第1判定条件を満たす範囲内、かつ第2判定条件を満たす範囲内で決定される。
 第1判定条件は、第1除霜開始条件が成立したときにおける水などの熱媒体の熱を利用する負荷装置3の負荷容量と第1冷凍サイクルユニット201の除霜容量との合計が第2冷凍サイクルユニット202の暖房容量を超えないという条件である。この第1判定条件を満たすように、式(6)に従って、水温を変化させないようにするための第1冷凍サイクルユニット201の除霜運転容量defQ1が計算される。
 第2判定条件は、直前に第2冷凍サイクルユニット202の除霜運転が終了した時点から第1除霜開始条件が成立した時点までのユニット間除霜インターバルTint21と第1冷凍サイクルユニット201の除霜期間Tintd1との合計時間Tt1が、第2冷凍サイクルユニット202が暖房容量の上限値で運転した場合の第2冷凍サイクルユニット202の最短除霜インターバルTinthmin2を超えないという条件である。たとえば、式(7)、(8)によって計算された合計時間Tt1と式(4)で計算された最短除霜インターバルTinthmin2を図9のステップS37で制御装置100が比較することによって第2判定条件が判断される。
 好ましくは、第1冷凍サイクルユニット201は、運転周波数が可変の圧縮機11たとえばインバータ圧縮機を備える。制御装置100は、第1判定条件および第2判定条件がともに成立する場合に、決定した第1冷凍サイクルユニット201の除霜容量に対応するように除霜運転における圧縮機11の運転周波数を式(9)で算出し、変更する。
 好ましくは、制御装置100は、第1除霜開始条件が成立した時点において、第1冷凍サイクルユニット201と第2冷凍サイクルユニット202がともに暖房運転を行なっていた場合には、第1冷凍サイクルユニット201の暖房容量と第2冷凍サイクルユニット202の暖房容量との合計値を算出し、合計値と第2冷凍サイクルユニット202の最大暖房容量との差を、第1判定条件を満たす除霜運転容量defQ1として算出する。たとえば、制御装置100は、式(6)によって除霜運転容量defQ1を算出する。
 好ましくは、制御装置100は、直前の第1冷凍サイクルユニット201の除霜期間td1における除霜容量である100×(Fdave1/Fdmax1)と第1判定条件を満たすように算出した除霜運転容量defQ1との比率を、直前の第1冷凍サイクルユニット201の除霜期間td1に対して掛け算した値を新たな除霜期間Tintdとして適用し、ステップS37において第2判定条件を満たすか否かを判断する。
 好ましくは、制御装置100は、直前の第2冷凍サイクルユニット202の除霜インターバルTinth2の実績値に、直前の除霜インターバルにおける第2冷凍サイクルユニット202の暖房容量の実績値に対応する平均周波数Fhave2を掛けて、第2冷凍サイクルユニット202の暖房容量の上限値に対応する運転周波数Fhmax2で割り算した値を最短除霜インターバルTinthmin2とする。
 好ましくは、制御装置100は、第1除霜開始条件が成立した場合に、第1冷凍サイクルユニット201の除霜容量を第1判定条件を満たすように決定し、決定された第1冷凍サイクルユニット201の除霜容量で除霜運転を行なう場合の除霜期間Tintdを式(7)で算出する。制御装置100は、算出した除霜期間Tintdが第2判定条件を満たさない場合には、第1冷凍サイクルユニット201の除霜期間が最短となるように第1冷凍サイクルユニット201の除霜容量を決定する。
 なお、図1に示した構成では、熱源機2と負荷装置3とポンプ6に分かれている構成であるが、熱源機2のうち、第2熱交換器16,26を分離させ、ポンプ6と合わせて中継機としてもよい。また、制御装置100は、熱源機2、負荷装置3のいずれにその主要部が配置されても良い。また、熱媒体が水である例を説明したが、熱媒体は熱を運ぶ媒体であれば他の物であっても良い。たとえば、水に変えてブラインなどを使用しても良い。
 今回開示された実施の形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記した実施の形態の説明ではなくて請求の範囲によって示され、請求の範囲と均等の意味及び範囲内でのすべての変更が含まれることが意図される。
 1 空気調和装置、2 熱源機、3 負荷装置、4,5 配管、6 ポンプ、11,21 圧縮機、12,22 四方弁、13,23 第1熱交換器、14,24,32,42,52 ファン、15,25 電子膨張弁、16,26 第2熱交換器、17,27,34,44,54 制御部、30,40,50 室内機、31,41,51 熱交換器、33,43,53 流量調整弁、100 制御装置、101 受信装置、102,302 プロセッサ、103 メモリ、201 第1冷凍サイクルユニット、202 第2冷凍サイクルユニット、300 リモコン、301 入力装置、303 送信装置。

