KR20040033551A - Execution method for repairing manhole and manhole structure repaired by the same execution method - Google Patents

Execution method for repairing manhole and manhole structure repaired by the same execution method Download PDF

Info

Publication number
KR20040033551A
KR20040033551A KR1020020062687A KR20020062687A KR20040033551A KR 20040033551 A KR20040033551 A KR 20040033551A KR 1020020062687 A KR1020020062687 A KR 1020020062687A KR 20020062687 A KR20020062687 A KR 20020062687A KR 20040033551 A KR20040033551 A KR 20040033551A
Authority
KR
South Korea
Prior art keywords
manhole
new
lower structure
housing
road surface
Prior art date
Application number
KR1020020062687A
Other languages
Korean (ko)
Other versions
KR100488401B1 (en
Inventor
황의철
Original Assignee
황의철
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 황의철 filed Critical 황의철
Priority to KR10-2002-0062687A priority Critical patent/KR100488401B1/en
Publication of KR20040033551A publication Critical patent/KR20040033551A/en
Application granted granted Critical
Publication of KR100488401B1 publication Critical patent/KR100488401B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/128Repairs of manhole shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/0021Mortar

Abstract

PURPOSE: A repair method for a manhole is provided to secure the flatness of a road surface and the safety and rapidness of vehicles. CONSTITUTION: The repair method for a manhole comprises the steps of: cutting off the surroundings of the existing manhole cover by installing a vertical cutter on the upper part of the existing manhole cover, then removing the existing manhole housing containing the existing manhole cover by exposing the top of a horizontal flange of the existing manhole housing to the outside; forming a cut section by cutting off an inner circumferential surface of a manhole lower structure horizontally by installing/operating a horizontal cutter on the top of a manhole where the existing manhole housing is removed, then installing a safety device on the cut section; excavating from the top of the manhole lower structure to the horizontal cut section, and injecting rapid hardening mortar between the bases formed by installing a new manhole lower structure and between pavement layers; locating a new manhole housing attached with a backup member on the top of the new manhole lower structure, then injecting rapid hardening mortar between the top of the new manhole lower structure and the base of the new manhole housing and between pavement layers to fix the new manhole housing; injecting road sealants(25e) between an outer flange of the new manhole housing and the vertical cut section of a road surface layer and on the road surface around a manhole having rugged parts to correspond the upper surface of the new manhole housing to the road surface layer; and setting a new manhole cover(24d) on the top of the new manhole housing, then covering up a through-hole of the manhole.

Description

맨홀의 보수 시공법 및 그 시공법에 의해 보수 시공된 맨홀구조{EXECUTION METHOD FOR REPAIRING MANHOLE AND MANHOLE STRUCTURE REPAIRED BY THE SAME EXECUTION METHOD}Manhole repair method and the manhole structure repaired by the construction method {EXECUTION METHOD FOR REPAIRING MANHOLE AND MANHOLE STRUCTURE REPAIRED BY THE SAME EXECUTION METHOD}

본 발명은 맨홀의 보수 시공법 및 그 시공법에 의해 보수 시공된 맨홀구조에 관한 것으로서, 보다 상세하게는 도로에 매설되는 맨홀의 보수 시공에 사용되는 재료와 장비 및 시공법을 종전과 달리하여, 맨홀이 보수 시공된 이후에 노면의 평탄성과 통행 차량의 안전 및 쾌속성을 확보할 수 있도록 함은 물론 차후 필요에 따라 시행되는 맨홀의 재 보수 시공을 저렴한 비용으로 용이하게 수행 할 수 있는 맨홀의 보수 시공법 및 그 시공법에 의해 보수 시공된 맨홀구조에 관한 것이다.The present invention relates to a manhole repair method and a manhole structure repaired and repaired by the construction method. More specifically, the manhole is repaired by different materials, equipment, and construction methods used for repair and repair of a manhole embedded in a road. After the construction, the flatness of the road surface and the safety and speed of the traffic vehicle can be secured, and the manhole repairing method that can be easily carried out at a later cost as well as the renovation of the manhole, which is carried out as needed later, and its The manhole structure repaired by the construction method.

일반적으로 도로에 매설되는 맨홀은 지하에 매설된 관거와 수도·가스관 및 전기·통신 선로 등의 시설을 유지 보수할 때 출입할 수 있도록 된 구조물로, 크게 리브 등으로 구성된 상부구조와 벽돌 또는 콘크리트로 구성된 하부구조로 구분할 수 있다. 그리고 맨홀 주변은 도로 건설시 최초에 시공된 포장층과 오버레이(Overlay; 노면 씌우기 공사) 시공으로 형성된 노면층으로 구성되어 있다.In general, the manhole buried in the road is a structure that can be accessed when maintenance of facilities such as underground pipes, water, gas pipes, and electric / communication lines. It can be divided into constructed substructures. And around the manhole is composed of pavement layer initially constructed during road construction and road surface layer formed by overlay construction.

그런데 상부구조인 리브가 통행 차량의 충격하중 때문에 유동되면서 한쪽으로 밀리는 경우가 있으며, 오버레이 이후에 노면이 맨홀 표면보다 높아지면서 노면과 맨홀 사이에 높이 편차가 발생된다.However, the rib, which is an upper structure, may be pushed to one side while being flowed due to the impact load of the traffic vehicle, and a height deviation occurs between the road surface and the manhole after the road surface becomes higher than the manhole surface after the overlay.

그리고 벽돌 또는 콘크리트 구조인 하부구조가 부실하게 시공되었거나 또는 시공된지 오래되어서 내구성이 떨어지면, 통행 차량의 충격하중에 무너지면서 맨홀과 주변의 노면을 침하시키게 된다.If the durability of the brick or concrete substructure is poorly constructed or old, the durability is reduced, and the manhole and surrounding roads are settled while falling under the impact load of the traffic vehicle.

상기와 같이 맨홀과 노면의 침하 및 노면과 맨홀 사이에 발생된 높이 편차는 차량 통행에 지장을 주면서 쾌속성을 떨어트리므로, 이러한 경우에 맨홀 표면과 노면을 일치시키는 맨홀의 보수 시공이 이루어진다.As described above, since the settlement of the manhole and the road surface and the height deviation generated between the road surface and the manhole decreases the rapidity while hindering vehicle traffic, in this case, the construction of the manhole is made to match the manhole surface and the road surface.

그럼 여기서 종래의 맨홀 시공법에 의해 시공된 기존 맨홀구조를 첨부된 도 2 내지 도 3에 의해 참고적으로 살펴보면 다음과 같다.Then, referring to the conventional manhole structure constructed by the conventional manhole construction method by reference to Figures 2 to 3 attached as follows.

도 2는 종래 맨홀의 시공법에 의해 시공된 맨홀의 단면도며, 도 3는 종래 맨홀의 시공법에 의해 시공되어 있던 맨홀(27)이 오버레이(25)로 말미암아 노면(25a)과 높이편차(25b)가 발생된 상태를 나타낸 단면도이다.2 is a cross-sectional view of a manhole constructed by a conventional manhole construction method, and FIG. 3 shows that the manhole 27 that has been constructed by a conventional manhole construction method has a road surface 25a and a height deviation 25b due to the overlay 25. It is sectional drawing which shows the generated state.

도 2 내지 도 3에 도시된 바와 같이, 기존 맨홀은 크게 리브(27)과 뚜껑(27b)으로 구성된 상부구조와, 벽돌층 또는 콘크리트로 구성된 하부구조(30)로 구분할 수 있는데, 이 같은 구조를 좀 더 상세하게 살펴보면 다음과 같다.As shown in Figure 2 to 3, the existing manhole can be largely divided into an upper structure consisting of ribs 27 and the lid 27b, and a lower structure 30 consisting of a brick layer or concrete, such a structure In more detail,

지하에 매설된 관거 슬래브(29)의 상면에 콜크리트 또는 벽돌층으로 구성되며 관거에 출입이 가능하도록 통공(29a)이 형성되어 있는 맨홀하부구조(30)와; 상기 맨홀하부구조(30) 위에 얹혀져서 견고하게 고착되면서 수평 플랜지(27a)와 안착턱이 형성되어 있는 리브(27)과; 상기 리브(27)의 안착턱에 얹혀져서 맨홀의 통공(29a)을 덮어주는 뚜껑(27b)과; 아스팔트 콘크리트 층과 같은 맨홀 주변의 포장층(26)으로 구성되어 있다.A manhole lower structure 30 composed of a corkcrete or brick layer on the upper surface of the conduit slab 29 buried underground and a through hole 29a formed to allow access to the conduit; A rib 27 mounted on the lower manhole structure 30 and firmly fixed to the rib 27 having a horizontal flange 27a and a seating jaw formed therein; A lid 27b mounted on the seating jaw of the rib 27 to cover the through hole 29a of the manhole; It is composed of a pavement layer 26 around a manhole, such as an asphalt concrete layer.

그러나 이와 같은 구조의 기존 맨홀은 앞에서 설명된 바와 같이 통행 차량의 충격하중으로 하부구조(30)가 깨지면서 상부구조인 리브(27)이 유동 및 침하되거나, 오버레이(25) 이후에 노면(25a)이 맨홀(27) 표면보다 높아지면서 맨홀(27)과 노면(25a) 사이에 높이 편차(25b)가 발생하면, 이때 맨홀을 견고하게 하면서 노면의 평탄성을 개선시키기 위해 맨홀을 보수 시공하게 된다.However, the existing manhole of such a structure, as described above, as the lower structure 30 is broken by the impact load of the traffic vehicle, the upper structure rib 27 flows and sinks, or the road surface 25a is disposed after the overlay 25. When the height deviation 25b occurs between the manhole 27 and the road surface 25a while being higher than the surface of the manhole 27, the manhole is repaired to improve the flatness of the road surface while strengthening the manhole.

그럼 여기서 종래 맨홀의 보수 시공법에 관하여 참고적으로 간략하게 살펴보면 다음과 같다.So here is a brief look at the conventional construction of the repair method of the manhole as follows.

종래 맨홀의 보수 시공법들은 다양하게 개발되어 있으며, 그 시공법들은 사용하는 장비와 재료 및 그것들의 사용방법에 각각의 차이점이 있는데, 그 차이점을 요약해 보면 노면층을 포함하는 포장층의 절단 및 굴착하는 방법과 이때 사용하는 장비가 각각 다르고, 맨홀의 높이를 조절하는 높이조절 링 또는 초속경 모르타르의 재료와 그것의 사용방법도 각각 다르며, 굴착된 포장층과 노면층을 되메워서 리브를 고정시켜주는 방법과 이때 사용하는 재료 역시 각각 다르다.Conventional manhole repair methods have been developed in a variety of ways, the construction methods are different in each of the equipment and materials used and how to use them, summarize the differences in cutting and digging the pavement layer including the road surface layer The method and the equipment used at this time are different, and the material of the height adjusting ring or superhard mortar adjusting the height of the manhole and the method of use are different, respectively, and the ribs are fixed by filling the excavated pavement layer and the road surface layer. The method and the materials used are also different.

그리고 노면을 굴착할 필요 없이 리브의 상단에 높이조절 링을 고정시켜서 맨홀의 높이를 조절하는 방법과 이때 사용되는 높이조절 링 또한 여러 종류가 개발되어 있다.And there is a variety of ways to adjust the height of the manhole by fixing the height adjustment ring on the top of the ribs without having to excavate the road surface and the height adjustment ring used at this time.

그러나 상기와 같은 종래 맨홀의 보수 시공법으로 맨홀을 보수 시공할 경우 다음과 같은 제반 문제점이 있었다.However, when repairing the manhole by the repair method of the conventional manhole as described above, there were various problems as follows.

첫째, 종래의 방법으로 보수 시공된 맨홀을 필요에 따라 재 보수 시공할 경우 보수 시공 과정에서 되메움재로 사용된 고강도의 초속경 모르타르를 굴착해야 하는 등 그 과정이 매우 까다롭고 공사비가 과다하게 소요되었다.First, if the manhole repaired by the conventional method is renovated as necessary, the process is very difficult and requires excessive construction cost, such as digging high strength cemented carbide mortar used as backfilling material during the repairing process. It became.

둘째, 종래의 방법으로 보수 시공된 맨홀을 필요에 따라 재 보수 시공할 경우 맨홀 주변의 노면을 과다하게 굴착해야 하기 때문에 굴착 폐기물이 다량으로 발생되었으며, 이런 폐기물은 환경 오염원이 될뿐더러 굴착된 부분을 되메우는데 가격이 매우 비싼 초속경 모르타르가 다량으로 소요되었다.Second, when the renovated manhole is repaired according to the conventional method, a lot of excavated wastes are generated because the road surface around the manhole is excessively excavated, and this waste becomes an environmental pollutant and the excavated part It took a large amount of superhard mortar, which was very expensive to backfill.

셋째, 맨홀하부구조의 상면에 수지성분이 혼합된 초속경 모르타르를 깔고 그 위에 높이조절 링과 리브를 차례차례 얹혀 놓고 고정시킬 경우에 초속경 모르타르가 경화되는 과정에서 혼합물인 수지성분의 일부분이 외부로 흘러나오면서 초속경모르타르 내에 공극이 형성되므로, 초속경 모르타르가 경화된다 해도 상기 공극 때문에 내구성이 떨어진 초속경 모르타르가 통행 차량의 충격하중에 쉽게 깨지면서 노면과 맨홀을 침하시키는 경우가 있었다.Third, when a cemented carbide mortar mixed with a resin component is laid on the upper surface of the lower part of the manhole, and a height adjusting ring and ribs are placed on it in order to fix it, a portion of the resin component, which is a mixture, is hardened in the process of curing the cemented carbide mortar. Since the voids are formed in the cemented carbide mortar as it flows out, the cemented carbide mortar inferior in durability due to the voids may be easily broken by the impact load of the traffic vehicle, even if the cemented carbide mortar is cured.

넷째, 일정한 두께로 규격화 된 높이조절 링을 리브의 상단에 나사조임 등으로 고정시켜서 맨홀의 높이를 인상시키는 경우에, 규격화 된 높이조절링의 두께만큼 맨홀의 높이조절이 이루어지므로, 인상된 맨홀이 노면보다 높거나 또는 낮은 경우가 발생되었으며, 이러한 원인으로 맨홀이 보수 시공되었다 해도 도로의 평탄성이 떨어졌고, 리브의 상단에 나사 조임 된 높이조절 링과 조임볼트 및 너트가 통행 차량의 충격하중 및 진동으로 쉽게 파손되었다.Fourth, in the case where the height of the manhole is raised by fixing the height adjusting ring standardized to a certain thickness by screwing or the like on the top of the rib, the height of the manhole is adjusted by the thickness of the standardized height adjusting ring. It is higher or lower than the road surface, and even if the manhole is repaired, the flatness of the road is reduced, and the height adjustment ring screwed on the top of the rib and the tightening bolt and nut are impact load and vibration of the traffic vehicle. As easily broken.

상기와 같은 종래의 맨홀 보수시공법 및 맨홀구조의 문제점을 해결하기 위하여, 본 발명은 기존의 리브를 철거한 다음과 기능을 개선시킨 새로운 형태의 리브로 대체시켜서 맨홀의 보수 시공된 상태를 종전보다 더욱 견고하게 함과 동시에 그 맨홀을 차후 필요에 따라 재보수 시공할 때 노면을 절단 및 굴착할 필요없이 리브를 용이하게 들어올리고 그 밑에 초속경 모르타르를 주입, 경화시켜서 맨홀의 재보수 시공과정을 종전보다 훨씬 용이하게 함과 함께 소요되는 비용을 대폭 절감시킬 수 있는 맨홀의 보수 시공법 및 그 시공법에 의해 보수 시공된 맨홀구조를 제공하는데 그 목적이 있다.In order to solve the problems of the conventional manhole repair method and the manhole structure as described above, the present invention is more robust than before by replacing the existing ribs with a new type of ribs with improved function and then improved repair function of the manhole At the same time, when the manhole is later renovated as needed, it is easy to lift the ribs without injecting and hardening the road surface and inject and harden the carbide mortar underneath to make the manhole renovation process much more difficult than before. It is an object of the present invention to provide a manhole repair method and a manhole structure repaired and repaired by the construction method which can greatly reduce the cost required.

도 1은 본 발명에 따른 맨홀의 보수 시공법의 개략적인 공정을 도시한 공정도;1 is a process diagram showing a schematic process of the repair construction method of the manhole according to the present invention;

도 2는 종래 맨홀의 시공법에 의해 시공된 맨홀의 단면도;2 is a cross-sectional view of a manhole constructed by a conventional manhole construction method;

도 3은 종래 맨홀의 시공법에 의해 시공되어 있던 맨홀이 오버레이 시공에 의하여 높이편차가 발생된 상태를 도시한 단면도;3 is a cross-sectional view showing a state in which a height deviation is generated by overlay construction of a manhole that has been constructed by a conventional manhole construction method;

도 4는 본 발명에 따른 맨홀의 보수시공법에 이용되는 수직커터가 종래의 맨홀 상부에 설치된 상태를 도시한 단면도;Figure 4 is a cross-sectional view showing a state in which the vertical cutter used in the repair construction method of the manhole according to the present invention is installed on the top of the conventional manhole;

도 5는 본 발명에 따른 맨홀의 보수시공법에 이용되는 수직커터에 의하여 맨홀뚜껑의 둘레에 형성되는 수직 절단면을 도시한 단면도;Figure 5 is a cross-sectional view showing a vertical cut surface formed around the manhole cover by a vertical cutter used in the repair method of the manhole according to the present invention;

도 6은 본 발명에 따른 맨홀의 보수시공법에 의하여 기존 맨홀하우징의 수평 플랜지 상면이 외부에 완전 노출된 상태를 도시한 단면도;6 is a cross-sectional view showing a state in which the upper surface of the horizontal flange of the existing manhole housing completely exposed to the outside by the repairing method of the manhole according to the present invention;

도 7은 본 발명에 따른 맨홀의 보수시공법에 의하여 기존 맨홀뚜껑을 포함하는 기존 맨홀하우징 일체가 철거된 상태를 도시한 단면도;Figure 7 is a cross-sectional view showing a state in which the existing manhole housing including a manhole cover is removed by a repair method of the manhole according to the present invention;

도 8은 본 발명에 따른 맨홀의 보수시공법에 이용되는 수평커터를 설치하여맨홀하부구조에 수평 절단면이 형성되는 상태를 도시한 단면도;8 is a cross-sectional view showing a state in which a horizontal cutting surface is formed in the lower structure of the manhole by installing a horizontal cutter used for repairing a manhole according to the present invention;

도 9는 본 발명에 따른 맨홀의 보수시공법에 의하여 형성된 수평 절단면에 안전장치가 설치된 상태를 도시한 단면도;9 is a cross-sectional view showing a state in which a safety device is installed on the horizontal cutting surface formed by the repair method of the manhole according to the present invention;

도 10은 본 발명에 따른 맨홀의 보수시공법에 의하여 맨홀하부구조의 상부에서 수평 절단면까지 굴착된 상태를 도시한 단면도;10 is a cross-sectional view illustrating a state in which the manhole is excavated from the upper portion of the lower portion of the manhole structure to a horizontal cutting surface by the repairing method according to the present invention;

도 11은 본 발명에 따른 맨홀의 보수시공법에 의하여 굴착된 맨홀하부구조의 상부에서 수평 절단면에 신규 맨홀하부구조가 위치한 상태를 도시한 단면도;Figure 11 is a cross-sectional view showing a state in which the new manhole lower structure is located on the horizontal cutting plane in the upper portion of the manhole lower structure excavated by the repair method of the manhole according to the present invention;

도 12는 본 발명에 따른 맨홀의 보수시공법에 의하여 설치된 신규 맨홀하부구조의 저면 사이 및 포장층 사이에 초속경 모르타르를 주입하여 일체화시키는 상태를 도시한 단면도;12 is a cross-sectional view showing a state in which the superscopy mortar is injected and integrated between the bottom surface of the new manhole lower structure and the pavement layer installed by the repairing method of the manhole according to the present invention;

도 13은 본 발명에 따른 맨홀의 보수시공법에 의하여 일체화된 신규 맨홀하부구조의 상부면에 신규 맨홀하우징이 설치되는 상태를 도시한 단면도;Figure 13 is a cross-sectional view showing a state in which the new manhole housing is installed on the upper surface of the new manhole lower structure integrated by the repair method of the manhole according to the present invention;

도 14는 본 발명에 따른 맨홀의 보수시공법에 의하여 설치된 신규 맨홀하우징의 저면 사이 및 포장층 사이에 초속경 모르타르가 주입되는 상태를 도시한 단면도;14 is a cross-sectional view showing a state in which superscopy mortar is injected between the bottom surface of the new manhole housing and the packaging layer installed by the repair method of the manhole according to the present invention;

도 15는 본 발명에 따른 맨홀의 보수시공법에 의하여 고정된 신규 맨홀하우징에 의하여 형성되는 수직 절단면 및 주변노면에 도로봉합재가 주입 도포된 다음, 신규 맨홀뚜껑이 안착된 상태를 도시한 단면도;15 is a cross-sectional view showing a state in which a new manhole cover is seated after road sealing material is injected and applied to a vertical cut surface and a peripheral road surface formed by a new manhole housing fixed by a repairing method of a manhole according to the present invention;

도 16은 본 발명에 따른 맨홀의 보수시공법에 의하여 보수시공된 맨홀의 상부 평면도이다.16 is a top plan view of a manhole repaired by the manhole repair method according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

22:신규 맨홀하부구조23a,b:초속경 모르타르22: New manhole lower structure 23a, b: Carbide mortar

24:신규 맨홀하우징24a:내주 플랜지24: new manhole housing 24a: inner flange

24b:백업재24c:외주 플랜지24b: backup material 24c: outer flange

24d:신규 맨홀뚜껑25:노면층(오버레이 층)24d: new manhole cover 25: road surface layer (overlay layer)

25a:노면25b:높이 편차 지점25a: road surface 25b: height deviation point

25c:수직 절단면25d:절단면 안쪽의 노면층25c: vertical cut surface 25d: road surface layer inside cut surface

25e:도로봉합재26:포장층25e: road seal 26: pavement layer

26a:포장층의 굴착면26b:절단면 안쪽의 포장층26a: Excavation surface of the packaging layer 26b: Pavement layer inside the cutting surface

30:기존 맨홀하부구조30a:잔존 맨홀하부구조30: existing manhole lower structure 30a: remaining manhole lower structure

30b:맨홀하부구조의 내주면30c:수평 절단면30b: Inner circumferential surface of the lower manhole structure 30c: Horizontal cut surface

31:수평커터(프레임)31a:수평커터의 로드31: Horizontal cutter (frame) 31a: Load of horizontal cutter

31b:수평커터의 날32:수직커터(엔진형 커터)31b: Horizontal cutter blade 32: Vertical cutter (engine cutter)

32a:회전판32b:조절봉32a: rotating plate 32b: adjusting rod

33:맨홀 설치기(프레임)34:안전장치33: Manhole mounter (frame) 34: Safety device

상기한 목적을 달성하기 위하여, 본 발명은 기존 맨홀뚜껑의 상부 중앙에 수직커터를 설치 작동시켜 상기 맨홀뚜껑의 둘레를 절단한 다음, 기존 맨홀하우징의 수평 플랜지 상면을 외부에 완전히 노출시켜 상기 기존 맨홀뚜껑을 포함하는 기존 맨홀하우징 일체를 철거하는 단계와;In order to achieve the above object, the present invention cuts the circumference of the manhole cover by installing a vertical cutter in the upper center of the existing manhole cover, and then completely exposed to the outside of the horizontal flange of the existing manhole housing the existing manhole Removing the existing manhole housing unit including a lid;

상기 기존 맨홀하우징이 철거된 맨홀상단에 수평커터를 설치 작동시켜 맨홀하부구조의 내주면을 수평상태로 절단하여 절단면을 형성한 다음, 상기 절단면에 안전장치를 설치하는 단계와;Installing a horizontal cutter on the upper manhole from which the existing manhole housing is removed, cutting the inner circumferential surface of the lower manhole structure in a horizontal state to form a cut surface, and then installing a safety device on the cut surface;

상기 맨홀하부구조의 상단에서부터 수평 절단면까지 굴착한 다음, 신규 맨홀하부구조를 설치하여 형성되는 저면 사이 및 포장층 사이에 초속경 모르타르를 주입하여 일체화시키는 단계와;Excavating from an upper end of the lower manhole structure to a horizontal cutting surface, and then injecting supersonic mortar between the pavement layer and the bottom layer formed by installing a new manhole lower structure to integrate the lower manhole;

상기 신규 맨홀하부구조의 상부면에 하단부에 백업재가 부착된 신규 맨홀하우징을 위치시켜 상기 신규 맨홀하부구조의 상면과 신규 맨홀하우징의 저면 사이 및 포장층 사이에 초속경 모르타르를 주입하여 신규 맨홀하우징을 고정시키는 단계와;A new manhole housing having a backing material attached to the lower end of the new manhole lower structure is placed, and a new manhole housing is injected by injecting superscopy mortar between the upper surface of the new manhole lower structure and the bottom of the new manhole housing and between the pavement layer. Fixing;

상기 고정된 신규 맨홀하우징의 외주 플랜지와 노면층의 수직 절단면 사이 및 요철이 형성된 맨홀 주변의 노면에도 도로봉합재를 주입 및 도포하여 신규 맨홀하우징의 상단 표면을 노면층과 일치시켜 주는 단계와;Injecting and applying a road sealant between the fixed outer periphery of the new manhole housing and the vertical cut surface of the road surface layer and the road surface around the uneven manhole to match the top surface of the new manhole housing with the road surface layer;

상기 노면층과 높이가 일치된 신규 맨홀하우징의 상단에 신규 맨홀뚜껑을 안착시켜 맨홀의 통공을 덮는 단계로 구성되는 것을 특징으로 하는 맨홀의 보수 시공법을 제공한다.It provides a repair construction method of the manhole comprising the step of covering the through-holes of the manhole by seating a new manhole cover on the top of the new manhole housing with the same height as the road surface layer.

또한, 본 발명은 벽돌층 또는 콘크리트 구조의 맨홀하부구조가 일부분이 굴착되고 일부분만 남아 있게 된 맨홀하부구조와; 상기 맨홀하부구조의 굴착된 부분을 대체해서 굴착되고 남은 맨홀하부구조의 상단에 설치되는 프리캐스트 콘크리트제의 신규 맨홀하부구조와; 상기 신규 맨홀하부구조의 상단에 기존 맨홀하우징을 대체해서 설치되면서, 내주 플랜지와 외주 플랜지 및 백업재와 안착턱 등으로 구성된 새로 설치된 신규 맨홀하우징과; 상기 굴착되고 남은 맨홀하부구조의 상면과 신규 맨홀하부구조의 저면 및 포장층 사이에 주입되어서 경화된 초속경 모르타르 및 상기 신규 맨홀하부구조의 상면과 신규 맨홀하우징의 주변에 주입되어서 경화된 초속경 모르타르와; 상기 신규 맨홀하우징의 안착턱에 얹혀져서 맨홀의 통공을 덮어주는 맨홀뚜껑과; 상기 신규 맨홀하우징과 노면층 및 노면의 요철부위에 주입 또는 도포 된 상태로 새로 설치된 신규 맨홀하우징의 상단 표면과 노면을 매우 정밀하게 일치시켜 주는 신축재료인 고무아스팔트 계통의 도로봉합재로 구성되는 것을 특징으로 하는 보수 시공된 맨홀구조를 제공하게 된다.In addition, the present invention provides a manhole lower structure in which a manhole lower structure of a brick layer or concrete structure is partially excavated and only a part thereof remains; A new manhole lower structure made of precast concrete, which is installed on the upper end of the manhole lower structure which has been excavated by replacing the excavated portion of the manhole lower structure; A newly installed new manhole housing composed of an inner circumferential flange, an outer circumferential flange, a backing material and a seating jaw, while being installed to replace the existing manhole housing on top of the new manhole lower structure; Superhard mortar hardened by injection between the upper surface of the excavated and remaining manhole lower structure and the bottom and pavement layers of the new manhole lower structure and superhard mortar hardened by being injected around the upper surface of the new manhole lower structure and the new manhole housing Wow; A manhole cover mounted on the seating jaw of the new manhole housing and covering the through hole of the manhole; The new manhole housing and the road seal material of the rubber asphalt system, which is an elastic material that matches the top surface and the road surface of the newly installed new manhole housing in a state of being injected or applied to the uneven portions of the road surface layer and the road surface. It provides a repaired manhole structure characterized by.

이하, 첨부된 도면을 참조하여 본 발명의 구성을 구체적으로 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail the configuration of the present invention.

도 1은 본 발명에 따른 맨홀의 보수 시공법의 개략적인 공정을 도시한 공정도이다.1 is a process chart showing a schematic process of the repair method of a manhole according to the present invention.

도 1에 도시된 바와 같이, 본 발명에 따른 맨홀의 보수시공법을 각 단계별로 실시하며, 이하에서는 본 발명을 각 단계별로 세분화하여 상세하게 설명한다.As shown in Figure 1, the manhole repair method according to the present invention is carried out in each step, hereinafter will be described in detail by subdividing the present invention in each step.

도 4는 본 발명에 따른 맨홀의 보수시공법에 이용되는 수직커터가 종래의 맨홀 상부에 설치된 상태를 도시한 단면도이고, 도 5는 본 발명에 따른 맨홀의 보수시공법에 이용되는 수직커터에 의하여 맨홀뚜껑의 둘레에 형성되는 수직 절단면을도시한 단면도이다.Figure 4 is a cross-sectional view showing a state in which the vertical cutter used in the repair method of the manhole according to the present invention is installed on the top of the conventional manhole, Figure 5 is a manhole cover by the vertical cutter used in the repair method of the manhole according to the present invention It is sectional drawing which shows the vertical cutting surface formed in the periphery.

도 4 내지 도 5에 도시된 바와 같이, 본 발명은 맨홀(27) 상단에 설치되어 있는 기존 맨홀뚜껑(27b)의 상면 중심부분에 수직커터(32)를 설치하여 작동시켜서 맨홀(27) 상단 둘레를 감싸면서 노면층(25)에 수직 상태의 절단면(25c)을 형성하게 된다.As shown in Figures 4 to 5, the present invention is installed by operating the vertical cutter 32 in the central portion of the upper surface of the existing manhole cover 27b installed on top of the manhole 27, the upper periphery of the manhole 27 While enclosing the cut surface 25c perpendicular to the road surface layer 25 is formed.

도 6은 본 발명에 따른 맨홀의 보수시공법에 의하여 기존 맨홀하우징의 수평 플랜지 상면이 외부에 완전 노출된 상태를 도시한 단면도이며, 도 7은 본 발명에 따른 맨홀의 보수시공법에 의하여 기존 맨홀뚜껑을 포함하는 기존 맨홀하우징 일체가 철거된 상태를 도시한 단면도이다.6 is a cross-sectional view showing a state in which the upper surface of the horizontal flange of the existing manhole housing completely exposed to the outside by the repair method of the manhole according to the present invention, Figure 7 is a conventional manhole cover by the repair method of the manhole according to the present invention It is a cross-sectional view showing a state in which the existing manhole housing integral including.

도 6 내지 도 7에 도시된 바와 같이, 본 발명은 상기 기존 맨홀뚜껑(27b)의 상면에서 수직커터(32)를 철거한 다음에 수직 절단면(25c) 안쪽의 노면층(25d)과 포장층(26b)을 차례차례 굴착해서, 기존 리브(27)을 구성하는 수평 플랜지(27a)의 상면을 외부로 완전히 노출시키게 되며,As shown in FIGS. 6 to 7, the present invention removes the vertical cutter 32 from the upper surface of the existing manhole cover 27b, and then the road surface layer 25d and the paving layer inside the vertical cut surface 25c. 26b) is sequentially excavated to completely expose the upper surface of the horizontal flange 27a constituting the existing rib 27 to the outside,

상기와 같이 완전 노출되면 기존 맨홀뚜껑(27b)을 포함하는 기존 맨홀하우징(27)을 맨홀 상단에서 철거하게 된다.When completely exposed as described above, the existing manhole housing 27 including the existing manhole cover 27b is demolished from the top of the manhole.

도 8은 본 발명에 따른 맨홀의 보수시공법에 이용되는 수평커터를 설치하여 맨홀하부구조에 수평 절단면이 형성되는 상태를 도시한 단면도이고, 도 9는 본 발명에 따른 맨홀의 보수시공법에 의하여 형성된 수평 절단면에 안전장치가 설치된 상태를 도시한 단면도이다.8 is a cross-sectional view showing a state in which a horizontal cutting surface is formed in the lower structure of the manhole by installing a horizontal cutter used for repairing the manhole according to the present invention, Figure 9 is a horizontal formed by the repair method of the manhole according to the present invention It is sectional drawing which shows the state in which the safety device is installed in the cut surface.

도 8 내지 도 9에 도시된 바와 같이, 상기한 기존 맨홀하우징(27)이 철거된맨홀 상단에 수평커터(31)를 설치, 작동시켜서, 콘크리트 또는 벽돌층으로 구성된 맨홀하부구조(30)의 내주면(30b)에 수평 상태의 절단면(30c)을 형성하게 되며,As shown in Figure 8 to 9, by installing and operating the horizontal cutter 31 on the top of the manhole, the existing manhole housing 27 is removed, the inner circumferential surface of the manhole lower structure 30 composed of a concrete or brick layer A cut surface 30c in a horizontal state is formed at 30b,

상기 형성된 수평 상태의 절단면(30c)이 형성되면 수평커터(31)를 철거한 다음, 앞으로 수행될 맨홀하부구조(30)의 굴착 과정에서 발생할 수 있는 각종 안전사고를 예방하기 위해 상기 형성된 수평 상태의 절단면(30c)에 안전장치(34)를 삽입 설치하게 된다.When the cut surface 30c of the formed horizontal state is formed, the horizontal cutter 31 is removed, and then the horizontal state of the formed horizontal state is prevented in order to prevent various safety accidents that may occur in the excavation process of the manhole lower structure 30 to be performed. The safety device 34 is inserted into the cutting surface 30c.

도 10은 본 발명에 따른 맨홀의 보수시공법에 의하여 맨홀하부구조의 상부에서 수평 절단면까지 굴착된 상태를 도시한 단면도이다.10 is a cross-sectional view illustrating a state in which the manhole is excavated from the upper portion of the lower portion of the manhole structure to a horizontal cutting surface by the repairing method of the manhole according to the present invention.

도 10에 도시된 바와 같이, 본 발명은 상기 맨홀하부구조(30)의 상단에서부터 수평 절단면(30c)까지 굴착해서, 수평 절단면(30c)이 굴착되고 남은 맨홀하부구조(30a)의 평평한 상면이 되도록 작업을 실시하게 되며,As shown in FIG. 10, the present invention excavates from the upper end of the manhole lower structure 30 to the horizontal cutting surface 30c so that the horizontal cutting surface 30c is excavated and becomes a flat upper surface of the remaining manhole lower structure 30a. To do the work,

상기와 같은 수평작업이 완료되면 맨홀 안에 설치되었던 상기 안전장치(34)를 맨홀 밖으로 철거하게 된다.When the horizontal work is completed as described above, the safety device 34 installed in the manhole is removed from the manhole.

도 11은 본 발명에 따른 맨홀의 보수시공법에 의하여 굴착된 맨홀하부구조의 상부에서 수평 절단면에 신규 맨홀하부구조가 위치한 상태를 도시한 단면도이다.11 is a cross-sectional view illustrating a state in which a new manhole lower structure is positioned on a horizontal cut surface at an upper portion of a manhole lower structure excavated by the repairing method of a manhole according to the present invention.

도 11에 도시된 바와 같이, 본 발명은 포장층의 굴착면(26a)과 상기 수평 절단면(30c) 및 앞으로 사용된 프리캐스트 콘크리트제의 새로운 신규 맨홀하부구조(30a)의 표면에 물을 적셔서, 이후 수행되는 초속경 모르타르의 주입 및 접착이 잘 이루어질 수 있는 하며,As shown in Fig. 11, the present invention wets the surface of the excavation surface 26a of the pavement layer, the horizontal cutting surface 30c, and the surface of the new novel manhole substructure 30a made of precast concrete. Since the injection and adhesion of the cemented carbide mortar can be performed well,

상기 굴착되고 남은 맨홀하부구조(30a)의 상면에 프리캐스트 콘크리트제의새로이 설치되는 신규 맨홀하부구조(22)를 설치하여 맨홀하부구조의 굴착된 부분을 대체시키게 된다.The new manhole lower structure 22, which is made of precast concrete, is installed on the upper surface of the excavated remaining manhole lower structure 30a to replace the excavated portion of the lower manhole structure.

도 12는 본 발명에 따른 맨홀의 보수시공법에 의하여 설치된 신규 맨홀하부구조의 저면 사이 및 포장층 사이에 초속경 모르타르를 주입하여 일체화시키는 상태를 도시한 단면도이다.12 is a cross-sectional view showing a state in which superscopy mortar is injected and integrated between the bottom surface of the new manhole lower structure and the pavement layer installed by the repairing method of the manhole according to the present invention.

도 13에 도시된 바와 같이, 본 발명은 상기 굴착되고 남은 맨홀하부구조(30a)의 상면과 새로 설치된 신규 맨홀하부구조(22)의 저면 사이 및 새로 설치된 신규 맨홀하부구조(22)와 포장층(26) 사이에 초속경 모르타르(23)를 주입해서, 굴착되고 남은 맨홀하부구조(30a)와 새로 설치된 신규 맨홀하부구조(22) 및 포장층(26)을 일체화시키게 된다.As shown in FIG. 13, the present invention provides a structure between the top surface of the excavated remaining manhole lower structure 30a and the bottom surface of the newly installed new manhole lower structure 22 and the newly installed new manhole lower structure 22 and the paving layer ( By inserting the cemented carbide mortar 23 between the 26, the excavated and left manhole lower structure 30a and the newly installed new manhole lower structure 22 and the pavement layer 26 are integrated.

도 13은 본 발명에 따른 맨홀의 보수시공법에 의하여 일체화된 신규 맨홀하부구조의 상부면에 신규 맨홀하우징이 설치되는 상태를 도시한 단면도이고, 도 14는 본 발명에 따른 맨홀의 보수시공법에 의하여 설치된 신규 맨홀하우징의 저면 사이 및 포장층 사이에 초속경 모르타르가 주입되는 상태를 도시한 단면도이다.13 is a cross-sectional view showing a state in which the new manhole housing is installed on the upper surface of the lower manhole structure integrated by the repair method of the manhole according to the present invention, Figure 14 is installed by the repair method of the manhole according to the present invention It is sectional drawing which shows the state which superhard mirror mortar is inject | poured between the bottom face of a new manhole housing, and a pavement layer.

도 13 내지 도 14에 도시된 바와 같이, 본 발명은 상기 기존 맨홀하우징(27)과 다른 새로운 형태의 신규 맨홀하우징(24)을 맨홀 설치기(33)에 체결시킨 상태로 맨홀 설치기의 프레임(33)이 맨홀 주변의 노면(25a)에 걸치도록 맨홀 상단의 중심에 설치해서, 새로 설치된 신규 리브(24)의 내주 플랜지(24a)와 새로 설치된 신규 맨홀하부구조(22) 사이에 백업재(24b)가 빈틈없이 끼워진 상태가 되도록 하며,As shown in Figure 13 to 14, the present invention is a frame 33 of the manhole installer in a state in which the new manhole housing 24 of the new type different from the existing manhole housing 27 is fastened to the manhole installer 33 It is installed at the center of the upper end of the manhole so as to span the road surface 25a around the manhole, and a backup material 24b is provided between the inner circumferential flange 24a of the newly installed new rib 24 and the newly installed manhole lower structure 22. Make sure that it fits tightly,

상기 새로 설치된 신규 맨홀하부구조(22)의 상면과 새로 설치된 신규 맨홀하우징(24)의 저면 사이 및 새로 설치된 신규 리브(24)과 포장층(26) 사이에 초속경 모르타르(23b)를 주입해서, 새로 설치된 신규 맨홀하부구조(22) 위에 새로 설치된 신규 맨홀하우징(24)을 고정시키게 되는데, 이 때 상기 신규 맨홀하우징(24)이 고정되면 가스버너와 같은 건조기를 사용해서 상기 노면층(25)에 형성된 수직 절단면(25c)과 새로 설치된 신규 맨홀하부구조(22) 위에 새로 설치된 신규 리브(24)을 고정시키게 되는 것이다.By inserting the superhard mirror mortar 23b between the upper surface of the newly installed new manhole lower structure 22 and the bottom of the newly installed new manhole housing 24 and between the newly installed new rib 24 and the packaging layer 26, The newly installed new manhole housing 24 is fixed on the newly installed new manhole lower structure 22. At this time, when the new manhole housing 24 is fixed, a drier such as a gas burner is used to attach to the road surface layer 25. The newly installed new ribs 24 are fixed on the formed vertical cut surface 25c and the newly installed new manhole lower structure 22.

도 15는 본 발명에 따른 맨홀의 보수시공법에 의하여 고정된 신규 맨홀하우징에 의하여 형성되는 수직 절단면 및 주변노면에 도로봉합재가 주입 도포된 다음, 신규 맨홀뚜껑이 안착된 상태를 도시한 단면도이고, 도 16은 본 발명에 따른 맨홀의 보수시공법에 의하여 보수시공된 맨홀의 상부 평면도이다.15 is a cross-sectional view illustrating a state in which a new manhole cover is seated after road sealing material is injected and applied to a vertical cut surface and a peripheral road surface formed by a new manhole housing fixed by a repairing method of a manhole according to the present invention. 16 is a top plan view of the manhole repaired by the manhole repair method according to the present invention.

도 15 내지 도 16에 도시된 바와 같이, 가스버너와 같은 건조기를 사용해서 상기 노면층(25)에 형성된 수직 절단면(25c)과 새로 설치된 신규 맨홀하우징(24)의 외주 플랜지(24c) 및 맨홀 주변의 노면(25a)을 건조시킨 다음에 새로 설치된 신규 맨홀하우징(24)으로부터 맨홀 설치기(33)을 분리시켜서 철거하게 되며,As shown in Figs. 15 to 16, a vertical cut surface 25c formed on the road surface layer 25 using a dryer such as a gas burner and a peripheral flange 24c and a manhole periphery of the newly installed new manhole housing 24 are shown. After drying the road surface (25a) of the new manhole housing 24, the manhole installer 33 is separated and removed,

상기 새로 설치된 신규 맨홀하우징(24)의 외주 플랜지(24c)와 노면층(25)의 수직 절단면(25c) 사이에 신축(伸縮)재료인 고무아스팔트 계통의 도로봉합재(25e)를 주입하면서, 요철이 형성된 맨홀 주변의 노면에도 상기 도로봉합재(25e)를 도포해서, 노면(25a)과 새로 설치된 신규 리브(24)의 상단 표면을 정밀하게 일치시켜주는 작업을 실시한다.Unevenness while injecting the road seal material 25e of rubber asphalt system, which is a stretchable material, between the outer peripheral flange 24c of the newly installed new manhole housing 24 and the vertical cut surface 25c of the road surface layer 25. The road sealant 25e is also applied to the road surface around the formed manhole to precisely match the road surface 25a with the upper surface of the newly installed rib 24.

