SU956793A1 - Method of working thick ore deposits - Google Patents
Method of working thick ore deposits Download PDFInfo
- Publication number
- SU956793A1 SU956793A1 SU803006420A SU3006420A SU956793A1 SU 956793 A1 SU956793 A1 SU 956793A1 SU 803006420 A SU803006420 A SU 803006420A SU 3006420 A SU3006420 A SU 3006420A SU 956793 A1 SU956793 A1 SU 956793A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- ore
- workings
- pillars
- leading
- deposits
- Prior art date
Links
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Description
(54) СПОСОБ РАЗРАБОТКИ МОЩНБ1Х РУДНЫХ ЗАЛЕЖЕЙ(54) METHOD FOR DEVELOPMENT OF POWERFUL ORE ARRANGEMENTS
1 one
Изобретение относитс к горнодобывающей промышленности и может быть использовано при выемке мошных рудных залежей сло ми с закладкой выработанного пространства твердеюш,ёй смесью.The invention relates to the mining industry and can be used in the excavation of moscid ore deposits with layers of hardened space, hardened mixture.
Известен способ разработки мош,ных рудных залежей, включающий опережающую сплошную подсечку по руде на контакте с породами кровли, установку анкерной крепи в почве подсечки, закладку подсечки и последующую очистную выемку запасов разгруженных очистных слоев 1.There is a known method of developing moshs, ore deposits, including advanced continuous cutting of ore on contact with roof rocks, installation of anchor in the soil of hooking, laying of hooking and subsequent cleaning of the stocks of unloaded cleaning layers 1.
Недостатками данного способа вл ютс большой объем горнопроходческих работ при образовании подсечки, высока трудоемкость работ при креплении почвы подсечки , невысока устойчивость получаемого перекрыти при ведении под ним взрывных работ.The disadvantages of this method are the large amount of mining work during the formation of the sweep, the laboriousness of the work during the fastening of the soil of the sweep is high, the low stability of the resulting overlap when blasting works under it.
Наиболее близким к предлагаемому вл етс способ разработки мощных рудных залежей, включающий разгрузку рудного массива путем проходки опережающих параллельных выработок на контакте руды и налегающих пород, оформление целиков между ними, закладку опережающих выработок твердеющими смес ми, очистную выемку запасов полезного ископаемого сло ми, извлечени оставленных целиков и закладку выработанного пространства твердеющими смес ми 2.The closest to the present invention is a method of developing powerful ore deposits, including unloading the ore massif by sinking leading parallel workings on the contact of ore and overburden, forming pillars between them, laying out leading workings with hardening mixtures, clearing the reserves of mineral deposits, extracting the abandoned pillars and laying of the worked-out space with hardening mixtures 2.
Однако этот способ характеризуетс недостаточной устойчивостью подкровельного сло и значительным объемом работ, св занным с проходкой выработок дл частичного извлечени запасов руды из целиков,However, this method is characterized by insufficient stability of the roofing layer and a considerable amount of work related to the excavation of workings for the partial extraction of ore reserves from the pillars,
10 что снижает эффективность разработки месторождений .10 which reduces the efficiency of field development.
Цель изобретени - повьшение эффективности запасов залежей и увеличение устойчивости подкровельных слоев.The purpose of the invention is to increase the efficiency of deposits and increase the stability of the roofing layers.
1515
Цель достигаетс тем, что из опережающих выработок разуплотн ют рудный массив и рудную часть целиков в зоне контакта руды с налегающими породами, укрепл ют опережающие выработки штангами, которые 20 устанавливают в выработках перед их закладкой , а запасы руды в целиках между опережающими выработками полностью извлекают при очистной выемке нижелажащего сло руды.The goal is achieved by decomposing the ore massif and the ore part of the pillars in the zone of contact of the ore with overlying rocks from the advanced workings, reinforcing the advance workings by rods, which are installed in the workings before their laying, and the ore reserves in the pillars between the leading workings are completely removed at clearing a lower layer of ore.
На фиг. 1 показана схема отработки рудной залежи сло ми в нисход щем пор дке , на фиг. 2 - узел -1 на фиг. 1; на фиг. 3 - схема отработки залежи в восход ще .м пор дке.FIG. 1 is a diagram of mining of ore deposits in downward order; FIG. 2 - node -1 in FIG. one; in fig. 3 is a reservoir mining scheme in the ascending order.
Рудную залежь 1 отрабатывают сло ми с закладкой выработанного пространства твердеющей смесью. В процессе отработки у поверхности контакта руды с налегающими породами проход т опережающие выработки 2, между которыми оформл ют ленточные рудопородные целики 3. В рудной части этих целиков при проходке опережающих выработок бур т разуплотн ющие щпуры 4, взрывают в них камуфлетирующие зар ды 5 взрывчатых веществ и, таки.м образом , образуют у контакта с налегающими породами разуплотненную область. Выще разуплотненной области налегающие породы скрепл ют железобетонными штангами или ст жками 6 и устанавливают железобетонные щтанги 7 в кровле пройденных опережающих выработок. В результате выполнени этих меропри тий создают податливость в нижних част х целиков, что пе реносит зону опорного давлени в глубину рудного массива, упрочн ют верхние части оформленных целиков, преп тствуют тем са.мым их разрущению и повыщают устойчивость и плавность опускани кровли.Ore deposit 1 is worked by layers with laying of the developed space with hardening mixture. In the process of working out, at the contact surface of the ore with overlying rocks, the advanced workings 2 are passing, between which tape ore-breed pillars 3 are formed. In the ore part of these pillars, when de-energizing the workings of the pillars 4, explode the camouflaging charges of 5 explosives and, in a similar way, form a decompressed area at contact with overlying rocks. Over the decompressed area, the overlying rocks are fastened with reinforced concrete rods or straps 6, and reinforced concrete pillars 7 are installed in the roof of the advanced workings. As a result of these measures, compliance in the lower parts of the pillars is created, which transfers the reference pressure zone to the depth of the ore mass, strengthens the upper parts of the decorated pillars, prevents them from destroying them and increases the stability and lowering of the roof.
В полностью пройденных опережающих выработках на почве оставл ют слой отбитой горной массы 8 толщиной 0,3-0,5 м, подвещивают на щтанги вертикальные (крутонаклонные ) арматурные стержни 9 и скрепл ют их нижние концы горизонтальной арматурой 10. По окончании подвески вертикальной и горизонтальной арматуры производ т изол цию пройденных опережающих выработок и заполн ют последние твердеющей смесью. При ее отверждении на податливо .м основании формируетс скрепленна с кровлей железобетонна конструкци 11. В качестве закладки используют низкомарочную закладочную смесь.In the completely completed advance workings, a layer of broken rock mass 8 with a thickness of 0.3-0.5 m is left on the soil, vertical (steeply inclined) reinforcing rods 9 are mounted on the shanks and their lower ends are fastened with horizontal reinforcement 10. At the end of the suspension, vertical and horizontal The armatures isolate the completed workings and fill the latter with a hardening mixture. When it is cured on a pliable basis, a reinforced concrete structure 11 bonded to the roof is formed. A low-grade filling mixture is used as a bookmark.
Оставленные в целиках запасы разуплотненной руды и руды под разуплотненной областью извлекают при отработке ниже .тежащего сло . Его отрабатывают проходкой выработок 12, расположенных между ос ми возведенных железобетонных опор вприсечку к надработанному рудному массиву .The reserves of uncompacted ore left in the pillars and the ore under the uncompacted area are extracted when working below the corresponding layer. It is worked out by driving openings 12 located between the axes of the erected reinforced concrete supports to the above-developed ore massif.
В процессе отработки нижнего сло нар ду с выемкой рудных запасов целиков между опережающими выработками извлекают законсервированные на почве при создании податливого основани запасы отбитой руды . При этом на почве вновь проходимых нижних очистных выработок также составл ют защитную подущку из руды. Пройденные нижние выработки также закладывают твердеющей смесью.In the process of mining the lower layer, along with excavation of the ore reserves of the pillars between the advancing workings, the reserves of broken ore that are conserved on the soil during the creation of a pliable base are extracted. At the same time, on the soil of the newly traversed under-workings, a protective feeder of ore is also made. The completed lower workings also lay a hardening mixture.
Запасы извлекают либо в нисход щем, либо в восход щем пор дке. При реализации нисход щей выемки слоев работы по выемке запасов рудной залежи ведут, как правило, во всех сло х. При восход щейStocks are recovered either in descending order or in ascending order. When implementing the downward excavation of layers, the work on the extraction of reserves of the ore deposit is carried out, as a rule, in all layers. At ascending
выемке работы ведут в двух надрабатывающих сло х и в одном-двух (в зависимости от моп ности рудного тела) полностью надработанных сло х. При этом отработку полностью надрабатывающего сло осуществл ют при сохрании двух-трех целиков между опережающими выработками подкровельного сло , выбира щирину последних в зависимости от устойчивости закрепленных пород кровли. Выемку руды в полностью надработанных сло х ведут с таким расчетом , чтобы при отработке сло , ближайщего к полностью надрабатывающему Слою, опережение фронта работ по полностью надрабатывающему слою составл ло не менее , чем 1,5 В и 0,4 тВ (В - щирина очистной выработки, тВ - высота от почвы очистной выработки до почвы полностью надрабатывающей выработки). В результате такого пор дка работ извлечение запасов всех слоев ведут на разгруженных от опорного давлени участках.the excavation work is carried out in two overlaying layers and in one or two (depending on the mass of the ore body) fully developed layers. At the same time, the development of a fully working layer is carried out while maintaining two or three pillars between the leading workings of the under-roofing layer, choosing the width of the latter depending on the stability of the fixed roof rocks. The extraction of ore in fully developed layers is carried out in such a way that when mining the layer closest to the fully developed Layer, the front of the work on the fully developed layer is no less than 1.5 V and 0.4 tV (B - width output, tV - height from the soil of the sewage treatment to the soil of the fully developed production) As a result of this order of work, the extraction of reserves of all layers is carried out in areas unloaded from the reference pressure.
Кроме того, это дает возможность увеличить количество очистных забоев и сократить объем проходческих работ по выемке подкровельного сло .In addition, it provides an opportunity to increase the number of cleaning faces and reduce the amount of tunneling work on the excavation of the under-roofing layer.
Использование предлагаемого способа обеспечивает повыщение устойчивости подкровельных слоев, увеличение интенсивности очистных работ и снижение стоимости разработки руды в результате уменьщени The use of the proposed method provides an increase in the stability of the under-roof layers, an increase in the intensity of cleaning works and a reduction in the cost of developing ore as a result of
затрат на создани перекрыти в кровле залежи.the cost of creating an overlap in the reservoir roof.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU803006420A SU956793A1 (en) | 1980-11-20 | 1980-11-20 | Method of working thick ore deposits |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU803006420A SU956793A1 (en) | 1980-11-20 | 1980-11-20 | Method of working thick ore deposits |
Publications (1)
Publication Number | Publication Date |
---|---|
SU956793A1 true SU956793A1 (en) | 1982-09-07 |
Family
ID=20926871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU803006420A SU956793A1 (en) | 1980-11-20 | 1980-11-20 | Method of working thick ore deposits |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU956793A1 (en) |
-
1980
- 1980-11-20 SU SU803006420A patent/SU956793A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU956793A1 (en) | Method of working thick ore deposits | |
US1872016A (en) | Surface mining | |
SU998759A1 (en) | Method of controlling rock pressure | |
SU1129354A1 (en) | Method of underground working of mineral deposits | |
SU848643A1 (en) | Method of mining ore bodies | |
SU825964A1 (en) | Method of working thick steeply-inclined ore bodies | |
SU602684A1 (en) | Method of mining mineral deposits | |
SU898075A2 (en) | Method of working ore deposits | |
SU1028846A1 (en) | Method of mining steep ore deposit | |
SU827790A1 (en) | Method of working thick gently sloping mineral deposits | |
SU1004639A1 (en) | Method of mining thick gently-sloping beds | |
SU899963A1 (en) | Method of mining unstable ores | |
SU1643717A1 (en) | Method for working out contiguous seams of minerals | |
SU914773A1 (en) | Method of filling an excavated space | |
SU768985A1 (en) | Method of working seam formations of minerals | |
SU905496A2 (en) | Method of protecting development working | |
SU1717821A1 (en) | Method for mining mineral deposits | |
SU1710742A1 (en) | Method of mining thick gently-dipping ore deposits | |
SU1633127A1 (en) | Method of mining sloping ore bodies | |
RU2083833C1 (en) | Method for development of steep coal seams with backing worked-out area | |
SU737628A1 (en) | Method of mining mineral deposits | |
SU981609A1 (en) | Method of working near-shaft pillars in thick gently-sloping deposits | |
SU829948A1 (en) | Method of working ore deposits | |
SU810973A1 (en) | Method of working sloping ore bodies | |
SU875048A1 (en) | Method of subterranean mining of mineral deposits in ascending layers |