Claims (6)

  1.  各々が冷媒を使用する互いに独立した冷媒回路を有し、共通する熱媒体の循環路に配置され、前記熱媒体の温度を制御する第1冷凍サイクルユニットおよび第2冷凍サイクルユニットと、
     前記第1冷凍サイクルユニットおよび前記第2冷凍サイクルユニットの暖房運転時の暖房容量と除霜運転時の除霜容量とを制御する制御装置とを備え、
     前記制御装置は、第1除霜開始条件が成立した場合に、前記第1冷凍サイクルユニットの除霜運転における除霜容量を決定するとともに除霜運転を開始し、
     前記第1冷凍サイクルユニットの除霜容量は、第1判定条件を満たす範囲内、かつ第2判定条件を満たす範囲内で決定され、
     前記第1判定条件は、前記第1除霜開始条件が成立したときにおける前記熱媒体の熱を利用する負荷装置の負荷容量と前記第1冷凍サイクルユニットの除霜容量との合計が、前記第2冷凍サイクルユニットの暖房容量を超えないという条件であり、
     前記第2判定条件は、前記第2冷凍サイクルユニットの除霜運転が終了した時点から前記第1除霜開始条件が成立した時点までのユニット間除霜インターバルと前記第1冷凍サイクルユニットの除霜期間との合計が、前記第2冷凍サイクルユニットが暖房容量の上限値で運転した場合の前記第2冷凍サイクルユニットの最短除霜インターバルを超えないという条件である、冷凍サイクル装置。
  2.  前記制御装置は、前記第1除霜開始条件が成立した場合に、
     前記第1冷凍サイクルユニットの除霜容量を前記第1判定条件を満たすように決定し、
     決定された前記第1冷凍サイクルユニットの除霜容量で除霜運転を行なう場合の除霜期間を算出し、
     算出した除霜期間が前記第2判定条件を満たさない場合には、前記第1冷凍サイクルユニットの除霜期間が最短となるように前記第1冷凍サイクルユニットの除霜容量を決定する、請求項1に記載の冷凍サイクル装置。
  3.  前記第1冷凍サイクルユニットは、運転周波数が可変の圧縮機を備え、
     前記制御装置は、前記第1判定条件および前記第2判定条件がともに成立する場合に、決定した第1冷凍サイクルユニットの除霜容量に対応するように除霜運転における前記圧縮機の運転周波数を変更する、請求項1に記載の冷凍サイクル装置。
  4.  前記制御装置は、前記第1除霜開始条件が成立した時点において、前記第1冷凍サイクルユニットと前記第2冷凍サイクルユニットがともに暖房運転を行なっていた場合には、前記第1冷凍サイクルユニットの暖房容量と前記第2冷凍サイクルユニットの暖房容量との合計値を算出し、前記合計値と前記第2冷凍サイクルユニットの最大暖房容量との差を、前記第1判定条件を満たす除霜容量として算出する、請求項1に記載の冷凍サイクル装置。
  5.  前記制御装置は、直前の前記第1冷凍サイクルユニットの除霜期間における除霜容量と前記第1判定条件を満たすように算出した除霜容量との比率を、直前の前記第1冷凍サイクルユニットの除霜期間に対して掛け算した値を新たな除霜期間として適用し、前記第2判定条件を満たすか否かを判断する、請求項1に記載の冷凍サイクル装置。
  6.  前記制御装置は、直前の前記第2冷凍サイクルユニットの除霜インターバルの実績値に対して直前の除霜インターバルにおける前記第2冷凍サイクルユニットの暖房容量の実績値を掛けて前記第2冷凍サイクルユニットの暖房容量の上限値で割った値を前記最短除霜インターバルとする、請求項1に記載の冷凍サイクル装置。
PCT/JP2019/026525 2019-07-03 2019-07-03 冷凍サイクル装置 WO2021001969A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US18/000,149 US20230204276A1 (en) 2019-07-03 2019-07-03 Refrigeration cycle apparatus
CN201980097971.3A CN114026373B (zh) 2019-07-03 2019-07-03 制冷环路装置
PCT/JP2019/026525 WO2021001969A1 (ja) 2019-07-03 2019-07-03 冷凍サイクル装置
EP19936504.0A EP3995763B1 (en) 2019-07-03 2019-07-03 Refrigeration cycle device
JP2021529636A JP7150177B2 (ja) 2019-07-03 2019-07-03 冷凍サイクル装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/026525 WO2021001969A1 (ja) 2019-07-03 2019-07-03 冷凍サイクル装置

Publications (1)

Publication Number Publication Date
WO2021001969A1 true WO2021001969A1 (ja) 2021-01-07

Family

ID=74100787

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/026525 WO2021001969A1 (ja) 2019-07-03 2019-07-03 冷凍サイクル装置

Country Status (5)

Country Link
US (1) US20230204276A1 (ja)
EP (1) EP3995763B1 (ja)
JP (1) JP7150177B2 (ja)
CN (1) CN114026373B (ja)
WO (1) WO2021001969A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006123687A1 (ja) * 2005-05-17 2006-11-23 Daikin Industries, Ltd. デフロスト制御システム、デフロスト制御装置、及びデフロスト制御方法
JP2008249236A (ja) * 2007-03-30 2008-10-16 Mitsubishi Electric Corp 空気調和装置
JP2013108732A (ja) 2011-11-24 2013-06-06 Mitsubishi Heavy Ind Ltd ヒートポンプシステムの除霜運転方法及びヒートポンプシステム

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0674531A (ja) * 1992-04-10 1994-03-15 Sanyo Electric Co Ltd 空気調和装置
JP4104519B2 (ja) * 2003-09-30 2008-06-18 三洋電機株式会社 冷凍システム
US9835368B2 (en) * 2011-09-13 2017-12-05 Mitsubishi Electric Corporation Refrigerating and air-conditioning apparatus for use in a defrosting operation
WO2013151005A1 (ja) * 2012-04-04 2013-10-10 東芝キヤリア株式会社 複合二元冷凍サイクル装置
CN104180570A (zh) * 2014-07-30 2014-12-03 珠海格力电器股份有限公司 热泵空调机组除霜控制方法及系统
CN105222337A (zh) * 2015-11-24 2016-01-06 浙江万宝新能源科技有限公司 并联式互助除霜空气源热泵热水器
CN106871479B (zh) * 2017-04-14 2020-01-10 江苏天舒电器有限公司 一种冷量回收式变容量空气源热泵系统
CN208431979U (zh) * 2018-05-22 2019-01-25 山东神舟制冷设备有限公司 一种大型多联空气源热泵系统
CN114502898A (zh) * 2019-09-30 2022-05-13 大金工业株式会社 空调装置
JP7295779B2 (ja) * 2019-10-31 2023-06-21 株式会社コロナ ヒートポンプ式温水暖房システム
KR20220011263A (ko) * 2020-07-20 2022-01-28 엘지전자 주식회사 냉난방 멀티 공기조화기

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006123687A1 (ja) * 2005-05-17 2006-11-23 Daikin Industries, Ltd. デフロスト制御システム、デフロスト制御装置、及びデフロスト制御方法
JP2008249236A (ja) * 2007-03-30 2008-10-16 Mitsubishi Electric Corp 空気調和装置
JP2013108732A (ja) 2011-11-24 2013-06-06 Mitsubishi Heavy Ind Ltd ヒートポンプシステムの除霜運転方法及びヒートポンプシステム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3995763A4

Also Published As

Publication number Publication date
JP7150177B2 (ja) 2022-10-07
CN114026373A (zh) 2022-02-08
EP3995763A4 (en) 2022-07-20
CN114026373B (zh) 2023-01-10
US20230204276A1 (en) 2023-06-29
JPWO2021001969A1 (ja) 2021-01-07
EP3995763A1 (en) 2022-05-11
EP3995763B1 (en) 2023-06-07

Similar Documents

Publication Publication Date Title
US8939196B2 (en) Secondary pump type heat source and secondary pump type heat source control method
JP6319334B2 (ja) 冷凍装置
CN110715466A (zh) 一种多联式空调系统及其控制方法
JP5182358B2 (ja) 冷凍装置
CN107076448B (zh) 空调机
US8215122B2 (en) Air conditioner and method of controlling the same
CN109425069B (zh) 一种制热电子膨胀阀控制方法
JP2009014212A (ja) 冷凍装置
CN107477798B (zh) 用于控制空调的冷媒的方法和装置、空调
US6102114A (en) Multi-room air conditioning system
US20200166233A1 (en) Air conditioner
JP2018128158A (ja) 空気調和機
JP2005016782A (ja) 多室空気調和機の膨張弁制御方法
WO2021001969A1 (ja) 冷凍サイクル装置
JP6638468B2 (ja) 空気調和装置
JP5677198B2 (ja) 空冷ヒートポンプチラー
JP4104218B2 (ja) 空気調和装置
JP6638426B2 (ja) 空気調和装置
WO2019058464A1 (ja) 空気調和装置
WO2021205535A1 (ja) 冷凍サイクル装置
CN111397144A (zh) 空调器的静音运行控制方法
JP2002130861A (ja) 空気調和機
JP3174153B2 (ja) 多室型空気調和機の冷房制御装置
JPH01127865A (ja) 空気調和機
JP2001208441A (ja) 空気調和装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19936504

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021529636

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2019936504

Country of ref document: EP

Effective date: 20220203