NO335948B1 - Fremgangsmåte for inngrep i en rørledning, og apparat for gjenoppretting av en offshore-rørledning og produksjon av brønnfluider. - Google Patents

Fremgangsmåte for inngrep i en rørledning, og apparat for gjenoppretting av en offshore-rørledning og produksjon av brønnfluider. Download PDF

Info

Publication number
NO335948B1
NO335948B1 NO20042922A NO20042922A NO335948B1 NO 335948 B1 NO335948 B1 NO 335948B1 NO 20042922 A NO20042922 A NO 20042922A NO 20042922 A NO20042922 A NO 20042922A NO 335948 B1 NO335948 B1 NO 335948B1
Authority
NO
Norway
Prior art keywords
pipeline
vessel
well
coupling
drilling
Prior art date
Application number
NO20042922A
Other languages
English (en)
Other versions
NO20042922L (no
Inventor
John Boyle
Original Assignee
Weatherford Lamb
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weatherford Lamb filed Critical Weatherford Lamb
Publication of NO20042922L publication Critical patent/NO20042922L/no
Publication of NO335948B1 publication Critical patent/NO335948B1/no

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
    • E21B7/201Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes with helical conveying means
    • E21B7/203Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes with helical conveying means using down-hole drives
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/24Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/64Drill bits characterised by the whole or part thereof being insertable into or removable from the borehole without withdrawing the drilling pipe
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • E21B21/085Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T137/00Fluid handling
    • Y10T137/0318Processes
    • Y10T137/0402Cleaning, repairing, or assembling
    • Y10T137/0441Repairing, securing, replacing, or servicing pipe joint, valve, or tank
    • Y10T137/0458Tapping pipe, keg, or tank

Abstract

Foreliggende oppfinnelse vedrører en fremgangsmåte og et apparat for inngrep i en offshore-rørledning, mens man avleder væskestrøm til en lagringsplass, slik at produksjon gjennom offshorerørledningen kan fortsette mens man utfører en inngrepsoperasjon i rørledningen. Et offshore-fartøy kan brukes for å avlede og lagre væskestrøm mens man trenger inn i rørledningen. Videre tilveiebringes det en fremgangsmåte og et apparat for boring av et borehull under vann med et offshore-fartøy. Metoden og apparatet involverer boring av borehullet og foring av borehullet med et kontinuerlig foringsrør, senket fra offshore-fartøyet.

