RU2059749C1 - Method for erecting walls in ground - Google Patents

Method for erecting walls in ground Download PDF

Info

Publication number
RU2059749C1
RU2059749C1 SU4924145A RU2059749C1 RU 2059749 C1 RU2059749 C1 RU 2059749C1 SU 4924145 A SU4924145 A SU 4924145A RU 2059749 C1 RU2059749 C1 RU 2059749C1
Authority
RU
Russia
Prior art keywords
soil
binder
trench
ground
mixed
Prior art date
Application number
Other languages
Russian (ru)
Inventor
А.С. Шаволов
Original Assignee
Шаволов Андрей Сергеевич
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Шаволов Андрей Сергеевич filed Critical Шаволов Андрей Сергеевич
Priority to SU4924145 priority Critical patent/RU2059749C1/en
Application granted granted Critical
Publication of RU2059749C1 publication Critical patent/RU2059749C1/en

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

FIELD: civil engineering. SUBSTANCE: method for erecting walls in ground is implemented by digging a trench using digging mechanism. Once the worked soil has been mixed with binder the trench is filled with the soil. Prior to it the binder is discharged onto soil surface. Then the binder is added to the soil by a slit cutter used as digging member. Slit cutter is moved from top to bottom and the trench is dug and filled. Then the soil mixed with binder is additionally compacted. EFFECT: high efficiency. 2 dwg

Description

Изобретение относится к способам возведения узких неглубоких противофильтрационных завес для ограждения котлованов от проникновения в них вод в однородных и лишенных каменистых включений грунтах. The invention relates to methods for the construction of narrow shallow anti-filter curtains to protect pits from the penetration of water into them in homogeneous and devoid of rocky soils.

Известен способ сооружения противофильтрационной завесы, при котором в грунте пробуривают скважины с последовательным смежным перекрытием или в грунт с помощью вибрации вдавливают, а затем выдергивают сваи. Полученные скважины заполняют мелким легким глиноцементным раствором или тяжелой бетонной смесью [1]
Однако этот способ трудоемок и сложен в исполнении.
There is a method of constructing an airtight curtain, in which wells with consecutive adjacent overlap are drilled in the ground or pressed into the ground by vibration and then pulled out. The obtained wells are filled with a small light clay cement mortar or heavy concrete mixture [1]
However, this method is time consuming and difficult to implement.

Наиболее близким является способ возведения стены в грунте путем разработки траншеи разрабатывающим механизмом и заполнение траншеи вырабатываемым грунтом после предварительного перемешивания его с вяжущим [2]
Недостатком этого способа является его низкая производительность.
The closest is the method of erecting a wall in the soil by developing a trench with a developing mechanism and filling the trench with the produced soil after preliminary mixing it with a binder [2]
The disadvantage of this method is its low productivity.

Целью изобретения является увеличение производительности работ при возведении "стены в грунте". The aim of the invention is to increase the productivity during the construction of the "wall in the ground."

Поставленная цель достигается тем, что в способе перемешивание грунта с вяжущим осуществляют путем отсыпки вяжущего на поверхность грунта и вовлечением его в грунт разрабатывающим органом, в качестве которого используют баровый механизм, перемещающийся сверху вниз и осуществляющий разработку траншеи и ее заполнение, после чего грунт смешанный с вяжущим доуплотняют. This goal is achieved by the fact that in the method the mixing of soil with a binder is carried out by pouring the binder onto the soil surface and involving it into the soil by the developing body, which is used as a bar mechanism moving from top to bottom and developing the trench and filling it, after which the soil mixed with they bind with binders.

На фиг.1 изображены схема и средства механизации, используемые при возведении "стены в грунте" предлагаемым способом, поперечный разрез; на фиг.2 то же, план. Figure 1 shows a diagram and means of mechanization used in the construction of "walls in the ground" of the proposed method, a cross section; figure 2 is the same plan.

Способ осуществляется следующим образом. The method is as follows.

Сначала разрабатывающим механизмом 1, в качестве которого используют баровый механизм, прикрепленный, например, к копру, перемещающийся сверху вниз, производят пионерное вертикальное заглубление бара в грунт и уборку вынесенного на поверхность от этого грунта. Затем на дневную поверхность, подлежащую разработке, осуществляют отсыпку вяжущего 2. Отсыпку вяжущего 2 осуществляют непрерывно, смонтированным на копре дозировочным устройством 3. После чего продолжают разработку траншеи баровым механизмом 1. При этом вовлекают вяжущее 2 в грунт. При вовлечении вяжущего 2 в глубь траншеи, происходит его перемешивание со срезаемым грунтом и образование синтезированного цементно-грунтового материала 4, который заполняет траншею. Далее производят окончательное доуплотнение этого материала с поверхности виброплощадкой (или вибротрамбовкой) 5, которую предпочтительно протаскивать сразу же за баром, подвешивая к тому же копру. После прохода виброплощадкой 5 сверху материала 4, последний становится готовым 6 для своего последующего созревания и твердения, представляя в последствии уже готовую "стену в грунте". First, the developing mechanism 1, which is used as a bar mechanism, attached, for example, to the pile driver, moving from top to bottom, pioneers the vertical penetration of the bar into the ground and removes the soil brought to the surface. Then, the binder 2 is poured onto the surface to be developed. The binder 2 is poured continuously using the metering device 3 mounted on the copra. Then, the trench is continued to be developed by the bar mechanism 1. In this case, the binder 2 is drawn into the ground. With the involvement of binder 2 in the depths of the trench, it is mixed with the cut soil and the formation of the synthesized cement-soil material 4, which fills the trench. Next, the final compaction of this material from the surface with a vibrating plate (or rammer) 5 is carried out, which is preferably pulled right behind the bar, hanging to the same pile. After the vibratory plate 5 passes on top of the material 4, the latter becomes ready 6 for its subsequent ripening and hardening, presenting later a ready-made “wall in the ground”.

Предложенный способ может быть использован и для создания наклонной (в поперечном сечении траншеи) "стены в грунте", что достигается предварительным наклоном направляющих копровой установки. The proposed method can also be used to create an inclined (in the cross section of the trench) "wall in the ground", which is achieved by a preliminary inclination of the guides of the pile plant.

Claims (1)

СПОСОБ ВОЗВЕДЕНИЯ СТЕНЫ В ГРУНТЕ путем разработки траншеи разрабатывающим механизмом и заполнение траншеи вырабатываемым грунтом после предварительного перемешивания его с вяжущим, отличающийся тем, что, с целью увеличения производительности, перемешивание грунта с вяжущим осуществляют путем отсыпки вяжущего на поверхность грунта и вовлечения его в грунт разрабатывающим органом, в качестве которого используют баровый механизм, перемещающийся сверху вниз и осуществляющий разработку траншеи и ее заполнение, после чего грунт, смешанный с вяжущим, доуплотняют. METHOD FOR BUILDING A WALL IN SOIL by developing a trench with a developing mechanism and filling the trench with the produced soil after preliminary mixing it with a binder, characterized in that, in order to increase productivity, the soil is mixed with a binder by pouring the binder onto the soil surface and drawing it into the soil by the developing body , which is used as a bar mechanism, moving from top to bottom and carrying out the development of the trench and its filling, after which the soil is mixed th astringent, douplotnyayut.
SU4924145 1991-04-02 1991-04-02 Method for erecting walls in ground RU2059749C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU4924145 RU2059749C1 (en) 1991-04-02 1991-04-02 Method for erecting walls in ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU4924145 RU2059749C1 (en) 1991-04-02 1991-04-02 Method for erecting walls in ground

Publications (1)

Publication Number Publication Date
RU2059749C1 true RU2059749C1 (en) 1996-05-10

Family

ID=21567875

Family Applications (1)

Application Number Title Priority Date Filing Date
SU4924145 RU2059749C1 (en) 1991-04-02 1991-04-02 Method for erecting walls in ground

Country Status (1)

Country Link
RU (1) RU2059749C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2778149C1 (en) * 2021-12-22 2022-08-15 Общество с ограниченной ответственностью "МЕЩЕРСКИЙ НАУЧНО-ТЕХНИЧЕСКИЙ ЦЕНТР" Method for creating an anti-filtration sand-sapropel curtain

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Смородинов М.И. Устройство сооружений и фундаментов способом "стена в грунте". М.: Стройиздат, 1986, с.5,139. 2. Авторское свидетельство СССР N 388777, кл. E 02B 3/16, 1971. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2778149C1 (en) * 2021-12-22 2022-08-15 Общество с ограниченной ответственностью "МЕЩЕРСКИЙ НАУЧНО-ТЕХНИЧЕСКИЙ ЦЕНТР" Method for creating an anti-filtration sand-sapropel curtain

Similar Documents

Publication Publication Date Title
CN101008178B (en) Soft base processing construction process using excavating and stirring method
RU2059749C1 (en) Method for erecting walls in ground
CN108360532A (en) The construction method that Soft Deep Foundation Pit is gone along with sb. to guard him with SMW engineering method stake cantilevers
RU2058464C1 (en) Method for making foundation
JPS5847527B2 (en) Anti-forming method using soil condensation
JPS5530039A (en) Method for constructing underground structures
JPS6049734B2 (en) How to form a basement
JPH04258410A (en) Constructing method of underground continuous wall in underground obstruction existing ground
JPS62178620A (en) Formation of improved angular ground
RU1792470C (en) Method for erecting a pile base
JPS6117973B2 (en)
JP2530980B2 (en) Foundation soil improvement method with aggregate
RU1791541C (en) Method for erection of padded support structure in soil
JP3206596U (en)
SU983197A1 (en) Method of erecting a retaining wall
SU829785A1 (en) Method of making pits in sandy soils
SU996626A1 (en) Method of constracting a cast-in-place pile
SU1583516A1 (en) Method of construction of counter-seepage solid concrete-film lining of slopes
JP2001164550A (en) Improvement method of construction ground for underground structure
SU1469027A1 (en) Method of working a pit
SU1629372A1 (en) Method for construction of concreate dam
SU887735A1 (en) Foundation construction method
SU966167A1 (en) Method of strengthening foundation on constructed building
JPH02266016A (en) Structural process of underground concrete body of building
JPH0434116A (en) Constructing method of underground structure body