MY100417A - Improvements relating to cast-in-situ concrete pile construction. - Google Patents
Improvements relating to cast-in-situ concrete pile construction.Info
- Publication number
- MY100417A MY100417A MYPI87000582A MYPI19870582A MY100417A MY 100417 A MY100417 A MY 100417A MY PI87000582 A MYPI87000582 A MY PI87000582A MY PI19870582 A MYPI19870582 A MY PI19870582A MY 100417 A MY100417 A MY 100417A
- Authority
- MY
- Malaysia
- Prior art keywords
- pile
- cast
- cement mortar
- pile construction
- concrete pile
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/44—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
THE INVENTION PROVIDES A PILE CONSTRUCTION METHOD WHICH ALLOWS REPEATED FORMATION OF A SUPPLEMENTAL BASE CONCRETE BODY AT THE BOTTOM OF A CAST-IN-PLACE PILE, WHEREIN BEFORE A PREVIOUSLY INTRODUCED CEMENT MORTAR CONSOLIDATES AT THE BOTTOM OF THE PILE, A SOIL STABILIZING LIQUID AGENT IS INJECTED THROUGH AN INJECTION TUBE (18) WHICH EXTENDS TO THE BOTTOM OF A PILE SO AS TO PENETRATE INTO THE EARTH SURROUNDING THE BOTTOM OF THE PILE. AFTER THE CEMENT MORTAR CONSOLIDATES, THE FLOW PASSAGES OF THE SOIL STABILIZING AGENT BECOME PERMANENT PASSAGES (23) IN THE PILE BASE FOR A NEXT INJECTION OF CEMENT MORTAR. (FIG 4)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB08410308A GB2157750B (en) | 1984-04-19 | 1984-04-19 | Improvements relating to cast-in-situ concrete pile construction |
Publications (1)
Publication Number | Publication Date |
---|---|
MY100417A true MY100417A (en) | 1990-09-29 |
Family
ID=10559914
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MYPI87000582A MY100417A (en) | 1984-04-19 | 1987-05-06 | Improvements relating to cast-in-situ concrete pile construction. |
Country Status (2)
Country | Link |
---|---|
GB (1) | GB2157750B (en) |
MY (1) | MY100417A (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2192419A (en) * | 1986-07-10 | 1988-01-13 | Lin Juei Jse | Method of producing a pile or a diaphragm wall |
SE501607C2 (en) * | 1993-03-28 | 1995-03-27 | Soilex Ab | Procedure for casting piles |
CN1112487C (en) * | 1996-08-28 | 2003-06-25 | 王国奋 | Pipe sinking prefabricated steel concrete club-footed pile and its pile making method and equipment |
AU2003298000A1 (en) * | 2002-12-06 | 2004-06-30 | Geotechnical Reinforcement, Inc. | Method for construction of piers in soil and a pier construction |
CN104846811A (en) * | 2015-05-20 | 2015-08-19 | 王继忠 | Construction method of carrier pile of various technical line productions |
CN106284316A (en) * | 2016-10-10 | 2017-01-04 | 启东建筑集团有限公司 | Diesel hammer immersed tube carrier pile construction method |
-
1984
- 1984-04-19 GB GB08410308A patent/GB2157750B/en not_active Expired
-
1987
- 1987-05-06 MY MYPI87000582A patent/MY100417A/en unknown
Also Published As
Publication number | Publication date |
---|---|
GB2157750B (en) | 1988-01-27 |
GB2157750A (en) | 1985-10-30 |
GB8410308D0 (en) | 1984-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB1476996A (en) | Composite piles for foundations of structures and a method for manufacturing the same | |
MY100417A (en) | Improvements relating to cast-in-situ concrete pile construction. | |
ES8701273A1 (en) | Foundation arrangement. | |
ES8204499A1 (en) | Process for construction of an underground structure and the structure thus obtained | |
JPS5530039A (en) | Method for constructing underground structures | |
GB1252244A (en) | ||
JPS5664028A (en) | Sheathing construction work by antecedent support framework | |
JPS6417920A (en) | Construction of precast pile with bag | |
JPS57108328A (en) | Formation of basement | |
RU1792470C (en) | Method for erecting a pile base | |
JPS57112513A (en) | Construction of foundation pile for ground improvement | |
JPS5670322A (en) | Construction of underground wall by column strip | |
JPS57130622A (en) | Construction of continuous underground wall | |
JPS5792218A (en) | Laying work of ready-made pile | |
JPS6417994A (en) | Method of executing underground structure | |
JPS57143013A (en) | Large scale process for constructing submarine anchor block | |
GB639829A (en) | Improvements in or relating to walls adapted to form watertight structures | |
RU2059749C1 (en) | Method for erecting walls in ground | |
SU981499A1 (en) | Method of producing counter-filtration curtains in karsted and cavernous rock | |
GB1525445A (en) | Process for constructing a landslide protecting wall | |
JPS641829A (en) | Construction foundation | |
JPH02266091A (en) | Vertical shaft mechanism for shield machine starting section, its constructing method, and starting and reaching method of shield machine using its mechanism | |
JPS5641924A (en) | Construction engineering for continuous underground wall | |
IT1183119B (en) | Method of constructing cast-in-place concrete pile | |
RU95109180A (en) | Method for construction of encased cast-in-place pile |