Description

BAKGRUNNSOPPLYSNINGER FOR OPPFINNELSEN
Oppfinnelsens bruksområde
Foreliggende oppfinnelse vedrører generelt et apparat og en metode for inngrep i offshore-rørledninger. Foreliggende oppfinnelse vedrører også et apparat og en metode for boring og foring av et offshore-borehull.
Beskrivelse av gjeldende oppfinnelse
Hydrokarbonproduksjon foregår enten direkte fra jorden eller fra jorden under vann. Produksjon direkte fra jorden blir typisk betegnet som en "landproduksjonsoperasjon" mens produksjon fra jorden under vann vanligvis blir betegnet som en "offshore-produksjonsoperasjon" eller en "undervanns produksjonsoperasjon". For å få hydrokarboner i enten en landproduksjonsoperasjon eller en offshore-produksjonsoperasjon, føres et foringsrør inn i et utboret borehull i den geologiske formasjonen. Foringsrøret isolerer borehullet fra formasjonen og forhindrer uønskede fluider / væsker, så som vann, fra å strømme fra formasjonen og inn i borehullet. Foringsrøret blir perforert ved det området i innen formasjonen som inneholder de ønskede hydrokarbonene, idet hydrokarbonene strømmer fra det aktuelle området til overflaten av formasjonen. Dette resulterer i produksjon av hydrokarbonene. I prinsippet strømmer hydrokarbonene til overflaten av formasjonen gjennom produksjonsrør som er ført inn i det forede borehullet.
Foringsrør legges inn i formasjonen for å danne et foret borehull ved komplettering av brønnen. I konvensjonelle kompletteringsoperasjoner for brønner blir borehullet laget for å få tilgang til hydrokarbonbærende formasjoner ved bruk av boring. Boring utføres ved bruk av et skjæreverktøy som er montert på enden av en borstøtte, mest kjent som en borestreng. For å bore borehullet ned til en forhånds-bestemt dybde, roteres borestrengen ofte ved hjelp av et toppdrevet rotasjonssystem eller rotasjonsbord på en plattform eller rigg på overflaten, eller ved hjelp av en borkronemotor montert på den nedre enden av borestrengen. Etter boring til en for-håndsbestemt dybde, fjernes borestrengen og dens skjæreverktøy fra borehullet, idet en del av foringsrøret senkes ned i borehullet. Slik dannes det et ringformet område mellom strengen av foringsrør og formasjonen. Strengen av foringsrør henges midlertidig fra brønnens overflate. Deretter utføres en sementeringsoperasjon for å fylle det ringformede rommet med sement. Ved bruk av konvensjonelle apparater sementeres foringsrør-strengen fast i borehullet ved å føre sement inn i det ring formede rommet som er definert mellom den ytre veggen av foringsrøret og borehullet. Kombinasjonen av sement og foringsrør styrker borehullet og forenkler isolasjon av spesielle områder av formasjonen bak foringsrøret for produksjon av hydrokarboner.
Det er vanlig å anvende mer enn én streng av foringsrør i et borehull. I dette henseende bores brønnen til en første, fastsatt dybde med et skjæreverktøy på en borestreng. Så fjernes borestrengen. En første streng av foringsrør, eller lederør, kjøres deretter ned i borehullet og plasseres i den utborede delen av borehullet, hvorpå det sirkuleres sement inn i ringrommet bak foringsrørstrengen. Deretter bores brønnen ned til en andre, fastsatt dybde, hvorpå en andre foringsrørstreng eller et foringsrør kjøres ned i den utborede delen av borehullet. Den andre strengen plasseres slik at den øvre delen av den andre strengen av foringsrør overlapper den nedre delen av den første foringsrørstrengen. Den andre strengen av foringsrør festes eller "henges" deretter i det eksisterende foringsrøret ved hjelp av kilebelter som bruker kilebelteledd og konuser for å kile fast den nye strengen av foringsrør i borehullet. Den andre strengen av foringsrør blir deretter sementert. Denne prosessen blir typisk sett repetert med ytterligere foringsrørstrenger inntil brønnen har blitt boret til total dybde. På denne måten blir brønner typisk sett dannet med to eller flere foringsrørstrenger med en jevnt avtagende diameter.
Som et alternativ til denne konvensjonelle metoden, brukes ofte boring med foringsrør for å plassere foringsrørstrenger med en jevnt avtagende diameter innen borehullet. Denne metoden involverer kopling av et skjæreverktøy i form av en bor-krone til den samme foringsrørstrengen som skal fore borehullet. I stedet for å kjøre et skjæreverktøy på en borestreng kjøres skjæreverktøyet eller en boresko inn ved enden av foringsrøret, og vil forbli i borehullet og bli sementert fast i dette. Boring med foringsrør er ofte den foretrukne metoden for komplettering av brønner, fordi kun én innkjøring av arbeidsstrengen ned i borehullet er nødvendig for å danne og fore borehullet per del av foringsrør som utplasseres i hullet.
Boring med foringsrør er spesielt egnet for boring og foring av et borehull under vann i en dypvannsfullføringsoperasjon for brønner. Når man lager et borehull under vann, blir den opprinnelige lengden av borehullet som har blitt boret, utsatt for potensiell kollaps grunnet forekomster av myke formasjoner under havbunnen. I tillegg kan deler av borehullet som går gjennom områder med høyt trykk, forårsake skade på borehullet i løpet av den tiden som går mellom boringen og foringen av borehullet. Boring med foringsrør minimerer tiden mellom boringen og foringen av borehullet, og letter derved de ovennevnte problemene.
Etter produksjon av hydrokarboner ved overflaten av den geologiske formasjonen, lagres hydrokarbonene i et anlegg for deretter å bli behandlet med tanke på å fjerne uønskede, forurensende stoffer i hydrokarbonene, samt for å tilvirke det ønskede produktet. Ved landproduksjonsoperasjoner vil en mulig lagringsmåte for hydrokarbonene omfatte en tank som er anordnet ved siden av borehullet, idet hydrokarbonene jevnlig hentes fra lagringsenheten ved hjelp av en mobil lagringsenhet som fysisk transporterer hydrokarbonene til en behandlingsenhet. Deretter losses hydrokarbonene inn i behandlingsenheten og behandles der.
En annen mulighet for lagring og behandling av hydrokarbonene i landproduksjonsoperasjoner vil være bruk av en rørledning koplet til produksjonsrøret. Hydrokarbonene strømmer da fra formasjonen gjennom perforeringene og inn i produk-sjonsrøret, gjennom rørledningen og inn i en lagrings- og behandlingsenhet ved en fjern beliggenhet. Lagrings- og behandlingsenheten mottar gjerne produkter fra flere rørledninger fra landproduksjonsoperasjoner ved forskjellige borehull. Dermed tillates lagring og behandling av hydrokarbonene fra flere brønner ved ett anlegg, uten behov for å transportere hydrokarboner fysisk til behandlingsanlegget.
Ovennevnte alternativer for lagring og behandling av hydrokarboner som er produsert under landproduksjonsoperasjoner, kan gjennomføres som følge av den ubegrensede kapasiteten som er tilgjengelig med tanke på lagringsenheter og behandlingsanlegg på land. Produksjonsoperasjoner offshore krever imidlertid andre lagrings og behandlingsmetoder på grunn av den begrensede plassen for hydrokarbonproduksjon ved overflaten av vannmassen. Derfor brukes det for tiden metoder for lagring av store mengder med hydrokarboner ved fjerntliggende anlegg.
Offshore-brønner blir ofte boret og komplettert ved bruk av en borerigg. Boreriggen har ben som hviler på havbunnen og bærer dekket på riggen. Det er et hull i dekket på boreriggen, og gjennom dette kan utstyr for komplettering og boring av borehullet, så som en borestreng og foringsrørstrenger, settes inn og senkes ned i vannmassen. Borehullet blir vanligvis boret ut ved hjelp av en borestreng, hvorpå foringsrørstrengen plasseres i det utborede borehullet for å danne et foret borehull. Det blir laget perforeringer i foringen og i formasjonen, som beskrevet ovenfor. Et stigerør er et rørsystem som strekker seg fra havbunnen til overflaten av vannet. Dette blir til slutt satt inn ved toppen av det forede borehullet. Denne metoden er relativt kostbar da det må bygges og vedlikeholdes en produksjonsplattform over hvert brønnhode. Fordi borerigger er relativt kostbare å vedlikeholde over borehullet etter fullførelsesoperasjonen, blir boreriggen fjernet fra sin posisjon over det fullførte borehullet og utplassert for å bore et etterfølgende borehull ved en annen beliggenhet. På dette punktet blir produksjonen av hydrokarbonene og etterfølgende lagring av hydrokarbonene et problem.
En metode for produksjon og lagring av hydrokarboner i offshore-operasjoner involverer å først bygge en produksjonsplattform på havbunnen. Akkurat som boreriggen omfatter produksjonsplattformen et dekk som er støttet på ben som forlenges til havbunnen. Det senkes ned produksjonsrør gjennom et hull i produksjonsplattformen, idet produksjonsrøret strekkes ned gjennom stigerøret og det forede borehullet, ned til det området der perforeringene finnes, idet hydrokarbonene strømmer opp gjennom produksjonsrøret til en lagringsenhet på produksjonsplattformen. Produksjonsplattformen er vanligvis ikke stor nok til å ta imot det store volumet med hydrokarboner som strømmer opp gjennom produksjonsrøret til platt-formen. Derfor behøver produksjonsplattformen kun lagre hydrokarbonene inntil et tankskip ankommer for å transportere den fra lagringsenheten til en større lagringsenhet og behandlingsanlegg på en annen beliggenhet. Denne metoden er kostbar fordi det må bygges og vedlikeholdes en produksjonsplattform over hvert brønnhode og dette representerer en relativt stor utgift.
Alternativt kan det anvendes et undervanns brønnhode som omfatter prosessutstyr som er koblet til lagringstanker samt utstyr for håndtering av undervanns-brønner, ved produksjon av hydrokarboner ved hjelp av kveilerørsboring, eller lagring eller prosessering av hydrokarbonblandinger som produseres ved underbalansert boring. Dette er beskrevet i US-publikasjonsnr. 2003/0000740, publisert 2. januar 2003, registrert av Haynes m. fl. og med tittelen "Subsea Well Intervention Vessel"
(Fartøy for inngrep i undervannsbrønner), som herved innlemmes i sin helhet i dette skrift. Håndteringsutstyret kan teoretisk sett inngå i eksisterende produksjonsbrønner uten å måtte ta borehullet ut av produksjonsmodus.
Som et mer økonomisk alternativ til installasjon av en produksjonsplattform over hvert borehull, er en annen metode for produksjon og lagring av hydrokarboner i en offshore-operasjon mer brukt. I stedet for å bygge og vedlikeholde en produksjonsplattform for hvert borehull, kan det midtre trinnet i produksjons- og lagrings-operasjonen, som inkluderer en produksjonsplattform, elimineres ved bruk av en satellittinstallasjon. Bruk av en satellittinstallasjon involverer installasjon av rør-ledninger ved hvert borehull, og overføring av alle rørledningene til et felles lagrings-og behandlingsanlegg, vanligvis betegnet som "satellittenhet", gjennom rør-ledningene. Rørledningene går under vann fra borehullet til det når lagrings- og behandlingsanlegget.
For tiden møter man spesielle problemer ved bruk av satellittinstallasjoner. Hydrokarbonene må ofte transporteres lange strekninger gjennom rørledningene under vann for å nå satellittinstallasjonen. Vannet som rørledningen går gjennom, holder meget lav temperatur, spesielt på dypt vann, der rørledningene vanligvis er plassert. På grunn av den lave temperaturen i vannet, er det en utfordring å få de flytende hydrokarbonene til å strømme over lengre strekninger. Et problem som kan oppstå på grunn av den lave temperaturen i vannet, gjelder viskositeten på hydrokarbonene. Viskositeten på flytende hydrokarboner økes når hydrokarbonene synker i temperatur. Jo høyere viskositet hydrokarbonvæsken har, desto lavere blir strømningsmengden. Derfor, jo kaldere vannet rundt rørledningene er, desto vanske-ligere, eller umulig, blir det å få hydrokarbonvæsken til å strømme fra borehullet til lagringsenheten. Den reduserte viskositet til de flytende hydrokarbonene som strøm-mer i rørledningen, kan til slutt forårsake blokkering i rørledningen, noe som reduserer eller stopper hydrokarbonproduksjonen.
Et annet problem som kan oppstå på grunn av den lave temperaturen i vannet gjelder endringer i temperaturen til hydrokarbonene under produksjonen. Inne i borehullet er temperaturene høye, noe som gjør at hydrokarbonene holder en høy temperatur. Hydrokarbonene i borehullet kan være i både væske- og gassfase. Som beskrevet ovenfor har miljøet i vannet der hydrokarbonene skal transporteres gjennom rørledningene ganske lave temperaturer. Derfor, når hydrokarbonene strømmer gjennom rørledningen opp til satellitten heten, øker temperaturen på hydrokarbonene stadig da temperaturen øker jo høyere de stiger gjennom vannet. Når man bruker rørledninger til å transportere produserte hydrokarboner til satellitt-enheten, vil temperaturgradienten mellom det transporterte fluidet i røret og om-givelsene ofte resultere i utfelling av hydrokarbonene på innsiden av rørledningen. Til slutt kan oppbygging av utfellingene resultere i delvis eller total blokkering av strømningssveien gjennom rørledningen, noe som senker eller stopper hydrokarbonproduksjonen. Redusert hydrokarbonproduksjon minsker lønnsomheten til borehullet.
Andre problemer som krever inngrep i rørledninger for å redusere blokkering kan gjelde parafinrester som ofte bygges opp i rørledningene på grunn av olje-strømmen, så vel som gasshydratisering når det forekommer gass i hydrokarbon-strømmen. Det må da gjøres en form for inngrep i rørledningen for å redusere blokkeringen som er forårsaket av lave og varierende temperaturer. Inngrep i rør-ledninger kan også være nødvendig for å reparere hull eller slitasje i rørledningen som følge av korrosjon i rørledningen, eller hull, slitasje eller knekker etter fysisk belastning på rørledningen.
For tiden vil en operasjon med inngrep i rørledningen kreve en fjernoperert farkost som hever rørledningen fra sjøbunnen, skjærer ut den skadde delen av rør-ledningen, installerer rørkoplinger på de avskårne endene, og deretter installerer og kopler til en ny rørledningsbit. Andre operasjoner med inngrep krever stopp i strømmen av hydrokarboner gjennom rørledningen for å introdusere behandlings-væske eller -fluid inn i rørledningen for å fjerne blokkeringer i den. For at inngreps-prosessen skal hindre hydrokarboner i å komme ut i vannet, må hydrokarbon-strømmen stoppes i løpet av inngrepsoperasjonen.
Inngrepsoperasjoner i rørledninger er kostbare. Da inngrep krever fysisk inn-trengning i rørledningen, må hydrokarbonstrømmen stoppes for å utføre et inngrep. Stopp av hydrokarbonstrømmen reduserer lønnsomheten til brønnen da kostnaden på utstyret og arbeidet som kreves for å produsere hydrokarbonene fremdeles løper, mens det ikke forgår noen hydrokarbonproduksjon som kan betale disse kostnadene. Det er derfor ønskelig at produksjonen kan fortsette uavbrutt under inngrepsoperasjoner på rørledninger ved offshore-brønner.
Det finnes lette inngrepsfartøyer som gjør det mulig å utføre operasjoner som brønnvedlikehold, dvs. brønnlogging og generelt vedlikehold. Slike inngrepsfartøyer anses imidlertid ikke som egnede plattformer for inngrep som krever boring eller hydrokarbonproduksjon, siden de ikke er tilstrekkelig stabile for slike operasjoner og er for små til å håndtere material-volumet som det er snakk om under boringen. På grunn av dette må redskapene utstyres med hjelpetanker som kan motta produserte hydrokarboner. Videre krever lettere inngrepsfartøyer store kapitalinvesteringer i forhold til avkastningen av det som blir produsert, spesielt siden de er meget føl-somme for dårlig vær, slik at kostnadene for inngrep blir relativt høye, og brukstiden relativt lav. Det er enda mer kostnadskrevende å bruke en ytterligere hjelpetank. På grunn av ulempene ovenfor, har det ikke blitt gjort forsøk på å bruke uavbrutte foringsrør ved boring og fore et borehull fra flytende installasjoner, eller for å opprettholde hydrokarbonproduksjon under inngrepsoperasjoner på offshore-brønner.
US 6,079,498 beskriver en fremgangsmåte og utstyr egnet for å avhjelpe strømmen ved offshore-oljeproduksjon.
WO 02/44601 A2 angir en fremgangsmåte og et apparat for pigging av et rørledningsnett.
Selv om boring med foringsrør i seksjoner minsker tiden mellom boring og foring av borehullet, kan det likevel være ønskelig å redusere denne tiden ytterligere for å forhindre at formasjonen kollapser under den forløpte tiden. Det er også ønskelig å ha et alternativ til den kostbare boreplattformen, eller muligheten for to installasjoner (en med boreutstyret, og en som har lagringsutstyr), ved å tillate at boring med fullføringsoperasjoner for foringen, så vel som produksjonsoperasjoner, kan utføres samtidig fra den samme installasjonen.
OPPSUMMERING AV OPPFINNELSEN
Hovedtrekkene ved oppfinnelsen fremgår av de selvstendige patentkrav. Ytterligere trekk ved oppfinnelsen er angitt i de uselvstendige krav.
Ved et aspekt tilveiebringer den foreliggende oppfinnelsen en metode og verk-tøy for inngrep i en rørledning som omfatter en rørledning for transport av fluid-strømmen fra en offshore-brønn til en annen beliggenhet, avledning av fluid-strømmen til lagringsstedet og inngrep i rørledningen. Avledning av fluidstrømmen til lagringsstedet kan omfatte avledning til et offshore-tankskip mens man foretar et inngrep i rørledningen fra fartøyet.
Ved et annet aspekt tilveiebringer den foreliggende oppfinnelsen en meka-nisme for gjenoppretting av en offshore-rørledning og produksjon av brønnfluider som omfatter en tank som kan lagre fluider som strømmer gjennom rørledningen fra en brønn, med en rørformet kropp i fartøyet for å avlede brønnfluidstrømmen fra rørledningen til fartøyet for lagring, og en annen rørformet kropp i fartøyet for gjenoppretting av rørledningen uten avbrudd i produksjonen.
Ved et ytterligere aspekt tilveiebringer den foreliggende oppfinnelsen en metode for boring av et borehull under vann fra en installasjon som omfatter et posisjonerbart fartøy, med kontinuerlig foringsrør med boresko påsatt, boring av bore hullet og foring av det med det kontinuerlige foringsrøret. Boring og foring av borehullet kan omfatte boring av borehullet med det kontinuerlige foringsrøret.
Ved et ytterligere aspekt tilveiebringer den foreliggende oppfinnelsen en installasjon for boring av et offshore-borehull som omfatter et posisjonerbart fartøy, kontinuerlig foringsrør med påsatt boresko og anordnet på fartøyet for boring av borehullet, med lagringsutstyr anordnet på fartøyet for lagring av hydrokarbonfluider produsert fra borehullet. Fartøyet kan videre omfatte behandlingsutstyr koplet til lagringsutstyret for behandling av hydrokarbonfluider produsert fra borehullet.
Den aktuelle oppfinnelsen gir muligheten for, med store fordeler, å utføre inngrepsoperasjoner offshore eller under vann på en rørledning mens det samtidig produseres hydrokarboner fra den, noe som således øker lønnsomheten for borehullet. Videre tillater den aktuelle oppfinnelsen formasjon av et foret borehull, offshore eller under vann, med bare én innkjøring av foringen, og gir også mulighet for lagring og/eller behandling av hydrokarboner under boreprosessen på det samme fartøyet som huser utstyret brukt for å danne det forede borehullet, noe som øker lønnsomheten på borehullet.
KORT BESKRIVELSE AV TEGNINGENE
For å vise hvordan de ovenstående egenskapene for den foreliggende oppfinnelsen kan forstås i detalj, er en mer nøyaktig beskrivelse av oppfinnelsen, som er kort sammenfattet ovenfor, gitt ved referanse til utførelsene, idet noen av disse er illustrert i de vedlagte tegningene. Det skal imidlertid bemerkes at de vedlagte tegningene bare illustrerer typiske utførelser av denne oppfinnelsen, og bør derfor ikke anses som en begrensning av beskyttelsesområdet, da oppfinnelsen kan til-passes andre og like effektive utførelser. Figur 1 viser et snitt av en rørledningsoperasjon på en satellittinstallasjon. En første kopling er lagt inn i rørledningen for kopling til et fartøy ved eller nær vannoverflaten. Figur 2 viser et snitt av rørledningsoperasjonen i figur 1, med en første rør-formet kropp senket fra fartøyet, og koplet til den første koplingen for å avlede fluid- / væskestrøm fra rørledningen til fartøyet. Figur 3 viser et snitt av rørledningsoperasjonen i figur 1, med en andre kopling lagt inn i rørledningen nedstrøms fra den første koplingen for å gjenopprette rør-ledningen. Figur 4 viser et snitt av rørledningsoperasjonen i figur 1, med en andre rør-formet kropp senket fra fartøyet og koplet til en andre kopling for å gjenopprette rør-ledningen. Figur 5 viser et snitt av en boreoperasjon med kontinuerlig foringsrør, hvor boreoperasjonen utføres fra et fartøy på eller nær vannoverflaten. Det kontinuerlige foringsrøret er plassert over et hull i dekket på fartøyet før boring. Figur 6 viser et snitt av boreoperasjonen i figur 5, der boreverktøyet som er operativt koplet til det kontinuerlige foringsrøret bores gjennom havbunnen og inn i formasjonen for å danne et borehull. Figur 7 viser et snitt av boreoperasjonen i figur 5, der det kontinuerlige forings-røret er boret ned i formasjonen til ønsket dybde. Det kontinuerlige foringsrøret blir avløst ved en viss dybde, og boreverktøyet hentes opp fra borehullet. Figur 8 viser et oppriss av en utførelse av et fartøy som kan huse og forenkle bruk av utstyr for oppretting av en rørledning eller boring av et borehull. Figur 9 viser et skjematisk arrangement av inngrepsutstyr for rørledning på fartøyet i figur 8. Figur 10 viser et skjematisk arrangement for en alternativ utførelse av et fartøy med en åpning for borestrengen i skroget ("Moon pool"), som boringen eller inngrepet kan utføres gjennom.
DETALJERT BESKRIVELSE AV DEN FORETRUKNE UTFØRELSEN
Figur 8 viser et fartøy 10 med en utførelse av foreliggende oppfinnelse. Figur 8 er basert på en tegning hentet fra "Første Olsen tankskip" og viser et tankskip for skyttelfart, av den typen som er mye brukt i Nordsjøen. På fartøyet 10 er den eneste modifikasjonen som er gjort i forhold til et standard tankskip, montering av et overbygg 107 over hoveddekket (ikke vist) på fartøyet 10, for eksempel med en høyde på ca. 3 meter, slik at det kan stå over de installerte dekksrørene og luftekanalene (ikke vist). Et standard Nordsjø-spesifisert tankskip for skyttelfart med dynamisk posisjonering kan lett chartres og utstyres med nye dekk over de installerte dekks-rørene og luftekanalene, og for å oppnå dette kan det for eksempel installeres et dekk med det følgende utstyr: et glidende montert boretårn med håndteringsenhet for stigerør og kontrollpanel for undervannsutstyr; rørkoplinger for inngrepsutstyr for undervannsbrønner; en rørreol; rørtromler; en kontrollenhet; og en generatorpakke; en sementeringsenhet med blander; testutstyr for produksjon, innbefattet en strupemanifold, varmebehandler, separatorer, avgassingssump og gassfakkel; tanker for brønndrepingsslam; et lukket sirkulasjonssystem for håndtering av boreslam og borekaks under underbalansert boring; lagringstanker for kjemisk og fast avfall; kraner for undervannsutstyr og tilbehør; fjernkontrollerte farkoster for arbeids- og observasjonsoppgaver; og vannutstyr for avkjøling og brannslukningstjenester (se nedenfor). Alt utstyr som er nødvendig for inngrep i rørledninger og/eller boring, er montert på overbygget 107, inkludert en kran 108. Det detaljerte arrangementet av utstyret på overbygget 107 i figur 8 er vist i figur 9.
Vi henviser til figur 9 hvor et riggflyttingsdekk 109 er sentralt montert på overbygget 107, nær en portalkran 110. På den andre siden av portalkranen 110 er det et dekk for stigerør og et mellomlager 335. Mellom kranene 108 og riggflyttingsdekket 109 er det et mellomlager for undervannsutstyr og utstyrskoplinger 340, fjernopererte farkoster 341, og en kontrollenhet for undervannsutstyr 342. På overbygget 107 er det også plassert en gasskompressor 343, luftkompressor 344 og brannpumper 345. Boreutstyr for kveilerør på trommel 111 av konvensjonell type (beskrevet nedenfor) er montert nær portalkranen 110, inkludert men ikke begrenset til et mellomlager, generatorpakke, kontrollenhet, svanehals, injeksjonshode, transportør, tromler og utblåsningssikring. Operatører for glattvaier 302 og elektrisk målekabel 301 kan plasseres ved boreutstyret for kveilerøret 111. En separatorpakke 112 og en tilordnet utstyrspakke for borestøtte 106 er også montert på overbygget 107. Separatorpakken 112 kan innbefatte, men er ikke begrenset til; separatorer 310A-D, strupere 311, en varmebehandler 312, enhet for borekaksbehandling 313, slamrenserenhet 314, rengjøringsenhet for produsert vann 315, enhet for måling av gass/olje 316, og injeksjonsenhet for kjemikalier 317. Den tilordnede utstyrspakken for borestøtte 106 kan innbefatte, men er ikke begrenset til: enhet for brønndrepingsslam 320, enhet for kompletteringsfluid / -væske 321, aktive slamtanker 322 og 323, heksanolenhet (HeOH) 324, reserveenhet 325, avfallsenhet 326, enhet for borekaksavfall 327, slampumper 328, og sementenhet 329. Mellom utstyrspakken for borestøtte 106 og separatorpakken 112 er det en prosesskontrollenhet 330 og et laboratorium 331. Alt annet utstyr som man er avhengig av for å oppnå det påkrevde, direkte brønninngrepet er også montert på overbygget 107. Separatorpakken 112 er koplet til et passende plassert fakkelrør (ikke vist), for eksempel på hekken (ikke vist) på fartøyet 10 og til lagringstankene (ikke vist) på fartøyet 10, slik at man muliggjør lagring av produserte hydrokarbonfluider for etterfølgende transport.
Under bruk blir fartøyet 10 dynamisk posisjonert over en undervannsbrønn eller en rørledning. Riggflyttingsdekket 109 blir deretter flyttet til en utenbords stilling (ikke vist) over undervannsbrønnen eller rørledningen for å gjøre det mulig å kople kveilerørutstyret 111 til et stigerør over undervannsbrønnen for boring, eller til en kopling 80 eller 90 (se figurene 1-4), installert på rørledningen 20. Deretter kan de nødvendige inngrep foretas via den rørformede delen, eller det kan utføres kveile-rørsboring på en måte som produserer en flerfaset blanding i hydrokarbonfluidet, og som deretter separeres i sine ulike faser i separatorpakken 112.
Figur 10 viser et alternativt arrangement for montering av utstyr på fartøyet 10 for bruk av den aktuelle oppfinnelsen. Som et alternativ til å ha et riggflyttingsdekk som kan forskyves til en utenbords stilling, som vist i figurene 8-9, kan bore- og/eller inngrepsutstyret monteres ved en "moon pool"-åpning i underdekket 113 eller 114, som går gjennom dekket på fartøyet 10. Komponentene som er montert nær "moon pool"-åpningen i underdekket 113 og 114, er forlenget vertikalt gjennom skroget på fartøyet 10. Tre kraner 115,116 og 117 kan rekke over "moon pool"-åpningene 113 og 114, og områdene som gjelder lastmanifold 118, en boretårnmodul 119, og et mellomlagringsområde 120. Område 121 huser gasskompresjons-og prosess-enheter, område 122 en fakkelbom, område 123 en (væske)utskiller for fakkelen, og område 124 er et videre mellomlagringsområde betjent av en kran 125.
Når man bruker et standard tankskip med dobbelt skrog for skyttelfart, kan de modifikasjonene som kreves for å fremstille fartøyet 10, illustrert i figur 10, som kan fungere i forhold til den aktuelle oppfinnelsen, innbefatte en oppgradering av den dynamiske posisjoneringsevnen, installasjon av en første "moon pool"-åpning for inngrepet og/eller borearbeid, installasjon av en andre "moon pool"-åpning for arbeide med fjernstyrte farkoster, montere kraner, prosessutstyr og mellomlagringsområder for dekksmontert utstyr, samt montering av fakkelinnretninger og tilhørende utstyr.
Figurene 1-4 viser fartøyet 10 for den aktuelle oppfinnelsen, som kan avlede strømmen fra en rørledning 20 og/eller gjenopprette rørledningen 20 under operasjon på en satellittinstallasjon. Et overbygg 215 er montert på bein 216 på fartøyet 10, og har et gjennomgående hull 218 der man kan senke ned inngrepsutstyr. Fartøyet 10, i den viste utførelsen, har et hull 213 i dekket på linje med hullet 218, der man kan senke ned inngrepsutstyret. Vi henviser til figur 1, i operasjon på en satellittinstallasjon, der rørledningen 20 er lokalisert ved eller nær havbunnen 30 under vann 40. Rørledningen 20 transporterer innledningsvis brønnfluider 45, typisk sett hydro karbonfluider, fra et borehull 50, posisjonert på bunnen 30, til en satellittlagringsenhet 55 som er anordnet delvis over overflaten 50 av vannet 40.
Borehullet 50 er boret ned i havbunnen 30 til en dybde der brønnfluidet 45 finnes. Borehullet 50 kan ferdiggjøres med foringsrør 51, som vist i figurene 1-4, eller kan forbli et åpent borehull, uten foringsrør. Rørledningen 20 er koplet til produk-sjonsrøret 52. Produksjonsrøret 52 ligger inne i borehullet 50, og forlenges minst til et interessant område (ikke vist) under havbunnen 30, som er den dybden hvor brønn-fluidet 45 finnes. Produksjonsrøret 52 har vanligvis tetningselementer (ikke vist) anordnet rundt utsiden, som forlenges til borehullet 50 over og under det interessante området under havbunnen 30, for å isolere det interessante området av borehullet 50. Perforeringer (ikke vist) blir lagt inn i produksjonsrøret 52 ved det interessante området i borehullet 50, og perforeringer (ikke vist) blir på samme måte lagt inn ved det interessante området i borehullet 50. Brønnfluidene 45 strømmer således fra det interessante området i borehullet 50, inn i et ringformet område 53 mellom utsiden av produksjonsrøret 52 og borehullet 50, og deretter opp gjennom produksjonsrøret 52 som er plassert i borehullet 50, og inn i rørledningen 20.
Satellittlagringsenheten 55 kan lagre brønnfluider 45 mottatt fra rørledningen 20. Satellittlagringsenheten 55 kan også ha mulighet for behandling av brønnfluid eller -væske. I tillegg til lagring og/eller behandling av brønnfluider 45 fra rør-ledningen 20, kan satellittlagringsenheten 55 også motta brønnfluider 60 fra et ubestemt antall av ytterligere rørledninger 65. Hver ytterligere rørledning 65 er koplet til produksjonsrør (ikke vist) i et borehull (ikke vist), som beskrevet ovenfor når det gjelder produksjonsrøret 52 i borehullet 50, ved en annen beliggenhet på havbunnen 30 enn borehullet 50.
Figur 1 viser et problemområde 70 i rørledningen 20 som må behandles på en eller annen måte for å gjenoppta den ønskede strømmen av brønnfluid 45 gjennom rørledningen 20. Problemområdet 70 kan inkludere, men er ikke begrenset til delvis eller total blokkering av strømmen i rørledningen 20 på grunn av oppbygging av utfellinger på innsiden av rørledningen 20, som må fjernes fra den, parafinrester på innsiden av rørledningen 20 som må avskalles eller fjernes, eller gasshydratering innen rørledningen 20. Problemområde 70 kan også inkludere knekker, hull, eller korrosjonsskader på rørledningen 20, som må repareres. I tillegg kan problemområde 70 innbefatte utstyr som sitter fast og må løsnes fra rørledningen, så som en fastkilt renseplugg.
Fordi problemområdet 70 avbryter den ønskede strømmen av brønnfluidet 45, må det utføres et inngrep eller opprettelse av rørledningen 20. Inngrepet kan innbefatte bortdriving av utstyr som sitter fast, fjerning av oppbygging eller rester i rørledningen 20 som forårsaker delvis eller total blokkering av den, og/eller reparasjon av rørledningen 20. I alle de ovenstående inngrepssituasjonene må det på en eller annen måte gjøres en fysisk inntrenging i rørledningen 20 for å utbedre problemområdet 70 og gjenopprette ordinær væske- eller fluidstrøm 45 fra borehullet 50 til satellittlagringsenheten 55.
Fartøyet 10 eller tankskipet for den aktuelle oppfinnelsen brukes for å utbedre problemområdet 70. Fartøyet 10 kan være posisjonert på overflaten 60 av vannet 40, delvis under overflaten 60, eller fullstendig under overflaten 60. På fartøyet 10 finnes en andre rørformet kropp 12, som fortrinnsvis er et kveilerør. En første rørformet kropp 11, også fortrinnsvis et kveilerør, forlenges fra fartøyet 10, ned i vannet 40. Den første rørformede kroppen 11 kan legges inn i et stigerør (ikke vist) som forlenges fra fartøyet 10 og ned til havbunnen 30. Ved den øvre enden er den første rørformede kroppen 11 koplet tett til en lagringstank 13 for lagring av produserte brønnfluider 45 fra borehullet, som kan koples til en behandlingsenhet (ikke vist) på fartøyet 10 for behandling av brønnfluid 45. Behandlingsenheten kan innbefatte utstyr for væskeseparasjon. Den første rørformede kroppen 11 kan omfatte tre rør-formede deler inkludert 11 A, 11B, og 11C. Ved den nedre enden er den rørformede delen 11A koplet, fortrinnsvis med gjenger til den øvre enden av en rørformet del 11B. Den rørformede delen 11B er en del av en utblåsingssikring 9. Utblåsings-sikringen 9 innbefatter en stor ventil 8 som kan lukkes for å kontrollere brønnfluider 45. Ventilen 8 blir vanligvis fjernlukket ved hjelp av hydrauliske aktuatorer (ikke vist). Den rørformede delen 11B er koplet, fortrinnsvis med gjenger, ved den nedre enden til den øvre enden av rørformet del 11C.
Figur 1 viser en første kopling 80, som kan overføre fluid / væske til/fra rør-ledningen 20 gjennom et første hull 84 i denne. Den første koplingen 80 er en rør-formet kropp som er koplet til en ventil 81 for selektiv avbryting av fluidstrøm gjennom den rørformede kroppen. Den første koplingen 80 er koplet til rørledningen 20 gjennom en første klemme 82, plassert rundt rørledningen 20, og holdes i tettet kontakt med rørledningen 20 med tetningsorganene 83A, 83B, 83C, og 83D. Det kan brukes et ubestemt antall tetningsorganer 83A-D for å sikre tettet fluid- / væskeover-føring mellom den første koplingen 80 og rørledningen 20.
Vi henviser nå til figur 3, hvor en andre kopling 90 er installert på rørledningen 20 mellom problemområdet 70 og den første koplingen 80. Den andre koplingen 90 er en rørformet kropp påmontert en andre ventil 91, for å selektivt forhindre fluidstrøm gjennom den rørformede kroppen. En andre klemme 92 er lagt rundt rørledningen 20 ved tetningsleddene 93A-D for å sikre forseglet fluidoverføring eller -kommunikasjon mellom den andre koplingen 90 og rørledningen 20 gjennom et andre hull 94 i rør-ledningen 20.
Under drift blir borehullet 50 boret ned i havbunnen 30 og foret med forings-røret 51, og rørledningen 20 blir koplet med ene enden til produksjonsrøret 52 i borehullet 50, og med den motsatte enden til satellittlagringsenheten 55. Fluidstrømmen 45 fortsetter hovedsakelig uhindret gjennom rørledningen 20 fra det interessante området i borehullet 50 til satellittlagringsenheten 55, inntil det utvikles et problemområde 70 i rørledningen. Fartøyet 10 ligger over rørledningen 20, nær problemområdet 70 for å utføre en inngrepsoperasjon på rørledningen og fjerne eller reparere problemområdet 70.
Så snart fartøyet 10 er posisjonert over rørledningen 20, nær problemområdet 70, blir en første kopling 80 med den første ventilen 81 i lukket posisjon installert på rørledningen 20 mellom problemområdet 70 og borehullet 50. For å installere den første koplingen 80 brukes et skjæreverktøy (ikke vist), så som et freseverktøy, som er kjent for de som er erfarne i bransjen, for å bore det første hullet 84 i rørledningen. Den første klemmen 82 blir åpnet og plassert rundt rørledningen 20 ved det ønskede punktet for plassering av den første koplingen 80. Tetningsleddene 83A-D, plassert mellom den første klemmen 82 og rørledningen 20, brukes for å lage og opprettholde en forseglet og væske- eller fluidtett kopling mellom den første koplingen 80 og rør-ledningen 20. Etter installasjon av den første koplingen 80, blir den første rørformede kroppen 11 senket fra fartøyet 10 gjennom hullet 113 i dekket på fartøyet 10, som kan være riggflyttingsdekket 109 i utenbords stilling på figurene 8-9, eller "moon pool"-åpningen 113 eller 114 i figur 10, avhengig av konfigurasjonen på fartøyet 10 som er brukt.
Deretter blir den nedre delen av den første rørformede kroppen 11 tilkoplet, fortrinnsvis med gjenger, til den øvre enden av den første koplingen 80. Den første ventilen 81 blir deretter åpnet for å tillate brønnfluidet 45 å strømme gjennom en forseglet bane fra perforeringene i borehullet 50 inn til produksjonsrøret 52 gjennom perforeringene i produksjonsrøret 52 og inn til rørledningen 20. Deretter blir fluid- strømmen 45 avledet fra videre strømning gjennom rørledningen 20 for å strømme opp gjennom den første koplingen 80 og den første rørformede kroppen 11 inn i lagringstanken 13. Fra lagringstanken 13 kan brønnfluidet 45 avledes til behandlingsenheten som kan finnes på fartøyet 10, eller, alternativt, kan til slutt transporteres til et annet anlegg for behandling. Figur 2 viser produksjon av brønnfluider 45, avledet gjennom den første koplingen 80 til fartøyet 10 for lagring og/eller behandling.
Så snart brønnfluidstrømmen 45 er effektivt avledet til fartøyet 10, kan inngrepet oppnås uten å avbryte produksjonen av brønnfluidet 45. Utvendig tetting eller oppretting av problemområdet 70 kan utføres uten installasjon av den andre koplingen 90, dersom problemområdet 70 er et hull eller en knekk. Om det er ønskelig å trenge inn i rørledningen 20 ved introduksjon av et objekt (ikke vist) eller en behandlingsfluid 21 (se figur 4) i rørledningen 20, kan den andre koplingen 90 installeres på rørledningen 20 mellom problemområdet 70 og den første koplingen 80.
Installasjon av den andre koplingen 90 foregår mer eller mindre som installasjon av den første koplingen 80. Igjen er den andre ventilen 91 i lukket posisjon under installasjon av den andre koplingen 90. Skjæreverktøyet (ikke vist), som et freseverktøy, kan brukes for å bore det andre hullet 94 i rørledningen 20. Om det er ønskelig å installere den andre koplingen 90 (eller den første koplingen 80) i en vinkel i forhold til rørledningen 20, kan en ledekile (ikke vist) brukes for å styre skjæreverktøyet (for eksempel freseverktøyet) inn i rørledningen 20 i en vinkel, som er kjent fra boring av avvikende borehull fra primære borehull. Den andre klemmen 92 blir deretter åpnet og plassert rundt rørledningen 20 ved det ønskede punktet for plassering av den andre koplingen 90. Tetningsleddene 93A-D, som er plassert mellom den andre klemmen 92 og rørledningen 20, brukes for å lage og opprettholde en fluidtett og forseglet kopling mellom den andre koplingen 90 og rørledningen 20. Figur 3 viser den andre koplingen 90 installert ved rørledningen 20 mellom problemområdet 70 og den første koplingen 80, med den andre ventilen 91 i lukket posisjon.
Etter at den andre koplingen 90 er installert på rørledningen 20, blir den nedre enden av den andre rørformede kroppen 12 koplet, fortrinnsvis med gjenger, til den øvre enden av den andre koplingen 90. Den andre ventilen 91 blir deretter åpnet for å tillate fluidoverføring mellom fartøyet 10 og rørledningen 20. Om det er ønskelig å sette inn et objekt i den andre rørformede kroppen 12, kan objektet settes direkte inn i den øvre delen av den andre rørformede kroppen 12. Om det er ønskelig, som vist i figur 4, å introdusere behandlingsfluid 21 inn i rørledningen 20 for å forskyve, oppløse eller fjerne en delvis eller total blokkering som finnes i problemområdet 70, blir en lagringstank 22 som inneholder behandlingsfluid 21 koplet til den øvre enden av den andre rørformede kroppen 12. Som vist i figur 4 blir behandlingsfluidet 21 deretter introdusert inn i den andre rørformede kroppen 12 for å strømme gjennom den andre koplingen 90 og inn i rørledningen 20 mot problemområdet 70. Behandlingsfluidet 21 kan separeres fra brønnfluidene ved satellittlagringsenheten 55, inntil rørledningsstrømmen 20 mellom borehullet 50 til satellittlagringsenheten 55 er gjenopprettet. Figur 4 viser inngrepsoperasjonen utført gjennom den andre koplingen 90 og rørledningen 20 mens produksjonen av brønnfluider 45 fortsetter uavbrutt fra borehullet 50, gjennom den første koplingen 80 og opp i fartøyet 10.
Inngrepsoperasjonen for rørledningen fortsettes til problemområdet 70 er effektivt behandlet og ikke lenger er en fare for produksjon av brønnfluidet 45. Ved fullføring av inngrepsoperasjonen i rørledningen, blir behandlingsfluidstrømmen 21 stoppet, slik at behandlingsfluidet 21 ikke lenger introduseres inn i den andre rør-formede kroppen 12 fra fartøyet 10. Den andre ventilen 91 blir deretter lukket og den andre rørformede kroppen 12 blir koblet fra den andre koplingen 90. Deretter blir den første ventilen 81 lukket og den første rørformede kroppen 11 kobles fra den første koplingen 80. Den første rørformede kroppen 11, så vel som den andre rørformede kroppen 12, blir deretter tatt opp til fartøyet 10.
Ved lukking av den andre ventilen 91 og den første ventilen 81 blir den gjen-opptatte brønnfluidstrømmen 45 gjennom rørledningen 20 til slutt omtrent upåvirket av inngrepsoperasjonen i rørledningen. Lukking av ventilene 91 og 81 forhindrer de alternative banene for brønnfluidstrømmen 45 som fantes under inngrepsoperasjonen. Brønnfluider 45 kan igjen strømme fra borehullet 50 gjennom pro-duksjonsrøret 52, inn i rørledningen, gjennom det tidligere problemområdet 70 og opp i satellittlagringsenheten 55 for lagring og/eller behandling. Ved hjelp av foreliggende oppfinnelse oppnår man en uavbrutt produksjon av brønnfluid 45, enten til lagringstanken 13 eller til satellittlagringsenheten 55.
Det er underforstått at den ovenstående inngrepsmetoden og utstyret kan brukes, ikke bare for reparasjon av et problemområde 70 i rørledningen, men også for installasjon og opphenting av undervannsutstyr. Den alternative veien gjennom den første koplingen 80 og den første rørformede kroppen 11 kan brukes for å avlede brønnfluidstrøm 45 mens man installerer eller henter opp utstyr fra vannet 40 når installasjonen eller hentingen involverer at man må fysisk trenge seg inn i rør-ledningen 20.
I en annen utførelse av den foreliggende oppfinnelsen kan fartøyet 10 brukes for å bore ned i en formasjon 201 i bunnen 30 under vannmassen 40 ved bruk av kontinuerlig foringsrør 210. Figurene 5-7 viser utførelsen av fartøyet 10 som beskrevet i figur 10, idet "moon pool"-åpningen 113 er anordnet på bunnen av fartøyet 10. Alternativt er det forventet at riggflyttingsdekkarrangementet 109 i figurene 8-9 også kan brukes for å overføre det kontinuerlige foringsrøret 210 ned i formasjonen 201 fra fartøyet 10.
Vi henviser nå til figur 5, hvor fartøyet 10 er forsynt med et overbygg 215, som er støttet over dekket 217 med beina 216. Det er laget et hull 218 i overbygget 215 over "moon pool"-åpningen 113, på aksial linje med "moon pool"-åpningen 113. Utstyr som brukes i boreprosessen senkes ned gjennom hullet 218 i overbygget 215 og "moon pool"-åpningen 113 ved forskjellige stadier av operasjonen.
Et stigerør 221 forlenges fra "moon pool"-åpningen 113 til havbunnen 30. Stigerøret 221 danner en bane gjennom vannmassen 40 til bunnen 30, som det kontinuerlige foringsrøret 210 kan senkes ned gjennom.
Det kontinuerlige foringsrøret 210 plasseres på overbygget 215, på en
trommel 225. En borefluidkilde 226 er i strømmingsforbindelse / fluidkommunikasjon med et sted på det kontinuerlige foringsrøret 210 for å forsyne borefluid eller -væske til det kontinuerlige foringsrøret 210 ved ulike stadier av boreoperasjonen. En spider 227 eller en annen gripemekanisme med gripeledd som kilebelter (ikke vist), er også anordnet på overbygget 215, rundt eller i hullet 218 for å tjene som en reservegripeanordning for det kontinuerlige foringsrøret 210 under boreoperasjonen.
På overbygget 215 er det også plassert utstyr som brukes for å senke så vel som å ta opp det kontinuerlige foringsrøret 210 til og fra trommelen 225 som ønsket under boreoperasjonen. På denne enden er det plassert et injeksjonshode 230 på overbygget 215. Injeksjonshodet 230 innbefatter transportørorganet 232 og 233, som er sentrert rundt hullet 218 og opphengt over hullet 218 med støttene 234 og 235. Transportleddene 232 og 233 for injeksjonshodet 230 tjener hovedsakelig som transportbånd og er flyttbare både med og mot klokken, rundt aksen på transportør-organene 232 og 233 for å senke eller ta opp det kontinuerlige foringsrøret 210 ned i eller ut av hullet 218. Også brukt for å senke og ta opp det kontinuerlige foringsrøret 210, er et transportbånd 240 på et spor 241. Transportbåndet 240 på sporet 241 ligger mellom trommelen 225 og injeksjonshodet 230 for å få tak i det kontinuerlige foringsrøret 210 fra trommelen 225 og mate det kontinuerlige foringsrøret 210 inn i injeksjonshodet 230, eller for å returnere det kontinuerlige foringsrøret 210 til trommelen 225 fra injeksjonshodet 230. Injeksjonshodet 230 og transportbåndet 240 på sporet 241 som beskrevet ovenfor er kjent for de som er erfarne i bransjen som en metode for mating av kontinuerlige rør. Andre aspekter av metoden for mating av kontinuerlig rør eller kontinuerlig foringsrør for å bore et borehull, som kjent av de som er erfarne i bransjen, er planlagt for bruk med den aktuelle oppfinnelsen.
Det kontinuerlige foringsrøret 210 omfatter en borkronemotor 245 som er
koplet med en utløsbar kopling 246 på innsiden av det kontinuerlige foringsrøret 210. En utvidbar skjæreanordning 250 med perforeringer 260 for sirkulering av borefluider / -væsker og/eller innstillingsfluid / -væske er koplet til borkronemotoren 245. Den utvidbare skjæreanordningen 250 inkluderer en kropp (ikke vist) og en bladsammenstil-ling (ikke vist) som er anordnet på kroppen, som det er redegjort for i en felles pågå-ende U.S. patentsøknad med serienummer 10/335,957 registrert 31. desember 2002, som herved innlemmes i dette skrift som referanse. Som redegjort i ovennevnte søknad er bladsammenstillingen justerbar mellom en lukket posisjon der den utvidbare skjæreanordningen 250 har en mindre ytre diameter og en åpen posisjon der den utvidbare skjæreanordningen har en større ytre diameter. Bladsammenstillingen kan være justerbar mellom åpen posisjon og lukket posisjon med en hydraulisk trykkdifferanse over dyser (ikke vist) i den utvidbare skjæreanordningen 250. Den utvidbare skjæreanordningen 250 kan videre innbefatte en utløsersammen-stilling som gir en reservemekanisme for å justere bladsammenstillingen fra åpen posisjon til lukket posisjon, som redegjort for i søknaden ovenfor.
Borkronemotoren 245 kan innbefatte en aksel (ikke vist) og et motordrifts-system (ikke vist). Borkronemotoren 245, som er mekanismen for rotasjon av skjæreanordningen 250, er hul for å tillate fluidgjennomstrømning under ulike stadier av boreoperasjonen og er i prinsipp en hydraulisk borkronemotor som drives ved at det pumpes fluider gjennom den. Motordriftssystemet dreier akselen som roterer den utvidbare skjæreanordningen 250 for boring inn i formasjonen 201. Den beskrevne borkronemotoren 245 er ikke den eneste borkronemotoren tilgjengelig for bruk i forbindelse med den foreliggende oppfinnelsen. Andre typer borkronemotorer som er kjent for de som er erfarne i bransjen kan også anvendes i forbindelse med den foreliggende oppfinnelsen.
I tillegg til utstyret for boring med kontinuerlig foringsrør 210 beskrevet ovenfor, kan fartøyet 10 innbefatte separasjonsutstyr for hydrokarbonfluider (ikke vist) som er koplet til én eller flere lagringsenheter (ikke vist) for å motta separerte hydrokarbonfluider fra borehullet 270. Med dette tillegget i lagringskapasitet kan fartøyet samle opp produserte hydrokarbonfluider under boring med det kontinuerlige foringsrøret 210, som derved eliminerer behovet for et separat fartøy i tilfelle hydrokarbonfluidet produseres under boring.
Med henvisning til figur 5, posisjoneres fartøyet 10 under bruk over bunnen 30 av vannmassen 40, ved eller nære overflaten 60 på vannmassen 40, slik at hullet 218 i overbygget 215 og "moon pool"-åpningen 113 i prinsipp er stilt inn til beliggenheten hvor det er ønskelig å bore ned i formasjonen 201. Stigerøret 221 blir senket ned i "moon pool"-åpningen 113 for å kople fartøysdekket 217 til bunnen 30 av vannmassen 40, slik at det kontinuerlige foringsrøret 210 og/eller andre verktøy kan senkes ned i formasjonen 201 uten forstyrrelse fra vannmassen 40 i bore prosessen. Det kontinuerlige foringsrøret 210 blir deretter trukket fra trommelen 225 på transportbåndet 240, og transportbåndet 240 flyttes mot klokken langs sporet 241 for å mate det kontinuerlige foringsrøret 210 inn i injeksjonshodet 230 mellom transportleddene 232 og 233. Den utvidbare skjæreanordningen 250 trekkes på dette tidspunktet i operasjonen tilbake. Gripeleddene i spideren 227 er ikke aktivert. Figur 5 illustrerer dette stadiet i boreoperasjonen.
Deretter blir det kontinuerlige foringsrøret 210 senket gjennom hullet 218 i overbygget 215, gjennom "moon pool"-åpningen 113 og gjennom stigerøret 221. Før det kontinuerlige foringsrøret 210 når bunnen 30, blir den utvidbare skjæreanordningen 250 utvidet, fortrinnsvis ved hjelp av et hydraulisk trykk. Det kontinuerlige foringsrøret 210 senkes deretter ned i formasjonen 201 mens borkronemotoren 245 gir dreiekraft til skjæreanordningen 250, som derved borer et borehull 270. Mens den utvidbare skjæreanordningen 250 borer seg inn i formasjonen 201, blir det sirkulert borefluider / -væsker fra borefluidkilden 226 ned til det kontinuerlige foringsrøret 201, og deretter inn i borkronemotoren 245, gjennom perforeringene 260 i den utvidbare skjæreanordningen 250, opp gjennom et hulrom 275 mellom det kontinuerlige foringsrøret 210 og borehullet 270, opp gjennom et hulrom 280 mellom det kontinuerlige foringsrøret 210 og stigerøret 221, og opp til fartøyet 10 for lagring eller resirkula-sjon. Fluidet sirkuleres for å bringe med seg produsert borkaks og/eller rester fra formasjonen 201 opp til overflaten i løpet av boringen, og for å gjøre veien for boringen av det kontinuerlige foringsrøret 210 inn i formasjonen 201 lettere. Figur 6 viser det kontinuerlige foringsrøret 210 som bores ned i formasjonen 201.
Det kontinuerlige foringsrøret 210 er nå boret til en ønsket dybde i formasjonen 201. På dette tidspunktet i operasjonen blir det introdusert innstillingsfluid ned i det kontinuerlige foringsrøret 210 som sirkuleres inn i ringrommet 275 for å innstille det kontinuerlige foringsrøret 210 i borehullet. Den utvidbare skjæreanordningen 250 trelles deretter tilbake for å tillate den å passe gjennom det kontinuerlige foringsrøret 210, idet et skjæreverktøy (ikke vist) brukes for å skjære av det kontinuerlige foringsrøret 210 ved bunnen 30. Transportøren 240 kan manipuleres til å flyttes med klokken rundt sporet 241 for å returnere den avkuttede delen av det kontinuerlige foringsrøret 210 som ligger over bunnen 30, til trommelen 225.
For å hente opp borkronemotoren 245 og den tilbaketrukkede, utvidbare skjæreanordningen 250 fra det kontinuerlige foringsrøret 250, blir en kabel 290 senket fra overbygget 215. Kabelen 290 manipuleres inn i et kilespor 291 på borkronemotoren 245 og blir deretter trukket oppover, trykket nedover, eller dreiet (når den utløsbare koplingen 246 er en gjenget kopling) for å utløse den utløsbare koplingen 246 som fortrinnsvis er en brytekopling som brytes ved å trekke kabelen 290 oppover eller ved å trykke den nedover. Utløsing av den utløsbare koplingen 246 gjør at borkronemotoren 245 og den utvidbare skjæreanordningen 250 kan flyttes i forhold til det kontinuerlige foringsrøret 210. Figur 7 viser kabelen 290 som henter opp den utvidbare skjæreanordningen 250 og borkronemotoren 245 fra det kontinuerlige foringsrøret 210. Kabelen 290 blir trukket gjennom "moon pool"-åpningen 113 på fartøyet 10, langs den utvidbare skjæreanordningen 250 og borkronemotoren 245. Ethvert annet apparat og metode for henting av borkronemotoren 245 og skjæreanordningen 250 som er kjent av de som er erfarne i bransjen, kan også brukes i forbindelse med den foreliggende oppfinnelsen.
Boremetoden som er vist i figurene 5-7 og fartøyet 10 for å utføre boringen, tillater at borehullet 270 blir boret ned i formasjonen 201 med én innkjøring av det kontinuerlige foringsrøret 210. Borehullet 270 er nå klart for etterfølgende operasjoner, så som hydrokarbonproduksjonsoperasjoner. Det samme fartøyet 10 som ble brukt for boring med kontinuerlig foringsrør 210, beskrevet i figurene 5-7, kan også brukes for inngrepsoperasjoner beskrevet i figurene 1-4 dersom en rørledning 20 brukes for å produsere fluider 45 fra borehullet 270 til satellittlagringsenheten 55.
Boremetodene i figurene 5-7 er spesielt nyttige ved bruk av et fartøy 10 når man borer et offshore-borehull 270 i underbalansert tilstand. Boring i underbalansert tilstand innebærer det å opprettholde et positivt trykk ved overflaten av borehullet 270. Underbalansert boring forhindrer skader på borehullet 270 som kan komme av overbalanserte boretilstander når borefluidene trenger inn i formasjonen 201. Underbalansert boring tillater en mer effektiv og raskere hydrokarbonproduksjon fra formasjonen 201. Fordi underbalanserte brønner produserer store volum med hydrokarboner, er de mindre, fjernopererte farkostene ikke tilstrekkelig for å lagre de produserte fluidene. Fartøyet 10 kan lagre fluidvolumer produsert under underbalansert boring. Videre, når man borer i underbalansert tilstand, er den produserte hydrokarbonfluidet en flerfaseblanding av gass, faste bestanddeler og væsker som krever separasjon. Boremetoden i figurene 5-7 tillater boring med kontinuerlig foringsrør 210 for å produsere hydrokarboner, lagre hydrokarbonene med lagringsutstyr, og separasjon av de produserte flerfaseblandingene med separasjonsutstyret ved bruk av det samme fartøyet 10. For en mer detaljert beskrivelse av underbalansert boring og problemene med dette, spesielt problemer i forbindelse med den resulterende flerfaseblandingen man støter på når man borer underbalansert, henviser vi til US-patentsøknadsnr. 10/192,784, med tittelen "Closed Loop Multiphase Underbalanced Drilling Process" (Lukket omløpsprosess for flerfaset underbalansert boring), registrert 10. juli 2002 ved Chitty m. fl., som er innlemmet her som referanse i sin helhet.
Mens det foregående er rettet mot utførelser for den aktuelle oppfinnelsen, kan andre og videre utførelser av oppfinnelsen planlegges uten å vike fra det grunn-leggende bruksområdet, samt det som er bestemt ved de patentkravene som følger.

