KR102118064B1 - Uninterruptible construction method of high and low pressure uninterruptible junction box using recycled composite resin - Google Patents

Uninterruptible construction method of high and low pressure uninterruptible junction box using recycled composite resin Download PDF

Info

Publication number
KR102118064B1
KR102118064B1 KR1020200023711A KR20200023711A KR102118064B1 KR 102118064 B1 KR102118064 B1 KR 102118064B1 KR 1020200023711 A KR1020200023711 A KR 1020200023711A KR 20200023711 A KR20200023711 A KR 20200023711A KR 102118064 B1 KR102118064 B1 KR 102118064B1
Authority
KR
South Korea
Prior art keywords
main body
uninterruptible
installing
junction box
low voltage
Prior art date
Application number
KR1020200023711A
Other languages
Korean (ko)
Inventor
박창일
Original Assignee
주식회사 제이엠종합건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 제이엠종합건설 filed Critical 주식회사 제이엠종합건설
Priority to KR1020200023711A priority Critical patent/KR102118064B1/en
Application granted granted Critical
Publication of KR102118064B1 publication Critical patent/KR102118064B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/10Installations of electric cables or lines in or on the ground or water in cable chambers, e.g. in manhole or in handhole
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • E02D2300/0012Plastics recycled

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

According to an aspect of the present invention, provided is an uninterruptible construction method of a high and low voltage uninterruptible connection box using a recycled composite resin. The uninterruptible construction method of a high and low voltage uninterruptible connection box using a recycled composite resin comprises: an advance preparation step; a step of removing an existing connection box; a step of installing a main body unit of a high and low voltage uninterruptible connection box; a step of installing a cover unit of the high and low voltage uninterruptible connection box on an upper end of the main body unit; and a finishing step.

Description

재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법{Uninterruptible construction method of high and low pressure uninterruptible junction box using recycled composite resin}Uninterruptible construction method of high and low pressure uninterruptible junction box using recycled composite resin}

본 발명은 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법에 관한 것으로, 더욱 상세하게는 전기케이블을 절단하지 않은 상태에서 신속한 시공을 할 수 있는 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법에 관한 것이다.The present invention relates to an uninterruptible construction method of a high and low voltage uninterruptible junction box using a recycled composite resin, and more specifically, to a high and low voltage uninterruptible junction box using a recycled composite resin capable of rapid construction without cutting an electric cable. It is about an uninterruptible construction method.

각종 토목, 건축공사 및 도로공사를 함에 있어서, 우수, 오수, 폐수 등을 처리하기 위한 하수관거 공사가 필요하다. 맨홀블록은 관거 내의 검사, 청소, 통풍, 환기, 접합, 분기 등의 목적으로 하수관거의 중간에 설치된다.In the construction of various civil works, building constructions and roads, sewer pipe construction is required to treat rainwater, sewage, and wastewater. The manhole block is installed in the middle of the sewer pipe for the purpose of inspection, cleaning, ventilation, ventilation, splicing, branching, etc. in the pipe.

그 중에서 전력선용 맨홀은 도로가 분기되는 지점, 관로가 분기되는 지점, 관로가 허용 곡률 이상으로 굴곡되어야 할 경우, 급경사 언덕길, 긴 교량의 전후, 및 케이블의 접속 또는 분기 장소에 설치된다.Among them, manholes for power lines are installed at the point where the road diverges, at the point where the pipeline diverges, and when the pipeline must be bent beyond the allowable curvature, steep slope hill roads, before and after long bridges, and at cable connection or branch locations.

전력선용 맨홀을 지하에 설치할 경우에는 주로 현장에서 콘크리트를 타설하여 맨홀을 시공하는 현장 타설식 공법을 채택한다.When installing a manhole for power lines underground, the site pouring method is mainly used to construct concrete manholes at the site.

현장 타설식 공법은 설치 장소에 거푸집을 설치하고 철근을 조립한 후, 소정의 재료를 혼합하여 생성된 콘크리트를 거푸집 내에 타설하고 소정의 양생 기간을 거친 후 거푸집을 제거하여 제작하는 방법이다.The on-site casting method is a method of installing a formwork at an installation site, assembling the reinforcing bar, and then mixing the predetermined materials to pour concrete produced in the formwork and removing the formwork after a predetermined curing period.

그러나 상기 현장 타설식 공법은 현장에서 모든 작업이 이루어져야 하므로 모든 장비를 현장으로 옮겨 작업을 해야 하는 어려움이 있고, 시공 기간이 길고 현장의 교통 혼잡이 발생하는 단점이 있다.However, the above-mentioned pour-in-place construction method has a drawback in that it is difficult to move all equipment to the site, and the construction period is long and traffic congestion occurs on the site.

또한, 회선 과다, 설비증설, 구조적 안전성 확보를 위해 개축/확장 공사시 전력선을 1일 이상 휴전상태로 공사를 진행해야 하므로 인근지역에 불편함을 초래하는 문제점이 있다.In addition, there is a problem in that inconvenience occurs in a nearby area because the power line must be under a truce state for at least one day during renovation/expansion to secure excessive line, facility expansion, and structural safety.

본 출원인은 상기의 문제점을 해결하기 위한 기술인 '재활용 복합수지를 이용한 고저압 접속함 및 이의 무정전 시공방법'의 특허를 2017년 05월 23일에 등록받았으며, 상기의 기술을 보완 및 개선하였다.The applicant has registered a patent for'high and low voltage junction box using recycled composite resin and its uninterruptible construction method', which is a technique for solving the above problems, on May 23, 2017, and supplemented and improved the above technology.

대한민국 등록특허 제10-1741022호(2017.05.29)Republic of Korea Registered Patent No. 10-1741022 (2017.05.29)

본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로, 본 발명의 목적은 무정전 상태에서 시공을 할 수 있는 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법을 제공하는 것이다.The present invention has been devised to solve the above problems, and an object of the present invention is to provide an uninterruptible construction method of a high and low voltage uninterruptible junction box using a recycled composite resin capable of construction in an uninterruptible state.

또한, 시공시간을 저감할 수 있는 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법을 제공하는 것이다.In addition, it is to provide an uninterruptible construction method of a high and low voltage uninterruptible junction box using a recycled composite resin capable of reducing construction time.

또한, 시공비용을 저감할 수 있는 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법을 제공하는 것이다.In addition, it is to provide an uninterruptible construction method of a high and low voltage uninterruptible junction box using a recycled composite resin capable of reducing construction costs.

상기와 같은 목적을 달성하기 위한 본 발명의 일 실시 예에 따른 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법은 사전준비단계와, 기존접속함을 제거하는 단계와, 고·저압 무정전 접속함의 본체부를 설치하는 단계와, 상기 본체부의 상단에 상기 고·저압 무정전 접속함의 덮개부를 설치하는 단계와, 마무리단계를 구비할 수 있다.An uninterruptible construction method of a high and low voltage uninterruptible junction box using a recycled composite resin according to an embodiment of the present invention for achieving the above object is a preliminary preparation step, a step of removing an existing junction box, and a high and low voltage uninterruptible connection. A step of installing a main body of the box, a step of installing a cover part of the high- and low-voltage uninterruptible junction box on the upper end of the main body, and a finishing step may be provided.

상기 사전준비단계는 안전회의를 하는 단계와, 안전시설물을 설치하는 단계와, 상기 기존접속함을 점검하는 단계와, 케이블 보호재를 설치하는 단계를 구비할 수 있다.The preliminary step may include a step of having a safety meeting, a step of installing a safety facility, a step of checking the existing junction box, and a step of installing a cable protection material.

기존접속함을 제거하는 단계는 아스팔트 포장면을 커팅하는 단계와, 보도블럭 및 대리석을 철거하는 단계와, 상기 기존접속함의 뚜껑 및 틀을 철거하는 단계와, 터파기 단계와, 상기 기존접속함의 접속함체를 철거하는 단계와, 폐기물을 상차하는 단계를 구비할 수 있다.The step of removing the existing junction box includes cutting an asphalt pavement surface, removing a sidewalk block and marble, removing a lid and a frame of the existing junction box, destroying, and connecting the existing junction box. A step of removing the housing and a step of loading the waste may be provided.

상기 고·저압 무정전 접속함의 본체부를 설치하는 단계는 접지 저항치를 측정하여 접지를 시공하는 단계와, 잡석지정 및 다짐하는 단계와, 상기 본체부에 관로구를 천공하는 단계와, 상기 본체부의 내부에 난연도료를 도포하는 단계와, 상기 본체부에 바닥판을 설치하는 단계와, 상기 본체부의 하체를 설치하는 단계와, 상기 본체부의 상체를 설치하는 단계와, 상기 관로구의 내외부에 거푸집 설치하는 단계와, 초속경 콘크리트를 타설 및 양생하는 단계와, 상기 관로구의 외부에 설치된 상기 거푸집을 철거하는 단계와, 되메우기 및 다짐작업 후 잔토 처리 단계를 구비할 수 있다.The step of installing the main body portion of the high and low voltage uninterruptible junction box includes measuring a ground resistance value, constructing a ground, designating and compacting rubble, and drilling a pipeline through the body portion, and flame retardant inside the body portion. Applying a paint; installing a bottom plate on the main body; installing a lower body of the main body; installing an upper body of the main body; and installing a formwork on the inside and outside of the conduit. It may include a step of pouring and curing super-hard concrete, a step of removing the formwork installed on the outside of the conduit, and a step of treating the soil after backfilling and compaction.

상기 본체부의 상단에 상기 고·저압 무정전 접속함의 덮개부를 설치하는 단계는 콘크리트 링을 설치하는 단계와, 임시로 절연 뚜껑을 거치하는 단계와, 틀 고정용 볼트를 설치하는 단계와, 높이조절용 너트로 높이를 조정하는 단계와, 고무튜브 거푸집을 설치하는 단계와, 틀 하부에 초속경 콘크리트를 타설하는 단계와, 상기 고무튜브 거푸집을 철거하는 단계와, 상기 관로구의 내부에 설치된 상기 거푸집 및 케이블 보호재를 철거하는 단계를 구비할 수 있다.The step of installing the cover portion of the high and low voltage uninterruptible junction box on the top of the main body portion includes a step of installing a concrete ring, a step of temporarily mounting an insulating lid, a step of installing a frame fixing bolt, and a nut for height adjustment. The step of adjusting the height, the step of installing the rubber tube formwork, the step of pouring superhard concrete into the lower part of the frame, the step of removing the formwork of the rubber tube, and the formwork and cable protection material installed inside the conduit Dismantling may be provided.

상기 마무리단계는 상기 본체부의 내부를 청소 및 정리하는 단계와, 신규뚜껑을 설치하는 단계와, 포장 복구, 주변정리 및 청소하는 단계와, 교통을 개방하는 단계를 구비할 수 있다.The finishing step may include a step of cleaning and arranging the inside of the main body, a step of installing a new lid, a step of restoring and cleaning the packaging, and a step of opening the traffic.

상기 재활용 복합수지를 이용한 고·저압 무정전 접속함은 상기 본체부와 상기 덮개부를 구비하고, 상기 덮개부는 상기 신규뚜껑, 상기 신규뚜껑과 결합하는 상기 틀, 상기 틀의 하부에 위치하고, 현장 타설을 통해 구비되는 높이조절 초속경콘크리트 링, 상기 높이조절 초속경콘크리트 링의 하부에 구비되어 상기 높이조절 초속경콘크리트 링을 받치는 받침콘크리트 링, 상기 받침콘크리트 링에서 상기 높이조절 초속경콘크리트 링 방향으로 삽입되는 틀 고정용 볼트 및 상기 고정용 볼트에 체결되어 상기 틀의 높이를 조절하는 높이조절용 너트를 구비할 수 있다.The high and low voltage uninterruptible junction box using the recycled composite resin is provided with the main body part and the cover part, and the cover part is located at the lower part of the new lid, the mold coupled with the new lid, and the mold, and through field pouring. The height-adjustable superhard concrete ring, which is provided below the height-adjustable superhard concrete ring, supports the height-adjustable superhard concrete ring and is inserted in the direction of the height-adjustable superhard concrete ring from the support concrete ring. A frame fixing bolt and a height adjusting nut that is fastened to the fixing bolt and adjusts the height of the frame may be provided.

상기 본체부는 상기 받침콘크리트 링의 하부와 결합하여 내부에 케이블이 위치하는 상기 본체부의 상체와, 상기 상체의 하부와 결합하여 내부에 케이블이 위치하는 상기 본체부의 하체와, 상기 하체의 하부에 구비되어 상기 본체부를 받치는 바닥판과, 일단이 상기 본체부의 내부에 구비되고, 타단이 상기 바닥판에 형성된 배수홀을 통해 지면에 삽입되는 접지봉을 구비할 수 있다.The main body portion is provided on the lower body of the main body portion and the lower body of the main body portion where the cable is located inside and the lower body of the body coupled to the lower portion of the upper body, coupled to the lower portion of the support concrete ring, the cable is located therein. A bottom plate supporting the main body portion, one end is provided inside the main body portion, and the other end may be provided with a ground rod inserted into the ground through a drainage hole formed in the bottom plate.

상기 바닥판은 외주면에 결합홈이 형성되는 테두리부재와, 상기 테두리부재와 결합하여 상기 하체를 받치는 받침부재를 구비하고, 상기 받침부재는 상기 배수홀, 상기 하체가 안착하는 안착홈, 상기 테두리부재의 상면과 맞대어지는 연장돌기 및 상기 연장돌기에서 하 방향으로 연장되어 상기 결합홈과 결합하는 결합돌기를 구비할 수 있다.The bottom plate is provided with a rim member in which an engaging groove is formed on an outer circumferential surface, and a fulcrum member for supporting the lower body in combination with the rim member, and the fulcrum member is the drain hole, a seating groove for the lower body, and the rim member An extended protrusion facing the upper surface of the and an extended protrusion extending downward from the extended protrusion may be provided with a coupling protrusion engaging with the coupling groove.

본 발명의 따른 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법에 의하면, 활선 상태의 전기케이블에 고·저압 접속함이 결합함으로써 전기케이블을 절단하지 않고 시공이 이루어질 수 있는 것이다.According to the uninterruptible construction method of the high and low voltage uninterruptible junction box using the recycled composite resin according to the present invention, the construction can be performed without cutting the electric cable by combining the high and low voltage junction box with the live cable.

또한, 프리캐스트(Precast)공법을 활용한 현장 조립방식으로 시공됨으로써 시공시간을 저감할 수 있는 것이다.In addition, it is possible to reduce the construction time by being constructed in a field assembly method using a precast method.

또한, 재활용 복합수지를 사용함으로써 시공비용을 저감할 수 있는 것이다.In addition, the construction cost can be reduced by using a recycled composite resin.

도 1은 본 발명의 일 실시 예에 따른 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법을 나타낸 순서도.
도 2는 도 1에 도시된 재활용 복합수지를 이용한 고·저압 무정전 접속함을 나타낸 사시도.
도 3은 도 2에 도시된 재활용 복합수지를 이용한 고·저압 무정전 접속함의 단면도.
도 4는 도 1에 도시된 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법을 통해 시공된 고·저압 무정전 접속함을 나타낸 단면도.
1 is a flow chart showing an uninterruptible construction method of a high and low voltage uninterruptible junction box using a recycled composite resin according to an embodiment of the present invention.
2 is a perspective view showing a high and low voltage uninterruptible junction box using the recycled composite resin shown in FIG. 1.
FIG. 3 is a cross-sectional view of a high and low voltage uninterruptible junction box using the recycled composite resin shown in FIG. 2.
4 is a cross-sectional view showing a high and low voltage uninterruptible junction box constructed through an uninterruptible construction method of a high and low voltage uninterruptible junction box using the recycled composite resin shown in FIG. 1.

이하에서는 첨부된 도면을 참조하여 본 발명의 일 실시 예에 따른 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법에 대해 상세히 설명한다.Hereinafter, an uninterruptible construction method of a high and low voltage uninterruptible junction box using a recycled composite resin according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 일 실시 예에 따른 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법을 나타낸 순서도이고, 도 2는 도 1에 도시된 재활용 복합수지를 이용한 고·저압 무정전 접속함을 나타낸 사시도이고, 도 3은 도 2에 도시된 재활용 복합수지를 이용한 고·저압 무정전 접속함의 단면도이고, 도 4는 도 1에 도시된 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법을 통해 시공된 고·저압 무정전 접속함을 나타낸 단면도이다.1 is a flow chart showing an uninterruptible construction method of a high and low voltage uninterruptible junction box using a recycled composite resin according to an embodiment of the present invention, and FIG. 2 is a high and low pressure uninterruptible junction box using the recycled composite resin shown in FIG. 1. 3 is a cross-sectional view of a high and low voltage uninterruptible junction box using the recycled composite resin shown in FIG. 2, and FIG. 4 is a method through an uninterruptible construction method of a high and low voltage uninterruptible junction box using the recycled composite resin shown in FIG. It is a cross-sectional view showing a high and low voltage uninterruptible junction box constructed.

도 1 내지 도 4를 참조하면, 본 발명의 일 실시 예에 따른 재활용 복합수지를 이용한 고·저압 무정전 접속함(10)의 무정전 시공방법은 사전준비단계(S100), 기존접속함을 제거하는 단계(S200), 고·저압 무정전 접속함(10)의 본체부(100)를 설치하는 단계(S300), 본체부(100)의 상단에 고·저압 무정전 접속함(10)의 덮개부(200)를 설치하는 단계(S400) 및 마무리단계(S500)를 구비할 수 있다.1 to 4, the uninterruptible construction method of the high and low voltage uninterruptible junction box 10 using the recycled composite resin according to an embodiment of the present invention includes a preliminary preparation step (S100) and removing an existing junction box. (S200), the step of installing the main body portion 100 of the high and low voltage uninterruptible junction box (S300), the cover portion 200 of the high and low voltage uninterruptible junction box 10 on the top of the main body portion 100 It may include a step of installing (S400) and a finishing step (S500).

사전준비단계(S100), 기존접속함을 제거하는 단계(S200), 재활용 복합수지를 이용한 고·저압 무정전 접속함(10)의 본체부(100)를 설치하는 단계(S300), 본체부(100)의 상단에 재활용 복합수지를 이용한 고·저압 무정전 접속함(10)의 덮개부(200)를 설치하는 단계(S400) 및 마무리단계(S500)는 현장에서 이루어지는 작업으로써, 사전준비단계(S100) 이전에 사전작업으로 개소별 위치 파악, NDIS(new distribution information system) 도면 확보, 매설물도 확보, 현장 조사(매설물 탐지), 지자체의 굴착허가, 도로공사 신고 및 폐기물 신고 등이 이루어질 수 있으며, 사후작업으로 검수 및 준공이 이루어질 수 있다.Pre-preparation step (S100), removing the existing junction box (S200), installing the main body 100 of the high and low voltage uninterruptible junction box 10 using recycled composite resin (S300), main body 100 Step (S400) and the finishing step (S500) of installing the cover part 200 of the high and low voltage uninterruptible junction box 10 using recycled composite resin on the top of the) are preliminary preparation steps (S100). Previously, pre-work location can be identified by location, NDIS (new distribution information system) drawings secured, buried items secured, site survey (detected buried), local governments' excavation permits, road construction reports and waste reports can be made. As a result, inspection and completion can be done.

한편, 도면에는 도시하지 않았지만, 기존접속함은 접속함체, 뚜껑 및 틀로 구성되고, 내부에 케이블(20)이 위치한 상태로 구비될 수 있다.On the other hand, although not shown in the drawings, the existing connection box is composed of a connection box, a lid and a frame, and may be provided with a cable 20 located therein.

사전준비단계(S100)에 대해 자세히 살펴보면, 사전준비단계(S100)는 안전회의를 하는 단계(S101), 안전시설물을 설치하는 단계(S102), 기존접속함을 점검하는 단계(S103) 및 케이블(20) 보호재를 설치하는 단계(S104)를 구비할 수 있다. 안전회의의 하는 단계(S101)를 통해 안전시설물의 설치 계획 등이 수립될 수 있으며, 기존접속함을 점검하는 단계(S103)와 케이블(20) 보호재를 설치하는 단계(S104)를 통해 안전한 시공이 이루어질 수 있다.Looking in detail about the pre-preparation step (S100), the pre-preparation step (S100) includes a safety meeting (S101), a step of installing safety facilities (S102), a step of checking the existing junction box (S103) and a cable ( 20) A step (S104) of installing a protective material may be provided. A safety facility installation plan may be established through a step (S101) of the safety meeting, and safe construction is performed through a step (S103) of checking the existing junction box and a step (S104) of installing a protective material for the cable 20. It can be done.

기존접속함을 제거하는 단계(S200)는 아스팔트 포장면을 커팅하는 단계(S201), 보도블럭 및 대리석을 철거하는 단계(S202), 기존접속함의 뚜껑 및 틀을 철거하는 단계(S203), 터파기 단계(S204), 기존접속함의 접속함체를 철거하는 단계(S205) 및 폐기물을 상차하는 단계(S206)를 구비할 수 있다. 터파기 단계(S204)를 통해 매립공간(30)이 형성되고, 매립공간(30)에는 추후 설명할 재활용 복합수지를 이용한 고·저압 무정전 접속함(10)이 안착된 후 다층의 보강이 이루어질 수 있다.The step of removing the existing junction box (S200) includes cutting the asphalt pavement surface (S201), removing the sidewalk block and marble (S202), removing the lid and frame of the existing junction box (S203), and digging Step (S204), the step of removing the connection box of the existing junction box (S205) and loading the waste (S206) may be provided. The buried space 30 is formed through the trenching step (S204), and the multi-layer reinforcement can be performed after the high and low voltage uninterruptible junction box 10 using the recycled composite resin to be described later is seated. have.

재활용 복합수지를 이용한 고·저압 무정전 접속함(10)의 본체부(100)를 설치하는 단계(S300)는 접지 저항치를 측정하여 접지를 시공하는 단계(S301), 잡석지정 및 다짐하는 단계(S302), 본체부(100)에 관로구를 천공하는 단계(S303), 본체부(100)의 내부에 난연도료를 도포하는 단계(S304), 본체부(100)에 바닥판(130)을 설치하는 단계(S305), 본체부(100)의 하체(120)를 설치하는 단계(S306), 본체부(100)의 상체(110)를 설치하는 단계(S307), 관로구의 내외부에 거푸집 설치하는 단계(S308), 초속경 콘크리트를 타설 및 양생하는 단계(S309), 관로구의 외부에 설치된 거푸집을 철거하는 단계(S310) 및 되메우기 및 다짐작업 후 잔토 처리 단계(S311)를 구비할 수 있다. 잡석지정 및 다짐하는 단계(S302)를 통해 매립공간(30)에 바닥층(31)이 형성되고, 초속경 콘크리트를 타설 및 양생하는 단계(S309)를 통해 제1보강층(32)이 형성될 수 있다. 그리고 되메우기 및 다짐작업 후 잔토 처리 단계(S311)를 통해 제2보강층(33), 골재 포설 또는 레미콘 타설을 통한 제3보강층(34) 및 포장층(35)이 형성될 수 있다. 또한, 본체부(100)에 바닥판(130)을 설치하는 단계(S305)에서는 배수가 용이하게 이루어지도록 하기 위해 바닥판(130)에 형성된 배수홀(1321)의 상태를 확인하는 것이 바람직하다.The step of installing the main body 100 of the high and low voltage uninterruptible junction box 10 using the recycled composite resin (S300) is a step of constructing a ground by measuring a ground resistance value (S301), designating and compacting rubble (S302) ), perforating a pipeline to the body portion 100 (S303), applying a flame retardant paint to the interior of the body portion 100 (S304), and installing the bottom plate 130 to the body portion 100 (S305), the step of installing the lower body 120 of the body portion 100 (S306), the step of installing the upper body 110 of the body portion 100 (S307), the step of installing the formwork inside and outside the pipeline (S308) ), pouring and curing super-hard concrete (S309), removing demolition (S310) installed on the outside of the conduit, and reclaiming and compacting after the remnant treatment (S311). The bottom layer 31 is formed in the landfill space 30 through the rubble designation and compaction step S302, and the first reinforcement layer 32 may be formed through the step S309 of pouring and curing super-hard concrete. . Then, after the backfilling and compaction work, the second reinforcement layer 33, the third reinforcement layer 34 and the pavement layer 35 through aggregate placement or ready-mixed concrete placement may be formed through the residual soil treatment step (S311). In addition, in the step (S305) of installing the bottom plate 130 in the main body 100, it is preferable to check the state of the drain hole 1321 formed in the bottom plate 130 to facilitate drainage.

본체부(100)의 상단에 재활용 복합수지를 이용한 고·저압 무정전 접속함(10)의 덮개부(200)를 설치하는 단계(S400)는 받침콘크리트 링(240)을 설치하는 단계(S401), 임시로 절연 뚜껑을 거치하는 단계(S402), 틀 고정용 볼트(250)를 설치하는 단계(S403), 높이조절용 너트(260)로 높이를 조정하는 단계(S404), 고무튜브 거푸집을 설치하는 단계(S405), 틀(220) 하부에 초속경 콘크리트를 타설하는 단계(S406), 고무튜브 거푸집을 철거하는 단계(S407) 및 관로구의 내부에 설치된 상기 거푸집 및 케이블(20) 보호재를 철거하는 단계(S408)를 구비할 수 있다. 높이조절용 너트(260)로 높이를 조정하는 단계(S404)에서는 후술할 신규뚜껑(210)이 도로의 최종 마감높이와 동일하게 조정하는 것이 바람직하다. 그리고 고무튜브 거푸집을 설치하는 단계(S405)에서 고무튜브 거푸집은 틀(220) 하부에 초속경 콘크리트를 타설하는 단계(S406)를 통해 타설되는 초속경 콘크리트가 내부로 유출되는 것을 방지할 수 있다.The step of installing the cover portion 200 of the high and low voltage uninterruptible connection box 10 using recycled composite resin on the top of the main body 100 (S400) is a step of installing the support concrete ring 240 (S401), Temporarily mounting the insulating lid (S402), installing the frame fixing bolt 250 (S403), adjusting the height with the height adjusting nut 260 (S404), and installing the rubber tube formwork (S405), pouring a super-hard concrete under the frame 220 (S406), removing the rubber tube formwork (S407) and removing the formwork and cable 20 protective material installed inside the pipeline ( S408). In the step of adjusting the height with the nut 260 for height adjustment (S404), it is preferable that the new lid 210, which will be described later, is adjusted to be equal to the final finishing height of the road. And in the step (S405) of installing the rubber tube formwork, the rubber tube formwork can be prevented from being leaked into the inside through the step (S406) of pouring the superhard concrete into the lower part of the mold (220).

마무리단계(S500)는 본체부(100)의 내부를 청소 및 정리하는 단계(S501), 신규뚜껑(210)을 설치하는 단계(S502), 포장 복구, 주변정리 및 청소하는 단계(S503) 및 교통을 개방하는 단계(S504)를 구비할 수 있다. 상기와 같은 시공 단계를 거쳐 당일 굴착 및 당일 교통개방이 이루어질 수 있다.The finishing step (S500) is a step of cleaning and arranging the interior of the main body 100 (S501), a step of installing a new lid 210 (S502), repairing the packaging, cleaning and cleaning the surroundings (S503), and transportation It may be provided with the step of opening (S504). Excavation on the same day and opening of traffic on the same day may be performed through the above-described construction steps.

한편, 본 발명의 일 실시 예에 따른 재활용 복합수지를 이용한 고·저압 무정전 접속함(10)은 본체부(100)와 덮개부(200)를 구비할 수 있다.Meanwhile, the high and low voltage uninterruptible connection box 10 using the recycled composite resin according to an embodiment of the present invention may include a body part 100 and a cover part 200.

덮개부(200)는 신규뚜껑(210), 틀(220), 높이조절 초속경콘크리트 링(230), 받침콘크리트 링(240), 틀 고정용 볼트(250) 및 높이조절용 너트(260)를 구비할 수 있다.The cover part 200 is provided with a new lid 210, a frame 220, a height-adjustable super-hard concrete ring 230, a base concrete ring 240, a frame fixing bolt 250, and a height adjustment nut 260. can do.

신규뚜껑(210) 및 틀(220)은 FRP(fiber reinforced plastics:열 경화성 강화 플라스틱)계열의 복합소재를 사용하여 45ton의 정하중 강도를 구현하도록 제작될 수 있다. 소재의 특성상 전기절연성, 난연성, 내식성, 내약품성이 뛰어나고 열전도율은 매우 낮다. 그리고 주철로 제작했을 때보다 무게가 약 50% 이상 가벼워져 운반이 용이하고 시공성이 향상될 수 있다.The new lid 210 and the mold 220 may be manufactured to implement a static load strength of 45ton using a composite material of FRP (fiber reinforced plastics). Due to the characteristics of the material, it has excellent electrical insulation, flame retardancy, corrosion resistance, and chemical resistance, and its thermal conductivity is very low. In addition, since the weight is about 50% lighter than when it is made of cast iron, it can be easily transported and workability can be improved.

높이조절 초속경콘크리트 링(230)은 틀(220)의 하부에 구비될 수 있다. 여기서, 높이조절 초속경콘크리트 링(230)은 공장에서 제작되어 현장에서 조립되지 않고 현장 타설을 통해 구비될 수 있다.Height-adjustable superhard concrete ring 230 may be provided on the lower portion of the frame (220). Here, the height-adjustable superhard concrete ring 230 may be manufactured at a factory and not assembled in the field, but may be provided through pouring.

이에 따라, 시공 여건이나 상황 등에 따라 현장에서 유동적으로 틀(220)의 높이를 조절할 수 있게 됨으로써 시공성을 향상시키는 효과를 발휘할 수 있다.Accordingly, it is possible to flexibly adjust the height of the frame 220 in the field according to the construction conditions or circumstances, thereby exerting an effect of improving the constructability.

받침콘크리트 링(240)은 높이조절 초속경콘크리트 링(230)의 하부에 구비되어 높이조절 초속경콘크리트 링(230)을 비롯한 신규뚜껑(210)이 결합 된 틀(220)을 받치는 역할을 하여 높이조절 초속경콘크리트 링(230)과 틀(220)의 지지력이 향상되도록 할 수 있다.The support concrete ring 240 is provided at the bottom of the height-adjustable super-hard concrete ring 230 and serves to support the frame 220 to which the new lid 210 including the height-adjustable super-hard concrete ring 230 is coupled. Adjusting the super-hard diameter concrete ring 230 and the support of the frame 220 can be improved.

그리고 받침콘크리트 링(240)은 하부에 삽입부(241)를 구비할 수 있다. 삽입부(241)는 받침콘크리트 링(240)의 하부에 구비되어 후술할 본체부(100)가 삽입되도록 함으로써 받침콘크리트 링(240)이 본체부(100)와 결합하도록 할 수 있다. 이에 따라, 덮개부(200)와 본체부(100)의 결합력이 향상되어 구조적 안전성이 더욱 높아지고, 현장 타설 작업을 최소화함으로써 시공성을 향상시키는 효과를 발휘할 수 있다.In addition, the support concrete ring 240 may include an insertion portion 241 at the bottom. The insertion portion 241 is provided at the lower portion of the support concrete ring 240 so that the body portion 100 to be described later is inserted so that the support concrete ring 240 can be coupled to the body portion 100. Accordingly, the bonding force between the lid part 200 and the main body part 100 is improved, thereby increasing the structural safety and minimizing on-the-spot work, thereby improving the workability.

틀 고정용 볼트(250)는 받침콘크리트 링(240)에서 높이조절 초속경콘크리트 링(230) 방향으로 삽입되며, 일단이 틀(220)을 관통하여 노출될 수 있다. 높이조절용 너트(260)는 다수가 틀 고정용 볼트(250)에 체결되어 틀(220)과 받침콘크리트 링(240) 사이에 타설될 높이조절 초속경콘크리트 링(230)의 두께를 조정 및 고정하여 조정이 완료된 높이조절 초속경콘크리트 링(230)의 두께가 외부의 충격 등에 의해 변경되는 것을 방지할 수 있고, 타설시 유동하는 것을 방지하여 시공성을 향상시킬 수 있다.The frame fixing bolt 250 is inserted in the direction of the height-adjustable superhard concrete ring 230 from the support concrete ring 240, and one end may be exposed through the frame 220. The height adjusting nut 260 is fastened to the bolt 250 for fixing the frame to adjust and fix the thickness of the height-adjustable superhard concrete ring 230 to be placed between the frame 220 and the base concrete ring 240. It is possible to prevent the thickness of the height-adjusted superhard concrete ring 230, which has been adjusted, from being changed due to external impact, and prevents flow during pouring, thereby improving workability.

한편, 본체부(100)는 상체(110), 하체(120), 바닥판(130) 및 접지봉(140)을 구비할 수 있다.Meanwhile, the body portion 100 may include an upper body 110, a lower body 120, a bottom plate 130, and a ground rod 140.

상체(110)는 재활용 복합수지로 제작되고, 원형의 파이프 형태로 형성되며, 받침콘크리트 링(240)의 하부와 결합할 수 있다. 그리고 상체(110)와 하체(120)는 폴리에틸렌(PE, polyethylene), 폴리프로필렌(PP, polyprolene), 폴리스티렌(PS, polystyrene) 또는 폴리아미드(PA, polyamide) 소재의 각종 폐포장재, 폐비닐류, 폐플라스틱, 폐전선의 피복 등을 혼합 가공하여 만든 재활용 복합수지를 재료로 제작될 수 있다. 그리고 재료 특성상 상체(110) 및 하체(120)의 일부를 손쉽게 절개할 수 있어 케이블(20)이 상체(110) 및 하체(120)의 내부에 삽입되도록 할 수 있다. 이에 따라, 케이블(20)을 절단하지 않고 활선 상태에서 재활용 복합수지를 이용한 고·저압 무정전 접속함(10)을 설치 또는 교체할 수 있다. 또한, 콘크리트로 제작되었을 때보다 무게가 약 80% 이상 가벼워 운반이 용이하고 시공성이 향상되며 공사비를 저감하는 효과를 발휘할 수 있다.The upper body 110 is made of recycled composite resin, is formed in a circular pipe shape, and can be combined with the lower portion of the support concrete ring 240. And the upper body 110 and the lower body 120 are polyethylene (PE, polyethylene), polypropylene (PP, polyprolene), polystyrene (PS, polystyrene) or polyamide (PA, polyamide) material of various waste packaging materials, waste vinyls, waste Recyclable composite resins made by mixing processing of plastics, waste wire coverings, etc. can be made of materials. In addition, a part of the upper body 110 and the lower body 120 can be easily cut off due to the material characteristics, so that the cable 20 can be inserted into the upper body 110 and the lower body 120. Accordingly, it is possible to install or replace the high and low voltage uninterruptible junction box 10 using the recycled composite resin in a live state without cutting the cable 20. In addition, the weight is more than about 80% lighter than that made of concrete, so it is easy to carry, improves workability, and can reduce the construction cost.

하체(120)는 상체(110)와 마찬가지로 재활용 복합수지로 제작되고, 원형의 파이프 형태로 형성되며, 내부에 케이블(20)이 위치하도록 할 수 있다. 여기서, 상체(110)와 하체(120)는 각각 본체부재(110a, 120a), 돌기부재(110b, 120b) 및 끼움홈(110c, 120c)을 구비할 수 있다. 본체부재(110a, 120a)는 상체(110) 또는 하체(120)의 전체적인 형태를 결정하는 것으로 원형의 파이프형상으로 구비될 수 있다. 돌기부재(110b, 120b)는 본체부재(110a, 120a)의 하부에 형성되어 본체부재(110a, 120a)의 외주방향으로 돌출된 형태로 구비될 수 있다. 그리고 돌기부재(110b, 120b)의 하부는 본체부재(110a, 120a)의 하부보다 돌출된 형태로 구비되어 돌기부재(110b, 120b)의 하부와 본체부재(110a, 120a)의 하부에 단 차이가 발생할 수 있으며, 상기의 단 차이로 인해 끼움홈(110c, 120c)이 형성될 수 있다.The lower body 120, like the upper body 110, is made of a recycled composite resin, is formed in a circular pipe shape, and allows the cable 20 to be positioned therein. Here, the upper body 110 and the lower body 120 may be provided with body members 110a, 120a, protruding members 110b, 120b, and fitting grooves 110c, 120c, respectively. The body members 110a and 120a determine the overall shape of the upper body 110 or the lower body 120 and may be provided in a circular pipe shape. The protruding members 110b and 120b may be formed under the main body members 110a and 120a to protrude in the outer circumferential direction of the main body members 110a and 120a. And the lower portion of the projection member (110b, 120b) is provided in a protruding form than the lower portion of the body member (110a, 120a), the difference between the lower portion of the lower portion of the projection member (110b, 120b) and the body member (110a, 120a) It may occur, and the fitting grooves 110c and 120c may be formed due to the step difference.

여기서, 하체(120)의 상부는 상체(110)에 형성된 끼움홈(110c, 120c)에 삽입되어 상체(110)와 결합할 수 있다. 이에 따라, 상체(110)와 하체(120)의 결합력이 향상되어 구조적 안전성이 더욱 높아지는 효과를 발휘할 수 있다.Here, the upper portion of the lower body 120 may be inserted into the fitting grooves 110c and 120c formed in the upper body 110 to be combined with the upper body 110. Accordingly, the bonding force between the upper body 110 and the lower body 120 is improved, so that the structural safety can be further enhanced.

한편, 바닥판(130)은 하체(120)의 하부에 구비되어 하체(120)를 받치는 역할을 할 수 있다. 그리고 바닥판(130)은 하체(120)의 밑면 넓이보다 큰 면적을 가져 재활용 복합수지를 이용한 고·저압 무정전 접속함(10)의 지지력을 향상시킬 수 있다.Meanwhile, the bottom plate 130 may be provided below the lower body 120 to serve to support the lower body 120. In addition, the bottom plate 130 may have a larger area than the bottom area of the lower body 120 to improve the support of the high and low voltage uninterruptible junction box 10 using recycled composite resin.

바닥판(130)에 대해 자세히 살펴보면, 바닥판(130)은 테두리부재(131)와 받침부재(132)를 구비할 수 있다. 테두리부재(131)는 원형의 링 형상을 가지며, 외주면에 결합홈(1311)을 구비할 수 있다. 받침부재(132)는 테두리부재(131)와 결합하여 실질적으로 하체(120)를 받치는 역할을 할 수 있다. 그리고 받침부재(132)는 배수홀(1321), 하체(120)의 돌기부재(120b)가 안착되는 안착홈(1322), 테두리부재(131)의 상면과 맞대어지는 연장돌기(1323) 및 연장돌기(1323)에서 하 방향으로 연장되어 결합홈(1311)에 결합하는 결합돌기(1324)를 구비할 수 있다. 바닥판(130)을 설치할 시에는 먼저 테두리부재(131)를 설치하고, 테두리부재(131)의 결합홈(1311)에 결합돌기(1324)기 결합하고 테두리부재(131)의 상면에 연장돌기(1323)가 얹혀지도록 받침부재(132)를 테두리부재(131)와 결합함으로써 바닥판(130) 설치를 완료할 수 있다. 이와 같이, 테두리부재(131)만으로 바닥판(130)의 설치위치를 설정할 수 있으므로 바닥판(130)의 설치위치 조정이 용이하고, 돌기와 홈의 결합방식으로 테두리부재(131)와 받침부재(132)가 결합함으로써 시공이 용이하게 이루어질 수 있다.Looking at the bottom plate 130 in detail, the bottom plate 130 may include a rim member 131 and a support member 132. The rim member 131 has a circular ring shape, and may have a coupling groove 1311 on its outer circumferential surface. The supporting member 132 may be combined with the edge member 131 to substantially support the lower body 120. And the support member 132 is a drain hole 1321, a seating groove 1322 on which the protruding member 120b of the lower body 120 is seated, an extended protrusion 1323 and an extended protrusion facing the upper surface of the rim member 131 It may be provided with a coupling protrusion 1324 extending in the downward direction from (1323) to engage the coupling groove (1311). When installing the bottom plate 130, first install the rim member 131, engage the engaging projection 1324 in the engaging groove 1311 of the rim member 131 and extend the projection on the upper surface of the rim member 131 ( 1323) the bottom plate 130 can be completed by combining the support member 132 with the edge member 131 so that it is placed. In this way, since the installation position of the bottom plate 130 can be set only by the edge member 131, it is easy to adjust the installation position of the bottom plate 130, and the edge member 131 and the support member 132 are combined with the projection and groove combination method. ) May be combined to facilitate construction.

한편, 접지봉(140)은 일단이 본체부(100)의 내부에 구비되고, 타단이 바닥판(130)에 형성된 배수홀(1321)을 통해 본체부(100)의 외부로 노출되어 지면에 삽입될 수 있다. 이와 같이, 접지봉(140)을 설치함으로써 시공시 감전으로 인한 안전사고를 방지하는 효과를 발휘할 수 있다.On the other hand, the ground rod 140 is one end is provided inside the body portion 100, the other end is exposed to the outside of the body portion 100 through the drain hole 1321 formed in the bottom plate 130 to be inserted into the ground Can be. As described above, by installing the ground rod 140, it is possible to exert an effect of preventing a safety accident due to electric shock during construction.

한편, 삽입홀(300)은 상체(110) 및 하체(120)에 형성되어 케이블(20)이 내부에 삽입되도록 할 수 있으며, 공구 등을 통해 현장에서 형성될 수 있다. 그리고 케이블(20)의 위치나 개수에 따라 삽입홀(300)의 개수나 위치가 자유롭게 설정될 수 있다. 그리고 삽입홀(300)을 형성하기 위해 절단된 조각(미도시)은 삽입홀(300)에 케이블(20)이 삽입된 후 남아있는 공간을 채워 삽입홀(300)을 통해 하체(120)의 내부로 토사 등의 이물질이 유입되는 것을 최소화하고 케이블(20)의 유동을 막을 수 있다.Meanwhile, the insertion hole 300 is formed in the upper body 110 and the lower body 120 so that the cable 20 can be inserted therein, and can be formed in the field through a tool or the like. In addition, the number or position of the insertion holes 300 may be freely set according to the position or number of cables 20. In addition, the cut piece (not shown) to form the insertion hole 300 fills the remaining space after the cable 20 is inserted into the insertion hole 300, and the inside of the lower body 120 through the insertion hole 300. It is possible to minimize the inflow of foreign substances such as soil and sand and prevent the flow of the cable 20.

이상에서는 본 발명의 일 실시 예에 따른 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법에 대해 설명하였으나, 본 발명의 사상은 본 명세서에 제시되는 실시 예에 제한되지 아니한다. 그리고, 본 발명의 사상을 이해하는 당업자는 동일한 사상의 범위 내에서 구성요소의 부가, 변경, 삭제, 추가 등에 의해서 다른 실시 예를 용이하게 제안할 수 있을 것이나, 이 또한 본 발명의 사상범위 내에 든다고 할 것이다.In the above, an uninterruptible construction method of a high- and low-voltage uninterruptible junction box using a recycled composite resin according to an embodiment of the present invention has been described, but the spirit of the present invention is not limited to the embodiments presented herein. And, those skilled in the art to understand the spirit of the present invention can easily propose other embodiments by adding, changing, deleting, adding, or the like components within the scope of the same spirit, but this also falls within the spirit of the present invention. something to do.

10: 재활용 복합수지를 이용한 고·저압 무정전 접속함
20: 케이블 30: 매립공간
31: 바닥층 32: 제1보강층
33: 제2보강층 34: 제3보강층
35: 포장층 100: 본체부
110: 상체 110a: 본체부재
110b: 돌기부재 110c: 끼움홈
120: 하체 120a: 본체부재
120b: 돌기부재 120c: 끼움홈
130: 바닥판 131: 테두리부재
1311: 결합홈 132: 받침부재
1321: 배수홀 1322: 안착홈
1323: 연장돌기 1324: 결합돌기
140: 접지봉 200: 덮개부
210: 신규뚜껑 220: 틀
230: 높이조절 초속경콘크리트 링
240: 받침콘크리트 링 241: 삽입부
250: 틀 고정용 볼트 260: 높이조절용 너트
300: 삽입홀
10: High and low voltage uninterruptible junction box using recycled composite resin
20: Cable 30: Landfill
31: bottom layer 32: first reinforcement layer
33: 2nd reinforcement layer 34: 3rd reinforcement layer
35: packaging layer 100: main body
110: upper body 110a: body member
110b: projection member 110c: fitting groove
120: lower body 120a: body member
120b: projection member 120c: fitting groove
130: bottom plate 131: border member
1311: engaging groove 132: support member
1321: drainage hole 1322: seating groove
1323: extended projection 1324: combined projection
140: ground rod 200: cover
210: new lid 220: frame
230: height-adjustable superhard concrete ring
240: support concrete ring 241: insert
250: Frame fixing bolt 260: Height adjustment nut
300: insertion hole

Claims (9)

사전준비단계와,
기존접속함을 제거하는 단계와,
고·저압 무정전 접속함의 본체부를 설치하는 단계와,
상기 본체부의 상단에 상기 고·저압 무정전 접속함의 덮개부를 설치하는 단계와,
마무리단계를 구비하고,
상기 고·저압 무정전 접속함의 본체부를 설치하는 단계는 접지 저항치를 측정하여 접지를 시공하는 단계와, 잡석지정 및 다짐하는 단계와, 상기 본체부에 관로구를 천공하는 단계와, 상기 본체부의 내부에 난연도료를 도포하는 단계와, 상기 본체부에 바닥판을 설치하는 단계와, 상기 본체부의 하체를 설치하는 단계와, 상기 본체부의 상체를 설치하는 단계와, 상기 관로구의 내외부에 거푸집을 설치하는 단계와, 초속경 콘크리트를 타설 및 양생하여 상기 본체부의 외면을 감싸는 형태의 제1보강층을 형성하는 단계와, 상기 관로구의 외부에 설치된 상기 거푸집을 철거하는 단계와, 되메우기 및 다짐작업 후 잔토 처리하는 단계를 구비하고,
상기 본체부의 상단에 상기 고·저압 무정전 접속함의 덮개부를 설치하는 단계는 받침콘크리트 링을 설치하는 단계와, 임시로 절연 뚜껑을 거치하는 단계와, 틀 고정용 볼트를 설치하는 단계와, 높이조절용 너트로 상기 절연 뚜껑과 결합되어 있는 틀의 높이를 조정하는 단계와, 고무튜브 거푸집을 설치하는 단계와, 틀 하부에 초속경 콘크리트를 타설하는 단계와, 상기 고무튜브 거푸집을 철거하는 단계와, 상기 관로구의 내부에 설치된 상기 거푸집 및 케이블 보호재를 철거하는 단계를 구비하고,
상기 재활용 복합수지를 이용한 고·저압 무정전 접속함은 상기 본체부와 상기 덮개부를 구비하고, 상기 덮개부는 신규뚜껑, 상기 신규뚜껑과 결합하는 상기 틀, 상기 틀의 하부에 위치하고, 현장 타설을 통해 구비되는 높이조절 초속경콘크리트 링, 상기 높이조절 초속경콘크리트 링의 하부에 구비되어 상기 높이조절 초속경콘크리트링을 받치는 받침콘크리트 링, 상기 받침콘크리트 링에서 상기 높이조절 초속경콘크리트 링 방향으로 삽입되는 틀 고정용 볼트 및 상기 틀 고정용 볼트에 체결되어 상기 틀의 높이를 조절하는 높이조절용 너트를 구비하고,
상기 본체부는 상기 받침콘크리트 링의 하부와 결합하여 내부에 케이블이 위치하는 상기 본체부의 상체와, 상기 상체의 하부와 결합하여 내부에 케이블이 위치하는 상기 본체부의 하체와, 상기 하체의 하부에 구비되어 상기 본체부를 받치는 바닥판과, 일단이 상기 본체부의 내부에 구비되고, 타단이 상기 바닥판에 형성된 배수홀을 통해 지면에 삽입되는 접지봉을 구비하고,
상기 바닥판은 외주면에 결합홈이 형성되는 테두리부재와, 상기 테두리부재와 결합하여 상기 하체를 받치는 받침부재를 구비하고, 상기 받침부재는 상기 배수홀, 상기 하체가 안착하는 안착홈, 상기 테두리부재의 상면과 맞대어지는 연장돌기 및 상기 연장돌기에서 하 방향으로 연장되어 상기 결합홈과 결합하는 결합돌기를 구비하는 것을 특징으로 하는 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법.
Pre-preparation phase,
Removing the existing junction box,
The step of installing the main body of the high and low voltage uninterruptible junction box,
Installing a cover portion of the high- and low-voltage uninterruptible junction box on an upper end of the main body portion;
A finishing step,
The step of installing the main body portion of the high and low voltage uninterruptible junction box includes measuring ground resistance and constructing a ground, designating and compacting rubble, and drilling a pipeline through the main body, and flame retardant inside the main body. Applying a paint; installing a bottom plate on the main body; installing a lower body of the main body; installing an upper body of the main body; and installing a formwork on the inside and outside of the conduit. , Forming a first reinforcement layer in a form surrounding the outer surface of the main body by pouring and curing super-hard concrete, and removing the formwork installed outside the conduit, and treating the soil after backfilling and compaction Equipped,
The step of installing the cover portion of the high and low voltage uninterruptible junction box on the top of the main body portion includes installing a support concrete ring, temporarily mounting an insulating lid, installing a frame fixing bolt, and a nut for height adjustment. Adjusting the height of the frame coupled with the insulating lid, the step of installing a rubber tube formwork, the step of pouring super-hard concrete in the lower part of the frame, and removing the rubber tube formwork, the conduit And removing the formwork and cable protection material installed inside of the,
The high and low voltage uninterruptible junction box using the recycled composite resin is provided with the main body part and the cover part, the cover part is located in the lower part of the frame, the frame to be combined with the new lid, and the new lid, and is provided through field pouring The height-adjustable superhard concrete ring is provided on the lower portion of the height-adjustable superhard concrete ring and supports the height-adjustable superhard concrete ring. It is fastened to the fixing bolt and the fixing bolt of the frame and has a height adjusting nut for adjusting the height of the frame,
The main body part is provided on the lower body of the main body part where the cable is located inside, and the lower body of the main body part where the cable is located inside and the lower body of the lower body by being coupled with the lower part of the support concrete ring. It has a bottom plate for supporting the main body portion, one end is provided inside the main body portion, the other end is provided with a ground rod that is inserted into the ground through the drain hole formed in the bottom plate,
The bottom plate is provided with a rim member in which an engaging groove is formed on an outer circumferential surface, and a fulcrum member for supporting the lower body in combination with the rim member, and the fulcrum member is the drain hole, a seating groove for the lower body, and the rim member An uninterruptible construction method of a high and low voltage uninterruptible junction box using a recycled composite resin, characterized in that it has an extended protrusion facing the upper surface of the and an extended protrusion extending downward from the extended protrusion to engage with the coupling groove.
제 1항에 있어서,
상기 사전준비단계는 안전회의를 하는 단계와,
안전시설물을 설치하는 단계와,
상기 기존접속함을 점검하는 단계와,
케이블 보호재를 설치하는 단계를 구비하는 것을 특징으로 하는 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법.
According to claim 1,
The pre-preparation step includes a safety meeting,
The step of installing safety facilities,
Checking the existing connection box,
Uninterruptible construction method of a high and low voltage uninterruptible junction box using a recycled composite resin, comprising the step of installing a cable protection material.
제 2항에 있어서,
기존접속함을 제거하는 단계는 아스팔트 포장면을 커팅하는 단계와,
보도블럭 및 대리석을 철거하는 단계와,
상기 기존접속함의 뚜껑 및 틀을 철거하는 단계와,
터파기 단계와,
상기 기존접속함의 접속함체를 철거하는 단계와,
폐기물을 상차하는 단계를 구비하는 것을 특징으로 하는 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법.
According to claim 2,
The step of removing the existing junction box is a step of cutting the asphalt pavement surface,
Demolition of the sidewalk block and marble,
Removing the lid and the frame of the existing junction box,
Digging stage,
Removing the connection box of the existing connection box,
Uninterruptible construction method of a high- and low-pressure uninterruptible junction box using a recycling composite resin, characterized by comprising a step of loading the waste.
삭제delete 삭제delete 제 1항에 있어서,
상기 마무리단계는 상기 본체부의 내부를 청소 및 정리하는 단계와,
신규뚜껑을 설치하는 단계와,
포장 복구, 주변정리 및 청소하는 단계와,
교통을 개방하는 단계를 구비하는 것을 특징으로 하는 재활용 복합수지를 이용한 고·저압 무정전 접속함의 무정전 시공방법.
According to claim 1,
The finishing step includes cleaning and arranging the inside of the main body,
The step of installing a new lid,
Packaging repair, cleanup and cleaning,
Uninterruptible construction method of a high- and low-voltage uninterruptible junction box using a recycled composite resin, comprising the step of opening the traffic.
삭제delete 삭제delete 삭제delete
KR1020200023711A 2020-02-26 2020-02-26 Uninterruptible construction method of high and low pressure uninterruptible junction box using recycled composite resin KR102118064B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200023711A KR102118064B1 (en) 2020-02-26 2020-02-26 Uninterruptible construction method of high and low pressure uninterruptible junction box using recycled composite resin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200023711A KR102118064B1 (en) 2020-02-26 2020-02-26 Uninterruptible construction method of high and low pressure uninterruptible junction box using recycled composite resin

Publications (1)

Publication Number Publication Date
KR102118064B1 true KR102118064B1 (en) 2020-06-09

Family

ID=71082371

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200023711A KR102118064B1 (en) 2020-02-26 2020-02-26 Uninterruptible construction method of high and low pressure uninterruptible junction box using recycled composite resin

Country Status (1)

Country Link
KR (1) KR102118064B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110110931A (en) * 2010-04-02 2011-10-10 박민혜 Manhole mending device and manhole mending method for environmental-friendly construction
KR101741022B1 (en) 2016-11-03 2017-05-29 대실테크 주식회사 High-low-voltage junction boxes, and a method for uninterrupted construction using recycled composite resin

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110110931A (en) * 2010-04-02 2011-10-10 박민혜 Manhole mending device and manhole mending method for environmental-friendly construction
KR101741022B1 (en) 2016-11-03 2017-05-29 대실테크 주식회사 High-low-voltage junction boxes, and a method for uninterrupted construction using recycled composite resin

Similar Documents

Publication Publication Date Title
US7150131B2 (en) Utility trenching and sidewalk system
US11480267B2 (en) System and method for protection of under-slab utilities from changes in soil volume
KR100926173B1 (en) Piping structure and method for constructing the same
KR101026836B1 (en) Structure for open cut excavation using light weight composite lining boards, and their construction methods
CN101082382A (en) Lay out method of pipeline and synthetic pipeline with pipe frame component
KR20120013182A (en) Structure for Open Cut Excavation Using Light Weight Composite Lining Boards, and Their Construction Methods
KR102118064B1 (en) Uninterruptible construction method of high and low pressure uninterruptible junction box using recycled composite resin
KR101682541B1 (en) Culvert crossing buried pipeline construction and pipeline laying method using the same
KR101624518B1 (en) Live wire precast manhole and its construction method
KR102170561B1 (en) Eco-friendly open-type electric power line river crossing method using pipeline protection PC culvert
KR101741022B1 (en) High-low-voltage junction boxes, and a method for uninterrupted construction using recycled composite resin
KR100876150B1 (en) Electric power manhole for supply of electric power have sinking prevention stick
KR101524272B1 (en) A repairing assembled structure precast-manhole and constructing method it
KR20190072213A (en) Method Of Ground Half-Openning For Tunnel Excavation
KR100385439B1 (en) method for constructing repair of manhole and manhole structure constructing repair using method the same
KR101117774B1 (en) Basic concrete structure of valve room and valve room embedding method using the same
Obradović A short review: Techniques for trenchless sewer rehabilitation
KR100274747B1 (en) Method for installation of electric pole and supporting device of the same
KR102447317B1 (en) Piloti manhall and its construction method
CN212866239U (en) Mounting structure of rural sewage pipe network plastics inspection shaft
KR100912899B1 (en) Height adjustable ease manhole structure body and Construction method using the same
KR101252656B1 (en) Apparatus adjustable level of the manhole cover assembly and construction method of the same
US20240102583A1 (en) System and Method for Protection of Under-Slab Utilities From Changes in Soil Volume
US11269151B2 (en) Protective cable or duct routing enclosure
KR200306639Y1 (en) Manhole housing

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant