WO2003080425A1 - Structure de transport, d'installation et de demantelement d'un pont d'une plate-forme petroliere fixe et procede de mise en oeuvre d'une telle structure - Google Patents
Structure de transport, d'installation et de demantelement d'un pont d'une plate-forme petroliere fixe et procede de mise en oeuvre d'une telle structure Download PDFInfo
- Publication number
- WO2003080425A1 WO2003080425A1 PCT/FR2003/000723 FR0300723W WO03080425A1 WO 2003080425 A1 WO2003080425 A1 WO 2003080425A1 FR 0300723 W FR0300723 W FR 0300723W WO 03080425 A1 WO03080425 A1 WO 03080425A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- bridge
- shuttle
- hull
- lifting
- lifting legs
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/04—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
- E02B17/08—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
- E02B17/0818—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with racks actuated by pinions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/003—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02B17/021—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/04—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
- E02B17/06—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for immobilising, e.g. using wedges or clamping rings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0052—Removal or dismantling of offshore structures from their offshore location
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/006—Platforms with supporting legs with lattice style supporting legs
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/0073—Details of sea bottom engaging footing
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/0073—Details of sea bottom engaging footing
- E02B2017/0082—Spudcans, skirts or extended feet
Definitions
- the present invention relates to a structure for transporting, installing and dismantling a bridge of a fixed oil platform for exploitation at sea. It also relates to a method for transporting, installing and dismantling of a bridge of a fixed oil platform.
- a fixed petroleum platform which includes a bridge carrying in particular the exploitation equipment and the living quarters.
- the bridge is supported by a support column anchored on the sea floor.
- the first method is to use lifting cranes mounted on barges to transfer the deck from the platform of the transport boat to a superstructure consisting of a support column. This method, which is the most widely used to date, has limitations.
- the first of these limitations is the capacity of the lifting cranes, which can impose the construction of the bridge in several elements, which significantly increases the cost of manufacturing this bridge and the cost of installation and dismantling. of the said oil platform bridge.
- the second limitation lies in the fact that this method requires having a relatively large favorable time window in order to be able to carry out this operation at sea in good conditions.
- the second method consists in installing the deck of the oil platform in a single block on the support column by making it float above it. Then, the bridge is placed on this support column either by a ballasting / deballasting system, or by a mechanical system.
- the deck of the platform is supported either by a floating support constituted for example by a barge, pontoons or by a floating support in the shape of a U, or by means of a structure associated with this floating support.
- the superstructure can be ballasted or unpacked, it is known to use for the dismantling of the deck of the oil platform, the deballasting of the floating support and the ballasting of the superstructure.
- the superstructure having a large ballasting capacity, the dismantling operation can take place relatively quickly.
- the deballasting capacity of the floating support can be used. This capacity being limited, the operation proceeds slowly.
- the systems using ballasting or deballasting have drawbacks which mainly reside in the fact that they impose a complex structure at the level of the boxes or pumps and a very precise control of filling and emptying of the boxes to maintain the stability of the floating support. during the operation.
- the speed of the operation depends on the ballasting and load shedding capacity of these boxes of the floating supports which is generally relatively low so that the speed of the operation is thereby limited in particular when the superstructure is anchored on the seabed.
- sea conditions must be favorable in order to perform this operation in good conditions.
- An alternative to the ballasting / deballasting system is the use of a mechanical system to raise or lower the deck of the oil platform. These systems allow the installation or dismantling of the oil platform bridge to be carried out more quickly than the previously mentioned systems.
- a system which comprises two barges supporting the deck of the oil platform by means of two pivoting structures.
- a system of winches and cables is used to ensure the stability of the system and control the descent and ascent of the bridge of the oil platform.
- Another mechanical system consists of a rack and pinion system for raising or lowering the deck of the oil platform.
- the object of the invention is to avoid these drawbacks by proposing a structure for transporting, installing or dismantling a bridge of a fixed oil platform which is designed to facilitate the various operations, while making it possible to obtain a significant time savings and avoid all risks of environmental pollution and increase the safety of personnel responsible for performing the various operations.
- the subject of the invention is a structure for transporting, installing and dismantling a bridge of a fixed oil platform for exploitation at sea, characterized in that it comprises:
- a U-shaped floating hull fitted with at least three lifting legs for this hull and adapted to bear on the seabed, each leg being associated with mechanical means of movement, and
- a shuttle movable along said legs by the shell and intended to be applied to the underside of the bridge in a support position of said bridge, said shuttle being provided with locking means on the legs.