Claims (28)

1. Fremgangsmåte for inngrep i en rørledning, omfattende følgende trinn: å tilveiebringe en rørledning (20) for transport av fluidstrøm fra en offshore-brønn (50) til en beliggenhet (55), karakterisert vedat den videre omfatter trinn med å: plassere en kopling (80) inn i den eksisterende rørledning, avlede fluidstrømmen gjennom koplingen til en lagringsplass (13), og inngripe i rørledningen.
2. Fremgangsmåte ifølge krav 1, hvor brønnen (50) er underbalansert.
3. Fremgangsmåte ifølge krav 1 eller 2, hvor avledning av fluidstrømmen til lagringsplassen (13) omfatter avledning av fluidstrømmen til et offshore-tankskip (10).
4. Fremgangsmåte ifølge krav 1, hvor koplingen (80) settes inn i rørledningen (20) mellom brønnen (50) og lagringsplassen.
5. Fremgangsmåte ifølge ethvert av de foregående krav, hvor trinnet med inngrep i rørledningen (20) omfatter innføring eller utplassering av en kopling (90) i rørledningen nedstrøms fra avledningen av fluidstrømmen til lagringsplassen (13).
6. Fremgangsmåte ifølge krav 5, hvor et kveilerør (11) blir senket fra lagringsplassen (13) og satt inn i koplingen for inngrep i rørledningen.
7. Fremgangsmåte ifølge krav 6, hvor kveilerøret (11) blir senket gjennom en "moon pool"-åpning (113) anordnet i fartøyet (10).
8. Fremgangsmåte ifølge krav 6, hvor kveilerøret (11) blir senket gjennom et riggflyttingsdekk (109) som er forskjøvet til en utenbords stilling.
9. Fremgangsmåte ifølge ethvert av de foregående krav, hvor trinnet med inngrep i rørledningen (20) skjer nedstrøms i forhold til den opprinnelige fluid- strømmen gjennom rørledningen til plasseringen av avledningen av fluidstrømmen til lagringsplassen (13).
10. Fremgangsmåte ifølge ethvert av de foregående krav, hvor trinnet med inngrep i rørledningen (20) fjerning av blokkering av fluidstrømmen innen rør-ledningen.
11. Fremgangsmåte ifølge krav 10, hvor fjerningen av blokkering omfatter injisering av syre gjennom kveilerør som er lagt eller satt inn i rørledningen (20).
12. Fremgangsmåte ifølge krav 10, hvor fjerningen av blokkering omfatter boring inn i rørledningen og fysisk fjerning av blokkeringen.
13. Fremgangsmåte ifølge et av krav 1 -9, hvor trinnet med inngrepet omfatter fjerning av en plugg som erfastkilt i rørledningen.
14. Fremgangsmåte ifølge et av krav 1-9, hvor trinnet med inngrepet omfatter avskalling i rørledningen.
15. Fremgangsmåte ifølge et av krav 1 -9, hvor trinnet med inngrepet omfatter fjerning av parafin fra innsiden av rørledningen.
16. Fremgangsmåte ifølge et av krav 1 -9, hvor trinnet med inngrepet omfatter reparasjon av skade på rørledningen.
17. Fremgangsmåte ifølge ethvert av de foregående krav, hvor trinnet med avledningen og trinnet med inngrepet oppnås fra samme beliggenhet.
18. Fremgangsmåte ifølge krav 17, hvor beliggenheten er et offshore-tankskip.
19. Apparat for gjenoppretting av en offshore-rørledning og produksjon av brønn-fluider, omfattende: et fartøy (10) som kan lagre brønnfluider som strømmer gjennom rørledningen (20) fra en brønn (50) til en beliggenhet (55), karakterisert vedat fartøyet er forskjellig fra beliggenheten, idet en første rørformet kropp (11) er anordnet på fartøyet for avledning av brønnfluidstrøm fra rørledningen til fartøyet for lagring, og en andre rørformet kropp (12) er anordnet på fartøyet for gjenoppretting av rørledningen.
20. Apparat ifølge krav 19, hvor den første rørformede kroppen (11) og en andre rørformet kroppen (12) er montert på et overbygg (215) over et hoveddekk på fartøyet.
21. Apparat ifølge krav 19 eller 20, hvor fartøyet (10) har mulighet for å avlede brønnfluidstrøm gjennom den første rørformede kroppen (11) mens den gjenoppretter rørledningen (20) gjennom den andre rørformede kroppen (12).
22. Apparat ifølge krav 21, hvor fartøyet kan gjenopprette rørledningen (20) uten å forstyrre produksjonen av brønnfluider.
23. Apparat ifølge ethvert av krav 19-22, hvor den første rørformede kroppen (11) er et stigerør.
24. Apparat ifølge krav ethvert av krav 19-23, hvor den andre rørformede kroppen (12) er et kveilerør.
25. Apparat ifølge ethvert av krav 19-24, hvor den første rørformede kroppen (11) er koplet til en første kopling (80) satt inn i rørledningen (20).
26. Apparat ifølge krav 25, hvor den andre rørformede kroppen (12) er koplet til en andre kopling (90) satt inn i rørledningen (20).
27. Apparat ifølge krav 26, hvor den andre koplingen (90) er satt inn i rørledningen (20) nedstrøms fra den første koplingen (80) som er satt inn i rørledningen (20).
28. Apparat ifølge ethvert av krav 19-27, hvor fartøyet (10) kan behandle brønn-fluider som strømmer gjennom rørledningen (20) fra brønnen (50).
NO20042922A 2003-07-11 2004-07-09 Fremgangsmåte for inngrep i en rørledning, og apparat for gjenoppretting av en offshore-rørledning og produksjon av brønnfluider. NO335948B1 (no)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US10/618,093 US7650944B1 (en) 2003-07-11 2003-07-11 Vessel for well intervention

Publications (2)

Publication Number Publication Date
NO20042922L NO20042922L (no) 2005-01-12
NO335948B1 true NO335948B1 (no) 2015-03-30

Family

ID=33452702

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20042922A NO335948B1 (no) 2003-07-11 2004-07-09 Fremgangsmåte for inngrep i en rørledning, og apparat for gjenoppretting av en offshore-rørledning og produksjon av brønnfluider.

Country Status (6)

Country Link
US (1) US7650944B1 (no)
EP (1) EP1496297B1 (no)
AU (1) AU2004203054B2 (no)
BR (1) BRPI0402753B1 (no)
CA (1) CA2473073C (no)
NO (1) NO335948B1 (no)

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100678842B1 (ko) 2006-06-29 2007-02-06 대우조선해양 주식회사 터릿에 설치되는 소방장치를 구비한 lng 선박 및 상기 소방장치를 이용한 화재 진화 방법
EP3241733A1 (en) 2008-02-15 2017-11-08 Itrec B.V. Offshore drilling vessel
US20100059990A1 (en) * 2008-09-05 2010-03-11 Avery Fred L Single ended clamp fitting
US8360155B2 (en) * 2008-09-05 2013-01-29 Quality Connector Systems Equalizer stopple fitting with integral pressure equalization fitting
US20100059998A1 (en) * 2008-09-05 2010-03-11 Avery Fred L Bypass fitting
WO2010151661A2 (en) * 2009-06-25 2010-12-29 Cameron International Corporation Sampling skid for subsea wells
US8322431B2 (en) * 2009-09-04 2012-12-04 Halliburton Energy Services Inc. Wellbore servicing compositions and methods of making and using same
US20110176874A1 (en) * 2010-01-19 2011-07-21 Halliburton Energy Services, Inc. Coiled Tubing Compensation System
EP2633154A2 (en) * 2010-10-28 2013-09-04 Gulfstream Services, Inc. Method and apparatus for evacuating hydrocarbons from a distressed well
AP3645A (en) * 2010-11-18 2016-03-16 Shell Internationale Res Maatcvhappij B V Water intake riser assembly for an off-shore structure, and method of producing a liquefied hydrocarbon stream and method of producing a vaporous hydrocarbon stream
US8622139B2 (en) * 2010-12-15 2014-01-07 Vetco Gray Inc. Emergency subsea wellhead closure devices
US8950499B2 (en) * 2011-07-26 2015-02-10 Chevron U.S.A. Inc. Pipe-in-pipe apparatus, and methods and systems
US8783358B2 (en) * 2011-09-16 2014-07-22 Chevron U.S.A. Inc. Methods and systems for circulating fluid within the annulus of a flexible pipe riser
BR112014020343A2 (pt) * 2012-02-20 2020-10-27 Saudi Arabian Oil Company aparelho para conter vazamentos na porção longitudinal da tubulação de oleoduto
KR101465733B1 (ko) * 2013-07-05 2014-11-28 삼성중공업 주식회사 폐 파이프라인의 기름 회수 시스템과 그 회수 방법 및 폐 파이프라인의 회수방법
US9540907B1 (en) 2013-08-28 2017-01-10 Jaco du Plessis In-line fire control system for a hydrocarbon fluid stream
RU2536525C1 (ru) * 2013-09-06 2014-12-27 Николай Александрович Саврасов Система разработки подводного месторождения нефти или газа
RU2567586C2 (ru) * 2014-03-27 2015-11-10 Российская Федерация, от имени которой выступает государственный заказчик (Министерство промышленности и торговли Российской Федерации) Направляющий раструб бурового научно-исследовательского судна для бурения без использования райзера
GB2524845B (en) * 2014-04-05 2019-01-02 Paradigm Flow Services Ltd Apparatus and method for treating subsea fluid conduits
WO2016057126A1 (en) * 2014-10-10 2016-04-14 Exxonmobil Upstream Research Company Bubble pump utilization for vertical flow line liquid unloading
GB201501432D0 (en) 2015-01-28 2015-03-11 Paradigm Flow Services Ltd Method and apparatus for performing operations in fluid conduits
SG11201804748PA (en) * 2016-02-03 2018-08-30 Fmc Technologies Systems for removing blockages in subsea flowlines and equipment
US10794126B2 (en) 2016-08-30 2020-10-06 Nabors Drilling Technologies Usa, Inc. Dual-activity mast
US10982508B2 (en) * 2016-10-25 2021-04-20 Stress Engineering Services, Inc. Pipeline insulated remediation system and installation method
CN109930999B (zh) * 2019-04-01 2020-06-30 无锡锡钻地质装备有限公司 一种地质勘探钻头及其制造工艺
WO2021016367A1 (en) * 2019-07-23 2021-01-28 Bp Corporation North America Inc. Systems and methods for identifying blockages in subsea conduits
BR102019025811A2 (pt) * 2019-12-05 2021-06-15 Petróleo Brasileiro S.A. - Petrobras Método de desobstrução de dutos flexíveis utilizando flexitubo a partir de uma sonda de intervenção em poços

Family Cites Families (704)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US122514A (en) 1872-01-09 Improvement in rock-drills
US3123160A (en) 1964-03-03 Retrievable subsurface well bore apparatus
US3124023A (en) 1964-03-10 Dies for pipe and tubing tongs
US3006415A (en) 1961-10-31 Cementing apparatus
US1077772A (en) 1913-01-25 1913-11-04 Fred Richard Weathersby Drill.
US1185582A (en) 1914-07-13 1916-05-30 Edward Bignell Pile.
US1301285A (en) 1916-09-01 1919-04-22 Frank W A Finley Expansible well-casing.
US1342424A (en) 1918-09-06 1920-06-08 Shepard M Cotten Method and apparatus for constructing concrete piles
US1471526A (en) 1920-07-19 1923-10-23 Rowland O Pickin Rotary orill bit
US1418766A (en) 1920-08-02 1922-06-06 Guiberson Corp Well-casing spear
US1585069A (en) 1924-12-18 1926-05-18 William E Youle Casing spear
US1728136A (en) 1926-10-21 1929-09-10 Lewis E Stephens Casing spear
US1830625A (en) 1927-02-16 1931-11-03 George W Schrock Drill for oil and gas wells
US1777592A (en) 1929-07-08 1930-10-07 Thomas Idris Casing spear
US1998833A (en) 1930-03-17 1935-04-23 Baker Oil Tools Inc Cementing guide
US1825026A (en) 1930-07-07 1931-09-29 Thomas Idris Casing spear
US1842638A (en) 1930-09-29 1932-01-26 Wilson B Wigle Elevating apparatus
US1880218A (en) 1930-10-01 1932-10-04 Richard P Simmons Method of lining oil wells and means therefor
US1917135A (en) 1932-02-17 1933-07-04 Littell James Well apparatus
US2105885A (en) 1932-03-30 1938-01-18 Frank J Hinderliter Hollow trip casing spear
US2049450A (en) 1933-08-23 1936-08-04 Macclatchie Mfg Company Expansible cutter tool
US2017451A (en) 1933-11-21 1935-10-15 Baash Ross Tool Co Packing casing bowl
US1981525A (en) 1933-12-05 1934-11-20 Bailey E Price Method of and apparatus for drilling oil wells
US2060352A (en) 1936-06-20 1936-11-10 Reed Roller Bit Co Expansible bit
US2167338A (en) 1937-07-26 1939-07-25 U C Murcell Inc Welding and setting well casing
US2216895A (en) 1939-04-06 1940-10-08 Reed Roller Bit Co Rotary underreamer
US2228503A (en) 1939-04-25 1941-01-14 Boyd Liner hanger
US2214429A (en) 1939-10-24 1940-09-10 William J Miller Mud box
US2324679A (en) 1940-04-26 1943-07-20 Cox Nellie Louise Rock boring and like tool
GB540027A (en) 1940-04-26 1941-10-02 Percy Cox Improvements in and relating to rock boring and like tools
US2305062A (en) 1940-05-09 1942-12-15 C M P Fishing Tool Corp Cementing plug
US2295803A (en) 1940-07-29 1942-09-15 Charles M O'leary Cement shoe
US2370832A (en) 1941-08-19 1945-03-06 Baker Oil Tools Inc Removable well packer
US2379800A (en) 1941-09-11 1945-07-03 Texas Co Signal transmission system
US2414719A (en) 1942-04-25 1947-01-21 Stanolind Oil & Gas Co Transmission system
US2522444A (en) 1946-07-20 1950-09-12 Donovan B Grable Well fluid control
US2641444A (en) 1946-09-03 1953-06-09 Signal Oil & Gas Co Method and apparatus for drilling boreholes
US2499630A (en) 1946-12-05 1950-03-07 Paul B Clark Casing expander
US2668689A (en) 1947-11-07 1954-02-09 C & C Tool Corp Automatic power tongs
US2621742A (en) 1948-08-26 1952-12-16 Cicero C Brown Apparatus for cementing well liners
US2536458A (en) 1948-11-29 1951-01-02 Theodor R Munsinger Pipe rotating device for oil wells
US2720267A (en) 1949-12-12 1955-10-11 Cicero C Brown Sealing assemblies for well packers
US2610690A (en) 1950-08-10 1952-09-16 Guy M Beatty Mud box
US2627891A (en) 1950-11-28 1953-02-10 Paul B Clark Well pipe expander
US2743495A (en) 1951-05-07 1956-05-01 Nat Supply Co Method of making a composite cutter
GB716761A (en) 1952-01-29 1954-10-13 Standard Oil Dev Co Improvements in or relating to drill assemblies
GB709365A (en) 1952-01-29 1954-05-19 Standard Oil Dev Co Improvements in or relating to drill assemblies
US2765146A (en) 1952-02-09 1956-10-02 Jr Edward B Williams Jetting device for rotary drilling apparatus
US2805043A (en) 1952-02-09 1957-09-03 Jr Edward B Williams Jetting device for rotary drilling apparatus
US2650314A (en) 1952-02-12 1953-08-25 George W Hennigh Special purpose electric motor
US2764329A (en) 1952-03-10 1956-09-25 Lucian W Hampton Load carrying attachment for bicycles, motorcycles, and the like
US2663073A (en) 1952-03-19 1953-12-22 Acrometal Products Inc Method of forming spools
US2743087A (en) 1952-10-13 1956-04-24 Layne Under-reaming tool
US2738011A (en) 1953-02-17 1956-03-13 Thomas S Mabry Means for cementing well liners
US2741907A (en) 1953-04-27 1956-04-17 Genender Louis Locksmithing tool
US2692059A (en) 1953-07-15 1954-10-19 Standard Oil Dev Co Device for positioning pipe in a drilling derrick
SU112631A1 (ru) 1956-01-10 1957-11-30 Г.С. Баршай Гидравлический привод механизма раскрыти вставного долота
GB792886A (en) 1956-04-13 1958-04-02 Fritz Huntsinger Well pipe and flexible joints therefor
US2978047A (en) 1957-12-03 1961-04-04 Vaan Walter H De Collapsible drill bit assembly and method of drilling
US3054100A (en) 1958-06-04 1962-09-11 Gen Precision Inc Signalling system
US3159219A (en) 1958-05-13 1964-12-01 Byron Jackson Inc Cementing plugs and float equipment
US3087546A (en) 1958-08-11 1963-04-30 Brown J Woolley Methods and apparatus for removing defective casing or pipe from well bores
GB838833A (en) 1958-08-25 1960-06-22 Archer William Kammerer Expansible rotary drill bit
US2953406A (en) 1958-11-24 1960-09-20 A D Timmons Casing spear
US3041901A (en) 1959-05-20 1962-07-03 Dowty Rotol Ltd Make-up and break-out mechanism for drill pipe joints
US3090031A (en) 1959-09-29 1963-05-14 Texaco Inc Signal transmission system
GB881358A (en) 1960-02-12 1961-11-01 Archer William Kammerer Retrievable drilling apparatus for bore holes
US3117636A (en) 1960-06-08 1964-01-14 John L Wilcox Casing bit with a removable center
US3111179A (en) 1960-07-26 1963-11-19 A And B Metal Mfg Company Inc Jet nozzle
BE621348A (no) 1961-08-25
US3102599A (en) 1961-09-18 1963-09-03 Continental Oil Co Subterranean drilling process
US3191680A (en) 1962-03-14 1965-06-29 Pan American Petroleum Corp Method of setting metallic liners in wells
US3131769A (en) 1962-04-09 1964-05-05 Baker Oil Tools Inc Hydraulic anchors for tubular strings
US3122811A (en) 1962-06-29 1964-03-03 Lafayette E Gilreath Hydraulic slip setting apparatus
US3169592A (en) 1962-10-22 1965-02-16 Lamphere Jean K Retrievable drill bit
US3193116A (en) 1962-11-23 1965-07-06 Exxon Production Research Co System for removing from or placing pipe in a well bore
US3191677A (en) 1963-04-29 1965-06-29 Myron M Kinley Method and apparatus for setting liners in tubing
US3239004A (en) * 1963-06-10 1966-03-08 Kobe Inc Apparatus for running equipment into and out of offshore well completions
NL6411125A (no) 1963-09-25 1965-03-26
US3353599A (en) 1964-08-04 1967-11-21 Gulf Oil Corp Method and apparatus for stabilizing formations
DE1216822B (de) 1965-03-27 1966-05-18 Beteiligungs & Patentverw Gmbh Streckenvortriebsmaschine
US3346045A (en) * 1965-05-20 1967-10-10 Exxon Production Research Co Operation in a submarine well
US3380528A (en) 1965-09-24 1968-04-30 Tri State Oil Tools Inc Method and apparatus of removing well pipe from a well bore
US3419079A (en) 1965-10-23 1968-12-31 Schlumberger Technology Corp Well tool with expansible anchor
US3392609A (en) 1966-06-24 1968-07-16 Abegg & Reinhold Co Well pipe spinning unit
US3390609A (en) 1966-08-23 1968-07-02 Army Usa Firing mechanism for cannons
US3477527A (en) 1967-06-05 1969-11-11 Global Marine Inc Kelly and drill pipe spinner-stabber
US3635105A (en) 1967-10-17 1972-01-18 Byron Jackson Inc Power tong head and assembly
US3518903A (en) 1967-12-26 1970-07-07 Byron Jackson Inc Combined power tong and backup tong assembly
GB1277461A (en) 1968-06-05 1972-06-14 Wadsworth Walton Mount Method and apparatus for joining ends of pipe sections by driven force fit and joints formed thereby
US3489220A (en) 1968-08-02 1970-01-13 J C Kinley Method and apparatus for repairing pipe in wells
US3548936A (en) 1968-11-15 1970-12-22 Dresser Ind Well tools and gripping members therefor
US3747675A (en) 1968-11-25 1973-07-24 C Brown Rotary drive connection for casing drilling string
US3552507A (en) 1968-11-25 1971-01-05 Cicero C Brown System for rotary drilling of wells using casing as the drill string
FR1604950A (no) 1968-12-31 1971-05-15
US3575245A (en) 1969-02-05 1971-04-20 Servco Co Apparatus for expanding holes
US3552508A (en) 1969-03-03 1971-01-05 Cicero C Brown Apparatus for rotary drilling of wells using casing as the drill pipe
US3606664A (en) 1969-04-04 1971-09-21 Exxon Production Research Co Leak-proof threaded connections
US3570598A (en) 1969-05-05 1971-03-16 Glenn D Johnson Constant strain jar
US3550684A (en) 1969-06-03 1970-12-29 Schlumberger Technology Corp Methods and apparatus for facilitating the descent of well tools through deviated well bores
US3566505A (en) 1969-06-09 1971-03-02 Hydrotech Services Apparatus for aligning two sections of pipe
US3559739A (en) 1969-06-20 1971-02-02 Chevron Res Method and apparatus for providing continuous foam circulation in wells
DE1937349B2 (de) 1969-07-23 1973-08-23 Leo Gottwald KG, 4000 Dusseldorf Kranfahrzeug mit drehbarem oberwagen
US3552509A (en) 1969-09-11 1971-01-05 Cicero C Brown Apparatus for rotary drilling of wells using casing as drill pipe
US3603413A (en) 1969-10-03 1971-09-07 Christensen Diamond Prod Co Retractable drill bits
US3552510A (en) 1969-10-08 1971-01-05 Cicero C Brown Apparatus for rotary drilling of wells using casing as the drill pipe
US3624760A (en) 1969-11-03 1971-11-30 Albert G Bodine Sonic apparatus for installing a pile jacket, casing member or the like in an earthen formation
US3602302A (en) 1969-11-10 1971-08-31 Westinghouse Electric Corp Oil production system
BE757087A (fr) 1969-12-03 1971-04-06 Gardner Denver Co Mecanisme de devissage de tiges de forage commande a distance
US3691624A (en) 1970-01-16 1972-09-19 John C Kinley Method of expanding a liner
US3603411A (en) 1970-01-19 1971-09-07 Christensen Diamond Prod Co Retractable drill bits
US3603412A (en) 1970-02-02 1971-09-07 Baker Oil Tools Inc Method and apparatus for drilling in casing from the top of a borehole
US3662842A (en) 1970-04-14 1972-05-16 Automatic Drilling Mach Automatic coupling system
US3696332A (en) 1970-05-25 1972-10-03 Shell Oil Co Telemetering drill string with self-cleaning connectors
US3808916A (en) 1970-09-24 1974-05-07 Robbins & Ass J Earth drilling machine
US3656564A (en) 1970-12-03 1972-04-18 Cicero C Brown Apparatus for rotary drilling of wells using casing as the drill pipe
US3669190A (en) 1970-12-21 1972-06-13 Otis Eng Corp Methods of completing a well
US3692126A (en) 1971-01-29 1972-09-19 Frank C Rushing Retractable drill bit apparatus
US3785193A (en) 1971-04-10 1974-01-15 Kinley J Liner expanding apparatus
US3838613A (en) 1971-04-16 1974-10-01 Byron Jackson Inc Motion compensation system for power tong apparatus
US3776991A (en) 1971-06-30 1973-12-04 P Marcus Injection blow molding method
US3851492A (en) * 1971-09-29 1974-12-03 Seascope Services Inc Apparatus and method for offshore operations
US3746330A (en) 1971-10-28 1973-07-17 W Taciuk Drill stem shock absorber
GB1306568A (en) 1971-11-09 1973-02-14 Fox F K Rotary drilling tool for use in well bores
US3760894A (en) 1971-11-10 1973-09-25 M Pitifer Replaceable blade drilling bits
US3729057A (en) 1971-11-30 1973-04-24 Werner Ind Inc Travelling drill bit
US3691825A (en) 1971-12-03 1972-09-19 Norman D Dyer Rotary torque indicator for well drilling apparatus
US3776320A (en) 1971-12-23 1973-12-04 C Brown Rotating drive assembly
SU395557A1 (ru) 1971-12-30 1973-08-28 Всесоюзный иаучно исследовательский институт буровой техники Устройство для бурения скважин12
SU415346A1 (no) 1972-03-03 1974-02-15
SU481689A1 (ru) 1972-06-09 1975-08-25 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Буровой Техники Расширитель
FR2209038B1 (no) 1972-12-06 1977-07-22 Petroles Cie Francaise
US3881375A (en) 1972-12-12 1975-05-06 Borg Warner Pipe tong positioning system
US4054426A (en) 1972-12-20 1977-10-18 White Gerald W Thin film treated drilling bit cones
SU461218A1 (ru) 1973-04-23 1975-02-25 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Буровой Техники Вставное четырехшарошечное долото
FR2234448B1 (no) 1973-06-25 1977-12-23 Petroles Cie Francaise
US3840128A (en) 1973-07-09 1974-10-08 N Swoboda Racking arm for pipe sections, drill collars, riser pipe, and the like used in well drilling operations
US3870114A (en) 1973-07-23 1975-03-11 Stabilator Ab Drilling apparatus especially for ground drilling
US3848684A (en) 1973-08-02 1974-11-19 Tri State Oil Tools Inc Apparatus for rotary drilling
US3857450A (en) 1973-08-02 1974-12-31 W Guier Drilling apparatus
SU501139A1 (ru) 1973-12-14 1976-01-30 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Буровой Техники Устройство дл расширени скважин
US3913687A (en) 1974-03-04 1975-10-21 Ingersoll Rand Co Pipe handling system
US3915244A (en) 1974-06-06 1975-10-28 Cicero C Brown Break out elevators for rotary drive assemblies
US3934660A (en) 1974-07-02 1976-01-27 Nelson Daniel E Flexpower deep well drill
US3964556A (en) 1974-07-10 1976-06-22 Gearhart-Owen Industries, Inc. Downhole signaling system
SU585266A1 (ru) 1974-07-26 1977-12-25 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Буровой Техники Вниибт Устройство дл креплени забойного двигател в бурильной колонне
SU583278A1 (ru) 1974-08-30 1977-12-05 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Буровой Техники Вставной лопастной расширитель
US4077525A (en) 1974-11-14 1978-03-07 Lamb Industries, Inc. Derrick mounted apparatus for the manipulation of pipe
US3947009A (en) 1974-12-23 1976-03-30 Bucyrus-Erie Company Drill shock absorber
US3945444A (en) 1975-04-01 1976-03-23 The Anaconda Company Split bit casing drill
US3980143A (en) 1975-09-30 1976-09-14 Driltech, Inc. Holding wrench for drill strings
SU601390A1 (ru) 1976-01-12 1978-04-05 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Буровой Техники Устройство дл создани осевого усилени на вставной инструмент при подъеме
DE2604063A1 (de) 1976-02-03 1977-08-04 Miguel Kling Selbstfahrende und selbstarretierende vorrichtung zum befahren von kanaelen bzw. von langgestreckten gebilden
SU581238A1 (ru) 1976-02-23 1977-11-25 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Буровой Техники Устройство дл захвата вставного инструмента
US4183555A (en) 1976-04-02 1980-01-15 Martin Charles F Methods and joints for connecting tubular members
US4049066A (en) 1976-04-19 1977-09-20 Richey Vernon T Apparatus for reducing annular back pressure near the drill bit
US4054332A (en) 1976-05-03 1977-10-18 Gardner-Denver Company Actuation means for roller guide bushing for drill rig
GB1516491A (en) 1976-05-06 1978-07-05 A Z Int Tool Co Well drilling method and apparatus therefor
US4100968A (en) 1976-08-30 1978-07-18 Charles George Delano Technique for running casing
US4189185A (en) 1976-09-27 1980-02-19 Tri-State Oil Tool Industries, Inc. Method for producing chambered blast holes
US4257442A (en) 1976-09-27 1981-03-24 Claycomb Jack R Choke for controlling the flow of drilling mud
US4127927A (en) 1976-09-30 1978-12-05 Hauk Ernest D Method of gaging and joining pipe
US4082144A (en) 1976-11-01 1978-04-04 Dresser Industries, Inc. Method and apparatus for running and retrieving logging instruments in highly deviated well bores
US4064939A (en) 1976-11-01 1977-12-27 Dresser Industries, Inc. Method and apparatus for running and retrieving logging instruments in highly deviated well bores
US4186628A (en) 1976-11-30 1980-02-05 General Electric Company Rotary drill bit and method for making same
US4100981A (en) 1977-02-04 1978-07-18 Chaffin John D Earth boring apparatus for geological drilling and coring
SU655843A1 (ru) 1977-03-22 1979-04-05 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Буровой Техники Разъемное соединение типа "ласточкин хвост"
US4142739A (en) 1977-04-18 1979-03-06 Compagnie Maritime d'Expertise, S.A. Pipe connector apparatus having gripping and sealing means
SE411139B (sv) 1977-04-29 1979-12-03 Sandvik Ab Anordning for borrning
US4125162A (en) * 1977-05-13 1978-11-14 Otis Engineering Corporation Well flow system and method
US4095865A (en) 1977-05-23 1978-06-20 Shell Oil Company Telemetering drill string with piped electrical conductor
US4133396A (en) 1977-11-04 1979-01-09 Smith International, Inc. Drilling and casing landing apparatus and method
SU659260A1 (ru) 1977-12-05 1979-04-30 Предприятие П/Я Р-6209 Способ получени толстых листов из алюминиевых, жаропрочных и титановых сплавов
GB1575104A (en) 1977-12-08 1980-09-17 Marconi Co Ltd Load moving devices
US4173457A (en) 1978-03-23 1979-11-06 Alloys, Incorporated Hardfacing composition of nickel-bonded sintered chromium carbide particles and tools hardfaced thereof
US4280380A (en) 1978-06-02 1981-07-28 Rockwell International Corporation Tension control of fasteners
US4194383A (en) 1978-06-22 1980-03-25 Gulf & Western Manufacturing Company Modular transducer assembly for rolling mill roll adjustment mechanism
SU781312A1 (ru) 1978-07-03 1980-11-23 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Буровой Техники Лопастной расширитель
US4274777A (en) 1978-08-04 1981-06-23 Scaggs Orville C Subterranean well pipe guiding apparatus
US4175619A (en) 1978-09-11 1979-11-27 Davis Carl A Well collar or shoe and cementing/drilling process
US4221269A (en) 1978-12-08 1980-09-09 Hudson Ray E Pipe spinner
US4252465A (en) * 1979-02-13 1981-02-24 Shell Oil Company Pipeline gel plug
US4241878A (en) 1979-02-26 1980-12-30 3U Partners Nozzle and process
US4281722A (en) 1979-05-15 1981-08-04 Long Year Company Retractable bit system
US4345613A (en) * 1979-05-21 1982-08-24 Internorth, Inc. Pressure-operated portable siphon apparatus for removing concentrations of liquid from a gas pipeline
US4274778A (en) 1979-06-05 1981-06-23 Putnam Paul S Mechanized stand handling apparatus for drilling rigs
DE2925400C2 (de) 1979-06-23 1983-11-10 Siegfried 7971 Aichstetten Gebhart Vorrichtung zum Sägen von Mauersteinen, Platten, Holz, Rohren u. dgl. Baumaterialien
SU899820A1 (ru) 1979-06-29 1982-01-23 Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Буровой Техники Устройство дл определени местонахождени вставного инструмента в колонне бурильных труб
US4262693A (en) 1979-07-02 1981-04-21 Bernhardt & Frederick Co., Inc. Kelly valve
GB2057534B (en) * 1979-07-26 1983-02-16 Mobell Blowout Services Ltd Tool jig for oil well blow-out control
US4287949A (en) 1980-01-07 1981-09-08 Mwl Tool And Supply Company Setting tools and liner hanger assembly
US4277197A (en) 1980-01-14 1981-07-07 Kearney-National, Inc. Telescoping tool and coupling means therefor
MX153352A (es) 1980-03-11 1986-10-01 Carlor Ramirez Jauregui Mejoras en barrena contractil para perforar pozos
US4320915A (en) 1980-03-24 1982-03-23 Varco International, Inc. Internal elevator
US4336415A (en) 1980-05-16 1982-06-22 Walling John B Flexible production tubing
US4311195A (en) 1980-07-14 1982-01-19 Baker International Corporation Hydraulically set well packer
FR2488973B1 (fr) * 1980-08-22 1985-09-06 Petroles Cie Francaise Procede et dispositif d'intervention sur une conduite sous-marine
US4392534A (en) 1980-08-23 1983-07-12 Tsukamoto Seiki Co., Ltd. Composite nozzle for earth boring and bore enlarging bits
US4315553A (en) 1980-08-25 1982-02-16 Stallings Jimmie L Continuous circulation apparatus for air drilling well bore operations
SU955765A1 (ru) 1981-02-09 1995-01-20 Всесоюзный Научно-Исследовательский Институт Буровой Техники Вставное трехшарошечное долото
US4483399A (en) 1981-02-12 1984-11-20 Colgate Stirling A Method of deep drilling
US4407378A (en) 1981-03-11 1983-10-04 Smith International, Inc. Nozzle retention method for rock bits
US4446745A (en) 1981-04-10 1984-05-08 Baker International Corporation Apparatus for counting turns when making threaded joints including an increased resolution turns counter
US4396076A (en) 1981-04-27 1983-08-02 Hachiro Inoue Under-reaming pile bore excavator
US4437363A (en) 1981-06-29 1984-03-20 Joy Manufacturing Company Dual camming action jaw assembly and power tong
US4450857A (en) * 1981-08-10 1984-05-29 Hughes Tool Company Device for tapping and plugging a fluid conductor
US4460053A (en) 1981-08-14 1984-07-17 Christensen, Inc. Drill tool for deep wells
GB2108552B (en) 1981-09-17 1985-01-23 Sumitomo Metal Mining Co Earth boring apparatus
US4396077A (en) 1981-09-21 1983-08-02 Strata Bit Corporation Drill bit with carbide coated cutting face
DE3138870C1 (de) 1981-09-30 1983-07-21 Weatherford Oil Tool Gmbh, 3012 Langenhagen Einrichtung zum Verschrauben von Rohren
US4427063A (en) 1981-11-09 1984-01-24 Halliburton Company Retrievable bridge plug
US4445734A (en) 1981-12-04 1984-05-01 Hughes Tool Company Telemetry drill pipe with pressure sensitive contacts
US4441328A (en) * 1981-12-08 1984-04-10 Brister, Incorporated Method and apparatus for forming a temporary plug in a submarine conduit
FR2522144A1 (fr) 1982-02-24 1983-08-26 Vallourec Procede et dispositif pour s'assurer du vissage correct d'un joint tubulaire comportant une butee de limitation de vissage
FR2523635A1 (fr) 1982-03-17 1983-09-23 Bretagne Atel Chantiers Dispositif pour le montage d'un train de tiges de forage et pour son entrainement en rotation et translation
FR2523637A1 (fr) 1982-03-17 1983-09-23 Eimco Secoma Guide-fleuret escamotable pour glissiere de foration et de boulonnage
US4474243A (en) 1982-03-26 1984-10-02 Exxon Production Research Co. Method and apparatus for running and cementing pipe
DE3213464A1 (de) 1982-04-10 1983-10-13 Schaubstahl-Werke, 5910 Kreuztal Vorrichtung zum einschneiden von laengsschlitzen in den umfang von brunnenrohren
US4489793A (en) 1982-05-10 1984-12-25 Roy Boren Control method and apparatus for fluid delivery in a rotary drill string
USRE34063E (en) 1982-06-01 1992-09-15 Monitoring torque in tubular goods
US4738145A (en) 1982-06-01 1988-04-19 Tubular Make-Up Specialists, Inc. Monitoring torque in tubular goods
US4440220A (en) 1982-06-04 1984-04-03 Mcarthur James R System for stabbing well casing
US4413682A (en) 1982-06-07 1983-11-08 Baker Oil Tools, Inc. Method and apparatus for installing a cementing float shoe on the bottom of a well casing
US4676310A (en) 1982-07-12 1987-06-30 Scherbatskoy Serge Alexander Apparatus for transporting measuring and/or logging equipment in a borehole
US4449596A (en) 1982-08-03 1984-05-22 Varco International, Inc. Drilling of wells with top drive unit
US4579484A (en) * 1982-08-20 1986-04-01 T. D. Williamson, Inc. Underwater tapping machine
US4466498A (en) 1982-09-24 1984-08-21 Bardwell Allen E Detachable shoe plates for large diameter drill bits
US4681158A (en) 1982-10-07 1987-07-21 Mobil Oil Corporation Casing alignment tool
US4605268A (en) 1982-11-08 1986-08-12 Nl Industries, Inc. Transformer cable connector
US4463814A (en) 1982-11-26 1984-08-07 Advanced Drilling Corporation Down-hole drilling apparatus
US4760882A (en) 1983-02-02 1988-08-02 Exxon Production Research Company Method for primary cementing a well with a drilling mud which may be converted to cement using chemical initiators with or without additional irradiation
US4515045A (en) 1983-02-22 1985-05-07 Spetsialnoe Konstruktorskoe Bjuro Seismicheskoi Tekhniki Automatic wrench for screwing a pipe string together and apart
US4604724A (en) 1983-02-22 1986-08-05 Gomelskoe Spetsialnoe Konstruktorsko-Tekhnologicheskoe Bjuro Seismicheskoi Tekhniki S Opytnym Proizvodstvom Automated apparatus for handling elongated well elements such as pipes
US4489794A (en) 1983-05-02 1984-12-25 Varco International, Inc. Link tilting mechanism for well rigs
US4630691A (en) 1983-05-19 1986-12-23 Hooper David W Annulus bypass peripheral nozzle jet pump pressure differential drilling tool and method for well drilling
US4494424A (en) 1983-06-24 1985-01-22 Bates Darrell R Chain-powered pipe tong device
SE454196C (sv) 1983-09-23 1991-10-24 Jan Persson Jord- och bergborrningsanordning foer samtidig borrning och infodring av borrhaalet
GB8326736D0 (en) 1983-10-06 1983-11-09 Salvesen Drilling Services Analysis of torque applied to joint
US4683962A (en) 1983-10-06 1987-08-04 True Martin E Spinner for use in connecting pipe joints
US4544041A (en) 1983-10-25 1985-10-01 Rinaldi Roger E Well casing inserting and well bore drilling method and means
US4646827A (en) 1983-10-26 1987-03-03 Cobb William O Tubing anchor assembly
NO154578C (no) 1984-01-25 1986-10-29 Maritime Hydraulics As Broennboreinnretning.
US4652195A (en) 1984-01-26 1987-03-24 Mcarthur James R Casing stabbing and positioning apparatus
US4921386A (en) 1988-06-06 1990-05-01 John Harrel Device for positioning and stabbing casing from a remote selectively variable location
US5049020A (en) 1984-01-26 1991-09-17 John Harrel Device for positioning and stabbing casing from a remote selectively variable location
US4529045A (en) 1984-03-26 1985-07-16 Varco International, Inc. Top drive drilling unit with rotatable pipe support
US4589495A (en) 1984-04-19 1986-05-20 Weatherford U.S., Inc. Apparatus and method for inserting flow control means into a well casing
US4651837A (en) 1984-05-31 1987-03-24 Mayfield Walter G Downhole retrievable drill bit
US4649777A (en) 1984-06-21 1987-03-17 David Buck Back-up power tongs
US4759239A (en) 1984-06-29 1988-07-26 Hughes Tool Company Wrench assembly for a top drive sub
US4832552A (en) 1984-07-10 1989-05-23 Michael Skelly Method and apparatus for rotary power driven swivel drilling
CA1239634A (en) 1984-07-27 1988-07-26 William D. Stringfellow Weight compensating elevator
US4604818A (en) 1984-08-06 1986-08-12 Kabushiki Kaisha Tokyo Seisakusho Under reaming pile bore excavating bucket and method of its excavation
FR2568935B1 (fr) 1984-08-08 1986-09-05 Petroles Cie Francaise Raccord de garniture de forage, notamment pour la traversee d'une zone a perte de circulation
US4595058A (en) 1984-08-28 1986-06-17 Shell Oil Company Turbulence cementing sub
SU1304470A1 (ru) 1984-08-31 1995-01-20 Всесоюзный Научно-Исследовательский Институт Буровой Техники Способ бурения с отбором керна
HU195559B (en) 1984-09-04 1988-05-30 Janos Fenyvesi Drilling rig of continuous operation
US4605077A (en) 1984-12-04 1986-08-12 Varco International, Inc. Top drive drilling systems
GB2170528A (en) 1985-01-26 1986-08-06 Ed Oscar Seabourn Casing extender
US4580631A (en) 1985-02-13 1986-04-08 Joe R. Brown Liner hanger with lost motion coupling
US4655286A (en) 1985-02-19 1987-04-07 Ctc Corporation Method for cementing casing or liners in an oil well
US4616706A (en) * 1985-02-21 1986-10-14 Exxon Production Research Co. Apparatus for performing subsea through-the-flowline operations
US4825947A (en) 1985-02-22 1989-05-02 Mikolajczyk Raymond F Apparatus for use in cementing a casing string within a well bore
US4625796A (en) 1985-04-01 1986-12-02 Varco International, Inc. Well pipe stabbing and back-up apparatus
US4667752A (en) 1985-04-11 1987-05-26 Hughes Tool Company Top head drive well drilling apparatus with stabbing guide
US4709766A (en) 1985-04-26 1987-12-01 Varco International, Inc. Well pipe handling machine
SE461345B (sv) 1985-06-03 1990-02-05 Sandvik Rock Tools Ab Saett och anordning foer att varsamt nedfoera foderroer genom oemtaalig mark och oemtaaliga konstruktioner
DE3523221A1 (de) 1985-06-28 1987-01-02 Svetozar Dipl Ing Marojevic Verfahren zum verschrauben von rohren
US4686873A (en) 1985-08-12 1987-08-18 Becor Western Inc. Casing tong assembly
FR2588297B1 (fr) 1985-10-09 1987-12-04 Soletanche Dispositif pour le forage sous-marin de fondations
US4693316A (en) 1985-11-20 1987-09-15 Halliburton Company Round mandrel slip joint
US4671358A (en) 1985-12-18 1987-06-09 Mwl Tool Company Wiper plug cementing system and method of use thereof
US4691587A (en) 1985-12-20 1987-09-08 General Motors Corporation Steering column with selectively adjustable and preset preferred positions
US4709599A (en) 1985-12-26 1987-12-01 Buck David A Compensating jaw assembly for power tongs
FR2600172B1 (fr) 1986-01-17 1988-08-26 Inst Francais Du Petrole Dispositif d'installation de capteurs sismiques dans un puits de production petroliere
US4678031A (en) 1986-01-27 1987-07-07 Blandford David M Rotatable reciprocating collar for borehole casing
US4681162A (en) 1986-02-19 1987-07-21 Boyd's Bit Service, Inc. Borehole drill pipe continuous side entry or exit apparatus and method
SE460141B (sv) 1986-02-24 1989-09-11 Santrade Ltd Borrverktyg foer rotations- och/eller slagborrning innefattande en excentrisk rymmare samt rymmare ingaaende i ett saadant borrverktyg
FR2596803B1 (fr) 1986-04-02 1988-06-24 Elf Aquitaine Dispositif de forage et cuvelage simultanes
US4699224A (en) 1986-05-12 1987-10-13 Sidewinder Joint Venture Method and apparatus for lateral drilling in oil and gas wells
DE3617227A1 (de) 1986-05-22 1987-11-26 Wirth Co Kg Masch Bohr Vorrichtung mit einem am ende eines rohres festklemmbaren spider od.dgl.
US4744426A (en) 1986-06-02 1988-05-17 Reed John A Apparatus for reducing hydro-static pressure at the drill bit
GB8616006D0 (en) 1986-07-01 1986-08-06 Framo Dev Ltd Drilling system
US4765401A (en) 1986-08-21 1988-08-23 Varco International, Inc. Apparatus for handling well pipe
FR2605657A1 (fr) 1986-10-22 1988-04-29 Soletanche Procede pour la realisation d'un pieu dans le sol, machine de forage et dispositif pour la mise en oeuvre de ce procede
US4725179A (en) 1986-11-03 1988-02-16 Lee C. Moore Corporation Automated pipe racking apparatus
US5717334A (en) 1986-11-04 1998-02-10 Paramagnetic Logging, Inc. Methods and apparatus to produce stick-slip motion of logging tool attached to a wireline drawn upward by a continuously rotating wireline drum
US4676312A (en) 1986-12-04 1987-06-30 Donald E. Mosing Well casing grip assurance system
US4788544A (en) 1987-01-08 1988-11-29 Hughes Tool Company - Usa Well bore data transmission system
US4778008A (en) 1987-03-05 1988-10-18 Exxon Production Research Company Selectively releasable and reengagable expansion joint for subterranean well tubing strings
US4843945A (en) 1987-03-09 1989-07-04 National-Oilwell Apparatus for making and breaking threaded well pipe connections
NO881445L (no) 1987-04-02 1988-10-03 Apache Corp Apparat for paafoering av dreiemoment paa en roerdel i en jordboremaskin.
US4821814A (en) 1987-04-02 1989-04-18 501 W-N Apache Corporation Top head drive assembly for earth drilling machine and components thereof
US4762187A (en) 1987-07-29 1988-08-09 W-N Apache Corporation Internal wrench for a top head drive assembly
US4836064A (en) 1987-04-10 1989-06-06 Slator Damon T Jaws for power tongs and back-up units
US4813493A (en) 1987-04-14 1989-03-21 Triten Corporation Hydraulic top drive for wells
US4813495A (en) 1987-05-05 1989-03-21 Conoco Inc. Method and apparatus for deepwater drilling
US4901069A (en) 1987-07-16 1990-02-13 Schlumberger Technology Corporation Apparatus for electromagnetically coupling power and data signals between a first unit and a second unit and in particular between well bore apparatus and the surface
US4806928A (en) 1987-07-16 1989-02-21 Schlumberger Technology Corporation Apparatus for electromagnetically coupling power and data signals between well bore apparatus and the surface
US4800968A (en) 1987-09-22 1989-01-31 Triten Corporation Well apparatus with tubular elevator tilt and indexing apparatus and methods of their use
US4781359A (en) 1987-09-23 1988-11-01 National-Oilwell Sub assembly for a swivel
CA1302391C (en) 1987-10-09 1992-06-02 Keith M. Haney Compact casing tongs for use on top head drive earth drilling machine
US4836299A (en) 1987-10-19 1989-06-06 Bodine Albert G Sonic method and apparatus for installing monitor wells for the surveillance and control of earth contamination
US4883125A (en) 1987-12-11 1989-11-28 Atlantic Richfield Company Cementing oil and gas wells using converted drilling fluid
CA1270479A (en) 1987-12-14 1990-06-19 Jerome Labrosse Tubing bit opener
US4791997A (en) 1988-01-07 1988-12-20 Vetco Gray Inc. Pipe handling apparatus and method
US4878546A (en) 1988-02-12 1989-11-07 Triten Corporation Self-aligning top drive
US4793422A (en) 1988-03-16 1988-12-27 Hughes Tool Company - Usa Articulated elevator links for top drive drill rig
GB2216926B (en) 1988-04-06 1992-08-12 Jumblefierce Limited Drilling method and apparatus
SU1618870A1 (ru) 1988-04-19 1991-01-07 Украинский научно-исследовательский институт природных газов Способ цементировани скважин
US4880058A (en) 1988-05-16 1989-11-14 Lindsey Completion Systems, Inc. Stage cementing valve
SE8802142L (sv) 1988-06-08 1989-12-09 Diamant Boart Craelius Ab Anordning foer fasthaallning av ett verktyg inuti ett i marken nedfoert roer
US4848469A (en) 1988-06-15 1989-07-18 Baker Hughes Incorporated Liner setting tool and method
NO169399C (no) 1988-06-27 1992-06-17 Noco As Anordning for boring av hull i jordmasser
US4854386A (en) 1988-08-01 1989-08-08 Texas Iron Works, Inc. Method and apparatus for stage cementing a liner in a well bore having a casing
US4962579A (en) 1988-09-02 1990-10-16 Exxon Production Research Company Torque position make-up of tubular connections
US4854383A (en) 1988-09-27 1989-08-08 Texas Iron Works, Inc. Manifold arrangement for use with a top drive power unit
GB2224481A (en) 1988-11-04 1990-05-09 Heerema Engineering Improvements in internal elevators
US4899816A (en) 1989-01-24 1990-02-13 Paul Mine Apparatus for guiding wireline
GB8901918D0 (en) 1989-01-28 1989-03-15 Franks Casing Crews Uk Limited Control system
US4962819A (en) 1989-02-01 1990-10-16 Drilex Systems, Inc. Mud saver valve with replaceable inner sleeve
US5044388A (en) * 1989-02-13 1991-09-03 Dresser Industries, Inc. Perforating gun pressure bleed device
US5009265A (en) 1989-09-07 1991-04-23 Drilex Systems, Inc. Packer for wellhead repair unit
US5036927A (en) 1989-03-10 1991-08-06 W-N Apache Corporation Apparatus for gripping a down hole tubular for rotation
US4936382A (en) 1989-03-31 1990-06-26 Seaboard-Arval Corporation Drive pipe adaptor
US4909741A (en) 1989-04-10 1990-03-20 Atlantic Richfield Company Wellbore tool swivel connector
US5456317A (en) 1989-08-31 1995-10-10 Union Oil Co Buoyancy assisted running of perforated tubulars
IE903114A1 (en) 1989-08-31 1991-03-13 Union Oil Co Well casing flotation device and method
US4960173A (en) 1989-10-26 1990-10-02 Baker Hughes Incorporated Releasable well tool stabilizer
BR8905595A (pt) 1989-11-01 1991-05-07 Petroleo Brasileiro Sa Sistema de intervecao expansao e reparos de linhas submarinas operador por veiculo de operacao remota
US5022472A (en) 1989-11-14 1991-06-11 Masx Energy Services Group, Inc. Hydraulic clamp for rotary drilling head
US5096465A (en) 1989-12-13 1992-03-17 Norton Company Diamond metal composite cutter and method for making same
US4962822A (en) 1989-12-15 1990-10-16 Numa Tool Company Downhole drill bit and bit coupling
DE3942438A1 (de) 1989-12-22 1991-07-11 Eastman Christensen Co Vorrichtung zum bohren einer neben- oder ablenkbohrung eines insbesondere verrohrten bohrlochs
US4997042A (en) 1990-01-03 1991-03-05 Jordan Ronald A Casing circulator and method
US5191939A (en) 1990-01-03 1993-03-09 Tam International Casing circulator and method
US5069297A (en) 1990-01-24 1991-12-03 Rudolph E. Krueger, Inc. Drill pipe/casing protector and method
US5251709A (en) 1990-02-06 1993-10-12 Richardson Allan S Drilling rig
US5082069A (en) 1990-03-01 1992-01-21 Atlantic Richfield Company Combination drivepipe/casing and installation method for offshore well
US5176518A (en) 1990-03-14 1993-01-05 Fokker Aircraft B.V. Movement simulator
US5908049A (en) 1990-03-15 1999-06-01 Fiber Spar And Tube Corporation Spoolable composite tubular member with energy conductors
US5172765A (en) 1990-03-15 1992-12-22 Conoco Inc. Method using spoolable composite tubular member with energy conductors
US5097870A (en) 1990-03-15 1992-03-24 Conoco Inc. Composite tubular member with multiple cells
BR9106334A (pt) 1990-04-12 1993-04-20 H T C A S Companhia Dinamarque Furo de sondagem,processo de sua formacao e aparelho para realizacao do processo
US5224540A (en) 1990-04-26 1993-07-06 Halliburton Company Downhole tool apparatus with non-metallic components and methods of drilling thereof
US5271468A (en) 1990-04-26 1993-12-21 Halliburton Company Downhole tool apparatus with non-metallic components and methods of drilling thereof
US5062756A (en) 1990-05-01 1991-11-05 John Harrel Device for positioning and stabbing casing from a remote selectively variable location
US5027914A (en) 1990-06-04 1991-07-02 Wilson Steve B Pilot casing mill
US5074366A (en) 1990-06-21 1991-12-24 Baker Hughes Incorporated Method and apparatus for horizontal drilling
US5148875A (en) 1990-06-21 1992-09-22 Baker Hughes Incorporated Method and apparatus for horizontal drilling
US5141063A (en) 1990-08-08 1992-08-25 Quesenbury Jimmy B Restriction enhancement drill
GB9019416D0 (en) 1990-09-06 1990-10-24 Frank S Int Ltd Device for applying torque to a tubular member
US5083356A (en) 1990-10-04 1992-01-28 Exxon Production Research Company Collar load support tubing running procedure
US5085273A (en) 1990-10-05 1992-02-04 Davis-Lynch, Inc. Casing lined oil or gas well
BR9005125A (pt) * 1990-10-12 1992-06-30 Petroleo Brasileiro Sa Processo para lancamento de raspadores,particularmente para linhas de pocos de petroleo submarinas
US5060542A (en) 1990-10-12 1991-10-29 Hawk Industries, Inc. Apparatus and method for making and breaking joints in drill pipe strings
FR2668198B1 (fr) 1990-10-19 1997-01-10 Elf Aquitaine Tete d'injection motorisee munie d'un ensemble de mesure dynamometrique.
US5052483A (en) 1990-11-05 1991-10-01 Bestline Liner Systems Sand control adapter
US5152554A (en) 1990-12-18 1992-10-06 Lafleur Petroleum Services, Inc. Coupling apparatus
US5160925C1 (en) 1991-04-17 2001-03-06 Halliburton Co Short hop communication link for downhole mwd system
US5156213A (en) 1991-05-03 1992-10-20 Halliburton Company Well completion method and apparatus
US5191932A (en) 1991-07-09 1993-03-09 Douglas Seefried Oilfield cementing tool and method
FR2679957B1 (fr) 1991-08-02 1998-12-04 Inst Francais Du Petrole Methode et dispositif pour effectuer des mesures et/ou interventions dans un puits fore ou en cours de forage.
FR2679958B1 (fr) 1991-08-02 1997-06-27 Inst Francais Du Petrole Systeme, support pour effectuer des mesures ou interventions dans un puits fore ou en cours de forage, et leurs utilisations.
US5197553A (en) 1991-08-14 1993-03-30 Atlantic Richfield Company Drilling with casing and retrievable drill bit
US5271472A (en) 1991-08-14 1993-12-21 Atlantic Richfield Company Drilling with casing and retrievable drill bit
US5186265A (en) 1991-08-22 1993-02-16 Atlantic Richfield Company Retrievable bit and eccentric reamer assembly
US5294228A (en) 1991-08-28 1994-03-15 W-N Apache Corporation Automatic sequencing system for earth drilling machine
DE4129709C1 (no) 1991-09-06 1992-12-03 Bergwerksverband Gmbh
NO173750C (no) 1991-09-30 1994-01-26 Wepco As Sirkulasjonsutstyr
DE4133802C1 (en) 1991-10-12 1992-10-22 Manfred 5210 Troisdorf De Hawerkamp Thermoplastics thrust pipe - has respective plug and socket ends with opposed angle cone design so it can mate with next section
US5199496A (en) * 1991-10-18 1993-04-06 Texaco, Inc. Subsea pumping device incorporating a wellhead aspirator
US5168942A (en) 1991-10-21 1992-12-08 Atlantic Richfield Company Resistivity measurement system for drilling with casing
US5255751A (en) 1991-11-07 1993-10-26 Huey Stogner Oilfield make-up and breakout tool for top drive drilling systems
US5351767A (en) 1991-11-07 1994-10-04 Globral Marine Inc. Drill pipe handling
US5183364A (en) * 1991-11-26 1993-02-02 Hardwig Ronald B Device for installing an in-line valve
US5255741A (en) 1991-12-11 1993-10-26 Mobil Oil Corporation Process and apparatus for completing a well in an unconsolidated formation
US5238074A (en) 1992-01-06 1993-08-24 Baker Hughes Incorporated Mosaic diamond drag bit cutter having a nonuniform wear pattern
US5291956A (en) 1992-04-15 1994-03-08 Union Oil Company Of California Coiled tubing drilling apparatus and method
US5234052A (en) 1992-05-01 1993-08-10 Davis-Lynch, Inc. Cementing apparatus
US5311952A (en) 1992-05-22 1994-05-17 Schlumberger Technology Corporation Apparatus and method for directional drilling with downhole motor on coiled tubing
MY108743A (en) 1992-06-09 1996-11-30 Shell Int Research Method of greating a wellbore in an underground formation
FR2692315B1 (fr) 1992-06-12 1994-09-02 Inst Francais Du Petrole Système et méthode de forage et d'équipement d'un puits latéral, application à l'exploitation de gisement pétrolier.
US5233742A (en) 1992-06-29 1993-08-10 Gray N Monroe Method and apparatus for controlling tubular connection make-up
US5285204A (en) 1992-07-23 1994-02-08 Conoco Inc. Coil tubing string and downhole generator
US5318122A (en) 1992-08-07 1994-06-07 Baker Hughes, Inc. Method and apparatus for sealing the juncture between a vertical well and one or more horizontal wells using deformable sealing means
US5322127C1 (en) 1992-08-07 2001-02-06 Baker Hughes Inc Method and apparatus for sealing the juncture between a vertical well and one or more horizontal wells
US5524180A (en) 1992-08-10 1996-06-04 Computer Motion, Inc. Automated endoscope system for optimal positioning
US5340182A (en) 1992-09-04 1994-08-23 Varco International, Inc. Safety elevator
DE59209119D1 (de) 1992-10-21 1998-02-12 Weatherford Lamb Vorrichtung zum Positionieren von Lasten
US5343951A (en) 1992-10-22 1994-09-06 Shell Oil Company Drilling and cementing slim hole wells
US5343950A (en) 1992-10-22 1994-09-06 Shell Oil Company Drilling and cementing extended reach boreholes
US5332048A (en) 1992-10-23 1994-07-26 Halliburton Company Method and apparatus for automatic closed loop drilling system
US5355967A (en) 1992-10-30 1994-10-18 Union Oil Company Of California Underbalance jet pump drilling method
US5297833A (en) 1992-11-12 1994-03-29 W-N Apache Corporation Apparatus for gripping a down hole tubular for support and rotation
US5323858A (en) 1992-11-18 1994-06-28 Atlantic Richfield Company Case cementing method and system
US5320178A (en) 1992-12-08 1994-06-14 Atlantic Richfield Company Sand control screen and installation method for wells
DE4244587A1 (de) 1992-12-28 1994-07-07 Mannesmann Ag Rohrstrang mit Gewinderohren und einer sie verbindenden Muffe
US5305839A (en) 1993-01-19 1994-04-26 Masx Energy Services Group, Inc. Turbine pump ring for drilling heads
US5284210A (en) 1993-02-04 1994-02-08 Helms Charles M Top entry sub arrangement
US5354150A (en) 1993-02-08 1994-10-11 Canales Joe M Technique for making up threaded pipe joints into a pipeline
US5361859A (en) 1993-02-12 1994-11-08 Baker Hughes Incorporated Expandable gage bit for drilling and method of drilling
US5560440A (en) 1993-02-12 1996-10-01 Baker Hughes Incorporated Bit for subterranean drilling fabricated from separately-formed major components
IT1272119B (it) * 1993-03-22 1997-06-11 Snam Progetti Procedimento perfezionato per la riparazione automatica di condotte sottomarine particolarmente adatto per alti fondali e relative apparecchiature.
GB2276886B (en) 1993-03-19 1997-04-23 Smith International Rock bits with hard facing
US5388651A (en) 1993-04-20 1995-02-14 Bowen Tools, Inc. Top drive unit torque break-out system
US5379835A (en) 1993-04-26 1995-01-10 Halliburton Company Casing cementing equipment
US5386746A (en) 1993-05-26 1995-02-07 Hawk Industries, Inc. Apparatus for making and breaking joints in drill pipe strings
RU2109907C1 (ru) 1993-06-16 1998-04-27 Даун Хоул Текнолоджиз Пти.Лтд. Буровой элемент
US5332043A (en) 1993-07-20 1994-07-26 Abb Vetco Gray Inc. Wellhead connector
US5433279A (en) 1993-07-20 1995-07-18 Tessari; Robert M. Portable top drive assembly
US5826651A (en) 1993-09-10 1998-10-27 Weatherford/Lamb, Inc. Wellbore single trip milling
US5887655A (en) 1993-09-10 1999-03-30 Weatherford/Lamb, Inc Wellbore milling and drilling
US5887668A (en) 1993-09-10 1999-03-30 Weatherford/Lamb, Inc. Wellbore milling-- drilling
US5787978A (en) 1995-03-31 1998-08-04 Weatherford/Lamb, Inc. Multi-face whipstock with sacrificial face element
DE4334378C2 (de) 1993-10-08 1999-01-14 Weatherford Oil Tool Vorrichtung zum Ausrichten von hängenden Lasten
US5392715A (en) 1993-10-12 1995-02-28 Osaka Gas Company, Ltd. In-pipe running robot and method of running the robot
US5542472A (en) 1993-10-25 1996-08-06 Camco International, Inc. Metal coiled tubing with signal transmitting passageway
JPH07158124A (ja) 1993-12-02 1995-06-20 Nagaoka:Kk 均一外径を有する井戸用スクリーン
US5402856A (en) 1993-12-21 1995-04-04 Amoco Corporation Anti-whirl underreamer
US5588916A (en) 1994-02-17 1996-12-31 Duramax, Inc. Torque control device for rotary mine drilling machine
US5836395A (en) 1994-08-01 1998-11-17 Weatherford/Lamb, Inc. Valve for wellbore use
US5472057A (en) 1994-04-11 1995-12-05 Atlantic Richfield Company Drilling with casing and retrievable bit-motor assembly
US5461905A (en) 1994-04-19 1995-10-31 Bilco Tools, Inc. Method and apparatus for testing oilfield tubular threaded connections
US5435400B1 (en) 1994-05-25 1999-06-01 Atlantic Richfield Co Lateral well drilling
ES2180634T3 (es) 1994-05-28 2003-02-16 Kenneth Mackintosh Herramienta de acceso a pozos.
GB9411228D0 (en) 1994-06-04 1994-07-27 Camco Drilling Group Ltd A modulated bias unit for rotary drilling
IT1266026B1 (it) 1994-06-14 1996-12-16 Soilmec Spa Dispositivo per la manovra di caricamento ed avvitamento di aste e tubazioni di rivestimento componenti una batteria di trivellazione
US5452923A (en) 1994-06-28 1995-09-26 Canadian Fracmaster Ltd. Coiled tubing connector
GB9413141D0 (en) 1994-06-30 1994-08-24 Exploration And Production Nor Downhole data transmission
US5577566A (en) 1995-08-09 1996-11-26 Weatherford U.S., Inc. Releasing tool
US6547017B1 (en) 1994-09-07 2003-04-15 Smart Drilling And Completion, Inc. Rotary drill bit compensating for changes in hardness of geological formations
US5615747A (en) 1994-09-07 1997-04-01 Vail, Iii; William B. Monolithic self sharpening rotary drill bit having tungsten carbide rods cast in steel alloys
US5526880A (en) 1994-09-15 1996-06-18 Baker Hughes Incorporated Method for multi-lateral completion and cementing the juncture with lateral wellbores
RU2079633C1 (ru) 1994-09-22 1997-05-20 Товарищество с ограниченной ответственностью "ЛОКС" Способ бурения дополнительного ствола из эксплуатационной колонны скважины
US5547029A (en) 1994-09-27 1996-08-20 Rubbo; Richard P. Surface controlled reservoir analysis and management system
US5503234A (en) 1994-09-30 1996-04-02 Clanton; Duane 2×4 drilling and hoisting system
US5501286A (en) 1994-09-30 1996-03-26 Bowen Tools, Inc. Method and apparatus for displacing a top drive torque track
US5494122A (en) 1994-10-04 1996-02-27 Smith International, Inc. Composite nozzles for rock bits
US5553672A (en) 1994-10-07 1996-09-10 Baker Hughes Incorporated Setting tool for a downhole tool
US5894897A (en) 1994-10-14 1999-04-20 Vail Iii William Banning Method and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells
US6868906B1 (en) 1994-10-14 2005-03-22 Weatherford/Lamb, Inc. Closed-loop conveyance systems for well servicing
US6857486B2 (en) 2001-08-19 2005-02-22 Smart Drilling And Completion, Inc. High power umbilicals for subterranean electric drilling machines and remotely operated vehicles
US7100710B2 (en) 1994-10-14 2006-09-05 Weatherford/Lamb, Inc. Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells
US7108084B2 (en) 1994-10-14 2006-09-19 Weatherford/Lamb, Inc. Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells
US7013997B2 (en) 1994-10-14 2006-03-21 Weatherford/Lamb, Inc. Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells
US7040420B2 (en) 1994-10-14 2006-05-09 Weatherford/Lamb, Inc. Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells
US7147068B2 (en) 1994-10-14 2006-12-12 Weatherford / Lamb, Inc. Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells
US6397946B1 (en) 1994-10-14 2002-06-04 Smart Drilling And Completion, Inc. Closed-loop system to compete oil and gas wells closed-loop system to complete oil and gas wells c
US6158531A (en) 1994-10-14 2000-12-12 Smart Drilling And Completion, Inc. One pass drilling and completion of wellbores with drill bit attached to drill string to make cased wellbores to produce hydrocarbons
US5551521A (en) 1994-10-14 1996-09-03 Vail, Iii; William B. Method and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells
US6263987B1 (en) 1994-10-14 2001-07-24 Smart Drilling And Completion, Inc. One pass drilling and completion of extended reach lateral wellbores with drill bit attached to drill string to produce hydrocarbons from offshore platforms
US5566769A (en) 1994-10-31 1996-10-22 Eckel Manufacturing Company, Inc. Tubular rotation tool for snubbing operations
US5497840A (en) 1994-11-15 1996-03-12 Bestline Liner Systems Process for completing a well
US5667023B1 (en) 1994-11-22 2000-04-18 Baker Hughes Inc Method and apparatus for drilling and completing wells
EP0713953B1 (en) 1994-11-22 2002-10-02 Baker Hughes Incorporated Method of drilling and completing wells
US5477925A (en) 1994-12-06 1995-12-26 Baker Hughes Incorporated Method for multi-lateral completion and cementing the juncture with lateral wellbores
US5842149A (en) 1996-10-22 1998-11-24 Baker Hughes Incorporated Closed loop drilling system
MY121223A (en) 1995-01-16 2006-01-28 Shell Int Research Method of creating a casing in a borehole
US5732776A (en) 1995-02-09 1998-03-31 Baker Hughes Incorporated Downhole production well control system and method
US5829520A (en) 1995-02-14 1998-11-03 Baker Hughes Incorporated Method and apparatus for testing, completion and/or maintaining wellbores using a sensor device
GB9503830D0 (en) 1995-02-25 1995-04-19 Camco Drilling Group Ltd "Improvements in or relating to steerable rotary drilling systems"
GB9504968D0 (en) 1995-03-11 1995-04-26 Brit Bit Limited Improved casing shoe
US5651420A (en) 1995-03-17 1997-07-29 Baker Hughes, Inc. Drilling apparatus with dynamic cuttings removal and cleaning
US5566772A (en) 1995-03-24 1996-10-22 Davis-Lynch, Inc. Telescoping casing joint for landing a casting string in a well bore
US5735351A (en) 1995-03-27 1998-04-07 Helms; Charles M. Top entry apparatus and method for a drilling assembly
US5584343A (en) 1995-04-28 1996-12-17 Davis-Lynch, Inc. Method and apparatus for filling and circulating fluid in a wellbore during casing running operations
US5575344A (en) 1995-05-12 1996-11-19 Reedrill Corp. Rod changing system
US5540279A (en) 1995-05-16 1996-07-30 Halliburton Company Downhole tool apparatus with non-metallic packer element retaining shoes
US5743344A (en) 1995-05-18 1998-04-28 Down Hole Technologies Pty. Ltd. System for in situ replacement of cutting means for a ground drill
US5542473A (en) 1995-06-01 1996-08-06 Pringle; Ronald E. Simplified sealing and anchoring device for a well tool
US5661888A (en) 1995-06-07 1997-09-02 Exxon Production Research Company Apparatus and method for improved oilfield connections
AUPN357995A0 (en) 1995-06-15 1995-07-06 Rear, Ian Graeme Down hole hammer assembly
US5711382A (en) 1995-07-26 1998-01-27 Hansen; James Automated oil rig servicing system
AUPN505295A0 (en) 1995-08-28 1995-09-21 Down Hole Technologies Pty Ltd Retraction system for a latching mechanism of the tool
GB9519247D0 (en) * 1995-09-21 1995-11-22 Coflexip Stena Offshore Ltd Improvements in or relating to pipeline pigging
US5791417A (en) 1995-09-22 1998-08-11 Weatherford/Lamb, Inc. Tubular window formation
US5921285A (en) 1995-09-28 1999-07-13 Fiberspar Spoolable Products, Inc. Composite spoolable tube
DE59508569D1 (de) 1995-10-09 2000-08-17 Baker Hughes Inc Verfahren und Bohrgerät zum Abteufen von Bohrungen in unterirdische Formationen
US6196336B1 (en) 1995-10-09 2001-03-06 Baker Hughes Incorporated Method and apparatus for drilling boreholes in earth formations (drilling liner systems)
US5878815A (en) 1995-10-26 1999-03-09 Marathon Oil Company Assembly and process for drilling and completing multiple wells
US5842530A (en) 1995-11-03 1998-12-01 Canadian Fracmaster Ltd. Hybrid coiled tubing/conventional drilling unit
US5697442A (en) 1995-11-13 1997-12-16 Halliburton Company Apparatus and methods for use in cementing a casing string within a well bore
FR2741907B3 (fr) 1995-11-30 1998-02-20 Drillflex Procede et installation de forage et de chemisage d'un puits, notamment d'un puits de forage petrolier, au moyen de troncons tubulaires aboutes initialement souples, et durcis in situ
GB2307939B (en) 1995-12-09 2000-06-14 Weatherford Oil Tool Apparatus for gripping a pipe
US5828003A (en) 1996-01-29 1998-10-27 Dowell -- A Division of Schlumberger Technology Corporation Composite coiled tubing apparatus and methods
BR9600249A (pt) 1996-01-29 1997-12-23 Petroleo Brasileiro Sa Método e aparelhagem para escoamento da produção submarina de petróleo
US6065550A (en) 1996-02-01 2000-05-23 Gardes; Robert Method and system for drilling and completing underbalanced multilateral wells utilizing a dual string technique in a live well
US5720356A (en) 1996-02-01 1998-02-24 Gardes; Robert Method and system for drilling underbalanced radial wells utilizing a dual string technique in a live well
GB9603402D0 (en) 1996-02-17 1996-04-17 Camco Drilling Group Ltd Improvements in or relating to rotary drill bits
US5785132A (en) 1996-02-29 1998-07-28 Richardson; Allan S. Backup tool and method for preventing rotation of a drill string
GB9605801D0 (en) 1996-03-20 1996-05-22 Head Philip A casing and method of installing the casing in a well and apparatus therefore
US6085851A (en) 1996-05-03 2000-07-11 Transocean Offshore Inc. Multi-activity offshore exploration and/or development drill method and apparatus
US5823264A (en) 1996-05-03 1998-10-20 Halliburton Energy Services, Inc. Travel joint for use in a subterranean well
GB2313860B (en) 1996-06-06 2000-11-01 Paul Bernard Lee Adjustable roller reamer
US5833002A (en) 1996-06-20 1998-11-10 Baker Hughes Incorporated Remote control plug-dropping head
US5706894A (en) 1996-06-20 1998-01-13 Frank's International, Inc. Automatic self energizing stop collar
US5931231A (en) 1996-06-27 1999-08-03 Bucyrus International, Inc. Blast hole drill pipe gripping mechanism
US5794703A (en) 1996-07-03 1998-08-18 Ctes, L.C. Wellbore tractor and method of moving an item through a wellbore
GB9614761D0 (en) 1996-07-13 1996-09-04 Schlumberger Ltd Downhole tool and method
GB2315696A (en) 1996-07-31 1998-02-11 Weatherford Lamb Mechanism for connecting and disconnecting tubulars
US5890537A (en) 1996-08-13 1999-04-06 Schlumberger Technology Corporation Wiper plug launching system for cementing casing and liners
US5971086A (en) 1996-08-19 1999-10-26 Robert M. Bee Pipe gripping die
US6056060A (en) 1996-08-23 2000-05-02 Weatherford/Lamb, Inc. Compensator system for wellbore tubulars
US5850877A (en) 1996-08-23 1998-12-22 Weatherford/Lamb, Inc. Joint compensator
NO302774B1 (no) 1996-09-13 1998-04-20 Hitec Asa Anordning til bruk ved skjöting av fôringsrör
AU738284C (en) 1996-09-23 2002-06-13 Halliburton Energy Services, Inc. Autonomous downhole oilfield tool
US5947213A (en) 1996-12-02 1999-09-07 Intelligent Inspection Corporation Downhole tools using artificial intelligence based control
US5735348A (en) 1996-10-04 1998-04-07 Frank's International, Inc. Method and multi-purpose apparatus for dispensing and circulating fluid in wellbore casing
US5918673A (en) 1996-10-04 1999-07-06 Frank's International, Inc. Method and multi-purpose apparatus for dispensing and circulating fluid in wellbore casing
US6279654B1 (en) 1996-10-04 2001-08-28 Donald E. Mosing Method and multi-purpose apparatus for dispensing and circulating fluid in wellbore casing
AU732227B2 (en) 1996-10-15 2001-04-12 National Oilwell Varco, L.P. Continuous circulation drilling method
US6688394B1 (en) 1996-10-15 2004-02-10 Coupler Developments Limited Drilling methods and apparatus
US6059051A (en) 1996-11-04 2000-05-09 Baker Hughes Incorporated Integrated directional under-reamer and stabilizer
US5839519A (en) 1996-11-08 1998-11-24 Sandvik Ab Methods and apparatus for attaching a casing to a drill bit in overburden drilling equipment
US5813456A (en) 1996-11-12 1998-09-29 Milner; John E. Retrievable bridge plug and retrieving tool
JP3187726B2 (ja) 1996-12-05 2001-07-11 日本海洋掘削株式会社 大水深掘削用複合型パイプ揚降装置
GB2320270B (en) 1996-12-06 2001-01-17 Psl Tools Ltd Downhole tool
FR2757426B1 (fr) 1996-12-19 1999-01-29 Inst Francais Du Petrole Composition moussante a base d'eau - procede de fabrication
US5803666A (en) 1996-12-19 1998-09-08 Keller; Carl E. Horizontal drilling method and apparatus
US5890549A (en) 1996-12-23 1999-04-06 Sprehe; Paul Robert Well drilling system with closed circulation of gas drilling fluid and fire suppression apparatus
US5791410A (en) 1997-01-17 1998-08-11 Frank's Casing Crew & Rental Tools, Inc. Apparatus and method for improved tubular grip assurance
US6360633B2 (en) 1997-01-29 2002-03-26 Weatherford/Lamb, Inc. Apparatus and method for aligning tubulars
GB9703854D0 (en) 1997-02-25 1997-04-16 Weir Pumps Ltd Improvements in downhole pumps
US5950742A (en) 1997-04-15 1999-09-14 Camco International Inc. Methods and related equipment for rotary drilling
US5960881A (en) 1997-04-22 1999-10-05 Jerry P. Allamon Downhole surge pressure reduction system and method of use
US6464004B1 (en) 1997-05-09 2002-10-15 Mark S. Crawford Retrievable well monitor/controller system
US6085838A (en) 1997-05-27 2000-07-11 Schlumberger Technology Corporation Method and apparatus for cementing a well
WO1998054499A1 (en) * 1997-05-30 1998-12-03 Fmc Corporation Pig delivery and transport system for subsea wells
US6234257B1 (en) 1997-06-02 2001-05-22 Schlumberger Technology Corporation Deployable sensor apparatus and method
US5860474A (en) 1997-06-26 1999-01-19 Atlantic Richfield Company Through-tubing rotary drilling
US5839515A (en) 1997-07-07 1998-11-24 Halliburton Energy Services, Inc. Slip retaining system for downhole tools
US6119772A (en) 1997-07-14 2000-09-19 Pruet; Glen Continuous flow cylinder for maintaining drilling fluid circulation while connecting drill string joints
US5957225A (en) 1997-07-31 1999-09-28 Bp Amoco Corporation Drilling assembly and method of drilling for unstable and depleted formations
MY122241A (en) 1997-08-01 2006-04-29 Shell Int Research Creating zonal isolation between the interior and exterior of a well system
US6275938B1 (en) 1997-08-28 2001-08-14 Microsoft Corporation Security enhancement for untrusted executable code
US7140445B2 (en) 1997-09-02 2006-11-28 Weatherford/Lamb, Inc. Method and apparatus for drilling with casing
GB9718543D0 (en) 1997-09-02 1997-11-05 Weatherford Lamb Method and apparatus for aligning tubulars
US6742596B2 (en) 2001-05-17 2004-06-01 Weatherford/Lamb, Inc. Apparatus and methods for tubular makeup interlock
US6536520B1 (en) 2000-04-17 2003-03-25 Weatherford/Lamb, Inc. Top drive casing system
US7509722B2 (en) 1997-09-02 2009-03-31 Weatherford/Lamb, Inc. Positioning and spinning device
US5988273A (en) 1997-09-03 1999-11-23 Abb Vetco Gray Inc. Coiled tubing completion system
US6179055B1 (en) 1997-09-05 2001-01-30 Schlumberger Technology Corporation Conveying a tool along a non-vertical well
US5971079A (en) 1997-09-05 1999-10-26 Mullins; Albert Augustus Casing filling and circulating apparatus
US5954131A (en) 1997-09-05 1999-09-21 Schlumberger Technology Corporation Method and apparatus for conveying a logging tool through an earth formation
US6098717A (en) 1997-10-08 2000-08-08 Formlock, Inc. Method and apparatus for hanging tubulars in wells
US6199641B1 (en) 1997-10-21 2001-03-13 Tesco Corporation Pipe gripping device
US6296066B1 (en) 1997-10-27 2001-10-02 Halliburton Energy Services, Inc. Well system
US6012878A (en) * 1997-12-02 2000-01-11 Tdw Delaware, Inc. Pressure balanced subsea tapping machine
US6527493B1 (en) 1997-12-05 2003-03-04 Varco I/P, Inc. Handling of tube sections in a rig for subsoil drilling
US5921332A (en) 1997-12-29 1999-07-13 Sandvik Ab Apparatus for facilitating removal of a casing of an overburden drilling equipment from a bore
US5984007A (en) 1998-01-09 1999-11-16 Halliburton Energy Services, Inc. Chip resistant buttons for downhole tools having slip elements
GB2333542B (en) 1998-01-24 2002-12-11 Downhole Products Plc Downhole tool
US6200068B1 (en) * 1998-02-06 2001-03-13 Sonsub, Inc. Hot tap fluid blaster apparatus and method of using same
US6367566B1 (en) 1998-02-20 2002-04-09 Gilman A. Hill Down hole, hydrodynamic well control, blowout prevention
CA2261495A1 (en) 1998-03-13 1999-09-13 Praful C. Desai Method for milling casing and drilling formation
EP1075584B1 (en) * 1998-03-30 2009-10-14 Kellogg Brown & Root, Inc. Extended reach tie-back system
DK1071863T3 (da) 1998-04-14 2004-01-26 Welltec Aps Kobling til borerør
US6070500A (en) 1998-04-20 2000-06-06 White Bear Energy Serives Ltd. Rotatable die holder
US6390190B2 (en) 1998-05-11 2002-05-21 Offshore Energy Services, Inc. Tubular filling system
US6142246A (en) 1998-05-15 2000-11-07 Petrolphysics Partners Lp Multiple lateral hydraulic drilling apparatus and method
GB2364728B (en) 1998-05-16 2002-12-04 Duncan Cuthill Method of and apparatus for installing a pile underwater to create a mooring anchorage
US6135208A (en) 1998-05-28 2000-10-24 Halliburton Energy Services, Inc. Expandable wellbore junction
CA2273568C (en) 1998-06-04 2007-08-14 Philip Head A method of installing a casing in a well and apparatus therefor
EP0962384A1 (en) 1998-06-05 1999-12-08 Single Buoy Moorings Inc. Loading arrangement
AU751544B2 (en) 1998-06-11 2002-08-22 Weatherford Technology Holdings, Llc A drilling tool
CA2240559C (en) 1998-06-12 2003-12-23 Sandvik Ab Embankment hammer
US6012529A (en) 1998-06-22 2000-01-11 Mikolajczyk; Raymond F. Downhole guide member for multiple casing strings
US6170573B1 (en) 1998-07-15 2001-01-09 Charles G. Brunet Freely moving oil field assembly for data gathering and or producing an oil well
GB9815809D0 (en) 1998-07-22 1998-09-16 Appleton Robert P Casing running tool
US6220117B1 (en) 1998-08-18 2001-04-24 Baker Hughes Incorporated Methods of high temperature infiltration of drill bits and infiltrating binder
GB2340859A (en) 1998-08-24 2000-03-01 Weatherford Lamb Method and apparatus for facilitating the connection of tubulars using a top drive
US6079509A (en) 1998-08-31 2000-06-27 Robert Michael Bee Pipe die method and apparatus
US6202764B1 (en) 1998-09-01 2001-03-20 Muriel Wayne Ables Straight line, pump through entry sub
US6241036B1 (en) 1998-09-16 2001-06-05 Baker Hughes Incorporated Reinforced abrasive-impregnated cutting elements, drill bits including same
CA2345244C (en) 1998-09-25 2009-04-21 Robert Patrick Appleton An apparatus for facilitating the connection of tubulars using a top drive
AUPP683898A0 (en) 1998-10-29 1998-11-26 Dht Technologies Limited Retractable drill bit system
US6142545A (en) 1998-11-13 2000-11-07 Bj Services Company Casing pushdown and rotating tool
US6557640B1 (en) 1998-12-07 2003-05-06 Shell Oil Company Lubrication and self-cleaning system for expansion mandrel
US6863129B2 (en) 1998-11-19 2005-03-08 Schlumberger Technology Corporation Method and apparatus for providing plural flow paths at a lateral junction
US6186233B1 (en) 1998-11-30 2001-02-13 Weatherford Lamb, Inc. Down hole assembly and method for forming a down hole window and at least one keyway in communication with the down hole window for use in multilateral wells
US6725919B2 (en) 1998-12-07 2004-04-27 Shell Oil Company Forming a wellbore casing while simultaneously drilling a wellbore
CA2351176C (en) 1998-12-12 2009-02-24 Dresser Industries, Inc. Apparatus for measuring downhole drilling efficiency parameters
US6347674B1 (en) 1998-12-18 2002-02-19 Western Well Tool, Inc. Electrically sequenced tractor
DE69926802D1 (de) 1998-12-22 2005-09-22 Weatherford Lamb Verfahren und vorrichtung zum profilieren und verbinden von rohren
GB2347441B (en) 1998-12-24 2003-03-05 Weatherford Lamb Apparatus and method for facilitating the connection of tubulars using a top drive
GB2345074A (en) 1998-12-24 2000-06-28 Weatherford Lamb Floating joint to facilitate the connection of tubulars using a top drive
US6218328B1 (en) 1998-12-29 2001-04-17 Phillips Petroleum Company Method of preparing a zeolite based catalyst material
US6250405B1 (en) 1999-01-06 2001-06-26 Western Well Tool, Inc. Drill pipe protector assembly
DE60010647T2 (de) 1999-01-11 2005-05-19 Weatherford/Lamb, Inc., Houston Rohreinheit mit einer mehrzahl von auslässen zur verwendung in einem bohrloch und verfahren zum einführen einer solchen rohreinheit
US6273189B1 (en) 1999-02-05 2001-08-14 Halliburton Energy Services, Inc. Downhole tractor
US6173777B1 (en) 1999-02-09 2001-01-16 Albert Augustus Mullins Single valve for a casing filling and circulating apparatus
US6429784B1 (en) 1999-02-19 2002-08-06 Dresser Industries, Inc. Casing mounted sensors, actuators and generators
US7311148B2 (en) 1999-02-25 2007-12-25 Weatherford/Lamb, Inc. Methods and apparatus for wellbore construction and completion
US6837313B2 (en) 2002-01-08 2005-01-04 Weatherford/Lamb, Inc. Apparatus and method to reduce fluid pressure in a wellbore
GB9904380D0 (en) 1999-02-25 1999-04-21 Petroline Wellsystems Ltd Drilling method
US6896075B2 (en) 2002-10-11 2005-05-24 Weatherford/Lamb, Inc. Apparatus and methods for drilling with casing
US6857487B2 (en) 2002-12-30 2005-02-22 Weatherford/Lamb, Inc. Drilling with concentric strings of casing
US6854533B2 (en) 2002-12-20 2005-02-15 Weatherford/Lamb, Inc. Apparatus and method for drilling with casing
US6691801B2 (en) 1999-03-05 2004-02-17 Varco I/P, Inc. Load compensator for a pipe running tool
US6637526B2 (en) 1999-03-05 2003-10-28 Varco I/P, Inc. Offset elevator for a pipe running tool and a method of using a pipe running tool
ATE373160T1 (de) 1999-03-05 2007-09-15 Varco Int Ein- und ausbauvorrichtung für rohre
GB2348223B (en) 1999-03-11 2003-09-24 Shell Internat Res Maatschhapp Method of creating a casing in a borehole
US6290432B1 (en) 1999-04-06 2001-09-18 Williams Field Services Gulf Coast Company, L.P. Diverless subsea hot tap system
DE60003651T2 (de) 1999-04-09 2004-06-24 Shell Internationale Research Maatschappij B.V. Verfahren zur herstellung eines bohrloches in einer untergrundformation
US6309002B1 (en) 1999-04-09 2001-10-30 Frank's Casing Crew And Rental Tools, Inc. Tubular running tool
US6431626B1 (en) 1999-04-09 2002-08-13 Frankis Casing Crew And Rental Tools, Inc. Tubular running tool
US6538576B1 (en) 1999-04-23 2003-03-25 Halliburton Energy Services, Inc. Self-contained downhole sensor and method of placing and interrogating same
GB9910238D0 (en) 1999-05-05 1999-06-30 Brit Bit Down Hole Tools Improvements relating to subsea drilling of boreholes
GB2349401B (en) 1999-05-05 2003-06-04 Smith International Assembly and method for jarring a drilling drive pipe into undersea formation
US6598677B1 (en) 1999-05-20 2003-07-29 Baker Hughes Incorporated Hanging liners by pipe expansion
OA11882A (en) 1999-06-03 2006-03-28 Shell Int Research Method of creating a wellbore.
US6446723B1 (en) 1999-06-09 2002-09-10 Schlumberger Technology Corporation Cable connection to sensors in a well
US6237684B1 (en) 1999-06-11 2001-05-29 Frank's Casing Crewand Rental Tools, Inc. Pipe string handling apparatus and method
NO20003824L (no) 1999-07-27 2001-01-29 Baker Hughes Inc Gjenbrukbart skjære- og freseverktöy
US6189621B1 (en) 1999-08-16 2001-02-20 Smart Drilling And Completion, Inc. Smart shuttles to complete oil and gas wells
US6371693B1 (en) * 1999-08-27 2002-04-16 Shell Oil Company Making subsea pipelines ready for electrical heating
US6343649B1 (en) 1999-09-07 2002-02-05 Halliburton Energy Services, Inc. Methods and associated apparatus for downhole data retrieval, monitoring and tool actuation
EA003012B1 (ru) 1999-09-15 2002-12-26 Шелл Интернэшнл Рисерч Маатсхаппий Б.В. Система для увеличения потока текучей среды в буровой скважине
US6315062B1 (en) 1999-09-24 2001-11-13 Vermeer Manufacturing Company Horizontal directional drilling machine employing inertial navigation control system and method
NO994854L (no) 1999-10-06 2001-04-09 Subsurface Technology As Beskyttelseshylse for fleksible kabler som strekker seg langs produksjonsstrengen
US6311792B1 (en) 1999-10-08 2001-11-06 Tesco Corporation Casing clamp
CA2287696C (en) 1999-10-28 2005-11-22 Leonardo Ritorto Locking swivel device
US6367552B1 (en) 1999-11-30 2002-04-09 Halliburton Energy Services, Inc. Hydraulically metered travel joint
US6419033B1 (en) 1999-12-10 2002-07-16 Baker Hughes Incorporated Apparatus and method for simultaneous drilling and casing wellbores
US6325148B1 (en) 1999-12-22 2001-12-04 Weatherford/Lamb, Inc. Tools and methods for use with expandable tubulars
EP1242711B1 (en) 1999-12-22 2006-08-16 Weatherford/Lamb, Inc. Drilling bit for drilling while running casing
GB9930450D0 (en) 1999-12-23 2000-02-16 Eboroil Sa Subsea well intervention vessel
US6227587B1 (en) 2000-02-07 2001-05-08 Emma Dee Gray Combined well casing spider and elevator
US6374924B2 (en) 2000-02-18 2002-04-23 Halliburton Energy Services, Inc. Downhole drilling apparatus
GB2373520B (en) 2000-02-18 2004-11-24 Halliburton Energy Serv Inc Downhole drilling apparatus and method for use of same
US6553825B1 (en) 2000-02-18 2003-04-29 Anthony R. Boyd Torque swivel and method of using same
EP1257728B1 (en) 2000-02-22 2012-04-11 Weatherford/Lamb, Inc. Artificial lift apparatus with automated monitoring of fluid height in the borehole
US6412554B1 (en) 2000-03-14 2002-07-02 Weatherford/Lamb, Inc. Wellbore circulation system
US7107875B2 (en) 2000-03-14 2006-09-19 Weatherford/Lamb, Inc. Methods and apparatus for connecting tubulars while drilling
CA2301963C (en) 2000-03-22 2004-03-09 Noetic Engineering Inc. Method and apparatus for handling tubular goods
US6427776B1 (en) 2000-03-27 2002-08-06 Weatherford/Lamb, Inc. Sand removal and device retrieval tool
WO2001073261A2 (en) * 2000-03-27 2001-10-04 Rockwater Limited Riser with retrievable internal services
US20020108748A1 (en) 2000-04-12 2002-08-15 Keyes Robert C. Replaceable tong die inserts for pipe tongs
GB0008988D0 (en) 2000-04-13 2000-05-31 Bbl Downhole Tools Ltd Drill bit nozzle
US7334650B2 (en) 2000-04-13 2008-02-26 Weatherford/Lamb, Inc. Apparatus and methods for drilling a wellbore using casing
US7296623B2 (en) 2000-04-17 2007-11-20 Weatherford/Lamb, Inc. Methods and apparatus for applying torque and rotation to connections
US7325610B2 (en) 2000-04-17 2008-02-05 Weatherford/Lamb, Inc. Methods and apparatus for handling and drilling with tubulars or casing
GB0010378D0 (en) 2000-04-28 2000-06-14 Bbl Downhole Tools Ltd Expandable apparatus for drift and reaming a borehole
CA2406663C (en) 2000-05-05 2006-01-03 Weatherford/Lamb, Inc. Apparatus and methods for forming a lateral wellbore
CA2335192A1 (en) 2000-05-31 2001-11-30 Vincent J. Kozak Improvements in downhole tools
US6349764B1 (en) 2000-06-02 2002-02-26 Oil & Gas Rental Services, Inc. Drilling rig, pipe and support apparatus
US6374506B1 (en) 2000-06-16 2002-04-23 Stp Nuclear Operating Company Shaft centering tool for nuclear reactor coolant pump motor
GB2364079B (en) 2000-06-28 2004-11-17 Renovus Ltd Drill bits
US6454007B1 (en) 2000-06-30 2002-09-24 Weatherford/Lamb, Inc. Method and apparatus for casing exit system using coiled tubing
US20030070841A1 (en) 2000-06-30 2003-04-17 S & S Trust Shallow depth, coiled tubing horizontal drilling system
US6554064B1 (en) 2000-07-13 2003-04-29 Halliburton Energy Services, Inc. Method and apparatus for a sand screen with integrated sensors
US6408943B1 (en) 2000-07-17 2002-06-25 Halliburton Energy Services, Inc. Method and apparatus for placing and interrogating downhole sensors
US6419014B1 (en) 2000-07-20 2002-07-16 Schlumberger Technology Corporation Apparatus and method for orienting a downhole tool
GB2365463B (en) 2000-08-01 2005-02-16 Renovus Ltd Drilling method
GB2365888B (en) 2000-08-11 2002-07-24 Renovus Ltd Drilling apparatus
US8171989B2 (en) 2000-08-14 2012-05-08 Schlumberger Technology Corporation Well having a self-contained inter vention system
US6392317B1 (en) 2000-08-22 2002-05-21 David R. Hall Annular wire harness for use in drill pipe
NO328641B1 (no) 2000-09-01 2010-04-12 Maersk Olie & Gas Fremgangsmate for stimulering av en bronn
US7264050B2 (en) 2000-09-22 2007-09-04 Weatherford/Lamb, Inc. Method and apparatus for controlling wellbore equipment
US20040011534A1 (en) 2002-07-16 2004-01-22 Simonds Floyd Randolph Apparatus and method for completing an interval of a wellbore while drilling
GB2357530B (en) 2000-11-04 2003-09-03 Weatherford Lamb Method and apparatus for gripping tubulars
US6752211B2 (en) 2000-11-10 2004-06-22 Smith International, Inc. Method and apparatus for multilateral junction
GB0029285D0 (en) * 2000-11-30 2001-01-17 Alpha Thames Ltd Pigging method and apparatus
US6651737B2 (en) 2001-01-24 2003-11-25 Frank's Casing Crew And Rental Tools, Inc. Collar load support system and method
GB0103576D0 (en) 2001-02-14 2001-03-28 Axtech Ltd Pump
GB2372765A (en) 2001-02-27 2002-09-04 Philip Head Use of coiled tubing and jet drilling to install a casing
US6698595B2 (en) 2001-04-19 2004-03-02 Weatherford/Lamb, Inc. Screen material
US6702040B1 (en) 2001-04-26 2004-03-09 Floyd R. Sensenig Telescopic drilling method
US6745834B2 (en) 2001-04-26 2004-06-08 Schlumberger Technology Corporation Complete trip system
US6648562B1 (en) * 2001-06-08 2003-11-18 Charles D. Calkins Apparatus for tapping a hole in a pipeline
US6725924B2 (en) 2001-06-15 2004-04-27 Schlumberger Technology Corporation System and technique for monitoring and managing the deployment of subsea equipment
WO2003006778A1 (en) 2001-07-09 2003-01-23 Baker Hughes Inc Drilling system and method for controlling equivalent circulating density during drilling of wellbores
US6648075B2 (en) 2001-07-13 2003-11-18 Weatherford/Lamb, Inc. Method and apparatus for expandable liner hanger with bypass
GB2377951B (en) 2001-07-25 2004-02-04 Schlumberger Holdings Method and system for drilling a wellbore having cable based telemetry
US6877553B2 (en) 2001-09-26 2005-04-12 Weatherford/Lamb, Inc. Profiled recess for instrumented expandable components
US6655460B2 (en) 2001-10-12 2003-12-02 Weatherford/Lamb, Inc. Methods and apparatus to control downhole tools
US6679333B2 (en) 2001-10-26 2004-01-20 Canrig Drilling Technology, Ltd. Top drive well casing system and method
US6634430B2 (en) 2001-12-20 2003-10-21 Exxonmobil Upstream Research Company Method for installation of evacuated tubular conduits
AU2002237401A1 (en) * 2002-03-01 2003-09-16 Head Philip Conductor system
GB0206227D0 (en) 2002-03-16 2002-05-01 Weatherford Lamb Bore-lining and drilling
US6749026B2 (en) 2002-03-21 2004-06-15 Halliburton Energy Services, Inc. Method of forming downhole tubular string connections
US7234546B2 (en) 2002-04-08 2007-06-26 Baker Hughes Incorporated Drilling and cementing casing system
US6666274B2 (en) 2002-05-15 2003-12-23 Sunstone Corporation Tubing containing electrical wiring insert
US6688392B2 (en) * 2002-05-23 2004-02-10 Baker Hughes Incorporated System and method for flow/pressure boosting in a subsea environment
FR2841293B1 (fr) 2002-06-19 2006-03-03 Bouygues Offshore Conduite de guidage telescopique de forage en mer
US6832656B2 (en) 2002-06-26 2004-12-21 Weartherford/Lamb, Inc. Valve for an internal fill up tool and associated method
US7178592B2 (en) 2002-07-10 2007-02-20 Weatherford/Lamb, Inc. Closed loop multiphase underbalanced drilling process
US6715430B2 (en) 2002-07-19 2004-04-06 Jae Chul Choi Sectional table with gusset
US6892835B2 (en) 2002-07-29 2005-05-17 Weatherford/Lamb, Inc. Flush mounted spider
US6994176B2 (en) 2002-07-29 2006-02-07 Weatherford/Lamb, Inc. Adjustable rotating guides for spider or elevator
GB2382361B (en) 2002-08-30 2004-02-25 Technology Ventures Internat L A method of forming a bore
US6899186B2 (en) 2002-12-13 2005-05-31 Weatherford/Lamb, Inc. Apparatus and method of drilling with casing
US7219730B2 (en) 2002-09-27 2007-05-22 Weatherford/Lamb, Inc. Smart cementing systems
US6832658B2 (en) 2002-10-11 2004-12-21 Larry G. Keast Top drive system
US7303022B2 (en) 2002-10-11 2007-12-04 Weatherford/Lamb, Inc. Wired casing
US6889772B2 (en) 2002-10-23 2005-05-10 Frank's International, Inc. Method and apparatus for installing control lines in a well
US6953096B2 (en) 2002-12-31 2005-10-11 Weatherford/Lamb, Inc. Expandable bit with secondary release device
US7128154B2 (en) 2003-01-30 2006-10-31 Weatherford/Lamb, Inc. Single-direction cementing plug
GB2414502B (en) 2003-02-27 2007-10-17 Weatherford Lamb Drill shoe
CA2677247C (en) 2003-03-05 2012-09-25 Weatherford/Lamb, Inc. Casing running and drilling system
CA2517978C (en) 2003-03-05 2009-07-14 Weatherford/Lamb, Inc. Drilling with casing latch
WO2004079150A2 (en) 2003-03-05 2004-09-16 Weatherford/Lamb, Inc. Full bore lined wellbores
US7311114B2 (en) * 2005-05-20 2007-12-25 Tdw Delaware, Inc. Cross-line plugging system

Also Published As

Publication number Publication date
NO20042922L (no) 2005-01-12
EP1496297A2 (en) 2005-01-12
BRPI0402753B1 (pt) 2015-06-23
CA2473073C (en) 2010-11-09
CA2473073A1 (en) 2005-01-11
US7650944B1 (en) 2010-01-26
AU2004203054A1 (en) 2005-01-27
BRPI0402753A (pt) 2005-02-22
EP1496297B1 (en) 2007-11-14
AU2004203054B2 (en) 2007-09-13
EP1496297A3 (en) 2005-05-11

Similar Documents

Publication Publication Date Title
NO335948B1 (no) Fremgangsmåte for inngrep i en rørledning, og apparat for gjenoppretting av en offshore-rørledning og produksjon av brønnfluider.
US10012044B2 (en) Annular isolation device for managed pressure drilling
US6840322B2 (en) Subsea well intervention vessel
EP2900897B1 (en) Managed pressure drilling system having well control mode
US4630680A (en) Well control method and apparatus
NO339578B1 (no) Fremgangsmåte og system for å føre borevæske ved bruk av en konstruksjon som flyter i en overflate av et hav
NO335386B1 (no) Framgangsmåte for boring med forlengelsesrør og boresystem
NO314771B1 (no) Boreramme for en undervanns brönnhode-sammenstilling
US5842528A (en) Method of drilling and completing wells
NO327352B1 (no) System og fremgangsmate for a gjenvinne returfluid fra undersjoiske bronnboringer
US3468373A (en) Apparatus for severing well casing in a submarine environment
EP3762577A1 (en) Plug and play connection system for a below-tension-ring managed pressure drilling system
NO333844B1 (no) Fremgangsmåte for å etablere et borehull i en sjøbunn og et lederør og en sugemodul for utøvelse av fremgangsmåten
NO317821B1 (no) Brønnhodesammenstilling og fremgangsmåte for boring av brønner
WO2017031464A1 (en) Riserless well systems and methods
US7451822B2 (en) Method for retrieving riser for storm evacuation
EP3172398B1 (en) Method of subsea containment and system
US20220268127A1 (en) Downhole apparatus and methods for casing
US20180171728A1 (en) Combination well control/string release tool
NO20160250A1 (en) Device for enabling removal or installation of a horizontal Christmas tree and methods thereof
WO2016106267A1 (en) Riserless subsea well abandonment system
US20100258320A1 (en) Ocean floor deep-sea submerged deck
NO325188B1 (no) Fremgangsmate for vaeskeloft i borestigeror

Legal Events

Date Code Title Description
MM1K Lapsed by not paying the annual fees