PL418366A1 - Method for producing prefabricated double wall and the prefabricated double wall - Google Patents
Method for producing prefabricated double wall and the prefabricated double wallInfo
- Publication number
- PL418366A1 PL418366A1 PL418366A PL41836616A PL418366A1 PL 418366 A1 PL418366 A1 PL 418366A1 PL 418366 A PL418366 A PL 418366A PL 41836616 A PL41836616 A PL 41836616A PL 418366 A1 PL418366 A1 PL 418366A1
- Authority
- PL
- Poland
- Prior art keywords
- concrete
- layer
- truss reinforcement
- spatial truss
- double wall
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 title abstract 2
- 239000004567 concrete Substances 0.000 abstract 10
- 230000002787 reinforcement Effects 0.000 abstract 6
- 239000000203 mixture Substances 0.000 abstract 5
- 230000003014 reinforcing effect Effects 0.000 abstract 4
- 239000002184 metal Substances 0.000 abstract 2
- 230000035800 maturation Effects 0.000 abstract 1
- 238000000034 method Methods 0.000 abstract 1
- 239000011178 precast concrete Substances 0.000 abstract 1
Landscapes
- Load-Bearing And Curtain Walls (AREA)
- Panels For Use In Building Construction (AREA)
Abstract
Przedmiotem zgłoszenia jest sposób wytwarzania prefabrykowanej ściany podwójnej i prefabrykowana ściana podwójna, znajdująca zastosowanie jako element budowlany ścian nośnych nadziemnych zewnętrznych i wewnętrznych przy stawianiu budynków mieszkalnych i gospodarczych. Sposób polega na tym, że na metalowym blacie stołu do produkcji płyt układa się prostokątne metalowe burty, wewnątrz których równolegle do dłuższego boku burty umieszcza się na dystansach z tworzywa sztucznego pręty zbrojeniowe oraz pomiędzy prętami zbrojeniowymi prostopadle do powierzchni stołu, umieszcza się przestrzenne zbrojenie kratownicowe (ZK), po czym zalewa się pierwszą warstwą mieszanki betonowej o grubości od 6 cm do 12 cm. Następnie w komorze dojrzewania prefabrykatów betonowych przyspiesza się wiązanie i twardnienie pierwszej mieszanki betonowej w temperaturze do 50°C oraz przy wilgotności równej punktowi rosy, w czasie do 16 godzin, aż do osiągnięcia przez pierwszą warstwę betonu (WB1) gwarantowanej wytrzymałości na ściskanie równej co najmniej 70%. Po czym zdejmuje się burtę, pierwszą warstwę betonu (WB1) z wystającym przestrzennym zbrojeniem kratownicowym (ZK) podnosi się i odwraca przestrzennym zbrojeniem kratownicowym (ZK) do dołu, w następnej kolejności przestrzenne zbrojenie kratownicowe (ZK) zanurza się w drugiej warstwie świeżej mieszanki betonowej ułożonej do burty i ponownie przyspiesza się wiązanie i twardnienie mieszanki betonowej w temperaturze do 50°C oraz przy wilgotności równej punktowi rosy, w czasie około 16 godzin, aż do osiągnięcia przez warstwę betonu (WB2) gwarantowanej wytrzymałości na ściskanie równej co najmniej 70%, przy czym burta jest ponownie umieszczona na stole, a w niej umieszczone są na podpórkach pręty zbrojeniowe i zalane drugą warstwą mieszanki betonowej o grubości od 6 cm do 12 cm. Ściana ma w obu zewnętrznych warstwach betonu pierwszej (WB1) i drugiej (WB2) osadzone są pręty zbrojeniowe oraz przestrzenne zbrojenie kratownicowe (ZK), przy czym przestrzenne zbrojenie kratownicowe (ZK) usytuowane jest pomiędzy warstwami betonu pierwszą (WB1) i drugą (WB2).The subject of the application is a method of manufacturing a prefabricated double wall and a prefabricated double wall, which is used as a building element for external and internal above-ground load-bearing walls when constructing residential and utility buildings. The method consists in placing rectangular metal sides on a metal table top, in which reinforcing bars are placed parallel to the long side of the side of the panel and between the reinforcing bars perpendicular to the table surface, spatial truss reinforcement is placed ( ZK), after which the first layer of concrete mix 6 cm to 12 cm thick is poured. Then, in the maturation chamber of precast concrete, the setting and hardening of the first concrete mix at a temperature of up to 50 ° C and humidity equal to dew point is accelerated, for up to 16 hours, until the first layer of concrete (WB1) reaches a guaranteed compressive strength of at least 70%. After which the side is removed, the first layer of concrete (WB1) with the protruding spatial truss reinforcement (ZK) is lifted and inverted with the spatial truss reinforcement (ZK) downwards, then the spatial truss reinforcement (ZK) is immersed in the second layer of fresh concrete mix laid to the side and the setting and hardening of the concrete mix at a temperature of up to 50 ° C and humidity equal to the dew point is accelerated again, for about 16 hours, until the concrete layer (WB2) reaches a guaranteed compressive strength of at least 70%, the side is again placed on the table, and reinforcing bars are placed on the supports and flooded with a second layer of concrete mix from 6 cm to 12 cm thick. The wall has reinforcing bars and spatial truss reinforcement (ZK) in both external layers of the first (WB1) and second (WB2) concrete, while the spatial truss reinforcement (ZK) is located between the first (WB1) and second (WB2) layers of concrete .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL418366A PL418366A1 (en) | 2016-08-16 | 2016-08-16 | Method for producing prefabricated double wall and the prefabricated double wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL418366A PL418366A1 (en) | 2016-08-16 | 2016-08-16 | Method for producing prefabricated double wall and the prefabricated double wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| PL418366A1 true PL418366A1 (en) | 2018-02-26 |
Family
ID=61227628
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL418366A PL418366A1 (en) | 2016-08-16 | 2016-08-16 | Method for producing prefabricated double wall and the prefabricated double wall |
Country Status (1)
| Country | Link |
|---|---|
| PL (1) | PL418366A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| PL444451A1 (en) * | 2023-04-18 | 2024-10-21 | Andrzej Meronk | Method of manufacturing a sandwich panel for construction purposes |
-
2016
- 2016-08-16 PL PL418366A patent/PL418366A1/en unknown
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| PL444451A1 (en) * | 2023-04-18 | 2024-10-21 | Andrzej Meronk | Method of manufacturing a sandwich panel for construction purposes |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104110095A (en) | Pre-cast shear wall and production method thereof | |
| ATE523305T1 (en) | METHOD AND SYSTEM FOR PRODUCING HOLLOW, PRISMATIC, MODULAR REINFORCED CONCRETE ELEMENTS AND ELEMENT OBTAINED THEREFROM | |
| KR20130001243A (en) | Energy and weight efficient building block, manufacturing and application process thereof | |
| CN203531220U (en) | Prefabricated composite wall plate with ultra-thin heat insulation and heat preservation plates | |
| CN104131647A (en) | Basalt fiber reinforced sea sand cement-base composite heat insulation wall plate | |
| CN111519960A (en) | A fully assembled concrete low-voltage power distribution room and its manufacturing method | |
| CN103938767A (en) | Trough type energy-saving bearing wall externally wrapped by steel wire mesh mortar plates and foamed concrete | |
| CN110869568B (en) | Improvement of Reinforced Concrete Wall Modules for Building Ventilation in General and Specialized Industrialized Building Systems | |
| RU2440472C1 (en) | Method to erect monolithic construction structure of building or facility "bliss house" | |
| Kiyanets | Resource-saving construction technologies | |
| PL418366A1 (en) | Method for producing prefabricated double wall and the prefabricated double wall | |
| CN204001407U (en) | Precast shear wall | |
| CN107246106A (en) | A kind of surface cuts shaping haydite concrete prefabricated panel | |
| RU68021U1 (en) | BRICK-FRAME BUILDING | |
| Girya et al. | Comparative analysis of environmentally friendly materials | |
| RU78834U1 (en) | CONSTRUCTION MODULE | |
| CN204139445U (en) | A kind of extra large sand cement base composite thermo-insulating wall board utilizing basalt fibre to strengthen | |
| RU49051U1 (en) | BUILDING BLOCK | |
| Kozlovská | Modern methods of construction vs. construction waste | |
| CN204401826U (en) | A kind of foamed ceramic steel construction wall | |
| CN204059652U (en) | A kind of energy-saving heat-insulating wall | |
| CN210316066U (en) | Be applied to prefabricated wallboard that has door frame structure of prefabricated building | |
| RU2658849C1 (en) | Progressive shuttering | |
| RU181667U1 (en) | WALL PANEL | |
| CN204983631U (en) | Novel engineering template |