- the mechanical means of movement comprise, on the one hand, two opposite plates, carried by the corresponding leg and comprising each, on each lateral face, a series of teeth and, on the other hand, at least two opposite assemblies, carried by the shell and each formed by a pinion driven in rotation and cooperating with one of the series of teeth,
- the shuttle is formed of at least three independent elements, each associated with a leg by guide means and comprising lateral stabilization members of the bridge in the support position of this bridge,
- each element of the shuttle comprises a vertical branch for positioning on the hull and comprising, at its upper part, the guide means and the locking means and a horizontal branch for supporting the bridge,
- the guide means are formed by two opposite edges each determining with the vertical branch a housing for a plate of the corresponding leg,
- the locking means comprise at least one rack which can be moved by at least one actuating member between a retracted position and a locking position engaged on one of the series of teeth of the corresponding leg,
- the stabilization members comprise, for each element of the shuttle, at least one hydraulic or pneumatic cylinder with horizontal displacement,
- the hull has horizontal sliding rails of the bridge between the support position on the elements of the shuttle and a storage position outside the structure.
- the invention also relates to a method of dismantling and transporting a bridge of a fixed oil platform from an exploitation site to a quay for dismantling the bridge, characterized in that it consists in the following steps:
- a transport structure below the deck comprising a floating U-shaped hull fitted with at least three lifting legs for this hull and a shuttle movable along these legs by said hull,
- the invention also relates to a method of transport and installation of a bridge of a fixed oil platform from a quay to an operating site, characterized in that it consists of the steps following:
- a transport structure comprising a floating U-shaped hull equipped with at least three lifting legs of this hull and a shuttle movable along these legs by said hull, - apply the lifting legs to the bottom to stabilize the hull,
- FIG. 1 is a schematic elevation view of a fixed oil platform in the operating position
- FIG. 2 is a schematic perspective view of a transport, installation and dismantling structure according to the invention
- FIG. 3 is a partial view in vertical section of the mechanical means for moving the structure
- FIG. 4 is a sectional view along line 4-4 of FIG. 3,
- FIG. 5 is a schematic perspective view of an element of the shuttle of the structure according to the invention.
- FIG. 6 is a schematic view in vertical section of the locking means of an element of the shuttle
- FIG. 7A to 7J are diagrams showing the different steps of the method according to the invention.
- a fixed oil platform designated as a whole by the reference 1 and comprising a bridge 2 provided with the usual operating equipment and living quarters.
- This bridge 2 is mounted on a support column 3, the base of which is anchored to the seabed 4 by anchoring members 5.
- a structure is used designated by the general reference 10 and represented in FIG. 2.
- the structure 10 comprises a floating hull 11 in the shape of a U equipped with lifting legs 12 of this hull 11 and adapted to bear on the seabed.
- the shell 11 has two lateral portions 11a and a connecting portion 11b connecting the two lateral portions 11a.
- the shell 11 is equipped with four lifting legs 12 arranged in pairs on each lateral branch 11 a of said shell 11.
- the shell 11 can be equipped with three lifting legs 12 distributed in a triangle, one leg 12 being placed on each lateral portion 11a and one leg 12 being placed on the connecting portion 11b.
- Each leg 12 ends at its lower end with a shoe 13 intended to bear on the seabed 4.
- each of these legs 12 has, in this embodiment, a triangular section.
- These legs 12 can also have a square or circular section.
- Each leg 12 is formed of three frames 14 connected together by a lattice of metal beams 15.
- Each leg 12 is associated with mechanical displacement means designated by the general reference 20 ( Figures 3 and 4).
- the mechanical displacement means 20 are housed in a support frame 16, also called by jack-house specialists, which is supported by the shell 11.
- the mechanical displacement means 20 of each leg 12 comprise, on the one hand, two opposite plates 21 each carried by a frame 14 of the corresponding leg 12 and each comprising, on each lateral face , a series of teeth 22 forming on the two members 14 a double rack.
- the mechanical displacement means 20 also comprise several assemblies 25 distributed on either side of each plate 21, according to the height of the latter.
- Each assembly 25 comprises a geared motor group 26 ensuring the drive of a pinion 27 which meshes with a series of teeth 22 of the corresponding plate 21.
- the two sets of teeth 22 of each plate 21 are associated with eight pinions 27 each driven in rotation by a geared motor group 26.
- the structure 10 also includes a shuttle designated by the general reference 30 which is movable along the legs 12 by the hull 11 and which is intended to be applied to the underside of the deck 2 of the oil platform 1, as will be seen later .
- the shuttle 30 is composed of independent elements 31, the number of which corresponds to the number of legs 12 of the structure 10.
- the shuttle 30 consists of four independent elements 31, each associated with a lifting leg 12.
- the shuttle 30 can also be constituted by a frame-shaped element supported by the lifting legs 12 by means of mechanical displacement means 20.
- the element 31 comprises a vertical branch 32 for positioning on a lateral face of the support frame 16 of the shell 11 and a horizontal branch 33 for supporting the bridge 2 during its transport.
- the vertical branch 32 includes guide means on the corresponding leg 12 and locking means on this leg 12.
- the guide means are formed by two opposite flanges 34 formed in the upper part of the vertical branch 32 and extending parallel to the horizontal branch 33 of the element 31.
- Each flange 34 determines with said vertical branch 32 a housing 35 for a plate 21 of the corresponding leg 12.
- each element 31 is guided on the corresponding leg 12 by the plates 21.
- each element 31 are formed, as shown in FIG. 6, by at least one counter-rack 36 and, preferably, by at least one counter-rack 36 for each plate 21.
- the counter-rack 36 is displaceable by at least one actuating member 37 and, preferably, by two actuating members 37 constituted for example by hydraulic or pneumatic cylinders in order to move the rack 36 between a retracted position and a locked position on one of the series of teeth 22 of the corresponding leg 12.
- the assembly constituted by the counter-rack 36 and the actuating members 37 is carried by the element 31 by means of suitable fixing members, not shown.
- each element 31 of the shuttle 30 is provided with lateral stabilization members of the bridge 2 in the support position of this bridge 2 and which are formed by at least one hydraulic or pneumatic cylinder 38 with horizontal displacement arranged for example in the vertical branch 32 of said element 31.
- each element 31 is provided with two slides 39 each extending vertically along a lateral edge of the vertical branch 32.
- Each slide 39 cooperates with a vertical slide 40 fixed on the frame 16 at each lifting leg 12.
- the slides 39 and 40 are provided on their faces opposite a sliding lining formed for example by a "Teflon" lining.
- each element 31 comprises, on its upper face, elastic members 41 for supporting the bridge 2 of the oil platform 1.
- elastic members 41 are constituted for example by elastomer blocks or for example by airbags or any other suitable system.
- the hull 11 is provided on its upper face with rails 42 extending in the same direction as the lateral portions 11a of said hull 11 and which allow the horizontal sliding of the deck 2 when the latter has been previously placed on said hull 11 between the support position on the elements 31 of the shuttle 30 and a storage position outside the structure 11, as for example on the quay of a port to allow the disassembly of the deck 2 in all safety for personnel or vice versa, ie the transfer of deck 2 from the quay to the elements 31 of the boat 30 for the transportation of this deck 2 to the operating site.
- the shell 11 has, at its open part, a door 43 formed for example of two leaves 44 movable between an open position for positioning the structure 10 below the deck 2 and a closed position during the transfer of said bridge 2 by the structure 10.
- the transport of the bridge 2 by the structure 10 between the operating site and a quay of a port is carried out as follows. First of all, and as shown in FIG. 7A, the structure 10, with the leaves 44 in the open position, is brought by floating below the bridge 2 of the platform 1 by positioning the support column 3 of the bridge 2 in the U-shaped space formed between the lateral portions 11a of the shell 11. During this positioning, the lifting legs 12 are in the retracted position so that the shoes 13 are arranged below the shell 11 The elements 31 of the shuttle 30 are applied against the shell 11, as shown in particular in FIG. 2.
- the geared motor groups 26 are actuated to rotate the pinions 27 which mesh with the series of teeth 22 of the plates 21 of each lifting leg 12 in order to bring the shoes 13 into contact with the seabed 4 .
- the hull 11 moves upwards, along the legs 12, under the effect of the drive in rotation of the pinions 27 which mesh with the series of teeth 22 of the plates 21 of the lifting legs 12.
- the shell 11 lifts the shuttle 30 to apply the elastic members 41 of each element 31 against the underside of the bridge 2.
- the drive of the pinions 27 is stopped and the counter-racks 36 are actuated by the jacks 37 so that these counter-racks 36 come into engagement with the adjacent teeth 22 in order to lock each element 31 of the shuttle 30 on the lifting legs 12, as shown in FIG. 7C.
- the support column 3 is separated from the bridge 2 for example by cutting the rods of this support column and the assembly constituted by the shell 11, the shuttle 30 and the bridge 2 is lifted in order to separate the bridge 2 from the support column 3 which remains in the vertical position, as shown in FIG. 7C.
- the shell 11 is lowered into flotation by the drive in the opposite direction of the pinions 27 which mesh with the series of teeth 22 (FIG. 7D) and the pinions 27 are always driven in rotation, which causes, by reaction , due to the depression of the shell 11 in the water, the lifting of the lifting legs 12 (FIG. 7E), which makes it possible to clear the hull 11 supporting the deck 2 via the shuttle 30 of the operating site on which the support column 3 is still in place, as shown in Figure 7F.
- the hull 11 supporting the deck 2 is brought by buoyancy (FIG. 71) to a quay of a port (FIG. 7J) and the lifting legs 12 are applied to the bottom to stabilize this hull 11.
- the jacks 38 are retracted and a connecting piece 6 is placed between the shell 11 and the platform to ensure continuity between the surface of this shell 11 and said platform. Then, the bridge 2 is unloaded on this quay by sliding it, for example, on the rails 42.
- the transport structure 10 is brought by floatation near the quay and the lifting legs 12 are applied to the bottom to stabilize the hull 11.
- the connection between the surface of the hull 11 and the quay is ensured by the part 6 and the bridge 2 is transferred from the quay to the elements 31 of the shuttle 30 by sliding it on the rails 42.
- the bridge 2 is stabilized laterally on the elements 31 of the shuttle 6 by means of the jacks 38 of each element 31, then the connecting piece 35 is removed and the lifting legs 12 are raised.
- the structure 10 supporting the deck 2 is brought by flotation to the vicinity of the operating site and the lifting legs 12 are applied to the seabed so as to raise the deck 2 by means of the hull 11 and the shuttle 30.
- the elements 31 of the shuttle 30 are locked on the lifting legs 12 by means of the counter-racks 36 which are actuated by the jacks 37 so that these counter-racks 36 come into engagement with the adjacent teeth 22 and therefore lock each element 31 of the shuttle 30 on the lifting legs 12.
- the hull 11 is brought into flotation and the legs 12 of the structure 11 are raised.
- the bridge 2 is brought above the support column 3 of the oil platform 1 and the lifting legs 12 of the structure 10 are again applied to the seabed.
- the shell 11 is lifted to bring it into contact with the elements 31 of the shuttle 30 and these elements 31 are unlocked, then the shell 11, the shuttle 30 and the bridge 2 are lowered in order to place this bridge 2 on the support column 3
- the bridge 2 is fixed to the support column 3 and the hull 11 and the shuttle 30 are lowered to bring said hull 11 into flotation, then the lifting legs 12 raised.
- the structure 10 is then removed from the operating site.
- the structure according to the invention has the advantage of being able to transport the entire deck of the oil platform directly from the exploitation site to a fixed site where its disassembly can be carried out safely, without risk of environmental pollution marine or vice versa between a fixed site and an operating site where the bridge is fixed on its support column.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Transportation (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Ship Loading And Unloading (AREA)
- Processing Of Solid Wastes (AREA)
- Separation, Recovery Or Treatment Of Waste Materials Containing Plastics (AREA)
Abstract
Description
Claims
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE60313755T DE60313755D1 (de) | 2002-03-22 | 2003-03-06 | Konstruktion für den transport, die installation und die zerlegung einer brücke einer festen ölplattform und verfahren zur implementierung der konstruktion |
DK03722695T DK1487693T3 (da) | 2002-03-22 | 2003-03-06 | Konstruktion til transport, installation og afmontering af en bro på en fastliggende olieplatform og fremgangsmåde til implementering af nævnte indretning |
US10/508,467 US7513713B2 (en) | 2002-03-22 | 2003-03-06 | Structure for transporting, commissioning and decommissioning of a deck of a fixed oil platform and method for implementing the structure |
AU2003229859A AU2003229859A1 (en) | 2002-03-22 | 2003-03-06 | Structure for the transport, installation and dismantlement of a bridge of a fixed oil platform and method for implementing said structure |
EP03722695A EP1487693B1 (fr) | 2002-03-22 | 2003-03-06 | Structure de transport, d'installation et de demantelement d'un pont d'une plate-forme petroliere fixe et procede de mise en oeuvre d'une telle structure |
NO20043773A NO330967B1 (no) | 2002-03-22 | 2004-09-09 | Anordning for transport, installasjon og demontering av et dekk til en fast olje plattform og fremgangsmate for bruk av anordningen |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR02/03637 | 2002-03-22 | ||
FR0203637A FR2837461B1 (fr) | 2002-03-22 | 2002-03-22 | Structure de transport, d'installation et de demantelement d'un pont d'une plate-forme petroliere fixe et procede de mise en oeuvre d'une telle structure |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2003080425A1 true WO2003080425A1 (fr) | 2003-10-02 |
Family
ID=27799194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/FR2003/000723 WO2003080425A1 (fr) | 2002-03-22 | 2003-03-06 | Structure de transport, d'installation et de demantelement d'un pont d'une plate-forme petroliere fixe et procede de mise en oeuvre d'une telle structure |
Country Status (9)
Country | Link |
---|---|
US (1) | US7513713B2 (fr) |
EP (1) | EP1487693B1 (fr) |
AT (1) | ATE361871T1 (fr) |
AU (1) | AU2003229859A1 (fr) |
DE (1) | DE60313755D1 (fr) |
DK (1) | DK1487693T3 (fr) |
FR (1) | FR2837461B1 (fr) |
NO (1) | NO330967B1 (fr) |
WO (1) | WO2003080425A1 (fr) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2865484A1 (fr) * | 2004-01-28 | 2005-07-29 | Technip France | Structure de transport, d'installation et de demantelement des elements d'une plate-forme petroliere fixe et procedes de mise en oeuvre d'une telle structure. |
FR2921894A1 (fr) * | 2007-10-09 | 2009-04-10 | Technip France Sa | Structure de transport, d'installation et de demantelement d'un pont d'une plate-forme petroliere et procedes de mise en oeuvre d'une telle structure |
Families Citing this family (40)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7910175B2 (en) * | 2003-03-25 | 2011-03-22 | E Ink Corporation | Processes for the production of electrophoretic displays |
NL1026591C2 (nl) * | 2004-07-06 | 2006-01-09 | Leendert Arie Willem Van Kooy | Werkwijze voor het op water manipuleren van een object zoals een schip alsmede ponton voor toepassing bij een dergelijke werkwijze. |
GB2428656B (en) * | 2005-08-01 | 2009-08-05 | Engineering Business Ltd | Gangway apparatus |
GB2434823A (en) * | 2006-02-06 | 2007-08-08 | Engineering Business Ltd | Transport and installation of offshore structures |
AU2007331430B2 (en) * | 2006-11-22 | 2013-07-25 | Technip France | Structure for the transport, installation and dismantling of an oil rig deck and method for using one such structure |
FR2932453B1 (fr) * | 2008-06-13 | 2010-05-28 | Technip France | Structure de transport et d'installation ou de recuperation d'un equipement sous-marin et procede de transport et d'installation ou de recuperation d'un equipement sous-marin |
FR2932771B1 (fr) * | 2008-06-20 | 2010-06-04 | Technip France | Structure de transport et d'installation en mer d'au moins une eolienne ou hydrolienne et procedes de transport et d'installation en mer d'au moins une eolienne ou hydrolienne. |
US8727690B2 (en) * | 2009-09-10 | 2014-05-20 | National Oilwell Varco, L.P. | Windmill handling system and method for using same |
CN101927815B (zh) * | 2009-11-27 | 2012-10-17 | 华锐风电科技(集团)股份有限公司 | 海上风力发电机组运输吊装船以及运输吊装方法 |
US20120027523A1 (en) * | 2010-07-29 | 2012-02-02 | GeoSea N.V. | Device and method for assembling a structure at sea |
US8444347B2 (en) * | 2010-08-03 | 2013-05-21 | Technip France | Truss heave plate system for offshore platform |
BRPI1105774B1 (pt) * | 2010-10-19 | 2020-08-11 | Horton Wison Deepwater, Inc | Estrutura offshore para perfuração e/ou produção de um poço submarino e método |
GB2502463B (en) * | 2011-01-14 | 2016-04-20 | Glosten Solutions Inc | Installation method for water-submersible platforms and installation vessel |
CN102337736B (zh) * | 2011-07-06 | 2013-10-09 | 中国海洋石油总公司 | 海洋石油平台上部模块的安装工艺 |
US8708604B2 (en) * | 2011-09-20 | 2014-04-29 | Technip France | Quick release system for topsides float-over installation on offshore platforms |
KR101323755B1 (ko) * | 2011-12-12 | 2013-10-31 | 삼성중공업 주식회사 | 풍력 발전기 설치 선박의 스퍼드 구조 |
KR101345810B1 (ko) * | 2012-02-23 | 2013-12-27 | 삼성중공업 주식회사 | 스퍼드 장치, 이를 구비한 선박 및 스퍼드 장치를 구비한 선박의 건조방법 |
KR101359645B1 (ko) * | 2012-04-04 | 2014-02-06 | 삼성중공업 주식회사 | 부유식 구조물의 레그 지지장치 및 부유식 구조물 |
KR101359647B1 (ko) * | 2012-04-04 | 2014-02-06 | 삼성중공업 주식회사 | 부유식 구조물의 레그 지지장치 및 부유식 구조물 |
KR101411518B1 (ko) | 2012-06-29 | 2014-07-01 | 삼성중공업 주식회사 | 부유식 구조물 |
KR101346233B1 (ko) | 2012-06-29 | 2014-01-03 | 삼성중공업 주식회사 | 부유식 구조물 |
WO2014003366A1 (fr) * | 2012-06-29 | 2014-01-03 | 삼성중공업 주식회사 | Structure de type flottant |
KR101399935B1 (ko) | 2012-06-29 | 2014-05-30 | 삼성중공업 주식회사 | 부유식 구조물 |
KR101444282B1 (ko) | 2012-11-23 | 2014-09-26 | 삼성중공업 주식회사 | 풍력 발전기 설치선의 제작 방법 |
SG2012086674A (en) * | 2012-11-23 | 2014-06-27 | Keppel Offshore & Marine Technology Ct Pte Ltd | Structure-supported jackup system |
CN103496433B (zh) * | 2013-09-23 | 2016-06-15 | 浙江海洋学院 | 船体分段自动合拢装置 |
CN104652394B (zh) * | 2015-01-23 | 2016-03-02 | 辽宁森淼海洋工程装备有限公司 | 一种新型多功能浅海作业平台 |
WO2017164919A1 (fr) * | 2016-03-25 | 2017-09-28 | Seaways Engineering International Inc. | Systèmes, appareils et procédés pour retirer des plate-formes en mer fixes |
US9650840B2 (en) | 2015-04-27 | 2017-05-16 | National Oilwell Varco, L.P. | Method and apparatus for erecting a drilling rig |
ES2683779B1 (es) * | 2015-09-24 | 2019-07-02 | Obrascon Huarte Lain S A | Pontona sumergible y procedimiento de funcionamiento |
CN105480380B (zh) * | 2015-11-25 | 2017-10-27 | 中国海洋石油总公司 | 张力腿平台上部模块与下部浮体结构的合拢工艺 |
CN105970820B (zh) * | 2016-06-03 | 2017-08-29 | 中交第二航务工程局有限公司 | 大型围堰u形平台辅助式定位方法 |
US10302068B2 (en) * | 2016-10-31 | 2019-05-28 | Zentech, Inc. | Conversion of movable offshore drilling structure to wind turbine application |
CN106741701A (zh) * | 2017-01-20 | 2017-05-31 | 上海交通大学 | 一种应用于浅水支撑定位系统的锥式基座机构 |
KR102084058B1 (ko) * | 2017-11-29 | 2020-04-28 | 삼성중공업 주식회사 | 가변 탑 사이드 플랫폼 |
DK180345B1 (en) | 2019-04-01 | 2021-01-15 | Maersk Supply Service As | A method of securing and transferring a load between a vessel and an offshore installation and an apparatus therefor |
DK180667B1 (en) * | 2019-04-01 | 2021-11-12 | Phoenix Ii As | A method of securing and transferring a load between a vessel and an offshore installation and an apparatus therefor |
RU2719053C1 (ru) * | 2019-09-26 | 2020-04-17 | Федеральное государственное унитарное предприятие "Крыловский государственный научный центр" (ФГУП Крыловский государственный научный центр") | Устройство транспортировки добычного модуля и установки его на плаву на стационарное морское опорное основание одноколонного типа |
CN113529678A (zh) * | 2021-07-29 | 2021-10-22 | 中船黄埔文冲船舶有限公司 | 一种风电安装平台的升降油缸检修方法 |
CN116950065A (zh) * | 2023-07-10 | 2023-10-27 | 中交第三公路工程局有限公司 | 一种深水桥梁桩基施工方法及施工装置 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3967457A (en) * | 1974-07-11 | 1976-07-06 | Engineering Technology Analysts, Inc. | Self-elevating offshore drilling unit legs |
US5855455A (en) * | 1997-07-09 | 1999-01-05 | Ensco International, Inc. | Submersible and semi-submersible dry lift carrier and method of operation for carrying a drilling rig and platform |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3830071A (en) * | 1972-10-13 | 1974-08-20 | Ihc Holland Letourneau Marine | Jack-up drilling platform |
JPS579911A (en) * | 1980-05-20 | 1982-01-19 | Mitsui Eng & Shipbuild Co Ltd | Landing/elevating system marine work platform |
US4431343A (en) * | 1980-08-14 | 1984-02-14 | Hitachi Shipbuilding & Engineering Limited | Leg clamping device for jack up platform |
US4456404A (en) * | 1982-02-17 | 1984-06-26 | Atlantic Pacific Marine Corporation | Method and apparatus for positioning a working barge above a sea surface |
JPS58160427A (ja) * | 1982-03-17 | 1983-09-22 | Ishikawajima Harima Heavy Ind Co Ltd | 昇降式プラツトフオ−ムの脚固定装置 |
JPS6217218A (ja) * | 1985-07-17 | 1987-01-26 | Sumitomo Heavy Ind Ltd | ラツクピニオン式昇降機におけるレツグ保持装置 |
JPS6344010A (ja) * | 1986-08-07 | 1988-02-25 | Sumitomo Heavy Ind Ltd | 海上作業台の脚保持装置 |
FR2657904B1 (fr) * | 1990-02-08 | 1992-12-31 | Technip Geoproduction | Dispositif de surcharge d'une plate-forme petroliere auto-elevatrice et plate-forme en comportant application. |
NO313130B1 (no) * | 1999-06-07 | 2002-08-19 | Mpu Entpr As | Anordning for posisjonering og löfting av en marin konstruksjon, s¶rlig et plattformdekk |
FR2865484B1 (fr) * | 2004-01-28 | 2006-05-19 | Technip France | Structure de transport, d'installation et de demantelement des elements d'une plate-forme petroliere fixe et procedes de mise en oeuvre d'une telle structure. |
-
2002
- 2002-03-22 FR FR0203637A patent/FR2837461B1/fr not_active Expired - Fee Related
-
2003
- 2003-03-06 EP EP03722695A patent/EP1487693B1/fr not_active Expired - Lifetime
- 2003-03-06 US US10/508,467 patent/US7513713B2/en not_active Expired - Fee Related
- 2003-03-06 AT AT03722695T patent/ATE361871T1/de not_active IP Right Cessation
- 2003-03-06 WO PCT/FR2003/000723 patent/WO2003080425A1/fr active IP Right Grant
- 2003-03-06 DE DE60313755T patent/DE60313755D1/de not_active Expired - Lifetime
- 2003-03-06 AU AU2003229859A patent/AU2003229859A1/en not_active Abandoned
- 2003-03-06 DK DK03722695T patent/DK1487693T3/da active
-
2004
- 2004-09-09 NO NO20043773A patent/NO330967B1/no not_active IP Right Cessation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3967457A (en) * | 1974-07-11 | 1976-07-06 | Engineering Technology Analysts, Inc. | Self-elevating offshore drilling unit legs |
US5855455A (en) * | 1997-07-09 | 1999-01-05 | Ensco International, Inc. | Submersible and semi-submersible dry lift carrier and method of operation for carrying a drilling rig and platform |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2865484A1 (fr) * | 2004-01-28 | 2005-07-29 | Technip France | Structure de transport, d'installation et de demantelement des elements d'une plate-forme petroliere fixe et procedes de mise en oeuvre d'une telle structure. |
WO2005083183A1 (fr) * | 2004-01-28 | 2005-09-09 | Technip France | Structure de transport, d'installation et de demantelement des elements d'une plate-forme petroliere fixe et procedes de mise en oeuvre d'une telle structure. |
EP1798342A2 (fr) * | 2004-01-28 | 2007-06-20 | Technip France | Dispositif de démentèlement et de transport d'une plate-forme pétrolière |
EA008616B1 (ru) * | 2004-01-28 | 2007-06-29 | Текнип Франс | Конструкция для транспортировки, установки и демонтажа элементов стационарной нефтедобывающей платформы и способы использования такой конструкции |
EP1798342A3 (fr) * | 2004-01-28 | 2008-11-19 | Technip France | Dispositif de démentèlement et de transport d'une plate-forme pétrolière |
AU2004316316B2 (en) * | 2004-01-28 | 2010-03-11 | Technip France | Structure for transporting, installing and dismantling the elements of a fixed oil platform and methods for using said structure |
US8070388B2 (en) | 2004-01-28 | 2011-12-06 | Technip France | Structure for transporting, commissioning and decommissioning the elements of a fixed oil platform and methods for implementing such a structure |
KR101230424B1 (ko) * | 2004-01-28 | 2013-02-06 | 테크니프 프랑스 | 고정형 석유굴착용 플랫폼의 요소를 이송, 설치 및분해하기 위한 구조물과 이러한 구조물을 이용하는 방법 |
FR2921894A1 (fr) * | 2007-10-09 | 2009-04-10 | Technip France Sa | Structure de transport, d'installation et de demantelement d'un pont d'une plate-forme petroliere et procedes de mise en oeuvre d'une telle structure |
Also Published As
Publication number | Publication date |
---|---|
NO330967B1 (no) | 2011-08-29 |
DK1487693T3 (da) | 2007-09-17 |
EP1487693B1 (fr) | 2007-05-09 |
AU2003229859A1 (en) | 2003-10-08 |
NO20043773L (no) | 2004-11-17 |
ATE361871T1 (de) | 2007-06-15 |
US7513713B2 (en) | 2009-04-07 |
FR2837461A1 (fr) | 2003-09-26 |
FR2837461B1 (fr) | 2004-06-18 |
EP1487693A1 (fr) | 2004-12-22 |
US20050158125A1 (en) | 2005-07-21 |
DE60313755D1 (de) | 2007-06-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1487693B1 (fr) | Structure de transport, d'installation et de demantelement d'un pont d'une plate-forme petroliere fixe et procede de mise en oeuvre d'une telle structure | |
EP1716293B1 (fr) | Procédé et structure de démantèlement d'une plate-forme pétrolière | |
EP2435293B1 (fr) | Structure de transport, d'installation et de demantelement d'un pont d'une plate-forme et procedes de transport, d'installation et de demantelement de ce pont | |
EP2091808B1 (fr) | Structure de transport, d'instalation et de demantelement d'un pont d'un plate-forme petroliere et procede de mise en oeuvre d'une telle structure | |
EP0090006B1 (fr) | Dispositif flottant et procede de levage et de transport de charge | |
WO2009153530A2 (fr) | Structure de transport et d'installation en mer d'au moins une éolienne ou hydrolienne et procédés de transport et d'installation en mer d'au moins une éolienne ou hydrolienne | |
WO2009150383A1 (fr) | Structure de transport et d'installation ou de récupération d'un équipement sous-marin et procédé de transport et d'installation ou de récupération d'un équipement sous-marin | |
WO2010072904A1 (fr) | Passerelle pour le chargement et le dechargement d'un navire roulier | |
EP0352204B1 (fr) | Procédé et dispositif d'implantation sur pieux d'appontements | |
EP1204806B1 (fr) | Support flottant comportant une cavite centrale comprenant une pluralite de compartiments | |
WO2006037870A1 (fr) | Procede d'installation des jambes sur un pont d'une plate-forme d'exploitation en mer | |
FR2486561A1 (fr) | Procede de montage en eau relativement peu profonde, ou moyennement profonde, et d'installation sur le site d'exploitation, d'une plate-forme de forage et de production petroliere a embase-poids | |
FR2921894A1 (fr) | Structure de transport, d'installation et de demantelement d'un pont d'une plate-forme petroliere et procedes de mise en oeuvre d'une telle structure | |
WO2003055739A1 (fr) | Procede de montage d'un equipement pesant sur la coque d'un navire | |
EP0097069B1 (fr) | Procédé d'installation d'une plateforme en mer, superstructure de plateforme pour la mise en oeuvre de ce procédé | |
FR2645827A1 (fr) | Plate-forme marine formee d'une pluralite d'elements modulaires pour le stockage de produits et pour l'amarrage et le chargement directs des navires, et procede d'installation, de demontage et de reinstallation en un autre endroit de cette plate-forme | |
WO2014108631A1 (fr) | Barge flottante submersible | |
WO2006037871A1 (fr) | Plate-forme d'exploitation en mer et procedes d'installation sur un site d'exploitation en mer d'une telle plate-forme | |
FR3140065A1 (fr) | Plateforme flottante off-shore pour fabrication, assemblage, maintenance et/ou démontage d’éoliennes flottantes | |
FR2604413A1 (fr) | Procede de placement d'une plate-forme de forage et d'exploitation en mer, d'un site a un autre | |
FR3129133A1 (fr) | Installation de mise à l’eau d’une charge lourde | |
FR3103000A1 (fr) | Installation pour supporter une plate-forme auto-élévatrice de forage ou d’exploitation pétrolière | |
FR2595106A1 (fr) | Procede pour la construction d'une plate-forme marine gravitaire | |
FR2770237A1 (fr) | Procede pour rehausser une plate-forme marine | |
FR2864019A1 (fr) | Transbordeur a sec d'embarcations depuis au moins un plan d'eau |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NI NO NZ OM PH PL PT RO RU SC SD SE SG SK SL TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2003722695 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 10508467 Country of ref document: US |
|
WWP | Wipo information: published in national office |
Ref document number: 2003722695 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: JP |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: JP |
|
WWG | Wipo information: grant in national office |
Ref document number: 2003722695 Country of ref document: EP |