RU1788247C - Method for combined mining of steeply dipping mineral deposits - Google Patents

Method for combined mining of steeply dipping mineral deposits

Info

Publication number
RU1788247C
RU1788247C SU894732454A SU4732454A RU1788247C RU 1788247 C RU1788247 C RU 1788247C SU 894732454 A SU894732454 A SU 894732454A SU 4732454 A SU4732454 A SU 4732454A RU 1788247 C RU1788247 C RU 1788247C
Authority
RU
Russia
Prior art keywords
overburden
deposit
underground
quarry
mining
Prior art date
Application number
SU894732454A
Other languages
Russian (ru)
Inventor
Анатолий Петрович Григорьев
Евгений Иванович Яценко
Николай Григорьевич Григорец
Александр Романович Черненко
Евгений Дмитриевич Прилипенко
Виктор Захарович Семешин
Original Assignee
Научно-Исследовательский Горнорудный Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-Исследовательский Горнорудный Институт filed Critical Научно-Исследовательский Горнорудный Институт
Priority to SU894732454A priority Critical patent/RU1788247C/en
Application granted granted Critical
Publication of RU1788247C publication Critical patent/RU1788247C/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Изобретение относитс  к горной промышленности и может быть использовано при комбинированной разработке крутопадающих рудных тел. Цель - сокращение вскрышных работ за счет их исключени  со стороны вис чего бока залежи и переноса борта карьера в пределы ее горизонтальной мощности. Эксплуатацию месторождени  начинают с вскрышных работ в карьере (К) 1 и складировани  пород вскрышки в будущей зоне обрушени  6 подземных работ (ПР). В процессе ведени  ПР у вис чего бока (В Б) залежи образуетс  зона обрушени  6, в которую попадают заскладированные вскрышные породы. При дальнейшем ведении вскрышных работ в К 1 его борта выход т за пределы горизонтальной мощности залежи как в лежачий бок, так и в ВБ. В то же врем  ведение ПР под ВБ и складирование вскрышных пород в зоне обрушени  6 позвол ет перенести борт 8 К 1 со стороны ВБ залежи в ее пределы. С увеличением глубины К 1 его площадь сокращаетс , а площадь ПР увеличиваетс  в сторону лежачего бока. Прирост расширени  ПР определ ют из выражени  Ab (H/tg p)+d, где Н - глубина ПР, м; tp - угол сдвижени  руды, град, d - ширина предохранительной бермы К1,м. 2 ил. feThe invention relates to the mining industry and can be used in the combined development of steeply falling ore bodies. The goal is to reduce stripping operations by eliminating them from the side of the hanging side of the deposit and transferring the side of the quarry to its horizontal capacity. Field development begins with overburden operations in quarry (K) 1 and storage of overburden rocks in the future collapse zone 6 of underground operations (PR). In the process of maintaining PR at the hanging side (B) of the deposit, a collapse zone 6 is formed, into which stored overburden falls. With further stripping operations in K 1, its sides go beyond the horizontal power of the deposit both in the lying side and in the WB. At the same time, maintaining a PR under the WB and storing overburden in the collapse zone 6 allows the 8 K 1 side to be moved from the WB side of the deposit to its limits. With increasing depth K 1, its area decreases, and the area of PR increases towards the lying side. The increase in PR expansion is determined from the expression Ab (H / tg p) + d, where H is the depth of PR, m; tp is the angle of ore displacement, degrees, d is the width of the safety berm K1, m. 2 ill. fe

Description

Изобретение относитс  к горному делу , а конкретно к способам разработки по- лезных ископаемых, и может быть использовано при комбинированной открыто-подземной отработке залежей.The invention relates to mining, and specifically to methods for developing mineral resources, and can be used in combined open-pit mining of deposits.

Известен способ комбинированной разработки крутопадающих залежей полез,- ных Ископаемых, включающий открытые горные работы,в карьере совместно с ведением подземных работ, образующих зону обрушени  в пределах карьера и складировани  в ней вскрышных пород.A known method for the combined development of steeply dipping deposits of minerals, including open pit mining, in a quarry, together with conducting underground work, forming a collapse zone within the quarry and storing overburden in it.

Недостатком указанного способа  вл етс  то, что при складировании вскрышных пород в зоне обрушени  от подземных ра- бот не достигают сокращени  объема вскрышных работ.The disadvantage of this method is that when storing overburden in the collapse zone from underground work, a reduction in the volume of overburden is not achieved.

Наиболее близким по технической сущности к за вл емому изобретению аналогом  вл етс  способ комбинированной отработки залежей полезных ископаемых, включающий одновременное ведение открытых и подземных горных работе расширением фронта подземных работ в сторону карьера по мере понижени  открытых работ и складирование вскрышных пород в зоне обрушени  подземных работ.The closest in technical essence to the claimed invention is a method of combined mining of mineral deposits, including the simultaneous conduct of open and underground mining by expanding the front of the underground work towards the quarry as open work decreases and storing overburden in the collapse zone of underground work.

Недостатком указанного способа  вл етс  то, что при углублении открытой разработки борта карьера значительно выходит за пределы горизонтальной мощности залежи как в лежачий, так и в вис чий бок, что и ведет к большим объемам вскрышных работ .The disadvantage of this method is that when deepening the open development of the side of the quarry, it significantly goes beyond the horizontal power of the deposit both in the lying and the hanging side, which leads to large volumes of overburden operations.

Целью насто щего изобретени   вл ет- с  сокращение объема вскрышных работ за счет их исключени  со стороны вис чего бока залежи и переноса борта карьера в пределы горизонтальной мощности.The aim of the present invention is to reduce the volume of stripping operations by eliminating them from the hanging side of the deposit and transferring the side of the quarry to horizontal power limits.

Согласно предлагаемому изобретению поставленна  цель достигаетс  тем, что в известном способе комбинированной отработки крутопадающих залежей полезных ископаемых, включающем одновременное ведение открытых и подземных горных ра- бот с расширением фронта подземных работ в сторону карьера по мере понижени  открытых работ и складирование вскрышных пород в зоне обрушени  подземных работ, подземные работы ведут только под вис чим боком залежи, а прирост расширени  их фронта в сторону лежачего бока определ ют из выражени According to the invention, the goal is achieved in that in the known method for the combined development of steeply dipping mineral deposits, including the simultaneous conduct of open and underground mining with the expansion of the front of the underground work towards the quarry as the open work decreases and storage of overburden in the underground collapse zone works, underground work is carried out only under the hanging side of the reservoir, and the increase in the expansion of their front towards the lying side is determined from the expression

АЬ Ab

НN

tgytgy

+ d, м+ d, m

где ЛЬ - прирост расширени  фронта подземных работ в сторону лежачего бока залежи по мере понижени  работ, м;where L is the increase in the expansion of the front of underground work towards the lying side of the deposit as the work decreases, m;

Н - глубина подземных горных работ, м;N - the depth of underground mining, m;

у-угол сдвижени  руды, град.;y-angle of ore displacement, deg .;

d - ширина предохранительной бермы, м.d is the width of the safety berm, m

Сопоставительный анализ с прототипом показывает, что за вл емый способ комбинированной разработки крутопадающих залежей полезных ископаемых отличаетс  от прототипа тем, что подземные горные работы с обрушением налегающих пород ведут только под вис чим боком залежи и борт карьера перенос т в пределы ее горизонтальной мощности. С понижением уровн  ведени  открытой выемки увеличиваетс  фронт подземных работ и прирост расширени  их фронта в сторону лежачего бока залежи определ ют из выражени :Comparative analysis with the prototype shows that the claimed method for the combined development of steeply dipping mineral deposits differs from the prototype in that underground mining with collapse of overlying rocks is carried out only under the hanging side of the deposit and the side of the quarry is transferred within its horizontal capacity. With a decrease in the level of open excavation, the front of underground work increases and the increase in the expansion of their front towards the lying side of the deposit is determined from the expression:

Ab Ab

НN

tgytgy

+ d, м+ d, m

20 5 20 5

0 0

5 5

0 5 0 0 5 0

55

(до полного перехода на подземный способ разработки);(until the full transition to the underground method of development);

где A b - прирост расширени  фронта подземных горных работ в сторону лежачего бока залежи по мере понижени  работ, м;where A b is the increase in the expansion of the front of underground mining in the direction of the lying side of the reservoir as the work decreases, m;

Н - глубина подземных горных работ, м;N - the depth of underground mining, m;

у -угол сдвижени  руды, град;at the angle of ore displacement, deg;

d - ширина предохранительной бермы , м.d is the width of the safety berm, m

Таким образом, за вл емый способ соответствует критерию изобретени  новизна . Отработка части залежи полезных ископаемых под вис чим боком подземным способом с обрушением налегающих пород дает возможность перенести борт карьера в пределы горизонтальной мощности и значительно сократить вскрышные работы за пределами вис чего бока залежи. Снижение объема вскрышных работ позвол ет уменьшить площади отчуждаемых плодородных земель, сократить затраты на транспортирование их, а также сократить рассто ние транспортировки вскрышных пород до места их складировани  (отвала). Как видно, предложенный способ дает значительный положительный эффект, что свидетельствует о том, что он приобрел новые свойства и техническое решение соответствует признаку изобретени  существенные отличи .Thus, the claimed method meets the criteria of the invention of novelty. Mining of a part of a mineral deposit under the sideways underground with the collapse of the overlying rocks makes it possible to move the quarry side to the limits of horizontal power and significantly reduce overburden operations outside the hanging side of the deposit. A decrease in the volume of stripping operations allows one to reduce the area of alienated fertile lands, reduce the cost of transporting them, and also reduce the distance of transportation of overburden to the place of their storage (dump). As can be seen, the proposed method gives a significant positive effect, which indicates that it has acquired new properties and the technical solution corresponds to the feature of the invention with significant differences.

На фиг.1 показан вертикальный разрез вскрест простирани  залежи в период развити  открытых и подземных работ; на фиг.2 - вертикальный разрез вскрест простирани  залежи с развитием подземных работ и отвалообразовани .Figure 1 shows a vertical cross section across the strike of a deposit during the development of open and underground work; Fig. 2 is a vertical cross-sectional view of the strike along with the development of underground work and dumping.

Способ осуществл ют следующим образом .The method is carried out as follows.

Приступа  к отработке залежи, вначале определ ют возможные участки дл  отработки подземными и открытыми горными работами. После чего приступают к вскрышным работам по удалению налегающих пород (наносов) в пределах части рудной залежи, отрабатываемой карьером 1. Вскрышные породы 2 складируют в отвал 3 в будущей зоне обрушени , которую получат при ведении очистных работ в массиве 4, подлежащем подземной отработке. Одновременно со вскрышными работами в карьере 1 провод т и подготовительные подземные выработки 5 в массиве 4. После проведени  подготовительных подземных выработок 5 приступают к очистным работам по извлечению полезных ископаемых в карьере 1 и в массиве 4. Дл  поддержани  производственных мощностей по добыче полезных ископаемых на открытых и подземных предпри ти х необходимо посто нно подготавливать новые горизонты к очистной выемке. Дл  этого ведут дальнейшие вскрышные работы в карьере 1, а также продолжают проходить подготовительные выработки 5 в массиве 4, подлежащем подземной отработке. По мере ведени  очистной выемки при подземных работах в массиве 4 получают зону обрушени  6 налегающих пород, в которую попадают ранее заскладированные в отвал 3 вскрышные породы , налегающие (вскрышные) породы 2 и взвешивающие породы 7 вис чего бока.Before mining the deposit, first determine the possible areas for mining by underground and opencast mining. Then they start overburden removal of overburden (sediment) within a part of the ore deposit mined by quarry 1. Overburden 2 is stored in dump 3 in the future collapse zone, which will be obtained during treatment work in array 4, which is to be mined. Simultaneously with the overburden operations in open pit 1, preparatory underground workings 5 are also being carried out in array 4. After preparatory underground workings 5 are carried out, the mine treatment works are started to extract minerals in opencast mine 1 and in array 4. In order to maintain open-cast mining production capacities and underground enterprises, it is necessary to constantly prepare new horizons for a treatment excavation. For this, further stripping operations are being carried out in quarry 1, as well as preparatory workings 5 continue in mining array 4, which is to be mined. As the treatment excavation is carried out during underground work in array 4, a collapse zone 6 of overlying rocks is obtained, into which overburden rocks, overburden rocks 2 and weighing rocks 7 of the hanging side are previously stored in dump 3.

При дальнейшем ведении вскрышных рабств карьере 1 его борта выход т за пределы горизонтальной мощности залежи как в лежачий так и вис чий бока, а ведение подземных работ под вис чим боком залежи с обрушением налегающих и вмещающих 7 пород и складирование их в зоне обруше: ни  6 позвол ет перенести борт 8 карьера 1 со стороны вис чего бока залежи в ее пределы . Размещение значительных объемов вскрышных пород в зоне обрушени  6 и зоне 9 карьера 1 позвол ет значительно сократить площади плодородных земель отчуждаемых под горный отвал 3. С увеличением глубины карьера 1 уменьшаетс  его площадь очистной выемки, а площадь рудной залежи, переход щей в зону массива 4,With further maintenance of overburden slavery, the quarries of one of its sides go beyond the horizontal thickness of the pool both in the lying and the hanging sides, and underground work under the hanging side of the deposit with the collapse of the overlying and enclosing 7 rocks and their storage in the caving zone: none 6 allows you to transfer the side 8 of the quarry 1 from the side of the hanging side of the reservoir in its limits. Placing significant volumes of overburden in collapse zone 6 and zone 9 of open pit 1 can significantly reduce the area of fertile land alienated for dump 3. With increasing depth of open pit 1, its mining area decreases and the area of ore deposit passing into the zone of massif 4

дл  подземной отработки, увеличиваетс , котора  с глубиной расшир етс  и достигает границ лежачего бока залежи. После чего дальнейшую отработку залежи производ т только подземным способом.for underground mining, increases, which expands with depth and reaches the boundaries of the lying side of the deposit. After that, the further development of the deposit is carried out only underground.

Предлагаемый способ комбинированной разработки позволит улучшить технико- экономические показатели отработки: снижение объемов вскрышных работ, уменьшение отчуждаемых площадей плодородных земель, а также, сокращение затрат на транспортирование вскрышных пород.The proposed method of combined development will improve the technical and economic performance of mining: reduction in the volume of overburden operations, reduction of the alienated areas of fertile land, as well as a reduction in the cost of transportation of overburden.

Claims (1)

Формула изобретени  Способ комбинированной разработкиSUMMARY OF THE INVENTION Combined Development Method крутопадающих залежей полезных ископаемых , включающий одновременное ведение открытых и подземных горных работ с расширением фронта подземных работ в сторону карьера по мере понижени  открытыхsteeply falling mineral deposits, including the simultaneous conduct of open and underground mining with the expansion of the underground front towards the quarry as the openings decrease работ и складирование вскрышных пород в зоне обрушени  подземных работ, о т л и.ч- а ю щ и и с   тем, что, с целью сокращени  вскрышных работ за счёт их исключени  со стороны вис чего бока залежи и переносаwork and storage of overburden in the area of the collapse of underground work, due to the fact that, in order to reduce overburden work due to their exclusion from the hanging side of the deposit and transfer борта карьера в пределы ее горизонтальной мощности, подземные горные работы ведут только под вис чим боком залежи, а прирост расширени  их фронта в сторону лежачего бока определ ют из выражени the sides of the quarry within its horizontal thickness, underground mining is carried out only under the hanging side of the deposit, and the increase in the expansion of their front towards the lying side is determined from the expression Н +d.M.H + d.M. AbAb где Ab - прирост расширени  фронта под- земных горных работ в сторону лежащего бока залежи по мере понижени  работ, м; Н - глубина подземных горных работ, м; (р-угол сдвижени  руды, град; d - ширина предохранительной бер- мы, м.where Ab is the increase in expansion of the front of underground mining in the direction of the lying side of the reservoir as the work decreases, m; H - the depth of underground mining, m; (p-angle of ore displacement, deg; d - width of the safety berma, m. Риг. 2Riga 2
SU894732454A 1989-08-29 1989-08-29 Method for combined mining of steeply dipping mineral deposits RU1788247C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894732454A RU1788247C (en) 1989-08-29 1989-08-29 Method for combined mining of steeply dipping mineral deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894732454A RU1788247C (en) 1989-08-29 1989-08-29 Method for combined mining of steeply dipping mineral deposits

Publications (1)

Publication Number Publication Date
RU1788247C true RU1788247C (en) 1993-01-15

Family

ID=21467382

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894732454A RU1788247C (en) 1989-08-29 1989-08-29 Method for combined mining of steeply dipping mineral deposits

Country Status (1)

Country Link
RU (1) RU1788247C (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР №901525, кл. Е21 С 41/00. Щелканов В.А. Комбинированна разработка рудных месторождений: М., Недра, 1974, с 75-76, рис.24а. *

Similar Documents

Publication Publication Date Title
CN106121648B (en) Sublevel open stoping chassis route ore drawing subsequent filling mining method
CN110388209B (en) Deep hole mining method for steeply inclined double-layer ore body stage
CN105626073B (en) A kind of mining methods for reserving cutting groove based on the method for mining by the way of filling
US2846205A (en) Mining method for supporting geological structures
US3964792A (en) Explosive fluid transmitted shock method for mining deeply buried coal
RU1788247C (en) Method for combined mining of steeply dipping mineral deposits
RU2208221C2 (en) Method for selective mining extraction of qualitative mineral resource in open pit
RU2539083C1 (en) Openworking with explosion effects on mineral bed
RU2691032C1 (en) Method for kimberlite pipe
RU2013550C1 (en) Method for open-pit mining of steeply dipping mineral deposits
SU1717821A1 (en) Method for mining mineral deposits
RU1789700C (en) Method for mineral deposit opencast mining
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
RU2290510C1 (en) Open underground method for extracting formations of mineral resources
SU1745941A1 (en) Method of exploitation of sloping and pitching thick deposits, elongated along their extension
SU929840A1 (en) Method for open-cast mining of mineral depositis
SU1559152A1 (en) Method of mining minerals in side-adjoining zone of open mine
RU2258811C1 (en) Open-cut mineral deposit mining method
SU1051280A1 (en) Method of mining minerals
SU1456579A1 (en) Method of mining sloping ore bodies
SU1150368A1 (en) Method of combination mining of thick ore bodies
SU1765403A1 (en) Mine field recompletion method
SU622978A1 (en) Method of open-cut mining of mineral deposits
RU1775559C (en) Method for open-cast mining of mineral deposits
RU2241119C1 (en) Method for extracting mineral resources deposits