SU829948A1 - Method of working ore deposits - Google Patents

Method of working ore deposits Download PDF

Info

Publication number
SU829948A1
SU829948A1 SU792716935A SU2716935A SU829948A1 SU 829948 A1 SU829948 A1 SU 829948A1 SU 792716935 A SU792716935 A SU 792716935A SU 2716935 A SU2716935 A SU 2716935A SU 829948 A1 SU829948 A1 SU 829948A1
Authority
SU
USSR - Soviet Union
Prior art keywords
ore
rocks
wells
empty
floors
Prior art date
Application number
SU792716935A
Other languages
Russian (ru)
Inventor
Владимир Никифорович Власов
Виктор Демидович Шапошников
Павел Тихонович Гайдин
Анатолий Емельянович Умнов
Виктор Андреевич Коваленко
Жорес Григорьевич Мухин
Original Assignee
Штаб Военизированных Горноспасатель-Ных Частей Сибири И Дальнего Boctoka
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Штаб Военизированных Горноспасатель-Ных Частей Сибири И Дальнего Boctoka filed Critical Штаб Военизированных Горноспасатель-Ных Частей Сибири И Дальнего Boctoka
Priority to SU792716935A priority Critical patent/SU829948A1/en
Application granted granted Critical
Publication of SU829948A1 publication Critical patent/SU829948A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Description

(54) СПОСОБ РАЗРАБОТКИ РУДНЫХ МЕСТОРОЖДЕНИЙ(54) METHOD FOR DEVELOPING MINERAL DEPOSITS

1one

Изобретение относитс  к горной промышленности и может быть использовано при поземной разработке рудных месторождений.The invention relates to the mining industry and can be used in the underground mining of ore deposits.

Известен способ разработки рудных месторождений этажным обрушением с площадным выпуском отбитой руды под отрезанной по контуру част междуэтажного целика l .There is a method of developing ore deposits floor collapse with areal release of broken ore under cut off along the contour of the part of the intermediate floor pillar l.

Известен способ разработки рудны месторождений с обрушением площадны выпуском под покрывающими породами, включающий проходку буровых и транспортных выработок с образованием днища блока, буровзрывную отбойку полезного ископаемого, площадный выпуск руды под покрывающими породами .There is a method of developing ore deposits with the collapse of the area of release under covering rocks, including the drilling of drilling and transport workings with the formation of the bottom of the block, drilling and blasting blasting of minerals, areal ore production under covering rocks.

Этот способ обладает высокой производительностью 2J.This method has a high performance of 2J.

Недостаток способа - засорение руд;ы покрывающими породами.The disadvantage of this method is the clogging of ores; s covering rocks.

Цель изобретени  - снижение трудоемкости создани  искусственных раздел ющих перекрытий из пустых пород .Поставленна  цель достигаетс  тем, что после выпуска руды из вышележащего этажа изолируют транспортные выработки указанного этажа отThe purpose of the invention is to reduce the laboriousness of creating artificial dividing floors from waste rock. The purpose of the invention is to ensure that after the ore is released from the upper floor, the transport outputs of the said floor are isolated from

пустых пород и из них разбуривают массив руды над транспортными выработками до выхода скважин к пустым обрушенным породам, после чего через указанные скважины инъектируют пустые породы в жущим раствором .empty rocks and from them drill up an array of ore over the transport workings until the wells reach the empty collapsed rocks, after which the said rocks are injected into the empty rocks in a slurry solution.

При этом перед подачей в жущего раствора через скважины промывают обрушенные пустые породы водой.At the same time, before feeding into the remaining solution, the collapsed waste rock is washed through the wells with water.

Кроме того, вначале инъектируют нижнюю часть пустых пород на высоту, по меньшей мере обеспечивающую перекрытие транспортных выработок, и после твердени  растврра инъектируют оставшийс  необходимый объем пустых пород.In addition, the lower part of the waste rock is firstly injected to a height that at least ensures the overlapping of the roadways, and after the solution has hardened, the remaining necessary amount of waste rock is injected.

После выпуска руды из вьлшележащего этажа производ т цементацию пустых пород, наход щихс  на отрабо0 танном днище и заполнившие выработанное очистное пространство. Это позвол ет значительно разгрузить бывшие транспортные выработки, уменьшить их разрушение, что в последующем обеспечивает безопасные услови  труда по ,бурению скважин и производству взрывных; работ в гребн х отработанного днища, а также рудного массива нижележащего этажа. Качест0 венное мелкое дробление верхнейAfter the ore has been released from the overlying floor, cementation of waste rock is carried out on the excavated bottom and filled the developed cleaning space. This makes it possible to significantly relieve the former transport workings, reduce their destruction, which subsequently ensures safe working conditions for drilling, drilling and producing explosives; works in the ridge of the waste bottom, as well as the ore massif of the underlying floor. High quality fine crushing

части обрушенного блока способствует уменьшению засорени  руды налегающими породами. Кроме того, сцементированные налегающие пустые породы в крупные куски, позвол ют сократить засорение руды. Получение общего щита из цементированных пустых пород над «отрабатываемым блоком,способным выдержать давление накрывающих пород и образование под ним пустого выработанного пространства не об зательно. На чертеже показана принципиальна  схема осуществлени  способа разработки рудных месторождений с обрушением и площадным выпуском под покрывающими породами (проекци  на вертикальную плоскость по простиранию залежи).part of the collapsed block helps to reduce the clogging of ore by overlying rocks In addition, cemented overburden in large pieces can reduce clogging of the ore. It is not necessary to obtain a common shield of cemented waste rock over the block being worked out, capable of withstanding the pressure of the overburden and the formation of empty waste space under it. The drawing shows a schematic diagram of the method for developing ore deposits with collapse and areal release under the overburden (projection onto a vertical plane along the strike of the deposit).

На схеме пунктирными лини ми 1 показаны границы блока, а пунктирным лини ми 2 - границы этажа. Вышележащий этаж полностью отработан и выработанное пространство 3 заполнено покрывающими пустыми породами 4. На нижележащем этаже из блока 5 ведетс  выпуск отбитой руды б под искусственными сцементированными из пустых пород крупными кусками 7. В блоке 8 проведены транспортные 9 и буровые 10 выработки и образовано днище 11, массив руды разбурен комплектом скважин 12 дл  отбойки. В выпускных выработках 13 на вышележащем этаже установлены перемычки 14, из бывших транспортных выработок 9 пробурены скважины 15 дл  нагнетани  твердеющего раствора 16 в пустоты между кусками пустых пород 4 в отработанном очистном пространстве 3. В блоке 17 ведутс  горноподготовительные и нарезные работы.The diagram shows dashed lines 1 as block boundaries, and dashed lines 2 show floor boundaries. The overlying floor is completely exhausted and the space 3 is filled with covering waste rocks 4. On the lower floor of block 5, there is a release of broken ore used by large pieces of artificial cement 7 that have been cemented from block 8. An array of ore is drilled by a set of wells 12 for breaking. Jumpers 14 are installed in the exhaust workings 13 on the upper floor, wells 15 are drilled from the former transport workings 9 to inject the hardening solution 16 into the voids between pieces of waste rock 4 in the spent treatment space 3. Mining and cutting works are carried out in block 17.

Приме р. Деление залежей на этажи, а этажей на блоки, а также проведение горноподготовительных и нарезных выработок, оформление днища ведут известными приемами. После выпуска руды из вышел,ежащего этажа в выпускных выработках 13 устанавливают перемычки 14, изолиру  бывшие транспортные выработки 9 от очистног пространства 3, заполненного покрываинцими пустыми породами 4. Из бывши транспортных выработок 9 бур т скважины 15 дл  нагнетани  твердеющего в жущего раствора, например бетонной смеси 16, в отработанное очистное пространство 3 дл  заполнени  пустот между кусками покрывающих пород 4. Высоту заполнени  определ ю из услови  образовани  в последующем крупных кусков 7 из сцементированных пустых пород. После твердени  раствора 16 создаетс  надежное перекрытие, предохран ющее бывшие транспортные выработки 9 от разрушени  на врем , когда фронт очистных работ подойдет к этому участку (3-5 лет), затем Производ т разбуривание комплекта ми скважин 12 массива руды нижележащего этажа. Надежное перекрытие из сцементированных пустых пород позвол ет проходить дополнительные буровые выработки 10 в непосредственной близости от очистного пространства , что обеспечивает равномерное разбуривание массива и качественное дробление. После отбойки ведут площадный выпуск отбитой руды 6 под прикрытием крупных кусков 7 из сцементированных пустых пород.Выпуск руды производ т до момента по влени  над выпускными выработками сцементированных кусков из пустых пород , после чего выпускные выработки изолируют и провод т работы по нагнетанию твердеющего раствора в отработанное очистное простракство и цикл повтор етс . По мере отработки месторождени  н.ад днищем каждого последующего этажа увеличиваетс  количество крупных кусков из сцементированных пустых пород, что способствует сокращению расхода твердеющего раствора и уменьшению засорени  руды покрывающими породами. Предлагаемый способ разработки месторождений с обрушением и площадным выпуском под покрывающими породами позвол ет сохранить выработкиPrimer p. The division of the pools into floors, and the floors into blocks, as well as the holding of mining and rifled workings, and the design of the bottom are well known. After the ore is released from the exit, the hemline 14 in the exhaust workings 13 install jumpers 14, isolate the former transport workings 9 from cleansing space 3 filled with flat rocks 4. From the former transport workings 9, drill 15 to inject a hardening mortar, eg the mixture 16, into the spent cleaning space 3 to fill the voids between the pieces of overburden 4. The filling height is determined by the condition of the subsequent formation of large pieces 7 of cemented empty he City of. After hardening the solution 16, a reliable overlap is created, which prevents the former transport excavations 9 from being destroyed for a time when the front of the refining operation approaches this site (3-5 years), then the hole sets 12 of the ore massif below are drilled. Reliable overlap of cemented waste rock allows additional drilling workings 10 to be made in the immediate vicinity of the treatment space, which ensures uniform array drilling and high-quality crushing. After blasting, areal production of broken ore 6 is carried out under the cover of large pieces 7 of cemented waste rock. cleansing prostraction and the cycle repeats. As the deposit is mined at the bottom of each subsequent floor, the number of large pieces of cemented waste rock increases, which contributes to reducing the consumption of hardening mortar and reducing the clogging of the ore by the overburden. The proposed method of field development with collapse and areal release under covering rocks allows to keep production

в отработанном днище, упрочнить массив , что дает возможность равномерно разбурить массив руды в нижележащем горизонте. Качественное дроблениеin the spent bottom, strengthen the array, which makes it possible to evenly drill an array of ore in the underlying horizon. High-quality crushing

и выпуск под прикрытием из искусственно созданных крупных кусков пустых пород позвол ет значительно сократить засорение руды покрывающими породами. Перед заполнением пустот между кусками покрывающих пород в выработанном очистном пространстве через скважины 15 производ т промывку водой покрывающих пород, наход щихс  н-ад днищем и выработках днища (воронках, транше х), дл  удалени  мелкой фракции и глины с целью обеспечени  большой прочности сцементированного массива пустых пород .and the release under cover of artificially created large pieces of waste rock can significantly reduce the clogging of ore by covering rocks. Before filling the voids between pieces of overburden in the developed cleaning space, wells 15 flush over the overburden with n-he and bottom workings (funnels, trenches) to remove fines and clay in order to ensure high strength of the cemented mass waste rocks.

Дл  обеспечени  монолитности сцементированного массива пустых пород и на большую высоту процесс заполнени  ведут в две стадии, в первую стадию с помощью твердеющего раствора прочно перекрывают выпускные выработки 13, а во вторую стадию под давлением заполн ют оставшийс  необходимый объем выработанного пространства. Это позвол ет получить сцементированный массив большей высоты, увеличить его габариты, что способствует уменьшению засорени  руды. Если хорошо раздроблен верхний массив руды в блоке, и выпуск ведетс  под прикрытием из крупных кусков сцементированннх пустых пород, то улучшаютс  качественные показатели по выпуску. Кроме того,твердеющими растворами заполн ют пустотыIn order to ensure the solidity of the cemented mass of waste rock and to a great height, the filling process is carried out in two stages; This makes it possible to obtain a cemented massif of greater height, to increase its dimensions, which helps to reduce the clogging of the ore. If the upper mass of ore in the block is well crushed, and the release is carried out under the cover of large pieces of cemented waste rock, then the quality indicators of the output will improve. In addition, hardening solutions fill the voids.

Claims (3)

Формула изобретенияClaim 1. Способ разработки рудных месторождений, включающий.проходку буровых и транспортных выработок с образованием днища блока, взрывную отбойку руды в этаже, площадный выпуск ее под искусственно создаваемыми опускающимися разделяющими перекрытиями из. покрывающих пустых пород, отличающийся тем, что, с целью снижения трудоемкости создания искусственных разделяющих перекрытий из пустых пород, после выпуска руды из вышележащего 1. A method of developing ore deposits, including drilling and transporting holes with the formation of the bottom of the block, explosive blasting of ore in the floor, its areal discharge under artificially created lowering dividing floors from. covering gangue, characterized in that, in order to reduce the complexity of creating artificial separating floors from gangue, after the release of ore from the overlying 3 Ч этажа изолируют транспортные выработки указанного этажа от пустых пород и из них разбуривают массив руды над транспортными выработками до выхода скважин к пустым обрушен5 ным породам, после чего через указанные скважины инъектируют пустые породы . вяжущим раствором.3 floors isolate the transport workings of the specified floor from waste rocks and from them drill an ore mass above the transport workings before the wells exit to the empty collapsed 5 rocks, after which empty rocks are injected through these wells. astringent solution. 2. Способ по п.1, отличающийся тем, что перед подачей ,» вяжущего раствора через скважины . промывают обрушенные пустые породы водой.2. The method according to claim 1, characterized in that before feeding, "cementing solution through the wells. washed collapsed waste rocks with water. 3. Способ по пп. 1 и 2, о т лича ю щ и й с я , тем, что вначале инъектируют нижнюю часть пустых по-3. The method according to PP. 1 and 2, which is different from the fact that first they inject the lower part of the empty 15 род на высоту, по меньшей мере обеспечивающую перекрытие транспортных выработок, а после твердения раствора инъектируют оставшийся необходимый объем пустых пород.15 genus to a height of at least providing overlapping transport workings, and after hardening the solution, the remaining necessary volume of waste rock is injected. 20 Источники информации, принятые во внимание при экспертизе20 Sources of information taken into account in the examination 1. Авторское свидетельство СССР W 232176, кл. Е 21 С 41/06, 1967.1. USSR copyright certificate W 232176, cl. E 21 C 41/06, 1967. 2. Еникеев А.Н. Прогрессивные2. Enikeev A.N. Progressive 25 техника и технология на подземных горных работах. Экспресс-информация, сер. 1, вып. 6, Черметинформация, 1976, с. 10-15.25 equipment and technology in underground mining. Express information, ser. 1, no. 6, Chermetinformation, 1976, p. 10-15. ZZ ВНИИПИ Заказ 3626/74 Тираж 627 ПодписноеВНИИПИ Order 3626/74 Circulation 627 Subscription Филиал ППП Патент, г. Ужгород, ул. Проектная,4Branch of PPP Patent, Uzhhorod, st. Project, 4
SU792716935A 1979-01-22 1979-01-22 Method of working ore deposits SU829948A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792716935A SU829948A1 (en) 1979-01-22 1979-01-22 Method of working ore deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792716935A SU829948A1 (en) 1979-01-22 1979-01-22 Method of working ore deposits

Publications (1)

Publication Number Publication Date
SU829948A1 true SU829948A1 (en) 1981-05-15

Family

ID=20806936

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792716935A SU829948A1 (en) 1979-01-22 1979-01-22 Method of working ore deposits

Country Status (1)

Country Link
SU (1) SU829948A1 (en)

Similar Documents

Publication Publication Date Title
RU2439323C1 (en) Method to mine inclined ore deposits
RU2449125C1 (en) Method to mine large sloping ore bodies
RU2208221C2 (en) Method for selective mining extraction of qualitative mineral resource in open pit
SU829948A1 (en) Method of working ore deposits
US2536869A (en) Mining method
RU2386812C1 (en) Method of complex development of kimberlitic pipes
RU1789737C (en) Method for formation of vertical working
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
SU602684A1 (en) Method of mining mineral deposits
RU2796836C1 (en) Method of mining ore bodies
RU2215145C1 (en) Method of mineral deposit underground mining in strips
SU1317128A1 (en) Method of mining thick ore deposits
RU2202041C2 (en) Process of development of reserves of thick steeply deepening deposits of ore located under pits
SU829950A1 (en) Method of working adjacent sloping beds of minerals
SU1446311A1 (en) Method of mining steep ore bodies
SU1071003A1 (en) Method of underground leaching of useful minerals from ore bodies
SU883445A1 (en) Method of underground leaching of minerals
SU1035226A1 (en) Method of solid working of ore bodies
SU883444A1 (en) Mineral working method
RU2150002C1 (en) Method of hydraulic borehole mining in hard rocks
SU991052A1 (en) Method of cutting adjoining gently-sloping beds separated by low-strength interlay
SU1666728A1 (en) Method of development of ore deposits
SU1643717A1 (en) Method for working out contiguous seams of minerals
RU2229600C1 (en) Method for excavation of steep-falling ore deposits
SU1717822A1 (en) Method of combined mining of mineral deposits