US20130299239A1 - Method For Controlling Drilling Unit of Rock Drilling Rig, and Rock Drilling Rig - Google Patents
Method For Controlling Drilling Unit of Rock Drilling Rig, and Rock Drilling Rig Download PDFInfo
- Publication number
- US20130299239A1 US20130299239A1 US13/989,861 US201113989861A US2013299239A1 US 20130299239 A1 US20130299239 A1 US 20130299239A1 US 201113989861 A US201113989861 A US 201113989861A US 2013299239 A1 US2013299239 A1 US 2013299239A1
- Authority
- US
- United States
- Prior art keywords
- drilling
- hole
- rotating angle
- unit
- drilled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 533
- 238000000034 method Methods 0.000 title claims abstract description 27
- 239000011435 rock Substances 0.000 claims abstract description 112
- 230000007246 mechanism Effects 0.000 claims description 13
- 238000004364 calculation method Methods 0.000 claims description 5
- 238000010586 diagram Methods 0.000 description 11
- 238000012544 monitoring process Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 238000012938 design process Methods 0.000 description 2
- 238000004422 calculation algorithm Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000009527 percussion Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/022—Control of the drilling operation; Hydraulic or pneumatic means for activation or operation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/025—Rock drills, i.e. jumbo drills
Definitions
- the invention relates to a method for controlling at least one drilling unit arranged in at least one drilling boom of a rock drilling rig when excavating a rock cavern one round at a time, the method comprising drilling holes of a round in accordance with a drilling pattern designed for the round, controlling, in order to drill each single hole, the drilling unit into a rotating angle which carries out a location and direction determined in the drilling pattern of the particular round for the particular hole, and storing the rotating angle of the drilling unit carried out during the drilling of each hole of the round.
- the invention further relates to a rock drilling rig comprising a movable carrier, at least one drilling boom, at least one drilling unit arranged in the drilling boom, the drilling unit comprising a feed beam and a rock drill, the rock drill being arranged to be movable on the feed beam by means of a feed device, a rotating mechanism for rotating the drilling unit into a rotating angle, at least one storage unit configured to store a drilling pattern to be used for drilling a round to be excavated for a rock cavern, at least one control unit configured, via the rotating mechanism, to control the drilling unit into a rotating angle which carries out a location and direction determined for a hole in the drilling pattern of the round, and at least one storage unit configured to store the rotating angle of the drilling unit carried out in the drilling of each hole of the round to be excavated.
- Tunnels, underground storage halls and other rock caverns are excavated in rounds, i.e. one round at a time, in other words, by employing a so-called drill-and-blast method, such that holes are drilled at a face of a rock cavern and then, after drilling, charged and blasted.
- one blast serves to break off rock material from the rock in an amount equal to that of one round.
- a drilling pattern is designed as office work and delivered to the rock drilling rig for drilling holes in the rock so as to generate a desired round.
- the drilling pattern includes at least the locations of the holes to be drilled and their directions and lengths or alternative start and end points of the holes to be drilled.
- the drilling pattern designer may also determine in the drilling pattern a rotating angle of the drilling unit for each hole of a round, such an angle being generally also referred to as a “roll-over” or a “roll-over angle”.
- the drilling boom or the drilling unit does not collide with the walls, ceiling or floor of the rock cavern during the drilling of the holes, and that a drill rod of the rock drill of the drilling unit is visible to the operator of the rock drilling rig during the drilling of a hole, and that the drilling unit does not collide with the drilling boom of the rock drilling rig during the drilling of holes which, with respect to the rock drilling rig, come close to a point where the drilling unit is supported against the drilling boom, either.
- the rotating angles of the drilling unit determined by the drilling pattern designer in the drilling pattern are quite seldom useful in a drilling situation in practice. This may be for instance because the designer of the drilling pattern does not see the practical situation in the rock cavern or even necessarily know the size of the rock drilling rig to be used for drilling a particular round. Consequently, the designer of the drilling pattern is not in practice capable of determining the rotating angles of the drilling unit for all holes such that it would be possible to drill all the holes by employing the particular rotating angles of the drill unit suggested by the designer of the drilling pattern without the operator of the rock drilling rig having to control the drilling unit into a new rotating angle with respect to no hole at all.
- An object of the invention is to provide a solution which enables the reliability and speed of advance of the operation of an automatic drilling cycle to be increased.
- the method according to the invention is characterized by determining the rotating angle of the drilling unit to be used for drilling a hole on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more previously drilled holes.
- the rock drilling rig according to the invention is characterized in that the control unit is configured to determine the rotating angle of the drilling unit to be used for drilling a hole on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more previously drilled holes.
- a rock drilling rig comprising at least one drilling boom and at least one drilling unit arranged in the drilling boom
- holes of a round are drilled in accordance with a drilling pattern designed for the round.
- the drilling unit is controlled into a rotating angle which carries out a location and direction determined for the particular hole in the drilling pattern designed for the particular round.
- the rotating angle of the drilling unit to be used for drilling the hole is determined on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more previously drilled holes.
- the solution thus utilizes values of the rotating angles of the drilling unit carried out in connection with previously drilled holes when determining the rotating angle of the drilling unit to be used in connection with drilling a hole to be drilled next.
- the previously drilled holes may thus be only previously drilled holes of the same round being presently excavated, or they may also be holes drilled in connection with already previously excavated rounds.
- the determination of a rotating angle of the drilling unit to be used for drilling holes is thus based on the rotating angles of the drilling unit actually carried out in connection with the previously drilled holes, which enables a situation to be achieved very quickly wherein a vast majority or even almost all of the holes of a round may be drilled by using the rotating angle of the drilling unit determined by the disclosed solution.
- the method comprises choosing, as initial data for the determination, location data about the hole and data about the rotating angle of the drilling unit associated with those already drilled holes which were drilled by the drilling unit arranged in the same drilling boom as the drilling unit to be used for drilling the hole to be drilled, determining a distance between the already drilled holes chosen in the previous step and the hole to be drilled, and choosing, on the basis of the distance between the already drilled holes and the hole to be drilled, one or more already drilled holes on the basis of whose rotating angle of the drilling unit carried out in the drilling thereof the rotating angle of the drilling unit to be used for drilling the hole to be drilled is determined, and determining, on the basis of the rotating angle of the drilling unit carried out in the drilling of the one or more already drilled holes, the rotating angle of the drilling unit to be used for drilling the hole to be drilled.
- the rotating angle of the drilling unit to be used for drilling the hole to be drilled is determined on the basis of the rotating angles carried out in the drilling of the already drilled holes located at a certain distance from the hole to be drilled, the value of the rotating angle of the drilling unit given by the determination is very accurate, since the determination of the rotating angle utilizes data associated with a limited number of previously drilled holes.
- the method comprises determining the rotating angle of the drilling unit to be used for drilling the hole to be drilled to correspond with the rotating angle of the drilling unit carried out in the drilling of an already drilled hole closest to the hole to be drilled.
- the determination of the rotating angle is very simple, and it is very likely that the value of the rotating angle of the drilling unit used in the drilling of the distance-wise closest already drilled hole is very suitable for use in the drilling of the next hole to be drilled.
- the method comprises determining the rotating angle of the drilling unit to be used for drilling the hole to be drilled to correspond, by a predetermined quantity, with a mean value of the rotating angles of the drilling unit carried out in the drilling of the distance-wise closest already drilled holes.
- the value of the rotating angle of the drilling unit used in connection with one, already drilled hole does not have too great importance for the rotating angle of the hole being presently drilled, which is advantageous if, for some reason, the value of the rotating angle of the drilling unit used in connection with the already drilled hole is completely unsuitable for use as the value of the rotating angle of the drilling unit in connection with the hole being presently drilled.
- FIG. 1 is a schematic side view showing a rock drilling rig
- FIGS. 2 a and 2 b are schematic side views showing some rotating mechanisms which may be used for turning a drilling unit into a correct position for a drilling event
- FIGS. 2 c and 2 d schematically show a rotating angle of a drilling unit as seen from behind the drilling unit
- FIG. 3 is a diagram schematically showing holes and a rotating angle of a drilling unit carried out in connection with drilling of each hole
- FIG. 4 is a flow diagram schematically showing a method for determining a rotating angle of a drilling unit to be used for drilling a single hole of a round to be drilled,
- FIGS. 5 a and 5 b schematically show a detail in determination of a rotating angle of a drilling unit to be used for drilling a single hole of a round to be drilled
- FIG. 6 schematically shows another detail in determination of a rotating angle of a drilling unit to be used for drilling a single hole of a round to be drilled
- FIGS. 7 to 10 schematically show examples relating to a use of the method according to FIG. 4 .
- FIG. 1 is a schematic side view showing a rock drilling rig 1 which may be used for excavating a rock cavern.
- the rock drilling rig 1 according to FIG. 1 comprises a movable carrier 2 , two drilling booms 3 , and drilling units 4 arranged in the drilling booms 3 .
- the rock drilling rig 1 may be provided with only one drilling boom 3 , or the number of drilling booms 3 may even be more than two.
- the drilling unit 4 which is shown larger in FIG. 2 , comprises a feed beam 5 and, arranged thereon, a rock drill 6 which may be moved with respect to the feed beam 5 by a feed device 22 shown schematically in FIGS. 1 and 2 .
- the drilling unit 4 further comprises a tool 7 , such as a drill rod, enabling impact pulses given by a percussion device, which for the sake of clarity is not shown, of the rock drill 6 to be transmitted to a rock 8 to be drilled.
- the rock drilling rig 1 further comprises at least one control unit 9 configured to control actuators of the rock drilling rig 1 for controlling operation of the drilling boom 3 and the drilling unit 4 , for instance.
- the control unit 9 may be a computer or a corresponding device, and it may comprise a user interface, including a display device, as well as control means, such as a keyboard or a joystick, for communicating commands and information to the control unit 9 .
- FIG. 1 the drilling unit 4 is arranged in the drilling boom 3 of the rock drilling rig 1 , in connection with the end of the drilling boom 3 , by means of a rotating mechanism 10 .
- FIGS. 2 a and 2 b show schematic examples of some possible rotating mechanisms 10 .
- the rotating mechanisms 10 according to FIGS. 2 a and 2 b are provided with a rotating unit 11 which, in the embodiment of FIGS. 2 a and 2 b , includes a rotating joint 11 ′ or a roll-over joint 11 and an actuator, such as a hydraulic motor, which, for the sake of clarity, is not shown in the figures, enabling a rotating motion to be produced in the rotating joint 11 ′.
- the rotating unit 11 or the rotating joint 11 ′ has a rotating axis A, or, in other words, the rotating unit 11 or the rotating joint 11 ′ defines the rotating axis A, which is substantially parallel with the feed beam 5 of the drilling unit 4 and around which the drilling unit 4 is arranged to turn or rotate as a consequence of the rotating motion of the rotating unit 11 or the rotating joint 11 ′ in a manner schematically shown by arrow A′, in which case the value of the rotating angle ⁇ describes the quantity of rotating of the drilling unit 4 around the rotating axis A.
- the rotating axis A is shown in FIGS. 2 a and 2 b schematically in broken line.
- the rotating mechanism 10 further comprises a turning unit 12 including a turning joint 12 ′, and an actuator, which, for the sake of clarity, is not shown in the figures, for turning the drilling unit 4 sideways around an axis B in the direction shown by arrow B′.
- a turning unit 12 including a turning joint 12 ′ and an actuator, which, for the sake of clarity, is not shown in the figures, for turning the drilling unit 4 sideways around an axis B in the direction shown by arrow B′.
- an actuator which, for the sake of clarity, is not shown in the figures, for turning the drilling unit 4 sideways around an axis B in the direction shown by arrow B′.
- the rotating mechanism 10 further comprises a second turning unit 13 including a second turning joint 13 ′, and an actuator, which, for the sake of clarity, is not shown in the figures, by means of which a tip of the tool 7 of the drilling unit 4 to be placed against the rock to be drilled may be inclined or lifted and lowered with respect to an axis C perpendicular to the surface of the paper in FIGS. 2 a and 2 b , in the direction shown by arrow C′.
- the rotating mechanisms 10 shown in FIGS. 2 a and 2 b are only some feasible examples of rotating mechanisms that enable the drilling unit 4 to be rotated around the aforementioned rotating axis A.
- any other rotating mechanism may also be used which enables at least said rotating of the drilling unit 4 around the rotating axis A to be achieved.
- FIGS. 2 c and 2 d schematically show a rotating angle ⁇ of the drilling unit 4 as seen from behind the drilling unit 4 .
- the drilling unit 4 has rotated around the rotating axis A of the drilling unit 4 to the left with respect to a vertical axis corresponding with the vertical position of the drilling unit 4 and indicated by a value of 0 degree of the rotating angle ⁇ .
- the rotating direction shown in FIG. 2 c has been determined to be a rotating direction corresponding with a negative rotating angle.
- the drilling unit 4 has rotated around the rotating axis A of the drilling unit 4 to the right with respect to a vertical axis corresponding with the vertical position of the drilling unit 4 and indicated by a value of 0 degree of the rotating angle ⁇ .
- the rotating direction shown in FIG. 2 d has been determined to be a rotating direction corresponding with a positive rotating angle.
- the connection between the rotating angle ⁇ and the rotating direction of the drilling unit 4 may also be determined in some other way which differs from that shown in FIGS. 2 c and 2 d.
- a drilling pattern 14 is provided which determines the locations, directions and lengths of the holes to be drilled or, alternatively, start and end points of the holes in a coordinate system of the drilling pattern.
- a drilling pattern is made outside a drilling site, e.g. in an office 15 , wherein the drilling pattern 14 may be stored on a memory member, such as a memory stick or a diskette, provided therein, or it may be transferred directly via a data transfer connection 16 to a storage unit 17 provided in the rock drilling rig 1 .
- the storage unit 17 may either be included in the control unit 9 , or it may be a storage unit located outside the control unit 9 and communicating with the control unit 9 .
- the drilling pattern 14 may also be amended either at or outside the drilling site.
- the preparation of the drilling pattern 14 is a computed-aided process, and usually iterative in nature.
- a design program is run on a computer 18 , and a designer 19 operates interactively with the design program, entering necessary data, making selections as well as controlling the design process.
- the already designed parts of the drilling pattern may yet be iteratively amended so as to achieve a better end result.
- the designer 14 may also determine for each hole his or her suggestion concerning the roll-over angle ⁇ or the rotating angle ⁇ to be used in the drilling of a hole.
- the drilling pattern 14 After the drilling pattern 14 is made, it may be stored in the storage unit 17 of the rock drilling rig 1 and implemented in the control unit 9 .
- the holes designed in the drilling pattern 14 are then drilled into the rock 8 , charged and blasted. A quantity of rock equal to that of a desired round is broken off the rock 8 and transported elsewhere. Next, new holes are drilled for the next round, in accordance with a new drilling pattern 14 .
- FIG. 3 schematically shows a diagram 20 or a rotating angle diagram 20 wherein the locations of holes 21 carried out in a drilled round are indicated by circles 21 ′, while directional lines 21 ′′ extending from the circles 21 ′′ indicate the rotating angle ⁇ of the drilling unit 4 carried out during the drilling of each hole 21 .
- a rock drilling rig 1 provided with two drilling booms 3 has been used, whereby the locations 21 ′ of the holes 21 indicated in thin lines in FIG.
- a storage unit provided in the rock drilling rig 1 , which storage unit may be the same as the storage unit 17 previously described in this description and FIG. 1 , or the storage unit may be e.g. a storage unit which communicates with the control unit 9 and is only used for storing the rotating angles ⁇ carried out in connection with the drilling of the holes 21 .
- Data about the location 21 ′ of each hole 21 may also be stored in connection with data indicating the rotating angle ⁇ of the drilling unit 4 carried out in connection with the corresponding hole 21 if the data about the rotating angle ⁇ of the drilling unit 4 carried out in connection with the hole 21 are not otherwise linked, e.g. via the drilling pattern 14 , with the data indicating the location 21 ′ of the corresponding hole 21 .
- FIG. 4 is a flow diagram schematically showing a method or a calculation algorithm for determining a rotating angle ⁇ of a drilling unit 4 to be used for drilling a single hole 21 of a round to be drilled next.
- a starting phase or an initial situation of drilling the hole 21 is indicated by a phase number one.
- data about the locations 21 ′ of the holes 21 drilled in connection with previous rounds and the rotating angles ⁇ of the drilling unit 4 carried out during the drilling of the particular holes 21 is collected from the storage unit 17 into a temporary working storage or another suitable memory provided in the control unit 9 , for instance.
- Said data may also comprise the location data about the holes 21 associated with the holes 21 already previously drilled during the drilling of the same round and the data about the rotating angles ⁇ of the drilling unit 4 carried out during the drilling of the particular holes 21 .
- Location data about a hole 21 refers to a starting location of the hole 21 in the drilling of each round.
- Said data may comprise data about the locations 21 ′ and the rotating angles ⁇ that have been carried out of the holes 21 of all rounds that have already been drilled, or data only about the locations 21 ′ and the rotating angles ⁇ that have been carried out of the holes 21 of e.g. 3 to 5 rounds that have been drilled most recently.
- the rotating angles c of the drilling unit 4 separately suggested by the designer 19 in the drilling pattern 14 may be used, or the operator of the rock drilling rig 1 may control the drilling unit 4 into a desired rotating angle ⁇ when starting the drilling of at least some or even all of the holes 21 .
- phase 2 of the diagram in FIG. 4 data about the locations 21 ′ of the holes 21 and the rotating angles ⁇ of the drilling unit 4 associated therewith that relate to the drilling boom 3 by whose drilling unit 4 the hole 21 is to be drilled are separated from the data collected in the starting phase.
- a distance between the location 21 ′ of each hole 21 chosen in phase 2 and the location of the hole 21 to be drilled next is determined in the control unit 9 .
- the distance may be determined by taking into account the distance between the previously drilled holes 21 and the hole 21 to be drilled next on the two-dimensional plane at the face of the rock cavern where the hole 21 to be drilled next is located. In this case, the previously drilled holes 21 are thus projected onto the same two-dimensional plane as the hole 21 to be drilled next.
- the distance in a three-dimensional space between the locations 21 ′ of the previously drilled holes 21 and the hole 21 to be drilled next is taken into account also in the direction of progression of excavation of the rock cavern e.g. such that with respect to the round being drilled, the distances between the locations 21 ′ of the holes 21 drilled in connection with the very previous round and the hole 21 to be drilled next is considered more important than the distances between the locations 21 ′ of the holes 21 drilled in connection with the already previously excavated rounds and the location of the hole 21 to be drilled next.
- the distances calculated in phase 3 may be arranged in the order of magnitude.
- the rotating angle ⁇ of the drilling unit 4 associated with the hole 21 to be drilled is determined on the basis of the rotating angle ⁇ of the drilling unit 4 carried out in connection with one or more previously drilled holes 21 .
- the rotating angle ⁇ of the drilling unit 4 associated with the hole 21 to be drilled may be determined or calculated in many different ways.
- An alternative is to use directly the rotating angle ⁇ of the drilling unit 4 carried out in the drilling of the already drilled hole 21 distance-wise closest to the hole 21 to be drilled.
- a second alternative is to determine the rotating angle ⁇ of the drilling unit 4 to be used in the drilling of the hole 21 to be drilled to correspond with a mean value ⁇ mean of the rotating angles ⁇ of the drilling unit 4 carried out in the drilling of a predetermined number of, e.g. two or more, such as 3 to 5, distance-wise closest already drilled holes 21 .
- a third alternative is to use, for drilling the hole 21 to be drilled, a value of the rotating angle ⁇ of the drilling unit 4 which corresponds with a mean value ⁇ mean of the rotating angles ⁇ of the drilling unit 4 carried out in connection with the drilling of the already drilled holes 21 residing at no more than a certain distance, such as at a distance of no more than one metre, from the hole 21 to be drilled next, or, if no previously drilled hole resides at said distance of e.g. no more than one metre, to use the rotating angle ⁇ of the drilling unit 4 carried out in connection with the drilling of the closest previously drilled hole 21 .
- FIG. 5 a schematically shows a situation wherein the origin OR1 of an imaginary coordinate system associated with the dimensions of the rock drilling rig 1 and attached to the rock drilling rig 1 resides at the same point as, or congruently with, the origin OR2 of the coordinate system of the drilling pattern 14 .
- the origin OR1 of the coordinate system associated with the rock drilling rig 1 may reside e.g. in a joint of the rock drilling rig 1 which connects the drilling booms 3 with the rock drilling rig 1 , as schematically shown in FIG. 1 .
- the rock drilling rig 1 is located in a rock cavern to be excavated in such a position wherein the location of the origin OR1 of the coordinate system associated with the rock drilling rig 1 differs from the location of the origin OR2 of the drilling pattern 14 .
- This difference between the location of the origin OR1 of the rock drilling rig 1 and the location of the origin OR2 of the drilling pattern 1 may preferably be taken into account when determining the rotating angle to be used in the drilling of the hole 21 to be drilled next e.g. in the following manner.
- the values of the rotating angles ⁇ of the drilling unit 4 carried out in the drilling of the holes 21 could be attached or determined also with respect to the origin OR1 of the coordinate system associated with the rock drilling rig 1 , in which case in connection with excavation of each round, data about the location of the origin OR1 of the rock drilling rig 1 with respect to the origin OR2 of the drilling pattern 14 is also stored so as to enable the difference between the location of the origin OR1 of the rock drilling rig 1 and the location of the origin OR2 of the drilling pattern 14 to be taken into account when determining the rotating angle ⁇ of the drilling unit 4 to be used in connection with the hole 21 to be drilled next.
- the rotating angle ⁇ of the drilling unit 4 used in connection with the drilling of the hole 21 is stored in the storage unit 17 .
- the rotating angle ⁇ of the drilling unit 4 used in the drilling of the hole 21 may be stored simultaneously, after drilling the round, in connection with storing the rotating angles ⁇ of the drilling unit 4 used in connection with the drilling of the other holes 21 of the same round, in which case the rotating angles ⁇ of the drilling unit 4 carried out and associated with all the holes 21 of the round are stored simultaneously after drilling the round.
- the value of the rotating angle ⁇ of the drilling unit 4 carried out in the drilling of a single hole 21 of the round is stored immediately during or after the drilling of the hole 21 , in which case the particular value carried out may be used for determining the rotating angle ⁇ of the drilling unit 4 to be used already in the drilling of the hole 21 to be drilled next in the same round.
- the method utilizes the values of the rotating angles ⁇ of the drilling unit 4 carried out in connection with the already previously drilled holes 21 for determining the value of the rotating angle ⁇ of the drilling unit 4 to be used in the drilling of the next hole 21 .
- the value of the rotating angle ⁇ of the drilling unit 4 to be used for the drilling of the hole 21 may be determined e.g. in degrees or another corresponding numerical value or another appropriate value. In such a case, for instance, if the value of the rotating angle ⁇ of the drilling unit 4 associated with one previous hole 21 is 34 degrees while the value of the rotating angle ⁇ of the drilling unit 4 associated with another previous hole is 40 degrees, their mean value is 37 degrees if the value of the rotating angle ⁇ of the drilling unit 4 to be used for drilling the next hole 21 is determined on the basis of the values of the rotating angles ⁇ of the drilling unit 4 carried out in connection with two previously drilled holes 21 .
- the determination of the rotating angle ⁇ of the drilling unit 4 to be used in the drilling of the hole 21 to be drilled next is shown to be performed by utilizing the control unit 9 provided in the rock drilling rig 1 and the storage unit 17 .
- the determination of the rotating angle ⁇ of the drilling unit 4 to be used in the drilling of the hole 21 to be drilled next is performed e.g. by the computer 18 in the office 15 or by another computer outside the drilling site, in which case the necessary data about the rotating angles ⁇ of the drilling unit 4 carried out in connection with the drilling of the already drilled holes 21 is communicated to the particular computer via the data transfer connection 16 .
- FIGS. 7 to 10 schematically show an example of a relation between the rotating angles ⁇ of the drilling unit 4 determined, by the method according to FIG. 4 and the rotating angles ⁇ of the drilling unit 4 carried out in the drilling of the already drilled holes 21 and used for the determination.
- a rock drilling rig provided with two drilling booms 3 , each having one drilling unit 4 , is used as the rock drilling rig 1 .
- FIG. 7 shows, by employing circles drawn in thin line, the locations 21 ′ of the holes 21 designated as residing within the coverage area or operation area of a first boom 3 of the rock drilling rig 1 and, by employing directional lines 21 ′′ drawn in thin line, the rotating angles ⁇ of the drilling unit 4 determined by the aforementioned method for the particular holes 21 . Said rotating angles ⁇ are thus suggestions about those rotating angles ⁇ of the drilling unit 4 suggested by the aforementioned method for use in the drilling of the holes 21 of the round.
- a thick line designates those previously drilled holes 21 and the rotating angles ⁇ of the drilling unit 4 carried out that were used for determining the rotating angles ⁇ of the drilling unit 4 designated in said thin lines. In the case shown in FIG. 7 there was one previously drilled round.
- FIG. 7 there was one previously drilled round.
- FIGS. 9 and 10 show a corresponding example concerning the coverage area or operation area of a second drilling boom 3 of the rock drilling rig 1 . It can be seen in FIGS. 7 to 10 how already after three excavated rounds, the suggestions designated in thin line about the values of the rotating angles ⁇ of the drilling unit 4 to be used in connection with the holes 21 of the round to be drilled next are already very much in accordance with the rotating angles ⁇ that were carried out.
- the disclosed solution thus utilizes the values of the rotating angles ⁇ of the drilling unit 4 carried out in connection with the previously drilled holes 21 when determining the rotating angle ⁇ of the drilling unit 4 to be used in connection with the drilling the hole 21 to be drilled next. Since the determination of the rotating angle ⁇ of the drilling unit 4 to be used in the drilling of the holes 21 is based on the actual rotating angles ⁇ of the drilling unit 4 carried out in connection with the previously drilled holes 21 , a situation is very quickly achieved wherein a vast majority of the holes 21 of a round may be drilled by using a rotating angle ⁇ of the drilling unit 4 determined by the disclosed solution such that the operator of the rock drilling rig 1 seldom has to participate in choosing the rotating angle ⁇ of the drilling unit 4 to be used in the drilling of the hole 21 .
- the solution also takes into account the real drilling situation prevalent in the rock cavern as well as the size and type of the rock drilling rig actually being used for the drilling. Since the determination of the rotating angle ⁇ of the drilling unit 4 may be implemented automatically e.g.
- the designer 19 of the drilling pattern 14 no longer has to determine the rotating angles ⁇ of the drilling unit 4 , possibly except for the rotating angles ⁇ of the drilling unit 4 associated with the holes 21 of the first round of a rock cavern, whereby the capacity of the designer 19 of the drilling pattern 14 may also be released for other tasks.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI20106255A FI125085B (sv) | 2010-11-29 | 2010-11-29 | Metod för styrning av borrningsenhet av bergborrningsrig och bergborrningsrig |
FI20106255 | 2010-11-29 | ||
PCT/FI2011/051011 WO2012072870A1 (en) | 2010-11-29 | 2011-11-16 | Method for controlling drilling unit of rock drilling rig, and rock drilling rig |
Publications (1)
Publication Number | Publication Date |
---|---|
US20130299239A1 true US20130299239A1 (en) | 2013-11-14 |
Family
ID=43269031
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/989,861 Abandoned US20130299239A1 (en) | 2010-11-29 | 2011-11-16 | Method For Controlling Drilling Unit of Rock Drilling Rig, and Rock Drilling Rig |
Country Status (8)
Country | Link |
---|---|
US (1) | US20130299239A1 (sv) |
EP (1) | EP2646638A1 (sv) |
JP (1) | JP5669952B2 (sv) |
CN (1) | CN103249904A (sv) |
AU (1) | AU2011334831B2 (sv) |
CA (1) | CA2817845C (sv) |
FI (1) | FI125085B (sv) |
WO (1) | WO2012072870A1 (sv) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
PT2725184T (pt) * | 2012-10-24 | 2019-06-12 | Sandvik Mining & Construction Oy | Aparelho de perfuração de rocha e método para controlar a orientação da viga de alimentação |
AU2014223301B8 (en) * | 2013-02-27 | 2018-07-19 | Technological Resources Pty Limited | A method of generating a drill hole sequence plan and drill hole sequence planning equipment |
AU2013396723B2 (en) * | 2013-06-27 | 2016-06-16 | Sandvik Mining And Construction Oy | Arrangement for controlling percussive drilling process |
CN103696689B (zh) * | 2013-12-12 | 2015-12-30 | 北京市三一重机有限公司 | 动力头巡航钻进方法、系统及旋挖钻机 |
WO2015106799A1 (en) * | 2014-01-14 | 2015-07-23 | Sandvik Mining And Construction Oy | Mine vehicle, mine control system and mapping method |
JP6371119B2 (ja) * | 2014-06-03 | 2018-08-08 | 株式会社鴻池組 | 穿孔ナビゲーション装置 |
CN104727804A (zh) * | 2014-11-27 | 2015-06-24 | 三一重型装备有限公司 | 一种凿岩台车及其钻臂定位控制方法和装置 |
EP3153654B1 (en) * | 2015-10-09 | 2019-04-24 | Sandvik Mining and Construction Oy | Rock drilling rig |
JP6590346B2 (ja) * | 2017-03-21 | 2019-10-16 | 株式会社辰巳商会 | 削孔用アタッチメント、削孔機、トンネル内壁面削孔方法 |
SE541217C2 (en) * | 2017-09-08 | 2019-05-07 | Epiroc Rock Drills Ab | Mining or construction vehicle |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4514796A (en) * | 1982-09-08 | 1985-04-30 | Joy Manufacturing Company | Method and apparatus for controlling the position of a hydraulic boom |
US4698570A (en) * | 1985-04-30 | 1987-10-06 | Mazda Motor Corporation | Boom positioning apparatus for rock drill |
US6957707B2 (en) * | 2001-12-03 | 2005-10-25 | Sandvik Intellectual Property Ab | Method for controlling a drilling sequence, a rock drilling apparatus and a computer programme to form a drilling sequence |
US7644782B1 (en) * | 1998-12-09 | 2010-01-12 | Sandvik Intellectual Property Ab | Method for correcting positioning errors in rock drilling, and rock drilling equipment |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5415402A (en) * | 1977-06-07 | 1979-02-05 | Toyo Kogyo Co | Core taking out apparatus of boring machine |
JP2005220627A (ja) * | 2004-02-06 | 2005-08-18 | Enzan Kobo:Kk | 削岩機搭載台車における穿孔位置決め制御方法 |
FI123153B (sv) * | 2006-12-22 | 2012-11-30 | Sandvik Mining & Construction Oy | Utarbetning av en borrplan för brytning av ett bergrum |
FI119780B (sv) * | 2007-04-17 | 2009-03-13 | Sandvik Mining & Constr Oy | Förfarande för bearbetning av borrningsdiagram, bergborningsanordning samt programprodukt |
US8122974B2 (en) * | 2008-07-10 | 2012-02-28 | Dragan Kosoric | Apparatus for drilling machine alignment |
JP2010216183A (ja) * | 2009-03-18 | 2010-09-30 | Shimizu Corp | 削孔機 |
-
2010
- 2010-11-29 FI FI20106255A patent/FI125085B/sv not_active IP Right Cessation
-
2011
- 2011-11-16 EP EP11845893.4A patent/EP2646638A1/en not_active Withdrawn
- 2011-11-16 AU AU2011334831A patent/AU2011334831B2/en not_active Ceased
- 2011-11-16 CA CA2817845A patent/CA2817845C/en not_active Expired - Fee Related
- 2011-11-16 WO PCT/FI2011/051011 patent/WO2012072870A1/en active Application Filing
- 2011-11-16 US US13/989,861 patent/US20130299239A1/en not_active Abandoned
- 2011-11-16 CN CN2011800573614A patent/CN103249904A/zh active Pending
- 2011-11-16 JP JP2013541393A patent/JP5669952B2/ja not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4514796A (en) * | 1982-09-08 | 1985-04-30 | Joy Manufacturing Company | Method and apparatus for controlling the position of a hydraulic boom |
US4698570A (en) * | 1985-04-30 | 1987-10-06 | Mazda Motor Corporation | Boom positioning apparatus for rock drill |
US7644782B1 (en) * | 1998-12-09 | 2010-01-12 | Sandvik Intellectual Property Ab | Method for correcting positioning errors in rock drilling, and rock drilling equipment |
US6957707B2 (en) * | 2001-12-03 | 2005-10-25 | Sandvik Intellectual Property Ab | Method for controlling a drilling sequence, a rock drilling apparatus and a computer programme to form a drilling sequence |
Also Published As
Publication number | Publication date |
---|---|
EP2646638A1 (en) | 2013-10-09 |
FI20106255A (sv) | 2012-05-30 |
JP2013544327A (ja) | 2013-12-12 |
CA2817845C (en) | 2016-03-29 |
CA2817845A1 (en) | 2012-06-07 |
CN103249904A (zh) | 2013-08-14 |
FI125085B (sv) | 2015-05-29 |
AU2011334831A1 (en) | 2013-06-13 |
JP5669952B2 (ja) | 2015-02-18 |
FI20106255A0 (sv) | 2010-11-29 |
AU2011334831B2 (en) | 2015-10-01 |
WO2012072870A1 (en) | 2012-06-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20130299239A1 (en) | Method For Controlling Drilling Unit of Rock Drilling Rig, and Rock Drilling Rig | |
JP5037678B2 (ja) | 曲線トンネルにおける穿孔パターン配向方法、岩盤掘削装置およびソフトウェア製品 | |
JP5986058B2 (ja) | 採掘車両及びブーム移動方法 | |
JP6727740B2 (ja) | 掘削器具の機首方位制御 | |
EP2539530B1 (en) | Rock drilling rig, method for rock drilling, and control system of rock drilling rig | |
AU2017276225B2 (en) | Systems and methods for preparing a worksite for additive construction | |
CN109972688A (zh) | 挖掘控制方法、装置及挖掘机控制器 | |
JP6974217B2 (ja) | 施工管理装置 | |
EP2539539B1 (en) | Method of presenting positioning information, user interface, and rock drilling rig | |
AU2016413503B9 (en) | Apparatus and method for positioning rock drilling rig | |
JP2011522983A (ja) | 穿孔の表示方法および装置ならびに岩盤穿孔時のドリルロッド案内方法 | |
AU2008300440A1 (en) | Method and software product for designing drilling pattern for rock cavity excavation | |
JP2023035987A (ja) | 建設機械 | |
KR102637524B1 (ko) | 작업 기계 | |
JP2020183681A (ja) | 立坑構築装置及び立坑構築方法 | |
JP7317926B2 (ja) | 施工管理装置、表示装置および施工管理方法 | |
JP2002097895A (ja) | 山岳トンネル用自動掘削装置 | |
JP2023183992A (ja) | 支援システム、遠隔操作支援装置、作業機械、プログラム | |
JP2022021055A (ja) | 施工管理方法 | |
Vlădeanu et al. | The determination of the bucket position at the excavators with the aid of the tilt sensors |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SANDVIK MINING AND CONSTRUCTION OY, FINLAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:PUURA, JUSSI;REEL/FRAME:030493/0835 Effective date: 20130524 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |