Prior art keywords
wall
ceiling
frame
living rooms
plane
Prior art date
Application number
PL1979218805A
Other languages
Polish (pl)
Other versions
PL218805A1 (en
Inventor
Zbigniew Anosowicz
Marceli Figurski
Janusz Wolkonski
Kazimierz Chudzicki
Lech Lisowski
Zbigniew Kempkiewicz
Zbigniew Wierzbicki
Jerzy Kiser
Florian Grzybowski
Michal Kowalski
Mikolaj Bialy
Original Assignee
Stocznia Szczecinska
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Stocznia Szczecinska filed Critical Stocznia Szczecinska
Priority to PL1979218805A priority Critical patent/PL122916B1/en
Priority to SU802991052A priority patent/SU1134116A3/en
Priority to NO802941A priority patent/NO802941L/en
Priority to DD80224332A priority patent/DD153354A5/en
Priority to EP80106046A priority patent/EP0026936A1/en
Priority to YU02539/80A priority patent/YU253980A/en
Publication of PL218805A1 publication Critical patent/PL218805A1/xx
Publication of PL122916B1 publication Critical patent/PL122916B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/76Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal
    • E04B2/78Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal characterised by special cross-section of the frame members as far as important for securing wall panels to a framework with or without the help of cover-strips
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B29/00Accommodation for crew or passengers not otherwise provided for
    • B63B29/02Cabins or other living spaces; Construction or arrangement thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/14Hull parts
    • B63B3/68Panellings; Linings, e.g. for insulating purposes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/7407Removable non-load-bearing partitions; Partitions with a free upper edge assembled using frames with infill panels or coverings only; made-up of panels and a support structure incorporating posts
    • E04B2/7453Removable non-load-bearing partitions; Partitions with a free upper edge assembled using frames with infill panels or coverings only; made-up of panels and a support structure incorporating posts with panels and support posts, extending from floor to ceiling
    • E04B2/7455Glazing details

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Door And Window Frames Mounted To Openings (AREA)
  • Residential Or Office Buildings (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Opis patentowy opublikowano: 30.07.1984 122916 Int. CPB63B 29/02 Twórcy wynalazku: Zbigniew Anosowicz, Marceli Figurski, Janusz wol- konski, Kazimierz Chudzicki, Lech Lisowski, Zbi¬ gniew Kempkiewicz, Zbigniew Wierzbicki, Jerzy Kiser, Florian Grzybowski, Michal Kowalski, Miko¬ laj Bialy Uprawniony z patentu: Stocznia Szczecinska im. A. Warskiego, Szcze- cin (Polska) ^ ~ Pomieszczenia bytowe zwlaszcza dla statków wodnych oraz sposób budowy pomieszczen bytowych zwlaszcza dla statków wodnych Przedmiotem wynalazków sa zespolowe pomiesz¬ czenia bytowe, przeznaczone zwlaszcza do instalo¬ wania na statkach wodnych oraz sposób kolejno powtarzalnej budowy tych zespolów pomieszczen bytowych, zestawianych z zunifikowanych elemen¬ tów prefabrykowanych.Znane jest rozwiazanie techniczne pomieszczen byrtowych, zgodnie z którym pomieszczenia te zbu¬ dowane sa z plyt szalunkowych, przymocowanych do pokladu dolnego i górnego, odpowiednio za pomoca uchwytów o ksztalcie li/tery „U" lub „L".Plyty szalunkowe do uchwytów mocowane sa przy tym zwykle za pomoca srub lub wkretów.Sposób budowy opisanych pomieszczen bytowych polega na tym, ze do pokladu dolnego i górnego spawa sie wpierw uchwyty, a nastepnie plyty szalunkowe obsadza sie w uchwytach dolnych i przymocowuje srubami w uchwytach górnych.Sufit zesitawda sie z docinanych na miejscu plyt, które mocuje sie srubami do uchwytów o ksztalcie litery „U", przyspawanych do pokladu górnego.W podobny sposób wykonywane sa równiez po¬ mieszczenia sanitarne z tym, ze scianki montowa¬ ne sa za pomoca fundamentu spawanego do po¬ kladu dolnego, a styki plyt tych scianek maja. wpusty wypelniane tworzywem uszczelniajacym.Wedlug innego znanego rozwiazania technicz¬ nego — pomieszczenia bytowe zbudowane sa w oparciu o szkielet tworzacy konstrukcje klatkowa, 10 16 25 30 przy czym szkielet ten wykonany jest z ksztal¬ towników metalowych, polaczonych ze soba glów¬ nie poprzez spawanie. Konstrukcja klatkowa wy¬ pelniona jest prefabrykowanymi plytami, które za pomoca sprezystych jezyczków utrzymywane sa w plaszczyznach sufitu i scian szkieletu no¬ snego.Ksztaltowniki stalowe tworzace szkielet nosny pomieszczenia bytowego maja rózne, zalezne od potrzeb profile elementów chwytnych i ksztaltow¬ niki te moga byc stosowane pojedynczo lub po¬ dwójnie, w postaci przykladowo dwu ksztaltowni¬ ków biegnacych równolegle, a przylegajacych do siebie podstawami. Rama dolna konstrukcji kla¬ tkowej wyposazona jest w sruby, na których spo¬ czywa na pokladzie cala konstrukcja klatkowa i za pomoca których ustalone jest wlasciwe poloze¬ nie tej konstrukcji.Stposób budowy tych pomieszczen bytowych po¬ lega na tym, ze w pierwszej kolejnosci wykonuje sie konstrukcje klatkowa z profilowanych ksztal¬ towników, które spawa sie ze soba w celu ich polaczenia.W dalszym ciagu budowy reguluje sie poloze¬ nie konstrukcji klatkowej i ustala, sie jej trwale polozenie.Plyty sufitowe wciska sie w szkielet no&ny sufitu od. zewnatrz, a plyty scienne od zewnatrz i/lub wewnatrz.Znane rozwiazania techniczne pomieszczen by- ^22 9163 122 916 4 towych na statkach, a takze i sposoby budowy tych pomieszczen charakteryzuja sie niezbyt dluza mozliwoscia standaryzacji ich elementów sklado¬ wych, jak równiez z tego wynikajacym niskim stopniem prefafbrykacji tych elementów. Przygoto¬ wywane elementy skladowe pomieszczen byto¬ wych, wykonywane byc musza przy utrzymaniu duzej dokladnosci ich wymiarów, co w sumie po¬ woduje koniecznosc wydatkowania stosunkowo du¬ zych nakladów pracochlonnosci przy budowie po¬ mieszczen.Istota wynalazku polega na tym, ze w konstruk¬ cji klatkowej pomieszczen bytowych do wykona¬ nia scian zastosowano nosniki pionowe o zamknie¬ tym w przekroju poprzecznym profilu, w których konce sa wsuniejte i trwale z nimi polaczone ramiona lacznika l wkladkowego, a wypusty tych laczników osadzone sa w gniazdach prowadnic i korzystnie trwale polaczone z grzbietami tych pro¬ wadnic.W narozach natomiast prowadnice wzajemnie ze soba polaczone sa za pomoca laczników ksztalto¬ wych i z lacznikami tymi sa trwale polaczone, korzystnie zlaczem spawanym. Plyty scienne maja pionowe obrzeza w postaci równoleglych do plasz¬ czyzny plyty odgiec przyligowych, czesciowo za¬ krywajacych profil uszczelniajacy, który wypelnia przestrzen miedzy tymi plytami. Odgiecia te prze¬ chodza w odgiecia boczne prostopadle do plasz¬ czyzny plyty, które sa zaopatrzone w zaczepy hakowe z usztywniajacymi przetloczeniami, slu¬ zace do zawieszania plyt na nosnikach piono¬ wych.Wewnejtrzne strony plyt wyklejone sa welna mineralna, przy czym welna ta wystaje ponad brzegi plyt i po zawieszeniu plyt na nosnikach, tworzy miedzy ich powierzchniami amortyzator drgan. m Wewnetrzne i zewnetrzne narozniki scian za¬ konczone sa jednorodnymi i stanowiacymi calosc plytami katowymi, zawieszonymi na nosnikach pionowych, a zewnetrzne narozniki scian sasied¬ nich pomieszczen, polaczone sa dodatkowo plyta¬ mi lacznikowymi, przez co pomieszczenia te two¬ rza zwarty zespól.Segment okienny, usytuowany w scianie pomie¬ szczenia, przyleglej do poszycia statku zawiera wnefce scienna, zawieszona na nosnikach piono¬ wych, która zaopatrzona jest w przesuwna rame kompensacyjna, zas wnejka okienna zaopatrzona jest w plyte z otworem, przy czym powierzchnia czolowa tej plyty jest wiejksaa od (powierzchni otworu ramy kompensacyjnej. Nadto wneka scien¬ na z przytwierdzonym do niej obramowaniem jest zamocowana rozlacznie do nosników pionowych.Segment drzwiowy osadzony w scianie pomiesz¬ czenia, przyleglej do korytarza sklada sie ze skrzy¬ dla i oscieznicy drzwi, przy czym zwrócone ku so¬ bie obrzeza tak skrzydla jak i oscieznicy drzwi uksztaltowane sa z metalowych elementów ich konstrukcji nosnej, przedzielonych warstwami izo¬ lacyjnymi, usytuowanymi prostopadle do plasz¬ czyzny oscieznicy i skrzydla drzwi. Obrzeze skrzy¬ dla drzwi ma ponadto uksztaltowany na calym obwodzie rowek, który wypelniony jest masa eks¬ pandujaca, a w dolnej czesci plaszczyzny skrzy¬ dla drzwi umieszczone jest wyjscie awaryjne.Oscieznice drzwi stanowi prostokatna rama, 5 przedluzona ku górze nosnikami pionowymi, przy czyim wszystkie poza progiem ksztaltowniki ramy, na jej zewnetrznym obrzezu maja obustronne u- skoki, przez co utworzony jest wystep, w którego bocznych powierzchniach wykonane sa otwory wzdluzne, przeznaczone do zawieszania plyt scien¬ nych.Istotna cecha sufitu, zestawionego z dzwigarów tworzacych swobodnie wiszaca kratownice i z wcisnietych w te kratownice plyt sufitowych, ka¬ setonów oswietleniowych, wentylacyjnych itp., po¬ lega na obramowaniu plaszczyzny sufitu zlozony¬ mi, dwuczesciowymi listwami przyscienno-sufito¬ wymi, z których kazda sklada sie z wzdluznie po¬ laczonych ze soba listew elementarnych, przy czym listwa dolna usytuowana jest w plaszczyz¬ nie sufitu i zwiazana z dzwigarem kratownicy tego sufitu, zas druga, listwa górna jest listwa kompensacyjna, mocowana w prowadnicy ramy górnej i przylega ona bezpo,srednio do plaszczyzny sciany. ^^ *<] Charakterystyczna i istotna cecha listwy przy- scienno-sufitowej jest to, ze laczna szerokosc li¬ stew elementarnych jest wieksza od szerokosci szczeliny miedzy skrajnymi plytami sufitowymi i sciana, a polaczenie obu listew usytuowane jest miedzy powierzchnia sciany i brzegiem listwy dol¬ nej.Podloga pomieszczenia wedlug wynalazku ma budowe wielowarstwowa i wsród warstw tych za¬ wiera co najmniej jedna, odksztalcalna sprezyscie i stosunkowo gruba warstwe, utworzona z ela¬ stycznego materialu oraz umieszczona nad nia co najmniej jedna sztywna warstwe nosna pokryta wykladzina dekoraeyjna.Istota wynalazku dotyczacego sposobu budowy pomieszczen bytowych polega na tym, ze w pier¬ wszej kolejnosci przestrzen przeznaczona na po¬ mieszczenia dzieli sie na jej czesci o wymiarach bedacych calkowita krotnoscia wybranego i przy¬ jetego wspólnego podzielnika, zwanego modulem, a punkty wezlowe i graniczne tych czesci oznacza sie trwale, korzystnie za pomoca uchwytów i za¬ mocowan, przyispawanych do pokladu dolnego i górnego, w polozeniu wyznaczonym metoda op¬ tyczna.W naroznikach plaszczyzny przeznaczonej pod kazde pomieszczenie osadza sie ksztaltowe laczni¬ ki^ korzystnie na elastycznych wspornikach wy¬ posazonych w plytki dystansowe z gwintowanym otworem, a nastepnie za pomoca metod optycz¬ nych ustala sie polozenie tych laczników, w plasz¬ czyznie bazowej wyznaczajacej podstawe pomie¬ szczenia. Po wyznaczeniu plaszczyzny bazowej w obrebie okreslonej powierzchni pomieszczenia ' miesizkalnego ustawia sie blok sanitarny.Na ustawionych i wstepnie umocowanych lacz¬ nikach uklada sie nastelpnie ksztaltowniki pro¬ wadnic, tworzacych rame dolna, które przytwier¬ dzane sa trwale do tych laczników. W punktach IB 20 25 30 35 40 45 60 65 60122 916 5 6 posrednich ksztaltowniki prowadnic ramy dolnej podpiera sie od spodu, równiez za pomoca plytek dystansowych osadzonych na uchwytach.W dalszej kolejnosci koryguje sie, w odniesieniu do optycznie wyznaczonej plaszczyzny usytuowanie górnych uchwytów naroznikowych, uprzednio przy¬ twierdzonych do pokladu górnego i ustala sie po¬ lozenie na uchwytach wsporników i ich plytek dystansowych, które okreslaja wysokosc konstruk¬ cji pomieszczenia.Na wspornikach za pomoca laczników ksztalto¬ wych mocuje sie ksztaltowniki prowadnic, two¬ rzacych rame górna, równolegla do plaszczyzny bazowej i ksztaltowniki te trwale mocuje z lacz¬ nikami podobnie jak rame dolna.Rame dolna i górna laczy sie za posrednictwem nosników pionowych, osadzonych w gniazdach, wypelnionych lacznikami wkladkowymi.W trakcie czynnosci nastepnej do poszycia nad¬ budówki przymocowuje sie trwale wneke okien¬ na,, stanowiaca element podstawy dla -montazu w dalszych operacjach, sciennego segmentu okienne¬ go. Blok sanitarny ustawia sie nastejpnie na miej¬ scu montazu, reguluje jego polozenie wzgledem plaszczyzny bazowej, podlacza do instalacji sani¬ tarnych i mocuje spoczynkowo z pokladem.W oforejbde ramy górnej tworzy sie samodzielna kratownice sufitu, przymocowana korzystnie ela¬ stycznie do pokladu górnego. Po wykonaniu kon¬ strukcji nosnej pomieszczen i jej uzbrojeniu w zamocowania i instalacje, zawiesza sie na nosni¬ kach pionowych profil uszczelniajacy, a nastepnie wklada sie w ksztaltowniki prowadnic górnych i dolnych plyty scienne i plyty te zawiesza na no¬ snikach pionowych.Po zawieszeniu plyt sciennych, w sciance okien¬ nej montuje sie wneke scienna segmentu okienne¬ go, która przylega do wneci okiennej tego seg¬ mentu.W sciance pomieszczenia od stromy korytarza ustawia i zamocowuje sie scienny segment drzwio¬ wy, a nastepnie w przestrzeni .po obu stronach tego seigmentu zawiesza sie na nosnikach pio¬ nowych i oscieznicy drzwi plyty scienne.W kratownice sufitu wmontowuje sie w pierw¬ szej kolejnosci kasetony oswietleniowe, wentyla¬ cyjne itp. oraz plyty sufitowe, tworzace zasad¬ nicza powierzchnie tego sufitu, która nastepnie obramowuje sie listwami przyscienno-sufitowymi.W dalszej kolejnosci wytwarza sie w postaci warstwowej podloge pomieszczenia, a polaczenie styku powierzchni sciany i podlogi maskuje sie listwa przyscienno-podlogowa, przytwierdzona do prowadnicy stanowiacej rame dolna.Przedmiot wynalazku jest przedstawiony w przykladzie, wykonania na rysunku, na którym fig. 1 przedstawia w ujeciu schematycznym jedno z pomieszczen bytowych w przekroju poziomym, fig. 2 — fragment pomieszczenia z jedna ze scian jednostronnie szalowana, fig. 3 podobny fragment tego pomieszczenia, lecz ze sciana dzialowa dwu¬ stronnie szalowana, fig. 4 przedstawia pomiesz¬ czenie wedlug wynalazku w przekroju pionowym, fig. 5 — naroznik ramy dolnej w widoku z góry, fig. 6 ten sam naroznik w przekroju pionowym, fig. 7 przedstawia pomieszczenie bytowe w kolej¬ nym etapie budowy ze zmontowana rama dolna i górna oraz zamocowanym miedzy nimi nosni¬ kiem pionowym, przy czym przekrój poprzeczny tego nosnika uwidacznia fig. 8, fig. 9 uwidacznia sciane pomieszczenia w przekroju pionowym, fig. 10— przekrój poziomy fragmentu tej sciany w obrebie usytuowania nosnika pionowego, fig. 11 przedstawia segment okienny w przekroju piono¬ wym, fig. 12 — widok na segment drzwiowy, fig. 13 — przekrój poziomy fragmentu oscieznicy i skrzydla drzwi tego segmentu wzdluz linii A—A z fig. 12, z uwidocznieniem zawieszonych plyt sciennych, fig. 14 przedstawia przekrój pio¬ nowy przez segment drzwiowy, fig. 15 pokaza- - ny jest rejon polaczenia sufitu i sciany za po¬ moca listwy przyscienno-sufitowej a na fig. 16 pokazano wycinek podlogi w przekroju piono¬ wym, z uwidocznieniem skladajacych sie na te podloge poszczególnych jej warstw.Szkielet nosny pomieszczenia bytowego zbudo¬ wany jest zasadniczo z ramy dolnej 3 i ramy górnej 14, polaczonych nosnikami pionowymi 17, które w ramach tych sa zamocowane za pomoca laczników wkladkowych 21. Laczniki te wyposa¬ zone sa w wypusty 59 osadzone w gniazdach 9 wykonanych w grzbiecie 13 prowadnicy 8, w któ¬ rej wyróznic mozna nadto ramie 10, krawedz do¬ ciskowa 11 i krawedz zatrzaskowa 12. Prowadni¬ ca 8 podwójna ma ksztalt zblizony do litery „W" zas pojedyncza do litery „S". Rama dolna 3 jest wsparta na pokladzie dolnym 1 za pomoca wspor¬ ników sztywnych 5 i sprezystych 6. Rama ta jest zestawiona z prowadnic 8 polaczonych za pomoca laczników ksztaltowych 4, a polozenie ramy dol¬ nej 3 jest regulowane na wspornikach za pomoca plytek dystansowych ?• W narozniku pomieszczenia bytowego usytuo¬ wany jest i trwale zamocowy blok sanitarny 52.Rama górna 14 przymocowana jest do pokladu górnego 2 poprzez wieszaki sztywne 30 i Spre¬ zyste 31 oraz uchwyty 15. Polozenie ramy górnej 14 regulowane jest na wieszakach, równiez za pomoca plytek dystansowych 7. W plaszczyznie ramy górnej 14 usytuowana jest kratownica 28 sufitu umocowana elastycznie do pokladu górne¬ go 2 za pomoca zawieszek 36. Kratownica ta jest wypelniona plytami sufitowymi 32, wcisnietymi w dzwigary sufitowe 35, a cala plaszczyzna su¬ fitu jest obramowana listwami przysciermo-sufi- towymi 29, które skladaja sie z listwy górnej 83 i dolnej 34.Plaszczyzny scian 16 wypelnione sa plytami sciennymi 19, katowymi 20 i lacznikowymi 22, które wyposazone sa w zaczepy hakowe 26 - z przetloczeniami 27 i za ich pomoca sa zawieszo¬ ne w otworach wzdluznych 23 nosników piono¬ wych 17. Styk tych plyt wyposazonych w od¬ giecia boczne 25 i przylgowe 24 z nosnikiem pio¬ nowym 17 jest dokonany posrednio poprzez profil uszczelniajacy 18.Pomieszczenie bytowe wyposazone jest w seg- 10 u M as 10 35 40 40 W 00122 916 7 8 ment okienny 37 i segment drzwiowy 43, które usytuowane sa w plaszczyznach scian tego po¬ mieszczenia. Segment okienny zawiera wneke o- kienma 38 i scienna 39 z umieszczona miedzy ni¬ mi plyta 41 z otworem. We wnece sciennej 39 zakonczonej obramowaniem 42 osadzona jest ra¬ ma kompesacyjna 40, która przylega do powierz¬ chni plyty 41.Segment drzwiowy 43 zawiera * oscieznice 44 i skrzydlo drzwi 45, przy czym skrzydlo jest wy¬ posazone w wyjscie awaryjne 46, a caly seg¬ ment poprzez uskok 50 i wystep 51 polaczony jest z zaczepami hakowymi 26 plyt sciennych 19 i plyty ^addrzwiowej 49. Ogniotrwalosc i szczel¬ nosc segmentu drzwiowego jest osiagnieta dlate¬ go, ze segment ten zawiera warstwy izolacyjne 47 i pasmo masy ekspandujacej 48.Podloga 53 w pomieszczeniu bytowym wyko¬ nana jest z kilku warstw i zawiera warstwe wyrównawcza 58, warstwe nosna 57, warstwe elastyczna 56 z welny mineralnej i na powierzch- . ni warstwe wykladziny dekoracyjnej 55. Obrzeze podlogi obramowane jest listwa przyscienno-pod¬ logowa 54, która maskuje polaczenie podlogi ze scianami.Budowy pomieszczen bytowych wedlug wyna¬ lazku dokonuje sie w ten sposób, ze w trakcie pierwszej czynnosci przestrzen przeznaczona na te pomieszczenia, zawarta wewnatrz nadbudówki lub tez miedzy pokladami dzieli sie za pomoca metod optycznych na jej czesci i punkty wezlo¬ we i graniczne tych czesci oznacza sie przez przyspawanie w tych punktach uchwytów 15 i zamocowan, w postaci wsporników sztywnych 5 i sprezystych 6 oraz wieszaków sztywnych 30 i sprezystych 31. Wsporniki spawa sie do pokla¬ du dolnego 1, zas uchwyty 15 i wieszaki do po¬ kladu górnego 2. Na gwintowane trzpienie wie¬ szaków i wsporników wkreca sie plyltki dystan¬ sowe 7, a nastepnie przystejpuje do ustalania pla¬ szczyzny bazowej, wedlug której orientowane jest przestrzenne polozenie wszystkich pomieszczen.Ustalenie tej plaszczyzny prowadzi sie przez re¬ gulacje na gwincie wsporników sztywnych i spre¬ zystych polozenia plytek dystansowych, przy czym wlasciwe polozenie tych plytek wyznacza sie rów¬ niez metoda optyczna. Na tak przygotowane wsporniki z plytkami dystansowymi zaklada sie laczniki ksztaltowe 4 i w naroznikach pomiesz¬ czenia lacznika te zamocowuje sie spoczynkowo.W obreb pomieszczenia wstawia sie nastepnie zintegrowany blok sanitarny 52. W dalszej ope^ racji na zamocowanych lacznikach uklada _sie prowadnice 8, które razem tworza rame dol¬ na 3 pomieszczenia, lezaca w plaszczyznie ba¬ zowej i prowadnice te spoczynkowo mocuje do tych laczników.W razie koniecznej potrzeby, przy odchyleniach prowadnic — od plaszczyzny bazowej, prowadni¬ ce doiksztaltowac mozna przez regulacje poloze¬ nia a nastepnie trwale zamocowanie wewnetrz¬ nych laczników ksztaltowych, usytuowanych mie¬ dzy lacznikami ksztaltowymi naroznikowymi.Po trwalym zamocowaniu prowadoic 8 do lacz¬ ników ksztaltowych 4 i sprawdzeniu geometrii utworzonej w ten sposób ramy dolnej 3, usta¬ la sie dokladne polozenie gwintowanego trzpienia wieszaków sztywnych 30 lub sprezystych 31, za¬ mocowanych w naroznikach pomieszczenia do po¬ kladu górnego 2 oraz ustala sie równiez na. tych trzpieniach polozenie plytek dystansowych 7. Od¬ wzorowanie polozenia wieszaka, zamocowanego do pokladu górnego," z osadzona na jego trzpieniu plytka dystansowa prowadzi sie przy tym, za pomoca przyrzadu kontrolnego orientowanego na trzech punktach naroznika ramy dolnej 3, z któ¬ rych to punktów jeden lezy w wierzcholku na¬ roznika a pozostale dwa na odpowiadajacych im prowadnicach.Na tak przygotowane wieszaki zaklada sie i mocuje w naroznikach laczniki ksztaltowe 4, a nastepnie na laczniki te zaklada i trwale z nimi laczy prowadnice 8 tworzace rame górna 14.Przygotowane ramy, dolna 3 i górna 14 laczy sie nosnikami pionowymi 17, które ria swych obu koncach maja wysuniete laczniki wkladkowe 21, przy czym jeden z tych laczników, lokalizowany w gniazdawch 9 wykonanych w grzbiecie 13 pro¬ wadnicy ramy górnej, jest juz w trakcie pre- faibrykacji zamocowany spoczynkowo. Lacznik wkladkowy lokalizowany w gniezdzie ramy dol¬ nej 3, jest mocowany spoczynkowo do nosnika pionowego, po osadzeniu nosnika w ramie gór¬ nej i dolnej i wygubieniu luzów jakie wystapic moga miedzy wypustami 59 laczników wklad¬ kowych a gniazdami 9 prowadnic.W dalszym ciagu procesu budowy do poszycia kadluba przymocowuje sie trwale wneke okienna 38 a nastepnie ustawia i reguluje sie wzglejdem plaszczyzny bazowej polozenie bloku sanitarnego 52, którego instalacje podlacza sie jednoczesnie do sieci instalacji statku i w koncowym etapie tej operacji blok sanitarny mocuje sie spoczyn¬ kowo do pokladu dolnego 1.Na wysokosci ramy górnej 14 i w jej obrebie tworzy sie nastepnie swobodnie wiszaca na wie¬ szakach' 36, pod podkladem górnym 2, kratowni¬ ce 28 sufitu, zestawiona z dzwigarów sufitowych 35. Wykonana konstrukcje nosna pomieszczen wy¬ posaza sie w dalszym ciagu budowy w zamoco¬ wania dla mebli oraz przewody instalacji ele¬ ktrycznych. Na nosnikach pionowych 17 zawiesza sie na zaczepach hakowych 26 profile uszczel¬ niajace 18 i plyty scienne 19, przyciskane do nos¬ ników przez krawedz dociskowa 11 ramienia 10 prowadnicy. Pionowe obrzeza plyt sciennych za¬ konczone sa Oidgieciem przylgowym 24, które czes¬ ciowo zakrywa profil uszczelniajacy 18. Odgiecia przylgowe plyt przechodza w prostopadle do pla¬ szczyzny plyty odgiecia boczne 25, które zakon¬ czone sa zaczepami hakowymi 26, wyposazonymi dla zwiejkszenia ich sztywnosci i wytrzymalosci w przetloczenia 27.Wewnetrzne powierzchnie plyt wylozone sa warstwa welny mineralnej, przyklejona do tych powierzchni, przy czym warstwa ta przez to, ze wystaje nad brzegiem plyty, po jej zawieszeniu 10 15 20 25 30 35 40 45 50 55 60122 9X6 9 na nosniku pionowym 17 ulega elastycznemu od¬ ksztalceniu i dlatego tez eliminuje luzy na po¬ laczeniu otworów wzdluznych 23 z zaczepami ha¬ kowymi 26 oraz tlumi drgania. Na zewnetrznych oraz wewnetrznych naroznikach scian 16 zawie¬ sza sie jednorodne i stanowiace calosc plyty ka¬ towe 20, a zewnetrzne narozniki sasiednich po¬ mieszczen laczy sie ponadto plytami lacznikowymi 22, zawieszonymi takze na nosnikach pionowych 17. W sciance okiennej montuje sie nastepujace elementy segmentu okiennego 37, poprzez przy¬ mocowanie do wneki okiennej .38 plyty z otwo¬ rem 41, a wneki sciennej 39, z prfcesuwna w niej rama kompensacyjna 40 do nosników pionowych 17. Zagiete do wewnatrz obrzeze wnejki sciennej 39^ dla wyrównania z plaszczyzna sciany 16, la¬ czy sie przy tyni z obramowaniem 42.Segment drzwiowy 43 montuje sie w scianie przyleglej do korytarza, przy czym zawiera on skrzydlo drzwi 45 i ich oscieznice 44. Obrzeza skrzydla drzwi i oscieznicy uksztaltowane sa z zagietych do wewnatrz brzegów ich konstrukcji nosnej, przedzielonych warstwami izolacyjnymi 47, oisyituowanymii prostopadle do plasizczyzny os¬ cieznicy i skrzydla drzwi. Na obrzezu skrzydla drzwi 45 utworzony jest ponadto rowek, wypel¬ niony masa ekspandujaca 48, a w dolnej czejsci plaszczyzny drzwi umieszczone jest wyjscie awa¬ ryjne 46.Oscieznica drzwi 44 wykonana jest w postaci pro¬ stokatnej ramy, przedluzonej ku górze nosnikami pianowymi 17 a wszystkie, poza progiem, ksztal¬ towniki tej ramy maja na zewnetrznym obrzezu obustronne uskoki 50, przez co utworzony jest wystep 51, w którego bocznych powierzchniach sa wykonane otwory wzdluzne 23, do których wciska sie zaczepy hakowe 26 plyt sciennych 19 oraz plyte naddrzwiowa 49. W wykonana w po¬ przednich operacjach, kratownice 28 sufitu wci¬ ska sie kasetony oswietleniowe, wentylacyjne o- raz plyty sufitowe 32, a powstala w ten sposób powierzchnie sufitu obramowuje sie listwami przyscienno-sufitowymi, 29, z których kazda skla¬ dacie z listwy dolnej 34, usytuowanej w plasz¬ czyznie sufitu i umocowanej w dzwigarze sufi¬ towym 35, oraz listwy górnej 33 podtrzymywa¬ nej przez krawedz zatrzaskowa 12 prowadnicy 8, przy czym listwa ta przylega bezposrednio do pla¬ szczyzny sciany 16.W operacji, zwykle ostatniej wytwarza sie war¬ stwowa podloge 53 pomieszczenia, przy czym w pierwszej kolejnosci poklad dolny 1 pokrywa sie warstwa wyrównawcza 58, na warstwe te kla¬ dzie sie warstwe elastyczna 56, korzystnie z wel¬ ny mineralnej, nastepnie wlewa sie warstwe nos¬ na 57, która po utwardzeniu pokrywa sie wy¬ kladzina dekoracyjna 55.Naroznik styiku powierzchni sciany 16 i podlogi 53 maskuje sie nadto listwa przyscienno-podlo¬ gowa 54, która zamocowana jest od góry miedzy powierzchnia sciany i krawedzia zatrzaskowa 12 prowadnicy 8, zas z dolu oparta jest ona o po¬ wierzchnie podlogi 53. 10 PLThe patent description was published: 30.07.1984 122916 Int. CPB63B 29/02 Creators of the invention: Zbigniew Anosowicz, Marceli Figurski, Janusz Wolkowski, Kazimierz Chudzicki, Lech Lisowski, Zbigniew Wierzbicki, Jerzy Kiser, Florian Grzybowski, Michal Kowalski , Mikolaj Bialy The holder of the patent: Stocznia Szczecinska im. A. Warski, Szczecin (Poland) - Living rooms, especially for water ships, and the method of building living rooms, especially for water-ships. The subject of the inventions are complex living rooms, intended especially for installation on water ships and a method of successively repeated construction There is a known technical solution of living rooms, according to which these rooms are made of shuttering boards, fixed to the lower and upper deck, respectively with the help of the letter / ground-shaped brackets. U "or" L ". The shuttering boards are usually attached to the holders with screws or screws. The construction of the living rooms described here is based on the fact that the holders are first welded to the lower and upper deck, and then the shuttering boards are placed in the holders and fasten with screws in the upper brackets. The ceiling will come off the cut in place panels that are bolted to the U-shaped brackets welded to the upper deck. Sanitary rooms are also made in a similar manner, but the walls are mounted with a foundation welded to the lower deck, and the contacts of the plates of these sides may. grooves filled with a sealing material. According to another known technical solution - living rooms are built on the basis of a skeleton forming a cage structure, where the skeleton is made of metal profiles, connected with each other mainly by welding. The cage structure is filled with prefabricated plates, which are held in the planes of the ceiling and the walls of the support skeleton by means of elastic tongues. The steel sections forming the load-bearing skeleton of the living room have different, depending on the needs, profiles of the gripping elements and these shapes can be used singly or double, for example in the form of two shaping blocks running parallel and adjacent to each other by their bases. The lower frame of the cuboid structure is equipped with bolts on which the entire cage structure rests on the deck and by means of which the correct position of this structure is established. The structure of these living rooms is based on the fact that it first performs The frame structure is made of profiled sections, which are welded together in order to connect them. During construction, the position of the frame structure is adjusted and its position is fixed permanently. The ceiling panels are pressed into the support frame of the ceiling. The known technical solutions of the rooms were 22 9163 122 916 4 on ships, and the methods of constructing these rooms are characterized by a short possibility of standardizing their components, as well as this resulting in a low degree of prefabrication of these elements. Prepared components of living rooms must be made while maintaining a high accuracy of their dimensions, which in total requires the expense of relatively large expenditure of labor in the construction of the premises. The essence of the invention is that the construction of In the cage of living rooms, the walls are made of vertical supports with a profile closed in cross-section, in which the ends are inserted and permanently connected with them, the arms of the insert connector, and the splines of these connectors are embedded in the slots of the guides and preferably permanently connected to At the corners, the guides are mutually connected with each other by means of shaped connectors, and with these connectors are permanently connected, preferably by a welded joint. The wall panels have vertical rims in the form of flange parallel to the panel plane, partially covering the sealing profile that fills the space between the panels. These bends pass into lateral bends perpendicular to the plane of the board, which are provided with hooks with stiffening ribs for hanging the boards on vertical supports. The internal sides of the boards are lined with mineral wool, but the latter protrudes above the edges of the plates and after hanging the plates on carriers, creates a vibration damper between their surfaces. m The internal and external corners of the walls are terminated with homogeneous and integral angle plates suspended on vertical supports, and the external corners of the walls of adjacent rooms are additionally joined by joining panels, thus forming a compact unit. window, located in the wall of the room, adjacent to the shell of the ship, includes a wall cushion, suspended on risers, which is provided with a sliding compensation frame, and the window recess is provided with a plate with an opening, and the front surface of this plate is narrow In addition, the wall recess with the frame attached to it is detachably attached to the vertical carriers. The door segment embedded in the wall of the room, adjacent to the corridor, consists of a box and a door frame, facing towards The edges of both the leaf and the door frame are made of metal elements their load-bearing structure, separated by insulating layers situated perpendicular to the plane of the frame and the door leaf. The rim of the door box also has a groove shaped all around, which is filled with expanding mass, and an emergency exit is located in the lower part of the plane of the door box. The door frame is a rectangular frame, extended upwards by vertical supports, all of which are apart from the threshold, the frame shapes have bends on both sides on its outer periphery, which creates a protrusion in the side surfaces of which there are longitudinal openings for hanging wall panels. An essential feature of the ceiling, composed of girders forming a free-hanging truss and squeezed into these trusses of ceiling panels, lighting and ventilation cassettes, etc., lie on the framing of the ceiling plane by folded, two-part ceiling-wall strips, each of which consists of elementary strips connected longitudinally, the bottom lath is situated in the ceiling plane and is connected with the girder of the grates At the end of this ceiling, while the other upper strip is a compensating strip, it is fixed in the guide of the upper frame and it rests directly, indirectly, on the wall plane. ^^ * <] A characteristic and significant feature of the wall-ceiling trim is that the total width of the elementary strips is greater than the width of the gap between the extreme ceiling panels and the wall, and the connection of the two strips is located between the wall surface and the edge of the strip bottom. According to the invention, the floor of the room has a multilayer structure and among these layers it comprises at least one deformable elastic and a relatively thick layer made of an elastic material and placed above it at least one rigid load-bearing layer covered with decorative covering. concerning the construction of living rooms consists in the fact that, in the first place, the space intended for the accommodation is divided into its parts with dimensions being a total multiplicity of the selected and adopted common divisor, called the module, and the nodes and boundaries of these parts are permanently, preferably by means of holders and fasteners, welded to the lower and upper deck, in the position determined by the optical method. At the corners of the plane intended for each room, shaped fasteners are placed, preferably on flexible supports equipped with distance plates with a threaded hole, and then using an optical method. the position of these connectors is determined in the base plane which constitutes the base of the room. After the base plane has been determined, a sanitary block is set up within a certain area of the monthly room. On the positioned and pre-fixed fasteners, the profiles of the guides forming the lower frame are then placed, which are permanently attached to these fasteners. In points IB 20 25 30 35 40 45 60 65 60 122 916 5 6 intermediate the shapes of the lower frame guides are supported from the bottom, also by means of distance plates mounted on the handles. Further, the position of the upper corner handles is corrected in relation to the optically determined plane. , previously attached to the upper deck, and the position of the brackets and their spacer plates on the holders, which determine the height of the room structure. On the brackets, by means of shaped fasteners, the profiles of the guides, forming the upper frame, are fixed in parallel to the base plane and these profiles are permanently attached with fasteners, similarly to the lower frame. The lower and upper frame are connected by means of vertical carriers, embedded in sockets, filled with insert connectors. During the next operation, the superstructure is permanently attached to the window recess. ¬na, which is the basis for the assembly in further operations, walls window segment. The sanitary block is then placed on the assembly site, it regulates its position in relation to the base plane, is connected to the sanitary installations and rests fixed to the deck. A separate ceiling truss is formed in the upper frame of the upper frame, preferably elastically attached to the upper deck. After the load-bearing structure of the rooms is completed and it is equipped with fixings and installations, the sealing profile is hung on the vertical supports, and then the wall panels are inserted into the profiles of the upper and lower guides, and these panels are hung on the vertical supports. The recess of the window segment is mounted in the window wall, adjacent to the window recess of this segment. In the wall of the room from the steep corridor, the wall segment of the door is placed and fixed, and then in the space on both sides. of this segment is hung on the risers and the door frame, wall panels. In the ceiling trusses, lighting and ventilation cassettes, etc. are installed in the first order, and ceiling panels, which form the principal surface of the ceiling, which are then framed with laths. In the following sequence, the room floor is made in the form of a layered floor, and the joint of the surface area The object of the invention is shown in an example, the embodiment in the drawing, in which Fig. 1 shows a schematic view of one of the living rooms in a horizontal section, Fig. 2 - a fragment a room with one of the walls boarded on one side, fig. 3 a similar part of this room, but with a partition wall on two sides, fig. 4 shows the room according to the invention in a vertical section, fig. 5 - corner of the lower frame in a top view, Fig. 6 shows the same corner in a vertical section, Fig. 7 shows a living room in the next stage of construction with an assembled lower and upper frame and a vertical carrier attached between them, the cross section of this carrier is shown in Fig. 8, Fig. 9 shows the wall of the room in a vertical section, Fig. 10 - a horizontal section of a fragment of this wall within the location of the vertical carrier, Fig. 11 shows Fig. 12 shows the window section in a vertical section, Fig. 12 - a view of the door section, Fig. 13 - a horizontal section of the frame and door leaf of this section along the A-A line in Fig. 12, showing the suspended wall panels, Fig. 14 shows a vertical section through a door section, Fig. 15 shows the area where the ceiling and wall connect with the support of a wall-ceiling batten, and Fig. 16 shows a section of the floor in a vertical section, showing the components that make up these the floor of its individual layers. The supporting skeleton of the living room consists essentially of a lower frame 3 and an upper frame 14, connected by vertical carriers 17, which are attached to them by insert connectors 21. These connectors are equipped with protrusions 59 embedded in in the slots 9 made in the ridge 13 of the guide 8, in which one can also distinguish the frame 10, the pressing edge 11 and the snap edge 12. The double guide 8 has a shape similar to the letter "W" up to the letter "S". The lower frame 3 is supported on the lower deck 1 by means of rigid brackets 5 and resilient 6. The frame is composed of guides 8 connected by means of shaped couplings 4, and the position of the lower frame 3 is adjusted on the brackets by means of spacer plates? • In the corner of the living room a sanitary block 52 is located and permanently fixed. The upper frame 14 is attached to the upper deck 2 by means of rigid hangers 30 and a spring 31 and handles 15. The position of the upper frame 14 is regulated on hangers, also by means of distance plates 7. In the plane of the upper frame 14 there is a ceiling grid 28, elastically fastened to the upper deck 2 by means of hangers 36. This grid is filled with ceiling plates 32 pressed into the ceiling girders 35, and the entire surface of the ceiling is framed with laths. adjacent to the ceiling 29, which consist of an upper strip 83 and a lower strip 34. The planes of walls 16 are filled with 19, angular wall panels and 20 and 22, which are equipped with hook catches 26 - with ribs 27, and by means of them are suspended in the slots 23 of the vertical carriers 17. The contact of these plates with lateral bends 25 and rebate 24 with the carrier The vertical 17 is made indirectly through the sealing profile 18. The living room is equipped with a segment M as 10 35 40 40 W 00122 916 7 8 window 37 and door segment 43, which are located in the plane of the walls of this room . The window section comprises a window recess 38 and a wall 39 with a panel 41 with an opening therebetween. In a wall recess 39 ending with a border 42, a compaction frame 40 is mounted, which adheres to the surface of the board 41. The door section 43 comprises a frame 44 and a door leaf 45, the sash being provided with an emergency exit 46, and the whole The segment, through a step 50 and a projection 51, is connected to the hooks 26 of the wall panels 19 and the door panel 49. The fire resistance and tightness of the door segment is achieved because this segment comprises insulating layers 47 and a band of expanding mass 48. The floor 53 in the living room is made of several layers and comprises a leveling layer 58, a wear layer 57, an elastic layer 56 of mineral wool and a surface. and the decorative lining layer 55. The perimeter of the floor is framed by a perimeter-floor strip 54, which masks the connection between the floor and the walls. The construction of living rooms according to the invention is carried out in such a way that during the first activity the space intended for these rooms is inside the superstructure or between decks, by optical methods, it is divided into its parts and knots, and the boundary points of these parts are marked by welding at these points holders 15 and fasteners in the form of rigid 5 and elastic 6 supports and rigid 30 and elastic hangers 31. The brackets are welded to the lower deck 1, and the holders 15 and hangers to the upper deck 2. Spacers 7 are screwed onto the threaded pins of the hangers and brackets, and then the base plane is fixed, according to which the spatial location of all rooms is oriented. The determination of this plane is carried out by adjusting the thread that the supports are rigid and resilient, the position of the spacer plates, the correct positioning of these plates also being determined by an optical method. Form connectors 4 are placed on the prepared supports with distance plates, and at the corners of the connector room, the connectors are attached at rest. Next to the room, an integrated sanitary block 52 is inserted. In a further operation, guides 8 are arranged on the fasteners, which together form The lower frame is placed in the base of 3 rooms, and the guides are resting at rest to these fasteners. If necessary, when the guides are deflected from the base plane, the guides can be deformed by adjusting the position and then permanently fixing them inside After firmly fastening the guides 8 to the shaped connectors 4 and checking the geometry of the lower frame 3 thus formed, the exact position of the threaded pin of the rigid 30 or elastic 31 hangers is determined, fixed in the corners of the room to the deck top 2 and is also set to. on these bolts, the position of the spacer plates 7. The modeling of the position of the hanger, attached to the upper deck, is guided by the spacer plate mounted on its mandrel by means of a test device oriented at three points of the corner of the lower frame 3, the points of which are one lies in the top of the nailer and the other two on the corresponding rails. Prepared shaped fasteners 4 are placed on such prepared hangers and fastened in the corners, then the guides 8 are placed on these fasteners and permanently connected to them, forming the upper frame 14. Prepared frames, the lower 3 and the upper 14 are connected by vertical carriers 17, which have protruding insert connectors 21 on their both ends, one of these connectors, located in the sockets 9 made in the ridge 13 of the upper frame guide, is already in the process of prefabrication It is fastened at rest. The insert connector, located in the seat of the lower frame 3, is fastened at rest to the vertical carrier, after seating In the course of the construction process, the window recess 38 is permanently attached to the hull plating, and then it is set and adjusted with respect to the base plane, and in the course of the construction process, the window recess 38 is permanently attached to the hull plating, and the loosening that may occur between the projections of the insert connectors and the slots 9 location of the sanitary block 52, the installations of which are simultaneously connected to the ship's installation network, and in the final stage of this operation, the sanitary block is fixed at rest to the lower deck 1. At the height of the upper frame 14 and within it, it then forms freely hanging on hangers 36 , under the upper sleeper 2, the ceiling truss 28, composed of the ceiling girders 35. The load-bearing structure of the rooms made will be used in the course of construction into fixings for furniture and electrical wiring. Sealing profiles 18 and wall plates 19, pressed to the supports by the pressing edge 11 of the guide arm 10, are hung on the vertical supports 17 from hook catches 26. The vertical edges of the wall panels are terminated with a rebate bend 24, which partially covers the sealing profile 18. The rebate bends of the plates pass into the side bends 25 perpendicular to the plate plane, which are terminated with hook hooks 26, equipped to increase their stiffness. 27. The internal surfaces of the boards are lined with a layer of mineral wool, glued to these surfaces, while this layer protrudes over the edge of the board after hanging 10 15 20 25 30 35 40 45 50 55 60 122 9X6 9 on the vertical carrier 17 undergoes elastic deformation and therefore eliminates play in the connection of the longitudinal holes 23 with the hooks 26 and dampens vibrations. On the external and internal corners of the walls 16, homogeneous and wholly angular boards 20 are hung, and the external corners of adjacent rooms are also joined by connecting plates 22, also suspended on vertical supports 17. The following elements are mounted in the window wall window 37, by attaching a panel with an opening 41 to the window recess .38, and a wall recess 39, with a compensating frame 40 for vertical supports 17 inserted therein. The rim of the recess 39 is bent inwards to align with the plane of the wall 16 it connects at the rear with a border 42. The door section 43 is mounted in the wall adjacent to the corridor, and it includes the door leaf 45 and its frame 44. The edges of the door leaf and the frame are formed from the edges of their bearing structure bent towards the inside, separated by insulating layers 47, insulated and perpendicular to the plane of the frame and the door leaf. On the perimeter of the door leaf 45, a groove is also formed, filled with an expanding mass 48, and an emergency exit 46 is located in the lower part of the door plane. The door frame 44 is made in the form of a rectangular frame, extended upwards by foam carriers 17 and all apart from the threshold, the profiles of this frame have on the outer periphery, step 50 on both sides, thus forming a protrusion 51, in the side surfaces of which there are longitudinal holes 23, into which hooks 26 of the wall panels 19 and the over-door panel 49 are pressed. made in the previous operations, the ceiling trusses 28 pressed into the light and ventilation coffers and the ceiling panels 32, and the ceiling surfaces thus formed are framed with wall-ceiling slats, 29, each of which consists of a lower slat. 34, located in the plane of the ceiling and fixed in the ceiling beam 35, and the upper strip 33 supported by the snap edge 12 of the guides 8, with this strip directly adjacent to the plane of the wall 16. In the last operation, usually a layered floor 53 of the room is produced, the lower deck 1 being first covered with a leveling layer 58, on the latter layer the elastic layer 56, preferably of mineral wool, is poured, then the nasal layer 57 is poured, which, after hardening, covers the decorative covering 55. The corner of the surface of the wall 16 and the floor 53 is also masked with a wall-floor strip 54 which is fastened at the top between the surface of the wall and the snap edge 12 of the guide 8, while at the bottom it rests against the floor surfaces 53. 10 EN

Claims (15)

Zastrzezenia patentowe 25 1. Pomieszczenia bytowe izwlaszcza dla statków wodnych, wyposazone w blok sanitarny, zestawio- 5 ne z prefabrykowanych elementów skladowych, majace szkieletowa konstrukcje nosna i podparta punktowo rame dolna, znamienne tym, ze pro¬ wadnice (8) w - ramie dolnej (3) i górnej (14) po¬ laczone sa ze soba za pomoca laczników ksztal- 10 towych (4), których polozenie ustalaja plytki dys¬ tansowe (7), ramy dolna i górna polaczone sa ze soba nosnikami pionowymi (17) z zawieszony¬ mi na nosnikach plytami sciennymi (19) i kato¬ wymi (20), przy czym na jednej ze scian (16) 15 zamontowany jest zintegrowany segment okienny (37), zas w drugiej segment drzwiowy (43), nato¬ miast sufit utworzony jest w oparciu o kratow¬ nice (28), swobodnie wiszaca, która z plaszczyzna scian polaczona jest poprzez dwuczesciowe listwy 20 przyscienno-sufitowe (29), obramowujace zlozona z kasetonów oswietleniowych, wentylacyjnych 1 plyt sufitowych (32) plaszczyzne sufitu, a kilku¬ warstwowa podloga (53) pomieszczenia z plasz¬ czyzna scian (16) uszczelniona jest listwa przys- cienno-podlogowa (54), zamocowana z jednej stro¬ ny miedzy powierzchnia sciany i prowadnicy a z drugiej strony oparta o powierzchnie podlo¬ gi. __Claims 25 1. Living rooms, and especially for water vessels, equipped with a sanitary block, assembled from prefabricated components, having a skeleton structure and a point-supported lower frame, characterized in that the guides (8) in the lower frame (3) and upper (14) are connected with each other by shaped connectors (4), the position of which is determined by spacer plates (7), the lower and upper frames are connected with each other by vertical carriers (17) with wall panels (19) and angle panels (20) suspended on supports, one of the walls (16) 15 has an integrated window segment (37), and the other one a door segment (43), and a ceiling it is formed on the basis of a free-hanging lattice (28), which is connected with the wall plane by two-part wall-ceiling strips (29), framing the ceiling plane (32), and a few ceiling panels (32). ¬ layered podl At the end of the room (53), the plane of the wall (16) is sealed with a floor-curtain rail (54), fixed on one side between the wall and guide surface, and on the other side resting against the floor surface. __ 2. Pomieszczenia bytowe wedlug zastrz. 1, zna- mienne tym, ze w punktach posrednich miedzy naroznikami, prowadnice (8) poidparte sa wspor¬ nikami sztywnymi ,(5)' lub elastycznymi (6), z o- sadzonymi na nich plytkami dystansowymi (7).2. Living rooms according to claim 1, characterized by the fact that at intermediate points between the corners, the guides (8) are supported by rigid (5) 'or flexible (6) supports with spacer plates (7) mounted thereon. 3. Pomieszczenia bytowe wedlug zastrz. 1, zna¬ mienne tym, ze prowadnica (8) podwójna, mas ksztalt zblizony do litery „W" a pojedyncza do litery „S", przy czym ich ramiona maja krawedz dociskowa sciany (16) i krawedz zatrzaskowa li- stwy przyscienno-sufitowej (28) lub przyscienno- -podlogowej (54), zas grzbiet prowadnicy ima, gnia¬ zda do osadzenia lacznika wkladkowego (21).3. Living rooms according to claim 1, characterized in that the double guide (8) has a shape similar to the letter "W" and the single one to the letter "S", their arms having a pressing edge of the wall (16) and a snap edge of the wall-ceiling strip (28) or diagonal-floor (54), and the ridge of the guide, and a seat for the insert connector (21). 4. Pomieszczenia bytowe wedlug zastrz. 1, zna¬ mienne tym, ze nosniki pionowe (17) maja zamk- ._ niety w przekroju poprzecznym profil i z piro- wadnicami (8) sa polaczone za pomoca lacznika wkladkowego (21), którego ramiona sa wsuniete w konce nosnika, a wypusty tych laczników o- sadzone sa w gniazdach prowadnic. 5. (4. Living rooms according to claims 1, characterized by the fact that the vertical supports (17) have a closed cross-sectional profile and the pyro tubes (8) are connected by means of an insert connector (21), the arms of which are inserted into the end of the carrier, and the projections these fasteners are seated in the slots of the guides. 5. ( 5. Pomieszczenia bytowe wedlug zastrz. 1, zna¬ mienne tym, ze narozniki ich scian (16) wypel¬ nione sa plytami katowymi (20), a w zespoly na tych naroznikach polaczone sa plytami lacz¬ nikowymi (22). 555. Living rooms according to claims 1, characterized by the fact that the corners of their walls (16) are filled with angle plates (20), and the assemblies on these corners are connected by connecting plates (22). 55 6. Pomieszczenia bytowe wedlug zastrz. 1, zna¬ mienne tym, ze plyty scienne (19) i katowe (20) maja pionowe obrzeza w postaci równoleglych do plaszczyzny plyty odgiec przylgowych (24), przechodzacych w odgiecia boczne (25), prostopa- 60 dle do plaszczyzny plyty, zakonczone zaczepami hakowymi (26), zaopatrzonymi w usztywniajace przemoczenia (27).6. Living rooms according to claims 1, characterized by the fact that the wall plates (19) and the angle plates (20) have vertical edges in the form of rebate flanges (24) parallel to the plate plane, passing into lateral bends (25), perpendicular to the plate plane, ended hook hooks (26), provided with stiffening soaks (27). 7. Pomieszczenia bytowe wedlug zastrz. 1, zna¬ mienne tym, ze. usytuowany w scianie (16) po- 65 mieszczenia segment okienny (37) zawiera wneke122 916 11 12 scienna (39), zawieszona na nosnikach pionowych (17), która zaopatrzona jest w przesuwna rame kompensacyjna (40), zas wneka okienna (38) zao¬ patrzona jest w plyte (41) z otworem o powierz¬ chni plyty wiekszej od otworu ramy kompensa¬ cyjnej.7. Living rooms according to claims 1, characterized by the fact that. the window segment (37) located in the wall (16) of the room includes a recess (39), suspended on vertical supports (17), which is provided with a sliding compensation frame (40), window recess (38) it is seated in the plate (41) with an opening having a plate area larger than the opening of the compensating frame. 8. Pomieszczenia bytowe wedlug zastrz. 1, zna¬ mienne tym, ze obrzeza skrzydla (45) i oscieznicy drzwi (44) uksztaltowane sa z metalowych ele¬ mentów ich konstrukcji nosnej, przedzielanych warsljwami izolacyjnymi (47), a skrzydlo drzwi (45) ma na obrzezu rowek wypelniony masa eks¬ pandujaca (48).8. Living rooms according to claims 1, characterized by the fact that the periphery of the leaf (45) and the door frame (44) are formed of metal elements of their load-bearing structure, separated by insulating layers (47), and the door leaf (45) has a groove filled with a mass of ex. ¬ pandujaca (48). 9. Pomieszczenia bytowe wedlug zastrz. 1 albo 8, znamienne tym, ze pionowe ksztaltowniki ra¬ my, tworzacej oscieznice drzwi (44), przedluzo¬ ne sa ku górze nosnikami pionowymi (17), a wszystkie, poza progiem, ksztaltowniki ramy maja obustronne uskoki (50) przez ca utworzony jest wystep (51), w którego bocznych powierzchniach wykonane sa pbdluzme otwory (23) do zawiesza¬ nia plyt sciennych (19).9. Living rooms according to claims According to claim 1 or 8, characterized in that the vertical profiles of the frame forming the door frame (44) are extended upwards by vertical struts (17), and all, except for the threshold, the frame profiles have two-sided steps (50) through the there is a projection (51) in the side surfaces of which there are longitudinal holes (23) for hanging the wall panels (19). 10. Pomieszczenia bytowe wedlug zastrz. 1, zna¬ mienne tym, ze obramowujaca sufit dwuczescio¬ wa listwa przyscienno-sufitowa (29) ma- listwe dolna (34) usytuowana w plaszczyznie sufitu, zas druga, listwa górna (33) jest listwa kompensa¬ cyjna, umocowana w prowadnicy raimy górnej (14) i przylega ona bezposrednio do plaszczyzny sciany (16) a obie te listwy polaczone sa wzdluz¬ nie ze soba.10. Living rooms according to claims 1, characterized by the fact that a two-piece ceiling-wall strip (29) framing the ceiling (29) located in the ceiling plane, and the second, upper strip (33) is a compensating strip, fixed in the guide rail upper (14) and it is directly adjacent to the plane of the wall (16) and both these slats are connected longitudinally with each other. 11. Pomieszczenia bytowe wedlug zastrz. 1 albo 10, znamienne tym, ze laczna szerokosc listwy dolnej (34) i górnej (33) jest wieksza od szero¬ kosci szczeliny miejdzy skrajnymi plytami sufi¬ towymi i sciana, a polozenie elementów polacze¬ nia obu listew usytuowane jest miedzy powierz¬ chnia sciany (16) i brzegiem listwy dolnej (34).11. Living rooms according to claims A method according to claim 1 or 10, characterized in that the total width of the lower (34) and upper (33) laths is greater than the width of the gap between the extreme ceiling panels and the wall, and the position of the joining elements of the two laths is located between the surface wall (16) and the edge of the bottom bar (34). 12. Pomieszczenia bytowe wedlug zastrz. 1, zna¬ mienne tym, ze ich wielowarstwowa podloga (53) zawiera co najmniej jedna stosunkowo gruba war¬ stwe elastyczna (56), wykonana ze sprezystego materialu oraz umieszczona nad nia co najmniej jedna ciensza od niej i sztywna warstwa nos¬ na (57).12. Living rooms according to claims 1, characterized in that their multilayer floor (53) comprises at least one relatively thick elastic layer (56) made of an elastic material and disposed above it at least one thinner and rigid supporting layer (57). ). 13. Sposób budowy pomieszczen bytowych zwla¬ szcza dla statków wodnych, przeprowadzony z prefabrykowanych elementów, które wytwarza sie poza statkiem a w przestrzeni ograniczonej po¬ szyciem kadluba statku laczy sie, znamienny tym, ze przestrzen przeznaczona na pomieszczenia dzie¬ li sie za pomoca metod optycznych na jej czesci, o wymiarach bedacych calkowita krotnoscia wy¬ branego i przyjetego wspólnego podzielnika, zwa¬ nego modulem, a punkty wezlowe i graniczne tych czesci oznacza sie trwale, korzysfciie za po¬ moca wsporników (5 i 6) i wieszaków (30 i 31) prizyspaiwanych do pokladu dolnego (1) i górne^ go (2), ustala sie nastepnie w plaszczyznie ba* zowej polozenie ramy dolnej (3), wstawia blok sanitarny (52), zestawia i mocuje rame dolna (3) i w odniesieniu do niej utwierdza sie polozenie ramy górnej (14), które to ramy laczy sie nos¬ nikami pionowymi <17), po czyim reguluje sie po¬ lozenie bloku sanitarnego (52), a po utrwaleniu jego polozenia, w obrebie ramy górnej tworzy sie samonosna kratownice (28) sufitu, która wraz z pozostala konstrukcja nosna wyposaza sie. w instalacje, nastejpnie wstawia sie miejdzy prowad¬ nice (8) segment drzwiowy (43) i montuje seg¬ ment okienny J37) a na nosnikach pionowych (17) zawiesza sie profile uszczelniajace (18) i plyty scienne (19), jednostronnie przy scianach kadluba a dwustronnie w budowanych sciankach dzialo¬ wych, wciskajac je w prowadnice (8) i otwory nosników pionowych (17), zas w naroznikach po¬ mieszczen zawiesza sie uzupelniajace plyty kato¬ we (20) i lacznikowe (22) oraz wciska sie w dzwi¬ gary sufitowe (35) kasetony oswietleniowe, wen¬ tylacyjne i plyty sufitowe (3£), a nastepnie pla¬ szczyzne sufitu obramowuje sie dwuczesciowymi listwami przyscienno-sufitowymi (29), po czym wytwarza sie warstwowa podloge (53), która po¬ krywa sie dekoracyjna wykladzina (55) i zaklada sie listwe przyscienno-podlogowa (54), wciskajac ja na dolna prowadnice (8) tak aby wargi tej listwy przylegaly do powierzchni sciany (16) i do powierzchni podlogi.13. The method of building living quarters, especially for watercraft, made of prefabricated elements, which are produced outside the ship and in the space limited by the hull of the ship's hull, characterized by the fact that the space intended for accommodation is divided by optical methods on its parts, with dimensions being an integer times the chosen and adopted common factor, called a module, and the nodes and boundary points of these parts are permanently marked, the benefits of using supports (5 and 6) and hangers (30 and 31) ) placed on the lower (1) and upper (2) deck, then the lower frame (3) is positioned in the base plane, the sanitary block (52) is inserted, the lower frame (3) is assembled and secured with reference to it the position of the upper frame (14) is fixed, which frame is joined by vertical carriers <17), after which the position of the sanitary block (52) is adjusted, and after its position is fixed, a new shape is formed within the upper frame. monocoque ceiling trusses (28) that fit with the rest of the supporting structure. in the installation, then the door section (43) is inserted between the guides (8) and the window section J37 is mounted, and the sealing profiles (18) and wall panels (19) are hung on the vertical supports (17), on one side at the walls of the hull and on both sides of the constructed partition walls, by pressing them into the guides (8) and the openings of the vertical supports (17), and in the corners of the rooms, complementary angle plates (20) and joining plates (22) are suspended and pressed into Ceiling bells (35), lighting, ventilation coffers and ceiling panels (3 £), then the flat ceiling is framed with two-piece ceiling-wall slats (29), after which a layered floor (53) is produced, ¬ the decorative carpet (55) is hidden and the diagonal-floor batten (54) is placed by pushing it over the lower guide (8) so that its lips touch the wall surface (16) and the floor surface. 14. sposób budowy wedlug zastrz. 13, zna¬ mienny tym, ze rame dolna (3) w plaszczyznie bazowej ustawia sie przez regulacje polozenia laczników ksztaltowych (4) na wspornikach sztyw¬ nych (5) i sprezystych (45).14. method of construction according to claim 13, characterized in that the lower frame (3) is set in the base plane by adjusting the position of the shaped couplings (4) on the rigid (5) and elastic (45) supports. 15. Sposób budowy wedlug zastrz. 13, zna¬ mienny tym, ze polozenie ramy górnej (14) regu¬ luje i ustala sie wzgledem co najmniej' trzech punktów naroznika ramy dolnej (3), z których jeden i tylko jeden jest wspólny dla obu pro¬ wadnic (8) ramy dolnej (3). II 11 SI 29 M 4t 45 M122 916 Flj.3122 916 Fig 4 jj. Fig.5 Fig 6122 916 \ \ \ \ 'LL 7 "\ v v v*K \ \ yHy \\v\\v\\ Fig.7122 916 24 48 25122 916 Fig. 11122 916 Ftg. H 8 33 34 3S 32 Fig. 16 Cen* 100 zl DN-3, zam. 559/84 PL15. Construction method according to claim 13, characterized in that the position of the upper frame (14) is regulated and fixed with respect to at least three corner points of the lower frame (3), one and only one of which is common to both guides (8) of the frame. lower (3). II 11 SI 29 M 4t 45 M122 916 Flj. 3122 916 Fig 4 jj. Fig. 5 Fig 6122 916 \ \ \ \ 'LL 7 "\ vvv * K \ \ yHy \\ v \\ v \\ Fig. 7122 916 24 48 25 122 916 Fig. 11122 916 Ftg. H 8 33 34 3S 32 Fig. 16 Prices * PLN 100 DN-3, order 559/84 PL
PL1979218805A 1979-10-06 1979-10-06 Personnal accomodation rooms in particular on waterborne vessels and method of building such rooms PL122916B1 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
PL1979218805A PL122916B1 (en) 1979-10-06 1979-10-06 Personnal accomodation rooms in particular on waterborne vessels and method of building such rooms
SU802991052A SU1134116A3 (en) 1979-10-06 1980-10-03 Ship service space
NO802941A NO802941L (en) 1979-10-06 1980-10-03 RESIDENCE ROOMS, SPECIFICALLY CALCULATED FOR MARINE VESSELS, AND PROCEDURES FOR BUILDING THESE
DD80224332A DD153354A5 (en) 1979-10-06 1980-10-03 PROCESS FOR THE CONSTRUCTION OF RESIDENTIAL SPACES, ESPECIALLY FOR SHIPS, AND HOUSES MADE BY THIS PROCEDURE
EP80106046A EP0026936A1 (en) 1979-10-06 1980-10-06 Process for creating living-spaces, especially on board ships, and living-spaces produced by this process
YU02539/80A YU253980A (en) 1979-10-06 1980-10-06 Method f building housing premises, particularly on floating objects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL1979218805A PL122916B1 (en) 1979-10-06 1979-10-06 Personnal accomodation rooms in particular on waterborne vessels and method of building such rooms

Publications (2)

Publication Number Publication Date
PL218805A1 PL218805A1 (en) 1981-04-10
PL122916B1 true PL122916B1 (en) 1982-09-30

Family

ID=19998776

Family Applications (1)

Application Number Title Priority Date Filing Date
PL1979218805A PL122916B1 (en) 1979-10-06 1979-10-06 Personnal accomodation rooms in particular on waterborne vessels and method of building such rooms

Country Status (6)

Country Link
EP (1) EP0026936A1 (en)
DD (1) DD153354A5 (en)
NO (1) NO802941L (en)
PL (1) PL122916B1 (en)
SU (1) SU1134116A3 (en)
YU (1) YU253980A (en)

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE456331B (en) * 1985-04-26 1988-09-26 Acci Handelsbolag ROOM UNIT, SPECIFICALLY CABIN OR COTTAGE BY VESSEL
FI852186L (en) * 1985-05-31 1986-12-01 Rakennusvalmiste Ky FOERFARANDE FOER MONTERING AV ETT UTRYMME, T.EX. EN FARTYGSHYTT.
SE455208B (en) * 1985-12-11 1988-06-27 Conforex Ab DEVICE FOR USING SPACES WITH SPACES WITH SPACES
DD282824A7 (en) * 1988-05-24 1990-09-26 Industriekooperation Schiffbau FIRE AND SOUND-BREATHING DOOR
DE9212886U1 (en) * 1992-09-24 1992-12-10 Niesmann + Bischoff Gmbh, 5403 Muelheim-Kaerlich, De
WO2008015302A1 (en) * 2006-08-03 2008-02-07 Perfilopla, S.L. Partitioning system with adjustable supports
RU2451781C1 (en) * 2011-03-17 2012-05-27 Олег Савельевич Кочетов Piece sound absorber
RU2451780C1 (en) * 2011-03-17 2012-05-27 Олег Савельевич Кочетов Pierce sound absorber for ship cabin
RU2495296C2 (en) * 2011-03-18 2013-10-10 Олег Савельевич Кочетов Vibration insulator of ship cabin
RU2451620C1 (en) * 2011-03-18 2012-05-27 Олег Савельевич Кочетов Low-noise ship cabin
RU2459987C1 (en) * 2011-03-18 2012-08-27 Олег Савельевич Кочетов Spring bumper of ship cabin
RU2451619C1 (en) * 2011-03-18 2012-05-27 Олег Савельевич Кочетов Ship cabin acoustic surface finishing
RU2495202C1 (en) * 2012-08-16 2013-10-10 Олег Савельевич Кочетов Single-piece sound absorber
RU2523636C1 (en) * 2012-11-27 2014-07-20 Олег Савельевич Кочетов Ship cabin acoustic surface finishing
RU2523638C1 (en) * 2012-11-27 2014-07-20 Олег Савельевич Кочетов Low-noise ship cabin
WO2015076759A1 (en) * 2013-11-22 2015-05-28 Seaway Yachts, D.O.O. The process of mounting boat panels
RU2576263C1 (en) * 2015-01-12 2016-02-27 Олег Савельевич Кочетов Single-piece kochetov(s sound absorber with reflecting element
RU2576703C1 (en) * 2015-01-20 2016-03-10 Олег Савельевич Кочетов Single-piece kochetov sound absorber
RU2658963C2 (en) * 2015-08-19 2018-06-26 Анна Михайловна Стареева Ship cabin single-piece sound absorber
RU2594914C1 (en) * 2015-08-26 2016-08-20 Олег Савельевич Кочетов Kochetov sound-absorbing spiral structure
RU2624117C1 (en) * 2016-03-09 2017-06-30 Олег Савельевич Кочетов Low-noise ship cabin
CN108791725B (en) * 2018-06-28 2024-02-23 上海外高桥造船有限公司 Fixed connection device and modularized unit cabin with same
CN108622310B (en) * 2018-07-26 2023-06-23 上海外高桥造船有限公司 Marine connection system
CN115158590A (en) * 2022-08-18 2022-10-11 上海外高桥造船有限公司 Sectional support and integrated assembly

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1254327B (en) * 1963-01-21 1967-11-16 Brunotte K G H Arrangement and design of movable partitions in a space bounded at the top by a false ceiling
FR1543597A (en) * 1966-10-26 Blohm Voss Ag Layout for the construction and equipment of residential premises
US3503166A (en) * 1968-03-22 1970-03-31 Yosh Nakazawa & Associates Inc Architectural system of interior modular construction
CH531624A (en) * 1970-08-19 1972-12-15 Syma Intercontinental Sa Building construction
GB1436116A (en) * 1972-04-29 1976-05-19 Gkn Sankey Ltd Partitioning
SE7513704L (en) * 1975-12-04 1977-06-05 Stora Kopparbergs Bergslags Ab FLOOR ELEMENT

Also Published As

Publication number Publication date
NO802941L (en) 1981-04-07
SU1134116A3 (en) 1985-01-07
DD153354A5 (en) 1982-01-06
EP0026936A1 (en) 1981-04-15
PL218805A1 (en) 1981-04-10
YU253980A (en) 1984-04-30

Similar Documents

Publication Publication Date Title
PL122916B1 (en) Personnal accomodation rooms in particular on waterborne vessels and method of building such rooms
US11808036B2 (en) Thermal and acoustic insulating and sealing system for a safing slot in a curtain wall
RU2389634C2 (en) System of premises, vessel, building and method for design of premises system
US3310917A (en) Building construction and modular panels therefor
UA81718C2 (en) Device for the earthquake-resistant mounting of partition and partition with such device
JPS60246952A (en) Exterior panel of building structure and method for shingling the same
US11486137B2 (en) Thermal and acoustic insulating and sealing system for a safing slot in a curtain wall
DK178581B1 (en) Modular system for post-insulating a wall in a building and / or facade renovation
WO2005103409A1 (en) Wall face exterior structure of outer wall face insulation building and its wall face exterior furring, lateral furring strip frame for installing wall face exterior material and wall face exterior froming method by lateral furring strip frame, and exterior furring material and outer wall employing it
RU2298619C2 (en) Outer wall panel and wall structure
EP2686498B1 (en) Modular interior partition for a structural frame building
KR890004177B1 (en) Walls or partitions for a building
RU67134U1 (en) DEVICE FOR FASTENING FRONT PLATES
SU1644722A3 (en) Building structure for dividing a room
JP3749597B2 (en) Sliding door fitting construction method in unit building
PL144375B1 (en) Waterborne vessel living rooms and method of constructing them
RU2032805C1 (en) Door
CN115030340A (en) Construction method of ALC wallboard side box column and fireproof plate structure
JPH0241611B2 (en)
PL71415Y1 (en) Single leaf metal entrance door
PL143458B1 (en) Partition wall for accomodation rooms,in particular shipborne ones,provided with fastening means
GB2116598A (en) Connecting panels
PL58521Y1 (en) Thermally insulating facade facing board
PL115369B1 (en) Fireproof door wing