US20130299239A1 - Method For Controlling Drilling Unit of Rock Drilling Rig, and Rock Drilling Rig - Google Patents
Method For Controlling Drilling Unit of Rock Drilling Rig, and Rock Drilling Rig Download PDFInfo
- Publication number
- US20130299239A1 US20130299239A1 US13/989,861 US201113989861A US2013299239A1 US 20130299239 A1 US20130299239 A1 US 20130299239A1 US 201113989861 A US201113989861 A US 201113989861A US 2013299239 A1 US2013299239 A1 US 2013299239A1
- Authority
- US
- United States
- Prior art keywords
- drilling
- hole
- rotating angle
- unit
- drilled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 533
- 238000000034 method Methods 0.000 title claims abstract description 27
- 239000011435 rock Substances 0.000 claims abstract description 112
- 230000007246 mechanism Effects 0.000 claims description 13
- 238000004364 calculation method Methods 0.000 claims description 5
- 238000010586 diagram Methods 0.000 description 11
- 238000012544 monitoring process Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 238000012938 design process Methods 0.000 description 2
- 238000004422 calculation algorithm Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000009527 percussion Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/022—Control of the drilling operation; Hydraulic or pneumatic means for activation or operation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/025—Rock drills, i.e. jumbo drills
Definitions
- the invention relates to a method for controlling at least one drilling unit arranged in at least one drilling boom of a rock drilling rig when excavating a rock cavern one round at a time, the method comprising drilling holes of a round in accordance with a drilling pattern designed for the round, controlling, in order to drill each single hole, the drilling unit into a rotating angle which carries out a location and direction determined in the drilling pattern of the particular round for the particular hole, and storing the rotating angle of the drilling unit carried out during the drilling of each hole of the round.
- the invention further relates to a rock drilling rig comprising a movable carrier, at least one drilling boom, at least one drilling unit arranged in the drilling boom, the drilling unit comprising a feed beam and a rock drill, the rock drill being arranged to be movable on the feed beam by means of a feed device, a rotating mechanism for rotating the drilling unit into a rotating angle, at least one storage unit configured to store a drilling pattern to be used for drilling a round to be excavated for a rock cavern, at least one control unit configured, via the rotating mechanism, to control the drilling unit into a rotating angle which carries out a location and direction determined for a hole in the drilling pattern of the round, and at least one storage unit configured to store the rotating angle of the drilling unit carried out in the drilling of each hole of the round to be excavated.
- Tunnels, underground storage halls and other rock caverns are excavated in rounds, i.e. one round at a time, in other words, by employing a so-called drill-and-blast method, such that holes are drilled at a face of a rock cavern and then, after drilling, charged and blasted.
- one blast serves to break off rock material from the rock in an amount equal to that of one round.
- a drilling pattern is designed as office work and delivered to the rock drilling rig for drilling holes in the rock so as to generate a desired round.
- the drilling pattern includes at least the locations of the holes to be drilled and their directions and lengths or alternative start and end points of the holes to be drilled.
- the drilling pattern designer may also determine in the drilling pattern a rotating angle of the drilling unit for each hole of a round, such an angle being generally also referred to as a “roll-over” or a “roll-over angle”.
- the drilling boom or the drilling unit does not collide with the walls, ceiling or floor of the rock cavern during the drilling of the holes, and that a drill rod of the rock drill of the drilling unit is visible to the operator of the rock drilling rig during the drilling of a hole, and that the drilling unit does not collide with the drilling boom of the rock drilling rig during the drilling of holes which, with respect to the rock drilling rig, come close to a point where the drilling unit is supported against the drilling boom, either.
- the rotating angles of the drilling unit determined by the drilling pattern designer in the drilling pattern are quite seldom useful in a drilling situation in practice. This may be for instance because the designer of the drilling pattern does not see the practical situation in the rock cavern or even necessarily know the size of the rock drilling rig to be used for drilling a particular round. Consequently, the designer of the drilling pattern is not in practice capable of determining the rotating angles of the drilling unit for all holes such that it would be possible to drill all the holes by employing the particular rotating angles of the drill unit suggested by the designer of the drilling pattern without the operator of the rock drilling rig having to control the drilling unit into a new rotating angle with respect to no hole at all.
- An object of the invention is to provide a solution which enables the reliability and speed of advance of the operation of an automatic drilling cycle to be increased.
- the method according to the invention is characterized by determining the rotating angle of the drilling unit to be used for drilling a hole on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more previously drilled holes.
- the rock drilling rig according to the invention is characterized in that the control unit is configured to determine the rotating angle of the drilling unit to be used for drilling a hole on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more previously drilled holes.
- a rock drilling rig comprising at least one drilling boom and at least one drilling unit arranged in the drilling boom
- holes of a round are drilled in accordance with a drilling pattern designed for the round.
- the drilling unit is controlled into a rotating angle which carries out a location and direction determined for the particular hole in the drilling pattern designed for the particular round.
- the rotating angle of the drilling unit to be used for drilling the hole is determined on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more previously drilled holes.
- the solution thus utilizes values of the rotating angles of the drilling unit carried out in connection with previously drilled holes when determining the rotating angle of the drilling unit to be used in connection with drilling a hole to be drilled next.
- the previously drilled holes may thus be only previously drilled holes of the same round being presently excavated, or they may also be holes drilled in connection with already previously excavated rounds.
- the determination of a rotating angle of the drilling unit to be used for drilling holes is thus based on the rotating angles of the drilling unit actually carried out in connection with the previously drilled holes, which enables a situation to be achieved very quickly wherein a vast majority or even almost all of the holes of a round may be drilled by using the rotating angle of the drilling unit determined by the disclosed solution.
- the method comprises choosing, as initial data for the determination, location data about the hole and data about the rotating angle of the drilling unit associated with those already drilled holes which were drilled by the drilling unit arranged in the same drilling boom as the drilling unit to be used for drilling the hole to be drilled, determining a distance between the already drilled holes chosen in the previous step and the hole to be drilled, and choosing, on the basis of the distance between the already drilled holes and the hole to be drilled, one or more already drilled holes on the basis of whose rotating angle of the drilling unit carried out in the drilling thereof the rotating angle of the drilling unit to be used for drilling the hole to be drilled is determined, and determining, on the basis of the rotating angle of the drilling unit carried out in the drilling of the one or more already drilled holes, the rotating angle of the drilling unit to be used for drilling the hole to be drilled.
- the rotating angle of the drilling unit to be used for drilling the hole to be drilled is determined on the basis of the rotating angles carried out in the drilling of the already drilled holes located at a certain distance from the hole to be drilled, the value of the rotating angle of the drilling unit given by the determination is very accurate, since the determination of the rotating angle utilizes data associated with a limited number of previously drilled holes.
- the method comprises determining the rotating angle of the drilling unit to be used for drilling the hole to be drilled to correspond with the rotating angle of the drilling unit carried out in the drilling of an already drilled hole closest to the hole to be drilled.
- the determination of the rotating angle is very simple, and it is very likely that the value of the rotating angle of the drilling unit used in the drilling of the distance-wise closest already drilled hole is very suitable for use in the drilling of the next hole to be drilled.
- the method comprises determining the rotating angle of the drilling unit to be used for drilling the hole to be drilled to correspond, by a predetermined quantity, with a mean value of the rotating angles of the drilling unit carried out in the drilling of the distance-wise closest already drilled holes.
- the value of the rotating angle of the drilling unit used in connection with one, already drilled hole does not have too great importance for the rotating angle of the hole being presently drilled, which is advantageous if, for some reason, the value of the rotating angle of the drilling unit used in connection with the already drilled hole is completely unsuitable for use as the value of the rotating angle of the drilling unit in connection with the hole being presently drilled.
- FIG. 1 is a schematic side view showing a rock drilling rig
- FIGS. 2 a and 2 b are schematic side views showing some rotating mechanisms which may be used for turning a drilling unit into a correct position for a drilling event
- FIGS. 2 c and 2 d schematically show a rotating angle of a drilling unit as seen from behind the drilling unit
- FIG. 3 is a diagram schematically showing holes and a rotating angle of a drilling unit carried out in connection with drilling of each hole
- FIG. 4 is a flow diagram schematically showing a method for determining a rotating angle of a drilling unit to be used for drilling a single hole of a round to be drilled,
- FIGS. 5 a and 5 b schematically show a detail in determination of a rotating angle of a drilling unit to be used for drilling a single hole of a round to be drilled
- FIG. 6 schematically shows another detail in determination of a rotating angle of a drilling unit to be used for drilling a single hole of a round to be drilled
- FIGS. 7 to 10 schematically show examples relating to a use of the method according to FIG. 4 .
- FIG. 1 is a schematic side view showing a rock drilling rig 1 which may be used for excavating a rock cavern.
- the rock drilling rig 1 according to FIG. 1 comprises a movable carrier 2 , two drilling booms 3 , and drilling units 4 arranged in the drilling booms 3 .
- the rock drilling rig 1 may be provided with only one drilling boom 3 , or the number of drilling booms 3 may even be more than two.
- the drilling unit 4 which is shown larger in FIG. 2 , comprises a feed beam 5 and, arranged thereon, a rock drill 6 which may be moved with respect to the feed beam 5 by a feed device 22 shown schematically in FIGS. 1 and 2 .
- the drilling unit 4 further comprises a tool 7 , such as a drill rod, enabling impact pulses given by a percussion device, which for the sake of clarity is not shown, of the rock drill 6 to be transmitted to a rock 8 to be drilled.
- the rock drilling rig 1 further comprises at least one control unit 9 configured to control actuators of the rock drilling rig 1 for controlling operation of the drilling boom 3 and the drilling unit 4 , for instance.
- the control unit 9 may be a computer or a corresponding device, and it may comprise a user interface, including a display device, as well as control means, such as a keyboard or a joystick, for communicating commands and information to the control unit 9 .
- FIG. 1 the drilling unit 4 is arranged in the drilling boom 3 of the rock drilling rig 1 , in connection with the end of the drilling boom 3 , by means of a rotating mechanism 10 .
- FIGS. 2 a and 2 b show schematic examples of some possible rotating mechanisms 10 .
- the rotating mechanisms 10 according to FIGS. 2 a and 2 b are provided with a rotating unit 11 which, in the embodiment of FIGS. 2 a and 2 b , includes a rotating joint 11 ′ or a roll-over joint 11 and an actuator, such as a hydraulic motor, which, for the sake of clarity, is not shown in the figures, enabling a rotating motion to be produced in the rotating joint 11 ′.
- the rotating unit 11 or the rotating joint 11 ′ has a rotating axis A, or, in other words, the rotating unit 11 or the rotating joint 11 ′ defines the rotating axis A, which is substantially parallel with the feed beam 5 of the drilling unit 4 and around which the drilling unit 4 is arranged to turn or rotate as a consequence of the rotating motion of the rotating unit 11 or the rotating joint 11 ′ in a manner schematically shown by arrow A′, in which case the value of the rotating angle ⁇ describes the quantity of rotating of the drilling unit 4 around the rotating axis A.
- the rotating axis A is shown in FIGS. 2 a and 2 b schematically in broken line.
- the rotating mechanism 10 further comprises a turning unit 12 including a turning joint 12 ′, and an actuator, which, for the sake of clarity, is not shown in the figures, for turning the drilling unit 4 sideways around an axis B in the direction shown by arrow B′.
- a turning unit 12 including a turning joint 12 ′ and an actuator, which, for the sake of clarity, is not shown in the figures, for turning the drilling unit 4 sideways around an axis B in the direction shown by arrow B′.
- an actuator which, for the sake of clarity, is not shown in the figures, for turning the drilling unit 4 sideways around an axis B in the direction shown by arrow B′.
- the rotating mechanism 10 further comprises a second turning unit 13 including a second turning joint 13 ′, and an actuator, which, for the sake of clarity, is not shown in the figures, by means of which a tip of the tool 7 of the drilling unit 4 to be placed against the rock to be drilled may be inclined or lifted and lowered with respect to an axis C perpendicular to the surface of the paper in FIGS. 2 a and 2 b , in the direction shown by arrow C′.
- the rotating mechanisms 10 shown in FIGS. 2 a and 2 b are only some feasible examples of rotating mechanisms that enable the drilling unit 4 to be rotated around the aforementioned rotating axis A.
- any other rotating mechanism may also be used which enables at least said rotating of the drilling unit 4 around the rotating axis A to be achieved.
- FIGS. 2 c and 2 d schematically show a rotating angle ⁇ of the drilling unit 4 as seen from behind the drilling unit 4 .
- the drilling unit 4 has rotated around the rotating axis A of the drilling unit 4 to the left with respect to a vertical axis corresponding with the vertical position of the drilling unit 4 and indicated by a value of 0 degree of the rotating angle ⁇ .
- the rotating direction shown in FIG. 2 c has been determined to be a rotating direction corresponding with a negative rotating angle.
- the drilling unit 4 has rotated around the rotating axis A of the drilling unit 4 to the right with respect to a vertical axis corresponding with the vertical position of the drilling unit 4 and indicated by a value of 0 degree of the rotating angle ⁇ .
- the rotating direction shown in FIG. 2 d has been determined to be a rotating direction corresponding with a positive rotating angle.
- the connection between the rotating angle ⁇ and the rotating direction of the drilling unit 4 may also be determined in some other way which differs from that shown in FIGS. 2 c and 2 d.
- a drilling pattern 14 is provided which determines the locations, directions and lengths of the holes to be drilled or, alternatively, start and end points of the holes in a coordinate system of the drilling pattern.
- a drilling pattern is made outside a drilling site, e.g. in an office 15 , wherein the drilling pattern 14 may be stored on a memory member, such as a memory stick or a diskette, provided therein, or it may be transferred directly via a data transfer connection 16 to a storage unit 17 provided in the rock drilling rig 1 .
- the storage unit 17 may either be included in the control unit 9 , or it may be a storage unit located outside the control unit 9 and communicating with the control unit 9 .
- the drilling pattern 14 may also be amended either at or outside the drilling site.
- the preparation of the drilling pattern 14 is a computed-aided process, and usually iterative in nature.
- a design program is run on a computer 18 , and a designer 19 operates interactively with the design program, entering necessary data, making selections as well as controlling the design process.
- the already designed parts of the drilling pattern may yet be iteratively amended so as to achieve a better end result.
- the designer 14 may also determine for each hole his or her suggestion concerning the roll-over angle ⁇ or the rotating angle ⁇ to be used in the drilling of a hole.
- the drilling pattern 14 After the drilling pattern 14 is made, it may be stored in the storage unit 17 of the rock drilling rig 1 and implemented in the control unit 9 .
- the holes designed in the drilling pattern 14 are then drilled into the rock 8 , charged and blasted. A quantity of rock equal to that of a desired round is broken off the rock 8 and transported elsewhere. Next, new holes are drilled for the next round, in accordance with a new drilling pattern 14 .
- FIG. 3 schematically shows a diagram 20 or a rotating angle diagram 20 wherein the locations of holes 21 carried out in a drilled round are indicated by circles 21 ′, while directional lines 21 ′′ extending from the circles 21 ′′ indicate the rotating angle ⁇ of the drilling unit 4 carried out during the drilling of each hole 21 .
- a rock drilling rig 1 provided with two drilling booms 3 has been used, whereby the locations 21 ′ of the holes 21 indicated in thin lines in FIG.
- a storage unit provided in the rock drilling rig 1 , which storage unit may be the same as the storage unit 17 previously described in this description and FIG. 1 , or the storage unit may be e.g. a storage unit which communicates with the control unit 9 and is only used for storing the rotating angles ⁇ carried out in connection with the drilling of the holes 21 .
- Data about the location 21 ′ of each hole 21 may also be stored in connection with data indicating the rotating angle ⁇ of the drilling unit 4 carried out in connection with the corresponding hole 21 if the data about the rotating angle ⁇ of the drilling unit 4 carried out in connection with the hole 21 are not otherwise linked, e.g. via the drilling pattern 14 , with the data indicating the location 21 ′ of the corresponding hole 21 .
- FIG. 4 is a flow diagram schematically showing a method or a calculation algorithm for determining a rotating angle ⁇ of a drilling unit 4 to be used for drilling a single hole 21 of a round to be drilled next.
- a starting phase or an initial situation of drilling the hole 21 is indicated by a phase number one.
- data about the locations 21 ′ of the holes 21 drilled in connection with previous rounds and the rotating angles ⁇ of the drilling unit 4 carried out during the drilling of the particular holes 21 is collected from the storage unit 17 into a temporary working storage or another suitable memory provided in the control unit 9 , for instance.
- Said data may also comprise the location data about the holes 21 associated with the holes 21 already previously drilled during the drilling of the same round and the data about the rotating angles ⁇ of the drilling unit 4 carried out during the drilling of the particular holes 21 .
- Location data about a hole 21 refers to a starting location of the hole 21 in the drilling of each round.
- Said data may comprise data about the locations 21 ′ and the rotating angles ⁇ that have been carried out of the holes 21 of all rounds that have already been drilled, or data only about the locations 21 ′ and the rotating angles ⁇ that have been carried out of the holes 21 of e.g. 3 to 5 rounds that have been drilled most recently.
- the rotating angles c of the drilling unit 4 separately suggested by the designer 19 in the drilling pattern 14 may be used, or the operator of the rock drilling rig 1 may control the drilling unit 4 into a desired rotating angle ⁇ when starting the drilling of at least some or even all of the holes 21 .
- phase 2 of the diagram in FIG. 4 data about the locations 21 ′ of the holes 21 and the rotating angles ⁇ of the drilling unit 4 associated therewith that relate to the drilling boom 3 by whose drilling unit 4 the hole 21 is to be drilled are separated from the data collected in the starting phase.
- a distance between the location 21 ′ of each hole 21 chosen in phase 2 and the location of the hole 21 to be drilled next is determined in the control unit 9 .
- the distance may be determined by taking into account the distance between the previously drilled holes 21 and the hole 21 to be drilled next on the two-dimensional plane at the face of the rock cavern where the hole 21 to be drilled next is located. In this case, the previously drilled holes 21 are thus projected onto the same two-dimensional plane as the hole 21 to be drilled next.
- the distance in a three-dimensional space between the locations 21 ′ of the previously drilled holes 21 and the hole 21 to be drilled next is taken into account also in the direction of progression of excavation of the rock cavern e.g. such that with respect to the round being drilled, the distances between the locations 21 ′ of the holes 21 drilled in connection with the very previous round and the hole 21 to be drilled next is considered more important than the distances between the locations 21 ′ of the holes 21 drilled in connection with the already previously excavated rounds and the location of the hole 21 to be drilled next.
- the distances calculated in phase 3 may be arranged in the order of magnitude.
- the rotating angle ⁇ of the drilling unit 4 associated with the hole 21 to be drilled is determined on the basis of the rotating angle ⁇ of the drilling unit 4 carried out in connection with one or more previously drilled holes 21 .
- the rotating angle ⁇ of the drilling unit 4 associated with the hole 21 to be drilled may be determined or calculated in many different ways.
- An alternative is to use directly the rotating angle ⁇ of the drilling unit 4 carried out in the drilling of the already drilled hole 21 distance-wise closest to the hole 21 to be drilled.
- a second alternative is to determine the rotating angle ⁇ of the drilling unit 4 to be used in the drilling of the hole 21 to be drilled to correspond with a mean value ⁇ mean of the rotating angles ⁇ of the drilling unit 4 carried out in the drilling of a predetermined number of, e.g. two or more, such as 3 to 5, distance-wise closest already drilled holes 21 .
- a third alternative is to use, for drilling the hole 21 to be drilled, a value of the rotating angle ⁇ of the drilling unit 4 which corresponds with a mean value ⁇ mean of the rotating angles ⁇ of the drilling unit 4 carried out in connection with the drilling of the already drilled holes 21 residing at no more than a certain distance, such as at a distance of no more than one metre, from the hole 21 to be drilled next, or, if no previously drilled hole resides at said distance of e.g. no more than one metre, to use the rotating angle ⁇ of the drilling unit 4 carried out in connection with the drilling of the closest previously drilled hole 21 .
- FIG. 5 a schematically shows a situation wherein the origin OR1 of an imaginary coordinate system associated with the dimensions of the rock drilling rig 1 and attached to the rock drilling rig 1 resides at the same point as, or congruently with, the origin OR2 of the coordinate system of the drilling pattern 14 .
- the origin OR1 of the coordinate system associated with the rock drilling rig 1 may reside e.g. in a joint of the rock drilling rig 1 which connects the drilling booms 3 with the rock drilling rig 1 , as schematically shown in FIG. 1 .
- the rock drilling rig 1 is located in a rock cavern to be excavated in such a position wherein the location of the origin OR1 of the coordinate system associated with the rock drilling rig 1 differs from the location of the origin OR2 of the drilling pattern 14 .
- This difference between the location of the origin OR1 of the rock drilling rig 1 and the location of the origin OR2 of the drilling pattern 1 may preferably be taken into account when determining the rotating angle to be used in the drilling of the hole 21 to be drilled next e.g. in the following manner.
- the values of the rotating angles ⁇ of the drilling unit 4 carried out in the drilling of the holes 21 could be attached or determined also with respect to the origin OR1 of the coordinate system associated with the rock drilling rig 1 , in which case in connection with excavation of each round, data about the location of the origin OR1 of the rock drilling rig 1 with respect to the origin OR2 of the drilling pattern 14 is also stored so as to enable the difference between the location of the origin OR1 of the rock drilling rig 1 and the location of the origin OR2 of the drilling pattern 14 to be taken into account when determining the rotating angle ⁇ of the drilling unit 4 to be used in connection with the hole 21 to be drilled next.
- the rotating angle ⁇ of the drilling unit 4 used in connection with the drilling of the hole 21 is stored in the storage unit 17 .
- the rotating angle ⁇ of the drilling unit 4 used in the drilling of the hole 21 may be stored simultaneously, after drilling the round, in connection with storing the rotating angles ⁇ of the drilling unit 4 used in connection with the drilling of the other holes 21 of the same round, in which case the rotating angles ⁇ of the drilling unit 4 carried out and associated with all the holes 21 of the round are stored simultaneously after drilling the round.
- the value of the rotating angle ⁇ of the drilling unit 4 carried out in the drilling of a single hole 21 of the round is stored immediately during or after the drilling of the hole 21 , in which case the particular value carried out may be used for determining the rotating angle ⁇ of the drilling unit 4 to be used already in the drilling of the hole 21 to be drilled next in the same round.
- the method utilizes the values of the rotating angles ⁇ of the drilling unit 4 carried out in connection with the already previously drilled holes 21 for determining the value of the rotating angle ⁇ of the drilling unit 4 to be used in the drilling of the next hole 21 .
- the value of the rotating angle ⁇ of the drilling unit 4 to be used for the drilling of the hole 21 may be determined e.g. in degrees or another corresponding numerical value or another appropriate value. In such a case, for instance, if the value of the rotating angle ⁇ of the drilling unit 4 associated with one previous hole 21 is 34 degrees while the value of the rotating angle ⁇ of the drilling unit 4 associated with another previous hole is 40 degrees, their mean value is 37 degrees if the value of the rotating angle ⁇ of the drilling unit 4 to be used for drilling the next hole 21 is determined on the basis of the values of the rotating angles ⁇ of the drilling unit 4 carried out in connection with two previously drilled holes 21 .
- the determination of the rotating angle ⁇ of the drilling unit 4 to be used in the drilling of the hole 21 to be drilled next is shown to be performed by utilizing the control unit 9 provided in the rock drilling rig 1 and the storage unit 17 .
- the determination of the rotating angle ⁇ of the drilling unit 4 to be used in the drilling of the hole 21 to be drilled next is performed e.g. by the computer 18 in the office 15 or by another computer outside the drilling site, in which case the necessary data about the rotating angles ⁇ of the drilling unit 4 carried out in connection with the drilling of the already drilled holes 21 is communicated to the particular computer via the data transfer connection 16 .
- FIGS. 7 to 10 schematically show an example of a relation between the rotating angles ⁇ of the drilling unit 4 determined, by the method according to FIG. 4 and the rotating angles ⁇ of the drilling unit 4 carried out in the drilling of the already drilled holes 21 and used for the determination.
- a rock drilling rig provided with two drilling booms 3 , each having one drilling unit 4 , is used as the rock drilling rig 1 .
- FIG. 7 shows, by employing circles drawn in thin line, the locations 21 ′ of the holes 21 designated as residing within the coverage area or operation area of a first boom 3 of the rock drilling rig 1 and, by employing directional lines 21 ′′ drawn in thin line, the rotating angles ⁇ of the drilling unit 4 determined by the aforementioned method for the particular holes 21 . Said rotating angles ⁇ are thus suggestions about those rotating angles ⁇ of the drilling unit 4 suggested by the aforementioned method for use in the drilling of the holes 21 of the round.
- a thick line designates those previously drilled holes 21 and the rotating angles ⁇ of the drilling unit 4 carried out that were used for determining the rotating angles ⁇ of the drilling unit 4 designated in said thin lines. In the case shown in FIG. 7 there was one previously drilled round.
- FIG. 7 there was one previously drilled round.
- FIGS. 9 and 10 show a corresponding example concerning the coverage area or operation area of a second drilling boom 3 of the rock drilling rig 1 . It can be seen in FIGS. 7 to 10 how already after three excavated rounds, the suggestions designated in thin line about the values of the rotating angles ⁇ of the drilling unit 4 to be used in connection with the holes 21 of the round to be drilled next are already very much in accordance with the rotating angles ⁇ that were carried out.
- the disclosed solution thus utilizes the values of the rotating angles ⁇ of the drilling unit 4 carried out in connection with the previously drilled holes 21 when determining the rotating angle ⁇ of the drilling unit 4 to be used in connection with the drilling the hole 21 to be drilled next. Since the determination of the rotating angle ⁇ of the drilling unit 4 to be used in the drilling of the holes 21 is based on the actual rotating angles ⁇ of the drilling unit 4 carried out in connection with the previously drilled holes 21 , a situation is very quickly achieved wherein a vast majority of the holes 21 of a round may be drilled by using a rotating angle ⁇ of the drilling unit 4 determined by the disclosed solution such that the operator of the rock drilling rig 1 seldom has to participate in choosing the rotating angle ⁇ of the drilling unit 4 to be used in the drilling of the hole 21 .
- the solution also takes into account the real drilling situation prevalent in the rock cavern as well as the size and type of the rock drilling rig actually being used for the drilling. Since the determination of the rotating angle ⁇ of the drilling unit 4 may be implemented automatically e.g.
- the designer 19 of the drilling pattern 14 no longer has to determine the rotating angles ⁇ of the drilling unit 4 , possibly except for the rotating angles ⁇ of the drilling unit 4 associated with the holes 21 of the first round of a rock cavern, whereby the capacity of the designer 19 of the drilling pattern 14 may also be released for other tasks.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
A method for excavating a rock cavern one round at a time and a rock drilling rig for the same. The rock drilling rig includes at least one drilling boom and at least one drilling unit is arranged in the drilling boom. A plurality of holes of a round is drilled in accordance with a drilling pattern designed for the round. In order to drill each single hole, the drilling unit is controlled in a rotating angle that effects a location and direction determined for the particular hole from the drilling pattern designed for the particular round. The rotating angle of the drilling unit to be used for drilling the hole is determined on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more previously drilled holes.
Description
- The invention relates to a method for controlling at least one drilling unit arranged in at least one drilling boom of a rock drilling rig when excavating a rock cavern one round at a time, the method comprising drilling holes of a round in accordance with a drilling pattern designed for the round, controlling, in order to drill each single hole, the drilling unit into a rotating angle which carries out a location and direction determined in the drilling pattern of the particular round for the particular hole, and storing the rotating angle of the drilling unit carried out during the drilling of each hole of the round.
- The invention further relates to a rock drilling rig comprising a movable carrier, at least one drilling boom, at least one drilling unit arranged in the drilling boom, the drilling unit comprising a feed beam and a rock drill, the rock drill being arranged to be movable on the feed beam by means of a feed device, a rotating mechanism for rotating the drilling unit into a rotating angle, at least one storage unit configured to store a drilling pattern to be used for drilling a round to be excavated for a rock cavern, at least one control unit configured, via the rotating mechanism, to control the drilling unit into a rotating angle which carries out a location and direction determined for a hole in the drilling pattern of the round, and at least one storage unit configured to store the rotating angle of the drilling unit carried out in the drilling of each hole of the round to be excavated.
- Tunnels, underground storage halls and other rock caverns are excavated in rounds, i.e. one round at a time, in other words, by employing a so-called drill-and-blast method, such that holes are drilled at a face of a rock cavern and then, after drilling, charged and blasted. Thus, one blast serves to break off rock material from the rock in an amount equal to that of one round.
- For excavating a rock cavern, a plan is made in advance and information is determined about the rock type, for instance. Usually, the orderer of the rock cavern also sets different quality requirements on the cavern to be excavated. For each round, a drilling pattern is designed as office work and delivered to the rock drilling rig for drilling holes in the rock so as to generate a desired round. The drilling pattern includes at least the locations of the holes to be drilled and their directions and lengths or alternative start and end points of the holes to be drilled. Further, the drilling pattern designer may also determine in the drilling pattern a rotating angle of the drilling unit for each hole of a round, such an angle being generally also referred to as a “roll-over” or a “roll-over angle”. By choosing the rotating angle correctly, it can be better ensured that the drilling boom or the drilling unit does not collide with the walls, ceiling or floor of the rock cavern during the drilling of the holes, and that a drill rod of the rock drill of the drilling unit is visible to the operator of the rock drilling rig during the drilling of a hole, and that the drilling unit does not collide with the drilling boom of the rock drilling rig during the drilling of holes which, with respect to the rock drilling rig, come close to a point where the drilling unit is supported against the drilling boom, either.
- However, the rotating angles of the drilling unit determined by the drilling pattern designer in the drilling pattern are quite seldom useful in a drilling situation in practice. This may be for instance because the designer of the drilling pattern does not see the practical situation in the rock cavern or even necessarily know the size of the rock drilling rig to be used for drilling a particular round. Consequently, the designer of the drilling pattern is not in practice capable of determining the rotating angles of the drilling unit for all holes such that it would be possible to drill all the holes by employing the particular rotating angles of the drill unit suggested by the designer of the drilling pattern without the operator of the rock drilling rig having to control the drilling unit into a new rotating angle with respect to no hole at all. Problems arise particularly at the edges of a rock cavern if the rotating angle of the drilling unit determined in the drilling pattern is such that the drilling unit tries to turn into a position wherein it comes into contact with the edge of the rock cavern, and also in the central part of the rock cavern, where a cut hole is drilled, if the rotating angle of the drilling unit determined in the drilling pattern is such that the drilling unit tries to turn into a position where it collides with the drilling boom of the rock drilling rig. In addition to these, another problematic situation arises when the rotating angle of the drilling unit given in the drilling pattern is such that the drilling unit tries to turn into a position where the drilling boom prevents the operator of the rock drilling rig from seeing the drill rod of the rock drill provided in the drilling unit when, in practice, the operator of the rock drilling rig wishes to see the drill rod for the purpose of monitoring the drilling and its advance as well as the condition of the drill rod, and for detecting possible water flowing out of the hole. Presently, in order to avoid all the aforementioned situations, the operator of the rock drilling rig has to monitor the operation of an automatic drilling cycle of the rock drilling rig very carefully and, when necessary, control the drilling unit into a new rotating angle upon starting the drilling of at least some holes, which slows down the drilling cycle and its advance.
- An object of the invention is to provide a solution which enables the reliability and speed of advance of the operation of an automatic drilling cycle to be increased.
- The method according to the invention is characterized by determining the rotating angle of the drilling unit to be used for drilling a hole on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more previously drilled holes.
- The rock drilling rig according to the invention is characterized in that the control unit is configured to determine the rotating angle of the drilling unit to be used for drilling a hole on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more previously drilled holes.
- When excavating a rock cavern one round at a time by a rock drilling rig comprising at least one drilling boom and at least one drilling unit arranged in the drilling boom, holes of a round are drilled in accordance with a drilling pattern designed for the round. In order to drill each single hole, the drilling unit is controlled into a rotating angle which carries out a location and direction determined for the particular hole in the drilling pattern designed for the particular round. The rotating angle of the drilling unit to be used for drilling the hole is determined on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more previously drilled holes.
- The solution thus utilizes values of the rotating angles of the drilling unit carried out in connection with previously drilled holes when determining the rotating angle of the drilling unit to be used in connection with drilling a hole to be drilled next. The previously drilled holes may thus be only previously drilled holes of the same round being presently excavated, or they may also be holes drilled in connection with already previously excavated rounds. The determination of a rotating angle of the drilling unit to be used for drilling holes is thus based on the rotating angles of the drilling unit actually carried out in connection with the previously drilled holes, which enables a situation to be achieved very quickly wherein a vast majority or even almost all of the holes of a round may be drilled by using the rotating angle of the drilling unit determined by the disclosed solution. In such a case, the operator of the rock drilling rig very seldom needs to participate in choosing the rotating angle to be used for drilling a hole. This makes a round quicker to drill, and it releases the capacity of the operator of the rock drilling rig for monitoring the drilling and the condition of the drilling equipment.
- According to an embodiment, when determining the rotating angle of the drilling unit to be used for drilling a hole, the method comprises choosing, as initial data for the determination, location data about the hole and data about the rotating angle of the drilling unit associated with those already drilled holes which were drilled by the drilling unit arranged in the same drilling boom as the drilling unit to be used for drilling the hole to be drilled, determining a distance between the already drilled holes chosen in the previous step and the hole to be drilled, and choosing, on the basis of the distance between the already drilled holes and the hole to be drilled, one or more already drilled holes on the basis of whose rotating angle of the drilling unit carried out in the drilling thereof the rotating angle of the drilling unit to be used for drilling the hole to be drilled is determined, and determining, on the basis of the rotating angle of the drilling unit carried out in the drilling of the one or more already drilled holes, the rotating angle of the drilling unit to be used for drilling the hole to be drilled.
- When the rotating angle of the drilling unit to be used for drilling the hole to be drilled is determined on the basis of the rotating angles carried out in the drilling of the already drilled holes located at a certain distance from the hole to be drilled, the value of the rotating angle of the drilling unit given by the determination is very accurate, since the determination of the rotating angle utilizes data associated with a limited number of previously drilled holes.
- According to a second embodiment, the method comprises determining the rotating angle of the drilling unit to be used for drilling the hole to be drilled to correspond with the rotating angle of the drilling unit carried out in the drilling of an already drilled hole closest to the hole to be drilled. In this embodiment, the determination of the rotating angle is very simple, and it is very likely that the value of the rotating angle of the drilling unit used in the drilling of the distance-wise closest already drilled hole is very suitable for use in the drilling of the next hole to be drilled.
- According to a third embodiment, the method comprises determining the rotating angle of the drilling unit to be used for drilling the hole to be drilled to correspond, by a predetermined quantity, with a mean value of the rotating angles of the drilling unit carried out in the drilling of the distance-wise closest already drilled holes. In such a case, the value of the rotating angle of the drilling unit used in connection with one, already drilled hole does not have too great importance for the rotating angle of the hole being presently drilled, which is advantageous if, for some reason, the value of the rotating angle of the drilling unit used in connection with the already drilled hole is completely unsuitable for use as the value of the rotating angle of the drilling unit in connection with the hole being presently drilled.
- The invention is now described in closer detail in connection with preferred embodiments and with reference to the accompanying drawings, in which:
-
FIG. 1 is a schematic side view showing a rock drilling rig, -
FIGS. 2 a and 2 b are schematic side views showing some rotating mechanisms which may be used for turning a drilling unit into a correct position for a drilling event, andFIGS. 2 c and 2 d schematically show a rotating angle of a drilling unit as seen from behind the drilling unit, -
FIG. 3 is a diagram schematically showing holes and a rotating angle of a drilling unit carried out in connection with drilling of each hole, -
FIG. 4 is a flow diagram schematically showing a method for determining a rotating angle of a drilling unit to be used for drilling a single hole of a round to be drilled, -
FIGS. 5 a and 5 b schematically show a detail in determination of a rotating angle of a drilling unit to be used for drilling a single hole of a round to be drilled, -
FIG. 6 schematically shows another detail in determination of a rotating angle of a drilling unit to be used for drilling a single hole of a round to be drilled, and -
FIGS. 7 to 10 schematically show examples relating to a use of the method according toFIG. 4 . -
FIG. 1 is a schematic side view showing arock drilling rig 1 which may be used for excavating a rock cavern. Therock drilling rig 1 according toFIG. 1 comprises amovable carrier 2, twodrilling booms 3, anddrilling units 4 arranged in thedrilling booms 3. As distinct fromFIG. 1 , therock drilling rig 1 may be provided with only onedrilling boom 3, or the number ofdrilling booms 3 may even be more than two. Thedrilling unit 4, which is shown larger inFIG. 2 , comprises afeed beam 5 and, arranged thereon, arock drill 6 which may be moved with respect to thefeed beam 5 by afeed device 22 shown schematically inFIGS. 1 and 2 . Thedrilling unit 4 further comprises atool 7, such as a drill rod, enabling impact pulses given by a percussion device, which for the sake of clarity is not shown, of therock drill 6 to be transmitted to arock 8 to be drilled. Therock drilling rig 1 further comprises at least onecontrol unit 9 configured to control actuators of therock drilling rig 1 for controlling operation of thedrilling boom 3 and thedrilling unit 4, for instance. Thecontrol unit 9 may be a computer or a corresponding device, and it may comprise a user interface, including a display device, as well as control means, such as a keyboard or a joystick, for communicating commands and information to thecontrol unit 9. - In
FIG. 1 , thedrilling unit 4 is arranged in thedrilling boom 3 of therock drilling rig 1, in connection with the end of thedrilling boom 3, by means of arotating mechanism 10.FIGS. 2 a and 2 b show schematic examples of some possiblerotating mechanisms 10. Therotating mechanisms 10 according toFIGS. 2 a and 2 b are provided with a rotatingunit 11 which, in the embodiment ofFIGS. 2 a and 2 b, includes a rotatingjoint 11′ or a roll-overjoint 11 and an actuator, such as a hydraulic motor, which, for the sake of clarity, is not shown in the figures, enabling a rotating motion to be produced in the rotatingjoint 11′. The rotatingunit 11 or the rotatingjoint 11′ has a rotating axis A, or, in other words, therotating unit 11 or the rotatingjoint 11′ defines the rotating axis A, which is substantially parallel with thefeed beam 5 of thedrilling unit 4 and around which thedrilling unit 4 is arranged to turn or rotate as a consequence of the rotating motion of the rotatingunit 11 or the rotatingjoint 11′ in a manner schematically shown by arrow A′, in which case the value of the rotating angle φ describes the quantity of rotating of thedrilling unit 4 around the rotating axis A. The rotating axis A is shown inFIGS. 2 a and 2 b schematically in broken line. - In the embodiments shown in
FIGS. 2 a and 2 b, therotating mechanism 10 further comprises aturning unit 12 including a turningjoint 12′, and an actuator, which, for the sake of clarity, is not shown in the figures, for turning thedrilling unit 4 sideways around an axis B in the direction shown by arrow B′. In addition, in the embodiments shown inFIGS. 2 a and 2 b, therotating mechanism 10 further comprises asecond turning unit 13 including a second turningjoint 13′, and an actuator, which, for the sake of clarity, is not shown in the figures, by means of which a tip of thetool 7 of thedrilling unit 4 to be placed against the rock to be drilled may be inclined or lifted and lowered with respect to an axis C perpendicular to the surface of the paper inFIGS. 2 a and 2 b, in the direction shown by arrow C′. - The
rotating mechanisms 10 shown inFIGS. 2 a and 2 b are only some feasible examples of rotating mechanisms that enable thedrilling unit 4 to be rotated around the aforementioned rotating axis A. Thus, in connection with the solution disclosed in this description, any other rotating mechanism may also be used which enables at least said rotating of thedrilling unit 4 around the rotating axis A to be achieved. -
FIGS. 2 c and 2 d schematically show a rotating angle φ of thedrilling unit 4 as seen from behind thedrilling unit 4. InFIG. 2 c, thedrilling unit 4 has rotated around the rotating axis A of thedrilling unit 4 to the left with respect to a vertical axis corresponding with the vertical position of thedrilling unit 4 and indicated by a value of 0 degree of the rotating angle φ. The rotating direction shown inFIG. 2 c has been determined to be a rotating direction corresponding with a negative rotating angle. InFIG. 2 d, thedrilling unit 4, in turn, has rotated around the rotating axis A of thedrilling unit 4 to the right with respect to a vertical axis corresponding with the vertical position of thedrilling unit 4 and indicated by a value of 0 degree of the rotating angle φ. The rotating direction shown inFIG. 2 d has been determined to be a rotating direction corresponding with a positive rotating angle. However, the connection between the rotating angle φ and the rotating direction of thedrilling unit 4 may also be determined in some other way which differs from that shown inFIGS. 2 c and 2 d. - Typically, for the drilling of holes of each round for a rock cavern, a
drilling pattern 14 is provided which determines the locations, directions and lengths of the holes to be drilled or, alternatively, start and end points of the holes in a coordinate system of the drilling pattern. Typically, a drilling pattern is made outside a drilling site, e.g. in anoffice 15, wherein thedrilling pattern 14 may be stored on a memory member, such as a memory stick or a diskette, provided therein, or it may be transferred directly via adata transfer connection 16 to astorage unit 17 provided in therock drilling rig 1. Thestorage unit 17 may either be included in thecontrol unit 9, or it may be a storage unit located outside thecontrol unit 9 and communicating with thecontrol unit 9. Thedrilling pattern 14 may also be amended either at or outside the drilling site. The preparation of thedrilling pattern 14 is a computed-aided process, and usually iterative in nature. A design program is run on acomputer 18, and adesigner 19 operates interactively with the design program, entering necessary data, making selections as well as controlling the design process. During the design process, the already designed parts of the drilling pattern may yet be iteratively amended so as to achieve a better end result. In thedrilling pattern 14, thedesigner 14 may also determine for each hole his or her suggestion concerning the roll-over angle φ or the rotating angle φ to be used in the drilling of a hole. - After the
drilling pattern 14 is made, it may be stored in thestorage unit 17 of therock drilling rig 1 and implemented in thecontrol unit 9. The holes designed in thedrilling pattern 14 are then drilled into therock 8, charged and blasted. A quantity of rock equal to that of a desired round is broken off therock 8 and transported elsewhere. Next, new holes are drilled for the next round, in accordance with anew drilling pattern 14. -
FIG. 3 schematically shows a diagram 20 or a rotating angle diagram 20 wherein the locations ofholes 21 carried out in a drilled round are indicated bycircles 21′, whiledirectional lines 21″ extending from thecircles 21″ indicate the rotating angle φ of thedrilling unit 4 carried out during the drilling of eachhole 21. When a round which corresponds with therotating angle pattern 20 shown inFIG. 3 was drilled, arock drilling rig 1 provided with twodrilling booms 3 has been used, whereby thelocations 21′ of theholes 21 indicated in thin lines inFIG. 3 and thedirectional lines 21″ corresponding with the rotating angles φ of thedrilling unit 4 carried out areholes 21 drilled by thedrilling unit 4 arranged in afirst drilling boom 3 of therock drilling rig 1, while thelocations 21′ of theholes 21 indicated in thick lines and thedirectional lines 21″ corresponding with the rotating angles φ of thedrilling unit 4 carried out areholes 21 drilled by thedrilling unit 4 arranged in asecond drilling boom 3 of therock drilling rig 1. The rotating angles φ of thedrilling unit 4 corresponding with thedirectional lines 21″ of the rotating angle diagram 20 shown inFIG. 3 are, during or after drilling the round, stored in a storage unit provided in therock drilling rig 1, which storage unit may be the same as thestorage unit 17 previously described in this description andFIG. 1 , or the storage unit may be e.g. a storage unit which communicates with thecontrol unit 9 and is only used for storing the rotating angles φ carried out in connection with the drilling of theholes 21. Data about thelocation 21′ of eachhole 21 may also be stored in connection with data indicating the rotating angle φ of thedrilling unit 4 carried out in connection with the correspondinghole 21 if the data about the rotating angle φ of thedrilling unit 4 carried out in connection with thehole 21 are not otherwise linked, e.g. via thedrilling pattern 14, with the data indicating thelocation 21′ of the correspondinghole 21. -
FIG. 4 is a flow diagram schematically showing a method or a calculation algorithm for determining a rotating angle φ of adrilling unit 4 to be used for drilling asingle hole 21 of a round to be drilled next. InFIG. 4 , a starting phase or an initial situation of drilling thehole 21 is indicated by a phase number one. In this starting phase, data about thelocations 21′ of theholes 21 drilled in connection with previous rounds and the rotating angles φ of thedrilling unit 4 carried out during the drilling of theparticular holes 21 is collected from thestorage unit 17 into a temporary working storage or another suitable memory provided in thecontrol unit 9, for instance. Said data may also comprise the location data about theholes 21 associated with theholes 21 already previously drilled during the drilling of the same round and the data about the rotating angles φ of thedrilling unit 4 carried out during the drilling of the particular holes 21. Location data about ahole 21 refers to a starting location of thehole 21 in the drilling of each round. Said data may comprise data about thelocations 21′ and the rotating angles φ that have been carried out of theholes 21 of all rounds that have already been drilled, or data only about thelocations 21′ and the rotating angles φ that have been carried out of theholes 21 of e.g. 3 to 5 rounds that have been drilled most recently. In the drilling of theholes 21 of the first round for a rock cavern, the rotating angles c of thedrilling unit 4 separately suggested by thedesigner 19 in thedrilling pattern 14 may be used, or the operator of therock drilling rig 1 may control thedrilling unit 4 into a desired rotating angle φ when starting the drilling of at least some or even all of theholes 21. - In the next phase of the drilling of the
hole 21, i.e. inphase 2 of the diagram inFIG. 4 , data about thelocations 21′ of theholes 21 and the rotating angles φ of thedrilling unit 4 associated therewith that relate to thedrilling boom 3 by whosedrilling unit 4 thehole 21 is to be drilled are separated from the data collected in the starting phase. - In the next phase of the drilling of the
hole 21, i.e. inphase 3 of the diagram inFIG. 4 , a distance between thelocation 21′ of eachhole 21 chosen inphase 2 and the location of thehole 21 to be drilled next is determined in thecontrol unit 9. The distance may be determined by taking into account the distance between the previously drilledholes 21 and thehole 21 to be drilled next on the two-dimensional plane at the face of the rock cavern where thehole 21 to be drilled next is located. In this case, the previously drilledholes 21 are thus projected onto the same two-dimensional plane as thehole 21 to be drilled next. It is also feasible that when determining the distance, the distance in a three-dimensional space between thelocations 21′ of the previously drilledholes 21 and thehole 21 to be drilled next is taken into account also in the direction of progression of excavation of the rock cavern e.g. such that with respect to the round being drilled, the distances between thelocations 21′ of theholes 21 drilled in connection with the very previous round and thehole 21 to be drilled next is considered more important than the distances between thelocations 21′ of theholes 21 drilled in connection with the already previously excavated rounds and the location of thehole 21 to be drilled next. - In the next phase of the drilling of the
hole 21, i.e. inphase 4 of the diagram inFIG. 4 , the distances calculated inphase 3 may be arranged in the order of magnitude. - In the next phase of the drilling of the
hole 21, i.e. inphase 5 of the diagram inFIG. 4 , the rotating angle φ of thedrilling unit 4 associated with thehole 21 to be drilled is determined on the basis of the rotating angle φ of thedrilling unit 4 carried out in connection with one or more previously drilled holes 21. The rotating angle φ of thedrilling unit 4 associated with thehole 21 to be drilled may be determined or calculated in many different ways. - An alternative is to use directly the rotating angle φ of the
drilling unit 4 carried out in the drilling of the already drilledhole 21 distance-wise closest to thehole 21 to be drilled. - A second alternative is to determine the rotating angle φ of the
drilling unit 4 to be used in the drilling of thehole 21 to be drilled to correspond with a mean value φmean of the rotating angles φ of thedrilling unit 4 carried out in the drilling of a predetermined number of, e.g. two or more, such as 3 to 5, distance-wise closest already drilled holes 21. - A third alternative is to use, for drilling the
hole 21 to be drilled, a value of the rotating angle φ of thedrilling unit 4 which corresponds with a mean value φmean of the rotating angles φ of thedrilling unit 4 carried out in connection with the drilling of the already drilledholes 21 residing at no more than a certain distance, such as at a distance of no more than one metre, from thehole 21 to be drilled next, or, if no previously drilled hole resides at said distance of e.g. no more than one metre, to use the rotating angle φ of thedrilling unit 4 carried out in connection with the drilling of the closest previously drilledhole 21. - In the determination of the rotating angle φ of the
drilling unit 4 associated with thehole 21 to be drilled next, it may also be taken into account how the location of therock drilling rig 1 varies with respect to the origin or zero point of thedrilling pattern 14 used for drilling the round when drilling successive rounds of the rock cavern.FIG. 5 a schematically shows a situation wherein the origin OR1 of an imaginary coordinate system associated with the dimensions of therock drilling rig 1 and attached to therock drilling rig 1 resides at the same point as, or congruently with, the origin OR2 of the coordinate system of thedrilling pattern 14. The origin OR1 of the coordinate system associated with therock drilling rig 1 may reside e.g. in a joint of therock drilling rig 1 which connects thedrilling booms 3 with therock drilling rig 1, as schematically shown inFIG. 1 . - In the situation shown in
FIG. 5 b, therock drilling rig 1 is located in a rock cavern to be excavated in such a position wherein the location of the origin OR1 of the coordinate system associated with therock drilling rig 1 differs from the location of the origin OR2 of thedrilling pattern 14. This difference between the location of the origin OR1 of therock drilling rig 1 and the location of the origin OR2 of thedrilling pattern 1 may preferably be taken into account when determining the rotating angle to be used in the drilling of thehole 21 to be drilled next e.g. in the following manner. First, when the value of the rotating angle φ of thedrilling unit 4 carried out in the drilling of the drilledhole 21 is stored, subtracting from said value of the rotating angle φ a proportion or quantity or value which results from the difference between the location of the origin OR1 of therock drilling rig 1 and the location of the origin OR2 of thedrilling pattern 14. Further, when the drilling of thehole 21 to be drilled next is started utilizing the value of the rotating angle φ of thedrilling unit 4 determined as disclosed above, adding to the value of the particular rotating angle φ a proportion or quantity or value which corresponds with the difference between the location of the origin OR1 of therock drilling rig 1 and the location of the origin OR2 of thedrilling pattern 14. - In the manner disclosed in the previous paragraph, it is thus possible to compensate for the variation in the location of the
rock drilling rig 1 with respect to the origin OR2 of thedrilling pattern 14. The necessary calculation may be performed in thecontrol unit 9, for instance. When making said compensation, the coordinates of the origin OR1 of therock drilling rig 1 are projected onto the same plane as that of the coordinate system of thedrilling pattern 14. In the previous paragraph, the values of the rotating angles of thedrilling unit 4 carried out in the drilling of theholes 21 were attached to the origin OR2 of thedrilling pattern 14. Alternatively, the values of the rotating angles φ of thedrilling unit 4 carried out in the drilling of theholes 21 could be attached or determined also with respect to the origin OR1 of the coordinate system associated with therock drilling rig 1, in which case in connection with excavation of each round, data about the location of the origin OR1 of therock drilling rig 1 with respect to the origin OR2 of thedrilling pattern 14 is also stored so as to enable the difference between the location of the origin OR1 of therock drilling rig 1 and the location of the origin OR2 of thedrilling pattern 14 to be taken into account when determining the rotating angle φ of thedrilling unit 4 to be used in connection with thehole 21 to be drilled next. - In the next phase of drilling the
hole 21, i.e. inphase 6 of the diagram inFIG. 4 , the rotating angle φ of thedrilling unit 4 used in connection with the drilling of thehole 21 is stored in thestorage unit 17. The rotating angle φ of thedrilling unit 4 used in the drilling of thehole 21 may be stored simultaneously, after drilling the round, in connection with storing the rotating angles φ of thedrilling unit 4 used in connection with the drilling of theother holes 21 of the same round, in which case the rotating angles φ of thedrilling unit 4 carried out and associated with all theholes 21 of the round are stored simultaneously after drilling the round. Preferably, the value of the rotating angle φ of thedrilling unit 4 carried out in the drilling of asingle hole 21 of the round is stored immediately during or after the drilling of thehole 21, in which case the particular value carried out may be used for determining the rotating angle φ of thedrilling unit 4 to be used already in the drilling of thehole 21 to be drilled next in the same round. - Thus, the method utilizes the values of the rotating angles φ of the
drilling unit 4 carried out in connection with the already previously drilledholes 21 for determining the value of the rotating angle φ of thedrilling unit 4 to be used in the drilling of thenext hole 21. - The value of the rotating angle φ of the
drilling unit 4 to be used for the drilling of thehole 21 may be determined e.g. in degrees or another corresponding numerical value or another appropriate value. In such a case, for instance, if the value of the rotating angle φ of thedrilling unit 4 associated with oneprevious hole 21 is 34 degrees while the value of the rotating angle φ of thedrilling unit 4 associated with another previous hole is 40 degrees, their mean value is 37 degrees if the value of the rotating angle φ of thedrilling unit 4 to be used for drilling thenext hole 21 is determined on the basis of the values of the rotating angles φ of thedrilling unit 4 carried out in connection with two previously drilled holes 21. - However, a problem in the aforementioned manner of calculation arises when the value of the rotating angle φ of the
drilling unit 4 associated with oneprevious hole 21 is 170 degrees while the value of the rotating angle φ of thedrilling unit 4 associated with anotherprevious hole 21 is 170 degrees, whereby, in view of the above, their mean value would be 0 degree when, however, the desired result would be either 180 degrees or 180 degrees. This situation is illustrated inFIG. 6 wherein the value of the rotating angle φ of thedrilling unit 4 indicated by arrow φ1 is 170 degrees while the value of the rotating angle φ of thedrilling unit 4 indicated by arrow φ2 is 170 degrees, in which case their mean value is 0 degree, as indicated by arrow φ3, rather than 180 degrees or −180 degrees, as it should be, as indicated by arrow φ4. - This problem may be avoided by dividing, in potential calculation of a mean value, the values of each single rotating angle φ first into a vertical component φsin=sin(φπ/180° and a horizontal component) φcos=sin(φπ/180°, wherein π is thus pi, i.e. mathematical Archimedes' constant or Ludolph's number. Next, mean values φsin
— mean of the vertical components and the mean values φcos— mean of the horizontal components of the rotating angles φ of thedrilling unit 4 carried out are calculated separately. The final mean value φmean of the rotating angles φ of thedrilling unit 4 to be used for drilling a hole is obtained on the basis of the aforementioned mean value of the vertical components and the aforementioned mean value of the horizontal components, from formula φmean=atan 2(φcos— mean, φsin— mean), whereby in the aforementioned example, the value of the rotating angle φ of thedrilling unit 4 to be used in the drilling of thehole 21 is 180 degrees or 180 degrees, as indicated by arrow φ4. - In the previous example, the determination of the rotating angle φ of the
drilling unit 4 to be used in the drilling of thehole 21 to be drilled next is shown to be performed by utilizing thecontrol unit 9 provided in therock drilling rig 1 and thestorage unit 17. However, it is possible that the determination of the rotating angle φ of thedrilling unit 4 to be used in the drilling of thehole 21 to be drilled next is performed e.g. by thecomputer 18 in theoffice 15 or by another computer outside the drilling site, in which case the necessary data about the rotating angles φ of thedrilling unit 4 carried out in connection with the drilling of the already drilledholes 21 is communicated to the particular computer via thedata transfer connection 16. In such a case, again via thedata transfer connection 16, data about the rotating angle φ of thedrilling unit 4 to be used in the drilling of thehole 21 to be drilled next is then communicated to thecontrol unit 4 of therock drilling rig 1 either from thecomputer 18 in theoffice 15 or from another computer. It is also possible that the values of the rotating angles φ of thedrilling unit 4 that have been determined on the basis of the values of the rotating angles φ of thedrilling unit 4 carried out in the drilling of theprevious holes 21 and that are to be used for drilling theholes 21 of a round to be drilled next are incorporated into thedrilling pattern 14 of the round to be drilled next. -
FIGS. 7 to 10 schematically show an example of a relation between the rotating angles φ of thedrilling unit 4 determined, by the method according toFIG. 4 and the rotating angles φ of thedrilling unit 4 carried out in the drilling of the already drilledholes 21 and used for the determination. In the example ofFIGS. 7 to 10 , a rock drilling rig provided with twodrilling booms 3, each having onedrilling unit 4, is used as therock drilling rig 1. -
FIG. 7 shows, by employing circles drawn in thin line, thelocations 21′ of theholes 21 designated as residing within the coverage area or operation area of afirst boom 3 of therock drilling rig 1 and, by employingdirectional lines 21″ drawn in thin line, the rotating angles φ of thedrilling unit 4 determined by the aforementioned method for the particular holes 21. Said rotating angles φ are thus suggestions about those rotating angles φ of thedrilling unit 4 suggested by the aforementioned method for use in the drilling of theholes 21 of the round. A thick line designates those previously drilledholes 21 and the rotating angles φ of thedrilling unit 4 carried out that were used for determining the rotating angles φ of thedrilling unit 4 designated in said thin lines. In the case shown inFIG. 7 there was one previously drilled round.FIG. 8 , in turn, shows a pattern corresponding withFIG. 6 in a situation wherein there were three previously drilled rounds.FIGS. 9 and 10 show a corresponding example concerning the coverage area or operation area of asecond drilling boom 3 of therock drilling rig 1. It can be seen inFIGS. 7 to 10 how already after three excavated rounds, the suggestions designated in thin line about the values of the rotating angles φ of thedrilling unit 4 to be used in connection with theholes 21 of the round to be drilled next are already very much in accordance with the rotating angles φ that were carried out. - The disclosed solution thus utilizes the values of the rotating angles φ of the
drilling unit 4 carried out in connection with the previously drilledholes 21 when determining the rotating angle φ of thedrilling unit 4 to be used in connection with the drilling thehole 21 to be drilled next. Since the determination of the rotating angle φ of thedrilling unit 4 to be used in the drilling of theholes 21 is based on the actual rotating angles φ of thedrilling unit 4 carried out in connection with the previously drilledholes 21, a situation is very quickly achieved wherein a vast majority of theholes 21 of a round may be drilled by using a rotating angle φ of thedrilling unit 4 determined by the disclosed solution such that the operator of therock drilling rig 1 seldom has to participate in choosing the rotating angle φ of thedrilling unit 4 to be used in the drilling of thehole 21. This makes the round quicker to drill, and it releases the capacity of the operator of therock drilling rig 1 for monitoring the drilling and the condition of the drilling equipment. Thus, the solution also takes into account the real drilling situation prevalent in the rock cavern as well as the size and type of the rock drilling rig actually being used for the drilling. Since the determination of the rotating angle φ of thedrilling unit 4 may be implemented automatically e.g. in thecontrol unit 9 of therock drilling rig 1 or by thecomputer 15 in theoffice 15, thedesigner 19 of thedrilling pattern 14 no longer has to determine the rotating angles φ of thedrilling unit 4, possibly except for the rotating angles φ of thedrilling unit 4 associated with theholes 21 of the first round of a rock cavern, whereby the capacity of thedesigner 19 of thedrilling pattern 14 may also be released for other tasks. - It will be obvious to a person skilled in the art that as technology advances, the basic idea of the invention may be implemented in many different ways. The invention and its embodiments are thus not restricted to the examples described above but may vary within the scope of the claims.
Claims (18)
1. A method for controlling at least one drilling unit arranged in at least one drilling boom of a rock drilling rig when excavating a rock cavern one round at a time, the method comprising the steps of:
drilling holes of a round in accordance with a drilling pattern designed for the round;
controlling, in order to drill each single hole, the drilling unit in a rotating angle which carries out a location and direction determined in the drilling pattern of the particular round for the particular hole, the rotating angle defining a quantity of rotating of the drilling unit around a rotating axis, which is substantially parallel with a feed beam of the drilling unit;
storing the rotating angle of the drilling unit carried out during the drilling of each hole of the round; and
determining the rotating angle of the drilling unit to be used for drilling the hole on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more previously drilled holes.
2. A method as claimed in claim 1 , wherein determining the rotating angle of the drilling unit to be used for drilling the hole is on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more holes of one or more previously drilled rounds.
3. A method as claimed in claim 1 further comprising the step of, when determining the rotating angle of the drilling unit to be used for drilling the hole, choosing, as initial data for the determination, location data about the hole and data about the rotating angle of the drilling unit associated with the one or more previously drilled holes which were drilled by the drilling unit arranged in the same drilling boom as the drilling unit to be used for drilling the hole to be drilled; determining a distance between the one or more previously drilled holes chosen in the previous step and the hole to be drilled; choosing, on the basis of the distance between the one or more previously drilled holes and the hole to be drilled, one or more already drilled holes on the basis of whose rotating angle of the drilling unit carried out in the drilling thereof the rotating angle of the drilling unit to be used for drilling the hole to be drilled is determined, and determining, on the basis of the rotating angle of the drilling unit carried out in the drilling of the one or more previously drilled holes, the rotating angle of the drilling unit to be used for drilling the hole to be drilled.
4. A method as claimed in claim 3 , wherein determining the rotating angle of the drilling unit to be used for drilling the hole to be drilled corresponds with the rotating angle of the drilling unit carried out in the drilling of a previously drilled hole closest to the hole to be drilled.
5. A method as claimed in claim 3 , wherein determining the rotating angle of the drilling unit to be used for drilling the hole to be drilled corresponds with a mean value of the rotating angles of the drilling unit carried out in the drilling of a predetermined number of distance-wise closest already drilled holes.
6. A method as claimed in claim 3 , wherein determining the rotating angle of the drilling unit to be used for drilling the hole to be drilled corresponds with a mean value of the rotating angles of the drilling unit carried out in the drilling of the one or more previously drilled holes residing at no more than a predetermined distance, or, if no previously drilled hole resides at said no more than a predetermined distance, determining the rotating angle of the drilling unit to be used for drilling the hole to be drilled to correspond with the rotating angle of the drilling unit carried out in the drilling of the closest already drilled hole.
7. A method as claimed in claim 5 , wherein determining the mean value of the rotating angles of the drilling unit carried out in the drilling of the one or more previously drilled holes further comprises dividing the value of each rotating angle into a vertical component and a horizontal component, by determining a mean value of the vertical components and a mean value of the horizontal components, and by determining the rotating angle of the drilling unit to be used for drilling the hole on the basis of the mean value of the vertical components and the mean value of the horizontal components.
8. A method as claimed in claim 7 , wherein determining the rotating angle of the drilling unit to be used for drilling the hole on the basis of the mean value of the vertical component and the mean value of the horizontal component by employing a calculation formula:
Φmean=atan 2(Φcos— mean,Φsin — mean), wherein
Φmean=atan 2(Φcos
Φcos — mean is the mean value of the horizontal component, and
Φsin — mean is the mean value of the vertical component.
9. A method as claimed in claim 1 , wherein determining the rotating angle of the drilling unit to be used for drilling the hole with respect to an origin of a coordinate system attached to the rock drilling rig.
10. A rock drilling rig, comprising:
a movable carrier;
at least one drilling boom;
at least one drilling unit arranged in the drilling boom, the drilling unit including a feed beam and a rock drill, the rock drill being movable on the feed beam by a feed device;
a rotating mechanism for rotating the drilling unit in a rotating angle, the rotating angle defining a quantity of rotation of the drilling unit around a rotating axis, which is substantially parallel with the feed beam of the drilling unit;
at least one storage unit for storing a drilling pattern to be used for drilling a round to be excavated for a rock cavern;
at least one control unit configured, via the rotating mechanism, to control the drilling unit in the rotating angle which carries out a location and direction determined for a hole in the drilling pattern of the round; and
at least one storage unit for storing the rotating angle of the drilling unit carried out in the drilling of each hole of the round to be excavated, wherein the control unit is configured to determine the rotating angle of the drilling unit to be used for drilling the hole on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more previously drilled holes.
11. A rock drilling rig as claimed in claim 10 , wherein the control unit determines the rotating angle of the drilling unit to be used for drilling the hole on the basis of the rotating angle of the drilling unit carried out in connection with the drilling of one or more holes of one or more previously drilled rounds.
12. A rock drilling rig as claimed in claim 10 , wherein the control unit determines the rotating angle of the drilling unit to be used for drilling the hole by choosing, from the storage unit, as initial data for the determination, location data about the hole and data about the rotating angle of the drilling unit associated with the one or more previously drilled holes which were drilled by the drilling unit arranged in the same drilling boom as the drilling unit to be used for drilling the hole to be drilled, by determining a distance between the already drilled holes chosen in the previous step and the hole to be drilled, and by choosing, on the basis of the distance between the one or more previously drilled holes and the hole to be drilled, one or more previously drilled holes on the basis of whose rotating angle of the drilling unit carried out in the drilling thereof the rotating angle of the drilling unit to be used for drilling the hole to be drilled is determined, and by determining, on the basis of the rotating angle of the drilling unit carried out in the drilling of the one or more previously drilled holes, the rotating angle of the drilling unit to be used for drilling the hole to be drilled.
13. A rock drilling rig as claimed in claim 12 , wherein the control unit determines the rotating angle of the drilling unit to be used for drilling the hole to be drilled to correspond with the rotating angle of the drilling unit carried out in the drilling of a previously drilled hole closest to the hole to be drilled.
14. A rock drilling rig as claimed in claim 12 , wherein the control unit determines the rotating angle of the drilling unit to be used for drilling the hole to be drilled to correspond with a mean value of the rotating angles of the drilling unit carried out in the drilling of a predetermined number of distance-wise closest previously drilled holes.
15. A rock drilling rig as claimed in claim 12 , wherein the control unit determines the rotating angle of the drilling unit to be used for drilling the hole to be drilled to correspond with a mean value of the rotating angles of the drilling unit carried out in the drilling of the one or more previously drilled holes residing at no more than a predetermined distance, or, if no previously drilled hole resides at said no more than a predetermined distance, to determine the rotating angle of the drilling unit to be used for drilling the hole to be drilled to correspond with the rotating angle of the drilling unit carried out in the drilling of the closest previously drilled hole.
16. A rock drilling rig as claimed in claim 14 , wherein the control unit determines the mean value of the rotating angles of the drilling unit carried out in the drilling of the one or more previously drilled holes by dividing the value of each rotating angle into a vertical component and a horizontal component, by determining the mean value of the vertical components and the mean value of the horizontal components, and by determining the rotating angle of the drilling unit to be used for drilling the hole on the basis of the mean value of the vertical components and the mean value of the horizontal components.
17. A rock drilling rig as claimed in claim 16 , wherein the control unit determines the rotating angle of the drilling unit to be used for drilling the hole on the basis of the mean value of the vertical component and the mean value of the horizontal component by employing a calculation formula:
Φmean=atan 2(φcos— mean,Φsin — mean), wherein
Φmean=atan 2(φcos
Φcos — mean is the mean value of the horizontal component, and
Φsin — mean is the mean value of the vertical component.
18. A rock drilling rig as claimed in claim 10 , wherein the control unit determines the rotating angle of the drilling unit to be used for drilling the hole with respect to an origin of a coordinate system attached to the rock drilling rig.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI20106255A FI125085B (en) | 2010-11-29 | 2010-11-29 | A method for controlling a drilling unit of a rock drilling machine and a rock drilling machine |
FI20106255 | 2010-11-29 | ||
PCT/FI2011/051011 WO2012072870A1 (en) | 2010-11-29 | 2011-11-16 | Method for controlling drilling unit of rock drilling rig, and rock drilling rig |
Publications (1)
Publication Number | Publication Date |
---|---|
US20130299239A1 true US20130299239A1 (en) | 2013-11-14 |
Family
ID=43269031
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/989,861 Abandoned US20130299239A1 (en) | 2010-11-29 | 2011-11-16 | Method For Controlling Drilling Unit of Rock Drilling Rig, and Rock Drilling Rig |
Country Status (8)
Country | Link |
---|---|
US (1) | US20130299239A1 (en) |
EP (1) | EP2646638A1 (en) |
JP (1) | JP5669952B2 (en) |
CN (1) | CN103249904A (en) |
AU (1) | AU2011334831B2 (en) |
CA (1) | CA2817845C (en) |
FI (1) | FI125085B (en) |
WO (1) | WO2012072870A1 (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
PT2725184T (en) * | 2012-10-24 | 2019-06-12 | Sandvik Mining & Construction Oy | Rock drilling apparatus and method for controlling the orientation of the feed beam |
AU2014223301B8 (en) * | 2013-02-27 | 2018-07-19 | Technological Resources Pty Limited | A method of generating a drill hole sequence plan and drill hole sequence planning equipment |
AU2013396723B2 (en) * | 2013-06-27 | 2016-06-16 | Sandvik Mining And Construction Oy | Arrangement for controlling percussive drilling process |
CN103696689B (en) * | 2013-12-12 | 2015-12-30 | 北京市三一重机有限公司 | Unit head cruises drilling method, system and rotary drilling rig |
WO2015106799A1 (en) * | 2014-01-14 | 2015-07-23 | Sandvik Mining And Construction Oy | Mine vehicle, mine control system and mapping method |
JP6371119B2 (en) * | 2014-06-03 | 2018-08-08 | 株式会社鴻池組 | Drilling navigation device |
CN104727804A (en) * | 2014-11-27 | 2015-06-24 | 三一重型装备有限公司 | Drill jambo and drill arm positioning control method and device thereof |
EP3153654B1 (en) * | 2015-10-09 | 2019-04-24 | Sandvik Mining and Construction Oy | Rock drilling rig |
JP6590346B2 (en) * | 2017-03-21 | 2019-10-16 | 株式会社辰巳商会 | Drilling attachment, drilling machine, tunnel wall surface drilling method |
SE541217C2 (en) * | 2017-09-08 | 2019-05-07 | Epiroc Rock Drills Ab | Mining or construction vehicle |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4514796A (en) * | 1982-09-08 | 1985-04-30 | Joy Manufacturing Company | Method and apparatus for controlling the position of a hydraulic boom |
US4698570A (en) * | 1985-04-30 | 1987-10-06 | Mazda Motor Corporation | Boom positioning apparatus for rock drill |
US6957707B2 (en) * | 2001-12-03 | 2005-10-25 | Sandvik Intellectual Property Ab | Method for controlling a drilling sequence, a rock drilling apparatus and a computer programme to form a drilling sequence |
US7644782B1 (en) * | 1998-12-09 | 2010-01-12 | Sandvik Intellectual Property Ab | Method for correcting positioning errors in rock drilling, and rock drilling equipment |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5415402A (en) * | 1977-06-07 | 1979-02-05 | Toyo Kogyo Co | Core taking out apparatus of boring machine |
JP2005220627A (en) * | 2004-02-06 | 2005-08-18 | Enzan Kobo:Kk | Boring positioning control method in rock drill mounted carriage |
FI123153B (en) * | 2006-12-22 | 2012-11-30 | Sandvik Mining & Construction Oy | Drawing up a drilling plan for mining a rock space |
FI119780B (en) * | 2007-04-17 | 2009-03-13 | Sandvik Mining & Constr Oy | A method for editing a drilling chart, a rock drilling machine, and a software product |
US8122974B2 (en) * | 2008-07-10 | 2012-02-28 | Dragan Kosoric | Apparatus for drilling machine alignment |
JP2010216183A (en) * | 2009-03-18 | 2010-09-30 | Shimizu Corp | Drilling machine |
-
2010
- 2010-11-29 FI FI20106255A patent/FI125085B/en not_active IP Right Cessation
-
2011
- 2011-11-16 EP EP11845893.4A patent/EP2646638A1/en not_active Withdrawn
- 2011-11-16 AU AU2011334831A patent/AU2011334831B2/en not_active Ceased
- 2011-11-16 CA CA2817845A patent/CA2817845C/en not_active Expired - Fee Related
- 2011-11-16 WO PCT/FI2011/051011 patent/WO2012072870A1/en active Application Filing
- 2011-11-16 US US13/989,861 patent/US20130299239A1/en not_active Abandoned
- 2011-11-16 CN CN2011800573614A patent/CN103249904A/en active Pending
- 2011-11-16 JP JP2013541393A patent/JP5669952B2/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4514796A (en) * | 1982-09-08 | 1985-04-30 | Joy Manufacturing Company | Method and apparatus for controlling the position of a hydraulic boom |
US4698570A (en) * | 1985-04-30 | 1987-10-06 | Mazda Motor Corporation | Boom positioning apparatus for rock drill |
US7644782B1 (en) * | 1998-12-09 | 2010-01-12 | Sandvik Intellectual Property Ab | Method for correcting positioning errors in rock drilling, and rock drilling equipment |
US6957707B2 (en) * | 2001-12-03 | 2005-10-25 | Sandvik Intellectual Property Ab | Method for controlling a drilling sequence, a rock drilling apparatus and a computer programme to form a drilling sequence |
Also Published As
Publication number | Publication date |
---|---|
EP2646638A1 (en) | 2013-10-09 |
FI20106255A (en) | 2012-05-30 |
JP2013544327A (en) | 2013-12-12 |
CA2817845C (en) | 2016-03-29 |
CA2817845A1 (en) | 2012-06-07 |
CN103249904A (en) | 2013-08-14 |
FI125085B (en) | 2015-05-29 |
AU2011334831A1 (en) | 2013-06-13 |
JP5669952B2 (en) | 2015-02-18 |
FI20106255A0 (en) | 2010-11-29 |
AU2011334831B2 (en) | 2015-10-01 |
WO2012072870A1 (en) | 2012-06-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20130299239A1 (en) | Method For Controlling Drilling Unit of Rock Drilling Rig, and Rock Drilling Rig | |
JP5037678B2 (en) | Drilling pattern orientation method in curved tunnel, rock drilling device and software product | |
JP5986058B2 (en) | Mining vehicle and boom moving method | |
JP6727740B2 (en) | Heading control of excavator | |
EP2539530B1 (en) | Rock drilling rig, method for rock drilling, and control system of rock drilling rig | |
AU2017276225B2 (en) | Systems and methods for preparing a worksite for additive construction | |
CN109972688A (en) | Excavate control method, device and controller for excavators | |
JP6974217B2 (en) | Construction management equipment | |
EP2539539B1 (en) | Method of presenting positioning information, user interface, and rock drilling rig | |
AU2016413503B9 (en) | Apparatus and method for positioning rock drilling rig | |
JP2011522983A (en) | Drilling display method and apparatus and drill rod guide method for drilling rock mass | |
AU2008300440A1 (en) | Method and software product for designing drilling pattern for rock cavity excavation | |
JP2023035987A (en) | Construction equipment | |
KR102637524B1 (en) | working machine | |
JP2020183681A (en) | Vertical shaft construction device and vertical shaft construction method | |
JP7317926B2 (en) | Construction management device, display device and construction management method | |
JP2002097895A (en) | Automatic excavator for mountain tunnel | |
JP2023183992A (en) | Support system, remote control support device, work machine, and program | |
JP2022021055A (en) | Construction management method | |
Vlădeanu et al. | The determination of the bucket position at the excavators with the aid of the tilt sensors |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SANDVIK MINING AND CONSTRUCTION OY, FINLAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:PUURA, JUSSI;REEL/FRAME:030493/0835 Effective date: 20130524 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |