SU934009A1 - Method of working thick gently-sloping ore deposits - Google Patents
Method of working thick gently-sloping ore deposits Download PDFInfo
- Publication number
- SU934009A1 SU934009A1 SU802919093A SU2919093A SU934009A1 SU 934009 A1 SU934009 A1 SU 934009A1 SU 802919093 A SU802919093 A SU 802919093A SU 2919093 A SU2919093 A SU 2919093A SU 934009 A1 SU934009 A1 SU 934009A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- ore
- workings
- filling
- hardening
- ore deposits
- Prior art date
Links
Landscapes
- Manufacture And Refinement Of Metals (AREA)
Description
(54) СПОСОБ РАЗРАБОТКИ МОЩНЫХ ПОЛОГОПАДАЮЩИХ РУДНБ1Х МЕСТОРОЖДЕНИЙ(54) METHOD FOR DEVELOPING POWERFUL SURROUNDING RUDNBIE DEPOSITS
1one
Изобретение относитс к горнодобывающей промыщленности и может использоватьс при отработке мощных пологопадающих месторождений, опасных по горным ударам.The invention relates to the mining industry and can be used in the development of powerful gently dipping deposits that are hazardous to rock bumps.
Известен способ разработки мощных залежей полезных ископаемых, включающий сплошную выемку руды ступенчато расположенными камерами, проходку верхней и нижней подсечки, причем поддержание выработок верхней подсечки осуществл ют податливыми целиками 1.There is a known method for developing powerful mineral deposits, including a continuous excavation of ore by stepped-up chambers, penetration of the upper and lower hooking, and maintaining the workings of the upper hooking is done with compliant pillars 1.
Известен также способ разработки мощных пологопадающих рудных месторождений , включающий слоевую выемку руды с последующей закладкой выработанного пространства под защитой опережающей подсечки, образуемой в руде у контакта с породами кровли и заполн емой твердеющей закладкой 2.There is also known a method for developing powerful gently dipping ore deposits, including a layer-dredging of ore, followed by laying the worked-out space under the protection of advance cuttings formed in the ore from contact with the roof rocks and filled with a hardening tab 2.
Недостатком этого способа вл етс невозможность увеличени интенсивности отработки запасов выемочного участка путем увеличени количества, очистных слоев (два фронта) из-за ограниченных размеров зон с безопасным уровнем концентрации напр жений .The disadvantage of this method is the impossibility of increasing the intensity of mining the reserves of the excavation site by increasing the number of cleaning layers (two fronts) due to the limited size of zones with a safe level of stress concentration.
Цель изобретени - интенсификаци отработки запасов руды, путем увеличени размеров защищенных зон.The purpose of the invention is to intensify the mining of ore reserves by increasing the size of protected zones.
Поставленна цель достигаетс тем, что опережающую подсечку образуют посредством проходки параллельных выработок и после затвердевани в них закладки проход т выработки между заложенными выработка .ми, обнажа закладку последних на высоту, определ емую из соотнощени .The goal is achieved by the fact that the advance cutting is formed by sinking parallel workings and after hardening in them the workings pass the workings between the laid workings, exposing the laying of the latter to a height determined from the ratio.
где Е - модуль упругости закладочной смеси в услови х одностороннего сжати , кг/см2;where E is the modulus of elasticity of the filling mixture under conditions of one-sided compression, kg / cm2;
средн мощность заложенного выработанного пространства, м., 6 - компресси закладочного массива К -коэффициент концентрации напр жений; average capacity of the laid excavated space, m., 6 - compression of the filling mass K - coefficient of stress concentration;
fH - вес налегающей толщи пород, кг/см .fH is the weight of the overlying strata of rocks, kg / cm.
На чертеже представлена отрабатываема рудна залежь, вертикальный разрез.The drawing shows a mining ore deposit, a vertical section.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802919093A SU934009A1 (en) | 1980-03-12 | 1980-03-12 | Method of working thick gently-sloping ore deposits |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802919093A SU934009A1 (en) | 1980-03-12 | 1980-03-12 | Method of working thick gently-sloping ore deposits |
Publications (1)
Publication Number | Publication Date |
---|---|
SU934009A1 true SU934009A1 (en) | 1982-06-07 |
Family
ID=20893485
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802919093A SU934009A1 (en) | 1980-03-12 | 1980-03-12 | Method of working thick gently-sloping ore deposits |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU934009A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2515285C2 (en) * | 2012-04-02 | 2014-05-10 | Открытое акционерное общество "Научно-исследовательский и проектный институт обогащения и механической обработки полезных ископаемых "Уралмеханобр" (ОАО "Уралмеханобр") | Method to develop edge ore bodies with unstable ores |
RU2761226C1 (en) * | 2021-06-01 | 2021-12-06 | Федеральное государственное бюджетное образовательное учреждение высшего образования «Уральский государственный горный университет» | Method for the development of powerful gentle and inclined rock burst hazardous ore deposits |
-
1980
- 1980-03-12 SU SU802919093A patent/SU934009A1/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2515285C2 (en) * | 2012-04-02 | 2014-05-10 | Открытое акционерное общество "Научно-исследовательский и проектный институт обогащения и механической обработки полезных ископаемых "Уралмеханобр" (ОАО "Уралмеханобр") | Method to develop edge ore bodies with unstable ores |
RU2761226C1 (en) * | 2021-06-01 | 2021-12-06 | Федеральное государственное бюджетное образовательное учреждение высшего образования «Уральский государственный горный университет» | Method for the development of powerful gentle and inclined rock burst hazardous ore deposits |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109000525A (en) | A kind of shield driving upper-soft lower-hard ground presplit blasting construction method | |
US3917346A (en) | Method of blasting a subterranean deposit | |
SU934009A1 (en) | Method of working thick gently-sloping ore deposits | |
SU1129354A1 (en) | Method of underground working of mineral deposits | |
RU2114307C1 (en) | Method for opencast mining of flooded mineral deposits | |
RU2010953C1 (en) | Method of determination of cracks spreading height in basic zone of working | |
RU2118459C1 (en) | Method for burying toxic waste in mine workings | |
SU581282A1 (en) | Method of mining thick ore bodies | |
RU2215145C1 (en) | Method of mineral deposit underground mining in strips | |
SU1163000A1 (en) | Method of fighting gas-dynamic phenomena in mines when driving entry workings | |
RU2187647C1 (en) | Method of softening of surface layer of opencast benches in seasonal ground freezing | |
SU754067A1 (en) | Method of mining thick ore bodies | |
SU825962A1 (en) | Method of controlling hard-to-cave roofs | |
RU2081324C1 (en) | Method for hydraulic bore-hole mining of minerals | |
SU487236A1 (en) | The way to develop gently dipping minerals | |
SU989083A1 (en) | Method of driving large-section workings | |
SU1032840A1 (en) | Method of excavating steep ore bodies | |
SU1461942A1 (en) | Method of mining thick ore deposits | |
SU1190039A1 (en) | Method of mining flooded mineral deposits | |
SU1745931A1 (en) | Method of exploitation of mineral deposits | |
RU2164601C1 (en) | Method of developing flooded deposits of water-soluble minerals | |
SU968408A1 (en) | Method of working sloping thick ore deposits | |
SU855209A1 (en) | Method of caving overlapping rocks | |
SU512290A1 (en) | The method of underground mining of ore deposits | |
SU994734A1 (en) | Method of working medium-thick and thick coal beds |