SU939752A1 - Method of working thick gently-sloping beds - Google Patents

Method of working thick gently-sloping beds Download PDF

Info

Publication number
SU939752A1
SU939752A1 SU802983698A SU2983698A SU939752A1 SU 939752 A1 SU939752 A1 SU 939752A1 SU 802983698 A SU802983698 A SU 802983698A SU 2983698 A SU2983698 A SU 2983698A SU 939752 A1 SU939752 A1 SU 939752A1
Authority
SU
USSR - Soviet Union
Prior art keywords
layers
layer
mineral
lava
bookmark
Prior art date
Application number
SU802983698A
Other languages
Russian (ru)
Inventor
Вячеслав Павлович Кругликов
Марк Абрамович Розенбаум
Леонид Николаевич Гапанович
Юрий Викторович Громов
Original Assignee
Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела filed Critical Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority to SU802983698A priority Critical patent/SU939752A1/en
Application granted granted Critical
Publication of SU939752A1 publication Critical patent/SU939752A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Description

1one

Изобретение относитс  к горной промышленности и предназначено дл  разработки мощных пологих пластов полезных ископаемых.The invention relates to the mining industry and is intended to develop thick, flat seams of minerals.

Известен способ разработки мощных пологих пластов полезных ископаемых 1.There is a method of developing powerful flat seams of minerals 1.

Однако этот способ характеризуетс  недостаточной эффективностью.However, this method is characterized by insufficient efficiency.

Известен разработки мощных пологих пластов, включающий разделение пласта на слои, проведение подготовительных выработок, выемку полезного ископаемого лавами с выпуском его. в выработку нижнего сло  и закладку выработанного пространства 2.Known to the development of powerful flat seams, including the separation of the reservoir into layers, holding preparatory workings, excavation of mineral fossils with the release of it. into the development of the lower layer and the laying of the goaf 2.

Известный способ также недостаточно эффективен,The known method is also not effective enough

Цель изобретени  - повышение эффективности разработки мощных пологих пластов.The purpose of the invention is to increase the efficiency of the development of powerful flat seams.

Поставленна  цель достигаетс  тем, что выемку полезного ископаемого производ т раздельно сло ми и камерами, причем сначала вынимают верхний слой у кровли пласта, а затем два сло , расположенные диагонально по мощности пласта под углом друг к другу, после чего отбивают и выпускают полезное ископаемое из образованной камеры с одновременной отработкой нижнего сло .The goal is achieved by the fact that the mineral excavation is carried out separately by layers and chambers, first removing the upper layer at the top of the reservoir, and then two layers located diagonally along the thickness of the reservoir at an angle to each other, and then kicking and releasing the mineral from formed by the camera while simultaneously working out the lower layer.

Длина лавы не превышает длины предельного устойчивого пролета основной кровли.The length of the lava does not exceed the length of the maximum stable span of the main roof.

Закладку, возвод т только в сло х.Bookmark, raised only in layers.

Закладку возвод т как в сло х, так и в камерах.The bookmark is erected both in the layers and in the chambers.

На фиг. 1 показан способ выемки весьма мощного пласта; на фиг. 2 способ выемки пласта мощностью до 20 м.FIG. 1 shows a method for excavating a very thick formation; in fig. 2 method of excavation reservoir up to 20 m.

Claims (3)

Способ осуществл етс  следующим образом. 3 По мощному пласту 1 провод т под готовительные выработки 2 у кровли и 3 У почвы пласта. В случае, если пласт весьма мощный, то в средней части провод т выработки Ц. После проведени  выработок отрабатывают лаву 5 верхнего сло  у кровли пласта , причем длину лавы выбирают из расчета предельно устойчивого проле та пород основной кровли. По мере отработки лавы 5 и возведени  закла дочного массива в выработанном пространстве, выработки 2, окоитуривающие лаву 5 сохран ют дл  отработки двух слоев 6, по мере отработки слоев 6 в них возвод т заклад ку. После этого из образованной камеры 7 выпускают полезное ископаемо которое разрушают при помощи буровзрывных работ. По мере выпуска .полезного ископаемого из камеры 7 ее заполн ют закладкой. Слой 8 отра батывают с одновременным выпуском полезного ископаемого из массива 9. В случае разработки весьма мощного пласта слой 8 отрабатывают с одновр менным выпуском массива 9, оконтуренного сло ми 10 и после выемки и закладки выпускают полезное ископае мое из камеры 11. Отработку можно производить как с возведением закла ки только в сло х, так и с возведением ее в сло х и камерах. Предлагаемый способ позволит зна чительно повысить эффективность раз работки мощных пологих пластов полезных ископаемых за счет снижени  трудоемкости работ, затрат на допол нительное оборудование, разубоживани  полезного ископаемого и за счет повторноГ-о использовани  подготовительных выработок. Формула изобретени  1.Способ разработки мощных пологих пластов, включающий разделение пласта на слои, проведение подготовительных выработок, выемку полезного ископаемого лавами с выпуском его в выработку нижнего сло  и закладку выработанного пространства, отличающийс  тем, что, с целью повышени  эффективности разработки мощных пологих пластов, выенку полезного ископаемого производ т раздельно сло ми и камерами, причем сначала вынимают верхний слой у кровли пласта, а затем два сло , расположенные диагонально по мощности пласта под углом друг к другу, после чего отбивают и выпускают полезное ископаемое из образованной камеры с одновременной отработкой нижнего сло , The method is carried out as follows. 3 A thick layer 1 is used for preparatory workings 2 near the roof and 3 near the soil of the layer. If the reservoir is very powerful, then in the middle part, the mine workings are carried out. After the workings are completed, the lava 5 of the upper layer at the roof of the reservoir is worked out, and the length of the lava is selected based on the extremely stable main roof rocks. As the lava 5 is mined and the embankment array is erected in the mined-out space, the mines 2 are formed, the surrounds of the lava 5 are retained for the two layers 6, and as the layers 6 are mined, the laying is made. After that, from the educated chamber 7 they release minerals which are destroyed by means of drilling and blasting operations. As the mineral is released from chamber 7, it is filled with a bookmark. Layer 8 is refined with simultaneous release of mineral from massif 9. In the case of the development of a very thick layer, layer 8 is worked out with simultaneous release of massif 9, outlined by layers 10 and after extraction and bookmark, minerals are released from chamber 11. Working out can be done as with erection of the slab only in layers, and with its erection in layers and chambers. The proposed method will make it possible to significantly increase the efficiency of developing powerful flat seams of minerals by reducing the complexity of work, the cost of additional equipment, dilution of the mineral and by re-using preparatory workings. Claim 1. The method of developing thick flat seams, including the separation of the layer into layers, carrying out preparatory workings, excavation of the mineral by lavas with its release into the production of the lower layer and laying the developed space, characterized in that, in order to increase the efficiency of the development of powerful flat layers, the mineral extraction is carried out separately by layers and chambers, and first the upper layer is removed from the roof of the formation, and then two layers located diagonally in thickness of the formation below angle to each other, after which they beat and release the mineral from the formed chamber while simultaneously working out the lower layer, 2.Способ поп,1,отличающ и и с   тем, что длина лавы верхнего сло  не превышает длины предельного устойчивого пролета основной кровли, 2. A pop method, 1, is also distinguished by the fact that the length of the upper layer lava does not exceed the length of the maximum stable span of the main roof, 3.Способ поп,1, отличающ и и с   тем, что закладку возвод т только в сло х. , Способ ПОП.1, отличающийс  тем, что закладку возвод т как в сло х, так и в камерах. Источники информации, прин тые во внимание при экспертизе 1.Авторское свидетельство СССР № 190848, кл, Е 21 С , . 2,Патент ПНР № 61978, кл, 5 D 15/02, 1968 (прототип).3. Method pop, 1, is also distinguished by the fact that the bookmark is raised only in layers. POP.1 method, characterized in that the bookmark is erected both in the layers and in the chambers. Sources of information taken into account during the examination 1. USSR author's certificate number 190848, class, E 21 C,. 2, the NDP Patent No. 61978, class, 5 D 15/02, 1968 (prototype).
SU802983698A 1980-09-24 1980-09-24 Method of working thick gently-sloping beds SU939752A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802983698A SU939752A1 (en) 1980-09-24 1980-09-24 Method of working thick gently-sloping beds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802983698A SU939752A1 (en) 1980-09-24 1980-09-24 Method of working thick gently-sloping beds

Publications (1)

Publication Number Publication Date
SU939752A1 true SU939752A1 (en) 1982-06-30

Family

ID=20918393

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802983698A SU939752A1 (en) 1980-09-24 1980-09-24 Method of working thick gently-sloping beds

Country Status (1)

Country Link
SU (1) SU939752A1 (en)

Similar Documents

Publication Publication Date Title
US3917346A (en) Method of blasting a subterranean deposit
SU939752A1 (en) Method of working thick gently-sloping beds
SU825964A1 (en) Method of working thick steeply-inclined ore bodies
RU2099524C1 (en) Combined method of mining of formation of steeply dipping coal seams
SU987103A1 (en) Method of working thick horizontal and gently sloping deposits
SU1155757A1 (en) Method of mining mineral deposits
SU842196A1 (en) Method of mining sloping ore bodies
RU2790648C1 (en) Method for underground development of steeping ore bodies in descenting order with chamber system
SU723162A1 (en) Method of protecting preparatory mine workings
SU992741A1 (en) Method of working sloping ore bodies separated by non-ore interbed
SU991052A1 (en) Method of cutting adjoining gently-sloping beds separated by low-strength interlay
SU1004639A1 (en) Method of mining thick gently-sloping beds
SU887809A1 (en) Method of mining sloping and gently sloping coal beds
SU1083662A1 (en) Method of mining steep-slope ore-bodies
RU2030581C1 (en) Method for combined mining of thick ore bodies
SU998771A1 (en) Method of excavating outburst-hazard coal formation
SU1028846A1 (en) Method of mining steep ore deposit
SU827790A1 (en) Method of working thick gently sloping mineral deposits
SU1125373A1 (en) Method of mining unstable ores
RU2229600C1 (en) Method for excavation of steep-falling ore deposits
SU976070A1 (en) Method of mining thick ore deposits
SU949182A1 (en) Method for working gently sloping mineral seams
SU1439240A1 (en) Method of combined exploitation of mineral deposits
RU96109970A (en) COMBINED METHOD FOR DEVELOPING STEPS OF STEEP COAL COAST
SU754067A1 (en) Method of mining thick ore bodies