RU2011120547A - METHOD FOR THE DEVELOPMENT OF POWERFUL CRUSHING ORE BODIES - Google Patents

METHOD FOR THE DEVELOPMENT OF POWERFUL CRUSHING ORE BODIES Download PDF

Info

Publication number
RU2011120547A
RU2011120547A RU2011120547/03A RU2011120547A RU2011120547A RU 2011120547 A RU2011120547 A RU 2011120547A RU 2011120547/03 A RU2011120547/03 A RU 2011120547/03A RU 2011120547 A RU2011120547 A RU 2011120547A RU 2011120547 A RU2011120547 A RU 2011120547A
Authority
RU
Russia
Prior art keywords
chambers
ore
chamber
hardening
iii
Prior art date
Application number
RU2011120547/03A
Other languages
Russian (ru)
Other versions
RU2475647C2 (en
Inventor
Юрий Абрамович Дик
Алексей Владимирович Котенков
Максим Сергеевич Танков
Владимир Иванович Фоминых
Original Assignee
Юрий Абрамович Дик
Алексей Владимирович Котенков
Максим Сергеевич Танков
Владимир Иванович Фоминых
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Юрий Абрамович Дик, Алексей Владимирович Котенков, Максим Сергеевич Танков, Владимир Иванович Фоминых filed Critical Юрий Абрамович Дик
Priority to RU2011120547/03A priority Critical patent/RU2475647C2/en
Publication of RU2011120547A publication Critical patent/RU2011120547A/en
Application granted granted Critical
Publication of RU2475647C2 publication Critical patent/RU2475647C2/en

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)
  • Earth Drilling (AREA)

Abstract

1. Способ разработки мощных крутопадающих рудных тел этажно-камерными системами разработки с твердеющей закладкой, включающий проходку выработок для деления рудного тела на блоки и стадийную выемку руды камерами отличающийся тем, что после деления рудного тела на блоки и камеры, отработку последних осуществляют в «шахматном» порядке по восстанию рудного тела по схеме I--II-, при этом днища смежных камер смещены на один подэтаж, а отбитую руду из камеры до откаточного штрека транспортируют по доставочному орту пройденному в средней части смежной камеры, который при ее отработке используют в качестве бурового орта, отбойку руды верхней части камер ведут между искусственными целиками из твердеющей закладки, а нижней - в рудном массиве,2. Способ по п.1, отличающийся тем, что размер каждого рудного целика (камеры) соответствует условию:0,8<0,6+0,4×b/h<1,где: b- ширина рудного целика (камеры), м;h- высота рудного целика (камеры), м.3. Способ по п.1, отличающийся тем, что закладку всех камер на 2/3 их высоты осуществляют твердеющей смесью, а верхнюю 1/3 часть камер - гидравлической, причем границу между твердеющей и гидравлической закладкой в каждой камере формируют выше отметки кровли камер нижележащего подэтажа на 1/6 ее высоты.4. Способ по п.3, отличающийся тем, что отработку камер II и IV осуществляют после закладки камер I и III, а отработку камер I и III - после набора закладкой нормативной прочности в камерах II и IV.1. A method for developing powerful steeply falling ore bodies by floor-chamber development systems with a hardening tab, including excavation of workings for dividing the ore body into blocks and stage-by-stage excavation of ore by cameras, characterized in that after dividing the ore body into blocks and chambers, the latter are mined in a “checkerboard” »The order of the rebellion of the ore body according to scheme I - II-, while the bottoms of adjacent chambers are shifted by one subfloor, and the beaten ore from the chamber to the recoil drift is transported along the delivery unit passed in the middle part a hedgehog chamber, which is used as a drilling unit vector when it is mined, ore is chipped off of the upper part of the chambers between artificial pillars from the hardening tab, and the lower one in the ore mass, 2. The method according to claim 1, characterized in that the size of each ore pillar (chamber) corresponds to the condition: 0.8 <0.6 + 0.4 × b / h <1, where: b is the width of the ore pillar (chamber), m ; h - the height of the ore pillar (chamber), m. 3. The method according to claim 1, characterized in that the laying of all chambers at 2/3 of their heights is carried out with a hardening mixture, and the upper 1/3 of the chambers are hydraulic, and the border between the hardening and hydraulic bookmarks in each chamber is formed above the roof mark of the cameras of the underlying substage 1/6 of its height. 4. The method according to claim 3, characterized in that the working out of chambers II and IV is carried out after laying the chambers I and III, and the working out of chambers I and III - after a set of standard strength in chambers II and IV is set.

Claims (4)

1. Способ разработки мощных крутопадающих рудных тел этажно-камерными системами разработки с твердеющей закладкой, включающий проходку выработок для деления рудного тела на блоки и стадийную выемку руды камерами отличающийся тем, что после деления рудного тела на блоки и камеры, отработку последних осуществляют в «шахматном» порядке по восстанию рудного тела по схеме I-III-II-IV, при этом днища смежных камер смещены на один подэтаж, а отбитую руду из камеры до откаточного штрека транспортируют по доставочному орту пройденному в средней части смежной камеры, который при ее отработке используют в качестве бурового орта, отбойку руды верхней части камер ведут между искусственными целиками из твердеющей закладки, а нижней - в рудном массиве,1. A method for developing powerful steeply falling ore bodies by floor-chamber development systems with a hardening tab, including excavation of workings for dividing the ore body into blocks and stage-by-stage excavation of ore by cameras, characterized in that after dividing the ore body into blocks and chambers, the latter are mined in a “checkerboard” »The order of the rebellion of the ore body according to the scheme I- III- II- IV , while the bottoms of adjacent chambers are shifted by one sub-floor, and the beaten ore from the chamber to the recoil drift is transported by a delivery unit passed in the middle hour of the adjacent chamber, which is used as a drilling unit, when it is mined, the ore of the upper part of the chambers is broken between artificial pillars from the hardening tab, and the lower one in the ore mass, 2. Способ по п.1, отличающийся тем, что размер каждого рудного целика (камеры) соответствует условию:2. The method according to claim 1, characterized in that the size of each ore pillar (chamber) meets the condition: 0,8<0,6+0,4×bц/hц<1,0.8 <0.6 + 0.4 × b c / h c <1, где: bц - ширина рудного целика (камеры), м;where: b c - the width of the ore pillar (chamber), m; hц - высота рудного целика (камеры), м.h c - the height of the ore pillar (chamber), m 3. Способ по п.1, отличающийся тем, что закладку всех камер на 2/3 их высоты осуществляют твердеющей смесью, а верхнюю 1/3 часть камер - гидравлической, причем границу между твердеющей и гидравлической закладкой в каждой камере формируют выше отметки кровли камер нижележащего подэтажа на 1/6 ее высоты.3. The method according to claim 1, characterized in that the laying of all chambers at 2/3 of their heights is carried out with a hardening mixture, and the upper 1/3 of the chambers are hydraulic, and the border between the hardening and hydraulic bookmarks in each chamber is formed above the roof mark of the chambers the underlying sub-floor at 1/6 of its height. 4. Способ по п.3, отличающийся тем, что отработку камер II и IV осуществляют после закладки камер I и III, а отработку камер I и III - после набора закладкой нормативной прочности в камерах II и IV. 4. The method according to claim 3, characterized in that the working out of chambers II and IV is carried out after laying the chambers I and III, and the working out of chambers I and III - after a set of standard strength in chambers II and IV is set.
RU2011120547/03A 2011-05-20 2011-05-20 Mining method of thick steep ore bodies RU2475647C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2011120547/03A RU2475647C2 (en) 2011-05-20 2011-05-20 Mining method of thick steep ore bodies

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2011120547/03A RU2475647C2 (en) 2011-05-20 2011-05-20 Mining method of thick steep ore bodies

Publications (2)

Publication Number Publication Date
RU2011120547A true RU2011120547A (en) 2012-11-27
RU2475647C2 RU2475647C2 (en) 2013-02-20

Family

ID=49121211

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2011120547/03A RU2475647C2 (en) 2011-05-20 2011-05-20 Mining method of thick steep ore bodies

Country Status (1)

Country Link
RU (1) RU2475647C2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103089268A (en) * 2013-02-20 2013-05-08 中南大学 Intensive mining method of ore cluster in ore-concentrated area
CN111005724A (en) * 2019-11-14 2020-04-14 南华大学 Method for stoping residual ores on top and bottom plates of slowly-inclined goaf
CN115324581A (en) * 2022-07-06 2022-11-11 山东黄金矿业(莱州)有限公司三山岛金矿 Mining method for high-stress medium-thickness crushed ore body

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590831B (en) * 2013-11-22 2015-10-07 北京科技大学 A kind of gentle dip is thin-the novel mining methods of middle thickness orebody
RU2558841C1 (en) * 2014-01-23 2015-08-10 Открытое акционерное общество "Научно-исследовательский и проектный институт обогащения и механической обработки полезных ископаемых "Уралмеханобр" (ОАО "Уралмеханобр") Method of developing thick steeply dipping ore bodies
CN104100270B (en) * 2014-06-13 2016-08-24 贵州开磷集团股份有限公司 A kind of low-angle dip mineral ore Truckless mining method
CN104929643A (en) * 2015-05-28 2015-09-23 广西高峰矿业有限责任公司 Top-bottom space reconstruction upward type cut-and-filling stoping method after high layering medium-length hole ore dropping
CN106014477A (en) * 2016-06-15 2016-10-12 山东华联矿业股份有限公司 Stable filler filling method
CN106437717B (en) * 2016-11-21 2019-04-26 武汉理工大学 Ore drawing synchronizes packing stage mining codes to vertical long hole twice
RU2648371C1 (en) * 2016-12-27 2018-03-26 федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" Method to mine thick steep deposits of unstable ore
CN109611095B (en) * 2019-01-17 2020-07-07 福州大学 Filling mining method for forming concave-convex rib-free mosaic structure by three steps and seven steps
CN109707381B (en) * 2019-01-23 2020-07-07 长沙矿山研究院有限责任公司 Mining method for filling open stope by upward high layering advanced unloading
CN110080773A (en) * 2019-05-24 2019-08-02 贵州开磷有限责任公司 A kind of gently inclined orebody reserves the filling mining method of cap pillar extraction
CN110145311B (en) * 2019-05-28 2021-05-18 贵州开磷有限责任公司 Underground mining method for gentle-inclination medium-thickness or thick phosphate ore body
CN111119894B (en) * 2019-12-02 2021-07-13 南华大学 Downward access filling mining method
CN111088979B (en) * 2019-12-03 2021-05-04 南华大学 Downward access filling mining method
CN111425205B (en) * 2020-03-06 2021-08-10 长沙矿山研究院有限责任公司 Mining support method for steeply inclined extremely thin ore body
CN111485883B (en) * 2020-04-30 2021-07-23 昆明理工大学 High ground stress environment low-cost mining method based on paste-multi-medium collaborative filling
CN111927452B (en) * 2020-09-25 2021-01-08 矿冶科技集团有限公司 Ore body upper and lower tray cooperative downward continuous mining method
RU2757883C1 (en) * 2021-04-14 2021-10-22 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for underground mining of steeply dipping thick ore bodies

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU134242A1 (en) * 1960-05-14 1960-11-30 Н.С. Кипарисова Chamber of mineral development system
SU877013A1 (en) * 1979-11-11 1981-10-30 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт (Кузниуи) Method of mining thick sloping coal beds
SU1638302A1 (en) * 1988-05-16 1991-03-30 Новочеркасский Политехнический Институт Им.Серго Орджоникидзе Method of mining ore bodies
SU1640457A1 (en) * 1989-04-03 1991-04-07 Ленинградский горный институт им.Г.В.Плеханова Method forming filling mass
SE469726B (en) * 1990-04-30 1993-08-30 Outokumpu Oy VERTICAL PILLAR BREAKING PROVIDING UPPER DOWN
RU2248448C1 (en) * 2003-12-02 2005-03-20 Государственное образовательное учреждение высшего профессионального образования Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (технический университет) Method for extraction of steep-falling deposits of weak ores

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103089268A (en) * 2013-02-20 2013-05-08 中南大学 Intensive mining method of ore cluster in ore-concentrated area
CN111005724A (en) * 2019-11-14 2020-04-14 南华大学 Method for stoping residual ores on top and bottom plates of slowly-inclined goaf
CN111005724B (en) * 2019-11-14 2021-01-12 南华大学 Method for stoping residual ores on top and bottom plates of slowly-inclined goaf
CN115324581A (en) * 2022-07-06 2022-11-11 山东黄金矿业(莱州)有限公司三山岛金矿 Mining method for high-stress medium-thickness crushed ore body

Also Published As

Publication number Publication date
RU2475647C2 (en) 2013-02-20

Similar Documents

Publication Publication Date Title
RU2011120547A (en) METHOD FOR THE DEVELOPMENT OF POWERFUL CRUSHING ORE BODIES
MX366797B (en) Prefabricated footing for wind turbines.
RU2009115389A (en) METHOD FOR DEVELOPING POWERFUL STEEPALLY DEPOSITING DEPOSITS OF UNSTABLE ORES
RU2009119090A (en) METHOD FOR COMBINED DEVELOPMENT OF MINERAL DEPOSITS
EA201300066A1 (en) METHOD OF CONSTRUCTING THE QUALITY SYSTEM FOR TREATING UNDERWATERED PART OF THE ORE BODY UNDER THE SUBSTRATE LEACHING
RU2449124C1 (en) Method to increase stability of ceiling in downward slicing development of deposit with backfilling
RU2522120C1 (en) Disposal of potassium concentration wastes
CN204224306U (en) A kind of ecological purification reaction tank column
RU2399764C1 (en) Development method of shallow placers with clay sands in conditions of repeated dragging
MX2016005077A (en) Set of accessories which, when combined and assembled, form moulds for receiving concrete or the like, which are used to construct cubes such as slabs, pillars, enclosures, columns, trusses, linings and flagstones and/or roofs, in civil engineering works.
RU2014132303A (en) BINDER FOR CONCRETE
AR110245A1 (en) METHOD FOR OBTAINING ARGAMASA APPLICABLE TO THE CONSTRUCTION OF CONSTRUCTION ELEMENTS AND ARGAMASS OBTAINED
RU2006127277A (en) METHOD FOR WORKING THE TRANSITION ZONE IN OPEN-UNDERGROUND DEVELOPMENT OF MINERAL DEPOSITS
RU2015111943A (en) The method of underground development of potash deposits and a device for sealing treatment panels of potash mines
EA201001462A1 (en) THE METHOD OF THE VERTICAL MAGNETIC CIRCULATION
RU2012134452A (en) METHOD FOR DEVELOPING STEAPALLY ORE BODIES WITH UNSTABLE ORE
RU2472935C1 (en) Protection method of reusable development workings
RU2010111207A (en) METHOD FOR DEVELOPING A PLOT OF A POWERFUL GANF COAL PLASTIC
UA107436U (en) CONCRETE MIXTURE FOR PAVEMENT TILES AND Paving
RU2010148936A (en) METHOD FOR TRANSITION OF CLEAN STOP OF PRODUCTION PASSED WITH UNDERGROUND SOIL SUBSTANCE
Shi et al. Application of GPS quasi-kinetic surveying in observation station of surface movement.
RU2005125481A (en) METHOD FOR MINING WITH THE UNLOADING CAVES WITH LEAVING THE BREED IN THE MINING
GB2567392A (en) Improved golf course bunker
RU2010128059A (en) METHOD FOR UNDERGROUND DEVELOPMENT OF POWERFUL ORE DEPOSITS
RU2014140463A (en) The method of installing the rack in the ground and the rack installed in the ground

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20130521