SU1638304A1 - Method of mining thick ore deposits - Google Patents
Method of mining thick ore deposits Download PDFInfo
- Publication number
- SU1638304A1 SU1638304A1 SU894663565A SU4663565A SU1638304A1 SU 1638304 A1 SU1638304 A1 SU 1638304A1 SU 894663565 A SU894663565 A SU 894663565A SU 4663565 A SU4663565 A SU 4663565A SU 1638304 A1 SU1638304 A1 SU 1638304A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- ore
- layer
- layers
- mining
- pillars
- Prior art date
Links
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
Изобретение относитс к слоевой выемке рудных месторождений. Цель изобретени - повышение безопасности работ за счет повышени устойчивости рудных и искусственных обнажений при выемке слоев руды сверху вниз. Производ т нисход щую слоевую выемку руды с закладкой выработанного пространства твердеющими смес ми . В каждом слое до его отработки нл контакте с налегающими породами проход т опережающую выработку параллельно фронту очистных работ и вдоль ее оформл ют ленточный рудный целик шириной, равной ширине столбчатых целиков (СЦ), которые оформл ют, наращива по вертикали в процессе выемки слоев, под указанным ленточным целиком. В процессе отработки сло на границе с лежачим боком обнажают сформированные при отработке вышележащих слоев СЦ. Указанные СЦ в процессе нарезных работ в слое надрабатывзют на границе с вис чим боком отработкой запасов образованного над ними ленточного целика . Указанные СЦ извлекают по мере развити очистных работ отрабатываемого сло . Закладку выработанного пространства отработанного сло осуществл ют через пустоты от выемки СЦ. 2 ил.The invention relates to a layered excavation of ore deposits. The purpose of the invention is to increase the safety of work by increasing the stability of ore and artificial outcrops when the ore layers are excavated from top to bottom. The downward layer ore is dug out with the laying of the worked-out space with hardening mixtures. In each layer, prior to its working out with contact with overlying rocks, advance development is carried out parallel to the front of the cleaning works, and a tape ore pillar with a width equal to the width of the columnar pillars (SP) are formed along it, which are increased vertically during the process of excavation of layers specified tape entirely. In the process of mining the layer at the border with the recumbent side, the SP formed during the mining of the overlying layers are exposed. These SCs in the process of threading in the layer above work at the border with the high side working out the reserves of the tape pillar formed above them. These SCs are recovered as the cleaning work of the layer under development is developed. The spent space is laid down through the voids from the SC notch. 2 Il.
Description
Изобретение относитс к горнодобывающей промышленности и может быть использовано при слоевой нисход щей выемке рудных месторождений, преимущественно пологопадающих, с закладкой выработанного пространства в услови х высокого горного давлени .The invention relates to the mining industry and can be used for layer-down mining of ore deposits, mainly gently dipping, with laying of the worked-out space under conditions of high mining pressure.
Цель изобретени - повышение безопасности работ за счет повышени устойчивости рудных и искусственных обнажений при выемке слоев руды сверху вниз.The purpose of the invention is to increase the safety of work by increasing the stability of ore and artificial outcrops when the ore layers are excavated from top to bottom.
На фиг.1 изображен вертикальный разрез по падению рудного тела; на фиг.2 - разрез А-А на фиг.1.Figure 1 shows a vertical section through the fall of the ore body; figure 2 - section aa in figure 1.
Способ осуществл ют следующим образом .The method is carried out as follows.
Слои 1 нарезают ориентированными вкрест простирани выработками 2, из которых до отработки сло по контакту с налегающими породами параллельно фронту очистных работ проход т опережающую выработку 3. Вдоль выработки оформл ют ленточный целик 4 и отрабатывают запасы сло камерно-столбовой системой, при этом формируют целики-столбы 5 под целиками вышерасположенного сло , наращива их таким образом от сло к слою на всю мощность залежи. Слои нарезают так, что кажС OJ 00 00Layers 1 are cut with the openings 2 oriented across the strike, of which prior to working the layer along the contact with overlying rocks parallel to the front of the clearing works pass advance working 3. The tape pillars 4 are drawn up along the development and the reserves of the layer are worked out pillars 5 under the pillars of the upper layer, thus increasing them from layer to layer to the full capacity of the deposit. Layers are cut so that the calf OJ 00 00
оabout
ЈьЈ
дому слою соответствует свой сопр женный с этим слоем у лежачего бока залежи р д полностью оформленных целиков, которые обнажают в процессе отработки зтого сло . Р д оформленных в процессе послойной отработки столбчатых целиков 5 надрабэтыва- ют выемкой запасов расположенного над ними ленточного целика 4 шириной, равной ширине целиков 5, после чего столбчатые целики извлекают. Надработку сопр женного с данным слоем р да полностью оформленных столбчатых целиков, расположенного у лежачего бока залежи, производ т в процессе нарезных работ в слое. По мере развити очистных работ и обнажени полностью оформленных и надработанных столбчатых целиков на фланге сло их разбуривают скважинами диаметром 65-105 мм и отбивают зар дами взрывчатых веществ . Отбойку производ т либо на кольце- чые врубовые полости, либо методом секционного взрывани . Отбитую горную массу отгружают.The home layer corresponds to its interfaced with this layer at the lying side of the deposit of a number of fully formed pillars, which are exposed in the process of working out this layer. A series of columnar pillars 5 formed in the process of layer-by-layer mining are excavated by excavating the reserves of the ribbon pillar 4 located above them, which is equal to the width of pillars 5, after which the columnar pillars are removed. The development of a row of fully decorated column pillars, adjacent to the recumbent side of the deposit, associated with this layer is carried out during the cutting process in the layer. With the development of cleaning works and exposure of fully decorated and developed columnar pillars on the flank of the layer, they are drilled with wells with a diameter of 65-105 mm and beat off with charges of explosives. Breaking is performed either on annular cutting-in cavities or by sectional blasting. Repulsed rock mass shipped.
Через образованные в результате выемки целиков 4 и 5 пустоты 6 и 7 подают в отработанный слой 1 твердеющую закладку , Транспортно-венти ционные св зи между блоками и сло ми осуществл ют по полевым выработкам 8 и слоевым заездам 9. После твердени закладки и набора необходимой прочности нарезают нижерасположенный слой, и цикл работ повтор ют.Through the voids 6 and 7 formed as a result of excavation of the pillars 4 and 5, a hardening bookmark is fed into the spent layer 1. Transport and ventilation connections between the blocks and the layers are carried out through field workings 8 and layer races 9. After hardening the bookmark and setting the required strength the underlying layer is cut and the cycle of work is repeated.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894663565A SU1638304A1 (en) | 1989-03-20 | 1989-03-20 | Method of mining thick ore deposits |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894663565A SU1638304A1 (en) | 1989-03-20 | 1989-03-20 | Method of mining thick ore deposits |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1638304A1 true SU1638304A1 (en) | 1991-03-30 |
Family
ID=21434687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU894663565A SU1638304A1 (en) | 1989-03-20 | 1989-03-20 | Method of mining thick ore deposits |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1638304A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2624490C1 (en) * | 2016-03-04 | 2017-07-04 | Публичное акционерное общество Приаргунское производственное горно-химическое объединение (ПАО ППГХО) | Method of the low and medium powered ore bodies preparation, cutting and mining |
RU2744499C1 (en) * | 2018-09-04 | 2021-03-10 | Чайна Юниверсити Оф Майнинг Энд Текнолоджи | Method for extraction of coal pulses in chamber development with internal filling |
-
1989
- 1989-03-20 SU SU894663565A patent/SU1638304A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР Ms 605969, кл.Е 21 С 41/06, 1978. Хом ков В.И. Зарубежный опыт закладки на рудниках. М.: Недра, 1984, с. 23 - 28. * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2624490C1 (en) * | 2016-03-04 | 2017-07-04 | Публичное акционерное общество Приаргунское производственное горно-химическое объединение (ПАО ППГХО) | Method of the low and medium powered ore bodies preparation, cutting and mining |
RU2744499C1 (en) * | 2018-09-04 | 2021-03-10 | Чайна Юниверсити Оф Майнинг Энд Текнолоджи | Method for extraction of coal pulses in chamber development with internal filling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2209972C2 (en) | Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks | |
SU1638304A1 (en) | Method of mining thick ore deposits | |
US4216998A (en) | Method of underground mining by pillar extraction | |
RU2136887C1 (en) | Powered complex for mining kimberlite | |
RU2010972C1 (en) | Method of working interchamber pillar | |
SU754067A1 (en) | Method of mining thick ore bodies | |
SU1317128A1 (en) | Method of mining thick ore deposits | |
SU939752A1 (en) | Method of working thick gently-sloping beds | |
SU1028846A1 (en) | Method of mining steep ore deposit | |
SU825964A1 (en) | Method of working thick steeply-inclined ore bodies | |
SU403853A1 (en) | '-' "- INVENTIONS | |
SU1120749A1 (en) | Method of underground leaching of minerals | |
RU1828921C (en) | Method for working pillars in room-and-pillar mining system | |
SU1317127A1 (en) | Method of mining mineral deposits | |
SU1659656A1 (en) | Method of winning panel pillars | |
SU1239336A1 (en) | Method of mining thick mineral deposits | |
SU1083662A1 (en) | Method of mining steep-slope ore-bodies | |
SU909178A1 (en) | Method of working beds of complex structure with intervening muck | |
SU934009A1 (en) | Method of working thick gently-sloping ore deposits | |
SU1643717A1 (en) | Method for working out contiguous seams of minerals | |
SU1086168A1 (en) | Method of working thick deposits of mineral | |
SU956793A1 (en) | Method of working thick ore deposits | |
SU1456579A1 (en) | Method of mining sloping ore bodies | |
SU602684A1 (en) | Method of mining mineral deposits | |
SU949182A1 (en) | Method for working gently sloping mineral seams |