SU1188326A1 - Method of mining bedded deposits - Google Patents

Method of mining bedded deposits Download PDF

Info

Publication number
SU1188326A1
SU1188326A1 SU843736865A SU3736865A SU1188326A1 SU 1188326 A1 SU1188326 A1 SU 1188326A1 SU 843736865 A SU843736865 A SU 843736865A SU 3736865 A SU3736865 A SU 3736865A SU 1188326 A1 SU1188326 A1 SU 1188326A1
Authority
SU
USSR - Soviet Union
Prior art keywords
space
panel
pillars
tape
pillar
Prior art date
Application number
SU843736865A
Other languages
Russian (ru)
Inventor
Асер Имангалиев
Вячеслав Васильевич Костюченко
Original Assignee
Imangaliev Aser
Kostyuchenko Vyacheslav V
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Imangaliev Aser, Kostyuchenko Vyacheslav V filed Critical Imangaliev Aser
Priority to SU843736865A priority Critical patent/SU1188326A1/en
Application granted granted Critical
Publication of SU1188326A1 publication Critical patent/SU1188326A1/en

Links

Landscapes

  • Earth Drilling (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

СПОСОБ РАЗРАБОТКИ ПЛАСТОВЫХ ЖСТОРРВДЕНИЙ, включашщй отработку запасов панели с формированием ленточных междукамерных целиков, закладку вьфаботанного пространства камер тверденмчими смес ми, выемку ленточных междукамерных целиков и закладку вновь образованного между смежными заложенными камерами вьфаботанного пространства, oтл чaюIi ийс   тем, что, с целью по1вышени  извлечени  активных запасов в панели с сохранением устойчивости обнажений, каждый ленточный междукамерный целик формируют шириной, равной ширине обуривани  забо  с одной установки бурового оборудовани  с образованием выступов, смещенных один относительно другого по сторонам целика на рассто ние , равное 2-3 ширины целика,кровлю над указанными целиками укрепл ют анкерами с выводом их концов в выработанное пространство камер, i Закладку выработанного пространства камер производ т после отработки активных запасов панели, а при отработке ленточных междукамерных целиков выемкой ранее образованных выступов создают свободное технологическое пространство. 00 00 00 ю О)METHOD OF DEVELOPMENT stocks in the panel while maintaining the stability of the outcrops, each inter-chamber pillar pillar is formed by a width equal to the width of the bottom from one installation of drilling equipment with the formation of protrusions displaced from each other on the sides of the rear sight to a distance of 2-3 widths of the rear sight, the roof above the said rear ends is reinforced with anchors with the ends coming out into the developed space of the chambers, i after working off the active reserves of the panel, and when mining tape intercameral pillars, excavation of the previously formed protrusions creates free technological space. 00 00 00 th O)

Description

Изобретение относитс  к горнодобы вающей промышленности и может быть использовано при подземной добыче полезных ископаемых с применением самоходного оборудовани  и закладом выработанного пространства. Целью изобретени   вл етс  повышение извлечени  активных запасов в панели с сохранением устойчивости обнажений. Способ разработки пластовых месторождений осуществл ют следующим образомо В пластовых залежах мощностью, соответствующей высоте обуривани  самоходными установками, панельные транспортный и вентил ционный штреки по оси каждой камеры соедин ют вентил ционными ортами с возможност их использовани  и .в качестве буровы выработок. Используют самоходные установки, которые по технической характеристике приемлемы дл  обуривани  забое высотой до 7-8 и более метров, напр мер, СБУ-2К и ЗБК-5Д и др. Дл  погрузки и доставки руды примен ют ма 1Ш1ны типа ПНВ и автосамосвал МоАЗ или ПДМ. Выемку камерных запасов производ сплошным забоем с безврубовой отбоЙ кой, располага  шпуры по одной из следующих схем: горизонтально, параллельно оси вентил ционного орта горизонтально, параллельно обнаженной . плоскости очистного забо ; гори зонтально и нисход щие (при мощности залелш больше высоты вентил цион ного орта), параллельно обнаженной плоскости очистного- забо . При посл них д)вух схемахимеетс  возможность совмещени  во времени бурени  и погрузки руды в камере. При обнаружении в кровле камер слабоустойчивых и подверженных под воздействием взрывных работ к вывалам и отслоени м пород устанавливаю обычную крепь. Одновременно из каме укрепл ют кровлю над междукамерными ленточными целиками крутонаклоненными анкерами с оставлением их концов .в вьфаботанном пространстве. Та кое закрепление кровли целиков возмо но и после полной отработки камер, но до их изол ции перемьшками и закладки. Междукамерные временные ленточны целики формируют шириной, равной ши рине обуривани  забо  самоходной буровой машиной с одной ее установки. По мере выемки запасов камеры целика в определенных местах формируют с выступами, смещенными один относительно другого по сторонам. Рассто ние между выступами принимают исход  из про влени  горного давлени  при выемке камер и целика, а также необходимости использовани  в последующем выработанного пространства в местах выступов дл  технологических целей . При известной величине зоны опорного горного давлени ,перемещающейс  на массив породи равной 2-4-кратному размерупроводимой выработки,это рассто ние состэвл нт2-4Ь(Ь-ширина междукамеоного целика). При прин тых параметрах и технологии работ скорость выемки целика может составл ть 10-18 м/сут. Дл  обеспечени  такой интенсивности отработки места сто нки оборудовани  в ожидании проезда другого, или укрыти  его должны быть определены через столько же метров. Тогда отвечающим этим критери м рациональным рассто нием расположени  выступов  вл етс  2-31 . В первой стадии очистных работ в панели производ т выемку активных запасов камер, не завис щих от .закладочных работ. Затем отработанные камеры изолируют перемычками и заполн ют твердеющими смес ми через закладочные выработки и скважины. Во второй стадии, после затвердевани  закладки в камерах, извлекают ленточные междукамерные целики с выступами с применением самоходного оборудовани , в том числе бурового, предназначенного дл  бурени  горизонтальных и наклонных шпуров с одной установки в сплошном забое, высотой до 7-8 и шириной до 5-6 и более метров , например, СБУ-2К или УЕГШ. Выемкой выступов создают свободное технологическое пространство дл  разминовки и замены забойных машин. Выработанное пространство, образовавшеес  после отработки целиков, заполн ют гидравлической смесью или малопрочной твердеющей закладкой. Ширину камеры определ ют расчетом исход  из несущей способности ленточных целиков с выступами и допускаемого обнажени  площади кровли в зависимости от физико-механических свойствThe invention relates to the mining industry and can be used in the underground mining of mineral resources using self-propelled equipment and mortgage out of the open space. The aim of the invention is to increase the recovery of active stocks in the panel while maintaining the stability of the outcrops. The method of developing reservoir deposits is carried out as follows. In reservoir deposits with a capacity corresponding to the height of drilling by self-propelled installations, panel transport and ventilation drifts along the axis of each chamber are connected by ventilation ports with the possibility of their use and as drilling workings. Self-propelled units are used that are technically acceptable for drilling the bottom up to 7-8 or more meters in height, for example, SBU-2K and ZBK-5D, etc. For the loading and delivery of ore, they use a type 1 PN1 and dump truck MoAZ or PDM . Excavation of cell stockpiles of continuous bottomhole production with non-cut-edge breakage, disposed of holes in one of the following schemes: horizontally, parallel to the axis of the ventilation court, horizontally, parallel to the exposed. clearing surface; horizontally and descending (at a power of more than the height of the ventilating port), parallel to the exposed plane of the treatment plant. If they were e), the depth of the diagrams has the possibility of combining in the time of drilling and loading of ore in the chamber. When found in the roof of the chambers of poorly resistant and exposed to blasting to the excavations and delaminations of rocks, I install the usual lining. At the same time, from the Kama, the roof is fixed above the inter-chamber tape pillars with steeply inclined anchors, leaving their ends in a cushioned space. Such fastening of the roof of the pillars is possible even after the chambers have been completely worked out, but before they are isolated by small mongles and bookmarks. Intercameral temporary ribbon pillars are formed with a width equal to the width of the drilling by the self-propelled drilling machine from one of its installations. As the stocks are removed, the pillar cell in certain places is formed with protrusions displaced from one another relative to the other. The distance between the protrusions is based on the occurrence of rock pressure during the excavation of the chambers and the rear sight, as well as the need to use the subsequent developed space in the places of the protrusions for technological purposes. With a known value of the reference mountain pressure zone, which is moved to the rock massif equal to 2–4 times the measured mine workings, this distance is equal to 2–4 B (L is the width between the rear pillar). With the adopted parameters and work technology, the speed of excavation of the rear sight can be 10-18 m / day. In order to provide such an intensity of working out the place where the equipment is parked in anticipation of the passage of another, or to shelter it, it must be determined in as many meters. Then the rational distance of the protrusions meeting these criteria is 2-31. In the first stage of the cleaning works, the panels in the panel seize the active stocks of the chambers that are independent of the stowing operations. Then, the spent chambers are insulated with bridges and filled with hardening mixtures through the fillings and boreholes. In the second stage, after solidification of the bookmark in the chambers, remove inter-chamber belt pillars with protrusions using self-propelled equipment, including drilling equipment, intended for drilling horizontal and inclined drilling holes from one installation in a continuous bottom, up to 7-8 and up to 5- 6 or more meters, for example, SBU-2K or UEGGSH. The indentations of the projections create a free technological space for turnout and replacement of the downhole machines. The developed space formed after the working out of the pillars is filled with a hydraulic mixture or a low-strength hardening tab. The width of the chamber is determined by calculation based on the carrying capacity of belt pillars with protrusions and the allowable exposure of the roof area depending on the physical and mechanical properties.

3 118832643 11883264

налегающих пород, глубины разработки,ку , воспринимаемую закладочньии маемощности залежи и др. Найденную ве-сивами , и требуемую к заданному личину дл  конкретных горно-геологи-времени прочность материала закческих условий уточн ют по техничес-ладки исход  из перераспределени  кой характеристике примен емого само-s горного давлени  и сохранени  усходного оборудовани .тойчивости обнажаемых стен закладТакже расчетом определ ют дл ки от воздействи  взрывных растадии выемки рудных целиков нагруз-бот.overburden, depth of development, ku, perceived bedding capacity of the deposit, etc. Found by the wave, and required for a given figure for specific geological-geological time, the strength of the material of the Zaky conditions is specified by technical basis on the basis of the redistribution of -s of rock pressure and the maintenance of waste equipment. The stability of exposed walls is also calculated for the impact of the explosive formation of the ore pillars of the load-bot.

Claims (1)

СПОСОБ РАЗРАБОТКИ ПЛАСТОВЫХ МЕСТОРОЖДЕНИЙ, включающий отработку запасов панели с формированием ленточных междукамерных целиков, заклад- ’ ку выработанного пространства камер твердеющими смесями, выемку ленточных междукамерных целиков и закладку вновь образованного между смежными заложенными камерами выработанного пространства, отличающийс я тем, что, с целью повышения извлечения активных запасов в панели с сохранением устойчивости обнажений, каждый ленточный междукамерный целик формируют шириной, равной ширине обуривания забоя с одной установки бурового оборудования с образованием выступов, смещенных один относитель но другого по сторонам целика на расстояние, равное 2-3 ширины целика,.METHOD FOR DEVELOPING PLASTIC DEPOSITS, including mining reserves of the panel with the formation of tape interchamber pillars, laying the worked out space of chambers with hardening mixtures, excavating tape interchamber pillars and laying the newly formed between adjacent embedded chambers of worked out space, characterized in that the extraction is active reserves in the panel while maintaining the stability of the outcrops, each tape interchamber pillar is formed by a width equal to the width of the bottom hole with one installation of drilling equipment with the formation of protrusions displaced one relative to the other on the sides of the pillar at a distance equal to 2-3 widths of the pillar. кровлю над указанными целиками укрепляют анкерами с выводом их концов в выработанное пространство камер, закладку выработанного пространства камер производят после отработки активных запасов панели, а при отработке ленточных междукамерных целиков выемкой ранее образованных выступов создают свободное технологическое пространство.the roof over the indicated pillars is strengthened with anchors with the withdrawal of their ends into the worked-out chamber space, the laying-out of the worked-out chamber space is carried out after working out the active reserves of the panel, and when working out the tape interchamber pillars by excavating the previously formed protrusions, they create a free technological space. 00 ю σ>00 th σ>
SU843736865A 1984-05-03 1984-05-03 Method of mining bedded deposits SU1188326A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843736865A SU1188326A1 (en) 1984-05-03 1984-05-03 Method of mining bedded deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843736865A SU1188326A1 (en) 1984-05-03 1984-05-03 Method of mining bedded deposits

Publications (1)

Publication Number Publication Date
SU1188326A1 true SU1188326A1 (en) 1985-10-30

Family

ID=21117479

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843736865A SU1188326A1 (en) 1984-05-03 1984-05-03 Method of mining bedded deposits

Country Status (1)

Country Link
SU (1) SU1188326A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2472932C1 (en) * 2011-09-19 2013-01-20 Открытое акционерное общество "Севуралбокситруда" Development method of flat and inclined thick ore bodies

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Цыганов М.Н, и Зурков Н.Э Разработка месторождений полезных ископаемых с монолитной закладкой. М. Недра, 1970, с. 166-167. Байконуров О.А. и др. Подземна разработка месторождений с закладкой .-Алма-Ата: Наука, 1972, с. 313314. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2472932C1 (en) * 2011-09-19 2013-01-20 Открытое акционерное общество "Севуралбокситруда" Development method of flat and inclined thick ore bodies

Similar Documents

Publication Publication Date Title
CN110259451B (en) Pre-control roof efficient mining method for gently inclined medium-thickness ore body
CN108625856A (en) A kind of mining methods in the two neighboring one ore removal lane of stope of underground mine
MX2012009756A (en) Underground mining.
CN113700527A (en) High-strength coal gangue overlying rock isolation grouting filling green mining method for mining working face
CN111058847A (en) Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
RU2209972C2 (en) Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks
CS257761B2 (en) Mining process for mineral deposits mining
CN109630116B (en) Mining method for inclined medium-thickness blind ore body
CN106703809A (en) Method for forming cover layer through induced falling of open-pit-to-underground multi-branched orebody
CN100552185C (en) Concrete pole top protection mining method
SU1188326A1 (en) Method of mining bedded deposits
RU2224107C1 (en) Process of opencast-underground mining of mineral resources
RU2132950C1 (en) Method for combination development of deposits
RU2114307C1 (en) Method for opencast mining of flooded mineral deposits
CN109139015B (en) Strip cutting type open stoping method
Valgma et al. Low depth mining in Estonian oil shale deposit-Abbau von Ölschiefer in Estland
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
RU2796992C1 (en) Method for mining inclined and steeply dipping ore bodies of medium thickness
RU2755287C1 (en) Method for developing thin and low-powered steel-falling ore bodies
SU1155757A1 (en) Method of mining mineral deposits
SU768985A1 (en) Method of working seam formations of minerals
O’Donnell The Use of Destressing at INCO’s Creighton Mine
SU1093828A1 (en) Method of working thick coal seams susceptible to gas-dynamic phenomena
RU2471990C1 (en) Method to mine sloping and inclined coal beds of average capacity
RU2107818C1 (en) Method for development of flat and inclined seams of minerals