SU1051280A1 - Method of mining minerals - Google Patents

Method of mining minerals Download PDF

Info

Publication number
SU1051280A1
SU1051280A1 SU823399175A SU3399175A SU1051280A1 SU 1051280 A1 SU1051280 A1 SU 1051280A1 SU 823399175 A SU823399175 A SU 823399175A SU 3399175 A SU3399175 A SU 3399175A SU 1051280 A1 SU1051280 A1 SU 1051280A1
Authority
SU
USSR - Soviet Union
Prior art keywords
layer
mining
laying
worked
berm
Prior art date
Application number
SU823399175A
Other languages
Russian (ru)
Inventor
Михаил Николаевич Цыгалов
Вячеслав Михайлович Васильев
Вячеслав Николаевич Калмыков
Марина Владимировна Рыльникова
Original Assignee
Магнитогорский горно-металлургический институт им.Г.И.Носова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Магнитогорский горно-металлургический институт им.Г.И.Носова filed Critical Магнитогорский горно-металлургический институт им.Г.И.Носова
Priority to SU823399175A priority Critical patent/SU1051280A1/en
Application granted granted Critical
Publication of SU1051280A1 publication Critical patent/SU1051280A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

СПОСОБ РАЗРАБОТКИ ПОЛЕЗНЫХ ИСКОПАЕМЫХ, включающий слоевую выемку полезного ископаемого заходками с последующей закладкой выработанного пространства, отличающийс  тем, что, с целью повышени  эффективности разработки путем сокращени  подготовительных работ и снижени  материальных затрат, заходки дл  слоевой выемки проход т с бермы уступа карьера, причем после отработки нижнего сло  и закладки выработанного пространства на берме уступа возвод т насыпь из вскрыщных пород на высоту отработанногосло , с которой осуществл ют отработку второго сло  с последующей закладкой выработанного пространства, после чего цикл отработки повтор ют до полного извлечени  приконтурных запасов. (Л ел N5 ооA METHOD FOR DEVELOPING MINERAL RESOURCES, which includes layer mining of the mineral fossil inlets with subsequent laying of the developed space, characterized in that, in order to increase the development efficiency by reducing preparatory work and reduce material costs, the approaches for layer excavation pass from the berm of the pit pit, of the lower layer and laying of the worked-out space on the berm of the ledge, build up a mound of overburden to the height of the waste layer from which The second layer is removed with the subsequent laying of the worked-out space, after which the mining cycle is repeated until the marginal reserves are completely removed. (L ate n5 oo

Description

Изобретение относитс  к способам разработки месторождений полезных ископаемых н может быть использовано в горнорудной промышленности при разработке приконтурных запасов полезных ископаемых на карьерах. . Известен способ разработки полезных Ископаемых в приконтурных зонах карьера, включающий проведение выемочных выработок из карьера Б его приконтурную зону и отработку полезного ископаемого (1). Недостаток известного способа - большой объем подготовительных работ. Наиболее близким к предлагаемому по технической сущности и достигаемому результату  вл етс  способ разработки полезных ископаемых, включающий слоевую выемку полезного ископаемого заходками с последующей з.акладкой выработанного пространства 2). Недостатком этого способа  вл етс  низ,ка  эффективность разработки и большие материальные затраты на крепление выраЦель изобретени  - повышение эффективности разработки за счет сокраш;ени  подготовительных работ и снижени  материальных затрат. Поставленна  цель -достигаетс  тем, что согласно способу подземной разработки, полезных ископаемых, включающему слоевую выемку полезного ископаемого заходками с последующей закладкой выработанного пространства, заходки дл  слоевой выемки проход т с бермы уступа карьера, причем- после обработки нижнего сло  и закладки выработанного пространства на берме уступа возвод т насыпь из вскрышных пород на высоту отработанного с;1о , : которой осуществл ют отработку второго сло  с последующей закладкой выработанногоRpotVpraHcTBa , Гюсле чего цикл отра-, ботки повтор ют до полного извлечени  приконтурнь,1х запасов. На чертеже представлена схема разработки приконтурных запасов. Проведение очистных работ заключаетс  в послойной выемке полезного ископаемого 1 заходками 2, которые проход т буровзрывным способом с бермы уступа карьера в глубину массива с оставлением между выработками ленточных предохранительных целиков. Сечение выработок определ етс  характеристиками устойчивости горнь х пород и технологическими параметрамк примен емого погрузочно-транспортного оборудовани . По мере отработки сло  осуществл ют закладку 3 выработанного пространства и извлечение полезного ископаемого из целика с последующей закладкой образовавшихс  полостей. По окончании отработки нижнего сло  рудного тела и закладки выработанного пространства на берме уступа возвод т насыпь 4 из вскрь1шнь1х пород на высоту отработанного сло . С насыпи осуществл ют отработку второго сло  полезного ископаемого по приведенной схеме. Наращивание насыпи и отработку производ т до полной выемки приконтурной части залежи. Использование изобретени  позвол ет обеспечить повыщение эффективности разработки за счет сокращени  подготовительных работ и снижени  материальных,затрат, что ведет к уменьшению себестоимости добычи полезного ископаемого.The invention relates to methods for the development of mineral deposits and can be used in the mining industry in the development of marginal mineral reserves in quarries. . There is a method of developing minerals in the marginal zones of the open pit, including the carrying out of excavation workings from the open pit B, its marginal zone and the mining of mineral resources (1). The disadvantage of this method is a large amount of preparatory work. The closest to the proposed technical essence and the achieved result is a method of developing mineral resources, including a layer-dredging of the mineral by means of bores followed by laying of the mined-out space 2). The disadvantage of this method is low, as the development efficiency and high material costs for mounting the purpose of the invention is to increase the development efficiency by reducing the preparatory work and reducing the material costs. The goal is achieved by the fact that, according to the method of underground mining, minerals, including layer excavation of minerals, are entered by steps, followed by laying the mined-in space, the stops for the layer excavation are taken from the berm of the pit mine, and after the treatment of the lower layer the ledge was erected of an overburden mound to the height of the spent s; 1o: which the second layer is being worked out with the subsequent laying of the developed RpotVpraHcTBa, Gusla which is the cycle tra-, Botko repeated until complete recovery of marginal 1x stocks. The drawing shows the scheme of development of marginal reserves. The clean-up work consists of layer-by-layer excavation of mineral 1 by stopping 2, which are drilled from the berm in the pit’s quarry to the depth of the massif, leaving tape safety pillars between the workings. The cross section of the workings is determined by the stability characteristics of the mining rocks and the technological parameters of the loading and transport equipment used. As the layer is mined, bookmark 3 of the mined space and extraction of the mineral from the rear sight are performed, followed by laying of the cavities formed. At the end of the mining of the lower pore body and the laying of the worked-out space on the berm of the ledge, an embankment 4 is erected from all the above-mentioned rocks to the height of the depleted layer. From the embankment, the second layer of the mineral is worked out according to the above scheme. The buildup of the embankment and the mining operation are carried out to the complete excavation of the marginal part of the deposit. The use of the invention allows to increase the efficiency of development by reducing preparatory work and reducing material costs, which leads to a reduction in the cost of mining.

Claims (1)

СПОСОБ РАЗРАБОТКИ ПОЛЕЗНЫХ ИСКОПАЕМЫХ, включающий слоевую выемку полезного ископаемого заходками с последующей закладкой выработанного пространства, отличающийся тем, что, с целью повышения эффективности разработки путем сокращения подготовительных работ и снижения материальных затрат, заходки для слоевой выемки проходят с бермы уступа карьера, причем после отработки нижнего слоя и закладки выработанного пространства на берме уступа возводят насыпь из вскрышных пород на высоту отработанного'слоя, с которой осуществляют отработку второго слоя с последующей закладкой выработанного пространства, после чего цикл отработки повторяют до полного извлечения приконтурных запасов.METHOD FOR DEVELOPING USEFUL FOSSILS, including layer mining of minerals with fillings followed by laying out the worked out space, characterized in that, in order to increase the development efficiency by reducing preparatory work and reducing material costs, fillings for layer mining take place from the berm of the quarry ledge, and after mining the lower of the layer and the laying of the mined-out space on the ledge berm erect an embankment from overburden to the height of the worked-out layer with which mining is carried out in the second layer with the subsequent laying of the worked out space, after which the mining cycle is repeated until the complete extraction of marginal reserves.
SU823399175A 1982-02-23 1982-02-23 Method of mining minerals SU1051280A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823399175A SU1051280A1 (en) 1982-02-23 1982-02-23 Method of mining minerals

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823399175A SU1051280A1 (en) 1982-02-23 1982-02-23 Method of mining minerals

Publications (1)

Publication Number Publication Date
SU1051280A1 true SU1051280A1 (en) 1983-10-30

Family

ID=20998275

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823399175A SU1051280A1 (en) 1982-02-23 1982-02-23 Method of mining minerals

Country Status (1)

Country Link
SU (1) SU1051280A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2600579C2 (en) * 2014-08-01 2016-10-27 Александр Глебович Нецветаев Method for combined development of gently pitching coal beds

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР № 785488, кл. Е 21 С 41/00, 1979. 2. Именитов В. Р. Технологи , механизаци и организаци производственных процессов при подземной разработке рудных месторождений, М., «Недра, 1973, с. 404-405 (прототип). *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2600579C2 (en) * 2014-08-01 2016-10-27 Александр Глебович Нецветаев Method for combined development of gently pitching coal beds

Similar Documents

Publication Publication Date Title
AU2011217748A1 (en) Underground mining
SU1051280A1 (en) Method of mining minerals
RU2208221C2 (en) Method for selective mining extraction of qualitative mineral resource in open pit
RU2224107C1 (en) Process of opencast-underground mining of mineral resources
RU2453700C2 (en) Method for selective development of upland mineral estate reserves
SU1314060A1 (en) Method of combination mining of mineral deposits
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
SU1155757A1 (en) Method of mining mineral deposits
RU2790648C1 (en) Method for underground development of steeping ore bodies in descenting order with chamber system
RU2205955C1 (en) Method of mineral extraction in filled flanks of opencast
RU2187643C2 (en) Method of combined mining of mineral deposits in opencast contour zone
SU1317128A1 (en) Method of mining thick ore deposits
SU1097796A1 (en) Method of underground working of bed deposits of minerals
RU1828921C (en) Method for working pillars in room-and-pillar mining system
RU96109970A (en) COMBINED METHOD FOR DEVELOPING STEPS OF STEEP COAL COAST
SU1703817A1 (en) Method of mining ore deposits
SU1767178A1 (en) Method for combination working of mineral deposits
SU1420159A1 (en) Method of final mining of ores in open mine sides
RU2206741C2 (en) Method of mining of thick mineral beds
SU1104274A1 (en) Method of working ore reserves behind controur in quarry near-edge areas
RU1789700C (en) Method for mineral deposit opencast mining
SU1640422A1 (en) Method of combined mining of radioactive ore deposits
SU1188326A1 (en) Method of mining bedded deposits
SU1323720A1 (en) Method of mining potassium deposits
SU1625986A1 (en) Method of mining mineral deposits