상기 철거된 기존 맨홀 뚜껑(27b)보다 기능을 개선시킨 새로운 형태의 신규맨홀뚜껑(24d)을 새로 설치된 신규 맨홀하우징(24)의 상단에 안착시켜서 맨홀의 통공(29a)을 덮음으로써 본 발명의 맨홀 보수시공법이 완료되는 것이다.The manhole of the present invention by covering the through-hole 29a of the manhole by seating a new manhole cover 24d of a new form having improved function than the existing manhole cover 27b removed on the top of the newly installed manhole housing 24 The repair construction method is completed.

이하, 상기 구성을 설명하면서 참조한 도 4 내지 도 16을 참조하여 본 발명의 실시예를 더욱 상세하게 설명한다.Hereinafter, embodiments of the present invention will be described in more detail with reference to FIGS.

도4 내지 도 5에 도시된 바와 같이, 기존 맨홀 뚜껑(27b)의 상면 중심부분에 수직커터(32)를 설치한 다음 수직 커터의 작동 범위를 설정함과 함께 작동시켜서, 맨홀 상단 둘레의 바깥쪽으로 일정한 간격을 두고 맨홀을 감싼 상태로 노면층(25)에 수직 상태의 절단면(25c)을 형성하게 된다.4 to 5, the vertical cutter 32 is installed in the central portion of the upper surface of the existing manhole cover 27b, and then operated while setting the operating range of the vertical cutter to the outside of the upper periphery of the manhole. The cut surface 25c of the perpendicular state is formed on the road surface layer 25 while the manhole is wrapped at regular intervals.

여기서 회전판(32a)과 조절봉(32b) 및 엔진형 커터(32)로 구성된 수직 커터의 사용방법과 특징에 관해 참고적으로 살펴보면 다음과 같다.Here, referring to the use method and features of the vertical cutter consisting of the rotating plate 32a, the adjusting rod 32b, and the engine-type cutter 32 are as follows.

상기 수직 커터의 사용방법은, 설치되어 있는 기존 맨홀뚜껑(27b)의 상면 중심부분에 회전판(32a)을 설치하는 단계와; 상기 회전판(32a)에 조절봉(32b)을 체결하는 단계와; 상기 조절봉(32b)의 일단에 엔진형 커터(32)를 체결하는 단계와; 상기 조절봉(32b)의 길이를 조절해서 절단 범위(노면층에 형성되는 절단면이 노면상에 원형을 형성하게 되는데 여기서 상기 원형의 반경이 절단 범위가 된다)를 설정하는 단계를 거쳐서 상기 엔진형 커터(32)를 작동시키면, 엔진형 커터(32a)가 회전판을 축으로 하여 맨홀의 주변을 감싸 돌면서 노면층(25)에 수직 상태의 절단면(25c)을 형성하게 된다.The method of using the vertical cutter, the step of installing a rotating plate (32a) in the central portion of the upper surface of the existing manhole cover (27b) is installed; Fastening an adjusting rod (32b) to the rotating plate (32a); Fastening an engine type cutter (32) to one end of the adjusting rod (32b); By adjusting the length of the adjusting rod (32b) through the step of setting the cutting range (the cutting surface formed in the road surface layer to form a circle on the road surface where the radius of the circle is a cutting range) When the 32 is operated, the engine cutter 32a turns around the manhole around the rotating plate to form a cut surface 25c perpendicular to the road surface layer 25.

그리고 상기 수직커터(32)는 구조가 간단해서 사용이 용이하고 구입 비용이 저렴하므로 맨홀의 보수 시공비를 낮출 수 있게 하는 특징이 있다.In addition, the vertical cutter 32 is characterized by a simple structure, easy to use and low in cost to purchase and lower the maintenance cost of the manhole.

계속해서, 도 6에 도시된 바와 같이, 상기 기존 맨홀뚜껑(27b)의 상면에서 수직커터(32)를 철거한 다음 포장 파쇄기를 사용 수직 절단면(25c)에서 기존 맨홀하우징(27)사이의 노면층(25d)과 포장층(26b)을 차례차례 굴착해서, 기존 맨홀하우징(27)을 구성하는 수평 플랜지(27a)의 상면을 외부에 완전히 노출시키게 되며,Subsequently, as shown in FIG. 6, the vertical cutter 32 is removed from the upper surface of the existing manhole cover 27b, and then the road surface layer between the existing manhole housings 27 at the vertical cutting surface 25c using a pavement crusher. 25d and the pavement layer 26b are sequentially excavated to completely expose the upper surface of the horizontal flange 27a constituting the existing manhole housing 27 to the outside,

도 7 내지 도 8에 도시된 바와 같이, 상기 맨홀뚜껑(27b)을 포함하는 기존 맨홀하우징(27)을 맨홀 상단으로부터 철거시킨 다음, 도 8에 도시된 바와 같이, 상기 기존 맨홀하우징(27)이 철거된 맨홀 상단에 작동 범위가 설정된 수평커터(31)를 설치한 다음 작동시켜서, 벽돌 또는 콘크리트 층인 맨홀하부구조(30)의 내주면(30b)에 수평 상태의 절단면(30c)을 형성하게 된다.As shown in FIGS. 7 to 8, the existing manhole housing 27 including the manhole cover 27b is demolished from the upper end of the manhole, and as shown in FIG. 8, the existing manhole housing 27 is A horizontal cutter 31 having an operating range set on the top of the removed manhole is operated to form a horizontal cut surface 30c on the inner circumferential surface 30b of the manhole lower structure 30 which is a brick or concrete layer.

여기에서 상기 수평커터(31)의 구조와 사용방법 및 특징을 참고적으로 살펴보면 다음과 같다.Herein, the structure, the method of use, and the features of the horizontal cutter 31 will be described as follows.

상기 수평커터(31)에 장착된 상태로 상하 높이조절이 가능한 로드(31a)와, 상기 로드(31a)의 일단에 부착된 모터에 의해 고속 회전하는 수평 커터의 날(31b) 등으로 구성되어 있다.It is composed of a rod 31a capable of adjusting the vertical height while being mounted on the horizontal cutter 31, and a horizontal cutter blade 31b which rotates at high speed by a motor attached to one end of the rod 31a. .

그리고 상기 수평커터(31)의 사용방법은 맨홀 상단에서 기존 맨홀하우징(27)을 철거한 다음에 맨홀하부구조(30)의 상태를 살펴보고, 그 맨홀하부구조(30)의 굴착 여부와 굴착 범위를 결정하게되며,And the use of the horizontal cutter 31 is to remove the existing manhole housing 27 at the top of the manhole and then look at the state of the manhole lower structure 30, whether the excavation and excavation range of the manhole lower structure 30 Will be determined,

상기와 같이 굴착범위가 결정되면 이후 수평커터(31)의 작동 범위 즉 높이(노면에서부터 맨홀하부구조의 절단 될 부위까지의 간격)와 폭(맨홀의 내경과 비례한다)을 설정한 상태에서, 수평 커터의 프레임(31)이 맨홀 외측의 노면층(25)에 걸쳐 지도록 맨홀 상단의 중심에 설치하고 이후 작동시키게 되며,After the excavation range is determined as described above, the horizontal cutter 31 is operated in a horizontal state in which the operating range, that is, the height (the distance from the road surface to the portion to be cut off) and the width (proportional to the inner diameter of the manhole) are set. The frame 31 of the cutter is installed in the center of the top of the manhole so as to span the road surface layer 25 on the outside of the manhole, and then operated.

상기 로드(31a)의 일단에 장착된 유압모터에 의해 고속 회전하는 수평 커터의 날(31b)이 맨홀하부구조(30)의 내주면을 따라 최소 한 바퀴 이상 돌면서, 상기 맨홀하부구조(30)의 전체를 일정한 깊이까지 수평 상태로 절단해서 수평 상태의 절단면(30c)을 형성하게 된다.The horizontal cutter blade 31b that rotates at a high speed by the hydraulic motor mounted to one end of the rod 31a rotates at least one or more times along the inner circumferential surface of the manhole lower structure 30, and thus the whole of the manhole lower structure 30 Is cut in a horizontal state to a certain depth to form a cutting surface 30c in a horizontal state.

그 후, 상기 맨홀 상단으로부터 수평커터(31)를 철거하는 과정을 거쳐서 수평커터(31)를 사용한다.Thereafter, the horizontal cutter 31 is used by going through the process of removing the horizontal cutter 31 from the upper end of the manhole.

한편, 본 발명에서 상기 수평커터(31)를 사용하는 이유는 상기 설명된 바와 같이 내구성이 떨어진 맨홀하부구조(30)가 내려앉거나 또는 오버레이(25) 시공 등으로 맨홀(27) 표면과 노면925a) 사이에 높이 편차(25b)가 발생하면, 맨홀하부구조(30)와 리브(27)을 굴착·철거하고, 이후 상기 맨홀하부구조(30)를 견고하게 복구하면서 그 위에 철거된 리브(27)을 다시 얹히고 고정시켜서, 맨홀을 보수 시공하게 되는데,On the other hand, the reason for using the horizontal cutter 31 in the present invention is because the manhole lower structure 30 is inferior as described above, or the manhole 27 surface and road surface 925a due to the overlay 25 construction, etc. When the height deviation 25b occurs between), the manhole lower structure 30 and the rib 27 are excavated and removed, and then the rib 27 removed thereon is firmly restored while the manhole lower structure 30 is firmly recovered. To fix the manhole again.

종래 맨홀의 보수 시공법에서는 맨홀하부구조의 굴착 및 복구하는 기술이 부족했기 때문에 맨홀하부구조와 리브를 동시에 보수 시공하는데 어려움이 많았으며, 이러한 원인으로 종래에는 대부분 리브(27)의 높이조절에 국한되어서 맨홀의 보수 시공이 이루어졌고, 맨홀하부구조(30)의 보수에는 소홀 할 수밖에 없었다.In the conventional manhole repair method, the manhole substructure and ribs were difficult to repair and repair at the same time because of lack of technology for excavating and restoring the manhole substructure. For this reason, most of the conventional manholes were limited to height adjustment of the ribs 27. The repair of the manhole was made, and the manhole undercarriage 30 had no choice but to be repaired.

그러므로 맨홀이 보수 시공되었다 하여도 통행 차량의 충격하중에 내구성이 떨어진 맨홀하부구조(30)가 쉽게 내려앉거나 하면서 보수 시공된 리브(27)까지도 쉽게 유동·침하시키는 경우가 있었다.Therefore, even if the manhole has been repaired, the manhole lower structure 30, which is inferior to the impact load of the traffic vehicle, easily descends, and even the repaired rib 27 may easily flow and settle down.

이에 상기 수평커터(31)를 사용해서 부실한 맨홀하부구조(30)의 이정부위를 수평 상태로 절단하면 그 절단면(30c)이 평평하고, 절단면(30c)에서부터 노면(25a)까지의 높이가 새로 설치된 프리캐스트 콘크리트제의 맨홀하부구조(22)와 그 상단에 새로 설치되는 신규 리브(24)의 두께를 합친 것과 똑같기 때문에, 수평 상태의 절단면(30c) 위에 새로 설치되는 신규 맨홀하부구조(22)와 리브를 높이조절 없이 차례차례 얹혀 놓기만 해도 맨홀 표면의 높이와 노면(25a)의 높이를 용이하게 일치시킬 수 있게 되며, 이후 그것들의 주변에 초속경 모르타르(23)를 주입하고 경화시켜서 맨홀하부구조(30)를 포함하는 맨홀 전체를 매우 정밀·견고하면서도 신속하고 경제적으로 보수 시공할 수 있으므로, 본 발명에서 맨홀의 보수 시공용 수평 커터(31)를 새로 개발해서 사용하는 것이다.Therefore, when the cutting portion 30c of the poor manhole lower structure 30 is cut horizontally using the horizontal cutter 31, the cut surface 30c is flat, and the height from the cut surface 30c to the road surface 25a is newly installed. Since the thickness of the manhole lower structure 22 made of precast concrete and the new rib 24 newly installed on the upper side is the same, the new manhole lower structure 22 newly installed on the horizontal cut surface 30c and Even if the ribs are placed one after another without height adjustment, it is possible to easily match the height of the surface of the manhole and the height of the road surface 25a, and then, by injecting and hardening the superhard mirror mortar 23 around them, the manhole lower structure Since the entire manhole including the 30 can be repaired very precisely and steadily, quickly and economically, the newly developed horizontal cutter 31 for repairing the manhole is newly developed and used in the present invention. A.

계속해서, 도 9에 도시된 바와 같이, 상기 맨홀 상단에서 수평커터(31)를 철거한 다음 벽돌 또는 콘크리트 층인 맨홀하부구조(30)의 굴착 과정에서 발생할 수 있는 각종 안전사고를 예방하기 위해 맨홀 안에 안전장치(34)를 설치한다.Subsequently, as shown in FIG. 9, the horizontal cutter 31 is removed from the upper end of the manhole, and then in the manhole to prevent various safety accidents that may occur during the excavation process of the manhole lower structure 30, which is a brick or concrete layer. Install the safety device (34).

그런 다음, 도 10에 도시된 바와 같이, 상기 포장 파쇄기를 사용 맨홀하부구조(30)를 수평 절단면(30c)까지 굴착해서, 수평 절단면(30c)이 굴착되고 남은 맨홀하부구조(30a)의 평평한 상면이 되도록 한 후에, 상기 맨홀 안에 설치된 안전장치(34)를 맨홀 밖으로 철거하게 되며,Then, as shown in FIG. 10, the manhole lower structure 30 is excavated to the horizontal cutting surface 30c using the pavement crusher, so that the horizontal cutting surface 30c is excavated and the flat upper surface of the remaining manhole lower structure 30a is removed. After this, the safety device 34 installed in the manhole is removed from the manhole,

도 11에 도시된 바와 같이, 포장층의 굴착면(26a)과 상기 수평 절단면(30c) 및 앞으로 사용될 프리캐스트 콘크리트제의 맨홀하부구조(22)의 표면에 물을 적셔서, 이후 초속경 모르타르의 주입 및 접착이 잘 이루어지게 한 다음에 상기 굴착되고 남은 맨홀하부구조(30a)의 상면에 상기 프리캐스트 콘크리트제의 새로운 신규 맨홀하부구조(22)를 설치해서, 상기 굴착된 맨홀하부구조를 대체시키게 된다.As shown in Fig. 11, the surface of the excavation surface 26a of the pavement layer and the horizontal cut surface 30c and the surface of the manhole substructure 22 made of precast concrete to be used in the future is moistened, followed by the injection of superhard mortar. And after the adhesion is made well, a new manhole substructure 22 made of precast concrete is installed on the upper surface of the remaining manhole substructure 30a to replace the excavated manhole substructure. .

도 12에 도시된 바와 같이, 상기 굴착되고 남은 맨홀하부구조(30a)의 상면과 새로 설치된 신규 맨홀하부구조(22)의 저면 및 포장층의 굴착면(26a) 사이에 초속경 모르타르(23a)를 주입해서, 굴착되고 남은 맨홀하부구조(30a)와 새로 설치된 신규 맨홀하부구조(22) 및 굴착 된 포장층(26)을 일체화시키게 되며,As shown in FIG. 12, a superhard tip mortar 23a is disposed between the upper surface of the excavated remaining manhole lower structure 30a and the bottom surface of the newly installed new manhole lower structure 22 and the excavation surface 26a of the pavement layer. By injecting, the excavated remaining manhole lower structure 30a and the newly installed new manhole lower structure 22 and the excavated pavement layer 26 are integrated.

이후, 도 13에 도시된 바와 같이, 새로운 형태의 신규 맨홀하우징(24)을 맨홀 설치기(33)에 매달은 상태로 상기 맨홀 설치기의 프레임(33)이 맨홀 주변의 노면층(24)에 걸쳐지도록 맨홀 상단의 중심에 설치해서, 새로 설치된 상기 신규 맨홀하우징(24)의 내주 플랜지(24a)와 새로 설치된 신규 맨홀하부구조(22)의 상면 사이에 백업재(24b)가 빈틈없이 끼워진 상태가 되도록 한다.Thereafter, as shown in FIG. 13, the frame 33 of the manhole installer spans the road surface layer 24 around the manhole while the new manhole housing 24 of the new type is suspended on the manhole installer 33. Installed at the center of the upper end of the manhole, the backing material 24b is sandwiched between the inner circumferential flange 24a of the newly installed manhole housing 24 and the upper surface of the newly installed manhole lower structure 22. .

도 14에 도시된 바와 같이, 상기 새로 설치된 신규 맨홀하부구조(22)의 상면과 굴착된 포장층(26) 및 새로 설치된 신규 리브(24)의 저면 사이에 초속경 모르타르(23b)를 주입해서, 새로 설치된 신규 맨홀하부구조(22)의 상면에 새로 설치된 신규 리브(24)을 고정시키게 되며,As shown in Figure 14, by inserting the superscopy mortar (23b) between the upper surface of the newly installed new manhole lower structure 22 and the bottom surface of the excavated pavement layer 26 and the newly installed new rib 24, The newly installed new rib 24 is fixed to the upper surface of the newly installed new manhole lower structure 22,

그런 다음, 도 15에 도시된 바와 같이, 상기 노면층(25)에 형성된 수직 절단면과 상기 새로 설치된 신규 맨홀하우징(24)의 외주 플랜지(24c) 사이 및 맨홀 주변의 노면(25a)을 열풍 건조시킨 후에, 상기 새로 설치된 신규 맨홀하우징(24)으로부터 맨홀 설치기(33)를 분리시켜서 철거한 다음,Then, as illustrated in FIG. 15, hot air is dried between the vertical cut surface formed in the road surface layer 25 and the outer circumferential flange 24c of the newly installed new manhole housing 24 and around the manhole. Later, the manhole installer 33 is detached from the newly installed new manhole housing 24 and then removed.

상기 새로 설치된 신규 맨홀하우징(24)의 외주 플랜지(24c)와 열풍 건조된수직 절단면(25c) 및 맨홀 주변의 노면에 형성된 요철에 신축재료인 고무아스팔트 계통의 도로봉합재(25e)를 주입 및 도포해서, 상기 노면(25a)과 새로 설치된 신규 리브(24)의 상단 표면을 정밀하게 일치시켜줌과 함께 상기 새로 설치된 신규 리브(24)의 안착턱에 새로운 형태의 맨홀 뚜껑(24d)을 안착시켜서 본 발명에 따른 맨홀의 보수 시공법에 따라 맨홀의 보수 시공이 완료되는 것이다.Injecting and applying the newly-installed manhole housing 24, the outer flange (24c) and the hot air-dry vertical cut surface (25c) and the road seal material (25e) of the rubber asphalt system as a stretch material to the unevenness formed on the road surface around the manhole In order to precisely match the top surface of the newly installed rib 24 with the road surface 25a, a new type of manhole cover 24d is seated on the seating jaw of the newly installed new rib 24. According to the repair method of the manhole according to the repair of the manhole is completed.

상술한 바와 같이, 본 발명에 따른 맨홀의 보수시공법에 의하여 맨홀을 보수 시공할 경우 다음과 같은 여러 가지의 효과를 얻을 수 있다.As described above, when the manhole is repaired by the repairing method of the manhole according to the present invention, the following various effects can be obtained.

첫째, 기존 리브(27)을 철거하고 새로운 형태의 신규 리브(24)으로 대체시키면, 새로 설치한 신규 맨홀하부구조(22)의 상단에 고착된 초속경 모르타르(23b) 내에 새로 설치된 신규 리브(24)의 내주 플랜지(24a)가 묻혀져서 견고하게 고정되므로, 이후 통행 차량의 충격하중에도 리브(24)이 유동되지 않게 된다.First, when the existing rib 27 is dismantled and replaced with a new rib 24 having a new shape, the new rib 24 newly installed in the superscopy mortar 23b fixed to the upper end of the newly installed new manhole lower structure 22 is installed. Since the inner circumferential flange 24a of the) is buried and firmly fixed, the rib 24 does not flow even after the impact load of the traffic.

둘째, 기존 리브(27)을 철거하고 새로운 형태의 신규 리브(24)으로 대체시켜서 보수 시공된 맨홀을 차후 필요에 따라 재 보수 시공할 때, 맨홀 주변의 노면층과 포장층을 절단하거나 굴착할 필요 없이 리브(24)을 용이하게 들어올려서 리브의 상단 표면의 높이와 노면(25a)의 높이를 정밀하게 일치시킨 다음에, 리브(24)의 밑에 초속경 모르타르를 주입 및 경화 시켜서 맨홀의 재 보수 시공을 완료시키므로, 맨홀의 재 보수 시공을 용이하게 하면서 소요되는 공사비를 최소화시킬 수 있게 된다.Second, when removing the existing rib 27 and replacing it with a new type of new rib 24, the repaired manhole needs to be cut or excavated in the road surface layer and pavement layer around the manhole. Easy lifting of the ribs 24 to precisely match the height of the top surface of the ribs with the height of the road surface 25a, and then inserting and hardening a superhard mirror mortar under the ribs 24 to rebuild the manhole. Since it is completed, it is possible to minimize the construction cost required while facilitating the renovation construction of the manhole.

셋째, 수평 커터(31)와 노면 파쇄기를 사용 내구성이 떨어진맨홀하부구조(30)의 일정부위를 수평 상태로 절단(30c) 및 굴착하고, 그 굴착된 곳을 새로운 재료로 대체시켜서, 맨홀의 보수 시공 과정을 용이하게 하면서도 맨홀하부구조(30)를 포함하는 맨홀 전체를 신속하고 정밀·견고하게 보수 시공할 수 있게 된다.Third, by cutting (30c) and excavating a predetermined portion of the manhole lower structure (30), which is inferior in durability, using a horizontal cutter (31) and a road crusher, and replacing the excavated portion with a new material to repair the manhole. While facilitating the construction process, the entire manhole including the manhole lower structure 30 can be repaired quickly, precisely, and firmly.

넷째, 맨홀 설치기(33)를 사용 맨홀 표면 즉 리브(24)의 상단 표면의 높이와 노면(25a) 높이를 정밀하게 일치시켜서, 리브(24)의 설치 과정을 용이하게 하면서도 매우 정밀하게 맨홀을 보수 시공할 수 있게 된다.Fourth, the manhole mounting device 33 is used to precisely match the height of the manhole surface, that is, the top surface of the rib 24 with the height of the road surface 25a, thereby facilitating the installation process of the rib 24 and repairing the manhole very precisely. It is possible to construct.

다섯째, 보수 시공된 맨홀을 차후 재 보수 시공할 때 노면층과 포장층(26)의 굴착을 최대한 줄일 수 있게 되므로, 환경 오염원인 굴착 폐기물의 발생을 줄일 수 있음은 물론 굴착된 포장층을 되메우는 데 가격이 비싼 초속경 모르타르(23a, 23b)의 소요량을 최소화시켜서, 맨홀의 재 보수 시공비를 최소화 할 수 있게 된다.Fifth, since the excavation of the road surface layer and the pavement layer 26 can be reduced as much as possible when the renovated manhole is repaired later, it is possible to reduce the occurrence of excavation waste, which is a source of environmental pollution, and to refill the excavated pavement layer. By minimizing the cost of the super fast mortars (23a, 23b), the cost of manhole repair can be minimized.

여섯째, 맨홀을 정밀·견고하게 보수 시공하여, 맨홀의 견고성과 노면(25a)의 평탄성을 현저하게 개선시킴은 물론 그러한 상태를 지속적으로 유지시켜서, 통행차량의 안전성과 쾌속성 또한 지속적으로 유지시킬 수 있게 되므로, 이후 맨홀 뚜껑과 통행 차량 간에 충돌로 발생되던 소음을 줄여서 연도의 환경을 좋게 할 수 있다.Sixth, the manhole can be repaired precisely and firmly to significantly improve the manhole's robustness and the flatness of the road surface 25a, as well as to maintain such a state continuously, thereby maintaining the safety and speed of the traffic. Therefore, it is possible to reduce the noise generated by the collision between the manhole cover and the traffic vehicle, thereby improving the year's environment.

Claims (7)

기존 맨홀뚜껑(27b)의 상부 중앙에 수직커터(32)를 설치 작동시켜 상기 맨홀뚜껑(27b)의 둘레를 절단한 다음, 기존 맨홀하우징(27)의 수평 플랜지(27a) 상면을 외부에 완전히 노출시켜 상기 기존 맨홀뚜껑(27b)을 포함하는 기존 맨홀하우징(27) 일체를 철거하는 단계와;Install the vertical cutter 32 at the upper center of the existing manhole cover 27b to cut the periphery of the manhole cover 27b, and then completely expose the upper surface of the horizontal flange 27a of the existing manhole housing 27 to the outside. Dismantling the existing manhole housing 27 integrally including the existing manhole cover 27b; 상기 기존 맨홀하우징(27)이 철거된 맨홀상단에 수평커터(31)를 설치 작동시켜 맨홀하부구조(30)의 내주면(30b)을 수평상태로 절단하여 절단면(30c)을 형성한 다음, 상기 절단면(30c)에 안전장치(34)를 설치하는 단계와;By installing the horizontal cutter 31 on the upper manhole in which the existing manhole housing 27 is removed, the inner peripheral surface 30b of the manhole lower structure 30 is cut in a horizontal state to form a cutting surface 30c, and then the cutting surface Installing a safety device (34) at 30c; 상기 맨홀하부구조(30)의 상단에서부터 수평 절단면(30c)까지 굴착한 다음, 신규 맨홀하부구조(22)를 설치하여 형성되는 저면 사이 및 포장층(26) 사이에 초속경 모르타르(23a)를 주입하여 일체화시키는 단계와;After excavating from the upper end of the manhole lower structure 30 to the horizontal cutting surface 30c, supersonic mortar 23a is injected between the bottom surface and the pavement layer 26 formed by installing the new manhole lower structure 22. To integrate; 상기 신규 맨홀하부구조(22)의 상부면에 하단부에 백업재(24b)가 부착된 신규 맨홀하우징(24)을 위치시켜 상기 신규 맨홀하부구조(22)의 상면과 신규 맨홀하우징(24)의 저면 사이 및 포장층(26) 사이에 초속경 모르타르(23a)를 주입하여 신규 맨홀하우징(24)을 고정시키는 단계와;A new manhole housing 24 having a backing material 24b attached thereto is disposed on the lower surface of the new manhole lower structure 22, and the upper surface of the new manhole lower structure 22 and the bottom of the new manhole housing 24. Fixing a new manhole housing 24 by injecting a superscopy mortar 23a between the pavement layer 26 and the pavement layer 26; 상기 고정된 신규 맨홀하우징(24)의 외주 플랜지(24c)와 노면층(25)의 수직 절단면(25c) 사이 및 요철이 형성된 맨홀 주변의 노면에도 도로봉합재(25e)를 주입 및 도포하여 신규 맨홀하우징(24)의 상단 표면을 노면층(25)과 일치시켜 주는 단계와;New manholes are injected and applied to the road surface material 25e between the outer circumferential flange 24c of the fixed new manhole housing 24 and the vertical cut surface 25c of the road surface layer 25 and the road surface around the manhole in which the unevenness is formed. Matching the top surface of the housing (24) with the road surface layer (25); 상기 노면층(25)과 높이가 일치된 신규 맨홀하우징(24)의 상단에 신규 맨홀뚜껑(24d)을 안착시켜 맨홀의 통공(29a)을 덮는 단계로 구성되는 것을 특징으로 하는 맨홀의 보수 시공법.Repairing method of the manhole comprising a step of covering the through hole (29a) of the manhole by seating a new manhole cover (24d) on the top of the new manhole housing 24, the height of the road surface layer (25). 제1항에 있어서,The method of claim 1, 상기 기존 맨홀하우징(27) 일체를 철거하는 단계에서 상기 맨홀뚜껑(27b)의 둘레를 절단하는 공정은 상기 기존 맨홀뚜껑(27b)의 상면 중심부분에 수직 커터의 회전판(32a)을 설치하고, 상기 회전판(32a)에 조절봉(32b)을 체결시킴과 함게 조절봉(32b)의 길이를 조절해서 수직 커터(32)의 작동 범위를 설정한 다음, 상기 조절봉(32b)의 일단에 엔진형 커터(32)를 체결시키고, 상기 조절봉(32b)의 일단에 부착된 엔진형 커터(32)를 작동시켜 상기 엔진형 커터(32)가 회전판(32a)을 축으로 하여 기존 리브(27)을 감싸 돌면서 노면층(25)에 수직 상태의 절단면(25c)을 형성하는 것을 특징으로 하는 맨홀의 보수 시공법.The step of cutting the periphery of the manhole cover 27b in the step of removing the existing manhole housing 27 integrally installs the rotary plate 32a of the vertical cutter on the central portion of the upper surface of the manhole cover 27b. The operating range of the vertical cutter 32 is set by fastening the adjusting rod 32b to the rotating plate 32a and adjusting the length of the adjusting rod 32b. Then, the engine-type cutter is attached to one end of the adjusting rod 32b. (32) is fastened, and the engine-type cutter 32 attached to one end of the adjusting rod 32b is operated so that the engine-type cutter 32 surrounds the existing ribs 27 with the rotation plate 32a as the axis. Repairing method of the manhole, characterized in that to form a cut surface (25c) perpendicular to the road surface layer 25 while turning. 제1항에 있어서,The method of claim 1, 상기 절단면(30c)에 안전장치(34)를 설치하는 단계에서 상기 맨홀하부구조(30)의 내주면(30b)을 수평상태로 절단하여 절단면(30c)을 형성하는 공정은 상기 맨홀하부구조(30)의 상태를 살펴서 그 맨홀하부구조(30)의 굴착여부와 절단범위를 결정한 다음, 상기 결정된 굴착여부 및 절단범위에 따라 수평커터(31)의 작동범위인 높이(노면에서 맨홀하부구조의 절단될 부위까지의 간격)와 폭(수평상태로 형성될 절단선의 폭)을 설정하고, 상기 수평커터의 프레임(31)이 맨홀 외측이 노면(25a)에 걸치도록 맨홀(27)의 상단 중심에 설치한 다음 수평커터(31)를 작동시킨 다음, 상기 작동하는 수평커터(31)의 날(31b)이 맨홀하부구조의 내주면(30b)을 최소 한바퀴 이상 돌면서 맨홀하부구조930)의 일정부위를 적당한 깊이로 절단해서 편평한 절단면(30c)을 형성하는 것을 특징으로 하는 맨홀의 보수 시공법.In the step of installing the safety device 34 on the cut surface 30c, the process of cutting the inner circumferential surface 30b of the manhole lower structure 30 in a horizontal state to form the cut surface 30c includes the manhole lower structure 30. Determine the excavation and cutting range of the manhole lower structure 30 by looking at the state of, then the height of the operating range of the horizontal cutter 31 in accordance with the determined excavation and cutting range (site to be cut of the manhole lower structure on the road surface) Intervals) and width (width of the cutting line to be formed in a horizontal state), and the frame 31 of the horizontal cutter is installed at the upper center of the manhole 27 so that the outside of the manhole spans the road surface 25a. After the horizontal cutter 31 is operated, the blade 31b of the operating horizontal cutter 31 cuts a predetermined portion of the lower manhole structure 930 to an appropriate depth while rotating the inner circumferential surface 30b of the lower manhole structure at least one turn. Characterized in that to form a flat cutting surface (30c) The repair of a manhole construction method. 제1항에 있어서,The method of claim 1, 상기 신규 맨홀하부구조(22)를 설치하여 형성되는 저면 사이 및 포장층(26) 사이에 초속경 모르타르(23a)를 주입하여 일체화시키는 단계는 상기 포장층(26)의 굴착면(26a)과 상기 수평 상태로 형성된 절단면(30c)을 깨끗하게 청소하고, 청소된 절단면(30c)과 신규 맨홀하부구조(22)의 표면에 흐르지 않고 젖을 정도로 물을 뿌려준 다음, 상기 굴착된 맨홀하부구조의 깊이에 따라 프리캐스트 콘크리트제의 신규 맨홀하부구조(22)를 한 개 또는 몇 개를 겹쳐서 설치하고, 상기 설치된 신규 맨홀하부구조(22)가 형성하는 사이공간에 초속경 모르타르(23a, 23b)의 주입한 다음, 상기 고정된 신규 맨홀하우징(24) 사이공간에 주입된 초속경 모르타르(23a)를 건조기를 사용하여 건조시켜 경화시키는 것을 특징으로 하는 맨홀의 보수 시공법.The step of injecting and integrating the superhard mirror mortar 23a between the bottom surface formed by installing the new manhole lower structure 22 and between the pavement layer 26 is an excavation surface 26a of the pavement layer 26 and the Clean the cut surface (30c) formed in a horizontal state to clean, sprayed with water wet enough not flowing on the surface of the clean cut surface (30c) and the new manhole lower structure 22, and then free depending on the depth of the excavated manhole lower structure One or several new manhole substructures 22 made of cast concrete are piled up, and superhard mortars 23a and 23b are injected into the interspace formed by the installed new manhole substructures 22, Repairing method of the manhole, characterized in that the hard boiled mortar (23a) injected into the space between the fixed new manhole housing (24) using a dryer to cure. 제1항에 있어서,The method of claim 1, 상기 신규 맨홀하부구조(22)의 상면과 신규 맨홀하우징(24)의 저면 사이 및포장층(26) 사이에 초속경 모르타르(23a)를 주입하여 신규 맨홀하우징(24)을 고정시키는 단계는 상기 신규 맨홀하우징(24)의 상단 표면높이가 노면(25a)보다 높거나 낮을 경우 내주 플랜지(24a)로부터 백업재(24b)를 완전히 떼어 내거나 두께가 다른 백업재(24b)로 대체시킨 다음 신규 맨홀하우징(24)을 다시 설치하여 맨홀 상단표면과 노면의 높이를 일치시키는 것을 특징으로 하는 맨홀의 보수 시공법.The step of fixing the new manhole housing 24 by injecting a superhard mirror mortar 23a between the upper surface of the new manhole lower structure 22 and the bottom of the new manhole housing 24 and the packaging layer 26 is performed. If the top surface height of the manhole housing 24 is higher or lower than the road surface 25a, completely remove the backup material 24b from the inner circumference flange 24a or replace it with a backup material 24b of different thickness, and then replace the new manhole housing ( 24) Re-installation method of the manhole, characterized in that to match the height of the manhole top surface and the road surface again. 제1항에 있어서,The method of claim 1, 상기 신규 맨홀하우징(24)의 상단 표면을 노면층(25)과 일치시켜 주는 단계는 상기 신규 맨홀하부구조(22)와 신규 맨홀하우징(24) 사이에 초속경 모르타르(23b)를 주입하면서, 상기 신규 맨홀하우징(24)의 외주 플랜지(24c)와 노면층(25)의 수직 절단면(25c)의 중간부분까지 초속경 모르타르(23b)를 채운 다음, 상기 채워진 초속경 모르타르(23b)의 표면부터 노면까지는 신축재료인 고무아스팔트 계통의 도로봉합재(25e)를 주입하면서, 노면(25a)에 형성된 요철부위도 도로봉합재(25e)로 도포해서 노면(25a)과 맨홀(24)의 표면을 정밀하게 일치시켜 주는 것을 특징으로 하는 맨홀의 보수 시공법.Matching the upper surface of the new manhole housing 24 with the road surface layer 25 is performed by injecting a superhard mortar 23b between the new manhole lower structure 22 and the new manhole housing 24. The superscopy mirror mortar 23b is filled up to the middle of the outer peripheral flange 24c of the new manhole housing 24 and the vertical cut surface 25c of the road surface layer 25, and then from the surface of the filled superscopy mortar 23b to the road surface. While injecting the road seal material 25e of the rubber asphalt system, which is a stretchable material, the uneven portions formed on the road surface 25a are also coated with the road seal material 25e to precisely cover the surfaces of the road surface 25a and the manhole 24. The repair construction method of the manhole characterized by matching. 벽돌층 또는 콘크리트 구조의 맨홀하부구조가 일부분이 굴착되고 일부분만 남아 있게 된 맨홀하부구조와;A manhole lower structure in which part of the manhole lower structure of the brick layer or concrete structure is excavated and only part thereof remains; 상기 맨홀하부구조의 굴착된 부분을 대체해서 굴착되고 남은 맨홀하부구조의 상단에 설치되는 프리캐스트 콘크리트제의 신규 맨홀하부구조와;A new manhole lower structure made of precast concrete, which is installed on the upper end of the manhole lower structure which has been excavated by replacing the excavated portion of the manhole lower structure; 상기 신규 맨홀하부구조의 상단에 기존 맨홀하우징을 대체해서 설치되면서, 내주 플랜지와 외주 플랜지 및 백업재와 안착턱 등으로 구성된 새로 설치된 신규 리브와;A newly installed new rib composed of an inner circumferential flange, an outer circumferential flange, a backing member, a seating jaw, etc., while being installed by replacing the existing manhole housing on the upper portion of the new manhole lower structure; 상기 굴착되고 남은 맨홀하부구조의 상면과 신규 맨홀하부구조의 저면 및 포장층 사이에 주입되어서 경화된 초속경 모르타르 및 상기 신규 맨홀하부구조의 상면과 신규 맨홀하우징의 주변에 주입되어서 경화된 초속경 모르타르와;Superhard mortar hardened by injection between the upper surface of the excavated and remaining manhole lower structure and the bottom and pavement layers of the new manhole lower structure and superhard mortar hardened by being injected around the upper surface of the new manhole lower structure and the new manhole housing Wow; 상기 신규 맨홀하우징의 안착턱에 얹혀져서 맨홀의 통공을 덮어주는 맨홀뚜껑과;A manhole cover mounted on the seating jaw of the new manhole housing and covering the through hole of the manhole; 상기 신규 맨홀하우징과 노면층 및 노면의 요철부위에 주입 또는 도포 된 상태로 새로 설치된 신규 리브의 상단 표면과 노면을 매우 정밀하게 일치시켜 주는 신축재료인 고무아스팔트 계통의 도로봉합재로 구성되는 것을 특징으로 하는 보수 시공된 맨홀구조.The new manhole housing and the road seal material of the rubber asphalt system, which is an elastic material that matches the top surface and the road surface of the newly installed new ribs very precisely in the state of being injected or applied to the uneven part of the road surface layer and the road surface. Repaired manhole structure.
KR10-2002-0062687A 2002-10-15 2002-10-15 Execution method for repairing manhole and manhole structure repaired by the same execution method KR100488401B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0062687A KR100488401B1 (en) 2002-10-15 2002-10-15 Execution method for repairing manhole and manhole structure repaired by the same execution method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0062687A KR100488401B1 (en) 2002-10-15 2002-10-15 Execution method for repairing manhole and manhole structure repaired by the same execution method

Publications (2)

Publication Number Publication Date
KR20040033551A true KR20040033551A (en) 2004-04-28
KR100488401B1 KR100488401B1 (en) 2005-05-11

Family

ID=37332974

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0062687A KR100488401B1 (en) 2002-10-15 2002-10-15 Execution method for repairing manhole and manhole structure repaired by the same execution method

Country Status (1)

Country Link
KR (1) KR100488401B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100773122B1 (en) * 2006-07-11 2007-11-02 (주)우암건설 Manhole repair method
KR100869969B1 (en) * 2007-07-06 2008-11-21 (주)우암건설 Manhole repair method
CN102720212A (en) * 2012-06-11 2012-10-10 贵阳市云岩区市政工程管理所 Method and structure for rapidly replacing highway inspection well cover base
CN103806524A (en) * 2012-11-07 2014-05-21 中国石油化工股份有限公司 Sewer well treatment method and fast-setting cement mortar dry blend
CN104837389A (en) * 2012-09-27 2015-08-12 皇家飞利浦有限公司 Soymilk maker and method of making soymilk

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101598061B1 (en) 2014-06-26 2016-02-29 주식회사 평강산업개발 Manhole repair device

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5441085Y2 (en) * 1976-07-09 1979-12-03
JPH0250443U (en) * 1988-09-30 1990-04-09
KR960004916B1 (en) * 1992-01-20 1996-04-17 신이찌 쯔바끼모리 Overlay method for height adjustable manhole
JP3038103B2 (en) * 1993-06-30 2000-05-08 株式会社エポ Manhole frame removal method and replacement method
JP2771455B2 (en) * 1994-03-08 1998-07-02 富士邑工業株式会社 Manhole removal and repair method
KR950029479A (en) * 1994-04-12 1995-11-22 김현준 Manhole Lifting Method
KR200236485Y1 (en) * 1998-05-26 2001-09-06 김영민 Height Adjustable Manhole Assemblies
KR100358260B1 (en) * 1998-11-26 2003-01-24 서울특별시 중랑구 Manhole Rrepair Cover
JP3314049B2 (en) * 1999-05-14 2002-08-12 雄司 今崎 Protective lid device for manhole repair work
KR100374540B1 (en) * 2000-09-25 2003-03-03 (주)평강산업개발 Method of Manhole Repair and Used the Method of Equipment
KR100375811B1 (en) * 2000-12-20 2003-03-15 미래피앤씨(주) manhole repair apparatus and method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100773122B1 (en) * 2006-07-11 2007-11-02 (주)우암건설 Manhole repair method
KR100869969B1 (en) * 2007-07-06 2008-11-21 (주)우암건설 Manhole repair method
CN102720212A (en) * 2012-06-11 2012-10-10 贵阳市云岩区市政工程管理所 Method and structure for rapidly replacing highway inspection well cover base
CN104837389A (en) * 2012-09-27 2015-08-12 皇家飞利浦有限公司 Soymilk maker and method of making soymilk
CN103806524A (en) * 2012-11-07 2014-05-21 中国石油化工股份有限公司 Sewer well treatment method and fast-setting cement mortar dry blend

Also Published As

Publication number Publication date
KR100488401B1 (en) 2005-05-11

Similar Documents

Publication Publication Date Title
KR100488401B1 (en) Execution method for repairing manhole and manhole structure repaired by the same execution method
US20110076099A1 (en) Method for renovation of surface dressings around well curbs, and a compressible device for use in the method
RU2266370C2 (en) Method for manhole chimney and cover replacement
KR100905728B1 (en) Manhole repairing apparutus and manhole repairing method using the same
KR100662002B1 (en) A free height controllable manhole, method for constructiong and method of repairing thereof
JP6183869B2 (en) Manhole renewal method and manhole new construction method
JP2007169955A (en) Reinforcing tool for repairing side ditch, repairing auxiliary tool, repairing grating, repairing structure, and repairing method
EP3394346B1 (en) Adapter
KR20100023707A (en) Method for constructing repair of manhole
KR100385439B1 (en) method for constructing repair of manhole and manhole structure constructing repair using method the same
KR100578554B1 (en) Manhole maintenance method and suppoting device for the method
KR101029884B1 (en) Manhole cover fabrication
JP3171675U (en) Anti-sinking floor slab with maneuvering prevention function
KR200306639Y1 (en) Manhole housing
KR101181844B1 (en) Manhole repair apparatus and manhole repair method using the same
JP4392001B2 (en) Manhole cover frame replacement method
KR102279927B1 (en) Construction method for underground culvert
CN215629204U (en) Concrete road surface adds well lid of spreading pitch and promotes and pour template
KR200316564Y1 (en) Height adjustment device for the lower part structure of manhole
KR102118064B1 (en) Uninterruptible construction method of high and low pressure uninterruptible junction box using recycled composite resin
JP3171670U (en) Preventing subsidence around the manhole
KR200462762Y1 (en) Assist cover frame for manhole cover assembly
JPH072703Y2 (en) Manhole structure
CN207419538U (en) A kind of height-adjustable inspection shaft covering system
KR100881438B1 (en) Manhole repairing structure

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee