US20040261349A1 - Frame structure of low-rise building - Google Patents
Frame structure of low-rise building Download PDFInfo
- Publication number
- US20040261349A1 US20040261349A1 US10/495,406 US49540604A US2004261349A1 US 20040261349 A1 US20040261349 A1 US 20040261349A1 US 49540604 A US49540604 A US 49540604A US 2004261349 A1 US2004261349 A1 US 2004261349A1
- Authority
- US
- United States
- Prior art keywords
- steel
- girder
- frame
- panel
- coupled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/02—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
- E04B1/08—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2415—Brackets, gussets, joining plates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2448—Connections between open section profiles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2457—Beam to beam connections
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2463—Connections to foundations
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B2001/2496—Shear bracing therefor
Definitions
- the present invention relates to a frame construction for a low-rise building of one to three stories having a large opening such as a doorway or a window, and/or for a large span low-rise building of, e.g., one to three stories having a large opening such as a doorway or a window.
- a steel frame work method (hereinafter referred to as a first prior art method) has been mainly employed as a construction method for a low-rise building of one to three stories in the prior art
- a steel house construction method has recently been prevalent.
- the steel house is defined as a building of a steel panel structure composed of frame members made of thin lightweight section steel and construction surface members or braces.
- This construction method is referred to as a second prior art method hereinafter.
- FIGS. 16 to 18 An example of a single-storied building constructed by the first prior art method (the steel frame work method) is illustrated in FIGS. 16 to 18 .
- Individual footings 1 and a floor (a stall) 2 are constructed from concrete.
- Columns 3 made of steel frame are facilitated on the individual footings 1 , and wall substrates 4 are provided.
- Beams 5 of H-shaped steel are mounted to the upper ends of the columns 3 , and girders 5 a are bridged between the left and right beams 5 , by which beams and girders a roof 6 is supported.
- reference numeral 4 a denotes a wall and 7 denotes a doorway (e.g., an opening).
- the features of the first example are as follows.
- a material cost for the roof is low; the number of parts is low; manufacturing is easy; site work is easy in that one day is sufficient for erecting a building for a convenience store or the like; the opening is freely prepared (if necessary, studs may be used in accordance with a width of the opening); and only cutting of the constituent members is needed.
- drawbacks thereof are that the precision of execution of work is liable to vary; LGS (light-gage steel) is necessary as a substrate for finishing the wall; and site work needs two days.
- FIGS. 19 to 21 illustrate another example of a single-storied building for a convenience store or the like constructed by the second prior art method (the steel house (SH) method).
- a continuous footing 8 and a floor (a stall) 2 are constructed from concrete, and wall frame panels 9 made of thin light-gauge section steel are stood on the continuous footing 8 .
- the wall frame panel 9 is formed by standing vertical frame members 11 of thin light-gauge section steel on a lower frame member 10 of thin light-gauge section steel, placing an upper frame member 12 of thin light-gauge section steel on the vertical frame members 11 , and fixing a construction surface member 13 to the respective frame members with drill screws 19 .
- the product obtained by fixing the construction surface member 13 to the respective frame members is referred to as an “SH” panel 9 .
- a truss 14 of thin light-gauge section steel (hereinafter referred to as an SH truss) is assembled to be supported by the wall frame panel 9 , and a roof 6 is supported by the SH truss 14 .
- reference numeral 15 denotes a relatively large opening (e.g., a window or a doorway).
- FIGS. 20 (A) and 20 (C) illustrate examples of the lintel 16 , in which lipped channels 16 a of thin steel sheet are opposed to each other and the outside thereof is reinforced with a reinforcement channel(s) 18 .
- FIGS. 20 (B) and 20 (C) illustrate examples of the lintel 16 , in which lipped channels 16 a of thin steel sheet are opposed to each other and the outside thereof is reinforced with a reinforcement channel(s) 18 .
- 20 (D) and 20 (E) illustrate another example, in which opposite flanges of the lintel bracket 17 of a U-shaped thin steel plate as seen in a plan view are brought into contact with lateral sides of an end of the lintel 16 and fixed to each other with drill screws 19 , and a web is brought into contact with a back side of the vertical frame members 11 and fixed to each other with drill screws 19 .
- the steel house is constructed by using the frame members of thin light-gauge section steel as main frame elements, to which wood frame members are partially combined or a surface member of plywood is used as a construction surface member if necessary.
- the frame member of thin light-gauge section steel is formed by shaping a thin steel sheet of approximately 1 mm thick, through roll-forming, to be a channel, a lipped channel or a box so that a width or others thereof is matched with a predetermined specification.
- FIGS. 22 to 25 A further example of a frame construction according to the second prior art method is illustrated in FIGS. 22 to 25 .
- a plurality of vertical frame members 11 are provided from lower frame members 10 at a distance between the adjacent ones thereof, and the upper ends of the respective vertical frame members 11 are coupled by upper frame members 12 .
- Wall frame panels (force-resisting wall panels) 9 are formed by attaching construction surface members 13 (see FIGS. 24 and 25) or braces to the wall frame members constructed by the lower frame members 10 , the vertical frame members 11 and the upper frame members 12 . Openings 15 such as a doorway 7 or a window 7 a are formed in the building.
- Side beams 5 b and end beams 5 c are supported by the upper frame members 12 of the wall frame panel (force-resisting wall panel) 9 so that both the beams are combined to form a rectangle.
- a plurality of beams 5 c of various lengths are provided in parallel to the side at a predetermined distance. Opposite ends of the longer beam 5 d are coupled to the front and rear end beams 5 c via brackets 20 , while one end of the shorter beam 5 d is coupled to the front or rear end beam 5 c and the other end thereof is coupled to a girder 5 a via brackets 11 , respectively.
- a floor panel 2 is constructed by covering the beams 5 d with the construction surface members 13 of plywood or the like.
- reference numeral Se denotes an end beam in the floor opening
- 5 f denotes a side beam in the opening
- 20 a denotes a beam bracket
- 20 b denotes a cleat.
- the lintel 16 is provided above the opening 15 .
- an upper frame member 12 and an lintel frame member 16 b are provided above and beneath the lintel 16 of the window 7 a , respectively.
- Upper frame members 12 a of the opening are provided between the lintel frame member 16 b and upper frame member 16 c of the window, and opposite ends of the lintel 16 are attached to lintel receiving members 16 d via the lintel brackets 17 , and vertical frame members 11 a for attaching the lintel brackets are coupled to the vertical frame members 11 at ends of the force-resisting wall 9 by drill screws 19 .
- Reference numeral 7 b denotes a window base
- 7 c denotes a window base
- 10 a denotes a lower frame member of the opening.
- FIG. 24 schematically illustrates an opening 15 of a building formed of a ground floor portion 36 constructed by the SH method and a second floor portion 37 placed on the former
- FIG. 25 illustrates a section taken along a line A-A in FIG. 24.
- Each of the drawings shows a connection structure between the lintel 16 , the end beam 5 c and the beam 5 d .
- An end of the beam 5 d having the bracket 20 is coupled to the end beam 5 c made of thin light-gauge section steel.
- the bracket 20 is formed by cutting a lipped channel of thin light-gauge section steel into short pieces and disposing it so that the channel portion is in the vertical direction.
- the lintel 16 arranged beneath the end beam 5 c and coupled thereto by drill screws is formed by opposing the lipped thin light-gauge channels 16 a to each other and fixing the upper and lower sides thereof by connection frame members 16 d.
- a skeleton is constructed of the force-resisting wall panels (SH panels) constructed by the wall frame members which are formed by assembling the frame members of thin light-gauge section steel by using the drill screws and are coupled to the construction surface members also by using the drill screws.
- the merit thereof is that the thin light-gauge section steel necessitates no welding, and is easily cut and drilled, as well as it also being light in weight and capable of being manually conveyed, whereby the working efficiency is high and the manufacturing cost is low.
- the merit of the force-resisting wall panel (SH panel) is that the accuracy of the product is stable and prefabrication of the panel is possible, whereby the execution of work becomes easy due to the shortening of construction period and the maintenance of panel accuracy.
- the period of erection is half of a day, and in a two or three storied building of approximately 99 to 132 m 2 , the period of erection is 2 days. Accordingly, this construction method is economical in the field of low-rise buildings.
- the second prior art method (steel house (SH) method), however, has the following drawbacks.
- SH steel house
- the building for a convenience store or the like it is required that a large opening is formed on the wall surface and the number of columns is reduced to as small as possible to ensure a large space.
- the building when a roof of large span is constructed in correspondence to a required large span of several meters or longer, as the cross-section of the thin light-gauge section steel is small, the strength thereof is too weak to support a load from the roof solely by the end members. Thereby, it is necessary to construct a roof truss consisting of a plurality of members.
- the lintel is provided in the upper portion of the opening to distribute the vertical load, applied to the opening from above, to the opposite vertical frames of the force-resisting wall panel.
- the lintel is required to have a strength capable of withstanding a vertical load, from above, such as the load of a roof or a floor.
- the lintel must preferably uses a member in which a plurality of thin light-gauge section steel pieces are combined to result in the complexity of the manufacture and construction of the lintel.
- the attachment of the lintel to the peripheral members becomes complex in relation to complexity in the structure of the lintel.
- the height of the opening i.e., reference h provided in FIG. 24
- One of the objects of the present invention is to provide a frame construction for a low-rise building in which the above-mentioned problem has been solved.
- frame construction may be preferably free from the drawbacks of the SH method while maintaining the advantages of a steel house for a low-rise building (for example, a single or two to three-storied building for a convenience store), which partially adopts a heavyweight steel frame structure (hereinafter referred to as a mixed construction) or a frame member construction consisting of a plurality of thin light-gauge section steels coupled together (hereinafter referred to as a composite construction).
- a mixed construction a heavyweight steel frame structure
- a composite construction consisting of a plurality of thin light-gauge section steels coupled together
- another object of the present invention is to provide the frame construction which maintains the advantage of the frame members of thin light-gauge section steel used in the SH method in that it is light in weight and capable of being manually conveyed; and eliminating the drawback thereof in that it is inferior in strength, by combining the same with heavyweight section steel which is inferior in execution property and heavy in weight.
- the frame construction for the low-rise building is provided, having features of both the frame member made of thin light-gauge section steel and the heavyweight section steel.
- the lintel is generally not used in the opening, but the force-resisting wall panel and the roof panel or the floor panel can be coupled together via the girder provided in the upper portion of the force-resisting wall panel.
- a frame construction is provided, which require no time for processing the lintel and is free from a restriction in the height of the opening.
- the frame construction for a low-rise building is provided.
- a wall frame panel (structured from a lower frame member, an upper frame member and vertical frame members of thin light-gauge section steel) is coupled to a girder of heavyweight steel provided at the upper end of the wall frame panel by a coupling arrangement comprising bolts and/or hold-down fasteners.
- a reinforcement steel column may also be provided.
- the wall frame panel can be structured by fixing a construction surface member or a brace to the lower frame member, the upper frame member and the vertical frame members.
- the girder may be formed of channel steel, and the channel steel can be coupled to the upper frame member of the wall frame panel by bolts.
- the girder may also be formed of H-shaped steel, and the H-shaped steel is coupled to the upper frame member of the wall frame panel by bolts.
- the channel steel may be coupled to the upper frame member of the wall frame panel by bolts via a hold-down fastener disposed so that a horizontal member is on the upper side, and/or the H-shaped steel can be coupled to the upper frame member of the wall frame panel by bolts via a hold-down fastener disposed so that a horizontal member is on the upper side.
- the problem of the thin light-gauge section steel may be solved by combining the same with heavyweight section steel, while maintaining the merit thereof in that it is light in weight and capable of being manually conveyed, it is possible to smoothly support a roof load by a simple construction based on the steel house method without using a complicated structure such as a roof truss or others.
- the exemplary embodiments of the present invention may solve the following problem which may be inherent to the steel house method: e.g., (i) a cost for constructing a roof is high because it may be necessary to form a truss in the roof portion because the cross-section of the frame member of thin light-gauge channel is thin, resulting in the inferior strength, and the frame member of thin light-gauge section steel is unsuitable for a structure for supporting the roof by a large span of ten or more meters or more when a large room space may be desired.
- the coupling method can be useful for smoothly transmitting a force between the horizontal member of heavyweight steel frame for supporting the roof and the assembled panel of thin steel frames.
- a force may be transmitted as an axial force to vertical frame members of the assembled panel of thin steel frames, whereby the arrangement can be durable against a large withdrawing force.
- the frame construction can include a wall frame panel (formed of frame members of thin light-gauge section steel) attached to a construction surface member or a brace, and a girder that is provided above the wall frame panel for supporting a floor panel or a roof.
- the girder may be formed of section steel and coupled to the force-resisting panel and/or the floor panel by bolts, and a lintel is needed above the opening so that the opening extends to directly beneath the girder.
- a reinforcement member can be provided in a channel of the girder formed of section steel.
- the frame construction having an opening in a wall thereof includes a wall frame panel (formed of frame members of thin light-gauge section steel) attached to a construction surface member or a brace, as well as a girder provided above the wall frame panel for supporting a floor panel or a roof.
- the girder can be formed from a plurality of thin light-gauge section steel members assembled together and coupled to the force-resisting panel and/or the floor panel by bolts, and the lintel does not have to be provided above the opening so that the opening extends to directly beneath the girder.
- a reinforcement member can be provided in a channel of the girder formed of the assembled members.
- the girder, provided on the wall surface having the opening extending parallel to beams can be formed of a channel steel disposed so that the web thereof extends in the vertical direction, and a lateral side of the beam is brought into contact with a back surface of the web of the channel steel and coupled to the latter by bolts.
- the girder, provided on the wall surface having the opening extending parallel to beams can be formed of a H-shaped steel disposed so that the web thereof extends in the vertical direction, and a lateral side of the beam is brought into contact with a web surface of the H-shaped steel and coupled to the latter by bolts.
- the girder provided on the wall surface having the opening extending vertical to beams, may be formed of a channel steel disposed so that the web thereof extends in the vertical direction, and an end of the beam is placed on the upper surface of the upper flange of the channel steel and coupled to the latter by bolts.
- the girder provided on the wall surface having the opening extending vertical to beams, can be formed of a H-shaped steel disposed so that the web thereof extends in the vertical direction, and an end of the beam is placed on the upper surface of the upper flange of the H-shaped steel and coupled to the latter by bolts.
- the assembled members of thin light-gauge section steel constituting the girder, provided on the wall surface having the opening extending parallel to beams, may be disposed so that the web thereof extends in the vertical direction, and a lateral side of the beam is brought into contact with the inner surface of the web and coupled to the latter by bolts.
- the assembled members of thin light-gauge section steel constituting the girder provided on the wall surface having the opening extending vertical to beams, can be disposed so that the web thereof extends in the vertical direction, and an end of the beam is brought into contact with the upper surface of the upper surface of the respective upper flange of the assembled member and coupled to the latter by bolts.
- the girder disposed above the force-resisting wall panel with heavyweight steel such as H-shaped steel or channel steel, or the assembled members of thin light-gauge channel steel, it is possible to eliminate the lintel in the low-rise building, whereby it is possible to enlarge the height and width of the opening due to the elimination of lintel, while maintaining the advantage of the method for constructing the steel house mainly formed of frame members of thin light-gauge section steel in that no welding is necessary, cutting and boring are simple, the working efficiency is high, because the material is light in weight and can be manually conveyed, the force-resisting wall panel, the roof and the floor panel are efficiently manufactured in the factory at a high accuracy, the site work is simplified, the construction period is short, and the manufacturing cost is low.
- heavyweight steel such as H-shaped steel or channel steel, or the assembled members of thin light-gauge channel steel
- FIG. 1(A) is a sectional view of a single-storied building of a mixed construction consisting of SH panels formed of frame members and surface members of thin light-gauge section steel and a girder of a heavyweight steel frame FIG. 1 according to a first exemplary embodiment of the present invention
- FIG. 1(B) is a plan view of the single-storied building of FIG. 1(A);
- FIG. 2(A) is an enlarged view of a portion Q shown in FIG. 1 which illustrates a front of an opening of the single-storied building;
- FIG. 2(B) is an enlarged view of a portion R shown in FIG. 2(A) illustrating a first example of the coupling between the SH panel and the peripheral beam;
- FIG. 2(C) is an enlarged view of a portion R shown in FIG. 2(A) illustrating a second example of the coupling between the SH panel and the peripheral beam;
- FIG. 2(D) is a side view of the first and second examples shown in FIGS. 2 (B) and 2 (C);
- FIG. 3 is an exemplary illustration of a coupling of the SH panel and the beams (e.g., the peripheral beams and the girder) in correspondence to FIG. 2(C);
- the beams e.g., the peripheral beams and the girder
- FIG. 4 is an illustration of an exemplary structure of the coupling between the SH panel and the peripheral beams shown in FIG. 3;
- FIG. 5(A) is an illustration of a first example as to how the SH panel and the beams (the peripheral beams and the girder) are coupled;
- FIG. 5(B) is an illustration of a second example as to how the SH panel and the beams (the peripheral beams and the girder) are coupled;
- FIG. 6 is an illustration of an exemplary structure of the coupling between the SH panel and the peripheral beams shown in FIGS. 5 (A) and 5 (B);
- FIG. 7(A) is an illustration of a first combination of the SH panel and the heavyweight steel frame members with the peripheral beams;
- FIG. 7(B) is an illustration of a second combination of the SH panel and the heavyweight steel frame members with the peripheral beams;
- FIG. 7(C) is an illustration of a third combination of the SH panel and the heavyweight steel frame members with the peripheral beams;
- FIG. 7(D) is an illustration of a fourth combination of the SH panel and the heavyweight steel frame members with the peripheral beams;
- FIG. 7(E) is an illustration of the SH panel of the heavyweight steel frame
- FIG. 7(F) is an illustration of the peripheral beam of the heavyweight steel frame
- FIG. 8 is an illustration of another exemplary embodiment of the present invention (which is embodied in a two-storied building);
- FIG. 9(A) is a sectional view of an exemplary section taken along a line B-B in FIG. 8;
- FIG. 9(B) is a plan view of the exemplary section taken along a line B-B in FIG. 8;
- FIG. 10(A) is an illustration of an example of the section taken along the line B-B in FIG. 8;
- FIG. 10(B) is an illustration of another example of the section taken along the line B-B in FIG. 8;
- FIG. 10(C) is an illustration of a beam and a reinforcement member illustrated in FIG. 10(B);
- FIG. 11(A) is an illustration of a first example of yet another section taken along the line B-B in Fig;
- FIG. 11(B) is an illustration of a second example of yet another section taken along the line B-B in Fig;
- FIG. 11(C) is an illustration of a third example of yet another section taken along the line B-B in Fig;
- FIG. 12 is an illustration of another example (e.g., a two-storied building) according to a further exemplary embodiment of the present invention.
- FIG. 13 is an illustration of a further example (e.g., a two-storied building) according to a further exemplary embodiment of the present invention.
- FIG. 14 is an illustration of a still further example (e.g., a two-storied building) according to the further embodiment of the present invention.
- FIG. 15(A) is an illustration of a first example of a force-resisting wall panel according to the present invention.
- FIG. 15(B) is an illustration of a second example of the force-resisting wall panel
- FIG. 16 illustrates a sectional view of a single-storied building constructed by a steel frame work method which is a first prior art method
- FIG. 17 is a front view of the single-storied building shown in FIG. 16;
- FIG. 18 is a sectional plan view shown in FIG. 16;
- FIG. 19 is an illustration of a sectional view of a single-storied building constructed by an SH (steel house) method which is a second prior art method;
- FIG. 20(A) is front view of a structure as provided in the direction S shown in FIG. 19, showing an opening of the single-storied building;
- FIG. 20(B) is an illustration of a first example of a portion P of the combination of window lintel shown in FIG. 20(A);
- FIG. 20(C) is an illustration of a second example of the portion P of the combination of window lintel shown in FIG. 20(A);
- FIG. 20(D) is a front view of a portion T of a lintel bracket shown in FIG. 20(A);
- FIG. 20(E) is a side view of the portion T of the lintel bracket shown in FIG. 20(A);
- FIG. 21 is an illustration of an SH panel formed of wall frame panels of thin steel sheet coupled to construction surface members
- FIG. 22 is an illustration of a frame construction of a ground floor portion of a steel house
- FIG. 23(A) is an exploded view of a construction of a window frame
- FIG. 23(B) is an illustration of the assembled window frame of FIG. 23(A);
- FIG. 24 is an illustration of a low-rise building constructed by a conventional steel house method.
- FIG. 25 is a sectional view taken along a line A-A shown in FIG. 24.
- FIG. 1 illustrates one example of a single-storied building of a size used for a convenience store or the like, constructed by the steel house (SH) method.
- a continuous footing 8 and a floor (stall) 2 are formed by placing concrete, and wall frame panels 9 of thin light-gauge section steel are stood on the continuous footing 8 .
- a structure of the wall frame panel 9 can be the same as shown in FIG.
- the wall frame panel 9 is formed by standing vertical frame members 11 of thin light-gauge section steel on a lower frame member 10 of thin light-gauge section steel, placing an upper frame member 12 of thin light-gauge section steel on the vertical frame members 11 , and fixing a construction surface member 13 to the respective frame members with drill screws 19 .
- This wall frame panel may be called a SH panel 9 a.
- Peripheral beams 5 B of heavyweight steel frame such as heavyweight section steel are provided at the upper end of the SH panel, and girders 5 a of H-shaped steel are bridged between the left and right peripheral beams disposed at a predetermined distance, by which horizontal beams is supported a roof 6 .
- reference numeral denotes 34 a stud for reinforcement.
- an upper frame member 12 of thin steel sheet is disposed downward at the upper ends of the vertical frame members 11 so that the upper ends of the plurality of vertical frames 11 are fixed together. Further, the lower surface of a lower flange 21 of the peripheral beam 5 B of H-shaped steel is brought into contact with the upper surface of a web of the upper frame member 12 , and a reinforcement plate 23 of a predetermined thickness is brought into contact with the lower surface of the web of the upper frame member 12 .
- Bolts 24 are inserted through holes bored through the contact portions of the respective members and fastened with nuts 25 , whereby the peripheral beam 5 B of the H-shaped steel (heavyweight steel frame) is fastened to the upper end of the SH panel 9 a formed of a construction surface member 13 fixed with the wall frame panel 9 .
- FIG. 2(C) illustrates an example in which a center of the peripheral beam 5 B of the H-shaped steel (that is, a web 26 ) coincides with a thickness center of the SH panel 9 a and both sides of the web 26 are fastened to the SH panel 9 a by the bolts 24 and nuts.
- FIG. 2(B) illustrates another example in which a center of the peripheral beam 5 B of the H-shaped steel (that is, a web 26 ) is shifted from a thickness center of the SH panel 9 a for the reason of design and one side of the web 26 is solely fastened to the SH panel 9 a by the bolt 24 and a nut.
- a horizontal additional frame 27 of thin steel sheet channel is arranged above a relatively large opening 15 and fixed at opposite ends thereof to the vertical frame members 11 .
- Vertical additional frames 28 are provided between the horizontal additional frame 27 and the peripheral beam 5 B of the H-shaped steel. These additional frames 27 and 28 have no function for transmitting the vertical load from the upper region of the opening 15 to the vertical members 11 of the SH panel 9 a .
- a coupling plate 30 is welded to a groove section encircled by the upper and lower flanges of the peripheral beam 5 B of the H-shaped steel and the web, and the coupling plate 30 is brought into contact with a lateral side of the web of the H-shaped steel in the girder 5 a .
- Bolts 31 are inserted through holes formed in the contact portion and fastened with nuts, whereby opposite ends of the girder 5 a are fixed to the peripheral beam 5 B.
- FIGS. 5 and 6 illustrate a second exemplary embodiment in which the peripheral beam 5 B of heavyweight steel frame is constructed by a channel.
- a coupling method can smoothly transmit a force between the SH panel 9 a and the peripheral beams 5 B.
- this coupling arrangement is formed of a hold-down fastener.
- the upper surface of the web of the upper frame member 12 of thin steel sheet disposed downward at the upper end of the vertical frame member 11 is brought into contact with a lower flange 33 of the peripheral beam 5 B formed of a channel.
- a vertical plate 32 a of the hold-down fastener 32 can be brought into contact with a back surface of the web of the vertical frame member 11 formed of thin steel sheet. Holes may be formed in the contact portion, into which are inserted drill screws 10 to fasten both the members.
- a horizontal plate 32 b provided at the upper end of the hold-down fastener 32 via a reinforcement plate 32 c is positioned in the lower surface of the web of the upper frame member 12 .
- the bolt 24 is inserted into a hole bored upward and downward through the contact portion between the lower flange 33 of the peripheral beam 5 B of channel brought into contact with the upper surface of the web of the upper frame member 12 and the horizontal plate 32 b of the hold-down fastener 32 and fastened to the nut 25 , whereby the peripheral beam 5 B formed of a channel is fixed to the upper end of the SH panel.
- the second exemplary embodiment it is possible to transmit a force between the SH panel 9 a and the peripheral beam 5 B via the hold-down fastener 32 so that a vertical load from the roof 6 or the like is smoothly transmitted to the vertical frame member 11 of the SH panel 9 a , whereby the peripheral beam 5 B is durable against a large withdrawal force applied thereto.
- the rest of the construction may be the same as that of the first exemplary embodiment.
- the peripheral beam 5 B formed of channel may be disposed opposite to FIG. 5(A) as shown in FIG. 5(B) so that the back surface of the web is located outside.
- the first and second exemplary embodiments may also be combined with each other. That is, as an arrangement for coupling the peripheral beam 5 B to the SH panel 9 a , a combination may be used in which the peripheral beam 5 B formed of the H-shaped steel is coupled to the SH panel 9 a by the hold-down fastener 32 and the bolt 24 of the first exemplary embodiment. Also, a combination may be used in which the peripheral beam 5 B formed of the channel is coupled to the SH panel 9 a by the bolt 31 of the second exemplary embodiment.
- FIGS. 7 (A) to 7 (D) a combination of a peripheral beam (e.g., a girder) 5 B formed of heavy weight steel frame and an SH panel (e.g., a force-resisting wall) 9 a , for the purpose of freely providing an opening 15 , is shown in FIGS. 7 (A) to 7 (D).
- FIG. 7(A) is an example in which the SH panels 9 a are arranged in a well-balanced manner when the width of the opening is not so large and the continuity of a sash is unnecessary.
- FIG. 7(A) is an example in which the SH panels 9 a are arranged in a well-balanced manner when the width of the opening is not so large and the continuity of a sash is unnecessary.
- FIG. 7(B) is an example in which reinforcement pillars 35 of heavyweight steel frame are provided along the SH panels 9 a disposed at opposite sides of the opening 15 when the stud cannot be disposed midway because a large opening is necessary for a shutter or the like.
- FIG. 7(C) is an example in which a stud 34 of heavyweight steel frame is disposed at a midpoint of the opening 15 when the continuity of a sash is required.
- FIG. 7(D) is an example in which the continuity of a sash is maintained while increasing or decreasing the number of studs 34 of heavyweight steel frame in accordance with the width of the opening.
- FIG. 8 illustrates an exemplary embodiment (e.g., a two-storied building) of the present invention (defined by claims 8 to 17 ).
- FIGS. 12, 13 and 14 illustrate other exemplary embodiments of the present invention.
- walls of a ground floor 36 and a second floor 37 are constructed by SH panels (force-resisting wall panels) 9 a , in which the force-resisting wall panels 9 a for the second floor 37 and floor beams 5 D are supported by side beams 5 b and end beams 5 c (both are referred to as beams 5 ) arranged along the upper ends of the force-resisting wall panels 9 a for the ground floor, and a floor panel 2 a can be constructed by bonding a construction surface member (plywood panel) 13 to the floor beams 5 D.
- SH panels force-resisting wall panels
- FIGS. 8 and 12 an opening 15 is provided in a wall vertical to the floor beams 5 D while, in FIG. 13, the opening 15 is provided in a wall parallel to the floor beams 5 D.
- FIG. 12 illustrates an example of the present invention which has no opening (i.e., referenced as 15 ) in the upper floor, while FIGS. 8 and 13 illustrate other examples having an opening 15 in the upper floor.
- FIG. 14 illustrates an arrangement of the force-resisting wall panels 9 a .
- This force-resisting wall panel 9 a can be structured as shown in FIGS. 15 (A) and 15 (B).
- the force-resisting wall panel 9 a is structured by assembling a wall frame member with a lower frame member 10 of thin light-gauge section steel, vertical frame members 11 of thin light-gauge section steel and an upper frame member 12 of thin light-gauge section steel and fixing a construction surface member 13 thereto by drill screws 19 .
- braces 38 are welded or fixed by drill screws 19 to the above-mentioned wall frame member structured by assembling the lower frame member 10 , the vertical frame members 11 and the upper frame member 12 .
- either of the force-resisting wall panel 9 a shown in FIGS. 15 (A) or 15 (B) may be used.
- the force-resisting wall panel in place of the wall frame member of thin light-gauge section steel, may be constructed by wooden frame members and the surface member (plywood).
- One of the objects of the present invention is to eliminate a conventional lintel in the opening 15 by using the girder 5 a of a special structure in a two or three-storied building constructed by the SH method, in which the coupling structure of three members, the force-resisting wall panel 9 a , the girder 5 a and the floor panel 2 a , constitutes part of the main construction.
- FIGS. 9 to 11 illustrate six examples in which the force-resisting wall panel 9 a , the girder 5 a and the floor panel 2 a are coupled together. These six examples may be classified into three types in accordance with the structure of the girder 5 a , and further into two kinds in accordance with the combination of the three members. Thus, in the drawings, the six examples are shown in total.
- a first example is illustrated, in which a girder (also called a peripheral beam) 5 a is coupled to three members of a floor panel 2 a .
- FIGS. 10 (A) and 10 (B) illustrate second and third examples; while FIGS. 11 (A), 11 (B) and 11 (C) illustrate fourth, fifth and sixth examples, respectively.
- a coupling structure is illustrated, in which vertical and horizontal forces applied to the opening 15 formed in the wall are relatively small, for example, when the opening 15 is disposed on the wall surface parallel to the floor beam 5 D.
- coupling structures are illustrated, in which vertical and horizontal forces applied to the opening 15 formed in the wall are relatively large, for example, when the opening is disposed on the wall surface vertical to the floor beam 5 D.
- the girder 5 a is constructed of: (i) a channel steel in FIGS. 9 and 11(A), (ii) an H-shaped steel in FIGS. 10 (A) and 11 (B); and (iii) a combination member, in which two thin light-gauge channels are coupled in a back-to-back relationship, in FIGS. 10 (B) and 11 (C).
- the floor beam 5 D is coupled to the lateral side of the girder 5 a by bolts.
- the floor beam 5 D is placed on the upper surface of the girder 5 a and coupled by bolts.
- FIGS. 9 to 11 Detailed structures shown in FIGS. 9 to 11 are described as follows.
- a lower flange 21 of a circumferential girder 5 formed of a channel which is disposed so that the web 26 is vertical and the channel portion is outward is brought into contact with the upper surface of the web of an upper frame member 12 formed of thin light-gauge channel in a force-resisting wall panel 9 a , and a bracing plate 39 is disposed on the lower surface of the web.
- bolts 24 are provided and screw-engaged with nuts 25 .
- the force-resisting wall panel 9 a is coupled to the girder 5 a.
- a bracket 20 provided at an end of the floor beam 5 D is brought into contact with a back surface of the web in the circumferential beam 5 formed of channel steel.
- This bracket 20 is formed of a lipped channel of thin steel sheet cut into short pieces and is coupled to an end of the floor beam 5 D in the vertical posture so that one flange thereof is brought into contact with a back surface of the web in the girder 5 a .
- a bolt 24 is inserted through the contact portion via a bracing plate 39 and screw-engaged with a nut 25 .
- the floor beam 5 D is coupled to the girder 5 a .
- a reinforcement member 40 is provided in the channel portion of the girder 5 a .
- the floor panel 2 a is structured by the floor beams 5 D on which the construction surface member 13 is bonded.
- the lower frame member 1 of thin light-gauge channel in the force-resisting wall panel 7 in the upper floor is placed and fixed by bolts.
- a bolt 24 is inserted into a hole bored through these members and fastened to a nut 25 to couple the force-resisting wall panel 9 a to the girder 5 a .
- the bracket 20 provided at the end of the floor beam 5 D is brought into contact with a back surface of the web of the girder 5 a formed of H-shaped steel.
- the remaining structure is the same as the first example shown in FIG. 9.
- the girder 5 a is constructed by a combination of two members formed of thin light-gauge channel steel coupled so that the back surfaces thereof are opposed to each other.
- the lower flange 21 of the girder 5 a disposed so that the web 26 thereof extends in the vertical direction, is brought into contact with the upper surface of the web of the upper frame member 12 formed of thin light-gauge channel steel in the force-resisting wall panel 9 a , and the respective members in the contact portion are coupled to each other by bolts or drill screws, whereby the force-resisting wall panel 9 a is coupled to the girder 5 a .
- the reinforcement member 40 is provided in the channel of the girder 5 a formed of the combination of the thin light-gauge channel steel members.
- the remaining structure is the same as the first example shown in FIG. 9.
- the girder 5 a As the girder 5 a high in rigidity formed of heavyweight steel such as channel or H-shaped steel or the combined member of thin light-gauge channel steel is provided above the force-resisting wall panel 9 a on the wall surface having the opening 15 (see FIG. 1), the girder 5 a functions as an lintel in the prior art without any problems. Thus, even if the lintel is omitted from the opening in the conventional steel house construction method, it is possible to sufficiently support the vertical load from the upper floor or the horizontal force.
- the vertical force and the horizontal force supported by the girder 5 a provided in the wall having the opening 15 parallel to the floor beam 5 D are relatively small in comparison with the vertical arrangement, it is possible to ensure a sufficient supporting force even if the end of the floor beam 5 D is coupled to the lateral side of the girder 5 a.
- FIGS. 11 (A), 11 (B) and 11 (C) illustrate fourth, fifth and sixth examples, respectively, in which the girder 5 a on the force-resisting wall panel 9 a is coupled to the floor beam 5 D on the wall surface having the opening disposed vertical to the floor beam 5 D. In either case, the end of the floor beam 5 D is placed on the girder 5 a and coupled thereto by bolts.
- the girder 5 a shown in FIGS. 11 (A), 11 (B) and 11 (C) has the same structure as the girder 5 a shown in FIGS. 9 , 10 (A) and 10 (B).
- the coupling structure thereof with the upper end of the force-resisting wall panel 9 a may be the same as that shown in the above-identified figures.
- the floor beam 5 D has the same structure as the floor beam 5 D shown in FIGS. 9 , 10 (A) and 10 (B).
- the end beam 5 c formed of thin light-gauge channel steel in the floor beam 5 D is placed on the upper surface of the upper flange 41 of the girder 5 a formed of channel steel.
- the bolt 24 is provided through the coupling portion of the upper flange 41 , the thin light-gauge channel steel member and the bracing plate 39 and fastened to the nut 25 , whereby the girder Sa is coupled to the floor beam 5 D.
- the lower frame member 10 formed of thin light-gauge channel steel in the force-resisting wall panel 9 a in the upper floor is placed and fastened by bolts.
- the end beam 5 c formed of thin light-gauge channel steel in the floor beam 5 D is placed on the upper surface of the upper flange 41 of the girder 5 a formed of channel steel.
- the bolt 24 is provided through the coupling portion of the upper flange 41 , the thin light-gauge channel steel member and the bracing plate 39 and fastened to the nut 25 , whereby the girder 5 a is coupled to the floor beam 5 D.
- the lower frame member 10 formed of thin light-gauge channel steel in the force-resisting wall panel 9 a in the upper floor is placed and fastened by bolts.
- the end beam 5 c formed of thin light-gauge channel steel in the floor beam 5 D is placed on the upper surface of the upper flange 41 of the girder 5 a formed of the combined members of thin light-gauge channel steel.
- the bolt 24 is provided through the coupling portion of the upper flange 41 , the thin light-gauge channel steel member and the bracing plate 39 and fastened to the nut 25 , whereby the girder 5 a is coupled to the floor beam 5 D.
- a reinforcement frame 42 formed of thin light-gauge channel steel is provided on the outside surface of the end beam 5 c , and the lower frame member 10 formed of thin light-gauge channel steel in the force-resisting wall panel 9 a in the upper floor is placed on the upper surface of the end of the construction surface member 13 bonded to the upper surface of the floor beam 5 D and coupled by bolts.
- the girder 5 a high in rigidity and formed of heavyweight channel steel or H-shaped steel or the combined member of thin light-gauge channel steel, may be provided on the wall surface having the opening 15 (see FIG. 14), the girder 5 a can function as an lintel in the prior art without any problems. Thus, even if the lintel is omitted from the opening in the conventional steel house construction method, it is possible to sufficiently support the vertical load, from the upper floor, or the horizontal force.
- the structure of the respective portion and the fastening member may be suitably changed in accordance with loads applied to the girder, which changes in design should be understood by those of ordinary skill in the art as being completely disclosed by the description and drawings referenced herein.
- the exemplary embodiments of the present invention while maintaining the advantages of the steel house method in the construction of a low-rise building mainly using frame members formed of thin light-gauge section steel, in that no welding is necessary, the cutting and boring are simple, the material is light in weight and capable of being manually conveyed, the panel accuracy may be improved and/or ensured, the execution of work can be easier, the construction period may be short and the manufacturing cost may be low, the problems thereof, in that the strength is too weak to support a roof load, are solved by combining the members of thin light-gauge section steel with a horizontal beam member of heavyweight section steel, high in strength, which is simple in structure because the roof truss is unnecessary.
- the circumferential beam on the force-resisting wall panel is formed of heavyweight section steel such as a H-shaped steel or a channel or the combination beam of thin light-gauge section steel, it is possible to omit the lintel member and thus to enlarge the height and width of the opening, while maintaining the merits of the conventional SH technology in that the roof and the floor panels are efficiently manufactured in a factory and the site work may be simplified.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/255,246 US20060037273A1 (en) | 2001-11-13 | 2005-10-21 | Frame construction for low-rise building |
US12/711,045 US8109056B2 (en) | 2001-11-13 | 2010-02-23 | Frame construction arrangement forming an opening in a wall of a low-rise building |
US12/729,395 US8112956B2 (en) | 2001-11-13 | 2010-03-23 | Frame construction arrangement forming an opening in a wall of a low-rise building |
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001-347119 | 2001-11-13 | ||
JP2001347119A JP3593329B2 (ja) | 2001-11-13 | 2001-11-13 | 低層建物の枠組構造 |
JP2001348879A JP3559543B2 (ja) | 2001-11-14 | 2001-11-14 | スチールハウス製低層建物の枠組構造 |
JP2001-348879 | 2001-11-14 | ||
PCT/JP2002/004966 WO2003042467A1 (fr) | 2001-11-13 | 2002-05-22 | Structure de bati de construction peu elevee |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/255,246 Division US20060037273A1 (en) | 2001-11-13 | 2005-10-21 | Frame construction for low-rise building |
Publications (1)
Publication Number | Publication Date |
---|---|
US20040261349A1 true US20040261349A1 (en) | 2004-12-30 |
Family
ID=26624493
Family Applications (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/495,406 Abandoned US20040261349A1 (en) | 2001-11-13 | 2002-05-22 | Frame structure of low-rise building |
US11/255,246 Abandoned US20060037273A1 (en) | 2001-11-13 | 2005-10-21 | Frame construction for low-rise building |
US12/711,045 Expired - Fee Related US8109056B2 (en) | 2001-11-13 | 2010-02-23 | Frame construction arrangement forming an opening in a wall of a low-rise building |
US12/729,395 Expired - Fee Related US8112956B2 (en) | 2001-11-13 | 2010-03-23 | Frame construction arrangement forming an opening in a wall of a low-rise building |
Family Applications After (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/255,246 Abandoned US20060037273A1 (en) | 2001-11-13 | 2005-10-21 | Frame construction for low-rise building |
US12/711,045 Expired - Fee Related US8109056B2 (en) | 2001-11-13 | 2010-02-23 | Frame construction arrangement forming an opening in a wall of a low-rise building |
US12/729,395 Expired - Fee Related US8112956B2 (en) | 2001-11-13 | 2010-03-23 | Frame construction arrangement forming an opening in a wall of a low-rise building |
Country Status (5)
Country | Link |
---|---|
US (4) | US20040261349A1 (zh) |
KR (1) | KR100536547B1 (zh) |
CN (3) | CN1585849A (zh) |
TW (1) | TW544480B (zh) |
WO (1) | WO2003042467A1 (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090223153A1 (en) * | 2008-03-07 | 2009-09-10 | Macgregor's Custom Machining Ltd., | Modular building capable of being readily assembled |
ITAN20100029A1 (it) * | 2010-03-05 | 2011-09-06 | Mariotti Prefabbricati Snc Di Mariotti Alviero & | Attrezzatura modulare per la realizzazione di un edificio ed edificio realizzato per il tramite dell'anzidetta attrezzatura. |
WO2012120162A1 (es) * | 2011-03-04 | 2012-09-13 | TERRADAS CANAL, María Victoria | Construccion modular |
US20130076017A1 (en) * | 2011-09-23 | 2013-03-28 | Consolidated Metal Products, Inc. | Hot-rolled high-strength steel structural members and method |
US20130283721A1 (en) * | 2012-04-25 | 2013-10-31 | Tae Sang Ahn | Steel frame structure using u-shaped composite beam |
US9004342B2 (en) | 2012-01-09 | 2015-04-14 | Consolidated Metal Products, Inc. | Welded hot-rolled high-strength steel structural members and methods |
EP2513384A4 (en) * | 2009-12-18 | 2015-07-22 | Patco Llc | STRUCTURAL SYSTEM PER PANELS FOR CONSTRUCTION |
US10041288B1 (en) | 2016-05-04 | 2018-08-07 | Jobsite Steel Manufacturing, LLC | Panel-in-panel wall system |
US20190063057A1 (en) * | 2017-08-31 | 2019-02-28 | Robert Preddy | Stiffener for Connecting Beams and Columns |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1585849A (zh) | 2001-11-13 | 2005-02-23 | 新日本制铁株式会社 | 低层建筑物的构架结构 |
US9777479B2 (en) * | 2003-09-05 | 2017-10-03 | Bailey Metal Products Limited | Framing member having reinforced end |
JP3787348B2 (ja) | 2004-11-25 | 2006-06-21 | 新日本製鐵株式会社 | スチールハウスのパネル構造およびパネル構築方法 |
CN100570086C (zh) * | 2005-12-27 | 2009-12-16 | 洪百燿 | 一种钢构单元 |
KR100830240B1 (ko) * | 2007-07-02 | 2008-05-16 | 한국건설기술연구원 | 어댑터를 이용한 경량 합성구조 시스템의 상하층 경량합성벽체와 콘크리트 바닥 슬래브의 복합화방법 |
KR100956741B1 (ko) * | 2008-04-23 | 2010-05-06 | 이병화 | 구조용 복합 경량 패널을 이용한 건축물 및 그 시공 방법 |
JP5490476B2 (ja) * | 2009-09-25 | 2014-05-14 | 東芝三菱電機産業システム株式会社 | 電気機器の筐体フレーム |
CN102277906B (zh) * | 2011-05-05 | 2013-03-20 | 杨东佐 | 顶梁连接件 |
JP5814003B2 (ja) * | 2011-06-13 | 2015-11-17 | 積水ハウス株式会社 | 連結金具及びこれを備えたフレーム並びにこれを用いた建築物 |
KR101658954B1 (ko) * | 2015-08-24 | 2016-09-22 | 주식회사 해광 | 격자보형 이중마루 하부구조물 |
CN107700709A (zh) * | 2016-08-08 | 2018-02-16 | 湖北源盛钢构有限公司 | 一种环保型砼墙体的结构及施工方法 |
CN112302245A (zh) * | 2019-08-02 | 2021-02-02 | 黄永嘉 | 预铸建材结构 |
KR102461092B1 (ko) * | 2020-11-11 | 2022-10-31 | 서울대학교산학협력단 | 프리패브 전단벽모듈 연결구조 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1813044A (en) * | 1929-12-13 | 1931-07-07 | Tidal Oil Company | Mounting for calf wheels or the like |
US2114901A (en) * | 1934-03-06 | 1938-04-19 | William P Witherow | Structural steel system |
US5113631A (en) * | 1990-03-15 | 1992-05-19 | Digirolamo Edward R | Structural system for supporting a building utilizing light weight steel framing for walls and hollow core concrete slabs for floors and method of making same |
Family Cites Families (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1821015A (en) * | 1927-10-04 | 1931-09-01 | Francis D Hardesty | Fireproof building construction |
US2076728A (en) * | 1933-03-29 | 1937-04-13 | Bitting Inc | Building structure |
GB1073303A (en) * | 1963-02-19 | 1967-06-21 | Rigid Frame Construction Ltd | Improvements relating to the fabrication of building frameworks |
US3675385A (en) * | 1970-02-16 | 1972-07-11 | Metallic Building Co | Method of constructing parking garage structures |
US4144686A (en) * | 1971-07-22 | 1979-03-20 | William Gold | Metallic beams reinforced by higher strength metals |
JPS529206Y2 (zh) * | 1973-06-20 | 1977-02-26 | ||
JPS5022611A (zh) | 1973-06-27 | 1975-03-11 | ||
US4461130A (en) * | 1981-05-29 | 1984-07-24 | Calvin Shubow | Building construction using hollow core wall slabs |
US4875314A (en) * | 1987-01-06 | 1989-10-24 | Boilen Kenneth T | Connection system for preventing uplift of shear walls |
US4918897A (en) * | 1987-10-06 | 1990-04-24 | Luedtke Charles W | Construction system for detention structures and multiple story buildings |
US5048257A (en) * | 1987-10-06 | 1991-09-17 | Luedtke Charles W | Construction system for detention structures and multiple story buildings |
JP2779498B2 (ja) * | 1988-04-11 | 1998-07-23 | 積水ハウス株式会社 | 耐力壁フレーム |
JPH0355431U (zh) * | 1989-10-03 | 1991-05-28 | ||
US5195293A (en) * | 1990-03-15 | 1993-03-23 | Digirolamo Edward R | Structural system for supporting a building utilizing light weight steel framing for walls and hollow core concrete slabs for floors and method of making same |
US5333426A (en) * | 1993-01-06 | 1994-08-02 | Forintek Canada Corporation | Wood frame construction system with prefabricated components |
JPH06336776A (ja) * | 1993-05-28 | 1994-12-06 | Okuchi Kensan Kk | モジュラーコーディネーションにおける壁パネルの骨組み材の構造 |
JP3055431B2 (ja) | 1995-05-29 | 2000-06-26 | 松下電器産業株式会社 | 電子部品の製造方法 |
JPH0960156A (ja) | 1995-08-28 | 1997-03-04 | Matsushita Electric Works Ltd | 鉄骨梁壁パネル |
US6298612B1 (en) * | 1995-09-05 | 2001-10-09 | James A. Adams | Wall strengthening component |
JPH09273248A (ja) * | 1996-04-08 | 1997-10-21 | Nippon Steel Corp | スチールハウスにおける筋違いの接合構造 |
US5782047A (en) * | 1996-07-19 | 1998-07-21 | De Quesada; Jorge | High-rise building system using light gauge steel wall panels |
JPH10311110A (ja) * | 1997-05-13 | 1998-11-24 | Sugimoto Kenchiku Kenkyusho:Kk | 建築物の接合構造 |
JPH1155431A (ja) | 1997-07-31 | 1999-02-26 | Aiphone Co Ltd | 電源供給回路 |
PL194067B1 (pl) * | 1998-04-28 | 2007-04-30 | Jacek Michalski | Sposób budowy budynków |
US6460297B1 (en) * | 1999-12-21 | 2002-10-08 | Inter-Steel Structures, Inc. | Modular building frame |
EP1252113A1 (en) * | 1999-12-29 | 2002-10-30 | Owens Corning | Glass fiberizing combustion fuel mixture |
US6651393B2 (en) * | 2001-05-15 | 2003-11-25 | Lorwood Properties, Inc. | Construction system for manufactured housing units |
CN1585849A (zh) | 2001-11-13 | 2005-02-23 | 新日本制铁株式会社 | 低层建筑物的构架结构 |
US6623322B1 (en) * | 2002-05-08 | 2003-09-23 | Steve A. Lesniak | Inflatable dinghy cover |
US7716899B2 (en) * | 2003-04-14 | 2010-05-18 | Dietrich Industries, Inc. | Building construction systems and methods |
-
2002
- 2002-05-22 CN CNA028225074A patent/CN1585849A/zh active Pending
- 2002-05-22 KR KR10-2004-7007150A patent/KR100536547B1/ko not_active IP Right Cessation
- 2002-05-22 TW TW091110950A patent/TW544480B/zh not_active IP Right Cessation
- 2002-05-22 WO PCT/JP2002/004966 patent/WO2003042467A1/ja active Application Filing
- 2002-05-22 CN CN2009101666324A patent/CN101696583B/zh not_active Expired - Fee Related
- 2002-05-22 US US10/495,406 patent/US20040261349A1/en not_active Abandoned
- 2002-05-22 CN CN200910166633A patent/CN101696584A/zh active Pending
-
2005
- 2005-10-21 US US11/255,246 patent/US20060037273A1/en not_active Abandoned
-
2010
- 2010-02-23 US US12/711,045 patent/US8109056B2/en not_active Expired - Fee Related
- 2010-03-23 US US12/729,395 patent/US8112956B2/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1813044A (en) * | 1929-12-13 | 1931-07-07 | Tidal Oil Company | Mounting for calf wheels or the like |
US2114901A (en) * | 1934-03-06 | 1938-04-19 | William P Witherow | Structural steel system |
US5113631A (en) * | 1990-03-15 | 1992-05-19 | Digirolamo Edward R | Structural system for supporting a building utilizing light weight steel framing for walls and hollow core concrete slabs for floors and method of making same |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090223153A1 (en) * | 2008-03-07 | 2009-09-10 | Macgregor's Custom Machining Ltd., | Modular building capable of being readily assembled |
EP2513384A4 (en) * | 2009-12-18 | 2015-07-22 | Patco Llc | STRUCTURAL SYSTEM PER PANELS FOR CONSTRUCTION |
US10233643B2 (en) | 2009-12-18 | 2019-03-19 | Patco, Llc | Panelized structural system for building construction |
US9677272B2 (en) | 2009-12-18 | 2017-06-13 | Patco, Llc | Panelized structural system for building construction |
ITAN20100029A1 (it) * | 2010-03-05 | 2011-09-06 | Mariotti Prefabbricati Snc Di Mariotti Alviero & | Attrezzatura modulare per la realizzazione di un edificio ed edificio realizzato per il tramite dell'anzidetta attrezzatura. |
EP2365145A1 (en) | 2010-03-05 | 2011-09-14 | Mariotti Prefabbricati snc Di Mariotti Alviero & C. | A prefabricated modular building |
ES2387771A1 (es) * | 2011-03-04 | 2012-10-01 | Gustavo David AMOR CABADO | Construcción modular. |
WO2012120162A1 (es) * | 2011-03-04 | 2012-09-13 | TERRADAS CANAL, María Victoria | Construccion modular |
US8833039B2 (en) * | 2011-09-23 | 2014-09-16 | Consolidated Metal Products, Inc. | Hot-rolled high-strength steel truck frame rail |
US8906173B2 (en) | 2011-09-23 | 2014-12-09 | Consolidated Metal Products, Inc. | Hot-rolled high-strength steel truck frame rail |
US20130076017A1 (en) * | 2011-09-23 | 2013-03-28 | Consolidated Metal Products, Inc. | Hot-rolled high-strength steel structural members and method |
US9004342B2 (en) | 2012-01-09 | 2015-04-14 | Consolidated Metal Products, Inc. | Welded hot-rolled high-strength steel structural members and methods |
US8915042B2 (en) * | 2012-04-25 | 2014-12-23 | Drb Holding Co., Ltd. | Steel frame structure using U-shaped composite beam |
US20130283721A1 (en) * | 2012-04-25 | 2013-10-31 | Tae Sang Ahn | Steel frame structure using u-shaped composite beam |
US10041288B1 (en) | 2016-05-04 | 2018-08-07 | Jobsite Steel Manufacturing, LLC | Panel-in-panel wall system |
US20190063057A1 (en) * | 2017-08-31 | 2019-02-28 | Robert Preddy | Stiffener for Connecting Beams and Columns |
Also Published As
Publication number | Publication date |
---|---|
US8109056B2 (en) | 2012-02-07 |
US20100236185A1 (en) | 2010-09-23 |
CN101696584A (zh) | 2010-04-21 |
KR100536547B1 (ko) | 2005-12-14 |
TW544480B (en) | 2003-08-01 |
KR20040101193A (ko) | 2004-12-02 |
US8112956B2 (en) | 2012-02-14 |
CN101696583B (zh) | 2011-12-07 |
US20100146902A1 (en) | 2010-06-17 |
CN101696583A (zh) | 2010-04-21 |
CN1585849A (zh) | 2005-02-23 |
US20060037273A1 (en) | 2006-02-23 |
WO2003042467A1 (fr) | 2003-05-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8109056B2 (en) | Frame construction arrangement forming an opening in a wall of a low-rise building | |
US5706626A (en) | Pre-assembled internal shear panel | |
EP2513384B1 (en) | Panelized structural system for building construction | |
CA2678586C (en) | Insulated modular building frame | |
CA2285890C (en) | Shear wall panel | |
US20020046514A1 (en) | Shear wall panel | |
US20100005749A1 (en) | Steel building frame system | |
US4432184A (en) | Support for the construction of buildings | |
JP3559543B2 (ja) | スチールハウス製低層建物の枠組構造 | |
CA2227572C (en) | Modular frame building | |
US5718093A (en) | Floor panel joint structure and method of making a wooden building with the same | |
JP3593329B2 (ja) | 低層建物の枠組構造 | |
JP5004434B2 (ja) | スチールハウス | |
JP2524409B2 (ja) | 軸組、パネル工法の家屋 | |
WO2001029338A2 (en) | Shear wall panel | |
JP2561389Y2 (ja) | 鉄骨小梁・孫梁の接合部の構造 | |
JP3322161B2 (ja) | 建築物の床組構造 | |
JPH0515859B2 (zh) | ||
JP2001234589A (ja) | 単板積層材を用いた壁柱と基礎の結合構造 | |
JPH06257213A (ja) | 屋根パネルと壁パネルとの接合構造 | |
JPH1150579A (ja) | 大スパン木質パネル床 | |
JPH083214B2 (ja) | 家屋構築構造 | |
JP2003105863A (ja) | 建物ユニット及びユニット建物 | |
JPH083215B2 (ja) | 家屋構築工法 | |
JPH10102591A (ja) | 梁カット建物ユニット |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: NIPPON STEEL CORPORATION, JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HASHIMOTO, SHINICHIRO;MURAHASHI, YOSHIMITSU;TOHNAI, SHIGEAKI;AND OTHERS;REEL/FRAME:015708/0345 Effective date: 20040420 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |